23
Allston Brighton Boston College Task Force Meeting November 26, 2012

Allston Brighton Boston College Task Force Meeting ... · • Set back from Comm. Ave. • Limit to 5 – 6 floors • Open Courtyard to St. Thomas More • Program lower level •

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Allston Brighton Boston College Task Force Meeting ... · • Set back from Comm. Ave. • Limit to 5 – 6 floors • Open Courtyard to St. Thomas More • Program lower level •

Allston Brighton Boston College Task Force Meeting November 26, 2012

Page 2: Allston Brighton Boston College Task Force Meeting ... · • Set back from Comm. Ave. • Limit to 5 – 6 floors • Open Courtyard to St. Thomas More • Program lower level •

Agenda • Welcome and Introductions (BRA,

BC, Task Force)

• Update on Construction and

Renovation Projects (BC)

• IMP Overview (BC)

• 2150 Commonwealth Avenue

Residence Hall Planning (BC)

• Task Force Questions and

Comments

• Public Questions and Comments

Page 3: Allston Brighton Boston College Task Force Meeting ... · • Set back from Comm. Ave. • Limit to 5 – 6 floors • Open Courtyard to St. Thomas More • Program lower level •

COMPLETED

• 9 Lake Street

• Blessed Peter Faber Jesuit Housing – 188 Foster Street

• 129 Lake Street

• Cadigan Alumni Center

Construction and Renovation Projects

Page 4: Allston Brighton Boston College Task Force Meeting ... · • Set back from Comm. Ave. • Limit to 5 – 6 floors • Open Courtyard to St. Thomas More • Program lower level •

Create a unified and contiguous residential and academic core campus Develop cohesive residential villages by class Reinforce the mission by bringing together academic, social and spiritual pursuits Create a better pedestrian environment and peripheral vehicular circulation and parking

Extend the landscape quality found on the historic middle campus Respect the surrounding character of the neighborhoods by creating density closest to the core campus

Master Plan Principles

Page 5: Allston Brighton Boston College Task Force Meeting ... · • Set back from Comm. Ave. • Limit to 5 – 6 floors • Open Courtyard to St. Thomas More • Program lower level •

Vision

Creation of additional beds in several districts of the campus to meet student housing demand

Goals

• Meet full undergraduate student demand in university-controlled housing

• Offer a range of housing from traditional dorm-style to apartments

• Housing and programs that form good student behavior habits

IMP Housing Vision and Goals

Page 6: Allston Brighton Boston College Task Force Meeting ... · • Set back from Comm. Ave. • Limit to 5 – 6 floors • Open Courtyard to St. Thomas More • Program lower level •

Subtotal 94% - 96% of

undergraduate

demand

*150 beds taken under advisement by the BRA for further consideration, and not under consideration by the Zoning Commission at this time

Future Undergraduate Housing

350 Undergraduate Beds: subject to housing study to meet goal of 100%

More Hall + 470 beds

2000 Comm Ave

Raze Edmonds Hall

Subtotal

Shea Field

+ 560 beds

- 790 beds

+ 240 beds

+ 550 beds

Brighton Comm Ave

Combined Subtotal

+ 150 beds*

+ 940 beds

Mods Replacement - 185 beds + 185 beds

IMP Housing Plan

Page 7: Allston Brighton Boston College Task Force Meeting ... · • Set back from Comm. Ave. • Limit to 5 – 6 floors • Open Courtyard to St. Thomas More • Program lower level •

IMP Plan

Brighton Campus B

eac

on

Stre

et

Evergreen

Cemetery

Chestnut Hill Campus

Newton Campus

2150 Commonwealth

Avenue: proposed Residence Hall

Page 8: Allston Brighton Boston College Task Force Meeting ... · • Set back from Comm. Ave. • Limit to 5 – 6 floors • Open Courtyard to St. Thomas More • Program lower level •

housing

housing

proposed residence hall + student life

st. ignatius church

housing

housing

dining/theatre

university center

proposed academic

academic

parking

academic academic

2150 Commonwealth Avenue: proposed

residence hall

Proposed Residence Hall at 2150 Commonwealth Ave.

Page 9: Allston Brighton Boston College Task Force Meeting ... · • Set back from Comm. Ave. • Limit to 5 – 6 floors • Open Courtyard to St. Thomas More • Program lower level •

Program Summary

Approved IMP Program Elements • 470 student beds • Common spaces • Resident Director apartment • Retail • Underground parking • Open Space Alternate Program Elements Explored • Campus Police • Health Services

2150

Commonwealth

Avenue

Page 10: Allston Brighton Boston College Task Force Meeting ... · • Set back from Comm. Ave. • Limit to 5 – 6 floors • Open Courtyard to St. Thomas More • Program lower level •

Live / Learn Program

• Entry Lobby • Lobby Lounge • Common Room • Seminar Room • Quiet Room • Music Practice Rooms • Resident Minister / Resident Faculty • 1 Floor Lounge per floor • 3 Study Lounges per floor

2150

Commonwealth

Avenue

Page 11: Allston Brighton Boston College Task Force Meeting ... · • Set back from Comm. Ave. • Limit to 5 – 6 floors • Open Courtyard to St. Thomas More • Program lower level •

IMP

Campus

Gateways

Page 12: Allston Brighton Boston College Task Force Meeting ... · • Set back from Comm. Ave. • Limit to 5 – 6 floors • Open Courtyard to St. Thomas More • Program lower level •

IMP

Pedestrian

Circulation

Page 13: Allston Brighton Boston College Task Force Meeting ... · • Set back from Comm. Ave. • Limit to 5 – 6 floors • Open Courtyard to St. Thomas More • Program lower level •

IMP

Campus Open

Space

Page 14: Allston Brighton Boston College Task Force Meeting ... · • Set back from Comm. Ave. • Limit to 5 – 6 floors • Open Courtyard to St. Thomas More • Program lower level •

Institutional Master Plan Goals: • Strong building composition

• Create memorable open spaces

• Express active uses

2150

Commonwealth

Avenue

Page 15: Allston Brighton Boston College Task Force Meeting ... · • Set back from Comm. Ave. • Limit to 5 – 6 floors • Open Courtyard to St. Thomas More • Program lower level •

Commonwealth

Avenue

Page 16: Allston Brighton Boston College Task Force Meeting ... · • Set back from Comm. Ave. • Limit to 5 – 6 floors • Open Courtyard to St. Thomas More • Program lower level •

St. Thomas

More

Insert photo(s) from STM to south end of site

Try to find a shot from the south corner of the site looking north / east. Trying to capture mature trees at south triangle and forecourt to More Hall. If it doesn’t exist, just make this one bigger.

Page 17: Allston Brighton Boston College Task Force Meeting ... · • Set back from Comm. Ave. • Limit to 5 – 6 floors • Open Courtyard to St. Thomas More • Program lower level •

Project Constraints: • Mature landscape

• Height limitations

• Site topography

• Operational cost

2150

Commonwealth

Avenue

Page 18: Allston Brighton Boston College Task Force Meeting ... · • Set back from Comm. Ave. • Limit to 5 – 6 floors • Open Courtyard to St. Thomas More • Program lower level •

Aerial Photo

Page 19: Allston Brighton Boston College Task Force Meeting ... · • Set back from Comm. Ave. • Limit to 5 – 6 floors • Open Courtyard to St. Thomas More • Program lower level •

Site Section

Sketch

Page 20: Allston Brighton Boston College Task Force Meeting ... · • Set back from Comm. Ave. • Limit to 5 – 6 floors • Open Courtyard to St. Thomas More • Program lower level •

Site Analysis

Sketch Two building version

Page 21: Allston Brighton Boston College Task Force Meeting ... · • Set back from Comm. Ave. • Limit to 5 – 6 floors • Open Courtyard to St. Thomas More • Program lower level •

Merging Goals & Constraints: • Set back from Comm. Ave.

• Limit to 5 – 6 floors

• Open Courtyard to St. Thomas More

• Program lower level

• Create single building

• Make corner transparent

2150

Commonwealth

Avenue

Page 22: Allston Brighton Boston College Task Force Meeting ... · • Set back from Comm. Ave. • Limit to 5 – 6 floors • Open Courtyard to St. Thomas More • Program lower level •

Site Concept

Sketch Insert revised version

Page 23: Allston Brighton Boston College Task Force Meeting ... · • Set back from Comm. Ave. • Limit to 5 – 6 floors • Open Courtyard to St. Thomas More • Program lower level •

Discussion