Allama Abu Bakr Memorial Wind Power Private Limited
Presenters:• Haris Naved Ahmed
• Khateeb Hussain
• Syed Yawer Imam
Table of Content
Company Profile
Process Flow
Memorandum of Association (MOA)
Article of Association (AOA)
Company Registration
Alternative Energy Development Board (AEDB)
Milestones to be achieved
Front End Engineering &Design( FEED) Study
Regulatory Framework
Company Profile
Private Company
Existing Coal Power project: 560 MW
Registered Office: Suite # 22-24,Abu Bakr Memorial Building , Main Layyah Rd Karachi
Power Plant is located in Gharo, Sindh
B.O.D
Haris Naveed Ahmed 52%
Khateeb Hussain 24%
S. Yawer Imam 24%
Launching of 50 MW Wind Power project
Why Wind Power?
Based on wind data collected by Pakistan Meteorological Department, AEDB has established/identified a “Wind Corridor”
The corridor is 60 Km wide (Gharo to Keti Bandar) & extends upto Hyderabad
According to AEDB, the area within the corridor has potential to produce 50,000 MW of electricity
Keeping in view the huge available potential of wind power, current deficit of electricity in Pakistan and the technological development in wind power worldwide, Allama Abu Bakr Memorial Wind Power Company intends to diversify and install a wind farm
Process Flow Diagram
MOA AOA Company Registration AEDB
FEED Study Milestones to be achieved
Regulatory Framework
Commissioning
Memorandum of Association / Agreement
Objective: To setup a 50MW Wind Power Project in Pakistan
Name: Allama AbuBakar Memorial Wind Power(Pvt.) Ltd.
Registered Head Office: Suite # 22-24,Abu Bakr Memorial Building , Main Layyah Rd Karachi
B.O.D
Capital: US$ 120 million
Liability: Limited Liability Company
Article of Association
Rules: lock-in period for retainer ship of shares shall be minimum 5 years , share can be diversities with the permission of the consensus of share holders
No of Board of Directors: 3
Responsibilities: Detailed responsibilities are defined under Section II of AoA
Audit: CIA will be reporting to Chairman
Procedures: Detailed procedures are defined under Section IV of AoA
Frequency of Meeting: 1 meeting per Quarter of BOD
Company Registration Approval of company name through Securities and Exchange commission
of Pakistan SECP
Registration of company logo through Trade Mark registry / Intellectual Property Organization.
Registration of company on SECP for incorporation
Registration to the FBR for income tax
Registration to the FBR for the sales tax
Registration with the excise and Taxation department for professional tax
Registration with employees Social Security Institution ( SESSI)
Registration with the EOBI
Registration with the Labor department of the district
Alternative Energy Development BoardThe Alternative Energy Development Board (AEDB) is a principle cabinet institution and federal body responsible for formulating and directing policies regarding energy conservation and safety in handling nuclear materials.
Responsibilities
1. Energy conservation programs
2. Energy related research and production
3. Research and development in Bio electricity
Front End Engineering &Design (FEED) StudyAs a first step Allama Abu Bakr Memorial Wind Power company carried out the pre-feasibility study of wind power project through a local consultant having expertise in such studies in Pakistan
Feed Package
Evaluate options that will improve the return on assets (ROA)
Conduct hazardous operations reviews
Support internal funding requirements
Develop the engineering design packages that can be used to bid a lump sum EPC scope and / or provide the foundation for the detailed engineering phase
Prepare cost estimates for scope definition and for project funding
Milestones to be achieved Submission of proposal by Sponsors
Review of proposal by AEDB.
Submission of Bank Guarantee and Project Facilitation Fee by Sponsor
Issuance of Letter of Intent (LOI) by AEDB
Initial time for Feasibility Study and term of the LOI
Application for tariff determination and grant of Generation License to NEPRA by Sponsors (upon approval of Feasibility)
Generation License / Tariff approval from NEPRA.
Submission of Performance Guarantee by Sponsors upon acceptance of tariff determined by NEPRA
Issuance of LOS (Letter of Support) by AEDB
Signing of Energy Purchase Agreement & Implementation Agreement
Financial Close (FC)
Regulatory Framework Agreements with consultants through best industrial practices i.e. competitive bidding
process:
Legal
Commercial &
Technical Consultant
PPRA (Public Procurement Regulatory Authority) Ordinance 2002
PEPA (Pakistan Environmental Protection Agency)
ISO 9001:2008, OHSAS (Occupational Health & Safety Advisory services) 18001:2007 Accreditation
Grid Interconnection Approval from National Transmission and Dispatch Company (NTDC)
Land Acquisition from the owner through Sindh Board of Investment (SBoI)
Security Package (Financial Close, Implementation Agreement, Joint Venture Agreement)
Regulatory Framework
NEPRA's Responsibilities:
Issue Licences for generation, transmission and distribution of electric power
Establish and enforce Standards to ensure quality and safety of operation andsupply of electric power to consumers
Approve investment and power acquisition programs of the utility companies
Determine Tariffs for generation, transmission and distribution of electric power.