Alaska Space Grant Program. Alaska Research Cubesat Operating System. Gregg Christopher MSCS Graduate Project Presentation 3 11/22/2011. Introduction:. Alaska Research Cubesat (ARC) Started in Fall 2009 with a Space Systems Engineering course. Currently in Development; expect - PowerPoint PPT Presentation

Citation preview

Page 1: Alaska Research Cubesat Operating System

Alaska Research CubesatOperating System

Alaska Space Grant Program

Gregg ChristopherMSCS Graduate Project Presentation 3

11/22/2011

Page 2: Alaska Research Cubesat Operating System

Introduction:

• Alaska Research Cubesat (ARC)– Started in Fall 2009 with a Space Systems Engineering course.– Currently in Development; expect to fly in 2013.– First student-built spacecraft for UAF.

• MS CS Project– Driven by ARC requirements.– A subset of full Command and Data Handling (CDH)

functionality.• Collaborative project between CS/SWE and

Engineering departments.

*(Image Source: ARC1 CDR Presentation, 08/29/2011)

Page 3: Alaska Research Cubesat Operating System

CubeSat in a Nutshell

• Some Challenges:– Mechanical Design– Thermal Modeling– Power Budget– Attitude Determination

and Control– Ground Communication– Computer Architecture– Error Handling *(Image Source: ARC1 CDR Presentation,

08/29/2011)

Page 4: Alaska Research Cubesat Operating System

CDH System Overview

4

All subsystems share a set of electrical and software specifications.

One subsystem is designated as Master Controller.

All subsystems are connected to a Supervisor circuit responsible for reset-based fault recovery.

Command and Data are transmitted over a shared dedicated bus.

Subsystems may be tested independently according to system specification.

MasterController

Other Subsystems

Supervisor/Reset Circuit

COMMSubsystem

I2C Command BusSPI Data Bus

Interrupt LinesSupervisor Inspection / Reset Bus

Power Distribution Bus

ElectricalPower

Subsystem (EPS)

CompatibleI2C Device

CompatibleSPI Device

Dev/DebugHarness

DebugPort

Command Uplink / Data Downlink

ARCBus Devices Included in CDH Specification

Poweronly

I2C,Power

SPI,Power

Page 5: Alaska Research Cubesat Operating System

Imagine Failure

• Expected Failure Modes are Single Event Upset (SEU) bit flips, and Latchup Events.

• Within the failure mode model, assume errors are chosen adversarially to induce the worst-case scenario.

• Use this mindset

to steer toward

simpler choices.

(Source: http://nasawatch.com)

Page 6: Alaska Research Cubesat Operating System

Major Areas of This Project

• System and Software Engineering

• Architecture Requirements• Design Review Process• Physical Assembly• More Design Review Process• Re-Scoping for MS Project• Project Hardware Creation• Finally, Programming!

Page 7: Alaska Research Cubesat Operating System

Revisiting the Scope

Guidance from Advisor: • Demonstrate:

– Command exchange– Error simulation– Testing Capability

• Defer:– Complete command table.– Complicated command interactions.– Other features essential for cubesat, but not for

minimally functional CDH concept.– Anything requiring more hardware development.

+ Multi-master I2C exchange+ Representative Commands- Needs robustness- Needs “real” command structure

+ Works, Repeatable, Simple- Accurate space environment?

+ Automated Test Harness+ PC-Controlled Failure and Recovery!

Failure: I still had to make new circuits and other hardware workarounds

Page 8: Alaska Research Cubesat Operating System

Implementation Progress

• Functional in most areas.

• Many areas not yet complaint with CDR.

• Following Strategy From Talk 2:– Basic unified

firmware.– Tools for automation.– Representative

command set– Test case generation.

Page 9: Alaska Research Cubesat Operating System

Test Hardware

ARCBus

Test Harness Archictecture

Comm Interface

Switched Power Supply

ResetControl

Dev Board Dev Board Dev Board

Interactive Toolset Automated Test Rig

StandaloneController

Manual orScripted

CommandExchange

OptionalIntegration

FT245 Library Serial Library

Dev BoardEmulator Class

Test ScenarioGenerator

SubsystemPeripheral

SubsystemPeripheral

PC Software

Page 10: Alaska Research Cubesat Operating System

Test Command Table:• Set LED Pattern• Report LED Pattern• Remote Set LED Pattern (Across Boards)• Set Work Area Buffer Segment• Read Work Area Buffer Segment• Perform Calculation on Buffer• Send Buffer Segment to Other Board• Flip Bits (Intentionally corrupt memory)

Page 11: Alaska Research Cubesat Operating System

Test Sequence Generation:

• Commands are generally paired with verification commands.

• Random or pre-programmed sequences of operations.

• Vary the selection, speed and distribution of operations per test requirements.

• Induce Simulated Single Upset Events.

• Automatically Reset on Error and Repeat.

Test Harness Interface(dev boards unplugged)

Page 12: Alaska Research Cubesat Operating System

Error Simulation:

• Simulated Single Event Upset (SSEU)– Flip bits in addressable memory.– Register corruption will be harder.

• Non-addressable

volatile memory?

• Error simulation

does not replace

other testing and

review.

Page 13: Alaska Research Cubesat Operating System

Error Mode Categorization:

• Recoverable Error: Any change to memory that can be reverted to a previously known known state. (Currently only redundant memory.)– Immediate Action: correct and continue– Roughly 1-2% of SSEU result in this

condition. (Trivial and uninteresting result.)

• Non-Recoverable Error

Page 14: Alaska Research Cubesat Operating System

Error Mode Categorization:

• Non-Recoverable Error: Everything else that happens.– Recover via reset.– Currently very high. – High rate means that what I’m probably detecting are

weaknesses in the firmware.• This shouldn’t be surprising! (First large project on platform)• Probably the lack of error detection/recovery in I2C Multi-

Master implementation• Might also be bad interrupt programming.

– Still a valuable result! These are errors that didn’t occur during manual, interactive testing.

Page 15: Alaska Research Cubesat Operating System

Project Status Summary:

• Developed:– Hardware and firmware that implement

rudimentary CDH functionality.– PC software for automated and interactive

testing.– Toolchain development to reduce the barrier

to entry.– Drop-in testing environment for dev boards.

• Tested:– Runs of firmware with sample command set

for preliminary testing results.

Page 16: Alaska Research Cubesat Operating System

Next Steps (This Project)

• Deliver draft

• Eliminate sources of systematic error

• Improve error simulation

• Characterize Space Environment

• Validate with radiation-induced SEU and latchup events.

Page 17: Alaska Research Cubesat Operating System

Next Steps (Cubesat)

• Immediate need for CDH code for other system development.– An outcome of this MS Project is: I’ve done a

lot of things wrong; help the group avoid these.

– Robust μC firmware is exceedingly difficult.

• Bring Supervisor Circuit in line with CDR Design

• Establish Test Harness in the Lab

Page 18: Alaska Research Cubesat Operating System

Thanks for Attending!

Gregg Christopher:– [email protected]