74
0 COMPANY PROFILE AL WEDAD Email : [email protected] Web: www.alwedadsa.com Tel. +966 (12) 691 4410 / (11) 288 4155 Fax +966 (12) 662 2515 / (11) 288 3960

AL WEDAD GROUP PROFILEalwedadsa.com/wp-content/uploads/2018/05/alwedad.pdf0 COMPANY PROFILE AL WEDAD Email : [email protected] Web: Tel. +966 (12) 691 4410 / (11) 288 4155 Fax

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

0

COMPANY PROFILE

AL WEDAD

Email : [email protected]

Web: www.alwedadsa.com

Tel. +966 (12) 691 4410 / (11) 288 4155

Fax +966 (12) 662 2515 / (11) 288 3960

1

Table of Contents What we do

Introduction 2

Our mission 2

Our specialties 2

Services

Pre-Construction Services 3

Post Construction Services 3

Facilities management Services 3

Construction Services | Areas of expertise 4

Solutions

Sustainable Solutions 5

Energy Optimization Saving Solutions 5

Value engineering 5

Resources - Work force 6

Projects

On-going Projects | KSA 7

Completed major projects | KSA 11

Completed major projects | Lebanon 22

Completed major projects | Turkmenistan-Africa 41

Significant Installation 51

Plant and Equipment 54

Legal Documents 55

Appreciation letters 66

Key Personnel 71

Contacts 73

2

Introduction

Al Wedad is an electro-mechanical company with over 30 years of experience. Al Wedad and its affiliated

companies Arcode & Tyros Off-shore, operate in the Kingdom of Saudi Arabia, Lebanon, Turkmenistan & Africa with

offices in Riyadh, Jeddah, Beirut, Ashgabat & Cameroon.

What we do

High Rise Towers

Residential Towers

Office Towers

Mixed used Complexes

Industrial

Factories

Data Centers

Power Stations

Hospitality

Luxury Hotels

Catering Services

Restaurants

Government Facilities

Airport & Railroads

Ministries

Military buildings & Infrastructure

Maintenance & Testing Facilities

Specialties

Mission

Our mission is to execute demanding projects in the most efficient manner.

We also seek to form long-term relationships of value and trust with our clients and partners. We are committed to the

utilization of the best resources and latest cutting edge techniques to ensure high quality construction and

engineering solutions.

3

Pre-construction services

1. Estimation : Providing project estimation that is

timely and reliable, in addition to project

quantity surveying and BOQ production.

2. Feasibility Studies : Analyzing life cycle costs for

building system alternatives.

3. Planning : Developing a complete time

schedule.

4. Risk Management : Controlling cost, schedule

and owner objectives to mitigate any risks.

5. Quality Control : Monitoring methods,

procedures and checks from start to finish withthe goal of meeting the established standard

6. Material selection and technical submittals

7. Procurement and material management

Post construction services

1. Commissioning : Ensuring that building systems are

designed, installed and activated according to owner’s

operational needs.

2. O&M manuals : Development of operation and

maintenance instructions

3. Final close-out : Completion of snag listed items

4. Maintenance : Through providing an one-year walk-

through maintenance.

Services

Our services include the entire electro-mechanical process, from design and shop drawing to material

procurement and installation, testing and commissioning, as well as facility management and maintenance.

Facilities management services

1. Construction management & supervision

2. MEP engineering services

3. Health & safety quality

4. Inspection & auditing

5. Equipment site selection & placement

4

Construction services | Areas of expertise

HVAC

• Heating

• Ventilation

• Air-conditioning• Standard and critical environments

Electrical Power

• Medium and low voltage distribution

• Power generation

• Uninterruptible power supplies• Indoor and Outdoor lighting

Plumbing

• Residential

• Industrial

• Process

Low Current Systems

• Fire alarm and security systems

• Access control, CCTV & intrusion alarm

• Building automation & management• Public address and TV distribution

Fire Fighting

• Water sprinklers

• Active gas extinguishing systems

• Smoke control management

Telecommunications

• Structured cabling

• VOIP

• LAN/WAN design

• System integration• Active & Passive components

5

Sustainable solutions

• We are committed to building in a sustainable

and responsible manner during the design stage

followed by monitoring the environmental

impact throughout the construction process and

through the life of building

Solutions

Energy optimization saving solutions

• We have a comprehensive range of methods, tools,

techniques and technologies designed to optimize

the client’s use of energy.

• Al Wedad is highly experienced in implementing

energy audits equipment selection & placement on

existing buildings. The purpose and focal point being

long term operational cost savings and plant

optimization engineering.

Value Engineering

• Our extensive expertise allows us to offer value

engineering that is both cost effective and

energy sufficient

6

Workforce

Management Professionals Technicians Tradesman Total

20 30 85 150 285

Resources

7

Ongoing projects | Saudi Arabia

▪Luna Project- Al-kharj - (2015-2017)………….….…………………18,000,000$

Client: MIC Corporation

Main contractor: Arabian Gulf Co.

Consultant: DORSCH International Consultants / KHATIB & ALAMI

Total electro-mechanical works

8

Ongoing projects | Saudi Arabia

▪ Wellcome Lounge in Terminal 1 @ KKIA Riyadh - (2016-)………………..2,500,000$

Client: Saudia Catering (SACC)

Main contractor: UNIDECOR.

Total electro-mechanical works

▪ Wellcome Lounge in Terminal 2 @ KKIA Riyadh - (2016-2017)…………..3,000,000$

Client: Saudia Catering (SACC)

Main contractor: UNIDECOR

Total electro-mechanical works

9

Ongoing projects | Saudi Arabia

▪Helicopter Facilities at (KFNB) –Jeddah (2015-2017) …………………..10,000,000$

Client: Royal Saudi Naval Force (RSNF)

Main contractor: Arabian Gulf Co.

Consultant: HAZIM Consulting Co. and designed by Zouheir Fayez

Total electro-mechanical works

10

Ongoing projects | Saudi Arabia

▪Fuel Farm Office & Technical Building @ KAIA Jeddah- (2015-17)……….…4,000,000$

Client: General Authority of Civil Aviation (GACA)

Main contractor: SAUDI BIN LADIN GROUP

Consultant: Dar Al Handasah

Total electro-mechanical works

11

Completed major projects | Saudi Arabia

▪Multi-Story Car Park in K.A.I.A Jeddah - (2012-13)………….….…………22,000,000$

Client: General Authority of Civil Aviation (GACA)

Main contractor: SAUDI BIN LADIN GROUP

Consultant: Dar Al Handasah

Total electro-mechanical works

12

Completed major projects | Saudi Arabia

▪MODA – Prince office and Hotel- (2012-2015)………….….…………………7,000,000$

Client: Ministry of defense

Main contractor: Saudi Constructioneers

Consultant: Zouheir Fayez

Total electro-mechanical works

13

Completed major projects | Saudi Arabia

▪ Engine Test Facility at King Abdul Aziz Air Base - (2011-2012)………….……4,000,000$

Client: Royal Saudi Air Force (RSAF)

Main contractor: British Aerospace / Rolls Royce

Building & Process contractor: Techspace Aero

Consultant: Davis Langdon

Total electro-mechanical works

14

Completed major projects | Saudi Arabia

▪ RSNF Riyadh / Support and Training Center - (2009-2010)…………………..8,000,000$

Client: Royal Saudi Naval Force (RSNF)

Main contractor: Arabian Gulf Co.

Total electro-mechanical works

▪ U.S. Consulate Jeddah / New Consulate Compound - (2009-2010).……..5,000,000$

Client: U.S. Consulate

Main contractor: First Kuwaiti Tr. & Co.

Partial electro-mechanical works

15

Completed major projects | Saudi Arabia

▪ Air Defense Head Quarters Building - (1999-2004)……….…….……………….18,600,000$

Client: MODA/Air Defense Forces

Main contractor: Direct contract

Total electro-mechanical works

Air Defense Head Quarters Building

16

Completed major projects | Saudi Arabia

▪ The Equestrian Club of Jeddah / Park Hyatt - (Phase 2, 2006-2008)…….14,670,000$

Client: Al Muntazah

Main contractor: Bouygues

Total electro-mechanical works

17

Completed major projects | Saudi Arabia

▪ The Equestrian Club of Jeddah - (Phase 1, 1998-2000)……………………………1,000,000$

Client: Al Muntazah

Main contractor: Bouygues

Total electro-mechanical works

Lobby

SalonEntrance to the Gentlemen Social club

18

Completed major projects | Saudi Arabia

▪ King Abdullah Mosque / Kingdom Center - 77th Floor - (2004)….………………130,000$

Client: Kingdom Holding & Investment Co.

Main contractor: Direct contract

Total electro-mechanical works

King Abdullah Mosque at Kingdom Center’s 77th Floor

19

Completed major projects | Saudi Arabia

▪National Guard First Battalion Facilities in Riyadh, Jeddah and Taif - (1986-1989)… 6,267,000$– Client : SANG– Main contractor : SANG– Total electrical works

▪ Saudi Airlines Rolls Royce RB-211 Engines, Overhaul, testing and repair facilities in Jeddah -(1983-1984)……………………………………………………………………………………..……………….……..5,000,000$– Client : Saudi Arabian Airlines – Main contractor : ROLACO– Total electro-mechanical works

▪NAJRAN Airport - (1978-1981).………………………………………………………………………………25,000,000$– Client : Presidency of Civil Aviation– Main contractor : ARCODE– Total construction works

▪GASSIM Airport - (1976-1979).…………………………………………………………….…………..……36,000,000$– Client : Presidency of Civil Aviation– Main contractor : ARCODE– Total construction works

20

Completed major projects | Saudi Arabia

▪ Saudi Airlines Catering Facilities - (1993-1995)………..........................................…..…11,520,000$– Client: Saudi Arabian Airlines – Main contractor: ARCODE-SA– Total works – General contractor

▪ SAWARY1, Helicopter simulator building - (1992-1993)……………….……………..……..…..2,934,000$– Client: RSNF– Main contractor: Thales– Total electrical works

▪Naval Forces Ship Repair Facilities (SRF) - (1991-1992) ………………….……....................4,854,000$– Client: MODA– Main contractor: SAE-Al Mabani – Bouygues– Total electrical works

▪Air Defense Dattier Project, Training Facilities - (1990-1991)……………….…..………….…4,200,000$– Client: MODA/Air Defense Forces– Main contractor: Direct contract– Total electro-mechanical works

21

Completed major projects | Saudi Arabia

▪ King Abdul Aziz Base, Uninstalled Engine Test Facility “UETF” - (2010-2011)….………4,000,000$– Client: Rolls Royce (R.R)– Main contractor: Techspace-Aero – Cenco (Belgium)– Total electro-mechanical works

▪ SAWARY2, Specialized training school - (2000-2001)……………………….…..….…..….…….6,134,000$– Client : RSNF– Main contractor : Thales– Total electro-mechanical works

▪ SAWARY1, Helicopter landing facilities - (1996-1997)………………………….……………..…..1,800,000$– Client: RSNF– Main contractor: Thales– Total electrical works

▪ IFFA Project, Ammunition testing facilities - (1994-1996)……………………………….....… 3,867,000$– Client: MODA/Armament and ammunitions– Main contractor: SNPEI-BOUYGUES– Total electrical works

▪ King Abdullah Palace Khurais Road Riyadh - (1998-1999)……………………………….....… 2,000,000$– Client: Royal Diwan– Main contractor: Saudi Oger– Total Mechanical works

22

Completed major projects | Lebanon

▪ Vision 1793 High-End Residential Bldg., Spears – (2015-2017) …….……….1,500,000$

Client: Statumen

Main contractor: NATCON

Consultant: CHA / Georges Chamoun

Mechanical Works

23

Completed major projects | Lebanon

▪ The Backyard, Restaurants – Hazmieh (2015-2016)…………………….………1,300,000$

Client: Platinum Management

Main contractor: HAT

Consultant: Naji Geha & Rabih KhairAllah

Electro-Mechanical Works

24

Completed major projects | Lebanon

▪ Spears 1858 High-End Residential Bldg., Spears – (2014-2016)….…….2,500,000$

Client: Trusthold Development Group

Main contractor: EBCO Bitar.

Consultant: ASYA / Associated Mech. Engineers

Total electro-mechanical works

▪ BCD Waterfront Infrastructure - Beirut Central District – (2015-2016)

Client: Solidere

Main contractor: ARACO

Consultant: LACECO

Total electro-mechanical works

25

Completed major projects | Lebanon

▪ Kantari Residences High-End Residential Bldg., Kantari – (2013-2015)…………………… ……………………..………………………………………………………………………………………….3,000,000$

Client: DALFA - Dalloul

Main contractor: EBCO Bitar

Consultant: Hassib Ibrahim

Electro-Mechanical Works

26

Completed major projects | Lebanon

▪ 1200 Mina El Hosn High-End Residential Bldg., Clemenceau – (2010-2014)……………. ……………………..………………………………………………………………………………………….2,000,000$

Client: Masharih Construction & Development

Main contractor: Masharih Construction & Development

Consultant: SERT

Electro-Mechanical Works

27

Completed major projects | Lebanon

▪ Intra Bank HQ, Hamra – (2012-2013)

Client: Intra Investment Company

Main contractor: Fadi Barakat

Consultant: SDT

Electrical Works

28

Completed major projects | Lebanon

▪ Oman Embassy, Beirut– (2010-2012)….………………………………………………….1,400,000$

Client: Oman Embassy

Main contractor: Mahmoud Assaad

Consultant: Khatib & Alami

Electrical Works

29

Completed major projects | Lebanon

▪ Beirut Cardiac Institute, Beirut– (2008-2010)………..……………………………….2,000,000$

Client: Al Rassoul al Aatham Hospital

Main contractor: Meamar

Consultant: ARCH

Electrical Works

30

Completed major projects | Lebanon

▪ Hatab 2612 High-End Residential Bldg., Hamra– (2006-2008)

Client: Key Stone Group

Main contractor: Key Stone Group

Consultant: Adnan Olayan

Electro-Mechanical Works

31

Completed major projects | Lebanon

▪Al Waha Gardens 5061 High-End Residential Bldg., Ramlet el Bayda– (2005-2007) ……………………..…………………………………………………………………………………………….620,000$

Client: Key Stone Group

Main contractor: Key Stone Group

Consultant: Adnan Olayan

Electro-Mechanical Works

32

Completed major projects | Lebanon

▪Lebanese Swiss Bank, Hamra HQ, Dora, Tyre, Nabatiyeh, & Haret Horeik (2005-07)

Client: Lebanese Swiss Bank

Main contractor: Hussein Jomaa

Consultant: N/A, Design & Build

Electro-Mechanical Works

33

Completed major projects | Lebanon

▪Bella Riva Suite Hotel, Raoucheh - (1998-2001)…………………………………......1,500,000$

Client: Bella Riva Group

Main contractor: Hussein Jomaa

Consultant: Wadih Chouhaiber

Electro-Mechanical Works

34

Completed major projects | Lebanon

▪Sports Café, Borj al Ghazal- (1998-2000)…………………………………………………….450,000$

Client: Paramount

Main contractor: MODEC

Consultant: Adnan Khalil Architects & Consultants

Electro-Mechanical Works

▪Arcadio Commercial & Residential Bldg. Beirut - (1997-2000)……………………750,000$

Client: Paramount

Main contractor: MODEC

Consultant: Adnan Khalil Architects & Consultants

Electro-Mechanical Works

35

Completed major projects | Lebanon

▪Verdun 732 building and mall, Verdun- (1997-2000)…………………….......… 3,200,000$

Client: AAA Group

Main contractor: IDC

Consultant: Pierre Dammous & Partners

Electro-Mechanical Works

36

Completed major projects | Lebanon

▪Verdun 730 building and mall, Verdun - (1996-1999)………....…………………3,025,000$

Client: AAA Group

Main contractor: Said Chaddad

Consultant: Pierre Dammous & Partners

Electro-Mechanical Works

37

Completed major projects | Lebanon

▪ Zkak el Blat 24, Beirut Central District- (1997-1998)……..………………..………………………….650,000$

Client: Paramount

Main Contractor: MODEC

Consultant: Adnan Khalil Architects & Consultants / Gilbert Tambourgi

Electro-Mechanical Works

▪Maarad 168, Beirut Central District - (1996-1998)………………………..………………..………….600,000$

Client: Paramount

Main Contractor: MODEC

Consultant: Adnan Khalil Architects & Consultants

Electro-Mechanical Works

38

Completed major projects | Lebanon

▪ Foch 230/231 Mandaloun, Beirut Central District- (1996-1998)……..………..……………….850,000$

Client: Paramount

Main Contractor: MODEC

Consultant: Adnan Khalil Architects & Consultant

Electro-Mechanical Works

▪ Evergreen Villas, Chemlan - (1994-1998)……………………………………………………..………….550,000$

Client: Evergreen

Main Contractor: Root Engineering Company S.A.L.

Consultant: Mahmoud Barazi

Electrical Works

▪Al Serail 1374, Beirut Central District - (1994-1995)………………………………………..………….450,000$

Client: Paramount

Main Contractor: MODEC

Consultant: Adnan Khalil Architects & Consultants

Electrical-Mechanical works

39

Completed major projects | Lebanon

▪ Concorde Galleria, Verdun - (1994-1996)…………….……………….......…………………..........1,200,000$

Client: Concord Group

Main contractor: Direct contract

Consultant: Farid Abou Fadel

Electro-Mechanical works

40

Completed major projects | Lebanon

▪Engineering, procurement, and logistics works for the following projects in Turkmenistan (2004-2013)

▪ Museum of Fine Arts (2004)

▪ Cable Car Building (2005)

▪ School of Fine Arts (2005)

▪ Ministry of Textile (2005)

▪ Palais des Glaces (2005)

▪ Ashgabat University I (2006)

▪ Military Academy (2006)

▪ National Press Offices (2006)

▪ Ashgabat University 2 (2007)

▪ Ministry of Commerce (2008)

▪ Ministry of Agriculture (2008)

▪ Ministry of Telecommunications (2009)

▪ Presidential Reception Palace (2009)

▪ Sofitel Oguzkent Luxury Hotel (2009)

▪ Halk Bank (2010)

▪ Convention Center (2010)

▪ Parliament’s Extension (2011)

▪ Radar Ground Control Station (2012-2013)

41

Completed major projects | Turkmenistan

▪ Presidential Reception Palace - (2009-2010)………....………………………...… 18,500,000$

Main contractor: Bouygues Construction

Total electrical works

42

Completed major projects | Turkmenistan

▪ Sofitel Oguzkent Luxury Hotel - (2009-2010)………....…………………..…….… 34,000,000$

Main contractor: Bouygues Construction

Total electrical works

43

Completed major projects | Turkmenistan

▪ Convention Center - (2010-2011)……….………………………….……………………. 5,800,000$

Main contractor: Bouygues Construction

Total electrical works

▪ Parliament's Extension - (2010-2011)……………………................................ 2,800,000$

Main contractor: Bouygues Construction

Total electro-mechanical works

44

Completed major projects | Turkmenistan

▪Ground Control Station- (2012-2013)………………………………………................. 135,000$

Main contractor: Thales-Alienas

Design of electro-mechanical works

▪Ministry of Telecommunication - (2009-2010)......................................... 2,100,000$

Main contractor: Bouygues Construction

Total electrical works

45

▪Ministry of Commerce - (2008)………....……………….…………………………………. 3,550,000$

Main contractor: Bouygues Construction

Total electrical works

▪ Ministry of Agriculture - (2008)…………………….........................................… 4,200,000$

Main contractor: Bouygues Construction

Total electrical works

Completed major projects | Turkmenistan

46

Completed major projects | Turkmenistan

▪Halk Bank - (2010-2011)………....……………….………………………….………………... 3,600,000$

Main contractor: Bouygues Construction

Total electrical works

▪ University Phase II - (2007)……………………………………...............................….2,600,000$

Main contractor: Bouygues Construction

Total electrical works

47

▪ Other projects

- University I (2006)...................................... 1,930,000$

Total electrical works

- Military Academy (2006)………………………....1,610,000$

Total electrical works

- National Press Offices (2006)…………………..1,246,000$

Total electrical works

Completed major projects | Turkmenistan

University I

Military AcademyNational Press Offices

48

▪ Other projects

- Palais des Glaces (2005)…………………………1,540,000$

Total electrical works

- Ministry of Textile (2005)………………………..2,270,000$

Total electrical works

- School of Fine Arts (2005)……………………...2,265,000$

Total electrical works

Ministry of Textile School of Fine Arts

Completed major projects | Turkmenistan

Palais des Glaces

49

▪ Other projects

- Cable Car (2005)………………………………………………….. 1,057,000$

Total electrical works

- Museum of Fine Arts (2004).....................................3,050,000$

Total electrical works

Completed major projects | Turkmenistan

Cable Car Museum of Fine Arts

50

Completed major projects | Africa

▪ Palacio Bata / Presidential Palace, Equatorial Guinea - (2003-2004)…….1,700,000$

Main contractor: PAC International

Total electro-mechanical works

51

Significant Installations

Generators IP Telephone System -PABX

MV/LV Transformers MEP Networks

52

Significant Installations

Chillers Plant Pump Room Plant

FM-200 SYSTEMFire Pumps

53

Significant Installations

Piping & Duct Work Data Cabling

Monitoring SystemMV Switchgear

54

• Mobile manually operated sheet metal workshop 1

• Mechanical workshop consisting of fixed machine 2

• Electrical power plant 2

• Welding Machines (200A & 400A) 8

• Threading machines 6

• Vacuum pumps 2

• Ladders 45

• Measurement instruments 4

• Thickness Testing Meter 3

• Duct leak-test machines (high/low) 8

• Oxygen & Estelline set (for cutting & welding) 3

• Clipping tools 8

• Sound Level D.B Meter 4

• Ultra-sonic flow meter 4

• Cable laying trolley 4

• Jack hammers & hoses 75

• Freon fill units 5

• Meggers, AVO meters 20

• Water unit pressure test 4

• Cable cutters 8

• Hydraulic cable crimping toll set 4

• Scaffolding 1500 m2

Plant and Equipment

55

Legal Documents

56

Legal Documents

57

Legal Documents

58

Legal Documents

59

Legal Documents

60

Legal Documents

61

Legal Documents

62

Legal Documents

63

Legal Documents

64

Legal Documents

65

Legal Documents

66

Appreciation Letters

67

Appreciation Letters

68

Appreciation Letters

69

Appreciation Letters

70

Appreciation Letters

71

Key Personnel(Name| Current Postion | Years of Experience | Graduation)

▪ Hassan M. Khalil | Managing Partner | 40+ Years | M.S. Nuclear Power Engineering- INSTN Saclay, France.

▪ Hisham M Dawalibi | Managing Partner | 40+ Years | M.S. C.S from Stanford University, USA.

▪ Talal N. Al Maghamsi | Managing Partner | 40+ Years | King Fahd University of Petroleum & Minerals, KSA.

▪ Jean Vedel | Technical Director | 40+ Years |B.S. Refrigeration Engineering from I.F.F.I , France.

▪ Ali Al Zein | Chief Operating Officer | 10+ Years |B.S Business Administration, Lebanon.

▪ Ahmed A. Aziz | Chief Financial Officer | 30+ Years | B.S Finance and Account, Egypt.

▪ M. H. A. Quraishi | Program Manager | 30+ Years | B.S. Electrical Engineering, India.

▪ Mario Brucal | Senior Electrical Engineer | 30+ Years | B.S. Electrical Engineering, Philippines.

▪ Fadi Layous | Senior Mechanical Engineer | 20+ Years | B.S. Mechanical Engineering, Syria.

▪ Jamil Kanj| Electrical Engineer| 10+ Years | B.S. Electrical Engineering, Lebanon.

▪ Abdul Azeez Kiliya | Projects Control Manager | 20+ Years | Diploma in Computer Science, India.

Al Wedad - Saudi Arabia

72

Key Personnel(Name| Current Postion | Years of Experience | Graduation)

▪ Hassan M. Khalil | Managing Partner | 40+ Years | M.S. Nuclear Power Engineering- INSTN Saclay, France.

▪ Hassan Osseily| Technical Manager | 25+ Years | PHD in Electrical Engineering, Lebanon.

▪ Sarah Khalil| Business Development | 11+ Years | M.S in Business Management from HEC, France.

▪ Abed Halabi| Business Development | 10+ Years |PMP Professional, B.E. Elect & Computer Engineering, Lebanon.

Arcode - Lebanon

▪ Hassan M. Khalil | Managing Partner| 40+ Years | M.S. Nuclear Power Engineering- INSTN Saclay, France.

▪ Hussein Youness| Regional Manager| 25+ Years | PHD in Electrical Engineering, Lebanon.

▪ Sarah Khalil| Business Development | 11+ Years | M.S in Business Management from HEC, France.

▪ Abed Halabi| Business Development | 10+ Years |PMP Professional, B.E. Elect & Computer Engineering, Lebanon.

Tyros OS – Lebanon, Turkmenistan & Cameron

73

Contacts www.alwedadsa.com

Tyros Cameroon

T. .

email: [email protected]

Tyros Lebanon

Verdun St.

Verdun 732 Bldg, 6th Floor

P.O.Box- 135434,Beirut

T. 00961 1 804997/8

email: [email protected]

Al Wedad Jeddah

Sari Street, Engg. R/A.

Al Rabwa Dist.

P.O.Box- 2385, Zip 21451

T. 00966 12 6914410

F. 00966 12 6622 515

email: [email protected]

Al Wedad Riyadh

Prince Sultan Bin A. Aziz St.

Sulaimaniya Dist.

P.O.Box- 88916, Zip 11672

T. 00966 11 288 41 55

F. 00966 11 288 39 60

email: [email protected]

Arcode - Liban

Verdun Street

Verdun 732 Bldg,6th Floor

P.O.Box- 135434,Beirut

T. 00993 12 235783 / 8

email: [email protected]

Tyros Turkmenistan

33, 1939 Street, Artchabil

Avenue, 744036, Ashgabat.

T. 00993 12 235783 / 8

email: [email protected]