Page 1: Amendment in EC Condition of Kharai Harudi Mining Project (ML …environmentclearance.nic.in/writereaddata/modification/... · 2015. 1. 13. · along with distance in kms. Nearest
Page 2: Amendment in EC Condition of Kharai Harudi Mining Project (ML …environmentclearance.nic.in/writereaddata/modification/... · 2015. 1. 13. · along with distance in kms. Nearest

Amendment in EC Condition of Kharai Harudi Mining Project (ML Area: 2831.61 ha)

At Villages: Kharai, Jadva, Vaghapadhar & Harudi, Tehsil: Lakhpat & Abdasa, District: Kachchh (Gujarat)

Form – 1

M/s. UltraTech Cement Ltd. 1

(Unit: Sewagram Cement Works)

FORM-1

(I) Basic Information

S.

No.

Item Details

1 Name of the project/s Amendment in EC Condition of Kharai Harudi

Mining Project (ML Area: 2831.61 ha) at Villages:

Kharai, Jadva, Vaghapadhar & Harudi, Tehsil: Lakhpat

& Abdasa, District: Kachchh (Gujarat)

2 S. No. in the schedule As per EIA Notification dated 14th September 2006, as

amended from time to time, this project falls under

S.No. 1, Category “A”, Project or Activity 1(a) – (3)

3 Proposed capacity/area/length/tonnage

handled/command area/lease/number of

wells to be drilled

Existing Capacity: 6.8 MTPA

ML Area: 2831.61 ha

This is an existing mine and amendment is proposed

in EC Condition only.

4 New/Expansion /Modernization The proposal is for amendment in specific condition

stipulated in Environmental clearance granted by

MoEF, New Delhi for the project vide their letter No. J-

11015/390/ 2008-IA.II (M) dated 22nd February,

2011 & letter dated 22nd August, 2014.

5 Existing Capacity /Area etc. � ML area: 2831.61 ha

� Limestone Production: 6.8 MTPA

6 Category of Project i.e.' A' or 'B' ‘A’

7 Does it attract the general condition? If

yes, please specify.

Yes, Narayan Sarovar Wildlife Sanctuary is located at

a distance of 4.80 Km from Mine Lease area.

8 Does it attract the specific condition? If

yes, please specify.

No

9 Location -

Plot/Survey/Khasra No Khasra Details enclosed as Annexure-1

Villages Kharai, Jadva, Vaghapadhar and Harudi

Tehsil Lakhpat and Abdasa

District Kutch

State Gujarat

10 Nearest railway station/airport along with

distance in kms

� Nearest Railway Station: Bhuj railway station,

approx 99 km in SE direction from mine site.

� Nearest Airport – Bhuj Airport, approx 99 km in

SE direction from mine site.

11 Nearest Town, city, District Headquarters � Nearest Town: Lakhpat (~30 km in NE direction).

Page 3: Amendment in EC Condition of Kharai Harudi Mining Project (ML …environmentclearance.nic.in/writereaddata/modification/... · 2015. 1. 13. · along with distance in kms. Nearest

Amendment in EC Condition of Kharai Harudi Mining Project (ML Area: 2831.61 ha)

At Villages: Kharai, Jadva, Vaghapadhar & Harudi, Tehsil: Lakhpat & Abdasa, District: Kachchh (Gujarat)

Form – 1

M/s. UltraTech Cement Ltd. 2

(Unit: Sewagram Cement Works)

along with distance in kms. � Nearest City & District Headquarters: Bhuj (~99

Km in SE direction).

12 Village Panchayats Zilla Parishad,

Municipal Corporation, Local body

(complete postal addresses with

telephone nos. to be given)

� Village Kharai & Jadva Gram Panchayat, Jadva,

Tehsil-Lakhpat, District-Kutch, Gujarat.

� Village Harudi, Gram Panchayat, Baranda, Tehsil-

Lakhpat, District-Kutch, Gujarat.

� Village Vaghapadhar, Gram Panchayat, Fulray,

Tehsil-Abdasa, District-Kutch, Gujarat.

13 Name of the applicant M/s UltraTech Cement Limited (Unit : Sewagram

Cement Works)

14 Registered Address M/s UltraTech Cement Ltd, Ahura Centre, 1st floor,

‘A’ wing , Mahakali caves road, Andheri (E), Mumbai-

400 093

15 Address for correspondence Project Proponent EIA Consultant

Name Dr. K.V Reddy Shri B.R Taneja

Designation (Owner/ Partner/ CEO) Vice President &

Corporate Head

(Environment)

COO

Address ‘A’ wing, 1st floor, Ahura

Centre, Mahakali Caves

Road, Andheri-East

(Mumbai)

J. M. EnviroNet Pvt. Ltd.

1st & 2nd Floor, S.C.O.-16,

Sector- 10 A, Gurgaon

(Haryana)

Pin Code 400 093 122 001

E-mail kvijender.reddy@adityabi

rla.com

[email protected]

Telephone No 08424048990/ 022-

66917601

0124 – 3206559/

0124 – 4141029

Fax No 022-28244970 0124 – 4141029

16 Details of Alternative Sites examined, if

any. Location of these sites should be

shown on a toposheet.

This project involves site specific activity. Therefore,

no alternative site has been considered.

17 Interlinked Projects Integrated Cement Plant at village Vayur, Tehsil

Abdasa, District Kutch, Gujarat.

18 Whether separate application of

interlinked project has been submitted?

Existing EC letter No J-11011/398/2007-IA II (I)

dated 1st /4th August, 2008 and letter dated 15th

April, 2011 & 5th September, 2014

19 If yes, date of submission Existing EC letter No J-11011/398/2007-IA II (I)

Page 4: Amendment in EC Condition of Kharai Harudi Mining Project (ML …environmentclearance.nic.in/writereaddata/modification/... · 2015. 1. 13. · along with distance in kms. Nearest

Amendment in EC Condition of Kharai Harudi Mining Project (ML Area: 2831.61 ha)

At Villages: Kharai, Jadva, Vaghapadhar & Harudi, Tehsil: Lakhpat & Abdasa, District: Kachchh (Gujarat)

Form – 1

M/s. UltraTech Cement Ltd. 3

(Unit: Sewagram Cement Works)

dated 1st /4th August, 2008 and letter dated 15th

April, 2011 & 5th September, 2014

20 If no, reason -

21 Whether the proposal involves approval/

clearance under: if yes, details of the same

and their status to be given.

(a) The Forest (Conservation) Act 1980?

(b) The Wildlife (Protection) Act 1972?

(c) The C.R.Z Notification. 1991?

� No Forest Land is involved within the mining lease

area.

� Wildlife clearance issued by Chief Wildlife Warden

vide their letter no WLP/32/B/972-76/2013-14

Dated 08.05.2013. (Copy enclosed as Annexure-2).

� The project does not fall in the CRZ Area.

22 Whether there is any Government Order/

Policy relevant/ relating to the site?

No

23 Forest land involved (hectares) Nil

24 Whether there is any litigation pending

against the project and/ or land in which

the project is proposed to be set-up.

(a) Name of the Court

(b) Case No

(c) Orders/ Directions of the court, If any

and its relevance with the proposed

project

No

(II) Activity

1. Construction, operation or decommissioning of the Project involving actions, which

will cause physical changes in the locality (topography, land use, changes in water

bodies, etc.)

S. No Information/Checklist

confirmation

Yes/

No

Details thereof (with approximate

quantities/rates, wherever possible) with

source of information data

1.1 Permanent or temporary

change in land use, land

cover or topography

including increase in

intensity of land use (with

respect to local land

use plan)

Yes Total mining lease area is 2831.61 ha which

comprises of Government waste land (2649.39

ha) and Private agricultural land (182.22 ha).

Topography of the area is flat with minor

undulations.

At the conceptual stage, out of total ML Area

2831.61 ha, the excavated area due to mining

activity will be converted into water reservoir.

Green belt is being developed along the periphery

of the lease. 26 ha area is kept for mineral storage,

Page 5: Amendment in EC Condition of Kharai Harudi Mining Project (ML …environmentclearance.nic.in/writereaddata/modification/... · 2015. 1. 13. · along with distance in kms. Nearest

Amendment in EC Condition of Kharai Harudi Mining Project (ML Area: 2831.61 ha)

At Villages: Kharai, Jadva, Vaghapadhar & Harudi, Tehsil: Lakhpat & Abdasa, District: Kachchh (Gujarat)

Form – 1

M/s. UltraTech Cement Ltd. 4

(Unit: Sewagram Cement Works)

S. No Information/Checklist

confirmation

Yes/

No

Details thereof (with approximate

quantities/rates, wherever possible) with

source of information data

0.02 ha area under infrastructure and 1.40 ha area

under roads.

1.2 Clearance of existing land,

vegetation and buildings? No

No clearance of existing land vegetation and

buildings is required.

1.3 Creation of new land uses? Yes At the conceptual stage, out of total ML Area

2831.61 ha, the excavated area due to mining

activity will be converted into water reservoir.

Green belt is being developed along the periphery

of the lease. 26 ha area is kept for mineral storage,

0.02 ha area under infrastructure and 1.40 ha area

under roads.

1.4 Pre-construction investigations e.g.

bore houses, soil testing?

No Pre-construction investigations have already been

carried out and found satisfactory.

1.5 Construction works? No No additional construction works is proposed.

Existing infrastructure will be used. No new

building will be constructed. This is a case of

Amendment in EC condition only.

1.6 Demolition works? No No demolition works will be there.

1.7 Temporary sites used for

construction works or housing of

construction workers?

No

No temporary sites will be used for construction

works or housing of construction workers;

Facilities already exist within the mining lease

which are being used. This is a case of

Amendment in EC condition only.

1.8 Above ground buildings, structures

or earthworks including linear

structures, cut and fill or

excavations.

Yes Excavation during mining operation is being

carried out as per approved mining plan. Voids

are formed by excavation of mineral.

1.9 Underground works including

mining or tunneling?

No This is an opencast mine. No Underground works

including mining or tunneling required.

1.10 Reclamation works? Yes Reclamation work will be carried out as per

approved mining plan.

At the conceptual stage, out of total ML Area

2831.61 ha, the excavated area due to mining

activity will be converted into water reservoir.

Page 6: Amendment in EC Condition of Kharai Harudi Mining Project (ML …environmentclearance.nic.in/writereaddata/modification/... · 2015. 1. 13. · along with distance in kms. Nearest

Amendment in EC Condition of Kharai Harudi Mining Project (ML Area: 2831.61 ha)

At Villages: Kharai, Jadva, Vaghapadhar & Harudi, Tehsil: Lakhpat & Abdasa, District: Kachchh (Gujarat)

Form – 1

M/s. UltraTech Cement Ltd. 5

(Unit: Sewagram Cement Works)

S. No Information/Checklist

confirmation

Yes/

No

Details thereof (with approximate

quantities/rates, wherever possible) with

source of information data

Green belt is being developed along the periphery

of the lease. 26 ha area is kept for mineral storage,

0.02 ha area under infrastructure and 1.40 ha area

under roads.

1.11 Dredging? No There will be no dredging.

1.12 Offshore structures? No There are no offshore structures.

1.13 Production and manufacturing

processes?

Yes The mining is opencast by mechanized method

using surface miners without involving drilling &

blasting. Loader – Dumper combination is used in

loading. Limestone is transported from mining

face to captive cement plant by trucks & dumpers.

1.14 Facilities for storage of goods or

materials?

Yes Facilities for storage of goods and materials are

already available.

1.15 Facilities for treatment or

disposal of solid waste or liquid

effluents?

No No topsoil & overburden is envisaged during

mining operations. No wastewater is being

generated during mining operations.

1.16 Facilities for long term housing of

operational workers?

No Township is not proposed. Township for both

skilled and unskilled workers had been

constructed earlier for its integrated cement

plant.

1.17 New road, rail or sea traffic during

construction or operation?

No No new road, rail or sea traffic during construction

or operation.

1.18 New road, rail, air waterborne or

other transport infrastructure

including new or altered routes

and stations, ports, airports etc.?

No No new road, rail, air, waterborne or other

transport infrastructure including new or altered

routes and stations, ports, airports etc.

1.19 Closure or diversion of existing

transport routes or infrastructure

leading to changes in traffic

movements?

No No closure or diversion of existing transport

routes or infrastructure leading to changes in

traffic movements.

1.20 New or diverted transmission

lines or pipelines?

No No new or diverted transmission lines or pipelines

will be there.

1.21 Impoundment, damming, No No impoundment, damming, culverting,

Page 7: Amendment in EC Condition of Kharai Harudi Mining Project (ML …environmentclearance.nic.in/writereaddata/modification/... · 2015. 1. 13. · along with distance in kms. Nearest

Amendment in EC Condition of Kharai Harudi Mining Project (ML Area: 2831.61 ha)

At Villages: Kharai, Jadva, Vaghapadhar & Harudi, Tehsil: Lakhpat & Abdasa, District: Kachchh (Gujarat)

Form – 1

M/s. UltraTech Cement Ltd. 6

(Unit: Sewagram Cement Works)

S. No Information/Checklist

confirmation

Yes/

No

Details thereof (with approximate

quantities/rates, wherever possible) with

source of information data

culverting, realignment or other

changes to the hydrology of

watercourses or aquifers?

realignment or other changes to the hydrology of

watercourses or aquifers.

1.22 Stream crossings? Yes There are three seasonal drains in the western

portion of the lease area and one seasonal drain in

the eastern portion of the lease area. Appropriate

width barrier from the streams is left which is

being afforested. No modification/ diversion in

existing natural drainage pattern at any stage is

envisaged.

1.23 Abstraction or transfers of water

from ground or surface waters?

Yes Total water requirement of the project 204 KLD

sourced from its existing Desalination Plant.

1.24 Changes in water bodies or the

land surface affecting drainage or

run-off?

Yes There are three seasonal drains in the western

portion of the lease area and one seasonal drain in

the eastern portion of the lease area. No

modification/ diversion in existing natural

drainage pattern at any stage is envisaged. There

will be no changes in water bodies or the land

surface affecting drainage or run-off.

Appropriate width barrier from the water bodies

has been demarcated as “No Mining Zone” which

is being afforested.

1.25 Transport of personnel or

materials for construction,

operation or decommissioning?

Yes Limestone is transported from mining face to

captive cement plant by trucks & dumpers

through existing exclusive company’s road.

Staff vehicles are being provided to far away

commuters.

1.26 Long-term dismantling or

decommissioning or restoration

works?

No No long-term dismantling or decommissioning or

restoration works is required.

Greenbelt is being developed within the mining

lease area and along the boundary, which will

contribute in increasing the aesthetic beauty and

in reduction of pollution.

Page 8: Amendment in EC Condition of Kharai Harudi Mining Project (ML …environmentclearance.nic.in/writereaddata/modification/... · 2015. 1. 13. · along with distance in kms. Nearest

Amendment in EC Condition of Kharai Harudi Mining Project (ML Area: 2831.61 ha)

At Villages: Kharai, Jadva, Vaghapadhar & Harudi, Tehsil: Lakhpat & Abdasa, District: Kachchh (Gujarat)

Form – 1

M/s. UltraTech Cement Ltd. 7

(Unit: Sewagram Cement Works)

S. No Information/Checklist

confirmation

Yes/

No

Details thereof (with approximate

quantities/rates, wherever possible) with

source of information data

1.27 Ongoing activity during

decommissioning which could

have an impact on the

environment?

No There will be no impact on the environment due

to ongoing activity during decommissioning. This

is a case of Amendment in EC condition only.

1.28 Influx of people to an area in

either temporarily or

permanently?

Yes Temporary influx of people is there in the area.

1.29 Introduction of alien species? No There is no possible source for transportation of

vegetation by transport of material as excavated

limestone is being/ will only be transported

locally and dispatched to captive cement plant

located in nearby area. Plantation is being done as

per guidance of CPCB.

Every effort is being made to prevent inadvertent

entry of alien species through trucks, vehicles etc.

1.30 Loss of native species or genetic

diversity?

No Loss of native species or genetic diversity will not

be there as the project site is devoid of plantation

except small bushes.

1.31 Any other actions? No Nil.

2. Use of Natural resources for construction or operation of the Project (such as land, water,

materials or energy, especially any resources which are non-renewable or in short

supply):

S. No. Information/checklist

confirmation

Yes/

No

Details thereof (with approximate

quantities/rates, wherever possible) with

source of information data

2.1 Land especially undeveloped or

agricultural land (ha)

Yes The present land use of the ML area is as follows:

Type of Land Area (ha)

Private Agricultural Land 182.22

Government Waste Land 2649.39

Total 2831.61

No forest land is involved.

2.2 Water (expected source & competing users) unit: KLD.

Yes Total water requirement for the mining project is 204 KLD sourced from existing desalination plant.

This is a case of Amendment in EC condition, therefore no additional water requirement is

Page 9: Amendment in EC Condition of Kharai Harudi Mining Project (ML …environmentclearance.nic.in/writereaddata/modification/... · 2015. 1. 13. · along with distance in kms. Nearest

Amendment in EC Condition of Kharai Harudi Mining Project (ML Area: 2831.61 ha)

At Villages: Kharai, Jadva, Vaghapadhar & Harudi, Tehsil: Lakhpat & Abdasa, District: Kachchh (Gujarat)

Form – 1

M/s. UltraTech Cement Ltd. 8

(Unit: Sewagram Cement Works)

proposed.

2.3 Minerals (MT) No There is no requirement of mineral inputs as raw material for mining of limestone.

2.4 Construction material – stone, aggregates, sand/soil (expected

source – MT)

No No construction material required in mining of limestone.

2.5 Forests and timber (source – MT) No Not required

2.6 Energy including electricity and

fuels (source, competing users)

Unit: fuel (MT), energy (MW)

Yes Power requirement is sourced from captive

power plant. Diesel is required for operation of

mining machineries.

2.7 Any other natural resources (use appropriate standard units)

No None.

3. Use, storage, transport, handling or production of substances or materials, which could

be harmful to human health or the environment or raise concerns about actual or

perceived risks to human health.

S. No Information/Checklist

confirmation

Yes

/No

Details thereof (with approximate

quantities/rates, wherever possible)

with source of information data

3.1 Use of substances or materials, which are hazardous (as per

MSIHC rules) to human health or

the environment (flora, fauna, and

water supplies)

No No substances or materials will be used, which are hazardous to human health or the environment.

Safety will be ensured.

3.2 Changes in occurrence of disease

or affect disease vectors (e.g. insect or water borne diseases)

No This is a case of amendment in EC condition only,

therefore, no effect is envisaged

3.3 Affect the welfare of people e.g. by changing living conditions?

Yes The project provides direct employment opportunities for local people & indirect

employment will be generated due to mining activities.

The company has developed and will continue to do so in future, basic infrastructure and facilities

like roads, transportation, post-offices, primary

schools etc in nearby areas under CSR leading to an overall positive impact on the socio-economy

of the people.

3.4 Vulnerable groups of people who

could be affected by the project e.g. hospital patients, children,

the elderly etc.,

No Not envisaged

3.5 Any other causes No -

4. Production of solid wastes during construction or operation or decommissioning

(MT/month)

S. Information/Checklist Yes Details thereof (with approximate

Page 10: Amendment in EC Condition of Kharai Harudi Mining Project (ML …environmentclearance.nic.in/writereaddata/modification/... · 2015. 1. 13. · along with distance in kms. Nearest

Amendment in EC Condition of Kharai Harudi Mining Project (ML Area: 2831.61 ha)

At Villages: Kharai, Jadva, Vaghapadhar & Harudi, Tehsil: Lakhpat & Abdasa, District: Kachchh (Gujarat)

Form – 1

M/s. UltraTech Cement Ltd. 9

(Unit: Sewagram Cement Works)

No confirmation /No quantities/rates, wherever possible) with

source of information data

4.1 Spoil, overburden or mine wastes No No OB and topsoil will be generated during

mining activity.

4.2 Municipal waste (domestic and or

commercial wastes)

Yes It is generated only from the mines office &

canteen, which is being/ will be disposed off

suitably by composting/land filling.

4.3 Hazardous wastes (as per Hazardous Waste Management

Rules)

No No hazardous wastes will be generated due to the mining project.

4.4 Other industrial process wastes No There will be no other industrial process waste

generation.

4.5 Surplus product No Not Envisaged

4.6 Sewage sludge or other sludge from

effluent treatment

No Not Envisaged

4.7 Construction or demolition wastes No No construction work.

4.8 Redundant machinery/ equipment No There will be no redundant machinery or

equipment.

4.9 Contaminated soils or other

materials

No This is a case of amendment in EC condition only.

No contamination of soil or any other materials as

adequate precautions taken to control air and

water pollution.

4.10 Agricultural wastes No There will not be any agricultural waste.

4.11 Other solid wastes No None.

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

S.

No

Information/Checklist

confirmation

Yes/

No

Details thereof (with approximate Quantities /

rates, wherever possible) with source of

information data

5.1 Emissions from combustion of fossil

fuels from stationary or mobile sources

Yes Vehicular emission is kept under control by

proper maintenance and by regular monitoring of fuel and oil consumption. Every effort is being/

will be made to minimize emissions.

5.2 Emissions from production process Yes Particulate Matter is emitted during excavation and kept below the prescribed limits by adopting

suitable mitigating measures. Water sprinkling on

haul roads and at loading faces is being /will be

done.

5.3 Emissions from materials handling

including storage or transport

Yes The loading of excavated material and

transportation emit some amount of pollutants.

Proper maintenance of HEMMs will help reduce such emissions. The fugitive emission on haul

road is suppressed by water spray.

5.4 Emissions from construction activity including plant& equipment

No No new construction work will come in the existing mine as this is a case of amendment in EC

Page 11: Amendment in EC Condition of Kharai Harudi Mining Project (ML …environmentclearance.nic.in/writereaddata/modification/... · 2015. 1. 13. · along with distance in kms. Nearest

Amendment in EC Condition of Kharai Harudi Mining Project (ML Area: 2831.61 ha)

At Villages: Kharai, Jadva, Vaghapadhar & Harudi, Tehsil: Lakhpat & Abdasa, District: Kachchh (Gujarat)

Form – 1

M/s. UltraTech Cement Ltd. 10

(Unit: Sewagram Cement Works)

condition.

5.5 Dust or odors from handling of materials including construction

materials, sewage and waste

Yes Dust is generated during excavation and loading/unloading. Dust suppression is done by

sprinkling of water.

5.6 Emission from incineration of waste No Incineration activity is not involved in the project.

5.7 Emissions from burning of waste in

open air (e.g. slash materials,

construction debris)

No There is no burning of waste in open air.

5.8 Emissions from any other sources No There will be no emissions from any other sources.

6. Generation of Noise and Vibration and Emissions of Light and heat:

S. No Information/Checklist

confirmation

Yes/

No

Details thereof (with approximate

quantities/rates, wherever possible) with

source of information data with source of

information data

6.1 From operation of equipment e.g. engines, ventilation plant, crushers

Yes Noise is generated due to mining activities during excavation, loading & transportation. Proper noise

abatement measures will be taken to keep noise level within the prescribed limit by CPCB.

Proper selection of machines and their maintenance leads to less noise generation.

Greenbelt will be developed which provides barrier to propagation of noise outside the area.

6.2 From industrial or similar process No There is no generation of noise from any other industrial process.

6.3 From construction or demolition No Not applicable, as no construction or demolition is proposed as this is a case of amendment in EC

condition.

6.4 From blasting or piling No There will be no blasting and hence no generation

of ground vibrations as mining will be done with the help of Surface miner. Noise will be generated

during excavation, loading & transport.

Plantation all around the mining area as noise

barrier will minimize propagation of noise.

Workers working in close vicinity of machines will

be provided with personal protective equipment

etc.

6.5 From construction or operational traffic

Yes There will be some noise due to movement of trucks/dumpers/excavator. Operation of

machinery will generate the noise. It is an intermittent/slow process. AC cabins have been

provided in all the equipment with very less noise inside the cabin.

6.6 From lighting or cooling systems No Not envisaged

6.7 From any other sources No Not envisaged

Page 12: Amendment in EC Condition of Kharai Harudi Mining Project (ML …environmentclearance.nic.in/writereaddata/modification/... · 2015. 1. 13. · along with distance in kms. Nearest

Amendment in EC Condition of Kharai Harudi Mining Project (ML Area: 2831.61 ha)

At Villages: Kharai, Jadva, Vaghapadhar & Harudi, Tehsil: Lakhpat & Abdasa, District: Kachchh (Gujarat)

Form – 1

M/s. UltraTech Cement Ltd. 11

(Unit: Sewagram Cement Works)

7. Risks of contamination of land or water from releases of pollutants into the ground or

into sewers, surface waters, groundwater, coastal waters or the sea:

S. No Information/Checklist

confirmation

Yes/

No

Details thereof (with approximate

quantities/rates, wherever possible) with

source of information data

7.1 From handling, storage, use or spillage of hazardous materials

No No use/handling of hazardous material takes place except periodical oil change which will be

handled in closed containers. Spillage of

Oil/Grease during maintenance of heavy vehicles

is controlled by using collection tray etc. Care is

taken during its use for lubrication of equipment,

so that nothing falls on ground to contaminate

soil. Equipments are being / will be kept well

maintained to keep them leakage free.

7.2 From discharge of sewage or other effluents to water or the land

(expected mode and place of discharge).

No Zero discharge principle is followed. Waste water from office toilets will be disposed off in soak pit

via septic tank.

7.3 By deposition of pollutants emitted

to air into the land or into water.

Yes Dust is generated by movement of machinery &

mining operations, excavation, loading and

unloading. There is likelihood of increase of PM concentration (which may affect surrounding land

or water).

Impact referred above is localized, transitory and

intermittent in nature, and hence their effect on

environment is insignificant. Dust generation on

the haulage roads will be suppressed by water

spray.

7.4 From any other sources. No Not envisaged

7.5 Is there a risk of long term build up

of pollutants in the environment from these sources?

No Impact on air quality is localized, transitory and

intermittent in nature. No likely impact on surface water is envisaged.

8. Risk of accidents during construction or operation of the Project, which

could affect human health or the environment

S. No Information/Checklist

confirmation

Yes/

No

Details thereof (with approximate

quantities/rates, wherever possible) with

source of information data

8.1 From explosions, spillages, fires etc from storage, handling, use or

production of hazardous substances

No No explosive will be used. Possibility of accident on account of explosion, spillages, fire or

hazardous substances etc is very less. Proper

maintenance, operation and leakage proof

condition of machinery eliminates possibilities of

fire. All the safety precautions will be taken.

8.2 From any other causes No Not envisaged.

8.3 Could the project be affected by

natural disasters causing

environmental damage (e.g. floods,

Yes The project falls under Seismic Zone- V.

Page 13: Amendment in EC Condition of Kharai Harudi Mining Project (ML …environmentclearance.nic.in/writereaddata/modification/... · 2015. 1. 13. · along with distance in kms. Nearest

Amendment in EC Condition of Kharai Harudi Mining Project (ML Area: 2831.61 ha)

At Villages: Kharai, Jadva, Vaghapadhar & Harudi, Tehsil: Lakhpat & Abdasa, District: Kachchh (Gujarat)

Form – 1

M/s. UltraTech Cement Ltd. 12

(Unit: Sewagram Cement Works)

earthquakes, landslides, cloudburst

etc)?

9. Factors which should be considered (such as consequential development) which could

lead to environmental effects or the potential for cumulative impacts with other existing

or planned activities in the locality

S.

No.

Information/Checklist

confirmation

Yes/

No

Details thereof (with approximate

quantities/rates, wherever possible) with

source of information data

9.1 Lead to development of supporting facilities, ancillary development or

development stimulated by the

project which

could have impact on the environment e.g.:

• Supporting infrastructure

(roads, power supply, waste or

waste water treatment, etc.)

• Housing development

• Extractive industries

• Supply industries

• Other

No Residential facilities provided to the staff in township within captive cement plant. There will

not be any impact on existing housing facilities of

surrounding villages. Power supply will be

available from Captive power plant. Waste water

is treated in township STP. Local people are

preferred for employment. This contributes in

raising the socio-economic status and standard of

living of the nearby villagers.

And no adverse effect on environment and supporting infrastructure is envisaged as the

project is an established one with its own arrangements. Therefore there will be no negative

impact on existing infrastructure of surrounding community.

9.2 Lead to after-use of the site, which could have an impact on the

environment

Yes The after use of site planned would be helpful to the society, owing to better greenery and

development of water reservoir supporting the

surrounding localities.

9.3 Set a precedent for later developments

Yes A better after use scenario, which is likely to increase aesthetic beauty of the area in addition to

benefit of greenery and water reservoir, would set precedence for subsequent entrepreneurs who

venture such projects.

9.4 Have cumulative effects due to

proximity to other existing or planned projects with similar

effects

No No cumulative effect is envisaged.

Some other mining leases are near to this lease but the impact of the project will be limited to M.L

Area.

(II) Environmental Sensitivity

S.

No

Areas Name/

Identity

Aerial distance (within 15

km.)

Proposed project location

boundary

1 Areas protected under international conventions, national or local legislation for

their ecological, landscape, cultural or other related value

Narayan Sarovar

Wildlife

Sanctuary

~4.80 km in NNE direction (as per Wildlife Clearance letter no

WLP/32/B/972-76/2013-14 Dated 08.05.2013)

Page 14: Amendment in EC Condition of Kharai Harudi Mining Project (ML …environmentclearance.nic.in/writereaddata/modification/... · 2015. 1. 13. · along with distance in kms. Nearest

Amendment in EC Condition of Kharai Harudi Mining Project (ML Area: 2831.61 ha)

At Villages: Kharai, Jadva, Vaghapadhar & Harudi, Tehsil: Lakhpat & Abdasa, District: Kachchh (Gujarat)

Form – 1

M/s. UltraTech Cement Ltd. 13

(Unit: Sewagram Cement Works)

2 Areas which are important or sensitive for

ecological reasons - Wetlands, watercourses

or other water bodies, coastal zone,

biospheres, mountains, forests

Narayan Sarovar

Wildlife

Sanctuary

~4.80 km in NNE direction (as

per Wildlife Clearance letter no

WLP/32/B/972-76/2013-14

Dated 08.05.2013)

Reserved Forests

� Harudi R.F.

� Maniyara R.F

� Ratipur R.F.

� Mindhari RF

Water Bodies

� Kasadwali Nadi

� Bhalyawal Talav

� Rakhadi Nadi

� Barkhan Nadi

� Golay Nadi

� Berwari Nadi

� Khari Nadi

� Kakdi Nadi

3 Areas used by protected, important or sensitive species of flora or fauna for

breeding, nesting, foraging, resting, over

wintering, migration

No No such area is located within 15 km radius area

4 Inland, coastal, marine or underground waters.

No Not any within 15 km radius

area.

5 State, National boundaries. No Not any within 15 km radius

area.

6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim

areas.

National Highway - 8A

National highway -8A passing through lease area.

7 Defence installations. None No such area is located within

15 km radius area.

8 Densely populated or built-up area. None No such area is located within

15 km radius area

9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship,

community facilities).

Yes There are primary schools, dispensaries, small hospitals,

places of worship within 15 km from the project site. No

dislocation or demolition is proposed. Adequate mitigation

measures will be taken to

ensure safety.

10 Areas containing important, high quality or scarce resources

None No such area is located within 15 km radius area

Page 15: Amendment in EC Condition of Kharai Harudi Mining Project (ML …environmentclearance.nic.in/writereaddata/modification/... · 2015. 1. 13. · along with distance in kms. Nearest

Amendment in EC Condition of Kharai Harudi Mining Project (ML Area: 2831.61 ha)

At Villages: Kharai, Jadva, Vaghapadhar & Harudi, Tehsil: Lakhpat & Abdasa, District: Kachchh (Gujarat)

Form – 1

M/s. UltraTech Cement Ltd. 14

(Unit: Sewagram Cement Works)

(Ground water resources, surface resources,

forestry, agriculture, fisheries, tourism,

minerals).

11 Areas already subjected to pollution or environmental damage. (Those where existing

legal environmental standards are exceeded).

None No such area is located within 15 km radius area

12 Areas susceptible to natural hazard which

could cause the project to present

environmental problems

(Earthquakes, subsidence, landslides, erosion,

flooding or extreme or adverse climatic

conditions).

Zone- V The area falls under seismic

Zone- V and is earthquake

prone but as there would not

be any high rise buildings

within the ML Area, no adverse impact is envisaged.

(III) Proposed Terms of Reference for EIA studies

This proposal is for amendment in specific condition, as reproduced below, stipulated in

Environmental Clearance granted by MoEF, New Delhi for the project vide their letter No. J-

11015/390/2008-IA.II ((M) dated 22nd February, 2011 & letter dated 22nd August, 2014, and

change in name of project proponent to M/s. UltraTech Cement Ltd. (Unit: Sewagram Cement

Works).

A. Specific Conditions

(xx):- “No Transportation of ore outside the mine lease area shall be carried out

after sunset.”

The company wishes to propose transportation of ore after sunset hours from the Mining lease

area 2831.61 ha.

All the other Environmental Safeguards/ the terms and conditions as stipulated in the

Environmental Clearance will be complied with by UTCL. Therefore, no Terms of Reference are

proposed.

Page 16: Amendment in EC Condition of Kharai Harudi Mining Project (ML …environmentclearance.nic.in/writereaddata/modification/... · 2015. 1. 13. · along with distance in kms. Nearest

Annexure List of Form-I

S. No.

Annexure Name Annexure No.

1 Khasra Details of M.L Area

I

2 Wildlife Clearance issued by Chief Wildlife Warden vide their

letter no. WLP/32/B/972-76/2013-14 dated 08.05.2013

II

******

Page 17: Amendment in EC Condition of Kharai Harudi Mining Project (ML …environmentclearance.nic.in/writereaddata/modification/... · 2015. 1. 13. · along with distance in kms. Nearest
Page 18: Amendment in EC Condition of Kharai Harudi Mining Project (ML …environmentclearance.nic.in/writereaddata/modification/... · 2015. 1. 13. · along with distance in kms. Nearest
Page 19: Amendment in EC Condition of Kharai Harudi Mining Project (ML …environmentclearance.nic.in/writereaddata/modification/... · 2015. 1. 13. · along with distance in kms. Nearest
Page 20: Amendment in EC Condition of Kharai Harudi Mining Project (ML …environmentclearance.nic.in/writereaddata/modification/... · 2015. 1. 13. · along with distance in kms. Nearest
Page 21: Amendment in EC Condition of Kharai Harudi Mining Project (ML …environmentclearance.nic.in/writereaddata/modification/... · 2015. 1. 13. · along with distance in kms. Nearest
Page 22: Amendment in EC Condition of Kharai Harudi Mining Project (ML …environmentclearance.nic.in/writereaddata/modification/... · 2015. 1. 13. · along with distance in kms. Nearest