AMC Master Thesis
“HOW CAN AMC IMPROVE THE
EFFECTIVENESS OF THE ELECTRONIC
WORKSHOP?”
Mr. Marcelo
Astorquiza.
Astilleros desde 1895
Outline
• Introduction.
• Current Situation.
• Definition of the New Model.
• Software Demonstration.
• Conclusion and Recommendation.
Astilleros desde 1895
Introduction.
What really
is AMC?
New tools of
management.
Where could it
be used?
Who can use
AMC?
How can it be
used inside the
Navy and
Asmar?
Astilleros desde 1895
Introduction.
Asset’s
Effectiveness
Working as a team
Astilleros desde 1895
Introduction.
Astilleros desde 1895
Introduction.
• Main Contractor.
• Chilean Navy Shipyard.
• History between Chilean Navy
and Asmar.
Astilleros desde 1895
Introduction.
“What changes need to be implemented in
the present planning system, in order to
increase the customer’s satisfaction by
improving the Delivery on Time of
maintenance tasks?”
Astilleros desde 1895
Outline
• Introduction.
• Current Situation.
• Definition of the New Model.
• Software Demonstration.
• Conclusion and Recommendation.
Astilleros desde 1895
Current Situation.
Astilleros desde 1895
Current Situation.
Man Power Availability
Astilleros desde 1895
Electronic Workshop
Numbers of OEM training.
Current Situation.
Astilleros desde 1895
Current Situation.
Electronic Workshop Investments
Astilleros desde 1895
Current Situation.
Electronic workshop activities 2011.
Astilleros desde 1895
Current Situation.
Internal and external
effect of delivering
assigned tasks
delayed
Increase
customer
dissatisfaction
Loss of
customer
loyalty
Increase the
cost of
maintenance
activities
Decrease
Asmar’s profit
Astilleros desde 1895
Current Situation.
Astilleros desde 1895
Outline
• Introduction.
• Current Situation.
• Definition of the New Model.
• Software Demonstration.
• Conclusion and Recommendation.
Astilleros desde 1895
Definition of the New Model.
Astilleros desde 1895
Definition of the New Model.
OBJETIVO:
Instrucciones:
Definiciones Plan de producción
Conocimiento
Planificación
Repuestos
Bancos de prueba y
herramientas
especiales
Recurso humano
Identificación
Nombre
Unidad
Puesto o cargo
Prioridad 1 Prioridad 2 Prioridad 3 Prioridad 4 Prioridad 5
Plan de producción
Conocimiento
Planificación
Repuestos
Bancos de prueba y
herramientas
especiales
Recurso Humano
Otro
Definición de otros
Firma
ENCUESTA DE SATISFACCIÓN A CLIENTE
Establecer y cuantificar los factores que a juicio de los principales clientes del taller de electrónica,
dependiente del Departamento de Sistemas de Armas de Asmar (T), afectan en la entrega de acuerdo a
programa de los distintos trabajos desarrollados por el taller.
Priorizar la ponderación de cada una de las variables indicadas, objeto cuantificar o medir su efecto en los
plazos de entrega de los distintos trabajos solicitados al taller de electrónica, dependiente del
Departamento de Sistemas de Armas de Asmar (T). Se debe tener presente que la prioridad 1 corresponde
a la de mayor repercución, disminuyendo sucesivamente hasta la prioridad 5.
Planificación anual del astillero tendiente a determinar las necesidades mensuales
de cada taller productivo
En terminos de la capacidad y preparación profesional de los técnicos y ingenieros
que materializan los trabjos solicitados en cada uno de los talleres productivos
En términos de la programación de trabajos, estableciendo las fechas de inicio y de
término programado
La disponibilidad de bancos de prueba y herramientas especiales requeridas para la
materialización de los distintos trabajos que al día de hoy han sido solicitados
En términos de la administración y suministros de repuestos.
En terminos de disponibilidad de especialistas para materializar las tareas de
mantenimiento solicitadas
• WEO of FF Condell, T-23 Frigate.
• WEO of FF Riveros, “M” Class Frigate.
• CO of Missile Boat “Chipana”, Saar IV Class.
• CO of Missile Boat “Serrano”, Tiger Class.
• XO SS Carrera, Scorpene Class.
• XO SS Simpson, 209 Class.
• Head of Radar and C4I department of the
Technical Directorate “DIRISNAV.”
• Head of the Submarine Refit project, Repair and
Recovery Directorate “DRUAM”.
Astilleros desde 1895
Definition of the New Model.
Pareto’s Analysis.
“What changes need to be implemented in the present
planning system, in order to increase the customer’s
satisfaction by improving the Delivery on Time of
maintenance tasks?”
Astilleros desde 1895
Definition of the New Model.
Current diagram flow
How does Omega ERP
work nowadays?
Astilleros desde 1895
Definition of the New Model.
Gantt Chart
Astilleros desde 1895
Definition of the New Model.
Mini Malla
Astilleros desde 1895
Definition of the New Model.
Task scheduling
Astilleros desde 1895
Definition of the New Model.
Assigned tasks
Astilleros desde 1895
Definition of the New Model.
Current Weakness.
• The control of the maintenances activities are to task level.
• Omega doesn’t considered the skills of technician .
• Omega doesn’t considered the different phases of each
task as part of the maintenance activities.
Astilleros desde 1895
Definition of the New Model.
NO
YES
Cu
sto
mer
Are
aC
om
erci
al A
rea
Pla
nn
ing
A
rea
Wea
po
n D
epar
tmen
tE
lect
ron
ic W
ork
sho
p
Customer Requirement Submarine Fleets
Technical Directorate
Surface Fleet
Project Manager
Planning Department
NO
YES
Quotationaccepted
Support Technical Office
Electronic Workshop
ERF ESA ECF TCI/ COMM
Good definition scope of the task
YES
NEW SOFTWARE
Definition of tecnician or Engineer according with the Skills
Necessary reestimate the task assigned
NO
Definition in term of availability of the Tecnician or engineer incharge of the task according with the window time execution.
Control of the execution of the maintenace task according with the different phases previously defened.
If the task is not in execution
Astilleros desde 1895
Definition of the New Model.
YES
Ele
ctr
on
ic W
ork
sh
op
Electronic Workshop
ERF ESA ECF TCI/ COMM
NEW SOFTWARE
Definition of tecnician or Engineer according with the Skills
Necessary reestimate the task assigned
NO
Definition in term of availability of the Tecnician or engineer incharge of the task according with the window time execution.
Control of the execution of the maintenace task according with the different phases previously defened.
If the task is not in execution
Astilleros desde 1895
Definition of the New Model.
Improvement of the New Model:
• Control of availability in terms of Skills.
• Control of availability in terms of Time.
• Better control of assigned maintenance task
phases.
• Measure of the Delivery on Time.
Astilleros desde 1895
Outline
• Introduction.
• Current Situation.
• Definition of the New Model.
• Software Demonstration.
• Conclusion and Recommendation.
Astilleros desde 1895
Software Demonstration
Astilleros desde 1895
Software Demonstration
Astilleros desde 1895
Software Demonstration
Astilleros desde 1895
Software Demonstration
Astilleros desde 1895
Software Demonstration
Astilleros desde 1895
Outline
• Introduction.
• Current Situation.
• Definition of the New Model.
• Software Demonstration.
• Conclusion and Recommendation.
Astilleros desde 1895
Conclusion.
The variables includes into the new model allow to develop the
maintenance activities inside of the Electronic Workshop with a
better control, driver the availability of the technician in terms of
time, skills and facilities.
The improvement of the control inside the Electronic Workshop,
will allow improving the planning of the all task that are
assigned to the Electronic Workshop.
The fact of carried out the preventive maintenance according
with the real availability of the technician will allow improving
the customer’s satisfaction.
Astilleros desde 1895
Conclusion.
The measure of the delivery on time, will allow to the manager
using the information obtained as a source of motivation for the
different technician of the Electronic Workshop.
Astilleros desde 1895
Recommendation.
To continue using the software in testing mode in order to
increase their capacity of control.
Develop a new module that allow controlling the spare
requirement versus the technician availability.
Incorporate to this software the other section of the electronic
workshop in order to improve it considering their feedback
Astilleros desde 1895
Recommendation.
Coordinate with the Asmar IT department, once the scope been
achieved, incorporate this application to Omega E.R.P.
Using this software as reference, develop a strong application
using the knowledge of the IT Engineer.
QUESTION?