1
0BContents
Chapter 1: Introduction To Amos
1.1.0 What is Amos?
1.2.0 Starting the Amos program
1.3.0 The Amos User Interface
1.3.1 The Title Bar1.3.2 The Menu Bar
1.3.3 The Standard Toolbar
1.3.4 The Window Toolbar
1.3.5 Keyboard Shortcut Keys
1.4.0 Amos Speak(Terms Used in Amos)1.5.0 Codes used for Amos
1.5.1 Format of Component Code1.5.2 Format of Stock Item Code1.5.3 Format of address Code1.5.4 Format of Job Code1.5.5 Format of Work Order Code1.5.6 Format of Requisition Code
1.6.0 Filtering Data1.6.1 Sorting and Searching1.6.2 Column Ordering1.6.3 Calendar Facility
1BChapter 2: Registers
2.1.0 What is a Register?2.2.0 The Locations Register
2.2.1 Opening the Locations Register2.2.2 Creating a New location
2.3.0 The Addresses Register2.3.1 Opening the Addresses Register
7/29/2019 AMOS Manual
3/93
OMCI TABLE OF CONTENTS
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 4
Rev : 0
2
2.4.0 The Job Descriptions Register2.4.1 Opening the Job Descriptions Register
2.5.0 The Components Register
2.5.1 Opening the Components Register
2.5.2 Things to check/enter for a Component2.5.3 Viewing Stock Items linked to the Component2.5.4 Changing the Status of a Component
2.6.0 The Stock Items Registers2.6.1 Opening the Stock Items register2.6.2 Creating a New Stock Item2.6.3 Linking the Stock Items to the Component2.6.4 Things to check/enter for a Stock Item
Chapter 3:Maintenance
3.1.0 Hierarchy in Amos for organizing the maintenance tasks
3.1.1 How does Amos know when to schedule Jobs
3.2.0 Updating Counters3.3.0 Maintenance
3.3.1 Planned Maintenance3.3.1.1Viewing Work Orders3.3.1.2Examples of Filtering Work Orders3.3.1.3Printing a List of Work Orders3.3.1.4 Reporting Work
3.3.2 Unexpected Maintenance3.3.3 Unplanned Maintenance
3.3.3.1Creating a Work Order for an Unplanned Job3.4.0 Maintenance Log
3.4.1 Viewing Maintenance Log3.5.0 Maintenance and Repair
Chapter 4: Stock management
4.1.0 Stock management Functions in Amos
4.2.0 Stock Wanted
7/29/2019 AMOS Manual
4/93
OMCI TABLE OF CONTENTS
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 4
Rev : 0
3
4.3.0 Stock Transaction
4.3.1 Using Stock Transaction
4.4.0 Stock In/Out
4.4.1 Using In/Out of Stock
4.5.0Stock Control-Taking Inventory4.5.1 Printing a List to aid inventory4.5.2 Updating stock quantity after an inventory
Chapter 5: Requisitions
5.1.0 Purchase Module5.2.0 Opening the Forms Register5.3.0 Creating a New Requisition
5.3.1 Identify the Component5.3.2 Identify the Stock Items5.3.3 Stock Wanted5.3.4 Creating the Requisition Form5.3.5 Viewing Line Items for the Form5.3.6 Selecting Component5.3.7 Adding line Items to a Requisition5.3.8 Printing Requisition Forms
5.4.0 Various Steps in the Purchasing Chain5.5.0 Receiving Purchase Orders
5.5.1 Receiving Complete Purchase orders5.5.2 Receiving Incomplete Purchase orders
5.6.0 Creating a Manual requisition for Repairs
Chapter 6: Export/Import
6.1.0 Exchanging Data with the Office6.2.0 Performing the Export Operation
6.3.0 Performing the Import Operation
ANNEXURE I: PLAN OF CODES FOR OMCI FLEET
7/29/2019 AMOS Manual
5/93
OMCI CHAPTER 1: INTRODUCTIONTO AMOS
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 15
Rev : 0
1
1.1.0 WHAT IS AMOS?
Amos is a computer-based system to assist an organization to:
Plan and report Maintenance Perform Stock control Help in Stock Purchasing Assist in budgeting effectively
1.2.0 STARTING THE AMOS PROGRAM
Double-click on the Amos Business Suite icon on the desktop This displays the Amos Logon Screen as shown
Click in the Login ID field and type in the User Name i.e., say, CE, 1AE,2AE, 3AE, MTR, COF, 2OF, 3OF. Click in the Password field and type in
7/29/2019 AMOS Manual
6/93
OMCI CHAPTER 1: INTRODUCTIONTO AMOS
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 15
Rev : 0
2
Password (available with Master). You will see a* for each character thatyou type .
Click OK to log on and open the Amos Main window.
Why do I have to log on?
Some of the functions in Amos are reserved for authorized persons only When you Log ON you tell Amos who you are. and Amos grants you
access to only those commands that you are authorized to use.
Amos also keeps track of who performs certain actions and when. Thisassists in having a clear and secure record
1.3.0 The Amos User Interface The Amos Main Window appears as follows
The Menu Bar
The Title Bar
The Standard ToolbarThe Window Toolbar
1.3.1 The Title Bar When you first open Amos, the window that appears will have a title bar.
The title bar informs you which installation and department you are
viewing information for.
In addition to the main title bar, each window that is opened within theapplication has its own Window title Bar. These title bars always display
the name of the open window and depending on the information you are
7/29/2019 AMOS Manual
7/93
OMCI CHAPTER 1: INTRODUCTIONTO AMOS
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 15
Rev : 0
3
viewing, sometimes extra details of the individual item displayed withinthe window.
In the above example, the Window Title bar shows that the open window
is displaying Components menu option.
1.3.2 The Menu BarThe main navigation area within Amos M&P is the menu bar below
All of the commands and functions available within the application can beaccessed through the Menu Bar.
If you click on any of the items on the Menu Bar, a list of available sub-
menu items appears beneath that menu item. if any of the available menuitems have an arrow to the right hand side, it means that there is a further
sub-menu available, which is accessed by moving the mouse pointer over
the menu line containing the arrow. the following screenshot shows theFile menu fully expanded.
7/29/2019 AMOS Manual
8/93
OMCI CHAPTER 1: INTRODUCTIONTO AMOS
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 15
Rev : 0
4
Arrows indicate that a
sub-menu is available.
Use can be made of keyboard Short-cut keys for quick access toMenu Commands.
Each Menu item has a single underlined letter within its name. Ifyou want to select a top-level menu item such as the Stock menu,
you should press the Alt key at the same time as the S key
(usually indicated by Alt+s)
Once a top-level menu has been opened, you only need to press thekey corresponding to the underlined letter to move to the next
menu item.
The above menu selection can be achieved with the followingkeystrokes:
Alt+F(followed by) O (followed by)G
7/29/2019 AMOS Manual
9/93
OMCI CHAPTER 1: INTRODUCTIONTO AMOS
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 15
Rev : 0
5
Then, if u want to open the Price classes window, you should pressthe E key.
NOTE: Once you open a data window, the Menu Bar changes to include
the Edit and Options menu items illustrated below.
1.3.3 The standard ToolbarAMOS M& P, in similarity to many common applications, makes
extensive use of Toolbars to make it easier for the user to navigatewithin the program. The toolbar shown below is the Standard Toolbar
and is usually placed directly beneath the Menu Bar at the top of the
application window.
As you move the mouse pointer over a button, it will appear as if it is
raised up slightly and. if u have Toolbar tips activated (menu item
Tools/Options), a small description of the buttons function will appear.
The following buttons are normally available on the Standard Toolbar:
0BButton Description Menu Hierarchy
Components Maintenance/Components
Stock items Stock/Stock items
Job Descriptions File/Open Register/Maintenance/Job
Descriptions
Addresses File/Open Register/Addresses
Functions Maintenance/Functions
Rounds Maintenance/Rounds
7/29/2019 AMOS Manual
10/93
OMCI CHAPTER 1: INTRODUCTIONTO AMOS
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 15
Rev : 0
6
Component Hierarchy Maintenance/Components Hierarchy
Function Hierarchy Maintenance/Functions Hierarchy
Generate Work orders Maintenance/Generate work orders
` ` Report Work Maintenance/Report Work...
Work orders Maintenance/Work Order
Work Planning Maintenance/Work Planning
Requisition Work Maintenance/Requisition Work.
Purchase Forms Purchase/Forms
Procedures
Manuals
Circulars
Non-Conformity File/Open Register/Non-
Conformity
Quality Work Order
Emergency Response System
Trigger Jobs Maintenance/ Trigger Jobs
7/29/2019 AMOS Manual
11/93
OMCI CHAPTER 1: INTRODUCTIONTO AMOS
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 15
Rev : 0
7
Reports Tools/Reports
Switch Department File/Switch Department
Help Help/Contents
NOTE: The number of visible buttons may vary depending on how the
application has been set-up and your access level within the system.
1.3.4 The Window Toolbar
When you open a window within AMOS M&P,a second toolbar, called
the Window Toolbar usually becomes available.
This toolbar, unlike the Standard Toolbar, can be different for each window that youopen(the buttons available are dependant on the functions related to the open window)
The Window Toolbar is normally found directly beneath the Standard Toolbar
The toolbar shown below is for theComponentswindow.
The Functions represented on the Window Toolbar are a mixture of the morebasic functions of the File and Edit menus combined with the most used functions
within the Options menu.
These buttons behave in the same way as the ones on the standard Toolbar withregard to the toolbar tips description appearing when you point to a button with
the mouse.
Below is a list of each button from the window Toolbar shown above.
UButton U UDescription U UMenu Hierarchy
New Edit/New Record
7/29/2019 AMOS Manual
12/93
OMCI CHAPTER 1: INTRODUCTIONTO AMOS
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 15
Rev : 0
8
Save Edit/Save changes
Delete Edit/Delete Record
Filter File/Filter
Print File/Print..
Cut Edit/Cut
Copy Edit/Copy
Paste Edit/Paste
Details Options/Details
Requisition Work Options/Requisition Work..
Report Work Options/Report Work
NOTE: If you are viewing a window toolbar that contains different buttons to the ones
shown above you should point to the button you are interested in with the mouse pointer
and wait for the toolbar tip description to become visible.
7/29/2019 AMOS Manual
13/93
OMCI CHAPTER 1: INTRODUCTIONTO AMOS
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 15
Rev : 0
9
NOTE: Right clicking on the toolbar will display the following pop-up menu.
Selecting Show Text, will display the names of all short-cut icons, as shown below..
1.3.4 Keyboard Shortcut keys1BPressing a single key on the keyboard or a combination of key
presses can access many of the most commonly used commandswithin AMOS M&P. These keys combinations are called Shortcut
Keys
These are the shortcut
keys required to
perform the same tasks
that are shown
Wherever you see key combinations to the right hand side of the menu options, asabove, you can use then as an alternative .if the shortcut takes the form of Ctrl+? or
Alt+? you should press the control or Alt key represented by the ? at the same time .
7/29/2019 AMOS Manual
14/93
OMCI CHAPTER 1: INTRODUCTIONTO AMOS
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 15
Rev : 0
10
UShortcut keysU UEquivalent Action
Ctrl+F4 close (current window)
Ctrl+F Filter
Ctrl+P Print
Ctrl+X Cut
Ctrl+C Copy
Ctrl+V Paste
Ctrl_N New Record
Ctrl+S Save ChangesAlt+F4 Exit Application
1.4.0 Amos Speak(Terms Used in Amos)Register: Data existing in Amos is systematically grouped in to various Lists
know as Registers.
Location: Physical area on board where Stores/Spares are stored.
Address: These are the addresses of the various manufacturers and Suppliers
Component: it is any physical unit on board, for which a maintenance task needsto be performed and/or spares/stores for which need to be ordered..
Stock Items: These are the Spares used for Components, or Stores such as
Chemicals, Lubes, Paints, Ropes, etc. Which need to be ordered.
Job descriptions: These are the details of jobs required to be carried out on
components.
Order Forms: These are Forms for placing an order for stock items. These are of
three typesRequisition, Query and purchase order..
Work Order: Individual Job triggered by the program for a component
Transport Document: Document detailing a list of purchase orders that will bedelivered to the vessel at a particular port.
7/29/2019 AMOS Manual
15/93
OMCI CHAPTER 1: INTRODUCTIONTO AMOS
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 15
Rev : 0
11
1.5.0 OMCI Codes used for AMOSCodes are assigned to the various registers to uniquely identify each item in a
Register and also assist in ease of data Retrieval using the Filter.
OMCI has Decided upon the following codes for identifying the various registers
in Amos, such as components, stock items, addresses, Job, Work orders, order forms andTransport documents.
Code numbers for a particular Register are unique and cannot be duplicated. if a Codenumber needs to be assigned to a new item created in a Register, the user must determine
that the code number does not already exist in the register..
1.5.1 Format of a Component Code:Component codeXX. ####
Numerical code in
hierarchical order denotingparent components and sub-
components..
Alphabetical code
denoting system.eg: BB-bilge and
ballast.
LS-Life savingSystems
Examples of Component code: ME.000, ME110
2BThe standard alphabetical codes for components are as shown in the ANNEXURE 1
7/29/2019 AMOS Manual
16/93
OMCI CHAPTER 1: INTRODUCTIONTO AMOS
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 15
Rev : 0
12
1.5.2 Format of Stock Item Code:Stock Item CodeXX.####.###
Component Spare part numbers in
code numerical sequenceExamples of Stock Items Numbers: ME110.001, ME110.002
1.5.3 Format of address code:Address Code### XXX
Numerical Code Alphabetical code(which may be the
initials of the makers Name)Example of Address Code: 226 JRC for Japan Radio company..
1.5.4 Format of Job Code:Job codeXX ####
Alphabetical Code Numbers in numerical sequence001,002 and so on
Examples of job code: C012-check job
RO 050 a job routine.
The standard Alphabetical Codes for Job descriptions are as
follows:
C- Check
I-Inspect
L-lubrication
M-Measurement
O-Overhaul
7/29/2019 AMOS Manual
17/93
OMCI CHAPTER 1: INTRODUCTIONTO AMOS
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 15
Rev : 0
13
OC-Oil Change
R- Renew
RO-Routine
RT-Retention
S-Survey
T-Test
W-Wash/clean
1.5.5 Format of Work Order Code:Work Order Code..XXXX.##.##.#### Sequential No.
(automatically
GeneratedDept.No.Year
Alphabetical Code
(based on Name of Vessel)
Example Of Work Order code: SANJ.02.01.0010-a Work Order CodeNumber for the vessel San Jacinto
1.5.6 Format of Requisition Code:Requisition Code.. ####.##.###.XX.######
Sequential No.Starting from001YearAlphabeticalCode Based on
Name of Vessel
PO Number
Alphabetical
code as per LMSExisting Format
(refrer Annexure
III)
Example of Work Order Code: SANJ.02.002.ES-a Requisition Numberfor the vessel San Jacinto
7/29/2019 AMOS Manual
18/93
OMCI CHAPTER 1: INTRODUCTIONTO AMOS
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 15
Rev : 0
14
1.6.0 Filtering dataA filter window is displayed whenever you wish to view a Register or any
list. This Filter window enables you to view only the data you want to see.Judicious use of the Filter can help in reducing frustration involved in
scrolling through the data, trying to find the entry that is of interest to you.
Detailed Use of the Filter window is explained in the sections for thevarious Registers.
1.6.1 Sorting And SearchingApart from using filters. You can sort entries in data returned by a
search, by clicking on the column headers.
The columns that you see in the Data Area are fully sort able and
an arrow icon in the column header indicates their sort state.
1.6.2 Column OrderingMany of the screen displays within AMOS contain multiple
columns. Sometimes these columns may not be visible at the same
time and the information in the columns may be cropped, evenwhen the window has been maximized (see below)
7/29/2019 AMOS Manual
19/93
OMCI CHAPTER 1: INTRODUCTIONTO AMOS
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 15
Rev : 0
15
To make it easier for you to see the information that you really want, you can
change column widths and the order in which the columns appear using drag and droptechniques
To alter the width of a column you should move cursor to the vertical line at theside of the title of the column you wish to alter until the cursor changed to be a bold
vertical line with arrows on either side of it:
Once the above symbol is visible, you can left-click and drag it sideways untilyou have the desired column width and then release the mouse button
7/29/2019 AMOS Manual
20/93
OMCI CHAPTER 1: INTRODUCTIONTO AMOS
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 15
Rev : 0
16
To move a column that is not visible, even after maximizing the window, do the
following
Find the Column by scrolling to the right of the window.
Left-click the Title of the column, drag the column to the place where you wantthe column to be and release the mouse button..
1.6.3 Calendar Facility
Double-clicking or pressing F2 in any date field brings up a calendar, from
which you can choose the date to be inserted in that field.
In addition to the arrow buttons, the following commands are available:
Ctrl-Left(Right) Arrow - Previous (Next) Year
Shift-Left(Right)Arrow - Previous(Next) Month
Up(Down)Arrow - Previous (Next)Week
Left(Right)Arrow - Previous(Next) Day
Enter - Accept selected date
Alt-F4 - Close calendar
If you prefer to type the dates in manually, you can do so by typing two digits each for
the day month and year with space
Due Date : 15 04 00
When you enter the date information in this way, the date field will automaticallyadjust to the default view when you press enter or move to another Field.
7/29/2019 AMOS Manual
21/93
OMCI CHAPTER 1: INTRODUCTIONTO AMOS
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 15
Rev : 0
17
The format of the date within AMOS is controlled by default. Within yourOperating System.
7/29/2019 AMOS Manual
22/93
OMCI CHAPTER 2: REGISTERS
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 24
Rev : 1
1
2.1.0 What is a Register?
Data existing in the Amos database is systematically grouped in to various Lists
knows as registers.
Following are some of the registers.
Components, Stock items, Addresses, Locations, Rounds.
Data needs to be entered in the Registers first, which can then be linked to eachother.
2.2.0 The Locations register
This Register lists the different places where you keep your Stock.
All the storage areas on board should be listed here.
A location can be assigned to a Stock Item only if it is listed here.
2.2.1 Opening the Locations RegisterClick File/Locations
The following Locations window is displayed.
7/29/2019 AMOS Manual
23/93
OMCI CHAPTER 2: REGISTERS
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 24
Rev : 1
2
The + sign besides some of the Locations indicates that there are some Sub-
locations under these.
The sub-locations can be seen by clicking on the + sign
2.2.2 Creating a New locationIn the Locations window, select the location under which you want to createthe new location.
Click on the New icon in the second toolbar.
The following Location details window is displayed
Enter the Code for e.g. B7
Enter the Location Name .for e.g. Box 7
Click Ok
Save
If the new location is a root location, check the Root Location option in the
Location Details window,
2.3.0 The Addresses registerThis register is used as an Address book.
This consists of a Code and the full address information of all the
Manufacturers and Vendors.
After entering all the Manufacturers here, these can then be linked to thevarious Components and Stock items.
7/29/2019 AMOS Manual
24/93
OMCI CHAPTER 2: REGISTERS
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 24
Rev : 1
3
2.3.1 Opening the Addresses RegisterThe Format of the Addresses Code is as follows
Address Code.9 XXX XXX XXX
Alphabetical Code Country City
Example of Address Code: 9 ANS USA WIS for ANSUL INCORPORATED
Click File/Open Register/Addresses or click on the Addresses icon
A Filter Window is displayed as follows.
In the Filter Window enter relevant details to view a particular address orclick on Ok to view the entire list.
For Instance you may enter 9 T in the Code field and click on Ok.Thiswill display a list of all Addresses created in the office with code
beginning with T.
To display the Address Details for the Maker Taiyo electricManufacturing Co, enter %taiyo% in the Name Field and click on OK.
7/29/2019 AMOS Manual
25/93
OMCI CHAPTER 2: REGISTERS
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 24
Rev : 1
4
The % character is a wild card and stands for any letters or words whichmay be present before or after taiyo entered in the Name field.
2.4.0 The Job Descriptions register Click File/Open register/Maintenance/Job descriptions in the Menu orclick on the Job Descriptions icon in the second toolbar.
You are faced with the following Filter
The Format for the Job descriptions Code is as follows
Job CodeXX ###
Alphabetical Code Numbers in numerical sequence.
Examples of Job Code: C 012- Check job
RO 050- A job Routine
The standard Alphabetical codes are as follows:
C - Check
I - Inspect
L - Lubrication
M - Measurement
O - Overhaul
OC - Oil Change
R - Renew
7/29/2019 AMOS Manual
26/93
OMCI CHAPTER 2: REGISTERS
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 24
Rev : 1
5
RO - Routine
RT - Re-Tension
S - Survey
T - Test
W - Wash/Clean
Fill in the relevant details in the filter to view a particular group of jobs or click
OK to view all the Job descriptions.For Instance, to view only lubrication Jobs enter L in the Job code field and clickOK.
The following window is displayed.
7/29/2019 AMOS Manual
27/93
OMCI CHAPTER 2: REGISTERS
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 24
Rev : 1
6
2.5.0 The Components Register
The Components Register is the Hub around which all the data in the Amosrevolves.
A Component is any physical unit on board, for which a maintenance task isperformed or spares/Stores need to be ordered.
2.5.1 Opening the Components Register Click Maintenance/Components or click on the Components icon.
You are faced with the following filter window.
The format for the components code is as follows
Component Code. XX.###
Alphabetical code denoting Numerical code in hierarchical
System E.g. Order denoting Parent Components andBB-Bilge and Ballast sub-components
LS-life saving systems
7/29/2019 AMOS Manual
28/93
OMCI CHAPTER 2: REGISTERS
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 24
Rev : 1
7
Examples of Component Code: ME.000, ME110
0BNOTE: The standard alphabetical codes for components are as shown in ANNEXURE I
In the Filter Enter the first part of the code, say ME or CH and so on to display all thecomponents in that Group or System.
For instance, to view the Components in the Cargo Handling System, enter CH in theCode field of the Filter and click OK.
This will display the list of all Components in the Cargo Handling System. I.e.
Components with Codes beginning with CH.
If you want to see the Component Scavenge Blower which exists in the Main Engine,enter ME in the number field and enter %SCAV% in the Name field as shown and click
OK.This will display a list of components with the word SCAV in it.
7/29/2019 AMOS Manual
29/93
OMCI CHAPTER 2: REGISTERS
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 24
Rev : 1
8
This effectively lowers the number of components displayed in the list and avoids
frustration and wastage of time involved in scrolling through a long list of components.
NOTE: the % sign is a wildcard to represent characters which may be present before or
after the word that you are looking for instance, if you are looking for the CargoHandling System Stripping Pump, enter CH in the number field and % Strip %in the
Name field of the Filter.
2.5.2 Things to Check/Enter for a Component
Check that the Maker is selected.
If no Maker is assigned, click on the magnifying glass icon to the right of MakerField.
The Filter window for the Addresses register is displayed as follows
7/29/2019 AMOS Manual
30/93
OMCI CHAPTER 2: REGISTERS
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 24
Rev : 1
9
Enter part of the name of the Maker in the Name field, using the wildcard character %as shown above n click OK.
This displays a select window as shown
Select the appropriate Maker and click OK.Clicking on OK the Details button shows the detailed Address of the Maker
Ensure that the Type (Model) is entered.
Ensure that the Serial No. is entered.
Click on Options/Details. Ensure that the Technical Specifications are entered fromthe manual.
NOTE: When raising a requisition, ENSURE that the above have been entered for the
Component, whose Stock Items you wish to requisition.
7/29/2019 AMOS Manual
31/93
OMCI CHAPTER 2: REGISTERS
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 24
Rev : 1
10
When the Requisition form is printed, the maker, type and Serial No. Are picked up from
the component . If this date is incomplete a lot of time is wasted and the spare might notbe connected to the vessel on time.
2.5.3 Viewing Stock Items linked to the ComponentStock items that are linked to the Component can be viewed in the following manner.
Select the Component whose attached Stock Items are to be viewed.
Click on the Parts tab.
This will display all the parts that have been Linked to the Component.
NOTE: This is a good place to view what Stock Items you have and what is ROB.
2.5.4 Changing the Status of a ComponentOne of the Details that is displayed in the Components Register is theStatus of the component
7/29/2019 AMOS Manual
32/93
OMCI CHAPTER 2: REGISTERS
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 24
Rev : 1
11
This appears in one of the Columns displayed in the List and can beviewed by scrolling horizontally.
By Default, the Status is Available
2.6.0 The Stock Items RegisterThis register consists of a list of all the Spare Parts and various
information pertaining to them.
2.6.1 Opening the Stock Items RegisterClick on the Stock Items icon in the Toolbar or Click
Stock/Stock Items.
The Filter window is displayed as follows
7/29/2019 AMOS Manual
33/93
OMCI CHAPTER 2: REGISTERS
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 24
Rev : 1
12
The Format of the Stock Item Code is as Follows:
Stock item code. ##. XXX.XXX
Component code Spare Parts Numbers in Sequence.
In the Filter, enter relevant data to view a list of Stock Items.
For instance,a) if you want to view the Stock Items linked to a Component ME.116,
enter the code of the Component i.e. ME.116 in the Number field of the
Filter and click Okb) If you want to filter out all the Stock items named O-ring and linked to
the Component ME.116, do the following
In the Number field of the Filter, enter the Component code ME.116
and enter %O-Ring% in the Name field of the Filter. Click Ok.
This will display a list of stock items for ME.116 Component and havingthe string O-Ring in its name
Thus an effective combination of the various fields in the Filter will aidin reducing the number of Stock Items displayed in the list.
2.6.2 Creating a New Stock ItemClick on the Stock Items icon.
In the Filter window, enter the Number of the Component for which youare creating the Spare part, For instance, if you are entering a new Spare
part for the Component ME.116, enter ME.116 in the Number field of thefilter window and click Ok.
This will display a list of Stock Items for the Component ME.116. Clickon the new icon in the second Toolbar or click Edit/New Record. The
following window is displayed.
7/29/2019 AMOS Manual
34/93
OMCI CHAPTER 2: REGISTERS
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 24
Rev : 1
13
Enter the following Details
a) Number: Enter the Stock item Code Number.b) Namec) Select the Maker by clicking on the magnifying Glass.d) Makers Ref: Enter the Part No.e) Stock Unit: Select the Stock Unit from the drop-down list by clicking on
the down arrow.
f) Stock Class: select the Stock Class from the drop-down list by clicking onthe down-arrow
g) Working seth) Location: Click on the Location Hierarchy icon to the right of the
Add tab. Select the location. Save
i) Current Stock:Enter the ROB and Click on Save.
7/29/2019 AMOS Manual
35/93
OMCI CHAPTER 2: REGISTERS
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 24
Rev : 1
14
Click on the default Button to indicate Default Location. Save. this will
place a Flag next to the Location.
2.6.3 Linking the Stock items to the ComponentAfter creating a new Stock Items. The next step is to Link the StockItemto the Relevant Component.
Click in the Checkbox next to the Stock Item in the List, as shownbelow.
Click on Options/Link to a Component.
Enter the Component Number and Click on Ok.
NOTE: Linking a Stock Item to a Component allows the attached Stock Items to be
seen from the Components register by clicking on the Parts tab.
This is useful, as the Current Stock and Working Set can be easily seen,
without going to the Stock Items register.
2.6.4 Things to Check/Enter for a Stock Item.The Name of the Stock item should be entered as per the Spare Partsmanual.
The Makers Ref. should contain the Part No. As mentioned in the SpareParts Manual.
A Location should be assigned.
7/29/2019 AMOS Manual
36/93
OMCI CHAPTER 2: REGISTERS
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 24
Rev : 1
15
A relevant Stock Class should be selected
NOTE: When raising a requisition, ENSURE that the above have been entered for the
stock Items, which are to be ordered.
When the Requisition form is printed, the above data is picked up from the Stock
Items Register.
If this data is incomplete, a lot of time is wasted and the spares might not beconnected to the vessel on time.
7/29/2019 AMOS Manual
37/93
OMCI CHAPTER 3: MAINTENANCE
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 21
Rev : 1
1
3.1.0
Hierarchy in Amos for organizing the Maintenance Tasks.
Component: It all begins with the Component for which the Maintenance Job is to be
carried out.
Job: Jobs are linked to various Components defining the Maintenance and the periodic
frequency at which they are to be carried out.
Work Orders: Amos uses Work Orders to describe which Jobs need to be carried outand when.
Reporting Work: after completion of the Jobs the concerned Work orders have to bereported back along with the last done Date, Stock items (if any), History, Last done
Counter (if applicable).
This updates the records automatically.
Updating counters: The Component Counters have to be updated every Sunday Noon..
3.1.1 How does Amos know when to schedule Jobs:Every periodic Job linked to a Component has a periodic frequency, either in
weeks/months or a Working Hours counter, attachted to it.For instance, if a job is to be carried out every 4000 hours. Amos starts counting the
Hours as soon as you Report that the Particular job is done, When the 4000 Hours
approaches, this Job comes up when you Print Work Orders due for the coming period.Amos counts time by itself but it also requires that the Component Running Hours are
updates on a regular basis.
3.2.0 Updating CountersClick on Maintenance/Counters/Update
The following Filter Window is displayed.
7/29/2019 AMOS Manual
38/93
OMCI CHAPTER 3: MAINTENANCE
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 21
Rev : 1
2
Click OK to see the entire list
The list displayed will be as follows.
Select a particular component in the list whose counter is to be updated, by
clicking on it.
In the Current Value column, enter the latest counter. The Date Read is
automatically entered as the Current Date.
Update all the Counters and then save.
All counters dependent on these counters are also automatically updated.
7/29/2019 AMOS Manual
39/93
OMCI CHAPTER 3: MAINTENANCE
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 21
Rev : 1
3
3.3.0 Maintenance
All Maintenance on board can be categorized as Planned Maintenance,
Unexpected Maintenance and Unplanned Maintenance.
a) Planned MaintenanceAll the Periodic Jobs, which are to be done on the Components at a pre-defined
Periodic frequency, come under this category.
b) Unexpected MaintenanceBreakdown jobs that are normally part of Planned Maintenance and for which a
Work Order Exists (but with a Due Date in the future), fall in this category.
For instance, a breakdown of a Main Sea Water Pump needs the pump to beoverhauled.
A Work order already exists for the Overhaul Job as part of the planned
Maintenance, although the Due Date may be in the Future.
c) Unplanned MaintenanceAny maintenance that is not part of a Planned routine and for which no Work
order exists, falls in to this category.
For instance, a leaking sea water pipe needs to be repaired.No work Order exists for such a Job. Also there is no frequency for such jobs.
This job can be categorized as Unplanned Maintenance.
3.3.1 Planned Maintenance3.3.1.1Viewing Work Orders
In the Menu click Maintenance/Work Orders
The following Filter is displayed.
7/29/2019 AMOS Manual
40/93
OMCI CHAPTER 3: MAINTENANCE
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 21
Rev : 1
4
NOTE: Optimum use of this Filter enables you to see only the work orders that you need
and not the entire list of work orders.
Planning Section:
Due Now: Selecting this option and clicking on OK will display a list of Work Orders
having Due Date as Current Date,
Overdue: Selecting this option and clicking on Ok will display a list of all Work Ordershaving a Due Date less than the Current date.
Due This Week: Selecting this option and clicking on Ok will display a list of all Work
Orders having a Due Date in the Current week between Sunday and Saturday.
Due Next Week: Selecting this option and clicking on Ok will display a list of all Work
Orders having a Due Date in the next week between Sunday and Saturday.
Due Between: Entering Dates in the two fields and clicking on OK will display a list ofall Work Orders having a Due Date between the entered dates.
Component: Entering a Component Number and clicking on Ok will display a list of allWork Orders for that Component.
Only Disciplines: Selecting a Discipline and clicking on OK will display a list of allWork Orders having the selected discipline attached to them. (We are only using CHIEF
ENGINEER and CHIEF OFFICER for filtering Engine and Deck jobs respectively.
Only Job Classes: Selecting a Job Class and clicking on Ok will display a list of allWork Orders having the selected job class assigned to them.
7/29/2019 AMOS Manual
41/93
OMCI CHAPTER 3: MAINTENANCE
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 21
Rev : 1
5
Clicking on the Advanced tab will display the following:
Include Work Orders of Status:
By default, all Work orders have a Status of Issued
After a Work Order is reported, the Status changes to Completed and Filedselecting the relevant Status and de-selecting the others and clicking on Ok will display a
list of all Work Orders having the selected Status.
Include Work Orders of Type:
By Default all Types are selected.
Selecting particular Type and de-selecting the other types and clicking on Ok will
display all Work Orders of the Selected Type.
Maint. Criteria:
Following are the Maint.Criteria included
7/29/2019 AMOS Manual
42/93
OMCI CHAPTER 3: MAINTENANCE
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 21
Rev : 1
6
Maint. Criteria are assigned to an Unplanned Work Order to categorize whether a
Work Order is part of a Running Defect List or part of a list of Vetting Deficiencies.
Selecting a Criteria and clicking on OK will display a list of all Work Orders
having a Maint. Criteria as the selected Criteria.
Work Classification:
Unexpected Work Only: This option is selected for Unplanned Work Orders selecting
this option and clicking on OK will display a list of Unplanned Work Orders.
Maint. Type / Maint. Cause: selecting a type /cause and clicking on OK will display a
list of all work orders assigned the selected type / cause.
Following are the options available for Maintenance Cause
Priority:
Work Orders for Planned Maintenance have a default Priority of 5.
Unplanned Work Orders are automatically assigned a Priority 4 when they are created.Work Orders having a Priority between the Priorities entered in From Priority and
To Priority Fields are displayed.
Note: normally a combination of above options is used to Filter out the Work Orders .
7/29/2019 AMOS Manual
43/93
OMCI CHAPTER 3: MAINTENANCE
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 21
Rev : 1
7
3.3.1.2Examples of Filtering Work Orders:a) Normally on Sunday the first thing to do would be Update Counters. In the Filter for Work Orders, select the following:For Deck Work Orders select 2 . CH.OFFICER under Only Disciplines For engine Work Orders, select 8 CHIEF ENGINEER under Only Disciplines In addition to the above select Overdue and Due this Week Click OKThis will display a list of Work Orders for Deck or Engine jobs which have a due date
less than todays date and also falling due in the Week.
b) If you wish to view Work Orders for the Component ME.116, Enter ME 116 in the
Component field of the filter and click OK.
c) If you wish to view Work Orders for Survey Jobs for Engine falling due in the period
5/1/02 to 11/30/02 does the following:
Select SURVEY in Only Job Classes Select 8.CHIEF ENGINEER in Only Disciplines Enter the above dates for Due Between in the Planning section .Click OKd) If you wish to view the SUPDT. WORK LISR having Due Date between 1/1/02 and
6/30/02, Do the following In the filter, Put the dates in Due BetweenClick on the Advanced Tab In the Drop Down list for Maint. Cause, select SUPDT. WORK LIST and click OK.e) If you wish to see the Work Orders fro the round Jobs Due this Week, do the
Following:
In the Filter, select Due This Week in the Planning sectionClick on Advanced tab.De-select Periodic and Requisition in the Include Work Orders of Type section.Click OK.In all the above cases, a Work Orders window similar to the one shown below is
displayed.
7/29/2019 AMOS Manual
44/93
OMCI CHAPTER 3: MAINTENANCE
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 21
Rev : 1
8
To view the details of Work Order, Select it by clicking on the Work Order in the list
The details for the selected Work Order are displayed in the Top Half of the window.
Number displays the code for the Work Order.
This is automatically generated
The format for the work Order Number is as followsFormat of Work Order Code:
Work Order Code. ####.##.##.#####
Sequential noautomatically
generated
Year
Alphabetical Code(Based on Name of
Vessel Dept. no
7/29/2019 AMOS Manual
45/93
OMCI CHAPTER 3: MAINTENANCE
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 21
Rev : 1
9
For instance, in the above window the number for selected Work Orders isAPAR.10.01.0002
APAR stands for the Name for the vessel Prem Aparna
10 is the year 201001 is the department no
0002 Is the sequential number of the work Order in the year 2010
Title - is a short Description of the Job For component The Component on which the job is to be done Frequency The frequency at which the job is to be done. This may be in
weeks/Months or working Hours. Priority Normally 5 for planned Work Orders and 4 for Unplanned Work Orders. Window Days before the Due Date that the work Order will appear in the Due
list. This is used for giving an advanced warning that a job is coming up. Useful incase of Survey Jobs.
Maint.Criteria if Maintenance Criteria has been assigned to a work order when itwas created, this is reflected here. Used mainly for Unplanned Work Orders.
Resp. Discipline Discipline responsible for carrying out the Work Order.NOTE: In our Databases, only the disciplines 2.Ch.OFFICER and 8.CHIEF ENGINEER
Are assigned to the Work Orders, primarily for filtering out the Deck and Engine Jobs
respectively.
Unexpected Work This option is selected when an Unplanned Work Order iscreated.
Maint. Type /Maint. Cause Normally selected as Routine Maintenance andPlanned Maintenance respectively for all Planned Jobs.
Filed All work Orders are Automatically Filed when they are Reported Status All work Orders have a status of Issued when they are created They have a
Status of completed when they are Reported
Type This is periodic for all Planned work Orders, Requisition for UnplannedWork Orders and : Round for Work Orders for round Jobs.
3.3.1.3Printing a list of Work Orders In the Work Orders window, select the Work Orders to be printed by clicking on the
Check boxes to the left of the Work Orders in the list.
Normally you would want to select all the Work Orders in the list. Click on Edit / Select All
7/29/2019 AMOS Manual
46/93
OMCI CHAPTER 3: MAINTENANCE
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 21
Rev : 1
10
Click on Print icon in the second tool bar. The following displayed.
In the Print Work Orders windows, click on the radio button to the left of the list inthe Output Format section.
Click on the Print Preview to view the list on screen. Click OK to Print out the list on Printer
7/29/2019 AMOS Manual
47/93
OMCI CHAPTER 3: MAINTENANCE
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 21
Rev : 1
11
3.3.1.4Reporting Work
All the Work Orders, which are completed i.e., the jobs are done, have to beReported in Amos.
Work Orders can only be reported one at a time. Select Work Orders to be reported by clicking on it. ClickOptions/Report Workin the Menu. The following Report Work window is displayed.
Details Enter the date on which the job was completed in the Date Done field. Enter the Working Hour Counter of the Component at which the Job was done (the
working Hours Field is only displayed if the Component has a Counter Attached to it) Tick in the Unexpected Work check box , If the Job is an Unexpected Job (i.e. a
job for which Work Order existed and is done before the Due Date)
0BHistoryClick on the History Tab. The Following window is displayed
7/29/2019 AMOS Manual
48/93
OMCI CHAPTER 3: MAINTENANCE
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 21
Rev : 1
12
Click in the white section Enter a detailed description of Job done. Stock Used If any spare parts have been used , click on the stock used tab the following window
is displayed .
7/29/2019 AMOS Manual
49/93
OMCI CHAPTER 3: MAINTENANCE
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 21
Rev : 1
13
Click on the new icon on the second Toolbar. This will create a new entry
Under Item No. enter the component number, the Stock item from the List That isdisplayed
Enter the Quantity Consumed. For instance, If you wish to report Stock Items consumed for component ME.116,
enter the component number ME.116 in the Item No. and click on the magnifyingglass icon. This will display the list of Stock items for the Component ME.116. Select
the Stock Item and click on OK Enter the Consumed quantity.
Save by clicking on the Save icon in the second Toolbar.NOTE: ensure that all the details, as explained above, have been entered before saving.
Once a Work Order is Reported , the following things happen .a) A new Work Order for Job is automatically created.b) The status of the Reported Work Order changes to Completed and its is
automatically Filedc) The Reported Work Order can now be viewed in the Maintenance Logd) The Current Stock for the consumed stock item is automatically updated.
7/29/2019 AMOS Manual
50/93
OMCI CHAPTER 3: MAINTENANCE
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 21
Rev : 1
14
3.3.2 Unexpected Maintenance Breakdown jobs, that is normally part of planned Maintenance and for which a work
Order exists (but with Due Date in future), Fall in this category.
Consider an example of breakdown of AUX COOLING SW P/P NO. 1 This P/p needs to be overhauled. A Work Order for the overhauling of this p/p already exists, as it is part of the
Planned Maintenance Schedule.
The first steps is to Identify the component Number for AUX COOLING SW P/PNO.1
Click on the Component Register Icon. In the Filter enter CW in the Number field
and click. Select the required p/p and note the component Number, for instance CW.208 Click on Maintenance/ Work Orders In Filter enter CW .208 in the Component
field and click OK.This will display a list of Work Orders for the component CW.208 as shown.
7/29/2019 AMOS Manual
51/93
OMCI CHAPTER 3: MAINTENANCE
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 21
Rev : 1
15
Note that the Due Date is in future .you are doing this job it is due.
Select the Work Order for the Job of Overhauling and Report it as explained.
1BNOTE: while Reporting the work order remember to click in Unexpected Work
check box to select it. In the Report Work window.
3.3.3 Unplanned Maintenance Any maintenance that is not part of planned routine and for which no Work Order
exists, falls in to this category. Such as defect list for vessel, supdt. Work list, etc. All Maintenance carried out on board can and must be Reported in Amos.
Thus record of the Maintenance is maintained.
If a job is not part of the planned Maintenance, no Work Order exists for this Job.Any job that needs to be recorded in Amos needs a Work Order.
Hence, the first step is to create a Work Order for an Unplanned Job.3.3.3.1Creating a Work Order for an Unplanned JobIdentify the Component
First, The Component on which the job is to be carried out needs to be identified. Let us consider an example of an Unplanned Job where a leaking Sea Water pipe
needs to be repaired.
The Component is found in the following manner:Click on the Components Register icon
In the Filter, Enter CW (for Cooling Water System) in the Number Field and%pipe% in the Name Click OK. The Following window is displayed.
OR
Find the Component, Select the Component, right click on it. Click report Work.Then click next.
7/29/2019 AMOS Manual
52/93
OMCI CHAPTER 3: MAINTENANCE
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 21
Rev : 1
16
Select the Component by clicking on it in the List.
Click options / Requisition Work . The following Requisition Work isdisplayed.
7/29/2019 AMOS Manual
53/93
OMCI CHAPTER 3: MAINTENANCE
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 21
Rev : 1
17
Enter Details as explained below and click OK.
WO No: This Number is Automatically generated.
Title: Enter a short Description of the Job.
Component: The Component Number is automatically entered
Unexpected Work: This option is to be selected by clicking in the check box
Planned start: Enter the Date on Which the Job is scheduled
Priority: It is automatically set to 4
Discipline: Select the appropriate Discipline (Chief Engineer or Ch.Officer)
Maint. Criteria: Select the appropriate one from the drop down list if the job is partOf a Superintendent Work List, Select SUPDT.WORK LIST
7/29/2019 AMOS Manual
54/93
OMCI CHAPTER 3: MAINTENANCE
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 21
Rev : 1
18
This creates a Work Order for the Job
This Work Order can be viewed and reported as explained in 3.3.1.1 and 3.3.1.4NOTE: Since this is a one-time Job no new Work Order is generated for an Unplanned
Work Order.
3.3.0 Maintenance LogMaintenance Log is a record of all completed and filed Work Orders. This is the Place
where records of Maintenance carried out along with History and Stock Used can beviewed.
3.4.1 Viewing Maintenance Log Click Maintenance/ Log The following Filter window is displayed.
Of the various fields in the Filter, the most often used are component and PeriodStart and Period End in the Reported in Period section.
Component: Enter the component Number and click OK This will display a list ofcompleted and filed Work Orders for the component.
Period Start /Period End: Enter the two dates and click OK. This will display a list ofWork Orders whose Date Done falls between the period Start and Period End
dates.A List similar to the one shown below is displayed.
7/29/2019 AMOS Manual
55/93
OMCI CHAPTER 3: MAINTENANCE
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 21
Rev : 1
19
NOTE : The list can be sorted by clicking on the Date Done to arrange the list
according to descending order of date .
History To view History, Select a Work Order by Clicking on it and ClickOptions/ History.
Stock Used: To View Stock Consumed for carrying out the job, Click Options/Stock Used
Counter Readings: To view the running Hours at which a Counter Related Job wascarried out click Options/ Counter Readings
The Counter Readings Window as shown below is displayed
7/29/2019 AMOS Manual
56/93
OMCI CHAPTER 3: MAINTENANCE
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 21
Rev : 1
20
3.5.0 Maintenance & RepairGeneral
All M & R activities must be recorded in AMOS.
For any Item landed ashore or any Maintenance carried out on board by a Technician,
The following needs to be created to be done in Amos:
An Unplanned Work Order needs to be generated to report the maintenance carriedout.
A Manual Requisition needs to be created to account for the expenses involved.For instance consider the case where the motor for Aux. Blower needs to be landed for
re-winding
First, identify the component. Click on the components Register icon. In the Filter,Enter AC in the Number Field (for Air Conditioning) and %Air Conditioning% in the
Name field.
The Following components list is displayed.
7/29/2019 AMOS Manual
57/93
OMCI CHAPTER 3: MAINTENANCE
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 21
Rev : 1
21
Select the component and click on Options / Requisition Work. The followingRequisition Work window is displayed.
Enter the Title Click in the Unexpected Work check box Enter the Planned Start Date. Select Discipline(Chief Officer or Chief Engineer)
In Maint. Criteria, select BREAKDOWN
Click OK This creates a Work Order for the Job This Work Order can be viewed and reported as explained in 3.3.1.1 and 3.3.1.3NOTE: since this is a one-time Job, no new Work Order I s generated for an unplanned
Work Order
7/29/2019 AMOS Manual
58/93
OMCI CHAPTER 4: STOCKMANAGEMENT
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 6
Rev : 0
1
Amos assists in effective and automatic management of stock items onboard by keeping a
track of various stock transactions carried out. Amos adds items to stock when they are Purchased and Received Amos removes items from stock when Work reports in Maintenance Show that stock
Items are consumed.
4.1.0 Stock Management Functions in Amos
The Stock Menu leads you to the following windows to deal with stock Management.
4.2.0 Stock Wanted
The stock wanted window offers you a complete overview of your current stock. It also is the first step in setting up a requisition. (Refer 5.1.2.4).
4.3.0 Stock TransactionsUsing the Stock Transactions window, you can see a log of what is recorded as Moving
in and out of Stock through the Maintenance and purchasing functions.
4.3.1 Using Stock Transactions Click stock/Transactions you are faced with following Filter window.
You may fill in details in any of the fields to see the stock transaction you areinterested in.
Item Number: If you know the Stock Item Number whose transaction youare interested in, enter this Number. Incase you are unsure
Of the stock Item Number, select it by clicking on
Magnifying glass to the right of the field. Component: Enter /select Component for which Stock transaction is to
Be viewed.
7/29/2019 AMOS Manual
59/93
OMCI CHAPTER 4: STOCKMANAGEMENT
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 6
Rev : 0
2
Job: Enter /select the Job Description for which the StockTransaction was carried out.
Work order: Enter /select the Work Order Number involving the stockTransaction you want to view.
Period Start /: Enter the Period Start and Period End Dates to viewPeriod End all stock Transaction.
NOTE: You do not need to fill in details in all the fields of the Filter Window Only
Specify criteria necessary to show you the list you want to see.
Click OK .The Stock Transactions window similar to the one below is displayed.
Select the Stock Transaction you are interested in by clicking on it in the list andhighlighting it . The details are displayed in the upper half of the window.
7/29/2019 AMOS Manual
60/93
OMCI CHAPTER 4: STOCKMANAGEMENT
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 6
Rev : 0
3
4.4.0 Stock In /Out Most Stock Transactions are related to either a maintenance action or a Purchase
form. These are registered either as Used(due to consumption while reporting aWork Order) or as Purchased (due to receipt of a purchase order)
However, in some cases you may have to enter Stock In or Out Manually .Forinstance, consumption of paints /chemicals /lubes. There are no existing Work orderswhere their consumption can be reported.
NOTE: The current Stock for the above stores Items needs to be updated at the end of
ever month.
4.4.1 Using In / Out of StockFirst identify the components fro the Stock items for which consumption is to berecorded.
For instance, the Component for chemicals could be ST.300, For Paints ST.700 And
For Lubes ST.750
Click Stock/ In/Out of Stock in the Menu .The following window is displayed.
Enter the stock Item Number whose transaction is to be registered. Enter theComponent Number, for instance, AE .002.001 and click on the magnifying glass
icon .A list similar to the following is displayed.
7/29/2019 AMOS Manual
61/93
OMCI CHAPTER 4: STOCKMANAGEMENT
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 6
Rev : 0
4
Select the Stock item and click Ok
Enter the Quantity
Enter the Transaction Date.
Select the Trans. type by clicking on the down arrow next to the field.
For instance: Used, purchased, and so on.
4.5.0 Stock Control - Taking Inventory
An Inventory is taken at regular intervals to ensure that the actual Stock matches
The Current Stock records in Amos.
Sometimes the Spare Parts used during Maintenance may not be reported to AmosThis leads to difference in the actual Stock and the Stock record in Amos.
Stock Control helps to update Stock records so that minor differences do not add.
Up overtime leading to invalid Stock records
First an Inventory list is printed from Amos as an aid to doing the Inventory.
Then an actual physical count is done of the Stock items on board.
The Actual ROB is then entered in the Stock Control window.
Note These quantities are automatically given a Transition type Lost or Found
depending on whether the existing quantity is increased or decreased.
7/29/2019 AMOS Manual
62/93
OMCI CHAPTER 4: STOCKMANAGEMENT
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 6
Rev : 0
5
4.5.1 Printing a list to aid InventoryAmos assists the User in taking Inventory by allowing Sorting of the Parts by
Location.
Click Stock/Control in the Menu. The following Filter window isDisplayed.
NOTE: if you want a list of Stock Items in a particular Location, select this Location in
Name.
Click on the icon at the end of the Name field. A Locations window similar to
the one shown below is displayed.
7/29/2019 AMOS Manual
63/93
OMCI CHAPTER 4: STOCKMANAGEMENT
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 6
Rev : 0
6
Select the Location and click Ok.
Select include sub-locations in the Filter.
Click Ok to view a list of Stock Items in the Location Selected.
To print the list, Click File/Print in the menu.
4.5.2 Updating Stock Quantity after an Inventory. Open the Stock Control window.
To Update the Stock Quantity, Click the particular Stock Item and enter thecurrent ROB in the In Stock column.
Click the Save Icon in the second toolbar or click Edit/Save changes.
7/29/2019 AMOS Manual
64/93
OMCI CHAPTER 5: PURCHASEMODULE
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 22
Rev : 0
1
5.1.0 Purchase Module
All Purchase activities need to be carried out only in Amos.
NO REQUISITIONS WILL BE PROCESSED IN EXCEL
2BNOTE: Requisitions in any format, other then in Amos, will not be processed.
5.2.0 Opening the Forms Register Click Purchase/Forms
The Following Filter is displayed.
Click on OK to view all the Forms.
The list of Forms is displayed, as shown.
7/29/2019 AMOS Manual
65/93
OMCI CHAPTER 5: PURCHASEMODULE
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 22
Rev : 0
2
Following are the Details that can be viewed in the Forms window.
Number
The Format of Numbering Forms is as follows.
Format of requisition Code:
Requisition Code ####.##.###
Alphabetical
Code Based on SequentialNo. starting
from.001
year
The number is automatically generated.
7/29/2019 AMOS Manual
66/93
OMCI CHAPTER 5: PURCHASEMODULE
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 22
Rev : 0
3
Title- Enter a short Description for the Form, for instance, MAIN ENGINE SPARES.Vendor-This is the Address of the Supplier and will be entered by the office.
Budget Date- Automatically assigned as the Created Date.
Budget Code: The various Categories of Purchases are assigned various Budget Codes.
For instance, the Deck Stores-Consumables have a Budget Code-511000.This is
Selected by the Office.
Cost Overview- This section shows the total cost of the Purchase Order and the Currency
The Office enters this.
Created- The Created Date is automatically entered when the Requisition Form isCreated.
Approved- Before Converting a Form to a Purchase Order, it first needs to be approved
by the Superintendent. When a Superintendent grants approval the date is automaticallyEntered there.
Ordered- Once a Form is converted to a Purchase Order, the Office enters the Ordered
Date here.
Confirmed- Once the Vendor confirms delivery of the Purchase Order, the Office entersthe date here.
Received- After a Purchase order is delivered to the ship, the Current Stock of theReceived Stock needs to be updated by carrying out the Receive operation on the
Purchase Order. This date is automatically entered there.
Confirmation Ref:- This is a Reference Number given by the vendor, on accepting thedelivery of the Purchase Order. The Office enters this
Details- Click on Options/Details. This opens the Full Description window. Enter anydetails pertaining to this particular Requisition Form, here.
5.3.0 Creating a New RequisitionA Requisition is a purchasing form that is created by the vessel and sent to the
Office. The Requisition tells exactly what goods are wanted. And in whatquantities.
5.3.1 Identify the ComponentThe first step in creating a Requisition is to identify the Component for which the
Spares are needed.
Click Maintenance/Components or Click on the Components icon.
You are faced with the following filter window.
7/29/2019 AMOS Manual
67/93
OMCI CHAPTER 5: PURCHASEMODULE
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 22
Rev : 0
4
NOTE Let us raise a Requisition to order Spares for the MAIN COOL. F.W. PUMP
Enter CW in the Number field of the Filter. Click Ok.
The Following Components List will be displayed.
7/29/2019 AMOS Manual
68/93
OMCI CHAPTER 5: PURCHASEMODULE
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 22
Rev : 0
5
The important step here, is to check the followingMaker- Check that the proper Maker is selected, if not refer to 2.5.2 9(a) and
select the Maker.
Type- Ensure that the Model number is entered.
Serial no- Ensure that the Manufacturers No. is entered.
Details - Click Options/Details. Ensure that the technical specifications are entered
NOTE: When the requisition form is printed out, data for Machinery for Which spares
are to be ordered is picked up from the Maker, Type and Serial no. Fields Hence it is
imperative that these are entered prior to creating the Requisition.
5.3.2 Identify the stock Items Click on the Parts" tab in the Components window. The linked list of Stockitems is displayed as follows
Select the required part by clicking on it. The Instock (ROB) quantity is also visible here. Click on the View buttonThe following Stockitem window is displayed
7/29/2019 AMOS Manual
69/93
OMCI CHAPTER 5: PURCHASEMODULE
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 22
Rev : 0
6
Check that the following have been entered for the Stock Items that are to be ordered .
Name Ensure that the Name is as per the spare parts manual.
Makers Ref Ensure that the part no. is entered as per the spare parts Manual .
Location Ensure that a location is assigned. Click on the Location Hierarchy Icon
to the right of the Add tab. Select the location save.Stock unit Ensure that the proper stock Unit is selected. This is important in the case of
Stores Stock Items.
NOTE: When the Requisition form is printed out, Data for the line Items which are to be
ordered is picked up from the Name, Makers ref, Location and Stock Unit Fields Hence,
It is imperative that these are entered prior to creating the Requisition.
NOTE: If a Stock Item does not exist, a new one needs to be created as explained in 2.6.2
5.3.3 Stock Wanted The next step is to tell Amos how much you want. Enter the required quantity in the Wanted field Save and close the window. Follow the same process as above for all the items
required
5.3.4 Creating the Requisition Form The next step is to create the Requisition Form. Click Purchase / Forms
7/29/2019 AMOS Manual
70/93
OMCI CHAPTER 5: PURCHASEMODULE
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 22
Rev : 0
7
In the Filter, Click OK to display Forms Windows.
Click on the new icon to create a new Form. The following Form Creation window is displayed.
7/29/2019 AMOS Manual
71/93
OMCI CHAPTER 5: PURCHASEMODULE
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 22
Rev : 0
8
Click OK Enter the range as CW to CW The Create Forms (Automatic) window is displayed. Number- the requisition Number is automatically generated. Title-Enter an appropriate Title.
For instance, SPARES FOR MAIN COOL. F.W. PUMP.
After entering the above, Save.5.3.5 Viewing Line Items for the Form. In the Forms window highlight the form by clicking on it in the list . Double clicking on this Form will open the line Items Windows or click
options/line Items.
5.3.6 Selecting Component In the line Items window, highlight a line Item. In the component field, enter the component number CW.110 The Component needs to be entered for all the line items.NOTE: Component has to be entered for all the line items as Spares are being ordered
for machinery.
DO NOT select a component when ordering for stores.
7/29/2019 AMOS Manual
72/93
OMCI CHAPTER 5: PURCHASEMODULE
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 22
Rev : 0
9
5.3.7 Adding Line Items to a Requisition After creating a requisition, as explained above if you realize that a few more line
Items need to be added, it can be done in the following manner.
In the line Items window, Click on new icon. In the Part No. field enter, say CW.110 and Click on magnifying glass icon to the
right of the field. This will display a list of the stock Items for components CW.110 Select the Stock Item and Click OK. Enter Requested quantity and ComponentNOTE: line items cannot be added to an existing Requisition after an export is made ofthe office
When making an Export, ensure that all Requisitions Created are completed in all
respects. They cannot be edited after the export file is created.
NOTE: in case , a Requisition needs to be cancelled do the following in the Title of the
Form type cancelled .
NOTE: Forms having a number like APAR.10.505 are created in office
All Forms created on board have the numbers from 001 to 500 on board
All Forms created in office have numbers above 500
5.3.8 Printing Requisition FormsNOTE: Before sending an export to the office, it is good idea to Print Preview the
Requisition Form to ensure that all details have been entered.
The Requisition Forms can be printed in the following manner
7/29/2019 AMOS Manual
73/93
OMCI CHAPTER 5: PURCHASEMODULE
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 22
Rev : 0
10
Select the form by ticking in the tick box to the left of the Number column. Click on the printer icon in the Toolbar Select Printed Form (Original). Click on Print Pre-view button to print to screen.5.4.0 Various Steps in the Purchasing Chain
Once the Requisition is created, an export file is sent to the office. The following are various stages which a Requisition goes through in the office0BQuery The Requisition is first converted to query.
Quotations The Query is sent out for Quotations to the vendors.The vendors revert with the Quotations for the price of eachline Item. This is updatedinthe database.
Purchase Order The Form is converted to Purchase Order and a Budget Code isassigned.
Superintendent approves the purchase Order.
This data is sent to the vessels in the weekly Office export
7/29/2019 AMOS Manual
74/93
OMCI CHAPTER 5: PURCHASEMODULE
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 22
Rev : 0
11
NOTE: After carrying out Import operation, You can check The Form Status and
Form Type of the Various Forms in the forms window .you can check whether a
particular Requisition has been converted to a Purchase Order
This will give you an idea of the progress of the Requisition Form.
5.5.0 Receiving Purchase Orders
Once the spares / Stores are physically landed on board, the purchase Orders are to beReceived in Amos and an export should be sent to the Office.
This is done to Update the current stock (ROB) of items and also to let the office nowwhat has been received on board.
NOTE: The Purchase Orders received may be complete or incomplete. The procedurefor receiving complete and incomplete purchase Orders is as explained below.
5.5.1 Receiving Complete Purchase Orders Click on Purchase / Forms Use the Advanced tab available on the Filter window In Filter, de- select Requisition Form and Query in the include forms of Type
and Status , as shown below .
7/29/2019 AMOS Manual
75/93
OMCI CHAPTER 5: PURCHASEMODULE
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 22
Rev : 0
12
Click OK The following Forms window is displayed.
Select the purchase order to be Receivedw is displayed as below.
Click Options/ Receive The Receipt Options windo
Note that the receiving the complete P.O. option is selected by default.
orrect Date The Receipt Date is automatically entered as Todays Date. Enter the cand click on OK.
7/29/2019 AMOS Manual
76/93
OMCI CHAPTER 5: PURCHASEMODULE
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 22
Rev : 0
13
The Receive window is displayed as shown.
Note that the Receiving quantities are automatically entered.Click o the save icon
The following window is displayed.
Click on yes buttontically update the current stock (ROB) of the Stock Items and
onvert the status of the Purchase Order to Filed.
Click on Purchase /Formsndow
on Form and Query in the include forms of Type and
NOTE: This will automa
c
5.5.2 Receiving Incomplete Purchase Orders
Use the Advance tab available on the Filter wi In Filter, de-select Requisiti
status as shown below and
7/29/2019 AMOS Manual
77/93
OMCI CHAPTER 5: PURCHASEMODULE
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 22
Rev : 0
14
Click OKing forms window is displayed. The follow
7/29/2019 AMOS Manual
78/93
OMCI CHAPTER 5: PURCHASEMODULE
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 22
Rev : 0
15
Select the purchase Order to be received. Click Options /Receive The Receipt Options window is displayed.
Since only a part of the purchase order has been supplied on board, de-select theReceiving the complete P.O option.
Enter the Receipt date Click OK. The following Receive window is displayed.
7/29/2019 AMOS Manual
79/93
OMCI CHAPTER 5: PURCHASEMODULE
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 22
Rev : 0
16
Note that the Receiving quantities are not entered by default Enter the qualities, actually supplied on board, for each item.
Save On saving, note that the On Order quantity for each item changes as shown below
The Status of this Form remains ActiveNOTE: After Receiving the Purchase Orders, an export should be sent to the office,
Advising regarding the status of the Purchase Orders received.
7/29/2019 AMOS Manual
80/93
OMCI CHAPTER 5: PURCHASEMODULE
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 22
Rev : 0
17
Only after getting a confirmation from the vessel regarding the status of the Purchaseorders and the received items, can the Office begin processing the Invoices of the
vendors.Incase of incomplete Received Purchase Orders, the Office cancels the quantities not
received and advises the vessel to raise a fresh Requisition for the Items not received.
Such Incomplete Received Purchase Orders are filed by the Office.
5.6.0 Creating a Manual Requisition for landing repairs and On Board RepairsAll M & R activities must be recorded in AMOS.
1BGeneral
For any item landed ashore or any maintenance carried out on board by a Technician, Thefollowing needs to be done in Amos. An Unplanned Work order needs to be generated to report the maintenance carried
out.
A manual Requisition needs to be created to account for the expenses involved.NOTE: For instance consider the case where the motor for Aux.Blower needs to be
landed for re-winding.
First, identify the component. Click on the Components Register icon. In the Filter, Enter EE in the Number Field (for Electrical equipment) and %blow% in the Name field. The following components list is displayed.
7/29/2019 AMOS Manual
81/93
OMCI CHAPTER 5: PURCHASEMODULE
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 22
Rev : 0
18
Confirm that Maker, Type and Serial No. Are entered. Next create a Manual Requisition in the following manner Click Purchase/ Forms Click OK in the Filter to view a list of all existing Forms Click on the New icon to create a new From The following Form Creation window is displayed.
7/29/2019 AMOS Manual
82/93
OMCI CHAPTER 5: PURCHASEMODULE
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 22
Rev : 0
19
By default, the Creation Method is selected as Manual. Click OK A new Requisition Form is created Enter Suffix (LP for Landing Repair and OR for On Board Repair) for the Form
Number.
Enter Title, Say, and Landing Motor for Auxiliary Blower No. 1. Save Double-click the Form to open the Line Items window Click on the New Icon to create a new line Item. DO NOT enter any Part No. In Part Name, enter Motor for Auxiliary Blower No.1 Select the Unit as Numbers Enter Requested as 1 Enter Component as EE.040NOTE: Any changes made in Purchase Module are reflected in tab Audit Trail.
7/29/2019 AMOS Manual
83/93
OMCI CHAPTER 5: PURCHASEMODULE
Date : 01/09/10
Prep : SJK
Appr : BP
Page 1to 22
Rev : 0
20
7/29/2019 AMOS Manual
84/93
Date : 29/12/09
OMCI CHAPTER 6: EXPORT/IMPORT
Prep : SK
Appr : SMH
Page 1to 3
Rev : 0
6.1.0 Exchanging Data with Office The Amos database contains data about Stock Levels, Requisitions, Maintenance andother information which needs to be sent to the Office at regular intervals
In order to do so data must be exported from ship database. Similarly data (like newPurchase Orders) entered in the Office needs to be imported.
The ship sends a weekly export to the Office, every Sunday The Office sends a Weekly export to the Ship, every Friday The Ship can send an Export to the Office on other Days, too. For instance, if an
urgent Requisition is to be sent.
6.2.0 Performing the Export Operation
Click File /Export /Import/Export. The following Export window is displayed.
The Selection File is a file which consist of a list of instructions regarding theExport Operation .
Click on the Magnifying Glass to the right of the Selection File Field.
7/29/2019 AMOS Manual
85/93
Date : 29/12/09
OMCI CHAPTER 6: EXPORT/IMPORT
Prep : SK
Appr : SMH
Page 1to 3
Rev : 0
The above Select File window is displayed. Select The Shp-exp.sel file from the list by clicking on it and click on Open. The Shp-exp.sel file displayed in the selection file Field of Export window The File Name field consists of an automatically generated number. This is the
name of the Export File .For instance the name of the file in the above Picture would
be 81600015.SHP, the next file will be 81600015.SHP and so on.
Click OK This Export file is automatically saved to the following path in the hard drive on the
server.
E:\ourdocuments\Transfer
This file is to be sent to the Office as an Assessment in Mail65.6.3.0 Performing the Import Operation The File to be imported in to the Ship Database is sent by the Office as an attachment
in Mail65 in the ZIP format. This file has to be unzipped using the WINZIP Program and placed in the following
Folder
E:\ourdocuments\Transfer
After Unzipping, the file will have a name like, say 38160014.OFF
7/29/2019 AMOS Manual
86/93
Date : 29/12/09
OMCI CHAPTER 6: EXPORT/IMPORT
Prep : SK
Appr : SMH
Page 1to 3
Rev : 0
Click File /Export / Import/Import. The Following window is displayed
Click the magnifying glass to the right of the Selection File .The following SelectFile window is displayed.
Select the file Shp-imp.sel by clicking on it in the list . Click Open The Shp-imp.sel file is displayed in the Selection File field of the Import
window.
The File Name is an automatic sequential number and is the next Office Export Fileto be imported.
Click the magnifying glass to the right of the File Name .The following SelectFile window is displayed
Select the file 38160014.OFF by clicking on it in the list . Click Open Click OK to begin the Import operation.
7/29/2019 AMOS Manual
87/93
OMCI CHAPTER 6: EXPORT/IMPORT
Date : 29/12/09
Prep : SK
Appr : SMH
Page 1to 3
Rev : 0
NOTE: After the Import Operation is successfully completed, the Filename extensionchanges to OK For instance in this case the File name changes from
38160014.OFF to 38160014.OK
NOTE: Only Numbered sequential files, when imported, have their extension changing
from OFF to OK.
Sometimes, the office sends some Fixes, which are not Numbered files. The extension
of such files does not change to OK after Importing.
NOTE: The vessel Database has been set in a way that only the records, which have
changed since the last export operation will be Exported. This results in a smaller file
size .
NOTE: If selection file Shp-imp.sel is erroneously used as a selection file for creating
an export file, it will result in the creation of a very large export file. This file cannot be
sent to the office.
When this happens, inform the office in a message
7/29/2019 AMOS Manual
88/93
Date : 29/12/09
OMCI CHAPTER 6: EXPORT/IMPORT
Prep : SK
Appr : SMH
Page 1to 3
Rev : 0
6.1.0 Exchanging Data with Office The Amos database contains data about Stock Levels, Requisitions, Maintenance andother information which needs to be sent to the Office at regular intervals
In order to do so data must be exported from ship database. Similarly data (like newPurchase Orders) entered in the Office needs to be imported.
The ship sends a weekly export to the Office, every Sunday The Office sends a Weekly export to the Ship, every Friday The Ship can send an Export to the Office on other Days, too. For instance, if an
urgent Requisition is to be sent.
6.2.0 Performing the Export Operation
Click File /Export /Import/Export. The following Export window is displayed.
The Selection File is a file which consist of a list of instructions regarding theExport Operation .
Click on the Magnifying Glass to the right of the Selection File Field.
7/29/2019 AMOS Manual
89/93
Date : 29/12/09
OMCI CHAPTER 6: EXPORT/IMPORT
Prep : SK
Appr : SMH
Page 1to 3
Rev : 0
The above Select File window is displayed. Select The Shp-exp.sel file from the list by clicking on it and click on Open. The Shp-exp.sel file displayed in the selection file Field of Export window The File Name field consists of an automatically generated number. This is the
name of the Export File .For instance the name of the file in the above Picture would
be 81600015.SHP, the next file will be 81600015.SHP and so on.
Click OK This Export file is automatically saved to the following path in the hard drive on the
server.
E:\ourdocuments\Transfer
This file is to be sent to the Office as E mail attachment.6.3.0 Performing the Import Operation The File to be imported in to the Ship Database is sent by the Office as an attachment
in Mail65 in the ZIP format. This file has to be unzipped using the WINZIP Program and placed in the following
Folder
E:\ourdocuments\Transfer
After Unzipping, the file will have a name like, say 38160014.OFF
7/29/2019 AMOS Manual
90/93
Date : 29/12/09
OMCI CHAPTER 6: EXPORT/IMPORT
Prep : SK
Appr : SMH
Page 1to 3
Rev : 0
Click File /Export / Import/Import. The Following window is displayed
Click the magnifying glass to the right of the Selection File .The following SelectFile window is displayed.
Select the file Shp-imp.sel by clicking on it in the list . Click Open The Shp-imp.sel file is displayed in the Selection File field of the Import
window.
The File Name is an automatic sequential number and is the next Office Export Fileto be imported.
Click the magnifying glass to the right of the File Name .The following SelectFile window is displayed
Select the file 38160014.OFF by clicking on it in the list . Click Open Click OK to begin the Import operation.
7/29/2019 AMOS Manual
91/93
OMCI CHAPTER 6: EXPORT/IMPORT
Date : 29/12/09
Prep : SK
Appr : SMH
Page 1to 3
Rev : 0
NOTE: After the Import Operation is successfully completed, the Filename extensionchanges to OK For instance in this case the File name changes from
38160014.OFF to 38160014.OK
NOTE: Only Numbered sequential files, when imported, have their extension changing
from OFF to OK.
Sometimes, the office sends some Fixes, which are not Numbered files. The extension
of such files does not change to OK after Importing.
NOTE: The vessel Database has been set in a way that only the records, which have
changed since the last export operation will be Exported. This results in a smaller file
size .
NOTE: If selection file Shp-imp.sel is erroneously used as a selection file for creating
an export file, it will result in the creation of a very large export file. This file cannot be
sent to the office.
When this happens, inform the office in a message
7/29/2019 AMOS Manual
92/93
Date : 01/09/10
OMCIANNEXURE I : PLAN OF CODES
FOR OMCI FLEETPrep : SJK
Appr : BP
Page 1to 2
Rev : 0
0BU
COMPONENT CODES AMOS
AI Accommodation (internal) cabins / Alleyways / Common Rooms / Toilets /
Plumbing / Stores
AC Air Conditioning and ventilation Systems ventilation flaps / Fire Dampers
/Compressors / Condensers / Vent fans / Exhaust fans .
AE Auxiliary Engine Main / emergency / Cargo Pump drives / Pipelines and valves
AL Alarms
AM Anchor and Mooring Equipment Windlass & Mooring winches / anchor /
towing equipment /hyp.stm Pipes / Winches / Power packs /Pipelines and valves .
AU Automation Sensors / actuators / M/E Maneuvering /H/L Level alarms
BB Bilge and ballast systems Pumps / Valves / Strainers / Eductors / Strippingpump
BE Bridge Equipment Navigation and Radio equipment
BL Boilers Main and Exhaust boilers, B