AIR CONDITIONING & MECHANICAL VENTILATION (ACMV)
CLEANROOM & PROCESS UTILITES
DATA CENTER
SERVICE & MAINTENANCE
www.critical-eng.com
CRITICAL M&E ENGINEERING SDN BHD
CRITICAL SALES & SERVICES SDN BHD
CRITICAL POWER SYSTEMS SDN BHD
The GROUP was established in 2011, the objective then was to fulfill
the needs of our growing buildings and manufacturing industries,
especially the Multinational Corporation (MNC).
Our core activities are in design, supply, installation, repair, service
and maintenance of Mechanical, Electrical and Process
(MEP)utilities works such as Air-Conditioning (AC) System,
Mechanical Ventilation (MV) System, Smoke Spill System, Process
Cooling Water System (PCW), Compressed Dry Air (CDA) System,
Clean Room Construction, Ducting Work, Piping Work, Electrical
Work, Service & Maintenance, including preventive and predictive
maintenance, and Building Automation System (BAS). And, we
provide consultancy and project management services related to
existing system upgrading.
Today, the GROUP is a unique Engineering Services firm that offers
unsurpassed critical facility support. The GROUP has extensive
experience in consulting, project and construction management
and services for critical facilities environments. This allows us to
extend our expertise and services throughout the region, providing
MEP solutions for critical facilities covering the following areas;
About Us
•Manufacturing Plants & Factories
•Data Centers
•Military
•Telecommunication Industries
•Hospitals & Medical Centers
•Laboratories
•Government Buildings & Educational Institutions
•Commercial Building & Complex
Apart from providing critical facilities solutions and supports, the GROUP emphasis on the efficiency of the
resources use – to achieve to GREEN, especially through detail study and design in the HVAC systems, which
contributes to the highest electricity power consumption.
The GROUP partners each have over 15 years of experience in supporting clients’ critical facility needs. The
company’s staff is comprised of dedicated professionals, encompassing all engineering disciplines, with specialized
knowledge in critical facility requirements.
Our experience allows the GROUP to understand clients’ needs to optimize and deliver services to meet our
clients’ specific needs, standards and requirements, by providing the highest level of professionalism and total
customer satisfaction.
The GROUP approach to each project is ‘LISTEN, UNDERSTAND, HANDS ON, DELIVER’, where we tailor our efforts
to the specific needs of the client.
The GROUP as an engineering firm incorporated in Malaysia, is registered with Construction Industry Development
Board Malaysia (CIDB), asGrade G7, which shall allow the company to participate to a more sizable project, which
is in the company forecasted pipeline.
About Us
Vision
To be the leader in the critical facility industry.
Mission
A people oriented organization, team-up and share the common values, to provide unsurpassed solutions and
supports, to meet customer needs and expectations, with ZERO compromise to human safety.
Critical Facilities
Critical Facility is a term used by the industrial player to describe assets that are essential for the functioning of
business continuity.
Critical Facility Services is the GROUP’s primary business. The GROUP will assist to identify all the critical services
necessary to ensure customer’s business continuity, by properly designed and supported, so that the customer
can focus on its core business, and to fulfill its critical objectives.
Critical facilities namely the following areas;
- Manufacturing Plants & Factories
- Data Centers
- Military & Command Center
- Telecommunication Industries
- Hospitals & Medical Centers
- Laboratories
- Government Buildings & Educational Institutions
- Commercial Building & Complex
Which, any interruption to these operations will cause severe losses to the users.
Critical Facility Services and Support includes;
- Advance HVAC systems
o Capacity Elements - Consists of chillers, cooling towers, CRAC units, Air Handlers, Package DX
Systems, Chilled Water Pumps, Condenser Water Pumps, and associated building control systems
o Distribution/ Path Elements – Consists of refrigerant piping, chilled water piping, ducting, grills, and
associated building control systems
- Clean Room design and construction
- Data Center Architecture Electrical and mechanical system configurations designed for performance,
reliability and maintainability
- Main Electrical Systems Including utility coordination, service entrances and distribution systems
- Generator system
- Electrical transfer systems
- UPS Systems and Distribution
- Builder work includes of raised flooring system
- Fire Detection and Suppression Systems
- Data Center Grounding, Security and Communications Systems
- Commissioning and Failure Mode Testing and Acceptance
- Building Management System
- Services & Maintenance which 24x7x365 support
Company Introduction
Name of Company : Critical M&E Engineering Sdn. Bhd.
Company Registration No. : 946363-W
Paid Up Capital : RM1,000,000.00
Banker : Public Bank Berhad, Jalan Cantonment,
Pulau Tikus Branch, Penang.
Company Secretary : Lim Yong Chiat (MAICSA 7060553)
1772-B, Lorong Tiong,
05200 Alor Setar, Kedah.
Business Address : Penang
6&8 Cangkat Bukit Belah
11920 Bayan Lepas, Penang
Telephone No. : 604 – 649 6033
Fax No. : 604 – 649 3033
Business Address : KL
RK30A, Jalan Villa 3, Anggerik Villa, Off Jalan Semenyih
43500 Kajang, Selangor D.E.
Telephone No. : 603 – 8723 2033
Fax No. : 603 – 8724 2033
Email : [email protected]
Name of Company : Critical Sales & Services Sdn. Bhd.
Company Registration No. : 1079183-X
Paid Up Capital : RM300,000.00
Banker : Public Bank Berhad, Jalan Cantonment,
Pulau Tikus Branch, Penang.
Company Secretary : Lim Yong Chiat (MAICSA 7060553)
1772-B, Lorong Tiong,
05200 Alor Setar, Kedah.
Correspondence
Name of Company : Critical Power Systems Sdn. Bhd.
Company Registration No. : 1255506-W
Paid Up Capital : RM100,000.00
Banker : Maybank Berhad, Bayan Point,
Bayan Baru, Penang.
Company Secretary : Lim Yong Chiat (MAICSA 7060553)
1772-B, Lorong Tiong,
05200 Alor Setar, Kedah.
PERAKUAN PENDAFTARAN
Adalah dengan ini diperakui bahawa kontraktor yang dinyatakan di bawah ini telah berdaftar denganLembaga mengikut Bahagian VI Akta Lembaga Pembangunan Industri Pembinaan Malaysia 1994.Pendaftaran ini adalah tertakluk kepada syarat-syarat yang telah ditetapkan bersama perakuan ini.
No. Pendaftaran : 0120140218-PP155237
Nama Kontraktor : CRITICAL M&E ENGINEERING SDN. BHD.
Alamat Berdaftar : 6 & 8 CHANGKAT BUKIT BELAH11920 BAYAN BARUPULAU PINANG
Daerah : BARAT DAYA
Tarikh Mula Berdaftar : 18/02/2014
GRED KATEGORI PENGKHUSUSAN
G7 B B04
G7 CE CE21
G7 ME M01 M02 M15 M18
Tarikh Mula Berkuatkuasa : 01/06/2018
Tarikh Habis Tempoh Perakuan : 07/06/2020
STATUS: AKTIF
Ketua Eksekutif
Lembaga Pembangunan Industri Pembinaan Malaysia
Tarikh: 01/06/2018
Critical Group of Companies
CEO
Critical M&E Engineering
MD
Finance Dept Account Exec
Project Dept
Project Manager
Project Engineer
Project Engineer
Project Engineer
Drafter
Admin Exec
Project Manager
Project Engineer
Project Engineer
Drafter
QS
Project Site Manager
Project
Engineer
Safety Manager
Sr. Admin Exec
Critical Sales & Services
MD
Corporate Affair &
Strategic Management
Corporate Advisor
Business Development
Dept
Business Development
Manager
Service DeptService
Manager
Service Engineer
Technician
Technician Technician
Sr. Technician
Technician
Technician
Technician
Sr. Technician
Technician
Technician
Admin Assist
KL OfficeService
Manager
Technician
Technician
Sr. Admin Exec
Critical Power Systems
GM
Sr. Sales Manager
Organization Chart
THE DATA CENTER
Successful data center design build construction projectsrequire a balance that can only be maintained through adeep understanding of every element, process andrequirement of your data center infrastructure.
There’s no such thing as a “one-size-fits-all” solution• Before one piece of equipment is selected,• Before any topology is chosen,• Before the floor plan is envisioned,
we listen to your data center requirements, to produce aquality, constructible design that will help you achieveyour business goals.
A vendor neutral – meaning we’re not tied to any OEM,we select the right design, equipment, and partners forour client’s data center projects by putting their interestsfirst.
THE SOLUTIONS CYCLE
1 - POWER AVAILABILITY • UPS• GENSET
12 - SER`VICE & MAINTENANCE • PREVENTIVE/COMPREHENSIVE• SPARE PARTS• RECORDS KEEPING• 24X7X365 2 - POWER PROTECTION
• UPS• TVSS• EARTHING
10 - SECURITY• CARD ACCESS• CCTV
4 - POWER DISTRIBUTION • PDU
8 - FIRE SUPPRESSION• FM200• IG55
11 - REMOTE MONITORING• WEB BASED
SOFTWARE• EVENT TRENDING• REMOTE ON/OFF• SMS/EMAIL• ALARM ALERTING
5 - HEAT REMOVAL• CRAC• ACMV
6 - AIR DISTRIBUTION • HOT/COLD AISLE CONTAINMENT • PERFORATED RAISED FLOORING
9 - FIRE DETECTION• VESDA
7 - WATER PROTECTION • LEAK DETECTION SYSTEM
3 - BATTERY PROTECTION • BATTERY MONITORING
SYSTEM
THE PLANT ROOMMany large buildings, campuses, and other facilities have plantsthat make chilled water and distribute it to air handling units andother cooling equipment. The design operation andmaintenance of these chilled water plants has a very largeimpact on building energy use and energy operating cost.
Not only do chilled water plants use very significant amounts ofelectricity (as well as gas in some cases), they also significantlycontribute to the peak load of buildings. During this peak event,chilled water plants are often running at maximum capacity.When temperatures are moderate, chilled water plants are shutdown or operated in stand-by mode. This variation in the rate ofenergy use is a major contributor to the peaks and valleys inenergy demand, which is one of the problems that must beaddressed by utility grid managers.
Most buildings and facilities that have chilled water plants havespecial utility rates where the cost of electricity depends onwhen it is used and the maximum rate of use. The price ofelectricity is several times higher during the summer on-peakthan it is during the off-peak periods.
In addition to new construction, the chilled water plants of manyexisting buildings are being replaced or overhauled. Older chilledwater plants have equipment that uses ozone-damagingrefrigerants. International treaties, in particular the MontrealProtocol, call for ozone damaging chemicals (in particular CFCs)to be phased out of production. As the availability of CFCs isreduced, the price will skyrocket, creating pressure for chilledwater plants to be overhauled or replaced.
Efficient and reliable utility systems are a criticalrequirement for the successful operation of your processfacility. Utilizing the appropriate technology to meet thenecessary regulatory requirements, CMEE developssolutions that are "right sized" to your application.
CMEE are experts in the design, testing and troubleshootingof utility systems for GXP facilities, including:
- Compressed Dry Air (CDA)- Oil Free Air (OFA)- Nitrogen Gas (N2)- Liquid Petroleum Gas (LPG)- Process Chilled Water (PCW)- Hot Water Piping- Steam Piping- RO/DI- Waste Water Piping- Helium Exhaust- General Exhaust- Acid Scrubber
PROCESS UTILITY SYSTEMS
A cleanroom is a facility ordinarily utilized as a part of specialized industrial production or scientific research,including the manufacture of pharmaceutical items and microprocessors.
Cleanrooms are designed to maintain extremely low levels of particulates, such as dust, airborne organisms, orvaporized particles.
Cleanrooms typically have an cleanliness level quantified by the number of particles per cubic meter at apredetermined molecule measure.
THE CLEANROOM
US FED-STD-209E was a United States federal standard. It was officially cancelled by the General Services Administration on November 29, 2001,but is still widely used.
CLEANROOM CLASSIFICATION
Class Maximum Particles/ft3 ISO Equivalent
=> 0.1um => 0.2um => 0.3um => 0.5um => 5um
1 35 7.5 3 1 0.007 ISO3
10 350 75 30 10 0.07 ISO4
100 3,500 750 300 100 0.7 ISO5
1,000 35,000 7,500 3,000 1,000 7 ISO6
10,000 350,000 75,000 30,000 10,000 70 ISO7
100,000 3,500,000 750,000 300,000 100,000 830 ISO8
Data Center• Computer Room Air Conditioning (CRAC)• Uninterruptible Power Supply (UPS)• Batteries • Power Line Conditioner (PLC)• Water Detection System (WDS)• Aspirating Smoke Detection (ASD)• Transient Voltage Surge Suppressor (TVSS)• Automatic Transfer Switch (ATS)• Environmental Monitoring System (EMS)• Building Management System (BMS)
ACMV Plant Room • Chiller• Pump • Cooling Tower • AHU/MAU/FCU/ACSU
Process Utilities • Compressed Dry Air • Helium, N2, Hot Water, Steam
Cleanroom • Fan Filter Unit (FFU)• Dry Cooling Coil
WE SERVICE, MAINTAIN & SUPPORT
24 HOURS A DAY 7 DAYS A WEEK
365 DAYS A YEAR
Client Tele
Client Tele
Completion Dec 2018Type New Data CenterContract Sum RM3,600,000.00Scope Life TIEW III Data Center Design & Build upgrade, CSA & MEP supporting up to
600kW of server loading
DATA CENTER DELL APCC, Bayan Lepas FIZ, Penang
SEMICONDUCTOR – CLEANROOM, PROCESS UTILITES, ACMVVAT, Batu Kawan Industrial Park (BKIP), Penang, Malaysia
Owner
Main Con
Year Completion
Location
Contract Amount
Type of Project
Scope
VAT Manufacturing Plant - a precision valve manufacturing plant from Swiss.
BYG Projects Sdn Bhd
Apr 2018
Penang
RM7,000,000.00
Base Build
New factory expansion involving 170,000ft2 area ACMV set up, including of
55,000ft2 cleanroom (ISO6 & ISO8) c/w 15ft Height, walkable ceiling, 2 nos
Oil Free Air Compressor, Helium Exhaust, smoke spill system, Dry Cooling
Coil, 3 nos chiller, and other associated services
Owner Main Con Year Completion LocationContract AmountType of ProjectScope
Compliance
Hacks Estagold Sdn BhdOct 2017PenangRM5,800,000.00Base Build New factory involving ACMV set up, production having 20degC 35%RH environment GMP certified
FOODS – CLEANROOM, PROCESS UTILTIES, ACMV Hacks, Juru Science Park, Penang, Malaysia
SEMICONDUCTOR – CLEANROOM, PROCESS UTILTIES, ACMV
SEMICONDUCTOR – CLEANROOM, PROCESS UTILTIES , ACMV Osram, Kulim Type Base BuildContract Amount RM1,300,000.00Scope New factory involving PCW set up, covering stainless
steel ducting, PP process piping, SCH80 PVC process piping
SEMICONDUCTOR – CLEANROOM, PROCESS UTILTIES , ACMV QDOS, Batu Kawan Industrial Park (BKIP), Penang, Malaysia
Completion May 2018Type Base BuildContract Amount RM8,000,000.00Main Con Kok Constructions Sdn BhdScope New ACMV, CDA, Cleanroom, Scrubber System, and other associated mechanical
services for the new factory set up
MEDICALGleneagle Hospital, Penang
Completion July 2018Contract Sum RM2,000,000.00Type Upgarde & RetrofitScope Chiller plant room upgrading involving replacement of 3 nos water cooled chiller,
1000RT cooling tower, MCC, CHW & CW pump, chiller cooler insulation with PUc/w GI jacketing
HOTELBayview Beach Resort, Batu Ferringhi, PenangCompletion May 2018Type UpgradingContract Amount RM2,000,000.00Scope Project involving chiller plant room upgrading, 3 nos (1VSD + 2 Fix Speed) water
cooled chiller, 3000Amp MCC panel, upgrading and associated work @ basement level
CALL CENTERAIA – Strait Quay, PenangCompletion Jun 2018Type Base BuildContract Amount RM1,900,000.00Scope New Customer Service & Call Centre involving M&E services installation – Air
Conditoning & Ventilation, Fire, Electrical, incorporated into thein-house ID main con. design
OIL & GAS Schlumberger, PKFZ, Port Klang, SelangorCompletion Jun 2015Type Base BuildContract Amount RM3,700,000.00Main Con Tialoc Sdn BhdScope Project involving supply, install, testing & commissioning ACMV, CDA, Desiccant Wheel
System, Smoke Spill System, Process Utility & BMS Certification LEED Certified by U.S Green Building Council
FM Global Approved
GOVERNMENT – DATA CENTERJabatan Pengaliran & Saluran (JPS), Selangor
Completion Jun 2017Type New Data CenterContract Amount RM720,000.00Main Con ETE Sdn BhdScope New TIER III Data Center set up involving 3 nos DX Row Cooling, COdl Aisle
Containment, VESDA, EMS, 2 lots IG55, Water Detection System
COMPLETED PROJECTS
PHOTOVOLTAIC/SOLAR
OwnerYear Completion LocationContract AmountType of Project Scope
Compliance
First SolarApr 2016Kulim Hi-Tech Park, KedahRM1,035,000.00Retrofit Project Involving New Acid Scrubber System InstallationFM Global Approved
OwnerYear Completion LocationContract AmountType of Project Scope
TS SolartechJun 2016Penang Science ParkRM3,300,000.00New Installation Project involving supply, install, testing & commissioning UPS/FC system, having capacity up to 5.5MW
OwnerYear Completion LocationContract AmountType of Project Scope
Compliance
First SolarDec 2016Kulim Hi-Tech Park, KedahRM1,700,000.00Retrofit Project Involving KLM 1&2 T&R New ACMV InstallationFM Global Approved
COMPLETED PROJECTS
DATA CENTER
Owner Main Con Year Completion LocationContract AmountType of ProjectScope
Compliance
Western Digital Tialoc Sdn BhdDec 2015PenangRM570,000.00Retrofit Project involving new Data CenterinstallationFM Global Approved
Owner Year Completion LocationContract AmountType of ProjectScope
MotorolaAug 2015PenangRM620,000.00Retrofit Project involving 2 new Data Centerinstallation
OwnerYear Completion LocationContract AmountType of Project ScopeCompliance
DellFeb 2014APCC1 DC1 Penang RM340,000.00Retrofit Project involving Data Center ACMV Upgrading FM Global Approved
Owner Year Completion LocationContract AmountType of Project Scope
Compliance
First SolarJun 2015Kulim Hi-Tech Park, KedahRM775,000.00Retrofit Project Involving New Data CenterCRAC Upgrading (4 Data Centers)FM Global Approved
OwnerYear Completion LocationContract AmountType of Project Scope
Compliance
DellSep 2016APCC2 DC1 Bukit Minyak PenangRM800,000.00New Installation Project involving Data Center Battery Monitoring System (BMS) Installation FM Global Approved
OwnerYear Completion LocationContract AmountType of Project Scope
Compliance
DellJun 2017APCC1 DC3 PenangRM1,800,000.00New Installation Project involving new Tier III Data Center InstallationFM Global Approved
COMPLETED PROJECTS
DATA CENTER
Owner Main Con Year Completion LocationContract AmountType of ProjectScope
Jabatab Pengaliran & Saluran (JPS)ETE Sdn BhdSep 2017Ampang, SelangorRM720,000.00Retrofit New TIER III Data Center set up
OwnerYear Completion LocationContract AmountType of Project Scope
Compliance
DellFeb 2018APCC1 DC2 Penang RM3,600,000.00NEW DATA CENTER Project involving Data Center ACMV Upgrading FM Global Approved
OwnerYear Completion LocationContract AmountType of Project Scope
Compliance
DellFeb 2018APCC1 CEDAR LAB, Penang RM2,800,000.00NEW REGIONAL TRAINING CENTERProject involving Data Center CRAC, UPS, EMS, BMS installation FM Global Approved
COMPLETED PROJECTS
CALL CENTER
Owner Main Con Year Completion LocationContract AmountType of ProjectScope
AIAFacility Link/ Ivana Deco 2018Straight Quey, Penang RM3,100,000.00New Call Center Set Up Project involving all M&E services
COMPLETED PROJECTS
SEMICONDUCTOR
Owner Year Completion LocationContract AmountType of Project Scope
Compliance
EntegrisNov 2015Kulim Hi-Tech Park, KedahRM950,000.00 Retrofit Project involving ACMV Upgrading, 3 nos air cooled chiller, associated mechanical work FM Global Approved
Owner Main Con Year Completion LocationContract AmountType of ProjectScope
Classified (Top Tier Semincon Player)Johnson ControlDec 2015PenangRM180,000.00 Retrofit Project involving chiller plant room upgrading, 1 nos 800RT water cooled chiller replacement
Owner Year Completion LocationContract AmountType of Project Scope
Compliance
Latexx (Semperit)Dec 2015Taiping, PerakRM4,700,000.00 Base BuildProject involving Process Utility pipe work, Boiler pipe work, Natural Gas pipe work, & mechanical Ventilation system FM Global Approved
Owner Main Con Year Completion LocationContract AmountType of ProjectScope
VAT BYG Projects Sdn BhdMar 2016PenangRM380,000.00Retrofit Project involving new ISO6 & ISO8 cleanroom set up
Owner Year Completion LocationContract AmountType of ProjectScope
Osram Jan 2017Penang RM950,000.00RetrofitNew Oil Free Compressed Air System in Wafer Plant
COMPLETED PROJECTS
SEMICONDUCTOR
Owner Year Completion LocationContract AmountType of ProjectScope
Osram Aug 2017Penang RM800,000.00RetrofitNew PEN5 ISO8 Cleanroom set up
Owner Year Completion LocationContract AmountType of ProjectScope
CPI Oct 2017PenangRM1,800,,000.00Retrofit New ISO8 cleanroom set up, having total area of 32,000ft2. PU ducting instead of GI ducting deployed, to achieve to a better workmanship
Owner Main Con Year Completion LocationContract AmountType of ProjectScope
TF-AMD Tialoc Sdn BhdOct 2017PenangRM4,000,000.00Base Build New factory set up involving total CHW, CW, CDA, Process Piping Work
Owner Main Con Year Completion LocationContract AmountType of ProjectScope
VAT BYG Projects Sdn BhdJun 2018 PenangRM7,000,000.00Base Build New factory expansion involving 170,000ft2 area ACMV set up, including of 55,000ft2 cleanroom (ISO6 & ISO8), OFA, smoke spill system, DCC, 3 nos chiller, and other associated services
Owner Year Completion LocationContract AmountType of ProjectScope
CoherentMar 2018PenangRM1,000,000.00New Factory Extension As the main contractor for the entire project upgrading, that scope of the contract stretching from civil & structural upgrading, new mechanical (ACMV, Process Utility, Fire Protection) & electrical installation.
COMPLETED PROJECTS
SEMICONDUCTOR
Owner Year Completion LocationContract AmountType of ProjectScope
CPI 2018PenangRM1,200,,000.00Retrofit New ISO8 cleanroom set up, having total area of 20,000ft2
Owner Main Con Year Completion LocationContract AmountType of ProjectScope
QDOSKOK CONSTRUCTION SDN BHDJAN 2018Batu Kawan Industrial Park, PenangRM8,000,000.00Base Build New factory set up involving total CHW, CW, CDA, Process Piping Work, and all equipment
Owner Year Completion Location
Contract AmountType of ProjectScope
QDOSDec 2018Phase 2, Penang Free Trade Zone, , PenangRM2,650,000.00UpgradingFactory upgrade involving total CHW, CW, CDA, Process Piping Work and all equipment
Owner Year Completion LocationContract AmountType of ProjectScope
Globetronics 2018PenangRM2,500,000.00New Factory Extension New 20,000ft2 class 10k cleanroom, inclusive of chiller plant room, ahu room, and necessary services
Owner Year Completion LocationContract AmountType of Project
ADI2018Free Trade Zone, Penang RM1,800,000.00New 20,000ft2 class 100k & 10k cleanroom
COMPLETED PROJECTS
SEMICONDUCTOR
Owner Main Con Year Completion LocationContract AmountType of ProjectScope
Osram Tialoc Sdn Bhd2018Kulim Hi-Tech Park, Kedah RM1,350,000.00RetrofitNew process utility system set up
Owner Main Con Year Completion LocationContract AmountType of ProjectScope
Classified MNC Tialoc Sdn Bhd2018Kulim Hi-tech Park, Kedah RM2,300,000.00Re-trofitExisiting factory mechanical & electrical services dismantling
Owner Main Con Year Completion LocationContract AmountType of ProjectScope
Classified MNC Tialoc Sdn Bhd2018Kulim Hi-tech Park, Kedah RM5,200,000.00Re-trofitACMV ducting, CHW & CW piping, and process utility piping installation
Owner Main Con Year Completion LocationContract AmountType of ProjectScope
Classified MNC Tialoc Sdn Bhd2018Kulim Hi-tech Park, Kedah RM3,500,000.00Re-trofitACMV ducting, CHW & CW piping, and process utility piping installation
Owner Main Con Year Completion LocationContract AmountType of ProjectScope
Classified MNC JLL 2018Free Trade Zone, PenangRM1,100,000.00Re-trofitCDA upgrading consisting of air compressor c/w air dryer, filters and other associated services
COMPLETED PROJECTS
SEMICONDUCTOR
Owner Main Con Year Completion LocationContract AmountType of ProjectScope
Carsem (M) Sdn BHdYork (M) Sdn Bhd2018Jelapang, Ipoh, Perak RM900,000.00RetrofitACMV upgrading involving CHW & CW piping installation, pumps, and other necessary services
COMPLETED PROJECTS
PHARMACEUTICAL/FOOD/ MEDICAL
Owner Main Con Year Completion LocationContract AmountType of ProjectScope
Compliance
Hacks Estagold Sdn BhdOct 2017PenangRM5,800,000.00Base Build New factory involving ACMV set up, production having 20degC 35%RH environment GMP certified M&E services
Owner Year Completion LocationContract AmountType of ProjectScopeCompliance
Sun PhamaMar 2017Sg Petani, Kedah RM320,000.00RetrofitWater cooled chiller replacement GMP certified
Owner Main ConYear Completion LocationContract AmountType of ProjectScope
Compliance
Rembina Sdn BhdSouth Island Sdn BhdJan 2016Penang RM1,750,000.00 Base Build Project involving ACMV, CDA ISO8 Cleanroom, Smoke Spill System, BMS systemGMP Certified
COMPLETED PROJECTS
TELCO
Owner Year Completion LocationContract AmountType of ProjectScope
U MobileNov 2015Subang Hi-Tech, SelangorRM1,490,000.00Retrofit Project involving new TELCO ACMV upgrading, 7 nos CRAC, 2 nos 240kW Modular UPS, 3 sets CAC, and associated services
Owner Year Completion LocationContract AmountType of ProjectScope
MaxisNov 2016Subang Hi-Tech, SelangorRM450,000.00Retrofit Project involving new TELCO ACMV’s CRAC unit outdoor condenser total change-out
Owner Year Completion LocationContract AmountType of ProjectScope
MaxisJan 2018 NationwideRM6,200,000.00Retrofit Project involving new 900 nos TELCO outdoor free-cooling total change-out
COMPLETED PROJECTS
HEALTHCARE/HOSPITAL
Owner Year Completion LocationContract AmountType of ProjectScope
Pantai Hospital Sep 2015Sg Petani, KedahRM720,000.00 Retrofit Project involving 2 nos 300RT water cooled chiller replacement @ level 3 Sustainable Energy Development Authority Malaysia (SEDA)
Owner Year Completion LocationContract AmountType of ProjectScope
Pantai Hospital Oct 2017PenangRM1,800,000.00 Retrofit Project involving chiller plant room upgrading, 3 nos 300RT water cooled chiller, 2 nos 500Rt cooling tower, 2000Amp MCC panel, and associated work @ Level 6 roof top
COMPLETED PROJECTS
OIL & GAS
OwnerYear Completion Main ConLocationContract AmountType of Project Scope
Compliance
Schlumberger Jun 2015Tialoc Malaysia Sdn BhdPort Klang Free Zone (PKFZ), Klang, SelangorRM3,700,000.00Base Build Project involving supply, install, testing & commissioning ACMV, CDA, Desiccant Wheel System, Smoke Spill System, Process Utility & BMS LEED Certified by U.S Green (SEDA)
COMPLETED PROJECTS
GOVERNMENT/MILITARY
OwnerYear Completion Main ConLocationContract AmountType of Project Scope
TUDM (Air Force) Malaysia Jan 2015Sapura Defence Sdn BhdButterworth, Penang RM930,000.00RetrofitProject involving supply, install, testing & commissioning ACMV, 2*150RT air cooled chiller, CRAC, and BMS
OwnerYear Completion Main ConLocation
Contract AmountType of Project Scope
TUDM (Air Force) Malaysia Dec 2015Wekajaya Sdn BhdKota Samarahan, Kuching, Sarawak, MalaysiaRM2,900,000.00Base BuildProject involving supply, install, testing & commissioning ACMV, 2*300RT water cooled chiller, Smoke Spill System, and BMS
OwnerYear Completion Main ConLocation
Contract AmountType of Project Scope
TUDM (Air Force) Malaysia Dec 2016Wekajaya Sdn BhdGunung Ngili, Kuching, Sarawak, MalaysiaRM1,590,000.00Base BuildProject involving supply, install, testing & commissioning ACMV, UPS systems, BMS
Owner Main Con Year Completion LocationContract AmountType of ProjectScope
Thai Consulate Prestige ConstructionOct 2017PenangRM700,000.00Base Build New consulate building completed with full VRV system, and associated services
OwnerYear Completion LocationContract AmountType of Project Scope
Putrajaya Holding Oct 2017Putrajaya, SelangorRM1,050,000.00New Installation Project involving supply, install, testing & commissioning UPS system, having capacity up to 1.2MW (4 nos300kVA)
COMPLETED PROJECTS
HOTEL/ SUITE/TEMPLE
Owner Year Completion LocationContract AmountType of ProjectScope
Bayview Beach ResortMay 2018Batu Ferringhi, Penang RM1,500,000.00Retrofit Project involving chiller plant room upgrading, 3 nos (1VSD + 2 Fix Speed) water cooled chiller, 3000Amp MCC panel, upgrading and associated work @ basement level
Owner Year Completion LocationContract AmountType of ProjectScope
ET Hospitality Sdn Bhd2017Georgetown, Penang RM480,000.00Base Built Boutique Hotel having new VRV installation for all the guest room, hall, and other associated services
Owner Year Completion LocationContract AmountType of ProjectScope
Persatuan Buddist Liulishan2018Tangjong Sepat, Sepang, SelangorRM1,020,000.00Base BuiltACMV cover entire building inclusive of rooms, by installing VRF system for energy efficient environment
ON-GOING PROJECTS
Owner
Main Con
Year Completion
Location
Contract Amount
Type of Project
Scope
Kedah State Government (TOURISM)
Jayasarana
Target 2019
Kuah Town, Langkawi
RM3,300,000.00
Base Built
ACMV by installing energy efficient
VRF system
Owner
Main Con
Year Completion
Location
Contract Amount
Type of Project
Scope
Aemulus Corporation (SEMICON)
MLG Design & Construction Sdn Bhd
Target 2019
Free Trade Industrial Zone, Penang
RM1,500,000.00
Base Built
ACMV by installing energy efficient
VRF system
Owner
Main Con
Year Completion
Location
Contract Amount
Type of Project
Scope
100 Suits+Residence (HOTEL)
LSH Construction Sdn Bhd
Target 2019
Bayan Baru, Penang
RM1,390,000.00
Base Built
ACMV cover air pressurization and
smoke venting system
Owner
Main Con
Year Completion
Location
Contract Amount
Type of Project
Scope
Mahindarama Buddist Temple
Onice Bina Sdn Bhd
Target 2019
Georgetown, Penang
RM430,000.00
Base Built
ACMV cover aircond, air
pressurization and smoke venting
system
Owner
Main Con
Year Completion
Location
Contract Amount
Type of Project
Scope
Global Tobacco Manufacturing Sdn
Bhd (HOTEL)
Main Construction (M) Sdn Bhd
Target 2019
Georgetown, Penang
RM330,000.00
Base Built
ACMV cover10 storey guest rooms
aircond, air pressurization and smoke
venting system
Owner
Main Con
Year Completion
Location
Contract Amount
Type of Project
Scope
Personal Distinction Sdn Bhd (F&B)
PW Construction
2019
KOMTAR, Penang
RM900,000.00
Base Built
ACMV involving air conditioning for
banquet hall, exhaust system for
kitchen system, smoke venting
system
ON-GOING PROJECTS
Owner Year Completion LocationContract AmountType of ProjectScope
Bosch 2019Penang Free Trade ZoneRM780,000.00Re-trofitCompressed dry air system cover oil free air compressor, air dryer, filters, piping, wiring, and other necessary services
Owner Main Con Year Completion LocationContract AmountType of ProjectScope
SOC II, TUDM Kuantan, PahangBumitegap Sdn BhdTarget 2019Kuantan, Pahang RM500,000.00Base Built 14 nos Precision Air Cond (PAC) installation
Owner Main Con Year Completion LocationContract AmountType of ProjectScope
Infineon KulimYork (M) Sdn BhdTarget 2019Kulim Hi-Tech Park, Kulim, Kedah RM480,000.00Re-trofitChiller condenser body insulation & AHU installation
Owner Main Con Year Completion LocationContract AmountType of ProjectScope
Pantai Hospital SPLK Design Sdn BhdTarget 2019SP, Kedah RM350,000.00Re-trofitNew ACMV installation cover AHU, FCU, for CDR room