View
217
Download
0
Embed Size (px)
Citation preview
ALASKA’S FIRST UNIVERSITY AMERICA’S ARCTIC RESEARCH UNIVERSITY
University of Alaska FairbanksExecutive Leadership Workshop
1
ALASKA’ S FIRST UNIVERSITY AMERICA’ S ARCTIC RESEARCH UNIVERSITY
Agenda
I FY10 Status - Projected Results Projected Carryforward
II FY11 Conditions and Distributions The Issues How do we Address Them?
III FY12 budget and 3 - 5 year planning horizon
Operating Budget Priorities
IV Summary
2
ALASKA’ S FIRST UNIVERSITY AMERICA’ S ARCTIC RESEARCH UNIVERSITY
I – FY10 Status – Projected Results
3
ALASKA’ S FIRST UNIVERSITY AMERICA’ S ARCTIC RESEARCH UNIVERSITY
4
FY10 Budget$8.2M Non-General Funds Required to Maintain Existing
Programs! ($7.4M projected additional in FY10)
ALASKA’ S FIRST UNIVERSITY AMERICA’ S ARCTIC RESEARCH UNIVERSITY
Compensation Increase$4.2M General Fund$3.3M Non-General Fund
Maintenance & Repair$434K General Fund$657K Non-General Fund
Other Fixed Costs$150K General Fund$4.2M Non-General Fund
Programs$1.1M General Fund$2.7M Non-General Fund
Carryforward Analysis
Unrestricted (F1) carryforward projected at $6.5M or 2.8%
Estimate $5M to $7M at end of FY10
Initial contingency reserve low but a pullback replenished
Higher than anticipated tuition and ICR revenue partly offset fixed costs increases
Grants and Contracts accounts receivable reduced
Units with deficits at end of FY10 will submit a remedial plan
ALASKA’S FIRST UNIVERSITY AMERICA’S ARCTIC UNIVERSITY
5
ALASKA’ S FIRST UNIVERSITY AMERICA’ S ARCTIC RESEARCH UNIVERSITY
II - FY11 Conditions and Distributions
6
ALASKA’ S FIRST UNIVERSITY AMERICA’ S ARCTIC RESEARCH UNIVERSITY
Overall UAF status going into FY11 GF salary and benefit funding distributions Planning assumptions 3% SW Pool Central needs Structuring of required redistributions – PBB and
other
Initial Budget IssuesHow do we Solve them?
7
ALASKA’ S FIRST UNIVERSITY AMERICA’ S ARCTIC RESEARCH UNIVERSITY
8
FY 11 Budget$10.8M Non-General Funds Required to Maintain Existing Programs!
ALASKA’ S FIRST UNIVERSITY AMERICA’ S ARCTIC RESEARCH UNIVERSITY
Compensation Increase$3.91M General Fund (net of system level reduction)$3.68M Non-General Fund BOR Request ($4.7M GF, $3.8M NGF)
Maintenance & Repair$795K General Fund$790K Non-General Fund
BOR Request ($795K GF, $790K NGF)
Other Fixed Costs$1.58M General Fund$3.66M Non-General Fund
BOR Request ($1.8M GF, $3.8M NGF)
Programs$1.5M General Fund*$2.67M Non-General Fund
BOR Request ($4.9M GF, $7.2M NGF)
As passed by the Legislature
*Includes CES, ACEP, MAP and 150K of one-time STEM funding.
9
ALASKA’ S FIRST UNIVERSITY AMERICA’ S ARCTIC RESEARCH UNIVERSITY
Handouts:1. FY11 Conference Committee Action2. FY11 Fiscal Status - Delta Document3. FY11 Reference Document
Discussion
Fiscal Impact Planning Assumptions
10
ALASKA’ S FIRST UNIVERSITY AMERICA’ S ARCTIC RESEARCH UNIVERSITY
Legislature’s 3% redistribution pool is substantially returned to UAF
2% enrollment growth Anticipate utility trigger mechanism Flat research revenue
3% SW Pool
11
ALASKA’ S FIRST UNIVERSITY AMERICA’ S ARCTIC RESEARCH UNIVERSITY
$11.6M total for all of UAF $4.6M GF $7.0M NGF
Anticipate 95% will be returned
FY11 Central Obligations
12
ALASKA’ S FIRST UNIVERSITY AMERICA’ S ARCTIC RESEARCH UNIVERSITY
Must cover ongoing cost increases Fuel Tuition rate increases (institutional scholarships) SW chargebacks
Must cover existing structural deficits Bookstore/Tech Center Institutional scholarship budget shortfall
Must cover strategic facility upgrades One-stop shop Life Sciences planning advance
Must build adequate emergency reserve $2.6M required to meet
FY11 Campus-wide Unfunded Obligations
13
ALASKA’ S FIRST UNIVERSITY AMERICA’ S ARCTIC RESEARCH UNIVERSITY
KUAC Athletic Travel Upark Department Moves Wells Fargo Lease/Moves Sustainability (SIREN) Fee Match SOM/Northern Leadership OIT HR Office Grant Technician
$2.0M required to meet
Required Adjustments
14
ALASKA’ S FIRST UNIVERSITY AMERICA’ S ARCTIC RESEARCH UNIVERSITY
$2.6M required for central needs $2.0M in unfunded obligations campus-wide $1.3M PBB
$5.9M in required FY11 redistributions
Redistribution Options
15
ALASKA’ S FIRST UNIVERSITY AMERICA’ S ARCTIC RESEARCH UNIVERSITY
• Across the board• School/college/Unit level• VC/Provost/Chancellor level
• Amount allocated• By financial driver
• % GF, % NGF
• Administrative vs. Academic vs. Research• By Space• Vacancies centrally held• Other
16
ALASKA’ S FIRST UNIVERSITY AMERICA’ S ARCTIC RESEARCH UNIVERSITY
Discussion
III - FY12 Budget and 3–5 Year Planning Horizon
17
ALASKA’ S FIRST UNIVERSITY AMERICA’ S ARCTIC RESEARCH UNIVERSITY
ALASKA’S FIRST UNIVERSITY AMERICA’S ARCTIC RESEARCH UNIVERSITY
18
ALASKA’ S FIRST UNIVERSITY AMERICA’ S ARCTIC RESEARCH UNIVERSITY
FY 12 Operating Budget Priorities
Address fixed costs increases – 5% to 7% per year
Meet obligations to established programs: Biomedical, Climate, WFD including teacher preparation, others
Maintain momentum: Engineering, Energy
Increase graduation rates (including State financial aid)
ALASKA’S FIRST UNIVERSITY AMERICA’S ARCTIC RESEARCH UNIVERSITY
19
ALASKA’ S FIRST UNIVERSITY AMERICA’ S ARCTIC RESEARCH UNIVERSITY
Operating Budget 3 to 5 Year Conditions
Annual 3% salary increase Annual 15% benefit increase Annual 10% tuition increase Enrollment increase 10% if significant
State financial aid package ICR rate increase but Research flat overall
if no significant facilities investment 2% to 3% total increase in GF per year Debt Obligations
20
Unrestricted Revenue GapBased Upon FY05 to FY09 Annualized Data
ALASKA’ S FIRST UNIVERSITY AMERICA’ S ARCTIC RESEARCH UNIVERSITY
FY09 FY10 FY11 FY12 FY13$220,000.0
$240,000.0
$260,000.0
$280,000.0
$300,000.0
$320,000.0
$340,000.0
$360,000.0
Projected ExpenseProjected Unrestricted Revenue
Annualized Expense Increasing at 8.42%Annualized Revenue Increasing at 6.86%
$8.3M Gap
$13.8M Gap
$4.2MSurplus
Breakeven
$3.5M Gap
Does not include financial aid-dependent enrollment increase
Closing the Funding Gap
21
ALASKA’ S FIRST UNIVERSITY AMERICA’ S ARCTIC RESEARCH UNIVERSITY
Across the Board reductions will not be adequate for 3-year budget horizon
Vertical reductions will require elimination and/or restructuring of some programs / functions
Reallocation of savings from vertical reductions will meet “gap” in funding experienced by other units
Closing the Funding Gap
22
ALASKA’ S FIRST UNIVERSITY AMERICA’ S ARCTIC RESEARCH UNIVERSITY
Program review will need to occur in administrative, support, academic, and research operations
Criteria needed for each functional area
Priorities necessary within and across functional areas
Closing the Funding Gap
23
ALASKA’ S FIRST UNIVERSITY AMERICA’ S ARCTIC RESEARCH UNIVERSITY
Benchmarking to peers
Performance metrics
Areas of distinction or focus
Accreditation and mission alignment
?
Next Step
24
ALASKA’ S FIRST UNIVERSITY AMERICA’ S ARCTIC RESEARCH UNIVERSITY
Summer 2010 – begin Administrative review
Fall / Winter 2010 – begin Academic, Research, Student Support review
Implementation in FY12 based on reviews
VI - Summary
25
ALASKA’ S FIRST UNIVERSITY AMERICA’ S ARCTIC RESEARCH UNIVERSITY