Report Form Changes This Season
FIS Form Simplified
French and German removed
Separate Start Timers deleted
Sync at +1 Min at Finish deleted
Check-boxes utilized throughout
Options for malfunction offered
Replacement-time source offered
Timing Technical ReportForm
CODEX example 0247
To accompany TD Report immediate transmittal.- One form required for each Codex Version 6.41
Timing Technical Report Alpine
Race Site and NationEvent NameDate
Location: Nation: Event Name:
Date (dd/mm/yy): 03.04.06
TD Banknorth Eastern Cup
Sunday River Ski Resort
USA
•Codex or Race Code
•Event
•Gender
Codex
•Note the “check boxes”
CODEX example 0247
1591
DH: SL: GS: SG: SC:
MEN: LADIES:
Version 6.41
Equipment
Sys Timer ASys Timer BStart GateFinish Cell AFinish Cell B
• Brand Name• Model or Type• Serial Number• Homologation #
Brand Model Serial Number Homologation #
Sys A Timer: ALGE TDC8000 ALG.002.97
Sys B Timer: Tag Heuer CP 520 Tag.001.01
Start Gate: Tag Heuer HL 7-1 Tag.S54.03
Finish Cells A: Tag Heuer HL2-31 Tag.L47.03
Finish Cells B: Tag Heuer HL2-31 Tag.L47.03
1994
832
9908097
2090
1993
Brand
Model
Serial #
Homol. #
ALGE
TDC8000
9908097
ALG.002.97
Timer A
Brand Model Serial Number Homologation #
Sys A Timer: ALGE TDC8000 ALG.002.97
Sys B Timer: Tag Heuer CP 520 Tag.001.01
Start Gate: Tag Heuer HL 7-1 Tag.S54.03
Finish Cells A: Tag Heuer HL2-31 Tag.L47.03
Finish Cells B: Tag Heuer HL2-31 Tag.L47.03
1994
832
9908097
2090
1993
Brand
Model
Serial #
Homol. #
Tag Heuer
CP 520
2090
Tag.001.01
Timer B
Brand Model Serial Number Homologation #
Sys A Timer: ALGE TDC8000 ALG.002.97
Sys B Timer: Tag Heuer CP 520 Tag.001.01
Start Gate: Tag Heuer HL 7-1 Tag.S54.03
Finish Cells A: Tag Heuer HL2-31 Tag.L47.03
Finish Cells B: Tag Heuer HL2-31 Tag.L47.03
1994
832
9908097
2090
1993
Brand
Model
Serial #
Homol. #
Tag Heuer
HL 7-1
832
TAG.S54.03
Start Gate
Brand Model Serial Number Homologation #
Sys A Timer: ALGE TDC8000 ALG.002.97
Sys B Timer: Tag Heuer CP 520 Tag.001.01
Start Gate: Tag Heuer HL 7-1 Tag.S54.03
Finish Cells A: Tag Heuer HL2-31 Tag.L47.03
Finish Cells B: Tag Heuer HL2-31 Tag.L47.03
1994
832
9908097
2090
1993
Photo Cells Brand
Model
Serial #
Homol. #
Tag Heuer
HL2-31
1994
ALG.L47.03
Brand Model Serial Number Homologation #
Sys A Timer: ALGE TDC8000 ALG.002.97
Sys B Timer: Tag Heuer CP 520 Tag.001.01
Start Gate: Tag Heuer HL 7-1 Tag.S54.03
Finish Cells A: Tag Heuer HL2-31 Tag.L47.03
Finish Cells B: Tag Heuer HL2-31 Tag.L47.03
1994
832
9908097
2090
1993
Connections
• How do we communicate signals/data from Start to Finish?
• How is voice communication handled between Start and Finish?
• Cable• Radio• Snowmobile• Ski Lift• Skier• ??
Connections to Start: System A System B
Cable, Radio or other- (Specify) Cable Cable Cable/Radio
Voice Comm.
Warm-up and Synchronization
• At what time is the run scheduled to start?– Is there a rule about Synchronization?
– What is the minimum recommended warm up time?• Is there a maximum?
• Discuss Hand Time Synchronization.
• Discuss Second run Synchronization.
POWER ON Time (warm-up): 6:57 At least 30 minutes before Synchronization.
Time of day 1st Run
expressed in thouandths. System A (TOD) # System B (TOD) # Hand Sync,
Synchronization Time 8:43 8:01
Synchronization and Synch + 1 Minute
• Are Systems A and B synchronized?– How close are they?
• What is the maximum difference acceptable?– So what?
• What about Hand Times?– So what?
Time of day 1st Run
expressed in thouandths. System A (TOD) # System B (TOD) # Hand Sync,
Synchronization Time 8:43 8:01
Synch confirm at +1 minute 8:45:00.2871 8:45:00.289
First Competitor Quality Check
• Is Net Time the same as A time-of-day difference?– How close are they?– Does Net Time agree with Official Results?
• What is the B time-of-day difference?– Discuss the difference?
• What about Hand Time?
• Comment on system synchronization?
System A (TOD) # System B (TOD) #
Start TOD First Competitor * 9:11:27.9192 9:11:27.922 Net Time
Finish TOD First ( 2 ) ( 20 ) * 9:12:38.3558 9:12:38.3558 1:10.43
Hand Time First Competitor * 1:10.33
Last Competitor Quality Check
• Is Net Time the same as A time-of-day difference?– How close are they?– Does Net Time agree with Official Results?
• What is the B time-of-day difference?– Discuss the difference?
• What about Hand Time?
• Comment on system synchronization?
System A (TOD) # System B (TOD) #
Start TOD Last Competitor * 10:55:27.8453 10:55:27.850
Finish TOD Last ( 121 ) ( 121 )* 10:58:35.4578 10:58:35.465 3:07.61
Hand Time Last Competitor * 3:07.47
* First and Last to Finish with complete data.
First Run Summary
• Why do we show Best run-time?• Anything else?
Time of day 1st Run
expressed in thouandths. System A (TOD) # System B (TOD) # Hand Sync,
Synch confirm at +1 minute 8:45:00.2871 8:45:00.289
Start TOD First Competitor * 9:11:27.9192 9:11:27.922 Net Time
Finish TOD First ( 2 ) ( 20 ) * 9:12:38.3558 9:12:38.3558 1:10.43
Hand Time First Competitor * 1:10.33
Start TOD Last Competitor * 10:55:27.8453 10:55:27.850
Finish TOD Last ( 121 ) ( 121 )* 10:58:35.4578 10:58:35.465 3:07.61
Hand Time Last Competitor * 3:07.47
* First and Last to Finish with complete data.
Best run-time System A Bib : ( 6 ) 1:09.46
Were all Results from system A? # TOD seconds in thousandths, at leastIndicate Yes No
Second Run Synchand +1 minute
• Are Systems A & B synchronized?
• Discuss!
Time of day 2nd Run
expressed in thouandths. System A (TOD) # System B (TOD) # Hand Sync.
Synchronization Time 12:11 11:31
Synch confirm at +1 minute 12:12:00.3591 12:12:00.360
Second Run Summary
• Comment on First and Last racer quality data?• Anything else?
Time of day 2nd Run
expressed in thouandths. System A (TOD) # System B (TOD) # Hand Sync.
Synchronization Time 12:11 11:31
Synch confirm at +1 minute 12:12:00.3591 12:12:00.360
Start TOD First Competitor * 12:30:42.138 12:30:42.138 Net Time
Finish TOD First ( 2 ) ( 20 ) * 12:31:55.3255 12:31:55.327 1:13.18
Hand Time First Competitor * 1:13.12
Start TOD Last Competitor * 13:33:11.5095 13:33:11.512
Finish TOD Last ( 121 ) ( 121 )* 13:34:36.3297 13:34:36.334 1:24.82
Hand Time Last Competitor * 1:24.71
* First and Last to Finish with complete data.
Best run-time System A Bib : ( 50 ) 1:11.80
Race Summary
List any or all bib numbers in the results timed on any system other than system A in all runs (indicate run).
WHY? Batteries Snow obscuration Wire break Photocell alignment Other? (describe).
EET replacement source? System B System C Manual
Best run-time System A Bib : ( 6 ) 1:09.46 Bib : ( 50 ) 1:11.80
Were all Results from system A? # TOD seconds in thousandths, at least
List any or all bib numbers used in the results timed on any system other than system A in all runs (indicate run):
WHY? Batteries Snow obscuration Wire break Photocell alignment Other? (describe)
Data Source for replacement system A time. (resp. ICR 611.2.1) ? System B System C Manual
Indicate Yes No
Certification
• Any discussion on this?
• Are we through now?
We certify that the timing and calculations of this event adhered to the FIS rules.
YES : NO :
Sign Off
• Chief of Timing– Printed Name– Email address– Telephone nr.– USSA member nr.– SIGNATURE
• Technical Delegate– Printed Name– Email address– Telephone nr.– SIGNATURE– FIS TD #
Chief of Timing - Name (Print) Email, Telephone Signature
Technical Delegate - Name, NAT (Print) Email, Telephone Signature FIS TD #
/ S I G N A T U R EMACK G. JOHANSEN
Donald Pickfield, USA
E5678978
808/ S I G N A T U R [email protected]
802-8xx-2zzz
Thanks For Your Attention
This is a new presentation this season. It takes advantage of work of others in preparing for Officials Education.
The intention was to build a vehicle that can be used for explaining the intricacies of the form as well as for updating Timing Nerds as well as bright Technical Delegates.
Thanks to Thelma for her continuing leadership. ABC 8/06