GARFIELD COUNTYREGIONAL AIRPORT
MASTER PLAN PROCESS
Investigation Solutions Implementation
ImplementationPreparation Development
MASTERPLAN
Project Advisory Committee
BUSINESSPLAN
Inventory
Forecasts
Facility Requirements
Brief Planning Team
Update SWOT Analysis
Draft, Review & Finalize Plan
Obtain Plan Approval
Alternatives Analysis
Environmental Review
Identification of Preferred Alternatives
Financial Planning
Capital Improvement Plan (CIP)
Final Master Plan Document
Airport Layout Plan (ALP)
Develop Mission, Vision, Values
Establish & Prioritize Goals
Develop & Prioritize Objectives
Formulate Action Plans & Budget
GARFIELD COUNTYREGIONAL AIRPORT
FORECASTS
6,500
7,500
8,500
9,500
10,500
11,500
12,500
13,500
14,500
15,500
2013 2018 2023 2033
Op
era
tions
Preferred
FAA RIL TAF
0
10
20
30
40
50
60
70
80
90
100
2008 2013 2018 2023 2033
Op
era
tions
BASED AIRCRAFT FORECASTTOTAL OPERATIONS FORECAST
FAA RIL TAF
Preferred
FAA TAF
Total Operations
7,371
11,131
70
8,366
12,822
76
9,564
14,469
86Total Based Aircraft
2013 2023 2033
CAGR* 1.33%CAGR 1%
CAGR 1.67%
CAGR 1.31%
*CAGR: Compound Annual Growth Rate
GARFIELD COUNTYREGIONAL AIRPORT
FACILITY REQUIREMENTS
Airside
Landside
GeneralAviation
FacilityFunction Identified Need Identified Improvement
Runway Length
Runway Shoulders & Blast Pads
Taxiway System
Additional runway length
RDC D-III design standards are not met
TDG-3 taxiway design standards are not met
Examine runway extension alternatives
Add 20-foot runway shoulders
Add shoulders to taxiway, taxilanes, and aprons serving TDG-3 aircraft
Landside Requirements Auto parking is constrained during peak periods
Parking lot expansion & roadway improvement (other agencies)
General Aviation Apron
Transient Apron
Aircraft Hangar Storage
Shortfall of appoximately 4,560 SY by 2033
Shortfall of approximately 8,179 SY by 2033
16 additional based aircraft will need storage accommodations by 2033
Apron expansion (demand driven)
Apron expansion (demand driven)
Expand aircraft hangar storage capacity (demand driven)
GARFIELD COUNTYREGIONAL AIRPORT
RUNWAY LENGTH
5,886
6,043
6,218
6,620
6,637
6,777
6,881
6,934
6,951
7,000
7,286
7,945
8,357
8,453
8,837
8,898
8,907
9,396
9,483
9,640
9,657
9,815
9,832
9,937
10,024
10,059
10,181
10,181
10,618
10,618
10,775
10,984
11,656
11,665
12,119
12,800
0 2,000 4,000 6,000 8,000 10,000 12,000 14,000
CESSNA 550 CITATION IICESSNA 525 CITATION (CJ-1)
CESSNA 560 CITATION V ULTRALEAR 31
CESSNA 525A CITATIONJET II (CJ-2)SABRELINER 60
CESSNA 560 CITATION ENCORECESSNA 560 CITATION EXCEL
CESSNA 550 CITATION BRAVORIL RUNWAY 8/26BEECH 390 PREMIER
BEECH 400ALEAR 45
SABRELINER 75a/80FALCON 900
FALCON 50CANADAIR CL-300 CHALLENGER
LEAR 35/36GULFSTREAM G350
CESSNA 750 CITATION XCESSNA 650 CITATION III/VI
FALCON 2000HAWKER 125-1000
LEAR 55LEAR 60
HAWKER 125-800GULFSTREAM G450
SABRELINER 65CANADAIR CL-604 CHALLENGER
CANADAIR CL-601-3A/3R CHALLENGERBOEING BBJ
GULFSTREAM G550CANADAIR CL-800 CHALLENGER
CANADAIR BD-700 GLOBAL EXPRESSAIRBUS ACJ
BOEING BBJ2
Runway Length (feet)
Existing RIL Runway Length
7,500ALTERNATIVE 1 - 500FT EXTENSION Length with Runway Extension
Legend
Future Critical Aircraft
Based or Frequently Operate at RIL
GARFIELD COUNTYREGIONAL AIRPORT
RUNWAY EXTENSION
SOUTHEAST HANGAR DEVELOPMENTSOOOOOOOOOOOOOOOUTUTUTUUTUTUTUTU HEHEHEHEHEHEHEHEEAAASASASASASASSA T TT T TTTTTTT TTT T TTTTT T TTTTTT HAHAHAHAHAHAHAHAHAH NGNGNGNGNGNGNGNGNGNNGARARARARARARARRARARR DDDDDDDDDEVEVEVEVEVEVVEVVVVEELELELEELEEEEEEEEEEEEEE OPOPOPOPOPOPOOOPOPOPOPOPOPOOOOPOOOPPOOPOPOPOPOPPPMEMMEMMMMMMEMMENTNTNTNTNNNNNNNNNNNNNNNNNTNNN
Safety
Operational
Compatible Land Use
Environmental
Feasibility
Financial$16.2 million*
*Half of this cost is related to earthwork for fill, grading, and retaining wall structure
Evaluation Criteria Alternative 1
Equal level of safety for the intended aircraft
Requires an acquisition of approximately nine acres of avigation easements for the RPZ.
The project feasibility depends upon funding available if the FAA approves the justification of the runway extension.
Accommodates 100% of airplanes weighing less than 12,500 pounds on a hot day (91° Fahrenheit)
Accommodates 98% of large airplanes weighing 12,500 pounds up to 60,000 pounds at 60% useful load on a hot day (91° Fahrenheit)
On a cool day (roughly 54° Fahrenheit), accommodates approximately 100% of the large aircraft fleet weighing 60,000 pounds or less at 60% useful load
Requires Environmental Assessment (EA)Disruption to the existing surface trafficPotential impacts to Mamm Creek and wetlandsPotential impacts to the threatened and endangered species that may occur in Mamm CreekPotential impacts to land undisturbed by the runway realignment
GARFIELD COUNTYREGIONAL AIRPORT
GENERAL AVIATION & TRANSIENT APRON EXPANSION
GA APRON ALTERNATIVE 1 GA APRON ALTERNATIVE 2
GA APRON DEVELOPMENT
TRANSIENT APRON DEVELOPMENT
TRANSIENT APRON ALTERNATIVESafety
Operational
Total New T-Hangars 4
Total Small Aircraft Tiedowns 30
Additional Apron (SY) 32,600
3
52
36,000
Compatible Land Use
Environmental
Feasibility
Financial $5.0 Million $5.1 Million
Evaluation Criteria Alternative 1 Alternative 2
Equal level of safety for the intended aircraft
Will not alter on or off-airport land use
No significant environmental impacts anticipated.Appropriate level of environmental review is required.
If approved by the FAA, funding for apron development must be available. T-hangar construction is dependent upon 3rd party developers.
Safety
Operational 19,000 square yards of apron for aircraft parking
Compatible Land Use
Environmental
Feasibility
Financial $2.2 Million
Evaluation Criteria Alternative
Equal level of safety for the intended aircraft
Will not alter on or off-airport land use
No significant environmental impacts anticipated.Appropriate level of environmental review is required.
If approved by the FAA, funding for apron development must be available. T-hangar construction is dependent upon 3rd party developers.
GARFIELD COUNTYREGIONAL AIRPORT
SOUTHEAST HANGAR DEVELOPMENT
ALTERNATIVE 1 ALTERNATIVE 2
SOUTHEAST HANGAR DEVELOPMENT
ALTERNATIVE 3
Safety
Operational
100’ x 100’ Hangars 8
125’ x 150’ Hangars 1
150’ x 150’ Hangars 1
12
0
0
10
0
1
Compatible Land Use
Environmental
Feasibility
Financial (Cost of asphalt pavement, not including utilities) $3.3 Million $4.4 Million
Evaluation Criteria Alternative 1 Alternative 2 Alternative 3
Equal level of safety for the intended aircraft
No significant environmental impacts anticipated. Appropriate level of environmental review is required.
Will not alter on or off-airport land use Potential to change the existing land use Potential to change the existing land use
Access road construction and land acquisitions depend upon approval and funding availability by Garfield County.Hangar development is demand-driven by 3rd party developers.
$4.9 Million
GARFIELD COUNTYREGIONAL AIRPORT
AIRPORT PARKING AND ROADWAY
ALTERNATIVE 1 ALTERNATIVE 2
AIRPORT PARKING AND ROADWAY
ALTERNATIVE 3
Safety
OperationalTotal Parking Spaces 200*
Improved Circulation No
277
Yes
292*
Yes
Compatible Land Use
Environmental
Feasibility
Financial (Cost of asphalt pavement, not including utilities) $1.2 Million $2.2 Million
Evaluation Criteria Alternative 1 Alternative 2 Alternative 3
Equal level of safety for the intended aircraft
No significant environmental impacts anticipated. Appropriate level of environmental review is required.
Will not alter on or off-airport land use Will not alter on or off-airport land use Potential to change the existing land use
Access road construction and parking lot development depend upon approval and funding availability by Garfield County.
$2.2 Million
Modification of road may change existing surface traffic patterns
Potential impacts to undisturbed land
Potential impacts to Dry Creek
*Includes reserved parking for FBO terminal building.
GARFIELD COUNTYREGIONAL AIRPORT
ELEMENTS OF AN AIRPORT STRATEGIC BUSINESS PLAN
Executive Summary Summarizes the airport business plan
Introduction Sets the stage for the airport business plan
Mission Statement Conveys the reason for an airport's existence or purpose
Vision Statement Articulates the aspirations for an airport; it is a picture of success
Values Statement Describes the beliefs held throughout an organization
Budgets Forecasts the financial position or performance of the airport
Goals States a desired result, outcome, or level of attainment that needs to be reached to realize the mission and vision for the airport
Objectives Identifies a significant step towards achieving a goal or a means to an end
Action Plans Answers the key questions of who is going to do what, when, where, why, and how in order to accomplish a specific objective
Appendix Provides additional or supplemental information, data, and documentation
A v i a t i o nM a n a g e m e n tC o n s u l t i n gG r o u p
GARFIELD COUNTYREGIONAL AIRPORT
I. MISSION STATEMENT
Definition of an Airport Mission Statement An airport mission statement conveys the reason for the airport’s existence and may identify the core competencies of the airport as well.Proposed Mission Statement for the Garfield County Regional AirportTo operate, manage and develop a safe, secure, and efficient general aviation airport that is essential for the Garfield County community and visitors to the Colorado Rocky Mountain Region by:
providing exceptional airside and landside infrastructure and amenities;consistently delivering high quality aviation products, services, and facilities;encouraging compatible development on and nearby the airport;sustaining a positive economic impact in the community; andfacilitating emergency services and response.
II. VISION STATEMENT
Definition of an Airport Vision Statement An airport vision statement articulates the aspirations for the airport; it is a picture of success.Proposed Vision Statement for the Garfield County Regional AirportTo be the preferred general aviation airport in the Colorado Rocky Mountain Region, while striving to be as financially self-sufficient as possible.
GARFIELD COUNTYREGIONAL AIRPORT
AIRPORT STRATEGIC BUSINESS PLAN PROJECT PHASES
Preparation Phase
Educate airport management and staff
Obtain buy-in from policy makers
Determine approach
Form planning team
Brief planning team
Draft, review, and finalize the plan
Obtain policy maker approval of the plan
Execute the plan
Check progress and make adjustments
Report results
Update, review, and finalize updated plan
Obtain approval of updated plan
Execute the updated plan
Development Phase Implementation Phase
GARFIELD COUNTYREGIONAL AIRPORT
SWOT ANALYSIS
Strengths Weaknesses
Opportunities Threats
Nominal County bureaucracy
Board of County Commission support
Management’s and staff’s experience and knowledge
Runways’ and taxiways’ length, width, and weight bearing capacity
Apron size and weight bearing capacity
Airfield equipment (snow removal, mowing, ARFF)
24 hour operating hours
FBO products and services
Airport administrative offices
Aircraft storage capabilities
Landside signage, lighting, and markings
Passenger and crew products, services, and facilities
Lack of restaurant
Types and minimums for approaches
Rentable office space for based customers and SASOs
Terminal building age, condition, and layout
Competitive airports
Elevation
General aviation industry trends
Aviation industry regulations
Economy
Proximity to destination resorts
State aviation system plan
Proximity to other airports
Community support for airport
Economic development support for airport
Local educational institutions
Proximity to tourist attractions
GARFIELD COUNTYREGIONAL AIRPORT
NEXT STEPS
Establish & Prioritize Goals
Develop & Prioritize Objectives
Formulate Action Plans & Budgets
Approval of Finalized Plan
Master Plan Business Plan
Environmental Coordination
Financial Implementation
Airport Layout Plan Development
Final Master Plan Approval
GARFIELD COUNTYREGIONAL AIRPORT
PROJECT SCHEDULE
PAC kickoff meeting- Inventory
- Forecast
Brief Planning Team
- FAA Forecast Review - Finalize Working Paper #1
SWOT Analysis Team Survey
- FAA Forecast Approval - Begin Facility Requirements
Update SWOT Analysis
- PAC meeting #2 - Finalize Facility Requirements - Begin Alternatives Analysis
Develop Mission, Vision, and Values
Statements
December 2012
Master Plan
Business Plan
Master Plan
Business Plan
January/February 2013 March/April 2013 May-September 2013
- Finalize Alternatives- PAC Meeting #3
- Public Open House #1
Establish and Prioritize Goals
Develop and Prioritize Objectives
- Environmental Coordination- Financial Implementation
- Public Open House #2
Formulate Action Plans and Budgets
- Develop AirportLayout Plan
- Finalize CIP
Draft, Review, and Finalize the Plan
- Final Master Plan Document
Obtain Approval of the Plan
September/October 2013 November/December 2013 December-May 2014 June 2014