CENTRAL VIRGINIA TRANSMISSION RELIABILITY PROJECT AMHERST REUSENS The Amherst–Reusens phase includes: • Rebuilding approximately 12 miles of transmission line in or near existing right-of-way • Expanding the existing Monroe and Amherst Substations The project: • Provides a new electrical source for the region • Increases reliability for customers • Supports the retirement of aging Infrastructure The rebuild begins in Amherst County at Amherst Substation located off U.S. Route 60. The upgrades continue southeast for about eight miles toward Monroe Substation located off South Amherst Highway. From there, the power line continues for four miles, crossing the James River and ending at Reusens Substation located off Old Trents Ferry Road in the city of Lynchburg. WHAT WHY WHERE Appalachian Power representatives plan to upgrade the local electric transmission grid in Virginia. The Central Virginia Transmission Reliability Project provides a new electrical source for the region, increases reliability to customers and supports the retirement of aging equipment. The project includes several phases throughout the next few years. The Amherst–Reusens phase involves rebuilding approximately 12 miles of transmission line and expanding two substations in Amherst County and the city of Lynchburg. Company representatives expect construction for this phase to begin in Fall 2022 and last about a year. PROJECT SCHEDULE PROJECT IN SERVICE Fall 2023 SCC* FILING Winter 2020 PROPOSED ROUTE September 2020 DATA GATHERING BEGAN Fall 2019 Note: Timeline subject to change. Note: Timeline subject to change. PROJECT ANNOUNCEMENT AND VIRTUAL OPEN HOUSE August 2020 2019 2020 2022 2023 2021 2024 REBUILD CONSTRUCTION BEGINS Fall 2022 *SCC: Virginia State Corporation Commission *SCC: Virginia State Corporation Commission

Amherst Reusens - Factsheet V6 · 2020. 8. 6. · CENTRAL VIRGINIA TRANSMISSION RELIABILITY PROJECT AMHERST ˜ REUSENS The Amherst–Reusens phase includes: • Rebuilding approximately

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Amherst Reusens - Factsheet V6 · 2020. 8. 6. · CENTRAL VIRGINIA TRANSMISSION RELIABILITY PROJECT AMHERST ˜ REUSENS The Amherst–Reusens phase includes: • Rebuilding approximately

CENTRAL VIRGINIA TRANSMISSION RELIABILITY PROJECTAMHERST REUSENS

The Amherst–Reusens phase includes:

• Rebuilding approximately 12 miles of

transmission line in or near existing

right-of-way

• Expanding the existing Monroe and

Amherst Substations

The project:

• Provides a new electrical source for the region

• Increases reliability for customers

• Supports the retirement of aging Infrastructure

The rebuild begins in Amherst County at

Amherst Substation located off U.S. Route 60.

The upgrades continue southeast for about

eight miles toward Monroe Substation located

off South Amherst Highway. From there, the

power line continues for four miles, crossing

the James River and ending at Reusens

Substation located off Old Trents Ferry Road

in the city of Lynchburg.

WHAT WHY WHERE

Appalachian Power representatives plan to upgrade the local electric transmission grid in Virginia. The Central Virginia Transmission Reliability Project provides a new electrical source for the region, increases reliability to customers and supports the retirement of aging equipment. The project includes several phases throughout the next few years.

The Amherst–Reusens phase involves rebuilding approximately 12 miles of transmission line and expanding two substations in Amherst County and the city of Lynchburg. Company representatives expect construction for this phase to begin in Fall 2022 and last about a year.

PROJECT SCHEDULE

PROJECT IN SERVICEFall 2023

SCC* FILINGWinter 2020

PROPOSED ROUTESeptember 2020

DATA GATHERING BEGANFall 2019

Note: Timeline subject to change.Note: Timeline subject to change.

PROJECT ANNOUNCEMENT ANDVIRTUAL OPEN HOUSEAugust 2020

2019 2020 2022 20232021 2024

REBUILD CONSTRUCTION BEGINSFall 2022

*SCC: Virginia State Corporation Commission*SCC: Virginia State Corporation Commission

Page 2: Amherst Reusens - Factsheet V6 · 2020. 8. 6. · CENTRAL VIRGINIA TRANSMISSION RELIABILITY PROJECT AMHERST ˜ REUSENS The Amherst–Reusens phase includes: • Rebuilding approximately

29BUS

501BUS

685

675

130

657

663

29

29

659

739

60

S AMHERST HWY

S AMHERST HWY

TRENTSTRENTS

OLD

TREN

TS

FERR

Y RD

OLD

TREN

TS

FERR

Y RD

FERRY RD

FERRY RD

SWEETBRIARSWEETBRIAR

AMHERSTAMHERST

MADISON HEIGHTSMADISON HEIGHTSLYNCHBURGLYNCHBURG

BRANDYWINEBRANDYWINE

MONROEMONROE

AMHERST COUNTYAMHERST COUNTY

AMHERST COUNTYAMHERST COUNTY

BEDFORDCOUNTY

BEDFORDCOUNTY

APPOMATTOX COUNTYAPPOMATTOX COUNTY

JAMES RIVER

JAMES RIVER

JAMES RIVER

JAMES RIVER

MONROESUBSTATION

REUSENSSUBSTATION

WALTON PARKSUBSTATION

AMHERSTSUBSTATION

AMHERST REUSENS

SUBSTATION TO BE EXPANDEDEXISTING TRANSMISSION LINE

EXISTING TRANSMISSION LINE TO BE REBUILT EXISTING SUBSTATION

APPALACHIAN POWER VALUES YOUR INPUT ABOUT THIS PROJECT. PLEASE SEND COMMENTS AND QUESTIONS TO:

*Exact structure, height and right-of-way requirements may vary

08/03/202008/03/2020

Crews plan to replace the existing wood, H-frame structures with steel, H-frame or three-pole structures. Proposed structures vary depending on the location.

Proposed Structure Height: Approximately 65-85 feet*Right-of-Way Width: Approximately 100 feet*

TYPICAL STRUCTURES

CORTNEY MUSTARDProject Outreach [email protected]/CVTRP

THREE-POLE STRUCTURE H-FRAME