ALTERNATIVES FOR POWER GENERATION IN THE GREATER MEKONG SUB-REGION Volume 3: Power Sector Vision for the Lao People’s Democratic Republic Final 20 March 2016

ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

  • Upload
    ngocong

  • View
    217

  • Download
    1

Embed Size (px)

Citation preview

Page 1: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

ALTERNATIVES FOR POWER GENERATION IN THE GREATER MEKONG SUB-REGION

Volume 3:

Power Sector Vision for the Lao People’s Democratic Republic

Final

20 March 2016

Page 2: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 ii

Disclaimer

This report has been prepared by Intelligent Energy Systems Pty Ltd (IES) and Mekong

Economics (MKE) in relation to provision of services to World Wide Fund for Nature (WWF).

This report is supplied in good faith and reflects the knowledge, expertise and experience of

IES and MKE. In conducting the research and analysis for this report IES and MKE have

endeavoured to use what it considers is the best information available at the date of

publication. IES and MKE make no representations or warranties as to the accuracy of the

assumptions or estimates on which the forecasts and calculations are based.

IES and MKE make no representation or warranty that any calculation, projection,

assumption or estimate contained in this report should or will be achieved. The reliance that

the Recipient places upon the calculations and projections in this report is a matter for the

Recipient’s own commercial judgement and IES accepts no responsibility whatsoever for any

loss occasioned by any person acting or refraining from action as a result of reliance on this

report.

Page 3: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 iii

Acronyms

AD Anaerobic Digestion

ADB Asian Development Bank

ASEAN Association of Southeast Asian Nations

ASES Advanced Sustainable Energy Sector

BAU Business As Usual

BNEF Bloomberg New Energy Finance

BTU / Btu British Thermal Unit

CAGR Compound Annual Growth Rate

CAPEX Capital Expenditure

CCGT Combined Cycle Gas Turbine

CCS Carbon Capture and Storage

COD Commercial Operations Date

CSP Concentrated Solar Power

DNI Direct Normal Irradiation

DTU Technical University of Denmark

EDL Electricité du Laos

EE Energy Efficiency

EGAT Electricity Generation Authority of Thailand

EIA Energy Information Administration

EVN Electricity of Vietnam

FAO Food and Agriculture Organisation of the United Nations

FOB Free on Board

FOM Fixed Operating and Maintenance

GDP Gross Domestic Product

GHI Global Horizontal Irradiance

GMS Greater Mekong Subregion

GT Gas Turbine

HV High Voltage

ICT Information and Communication Technology

IEA International Energy Agency

IES Intelligent Energy Systems Pty Ltd

IPP Independent Power Producer

Page 4: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 iv

IRENA International Renewable Energy Agency

LCOE Overall Levelised Cost of Electricity

LNG Liquefied Natural Gas

MEM Ministry of Energy and Mines

MERRA Modern Era-Retrospective Analysis

MKE Mekong Economics

MOU Memorandum of Understanding

MV Medium Voltage

NASA National Aeronautics and Space Administration (the United States)

NPV Net Present Value

NREL National Renewable Energy Laboratory (the United States)

OECD Organisation for Economic Co-operation and Development

OPEC Organisation of the Petroleum Exporting Countries

OPEX Operational Expenditure

PDR People’s Democratic Republic (of Laos)

PRC People’s Republic of China

PV Photovoltaic

RE Renewable Energy

ROR Run of River

SCADA/EMS Supervisory Control and Data Acquisition/Energy Management System

SES Sustainable Energy Sector

SWERA Solar and Wind Energy Resource Assessment

SWH Solar Water Heating

UN United Nations

USD United States Dollar

VOM Variable Operating and Maintenance

WEO World Energy Outlook

WWF World Wide Fund for Nature

WWF-GMPO WWF – Greater Mekong Programme Office

Page 5: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 v

Table of Contents

1 Introduction 7

1.1 Report Structure 7 2 Background: Lao PDR Electricity Sector 9

2.1 Industry Structure 9 2.2 Power System 10 2.3 Installed Capacity 12 2.4 Electricity Demand 13 2.5 Generation Supply 15 2.6 Exports and Imports 16

3 Development Options for Lao PDR Electricity Sector 20

3.1 Natural Gas Resources 20 3.2 Coal Resources 20 3.3 Hydro Power 21 3.4 Wind Power 22 3.5 Solar Power 25 3.6 Geothermal Energy 29 3.7 Biomass and Biogas 29 3.8 Renewable Energy Potential and Diversity 31

4 Lao PDR Development Scenarios 33

4.1 Scenarios 33 4.2 Technology Cost Assumptions 36 4.3 Fuel Pricing Outlook 38 4.4 Lao PDR Real GDP Growth Outlook 39 4.5 Population Growth 41 4.6 Committed Generation Projects in BAU, SES and ASES Scenarios 41 4.7 Regional Transmission System Integration 42 4.8 Imports and Exports 43 4.9 Technical Economic Power System Modelling 43

5 Business as Usual Scenario 46

5.1 Business as Usual Scenario 46 5.2 Demand Growth 46 5.3 Installed Capacity Development 48 5.4 Projected Generation Mix 51 5.5 Grid to Grid Power Flows 54 5.6 Generation Fleet Structure 54 5.7 Reserve Margin and Generation Trends 56 5.8 Electrification and Off Grid 58

6 Sustainable Energy Sector Scenario 59

6.1 Sustainable Energy Sector Scenario 59 6.2 Demand Growth 59 6.3 Installed Capacity Development 61 6.4 Projected Generation Mix 64 6.5 Grid to Grid Power Flows 67 6.6 Generation Fleet Structure 67 6.7 Reserve Margin and Generation Trends 69 6.8 Electrification and Off-Grid 71

Page 6: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 vi

7 Advanced Sustainable Energy Sector Scenario 72

7.1 Advanced Sustainable Energy Sector Scenario 72 7.2 Demand Growth 72 7.3 Installed Capacity Development 74 7.4 Projected Generation Mix 77 7.5 Grid to Grid Power Flows 80 7.6 Generation Fleet Structure 80 7.7 Reserve Margin and Generation Trends 82 7.8 Electrification and Off-Grid 84

8 Analysis of Scenarios 85

8.1 Energy and Peak Demand 85 8.2 Energy intensity 87 8.3 Generation Mix Comparison 88 8.4 Carbon Emissions 90 8.5 Hydro Power Developments 91 8.6 Analysis of Bioenergy 91 8.7 Security of Supply Indicators 93 8.8 Interregional Power Flows 95

9 Economic Implications 97

9.1 Overall Levelised Cost of Electricity (LCOE) 97 9.2 LCOE Composition 98 9.3 Cumulative Capital Investment 100 9.4 Operating, Amortised Capital and Energy Efficiency Costs 105 9.5 Fuel Price Sensitivity 110 9.6 Impact of a Carbon Price 110 9.7 Renewable Technology Cost Sensitivity 111 9.8 Jobs Creation 112

10 Conclusions 115

10.1 Comparison of Scenarios 115 10.2 Economic Implications 116 10.3 Identified Barriers for the SES and ASES 117 10.4 Recommendations 118

Appendix A Technology Costs 120

Appendix B Fuel Prices 124

Appendix C Methodology for Jobs Creation 125

Page 7: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 7

1 Introduction

Intelligent Energy Systems Pty Ltd (“IES”) and Mekong Economics (“MKE”) have been

retained by WWF – Greater Mekong Programme Office (“WWF-GMPO”) to undertake a

project called “Produce a comprehensive report outlining alternatives for power generation

in the Greater Mekong Sub-region”. This is to develop scenarios for the countries of the

Greater Mekong Sub-region (GMS) that are as consistent as possible with the World Wildlife

Fund’s Global Energy Vision to the Power Sectors of all Greater Mekong Subregion countries.

The objectives of WWF’s vision are: (i) contribute to reduction of global greenhouse

emissions (cut by >80% of 1990 levels by 2050); (ii) reduce dependency on unsustainable

hydro and nuclear; (iii) enhance energy access; (iv) take advantage of new technologies and

solutions; (v) enhance power sector planning frameworks for the region: multi-stakeholder

participatory process; and (vi) develop enhancements for energy policy frameworks.

The purpose of this report is to provide detailed country-level descriptions of three scenarios

for the power sector of Lao People’s Democratic Republic (Lao PDR):

Business as Usual (BAU) power generation development path which is based on current

power planning practices, current policy objectives;

Sustainable Energy Sector (SES) scenario, where measures are taken to maximally

deploy renewable energy1 and energy efficiency measures to achieve a near-100%

renewable energy power sector; and

Advanced Sustainable Energy Sector (ASES) scenario, which assumes a more rapid

advancement and deployment of new and renewable technologies as compared to the

SES.

The scenarios were based on public data, independent assessments of resource potentials,

information obtained from published reports and power system modelling of the GMS region

for the period 2015 to 2050. All projections presented in this report commence in the year

2015.

1.1 Report Structure

This report has been organised in the following way:

Section 2 sets out recent outcomes for Lao PDR’s electricity industry;

Section 3 summarises the main development options covering both renewable energy

and fossil fuels;

Section 4 provides a brief summary of the scenarios that were modelled and a summary

of the assumptions in common;

Section 5 sets out the key results for the business as usual scenario;

1 Proposed but not committed fossil fuel based projects are not developed. Committed and existing fossil fuel based projects are retired at the end of their lifetime and not replaced with other fossil fuel projects. A least cost combination of renewable energy generation is developed to meet demand.

Page 8: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 8

Section 6 sets out the key results for the sustainable energy sector scenario;

Section 7 sets out the key results for an advanced sustainable energy sector scenario;

Section 8 provides comparative analysis of the three scenarios based on the

computation of a number of simple metrics that facilitate comparison;

Section 9 provides analysis of the economic implications of the scenarios; and

Section 10 provides the main conclusions from the modelling.

The following appendices provide some additional information for the scenarios:

Appendix A contains the technology cost assumptions that were used;

Appendix B provides the fuel price projections that were used; and

Appendix C sets out information used to estimate jobs creation potential for each

scenario.

Note that unless otherwise noted, all currency in the report is Real 2014 United States Dollars

(USD).

Page 9: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 9

2 Background: Lao PDR Electricity Sector

2.1 Industry Structure

The governance structure of Lao PDR’s electricity industry is illustrated in Figure 1.

Figure 1 Lao PDR Electricity Industry Governance Structure2

Source: Power to the People: Twenty Years of National Electrification, World Bank, 2012

The Ministry of Energy and Mines (MEM) under the Prime Ministry’s Office is the central

agency in charge of the energy sector and of renewable energy, and has the leading role in

preparing the country's renewable energy strategy. The MEM manages the electricity sector

through the Department of Electricity. A more specific statement of the policy objectives is:

Expand and improve the main grid supplies;

Expand and improve rural electrification;

Increase energy self-sufficiency and security;

Implement power projects that maximise long-term sustainability;

Develop power trade with GMS countries;

Develop IPP project selection and implementation procedures;

2 The Department of Energy Business, not shown in the chart, sits under the MEM and was established to share information on the Lao Government’s hydro power development plan and took over the role of Department of Energy promotional development since 2006. The Institute of Renewable Energy Promotion under MEM oversees the implementation of renewable energy, energy efficiency and rural electrification programs in Lao PDR.

Page 10: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 10

Maximise the benefits to Lao PDR from IPP developments; and

Develop transmission infrastructure for regional power trade.

Electricité du Laos (EDL) is wholly-owned by the government and owns and operates

vertically integrated generation, transmission and distribution assets in Lao PDR. EDL is

responsible for developing generation, transmission and distribution projects to meet policy

directives. As such they also perform system planning and manage electricity imports to and

electricity exports from the Lao PDR grid.

2.2 Power System

A representation of Lao PDR’s generation and transmission systems is shown in Figure 2. The

diagram highlights the present statehood of the country's national system in terms of the

main hydropower generation resources and 115 kV transmission lines that are used in the

power system and their locations within the country. We have also indicated the installed

capacity of each generator and highlighted whether the electricity is delivered for meeting

domestic demand or for exporting.

EDL operates the transmission and distribution network in the three regions of central,

northern and southern Lao PDR covering the 17 provinces. The Central 1 and Central 2

regions were integrated into a single region in 2011, however the three regions (115 kV

systems) remain isolated from each other. In addition to the main grid operated by EDL,

provincial authorities operate some 85 mini grids that are supplied by diesel generators or

small-scale hydro power stations in remote areas. These facilities primarily serve remote

areas that are not yet part of the national grid.

There is a significant amount of power exchange between Lao PDR and neighbouring

countries. Power is imported at a number of border points to meet local demand and

exported from dedicated hydro plants at other points. The largest exporter to Lao PDR is

neighbouring Thailand; however, some provinces receive power from Vietnam. On the other

hand, there are generation plans that largely export their electricity to Thailand, Viet Nam,

People’s Republic of China (PRC) and Cambodia. EDL effectively acts as a single buyer and

negotiates the terms and conditions for power imports and exports. To provide an indication

of the location of current installed capacity of hydro plants and whether the hydros are

geared towards serving Lao PDR’s national electricity system or for export, Figure 3 shows

installed capacity statistics by region and by type (whether export-oriented hydro or not).

Pertinent features of the Lao PDR power system as at 2013 are summarised below:

State-owned generation and network managed by a central electricity authority (EDL);

Generation capacity mostly owned by independent power producers (IPPs);

Total energy final demand of 3,381 GWh;

Low per capita consumption of 500 kWh per year;

High transmission and distribution losses;

Network connections with Thailand, China and Vietnam;

Imports of around one-third of its total electricity requirements and exported 690

GWh; and

Page 11: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 11

Household electrification ratio was 87%.

Figure 2 Map of Lao PDR Generators Map (2014)

Source: EDL

Nam Nhon

Nam Dong

Nam Ngay

Nam Ngum 5

Nam Long

Nam Ko

Nam Tha 3

Tad Salen

Nam Lik Nam Ngum 2

Nam Phao

Selabam

Nam Ngum 1

Theun HinbounNam Mang 3

Nam Theun 2

Nam Song

Xe Kaman 3Xe Set 1

Xe Set 2

Houay Ho

Nam Leuk

Page 12: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 12

Figure 3 Installed Hydro Capacity by Region and Type

2.3 Installed Capacity

All of the generation projects in Lao PDR were traditionally based on hydro power although

this has recently changed with the commissioning of the first 626 MW unit of the Hong Sa

Lignite Power Project in Xayaboury province early 2015.

As of 2014, 3,058 MW has been developed with most of this exported into Thailand and to a

smaller extent Vietnam. The levels of export into Thailand and Vietnam is set to increase with

the Government of Lao PDR signing MOUs that commit to the export of up to 7,000 MW to

Thailand and 5,000 MW to Vietnam by 20203. By March 2016 the coal-fired Hong Sa Lignite

Power Project will have a total of capacity of 1,878 MW, with some 1,473 MW having already

been sold to the Electricity Generation Authority of Thailand (EGAT). At present, there are

more than 50 hydropower sites planned to achieve the 2020 export target. The Lao PDR

Government and foreign investors jointly develop most of these exporting projects.

The current generation fleet in Lao PDR is shown in Table 1 and comprises of 610 MW owned

by EDL and 3,211 MW owned by independent power producers.

3 Lao PDR Country Report, Department of Energy Policy and Planning Ministry of Energy and Mines, 2013

13

228

- 8 -

870

1,588

523

-

200

400

600

800

1,000

1,200

1,400

1,600

Northern Central 1 Central 2 Souith

MW

Lao Hydro Export Hydro

Page 13: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 13

Table 1 Existing Large-scale Generators in Lao PDR

Generator Type Owner Capacity (MW)

Nam Ngum Hydro EDL 155

Nam Dong Hydro EDL 1

Xelabam Hydro EDL 5

Xeset 1 Hydro EDL 45

Nam Leuk Hydro EDL 60

Nam Ngay Hydro EDL 1.2

Nam Mang 3 Hydro EDL 35

Nam Ko Hydro EDL 1.5

Xeset2 Hydro EDL 76

Nam 1-2 Hydro EDL 100

Nam Ngum 5 Hydro EDL 120

Nam Nhone Hydro EDL 3

Tatsalen Hydro EDL 3

Nam Long Hydro EDL 5

Houay Ho Hydro IPP 150

Theun Hinboun Hydro IPP 490

Nam Theun 2 Hydro IPP 1,080

Nam Ngum 2 Hydro IPP 615

Xekaman 3 Hydro IPP 250

Hong Sa Lignite #1 Lignite IPP 626

Source: Various – as Compiled by Consultant

2.4 Electricity Demand

Figure 4 shows Lao PDR’s total final electricity consumption and the annual growth rates from

1996 to 2013. It indicates domestic demand has been growing rapidly; in particular, annual

electricity consumption increased at an average rate of 14.5% per annum over 10 years from

903 GWh in 2004 to 3,381 GWh in 2013. Electricity consumption has been traditionally

dominated by residential consumption, which made up 42% in 2010 dropping to 38% in 2013

(Figure 5). Industry consumption as at 2013 accounted for 33% of total electricity

consumption. This trend is expected to continue with additional industrial load to come

online over the next few years as part of the Government’s industrial development plans.

By 2013, the power system had a peak demand of 649 MW, which has been growing 12.5%

per annum over a 10 year period, and nearly doubled since 2008. Figure 6 indicates the

locations of main load centres, which include Vientiane capital city, Vientiane province,

Savannakhet, Khammouane and Champasak provinces.

Page 14: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 14

Figure 4 Electricity Demand Growth (1996-2013)

Source: Electricity Statistics 2013, Electricite Du Laos, 2014

Figure 5 Electricity Demand Shares by Category (2013)

0%

5%

10%

15%

20%

25%

-

500

1,000

1,500

2,000

2,500

3,000

3,500

4,000

An

nu

al A

vera

ge G

row

th (

%)

Dem

and

(G

Wh

)

Total Electricity Consumption Annual Average Growth Rate

Residential37.8%

Commercial21.7%

Entertainment0.3%

Gov. office5.6%

Irrigation1.0%

Int. Orgs0.3% Industry

33.1%

Edu. & Sport0.2%

Page 15: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 15

Figure 6 Main Load Centres (2013)

2.5 Generation Supply

Figure 7 shows annual statistics generation, import and export of electricity from 1991 to

2012. It indicates that while it had significantly increased its own generation supply (which

was entirely from hydropower), Lao PDR also had to import more electricity to meet the

domestic demand.

Page 16: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 16

Figure 7 Generation, Imports and Exports (1991-2012)

2.6 Exports and Imports

With many hydropower projects having been proposed, Lao PDR is expected to increase

electricity exports to neighbouring Thailand, and Vietnam to a lesser extent. The export of

energy via wider electricity trading arrangements in the surrounding regions is viewed by the

government as an opportunity to improve EDL’s financial position, foster economic growth

and over the longer-term reduce poverty.

The Lao PDR has various cross-border connections with other GMS neighbouring countries.

The numbers of agreed MOU interconnections and capacities between Lao PDR and each

country as at 2014 are4:

Thailand: 23 interconnections, 10,000 MW;

Vietnam: 7 interconnections, 5,000 MW; and

Lao PDR: 2 interconnections, 2,000 MW.

Dedicated transmission lines link each of the export IPP power plants into the respective off-

take countries. Links as at 2014 are:

Theun Hinboun to Sakhonnakhon (Electricity Generating Authority of Thailand - EGAT)

230 kV, 176 km, 440 MW (includes power station expansion);

Houay Ho to Ubon 2 (EGAT) 230 kV, 230 km, 150 MW;

4 IFC Workshop on Sustainable Hydropower & Regional Cooperation, Viravong, 2015

-

200

400

600

800

1,000

1,200

1,400

1,600

1,800

2,000

2,200

19

91

19

92

19

93

19

94

19

95

19

96

19

97

19

98

19

99

20

00

20

01

20

02

20

03

20

04

20

05

20

06

20

07

20

08

20

09

20

10

20

11

20

12

GW

h

Generation Imports Exports

Page 17: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 17

Nam Theun 2 to Roi Et (EGAT) 500 kV, 300 km, 1,000 MW;

Na Bong to Udon 3 (EGAT), 500 kV, 100 km, 615 MW; and

Xekaman 3 to Thanh My (Electricity of Vietnam - EVN) 230 kV, 150 km, 250 MW.

Lao PDR exports a large amount of hydropower to Thailand, but in exchange imports

electricity to supply provinces that are not connected to the national power grid. These

demand points include copper and gold mining operations, which consume significant

amounts of power.

Lao PDR also has 4 interconnections with China, with capacity of 2,000 MW to ensure

adequate power supplies in Luang Prabang and the Northern provinces. The interconnection

allows for power imports from China due to lower river levels up north and would indirectly

relieve pressure on the central Lao PDR hydro plants.5

The shares of neighbouring countries in Lao PDR exports and imports of electricity for 2013

are presented in Figure 8 and Figure 9. The approximate geographical representation of

power exchanges is shown in Figure 10.

Figure 8 Export and Import Shares by Country (2013)

Figure 9 Historical Annual Exports (2010-13)

5 http://www.vientianetimes.org.la/FreeContent/FreeConten_Laos%20imports.htm, accessed 20 May 2015

Exports to Thailand

71%

Exports to Cambodia

29%

Thailand (EGAT)

73%

Thailand (PEA)

7%

Vietnam2%

China18%

-

200

400

600

800

2010 2011 2012 2013

GW

h

Exports to Thailand Exports to Cambodia

Imports Exports

Page 18: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 18

Figure 10 Illustrative Flows of Cross Border Exports (2013)

Source: EDL

Page 19: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 19

Figure 11 Illustrative Flows of Cross Border Imports (2013)

Source: EDL

Page 20: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 20

3 Development Options for Lao PDR Electricity Sector

3.1 Natural Gas Resources

Lao PDR has no confirmed reserves of oil or gas, however, the Government has issued two

exploration concessions in central and southern Lao (Salamander Energy Group and Petro

Vietnam respectively)6. Significant work remains to be done to determine the results.

Based on this the likelihood of indigenous oil or gas reserves making an impact to the

electricity sector development in the next 10-20 years is low.

Consequently, Lao PDR imports petroleum products from other countries, with these

products being used approximately as follows:

88% used in transport sector;

11% used in the commercial sector; and

The remainder for residential, industry and agriculture.

3.2 Coal Resources

Lao PDR has coal reserves estimated at approximately 900 million tons7, comprising mostly

of lignite, and anthracite to a much smaller extent at various sites. Figure 12 shows the

location of coal deposits and occurrences in Lao PDR. Main lignite basins lie in Hong Sa,

Viengphoukha and Khangphaniang. Located in the northwestern region, Hong Sa is the

largest known reserve of lignite, with 400-700 million tons being reserved for power

generation. The country’s first coal-fired power plant - 1,878 MW Hong Sa Lignite Power

Project - would be completed by 2016 with 1,473 MW already sold to EGAT.

Anthracite (and bituminous) can be found at various sites, including Saravan and PHong

Saly provinces, with the total proven resource at approximately 100 million tons. Currently

130,000 tons of production is used for local factories and export purposes and the

government has a plan to support a 500 MW coal unit depending on further exploration

success.

6 Energy Sector Development in Lao PDR, Vongsay, 2013

7 Energy Sector Development in Lao PDR, Vongsay, 2013

Page 21: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 21

Figure 12 Location of Coal Deposits and Occurrences

3.3 Hydro Power

Hydropower is the most abundant energy resource in Lao PDR. There is an estimated

potential of 23,000 MW along the Mekong River and its sub-basins. By 2014, around 3,200

MW has been developed and is supplying domestic demand and neighbouring countries.

Table 2 below shows the hydro expansion plan to 2020. There is currently 6,000 MW of

committed projects in the pipeline with 75% of it planned for export. For implementation of

this plan, the Lao Government has opened up development opportunities to the

neighbouring governments (Thailand, Lao PDR, and Vietnam) and foreign companies.

The country’s small hydropower potential is also substantial, estimated to be around 2,000

MW. The development of small hydropower (capacity up to 15 MW) could also play an

important role in meeting the country’s objectives of increasing rural electrification coverage

from the current level of 70% to 90% in 20208. There are 75 smaller hydro projects as at the

8 Note that we refer to rural coverage in these statistics, the earlier stated “87%” relates to rural and urban.

Page 22: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 22

end of 2013 at various stages. There are also approximately 60,000 micro units installed in

Lao PDR servicing 90,000 households.

Figure 13 summarises the information about capacity of the existing, committed and

considered projects in Lao PDR.

Table 2 Hydroelectric Power Development Plan (2016-20)

Region No. Projects Capacity (MW) Production (GWh/yr)

Northern 31 1,623 7,783

Central 19 323 1,524

Southern 27 905 4,729

Total 77 2,851 14,036

Source: Electricite du Lao, 2011

Figure 13 Lao PDR Hydro Projects: Existing, Committed and Considered (2014)

Source: Compiled by Consultant

3.4 Wind Power

Lao PDR has a wind potential estimated at approximately 26,000 square kilometres with

wind speeds between 7-9 m/s. Table 3 shows the wind resource available in Lao PDR and

some of the other GMS countries. The resource mapping shows approximately 2,800 MW

2,426

1,635

3,632

1,288

2611.8

611

2,335

250

- 500 1,000 1,500 2,000 2,500 3,000 3,500 4,000

Other Considered (Potential Thailand Export)

Other Considered (Potential Vietnam Export)

Considered on Mekong (Potential Thailand Export)

Considered on Mekong (Potential Vietnam Export)

Committed (2020)

Existing (Lao PDR)

Existing (Export - Thailand)

Existing (Export - Vietnam)

MW

Page 23: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 23

at ‘very good’ and ‘excellent’ wind speeds and 24,280 MW at locations with ‘good’ wind

speeds.

Table 3 Wind Resource Potential in Lao PDR9

Poor Fair Good Very Good Excellent

Parameter Unit < 6 m/s [6, 7) m/s [7, 8) m/s [8, 9) m/s >= 9 m/s

Land Area km^2 184,511 38,787 6,070 671 35

% total % 80.2% 16.9% 2.6% 0.3% 0.0%

Potential MW na 155,148 24,280 2,684 140

Source: Wind Energy Resource Atlas of Southeast Asia, TrueWind Solutions, 2001

Lao PDR wind power potential has also been estimated in a recent ADB study entitled

“Renewable Energy Developments and Potential in the Greater Mekong Subregion” (2015).

According to this study, Lao PDR has a theoretical wind energy potential of 455 GW and a

potential production capacity of about 1,112 TWh/yr. To obtain these estimates, the land

area suitable for wind power result was multiplied by the average amount of wind power

capacity that can be installed in a given area (assumed to be 10 MW/km2). However, the

technical wind energy potential would be much less due to the limitations of the overall

power generation and transmission grid systems.

An illustration of the dispersion of wind potential is charted in Figure 14. This shows 3TIER’s

Global Wind Dataset10 , which provides average annual wind speed at 80 meters above

ground level. This illustrates regions of high potential along the border with Vietnam and in

the south of the country, as well as pockets of 6 to 7 m/s potential in the north. Figure 15

shows the DTU Global Wind Atlas11 onshore and 30 km offshore wind climate dataset which

accounts for high resolution terrain effects for 100 m above ground level. According to the

IRENA global atlas description: “this was produced using microscale modelling in the Wind

Atlas Analysis and Application Program and capture small scale spatial variability of winds

speeds due to high resolution orography (terrain elevation), surface roughness and surface

roughness change effects. The layers shared through the IRENA Global Atlas are served at

1km spatial resolution.”

The Government is planning to develop 50 MW of wind power by 2025 to promote the

development of wind energy in the country.

9 For large wind turbines only. Potential MW assumes an average wind turbine density of 4 MW per square kilometre and no exclusions for parks, urban, or inaccessible areas. Wind speeds are for 65 m height in the predominant land cover with no obstructions.

10 Source: 3TIER data set was accessed via the IRENA Global Atlas Server: http://irena.masdar.ac.ae/.

11 See: http://globalwindatlas.com/.

Page 24: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 24

Figure 14 3TIER’s Global Wind Dataset 5km onshore wind speed at 80m height12

Source: 3TIER’s Global Wind Dataset (accessed via IRENA Global Atlas)

12 Average for period from 1980 to 2011.

Page 25: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 25

Figure 15 Average Wind Speed 1km at 100 m AGL DTU (2015)

Source: IRENA Global Atlas and Global Wind Atlas (2015)

3.5 Solar Power

Solar energy is an abundant energy resource in Lao PDR. The southern part of the country

experiences slightly higher irradiation levels and would be suitable for the deployment of

solar technologies (see Figure 16).

Lao PDR solar power potential has also been estimated in a recent ADB study entitled

“Renewable Energy Developments and Potential in the Greater Mekong Subregion” (2015).

According to this study, Lao PDR has a potential of 8,812 MW of combined peak solar

capacity, which far exceeds the earlier estimates 13 . The details of estimates of solar

potential are in Table 4. Lao PDR has GHI levels ranging between 1,200 and 1,800 kWh/m2

13 Based on analysis of high resolution measurements and comparisons of Lao PDR solar maps to other countries, IES views solar potential in Lao PDR to be at least 11,000 MW.

Page 26: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 26

pa and average DNI levels around 1,350 kWh/m2 per annum14, however, the hotter regions

in Lao PDR have DNI levels between 1,600 to 1,800 kWh/m2 pa which can accommodate

CSP technology.

Figure 16 Lao PDR DNI Solar Resource Map (kWh/m^2 per day)

Source: Solar and Wind Energy Resource Assessment, accessed 15 April 2015

14 Source: ADB, “Renewable Energy Developments and Potential in the Greater Mekong Subregion”, 2015.

Page 27: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 27

Table 4 Lao PDR Solar Power Technical Potential

Solar Irradiation

Level, kWh/m2

Suitable Land Areas,

thousand km2

Technical Capacity

Potential, MW

Technical Production

Potential, MWh/yr

Less than 1,200 - - -

1,200–1,300 0.09 5 5,613

1,300–1,400 1.88 113 125,148

1,400–1,500 12.84 770 918,500

1,500–1,600 41.02 2,461 3,137,931

1,600–1,700 69.14 4,149 5,630,307

1,700–1,800 21.89 1,313 1,890,265

Over 1,800 - - -

Total 146.9 8,812 11,707,764

Source: Renewable Energy Developments and Potential in the Greater Mekong Subregion, ADB, 2015

Figure 17 plots the monthly average irradiation levels for a number of selected sights with

the highest annual average irradiation levels based on SWERA data. This shows the monthly

variation throughout the year for solar irradiation and hence generation. This highlights

November through to March exhibit excellent solar conditions. The map shading the

locations of solar for Lao PDR is provided in Figure 18. This also highlights that the greatest

potential for solar lies in the central region of the country, covering the main load centre of

Vientiane.

Figure 17 Monthly DNI Levels for Selected Locations in Lao PDR

Source: NASA Atmosphere Science Data Centre, obtained via the SWERA Geospatial Toolkit

0

1

2

3

4

5

6

7

8

9

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Ave

rage

-kW

h/d

ay

Page 28: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 28

Figure 18 Main Locations with DNI Solar Power Potential in Lao PDR

Source: Developed by Consultant based on Information from EDL and SWERA

Figure 19 plots measurements of Global Horizontal Irradiance (GHI) based on the 3TIER high

resolution dataset accessed via the IRENA Global Atlas. This map shows that the GHI

potential is significant throughout the entire country.

Page 29: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 29

Figure 19 3TIER’s Global Solar Dataset (3km in W/m^2) for GHI

Source: 3TIER’s Global Solar Dataset (accessed via IRENA Global Atlas)

3.6 Geothermal Energy

According to a recent study15, 11 geothermal resources have been identified in a study in the

country’s northern mountainous areas. These sources are believed to be of the low

temperature type and unlikely to support power projects on a large scale. The Asian

Development Bank (ADB) has however reported that some 59 MW of geothermal generation

capacity could be developed in Lao PDR.

3.7 Biomass and Biogas

Lao PDR has vast forest coverage around 100,000 square kilometres or about 45% of its

land. In addition, a large amount of agricultural residues representing significant energy

potential can be harvested. The total electricity potential from biomass is estimated at 938

MW16. Table 5 shows the biomass source and energy potential. IES projected estimates

15 Nguyen Tien Hung et al, “Overview of geothermal resources in North Part of Laos”, Proceedings World Geothermal Congress 2015, Melbourne, Australia

16 Renewable Energy Development Strategy in Lao PDR, 2011

Page 30: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 30

based on the ADB study “Renewable Energy Developments and Potential in the Greater

Mekong Subregion” suggest an energy potential of around 17,000 GWh/yr or up to 2,300

MW.

Table 5 Energy Potential from Agriculture and Forestry Residues

Biomass sources Type of fuel Equivalent energy (GWh/yr)

Rice husk Combustive 2,108

Rice straw Biogas 1,030

Husbandry Biogas 3,269

Forest residues Combustive 12,500

Total Various 18,907

Source: Rural Electrification in Lao PDR and Lao PDR, Innovation Energie Developpement, 2007

Biogas energy technical potential from livestock manure has been estimated at around

8,540 MWh per day according to ADB 2015 study. Details are in Table 6 below.

Table 6 Lao PDR Biogas Technical Potential

Livestock Net Dry Matter

Available

(kg/day)

Mean Biogas Yield Factor

(m3/kg)

Daily Biogas

Production

(m3/day)

Energy Content

per Day

(kWh/day)

Buffalo 1,094.337 0.25 273,584 1,641,505

Cows 1,359,147 0.25 339.787 2,038,721

Pigs 192.835 4.20 809,908 4,859,448

Total 2,646,319 1,423,279 8,539,674

Source: Renewable Energy Developments and Potential in the Greater Mekong Subregion, ADB, 2015

Figure 20 shows the existing biomass capacity installed and 2025 targets. There are

currently two large-scale biomass projects operating in the central and south region. The

Hoang Anh Sugar Mill has a capacity of 30 MW in the Attapeau province and the Mit Lao

Sugar Mill is located in the Savannakhet province with a capacity of 9.7 MW.

Page 31: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 31

Figure 20 Current Biomass and Biogas Developments and Targets (MW)

Source: Country Presentation on Status of Bioenergy Development in Lao PDR, IEA, IRENA, FAO, 2014

3.8 Renewable Energy Potential and Seasonal Diversification

In summary, the renewable energy potential for Lao PDR is provided in Table 7. The

numbers presented here have been drawn from multiple sources and informed by analysis

of the IRENA Global Atlas data. Figure 21 plots the monthly capacity factors for solar, wind

and hydro against the normalised average monthly demand. The chart shows that there is

some natural seasonal / monthly diversification between resources: demand in Lao PDR is

highest peaking between March to May which coincides with reduction in wind speeds in

Lao PDR. There is a clear diversification benefit as the solar intensity drops towards the

middle of the year and wind speeds and hydro inflows start to increase.

It should be noted that the key issue in the charts is correlation but not amplitude, and

furthermore, that the hydro inflows fall into reservoirs, some with significant amount of

storage, which enables smoothing out generation throughout the year (within the limits of

the storage capacity of the reservoirs), thus there is some scope for the role / operation of

hydro power stations to change in Lao PDR to accommodate high levels of renewable energy.

Page 32: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 32

Table 7 Summary of Estimated Renewable Energy Potential (Compiled from

Various Sources and Analysis)

Resource Potential (MW)

Source and comments

Hydro (Large) 23,000 Lao hydropower potential and policy in the GMS context (EDL)

Hydro (Small) 2,000 Sites smaller than 15 MW. The Need for Sustainable Renewable Energy in Lao PDR (Vongchanh)

Pump Storage - Given the abundance of conventional hydro potential there has been little focus in Lao PDR to assess the potential of this technology.

Solar At least 11,000

IES assessment based on various sources set out in 3.5.

Wind Onshore 27,104 Resource above 7m/s. Wind Energy Resource Atlas of Southeast Asia (TrueWind Solutions, 2001)

Wind Offshore 0 Not applicable

Biomass 1,271 IES projections based on data from Renewable Energy Developments and Potential in the Greater Mekong Subregion (ADB, 2015)

Biogas 1,146 IES projections based on data from Renewable Energy Developments and Potential in the Greater Mekong Subregion (ADB, 2015)

Geothermal 59 Lao PDR Energy Sector Assessment, Strategy, and Road Map (ADB, 2013)

Ocean - Not applicable

Figure 21 Seasonality in Renewable Resource Profiles and National Demand

Source: Consultant analysis

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Hydro Wind Solar Demand

Page 33: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 33

4 Lao PDR Development Scenarios

In this section, we define the three scenarios for Lao PDR’s electricity sector that we have

modelled: the Business as Usual (BAU), Sustainable Energy Sector (SES), and Advanced SES

(ASES) scenarios. We also set out the assumptions made for technology costs (section 4.2)

and fuel prices (section 4.3) before providing the details for a number of Lao PDR specific

assumptions – in particular: our assumed economic outlook for Lao PDR, a list of generation

projects that we consider committed 17 and comments on the status of power import

projects. Further assumptions for each scenario are provided in Section 5, Section 6 and

Section 7.

4.1 Scenarios

The three development scenarios (BAU, SES and ASES) for Lao PDR are conceptually

illustrated in Figure 22.

Figure 22 GMS Power Sector Scenarios

The BAU scenario is characterised by electricity industry developments consistent with the

current state of planning within the GMS countries and reflective of growth rates in electricity

demand consistent with an IES view of base development, existing renewable energy targets,

where relevant, aspirational targets for electrification rates, and energy efficiency gains that

are largely consistent with the policies seen in the region.

17 That is, construction is already in progress, the project is near to commissioning or it is in an irreversible / advanced state of the planning process.

Page 34: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 34

In contrast, the SES seeks to transition electricity demand towards the best practice

benchmarks of other developed countries in terms of energy efficiency, maximise the

renewable energy development, cease the development of fossil fuel resources, and make

sustainable and prudent use of undeveloped conventional hydro resources. Where relevant,

it leverages advances in off-grid technologies to provide access to electricity to remote

communities. The SES takes advantage of existing, technically proven and commercially

viable renewable energy technologies.

Finally the ASES assumes that the power sector is able to more rapidly transition towards a

100% renewable energy technology mix under an assumption that renewable energy is

deployed more than in the SES scenario with renewable energy technology costs declining

more rapidly compared to BAU and SES scenarios. A summary of the main features of the

three scenarios are summarised in Table 818.

Table 8 Key Features of BAU, SES and ASES

Scenario Demand Supply

BAU Demand was forecast to grow in line

with historical electricity consumption

trends and projected GDP growth rates

using techniques that are largely the

same as what is typically done in

government plans. Electric vehicle

uptake was assumed to reach 10%

across all cars and motorcycles by 2050.

Generator new entry follows that of power

development plans for the country

including limited levels of renewable

energy but not a maximal deployment of

renewable entry.

SES Assumed a transition towards

energy efficiency benchmark for the

industrial sector of Hong Kong19 and

of Singapore for the commercial

sector by year 2050.

For the residential sector, it was

assumed that urban residential

demand per electrified capita grows

to 800 kWh pa by 2050, 40% less

than in the BAU.

Demand-response measures were

assumed to be phased in from 2021

with some 15% of demand being

flexible20 by 2050.

Assumed no further coal and gas new

entry beyond what is already

understood to be committed.

A modest amount of large scale hydro

(between 4,000 to 5,000 MW) was

deployed in Lao PDR and Myanmar

above and beyond what is understood

to be committed hydro developments

in these countries21.

Supply was developed based on a least

cost combination of renewable

generation sources limited by

estimates of potential rates of

deployment and judgments in on

18 Note that we summarise the key drivers here. For further details, please refer to the separate IES assumptions document.

19 Based on our analysis of comparators in Asia, Hong Kong had the lowest energy to GDP intensity for industrial sector while Singapore had the lowest for the commercial sector.

20 Flexible demand is demand that can be rescheduled at short notice and would be implemented by a varie ty of smart grid and demand response technologies.

21 This is important to all countries because the GMS is modelled as an interconnected region.

Page 35: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 35

Slower electrification rates for the

national grids in Cambodia and

Myanmar compared to the BAU, but

deployment of off-grid solutions

that achieve similar levels of

electricity access.

Mini-grids (off-grid networks) were

assumed to connect to the national

system in the longer-term for

reliability / mutual support reasons.

Electric vehicle uptake was as per

the BAU.

when technologies would be feasible

for implementation to deliver a power

system with the same level of

reliability as the BAU.

Technologies used include: solar

photovoltaics, biomass, biogas and

municipal waste plants, CSP with

storage, onshore and offshore wind,

utility scale batteries, geothermal and

ocean energy.

Transmission limits between regions

were upgraded as required to support

power sector development in the GMS

as an integrated whole, and the

transmission plan allowed to be

different compared to the

transmission plan of the BAU.

ASES The ASES demand assumptions were

essentially done as a sensitivity to the

SES:

An additional 10% energy efficiency

was applied to the SES demands

(excluding transport).

Flexible demand was assumed to

reach 25% by 2050.

Uptake of electric vehicles doubled by

2050.

ASES supply assumptions were also

implemented as a sensitivity to the SES,

with the following the main differences:

Allow rates of renewable energy

deployment to be more rapid compared

to the BAU and SES.

Technology cost reductions were

accelerated for renewable energy

technologies.

Implement a more rapid programme of

retirements for fossil fuel based power

stations.

Energy policy targets of 70% renewable

generation by 2030, 90% by 2040 and

100% by 2050 across the region are in

place.

Assume that technical / operational

issues with power system operation and

control for a very high level of

renewable energy are addressed22.

22 In particular: (1) sufficient real-time monitoring for both supply and demand side of the industry, (2) appropriate forecasting for solar and wind and centralised real-time control systems in place to manage a more distributed supply side, storages and flexible demand resources, and (3) power systems designed to be able to manage voltage, frequency and stability issues that may arise from having a power system that is dominated by asynchronous technologies.

Page 36: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 36

4.2 Technology Cost Assumptions

Technology capital cost estimates from a variety of sources were collected and normalised

to be on a consistent and uniform basis23. Mid-points were taken for each technology that is

relevant to the GMS region. The data points collated reflect overnight, turnkey engineering

procurement construction capital costs and are exclusive of fixed operating and maintenance

costs, variable operating and maintenance costs and fuel costs. The capital costs by

technology assumed in the study are presented in Figure 23 for the BAU and SES scenarios.

For the ASES scenario, we assumed that the technology costs of renewable technologies

decline more rapidly. These technology cost assumptions are listed in Figure 24. Note that

the technology capital costs have not included land costs, transmission equipment costs, nor

decommissioning costs and are quoted on a Real USD 2014 basis.

Comments on the various technologies are discussed below in relation to the BAU and SES

technology costs:

Conventional thermal technology costs are assumed to decrease at a rate of 0.05% pa

citing maturation of the technologies with no significant scope for cost improvement.

Onshore wind costs were based on the current installed prices seen in China and India

with future costs decreasing at a rate of 0.6% pa. Future offshore wind costs were

developed by applying the current percentage difference between current onshore and

offshore capital costs for all future years.

Large and small-scale hydro costs are assumed to increase over time reflecting easy

and more cost-efficient hydro opportunities being developed in the first instance.

IRENA reported no cost improvements for hydro over the period from 2010 to 2014.

Adjustments are made in the case of Lao PDR and Myanmar where significant hydro

resources are developed in the BAU case24.

Solar PV costs are based on the more mature crystalline silicon technology which

accounts for up to 90% of solar PV installations (IRENA, 2015), and forecast to continue

to drop (2.3% pa) albeit at a slower pace than in previous years.

Utility scale battery costs are quoted on a $/kWh basis, and cost projections based on

a report by Deutsche Bank (2015) which took into account several forecasts from BNEF,

EIA and Navigant.

Solar thermal (CSP) capital costs are projected to fall at 2.8% pa on the basis of the

IRENA 2015 CSP LCOE projections. While globally there are many CSP installations in

place, the technology has not taken off and the cost of CSP technology over the past 5

years has not been observed to have fallen as rapidly as solar PV.

Biomass capital costs are based on costs observed in the Asia region which are

significantly less than those observed in OECD countries. Capital costs were assumed

to fall at 0.1% pa. Biogas capital costs were based on anaerobic digestion and assumed

to decline at the same rate as biomass.

23 We standardised on Real 2014 USD with all technologies costs normalised to reflect turnkey capital cost s.

24 Capital costs for large scale hydro projects are assumed to increase to $3,000/kW by 2050 consistent with having the most economically feasible hydro resources developed ahead of less economically feasible resources.

Page 37: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 37

Ocean energy (wave and tidal) technologies were based on learning rates in the ‘Ocean

Energy: Cost of Energy and Cost Reduction Opportunities’ (SI Ocean, 2013) report

assuming global installation capacities increase to 20 GW by 205025.

Capital costs were discounted at 8% pa across all technologies over the project

lifetimes. Decommissioning costs were not factored into the study.

For technologies that run on imported coal and natural gas, we have factored in the

additional capital cost of developing import / fuel management infrastructure in the

modelling.

For reference, Appendix A tabulates the technology cost assumptions that we have used in

the modelling.

Figure 23 Projected Capital Costs by Technology for BAU and SES

* Battery costs are quoted on a Real 2014 USD $/kWh basis.

25 Wave and tidal costs were averaged.

Page 38: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 38

Figure 24 Projected Capital Costs by Technology for ASES

* Battery costs are quoted on a Real 2014 USD $/kWh basis.

4.3 Fuel Pricing Outlook

IES has developed a global fuel price outlook which are based on short-term contracts traded

on global commodity exchanges before reverting towards long-term price global fuel price

forecasts based on the IEA’s World Energy Outlook (WEO) 2015 450 scenario26 and a set of

relationships between different fuels that have been inferred from historical relations

between different types of fuels. A summary of the fuel prices expressed on an energy-

equivalent basis ($US/MMBtu HHV) is presented in Figure 25.

The 30% fall from 2014 to 2015 for the various fuels was the result of a continued weakening

of global energy demand combined with increased stockpiling of reserves. Brent crude prices

fell from $155/bbl in mid-2014 to $50/bbl in early 2015. OPEC at the November 2014 meeting

did not reduce production causing oil prices to slump. However, fuel prices are then assumed

to return from the current low levels to formerly observed levels within a 10 year timeframe

based on the time required for there to be a correction in present oversupply conditions to

satisfy softened demand for oil and gas27.

To understand the implications of a lower and higher global fuel prices we also perform fuel

price sensitivity analysis. One of the scenarios is based on a 50% fuel cost increase28 to put

26 The IEA’s 450 scenario is an energy pathway consistent with the goal of limiting global increase in temperature to 2°C by limiting the concentration of greenhouse gases in the atmosphere to 450 parts per million CO2; further information available here: https://www.iea.org/media/weowebsite/energymodel/Methodology_450_Scenario.pdf .

27 Reference: Facts Global Energy / Australian Institute of Energy, F. Fesharaki, “A New World Oil Order Emerging in 2016 and Beyond?”, February 2016, suggest a rebound in prices levels over a 5 to 7 year period as the most “probabl e” scenario.

28 Including biomass prices.

Page 39: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 39

the study’s fuel prices in the range of the IEA’s Current Policies scenario29 which could be

argued to be closer to the fuel pricing outlook that could be anticipated in a BAU outlook,

while the SES and ASES scenarios could be argued to have fuel prices more consistent with

the IEA’s 450 scenario. We discuss the implications of fuel pricing on the BAU and SES within

the context of electricity pricing in section 9.5.

For reference, we provide the base fuel pricing outlook for each year that was used in the

fuel price modelling in Appendix B. These fuel prices were held constant in the BAU, SES

and ASES scenarios.

Figure 25 IES Base Case Fuel Price Projections to 2050

4.4 Lao PDR Real GDP Growth Outlook

Real GDP growth was assumed to stay relatively high at the current GDP growth rates due to

the focus on industrialisation in the region. Over time, GDP growth was assumed to decline

towards 1.96%30 pa by 2050 as seen in Figure 26. The trend down was assumed to reflect

the economic development outlook of the government to 2035, before there is a transition

towards the world average GDP growth rate. GDP assumptions were kept constant between

BAU, SES and ASES scenarios.

29 The IEA’s current policies scenario assumes no changes in policy from the year of WEO publication.

30 1.96% reflects the previous 5-year GDP growth of the top 10 GDP countries in the world excluding Brazil, China and Russia.

0

5

10

15

20

25

2012

2014

2016

2018

2020

2022

2024

2026

2028

2030

2032

2034

2036

2038

2040

2042

2044

2046

2048

2050

Pric

e ($

Rea

l 201

4 U

SD/M

MB

tu)

Crude Oil Dated Brent Fuel Oil Diesel Oil Imported Coal Asian LNG Uranium

Page 40: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 40

Figure 26 Lao PDR GDP Projection

The industrial sector’s increasing importance has been driven by policy and significant foreign

direct investments in the mineral and hydropower sectors. The GDP composition of Lao PDR

is weighted towards industry in line with the gradual shifting away from agriculture. The

industry share of GDP in Lao PDR was assumed to increase from 33% in 2014 to 60% in 2030,

similar to a number of the other GMS countries. The GDP composition is shown in Figure 27.

Note that this assumption was held constant in the BAU and SES.

Figure 27 Lao PDR GDP Composition

0.0%

1.0%

2.0%

3.0%

4.0%

5.0%

6.0%

7.0%

8.0%

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

GD

P G

row

th (

real

)

26.5

%

20.0

%

15.0

%

33.1

%

60.0

%

60.0

%

40.4

% 20.0

%

25.0

%

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

2014 2035 2050

Agriculture Industry Services

Page 41: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 41

4.5 Population Growth

Population was assumed to grow in line with the UN Medium Fertility scenario and is held

constant across all scenarios31.

4.6 Committed Generation Projects in BAU, SES and ASES Scenarios

Committed generation projects are the ones that are under construction or at a stage of

development that is sufficiently advanced for decision for the project to come online to not

be reversed. Table 9 lists Lao PDR’s committed generation projects in addition to the existing

790 MW 32 of hydro generation projects. The capacity column reflects the net capacity

available to the Lao PDR grid after exports to Thailand or Vietnam. Projects with links to other

countries have been highlighted in either green or red corresponding to exports to Thailand

or Vietnam, respectively. The export arrangements were assumed to continue throughout

the modelling horizon.

The Thailand export projects, Xayabouly (Xayaburi), Sepian-Xenamnoy and Nam Ngiep 1 are

also included in the BAU but come online just after 2018.

Table 9 Lao PDR Committed New Entry Assumptions

No. Project Exports To Capacity (MW) Technology COD*

1 Nam Ngiep 2 180 Hydro 2015

2 Hong Sa Thailand 405 Coal 2015

3 Nam Ou 2 120 Hydro 2015

4 Nam Ou 5 240 Hydro 2015

5 Nam Ou 6 180 Hydro 2015

6 Nam Kong 2 66 Hydro 2015

7 Xekaman 1 Viet Nam 64 Hydro 2016

8 Nam Sim 8 Hydro 2016

9 Nam Mang 1 64 Hydro 2016

10 Nam Beng 34 Hydro 2016

11 Nam Sane 3A 69 Hydro 2016

12 Nam Sane 3B 45 Hydro 2016

13 Nam Lik 1 61 Hydro 2017

14 Nam Phay 86 Hydro 2018

15 Nam Tha 1 (Nam Pha) 168 Hydro 2018

16 Xekaman 4 Viet Nam 16 Hydro 2018

* Commercial Operation Date

31 UN Department of Economic and Social Affairs, World Population Prospects: The 2012 Re vision.

32 The capacity quoted is net of export arrangements.

Page 42: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 42

4.7 Regional Transmission System Integration

The modelling presented in this report assumes transmission in the GMS becomes more

tightly integrated than at present. Given the modelling period is for 35 years, we use a

regional model for the interconnections as illustrated in Figure 2633. The figure shows the

assumed topology of the GMS as well as to countries outside the region (PRC and Malaysia).

Initially, not all transmission connections shown in the diagram are in place. However, over

the modelling period the transmission connections are expanded as required to allow power

exchange between regions to minimise costs and take advantage of diversity in demand and

resource availabilities. Each scenario therefore effectively has a different high-level

transmission development plan34.

Figure 28 Regional Transmission System Model of GMS

33 Currently, there is minimal physical interconnection between each GMS country. The model shows the topology that we have used in the modelling in order to gain an understanding of interregiona l power flows and to develop a very simple high-level transmission development plan.

34 We only consider a high-level transmission development plan based on the regional model shown in order to gain insight on interregional power flows.

THAILAND

MYANMAR

CAMBODIA

VIETNAM

LAO PDR

HanoiLuang Prabang

Vientiane

Mandalay

Yangon

Ho Chi Minh City

Phnom Penh

Bangkok Angkor

Siem Reap

Vientiane

Chiang MaiMM

TH

LAO

CAM

VN-S

VN-C

VN-N

PRC

MAL

Page 43: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 43

The main differences in the assumptions behind the transmission system enhancements in

each scenario were:

In the BAU, it was assumed that transmission developments occur slowly and a tightly

integrated regional power system is in place from about 2030, but the power sectors

are developed so that there is only a limited level of dependency on imports from

neighbouring countries. This is consistent with power sector planning that seeks to not

be overly dependent on power imports from neighbouring countries.

In the SES and ASES, the transmission system evolves from 2025 and we allow the

transmission system (based on a simplified model of the region) to expand as needed

to optimise the use of a geographically disperse set of renewable energy resources. A

consequence of this is that some countries become significant exporters of power

while others take advantage of power imports from neighbouring countries. In

particular Myanmar and Lao PDR become major power exporters with the beneficiaries

being the other GMS countries.

4.8 Imports and Exports

Lao PDR power exports to neighbouring countries are mainly in the form of projects that are

dedicated35 as noted in 4.5. In addition to these projects, Lao PDR also exports smaller

quantities of power into Thailand and Vietnam via Thakhek and Champasak respectively

(power flows totalling approximately 12 GWh in 2014).

Lao PDR have importing arrangements with Thailand, Vietnam and China. Flows from

Vietnam (34 GWh in 2014) and Thailand (1,137 GWh) provide electricity to areas in Lao PDR

not connected to the grid. The significant flows from Thailand support remote mines such as

the Sepon gold and copper mines, which are not connected to the main Lao PDR grid.

The flows from China totalled 239 GWh in 2014 or the equivalent of 27 MW average demand

and connected to the Luang Prabang and Northern provinces to relieve the pressure of

central Lao PDR plants. Power flows from China were assumed constant throughout the

modelling period.

4.9 Technical Economic Power System Modelling

Technical and economic modelling of the GMS was done in the PROPHET electricity planning

and simulation models. It develops a least cost generation based plan and was used to

simulate the operation of the GMS region as an integrated power system.

A brief overview of the various aspects is provided below:

Planning Module: The Planning Module of Prophet allows for intertemporal

constraints such as energy limits to be preserved when simulating the power system

and developments. It also develops a least cost set of new entrants to satisfy demand

over the 35 year modelling horizon.

35 That is the project is connected to the national grid of the neighbouring country.

Page 44: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 44

Transmission: The power system was modelled based on the configuration as per

Figure 28 with fixed / scheduled flows (red lines) to power systems outside the GMS

not being explicitly modelled while power transfers within the GMS countries were

optimised as needed to allow supply and demand to balance. This is important with

respect to modelling diversity in demand in the different regions and geographical

variation in generation patterns from supply-driven renewable energy (solar and wind)

and seasonal variation of inflows into the hydro storages (see Figure 28).

Economics: Capital and operating costs relating to generation plants as per the

assumptions covered in this report allow the Planning Module to model generation and

transmission development in a least cost manner. On top of this, resource constraints

had to be formulated to reflect actual limits such as the maximum renewable resource

and development rates available to each country.

Demand: Demand profiles were constructed from energy and peak demand forecasts

for electricity based on regression models that were developed for each sector of the

electricity industry (commercial, industrial, residential, agricultural and transport). The

monthly and intraday construction of the profiles were performed in Prophet based on

historical data and/or external data sources indicating the seasonal profile of demand

for each country.

Flexible demand: was modelled as MW and GWh/month quantities that can be

scheduled as necessary to reduce system costs. This means that demand tends to be

shifted from periods when supply and demand would otherwise be tight to other times.

The technology for rescheduling demand was assumed to be in place from 2020 in the

SES and ASES scenarios.

Supply: The approach taken for modelling generation supply technologies varied

according to the technology type. This is discussed further below:

- Conventional thermal plant: is modelled as capacity limited plants, with fuel take

or pay contracts applied to generators where relevant and other fuel supply

constraints in place also where relevant – for example, gas supply limits applied to

LNG facilities or offshore gas fields. Examples of such plants include coal, biomass,

gas, and diesel generators.

- Energy limited plants: such as large-scale hydros with reservoirs / storages and CSP

have monthly energy limits corresponding to seasonal variations in energy inflows.

The equivalent capacity factors are based on external reports for hydro and

resource data for CSP (see next point).

- Supply-driven generation forms: Seasonal profiles for wind, solar and run of river

hydros without reservoirs were developed on an hourly basis. For wind and solar

they were derived from monthly resource data collected from a variety of sources

including NASA, NREL36 and accessed via the Solar and Wind Energy Resource Atlas

(SWERA) Toolkit and IRENA Global Atlas. Resource amounts were matched against

actual generation data for known plants to develop equivalent monthly capacity

36 DNI and Wind NASA Low Resolution and NREL DI Moderate Resolution data.

Page 45: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 45

factors at various high resource pockets in each country. Several traces were built

from known generation traces to provide diversification benefits.

- Pump Storage and battery storage: these are modelled in a similar way to flexible

demand in that demand can be shifted with a capacity and energy limit but the

scheduled demand is stored for generation later with an appropriate energy

conversion efficiency (pumped storages assumed to be 70% and battery storage

systems at 85%).

Page 46: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 46

5 Business as Usual Scenario

5.1 Business as Usual Scenario

The BAU scenario assumes industry developments consistent with the current state of

planning in Lao PDR and reflective of growth rates in electricity demand consistent with an

IES view of base development, existing renewable energy targets, where relevant,

aspirational targets for electrification rates, and energy efficiency gains that are largely

consistent with the policies seen in the region.

5.2 Demand Growth

Lao PDR’s on-grid electricity demand (including transmission and distribution losses37) is

plotted in Figure 29. Lao PDR’s electricity demand is forecast to increase at a rate of 7.0% pa

over the 35-year period to 2050 with higher growth rates in the earlier years relating to

mining projects followed by a slowdown post-2040 as the economy trends towards long-term

global GDP growth rates.

The industrial sector is forecast to grow the fastest at 8.5% followed by the residential sector

at 5.6%, commercial sector at 5.1% and agriculture at 0.8% per annum as the GDP

composition shifts towards commerce/services and industry with increases in residential

electricity consumption. The transport sector is forecast to hit 800 GWh by 2050 as the

number of cars and uptake of electric cars and motorbikes increase to 15% uptake. Lao PDR

electricity demand is forecast to reach 55 TWh by 2050. Peak demand is plotted below in

Figure 30 and shows peak demand growing at 6.6% pa reaching 8 GW by 2050. The load

factor is assumed to trend towards 75% by 2040 mainly driven by additional industrial loads

impacting the demand base.

The key drivers for demand growth and the demand projections are summarised in Table 10.

37 Note that unless otherwise stated, all other demand charts and statistics include transmission and distribution losses.

Page 47: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 47

Figure 29 Lao PDR Projected Electricity Demand (2015-50, BAU)

Figure 30 Lao PDR Projected peak Demand (BAU)

0

10

20

30

40

50

602

01

0

20

12

20

14

20

16

20

18

20

20

20

22

20

24

20

26

20

28

20

30

20

32

20

34

20

36

20

38

20

40

20

42

20

44

20

46

20

48

20

50

Ener

gy (

inc

loss

es,

TWh

)

Agriculture Industry Commercial Residential Transport

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000

20

10

20

12

20

14

20

16

20

18

20

20

20

22

20

24

20

26

20

28

20

30

20

32

20

34

20

36

20

38

20

40

20

42

20

44

20

46

20

48

20

50

Pea

k D

eman

d (

MW

)

Page 48: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 48

Table 10 Lao PDR Demand and Demand Drivers (BAU)

No. Aspect 2015-30 2030-40 2040-50

1 Demand Growth (pa) 9.7% 5.5% 3.1%

2 GDP Growth (Real, pa) 7.0% 6.5% 3.5%

3 Electrification Rate (Population) 62.6% 97.0% 98.8%

4 Population Growth 1.54% 1.07% 0.78%

5 Per Capita Consumption (kWh) 1,322 3,009 3,995

6 Electricity Elasticity* 7.70 2.28 1.33

7 Electricity Intensity (kWh/USD) 0.337 0.454 0.464

* Electricity elasticity is calculated as electricity demand growth divided by the population growth over the same period

5.3 Installed Capacity Development

The BAU installed capacity (MW) for Lao PDR is plotted in Figure 31 and Figure 32 by

capacity shares for selected years: 2010, 2015, 2020, 2030, 2040 and 2050. The former

shows installed generation capacity by the main generation type categories. We provide

corresponding statistics in Table 11 and

Table 12. Note that the installed capacity numbers exclude currently dedicated generation

that is effectively available to its neighbouring countries as imports and where appropriate

this has been de-rated to reflect supply agreements.

Installed capacity in 2014 increases from 791 MW to 14,000 MW with large-scale hydro

generation accounting for 71% of total installed capacity in 2050. Coal-fired capacity

increases to 405 MW in 2015 with the commissioning of the Hong Sa coal plant and increases

to 1,905 MW by 2050. From 2020, additional renewable capacity is developed to achieve a

10% generation share (excluding large hydro) by 2050 comprised of solar PV, onshore wind,

biomass and run-of-river hydro accounting for 14% capacity share in 2050.

Page 49: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 49

Figure 31 Lao PDR Installed Capacity (BAU, MW)

Figure 32 Lao PDR Installed Capacity Mix Percentages (BAU, %)

0

2,000

4,000

6,000

8,000

10,000

12,000

14,000

16,000

20

10

20

12

20

14

20

16

20

18

20

20

20

22

20

24

20

26

20

28

20

30

20

32

20

34

20

36

20

38

20

40

20

42

20

44

20

46

20

48

20

50

Cap

acit

y M

W

Coal Hydro Wind Diesel/FO Bio Solar Hydro ROR

20%13% 13% 15% 14%

100%

80%

75% 72% 70% 71%

3% 5% 5% 5%

4%3% 3% 4%

3%

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

2010 2015 2020 2030 2040 2050

Cap

acit

y M

ix

Coal Hydro Wind Diesel/FO Bio Solar Hydro ROR

Page 50: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 50

Table 11 Lao PDR Capacity by Type (BAU, MW)

Resource 2010 2015 2020 2030 2040 2050

Coal 0 405 405 1,005 1,605 1,905

CCS 0 0 0 0 0 0

Diesel 0 0 0 200 200 200

Fuel Oil 0 0 0 0 0 0

Gas 0 0 0 0 0 0

Nuclear 0 0 0 0 0 0

Hydro 330 1,577 2,257 5,509 7,509 10,009

Onshore Wind 0 0 77 377 527 677

Offshore Wind 0 0 0 0 0 0

Biomass 0 0 53 203 323 323

Biogas 0 0 0 0 0 0

Solar 0 0 120 220 320 520

CSP 0 0 0 0 0 0

Battery 0 0 0 0 0 0

Hydro ROR 0 0 100 100 200 400

Geothermal 0 0 0 0 0 0

Pump Storage 0 0 0 0 0 0

Ocean 0 0 0 0 0 0

Off grid 0 0 0 0 0 0

Table 12 Lao PDR Capacity Share by Type (BAU, %)

Resource 2010 2015 2020 2030 2040 2050

Coal 0% 20% 13% 13% 15% 14%

CCS 0% 0% 0% 0% 0% 0%

Diesel 0% 0% 0% 3% 2% 1%

Fuel Oil 0% 0% 0% 0% 0% 0%

Gas 0% 0% 0% 0% 0% 0%

Nuclear 0% 0% 0% 0% 0% 0%

Hydro 100% 80% 75% 72% 70% 71%

Onshore Wind 0% 0% 3% 5% 5% 5%

Offshore Wind 0% 0% 0% 0% 0% 0%

Biomass 0% 0% 2% 3% 3% 2%

Biogas 0% 0% 0% 0% 0% 0%

Solar 0% 0% 4% 3% 3% 4%

CSP 0% 0% 0% 0% 0% 0%

Battery 0% 0% 0% 0% 0% 0%

Hydro ROR 0% 0% 3% 1% 2% 3%

Geothermal 0% 0% 0% 0% 0% 0%

Pump Storage 0% 0% 0% 0% 0% 0%

Ocean 0% 0% 0% 0% 0% 0%

Off grid 0% 0% 0% 0% 0% 0%

Page 51: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 51

5.4 Projected Generation Mix

Figure 33 plots the generation mix (on an as generated basis38) over time in the BAU case and

Figure 34 plots the corresponding percentage shares. Coal-fired generation initially increases

to 887 GWh with the commissioning of the Hong Sa coal-fired power station in 2015/16 with

the remaining output exported to Thailand39, and grows to 15 TWh by 2050. Large-scale

hydro initially supplied the majority of Lao PDR’s on-grid demand requirements but with the

additional coal and renewable developments, declines to 64% by 2050. Renewable

technologies account for 10% of generation by 2050.

38 Unless otherwise stated, all generation charts and statistics in this report are presented on an “as generated” basis, meaning that generation to cover generator’s auxiliary consumption accounted for.

39 Dedicated capacity to importing countries such as that relating to Hong Sa is no t reflected here.

Page 52: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 52

Figure 33 Lao PDR Generation Mix (BAU, GWh)

Figure 34 Lao PDR Generation Mix Percentages (BAU, %)

0

10,000

20,000

30,000

40,000

50,000

60,000

70,0002

01

0

20

12

20

14

20

16

20

18

20

20

20

22

20

24

20

26

20

28

20

30

20

32

20

34

20

36

20

38

20

40

20

42

20

44

20

46

20

48

20

50

Gen

erat

ion

(G

Wh

)

Coal Hydro Wind Diesel/FO Bio Solar Hydro ROR

17% 17%25% 28% 25%

100%

83%76%

65% 62% 64%

3% 3% 3%4% 5% 4%

3%

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

2010 2015 2020 2030 2040 2050

Ge

ne

rati

on

Mix

Coal Hydro Wind Diesel/FO Bio Solar Hydro ROR

Page 53: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 53

Table 13 Lao PDR Generation by Type (BAU, GWh)

Resource 2010 2015 2020 2030 2040 2050

Coal 0 887 1,927 8,161 13,036 15,402

CCS 0 0 0 0 0 0

Diesel 0 0 0 58 81 183

Fuel Oil 0 0 0 0 0 0

Gas 0 0 0 0 0 0

Nuclear 0 0 0 0 0 0

Hydro 2,093 4,211 8,698 21,229 28,936 38,569

Onshore Wind 0 0 198 958 1,337 1,716

Offshore Wind 0 0 0 0 0 0

Biomass 0 0 0 1,332 2,126 2,120

Biogas 0 0 0 0 0 0

Solar 0 0 215 392 573 928

CSP 0 0 0 0 0 0

Battery 0 0 0 0 0 0

Hydro ROR 0 0 388 385 775 1,541

Geothermal 0 0 0 0 0 0

Pump Storage 0 0 0 0 0 0

Ocean 0 0 0 0 0 0

Off grid 0 0 0 0 0 0

Table 14 Lao PDR Generation share by Type (BAU, %)

Resource 2010 2015 2020 2030 2040 2050

Coal 0% 17% 17% 25% 28% 25%

CCS 0% 0% 0% 0% 0% 0%

Diesel 0% 0% 0% 0% 0% 0%

Fuel Oil 0% 0% 0% 0% 0% 0%

Gas 0% 0% 0% 0% 0% 0%

Nuclear 0% 0% 0% 0% 0% 0%

Hydro 100% 83% 76% 65% 62% 64%

Onshore Wind 0% 0% 2% 3% 3% 3%

Offshore Wind 0% 0% 0% 0% 0% 0%

Biomass 0% 0% 0% 4% 5% 4%

Biogas 0% 0% 0% 0% 0% 0%

Solar 0% 0% 2% 1% 1% 2%

CSP 0% 0% 0% 0% 0% 0%

Battery 0% 0% 0% 0% 0% 0%

Hydro ROR 0% 0% 3% 1% 2% 3%

Geothermal 0% 0% 0% 0% 0% 0%

Pump Storage 0% 0% 0% 0% 0% 0%

Ocean 0% 0% 0% 0% 0% 0%

Off grid 0% 0% 0% 0% 0% 0%

Page 54: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 54

5.5 Grid to Grid Power Flows

Figure 35 plots the imports and exports in the BAU with the dotted line representing the net

interchange. Flows reported are in addition to the dedicated plant output such as that from

Hong Sa power plant. Overall flows in the BAU are relatively low up to 2029 when Lao PDR

starts to export to Thailand up to 6,500 GWh a year driven by significant differences in the

levelised cost of electricity – Thailand relies on gas compared to Lao PDR which has significant

hydro resources. Flows into Viet Nam are minimal.

Figure 35 Lao PDR Imports and Exports (BAU)

5.6 Generation Fleet Structure

Figure 36 shows the installed generation capacity by the main categories of generation:

thermal, renewable and large-scale hydro, in order to provide greater insight into the basic

structure of installed capacity under the BAU. This highlights that Lao PDR’s BAU projection

is heavily dominated by hydro generation followed by coal-fired generation. Figure 37 shows

the on-grid composition of generation by major categories of generation: thermal, large

hydro and renewable. As could be anticipated, generation closely reflects the BAU’s installed

capacity mix.

-8,000

-7,000

-6,000

-5,000

-4,000

-3,000

-2,000

-1,000

0

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

Flo

ws

(GW

h)

Imports Exports Net

Page 55: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 55

Figure 36 Lao PDR Installed Capacity by Generation Type (BAU, MW)

Figure 37 Lao PDR Generation Mix by Generation Type (BAU, GWh)

0

2,000

4,000

6,000

8,000

10,000

12,000

14,000

16,000

Cap

acit

y, M

W

Fossil Fuel Large Hydro Renewable

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

Gen

erat

ion

, GW

h

Fossil Fuel Large Hydro Renewable

Page 56: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 56

To facilitate later comparison with the SES, Figure 38 plots installed capacity with capacity

being distinguished between the following basic categories: (1) dispatchable capacity, (2)

non-dispatchable capacity; and (3) semi-dispatchable capacity40. This provides some insight

into the operational flexibility of the generation fleet to match demand uncertainty. The

dispatchable category relates to generation that can be controlled and dispatched at short

notice to ramp up or down, non-dispatchable means that the generation is not able to

respond readily to dispatch instructions while the semi-dispatchable category means that the

resource can respond within limits, and in particular is capable of being backed off should

the need arise to for example, avoid overloading the network or “spill” energy in the event

that an over generation situation emerges; solar photovoltaics and windfarms with

appropriately installed control systems can be classified in this category. In the BAU, the

dispatchable percentage starts at 100% with only coal and hydro then as renewables are

added to the system, it still remains above 85% by 2050.

Figure 38 Lao PDR Installed Capacity by Dispatch Status (BAU)

5.7 Reserve Margin and Generation Trends

Figure 39 plots the reserve margin based on nameplate capacity and annual peak demand.

The Lao PDR reserve margin in the BAU hovers around 60% and is higher than the other GMS

countries in the BAU case. This is driven by Lao PDR’s investment in hydro developments,

40 Wind and solar is classified as semi-dispatchable, geothermal and hydro run-of-river is classified as non-dispatchable and all other technologies are classified as dispatchable.

0

2,000

4,000

6,000

8,000

10,000

12,000

14,000

16,000

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

Cap

acit

y, M

W

Dispatchable Non-Dispatchable Semi-Dispatchable

Page 57: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 57

which are energy limited based on the size of the hydro’s reservoir and seasonal reservoir

inflows41..

Figure 39 Lao PDR Reserve Margin (BAU)

To obtain a better understanding of the broad mix of generation capacity and generation

mix, Figure 40 and Figure 41 show shares in installed capacity and in generation grouped by

the main categories of generator: thermal, large hydro, renewable energy (RE) and large

hydro plus renewable energy.

Figure 40 Lao PDR Capacity Shares by Generation Type (BAU)

41 The amount of energy that a hydro power station can generate depends on the size of its reservoir and the volume of water storage in the reservoir, which in turn increases with inflows to the reservoir and decreases when the hydro power station generates electricity (or water is released or spilled). The term “energy limited” means that at any point in time, based on the volume of water in the reservoir, the hyd ro generator would be able to generate a certain amount of electrical energy.

0%

20%

40%

60%

80%

100%

120%

140%

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

Reserve Margin Renewable CapacityHydro Capacity Fossil Fuel Capacity

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

Cap

acit

y Sh

are

Fossil Fuel Large Hydro Renewable Renewable + Large Hydro

Page 58: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 58

Figure 41 plots the generation shares by several different categories of generation. The

thermal generation share increases to almost 30% and renewable energy including large-

scale hydro gradually declines to 70% and maintains that level as more renewable plants

enter the system. The BAU has large-scale hydro being largely exploited to support the

growing power demands in Lao PDR and to a smaller extent the neighbouring countries.

Figure 41 Lao PDR Generation Shares by Generation Type (BAU)

5.8 Electrification and Off Grid

Lao PDR’s grid-based electrification rate for its urban and rural population is assumed to

reach close to 100% by 2030 in the BAU. Due to the limited impact of off-grid in this scenario

it has been decided to only model the central grid-connected power system.

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

Gen

erat

ion

Sh

are

Fossil Fuel Large Hydro Renewable Renewable + Large Hydro

Page 59: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 59

6 Sustainable Energy Sector Scenario

6.1 Sustainable Energy Sector Scenario

The SES seeks to transition electricity demand towards the best practice benchmarks of

other developed countries in terms of energy efficiency, maximise the renewable energy

development, cease the development of fossil fuel resources, and make sustainable and

prudent use of undeveloped conventional hydro resources. The SES takes advantage of

existing, technically proven and commercially viable renewable energy technologies.

6.2 Demand Growth

Figure 42 plots Lao PDR’s forecast energy consumption from 2015 to 2050 with the BAU

energy trajectory charted as a comparison. The significant savings are due to additional

energy efficiency assumptions relating to the various sectors achieving energy intensity

benchmarks of comparable developed countries in Asia42. The SES demand grows at a

slower rate of 6.4% pa over the period to 2050 with the commercial sector growing at 3.8%

pa, industry growing at 8.2% pa and the residential sector growing at 4.1% pa. The

agricultural sector grows at 0.7% and the uptake of electric transport options occur from

2025 onwards and grows to 800 GWh accounting for 2% of total demand by 2050, or 10%

of all vehicles.

Figure 43 plots peak demand of Lao PDR. The firm blue line represents peak demand before

any flexible demand side resources have been scheduled43. Flexible demand response is

“dispatched” in the model in line with the least cost dispatch of all resources in the power

system. The dashed line represents what peak demand became as a consequence of

scheduling (“time-shifting”) commercial, industrial and residential loads to minimise

system costs. From 2020, the amount of flexible demand was assumed to grow to 10% of

total demand across all sectors by 2050, or 15% if storage methods are included. The load

factor associated with the SES was also assumed to reach 80% (compared to 75% under the

BAU case) by 2030 as a further consequence of enhanced demand side management

measures relative to the BAU.

Key drivers for demand growth and the demand projections are summarised in Table 12.

42 Lao PDR’s industrial energy intensity was trended towards levels commensurate with Hong Kong (2014) by 2050. Hong Kong had the lowest intensity based on the intensity metric of a basket of comparable countries.

43 Flexible demand response is “dispatched” in the model in line with the least cost dispatch of all resources. The solid line represents peak demand as put in the model, while the dashed line represents what peak demand ended up being as a consequence of shifting demand from one period of time to another. This includes scheduling of loads associated with battery storage devices and rescheduling (time-shifting) commercial, industrial and residential loads.

Page 60: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 60

Figure 42 Lao PDR Projected Electricity Demand (2015-50, SES)

Figure 43 Lao PDR Projected Electricity Demand (SES, MW)

0

10

20

30

40

50

60

20

10

20

12

20

14

20

16

20

18

20

20

20

22

20

24

20

26

20

28

20

30

20

32

20

34

20

36

20

38

20

40

20

42

20

44

20

46

20

48

20

50

Ener

gy (

inc

loss

es,

TWh

)

Agriculture Industry Commercial

Residential Transport BAU

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

20

10

20

12

20

14

20

16

20

18

20

20

20

22

20

24

20

26

20

28

20

30

20

32

20

34

20

36

20

38

20

40

20

42

20

44

20

46

20

48

20

50

Pea

k D

eman

d (

MW

)

Page 61: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 61

Table 15 Lao PDR Demand and Demand Drivers (SES)

No. Aspect 2015-30 2030-40 2040-50

1 Demand Growth (pa) 7.3% 5.8% 2.3%

2 GDP Growth (Real, pa) 7.0% 6.5% 3.5%

3 Electrification Rate (Population) 49.3% 78.4% 84.5%

4 Population Growth 1.54% 1.07% 0.78%

5 Per Capita Consumption (kWh) 1,204 2,637 3,382

6 Electricity Elasticity* 7.01 2.19 1.28

7 Electricity Intensity (kWh/USD) 0.307 0.398 0.392

* Electricity elasticity is calculated as electricity demand growth divided by the population growth over the same period

6.3 Installed Capacity Development

Figure 44 plots the installed capacity developments under the SES and Figure 45 plots the

corresponding percentage shares. Table 16 and Table 17 provide the statistical details of

the installed capacity and capacity shares by type including the estimated 2010 levels.

Committed and existing plants are assumed to come online as per the BAU but aren’t

replaced when retired. Planned and proposed thermal and large-scale hydro developments

are assumed to not occur, with the exception of 2,500 MW of large scale hydro to support

renewable developments, and all other generation requirements are instead met by

renewable technologies. Coal and gas fired-generation in the earlier years is very similar to

the BAU due to committed projects. Over time, hydro and coal capacity shares drop from

100% in 2015 as more and more renewable generation, predominantly solar PV, comes

online.

Timing of renewable energy developments are based on the maturity of the technology and

judgments of when it could be readily deployed in Lao PDR. Additional demand in the SES is

mainly met by renewables with 23 GW required to meet 2050 electricity demand from a

current capacity base around 2,000 MW (large-scale and grid connected). Solar PV is to

account for 10 GW, biomass 2 GW, CSP 1 GW, and wind energy 6 GW of the total by 2050.

Battery storage with an equivalent capability of 2 GW is developed to support the significant

amount of solar PV and off-peak load. Small amounts of run-of-river hydro and geothermal

are also developed in the later stages.

Page 62: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 62

Figure 44 Lao PDR Installed Capacity by Type (SES, MW)

Figure 45 Lao PDR Capacity Shares (SES, %)

0

5,000

10,000

15,000

20,000

25,000

30,000

20

10

20

12

20

14

20

16

20

18

20

20

20

22

20

24

20

26

20

28

20

30

20

32

20

34

20

36

20

38

20

40

20

42

20

44

20

46

20

48

20

50

Cap

acit

y M

W

Coal Hydro Wind Bio Solar CSP Battery Hydro ROR

20%

9%4%

100%

80%

59%

39%

22%15%

15%

26%

22%

21%

4%

7%

9%

13%

18%

32%35%

3%5%

5%

6%5%

5%

5% 8%

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

2010 2015 2020 2030 2040 2050

Cap

acit

y M

ix

Coal Hydro Wind Bio Solar CSP Hydro ROR Battery

Page 63: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 63

Table 16 Lao PDR Capacity by Type (SES, MW)

Resource 2010 2015 2020 2030 2040 2050

Coal 0 405 405 405 405 405

CCS 0 0 0 0 0 0

Diesel 0 0 0 0 0 0

Fuel Oil 0 0 0 0 0 0

Gas 0 0 0 0 0 0

Nuclear 0 0 0 0 0 0

Hydro 330 1,577 2,692 4,192 4,192 4,192

Onshore Wind 0 0 701 2,801 4,301 5,801

Offshore Wind 0 0 0 0 0 0

Biomass 0 0 105 409 758 1,223

Biogas 0 0 0 36 647 1,101

Solar 0 0 580 1,980 6,080 9,580

CSP 0 0 0 300 900 1,350

Battery 0 0 0 0 890 2,247

Hydro ROR 0 0 100 700 1,000 1,300

Geothermal 0 0 0 0 50 50

Pump Storage 0 0 0 0 0 0

Ocean 0 0 0 0 0 0

Off grid 0 0 0 0 0 0

Table 17 Lao PDR Capacity Share by Type (SES, %)

Resource 2010 2015 2020 2030 2040 2050

Coal 0% 20% 9% 4% 2% 1%

CCS 0% 0% 0% 0% 0% 0%

Diesel 0% 0% 0% 0% 0% 0%

Fuel Oil 0% 0% 0% 0% 0% 0%

Gas 0% 0% 0% 0% 0% 0%

Nuclear 0% 0% 0% 0% 0% 0%

Hydro 100% 80% 59% 39% 22% 15%

Onshore Wind 0% 0% 15% 26% 22% 21%

Offshore Wind 0% 0% 0% 0% 0% 0%

Biomass 0% 0% 2% 4% 4% 4%

Biogas 0% 0% 0% 0% 3% 4%

Solar 0% 0% 13% 18% 32% 35%

CSP 0% 0% 0% 3% 5% 5%

Battery 0% 0% 0% 0% 5% 8%

Hydro ROR 0% 0% 2% 6% 5% 5%

Geothermal 0% 0% 0% 0% 0% 0%

Pump Storage 0% 0% 0% 0% 0% 0%

Ocean 0% 0% 0% 0% 0% 0%

Off grid 0% 0% 0% 0% 0% 0%

Page 64: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 64

6.4 Projected Generation Mix

Grid generation is plotted in Figure 46 and Figure 4744. The corresponding statistics for

snapshot years are provided in Table 19 and Table 20.

Lao PDR’s generation mix in the earlier years to 2020 is similar to the BAU case as committed

new entry are commissioned. Thermal and large hydro projects outside what is deemed

existing or committed (with the exception of some hydro) is not developed and renewable

technology is used to meet the remaining incremental demand.

Coal and large scale hydro decline to a combined 23% generation share by 2050 whereas

solar PV accounts for the highest generation share of 17 TWh or 22%, followed by onshore

wind at 19% then biomass and biogas at a combined 21% then CSP at 8%. All up Lao PDR

generates more than 75 TWh against a demand base of 43 TWh by 2050 with the excess

power exported into neighbouring countries.

44 Battery storage is not included as storage technologies are generation neutral.

Page 65: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 65

Figure 46 Lao PDR Generation Mix (SES, GWh)

Figure 47 Lao PDR Generation Share (SES, %)

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000

90,0002

01

0

20

12

20

14

20

16

20

18

20

20

20

22

20

24

20

26

20

28

20

30

20

32

20

34

20

36

20

38

20

40

20

42

20

44

20

46

20

48

20

50

Gen

erat

ion

(G

Wh

)

Coal Hydro Wind Bio Solar CSP Hydro ROR

17%8% 9%

5%

100%

83%

68%

43%

29%

21%

13%

19%

18%

19%

8%

16%

21%

7%

10%

18%22%

3% 7% 8%

4% 7% 6% 6%

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

2010 2015 2020 2030 2040 2050

Ge

ne

rati

on

Mix

Coal Hydro Wind Bio Solar CSP Hydro ROR

Page 66: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 66

Table 18 Lao PDR Generation by Fuel (SES, GWh)

Resource 2010 2015 2020 2030 2040 2050

Coal 0 887 1,128 3,342 2,798 1,745

CCS 0 0 0 0 0 0

Diesel 0 0 0 0 0 0

Fuel Oil 0 0 0 0 0 0

Gas 0 0 0 0 0 0

Nuclear 0 0 0 0 0 0

Hydro 2,093 4,211 9,614 16,020 17,382 15,902

Onshore Wind 0 0 1,807 7,117 10,908 14,707

Offshore Wind 0 0 0 0 0 0

Biomass 0 0 0 2,869 5,328 8,575

Biogas 0 0 0 249 4,545 7,718

Solar 0 0 1,038 3,532 10,887 17,091

CSP 0 0 0 1,010 3,939 6,100

Battery 0 0 0 0 0 0

Hydro ROR 0 0 504 2,698 3,877 5,009

Geothermal 0 0 0 0 334 333

Pump Storage 0 0 0 0 0 0

Ocean 0 0 0 0 0 0

Off grid 0 0 0 0 0 0

Table 19 Lao PDR Generation Share by Fuel (SES, %)

Resource 2010 2015 2020 2030 2040 2050

Coal 0% 17% 8% 9% 5% 2%

CCS 0% 0% 0% 0% 0% 0%

Diesel 0% 0% 0% 0% 0% 0%

Fuel Oil 0% 0% 0% 0% 0% 0%

Gas 0% 0% 0% 0% 0% 0%

Nuclear 0% 0% 0% 0% 0% 0%

Hydro 100% 83% 68% 43% 29% 21%

Onshore Wind 0% 0% 13% 19% 18% 19%

Offshore Wind 0% 0% 0% 0% 0% 0%

Biomass 0% 0% 0% 8% 9% 11%

Biogas 0% 0% 0% 1% 8% 10%

Solar 0% 0% 7% 10% 18% 22%

CSP 0% 0% 0% 3% 7% 8%

Battery 0% 0% 0% 0% 0% 0%

Hydro ROR 0% 0% 4% 7% 6% 6%

Geothermal 0% 0% 0% 0% 1% 0%

Pump Storage 0% 0% 0% 0% 0% 0%

Ocean 0% 0% 0% 0% 0% 0%

Off grid 0% 0% 0% 0% 0% 0%

Page 67: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 67

6.5 Grid to Grid Power Flows

Figure 48 plots the imports and exports in the SES with the dotted line representing the net

interchange. Lao PDR imports and exports more in the SES than the BAU due to optimising

generation across the region rather than on a country by country basis. Lao PDR exports to

all of its neighbouring countries with the majority of flows into northern Viet Nam and

Thailand. The power imports also come from Thailand due to diversification of renewable

resource profiles coinciding with peak demands and demand troughs throughout the year,

but mainly driven by the need to export power into Viet Nam. Lao PDR is a net exporter of

power of up to 23 TWh by 2050.

Figure 48 Lao PDR Imports and Exports (SES)

6.6 Generation Fleet Structure

As for the BAU, to gain insight into the nature of the mix of generation technologies deployed

in the SES, we present a number of additional charts. Figure 49 and Figure 50 show Lao PDR’s

installed capacity and generation by type for the SES – this is heavily biased towards

renewable generation forms. For Lao PDR, the only fossil-fuel based generation relates to

the Hong Sa coal project.

-80,000

-60,000

-40,000

-20,000

0

20,000

40,000

60,000

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

Flo

ws

(GW

h)

Imports Exports Net

Page 68: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 68

Figure 49 Lao PDR Installed Capacity by Generation Type (SES, MW)

Figure 50 Lao PDR Generation Mix by Generation Type (SES, MW)

0

5,000

10,000

15,000

20,000

25,000

30,000

Cap

acit

y, M

W

Fossil Fuel Large Hydro Renewable

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000

90,000

Gen

erat

ion

, GW

h

Fossil Fuel Large Hydro Renewable

Page 69: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 69

Figure 51, shows the dispatchable, semi-dispatchable and non-dispatchable components of

installed capacity and it can be seen that semi-dispatchable increases to around 61% of the

total system capacity compared to around 9% in the BAU by 2050. Based on operational

simulations with this resource mix, it appears to be operationally feasible, and generation

forms that provide storage and flexibility in the demand side play important roles. It is clear

that short-term renewable energy solar and wind forecasting systems will be important, as

will real-time updates on demand that can be controlled. Furthermore, control systems that

can allow the dispatch of flexible resources on both supply and demand sides of the industry

and across the region will be required.

Figure 51 Lao PDR Installed Capacity by Dispatch Status (SES, MW)

6.7 Reserve Margin and Generation Trends

Figure 52 plots the reserve margin under the SES. Figure 53 and Figure 54, respectively, show

the installed capacity mix and generation mix for different categories of generation in the

power system. Generation projects are built in Lao PDR well above the power requirements

in the country to support power flows into the neighbouring countries - explaining the

reserve margin trajectory. Renewable generation including large-scale hydro reaches 98% or

77% without large-scale hydro with the only fossil fuel project being the Hong Sa coal project

which exports the majority of its power into Thailand. It is worth noting conventional reserve

margin measures are generally not suited to measuring high renewable energy systems in

the same context used for thermal-based systems. Renewable technologies generally have

much lower capacity factors and require more capacity to meet the same amount of energy

produced from thermal-based technologies.

0

5,000

10,000

15,000

20,000

25,000

30,000

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

Cap

acit

y, M

W

Dispatchable Non-Dispatchable Semi-Dispatchable

Page 70: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 70

Figure 52 Lao PDR Reserve Margin (SES)

Figure 53 Lao PDR Installed Capacity Shares for SES by Generation Type

0%

50%

100%

150%

200%

250%

300%

350%

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

Reserve Margin Renewable Capacity

Hydro Capacity Fossil Fuel Capacity

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

Caa

city

Sh

are

Fossil Fuel Large Hydro Renewable Renewable + Large Hydro

Page 71: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 71

Figure 54 Lao PDR Generation Shares for SES by Generation Type

6.8 Electrification and Off-Grid

Lao PDR’s grid electrification rate for its urban and rural population is assumed to reach close

to 100% by 2030 as per the BAU.

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

Gen

erat

ion

Sh

are

Fossil Fuel Large Hydro Renewable Renewable + Large Hydro

Page 72: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 72

7 Advanced Sustainable Energy Sector Scenario

7.1 Advanced Sustainable Energy Sector Scenario

The ASES assumes that the power sector is able to more rapidly transition towards a 100%

renewable energy technology mix under an assumption that renewable energy is deployed

more than in the SES scenario with renewable energy technology costs declining more

rapidly compared to BAU and SES scenarios.

7.2 Demand Growth

Figure 55 plots Lao PDR’s forecast energy consumption from 2015 to 2050 with the BAU

and SES energy trajectory charted with a dashed line for comparison. The SES energy

savings against the BAU are due to allowing Lao PDR’s energy demand to transition towards

energy intensity benchmarks of comparable developed countries in Asia. The ASES applies

an additional 10% energy efficiency against the SES demands which is partially offset with

additional transport demands associated with higher uptake rates.

The ASES demand grows at a slower rate of 6.1% pa over the period from 2015 to 2050

with the commercial sector at 3.5% pa, industry growing at 7.8% pa and the residential

sector growing at 4.1% pa. Demand from the transport sector in the ASES is doubled and

grows to 1,618 GWh or 4% of total demand by 2050 accounting for 20% of all vehicles.

Figure 56 plots the peak demand of Lao PDR. The firm blue line represents peak demand in

Cambodia without any demand side management impacts. Demand side management

reflects demand responses to tight supply and network conditions. This is assumed to grow

to as much as 17.5% of demand across all sectors by 2050, representing the portion of

flexible demand that is not met through technology means (i.e. battery storage). The load

factor associated with the ASES is also assumed to reach 80% (compared to 75% under the

BAU case) by 2030 as a further consequence of enhanced demand side management

measures relative to the BAU.

Key drivers for demand growth and the demand projections are summarised in Table 17.

Page 73: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 73

Figure 55 Lao PDR Projected Electricity Demand (2015-50, ASES)

Figure 56 Lao PDR Projected Electricity Demand (ASES, MW)

0

10

20

30

40

50

60

20

10

20

12

20

14

20

16

20

18

20

20

20

22

20

24

20

26

20

28

20

30

20

32

20

34

20

36

20

38

20

40

20

42

20

44

20

46

20

48

20

50

Ener

gy (

inc

loss

es,

TWh

)

Agriculture Industry Commercial Residential

Transport BAU SES

0

1,000

2,000

3,000

4,000

5,000

6,000

20

10

20

12

20

14

20

16

20

18

20

20

20

22

20

24

20

26

20

28

20

30

20

32

20

34

20

36

20

38

20

40

20

42

20

44

20

46

20

48

20

50

Pea

k D

eman

d (

MW

)

Page 74: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 74

Table 20 Lao PDR Demand and Demand Drivers (ASES)

No. Aspect 2015-30 2030-40 2040-50

1 Demand Growth (pa) 6.4% 6.0% 2.9%

2 GDP Growth (Real, pa) 7.0% 6.5% 3.5%

3 Electrification Rate (Population) 41.4% 58.7% 60.0%

4 Population Growth 1.54% 1.07% 0.78%

5 Per Capita Consumption (kWh) 1,115 2,358 3,052

6 Electricity Elasticity* 6.49 2.12 1.29

7 Electricity Intensity (kWh/USD) 0.284 0.356 0.354

* Electricity elasticity is calculated as electricity demand growth divided by the population growth over the same period

7.3 Installed Capacity Development

Figure 57 plots the installed capacity developments under the SES and Figure 58 plots the

corresponding percentage shares. Table 21 and Table 22 provide the statistical details of the

installed capacity and capacity shares by type including the 2010 levels.

The ASES retires the coal plant earlier than in the SES under a 100% renewable generation

target across the region. Total installed capacity increases to almost 30 GW or 10% higher

than in the SES, with solar PV accounting for 33% of total installed capacity, or almost 10 GW,

supported by 3,710 MW equivalent of battery storage for generation deferral. Onshore wind

accounts for 7,300 MW or 25% and large scale hydro remains at 4,100 MW as per the SES. A

significant portion of this capacity is dedicated to exports noting Lao PDR ASES only demand

reaching 5,625 MW by 2050.

Page 75: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 75

Figure 57 Lao PDR Installed Capacity by Type (ASES, MW)

Figure 58 Lao PDR Capacity Shares (ASES, %)

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

20

10

20

12

20

14

20

16

20

18

20

20

20

22

20

24

20

26

20

28

20

30

20

32

20

34

20

36

20

38

20

40

20

42

20

44

20

46

20

48

20

50

Cap

acit

y M

W

Coal Hydro Wind Bio Solar CSP Battery Hydro ROR

20%

9%4%

100%

80%

59%

38%

19%14%

15%

26%

25%

25%

4%

6%

7%

13%

18%

28%33%

3%

4% 5%

6%

5% 4%

11% 13%

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

2010 2015 2020 2030 2040 2050

Cap

acit

y M

ix

Coal Hydro Wind Bio Solar CSP Hydro ROR Battery

Page 76: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 76

Table 21 Lao PDR Capacity by Type (ASES, MW)

Resource 2010 2015 2020 2030 2040 2050

Coal 0 405 405 405 405 0

CCS 0 0 0 0 0 0

Diesel 0 0 0 0 0 0

Fuel Oil 0 0 0 0 0 0

Gas 0 0 0 0 0 0

Nuclear 0 0 0 0 0 0

Hydro 330 1,577 2,692 4,192 4,192 4,192

Onshore Wind 0 0 701 2,801 5,301 7,301

Offshore Wind 0 0 0 0 0 0

Biomass 0 0 105 422 752 1,069

Biogas 0 0 0 22 533 855

Solar 0 0 580 1,980 6,080 9,580

CSP 0 0 0 300 900 1,350

Battery 0 0 0 116 2,330 3,710

Hydro ROR 0 0 100 700 1,000 1,300

Geothermal 0 0 0 0 50 50

Pump Storage 0 0 0 0 0 0

Ocean 0 0 0 0 0 0

Off grid 0 0 0 0 0 0

Table 22 Lao PDR Capacity Share by Fuel (ASES, %)

Resource 2010 2015 2020 2030 2040 2050

Coal 0% 20% 9% 4% 2% 0%

CCS 0% 0% 0% 0% 0% 0%

Diesel 0% 0% 0% 0% 0% 0%

Fuel Oil 0% 0% 0% 0% 0% 0%

Gas 0% 0% 0% 0% 0% 0%

Nuclear 0% 0% 0% 0% 0% 0%

Hydro 100% 80% 59% 38% 19% 14%

Onshore Wind 0% 0% 15% 26% 25% 25%

Offshore Wind 0% 0% 0% 0% 0% 0%

Biomass 0% 0% 2% 4% 3% 4%

Biogas 0% 0% 0% 0% 2% 3%

Solar 0% 0% 13% 18% 28% 33%

CSP 0% 0% 0% 3% 4% 5%

Battery 0% 0% 0% 1% 11% 13%

Hydro ROR 0% 0% 2% 6% 5% 4%

Geothermal 0% 0% 0% 0% 0% 0%

Pump Storage 0% 0% 0% 0% 0% 0%

Ocean 0% 0% 0% 0% 0% 0%

Off grid 0% 0% 0% 0% 0% 0%

Page 77: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 77

7.4 Projected Generation Mix

ASES grid generation is plotted in Figure 59 and generation shares in Figure 60. The

corresponding statistics for snapshot years are provided in Table 24 and Table 25. Lao PDR’s

generation mix in the earlier years to 2020 is similar to the BAU case as committed new

generation projects are commissioned and this has largely been kept the same.

Of the renewable technologies, by 2050, onshore wind generation contributes the highest

generation share of 19 TWh or 26% closely followed by solar PV at 24%. Biomass fills the

baseload role in the power system as gas and coal plants from other countries retire earlier

than in the SES. By 2030, more than 90% of all generation is from renewable sources (includes

large-scale hydro) and moves towards 100% by 2050.

Page 78: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 78

Figure 59 Lao PDR Generation Mix (ASES, GWh)

Figure 60 Lao PDR Generation Mix (ASES, %)

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,0002

01

0

20

12

20

14

20

16

20

18

20

20

20

22

20

24

20

26

20

28

20

30

20

32

20

34

20

36

20

38

20

40

20

42

20

44

20

46

20

48

20

50

Gen

erat

ion

(G

Wh

)

Coal Hydro Wind Bio Solar CSP Hydro ROR

17% 14%8%

100%

83%

62%

43%

27%23%

11%

20%

23%26%

4%

9%

15%

10%

6%

10%

19%

24%

3% 7% 9%

7% 7% 7%

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

2010 2015 2020 2030 2040 2050

Ge

ne

rati

on

Mix

Coal Hydro Wind Bio Solar CSP Hydro ROR

Page 79: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 79

Table 23 Lao PDR Generation by Type (ASES, GWh)

Resource 2010 2015 2020 2030 2040 2050

Coal 0 887 2,354 3,077 1,689 0

CCS 0 0 0 0 0 0

Diesel 0 0 0 0 0 0

Fuel Oil 0 0 0 0 0 0

Gas 0 0 0 0 0 0

Nuclear 0 0 0 0 0 0

Hydro 2,093 4,211 10,295 15,786 15,662 16,408

Onshore Wind 0 0 1,807 7,117 13,444 18,510

Offshore Wind 0 0 0 0 0 0

Biomass 0 0 690 2,963 5,253 3,758

Biogas 0 0 0 156 3,721 3,006

Solar 0 0 1,038 3,532 10,887 17,091

CSP 0 0 0 1,010 3,939 6,100

Battery 0 0 0 0 0 0

Hydro ROR 0 0 348 2,698 3,877 5,009

Geothermal 0 0 0 0 334 333

Pump Storage 0 0 0 0 0 0

Ocean 0 0 0 0 0 0

Off grid 0 0 0 0 0 0

Table 24 Lao PDR Generation Share by Type (ASES, %)

Resource 2010 2015 2020 2030 2040 2050

Coal 0% 17% 14% 8% 3% 0%

CCS 0% 0% 0% 0% 0% 0%

Diesel 0% 0% 0% 0% 0% 0%

Fuel Oil 0% 0% 0% 0% 0% 0%

Gas 0% 0% 0% 0% 0% 0%

Nuclear 0% 0% 0% 0% 0% 0%

Hydro 100% 83% 62% 43% 27% 23%

Onshore Wind 0% 0% 11% 20% 23% 26%

Offshore Wind 0% 0% 0% 0% 0% 0%

Biomass 0% 0% 4% 8% 9% 5%

Biogas 0% 0% 0% 0% 6% 4%

Solar 0% 0% 6% 10% 19% 24%

CSP 0% 0% 0% 3% 7% 9%

Battery 0% 0% 0% 0% 0% 0%

Hydro ROR 0% 0% 2% 7% 7% 7%

Geothermal 0% 0% 0% 0% 1% 0%

Pump Storage 0% 0% 0% 0% 0% 0%

Ocean 0% 0% 0% 0% 0% 0%

Off grid 0% 0% 0% 0% 0% 0%

Page 80: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 80

7.5 Grid to Grid Power Flows

Figure 61 plots the imports and exports in the ASES with the dotted line representing the net

interchange. The power flows in the ASES is similar in magnitude to the SES with most of the

power exported to Thailand around 2025 and into the central and north regions of Viet Nam

from 2030. Similar to the SES, imports into Lao PDR come from Thailand due to diversification

benefits and additional power flows required into Viet Nam due to its significant shift from

fossil fuels to renewable energy.

Figure 61 Lao PDR Imports and Exports (ASES, GWh)

7.6 Generation Fleet Structure

To gain insight into the nature of the mix of generation technologies deployed in the ASES,

we present a number of additional charts. Figure 62 and Figure 63 show Lao PDR’s installed

capacity by generation type for the SES – this is clearly biased towards renewable generation

forms as there are no additional thermal projects built after 2015. For Lao PDR, a

considerable amount of non-renewable energy continues to feature in the generation mix in

the earlier years before declining to 0 by 2050.

-80,000

-60,000

-40,000

-20,000

0

20,000

40,000

60,000

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

Flo

ws

(GW

h)

Imports Exports Net

Page 81: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 81

Figure 62 Lao PDR Installed Capacity by Type (ASES, MW)

Figure 63 Lao PDR Generation Mix by Type (ASES, GWh)

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

Cap

acit

y, M

W

Fossil Fuel Large Hydro Renewable

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000

Gen

erat

ion

, GW

h

Fossil Fuel Large Hydro Renewable

Page 82: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 82

Figure 64 shows the dispatchable, semi-dispatchable and non-dispatchable components of

installed capacity and it can be seen that semi-dispatchable increases to around 65% of the

total system capacity compared to around 9% in the BAU by 2050. Based on operational

simulations with this resource mix, it appears to be operationally feasible, and generation

forms that provide storage and having flexibility in the demand side play important roles. It

is clear that short-term renewable energy solar and wind forecasting systems will be

important, as will real-time updates on demand that can be controlled. Furthermore, control

systems that can allow the dispatch of flexible resources on both supply and demand sides

of the industry will be required.

Figure 64 Lao PDR Installed Capacity by Dispatch Status (ASES, MW)

7.7 Reserve Margin and Generation Trends

Figure 65 plots the reserve margin under the ASES. Figure 66 and Figure 67, respectively,

show the installed capacity mix and generation mix for different categories of generation in

the power system. The ASES reserve margin trends past 100% as Lao PDR has projects built

to supply power into Viet Nam and to a smaller extent to the other neighbouring countries.

It is worth noting conventional reserve margin measures are generally not suited to

measuring high renewable energy systems in the same context used for thermal-based

systems. Renewable technologies generally have much lower capacity factors and require

more capacity to meet the same amount of energy produced from thermal-based

technologies.

0

5,000

10,000

15,000

20,000

25,000

30,000

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

Cap

acit

y, M

W

Dispatchable Non-Dispatchable Semi-Dispatchable

Page 83: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 83

Figure 65 Lao PDR Reserve Margin (ASES)

Figure 66 Lao PDR Installed Capacity Shares for ASES by Generation Type

0%

50%

100%

150%

200%

250%

300%

350%

400%2

01

5

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

Reserve Margin Renewable Capacity

Hydro Capacity Fossil Fuel Capacity

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

Caa

city

Sh

are

Fossil Fuel Large Hydro Renewable Renewable + Large Hydro

Page 84: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 84

Figure 67 Lao PDR Generation Shares for ASES by Generation Type

7.8 Electrification and Off-Grid

Lao PDR’s grid-electrification rate for its urban and rural population is assumed to reach close

to 100% by 2030 as per the BAU.

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

Gen

erat

ion

Sh

are

Fossil Fuel Large Hydro Renewable Renewable + Large Hydro

Page 85: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 85

8 Analysis of Scenarios

Sections 5, 6 and 7 presented projections of capacity and generation mix for the BAU, SES

and ASES scenarios respectively. In order to understand the implications of the SES and ASES

over the BAU, we have formulated a set of metrics to assist in their comparison.

These are as follows:

Overall energy consumption per year;

Peak electricity demand per year;

Renewable energy percentage comparisons;

Carbon emissions measures;

Hydro power developments;

Analysis of bioenergy situation;

A number of simple security of supply measures; and

Interregional power flows.

8.1 Energy and Peak Demand

Figure 68 compares the total electricity consumption of the BAU, SES and ASES with Figure

69 plotting the percentage reduction in electricity consumption of the SES relative to the

BAU and ASES relative to the BAU. As can be seen the energy consumption of SES is lower

than the BAU with the main driver being enhancements in energy efficiency in the SES. The

reduction in energy in the ASES is partially offset by the doubling of electric transport

demand.

Page 86: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 86

Figure 68 Lao PDR Electricity Demand Comparison

Figure 69 Lao PDR Percentage Reduction in Electricity Demand

0

10,000

20,000

30,000

40,000

50,000

60,000

20

10

20

12

20

14

20

16

20

18

20

20

20

22

20

24

20

26

20

28

20

30

20

32

20

34

20

36

20

38

20

40

20

42

20

44

20

46

20

48

20

50

Ener

gy (

GW

h)

BAU SES

ASES

0%

5%

10%

15%

20%

25%

30%

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

SES ASES

Page 87: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 87

Figure 70 compares peak load and shows the same relativities. This is attributable to

improvements in load factor (80% in SES and ASES). On top of this the SES and ASES has

contributions from flexible and controllable demand that allows reductions in peak

demand consumption (not shown here).

Figure 70 Lao PDR Peak Demand Comparison

8.2 Energy intensity

Figure 71 plots the per capita electricity consumption per annum across the scenarios.

Electricity consumption includes all electricity consumption across the country. In the BAU,

per capita consumption levels increase at a rate of 5.4% to reach 5,200 kWh pa which is

significantly less than Hong Kong’s current level. In the ASES and SES, it increases more slowly

at 4.8% pa and 4.5% pa, respectively, due tohigher energy efficiency savings. It should be

noted that GDP growth assumptions remain constant across all scenarios with the difference

in the ASES and SES being measures taken to improve energy efficiency.

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000

20

10

20

12

20

14

20

16

20

18

20

20

20

22

20

24

20

26

20

28

20

30

20

32

20

34

20

36

20

38

20

40

20

42

20

44

20

46

20

48

20

50

Pea

k D

eman

d (

MW

)

BAU

SES

ASES

Page 88: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 88

Figure 71 Lao PDR Per Capita Consumption Comparison (kWh pa)

8.3 Generation Mix Comparison

Figure 72 and Figure 73 below show the renewable capacity and generation mix between the

two scenarios. Renewable capacity (including large-scale hydro) reaches 85% in the BAU,

which is equivalent to a 74% generation share driven by significant large-hydro exploitation.

The SES and ASES reaches 100% renewable capacity and generation capacity by 2050.

0

2,000

4,000

6,000

8,000

10,000

12,000

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

Tota

l ele

ctri

city

use

(kW

h p

er c

apit

a)

BAU SES ASES

Singapore - 2014 HK - 2014 Japan - 2014

Taiwan - 2014

Page 89: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 89

Figure 72 Lao PDR Renewable Installed Capacity Mix

Figure 73 Lao PDR Renewable Generation Mix Comparison

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

Re

ne

wab

le C

apac

ity

Mix

(%

)

BAU (RE) SES (RE) ASES (RE)

BAU (RE + Large Hydro) SES (RE + Large Hydro) ASES (RE + Large Hydro)

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

Re

ne

wab

le G

en

era

tio

n M

ix (

%)

BAU (RE) SES (RE) ASES (RE)

BAU (RE + Large Hydro) SES (RE + Large Hydro) ASES (RE + Large Hydro)

Page 90: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 90

8.4 Carbon Emissions

Figure 74 and Figure 75 show the carbon intensity of Lao PDR’s power system and the total

per annum carbon emissions respectively. The intensity trajectory goes up in the BAU as

more coal enters the scenario reaching 0.22t-CO2e/MWh by 2050. The SES gets to 0.02t-

CO2e/MWh by 2050 and the ASES is 100% carbon emissions free45. In terms of total carbon

emissions, the shift towards the SES and ASES saves up to 12 and 13 mt-CO2e, respectively,

or the equivalent to a 93% and 100% saving from the BAU. The emissions savings are

relatively small due to the large amount of large-hydro generation in the BAU.

Figure 74 Lao PDR Carbon Intensity Comparison

Figure 75 Lao PDR Carbon Emissions Comparison

45 We assume zero emissions from hydro and bio-generation.

0.00

0.05

0.10

0.15

0.20

0.25

0.30

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

Car

bo

n In

ten

sity

(t-

CO

2e/

MW

h)

BAU SES ASES

0

2

4

6

8

10

12

14

16

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

Emis

sio

ns

(mt-

CO

2e

per

an

nu

m)

BAU SES

ASES Avoided Emissions (SES)

Avoided Emissions (ASES)

Page 91: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 91

8.5 Hydro Power Developments

Table 22 lists the hydro generation projects and commissioning year under the three

scenarios. Hydro projects are assumed to be refurbished as required to maintain operations

throughout the modelling horizon. As discussed earlier, projects such as Xekaman 4 located

in other countries but dedicated to exports are included as projects in the export markets

(with capacities adjusted accordingly)46.

Table 25 Lao PDR Hydro Power Developments for BAU, SES, ASES

Hydro Project Installed Capacity

(MW)

Year Commissioned

BAU SES ASES

Nam Ngiep 2 180 2015 2015 2015

Nam Ou 2 120 2015 2015 2015

Nam Ou 5 240 2015 2015 2015

Nam Ou 6 180 2015 2015 2015

Nam Kong 2 66 2015 2015 2015

Xekaman 1 64.4 2016 2016 2016

Nam Sim 8 2016 2016 2016

Nam Mang 1 64 2016 2016 2016

Nam Beng 34 2016 2016 2016

Nam Sane 3A 69 2016 2016 2016

Nam Sane 3B 45 2016 2016 2016

Nam Lik 1 61 2017 2017 2017

Nam Phay 86 2018 2018 2018

Nam Tha 1 (Nam Pha) 168 2018 2018 2018

Xekaman 4 16 2018 2018 2018

Xayabouly (Mekong) 65 2020

Projects not developed in the SES and ASES

Sepian-Xenamnoy 56 2021

Nam Ngiep 1 21 2021

Nam Pha 130 2021

Nam Phak 45 2021

8.6 Analysis of Bioenergy

Figure 76 shows a projection of the biomass available for the GMS (converted to GWh) and

the total biomass generation for each scenario for the GMS. The shaded pink area represents

46 The hydro projects for future construction selected here are example or generic hydro projects only and do not mean that we have a particular preference for those hydro projects compared to others.

Page 92: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 92

the projected total technical biomass resource availability47 while the solid lines show the

biomass consumption used by each scenario. The projected available biomass was based on

forecast growth rates in the agricultural sectors of each country. It was assumed that no

more than 75% of the total projected available biomass resource was used. The remainder

of the bioenergy requirements for each scenario was then assumed to be satisfied by biogas

technologies.

Figure 77 shows a similar chart to Figure 76 for the GMS except for biogas. The green shaded

area in this chart represents the amount of biogas available (again in units of GWh) and the

corresponding generation from biogas in each scenario. This shows that the SES and ASES

are dependent on biogas while the BAU is assumed to not deploy this technology. Based on

the projections the biomass and biogas resources available to the region can be seen to be

sufficient to support the amount of biomass and biogas generation to 2050.

Figure 76 Projected Biomass Availability and Consumption in the BAU, SES and

ASES scenarios for the GMS as a whole

47 Projections of biomass availability developed by IES based on baselines established from information on biomass and biogas potential reported in ‘Renewable Energy Developments and Potential in the Greater Mekong Subregion’, ADB (2015) report.

0

50,000

100,000

150,000

200,000

250,000

300,000

2015

2017

2019

2021

2023

2025

2027

2029

2031

2033

2035

2037

2039

2041

2043

2045

2047

2049

GW

h

Biomass Limit BAU Biomass SES Biomass ASES Biomass

Page 93: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 93

Figure 77 Projected GMS Biogas Requirements

8.7 Security of Supply Indicators

Figure 78 plots the energy reserve margin calculated as the difference between the maximum

annual potential production from all plants accounting for energy limits and the annual

electricity demands in percentage terms. For exporting countries like Lao PDR the energy

reserve margins are generally high as seen in the SES and ASES cases where generation is

optimised across the region. As noted previously, an energy reserve margin is more suited

to measuring systems that are renewables-based.

Figure 78 Lao PDR Security of Supply Measure: Energy Reserve

0

20,000

40,000

60,000

80,000

100,000

120,000

2015

2017

2019

2021

2023

2025

2027

2029

2031

2033

2035

2037

2039

2041

2043

2045

2047

2049

GW

h

Biogas Limit BAU Biogas SES Biogas ASES Biogas

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

Ener

gy R

eser

ve M

argi

n

BAU SES ASES

Page 94: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 94

Figure 79 charts the percentage of electricity generated using domestic resources. The

percentage generated using domestic fuel sources starts above 95% and increases over

time. In the BAU the coal supply supporting 1,900 MW of coal-fired generation including

the Hong Sa coal project is sourced domestically. In all scenarios, the variations below 100%

are due to power imports into Lao PDR.

Figure 79 Lao PDR Security of Supply Measure: Percentage of Electricity

Generated by Domestic Resources

Figure 80 below plots the highest share of generation from a particular fuel source. In the

BAU, the dominance is held by large-scale hydro generation throughout the horizon. The SES

is dominated by large-scale hydro up until 2040 before solar PV captures 22% generation

share towards 2050. The ASES follows the same trend as the SES except wind energy solar

PV dominates the generation mix towards 2050 followed by solar PV at 24%. Across all

scenarios, it is clear that the SES and ASES generation mixes are a lot more diversified than

in the BAU.

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

Secu

rity

Ind

ex

BAU SES ASES

Page 95: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 95

Figure 80 Lao PDR Security of Supply Measure: Maximum Dominance of a

Technology in Generation Mix

Figure 81 plots the dependence on coal in all scenarios. The AES and SES trajectories decline

as expected whereas the BAU increases to 25% by 2050 as 1,900 MW of coal projects

dedicated to Lao PDR is brought into the mix to meet increasing demands.

Figure 81 Lao PDR Security of Supply Measure: Coal Share

8.8 Interregional Power Flows

Figure 82 compares the net flows in and out of Lao PDR. It is clear Lao PDR is a net exporter

given its significant renewable resource and development potential. Lao PDR primarily

exports to Viet Nam through its interconnections into the north and central regions of Viet

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49M

axim

um

Do

min

ance

of

a Te

chn

olo

gy

BAU SES ASES

0%

5%

10%

15%

20%

25%

30%

2010 2015 2020 2030 2040 2050

BAU SES ASES

Page 96: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 96

Nam. By 2050, its gross export limit is 1,000 MW into Lao PDR, 3,000 MW into Thailand, and

10,000 MW into Viet Nam for the SES and ASES cases.

Figure 82 Lao PDR Imports (positive) and Exports (negative) (GWh)

-35,000

-30,000

-25,000

-20,000

-15,000

-10,000

-5,000

0

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

GW

h

BAU SES ASES

Page 97: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 97

9 Economic Implications

In this section we consider the economic implications of the three scenarios and examine in

particular: (1) the levelised cost of electricity (LCOE) generation for the entire system, (2)

investment costs, (3) total operating and capital expenditure including the cost of energy

efficiency and (4) implications for job creation. It should be noted that the analysis presented

in this section is done for the purpose of comparison, and that the prices and costs provided

are dependent on the fuel price projections and technology cost assumptions that were used

in the scenarios and which have been listed in Appendix A and Appendix B. The analysis in

this section is also supported by sensitivity analysis to examine how changes in fuel prices

impact the LCOE and to examine how a carbon price would affect electricity costs.

9.1 Overall Levelised Cost of Electricity (LCOE)

The comparison of the LCOE (only includes generation costs) is shown in Figure 83. The LCOE

for the BAU starts to decrease as more large-scale hydro is deployed then gradually increases

as coal inputs start to rise, and large-scale hydro CAPEX increases as resource exploitation

becomes more difficult. By 2050 the BAU trends towards $67/MWh. The ASES and SES

initially decline then increase together to approximately $76/MWh by 2050 driven by

investment into more expensive renewable energy technologies relative to conventional coal

and large-scale hydro. This LCOE analysis does not include the cost of externalities48.

48 A detailed study on the cost of externalities is presented in the following reference: Mark Z. Jacobson et al., “100% Clean and Renewable Wind, Water, and Sunlight (WWS) All Sector Energy Roadmaps for 139 Countries of the World”, 13 December 2015, available: https://web.stanford.edu/group/efmh/jacobson/Articles/I/CountriesWWS.pdf .

Page 98: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 98

Figure 83 Lao PDR LCOE for Generation

9.2 LCOE Composition

High integration levels of renewable energy forms like wind and solar can avoid fuel

consumption and hence fuel costs. In order to understand the structure of the LCOE from

the previous section we provide decomposed versions of the LCOE in Figure 83 for the BAU,

Figure 84 for the SES and Figure 85 for the ASES. This reveals an important trend in the

structure of the cost of electricity: a thermal-dominated system has a high portion of its costs

as fuel costs while a renewable energy dominated power system is more heavily biased

towards capital costs.

The capital costs in the BAU increases slightly from 2030 because of increasing large-hydro

CAPEX and fuel costs increase as the coal share of generation increases over time. The SES

and ASES cost structures are very similar due to the similar generation developments with

the SES – the CAPEX in both gradually increases with the investment into battery storage,

biogas and CSP technology.

0

10

20

30

40

50

60

70

80

90

100

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

LCO

E ($

/MW

h)

BAU SES ASES

Page 99: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 99

Figure 84 Lao PDR LCOE Composition in BAU

Figure 85 Lao PDR LCOE Composition in SES

0

10

20

30

40

50

60

70

80

902

01

5

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

Co

sts

($/M

Wh

)

FOM VOM Capital Cost Fuel Cost

0

10

20

30

40

50

60

70

80

90

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

Co

sts

($/M

Wh

)

FOM VOM Capital Cost Fuel Cost

Page 100: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 100

Figure 86 Lao PDR LCOE Composition in ASES

9.3 Cumulative Capital Investment

The following section details the investment costs of meeting demand in Lao PDR taking into

account exports. The reallocated investment and operating costs of net exporting countries

will be reduced according to the percentage of power that is exported.

Figure 87 shows the cumulative investment in generation CAPEX and energy efficiency in

millions of Real 2014 USD. Figure 87 shows the BAU requiring the most capital investment

by the end of the modelling horizon primarily driven by the higher BAU demands. The SES

and ASES includes investment in energy efficiency measures and greater investments in CSP,

biogas and battery storage to defer generation post-2035 with the ASES requiring the least

investment because of lower demands. The lower demand in SES and ASES owing to energy

efficiency gains has a clear impact on investments.

The breakdown of costs by generation type are presented in Figure 88, Figure 89 and Figure

90. These charts include pro-rated investment costs relating to the dedicated capacity of

export units such as the Hong Sa coal project and Xekaman 4, classified as ‘investment for

export.

0

10

20

30

40

50

60

70

80

90

1002

01

5

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

Co

sts

($/M

Wh

)

FOM VOM Capital Cost Fuel Cost

Page 101: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 101

Figure 87 Lao PDR Cumulative Investment (Real 2014 USD)

Figure 88 Lao PDR Cumulative Investment by Type (BAU, Real 2014 USD)

0

5,000

10,000

15,000

20,000

25,000

30,000

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

Cu

mu

lati

ve I

nve

stm

ent

($m

's)

BAU SES ASES

0

5,000

10,000

15,000

20,000

25,000

30,000

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

Cu

mu

lati

ve I

nve

stm

ent

($m

's)

Hydro Wind Coal Diesel/FO Bio Solar

Page 102: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 102

Figure 89 Lao PDR Cumulative Investment by Type (SES, Real 2014 USD)

Figure 90 Lao PDR Cumulative Investment by Type (ASES, Real 2014 USD)

0

5,000

10,000

15,000

20,000

25,000

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

Cu

mu

lati

ve In

vest

me

nt

($m

's)

Hydro Wind Bio Solar CSP Battery Energy Efficiency

0

2,000

4,000

6,000

8,000

10,000

12,000

14,000

16,000

18,000

20,000

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

Cu

mu

lati

ve In

vest

me

nt

($m

's)

Hydro Wind Bio Solar CSP Battery Energy Efficiency

Page 103: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 103

Figure 91, Figure 92 and Figure 93 plot the cumulative investment split for imports and

exports. The BAU investment cost is made up of projects to supply domestic requirement

and dedicated projects for exports. By 2050, $27 billion is required to develop the BAU

generation requirements, and $18 billion for exports primarily made up of hydro projects. In

the SES, $22 billion is required to develop generation projects (and energy efficiency) in Lao

PDR, with a further $25 billion invested in projects within Lao PDR for exporting. The ASES

requires $19 billion with an additional $32 billion invested in Lao PDR from neighbouring

countries to export surplus resource potential. Note the projects for export, mainly to Viet

Nam, in the SES and ASES are mainly renewable energy developments as the region moves

away from its reliance on fossil-fuel technologies.

Figure 91 Lao PDR Cumulative Investment of BAU (Real 2014 USD)

0

5,000

10,000

15,000

20,000

25,000

30,000

35,000

40,000

45,000

50,000

Cu

mu

lati

ve I

nve

stm

ent

($m

's)

Investment in Own Country Investment for Export Net Investment

Page 104: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 104

Figure 92 Lao PDR Cumulative Investment of SES (Real 2014 USD)

Figure 93 Lao PDR Cumulative Investment of ASES (Real 2014 USD)

0

10,000

20,000

30,000

40,000

50,000

60,000

Cu

mu

lati

ve I

nve

stm

ent

($m

's)

Investment in Own Country Investment for Export

BAU Investment Net Investment

0

10,000

20,000

30,000

40,000

50,000

60,000

Cu

mu

lati

ve I

nve

stm

ent

($m

's)

Investment in Own Country Investment for Export

BAU Investment Net Investment

Page 105: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 105

9.4 Operating Costs, Amortised Capital Costs and Energy Efficiency Costs

Figure 94 plots the total CAPEX, OPEX and energy efficiency costs as a proportion of total

forecast GDP49. Capital expenditure has been amortised over the life of the project to derive

annual capex figures. The BAU rises to almost 5.5% of GDP mainly driven by the ramp up in

new entry with respect to increasing demands in Lao PDR. The BAU requires a higher cost

outlay to 2030 but converges to the SES towards 2050 to around 4% of GDP. The ASES

remains the lowest cost option across the horizon among the three scenarios. Figure 95,

Figure 96, and Figure 97 plots the total annual system cost for each of the scenarios.

Figure 94 Total CAPEX, OPEX and Energy Efficiency over GDP

49 Figures have been adjusted for exports

0%

1%

2%

3%

4%

5%

6%

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

An

nu

al S

yste

m C

ost

s o

ver

GD

P

BAU SES ASES

Page 106: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 106

Figure 95 Total System Cost by Type (BAU)

Figure 96 Total System Cost by Type (SES)

0

500

1,000

1,500

2,000

2,500

3,000

3,500

4,000

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

Syst

em c

ost

s ($

m's

)

OPEX CAPEX Energy Efficiency

0

500

1,000

1,500

2,000

2,500

3,000

3,500

4,000

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

Syst

em c

ost

s ($

m's

)

OPEX CAPEX Energy Efficiency

Page 107: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 107

Figure 97 Total System Cost by Type (ASES)

Figure 98 and Figure 99 plots the difference in amortised CAPEX, OPEX and energy efficiency

costs between the SES and BAU, and ASES and BAU respectively. The costs have also been

adjusted for exports and imports. Positive amounts represent an additional investment

required in either the SES or ASES and negative amounts correspond to cost savings.

For the SES against BAU case, fuel savings of up to $300 million occur post 2030 when more

coal capacity comes online whereas additional CAPEX in the SES is needed over and above

the BAU in the period from 2030-2045. This is due to higher renewable energy technology

costs against low cost conventional coal and large-scale hydro. Post-2045 hydro reaches

$3,000/kW against lower renewable technology costs causing a flip from additional CAPEX

expenditure to savings in the SES case. After taking into account the $230 million energy

efficiency cost, the SES comes out slightly ahead of the BAU by about $200 million a year by

2050.

The ASES experiences cost savings in CAPEX compared to the BAU due to the reduced

demand. Fuel cost savings are double that compared to the previous chart due to lower

bioenergy generation required. By 2050 the net impact of OPEX, CAPEX and energy efficiency

produces a net saving of $520 million a year by 2050.

0

500

1,000

1,500

2,000

2,500

3,000

3,500

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

Syst

em c

ost

s ($

m's

)

OPEX CAPEX Energy Efficiency

Page 108: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 108

Figure 98 Difference in CAPEX, OPEX and Energy Efficiency Costs (SES and BAU)

Figure 99 Difference in CAPEX, OPEX and Energy Efficiency Costs (ASES and BAU)

-500

-400

-300

-200

-100

0

100

200

300

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

Incr

emen

tal I

nve

stm

ent

($m

's)

OPEX CAPEX Energy Efficiency Net Investment

-1,000

-800

-600

-400

-200

0

200

400

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

Incr

emen

tal I

nve

stm

ent

($m

's)

OPEX CAPEX

Energy Efficiency Net Investment

Page 109: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 109

Figure 100 NPV of System Costs (2015-2050) over period 2015 to 2050

Figure 100 charts the net present value of the power system costs by component using an

8% and 15% discount rate. Figures are tabulated in Table 26. The BAU is comprised of a higher

percentage of fuel costs, whereas the ASES has the highest percentage relating to capital

costs. The total NPV difference between the BAU and ASES is approximately $1 billion under

an 8% discount rate

Table 26 NPV of System Costs (Real USD 2014)

NPV ($m’s) BAU @

8% SES @

8% ASES @

8% BAU @

15% SES @

15% ASES @

15%

Fuel Cost 2,451 1,462 1,252 796 502 516

Capital Cost 11,378 11,430 10,330 4,837 4,871 4,394

FOM 1,003 1,015 950 434 427 393

VOM 299 629 588 102 213 201

Energy Efficiency 0 469 798 0 151 267

Total 15,130 15,005 13,918 6,168 6,164 5,770

0

2,000

4,000

6,000

8,000

10,000

12,000

14,000

16,000

BAU @ 8% SES @ 8% ASES @ 8% BAU @15%

SES @ 15% ASES @15%

NP

V (

$m

's)

Fuel Cost Capital Cost FOM VOM Energy Efficiency

Page 110: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 110

9.5 Fuel Price Sensitivity

Figure 101 plots the LCOE of the BAU, SES and ASES as discussed in section 9.2. In addition,

it plots the LCOE for a 50% increase to all fuel prices50, which reflects the difference

between IEA’s crude oil pricing under the 450 Scenario and the Current Policies Scenario

($95/bbl and $150/bbl respectively). It can be seen that the LCOE of the BAU rises more

(up to $5/MWh) against a fuel price increase compared with smaller increases in the SES

and ASES as would be anticipated as a direct consequence of having a higher thermal

generation share in the BAU compared to renewable energy in the SES and ASES. The SES

increases, and the ASES to a smaller extent, as a consequence of bioenergy generation, but

still less sensitive to fuel price shocks than the BAU.

Figure 101 Lao PDR Fuel Price Sensitivity ($/MWh)

9.6 Impact of a Carbon Price

In a similar way to the previous section, Figure 102 plots the LCOE under the BAU, SES and

ASES and the LCOE under a carbon price scenario. The carbon scenario puts a $20/t-CO2

impost throughout the entire modelled period. This is intended to show the sensitivity of

the BAU, SES and ASES to a carbon price. In a similar way to the previous section, this shows

50 Coal prices, natural gas prices, uranium prices, biomass prices, biogas prices, diesel and fuel oil.

40

50

60

70

80

90

100

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

BAU.BASE BAU.Fuel +50% BAU.Fuel -50%

SES.BASE SES.Fuel +50% SES.Fuel -50%

ASES.BASE ASES.Fuel +50% ASES.Fuel -50%

Page 111: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 111

that LCOE in the SES and ASES is insensitive to carbon prices by 2050 while for the BAU, it

adds an additional $4 Real 2014 USD/MWh to the LCOE because of its coal generation.

Figure 102 Lao PDR Carbon Sensitivities ($/MWh)

9.7 Renewable Technology Cost Sensitivity

Figure 103 shows the LCOE sensitivity to 20% and 40% decreases in renewable technology

costs. As expected the ASES followed by the SES is the most sensitive with potential declines

of up to $19/MWh from the base under the highest sensitivity case. The results also show

that a 20% drop in the assumed renewable technology CAPEX will bring the LCOE in line with

the BAU.

40

50

60

70

80

90

100

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

BAU.BASE BAU.Carbon $20/t

SES.BASE SES.Carbon $20/t

ASES.BASE ASES.Carbon $20/t

Page 112: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 112

Figure 103 Renewable Technology Cost Sensitivities ($/MWh)

9.8 Jobs Creation

To assess the implications for Job Creation for each scenario we applied the methodology

used by the Climate Institute of Australia. The methodology is summarised in Appendix C.

The numbers of jobs created for each of the scenarios are shown in Figure 104, Figure 105

and Figure 106. The job categories shown include: manufacturing, construction, operations

and maintenance and fuel supply management. Figure 107 provides a comparison of total

jobs created for BAU, SES and ASES. The key observations are:

Across all scenarios, manufacturing and construction account for most of the jobs with

a much smaller share attributable to O&M and fuel supply.

The BAU job creation profile peaks at around 17,000 jobs compared to SES job creation

peaking towards 58,000 or more than three times that in the BAU. This is entirely driven

by renewable energy developments that require more jobs in the manufacturing and

construction phases.

The ASES job creation peaks at 70,000 jobs, or more than four times that of the BAU

driven by even more renewable energy projects required as the region moves towards

a 100% renewable generation target by 2050.

40

45

50

55

60

65

70

75

80

85

902

01

5

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

BAU.BASE BAU.RE Tech -20% BAU.RE Tech -40%

SES.BASE SES.RE Tech -20% SES.RE Tech -40%

ASES.BASE ASES.RE Tech -20% ASES.RE Tech -40%

Page 113: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 113

Different skills are required between the scenarios, BAU has people working on

conventional coal and hydro, whereas the SES and ASES has people mainly working on

solar & battery storage systems.

Note that the manufacturing and fuel supply jobs shown to be created may not be

created within Lao PDR with manufacturing of equipment and fuel management (for

imported fuels) occurring in other countries.

Figure 104 Job Creation by Category (BAU)

Figure 105 Job Creation by Category (SES)

0

2,000

4,000

6,000

8,000

10,000

12,000

14,000

16,000

18,000

20,000

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

Nu

mb

er o

f Jo

bs

Manufacturing Construction O&M Fuel Supply

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

Nu

mb

er o

f Jo

bs

Manufacturing Construction O&M Fuel Supply

Page 114: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 114

Figure 106 Job Creation by Category (ASES)

Figure 107 Total Job Creation Comparison BAU, SES and ASES

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

Nu

mb

er o

f Jo

bs

Manufacturing Construction O&M Fuel Supply

0

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

Nu

mb

er o

f Jo

bs

BAU SES ASES

Page 115: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 115

10 Conclusions

In this report we have presented the findings of power system modelling of Lao PDR’s

power system for a Business as Usual (BAU), Sustainable Energy Sector (SES) and Advanced

SES (ASES) scenarios for Lao PDR’s. The BAU outlook assumed that future power sector

developments would be based on continued large scale hydro development and coal. The

SES and ASES have both taken measures to deploy a maximal amount of renewable energy

and energy efficiency measures in order to provide some alternative scenarios for the

country. The SES and ASES both also assume a more rapid program of cross-border

interconnection in the GMS, which allows the region to more fully exploit diversity in

demand as well as geographically dispersed areas with high renewable energy potential.

10.1 Comparison of Scenarios

The following are the key conclusions that have been drawn from the analysis presented in

this report:

The SES delivers an energy efficiency gain beyond the BAU case of about 21% compared

to the BAU. The ASES delivers efficiency gains of 28% after doubling transport

electricity demand.

By 2030, the SES and ASES are able to achieve a power system that can respectively

deliver some 91% and 96% of generation from renewable energy (including large-scale

hydro). This compares to 75% in the BAU.

By 2050, the SES and ASES are able to achieve a power system that delivers 98% and

100% of generation from renewable energy resources (including large-scale hydro). In

contrast 75% of generation in the BAU is provided by renewable energy resources by

205051.

By 2050, the SES and ASES avoids around 12 and 13 million tons of greenhouse gas

emissions per year compared to the BAU. All scenarios achieve very low carbon

intensities given Lao PDR’s dependence on large-scale hydro in the BAU.

Compared to the SES, by 2050, the country has avoided developing 1500 MW of coal,

and 1905 MW of coal in the ASES. The SES and ASES would be able to mitigate against

externalities and potential health risks associated with developing these projects52.

The SES and ASES compared to the BAU have not needed to develop some 5817 MW

of large scale hydro projects.

Based on some simple measures for energy security:

- Under the ASES and SES, Lao PDR benefits from a more diverse mix of technologies

and is not as dependent on a single source of primary energy as the BAU; for

example, the BAU is highly dependent on large-scale hydro and coal, while the

51 Large-scale hydro is included

52 Further information on health impacts related to coal projects is provided in the Harvard University study: Cropper et. al. “The Health Effects of Coal Electricity Generation in India”, 2012, available from: http://www.rff.org/files/sharepoint/WorkImages/Download/RFF-DP-12-25.pdf.

Page 116: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 116

ASES and SES diversifies supply across a range of renewable energy technologies

with no generation type accounting for more than 30% of the generation share by

2050;

- All of the scenarios have close to 100% of electricity generated from domestically

controlled and managed resources. Under each of the scenarios a small amount of

power is imported from Thailand because of mismatches in renewable resource

profiles furthering the argument for strong interconnection amongst the GMS

countries under a sustainable energy scenario; and

- The ASES and SES achieve a reliable power system through coordination on both

the supply and demand side of the industry, with similar energy reserve margins

as the BAU after accounting for exports. Though as a measure of energy supply

storage and flexibility the ASES and SES overall is lower than the BAU, which means

that the BAU would be more resilient against extreme events. This enhances the

need to pursue an integrated regional power system through cross-border trading.

While modelling has shown that the ASES and SES is operationally feasible (even

with less directly dispatchable resources in the SES compared to the BAU), stress

testing of the BAU, SES and ASES scenarios against more significant threats to the

operation of the power system would likely not be handled as well compared to

the BAU. More work to understand and develop appropriate mitigation measures

is required.

10.2 Economic Implications

10.2.1 Cost of Electricity

Based on the outcomes of modelling the BAU, SES and ASES scenarios, we also examined the

following issues in relation to electricity costs: (1) levelised cost of electricity, (2) investment

requirements, (3) sensitivity of electricity prices to fuel price shocks, and (4) the implications

of a price on carbon equivalent emissions for electricity prices. Based on this analysis we draw

the following conclusions:

The BAU requires higher levels of capital investment than the SES and ASES, and in

relation to generation costs, the ASES across the modelling period delivers a lower

overall generation cost (dollar terms);

Under the SES and ASES significant benefits are gained in the form of avoided fuel costs

and this contributes to achieving a lower overall dollar cost for Lao PDR. The

observation is made that the composition of LCOE under the SES and ASES is largely

driven by investment costs, hence exposure to fuel shocks is significantly reduced; and

The LCOE under the SES and ASES is also largely insensitive to a carbon price, as could

be reasonably anticipated for a power system that is entirely dominated by renewable

energy.

Page 117: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 117

10.2.2 Investment Implications

From 2015 to 2050, the total cumulative investment in BAU, SES and ASES is respectively:

$27 billion, $22 billion, and $19 billion (Real 2014 USD). The composition of the investments

between BAU and the SES/ASES are quite different:

76% of the cumulative investments in the BAU are directed to hydro, followed by 16%

coal, the rest being a combination of renewables;

In the SES/ASES, investments are more diverse:

- SES has 38% solar and battery, 22% hydro, 14% wind, 13% energy efficiency and

the rest bioenergy; and

- ASES has 32% solar and battery, 25% energy efficiency, 18% hydro, 15% wind and

the rest bioenergy.

10.2.3 Jobs Creation

The SES and ASES scenarios both result in quite different technology mixes for Lao PDR

compared to the BAU. The SES and ASES have different implications for the workforce that

would need to be developed to support each scenario. Based on estimates of job creation,

we estimate that53:

The BAU from 2015 to 2050 would be accompanied by the creation of some 475,452

jobs years54 (40% manufacturing, 44% construction, 14% operations and maintenance,

and 2% fuel supply);

The SES would involve the creation of some 1.24 million job years (33% in

manufacturing, 56% in construction, 11% in operations and maintenance and 0.3% in

fuel supply); and

The ASES would involve the creation of 1.4 million job years (33% in manufacturing,

56% in construction, 10% in operations and maintenance and 0.2% in fuel supply).

10.3 Identified Barriers for the SES and ASES

The following barriers specific to Lao PDR were identified in the country assessment report:

There needs to be an increased focus on energy efficiency as electricity demand ramps

up in line with expected GDP growth over the next 10 years. To date there has not

been much work carried out by the government institutions in forming guidelines or

integrating energy efficiency measures into existing energy policy direction.

There are currently no specific policies or strategies on renewable energy promotion;

Lack of coordination between stakeholders in renewable energy projects;

53 Based on the employment factors presented in Appendix C.

54 A job year is one job for one person for one year. We use this measure to make comparisons easier across each scenario as the number of jobs created fluctuates from year to year.

Page 118: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 118

Renewable energy policy has not yet been clearly stated in the National Socio-

economic Development Plans or in strategies on growth and poverty reduction, as well

as five year plans of the government;

Lack of specific regulations and laws on renewable energies;

It is not clear who is responsible for approval of renewable energy projects;

Users have insufficient knowledge and understanding on renewable energy;

Lack of public funding support for the renewable energy sector, especially for research

and development;

Absence of energy pricing regulation is a risk for investors;

Insufficient information on renewable energy potential for provincial level; and

Electricity access rate in remote areas is still low due to high cost of grid extension.

Other barriers to the development of renewable energy include:

Awareness barriers among policy makers;

Significantly higher capital investment costs compared to conventional fuels;

Technical barriers including expertise and lack of standards for renewable energy

systems; and

There is currently also a lack of effective and considered measures relating to adverse

social and environmental impacts of large scale hydropower projects.

10.4 Recommendations

The following are key recommendations to reduce the barriers and “enable” the SES and

ASES:

Formation of more comprehensive energy policies to create an environment that

promotes investment in renewable energy technologies and energy efficiency

measures. Investor confidence in renewable energy investments will be enhanced by

having a stable and clear policy framework that, for example, provides a structured and

clear approach for renewable energy investors and steps by which to enter into offtake

agreements.

Formation of electricity pricing policies and mechanisms that encourage efficient

behavior and investment in generation technologies, transmission and distribution

equipment and end use energy consumption.

Conduct more detailed assessments of renewable energy potential and make the

results publicly available to enable prospective investors to understand the potential,

identify the best opportunities and subsequently take steps to explore investment and

deployment.

Knowledge transfer and capability building in the renewable energy technologies and

energy efficiency for policy makers, staff working in the energy industry, as well as

within education institutions to ensure the human capacity is being developed to

support a national power system that has a high share of generation from renewable

energy.

Page 119: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 119

Investments in ICT systems to allow for greater real-time monitoring, control and

forecasting of Cambodia’s national power system, including SCADA/EMS, and smart-

grid technology and renewable energy forecasting systems and tools. This will enable

efficient real-time dispatch and control of all resources in Cambodia’s national power

system and will create an environment more conducive for the management of high

levels of renewable energy in the generation mix.

Take measures to encourage cross-border power trade in the region, as this works to

the advantage of exploiting scattered renewable energy resource potentials and

diversity in electricity demand. In particular:

- Develop an overarching transmission plan that has been informed by detailed

assessments and plans to leverage renewable energy potential in the region and

diversity in demand and hydrological conditions. For Lao PDR, we see that under

the SES and ASES the country becomes an exporter of a more diverse mix of

resources (solar, hydro and wind) as compared to the BAU where the country is

mainly an exporter of hydro. In the SES and ASES Lao PDR’s potential in solar and

wind is leveraged to the benefit of the region.

- Enhance technical standards and transmission codes in each country to allow for

better interoperation of national power systems.

- Establish dispatch protocols to better coordinate real-time dispatch of power

systems in the region to make the best use of real-time information and

continuously updated demand and renewable generation forecasts.

- Develop a framework to encourage energy trade in the region, and in particular

towards a model that can support multilateral power trading via a regional power

market or exchange (for example).

Take measures to improve power planning in the region to:

- Explicitly account for project externalities and risks;

- Evaluate a more diverse range of scenarios including those with high levels of

renewable energy;

- Take into consideration energy efficiency plans;

- Take into consideration overarching plans to have tighter power system

integration within the region; and

- Carefully evaluate the economics of off-grid against grid connection where this is

relevant.

Page 120: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 120

Appendix A Technology Costs

Table 27 sets out the technology cost assumptions that were used in the modelling

presented in this report for the BAU and SES scenarios. Table 28 sets out the technology

costs used in the ASES. The technology costs of coal and gas do not include overheads

associated with infrastructure to develop facilities for storing / managing fuel supplies.

These costs were however accounted for in the modelling.

Figure 108 and Figure 109 presents the levelised cost of new entry generation based on

assumed capacity factors. LCOE levels presented in Section 9 are based on weighted

average LCOE’s and modelled output and will differ from the LCOE’s presented here. The

LCOE for battery storage is combined with solar PV technology assuming 75% of generation

is stored for off-peak generation.

Table 27 Technology Costs Assumptions for BAU and SES Scenarios

Technology Capital Cost (Unit: Real 2014 USD/kW)

Technology 2015 2030 2040 2050

Generic Coal 2,492 2,474 2,462 2,450

Coal with CCS 5,756 5,180 4,893 4,605

CCGT 942 935 930 926

GT 778 772 768 764

Wind Onshore 1,450 1,305 1,240 1,175

Wind Offshore 2,900 2,610 2,480 2,349

Hydro Large 2,100 2,200 2,275 2,350

Hydro Small 2,300 2,350 2,400 2,450

Pumped Storage 3,340 3,499 3,618 3,738

PV No Tracking 2,243 1,250 1,050 850

PV with Tracking 2,630 1,466 1,231 997

PV Thin Film 1,523 1,175 1,131 1,086

Battery Storage - Small 600 375 338 300

Battery - Utility Scale 500 225 213 200

Solar Thermal with Storage 8,513 5,500 4,750 4,000

Solar Thermal No Storage 5,226 4,170 3,937 3,703

Biomass 1,800 1,765 1,745 1,725

Geothermal 4,216 4,216 4,216 4,216

Ocean 9,887 8,500 7,188 5,875

Biogas (AD) 4,548 4,460 4,409 4,359

*Battery technology quoted on a $/kWh basis

Page 121: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 121

Figure 108 Levelised Cost of New Entry (BAU & SES, $/MWh)

0

50

100

150

200

250

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

Leve

lised

Co

st o

f G

ener

atio

n (

$/M

Wh

)

Hydro Wind Coal

Gas Bio Solar

CSP PV + Battery [75%] Hydro ROR

Geothermal Pump Storage

Page 122: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 122

Table 28 Technology Costs Assumptions for ASES Scenarios

Technology Capital Cost (Unit: Real 2014 USD/kW)

Technology 2015 2030 2040 2050

Generic Coal 2,492 2,462 2,450 2,437

Coal with CCS 5,756 4,893 4,605 4,334

CCGT 942 930 926 921

GT 778 768 764 761

Wind Onshore 1,450 1,240 1,175 1,113

Wind Offshore 2,900 2,480 2,349 2,225

Hydro Large 2,100 2,275 2,350 2,427

Hydro Small 2,300 2,400 2,450 2,501

Pumped Storage 3,340 3,618 3,738 3,861

PV No Tracking 2,243 1,050 850 688

PV with Tracking 2,630 1,231 997 807

PV Thin Film 1,523 1,131 1,086 1,043

Battery Storage - Small 600 338 300 267

Battery - Utility Scale 500 213 200 188

Solar Thermal with Storage 8,513 4,750 4,000 3,368

Solar Thermal No Storage 5,226 3,937 3,703 3,483

Biomass 1,800 1,745 1,725 1,705

Geothermal 4,215 4,215 4,216 4,215

Wave 9,886 7,187 5,875 4,802

Biogas (AD) 4,548 4,358 4,308 4,259

*Battery technology quoted on a $/kWh basis

Page 123: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 123

Figure 109 Levelised Cost of New Entry (ASES, $/MWh)

0

50

100

150

200

250

20

15

20

17

20

19

20

21

20

23

20

25

20

27

20

29

20

31

20

33

20

35

20

37

20

39

20

41

20

43

20

45

20

47

20

49

Leve

lised

Co

st o

f G

ener

atio

n (

$/M

Wh

)

Hydro Wind Coal

Gas Bio Solar

CSP PV + Battery [75%] Hydro ROR

Geothermal Pump Storage

Page 124: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 124

Appendix B Fuel Prices

Table 29 sets out the Free on board (FOB) fuel price assumptions that were used in the

modelling presented in this report. This fuel price set was common to all three scenarios.

Table 29 Fuel Price Assumptions (Real 2014 USD/GJ)

Year Coal Gas Diesel Uranium Fuel Oil Biomass Biogas

2015 2.39 10.08 13.34 0.72 9.13 2.57 1.00

2016 2.51 11.88 15.24 0.76 10.49 2.62 1.00

2017 2.63 12.91 15.28 0.80 11.68 2.67 1.00

2018 2.74 13.72 16.41 0.80 12.43 2.72 1.00

2019 2.86 14.47 17.53 0.80 13.18 2.78 1.00

2020 2.98 15.16 18.64 0.80 13.93 2.83 1.00

2021 3.10 15.81 19.73 0.80 14.65 2.89 1.00

2022 3.21 16.46 20.80 0.80 15.36 2.95 1.00

2023 3.33 17.10 21.86 0.80 16.06 3.01 1.00

2024 3.45 17.72 22.90 0.80 16.76 3.07 1.00

2025 3.56 18.34 23.93 0.80 17.44 3.13 1.00

2026 3.56 18.29 23.86 0.80 17.39 3.19 1.00

2027 3.56 18.24 23.79 0.80 17.34 3.25 1.00

2028 3.56 18.19 23.72 0.80 17.29 3.32 1.00

2029 3.56 18.14 23.65 0.80 17.24 3.39 1.00

2030 3.56 18.09 23.58 0.80 17.19 3.45 1.00

2031 3.56 18.06 23.53 0.80 17.15 3.52 1.00

2032 3.56 18.02 23.49 0.80 17.12 3.59 1.00

2033 3.56 17.99 23.44 0.80 17.08 3.67 1.00

2034 3.56 17.96 23.40 0.80 17.05 3.74 1.00

2035 3.56 17.92 23.35 0.80 17.02 3.81 1.00

2036 3.56 17.89 23.30 0.80 16.98 3.89 1.00

2037 3.56 17.86 23.26 0.80 16.95 3.97 1.00

2038 3.56 17.83 23.21 0.80 16.92 4.05 1.00

2039 3.56 17.79 23.16 0.80 16.88 4.13 1.00

2040 3.56 17.76 23.12 0.80 16.85 4.21 1.00

2041 3.56 17.76 23.12 0.80 16.85 4.29 1.00

2042 3.56 17.76 23.12 0.80 16.85 4.38 1.00

2043 3.56 17.76 23.12 0.80 16.85 4.47 1.00

2044 3.56 17.76 23.12 0.80 16.85 4.56 1.00

2045 3.56 17.76 23.12 0.80 16.85 4.65 1.00

2046 3.56 17.76 23.12 0.80 16.85 4.74 1.00

2047 3.56 17.76 23.12 0.80 16.85 4.84 1.00

2048 3.56 17.76 23.12 0.80 16.85 4.93 1.00

2049 3.56 17.76 23.12 0.80 16.85 5.03 1.00

2050 3.56 17.76 23.12 0.80 16.85 5.13 1.00

Page 125: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 125

Appendix C Methodology for Jobs Creation

This section briefly summarises the methodology that we adopted for jobs creation. The

methodology that we have adopted has been based on an approach developed by the

Institute for Sustainable Futures at the University of Technology, Sydney and used by the

Climate Institute of Australia55. In essence the jobs created in different economic sectors

(manufacturing, construction, operations & maintenance and fuel sourcing and

management) can be determined by the following with the information based on the

numbers provided in Table 30.

Figure 110 Job Creation Calculations

We have applied this methodology to the results in each scenario discussed in this report in

order to make estimates of the jobs creation impacts and allow comparisons to be made56.

55 A description of the methodology can be found in the following reference: The Climate Institute, “Clean Energy Jobs in Regional Australia Methodology”, 2011, available: http://www.climateinstitute.org.au/verve/_resources/cleanenergyjobs_methodology.pdf .

56 The percentage of local manufacturing and local fuel supply is assumed to be 1 to reflect the total job creation potential in total.

Page 126: ALTERNATIVES FOR POWER GENERATION IN THE · PDF fileALTERNATIVES FOR POWER GENERATION IN THE ... IES and MKE make no representations or ... outlining alternatives for power generation

FINAL

Intelligent Energy Systems IESREF: 5973 126

Table 30 Employment Factors for Different Technologies

Annual decline

applied to

employment

multiplier

Co

nst

ruct

ion

tim

e

Co

nst

ruct

ion

Man

ufa

ctu

rin

g

Op

era

tio

ns

&

mai

nte

nan

ce

Fue

l

Technology 2010- 20 2020-30 years per MW per MW per MW per GWh

Black coal 0.5% 0.5% 5 6.2 1.5 0.2 0.04 (include

in O&M) Brown coal 0.5% 0.5% 5 6.2 1.5 0.4

Gas 0.5% 0.5% 2 1.4 0.1 0.1 0.04

Hydro 0.2% 0.2% 5 3.0 3.5 0.2

Wind 0.5% 0.5% 2 2.5 12.5 0.2

Bioenergy 0.5% 0.5% 2 2.0 0.1 1.0

Geothermal 1.5% 0.5% 5 3.1 3.3 0.7

Solar thermal

generation

1.5% 1.0% 5 6.0 4.0 0.3

SWH 1.0% 1.0% 1 10.9 3.0 0.0

PV 1.0% 1.0% 1 29.0 9.0 0.4