24
Alpine Ski Racing One TTRF for All Uses

Alpine Ski Racing One TTRF for All Uses. Report Form Changes This Season FIS Form Simplified French and German removed Separate Start Timers deleted Sync

Embed Size (px)

Citation preview

Alpine Ski Racing

One TTRF for All Uses

Report Form Changes This Season

FIS Form Simplified

French and German removed

Separate Start Timers deleted

Sync at +1 Min at Finish deleted

Check-boxes utilized throughout

Options for malfunction offered

Replacement-time source offered

Timing Technical ReportForm

CODEX example 0247

To accompany TD Report immediate transmittal.- One form required for each Codex Version 6.41

Timing Technical Report Alpine

Race Site and NationEvent NameDate

Location: Nation: Event Name:

Date (dd/mm/yy): 03.04.06

TD Banknorth Eastern Cup

Sunday River Ski Resort

USA

•Codex or Race Code

•Event

•Gender

Codex

•Note the “check boxes”

CODEX example 0247

1591

DH: SL: GS: SG: SC:

MEN: LADIES:

Version 6.41

Equipment

Sys Timer ASys Timer BStart GateFinish Cell AFinish Cell B

• Brand Name• Model or Type• Serial Number• Homologation #

Brand Model Serial Number Homologation #

Sys A Timer: ALGE TDC8000 ALG.002.97

Sys B Timer: Tag Heuer CP 520 Tag.001.01

Start Gate: Tag Heuer HL 7-1 Tag.S54.03

Finish Cells A: Tag Heuer HL2-31 Tag.L47.03

Finish Cells B: Tag Heuer HL2-31 Tag.L47.03

1994

832

9908097

2090

1993

Brand

Model

Serial #

Homol. #

ALGE

TDC8000

9908097

ALG.002.97

Timer A

Brand Model Serial Number Homologation #

Sys A Timer: ALGE TDC8000 ALG.002.97

Sys B Timer: Tag Heuer CP 520 Tag.001.01

Start Gate: Tag Heuer HL 7-1 Tag.S54.03

Finish Cells A: Tag Heuer HL2-31 Tag.L47.03

Finish Cells B: Tag Heuer HL2-31 Tag.L47.03

1994

832

9908097

2090

1993

Brand

Model

Serial #

Homol. #

Tag Heuer

CP 520

2090

Tag.001.01

Timer B

Brand Model Serial Number Homologation #

Sys A Timer: ALGE TDC8000 ALG.002.97

Sys B Timer: Tag Heuer CP 520 Tag.001.01

Start Gate: Tag Heuer HL 7-1 Tag.S54.03

Finish Cells A: Tag Heuer HL2-31 Tag.L47.03

Finish Cells B: Tag Heuer HL2-31 Tag.L47.03

1994

832

9908097

2090

1993

Brand

Model

Serial #

Homol. #

Tag Heuer

HL 7-1

832

TAG.S54.03

Start Gate

Brand Model Serial Number Homologation #

Sys A Timer: ALGE TDC8000 ALG.002.97

Sys B Timer: Tag Heuer CP 520 Tag.001.01

Start Gate: Tag Heuer HL 7-1 Tag.S54.03

Finish Cells A: Tag Heuer HL2-31 Tag.L47.03

Finish Cells B: Tag Heuer HL2-31 Tag.L47.03

1994

832

9908097

2090

1993

Photo Cells Brand

Model

Serial #

Homol. #

Tag Heuer

HL2-31

1994

ALG.L47.03

Brand Model Serial Number Homologation #

Sys A Timer: ALGE TDC8000 ALG.002.97

Sys B Timer: Tag Heuer CP 520 Tag.001.01

Start Gate: Tag Heuer HL 7-1 Tag.S54.03

Finish Cells A: Tag Heuer HL2-31 Tag.L47.03

Finish Cells B: Tag Heuer HL2-31 Tag.L47.03

1994

832

9908097

2090

1993

Connections

• How do we communicate signals/data from Start to Finish?

• How is voice communication handled between Start and Finish?

• Cable• Radio• Snowmobile• Ski Lift• Skier• ??

Connections to Start: System A System B

Cable, Radio or other- (Specify) Cable Cable Cable/Radio

Voice Comm.

Warm-up and Synchronization

• At what time is the run scheduled to start?– Is there a rule about Synchronization?

– What is the minimum recommended warm up time?• Is there a maximum?

• Discuss Hand Time Synchronization.

• Discuss Second run Synchronization.

POWER ON Time (warm-up): 6:57 At least 30 minutes before Synchronization.

Time of day 1st Run

expressed in thouandths. System A (TOD) # System B (TOD) # Hand Sync,

Synchronization Time 8:43 8:01

Synchronization and Synch + 1 Minute

• Are Systems A and B synchronized?– How close are they?

• What is the maximum difference acceptable?– So what?

• What about Hand Times?– So what?

Time of day 1st Run

expressed in thouandths. System A (TOD) # System B (TOD) # Hand Sync,

Synchronization Time 8:43 8:01

Synch confirm at +1 minute 8:45:00.2871 8:45:00.289

First Competitor Quality Check

• Is Net Time the same as A time-of-day difference?– How close are they?– Does Net Time agree with Official Results?

• What is the B time-of-day difference?– Discuss the difference?

• What about Hand Time?

• Comment on system synchronization?

System A (TOD) # System B (TOD) #

Start TOD First Competitor * 9:11:27.9192 9:11:27.922 Net Time

Finish TOD First ( 2 ) ( 20 ) * 9:12:38.3558 9:12:38.3558 1:10.43

Hand Time First Competitor * 1:10.33

Last Competitor Quality Check

• Is Net Time the same as A time-of-day difference?– How close are they?– Does Net Time agree with Official Results?

• What is the B time-of-day difference?– Discuss the difference?

• What about Hand Time?

• Comment on system synchronization?

System A (TOD) # System B (TOD) #

Start TOD Last Competitor * 10:55:27.8453 10:55:27.850

Finish TOD Last ( 121 ) ( 121 )* 10:58:35.4578 10:58:35.465 3:07.61

Hand Time Last Competitor * 3:07.47

* First and Last to Finish with complete data.

First Run Summary

• Why do we show Best run-time?• Anything else?

Time of day 1st Run

expressed in thouandths. System A (TOD) # System B (TOD) # Hand Sync,

Synch confirm at +1 minute 8:45:00.2871 8:45:00.289

Start TOD First Competitor * 9:11:27.9192 9:11:27.922 Net Time

Finish TOD First ( 2 ) ( 20 ) * 9:12:38.3558 9:12:38.3558 1:10.43

Hand Time First Competitor * 1:10.33

Start TOD Last Competitor * 10:55:27.8453 10:55:27.850

Finish TOD Last ( 121 ) ( 121 )* 10:58:35.4578 10:58:35.465 3:07.61

Hand Time Last Competitor * 3:07.47

* First and Last to Finish with complete data.

Best run-time System A Bib : ( 6 ) 1:09.46

Were all Results from system A? # TOD seconds in thousandths, at leastIndicate Yes No

Second Run Synchand +1 minute

• Are Systems A & B synchronized?

• Discuss!

Time of day 2nd Run

expressed in thouandths. System A (TOD) # System B (TOD) # Hand Sync.

Synchronization Time 12:11 11:31

Synch confirm at +1 minute 12:12:00.3591 12:12:00.360

Second Run Summary

• Comment on First and Last racer quality data?• Anything else?

Time of day 2nd Run

expressed in thouandths. System A (TOD) # System B (TOD) # Hand Sync.

Synchronization Time 12:11 11:31

Synch confirm at +1 minute 12:12:00.3591 12:12:00.360

Start TOD First Competitor * 12:30:42.138 12:30:42.138 Net Time

Finish TOD First ( 2 ) ( 20 ) * 12:31:55.3255 12:31:55.327 1:13.18

Hand Time First Competitor * 1:13.12

Start TOD Last Competitor * 13:33:11.5095 13:33:11.512

Finish TOD Last ( 121 ) ( 121 )* 13:34:36.3297 13:34:36.334 1:24.82

Hand Time Last Competitor * 1:24.71

* First and Last to Finish with complete data.

Best run-time System A Bib : ( 50 ) 1:11.80

Race Summary

List any or all bib numbers in the results timed on any system other than system A in all runs (indicate run).

WHY? Batteries Snow obscuration Wire break Photocell alignment Other? (describe).

EET replacement source? System B System C Manual

Best run-time System A Bib : ( 6 ) 1:09.46 Bib : ( 50 ) 1:11.80

Were all Results from system A? # TOD seconds in thousandths, at least

List any or all bib numbers used in the results timed on any system other than system A in all runs (indicate run):

WHY? Batteries Snow obscuration Wire break Photocell alignment Other? (describe)

Data Source for replacement system A time. (resp. ICR 611.2.1) ? System B System C Manual

Indicate Yes No

Race Comments

– What comments might or should be shown?

Comments:

Certification

• Any discussion on this?

• Are we through now?

We certify that the timing and calculations of this event adhered to the FIS rules.

YES : NO :

Sign Off

• Chief of Timing– Printed Name– Email address– Telephone nr.– USSA member nr.– SIGNATURE

• Technical Delegate– Printed Name– Email address– Telephone nr.– SIGNATURE– FIS TD #

Chief of Timing - Name (Print) Email, Telephone Signature

Technical Delegate - Name, NAT (Print) Email, Telephone Signature FIS TD #

/ S I G N A T U R EMACK G. JOHANSEN

Donald Pickfield, USA

[email protected]

E5678978

808/ S I G N A T U R [email protected]

802-8xx-2zzz

Thanks For Your Attention

This is a new presentation this season. It takes advantage of work of others in preparing for Officials Education.

The intention was to build a vehicle that can be used for explaining the intricacies of the form as well as for updating Timing Nerds as well as bright Technical Delegates.

Thanks to Thelma for her continuing leadership. ABC 8/06

The Chief of Timing and Calculations is responsible for supervising, documenting and enforcing the quality control of all actual timing functions and the official results, and is not the individual operating the electronic timing equipment or the timing/race result software.