MASTER PLAN PROCESS

Investigation Solutions Implementation

ImplementationPreparation Development

MASTERPLAN

Project Advisory Committee

BUSINESSPLAN

Inventory

Forecasts

Facility Requirements

Brief Planning Team

Update SWOT Analysis

Draft, Review & Finalize Plan

Obtain Plan Approval

Alternatives Analysis

Environmental Review

Identification of Preferred Alternatives

Financial Planning

Capital Improvement Plan (CIP)

Final Master Plan Document

Airport Layout Plan (ALP)

Develop Mission, Vision, Values

Establish & Prioritize Goals

Develop & Prioritize Objectives

Formulate Action Plans & Budget

GARFIELD COUNTYREGIONAL AIRPORT

FORECASTS

6,500

7,500

8,500

9,500

10,500

11,500

12,500

13,500

14,500

15,500

2013 2018 2023 2033

Op

era

tions

Preferred

FAA RIL TAF

0

10

20

30

40

50

60

70

80

90

100

2008 2013 2018 2023 2033

Op

era

tions

BASED AIRCRAFT FORECASTTOTAL OPERATIONS FORECAST

FAA RIL TAF

Preferred

FAA TAF

Total Operations

7,371

11,131

70

8,366

12,822

76

9,564

14,469

86Total Based Aircraft

2013 2023 2033

CAGR* 1.33%CAGR 1%

CAGR 1.67%

CAGR 1.31%

*CAGR: Compound Annual Growth Rate

GARFIELD COUNTYREGIONAL AIRPORT

FACILITY REQUIREMENTS

Airside

Landside

GeneralAviation

FacilityFunction Identified Need Identified Improvement

Runway Length

Runway Shoulders & Blast Pads

Taxiway System

Additional runway length

RDC D-III design standards are not met

TDG-3 taxiway design standards are not met

Examine runway extension alternatives

Add 20-foot runway shoulders

Add shoulders to taxiway, taxilanes, and aprons serving TDG-3 aircraft

Landside Requirements Auto parking is constrained during peak periods

Parking lot expansion & roadway improvement (other agencies)

General Aviation Apron

Transient Apron

Aircraft Hangar Storage

Shortfall of appoximately 4,560 SY by 2033

Shortfall of approximately 8,179 SY by 2033

16 additional based aircraft will need storage accommodations by 2033

Apron expansion (demand driven)

Apron expansion (demand driven)

Expand aircraft hangar storage capacity (demand driven)

GARFIELD COUNTYREGIONAL AIRPORT

RUNWAY LENGTH

5,886

6,043

6,218

6,620

6,637

6,777

6,881

6,934

6,951

7,000

7,286

7,945

8,357

8,453

8,837

8,898

8,907

9,396

9,483

9,640

9,657

9,815

9,832

9,937

10,024

10,059

10,181

10,181

10,618

10,618

10,775

10,984

11,656

11,665

12,119

12,800

0 2,000 4,000 6,000 8,000 10,000 12,000 14,000

CESSNA 550 CITATION IICESSNA 525 CITATION (CJ-1)

CESSNA 560 CITATION V ULTRALEAR 31

CESSNA 525A CITATIONJET II (CJ-2)SABRELINER 60

CESSNA 560 CITATION ENCORECESSNA 560 CITATION EXCEL

CESSNA 550 CITATION BRAVORIL RUNWAY 8/26BEECH 390 PREMIER

BEECH 400ALEAR 45

SABRELINER 75a/80FALCON 900

FALCON 50CANADAIR CL-300 CHALLENGER

LEAR 35/36GULFSTREAM G350

CESSNA 750 CITATION XCESSNA 650 CITATION III/VI

FALCON 2000HAWKER 125-1000

LEAR 55LEAR 60

HAWKER 125-800GULFSTREAM G450

SABRELINER 65CANADAIR CL-604 CHALLENGER

CANADAIR CL-601-3A/3R CHALLENGERBOEING BBJ

GULFSTREAM G550CANADAIR CL-800 CHALLENGER

CANADAIR BD-700 GLOBAL EXPRESSAIRBUS ACJ

BOEING BBJ2

Runway Length (feet)

Existing RIL Runway Length

7,500ALTERNATIVE 1 - 500FT EXTENSION Length with Runway Extension

Legend

Future Critical Aircraft

Based or Frequently Operate at RIL

GARFIELD COUNTYREGIONAL AIRPORT

RUNWAY EXTENSION

SOUTHEAST HANGAR DEVELOPMENTSOOOOOOOOOOOOOOOUTUTUTUUTUTUTUTU HEHEHEHEHEHEHEHEEAAASASASASASASSA T TT T TTTTTTT TTT T TTTTT T TTTTTT HAHAHAHAHAHAHAHAHAH NGNGNGNGNGNGNGNGNGNNGARARARARARARARRARARR DDDDDDDDDEVEVEVEVEVEVVEVVVVEELELELEELEEEEEEEEEEEEEE OPOPOPOPOPOPOOOPOPOPOPOPOPOOOOPOOOPPOOPOPOPOPOPPPMEMMEMMMMMMEMMENTNTNTNTNNNNNNNNNNNNNNNNNTNNN

Safety

Operational

Compatible Land Use

Environmental

Feasibility

Financial$16.2 million*

*Half of this cost is related to earthwork for fill, grading, and retaining wall structure

Evaluation Criteria Alternative 1

Equal level of safety for the intended aircraft

Requires an acquisition of approximately nine acres of avigation easements for the RPZ.

The project feasibility depends upon funding available if the FAA approves the justification of the runway extension.

Accommodates 100% of airplanes weighing less than 12,500 pounds on a hot day (91° Fahrenheit)

Accommodates 98% of large airplanes weighing 12,500 pounds up to 60,000 pounds at 60% useful load on a hot day (91° Fahrenheit)

On a cool day (roughly 54° Fahrenheit), accommodates approximately 100% of the large aircraft fleet weighing 60,000 pounds or less at 60% useful load

Requires Environmental Assessment (EA)Disruption to the existing surface trafficPotential impacts to Mamm Creek and wetlandsPotential impacts to the threatened and endangered species that may occur in Mamm CreekPotential impacts to land undisturbed by the runway realignment

GARFIELD COUNTYREGIONAL AIRPORT

GENERAL AVIATION & TRANSIENT APRON EXPANSION

GA APRON ALTERNATIVE 1 GA APRON ALTERNATIVE 2

GA APRON DEVELOPMENT

TRANSIENT APRON DEVELOPMENT

TRANSIENT APRON ALTERNATIVESafety

Operational

Total New T-Hangars 4

Total Small Aircraft Tiedowns 30

Additional Apron (SY) 32,600

3

52

36,000

Compatible Land Use

Environmental

Feasibility

Financial $5.0 Million $5.1 Million

Evaluation Criteria Alternative 1 Alternative 2

Equal level of safety for the intended aircraft

Will not alter on or off-airport land use

No significant environmental impacts anticipated.Appropriate level of environmental review is required.

If approved by the FAA, funding for apron development must be available. T-hangar construction is dependent upon 3rd party developers.

Safety

Operational 19,000 square yards of apron for aircraft parking

Compatible Land Use

Environmental

Feasibility

Financial $2.2 Million

Evaluation Criteria Alternative

Equal level of safety for the intended aircraft

Will not alter on or off-airport land use

No significant environmental impacts anticipated.Appropriate level of environmental review is required.

If approved by the FAA, funding for apron development must be available. T-hangar construction is dependent upon 3rd party developers.

GARFIELD COUNTYREGIONAL AIRPORT

SOUTHEAST HANGAR DEVELOPMENT

ALTERNATIVE 1 ALTERNATIVE 2

SOUTHEAST HANGAR DEVELOPMENT

ALTERNATIVE 3

Safety

Operational

100’ x 100’ Hangars 8

125’ x 150’ Hangars 1

150’ x 150’ Hangars 1

12

0

0

10

0

1

Compatible Land Use

Environmental

Feasibility

Financial (Cost of asphalt pavement, not including utilities) $3.3 Million $4.4 Million

Evaluation Criteria Alternative 1 Alternative 2 Alternative 3

Equal level of safety for the intended aircraft

No significant environmental impacts anticipated. Appropriate level of environmental review is required.

Will not alter on or off-airport land use Potential to change the existing land use Potential to change the existing land use

Access road construction and land acquisitions depend upon approval and funding availability by Garfield County.Hangar development is demand-driven by 3rd party developers.

$4.9 Million

GARFIELD COUNTYREGIONAL AIRPORT

AIRPORT PARKING AND ROADWAY

ALTERNATIVE 1 ALTERNATIVE 2

AIRPORT PARKING AND ROADWAY

ALTERNATIVE 3

Safety

OperationalTotal Parking Spaces 200*

Improved Circulation No

277

Yes

292*

Yes

Compatible Land Use

Environmental

Feasibility

Financial (Cost of asphalt pavement, not including utilities) $1.2 Million $2.2 Million

Evaluation Criteria Alternative 1 Alternative 2 Alternative 3

Equal level of safety for the intended aircraft

No significant environmental impacts anticipated. Appropriate level of environmental review is required.

Will not alter on or off-airport land use Will not alter on or off-airport land use Potential to change the existing land use

Access road construction and parking lot development depend upon approval and funding availability by Garfield County.

$2.2 Million

Modification of road may change existing surface traffic patterns

Potential impacts to undisturbed land

Potential impacts to Dry Creek

*Includes reserved parking for FBO terminal building.

GARFIELD COUNTYREGIONAL AIRPORT

BUSINESS PLAN

GARFIELD COUNTYREGIONAL AIRPORT

ELEMENTS OF AN AIRPORT STRATEGIC BUSINESS PLAN

Executive Summary Summarizes the airport business plan

Introduction Sets the stage for the airport business plan

Mission Statement Conveys the reason for an airport's existence or purpose

Vision Statement Articulates the aspirations for an airport; it is a picture of success

Values Statement Describes the beliefs held throughout an organization

Budgets Forecasts the financial position or performance of the airport

Goals States a desired result, outcome, or level of attainment that needs to be reached to realize the mission and vision for the airport

Objectives Identifies a significant step towards achieving a goal or a means to an end

Action Plans Answers the key questions of who is going to do what, when, where, why, and how in order to accomplish a specific objective

Appendix Provides additional or supplemental information, data, and documentation

A v i a t i o nM a n a g e m e n tC o n s u l t i n gG r o u p

GARFIELD COUNTYREGIONAL AIRPORT

I. MISSION STATEMENT

Definition of an Airport Mission Statement An airport mission statement conveys the reason for the airport’s existence and may identify the core competencies of the airport as well.Proposed Mission Statement for the Garfield County Regional AirportTo operate, manage and develop a safe, secure, and efficient general aviation airport that is essential for the Garfield County community and visitors to the Colorado Rocky Mountain Region by:

providing exceptional airside and landside infrastructure and amenities;consistently delivering high quality aviation products, services, and facilities;encouraging compatible development on and nearby the airport;sustaining a positive economic impact in the community; andfacilitating emergency services and response.

II. VISION STATEMENT

Definition of an Airport Vision Statement An airport vision statement articulates the aspirations for the airport; it is a picture of success.Proposed Vision Statement for the Garfield County Regional AirportTo be the preferred general aviation airport in the Colorado Rocky Mountain Region, while striving to be as financially self-sufficient as possible.

GARFIELD COUNTYREGIONAL AIRPORT

AIRPORT STRATEGIC BUSINESS PLAN PROJECT PHASES

Preparation Phase

Educate airport management and staff

Obtain buy-in from policy makers

Determine approach

Form planning team

Brief planning team

Draft, review, and finalize the plan

Obtain policy maker approval of the plan

Execute the plan

Check progress and make adjustments

Report results

Update, review, and finalize updated plan

Obtain approval of updated plan

Execute the updated plan

Development Phase Implementation Phase

GARFIELD COUNTYREGIONAL AIRPORT

SWOT ANALYSIS

Strengths Weaknesses

Opportunities Threats

Nominal County bureaucracy

Board of County Commission support

Management’s and staff’s experience and knowledge

Runways’ and taxiways’ length, width, and weight bearing capacity

Apron size and weight bearing capacity

Airfield equipment (snow removal, mowing, ARFF)

24 hour operating hours

FBO products and services

Airport administrative offices

Aircraft storage capabilities

Landside signage, lighting, and markings

Passenger and crew products, services, and facilities

Lack of restaurant

Types and minimums for approaches

Rentable office space for based customers and SASOs

Terminal building age, condition, and layout

Competitive airports

Elevation

General aviation industry trends

Aviation industry regulations

Economy

Proximity to destination resorts

State aviation system plan

Proximity to other airports

Community support for airport

Economic development support for airport

Local educational institutions

Proximity to tourist attractions

GARFIELD COUNTYREGIONAL AIRPORT

NEXT STEPS

GARFIELD COUNTYREGIONAL AIRPORT

NEXT STEPS

Establish & Prioritize Goals

Develop & Prioritize Objectives

Formulate Action Plans & Budgets

Approval of Finalized Plan

Master Plan Business Plan

Environmental Coordination

Financial Implementation

Airport Layout Plan Development

Final Master Plan Approval

GARFIELD COUNTYREGIONAL AIRPORT

PROJECT SCHEDULE

PAC kickoff meeting- Inventory

- Forecast

Brief Planning Team

- FAA Forecast Review - Finalize Working Paper #1

SWOT Analysis Team Survey

- FAA Forecast Approval - Begin Facility Requirements

Update SWOT Analysis

- PAC meeting #2 - Finalize Facility Requirements - Begin Alternatives Analysis

Develop Mission, Vision, and Values

Statements

December 2012

Master Plan

Business Plan

Master Plan

Business Plan

January/February 2013 March/April 2013 May-September 2013

- Finalize Alternatives- PAC Meeting #3

- Public Open House #1

Establish and Prioritize Goals

Develop and Prioritize Objectives

- Environmental Coordination- Financial Implementation

- Public Open House #2

Formulate Action Plans and Budgets

- Develop AirportLayout Plan

- Finalize CIP

Draft, Review, and Finalize the Plan

- Final Master Plan Document

Obtain Approval of the Plan

September/October 2013 November/December 2013 December-May 2014 June 2014