ALOS2-INDONESIA REDD+ EXPERIMENT (AIREX): Soil Pool Carbon Application
M. Raimadoya1, A. Kristijono2, N. Sudiana2, B. Sumawinata1, Suwardi1, E. Santoso2, D. Mahargo2, S. Sudarman3, M. Mattikainen3
1Bogor Agricultural University (IPB), Dramaga Campus,
Bogor 16680, INDONESIA 2Agency for the Assessment and Application of Technology (BPPT), Jalan MH Thamrin 8,
Jakarta 10340, INDONESIA 3Riau Andalan Pulp and Paper (RAPP), Jalan Teluk Betung 31,
Jakarta 10230, INDONESIA
Acknowledgement
Acknowledgement
Outline
• Introduction
• Carbon Pools
• REDD+I: MRV System
• Study Approach
• Preliminary Results
• Outlook
Carbon Pools
DOM
SOIL
AGB
BGB
Tropical Peat Forest:
HCS (High Carbon Stock)
Peat (HCS)
FS: 2015-01-
26
COM-SAT
EO-SAT
NAV-SAT
“Peatlands make up just 3% of land but capture twice as much carbon as all forests combined”. http://www.esa.int/Our_Activities/Telecommunications_Integrated_Applications/Satellites_for_peat_s_sake (2015.01.26)
REDD+I: MRV System
DOM
SOIL
AGB
BGB
• Envisat-Indonesia Radar Biomass Exp (EIRBEX): C-Band DP/ESA
• ALOS-Indonesia POLinSAR Exp (AIPEX): L-Band QP/JAXA
ALOS2-Indonesia REDD+ Exp (AIREX) : L-Band QP/JAXA
Peat “Dome”
PEAT
RIVER RIVER
POLinSAR Ground Topography
GPR Peat Thickness
MINERAL MINERAL
Study Approach
01
Search for POLinSAR pairs
ALOS-1/ALOS-2
River River
02
Test the POLinSAR pairs
PolSARPro (4.2 or 5.0)
03
Process Data Profile
Ground Topography
04
GPR Field Test
Study Area
POLinSAR Pair
POLinSAR Pair ALS/PSR-1: 20070606; PLR-215
ALPSRP072730000 20090426; PLR-215
ALPSRP173380000 PolSAR image ALS/PSR-2 20140815; WBD
ALOS2012283600-140815
GPR Field Test
GPR: Thickness
GPR (200 MHz)
Geo-Resistivity
Peat Auger
GPR Result
Location : DW-15 Date : Tue 27 Aug 2013 Start Section
End Section
GPR Raw
Resampled 2,5cm
Air gap clipped
1 2
ReflexW
Resampling 2,5cm
Air gap clipped
Air gap clipped Running Average
3 4
1st Step Running Average 2nd Step Running Average
• 50 cm running average • 3x iteration
• 75 cm running average • 3x iteration
4a
4b
ELEVATION ADJUSTMENT
FINAL RESULT: DW 15 , Transect 02, Section 3 (E=8.93m)
LINE – MERANTI 7
Lokasi : DW – 15 Spasi Elektroda : 2,5 meter Panjang Lintasan : 117,5 meter Arah Lintasan : N 40o E Koordinat Center Line :
Keberadaan gambut di permukaan dicirikan dengan warna merah – ungu dengan harga tahanan jenis (ρ ) diatas 40,2 ohm meter.
LINE – MERANTI 8
Lokasi : DW – 15 Spasi Elektroda : 2,5 meter Panjang Lintasan : 117,5 meter Arah Lintasan : N 50o E Koordinat Center Line :
Keberadaan gambut di permukaan dicirikan dengan warna merah – ungu dengan harga tahanan jenis (ρ ) diatas 41,8 ohm meter.
FINAL RESULT: DW 11 , Transect1, Section 5
FINAL RESULT: DW10 , Transect 1, Section 1
Peat Uncertainty
U-01
Volume (V)= Area (A) * Thickness (T)
U-02
Weight (W) = V * Bulk Density (B)
U-03
Weight conversion C-Stock
U-04
Monitoring ∆C-Stock
Outlook
1. Forest height (POLinSAR/PolSARPro) Biomass Carbon Pool
2. Ground topography under dense vegetation (POLinSAR/PolSARPro) Soil (Peat) Carbon Pool
3. Ground topography under dense vegetation Secondary Mission Objectives (Biomass-EE/ESA)
4. 3-D PVM (Peat Volume Model) with input from: PolSARPro and ReflexW
5. Field test in small peat island Complete PVM process chain
#4 PolSARPro Export
SAVE TO CSV FILE
Thank You