Community Update ‐ June 2021 1 Alcoa Anglesea
Alcoa Groundwater Pumping Test COMMUNITY UPDATE JUNE 2021
This monthly update provides a status of groundwater levels and water quality for key monitoring
bores, including total extraction rates, as part of the Alcoa 12‐month groundwater pumping test of
the Upper Eastern View Formation (UEVF) aquifer.
In summary:
This report covers the period of 25 May 2021 to 23 June 2021.
The test is progressing well and all activities were conducted in accordance with the licence
conditions.
The daily pumping rate was increased from 3.45ML per day to 4.32ML per day on 8 June
2021.
118.3ML was extracted and placed into the mine void waterbody, with a total of 171.9ML
extracted since the pumping test commenced on 13 May 2021.
The water level increased to RL ‐19.93m (from RL ‐20.42m) which represents 11.8% of the
proposed full volume of the waterbody. (Relative level, or RL, is the water level in metres
below sea level.)
There is no significant change to groundwater levels in the upper part of the UEVF aquifer or
the unconfined shallow Demons Bluff Group (DBG) and Perched Water Table (PWT) aquifers
which are responding to natural climate variations.
As expected, groundwater levels have declined within modelled expectations at the
pumping bore in the lower part of the UEVF aquifer.
Investigation triggers were reached for three out of the 12 nominated trigger bores. Triggers
are set at conservative levels, and these occurrences do not represent any risk to
groundwater dependent ecosystems or any other users.
o Two occurrences (MW33 and MW64 ‐ refer Figure 1 below) are attributed to natural
climate variability and are not related to the pumping test.
o One occurrence (Bore 116459 ‐ refer Figure 1 below) is believed to be due to
multiple factors including climate variability and bore condition, and potentially also
the pumping test. This will continue to be monitored and the pumping rate will also
be reviewed.
Further information about the 12‐month groundwater pumping test can be found in this fact
sheet.
Water Monitoring Plan
The 12‐month groundwater pumping test commenced on 13 May 2021 and is underpinned by a
comprehensive water monitoring plan approved by Southern Rural Water. The plan will ensure the
groundwater extraction is not threatening groundwater dependent ecosystems that may connect to
the aquifer underlying and surrounding the mine, or adversely impact any other users.
Water extraction rates, groundwater levels and quality, and the waterbody level are closely
monitored by a specialist consultant. Results are reported monthly to the co‐regulator technical
Community Update ‐ June 2021 2 Alcoa Anglesea
working group (TWG) (inclusive of Alcoa, Southern Rural Water, Department Environment Land
Water and Planning, EPA Victoria, Earth Resources Regulation, Barwon Water and CCMA) for review,
and an update is published for the community.
A total of 1,500ML is permitted to be extracted during the pumping test, with a maximum daily
extraction limit of 5.18ML.
To monitor groundwater levels and quality during the pumping test, 28 bores have been selected
with 12 of those also nominated as trigger bores. The location of the trigger and other monitoring
bores are shown in Figure 1 below.
Figure 1: Trigger and other monitoring bore locations.
Each of the trigger bores has defined water level and/or water quality thresholds, known as triggers,
and defined response actions in the event that a trigger is met. The triggers and responses, known as
trigger rules, were developed in consultation with a specialist consultant and Southern Rural Water.
Each trigger has been set at a conservatively low level to ensure we are alerted early, and, if
necessary, able to act quickly during the pumping test to prevent damage to groundwater
dependent ecosystems. In total there are five separate trigger rules, with these applying in various
combinations to the 12 trigger bores. Each trigger rule has different responses ranging from
additional monitoring to reducing the pumping rate.
Data from key Barwon Water monitoring bores in the vicinity is also included in the water
monitoring plan for analysis. This data is provided by Barwon Water.
Community Update ‐ June 2021 3 Alcoa Anglesea
Extraction rates
Month Volume extracted
(ML) Maximum daily
volume extracted (ML)
Total volume
extracted to date (ML)
May 2021 (from 13/5) 53.6 ML 3.45ML 53.6 ML
June 2021 118.3ML 4.32ML 171.9ML
Figure 2:: Daily extraction rate and cumulative total extracted
Waterbody level
Date Waterbody level RL (m) Monthly Rainfall (mm) Waterbody % Full
26 April 2021 ‐20.93 N/A 10.3%
24 May 2021 ‐20.42 163.2 11.1%
21 June 2021 ‐19.93 65.8 11.8%
Figure 3:: Pit waterbody level and rainfall
0
100
200
300
400
500
600
700
800
900
1000
1100
1200
1300
1400
1500
1600
0
5
10
15
20
25
30
35
40
45
50
55
60
65
70
09‐Apr‐21
16‐Apr‐21
23‐Apr‐21
30‐Apr‐21
07‐M
ay‐21
14‐M
ay‐21
21‐M
ay‐21
28‐M
ay‐21
04‐Jun‐21
11‐Jun‐21
18‐Jun‐21
25‐Jun‐21
02‐Jul‐21
09‐Jul‐21
16‐Jul‐21
23‐Jul‐21
30‐Jul‐21
06‐Aug‐21
13‐Aug‐21
20‐Aug‐21
27‐Aug‐21
03‐Sep‐21
10‐Sep‐21
17‐Sep‐21
24‐Sep‐21
01‐Oct‐21
08‐Oct‐21
15‐Oct‐21
22‐Oct‐21
29‐Oct‐21
05‐Nov‐21
12‐Nov‐21
19‐Nov‐21
26‐Nov‐21
03‐Dec‐21
10‐Dec‐21
17‐Dec‐21
24‐Dec‐21
31‐Dec‐21
07‐Jan
‐22
14‐ Jan
‐22
21‐Jan
‐22
28‐Jan
‐22
04‐Feb‐22
11‐Feb‐22
18‐Feb‐22
25‐Feb‐22
04‐M
ar‐22
11‐M
ar‐22
18‐M
ar‐22
25‐M
ar‐22
01‐Apr‐22
08‐Apr‐22
15‐Apr‐22
Cumulative Volume Ectracted
(ML)
Maxim
um Daily Extraction Rate (L/sec)
Max Daily Flow Rate (L/sec)
Accumulative Volume Extracted (ML)
Daily Extracton Rate and Cumulative Total Extracted
Maximum rate permitted
Maximum volume permitted
0
20
40
60
80
100
120
140
‐45
‐40
‐35
‐30
‐25
‐20
‐15
‐10
Mar‐16
Apr‐16
Jun‐16
Aug‐16
Oct‐16
Dec‐16
Feb‐17
Apr‐17
Jun‐17
Aug‐17
Oct‐17
Dec‐17
Feb‐18
Apr‐18
Jun‐18
Aug‐18
Oct‐18
Dec‐18
Feb‐19
Apr‐19
Jun‐19
Aug‐19
Oct‐19
Dec‐19
Feb‐20
Apr‐20
Jun‐20
Aug‐20
Oct‐20
Dec‐20
Feb‐21
Apr‐21
Jun‐21
Aug‐21
Oct‐21
Nov‐21
Jan‐22
Mar‐22
May‐22
Jul‐22
Sep‐22
Nov‐22
Rainfall (Aireys Inlet (m
m/d)
Pit W
ater Level (mAHD)
Pit Lake
Rainfall Trigger Rule 5
Pit Water Body and Rainfall
Community Update ‐ June 2021 4 Alcoa Anglesea
Groundwater level monitoring and trigger status
Table 1: Groundwater level monitoring and trigger status.
Bore Overall status Action / Comment
WB05 No trigger reached Continue to monitor
SOBN 116459 Trigger 1 reached Level 1 (investigation) trigger reached. Believed to be as a
result of multiple factors including climate variability, bore
condition and also potentially the pumping test. As a
result of this the pumping rate is being reviewed with the
Technical Working Group.
UEVF MB3 No trigger reached Continue to monitor
UEVF MB5 No trigger reached Continue to monitor
UEVF MB7 No trigger reached Continue to monitor
UEVF MB8 No trigger reached Continue to monitor
DBG MB3 No trigger reached Continue to monitor
DBG MB5 No trigger reached Continue to monitor
DBG MB7 No trigger reached Continue to monitor
DBG MB8 No trigger reached Continue to monitor
MW33 Trigger 1 reached Level 1 (investigation) trigger reached. A result of climate
variability. Continue to monitor.
MW64 Trigger 1 reached Level 1 (investigation) trigger reached. A result of climate
variability. Continue to monitor.
Barwon Water Anglesea borefield monitoring data
The Anglesea borefield is one of a number of water sources that can supplement the existing
Greater Geelong water supply system for Barwon Water. Access to groundwater from the Lower
Eastern View Formation (LEVF) is governed by a bulk entitlement, issued by the Victorian
Government.
During operation, Barwon Water reports monthly on the status against the threshold level for two
key bores. They have recommenced these monthly updates for the duration of the Alcoa pumping
test. The Anglesea borefield groundwater level trigger components (P8 or P19) were not reached
during this reporting period.
For more information on the Anglesea borefield and the monthly updates please see the Barwon
Water website.