Aiming Zhou - Lighting the Way ADB’s Rooftop Solar Project

Embed Size (px)

Citation preview

  • 7/31/2019 Aiming Zhou - Lighting the Way ADBs Rooftop Solar Project

    1/13

    Lighting the Way- ADBs Rooftop Solar Project

    Aiming Zhou

    Energy Specialist

    Asian Development Bank

    7th Asia Clean Energy ForumManila, Phillippines

    4-8 June 2012

  • 7/31/2019 Aiming Zhou - Lighting the Way ADBs Rooftop Solar Project

    2/13

    1

    10

    100

    1000

    10000

    100000

    1000000

    2 3 4 5 6 7 8 910

    11

    12

    13

    14

    15

    16

    17

    18

    19

    20

    21

    22

    23

    24

    25

    26

    >27

    MWh

    US Cents per kWh

    # of MWh sold at each price point

    Why Solar Energy

    In 2010, $100 billion (approximately 5%) of global retail electricity

    demand could be competitively addressed with solar power~600 GWs ($2 Trillion of Solar)

    201020152020

    Area of solar competitiveness

    Source: Jigar Shah, 2011

    Solar ElectricityPrice Declining

    ConventionalElectricity Price

    Rising

  • 7/31/2019 Aiming Zhou - Lighting the Way ADBs Rooftop Solar Project

    3/13

    Approaches forSolar Project Financing

    Bankable SolarProjects

    PPA

    Utility Owned

    System Lease

    Contractual Intermediary

    User Owned Others

    Fia

    nncing

  • 7/31/2019 Aiming Zhou - Lighting the Way ADBs Rooftop Solar Project

    4/13

    1. Greening ADB Building Operations

    Energy Efficiency (chillers, lighting etc.)

    Solar Power Supply to ADB Headquarter Bldg

    Others

    Purposes of ADB567 kWp Rooftop Solar Project

    2002ADB

    EnvironmentPolicy

    2003Environment,Health and

    Safety Policy

    2004Six SigmaProgram

    2007

    SustainabilityReport

    2009

    LEEDCertification

    Process (Goldin 2011)

    2011 beyond

    Sustainabilityat ADB HQ

    Photo Essay

  • 7/31/2019 Aiming Zhou - Lighting the Way ADBs Rooftop Solar Project

    5/13

    2.Technology Demonstration

    3. Business Model, build-operate-transfer with PPA

    Purposes of ADB571 kWp Rooftop Solar Project (continued)

    ADB

    Suntech/PropmechConsortium

    PPA Power

    Financing (commercial financiers) Construction (571kWp)

    Operation (~ 613 MWh per year) Transfer (buyout option within 15 yearsand free at year 16)

    Portion of Facility Building rooftop isleased for 15 years at $1/sq meter, over

    6,640 square meters Solar power is sold to ADB at the ratedecided by the bidding

    Commercial Financier

    Business

    Financing

    Loan

    Repayment

  • 7/31/2019 Aiming Zhou - Lighting the Way ADBs Rooftop Solar Project

    6/13

    ADB Headquarters Complex

  • 7/31/2019 Aiming Zhou - Lighting the Way ADBs Rooftop Solar Project

    7/13

    Details of Procurement Process

    1. Pre Bidding Screening and clearance of legal, technical and commercial aspects

    for the project within Manila Jurisdiction Internal process for project development and approval by ADB

    Management

    2. Bidding Process The Bidding Process: Conception pre- qualification criteria Draft technical and legal specification document Invitation to bid to qualified bidders (July, 2010) Selection of contractor / PPA signed

    3. Project Development Construction , started in November, 2011 Trial operation and normal operation, May 2012

  • 7/31/2019 Aiming Zhou - Lighting the Way ADBs Rooftop Solar Project

    8/13

    Diagram of ADB Rooftop Solar System

    571 kWpRooftop PV

    System

    ADB Substations

    Meralco

    34.5KV/380Y/200V

    ADBHeadquaters

    Compus

    Inverters

    613MWh/yr

    Switch Busbar

    18,300 MWh/yr

    The solar system supplies about 3% ofthe electricity consumption in ADBs

    complex

  • 7/31/2019 Aiming Zhou - Lighting the Way ADBs Rooftop Solar Project

    9/13

    ADB Headquarters Complex -Before

  • 7/31/2019 Aiming Zhou - Lighting the Way ADBs Rooftop Solar Project

    10/13

    ADB Headquarters Complex -After

  • 7/31/2019 Aiming Zhou - Lighting the Way ADBs Rooftop Solar Project

    11/13Photo Credit: Propmech

  • 7/31/2019 Aiming Zhou - Lighting the Way ADBs Rooftop Solar Project

    12/13

    Highlights No upfront cost to ADB

    The business model uses a PPA between the Suntech/Propmech

    Consortium (Project Implementer) and ADB (End User), wherebythe project implementers bear the investment cost and O&M costsand user purchase the electricity at bid price.

    ADBs credit worthiness helps the consortium

    secure non-recourse loan financingPPA will help the project implementers to secure financing fromlocal commercial financiers. With a 15-year PPA from ADB, thisproject becomes a bankable project

    Challenges to replicationChallenges could arise in countries that have regulated andpartially deregulated electricity markets. This model needspermission for third party-owned systems to sell to end users