Allocation of Unidentified Gas Statement 22 nd May 2012

Allocation of Unidentified Gas Statement...Allocation of Unidentified Gas Statement 22 nd May 2012. Outline ... 1st May - 15th June First consultation period Mid June Consumption data

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Allocation of Unidentified Gas Statement...Allocation of Unidentified Gas Statement 22 nd May 2012. Outline ... 1st May - 15th June First consultation period Mid June Consumption data

Allocation of Unidentified Gas Statement22nd May 2012

Page 2: Allocation of Unidentified Gas Statement...Allocation of Unidentified Gas Statement 22 nd May 2012. Outline ... 1st May - 15th June First consultation period Mid June Consumption data

Outline

• Overview of current methodology

• Initiatives to improve estimate of UG

• Consumptions

• Sites with AQ=1

• WCF

• Lost/new sites

• Change in Seasonal Normal (incl. Mod254)

• Theft

• Initial questions / comments / clarifications on first draft 2012 AUGS for 2013/14

• discussion

Page 3: Allocation of Unidentified Gas Statement...Allocation of Unidentified Gas Statement 22 nd May 2012. Outline ... 1st May - 15th June First consultation period Mid June Consumption data

High Level PlanKey Dates Description Data Analysis

30th April First draft AUGS published

Update of

methodology

22nd May

UNCC Meeting

GL Noble Denton present AUGS

1st May - 15th June First consultation period

Mid June Consumption data expected

31st July Second draft AUGS to be published

1st August - 31st August Second consultation period

Mid August UNCC Meeting GL Noble Denton to

present updated AUGS

September date TBC Third draft AUGS published

October date TBC

UNCC Meeting

GL Noble Denton to present updated

AUGS

October date TBC

Methodology submitted to UNCC for final

approval and final version of AUGS

published including figures

October 2012 - 28th February 2013 Query processFebruary 1st 2013 Final Figures published

Apply

methodology

Provision

of data

Page 4: Allocation of Unidentified Gas Statement...Allocation of Unidentified Gas Statement 22 nd May 2012. Outline ... 1st May - 15th June First consultation period Mid June Consumption data

Unidentified Gas – Overview of current methodology

Page 5: Allocation of Unidentified Gas Statement...Allocation of Unidentified Gas Statement 22 nd May 2012. Outline ... 1st May - 15th June First consultation period Mid June Consumption data

Unidentified Gas – Definition

Unidentified Gas is defined as consisting of:

• Unregistered and Shipperless sites

• Independent Gas Transporter CSEP setup and registration delays

• Shipper-responsible theft

• Metering bias

• Other

• Shrinkage estimate error

• Open bypass valves

• Meters passing unregistered gas

• Unknown sites

Page 6: Allocation of Unidentified Gas Statement...Allocation of Unidentified Gas Statement 22 nd May 2012. Outline ... 1st May - 15th June First consultation period Mid June Consumption data

Unidentified Gas – Calculation

Total Unidentified Gas is calculated directly

• Currently estimated from UG assigned to LSP sector due to data availability

Components are calculated directly where possible:

• Unregistered and Shipperless sites

• Independent Gas Transporter CSEP setup and registration delays

• Metering bias

The remainder is calculated by subtraction

• Balancing Factor (equal to Theft plus Other)

Page 7: Allocation of Unidentified Gas Statement...Allocation of Unidentified Gas Statement 22 nd May 2012. Outline ... 1st May - 15th June First consultation period Mid June Consumption data

Unidentified Gas – Location

• Allocation process assigns UG to both LSP and SSP sectors

• LSP-assigned UG

• Consists of UG arising from both LSP and SSP sectors

• Accounts for the majority of total UG

• Can be calculated using available data

• SSP-assigned UG

• Consists of UG arising from both LSP and SSP sectors

• Is likely to be small

• Cannot be calculated using currently available data

Page 8: Allocation of Unidentified Gas Statement...Allocation of Unidentified Gas Statement 22 nd May 2012. Outline ... 1st May - 15th June First consultation period Mid June Consumption data

Unidentified Gas – Allocation Bias due to AQ Change

Year on Year AQ Change: Retained Meters

-12%

-10%

-8%

-6%

-4%

-2%

0%

2007 2008 2009 2010

SSP

LSP

Page 9: Allocation of Unidentified Gas Statement...Allocation of Unidentified Gas Statement 22 nd May 2012. Outline ... 1st May - 15th June First consultation period Mid June Consumption data

Unidentified Gas – Effects of Allocation Bias

Existence of allocation bias means that

• Not all of RbD is Unidentified Gas

• Majority of Unidentified Gas is assigned to LSP sector

Based on available data

• Long-term RbD bias can be estimated

• Allocation bias can be estimated

• Total LSP-assigned UG can be estimated

• This can then be split between market sectors

Page 10: Allocation of Unidentified Gas Statement...Allocation of Unidentified Gas Statement 22 nd May 2012. Outline ... 1st May - 15th June First consultation period Mid June Consumption data

Unidentified Gas – Balancing Factor

LSP Assigned UG = Average RbD – Algorithm Bias

= Shipperless UG + iGT CSEPs UG + Meter Error UG +

Balancing Factor

• Shipperless, iGT CSEPs and Meter Error calculated directly

• Balancing Factor calculated by subtraction

• Balancing Factor is:

• Theft

• Shrinkage estimate error

• Open bypass valves

• Meters passing unregistered gas

• Unknown sites

Page 11: Allocation of Unidentified Gas Statement...Allocation of Unidentified Gas Statement 22 nd May 2012. Outline ... 1st May - 15th June First consultation period Mid June Consumption data

Initiatives to Improve estimate of UG

Page 12: Allocation of Unidentified Gas Statement...Allocation of Unidentified Gas Statement 22 nd May 2012. Outline ... 1st May - 15th June First consultation period Mid June Consumption data

Initiatives to improve estimate of UG

• Consumption data

• Sites with AQ=1

• WCF

• Lost/new sites

• Change in Seasonal Normal (incl. Mod254)

• Theft

Page 13: Allocation of Unidentified Gas Statement...Allocation of Unidentified Gas Statement 22 nd May 2012. Outline ... 1st May - 15th June First consultation period Mid June Consumption data

Consumption Data

• Need enough data to accurately estimate the following for each LDZ

• SSP and LSP metered consumptions

• SSP and LSP aggregate allocations

• Actual metered consumptions are still unknown due to missing data

Total UG = (Alloc SSP + Alloc LSP) – (Metered SSP + Metered LSP)

• Calculation requires as much data as possible for both metered consumptions and

allocations

Page 14: Allocation of Unidentified Gas Statement...Allocation of Unidentified Gas Statement 22 nd May 2012. Outline ... 1st May - 15th June First consultation period Mid June Consumption data

Consumption Data

Data issues are as follows

• Sites with no/insufficient meter reads (at least 10% of population)

• Sites in CSEPs

What remains is a (large) sample of the whole LDZ

• We can therefore calculate both the best estimate and a Confidence Interval for the

LDZ total metered consumption

• The larger the sample, the narrower the Confidence Interval

Page 15: Allocation of Unidentified Gas Statement...Allocation of Unidentified Gas Statement 22 nd May 2012. Outline ... 1st May - 15th June First consultation period Mid June Consumption data

Consumption Data

Full statistical principles described in AUGS

• Calculate Confidence Interval for average consumption, using

• Central Limit Theorem

• Finite Population Correction

• Confidence Interval for average consumption given by

196.1

−−××±

NnN

nSx

Sample average consumption is Normally distributed, with a mean of x and a Standard Error

of nS , where x is the mean of the sample taken and S is the Standard Deviation.

Page 16: Allocation of Unidentified Gas Statement...Allocation of Unidentified Gas Statement 22 nd May 2012. Outline ... 1st May - 15th June First consultation period Mid June Consumption data

Consumption Data

• Multiply by population size to get Confidence Interval for aggregate load

• The larger the sample, the more accurately we will be able to estimate actual load

• Range for actual loads feeds into total UG calculation and gives range for this

• Best estimate

• 95% high and low limits

Risks

• UG range includes negative values

• Uncertainty in load estimate dwarfs UG meaning no estimate can be made

Page 17: Allocation of Unidentified Gas Statement...Allocation of Unidentified Gas Statement 22 nd May 2012. Outline ... 1st May - 15th June First consultation period Mid June Consumption data

Consumption Data

If primary analysis fails, the following alternatives are available

• Use results of consumption analysis to estimate SSP-assigned UG as a percentage

of LSP-assigned UG

• % factor described in 2012/13 AUGS

• An estimate rather than a robust statistical approach

• Erring on the side of caution necessary

• Final option if all else fails is to leave the percentage factor at zero, as in the 2012/13

analysis

Page 18: Allocation of Unidentified Gas Statement...Allocation of Unidentified Gas Statement 22 nd May 2012. Outline ... 1st May - 15th June First consultation period Mid June Consumption data

WCF

• Issue raised by British Gas

• UG allocated through WCF term

[ ] LDZ

t

LDZ

t

euc

t

euc

t

euc

teuc

t SFWCFDAFALPAQ

D **1365

*+=

AQ Inaccuracies

( )

LDZ

LDZLDZ

SND

SNDDWCF

−=

Pre Mod204

=

allEUC

allEUC

LDZ

ALPAQ

ALPAQD

WCF

365

*

365

*

Post Mod204

AQ Inaccuracies

+ UG

Page 19: Allocation of Unidentified Gas Statement...Allocation of Unidentified Gas Statement 22 nd May 2012. Outline ... 1st May - 15th June First consultation period Mid June Consumption data

WCF

• Sensitivity Analysis

• What do WCF & SF tell us about UG?

• EWCF

• What does WCF-EWCF tell us about UG?

WCF Gas Year Averages

-0.1500

-0.1000

-0.0500

0.0000

0.0500

0.1000

2005 2006 2007 2008 2009 2010

EA

EM

LC

LO

LS

LT

LW

NE

NO

NT

NW

SC

SE

SO

SW

WM

WN

WS

SF Gas Year Averages

0.8500

0.9000

0.9500

1.0000

1.0500

1.1000

2005 2006 2007 2008 2009 2010

EA

EM

LC

LO

LS

LT

LW

NE

NO

NT

NW

SC

SE

SO

SW

WM

WN

WS

Page 20: Allocation of Unidentified Gas Statement...Allocation of Unidentified Gas Statement 22 nd May 2012. Outline ... 1st May - 15th June First consultation period Mid June Consumption data

New/Lost MPRs

• Allocation Algorithm Error (AQ Bias)

• Allocation with Base AQ – Allocation with ‘Best’ AQ

• Base AQ & Best AQ do not vary through gas year

• Assess impact of this assumption

Page 21: Allocation of Unidentified Gas Statement...Allocation of Unidentified Gas Statement 22 nd May 2012. Outline ... 1st May - 15th June First consultation period Mid June Consumption data

Seasonal Normal Definition (Mod254)

• Definition of Seasonal Normal updated in 2010

• This included the ability to use forecast weather data (Mod254)

• AQ Calculated as Measured Consumption Corrected to SN

• Same consumption -> Different AQ

• Mod81 Report – Change in AQ

Mod81 Report PrevAQ CurrAQ

2008 Old SN Old SN

2009 Old SN Old SN

2010 Old SN New SN

2011 New SN New SN

Page 22: Allocation of Unidentified Gas Statement...Allocation of Unidentified Gas Statement 22 nd May 2012. Outline ... 1st May - 15th June First consultation period Mid June Consumption data

Seasonal Normal Definition (Mod254)

Effect on AQ Change from New SNCWV/Mod254

-12

-10

-8

-6

-4

-2

0

2008 2009 2010

Gas Year (Mod81 Report)

% C

han

ge i

n A

Q

SSP

SSP Adj

LSP

LSP AdjL

S

P

S

S

P

Page 23: Allocation of Unidentified Gas Statement...Allocation of Unidentified Gas Statement 22 nd May 2012. Outline ... 1st May - 15th June First consultation period Mid June Consumption data

Theft - update

Receive and validate data

Calculate and assign theft to year in which it occurred

Identify prevailing AQ prior to estimated start date

where AQ=1 use previous years AQ

if no AQ<>1 found ultimately use current AQ (which can also be 1)

Assign to market sector

proposed change: where AQ=1 and annual theft >73,200kWh per

annum set market sector to LSP

Aggregate by sector by year

Calculate average over 2008-2010

Page 24: Allocation of Unidentified Gas Statement...Allocation of Unidentified Gas Statement 22 nd May 2012. Outline ... 1st May - 15th June First consultation period Mid June Consumption data

Total detected theft by year of detection

0

10,000,000

20,000,000

30,000,000

40,000,000

50,000,000

60,000,000

70,000,000

2006 2007 2008 2009 2010 2011

Year

Es

tim

ate

d T

he

ft (

kW

h)

2010 data

2011 data

Page 25: Allocation of Unidentified Gas Statement...Allocation of Unidentified Gas Statement 22 nd May 2012. Outline ... 1st May - 15th June First consultation period Mid June Consumption data

Total detected theft by year of occurrence

0

5,000,000

10,000,000

15,000,000

20,000,000

25,000,000

30,000,000

35,000,000

20

00

20

01

20

02

20

03

20

04

20

05

20

06

20

07

20

08

20

09

20

10

20

11

Year

Esti

mate

d T

heft

(kW

h)

2010 data

2011 data

Page 26: Allocation of Unidentified Gas Statement...Allocation of Unidentified Gas Statement 22 nd May 2012. Outline ... 1st May - 15th June First consultation period Mid June Consumption data

SSP Theft by year of occurrence

0

5,000,000

10,000,000

15,000,000

20,000,000

25,000,000

20

00

20

01

20

02

20

03

20

04

20

05

20

06

20

07

20

08

20

09

20

10

20

11

Year

Th

eft

(k

Wh

)

2010 data

2011 data

Page 27: Allocation of Unidentified Gas Statement...Allocation of Unidentified Gas Statement 22 nd May 2012. Outline ... 1st May - 15th June First consultation period Mid June Consumption data

LSP Detected theft by year of occurrence

0

1,000,000

2,000,000

3,000,000

4,000,000

5,000,000

6,000,000

20

00

20

01

20

02

20

03

20

04

20

05

20

06

20

07

20

08

20

09

20

10

20

11

Year

Th

eft

(kW

h)

2010 data

2011 data

Page 28: Allocation of Unidentified Gas Statement...Allocation of Unidentified Gas Statement 22 nd May 2012. Outline ... 1st May - 15th June First consultation period Mid June Consumption data

LSP/SSP Theft split

Initial figures based on data received up to 31/12/2011

Will be updated with detections up to 30/6/2012

2011 not used although currently this has a 19.8% LSP split

79.676.279.782.8SSP %

20.423.820.317.2LSP %

Average201020092008

Page 29: Allocation of Unidentified Gas Statement...Allocation of Unidentified Gas Statement 22 nd May 2012. Outline ... 1st May - 15th June First consultation period Mid June Consumption data

First Draft 2012 AUGS for 2013/14

• Opportunity to raise initial clarification questions

Page 30: Allocation of Unidentified Gas Statement...Allocation of Unidentified Gas Statement 22 nd May 2012. Outline ... 1st May - 15th June First consultation period Mid June Consumption data

Thank you for your attention