Improving Efficiency of DewateringAlternatives to Conventional Dewatering
Technologies
Robert Gillette, PE, BCEESteve Swanback, PE
Rebecca Overacre, PE
2009 PNCWA Webinar Recent Developments In
Biosolids Management Processes
sgs809pncwa.ppt/2
Outline
1. Screw press technologya. Performance survey resultsb. Pilot testing resultsc. Lifecycle cost evaluation (Class A and Class B)d. Design considerations
2. Rotary fan press technologya. Performance survey resultsb. Pilot testing resultsc. Lifecycle cost evaluation (Class A and Class B)d. Design considerations
3. Overview of R&D Technologies
sgs809pncwa.ppt/3
Screw Press Technology
sgs809pncwa.ppt/4
Screw Press Manufacturers
Huber (inclined)
FKC (horizontal)
Screw Press General Description
Dewatering by Volume Reduction
Screw Press Expanded View
Screw Press Expanded ViewClass A Option
sgs809pncwa.ppt/9
Flow Schematic
sgs809pncwa.ppt/10
Tallahassee, FL, FKC InstallationTallahassee, FL, FKC Installation
FKC Screw Press
sgs809pncwa.ppt/11
FKC Screw Press
Petaluma, CA, FKC InstallationPetaluma, CA, FKC Installation
sgs809pncwa.ppt/12
Huber Press
Magna, UT, Huber InstallationMagna, UT, Huber Installation
sgs809pncwa.ppt/13
Huber Press
Maine, Huber InstallationMaine, Huber Installation
sgs809pncwa.ppt/14
Performance Survey
sgs809pncwa.ppt/15
Survey of 22 Full Scale Installations The Cake Solids Concentration Depends on Type of Sludge
Type of Sludge Screw Press Cake (% solids)FKC 15 20
FKC (with steam and lime) 20 45Huber 12 20FKC 21 28
WAS
Huber 22 25Raw Huber 18 40
PS+WASFKC > 18
Huber 19 24Aerobically Digested
Anaerobically Digested
FKC 17 25Anaerobically Digested Huber 13 16
Raw
sgs809pncwa.ppt/16
Survey of 22 Full Scale Installations The Median Cleaning Schedule is Once Per Week
Manual Cleaning Schedule(times per month)
0
5
10
15
20
25
30
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22Facility Number
sgs809pncwa.ppt/17
Case Study St Petersburg, FL
sgs809pncwa.ppt/18
Pilot Results - Projected Full Performance St. Petersburg
Manufacturers Recommendations
Screw PressBelt Press CentrifugeClass B Class A
Minimum Cake Solids Concentration (% solids)
18 21 16 33
Maximum Polymer Dosage (lb/DT)
19 25 30 33
Minimum Solids Capture (%)
95 95 90 90
Parameter
sgs809pncwa.ppt/19
Relative Cost Comparison
BFP Centrifuge Screw Press
Capital Cost $ $$$ $$
Building Modifications $ $$ $$
Odor Control $$$ $ $
Power $ $$$ $
Maintenance $$ $$ $
Chemical $$ $$$ $$
Hauling $$ $ $$
Disposal $$ $ $$
sgs809pncwa.ppt/20
Performance Comparison
Will Vary Depending on Conditions!!!Will Vary Depending on Conditions!!!
BFP Centrifuge Screw Press
% Solids Produced ++ +++ +
Filtrate/Centrate Quality ++ ++ +
Reliability ++ ++ +++
Operator Attention Required + ++ +++
Ease of startup and shutdown ++ + ++
sgs809pncwa.ppt/21
Design Considerations
sgs809pncwa.ppt/22
Design Considerations
Lead time (from Japan or Germany): prepurchase?
Custom design varying dimensions until shop drawing
Performance guarantee and penalty for non-compliance
Basis of design Loading & capacity: pilot test Run time, unattended operation
Effect of rising steel costs units all SST
sgs809pncwa.ppt/23
Design Considerations, Continued
Need headroom if RST on mezzanine Monorail/overhead crane Building considerations footprint
requirement or outside Provision for Class A in future Cake conveyance options affects layout
sgs809pncwa.ppt/24
Design Parameters
Range of Capacity: Up to 8.5 DT/day At nominal speed
RST output (% Solids): around 4% Screw Press output (% Solids): 15 28% Polymer consumption: 20 40 lb/DT Detention time: approximately 4 hours Motor speed: as low as 0.3 rpm Motor HP largest unit is 7.5 HP
sgs809pncwa.ppt/25
Rotary Press Technology
sgs809pncwa.ppt/26
Rotary Press Manufacturers
Fournier
Prime Solutions
sgs809pncwa.ppt/27
Rotary Press Schematic
sgs809pncwa.ppt/28
Process Cutaway
sgs809pncwa.ppt/29
Design Parameters
Range of Capacity: 7-250 gpm Cake % Solids: 12 28% Detention time: N/A Motor speed: as low as 1-3 rpm Motor HP: 5-20 HP
sgs809pncwa.ppt/30
Fournier Rotary Press
sgs809pncwa.ppt/31
Size Compared to Other Technologies
sgs809pncwa.ppt/32
Multiple Channels on Single Drive
sgs809pncwa.ppt/33
Fournier Rotary Press Pilot Test
sgs809pncwa.ppt/34
Prime Solutions Rotary Fan Press
sgs809pncwa.ppt/35
Performance Survey
sgs809pncwa.ppt/36
Survey Results
Facility EquipmentFacility
Size (mgd)
Solids Type Incoming % TS
Discharge % TS
Raiford, FL Prison WWTP
Rotary fan press 1.1 Extended aeration
1.6-2.5 19-22
Front Royal, VAMunicipal WWTP
Rotary fan press 3.3 Thermophilic Anaerobic Digestion
3.5 25
Fairfield, CAMunicipal WWTP
Rotary fan press 15.5 Conventional Anaerobic Digestion
2 17
Lafayette, TNMunicipal WWTP
Rotary press 0.5 Conventional Anaerobic Digestion
1.0-1.5 25
Portland, MEMunicipal WWTP
Rotary press 19.8 Thickened PS/WAS
3-6 19-25
Hampton, NHMunicipal WWTP
Rotary press 2.5 Septage/PS/WAS
6-8 26-28
Murfreesboro, TNMunicipal WWTP
Rotary press 15 PS/WAS 0.8-1 12-14
Scarborough, MEMunicipal WWTP
Rotary press 1.4 Thickened PS/WAS
3 28
sgs809pncwa.ppt/37
Rotary Dewatering Features
Low speed, low vibration, low shear Uses less energy than centrifuges or BFPs Modular Small footprint Minimal start-up and shutdown time Minimal moving parts Odors contained
Questions?
916-565-4888
sgs809pncwa.ppt/39
R&D Technologies
sgs809pncwa.ppt/40
EKG Technologies
Electrokinetic Geosynthetics (EKG) Technology Theory Electro-osmotic principle
sgs809pncwa.ppt/41
Uses of EKG Technology
Ashbrook Product Anaerobically/Aerobically Digested
Sludge Fresno England
Alternative to conventional dewatering
Siemens Product Secondary dewatering process Alternative to sludge drying
sgs809pncwa.ppt/42
Siemens ELODE Technology
sgs809pncwa.ppt/43
Siemens ELODE Technology
sgs809pncwa.ppt/44
Siemens ELODE Technology
Questions?
916-565-4888
Improving Efficiency of DewateringAlternatives to Conventional Dewatering TechnologiesOutlineScrew Press ManufacturersScrew Press General DescriptionDewatering by Volume ReductionScrew Press Expanded View Screw Press Expanded ViewClass A OptionFlow SchematicFKC Screw PressFKC Screw PressHuber PressHuber PressSurvey of 22 Full Scale Installations The Cake Solids Concentration Depends on Type of SludgeSurvey of 22 Full Scale Installations The Median Cleaning Schedule is Once Per WeekPilot Results - Projected Full Performance St. PetersburgRelative Cost ComparisonPerformance ComparisonDesign ConsiderationsDesign Considerations, ContinuedDesign ParametersRotary Press ManufacturersRotary Press SchematicProcess CutawayDesign ParametersFournier Rotary PressMultiple Channels on Single DriveFournier Rotary Press Pilot TestPrime Solutions Rotary Fan PressSurvey ResultsRotary Dewatering FeaturesQuestions?Bob [email protected] TechnologiesUses of EKG TechnologySiemens ELODE TechnologySiemens ELODE TechnologySiemens ELODE TechnologyQuestions?Bob [email protected]