10
1. Allowable load of Walk-thru Frame (A1217X, A917X) 2. Allowable load of other components Model Allowable Load (kN) Allowable Load (kg) TK6, HK6 2.45 250 FHK6 1.17 120 A20Y 4.91 500 AJ40 max 21.3 min 20.3 max 2175 min 2070 AK917 2.45 250 SG1 0.39 40 BM43 BM67 DS35X 2.45 250 DS57X 2.45 250 (i) Allowable load of main components of scaffold extension length of adjustable base (mm) allowable load of a frame with adjustable bases Remark kN kg 200 and under 200 42.6 4350 Those values are the values per 1 frame which is consisted of 2 legs(figure 1) , so that each allowable loads of 1 leg mean half of the said values. 201 250 40.6 4140 251 300 38.7 3950 Other length such as 1219mm, 914mm shall be taken same value as well. 301 350 37.2 3800 correct supporting points incorrect supporting points Description Load condition Remark Steel cat walk W500 concentrated load allowable loads are half of each widths Steel cat walk W240 concentrated load Joint for frame tensile strength Adjustable base usage for frame scaffold AJ40 : Max effective height 250mm Aliminium stair concentrated load 1.22kN(125kg)/1 foot step Stair guard frame horizontal load to top rail Scaffold beam 2 spans 9.81 1000 Amount of live load(service load) on and above the scaffold beam of 1set 2 beams Scaffold beam 3 spans Bracket type 300-500 concentrated load within the capacity of plank or catwalk Bracket type 500-750 concentrated load Maximum load on horizontal member shall be within the load amount of each catwalk's allowable loads. Load has to be supported on axis of vertical members. At first Objects in this table are the scaffold and the components of ALINCO GROUP and PT. KAPURINDO SENTANA BAJA. The said products are manufactured under Japanese official standard. Also rental scaffolding of PT. Kapurindo sentana is checked and well maintenanced. So that this table and the values shall not ensure the strength or safety of other company's products or other rental scaffolding. figure 1 figure 2 (i)

Allowable load of main components of scaffoldkapurindosb.co.id/wp-content/uploads/2017/08/rental...1. Allowable load of Walk-thru Frame (A1217X, A917X) 2. Allowable load of other components

  • Upload
    others

  • View
    12

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Allowable load of main components of scaffoldkapurindosb.co.id/wp-content/uploads/2017/08/rental...1. Allowable load of Walk-thru Frame (A1217X, A917X) 2. Allowable load of other components

1.AllowableloadofWalk-thruFrame(A1217X,A917X)

2.Allowableloadofothercomponents

Model AllowableLoad(kN)

AllowableLoad(kg)

TK6,HK6 2.45 250

FHK6 1.17 120

A20Y 4.91 500

AJ40max21.3min20.3

max2175min2070

AK917 2.45 250

SG1 0.39 40

BM43

BM67

DS35X 2.45 250

DS57X 2.45 250

(i)

Allowableloadofmaincomponentsofscaffold

extensionlengthofadjustablebase(mm)

allowableloadofaframewithadjustablebasesRemark

kN kg

200andunder200 42.6 4350Thosevaluesarethevaluesper1framewhichisconsistedof2legs(figure1),sothateachallowableloadsof1legmeanhalfofthesaidvalues.

201-250 40.6 4140

251-300 38.7 3950

Otherlengthsuchas1219mm,914mmshallbetakensamevalueaswell.

301-350 37.2 3800

correctsupportingpoints incorrectsupportingpoints

Description Loadcondition Remark

SteelcatwalkW500 concentratedload allowableloadsarehalfofeachwidthsSteelcatwalkW240 concentratedload

Jointforframe tensilestrength

Adjustablebase usageforframescaffold AJ40:Maxeffectiveheight250mm

Aliminiumstair concentratedload 1.22kN(125kg)/1footstep

Stairguardframe horizontalloadtotoprail

Scaffoldbeam2spans9.81 1000

Amountofliveload(serviceload)onandabovethescaffoldbeam

of1set2beamsScaffoldbeam3spans

Brackettype300-500 concentratedload withinthecapacityofplankorcatwalkBrackettype500-750 concentratedload

Maximumloadonhorizontal membershallbewithintheloadamountofeachcatwalk'sallowableloads.

Load hastobesupportedonaxisofverticalmembers.

AtfirstObjectsin thistable arethescaffoldandthecomponents ofALINCOGROUPand PT.KAPURINDOSENTANABAJA.ThesaidproductsaremanufacturedunderJapaneseofficialstandard. AlsorentalscaffoldingofPT.Kapurindosentanais checkedandwellmaintenanced.Sothatthistableandthevaluesshallnotensurethestrengthorsafetyofothercompany'sproductsorotherrentalscaffolding.

figure 1 figure 2

1.AllowableloadofWalk-thruFrame(A1217X,A917X)

2.Allowableloadofothercomponents

Model AllowableLoad(kN)

AllowableLoad(kg)

TK6,HK6 2.45 250

FHK6 1.17 120

A20Y 4.91 500

AJ40max21.3min20.3

max2175min2070

AK917 2.45 250

SG1 0.39 40

BM43

BM67

DS35X 2.45 250

DS57X 2.45 250

(i)

Allowableloadofmaincomponentsofscaffold

extensionlengthofadjustablebase(mm)

allowableloadofaframewithadjustablebasesRemark

kN kg

200andunder200 42.6 4350Thosevaluesarethevaluesper1framewhichisconsistedof2legs(figure1),sothateachallowableloadsof1legmeanhalfofthesaidvalues.

201-250 40.6 4140

251-300 38.7 3950

Otherlengthsuchas1219mm,914mmshallbetakensamevalueaswell.

301-350 37.2 3800

correctsupportingpoints incorrectsupportingpoints

Description Loadcondition Remark

SteelcatwalkW500 concentratedload allowableloadsarehalfofeachwidthsSteelcatwalkW240 concentratedload

Jointforframe tensilestrength

Adjustablebase usageforframescaffold AJ40:Maxeffectiveheight250mm

Aliminiumstair concentratedload 1.22kN(125kg)/1footstep

Stairguardframe horizontalloadtotoprail

Scaffoldbeam2spans9.81 1000

Amountofliveload(serviceload)onandabovethescaffoldbeam

of1set2beamsScaffoldbeam3spans

Brackettype300-500 concentratedload withinthecapacityofplankorcatwalkBrackettype500-750 concentratedload

Maximumloadonhorizontal membershallbewithintheloadamountofeachcatwalk'sallowableloads.

Load hastobesupportedonaxisofverticalmembers.

AtfirstObjectsin thistable arethescaffoldandthecomponents ofALINCOGROUPand PT.KAPURINDOSENTANABAJA.ThesaidproductsaremanufacturedunderJapaneseofficialstandard. AlsorentalscaffoldingofPT.Kapurindosentanais checkedandwellmaintenanced.Sothatthistableandthevaluesshallnotensurethestrengthorsafetyofothercompany'sproductsorotherrentalscaffolding.

figure 1 figure 2

Page 2: Allowable load of main components of scaffoldkapurindosb.co.id/wp-content/uploads/2017/08/rental...1. Allowable load of Walk-thru Frame (A1217X, A917X) 2. Allowable load of other components

Model AllowableLoad(kN)

AllowableLoad(kg)

allmodels 4.41 450

B20 7.36 750

BC1 4.90 500

BC3 3.43 350

3.09 315

4.41 450

3.09 315

6.65 670

CLT40,30,20 1.22 125

Model AllowableLoad(kN)

AllowableLoad(kg)

CSmodel 1.28 130

A1515type 2.45 250

BL8 2.45 250

(ii)

Hsteelclamporthogonaltype

H11(fixed)H13(swivel)

strengthforpull-offdirection tightenedat3.43kN・cm

torquestrengthforopen-updirection

strengthforopen-updirection

Description Loadcondition Remark

Walltiebothtensileandcompressivestrength

abletoincrease30%forwindforce

Jointforloosetube tensilestrength

Fixedclamp strengthofslidingandyielding

tightenedat3.43kN・cmtorqueSwivelclamp

Hsteelclampparalleltype

H21(fixed)H23(swivel)

strengthforpull-offdirection

ScaffoldcasterDM200mm compressiveload

Description Loadcondition Remark

Mightybase(Aluminiumplatform)

Allmodels 1.47 150 loadamontonaplatform 2andmorepersonsonaplatformarenotallowed.

tightenedat3.43kN・cmtorque

Allallowableloadspossesssafetyfactor2andabove.

Aluminiumladder serviceload setat75degree

Rollingtower serviceload includingpersons

Steelplank concentratedload within1800mmsupported

Model AllowableLoad(kN)

AllowableLoad(kg)

allmodels 4.41 450

B20 7.36 750

BC1 4.90 500

BC3 3.43 350

3.09 315

4.41 450

3.09 315

6.65 670

CLT40,30,20 1.22 125

Model AllowableLoad(kN)

AllowableLoad(kg)

CSmodel 1.28 130

A1515type 2.45 250

BL8 2.45 250

(ii)

Hsteelclamporthogonaltype

H11(fixed)H13(swivel)

strengthforpull-offdirection tightenedat3.43kN・cm

torquestrengthforopen-updirection

strengthforopen-updirection

Description Loadcondition Remark

Walltiebothtensileandcompressivestrength

abletoincrease30%forwindforce

Jointforloosetube tensilestrength

Fixedclamp strengthofslidingandyielding

tightenedat3.43kN・cmtorqueSwivelclamp

Hsteelclampparalleltype

H21(fixed)H23(swivel)

strengthforpull-offdirection

ScaffoldcasterDM200mm compressiveload

Description Loadcondition Remark

Mightybase(Aluminiumplatform)

Allmodels 1.47 150 loadamontonaplatform 2andmorepersonsonaplatformarenotallowed.

tightenedat3.43kN・cmtorque

Allallowableloadspossesssafetyfactor2andabove.

Aluminiumladder serviceload setat75degree

Rollingtower serviceload includingpersons

Steelplank concentratedload within1800mmsupported

Page 3: Allowable load of main components of scaffoldkapurindosb.co.id/wp-content/uploads/2017/08/rental...1. Allowable load of Walk-thru Frame (A1217X, A917X) 2. Allowable load of other components

(iii)

(iii)

Page 4: Allowable load of main components of scaffoldkapurindosb.co.id/wp-content/uploads/2017/08/rental...1. Allowable load of Walk-thru Frame (A1217X, A917X) 2. Allowable load of other components

(iv)

(iv)

Page 5: Allowable load of main components of scaffoldkapurindosb.co.id/wp-content/uploads/2017/08/rental...1. Allowable load of Walk-thru Frame (A1217X, A917X) 2. Allowable load of other components

(v)

(v)

Page 6: Allowable load of main components of scaffoldkapurindosb.co.id/wp-content/uploads/2017/08/rental...1. Allowable load of Walk-thru Frame (A1217X, A917X) 2. Allowable load of other components

(vi)

(vi)

Page 7: Allowable load of main components of scaffoldkapurindosb.co.id/wp-content/uploads/2017/08/rental...1. Allowable load of Walk-thru Frame (A1217X, A917X) 2. Allowable load of other components

(8)Wewillhaveconfirmedtocustomeraftercheckreturngoods(differentofquantity,size(code)and/ormerk)for3days.

16until25 0.25 16until25 (0.50)26until31 0 26until31 (0.25)

(vii)

1until5 0.75 1until5 (1.00)6until15 0.5 6until15 (0.75)

DeliveryDate ReturnDate

Date (+)month Date (-)month

AnnouncementofBusiness(1)InitialFee・Initialfeeincludes(i)costofloadingtoandunloadingfromtruckstherentedfacilitiesattheKapurindo’sfacilitiescenter,(ii)costforinspectionacceptance,(iii)costforsafetyinspectionand(iv)costforgeneralmaintenance.・Initialfeeshallbechargedonanyrentedfacilities,regardlessofperiodofrent,useornon-use,etc.・Initialfeeischargedinfullupondeliveryoftherentedfacilities.

(2)RentFee・ Basedontheamountoffacilitiesdescribedinthedeliverystatementandtheinspectionstatement,rentfeeshallbecalculatedasfollows:(amountoffacilities)X(rentfeeperunitdescribedinaproposal)X(rentperiod)・Minimumrentperiodshallbe30days.・ Rentfeeshallnotinclude(i)costfortransportationofrentedfacilities,(ii)costforassemblyanddisassemblyofrentedfacilitiesatconstructionsitesand(iii)costofloadingtoandunloadingfromtruckstherentedfacilitiesatconstructionsites.

(3)RepairFee・ CustomershallpaytherepairfeetoKapurindoforthereturnedfacilitieswhicharerecognizedtoneedrepairand/orpolishuponinspectionofthereturnedfacilitiesbybothParties.・ Degreeofnecessaryrepairand/orpolishshallbedecidedinaccordancewith“KapurindoInspectionStandard”andtherepairfeetobepaidbyCustomershallbedecidedinaccordancewithrepairfeestipulatedinthetableoffeeperunit.

(4)Damage/LossFee・ Customershallpaythedamage/lossfeeforthefacilitieswhicharerecognizedunabletoberepaireduponinspectionofthereturnedfacilitiesbybothParties.・Whetherthereturnedfacilitiescanberepairedornotshallbedecidedinaccordancewith“KapurindoInspectionStandard”andthedamage/lossfeetobepaidbyCustomershallbedecidedinaccordancewithdamage/lossfeestipulatedinthetableoffeeperunit.・ Incasepartoftherentedfacilitiesaredamagedorlostduringtherentperiod,thechargeofrentfeeissuspendedandthedamage/lossfeeshallbepaid.

(5)DeliveryFeeDeliverywillbechargedtoyourcompany.

(6)DeliveryLocationThedeliveryaddressistoourcompanyequipmentcenter.

(7) RateRentalof1monthfordeliveryandreturn

(8)Wewillhaveconfirmedtocustomeraftercheckreturngoods(differentofquantity,size(code)and/ormerk)for3days.

16until25 0.25 16until25 (0.50)26until31 0 26until31 (0.25)

(vii)

1until5 0.75 1until5 (1.00)6until15 0.5 6until15 (0.75)

DeliveryDate ReturnDate

Date (+)month Date (-)month

AnnouncementofBusiness(1)InitialFee・Initialfeeincludes(i)costofloadingtoandunloadingfromtruckstherentedfacilitiesattheKapurindo’sfacilitiescenter,(ii)costforinspectionacceptance,(iii)costforsafetyinspectionand(iv)costforgeneralmaintenance.・Initialfeeshallbechargedonanyrentedfacilities,regardlessofperiodofrent,useornon-use,etc.・Initialfeeischargedinfullupondeliveryoftherentedfacilities.

(2)RentFee・ Basedontheamountoffacilitiesdescribedinthedeliverystatementandtheinspectionstatement,rentfeeshallbecalculatedasfollows:(amountoffacilities)X(rentfeeperunitdescribedinaproposal)X(rentperiod)・Minimumrentperiodshallbe30days.・ Rentfeeshallnotinclude(i)costfortransportationofrentedfacilities,(ii)costforassemblyanddisassemblyofrentedfacilitiesatconstructionsitesand(iii)costofloadingtoandunloadingfromtruckstherentedfacilitiesatconstructionsites.

(3)RepairFee・ CustomershallpaytherepairfeetoKapurindoforthereturnedfacilitieswhicharerecognizedtoneedrepairand/orpolishuponinspectionofthereturnedfacilitiesbybothParties.・ Degreeofnecessaryrepairand/orpolishshallbedecidedinaccordancewith“KapurindoInspectionStandard”andtherepairfeetobepaidbyCustomershallbedecidedinaccordancewithrepairfeestipulatedinthetableoffeeperunit.

(4)Damage/LossFee・ Customershallpaythedamage/lossfeeforthefacilitieswhicharerecognizedunabletoberepaireduponinspectionofthereturnedfacilitiesbybothParties.・Whetherthereturnedfacilitiescanberepairedornotshallbedecidedinaccordancewith“KapurindoInspectionStandard”andthedamage/lossfeetobepaidbyCustomershallbedecidedinaccordancewithdamage/lossfeestipulatedinthetableoffeeperunit.・ Incasepartoftherentedfacilitiesaredamagedorlostduringtherentperiod,thechargeofrentfeeissuspendedandthedamage/lossfeeshallbepaid.

(5)DeliveryFeeDeliverywillbechargedtoyourcompany.

(6)DeliveryLocationThedeliveryaddressistoourcompanyequipmentcenter.

(7) RateRentalof1monthfordeliveryandreturn

Page 8: Allowable load of main components of scaffoldkapurindosb.co.id/wp-content/uploads/2017/08/rental...1. Allowable load of Walk-thru Frame (A1217X, A917X) 2. Allowable load of other components

(viii)

REQUESTTOCUSTOMERREGARDINGRETURNOFGOODS

Toreduceineffecticedeliveryfee,andtoshortentheprocessandwaitingtime,pleasecooperatewithbelowmatters.

Thesamewiththeshippingtime,pleasedopackingbyclassifyingit.(Classifyingbylengthortype,etc)

Pleasehandlealltheincominggoodswithlift.Becauseitismoreeasiertodoloadingandunloadingwithlift.

Pleasedodeliveryinaccordancetothetimedecided.

• Toavoidthetroublebecauseoflossgoods,pleaseattachthedeliverynoteandthedetail

ofthegoods.

• Toavoidthedangerbecauseoffallingdowngoodsorbrokeninthedeliverytime,pleasedo

packingasinstructedatPackingMethod.

• Pleasedoarrangementwithsmallgoods,soitcanbecountedeasily.

• Pleasedopackingtopipe,brace,handrail,etcseparately.

• Pleasekeepthegoodssortedwiththegoodsfromanothercompany.

• We willhaveconfirmedtocustomeraftercheckreturngoods(differentofquantity,size

(code)and/ormerk)for3days.

4

3

2

1

(viii)

REQUESTTOCUSTOMERREGARDINGRETURNOFGOODS

Toreduceineffecticedeliveryfee,andtoshortentheprocessandwaitingtime,pleasecooperatewithbelowmatters.

Thesamewiththeshippingtime,pleasedopackingbyclassifyingit.(Classifyingbylengthortype,etc)

Pleasehandlealltheincominggoodswithlift.Becauseitismoreeasiertodoloadingandunloadingwithlift.

Pleasedodeliveryinaccordancetothetimedecided.

• Toavoidthetroublebecauseoflossgoods,pleaseattachthedeliverynoteandthedetail

ofthegoods.

• Toavoidthedangerbecauseoffallingdowngoodsorbrokeninthedeliverytime,pleasedo

packingasinstructedatPackingMethod.

• Pleasedoarrangementwithsmallgoods,soitcanbecountedeasily.

• Pleasedopackingtopipe,brace,handrail,etcseparately.

• Pleasekeepthegoodssortedwiththegoodsfromanothercompany.

• We willhaveconfirmedtocustomeraftercheckreturngoods(differentofquantity,size

(code)and/ormerk)for3days.

4

3

2

1

Page 9: Allowable load of main components of scaffoldkapurindosb.co.id/wp-content/uploads/2017/08/rental...1. Allowable load of Walk-thru Frame (A1217X, A917X) 2. Allowable load of other components

(ix)

PACKINGMETHODSAMPLEDopackingasthesamewithincomingconditionasmuchaspossible,andshouldbeunitewithrope,etc.

Pileupthesamegoodsmutuallyuntil25stages,andthentieitwithrope.

first stage

second stage

ScaffoldingWalkthroughFrame

Ladder Frame

Catwalk withHooks

Pileupthesamegoodsinthesamedirection,andthentieitwithropeevery25stagesand25sheets.

Putthesamegoodsevery50sheetsinonepacking.(Thegoods inthebottomispositionedupsidedown)

CrossBrace,SteelPipe,etc.

Unitethegoodswiththesamelengthandthesametypeevery50sticksor100sticks.

Clamp,Joints,Base,etc.

Putthesametypeevery30pcsor50pcsinthebag.

(ix)

PACKINGMETHODSAMPLEDopackingasthesamewithincomingconditionasmuchaspossible,andshouldbeunitewithrope,etc.

Pileupthesamegoodsmutuallyuntil25stages,andthentieitwithrope.

first stage

second stage

ScaffoldingWalkthroughFrame

Ladder Frame

Catwalk withHooks

Pileupthesamegoodsinthesamedirection,andthentieitwithropeevery25stagesand25sheets.

Putthesamegoodsevery50sheetsinonepacking.(Thegoods inthebottomispositionedupsidedown)

CrossBrace,SteelPipe,etc.

Unitethegoodswiththesamelengthandthesametypeevery50sticksor100sticks.

Clamp,Joints,Base,etc.

Putthesametypeevery30pcsor50pcsinthebag.

(ix)

PACKINGMETHODSAMPLEDopackingasthesamewithincomingconditionasmuchaspossible,andshouldbeunitewithrope,etc.

Pileupthesamegoodsmutuallyuntil25stages,andthentieitwithrope.

first stage

second stage

ScaffoldingWalkthroughFrame

Ladder Frame

Catwalk withHooks

Pileupthesamegoodsinthesamedirection,andthentieitwithropeevery25stagesand25sheets.

Putthesamegoodsevery50sheetsinonepacking.(Thegoods inthebottomispositionedupsidedown)

CrossBrace,SteelPipe,etc.

Unitethegoodswiththesamelengthandthesametypeevery50sticksor100sticks.

Clamp,Joints,Base,etc.

Putthesametypeevery30pcsor50pcsinthebag.

(ix)

PACKINGMETHODSAMPLEDopackingasthesamewithincomingconditionasmuchaspossible,andshouldbeunitewithrope,etc.

Pileupthesamegoodsmutuallyuntil25stages,andthentieitwithrope.

first stage

second stage

ScaffoldingWalkthroughFrame

Ladder Frame

Catwalk withHooks

Pileupthesamegoodsinthesamedirection,andthentieitwithropeevery25stagesand25sheets.

Putthesamegoodsevery50sheetsinonepacking.(Thegoods inthebottomispositionedupsidedown)

CrossBrace,SteelPipe,etc.

Unitethegoodswiththesamelengthandthesametypeevery50sticksor100sticks.

Clamp,Joints,Base,etc.

Putthesametypeevery30pcsor50pcsinthebag.

Page 10: Allowable load of main components of scaffoldkapurindosb.co.id/wp-content/uploads/2017/08/rental...1. Allowable load of Walk-thru Frame (A1217X, A917X) 2. Allowable load of other components

(x)

LOCATION

PT.AlincoRentalIndonesia(KapurindoStockyard),BlockCC-2 CikarangPusat,KawasanIndustriGreenlandInternationalIndustrialCenter,DeltaMas, Kab.Bekasi,JawaBarat,Indonesia.

(x)

LOCATION

PT.AlincoRentalIndonesia(KapurindoStockyard),BlockCC-2 CikarangPusat,KawasanIndustriGreenlandInternationalIndustrialCenter,DeltaMas, Kab.Bekasi,JawaBarat,Indonesia.