6
Personal Data Full Name: Amr ESSAM Mohamed Khalifa Birth Date: July 28th, 1985. Gender: Male. Citizenship: Egyptian. Marital Status: Married. Military Status: Completed. Current Location: Cairo, Egypt. Contact Data Email: [email protected] Cellular: 002 010 2297 1300 Education University : Ain Shams University College : Faculty of Engineering-Mechanical Power Engineering Dep. Cumulative Grade : Good Graduation Project : Design of Central Air Conditioning System. Grade : Very Good

Amr Essam CV

Embed Size (px)

Citation preview

Page 1: Amr Essam CV

Personal Data

Full Name: Amr ESSAM Mohamed Khalifa

Birth Date: July 28th, 1985.

Gender: Male.

Citizenship: Egyptian.

Marital Status: Married.

Military Status: Completed.

Current Location: Cairo, Egypt.

Contact Data

Email: [email protected]

Cellular: 002 010 2297 1300

Education

University : Ain Shams University

College : Faculty of Engineering-Mechanical Power Engineering Dep.

Cumulative Grade : Good

Graduation Project : Design of Central Air Conditioning System.

Grade : Very Good

Page 2: Amr Essam CV

Qualifications & Capabilities

HVAC design projects.

Preparing conceptual and schematic reports. Preparing design of all HVAC systems for various applications such as health care

Facilities, hotels, malls, residential, court houses ….etc., using the common HVACcodes, standards and handbooks such as ASHRAE, SMACNA,NFPA, Carrierhandbook, Trane Handbook…etc.

Preparing schematic and tender drawings. Preparing smoke management systems calculations and sequence of operations. Preparing civil defense drawings and its related reports. Preparing detailed technical specifications and bills of quantities. Ability to perform energy simulations for various projects types. Estimating project man hours and budget.

Leading and instruct team for proper work sequence and procedure.Shop drawing projects.

Preparing and revising detailed HVAC shop drawing layouts.

Preparing coordination drawings for all disciplines. Preparing and revising all material and equipment submittals. Preparing projects plan and submissions schedule.

Preparing and following project invoices.

Work Experience

ALLIED CONSULTANTS GROUP (Egypt)o HVAC Engineer (May 2008-April 2013)

DISTANCE STUDIO CONSULTANT (Egypt)o HVAC Team Leader (April 2013- May 2014)

Qatar Electro Mechanical Solutions (QEMS) (Qatar)o HVAC Design In charge (May 2014-Apr 2015)

Shaker Consultancy Group (Egypt)o HVAC Design In charge (May 2015-Jan 2016)

DISTANCE STUDIO CONSULTANT (Egypt)o HVAC Group Leader / Project Manager (Jan 216- Now)

Page 3: Amr Essam CV

PROJECTS

Sr. Project Location App HVAC main systemdescription

ParticipationRule

1 Faculty Of MedicineA 5 floors existed building, converted from healthclub into faculty of medicine offers a challenge to fitthe new system requirement in the available areas.

Saudi Arabia(KSA)

Hos

pita

l and

Hea

lth

care

fac

iliti

es

Air cooled- Primaryvariable CHW system+VAV AHUs +FCUs

Group Leader

2

6th October University –HospitalExtensionA supervision project for a hospital consists of 5floors including services areas and patient rooms

EgyptAir cooled Primary-Secondary chilled waterSystem.

Team Leader(Supervision)

3Asfour HospitalA 400 beds cardiac and burns hospital includingalmost of medical departments in addition to aseparate utility building.

Egypt Water cooled Primary-Secondary chilled waterSystem+ CAV/TRAHUS+VAVsystem+FCUs

HVAC Engineer

4

Tamale Hospital Phase I & IIA 150 beds educational hospital including operatingrooms, Cardiac department with its medical services,educational building including classrooms andadministration offices

GhanaDX-Package and splitsystems

HVAC Engineer

5Tete Private Hospital - 50 bed.A 50 beds hospital consists of 3 blocks linked by adouble height main spine creating a main feature andmain circulation element of the Hospital

MozambiqueDX-Package and splitsystems

HVAC Engineer

6Guinea Hospital - 48 bedA 48 beds hospital including several medicaldepartment.

Guinea DX-Package and splitsystems

HVAC Engineer

7Medical Buildings–Porto CairoTwo buildings each consist of five floors havingclinics, physiotherapy department, public areas andradiology department

EgyptVRF and Split system Team Leader

8 Hilton DBTA 200 rooms Hilton hotel consists of 8 floors.

Saudi Arabia(KSA)

Hot

els

and

Mot

els

Air cooled- Primaryvariable CHW system+VAV /CAV AHUs+FCUs

Group Leader

9

Atlantis HotelA 400 rooms hotel consists of 3 basements, Ground,Mezzanine, 4 public floors (restaurants, kitchens andhealthy club), and 22 typical floors consists of guestrooms.

Saudi Arabia(KSA)

Air cooled- Primary-Secondary chilled waterSystem with tertiarypumps.

Team Leader

10Seashell ResortsThe projects consists of 5 low rise buildingsincluding chalets, services areas, restaurants, andadministration areas.

North coast-Egypt

DX- Split system Team Leader

Page 4: Amr Essam CV

11

Bin Samikh HotelA 600 rooms hotel consists of 3 basements, Ground,Upper Ground, and Mezzanine, 7 Public floors(restaurants, kitchens and healthy club), and 40typical floors consists of guest rooms.

Qatar

Air cooled- Primary-Secondary chilled waterSystem with tertiarypumps.

HVAC Engineer

12Al-Madinah HotelA 300 rooms hotel consists of 3 basements, Ground,Mezzanine, 15 typical floors consists ofGuest rooms.

Saudi Arabia(KSA)

Air cooled Primary-Secondary chilled waterSystem.

HVAC Engineer

13Ewaa HotelA 150 rooms hotel consists of basement, Ground,Mezzanine, 8 typical floors consists ofGuest rooms and service floor.

Saudi Arabia(KSA)

Air cooled Primary-Secondary chilled waterSystem.

Team Leader

14Eights Phase MallA 4 floors mall with 5000 m2 foot print area. AlRehab-

Egypt Mal

ls

Air cooled Primary-Secondary chilled waterSystem and water cooledpackage unit system.

Group Leader

15Al Khobar Business ParkA multiple buildings project with around 15000 m2foot print area consists of 6 podiums floors,4administration and retails buildings and a buildingfor Swiss hotel

Saudi Arabia(KSA)

Mix

ed U

se

Air cooled Primary-Secondary chilled waterSystem for hotel andVRF system for mixeduse building.

Group Leader

16Bakkah TowersA 8 floors podiums floors with 8000 m2 foot printarea including basements, retails and offices and two11 floors residential towers.

Saudi Arabia(KSA)

Air cooled Primary-Secondary chilled waterSystem for podiums andDX- system forresidential towers.

Group Leader

17Jeddah Gate Project (LOT- E3 )Project consists of 3 podiums floors and 3 residentialtowers with 17-21 floors.

Saudi Arabia(KSA)

DX-Package and splitsystems

HVAC Engineer

18

El Derae BuildingProject consists of 3 podiums floors and residentialtower with 14 floors.

Saudi Arabia(KSA)

Air cooled Primary-Secondary chilled waterSystem.

HVAC engineer.

19Retails and Business Center (RBC)A core and shell building consists of two floors ofshops and offices with area of 2000 m2 per floor

Saudi Arabia(KSA)

VRF system Team Leader

20Post BuildingA 3 floors administration building related to postorganization.

Egypt

Adm

inis

trat

ion

Bui

ldin

gs

VRF system Group Leader

21CIB BankA 3 floor CIB bank branch. Egypt DX-System Group Leader

22NC 14A 4 floor core and shell administration building Egypt

Water cooled withabsorption chillerssystem

Group Leader

23Administrative CourtThe Court consists of Parking Area at Basement floorand 14th floor 6000 m2 each. Containing offices,court halls, Large atrium &restaurant

Saudi Arabia(KSA)

Air cooled Primary-Secondary chilled waterSystem.

Team Leader

Page 5: Amr Essam CV

24Al Qurashi Office BuildingThe Project consists of Basement, Ground,Mezzanine and other 6 floors it include restaurant,galleries and administrative offices

Saudi Arabia(KSA)

Air cooled Primary-Secondary chilled waterSystem.

Team Leader

25Al Amirea Compound SchoolThe project consists of a group of buildings containswarehouses, workshops, offices and classrooms.

Egypt DX-Package and splitsystems

HVAC Engineer

26El Zohour Club Natatorium area.A natatorium area for popular club including itsservices area.

Egypt

Spor

ts C

lubs

Chilled water systemfrom existing network

Team Leader

27

Al-Nasr Youth ClubProject consists of a group of buildings includingvarious applications such as (Judo & Karate –Cinemas – Squash – Swimming pool – shops – andadministration).

Egypt DX-Package and splitsystems

HVAC Engineer

28Burger king restaurant chainAlmost of Saudi Arabian branches for burger kingrestaurants chain

Saudi Arabia(KSA)

Res

taur

ants DX-Package and split

systemsTeam Leader

29 Al Ghammas VillaA 3 floors luxury villa. Saudi Arabia

(KSA)R

esid

enti

al b

uild

ings

VRF-System Group Leader

30 Mivida-EmaarA 5 floor residential building. Egypt DX-Split units Group Leader

31Ayuni Villas CompoundA villas compound consists of 3 villas, majlis masjidand worker dorm.

Saudi Arabia(KSA)

DX-Split units Group Leader

32El Sheikh Abdullah Elrugaib VillaA 3 floors luxury villa. Saudi Arabia

(KSA)DX-Split units Team Leader

33

EL Sheikh Sami El Rashed PalaceThe Palace consists of Four Linked blocks have adifferent number of floors, that includes bed Rooms,living rooms, Diwaniya, Formal Saloon, ArabicMajlis,…etc.

Saudi Arabia(KSA)

DX-Package and splitsystems

Team Leader

34 The Season VillaA 3 floors luxury villa Egypt DX-Split units Team Leader

35Al Fawatem VillaA 4 floors luxury villa Egypt

VRF systemTeam Leader

36Royal Residence Korba (RRK)A core and shell building consists of two basementsand 10 floors divided into rentable apartments.

EgyptVRF system

Team Leader

Page 6: Amr Essam CV

37

Security Building (Elshamyia- HaramEnlargement )This project Consist of basement, five podiums 14000m2 each , three towers eleven floors each and twomechanical floors.

Saudi Arabia(KSA)

Shop

Dra

win

gs

Air cooled- Primary-Secondary chilled waterSystem with tertiarypumps.

HVAC Engineer/Coordinator

38Radisson BluA 5 floors podiums floors and two towers 8 floorseach.

Saudi Arabia(KSA)

Air cooled- Primaryvariable CHW system+VAV AHUs +FCUs

Group Leader/Project Manager

39Pharma pack companyA Pharmaceutical project consist of five building(administration building, ware house building, solidbuilding, HI-solution building and utility building)

Egypt Air cooled- Primaryvariable CHW system+VAV AHUs +FCUs

Team Leader/Coordinator

40Jabal Omar development plot 06AA project consist of 7 podiums with floor area 90000m2 each and roof floor

Saudi Arabia(KSA)

Air cooled- Primaryvariable CHW system+VAV AHUs +FCUs

Team Leader/Coordinator

41King Fahd Hospital Extension -100 BedThe hospital extension specializes in emergency andburns treatment.

EgyptAir cooled- Primaryvariable CHW system+VAV AHUs +FCUs

HVAC Engineer

42American Embassy in jeddahThe project consists of three buildings (main officebuilding, control building and utility building).

Saudi Arabia(KSA)

Air cooled- Primaryvariable CHW system+VAV AHUs +FCUs

Team Leader/Coordinator

43Al Waab Mall

The building Consists of 5 floors 16000 m2 each,Served by two chilled water plants located onbuilding roof.

Qatar

Des

ign

and

Bui

lt.

2 Primary-Secondarychilled water Systemwith air cooled chillers

HVAC Design in-charge

44Al Bustan ComplexThe project consists of 12 medium rise buildingsdivided into a various applications such as officesand hotels and various systems Qatar

Primary Secondarychilled water Systemwith air cooled chillers+VRF system + DX-Splitunits.

HVAC Design in-charge

45Al Marjan Island

Ras-Elkhaima-UAE

Chi

lled

Wat

erN

etw

ork

District cooling system HVAC Engineer-

46Danet network

(Abu Dhabi-UAE)

Languages

Arabic: Mother Tongue.

English: Very Good Spoken & Written.