0
COMPANY PROFILE
AL WEDAD
Email : [email protected]
Web: www.alwedadsa.com
Tel. +966 (12) 691 4410 / (11) 288 4155
Fax +966 (12) 662 2515 / (11) 288 3960
1
Table of Contents What we do
Introduction 2
Our mission 2
Our specialties 2
Services
Pre-Construction Services 3
Post Construction Services 3
Facilities management Services 3
Construction Services | Areas of expertise 4
Solutions
Sustainable Solutions 5
Energy Optimization Saving Solutions 5
Value engineering 5
Resources - Work force 6
Projects
On-going Projects | KSA 7
Completed major projects | KSA 11
Completed major projects | Lebanon 22
Completed major projects | Turkmenistan-Africa 41
Significant Installation 51
Plant and Equipment 54
Legal Documents 55
Appreciation letters 66
Key Personnel 71
Contacts 73
2
Introduction
Al Wedad is an electro-mechanical company with over 30 years of experience. Al Wedad and its affiliated
companies Arcode & Tyros Off-shore, operate in the Kingdom of Saudi Arabia, Lebanon, Turkmenistan & Africa with
offices in Riyadh, Jeddah, Beirut, Ashgabat & Cameroon.
What we do
High Rise Towers
Residential Towers
Office Towers
Mixed used Complexes
Industrial
Factories
Data Centers
Power Stations
Hospitality
Luxury Hotels
Catering Services
Restaurants
Government Facilities
Airport & Railroads
Ministries
Military buildings & Infrastructure
Maintenance & Testing Facilities
Specialties
Mission
Our mission is to execute demanding projects in the most efficient manner.
We also seek to form long-term relationships of value and trust with our clients and partners. We are committed to the
utilization of the best resources and latest cutting edge techniques to ensure high quality construction and
engineering solutions.
3
Pre-construction services
1. Estimation : Providing project estimation that is
timely and reliable, in addition to project
quantity surveying and BOQ production.
2. Feasibility Studies : Analyzing life cycle costs for
building system alternatives.
3. Planning : Developing a complete time
schedule.
4. Risk Management : Controlling cost, schedule
and owner objectives to mitigate any risks.
5. Quality Control : Monitoring methods,
procedures and checks from start to finish withthe goal of meeting the established standard
6. Material selection and technical submittals
7. Procurement and material management
Post construction services
1. Commissioning : Ensuring that building systems are
designed, installed and activated according to owner’s
operational needs.
2. O&M manuals : Development of operation and
maintenance instructions
3. Final close-out : Completion of snag listed items
4. Maintenance : Through providing an one-year walk-
through maintenance.
Services
Our services include the entire electro-mechanical process, from design and shop drawing to material
procurement and installation, testing and commissioning, as well as facility management and maintenance.
Facilities management services
1. Construction management & supervision
2. MEP engineering services
3. Health & safety quality
4. Inspection & auditing
5. Equipment site selection & placement
4
Construction services | Areas of expertise
HVAC
• Heating
• Ventilation
• Air-conditioning• Standard and critical environments
Electrical Power
• Medium and low voltage distribution
• Power generation
• Uninterruptible power supplies• Indoor and Outdoor lighting
Plumbing
• Residential
• Industrial
• Process
Low Current Systems
• Fire alarm and security systems
• Access control, CCTV & intrusion alarm
• Building automation & management• Public address and TV distribution
Fire Fighting
• Water sprinklers
• Active gas extinguishing systems
• Smoke control management
Telecommunications
• Structured cabling
• VOIP
• LAN/WAN design
• System integration• Active & Passive components
5
Sustainable solutions
• We are committed to building in a sustainable
and responsible manner during the design stage
followed by monitoring the environmental
impact throughout the construction process and
through the life of building
Solutions
Energy optimization saving solutions
• We have a comprehensive range of methods, tools,
techniques and technologies designed to optimize
the client’s use of energy.
• Al Wedad is highly experienced in implementing
energy audits equipment selection & placement on
existing buildings. The purpose and focal point being
long term operational cost savings and plant
optimization engineering.
Value Engineering
• Our extensive expertise allows us to offer value
engineering that is both cost effective and
energy sufficient
7
Ongoing projects | Saudi Arabia
▪Luna Project- Al-kharj - (2015-2017)………….….…………………18,000,000$
Client: MIC Corporation
Main contractor: Arabian Gulf Co.
Consultant: DORSCH International Consultants / KHATIB & ALAMI
Total electro-mechanical works
8
Ongoing projects | Saudi Arabia
▪ Wellcome Lounge in Terminal 1 @ KKIA Riyadh - (2016-)………………..2,500,000$
Client: Saudia Catering (SACC)
Main contractor: UNIDECOR.
Total electro-mechanical works
▪ Wellcome Lounge in Terminal 2 @ KKIA Riyadh - (2016-2017)…………..3,000,000$
Client: Saudia Catering (SACC)
Main contractor: UNIDECOR
Total electro-mechanical works
9
Ongoing projects | Saudi Arabia
▪Helicopter Facilities at (KFNB) –Jeddah (2015-2017) …………………..10,000,000$
Client: Royal Saudi Naval Force (RSNF)
Main contractor: Arabian Gulf Co.
Consultant: HAZIM Consulting Co. and designed by Zouheir Fayez
Total electro-mechanical works
10
Ongoing projects | Saudi Arabia
▪Fuel Farm Office & Technical Building @ KAIA Jeddah- (2015-17)……….…4,000,000$
Client: General Authority of Civil Aviation (GACA)
Main contractor: SAUDI BIN LADIN GROUP
Consultant: Dar Al Handasah
Total electro-mechanical works
11
Completed major projects | Saudi Arabia
▪Multi-Story Car Park in K.A.I.A Jeddah - (2012-13)………….….…………22,000,000$
Client: General Authority of Civil Aviation (GACA)
Main contractor: SAUDI BIN LADIN GROUP
Consultant: Dar Al Handasah
Total electro-mechanical works
12
Completed major projects | Saudi Arabia
▪MODA – Prince office and Hotel- (2012-2015)………….….…………………7,000,000$
Client: Ministry of defense
Main contractor: Saudi Constructioneers
Consultant: Zouheir Fayez
Total electro-mechanical works
13
Completed major projects | Saudi Arabia
▪ Engine Test Facility at King Abdul Aziz Air Base - (2011-2012)………….……4,000,000$
Client: Royal Saudi Air Force (RSAF)
Main contractor: British Aerospace / Rolls Royce
Building & Process contractor: Techspace Aero
Consultant: Davis Langdon
Total electro-mechanical works
14
Completed major projects | Saudi Arabia
▪ RSNF Riyadh / Support and Training Center - (2009-2010)…………………..8,000,000$
Client: Royal Saudi Naval Force (RSNF)
Main contractor: Arabian Gulf Co.
Total electro-mechanical works
▪ U.S. Consulate Jeddah / New Consulate Compound - (2009-2010).……..5,000,000$
Client: U.S. Consulate
Main contractor: First Kuwaiti Tr. & Co.
Partial electro-mechanical works
15
Completed major projects | Saudi Arabia
▪ Air Defense Head Quarters Building - (1999-2004)……….…….……………….18,600,000$
Client: MODA/Air Defense Forces
Main contractor: Direct contract
Total electro-mechanical works
Air Defense Head Quarters Building
16
Completed major projects | Saudi Arabia
▪ The Equestrian Club of Jeddah / Park Hyatt - (Phase 2, 2006-2008)…….14,670,000$
Client: Al Muntazah
Main contractor: Bouygues
Total electro-mechanical works
17
Completed major projects | Saudi Arabia
▪ The Equestrian Club of Jeddah - (Phase 1, 1998-2000)……………………………1,000,000$
Client: Al Muntazah
Main contractor: Bouygues
Total electro-mechanical works
Lobby
SalonEntrance to the Gentlemen Social club
18
Completed major projects | Saudi Arabia
▪ King Abdullah Mosque / Kingdom Center - 77th Floor - (2004)….………………130,000$
Client: Kingdom Holding & Investment Co.
Main contractor: Direct contract
Total electro-mechanical works
King Abdullah Mosque at Kingdom Center’s 77th Floor
19
Completed major projects | Saudi Arabia
▪National Guard First Battalion Facilities in Riyadh, Jeddah and Taif - (1986-1989)… 6,267,000$– Client : SANG– Main contractor : SANG– Total electrical works
▪ Saudi Airlines Rolls Royce RB-211 Engines, Overhaul, testing and repair facilities in Jeddah -(1983-1984)……………………………………………………………………………………..……………….……..5,000,000$– Client : Saudi Arabian Airlines – Main contractor : ROLACO– Total electro-mechanical works
▪NAJRAN Airport - (1978-1981).………………………………………………………………………………25,000,000$– Client : Presidency of Civil Aviation– Main contractor : ARCODE– Total construction works
▪GASSIM Airport - (1976-1979).…………………………………………………………….…………..……36,000,000$– Client : Presidency of Civil Aviation– Main contractor : ARCODE– Total construction works
20
Completed major projects | Saudi Arabia
▪ Saudi Airlines Catering Facilities - (1993-1995)………..........................................…..…11,520,000$– Client: Saudi Arabian Airlines – Main contractor: ARCODE-SA– Total works – General contractor
▪ SAWARY1, Helicopter simulator building - (1992-1993)……………….……………..……..…..2,934,000$– Client: RSNF– Main contractor: Thales– Total electrical works
▪Naval Forces Ship Repair Facilities (SRF) - (1991-1992) ………………….……....................4,854,000$– Client: MODA– Main contractor: SAE-Al Mabani – Bouygues– Total electrical works
▪Air Defense Dattier Project, Training Facilities - (1990-1991)……………….…..………….…4,200,000$– Client: MODA/Air Defense Forces– Main contractor: Direct contract– Total electro-mechanical works
21
Completed major projects | Saudi Arabia
▪ King Abdul Aziz Base, Uninstalled Engine Test Facility “UETF” - (2010-2011)….………4,000,000$– Client: Rolls Royce (R.R)– Main contractor: Techspace-Aero – Cenco (Belgium)– Total electro-mechanical works
▪ SAWARY2, Specialized training school - (2000-2001)……………………….…..….…..….…….6,134,000$– Client : RSNF– Main contractor : Thales– Total electro-mechanical works
▪ SAWARY1, Helicopter landing facilities - (1996-1997)………………………….……………..…..1,800,000$– Client: RSNF– Main contractor: Thales– Total electrical works
▪ IFFA Project, Ammunition testing facilities - (1994-1996)……………………………….....… 3,867,000$– Client: MODA/Armament and ammunitions– Main contractor: SNPEI-BOUYGUES– Total electrical works
▪ King Abdullah Palace Khurais Road Riyadh - (1998-1999)……………………………….....… 2,000,000$– Client: Royal Diwan– Main contractor: Saudi Oger– Total Mechanical works
22
Completed major projects | Lebanon
▪ Vision 1793 High-End Residential Bldg., Spears – (2015-2017) …….……….1,500,000$
Client: Statumen
Main contractor: NATCON
Consultant: CHA / Georges Chamoun
Mechanical Works
23
Completed major projects | Lebanon
▪ The Backyard, Restaurants – Hazmieh (2015-2016)…………………….………1,300,000$
Client: Platinum Management
Main contractor: HAT
Consultant: Naji Geha & Rabih KhairAllah
Electro-Mechanical Works
24
Completed major projects | Lebanon
▪ Spears 1858 High-End Residential Bldg., Spears – (2014-2016)….…….2,500,000$
Client: Trusthold Development Group
Main contractor: EBCO Bitar.
Consultant: ASYA / Associated Mech. Engineers
Total electro-mechanical works
▪ BCD Waterfront Infrastructure - Beirut Central District – (2015-2016)
Client: Solidere
Main contractor: ARACO
Consultant: LACECO
Total electro-mechanical works
25
Completed major projects | Lebanon
▪ Kantari Residences High-End Residential Bldg., Kantari – (2013-2015)…………………… ……………………..………………………………………………………………………………………….3,000,000$
Client: DALFA - Dalloul
Main contractor: EBCO Bitar
Consultant: Hassib Ibrahim
Electro-Mechanical Works
26
Completed major projects | Lebanon
▪ 1200 Mina El Hosn High-End Residential Bldg., Clemenceau – (2010-2014)……………. ……………………..………………………………………………………………………………………….2,000,000$
Client: Masharih Construction & Development
Main contractor: Masharih Construction & Development
Consultant: SERT
Electro-Mechanical Works
27
Completed major projects | Lebanon
▪ Intra Bank HQ, Hamra – (2012-2013)
Client: Intra Investment Company
Main contractor: Fadi Barakat
Consultant: SDT
Electrical Works
28
Completed major projects | Lebanon
▪ Oman Embassy, Beirut– (2010-2012)….………………………………………………….1,400,000$
Client: Oman Embassy
Main contractor: Mahmoud Assaad
Consultant: Khatib & Alami
Electrical Works
29
Completed major projects | Lebanon
▪ Beirut Cardiac Institute, Beirut– (2008-2010)………..……………………………….2,000,000$
Client: Al Rassoul al Aatham Hospital
Main contractor: Meamar
Consultant: ARCH
Electrical Works
30
Completed major projects | Lebanon
▪ Hatab 2612 High-End Residential Bldg., Hamra– (2006-2008)
Client: Key Stone Group
Main contractor: Key Stone Group
Consultant: Adnan Olayan
Electro-Mechanical Works
31
Completed major projects | Lebanon
▪Al Waha Gardens 5061 High-End Residential Bldg., Ramlet el Bayda– (2005-2007) ……………………..…………………………………………………………………………………………….620,000$
Client: Key Stone Group
Main contractor: Key Stone Group
Consultant: Adnan Olayan
Electro-Mechanical Works
32
Completed major projects | Lebanon
▪Lebanese Swiss Bank, Hamra HQ, Dora, Tyre, Nabatiyeh, & Haret Horeik (2005-07)
Client: Lebanese Swiss Bank
Main contractor: Hussein Jomaa
Consultant: N/A, Design & Build
Electro-Mechanical Works
33
Completed major projects | Lebanon
▪Bella Riva Suite Hotel, Raoucheh - (1998-2001)…………………………………......1,500,000$
Client: Bella Riva Group
Main contractor: Hussein Jomaa
Consultant: Wadih Chouhaiber
Electro-Mechanical Works
34
Completed major projects | Lebanon
▪Sports Café, Borj al Ghazal- (1998-2000)…………………………………………………….450,000$
Client: Paramount
Main contractor: MODEC
Consultant: Adnan Khalil Architects & Consultants
Electro-Mechanical Works
▪Arcadio Commercial & Residential Bldg. Beirut - (1997-2000)……………………750,000$
Client: Paramount
Main contractor: MODEC
Consultant: Adnan Khalil Architects & Consultants
Electro-Mechanical Works
35
Completed major projects | Lebanon
▪Verdun 732 building and mall, Verdun- (1997-2000)…………………….......… 3,200,000$
Client: AAA Group
Main contractor: IDC
Consultant: Pierre Dammous & Partners
Electro-Mechanical Works
36
Completed major projects | Lebanon
▪Verdun 730 building and mall, Verdun - (1996-1999)………....…………………3,025,000$
Client: AAA Group
Main contractor: Said Chaddad
Consultant: Pierre Dammous & Partners
Electro-Mechanical Works
37
Completed major projects | Lebanon
▪ Zkak el Blat 24, Beirut Central District- (1997-1998)……..………………..………………………….650,000$
Client: Paramount
Main Contractor: MODEC
Consultant: Adnan Khalil Architects & Consultants / Gilbert Tambourgi
Electro-Mechanical Works
▪Maarad 168, Beirut Central District - (1996-1998)………………………..………………..………….600,000$
Client: Paramount
Main Contractor: MODEC
Consultant: Adnan Khalil Architects & Consultants
Electro-Mechanical Works
38
Completed major projects | Lebanon
▪ Foch 230/231 Mandaloun, Beirut Central District- (1996-1998)……..………..……………….850,000$
Client: Paramount
Main Contractor: MODEC
Consultant: Adnan Khalil Architects & Consultant
Electro-Mechanical Works
▪ Evergreen Villas, Chemlan - (1994-1998)……………………………………………………..………….550,000$
Client: Evergreen
Main Contractor: Root Engineering Company S.A.L.
Consultant: Mahmoud Barazi
Electrical Works
▪Al Serail 1374, Beirut Central District - (1994-1995)………………………………………..………….450,000$
Client: Paramount
Main Contractor: MODEC
Consultant: Adnan Khalil Architects & Consultants
Electrical-Mechanical works
39
Completed major projects | Lebanon
▪ Concorde Galleria, Verdun - (1994-1996)…………….……………….......…………………..........1,200,000$
Client: Concord Group
Main contractor: Direct contract
Consultant: Farid Abou Fadel
Electro-Mechanical works
40
Completed major projects | Lebanon
▪Engineering, procurement, and logistics works for the following projects in Turkmenistan (2004-2013)
▪ Museum of Fine Arts (2004)
▪ Cable Car Building (2005)
▪ School of Fine Arts (2005)
▪ Ministry of Textile (2005)
▪ Palais des Glaces (2005)
▪ Ashgabat University I (2006)
▪ Military Academy (2006)
▪ National Press Offices (2006)
▪ Ashgabat University 2 (2007)
▪ Ministry of Commerce (2008)
▪ Ministry of Agriculture (2008)
▪ Ministry of Telecommunications (2009)
▪ Presidential Reception Palace (2009)
▪ Sofitel Oguzkent Luxury Hotel (2009)
▪ Halk Bank (2010)
▪ Convention Center (2010)
▪ Parliament’s Extension (2011)
▪ Radar Ground Control Station (2012-2013)
41
Completed major projects | Turkmenistan
▪ Presidential Reception Palace - (2009-2010)………....………………………...… 18,500,000$
Main contractor: Bouygues Construction
Total electrical works
42
Completed major projects | Turkmenistan
▪ Sofitel Oguzkent Luxury Hotel - (2009-2010)………....…………………..…….… 34,000,000$
Main contractor: Bouygues Construction
Total electrical works
43
Completed major projects | Turkmenistan
▪ Convention Center - (2010-2011)……….………………………….……………………. 5,800,000$
Main contractor: Bouygues Construction
Total electrical works
▪ Parliament's Extension - (2010-2011)……………………................................ 2,800,000$
Main contractor: Bouygues Construction
Total electro-mechanical works
44
Completed major projects | Turkmenistan
▪Ground Control Station- (2012-2013)………………………………………................. 135,000$
Main contractor: Thales-Alienas
Design of electro-mechanical works
▪Ministry of Telecommunication - (2009-2010)......................................... 2,100,000$
Main contractor: Bouygues Construction
Total electrical works
45
▪Ministry of Commerce - (2008)………....……………….…………………………………. 3,550,000$
Main contractor: Bouygues Construction
Total electrical works
▪ Ministry of Agriculture - (2008)…………………….........................................… 4,200,000$
Main contractor: Bouygues Construction
Total electrical works
Completed major projects | Turkmenistan
46
Completed major projects | Turkmenistan
▪Halk Bank - (2010-2011)………....……………….………………………….………………... 3,600,000$
Main contractor: Bouygues Construction
Total electrical works
▪ University Phase II - (2007)……………………………………...............................….2,600,000$
Main contractor: Bouygues Construction
Total electrical works
47
▪ Other projects
- University I (2006)...................................... 1,930,000$
Total electrical works
- Military Academy (2006)………………………....1,610,000$
Total electrical works
- National Press Offices (2006)…………………..1,246,000$
Total electrical works
Completed major projects | Turkmenistan
University I
Military AcademyNational Press Offices
48
▪ Other projects
- Palais des Glaces (2005)…………………………1,540,000$
Total electrical works
- Ministry of Textile (2005)………………………..2,270,000$
Total electrical works
- School of Fine Arts (2005)……………………...2,265,000$
Total electrical works
Ministry of Textile School of Fine Arts
Completed major projects | Turkmenistan
Palais des Glaces
49
▪ Other projects
- Cable Car (2005)………………………………………………….. 1,057,000$
Total electrical works
- Museum of Fine Arts (2004).....................................3,050,000$
Total electrical works
Completed major projects | Turkmenistan
Cable Car Museum of Fine Arts
50
Completed major projects | Africa
▪ Palacio Bata / Presidential Palace, Equatorial Guinea - (2003-2004)…….1,700,000$
Main contractor: PAC International
Total electro-mechanical works
54
• Mobile manually operated sheet metal workshop 1
• Mechanical workshop consisting of fixed machine 2
• Electrical power plant 2
• Welding Machines (200A & 400A) 8
• Threading machines 6
• Vacuum pumps 2
• Ladders 45
• Measurement instruments 4
• Thickness Testing Meter 3
• Duct leak-test machines (high/low) 8
• Oxygen & Estelline set (for cutting & welding) 3
• Clipping tools 8
• Sound Level D.B Meter 4
• Ultra-sonic flow meter 4
• Cable laying trolley 4
• Jack hammers & hoses 75
• Freon fill units 5
• Meggers, AVO meters 20
• Water unit pressure test 4
• Cable cutters 8
• Hydraulic cable crimping toll set 4
• Scaffolding 1500 m2
Plant and Equipment
71
Key Personnel(Name| Current Postion | Years of Experience | Graduation)
▪ Hassan M. Khalil | Managing Partner | 40+ Years | M.S. Nuclear Power Engineering- INSTN Saclay, France.
▪ Hisham M Dawalibi | Managing Partner | 40+ Years | M.S. C.S from Stanford University, USA.
▪ Talal N. Al Maghamsi | Managing Partner | 40+ Years | King Fahd University of Petroleum & Minerals, KSA.
▪ Jean Vedel | Technical Director | 40+ Years |B.S. Refrigeration Engineering from I.F.F.I , France.
▪ Ali Al Zein | Chief Operating Officer | 10+ Years |B.S Business Administration, Lebanon.
▪ Ahmed A. Aziz | Chief Financial Officer | 30+ Years | B.S Finance and Account, Egypt.
▪ M. H. A. Quraishi | Program Manager | 30+ Years | B.S. Electrical Engineering, India.
▪ Mario Brucal | Senior Electrical Engineer | 30+ Years | B.S. Electrical Engineering, Philippines.
▪ Fadi Layous | Senior Mechanical Engineer | 20+ Years | B.S. Mechanical Engineering, Syria.
▪ Jamil Kanj| Electrical Engineer| 10+ Years | B.S. Electrical Engineering, Lebanon.
▪ Abdul Azeez Kiliya | Projects Control Manager | 20+ Years | Diploma in Computer Science, India.
Al Wedad - Saudi Arabia
72
Key Personnel(Name| Current Postion | Years of Experience | Graduation)
▪ Hassan M. Khalil | Managing Partner | 40+ Years | M.S. Nuclear Power Engineering- INSTN Saclay, France.
▪ Hassan Osseily| Technical Manager | 25+ Years | PHD in Electrical Engineering, Lebanon.
▪ Sarah Khalil| Business Development | 11+ Years | M.S in Business Management from HEC, France.
▪ Abed Halabi| Business Development | 10+ Years |PMP Professional, B.E. Elect & Computer Engineering, Lebanon.
Arcode - Lebanon
▪ Hassan M. Khalil | Managing Partner| 40+ Years | M.S. Nuclear Power Engineering- INSTN Saclay, France.
▪ Hussein Youness| Regional Manager| 25+ Years | PHD in Electrical Engineering, Lebanon.
▪ Sarah Khalil| Business Development | 11+ Years | M.S in Business Management from HEC, France.
▪ Abed Halabi| Business Development | 10+ Years |PMP Professional, B.E. Elect & Computer Engineering, Lebanon.
Tyros OS – Lebanon, Turkmenistan & Cameron
73
Contacts www.alwedadsa.com
Tyros Cameroon
T. .
email: [email protected]
Tyros Lebanon
Verdun St.
Verdun 732 Bldg, 6th Floor
P.O.Box- 135434,Beirut
T. 00961 1 804997/8
email: [email protected]
Al Wedad Jeddah
Sari Street, Engg. R/A.
Al Rabwa Dist.
P.O.Box- 2385, Zip 21451
T. 00966 12 6914410
F. 00966 12 6622 515
email: [email protected]
Al Wedad Riyadh
Prince Sultan Bin A. Aziz St.
Sulaimaniya Dist.
P.O.Box- 88916, Zip 11672
T. 00966 11 288 41 55
F. 00966 11 288 39 60
email: [email protected]
Arcode - Liban
Verdun Street
Verdun 732 Bldg,6th Floor
P.O.Box- 135434,Beirut
T. 00993 12 235783 / 8
email: [email protected]
Tyros Turkmenistan
33, 1939 Street, Artchabil
Avenue, 744036, Ashgabat.
T. 00993 12 235783 / 8
email: [email protected]