  • 7/28/2019 Akshay Patil Tap

    1/9

    Garment type: formal shirt

    Fabric type : 100% cotton

    Fabric colour: blue,white,black

    Total order quantity: 8400

    Sizes : S,M,L,XL

    Size ratio : 1:2:3:1

    S M L XL

    1200 2400 3600 1200

    Color Blue White Black

    Ratio 1 2 1

    Size S M L XL

    consumption 1.75 1.8 1.9 2

    Color/size S M L XL Total

    Blue 300 600 900 300 2100

    White 600 1200 1800 600 4200

    Black 300 600 900 300 2100

    Maximum lay height: 100plies

    No of marker modes: 4 way

    End allowance = 4 cm = 0.04 m

    Max Lay length= 8m

  • 7/28/2019 Akshay Patil Tap

    2/9

    Fabric saving for multisize marker is 5%

    Cost of fabric= 70 rupees/meters

    Marker preparation time(hours)=0.8/lays

    Spreading time/ply(min)=0.85

    Cutting time/garment=10 minute

    Labour cost= 30 rupees/hour

    1. Calculate cut order plan clockwise

    2. Total labour cost

    3. Total fabric required

    4. Total fabric cost

    Solution:

  • 7/28/2019 Akshay Patil Tap

    3/9

    Sizes S M L XL

    Sizes ratio 1 2 3 1

    Garment /size 1200 2400 3600 1200

    Color/size S M L XL Total

    Blue 300 600 900 300 2100

    White 600 1200 1800 600 4200

    Black 300 600 900 300 2100

    For Blue shirts: 2100,4 way marker,100 plies

    Min no of lays = Total order quantity/ (max lay ht*no of modes)

    = 2100/100*4

    = 5.25

    = 6

    Cut order planning:

    S M L XL 100

  • 7/28/2019 Akshay Patil Tap

    4/9

    S M L XL 100

    S M L XL 100

    M M L L 75

    M M L L 75

    L L L L 75

    For above cut order 6 lay and 3 markers are used

    Fabric consumption in meter for Blue:

    For lay 1(1 to 3)= 3*100(1.75+1.8+1.9+2+0.04)

    = 2247*(95/100)

    = 2134.65 meters

    For lay 2(4 and 5)= 2*75(1.8+1.8+1.9+1.9+0.04)

    = 1116*(95/100)

    = 1060.2 meters

    For lay 3(6) =75(1.9+1.9+1.9+1.9+0.04)

    = 573 meters

    Total Blue consumed= 2134.65+1050.2+573

    = 3767.85 meters

    Cost of fabric = 3767.85*70

    = 263749 Rs

    For White shirts: 4200,4 way marker,100 plies

    Min no of lays = Total order quantity/ (max lay ht*no of modes)

  • 7/28/2019 Akshay Patil Tap

    5/9

    = 4200/100*4

    = 11

    Cut order planning:

    S M L XL 100

    S M L XL 100

    S M L XL 100

    S M L XL 100

    S M L XL 100

    S M L XL 100M L L L 100

    M L L L 100

    M L L L 100

    M M L L 75

    M M L L 75

    For above cut order 11 lay and 3 markers are used

    Fabric consumption in meter for White:

    For lay 1(1 to 6)= 6*100(1.75+1.8+1.9+2+0.04)

    = 4494*(95/100)

    = 4269.3 meters

    For lay 2(7 to 9)= 3*100(1.8+1.9+1.9+1.9+0.04)

    = 2262*(95/100)

  • 7/28/2019 Akshay Patil Tap

    6/9

    = 2148.9 meters

    For lay 3(10 and 11) =2*75(1.8+1.8+1.9+1.9+0.04)

    = 1116*(95/100)

    =1060.2 meters

    Total White consumed= 4269.3+2148.9+1060.2

    = 7478.4 meters

    Cost of fabric = 7478.4*70

    = 523488 Rs

    For Black shirts: 2100,4 way marker,100 plies

    Min no of lays = Total order quantity/ (max lay ht*no of modes)

    = 2100/100*4

    = 5.25

    = 6

    Cut order planning:

    S M L XL 100

    S M L XL 100

  • 7/28/2019 Akshay Patil Tap

    7/9

    S M L XL 100

    M M L L 75

    M M L L 75

    L L L L 75

    For above cut order 6 lay and 3 markers are used

    Fabric consumption in meter for Black:

    For lay 1(1 to 3)= 3*100(1.75+1.8+1.9+2+0.04)

    = 2247*(95/100)

    = 2134.65 meters

    For lay 2(4 and 5)= 2*75(1.8+1.8+1.9+1.9+0.04)

    = 1116*(95/100)

    = 1060.2 meters

    For lay 3(6) =75(1.9+1.9+1.9+1.9+0.04)

    = 573 meters

    Total Black consumed= 2134.65+1050.2+573

    = 3767.85 meters

    Cost of fabric = 3767.85*70

    = 263749 Rs

    Total meter =3767.85+7478.4+3767.85

    = 15014.1 meter

  • 7/28/2019 Akshay Patil Tap

    8/9

    Cost of fabric =15014.1*70

    = 10,50,987 rupees

    Marker preparation time in hours= 0.8/lay

    60 min*0.8=48 minute required for preparation of 1 marker

    Total markers used= 4 marker

    48*4=192 minutes

    3hour 12 minutes

    Spreading time/ply(min)=0.85

    60 sec*0.85=51 sec

    2100*51=107100 sec

    29 hour 45 minute

    Cutting time/garment=10 minutes

    92 gmt*10=1840 minute

    15 hour 20 minute

    Total time=3hour 12 minutes+29 hour 45 minute+15 hour 20 minute

    =48 hours 17 min

    = 1445.1 rupees (labour cost)

  • 7/28/2019 Akshay Patil Tap

    9/9

    NATIONAL INSTITUTE OF FASHJON TECHNOLOGY,

    BANGALORE

    TECHNOLOGY OF APPAREL PRODUCTION

    END TERM JURY ASSIGNMENT

    ON

    CUT ORDE PLANNING

    SUBMITTED BY

    AKSHAY PATIL

    M.F.tech 1st-sem