Sr. EPC Contractor/Clients. Project Name Project Scope Contract or/ Fabricat or Project Country Year 178 ERC Refinery project E&I Package for the tie-in works HCC EGYPT 2017 177 Al Burullus Power Plant 4800 M.W Electro-Mechanical Construction for Balance of Plant (BOP) HCC EGYPT 2016 176 Al Burullus Power Plant 4800 M.W Electro-Mechanical Construction for 1 Steam Turbine (STG) HCC EGYPT 2016 175 Al Burullus Power Plant 4800 M.W Electro-Mechanical Construction for 2 HRSG HCC EGYPT 2016 174 Al Burullus Power Plant 4800 M.W Electro-Mechanical Construction for 2 Gas Turbines (CTG) HCC EGYPT 2016 173 El Nasr Company for Fertilizers and Chemical. Mechanical & Installation works HCC EGYPT 2016 172 Al-Shabab & West Damietta Power Project IBDT Al-Shabab & West Damietta HCC EGYPT 2016 171 ERC Refinery project SMP Package for Tie-in Work HCC EGYPT 2016 170 El Nasr Company for Fertilizers and Chemical. Mechanical Rehabilitation Activities HCC EGYPT 2016 169 Al-Shabab & West Damietta Power Project Piping Fabrication Al-Shabab & West damietta HCC EGYPT 2016 168 Al-Shabab Power Project Converting Existing Simple Cycle to Combined Cycle Supply,Fabrication and Erection of Fire Water Tank HCC EGYPT 2016 167 ERC Refinery project Civil Package of Tie - in Works. HCC Egypt 2016 166 SIDPEC Petrochemicals Plant Supply & Fabrication of heat exchanger. HCC Egypt 2016 Al Hashemiah International Contracting Company Reference list

Al Hashemiah International Contracting Company …al-hashemiah.com/files/Ref-list-rev-09.pdf · Damietta Power Project Piping Fabrication Al-Shabab & ... Cycle to Combined Cycle Supply,Fabrication

  • Upload
    hathien

  • View
    213

  • Download
    0

Embed Size (px)

Citation preview

Sr. EPC Contractor/Clients. Project Name Project Scope

Contract

or/

Fabricat

or

Project

CountryYear

178 ERC Refinery project E&I Package for the tie-in works HCC EGYPT 2017

177Al Burullus Power Plant

4800 M.W

Electro-Mechanical Construction

for Balance of Plant (BOP)HCC EGYPT 2016

176Al Burullus Power Plant

4800 M.W

Electro-Mechanical Construction

for 1 Steam Turbine (STG)HCC EGYPT 2016

175Al Burullus Power Plant

4800 M.W

Electro-Mechanical Construction

for 2 HRSGHCC EGYPT 2016

174Al Burullus Power Plant

4800 M.W

Electro-Mechanical Construction

for 2 Gas Turbines (CTG)HCC EGYPT 2016

173El Nasr Company for

Fertilizers and Chemical.Mechanical & Installation works HCC EGYPT 2016

172Al-Shabab & West

Damietta Power Project IBDT Al-Shabab & West Damietta HCC EGYPT 2016

171 ERC Refinery project SMP Package for Tie-in Work HCC EGYPT 2016

170El Nasr Company for

Fertilizers and Chemical.

Mechanical Rehabilitation

ActivitiesHCC EGYPT 2016

169Al-Shabab & West

Damietta Power Project

Piping Fabrication Al-Shabab &

West damiettaHCC EGYPT 2016

168

Al-Shabab Power Project

Converting Existing Simple

Cycle to Combined Cycle

Supply,Fabrication and Erection

of Fire Water TankHCC EGYPT 2016

167 ERC Refinery project Civil Package of Tie - in Works. HCC Egypt 2016

166SIDPEC Petrochemicals

Plant

Supply & Fabrication of heat

exchanger.HCC Egypt 2016

Al Hashemiah International Contracting Company

Reference list

Sr. EPC Contractor/Clients. Project Name Project Scope

Contract

or/

Fabricat

or

Project

CountryYear

Al Hashemiah International Contracting Company

Reference list

165West Damietta Combined

Cycle Power Plant

6 Deaerator supply,Fabrication

and exporting.HCC Egypt 2015

164The Egyptian Methanex

Methanol Company S.A.E.

Heat Exchangers Maintenance &

RepairHCC Egypt 2015

163 Mirfa Power Plant3 Blowdown Tank

supply,Fabrication and exporting.HCC U.A.E 2015

162

Assil & Karam

Development Project -

BAPETCO

Pressure Vessel fabrication HCC Egypt 2015

161 Assuit Oil Refinery Plant. Boiler Economizer fabrication HCC Egypt 2015

160 ERC Refinery project Piping Fabrication HCC Egypt 2015

159

Midele Delta Electricity

Production Company

(Nubaria Power Plant )

Maintenance & Repair for 2 Boiler HCC Egypt 2015

158SIDPEC Petrochemicals

Plant

6 Heat Exchanger Supply and

FabricationHCC Egypt. 2015

157 Mirfa Power Plant3 Deaerator supply,Fabrication

and exporting.HCC U.A.E 2015

156 Mirfa Power Plant3 HRSGs Piping Fabrication and

exporting.HCC U.A.E 2015

155

Bort Said Power Plant

Menia Power Plant

Assuit Power Plant

Beni Swef Power Plant

( fast track project)

24 Tank Supply & fabricationHCC Egypt. 2015

154Ataqa Power Plant

(fast track project)

4 Gas Turbine Electro-Mechanical

Installation 170 M.WHCC Egypt. 2015

153Ataqa Power Plant

(fast track project)BOP Mechanical Installation HCC Egypt. 2015

Sr. EPC Contractor/Clients. Project Name Project Scope

Contract

or/

Fabricat

or

Project

CountryYear

Al Hashemiah International Contracting Company

Reference list

152 Midelec Power PlantMechanical Works for Gas

Turbine 1,2 Outage HCC Egypt. 2015

151SIDPEC Petrochemicals

Plant

3 Heat Exchanger Supply and

FabricationHCC Egypt. 2015

150 Damitta Power Plant Chemical Cleaning for Boiler 1 & 2 HCC Egypt 2015

149Sidi Krir Power Plant 750

MW

Mainteance & Repair for Boiler

No.1,2HCC Egypt 2014

148

Middle Delta Electricity

Production Company

(Talkha Power Plant)

Mainteance & Repair for Boiler

No.1HCC Egypt 2014

147

Industrial & Mining Projects

Authority ( Safaga mining

port )

supply and erection the

Telescopic with dust control

system

HCC Egypt 2014

146 Damitta Power Plant Rehabilitation for Boiler 1 & 2 HCC Egypt 2014

145

Midele Delta Electricity

Production Company

(Nubaria Power Plant )

Rehabilitation for gas turbine HCC Egypt 2014

144

Cairo Electricity Production

Company

(Shobra Power Plant )

Rehabilitation for Boiler No.03 HCC Egypt 2014

143Brothers Group beverage

plant

Supply , fabrication and erection

for 7 Tanks.HCC Egypt 2014

142Delta Co. For Fertilizers &

Chemical Industries

Rehabilitation for Primary

Reformer include furnace, Burner

and reaction tube x-36.

HCC Egypt 2014

141Delta Co. For Fertilizers &

Chemical IndustriesRehabilitation for Boilers HCC Egypt 2014

140Delta Co. For Fertilizers &

Chemical Industries

Catalyst loading (nickel Oxide

Methantor , Cooper Oxide low

temp shiest reactor , Iron Oxide

High temp shiest reactor and

nickel Oxide secondary reformer )

HCC Egypt. 2014

Sr. EPC Contractor/Clients. Project Name Project Scope

Contract

or/

Fabricat

or

Project

CountryYear

Al Hashemiah International Contracting Company

Reference list

139Suez Thermal Power Plant

650 M.WBoiler External piping fabrication. HCC Egypt 2014

138

Suiz Steel Company

Direct Reduction

Plant(DRP)

Supply and fabrication for belt

convoyers , PGH Steam Super

heater bundle and Venturi body

for dusting.

HCC Egypt 2014

137

Suiz Steel Company

Direct Reduction

Plant(DRP)

erection , commissioning and

start-up activities for Direct

Reduction Plant DRP(Reactor ,

PG Heater ,Co2 plant , water

treatment plant ,…etc.)

HCC Egypt 2013

136

Banha Power Plant 750

M.W (CP106) Steam

Turbine

Installation for Steam turbine ,

Generators,Condensers include

all auxiliary components ,piping

,steel,..etc.

HCC Egypt 2013

135Suez Thermal Power Plant

650 M.WSupply & fabrication of tanks HCC Egypt 2013

134Suez Thermal Power Plant

650 M.WPressure parts fabrication

DSD/

HCCEgypt 2013

133SIDPEC Petrochemicals

Plant

Heat Exchanger Supply and

FabricationHCC Egypt. 2013

132 Midelec Power Plant2 GAS TURBINES Mechanical &

Installation Work.HCC Egypt. 2013

131Talkha Power Plant 750

MWRehabilitation for Boiler 1 & 2 HCC Egypt 2013

130

Banha Power Plant 750

M.W (CP118) BOP

Package

BOP package installation HCC Egypt 2013

129

Banha Power Plant 750

M.W (CP118) BOP

Package

BOP Steel Structure fabrication HCC Egypt 2013

128

Banha Power Plant 750

M.W (CP118) BOP

Package

BOP Piping fabrication HCC Egypt 2013

127Banha Power Plant 750

M.W (CP105) HRSG

2 HRSG Chemical Cleaning,

Steam Blowing and pre-

commisioning.

HCC Egypt 2013

Sr. EPC Contractor/Clients. Project Name Project Scope

Contract

or/

Fabricat

or

Project

CountryYear

Al Hashemiah International Contracting Company

Reference list

126Banha Power Plant 750

M.W (CP105) HRSG 2 HRSG Installation HCC Egypt 2013

125Banha Power Plant 750

M.W (CP105) HRSG

Pressure parts supply and

fabricationHCC Egypt 2013

124Egyption & Indian

petrochemical plant

Piping fabrication and Installation

for the plant HCC Egypt 2013

123The Nile Ritz-Carlton,

Cairo

3 Sand fillter supply and

fabricationHCC Egypt 2013

122

Banha Power Plant 750

M.W (CP111) Water

Treatment plant

23 Pressure Vessel Supply ,

fabrication and erectionHCC Egypt 2013

121

Giza North Power Plant

2250 M.W (CP111) Water

Treatment plant

23 Pressure Vessel Supply ,

fabrication and erectionHCC Egypt 2013

120

(ANRPC)

Alexandria National

Refining & Petrochemicals

Co.

Suppy , Fabrication and erection

of Boiler EconomizerHCC Egypt 2012

119

El Nasr company for

intermediate chemicals for

Al fayoum fertilizers plant

Hopper and 2 Tanks supply and

fabrication and erectionHCC Egypt 2012

118Touggourt Desalination

Plant

5 Pressure Vessels Suppy ,

Fabrication and exportingHCC Algeria 2012

117Denszli 750MW Combied

cycle Power Plant.

Service on site for the pressure

parts installaionHCC TURKEY 2012

116 Suez Steel Company

Rehabilitation for 2 boilers and 2

pressure vessels (Stripper &

Absorber)

HCC Egypt 2012

115Delta Co. For Fertilizers &

Chemical IndustriesRehabilitation for E127 Unit HCC Egypt. 2012

114 Borg Al Arab AirportSupply , Fabriation and Insallation

for the Airport new extensionHCC Egypt. 2012

Sr. EPC Contractor/Clients. Project Name Project Scope

Contract

or/

Fabricat

or

Project

CountryYear

Al Hashemiah International Contracting Company

Reference list

113Talkha Power Plant 750

MWPressure Parts Modifications. HCC Egypt. 2012

112 Abo Qir Oil Rigs

Tanks, Pressure Vessel , Piping

& Steel Structure Fabrication and

Erection

HCC Egypt. 2012

111West Damietta Simple

Cycle Power Plant

Fabrication and Installation of the

treatment plantHCC Egypt. 2012

110 Mostroud plantFabrication and Installation of the

mechanical equipmentHCC Egypt. 2012

109SIDPEC Petrochemicals

Plant

Heat Exchanger Supply and

FabricationHCC Egypt. 2012

108 Midelec Power Plant2 GAS TURBINES Mechanical &

Installation Work.HCC Egypt. 2012

107 Attamya Plant tank and Piping fabrication HCC Egypt. 2012

106Gemsa Petroleum Co.

(TOM)Marine Plant Condenser Retubing HCC Egypt. 2012

105 Damanhour Power Plant Retubing pipes for 2 cooler HCC Egypt 2012

104Cairo Electricity Production

CompanyHaprs Rehabilitation for Unit 4 HCC Egypt 2012

103

Suiz Steel Company

Direct Reduction

Plant(DRP)

Material Handling Modification HCC Egypt 2012

102El Nasr Company for

Fertilizers and Chemical.Super Heater Fabrication HCC Egypt 2012

101El Nasr Company for

Fertilizers and Chemical.

Change under ground 24" pipe

for 15 kmHCC Egypt 2012

Sr. EPC Contractor/Clients. Project Name Project Scope

Contract

or/

Fabricat

or

Project

CountryYear

Al Hashemiah International Contracting Company

Reference list

100

Suiz Steel Company

Direct Reduction

Plant(DRP)

General service and repair

activites for spiral welded pipes in

DRP Area

HCC Egypt 2012

99El Nasr Company for

Fertilizers and Chemical.

Rehabilitation of Ammonia Plant

(Startup heater,Primery reformer,

Secondery reformer,Convention

system)

HCC Egypt 2012

98

Suiz Steel Company

Direct Reduction

Plant(DRP)

WEAR RESISTANT LINING FOR

EXHAUSTED PROCESS GAS HCC Egypt 2012

97El Nasr Company for

Fertilizers and Chemical.

Rehabilitation of the Ammonia

ConverterHCC Egypt 2012

96El Segundo 750 MW

Combied cycle Power Plant.

2 HRSGs Fabrication and

ExportingHCC U.S.A 2012

95Egyption Iron and steel

Company

Heat Exchangers for lubricating

cellers Supply & FabricationHCC Egypt 2012

94Egyption Liquefied Natural

Gas Co.Mechanical Maintenance HCC Egypt 2011

93 Boilers Factory Phase II .Steel Structure Engineering,

Supply, Fabrication & Installation.HCC Egypt 2011

92Cairo Electricity Production

CompanyRetubing for Unit A Condenser HCC Egypt 2011

91El Nasr Company for

Fertilizers and Chemical.

Boiler installation and piping

installationHCC Egypt 2011

90 Daber Ltd Co.

Steel structure installation in New

GF Manufacturing Plant of Dabur

Egypt LTD Supply , Fabrication

and Installation

HCC Egypt 2011

89Abu Qir Power Plant Super

Heater

Supply and fabrication of

superheat low temperature

elements and new hanging

system design

HCC Egypt 2011

88 IETOS Co.4 pressure vessel fabrication and

InstallationHCC Egypt 2011

Sr. EPC Contractor/Clients. Project Name Project Scope

Contract

or/

Fabricat

or

Project

CountryYear

Al Hashemiah International Contracting Company

Reference list

87ALNASR Co. for

Intermediate Chemicals.

S.S Piping Fabrication Services

and transportation to site .HCC Egypt. 2011

86 Abu Zaabal Fertilzers Plant

Tanks, Gas ducts, Fired Boilers,

Piping Systems

Removing, Suppling, Fabrication,

Installation, Precommisioinig.

HCC Egypt. 2011

85International Company

Chemical Plant in Gamasa.

"Methanol & Chemicals" Tanks,

Fire Firghting System, Cooling

System

Engineering, Fabrication and

Installation.

HCC Egypt. 2011

84 ALNASR COKE Co.Boiler Economizer Supply,

Fabrication and Installation.HCC Egypt. 2010

83Kuraimat 1500 MW

Combined Cycle.

Cooler Repair and all tubes

changing.HCC Egypt. 2010

82Hemewg 750 MW Combied

cycle Power Plant.

2 HRSGs Fabrication and

ExportingHCC HOLLAND 2010

81Sidi Krir Power Plant 750

MWAlloy Piping System Installation. HCC Egypt. 2010

80 Aswan Fertilzers Plant

Belt conveyors

Supply, Fabrication, INstallation

and Pre-commisioning.

HCC Egypt. 2010

79 Etaka Power Plant 900 MW.Etaka Fired Boiler Coils

Installation.HCC Egypt. 2010

78Denszli 750MW Combied

cycle Power Plant.

2 HRSGs Fabrication and

ExportingHCC TURKEY. 2010

77 MAKRO CASH & CARRYFire fighting system fabrication

and installation.HCC Egypt. 2010

76Bachaquero 750 MW

Combied cycle Power Plant.

2 HRSGs Fabrication and

Exporting HCC Venezuela 2010

75

Mansoura for Resins &

Chemical Industries

Co. SAE

New Cemical Plant fabrication

and Installation.HCC Egypt. 2010

Sr. EPC Contractor/Clients. Project Name Project Scope

Contract

or/

Fabricat

or

Project

CountryYear

Al Hashemiah International Contracting Company

Reference list

74TAMARA 750 MW

Combied cycle Power Plant.

2 HRSGs Fabrication and

Exporting HCC Venezuela 2010

73Kuraimat Solar Power Plant

140 MWAlloy Tubes Fabication HCC Egypt. 2010

72Sidi Krir Power station 750

MW Combied cycle project

Piping Installation adding to Start

up and operation and reliabilty

test in progress and health safety

enviromental in work site test

HCC Egypt. 2010

71Eencogen Power Plant 750

MW.

2 HRSGs Fabrication and

Exporting HCC HOLLAND 2010

70 Ezz Flat Steel Factory Steel Structure Fabrication.NSF/HC

CEgypt. 2010

69 El-Atf Power Plant 750 MW2 HRSGs Chemical Cleaning

Systems.HCC Egypt. 2010

68 SIDI KRIR Power Plant

750 MW

2 HRSGs Chemical Cleaning

Systems.HCC Egypt. 2010

67 Sinoma Cement Factory Steel Structure Fabrication.NSF/HC

CEgypt. 2010

66 Midelec Power Plant2 GAS TURBINES Mechanical &

Installation Work.HCC Egypt. 2010

65 Saint-Gobain Glass Factory. Steel Structure Fabrication and

Installation

NSF/HC

CEgypt. 2010

64 Boilers Factory .Electrical System Engineering

and installation.HCC Egypt. 2010

63 Boilers Factory .Steel Structure Engineering,

Supply, Fabrication & Installation.HCC Egypt. 2010

62

Magnum 750 MW

Combined Cycle Power

Plant.

2 HRSGs Fabrication and

ExportingHCC HOLLAND 2009

Sr. EPC Contractor/Clients. Project Name Project Scope

Contract

or/

Fabricat

or

Project

CountryYear

Al Hashemiah International Contracting Company

Reference list

61Kuraimat Solar Power Plant

140 MWSteel Fabrication.

NSF/HC

CEgypt. 2009

60 Saint-Gobain Glass Factory.

Piping System, Furnace, Fire

Fighting, Equipments, Steel

Structure Fabrication and

Installation

HCC Egypt. 2009

59Kurimat 1500 MW Power

Plant III Site services for BOP. HCC Egypt. 2009

58Kurimat 1500 MW Power

Plant III

2 HRSGs Fabrication and

Installation, Chemical cleaning,

Blowing, Pre-Commissioning

Support.

HCC Egypt. 2009

57Kurimat 1500 MW Power

Plant III

Electrical & Instrumentation Site

Work.HCC Egypt. 2009

56Cairo West Power Station

1300 MW.

Piping, Vessels and Tanks

Installation.HCC Egypt. 2009

55Kurimat 1500 MW Power

Plant II Pressure Parts Modifications. HCC Egypt. 2009

54 EL-Hesn Co. Boiler Maintainance. HCC Egypt. 2009

53Eltebien Power Station 700

MW.

Piping, Vessels and Tanks

Installation.HCC Egypt. 2009

52 Alameria Petroluem Co. Boilers, Heat exchangers Repairs. HCC Egypt. 2009

51 Gemsa Petroleum Co.Marine Plant Condenser

Replacment.HCC Egypt. 2009

50Kuraimat Solar Power Plant

140 MWInstallation Activities HCC Egypt. 2009

49 Abu Qir Power Plant

Boiler Coils Fabrication

(Superheat Low tempreture

elements)

HCC Egypt. 2009

Sr. EPC Contractor/Clients. Project Name Project Scope

Contract

or/

Fabricat

or

Project

CountryYear

Al Hashemiah International Contracting Company

Reference list

48Cairo West 660 MW Power

Plant

Fired Boiler Coils and Water wall

Fabrication.

NSF/HC

CEgypt. 2009

47Nubaria 1500 MW Power

Plant 2 HRSGs Harps Fabrication

NSF/HC

CEgypt. 2009

46 Gemsa Petroleum Co. Heat Exchangers MaintenanceNSF/HC

CEgypt. 2009

45 Midelec Power Plant2 GAS TURBINES Mechanical &

Installation Work.HCC Egypt. 2009

44 Alatf Power Plant 750 MW 2 HRSGs Fabrication. HCC Egypt. 2009

43Talkha Power Plant 750

MWPressure Parts Modifications. HCC Egypt. 2009

42 Midelec Power Plant2 GAS TURBINES Mechanical &

Installation Work.HCC Egypt. 2008

41Sidi Krir Power Plant 750

MWPiping Fabrication for 2 HRSGs HCC Egypt. 2008

40SIDPEC Petrochemicals

PlantSuper Ceritical Piping Installation. HCC Egypt. 2008

39 Besos 750 MW Power Plant2 HRSGs Fabrication and

exporting.HCC Spain 2008

38 Khalda Oil Co. PlantS.S Piping System Fabrication

and Installation.HCC Egypt. 2008

37

Kerewalapitya 300 MW

Combined Cycle Power

Plant

2 HRSGs & BOP Fabrication and

exporting.HCC Sirilanka 2008

36Darling Downs 1500 MW

Power Plant

3 HRSGs Fabrication and

exporting.HCC Austeralia 2008

Sr. EPC Contractor/Clients. Project Name Project Scope

Contract

or/

Fabricat

or

Project

CountryYear

Al Hashemiah International Contracting Company

Reference list

35Massaied Power Plant -

2250 MW

6 HRSGs Fabrication and

exporting.HCC Qatar 2008

34

Egyptian Linear Alkyl

Benzene Project 100000

MT/year.

Piping Systems Supplying,

Fabrication and Installation.HCC Egypt. 2008

33 Midelec Power Plant2 GAS TURBINES Mechanical &

Insulation Work.HCC Egypt. 2007

32Luxor Water Treatment

Plant. Piping , Equipments Installation HCC Egypt. 2007

31 Assuit Oil Refinery Plant.Boiler Fabrication,Super

Heater,Reheater.HCC Egypt. 2007

30Kuraimat Power 1500 MW

Combined Cycle II & III.

Water Treatment Plant

Fabrication & Installation.HCC Egypt. 2007

29Kuraimat Power 1500 MW

Combined Cycle II Condenser Fabrication

IBSF/

HCCEgypt. 2006

28CAIRO North Power 1500

MW Combined Cycle II

2 HRSGs & BOP Piping

Installation Hydrotest, Chemical

Cleaning, Steam Blowing and

pre-commisioning.

IBSF/

HCCEgypt. 2006

27 Beni Swief Cement Project.SteelStructure and Handrails

Fabrication.

IBSF/H

CCEgypt. 2006

26Water Treatment Project in

MatrohPiping System Installation. HCC Egypt. 2006

25CAIRO North Power 1500

MW Combined Cycle II

2 HRSGs & BOP Piping

Fabrication .

IBSF/

HCCEgypt. 2006

24CAIRO North Power 1500

MW Combined Cycle II

Electrical & Instrumentation Site

Work.HCC Egypt. 2006

23 General Motors Factory.Piping system Fabrication &

InstallationHCC Egypt. 2006

Sr. EPC Contractor/Clients. Project Name Project Scope

Contract

or/

Fabricat

or

Project

CountryYear

Al Hashemiah International Contracting Company

Reference list

22CAIRO North Power 1500

MW Combined Cycle II

2 HRSGs Harps and Drums

Fabrication.

IBSF/

HCCEgypt. 2006

21CAIRO North Power 1500

MW Combined Cycle II

2 HRSGs Steel Structure, Stack

Fabrication.

IBSF/

HCCEgypt. 2006

20CAIRO North Power 1500

MW Combined Cycle II Condenser Fabrication.

IBSF/

HCCEgypt. 2006

19 Oil Fired Power Plant.Boiler Casing, Steel Structure,

Coils and water wall Fabrication

IBSF/

HCC LYBIA 2006

18 Combined Cycle 750 MW

Powr Plant.Stack Fabrication and Exporting.

IBSF/

HCCGreece 2006

17 Asuit Petrolum Co. Boilers Ducts Fabrication.IBSF/

HCCEgypt. 2006

16 Oil Plant Project.Oil Plant Piping System

Fabrication and Installation.HCC Egypt. 2005

15Nubaria Power Plant 1500

MW Combined Cycle.

Water Treatment Plant

Installation.HCC Egypt. 2005

14 Asuit Petrolum Co. Boiler 2 Long type Economizer

Fabrication.

IBSF/

HCCEgypt. 2005

13Amonia/ Urea Fertilizers

Project Suez II .Ceritical Piping PWHT.

OCI/HC

CEgypt. 2005

12 SYRIA ( MAGHASEL ). Boiler Economizer Fabriation. HCC Egypt. 2005

11 EASTERN CO. BOILERS Maintenance. HCC Egypt. 2005

10 Agiba Petroleum project Duplex & S.S Piping Fabrication. HCC Egypt. 2005

Sr. EPC Contractor/Clients. Project Name Project Scope

Contract

or/

Fabricat

or

Project

CountryYear

Al Hashemiah International Contracting Company

Reference list

9 Midelec Power Plant2 GAS TURBINES Mechanical &

Insulation Work.HCC Egypt. 2006

8 Alamyria Petroleum project

PIPING SYSTEMS

FABRICATION , Boiler Super

Heater.

IBSF/

HCCEgypt. 2005

7 Midelec Power Plant2 GAS TURBINES Mechanical &

Insulation Work.HCC Egypt. 2005

6Nubaria Combined Cycle

Power Plant 1500 MW

Water Treatment Plant

Fabrication.HCC Egypt. 2004

5 Abou Zaabal Fertilizers Tanks Fabrication & Installation. HCC Egypt. 2004

4 Mahmodia Power Plant Inspecting & Supplying C.S piping

System & Steel Structure.HCC Egypt. 2004

3 Alamyria Petroleum project. Boiler Economizer Fabrication. IBSF/

HCCEgypt. 2004

2Spanish Egyption Gas

LNG Plant. Piping Site Installation Activities. HCC Egypt. 2003

1Spanish Egyption Gas LNG

Plant.

Inspecting & supplying piping

system high pressure valves.HCC Egypt. 2003