WHAT YOU NEED TO KNOW FOREFFECTIVE PREPARATION FOR
DEVELOPMENT WORKS
Organised by
Development & Building Control Division
7/24/2019 All LTA Work Instruction
2/89
Workshop TopicsWorkshop Topics
Preparation of Street Plan andPreparation of Street Plan and
Street Plan LodgementStreet Plan Lodgement Pointers on Covered LinkwayPointers on Covered Linkway
ProposalsProposals Quality Traffic SchemeQuality Traffic Scheme
Good Tips for Designing ParkingGood Tips for Designing Parking
Places & SpacesPlaces & Spaces
Permit for Works on Public StreetPermit for Works on Public Street
7/24/2019 All LTA Work Instruction
3/89
Preparation of Street PlanPreparation of Street Plan
and Street Plan Lodgementand Street Plan Lodgement
Organised by
Development & Building Control Division
7/24/2019 All LTA Work Instruction
4/89
To share on LTATo share on LTAs requirements fors requirements for
street plan submissionstreet plan submission
To help participants prepare qualityTo help participants prepare quality
plan submission for quicker approvalplan submission for quicker approval
To share on requirements & benefitsTo share on requirements & benefits
of street plan lodgementof street plan lodgement
Objectives
7/24/2019 All LTA Work Instruction
5/89
Submission Stages of Street Works
Proposals (General Overview)
Development Control StageDevelopment Control Stage
Street Plan StageStreet Plan Stage
Certificate of Statutory Completion StageCertificate of Statutory Completion Stage
Maintenance Period of 12 monthsMaintenance Period of 12 monthsIf New Street (s)
is/are constructed
Handing Over StageHanding Over Stage
Street Plan StageStreet Plan Stage
7/24/2019 All LTA Work Instruction
6/89
ee--Submission proceduresSubmission procedures
Street Plan presentationStreet Plan presentation
Tactile ti les (BFA)Tactile ti les (BFA)
Utility crossingUtility crossing
Zone of InfluenceZone of Influence
Frequent Errors Made (FEM)Frequent Errors Made (FEM)
LTALTAs Reference Materialss Reference Materials
Lodgement of Street PlanLodgement of Street Plan
Scope of Presentation for PreparationScope of Presentation for Preparation
of Street Plan and Lodgementof Street Plan and Lodgement
7/24/2019 All LTA Work Instruction
7/89
LTA ISSUES DC
CLEARANCE
PE SUBMIT STREET PLANS
FOR BP CLEARANCE
QP MAKES
AMENDMENTS
START
DEVELOPMENT
PROPOSAL
COMPLY WITH
LTA
REQUIREMENTS?
YES
NO
PE APPLY FOR
CSC CLEARANCE
7/24/2019 All LTA Work Instruction
8/89
7/24/2019 All LTA Work Instruction
9/89
Within 30 Days PE submits StreetPlan to LTA
via e-Submission
7/24/2019 All LTA Work Instruction
10/89
How do you make a Street Plan
e-submission ?
How do you make a Street Plan
e-submission ?
How do you make a Street Plan
e-submission ?
Form LTA-DBC_ROADS.XFD
PROJECT-PROFILE.XFD
SUBMISSION.XFD
Street Plan
Written Permission and Approved Layout Relevant documents as stated in Section IIIof the e-form LTA-DBC_ROADS.XFD
Site Photos of development frontage, etc Structural design calculations of concretestructures
Checklists and documents related toproposal
7/24/2019 All LTA Work Instruction
11/89
ee--FormForm
LTALTA--DBC_ROADS.XFDBC_ROADS.XFD
Select Street PlanSelect Street Plan
7/24/2019 All LTA Work Instruction
12/89
ee--FormForm
LTALTA--DBC_ROADS.XFDBC_ROADS.XFD
completecomplete
declaration indeclaration in
SECTION IIISECTION III
comments /comments /
clarifications related toclarifications related to
the submissionthe submission
7/24/2019 All LTA Work Instruction
13/89
ee--FormForm
LTALTA--DBC_ROADS.XFDDBC_ROADS.XFD
For resubmission ofFor resubmission ofstreet plans / prestreet plans / pre--
consultation, enquiriesconsultation, enquiries
and etcand etcSelect GENERALSelect GENERAL
CORRESPONDENCECORRESPONDENCE
7/24/2019 All LTA Work Instruction
14/89
ee--FormForm
LTALTA--DBC_ROADS.XFDDBC_ROADS.XFD
comments / clarifications oncomments / clarifications onthe submissionthe submission
7/24/2019 All LTA Work Instruction
15/89
Endorsement of LTAEndorsement of LTAs Generals General
Requirements (for DC & BP)Requirements (for DC & BP)
Endorsements are not consistent
Need not be endorsed on plan
Requirements are in the e-form
LTA- DBC_ROADS.XFD
7/24/2019 All LTA Work Instruction
16/89
Written Permission
7/24/2019 All LTA Work Instruction
17/89
Street Plan will have
Entrance
culvert
Site Plan including a Location Plan
Certified topographical survey plan
Layout of road, road reserve lines in
accordance with the RLP
Entrance culvert details Longitudinal Section
Cross Section Street Lighting Plans
Road Elements Label
Table for the Standard Road Elements
NOTE DESCRIPTION DRAWING NO.
1 PEDESTRIAN GRATING ( WITH CHEQUER PLATE) LTA/RD/SD99/GRA/2
2 TYPE K2 PC.C KERB LTA/RD/SD99/KER/1
3 FOOTPATH RAMP (SIDE ROAD) LTA/RD/SD99/KER/9
4 FOOTPATH RAMP (DRIVEWAY) LTA/RD/SD99/KER/10
5 CAST-IN-SITU BOX CULVERT LTA/RD/SD99/DRA/2
6 ALUMINIUM RUNG LTA/RD/SD99/DRA/4
7 PRECAST U-DRAIN AND SLABBED OVER U-DRAIN LTA/RD/SD99/DRA/5
8 PC.C DROP-INLET CHAMBER LTA/RD/SD99/DRA/7
9 FLEXIBLE PAVEMENT (TYPE III) FOR LOCAL ACCESS LTA/RD/SD99/PAV/4
10 SOIL AERATION LTA/RD/SD99/PNR/2&3
REFERENCE TO STANDARD DETAILS OF ROAD ELEMENTS (LTA 2000)
7/24/2019 All LTA Work Instruction
18/89
How would a complete Street Planlook?
7/24/2019 All LTA Work Instruction
19/89
Complete Set of Street Plans
LOCATION PLAN CROSS SECTIONS
TABLE OF
ROADELEMENTS
SITE PLAN
ROAD RESERVE LINE
& BOUNDARY LINE
7/24/2019 All LTA Work Instruction
20/89
Longitudinal Section Plan
LONGITUDINAL SECTION
Top of culverttop of drain slab
Extg road edge level
7/24/2019 All LTA Work Instruction
21/89
Cross sectionCross section
cross fall and components to be shown in the sectionscross fall and components to be shown in the sections
1:40 fall 1:30 fall
7/24/2019 All LTA Work Instruction
22/89
CRD-01
Typical Cross Section for Entrance
Culvert
1200 DRAIN CUM FOOTPATH
150 700 WIDE 150
BOX CULVERT
SLOPE GRADIENT < 1 : 10
E d t t t f d
7/24/2019 All LTA Work Instruction
23/89
End treatment of covered
drain and open drain
Railing at the
end of
covered drain
Footpath
link
Footpathlink
7/24/2019 All LTA Work Instruction
24/89
End treatment of covered
drain and open drain
Railing at the
end of
covered drain
Footpath
link
Footpath
link
D i l t h b d
7/24/2019 All LTA Work Instruction
25/89
Drop-inlet chamber and
scupper drain
Drop-inlet
chamber
C t l ti t l
7/24/2019 All LTA Work Instruction
26/89
Location of drop-inlet
chamber
Correct location to place
drop inlet chamber
7/24/2019 All LTA Work Instruction
27/89
DropDrop--inlet chamberinlet chamber
Direction of Traffic
Hinge
7/24/2019 All LTA Work Instruction
28/89
Lamp posts and sign postLamp posts and sign post
Lamp post
Street sign
Lamp post
F t th t l l f
7/24/2019 All LTA Work Instruction
29/89
Footpath at splay corner, clearance of
lamp post and signs from kerb
600 mm
Clearance from
edge of plate
600 mm
7/24/2019 All LTA Work Instruction
30/89
600mm
600mm
from edge of signplate above
Close up view of clearance
7/24/2019 All LTA Work Instruction
31/89
Tabulating the road elements
7/24/2019 All LTA Work Instruction
32/89
How are road elements labelled?
7/24/2019 All LTA Work Instruction
33/89
Enlarged area of Label
Note 7-soil aerationNote 2-drop-inlet chamber
Note 7 soil aeration
Note 2 drop-inlet chamber
7/24/2019 All LTA Work Instruction
34/89
Tabulation of Elements
Drg Nos from STANDARD DETAILS OF ROAD ELEMENTS
7/24/2019 All LTA Work Instruction
35/89
Stan
dard
DetailsM
E
N
M
E
N
T
Improve provision for barrier freeImprove provision for barrier free
Elderly friendly road related facilitiesElderly friendly road related facilities
To inform crossing boundariesTo inform crossing boundaries
for the visually impaired personfor the visually impaired person
Footpath Ramps at Pedestrian
Crossings
7/24/2019 All LTA Work Instruction
36/89
Tactile Tiles on footpath rampsTactile Tiles on footpath ramps
25mm drop25mm dropHomogeneous Tiles (robust & durable)
as Decision Tactile Tiles
Yellow coloured tiles provides a good contrastwith concrete footpath in low light intensity
condition (at night)
Main improvements to Standard Details
7/24/2019 All LTA Work Instruction
37/89
Main improvements to Standard Details
of Footpath Ramps at Entrance
Driveway
Footpath
ramp level
flushed
with road
level
(25mm
dropremoved)
Install 600mm wide
colour contrasting decision tactile tiles
600m
m
600m
m
wid
ewid
e
300mm from300mm from
road edgeroad edge
300mm300mm
300mm
300mm
7/24/2019 All LTA Work Instruction
38/89
Photo of Footpath Ramps across driveway
Tactile tiles
Entrance drivewayEntrance driveway300mm
Tactile tiles
Entrance drivewayEntrance driveway
300mm
7/24/2019 All LTA Work Instruction
39/89
New Footpath Ramp Details at Side Road
Decision tactileDecision tactile
tilestiles
S
ideroad
S
ideroad
1:40
7/24/2019 All LTA Work Instruction
40/89
Photo of Footpath Ramps at Side Road
Side roadSide road
Tactiletiles
Flushlevel
7/24/2019 All LTA Work Instruction
41/89
300mm300mm
900mm
Tactile Tiles for Curved Footpath Ramps
A minimum of 2 set of tactile tiles to be laidA minimum of 2 set of tactile tiles to be laid
300mm from kerb (staggered)300mm from kerb (staggered)
7/24/2019 All LTA Work Instruction
42/89
300mm300mm
Tactile Tiles for Junction Ramps
A minimum of 2 set of tactile tiles to be laidA minimum of 2 set of tactile tiles to be laid
300mm from kerb (staggered)300mm from kerb (staggered)
7/24/2019 All LTA Work Instruction
43/89
Structural calculations and
details of retaining wall, entranceculvert, cross culvert etc within
the road reserves are to besubmitted
7/24/2019 All LTA Work Instruction
44/89
Utility Pipes Crossing
Footpath Slab
7/24/2019 All LTA Work Instruction
45/89
Guideline on
Utility Services
Crossing footpath
7/24/2019 All LTA Work Instruction
46/89
Typical Details of
Water Pipe Crossing
Sectional View
Independent r.c.
slab for the pipe
Road reserve line
7/24/2019 All LTA Work Instruction
47/89
Typical Details of
Water Pipe Crossingr.c.slab maintained
by utility agency
Identification
plate
Road reserve line
Utili ty agency submits undertaking letter to LTA
7/24/2019 All LTA Work Instruction
48/89
Typical Details of
Gas Pipe Crossing
Independent r.cslab for the pipe
Sectional View
Road reserve line
7/24/2019 All LTA Work Instruction
49/89
Details for larger diameter
gas pipes
Utility agency submits undertaking letter to LTA
Independent r.cslab for the pipe
Utilityagency
submits
undertaking letter
toLTA tomaintainthe
independent slab
Independent slab to be maintained by
7/24/2019 All LTA Work Instruction
50/89
Details for gas
pipes which are
50mm and smaller
Independent slab to be maintained by
util ity agency
Utility agency submits undertaking
letter to LTA to maintain the channel
7/24/2019 All LTA Work Instruction
51/89
Zone of Influence
7/24/2019 All LTA Work Instruction
52/89
Where is the Zone of Influence?Where is the Zone of Influence?
When is method statement, soilWhen is method statement, soil
investigation & site monitoring required?investigation & site monitoring required?
45
road
45
Zone of Influence is where the line drawn 45Zone of Influence is where the line drawn 45
fromfrom
the lowestthe lowest point of excavationpoint of excavation
Road
Reserve
Line
RoadR
eserve
Line
45
45
road
Method Statement & site monitoring required whenMethod Statement & site monitoring required when
zone of influence falls within road reservezone of influence falls within road reserve
Not RequiredNot Requiredbut PE stil l requiredbut PE stil l required
to monitor siteto monitor site
RequiredRequired
Basement 1
Basement 2Basement 1
7/24/2019 All LTA Work Instruction
53/89
Slope Failure / Adjacent Ground may sink or subsideSlope Failure / Adjacent Ground may sink or subside
Danger to road users & vehicular trafficDanger to road users & vehicular traffic
Excavation Works beside RoadExcavation Works beside Road
If NOT suitably designed and supervised,
N ti ff t f E ti W kN ti ff t f E ti W k
7/24/2019 All LTA Work Instruction
54/89
Negative effects of Excavation WorksNegative effects of Excavation Works
F t E M d (FEM)F t E M d (FEM)
7/24/2019 All LTA Work Instruction
55/89
Frequent Errors Made (FEM)Frequent Errors Made (FEM)
Incorrect e-form attached
e.g. old CORRESPONDENCE.XFD instead ofthe LTA-DBC_ROADS.XFD
Resubmission not using GeneralCorrespondence
Written Permission not submitted
Location Plan with insufficient road
information
F t E M d (FEM)F t E M d (FEM)
7/24/2019 All LTA Work Instruction
56/89
Frequent Errors Made (FEM)Frequent Errors Made (FEM)
Missing cadastral lots information
Road Reserve line not indicated
Tactile tiles together with 25mm drop
Tactile tiles placed at the edge of footpath
ramp
Layout of tactile tiles not correct
F t E M d (FEM)F t E M d (FEM)
7/24/2019 All LTA Work Instruction
57/89
Annotations not made with reference to the
table for standard details
Unsuitable choice of colours used, making
plan viewing difficult
Submit street plan prior to DC Clearance
Submit street plan instead of lodgement
Frequent Errors Made (FEM)Frequent Errors Made (FEM)
F t E M d (FEM)F t E M d (FEM)
7/24/2019 All LTA Work Instruction
58/89
Connection of existing & proposed footpath
not shown
Cross fall stil l showing 1:36
Unnecessary endorsement of the LTA
requirements on plans
Frequent Errors Made (FEM)Frequent Errors Made (FEM)
Steep Entrance Approach
7/24/2019 All LTA Work Instruction
59/89
Steep Entrance Approach
Gradient improved
Steep Ramp
Incorrect Design of Footpath
7/24/2019 All LTA Work Instruction
60/89
Incorrect Design of Footpath
Railing erected &
grooves on footpath
Steep footpath
P bli ti & G idP bli ti & G id
7/24/2019 All LTA Work Instruction
61/89
Street Works Proposal related to
Development Works
Publications & GuidesPublications & Guides
Available in the LTA &Available in the LTA &
Corenet WebsitesCorenet Websites
Development & Building Control
http://www.lta.gov.sg/dbc/index_dbc_other.htmhttp://www.lta.gov.sg/dbc/index_dbc_other.htm
http://www.corenet.gov.sg/einfo/http://www.corenet.gov.sg/einfo/
St d d D t il f R dSt d d D t il f R d
7/24/2019 All LTA Work Instruction
62/89
Standard Details of RoadStandard Details of Road
ElementsElements
Available in the Corenet Website underAvailable in the Corenet Website underCORENET eCORENET e--Information SystemInformation System
http://www.lta.gov.sg/dbc/index_dbc_other.htmhttp://www.lta.gov.sg/dbc/index_dbc_other.htm
http://www.corenet.gov.sg/einfo/http://www.corenet.gov.sg/einfo/
P bli ti & G idP blications & G ides
7/24/2019 All LTA Work Instruction
63/89
Materials & Workmanship SpecificationsMaterials & Workmanship Specifications
for Civil & Structural Worksfor Civil & Structural Works
Can be obtained from theCan be obtained from the
LTA websiteLTA website
Publications & GuidesPublications & Guides
7/24/2019 All LTA Work Instruction
64/89
Publications and ReferenceGuides in the Website
7/24/2019 All LTA Work Instruction
65/89
__ _ _ __ _T
website
ebsite
Click on Regulations
Click on
Street proposals
Click on Development Control & Regulations
Click on
Street proposals
__ _ _ __ _T
website
ebsite
7/24/2019 All LTA Work Instruction
66/89
7/24/2019 All LTA Work Instruction
67/89
7/24/2019 All LTA Work Instruction
68/89
7/24/2019 All LTA Work Instruction
69/89
Civil Design Criteria
Architectural Design Criteria
Standard Details of Roads Elements
Circulars
7/24/2019 All LTA Work Instruction
70/89
Lodgement of Street PlanLodgement of Street Plan
7/24/2019 All LTA Work Instruction
71/89
ObjectivesObjectives
To share on theTo share on the
Requirements of LodgementRequirements of Lodgement
Benefits of LodgementBenefits of Lodgement
Scope of Presentation forScope of Presentation for
7/24/2019 All LTA Work Instruction
72/89
Scope of Presentation forScope of Presentation for
Lodgement of Street PlanLodgement of Street Plan
Flow Chart for Lodgement of Street PlanFlow Chart for Lodgement of Street Plan
Types of Development that can be LodgedTypes of Development that can be Lodged
Lodgement via CorenetLodgement via Corenet
Advantages of LodgementAdvantages of Lodgement
What you cannot LodgeWhat you cannot Lodge
Flow Chart for Lodgement of Street PlanFlow Chart for Lodgement of Street Plan
7/24/2019 All LTA Work Instruction
73/89
Flow Chart for Lodgement of Street PlanFlow Chart for Lodgement of Street Plan
QP (Civil) preparesQP (Civil ) prepares
the street plans forthe street plans for
BP ClearanceBP Clearance
QP (Civil) lodges the street plans with LTAQP (Civi l) lodges the street plans with LTA
LTA issue an auto generated acknowledgement letterLTA issue an auto generated acknowledgement letter
Development Control (DC) ApprovalDevelopment Control (DC) Approval
On completion of works,On completion of works,
PE request for CSC clearance (inspection by LTA)PE request for CSC clearance (inspection by LTA)
LTA grant CSC Clearance.LTA grant CSC Clearance.
Can be Lodged ?Can be Lodged ?
Yes
No
Types of Developments thatTypes of Developments that
7/24/2019 All LTA Work Instruction
74/89
Can be LodgedCan be Lodged
(not affected by road reserve lines)(not affected by road reserve lines)::
ResidentialResidential (all types(all types)) IndustrialIndustrial
Educational InstitutionsEducational Institutions
Places of WorshipPlaces of Worship
Health and Medical Care EstablishmentsHealth and Medical Care Establishments
Sports and Recreation CenterSports and Recreation Centerss Civic and Community InstitutionsCivic and Community Institutions
Conservation BuildingConservation Building
R id ti l ( ll t )R id ti l ( ll t )
7/24/2019 All LTA Work Instruction
75/89
Residential (all types)Residential (all types)
Detached Semi- Detached
Condominium Residential Apartment
Industrial (Factory Warehouse)Industrial (Factory Warehouse)
7/24/2019 All LTA Work Instruction
76/89
Industrial (Factory, Warehouse)Industrial (Factory, Warehouse)
Educational InstitutionsEducational Institutions
7/24/2019 All LTA Work Instruction
77/89
Primary Schools
Secondary Schools
ITE, Polytechnic,University
Places of WorshipPlaces of Worship
7/24/2019 All LTA Work Instruction
78/89
Places of WorshipPlaces of Worship
TempleTemple
ChurchMosque
Ci i & C it I tit tiCivic & Community Institution
7/24/2019 All LTA Work Instruction
79/89
Community Club
Civic & Community InstitutionCivic & Community Institution
Police Headquarters
7/24/2019 All LTA Work Instruction
80/89
Conservation Building
Lodgement via CorenetLodgement via Corenet
7/24/2019 All LTA Work Instruction
81/89
Lodgement via CorenetLodgement via Corenet
AttachmentsAttachments required for Lodgement of Streetrequired for Lodgement of Street
Plan via Corenet :Plan via Corenet :
Street PlanStreet Plan
Development Control (DC) ClearanceDevelopment Control (DC) Clearance
Written Permission (WP) from URAWritten Permission (WP) from URA
ee--FormForm
7/24/2019 All LTA Work Instruction
82/89
LTALTA--DBC_ROADS.XFDDBC_ROADS.XFD
LodgementLodgement
Select LodgementSelect Lodgement
7/24/2019 All LTA Work Instruction
83/89
PE must completePE must complete
the declarationthe declaration
7/24/2019 All LTA Work Instruction
84/89
Advantages of LodgementAdvantages of Lodgement
7/24/2019 All LTA Work Instruction
85/89
Advantages of LodgementAdvantages of Lodgement
Faster clearanceFaster clearance
(Immediate reply generated from system)(Immediate reply generated from system)
Expedite the process of the entireExpedite the process of the entire
developmentdevelopment
No resubmissionNo resubmission
What you cannot LodgeWhat you cannot Lodge
7/24/2019 All LTA Work Instruction
86/89
What you cannot LodgeWhat you cannot Lodge
Plans involvingPlans involving
Traffic PlanTraffic Plan
New Street under S18 of SWANew Street under S18 of SWA
Development with road widening plotsDevelopment with road widening plots
Provision or modification of road relatedProvision or modification of road relatedfacil ities (facilities (egeg. covered linkways, b. covered linkways, bus stop)us stop)
Entrance approach steeper than 1:10Entrance approach steeper than 1:10
NonNon--standard design of entrance culvertstandard design of entrance culvert
Completed Lodged CasesCompleted Lodged Cases
7/24/2019 All LTA Work Instruction
87/89
8m wide entrance access
New slab-overdrain / footpath
Connection to existing
footpath
Type B aluminium
alloy railings
Completed Lodged CasesCompleted Lodged Cases
Random ChecksRandom Checks
7/24/2019 All LTA Work Instruction
88/89
Random ChecksRandom Checks
LTA would carry out random checks on theLTA would carry out random checks on the
lodge Street Planslodge Street Plans
If details of Street Works do not comply withIf details of Street Works do not comply with
LTALTAs guidelines, a written direction to thes guidelines, a written direction to the
QP (Civil) will be issuedQP (Civil) will be issued
Any deviation discovered during CSCAny deviation discovered during CSCinspection, the PE will have to demolish theinspection, the PE will have to demolish the
completed works and reconstruct the Streetcompleted works and reconstruct the Street
WorksWorks
7/24/2019 All LTA Work Instruction