00422/KJ/AR/EC/RJ/KP -01
Email :[email protected] : (0712)2556402, Fax : 2556403
Shivam, 16 NIT Layout ,Ravinagar,
NAME OF WORK:CONSULTANT -
Nagpur-440033 Maharashtra, India.
CLIENT - DRG. NO.
SCALE
TITLE:
R 0
NTSK & J Projects Pvt. Ltd.LEGEND Consultancy services for preparation of DPR for Development of Economic Corridors, Inter Corridors, Feeder Routes & Greenfield alignment to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-4 / Package 7)
MINISTRY OF ROAD TRANSPORT AND HIGHWAY
(NHAI)
PIU - JODHPUR
GOVERNMENT OF INDIA
Sr.no Road Name/No.
1. Green Field Alignment
2. SH - 28
Description
SH 28 PARALLEL TO GREEN FIELD ALIGNMENT
GREEN FIELD ALIGNMENT
(NH-125 TO Sanchor)
with parallel stretch SH-28
AMRITSAR JAMNAGAR
Details of alternate alignment study
Sr. No. Parameters / Issues Option 1 (Parallel Existing Alignment-SH-28)
Option 2 (Greenfield) Remarks
1. Length (Km) 252 208.200
2.
Total Land acquired (Ha) 1500 ha 2100 ha
Pvt. Land (Ha) 1347 1935
Govt. land (Ha) 140 159
Forest land (Ha) 13 6
3. Area under Protected / important or sensitive of flora or fauna / Wildlife Sanctuary
None None
4. Area under water bodies (Ha) 02 River, 09 canal crossing 02 River, 05 Canal crossing
5. No. of structures 900 120
6. No. of families 3800 2180
7. No. of structure to be constructed
i.) ROB – Nil ii.) LVUP – 36 No's iii.) SVUP – 28 No’s iv.) VUP- 24 No’s v.) Major Bridge – 8 No’s vi.)Minor Bridge– 15 No’s
i.)ROB – 1 No’s ii.) LVUP – 33 No's iii.)SVUP – 24 No’s iv.)VUP- 24 No’s v.)Major Bridge – 8 No’s vi.)Minor Bridge– 15 No’s
Sr. No. Parameters / Issues Option 1 (Parallel Existing Alignment-SH-28)
Option 2 (Greenfield) Remarks
8. Connectivity
The site follows the existing alignment from Thob- Pachpadra- Balotra-Sindhri- Ramji ka Gol- Sanchore with. With proposed bypasses at major districts. The existing alignment does not provide good connectivity as compared to Opton-2
The site is approachable by road. Start point is Dhandniya (Jodhpur District), Existing Chainage 52+000 of NH-125 and terminates at RJ/GJ Border near Sanchore in Jalore District. It provides quicker alternative to traffic coming from Amritsar(PB) and going towards Jamnagar (GJ)
9. Project Cost (Cr.) 6650 approx. 5500 approx.
Based on the above study the following observations are there:-
1. Option – 2 seems most feasible as the length is less as compared to the Option 1. It provides quicker alternative to
traffic coming from Amritsar (PB) and going towards Jamnagar (GJ)/Kandhala.
Option – 2 is found to have less impact on Environment & Social components, hence it is followed.