21
AMS Commission on the Weather and Climate Enterprise Terry Tarbell RS Information Systems, Inc. Outgoing Chair, AMS BEP Tim Spangler Incoming Chair, BEP Commission Steering Committee Meeting New Orleans, LA 19 January 2007 Board on Enterprise Planning (BEP)

AMS Commission on the Weather and Climate Enterprise Terry Tarbell RS Information Systems, Inc. Outgoing Chair, AMS BEP Tim Spangler Incoming Chair, BEP

Embed Size (px)

Citation preview

Page 1: AMS Commission on the Weather and Climate Enterprise Terry Tarbell RS Information Systems, Inc. Outgoing Chair, AMS BEP Tim Spangler Incoming Chair, BEP

AMS Commission on the Weather and Climate Enterprise

Terry Tarbell

RS Information Systems, Inc.

Outgoing Chair, AMS BEP

Tim Spangler

Incoming Chair, BEP

Commission Steering Committee Meeting

New Orleans, LA

19 January 2007

Board on Enterprise Planning (BEP)

Page 2: AMS Commission on the Weather and Climate Enterprise Terry Tarbell RS Information Systems, Inc. Outgoing Chair, AMS BEP Tim Spangler Incoming Chair, BEP

Agenda

• BEP Charter

• BEP Membership

• Annual Partnership Topic (APT)

• BEP Status Update• Mesoscale Observing Networks APT

• Building America’s Resilience to Hurricane Disasters APT

• New APT for 2008

Page 3: AMS Commission on the Weather and Climate Enterprise Terry Tarbell RS Information Systems, Inc. Outgoing Chair, AMS BEP Tim Spangler Incoming Chair, BEP

BEP Charter

• Review issues identified by the Steering Committee that are of long-term strategic nature with importance to the enterprise as a whole

• Focus on a selected topic annually– Annual Partnership Topic– Working Group for a specific topic– Annual Report to Steering Committee

Page 4: AMS Commission on the Weather and Climate Enterprise Terry Tarbell RS Information Systems, Inc. Outgoing Chair, AMS BEP Tim Spangler Incoming Chair, BEP

BEP Membership

• Chair

• 13 members at large

• 3 Working Groups [WGs], one for each APT– WG membership: Private, academic, and

public sectors; user community

Page 5: AMS Commission on the Weather and Climate Enterprise Terry Tarbell RS Information Systems, Inc. Outgoing Chair, AMS BEP Tim Spangler Incoming Chair, BEP

Annual Partnership Topic Purpose

• Give all interested parties an opportunity to express their views on the selected topic

• Summarize those views in a concise report• Identify consensus views when such consensus

exists• Clarify differences of opinion when consensus

does not exist• Offer recommendations to AMS itself and the

enterprise as a whole based on the understanding of views gained during the study

Page 6: AMS Commission on the Weather and Climate Enterprise Terry Tarbell RS Information Systems, Inc. Outgoing Chair, AMS BEP Tim Spangler Incoming Chair, BEP

APT Selection

• Annual Partnership Topic will be selected based on nominations received by AMS during an open nomination period

• Selection based on published selection criteria• Selection made by Commission Steering

Committee• Any party may submit a nomination• All nominations will be available for comment

Page 7: AMS Commission on the Weather and Climate Enterprise Terry Tarbell RS Information Systems, Inc. Outgoing Chair, AMS BEP Tim Spangler Incoming Chair, BEP

Annual Partnership Topic Nominal Calendar of Events

• Year One:– Annual AMS Meeting – Issue call for nominations– Spring – Open comment period– Summer – Select topic, charge WG– Remainder of Year – Organize activities for Year Two

• Year Two:– Annual AMS Meeting – Frame topic– Remainder of Year – Conduct activities appropriate to topic

• Year Three:– Annual AMS Meeting – Conduct summary session on topic– Summer – WG presents final report for review/approval– Fall – Publish final report

Page 8: AMS Commission on the Weather and Climate Enterprise Terry Tarbell RS Information Systems, Inc. Outgoing Chair, AMS BEP Tim Spangler Incoming Chair, BEP

Annual Partnership Topic Topic Selection Criteria

1. Timeliness [30%]– Results of partnership topic activities must be

relevant to the weather and climate enterprise in relation to a 2-3 year timeline

– Topics which require results more rapidly will be rejected

– Topics which have longer time frames will be considered

2. Breadth [25%]– Partnership topic will have broad impact and

interest– Breadth judged on two factors:

• Sectoral breadth [60%] [private, academic, government]• Disciplinary breadth [40%] [scientific, policy, etc]

Page 9: AMS Commission on the Weather and Climate Enterprise Terry Tarbell RS Information Systems, Inc. Outgoing Chair, AMS BEP Tim Spangler Incoming Chair, BEP

Annual Partnership Topic Topic Selection Criteria

3. Impact [20%]– Impact it is expected to have on the weather and climate

enterprise and on society as a whole– May be evaluated in

• Tangible terms [e.g., fraction of the U.S. economy affected]• Intangible terms [e.g., potential legal effects]

4. Interest [15%]– Estimate of the likelihood of:

• Success in forming topic Working Group• Gaining multiple contributors to the topic

5. Linkage [10%]– Potential linkage to other planned activities [e.g., topic

related to a planned activity by an organization other than AMS]

Page 10: AMS Commission on the Weather and Climate Enterprise Terry Tarbell RS Information Systems, Inc. Outgoing Chair, AMS BEP Tim Spangler Incoming Chair, BEP

Annual Partnership Topic BEP Functions

1. Organize the APT nomination process– Issue call, make public, collect comments

2. Evaluate nominations– “Score” each nomination– Draft charge for Topic Committee

3. Fill the Topic Committee

4. Review Report

5. Submit report to Steering Committee

Page 11: AMS Commission on the Weather and Climate Enterprise Terry Tarbell RS Information Systems, Inc. Outgoing Chair, AMS BEP Tim Spangler Incoming Chair, BEP

Annual Partnership Topic Steering Committee Functions

• Select Annual Partnership Topic

• Finalize Charge to Topic Committee

• Approve Final Report

Page 12: AMS Commission on the Weather and Climate Enterprise Terry Tarbell RS Information Systems, Inc. Outgoing Chair, AMS BEP Tim Spangler Incoming Chair, BEP

APT 1--Mesoscale Observing Networks

Topic Committee Charge:– Criteria for Evaluating Potential Testbeds. Identify

potential technical criteria for evaluating mesoscale observing network testbeds. Propose ways the criteria can be applied to rank order potential testbeds

– Business Models for Partnerships in Mesoscale Network Testbeds. Identify potential business models. Propose ways the business criteria can be applied in conjunction with the technical criteria to rank order potential testbeds

– Potential Mesoscale Network Testbeds. Identify potential mesoscale network testbeds that meet at least some of the technical criteria

– Recommended Mesoscale Network Testbeds. Recommend at least three mesoscale network testbeds

Page 13: AMS Commission on the Weather and Climate Enterprise Terry Tarbell RS Information Systems, Inc. Outgoing Chair, AMS BEP Tim Spangler Incoming Chair, BEP

APT 1--Mesoscale Observing Networks

WG: Fred Carr (OU) [Chair], Tim Spangler, Don Winter, Bruce Telfeyan

Topic Committee: • .edu: Rebecca Morss (NCAR), Ken

Crawford (OU), John Horel (Utah)• .com: Maria Pirone (AER), Mike Kalb (GST),

John Lasley (SAIC), Peter Neilley (WSI), Brent Shaw (Weathernews)

• .gov: Greg Mandt (NOAA), Marty Ralph (NOAA), Ralph Patterson (Utah DOT), Paul Pisano or Andy Stearns (FHWA)

Page 14: AMS Commission on the Weather and Climate Enterprise Terry Tarbell RS Information Systems, Inc. Outgoing Chair, AMS BEP Tim Spangler Incoming Chair, BEP

APT 1--Mesoscale Observing Networks 2007 Milestones

January—THM to solicit community input

Page 15: AMS Commission on the Weather and Climate Enterprise Terry Tarbell RS Information Systems, Inc. Outgoing Chair, AMS BEP Tim Spangler Incoming Chair, BEP

APT 1--Mesoscale Observing Networks 2008 Plan

• Complete report

Page 16: AMS Commission on the Weather and Climate Enterprise Terry Tarbell RS Information Systems, Inc. Outgoing Chair, AMS BEP Tim Spangler Incoming Chair, BEP

APT 2—Hurricane Disasters Status

Topic Committee Charge:– [Private Sector Engagement] How can the

private sector engage more fully in hurricane disaster prevention, preparedness and recovery actions nationwide?

– [High Risk Populations] How can we do more to protect the poor and most vulnerable in hurricane disasters?

– [Educating the Enterprise] What can be done to better educate the Enterprise on responses to forecasts and warnings for hurricanes?

Page 17: AMS Commission on the Weather and Climate Enterprise Terry Tarbell RS Information Systems, Inc. Outgoing Chair, AMS BEP Tim Spangler Incoming Chair, BEP

APT 2—Hurricane Disasters Status

WG: Jim Harrison (.gov), Kristina Peterson (.edu), Bill Massey (.com)

Topic Committee: • .edu: Joe Friday (OU), John Harrald (GWU),

Susan Cutter (U. South Carolina), Shirley Laska (U. New Orleans), Jeff Lazo (UCAR)

• .com: Paul Try (STC), Jingli Yang (ERT), George Haddow (Bullock & Haddow), Betty Hearn Morrow (SocResearch Miami)

• .gov: Margaret Davidson (NOAA), James Kunde (Coalition to Improve Management in State and Local Government)

Page 18: AMS Commission on the Weather and Climate Enterprise Terry Tarbell RS Information Systems, Inc. Outgoing Chair, AMS BEP Tim Spangler Incoming Chair, BEP

APT 2—Hurricane Disasters 2007 Milestones

January—Topic Committee meeting in San Antonio

February—Selection of study topics for each study area (question)

July—THM at Natural Hazards Workshop in Boulder

December—Complete draft report

Page 19: AMS Commission on the Weather and Climate Enterprise Terry Tarbell RS Information Systems, Inc. Outgoing Chair, AMS BEP Tim Spangler Incoming Chair, BEP

APT 2—Hurricane Disasters 2007 Results

Information Gathering on Study Topics:

• Private Sector Engagement– Enhance incentives for the private sector – Meet individual and community unmet needs in the recovery

phase of a hurricane disaster • High Risk Populations

– Achieve selected improvements which will have high consequence results for vulnerable populations

– Resolve selected communications issues • Educating the Enterprise

– Achieve improvements in areas related to NOAA Weather Radio All Hazards (NWR)

– Achieve improvements in education and training on hurricanes and preparedness

Page 20: AMS Commission on the Weather and Climate Enterprise Terry Tarbell RS Information Systems, Inc. Outgoing Chair, AMS BEP Tim Spangler Incoming Chair, BEP

APT 2—Hurricane Disasters 2008 Plan

January—THM at AMS annual meeting in New Orleans

January—Topic Committee meeting in New Orleans

June—Complete final report

October—Publish final report

Page 21: AMS Commission on the Weather and Climate Enterprise Terry Tarbell RS Information Systems, Inc. Outgoing Chair, AMS BEP Tim Spangler Incoming Chair, BEP

APT 3--Status

• January—Issue call for APT nominations• Annual Meeting -- Issue Call for APT Nominations• Annual Meeting - 31 March – Receive APT

nominations• February – 30 April -- Open comment period• 1 May – 30 June – BEP prepares APT

recommendation for CSC• Summer CSC meeting – Select topic, charge Topic

Committee• CSC Meeting – 2008 Annual Meeting –Conduct

THM