29
1 ALL MATERIAL COPYRIGHT © 2013 Energy Northwest ALL MATERIAL COPYRIGHT © 2013 Energy Northwest

ALLALLMATERIAL MATERIAL COPYRIGHT 2013 Energy Northwest Energy... · Title: Microsoft PowerPoint - Distributed Energy Storage and Demand Response - John Steigers and Leo Quiachon

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ALLALLMATERIAL MATERIAL COPYRIGHT 2013 Energy Northwest Energy... · Title: Microsoft PowerPoint - Distributed Energy Storage and Demand Response - John Steigers and Leo Quiachon

1ALL MATERIAL COPYRIGHT © 2013 Energy NorthwestALL MATERIAL COPYRIGHT © 2013 Energy Northwest

Page 2: ALLALLMATERIAL MATERIAL COPYRIGHT 2013 Energy Northwest Energy... · Title: Microsoft PowerPoint - Distributed Energy Storage and Demand Response - John Steigers and Leo Quiachon

2

Distributed Energy StorageJohn SteigersGeneration Project DevelopmentEnergy / Business Services

2ALL MATERIAL COPYRIGHT © 2013 Energy Northwest

Page 3: ALLALLMATERIAL MATERIAL COPYRIGHT 2013 Energy Northwest Energy... · Title: Microsoft PowerPoint - Distributed Energy Storage and Demand Response - John Steigers and Leo Quiachon

ALL MATERIAL COPYRIGHT © 2013 Energy Northwest

Distributed Energy Storage

Sited within Utility & Serving One or More Value Propositions• Peak Shaving / Load Shifting ‐ at Multiple Scales• Power Supply Reserves & Management; “Demand Response”• Defer Investments in Transmission / Distribution Infrastructure• Integrate Intermittent Renewables• Voltage Management (VAR Control)• Frequency Regulation• Black Start / Uninterruptible Power Supply

3

Page 4: ALLALLMATERIAL MATERIAL COPYRIGHT 2013 Energy Northwest Energy... · Title: Microsoft PowerPoint - Distributed Energy Storage and Demand Response - John Steigers and Leo Quiachon

ALL MATERIAL COPYRIGHT © 2013 Energy Northwest

Modular and Dispatchable Battery Energy Storage System (ESS)

4

Demonstration and Evaluation Project• Self‐Contained & Portable; Flexible Distributed Deployment • Lithium‐Ion Battery‐Based; On‐Board Power Electronics• 500 kWh Energy Storage ‐ 120 kW Charge/Discharge Capacity• Remote Control & Monitoring

Project Partners• Powin Energy • Energy Northwest• City of Richland• PNNL• BPA

Page 5: ALLALLMATERIAL MATERIAL COPYRIGHT 2013 Energy Northwest Energy... · Title: Microsoft PowerPoint - Distributed Energy Storage and Demand Response - John Steigers and Leo Quiachon

ALL MATERIAL COPYRIGHT © 2013 Energy Northwest

Project Status

ESS Remote Monitoring, Control, & Operability DemonstratedAll Phase II (Nine Canyon Wind) Use Cases Implemented• Load Shifting ‐ Intermittent Generation from Off to On Peak• Manage to Schedule ‐ Actual Production vs. Scheduled• Compliance Management ‐ System Curtailment Events

5

Page 6: ALLALLMATERIAL MATERIAL COPYRIGHT 2013 Energy Northwest Energy... · Title: Microsoft PowerPoint - Distributed Energy Storage and Demand Response - John Steigers and Leo Quiachon

ALL MATERIAL COPYRIGHT © 2013 Energy Northwest

ESS Remote Monitoring, Control, & Operability

Robust Communication Links In Place and Demonstrated• Powin (Tualatin OR)  ESS (Nine Canyon)  PNNL (Richland WA)• Inputs from BPA’s Integrated Curtailment and Redispatch System (iCRS)• Web‐Based Communications ‐ Typical Signal Latency < 22 Seconds

6

• Mobile Device Enabled (Smart Phone, Tablet)

Complex Decision‐Making & 

Prioritization Demonstrated 

Page 7: ALLALLMATERIAL MATERIAL COPYRIGHT 2013 Energy Northwest Energy... · Title: Microsoft PowerPoint - Distributed Energy Storage and Demand Response - John Steigers and Leo Quiachon

ALL MATERIAL COPYRIGHT © 2013 Energy Northwest

Plot of Data Logs for 16-17 October 2013

‐6000

‐4000

‐2000

0

2000

4000

6000

8000

Total Power (0.1 KW) SCE (KW) Actual Gen (KW) Scheduled Gen (KW)

Use Case #1 – Load ShiftingESS Discharges On‐Peak (4:09‐7:03pm)

Use Case #2 – Manage to ScheduleESS Charging/Discharging per SCE (3:00‐8:25am)

Page 8: ALLALLMATERIAL MATERIAL COPYRIGHT 2013 Energy Northwest Energy... · Title: Microsoft PowerPoint - Distributed Energy Storage and Demand Response - John Steigers and Leo Quiachon

ALL MATERIAL COPYRIGHT © 2013 Energy Northwest

Compliance Management

• Use Case Successfully Demonstrated Using Actual May 2013 Event Files

• Real‐Time Event(s) Expected in 2Q 2014

8

ConvTemp<49ºC? ESS standby

Y

N

Query.csv exists?

Y

Write control.csv, call ESS model, then pause for 59 seconds

Start

Start

CurtailType =1 or 2?

TimeElasped>8 mins?

NCWCap-CurtailGoal< ESSCap?

Discharge ESS units which are

above SOC floor

Bay1=35Bay2=35

Bay3=32.2Pinput=(NCW_act-CurtailGoal)/totunits

NCWCap-CurtailGoal< ESSCap+Bay3Cap?

Bay1=35Bay2=35

Bay3=CurtailGoal-(32.2+31.2)+ESSCap

Pinput=-120

Bay1=0Bay2=35

Bay3=CurtailGoal-31.2+ESSCapPinput=-120

N

N

Y

Y

Y

Y

curtailment.csv exists?

Y

N

Page 9: ALLALLMATERIAL MATERIAL COPYRIGHT 2013 Energy Northwest Energy... · Title: Microsoft PowerPoint - Distributed Energy Storage and Demand Response - John Steigers and Leo Quiachon

ALL MATERIAL COPYRIGHT © 2013 Energy Northwest

• Nov 2013 ‐ Relocate ESS to a City of Richland Distribution Substation for Phase III Testing– Phase II Use Case Testing will Continue Through Phases III & IV 

• Feb 2014 ‐ ESS as Fast Demand Response Asset • May 2014 ‐ ESS Relocates to PNNL’s Richland Campus for Phase IV 

Testing; Behind‐the‐Meter Applications & Distributed Solar Integration• Nov 2014 ‐ Project Close & Final Report

Energy Storage Project Next Steps

9

Page 10: ALLALLMATERIAL MATERIAL COPYRIGHT 2013 Energy Northwest Energy... · Title: Microsoft PowerPoint - Distributed Energy Storage and Demand Response - John Steigers and Leo Quiachon

10ALL MATERIAL COPYRIGHT © 2013 Energy Northwest

Demand ResponseLeo QuiachonManager, O&M Professional ServicesEnergy / Business Services

Page 11: ALLALLMATERIAL MATERIAL COPYRIGHT 2013 Energy Northwest Energy... · Title: Microsoft PowerPoint - Distributed Energy Storage and Demand Response - John Steigers and Leo Quiachon

ALL MATERIAL COPYRIGHT © 2013 Energy Northwest

Demand Response (DR)

• An electric grid’s ability to manage consumption of electricity in response to power supply conditions

11

• Wind integration driving the need for BPA to secure additional Generation Reserves both Increasing (INC) and Decreasing (DEC) Balancing Reserves

Page 12: ALLALLMATERIAL MATERIAL COPYRIGHT 2013 Energy Northwest Energy... · Title: Microsoft PowerPoint - Distributed Energy Storage and Demand Response - John Steigers and Leo Quiachon

ALL MATERIAL COPYRIGHT © 2013 Energy Northwest

Wind Integration

0

500

1000

1500

2000

2500

3000

3500

4000

4500

5000

Wind Generation Capacity in BPA Balancing Area

Nine Canyon (III) 5/2008

Total Installed Capacity 4,740 MW

Nine Canyon (I) 9/25/2002

Nine Canyon (II) 12/31/2003

10X over 7 years

Page 13: ALLALLMATERIAL MATERIAL COPYRIGHT 2013 Energy Northwest Energy... · Title: Microsoft PowerPoint - Distributed Energy Storage and Demand Response - John Steigers and Leo Quiachon

ALL MATERIAL COPYRIGHT © 2013 Energy Northwest

Generation / Load Imbalance

Regularly swings +/‐100‐300MW and sometimes much more

Page 14: ALLALLMATERIAL MATERIAL COPYRIGHT 2013 Energy Northwest Energy... · Title: Microsoft PowerPoint - Distributed Energy Storage and Demand Response - John Steigers and Leo Quiachon

ALL MATERIAL COPYRIGHT © 2013 Energy Northwest

BPA Demand Response Pilot Project

• BPA Project Solicitation April 2013• Energy Northwest is Partnered with 6 Electric Utilities to Provide over 50 MW 

of DR Assets to BPA• Unique “By Public Power, For Public Power” Cost‐Based Solution • Energy Northwest Team Selected ‐ $3.2M per year over 2‐year duration• Develop and Demonstrate Demand Response Control Network• Project to provide up to 50 MW of aggregated DR product (INC and DEC)

– Fast (< 10 min)– Hour Ahead – Day  Ahead

14

Page 15: ALLALLMATERIAL MATERIAL COPYRIGHT 2013 Energy Northwest Energy... · Title: Microsoft PowerPoint - Distributed Energy Storage and Demand Response - John Steigers and Leo Quiachon

ALL MATERIAL COPYRIGHT © 2013 Energy Northwest

DR Aggregation Across Utilities and Load Segments

15

Page 16: ALLALLMATERIAL MATERIAL COPYRIGHT 2013 Energy Northwest Energy... · Title: Microsoft PowerPoint - Distributed Energy Storage and Demand Response - John Steigers and Leo Quiachon

ALL MATERIAL COPYRIGHT © 2013 Energy Northwest

DR Aggregation Across Utilities and Load Segments

16

Page 17: ALLALLMATERIAL MATERIAL COPYRIGHT 2013 Energy Northwest Energy... · Title: Microsoft PowerPoint - Distributed Energy Storage and Demand Response - John Steigers and Leo Quiachon

ALL MATERIAL COPYRIGHT © 2013 Energy Northwest

DR Aggregation Across Utilities and Load Segments

17

Page 18: ALLALLMATERIAL MATERIAL COPYRIGHT 2013 Energy Northwest Energy... · Title: Microsoft PowerPoint - Distributed Energy Storage and Demand Response - John Steigers and Leo Quiachon

ALL MATERIAL COPYRIGHT © 2013 Energy Northwest

DR Aggregation Across Utilities and Load Segments

18

Page 19: ALLALLMATERIAL MATERIAL COPYRIGHT 2013 Energy Northwest Energy... · Title: Microsoft PowerPoint - Distributed Energy Storage and Demand Response - John Steigers and Leo Quiachon

ALL MATERIAL COPYRIGHT © 2013 Energy Northwest

DR Aggregation Across Utilities and Load Segments

19

Page 20: ALLALLMATERIAL MATERIAL COPYRIGHT 2013 Energy Northwest Energy... · Title: Microsoft PowerPoint - Distributed Energy Storage and Demand Response - John Steigers and Leo Quiachon

ALL MATERIAL COPYRIGHT © 2013 Energy Northwest

DR Aggregation Across Utilities and Load Segments

20

Page 21: ALLALLMATERIAL MATERIAL COPYRIGHT 2013 Energy Northwest Energy... · Title: Microsoft PowerPoint - Distributed Energy Storage and Demand Response - John Steigers and Leo Quiachon

ALL MATERIAL COPYRIGHT © 2013 Energy Northwest

DR Aggregation Across Utilities and Load Segments

21

Page 22: ALLALLMATERIAL MATERIAL COPYRIGHT 2013 Energy Northwest Energy... · Title: Microsoft PowerPoint - Distributed Energy Storage and Demand Response - John Steigers and Leo Quiachon

ALL MATERIAL COPYRIGHT © 2013 Energy Northwest

DR Assets

22

Page 23: ALLALLMATERIAL MATERIAL COPYRIGHT 2013 Energy Northwest Energy... · Title: Microsoft PowerPoint - Distributed Energy Storage and Demand Response - John Steigers and Leo Quiachon

ALL MATERIAL COPYRIGHT © 2013 Energy Northwest

DR Assets

23

Page 24: ALLALLMATERIAL MATERIAL COPYRIGHT 2013 Energy Northwest Energy... · Title: Microsoft PowerPoint - Distributed Energy Storage and Demand Response - John Steigers and Leo Quiachon

ALL MATERIAL COPYRIGHT © 2013 Energy Northwest

Demand Response – US Actuals

TVA

NERC Reliability Assessment

Estimated total dispatchable DR in WECC region

4,300 MWPotential

WECC

Actual

Page 25: ALLALLMATERIAL MATERIAL COPYRIGHT 2013 Energy Northwest Energy... · Title: Microsoft PowerPoint - Distributed Energy Storage and Demand Response - John Steigers and Leo Quiachon

ALL MATERIAL COPYRIGHT © 2013 Energy Northwest

Building DR in the Northwest

1984-2008 2008-2009 2010-2012 2013-2015 2016 +

<1 MW<10 MW 50-100 MW

250+ MW

DR portfoliocapacity growth

Small scale individual projects

Two residential and one commercial pilot project projects

Continue to expand DR based business needs Refine funding and

cost allocation

Next Steps

Added commercial and industrial pilots Focused on utility peak Introduced wind

integration testing

Electric utility scale pilot Develop cost allocation

methodology BPA/electric utility

dispatch

Page 26: ALLALLMATERIAL MATERIAL COPYRIGHT 2013 Energy Northwest Energy... · Title: Microsoft PowerPoint - Distributed Energy Storage and Demand Response - John Steigers and Leo Quiachon

ALL MATERIAL COPYRIGHT © 2013 Energy Northwest

Demand Response

26

Nov 2013 to Jan 2014 ‐ Prepare Contracts & Secure ApprovalsFeb to Apr 2014 ‐ DRACS and Phase I Assets in ServiceMay to Dec 2014 ‐ Phase II Assets in ServiceJan 2016 ‐ DR Pilot Project CompleteFeb 2016 ‐ Initiate Fully Commercial DR Program

Page 27: ALLALLMATERIAL MATERIAL COPYRIGHT 2013 Energy Northwest Energy... · Title: Microsoft PowerPoint - Distributed Energy Storage and Demand Response - John Steigers and Leo Quiachon

ALL MATERIAL COPYRIGHT © 2013 Energy Northwest

Emerging Opportunity• Washington Clean Energy Funds ‐ “Smart Grid Grants to Utilities” • $15M Matching Funds AvailableTimeline • Nov 14, 2013 ‐ RFP Issued• Dec 5, 2013 ‐ Proposals Due• Dec 20, 2013 ‐ Selection• 1Q 2014 ‐ Contracts• 3Q to 4Q 2014 ‐ Deploy First Units• 1Q 2016 ‐ Full Build‐Out

Distributed Storage DevelopmentNext Steps & Opportunities

27

Page 28: ALLALLMATERIAL MATERIAL COPYRIGHT 2013 Energy Northwest Energy... · Title: Microsoft PowerPoint - Distributed Energy Storage and Demand Response - John Steigers and Leo Quiachon

ALL MATERIAL COPYRIGHT © 2013 Energy Northwest

Energy Northwest & Participating Members Team Targeting 25–35 MW of Distributed Storage Using Next‐Gen Powin ESS / Similar

Distributed Storage DevelopmentClean Energy Funds Proposal - Conceptual

28

All Member Utilities are Invited to Participate

• Units Available to Participants via Long‐Term Lease• Owned and Maintained by Energy Northwest• Advanced Comms/Control Infrastructure Not Needed by Utility• Unit Tasking By and All Benefits Flow To Participant Utility• Long‐Term Performance Warranties• Anticipated Deployed Cost ‐ $1.5k to $2.5k per kW Capacity

Page 29: ALLALLMATERIAL MATERIAL COPYRIGHT 2013 Energy Northwest Energy... · Title: Microsoft PowerPoint - Distributed Energy Storage and Demand Response - John Steigers and Leo Quiachon

ALL MATERIAL COPYRIGHT © 2013 Energy Northwest

John Steigers  Generation Project Developer(509) 377‐4547    jasteigers@energy‐northwest.com

Leo Quiachon  Manager O&M Professional Services(509) 377‐8610    liquiachon@energy‐northwest.com

Ted Beatty  Manager Generation Development(509) 372‐5531    tbeatty@energy‐northwest.com

Contacts

29