Alternatives for Willow Creek Flood Mitigation Study Presented by: Anil Tangirala, PE, CFM, ENV SP | ms consultants, inc. June 22, 2016

Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

Embed Size (px)

Citation preview

Page 1: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

Alternatives for Willow Creek Flood Mitigation StudyPresented by:

Anil Tangirala, PE, CFM, ENV SP | ms consultants, inc.

June 22, 2016

Page 2: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

Presentation Overview

• Introduction

• Project Background

• Willow Creek Existing Flooding

• Project Goals

• Hydrologic and Hydraulic Analysis

• Alternatives for Flood Mitigation

• Modeling LID tools in HEC-RAS

• Summary and Conclusions

Page 3: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

Flood Mitigation

• What is Flood Mitigation? Sustained action to

reduce or eliminate long term risk to people and property from flood hazards

• Structural Flood Mitigation Alternatives include: Upsizing culverts

Acquisition/demolition of repetitively flooded structures

Flood storage detention

Structural elevation

Page 4: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

Where is the project?

Page 5: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

What are the goals of this project?

• Reduce Congestions/Improve Safety

• Roadway Widening and Intersection Improvements

• Mitigate Flooding

Page 6: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

What are the goals of this project?

• Reduce Congestions/Improve Safety

• Roadway Widening and Intersection Improvements

• Mitigate Flooding

Page 7: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

What is the scope of the project?

• Phase I – Alternatives Evaluation Conduct existing System Hydrologic and Hydraulic Analysis

Identify Hydraulic Bottlenecks/Pinch Points in the Existing System

Develop Flood Mitigation Alternatives

Develop Planning level Cost Estimates

• Phase II – Detailed Design

• Project funded through federal earmark for transportation and flooding.

Page 8: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

Project Background

Page 9: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

Project Background

Page 10: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

Willow Creek – Just DS of Sheetz Gas Station

Page 11: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

Willow Creek –At Shepherd of the Valley Assisted Living Entrance Drive

Page 12: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

Willow Creek at Sharrott Road

Page 13: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

Willow Creek at Western Reserve Road

Page 14: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

Willow Creek at Private Drive of Apartment Complex

Page 15: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

Willow Creek at Private Drive for Daycare Center

Page 16: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

Willow Creek at Hitchcock Road

Page 17: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

Existing Flooding

Page 18: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

Western Reserve Road near Sharrott Road

June 26, 2015

Flooding

Page 19: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

Flooding on Western Reserve Road

June 23rd, 2015

Flooding

Page 20: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

Flooding Near Metro Park

June 23rd, 2015

Flooding

Page 21: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

June 2015 Rainfall in Youngstown, Ohio

0

0.2

0.4

0.6

0.8

1

1.2

1.4

1.6

1.8

2

1-Jun 4-Jun 7-Jun 10-Jun 13-Jun 16-Jun 19-Jun 22-Jun 25-Jun 28-Jun

PR

EC

IPIT

AT

ION

(IN

CH

ES

)

June 2015 Rainfall Data For Youngstown, Ohio

Historical Average Rainfall (inches) Total Recorded Rainfall (inches)

5yr - 10yr Storm

Event

1yr - 5yr Storm

Event

Page 22: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

Flooding near Market Street

Page 23: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

ODOT SR-7 Hydraulic Study

• Flooding also occurs north of CR 32 along the west side of the SR-7 roadway and within the Antone’s Banquet Centre parking area during moderate to heavy storms.

• Several culvert improvements proposed as part of this study conducted by ODOT.

Page 24: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

ODOT SR-7 Hydraulic Study

Page 25: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

ODOT SR-7 Hydraulic Study

Page 26: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

Existing Conditions Hydrologic Analysis

• Hydrologic Analysis using USACE HEC-HMS

• Sub-basins delineations

• Time of concentrations and curve numbers

• Reach Routing – Muskingum Cunge

• Boundary Conditions – ODOT SR-7 Study

Page 27: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

Drainage Basins

Page 28: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

Existing Hydrologic Analysis Results

Flow Change Location

Peak Discharge (cfs)R

EC

UR

RE

NC

E

Sheetz CMP Shepherd of the

Valley Assisted

Living Entrance

Sharrott

Road

Western

Reserve Road

Private

Drive

(Apartment

Complex)

Private Drive

(Daycare

Center)

Hitchcock

Road

2-YEAR 188.5 191.7 198.5 198.5 208.6 227.3 229.6

5-YEAR 275.4 280.1 289.9 289.9 204.6 334.5 339.1

10-YEAR 342.0 348.0 360.6 360.6 379.5 419.2 426.2

25-YEAR 428.7 436.7 453.3 453.3 487.1 532.3 543.2

50-YEAR 496.8 506.7 526.6 526.6 556.5 622.7 637.0

100-YEAR 564.2 575.9 599.0 599.0 634.3 713.3 731.6

Page 29: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

Existing Conditions Hydraulic Analysis

• Hydraulic Analysis using USACE HEC-RAS

• Cross-section and Channel Geometry

• Roughness- Channel and Overbank Manning’s

• Peak Discharges

• Boundary Conditions- Downstream

Page 30: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

Willow Creek Hydraulics

Page 31: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

Existing Conditions Flood Profiles

Page 32: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

Existing Conditions Level of ServiceCulvert Location Culvert Size and Type Approx. Culvert Opening

Area (Sq. Ft.)

Existing Level of Service

Shepherd of the

Valley Driveway

3 x 6’x4.5’ Elliptical

CMP Culverts

63.63 sq. ft. 2-year Storm Event

Sharrott Road 2 x 48” Circular CMP

Culverts

25.14 sq. ft. <2-year Storm Event

Western Reserve

Road/CR-32

1 x 12’ x 5’ Stone

Abutment Structure

60.00 sq. ft. 2-year storm event

Private Drive Bridge Wooden planks on

Steel I-beam Bridge

40.43 sq. ft. <5-year Storm Event

Private Daycare

Bridge

2 x 5.5’x4’ Elliptical

CMP Culverts

34.56 sq. ft. 2-year Storm Event

Hitchcock Road 14’ Span Slab Bridge 84.06 sq. ft. 100-Year Storm

Event

Page 33: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

Proposed Condition Level of Service Goals

• All water crossings to be mitigated to atleast meet LOS requirements based on Mahoning County Regulation.

• One driveway is a an entrance to a Old Age Home and classifies as a “Critical Facility”

• Higher level of protection planned for the Critical Facility

• Under Executive Order 11988, Floodplain Management, Federal agencies funding and/or permitting critical facilities are required to avoid the 0.2% (500-year) floodplain or protect the facilities to the 0.2% chance flood level.

Page 34: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

Flood Mitigation Alternatives

• Several Alternatives developed and evaluated

• Alternative 1a – Culvert Upgrades

• Alternative 1b – Culvert Upgrades and new Driveway

• Alternative 2 – Diversion

• Alternative 3 - Detention

Page 35: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

Alternative 1a Culvert Upgrades

Page 36: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

Alternative 1a Culvert Upgrades

Culvert Location Existing Culvert Size

and Type

Proposed Culvert Size

and Type

Shepherd of the Valley

Driveway

3 x 6’x4.5’ Elliptical CMP

Culverts

22’x4’ Box Culvert

Sharrott Road 2 x 48” Circular CMP

Culverts

13’x4’ Box Culvert

Western Reserve

Road/CR-32

1 x 12’ x 5’ Stone

Abutment Structure

13’x4’ Box Culvert

Private Drive Bridge Wooden planks on Steel

I-beam Bridge

Remove Bridge and

Extend 13’x4’ Box

Culvert from Western

Reserve Road/CR-32

Private Daycare Bridge 2 x 5.5’x4’ Elliptical CMP

Culverts

12’x5’ Box Culvert

Page 37: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

Alternative 1b Culvert Upgrades & New Driveway

Page 38: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

Alternative 1b Culvert Upgrades

Culvert Location Existing Culvert Size

and Type

Proposed Culvert Size

and Type

Shepherd of the Valley

Driveway

3 x 6’x4.5’ Elliptical

CMP Culverts

22’x4’ Box Culvert

Sharrott Road 2 x 48” Circular CMP

Culverts

13’x4’ Box Culvert

Western Reserve

Road/CR-32

1 x 12’ x 5’ Stone

Abutment Structure

13’x4’ Box Culvert

Private Drive Bridge Wooden planks on Steel

I-beam Bridge

Remove Bridge

Private Daycare Bridge 2 x 5.5’x4’ Elliptical

CMP Culverts

12’x5’ Box Culvert

Page 39: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

Alternative 2 – Diversion

Page 40: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

Modeling LIDs in HEC-RAS

• Pressurized Pipe Flow can be modeled in HEC-RAS

• Steady and Un-Steady Flow

• Diversion pipe can be modeled by using cross-sections to model the bottom and LID to model top of the pipe

• Steady Flow uses standard energy equation and Un-Steady uses Priessman Slot Theory and Water Hammer Equations.

Page 41: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

Modeling LID in HEC-RAS

Page 42: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

Calculation of Transition Losses

Page 43: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

Applications for modeling LIDs in HEC-RAS

• Long Culverts

• Tunnels

• Diversion Pipes/Conduits

• Culverts with bends-Ability to include minor losses.

Page 44: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

Alternative 2 - Diversion

Culvert Location Existing Culvert Size

and Type

Proposed Culvert

Size and Type

Shepherd of the Valley

Driveway

3 x 6’x4.5’ Elliptical

CMP Culverts

22’x4’ Box Culvert

Sharrott Road 2 x 48” Circular CMP

Culverts

11’x4’ Box Culvert

Western Reserve

Road/CR-32

1 x 12’ x 5’ Stone

Abutment Structure

11’x4’ Box Culvert

Page 45: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

Alternative 3 – Detention

Page 46: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

Alternatives Pros & Cons

Alternative Description Advantages Disadvantages

Hydraulic Alternative 1A Replacement of undersized

culverts and extension of

Western Reserve Road

Culvert

• Mitigates Flooding

• No major diversion or

detention

• Will require the

extension of the

Western Reserve

Culvert and

earthwork to cover

the new structure

Hydraulic Alternative 1B Replacement of undersized

culverts and removal of the

Private Drive downstream of

Western Reserve Road

• Mitigates Flooding

• Provides property owner

access from Western

Reserve Road

• Prevents frequent

overtopping of private

bridge

• Restricts access

between property

owners.

Page 47: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

Alternatives Pros & Cons

Alternative Description Advantages Disadvantages

Hydraulic Alternative 2B Replacement of undersized

culverts and diversion from

Sharott Road to the east side

of Hitchcock Road

• Only requires upsizing of

two culverts

• Does not solve the flooding

at the Private Drive

culvert

• Will require the

installation of the new 48”

diversion storm sewer

Hydraulic Alternative 3 Replacement of undersized

culverts and construction of a

detention basin upstream of

the Shepherd of the Valley

culvert

• Reduces peak discharges

downstream of the basin

• Not enough detention, still

requires upgrades

• Significant Environmental

Permitting

Page 48: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

Floodplain Permitting

Page 49: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

Alternatives Opinion of Probable Costs

Alternative Preliminary Costs

Alternative 1A $1,242,600

Alternative 1B $1,118,800

Alternative 2A $1,657,800

Alternative 2B $1,771,500

Alternative 3 $1,526,300

Page 50: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

Conclusions

• Existing System evaluation helps us understand pinch points in the system

• H&H useful in analyzing alternatives. Useful tools available within HEC-RAS to model alternatives

• Coordination with other projects essential

• Environmental Permitting Requirements

Page 51: Alternatives for Willow Creek Flood Mitigation Study … for Willow Creek Flood Mitigation Study ... •Steady and Un-Steady Flow •Diversion pipe can be modeled by ... the new structure

QuestionsAnil Tangirala, PE, CFM, ENV SP