Anchoring Instructions
ALL CNC
Important!! Anchors must be installed prior to setting the machine in place. These instructions must be delivered to the
person responsible for machine installations.
Should you have any questions, please call Haas Automation Service at (805) 278-1800.
Contents
Before You Begin ..........................................................2
Anchoring Overview ......................................................3
Coring Instructions ........................................................3
Anchor Pre-Assembly ...................................................4
Setting the Anchors .......................................................6
Anchor Installation ........................................................8
Final Anchoring .............................................................11
Anchor Kits ...................................................................13
ES0095 Rev CK Mar 2013 Page 2 of 13
Haas Technical Publications
Anchoring Instructions
Before You Begin
Important! Read these instructions thoroughly before attempting to anchor the machine.
This document must be used in conjunction with the installation section of the Reference Manual.
Anchoring is not required for proper performance of Haas machines, but is recommended for optimal machine
performance. It is strongly recommended that the EC-1600 series and the VS/HS series machines are
anchored with the supplied anchor kits.
The Haas machine anchor kits are speciically designed for this purpose. They are not intended to satisfy building, seismic or stationary equipment installation. Such requirements should be provided by an expert.
The anchoring kits include only the hardware to build the anchors. The epoxy required to secure the anchors
is not included. Use epoxy with 16000 psi compression and 4000 psi tensile strength such as Chockfast Gray,
which is available from ITW Resins. Please refer to their website, www.chockfastgrout.com, to ind a local distributor.
Before drilling the anchor cores, make sure there is enough clearance around the machine to install the
coolant tank. Please refer to the Haas website (www.haascnc.com) for machine footprint and coolant tank
dimensions. These can be found in the “Machine Dimensions” link on the page for each model.
Foundation Requirements
Refer to the Haas Pre-Installation Guide, ES0332, for details on the machine foundation requirement.
Placing the Machine
Refer to the Haas Pre-Installation Guide, ES0332, for details on machine placement.
ES0095 Rev CK Mar 2013 Page 3 of 13
Haas Technical Publications
Anchoring Instructions
Anchoring Overview
Setting the anchors is a multiple step process:
Coring: Holes are drilled into the foundation where the machine will be placed.
Anchor Pre-Assembly: The anchoring hardware is partially assembled hand-tight.
Setting the Anchors: Epoxy is poured into the cored holes and the in-ground anchor hardware is set in
place.
Anchor Final Installation: The machine is moved to its inal position and the above-ground anchors are attached to the machine. They are torqued in increments to a speciied rating.
Coring Instructions
Before drilling, please refer to the Haas website (www.haascnc.com) for appropriate hole pattern and
machine footprints. These can be found in the “Machine Dimensions” link on the page for each model.
On a 6” (150 mm) slab, cored holes must be 1.5” (38 mm) diameter by 6” (150 mm) deep, (Standard foun-
dation requirement).
On a 12” (300 mm) slab, cored holes must be 1.5” (38 mm) diameter 8.5” (215 mm) deep, (EC-1600 series,
VS, HS foundation requirement).
Anchor holes for the HS side-mount tool changer are 4" (100 mm) diameter by 10" (250 mm) deep.
NOTE:
Thoroughly clean and dry the cored holes. The holes must be completely free of oil and water. If blasting
with air, ensure that the air is free of oil.
ES0095 Rev CK Mar 2013 Page 4 of 13
Haas Technical Publications
Anchoring Instructions
Anchor Pre-Assembly
1. Screw the coupling nut onto the 5/8-11 hex
head bolt (HHB). The HHB should reach
halfway into the coupling nut.
2. Thread the 5/8-11 hex nut halfway up the
length of the long threaded end of the stud.
3. Thread the loor plate and the 5/8 washer onto the long end of the stud below
the 5/8-11 hex nut.
ES0095 Rev CK Mar 2013 Page 5 of 13
Haas Technical Publications
Anchoring Instructions
4. Thread the long end of the stud into the
coupling nut as far as it will go.
5. Tighten the 5/8-11 hex nut until the loor plate and washer are held tightly against the
coupling nut. Finger-tight pressure is all that
is needed at this point.
Procedure Complete.
ES0095 Rev CK Mar 2013 Page 6 of 13
Haas Technical Publications
Anchoring Instructions
Setting the Anchors
1. Mix the epoxy per the manufacturer’s
instructions.
2. Fill the hole until the epoxy is approximately
2" (50 mm) from the top.
IMPORTANT! DO NOT OVERFILL THE
HOLE. The epoxy will rise once the anchor
assembly is placed in the hole.
3. Place the anchor assembly briely into the hole (stud end up) and then quickly lift it
back out.
At least half of the coupling nut must be
covered in epoxy to ensure proper
anchoring. When the epoxy cures it must
hold the coupling nut irmly in place.
Make certain that the epoxy does not seep
over the top of the coupling nut or you may
not be able to remove the stud later in this
procedure.
Epoxy Level BeforeInstallation
Floor
Concrete Foundation
Epoxy mustExtend Least Halfway
ES0095 Rev CK Mar 2013 Page 7 of 13
Haas Technical Publications
Anchoring Instructions
4. Reinsert the anchor assembly into the hole,
stud-end up. Use a carpenter’s square to
make certain that the stud is perpendicular
to the loor.
NOTE: At this point you must work quickly as
the epoxy will begin to harden.
Refer to the epoxy manufacturer’s
instructions for curing time. It typically takes
18-24 hours..
Procedure Complete.
5/8 - 11 X 2 1/8 COUPLING NUT
5/8 - 11 X 6 HHB
5/8 WASHERSTEP 2 LOCATION
5/8 -11 HEX NUTSTEP 2 LOCATION
5/8 - 11 X 8 STUD
LONG THREADED END DOWN FOR STEP 2 ONLY!
FLOOR PLATE
EPOXY LEVEL BEFORE INSTALLATION
EPOXY LEVEL AFTERINSTALLATION
ES0095 Rev CK Mar 2013 Page 8 of 13
Haas Technical Publications
Anchoring Instructions
Anchor Installation
1. Once the epoxy has cured, remove the
studs. Remove the loor plate, the washer and the 5/8-11 hex nut from each stud.
2. Move the machine into position.
3. Screw the short end of the stud into the
coupling nut in the loor. Make sure that the machine base casting does not interfere with
the stud.
Thread the stud as far into the coupling nut
as it will go.
Coupling Nut
Coupling Nut
ES0095 Rev CK Mar 2013 Page 9 of 13
Haas Technical Publications
Anchoring Instructions
4. Slide the loor plate down the stud so that it lies lat on the loor.
5. Thread the 3/4-10 hex nut onto the
3/4-10 x 6 HHB and drive it
roughly 2" (50 mm) down the bolt.
6. Set the 3/4-10 x 6 HHB head-down on the
loor plate and align it so that the anchor strap will it over both the hex head bolt and the stud.
About2” (50 mm)About
2” (50 mm)
ES0095 Rev CK Mar 2013 Page 10 of 13
Haas Technical Publications
Anchoring Instructions
7. Place the anchor strap onto the bolt and
stud.
8. Place the 5/8 washer onto the stud, followed
by the 5/8-11 hex nut.
Loosen the anchoring assembly prior to
leveling the machine.
9. Make certain that the anchor plate rests
irmly on the 3/4-10 hex nut and on the machine base.
Procedure Complete.
Correct Incorrect
ES0095 Rev CK Mar 2013 Page 11 of 13
Haas Technical Publications
Anchoring Instructions
Final Anchoring
1. Once the machine has been leveled, torque the 3/4-11 hex nuts on the stud to 50 ft-lb (68 Nm) in the
following pattern:
2. Torque the 3/4-11 hex nuts on the studs to
80 ft-lb (109 Nm) in the same pattern.
Please refer to the Haas website (www.haascnc.com)
for appropriate hole pattern and
machine footprints. These can be found in the
“Machine Dimensions” link on the page for each
model.
FOUR ANCHOR
TORQUE PATTERN
1
23
41
23
4
SIX ANCHOR
TORQUE PATTERN
1
2
3
4
5
6
1 3 5
2 4 6
EIGHT ANCHOR
TORQUE PATTERN
1
2
3
4
5 7
6 8
1 3 5 7
2 4 6 8
ES0095 Rev CK Mar 2013 Page 12 of 13
Haas Technical Publications
Anchoring Instructions
3. Recheck the level and re-level the machine if
needed.
Procedure Complete.
ES0095 Rev CK Mar 2013 Page 13 of 13
Haas Technical Publications
Anchoring Instructions
Anchor Kits
The Haas machine anchor kits are speciically designed to improve machine stability and performance. They are not intended to satisfy building, seismic or stationary equipment installation. Such requirements should be
provided by an expert.
Please contact your Haas Factory Outlet to obtain the correct anchoring kit (if not included with the machine).
For anchoring patterns and machine drawings, refer to the Haas website (www.haascnc.com). These can be
found in the “Machine Dimensions” link on the page for each model.
MachineNumber of
Anchors Needed
Anchor Kit
Part Number
Number of
Anchors per Box
Number of
Boxes Needed
TM-1 to 3, 1P to 3P 4 30-4535 4 1
VF-1 to 4 4 30-4535 4 1
VF-3YT (SS) 6 30-4535 4 2
VF-5 to 12 6 30-4535 4 2
VM-2,3,6 6 30-4535 4 2
VR-8,9,11 8 30-4535 4 2
MDC 4 30-4535 4 1
DT 6 30-4535 4 2
ES 4 30-4535 4 1
GR 4 30-4535 4 1
EC-300 4 30-4535 4 1
EC-400, 500 4 30-4536 4 1
EC-400 Pallet Pool 4 30-4537 4 1
EC-1600 (All) 11 30-4536 4 3
HS, VS 28 30-4538 4 7