AIXM 5.1 implementation experience

Dr. Vadim Tumarkin

Head of AIS

Jabir Joumshoudov

General manager

Page 2: AIXM 5.1 implementation experience Dr. Vadim Tumarkin Head of AIS Jabir Joumshoudov General manager

To refer to the AIXM continious evolution To give a reference to the AIXM tenets that support

transition from AIS to AIM To provide an information related to LGS-R.I.S.K.

Company approach to support AIM To focus on Data Management presented in AIXM To demonstrate LGS-R.I.S.K. Company AIXM

implementation experience

The presentation purpose

2AIXM 5.1 Seminar

Page 3: AIXM 5.1 implementation experience Dr. Vadim Tumarkin Head of AIS Jabir Joumshoudov General manager

An exhaustive temporality model, including support for the temporary information contained in NOTAM

Alignment with ISO standards for geospatial information, including the use of the Geography Markup Language (GML)

Support for the latest ICAO and user requirements for aeronautical data including obstacles, terminal procedures and airport mapping databases

Modularity and extensibility to support current and future aeronautical information messaging requirements and additional data attributing requirements

The major tenets of AIXM 5.1

3AIXM 5.1 Seminar

Page 4: AIXM 5.1 implementation experience Dr. Vadim Tumarkin Head of AIS Jabir Joumshoudov General manager

One of the mechanisms for ensuring data quality throughout the Aeronautical Data Process is using of the standardized formats for data presentation and exchange (AICM/AIXM)

This is explained by the fact that once "properly organized" data continue to be suitable for use in the future in various aeronautical applications

During today's presentation will be demonstrated the AIXM4.5 /5.1 benefits for AIS/AIM process automation and data quality monitoring

AICM/AIXM as a driver towards AIM

4AIXM 5.1 Seminar

Page 5: AIXM 5.1 implementation experience Dr. Vadim Tumarkin Head of AIS Jabir Joumshoudov General manager

MS Word AIP Production + MicroStation Charts Production EAD pAIP/eAIP production with SDO connection GIS Chart production AIXM 4.5 Chart Production based on EAD Snapshot

received CHAIN based on GIS/AIXM covers

Flight Procedure Design Procedure Coding Chart Generation (CHAIN)

LGS-R.I.S.K. Company AIS Evolution

5AIXM 5.1 Seminar

Page 6: AIXM 5.1 implementation experience Dr. Vadim Tumarkin Head of AIS Jabir Joumshoudov General manager

• Procedure Design Data ChainData Chain means Survey/Origination + Preparation + Design + End-use/Application

• Aeronautical Information Data Chain Annex 15 AMDT 36 new provisionQuality management should be applicable to the whole Aeronautical Information Data Chain from data origination to distribution to the next intended user, taking into consideration the intended use of data.

• Aeronautical Cartography Data ChainAnnex 4 AMDT 56 There is no relevant information

Remark related to Data Chain

6AIXM 5.1 Seminar

Page 7: AIXM 5.1 implementation experience Dr. Vadim Tumarkin Head of AIS Jabir Joumshoudov General manager

When the completed IFP is published, it should be forwarded to the commercial database suppliers so they may enter the IFP into a database for airborne applications.

ANNEX 4. Chapter 11. Instrument Approach Chart - ICAO

11.10.9 Aeronautical database requirementsAppropriate data to support navigation database coding shall be published in accordance with the Procedures for Air Navigation Services — Aircraft Operations (PANS-OPS, Doc 8168), Volume II, Part III, Section 5, Chapter 2, 2.3, for RNAV procedures and Volume II, Part I, Section 4, Chapter 9, 9.4.1.3, for non-RNAV procedures, on the verso of the chart or as a separate, properly referenced sheet

Note.— Appropriate data are those provided by the procedures specialist (or by FPD automated system like PANDA used at LGS)

Measures to support automated flight

7AIXM 5.1 Seminar

Page 8: AIXM 5.1 implementation experience Dr. Vadim Tumarkin Head of AIS Jabir Joumshoudov General manager

The aviation industry applies a “Path and Terminator Concept” for transforming arrival, departure, and approach procedures into coded flight paths

. That can be interpreted

and used by a computer-based navigation system

Standards for Aeronautical Information

8AIXM 5.1 Seminar

RTCA DO-201A

Page 9: AIXM 5.1 implementation experience Dr. Vadim Tumarkin Head of AIS Jabir Joumshoudov General manager

PANDA System and coded flight paths

9AIXM 5.1 Seminar

PANDA system automatically produces ARINC 424 Procedure description to facilitate the coding of procedure into navigation databases

That transforms designed nominal track into ARINC 424 Paths and Terminators

FPD/ARINC gradients and speeds may differ

Page 10: AIXM 5.1 implementation experience Dr. Vadim Tumarkin Head of AIS Jabir Joumshoudov General manager

Aeronautical chart production has a complicated nature, because the chart is like a mirror which reflects the flight or ground movement procedure to ensure safe and efficient aircraft operations.

For this reason, the attention of developer of LGS AIM systems was drawn to the need to combine the FPD and Chart production functionality.

We divided our DEMO into 3 sub-sections.The first refers to FDP, second to Data management and finally will be demonstrate the prototype of the intelligent Cartography system ACCENT Plus developed by R.I.S.K. Company

FPD/Chart Production complex solution

10AIXM 5.1 Seminar

Page 11: AIXM 5.1 implementation experience Dr. Vadim Tumarkin Head of AIS Jabir Joumshoudov General manager

Real connection to AIXM 5.1 DB AIXM 5.1 Data Managment

AIXM Data origination Data Delivery Data Input Data Storing Data Visualizasion

AIXM 5.1 Implementation Practice Automated Flight Procedure Design Procedure Coding Aeronaitical Chart Productiion

Demo scenario

11AIXM 5.1 Seminar

Page 12: AIXM 5.1 implementation experience Dr. Vadim Tumarkin Head of AIS Jabir Joumshoudov General manager

Connection to AIXM DB “Show mode” activation AIXM 5.1 Real Data access Features attributes analysis Features associations analysis Flight Transition analysis FIX creation, Facility used Holding

Demo activities

12AIXM 5.1 Seminar

Page 13: AIXM 5.1 implementation experience Dr. Vadim Tumarkin Head of AIS Jabir Joumshoudov General manager

ACCENT Plus activation Chart Design Document Tool Demo Chart Generation Tool Demo Live ICAO IAC generation proceess Demo Additional focus on Profile Chart View Chart Editorial works

Real Chart Generation

13AIXM 5.1 Seminar

Page 14: AIXM 5.1 implementation experience Dr. Vadim Tumarkin Head of AIS Jabir Joumshoudov General manager

Real AIXM 5.1 benefits

14AIXM 5.1 Seminar

Page 15: AIXM 5.1 implementation experience Dr. Vadim Tumarkin Head of AIS Jabir Joumshoudov General manager

Thank you for attention

15AIXM 5.1 Seminar

Vadim Tumarkin

Head of AIS

Phone: +371 67 300 661

Mobile: +371 29 442 210

[email protected]

https://ais.lgs.lv

www.lgs.lv

Jabir Joumshoudov

R.I.S.K. Company general manager

Mobile: +994502101659

[email protected]

www.risk.com