AIM FRB Briefing Strategic Systems Programs (SSP). Briefer: Jamie Swaim Billet: Personnel Program Coordinator Learning Center: SLC Date: 11/04/08. Use of Traditional AIM I LP/TG Content. ILT materials are maintained in Central Site AIM I, which is hosted by NAVAIR Orlando. - PowerPoint PPT Presentation
Citation preview
AIM FRB Briefing
Strategic Systems Programs (SSP)
Briefer: Jamie SwaimBillet: Personnel Program Coordinator
Learning Center: SLCDate: 11/04/08
Use of Traditional AIM I LP/TG Content
• ILT materials are maintained in Central Site AIM I, which is hosted by NAVAIR Orlando.
• Courses are exported to SCORM V1.2 and imported into Elite.
Top Five AIM Change Requests (ACRs)
• 1. AIM-I-2003-002: Add RRL, OAC, and FAL to HTML output.
• 2. AIM-I-2004-003: Add ability to create changes to RRL items.
• 3. AIM-I-2007-001: Include TG graphics that were embedded in Word in SCORM output.
• 4. AIM-I-2008-002: Allow simultaneous editing of TCCD, COI, and LP/TG.
• 5. AIM-I-2008-004: Add Developing Authority functionality to LO module.
Electronic Classroom and ILT Delivery
• All ECs are connected to a central server, which contains the Elite courses, IETMs, IMIs, and Training Assets Menu.
• The EC Instructor stations are dual-monitored for simultaneous viewing presentation materials and staging of materials for broadcast to Student stations.
• Materials are sent to Student stations from the Instructor station using Robotel.
JTA/NJA Data and ProcessSSP has:• Revised OCCSTDS• Re-developed NJA
and OCCSTDS• Uploaded NJA into
CPM (R&D site) from Excel spreadsheets
• Sent refreshed OCCSTDS for NAVMAC review
SME Panel (SME, SLC, TYCOM,
SSP, Fleet)Develops integrated
OCCSTDS/NJA
Skill Group (KSAs) Tasks (KSAs) Subtasks (KSAs) Steps (KSAs)
Reviewed and approvedSSP and SLC
OCCSTDS WGPulled NJA data out
and created OCCSTDS update
OCCSTDS Review/Approval Process
Operator NJA
Technician NJA
Manager NJA
MT 3 OCCSTDS
FunctionalAreaTasks
Functional AreaTasks
Functional AreaTasks
Functional AreaTasks
MT 2 OCCSTDS
MT 1 OCCSTDS
MTC OCCSTDS
ILE Projects and CPM/LO Module
• MT Continuum– MT Continuum Overview– Development Process
MT Continuum Development Process
MT Continuum Development Process
NJA
Excel
COI/ISD
Word Doc
MT Continuum Process Lessons Learned
• Need to be able to update AIM data with changes made in final development (As Designed = As built) for maintenance of content.
• AIM automatic metadata needs better definition process to make more effective.
• Must have a “GOTS” product do the “finishing work”—or else minor changes require going back to developer EVEN if you have the source files.
• Need a Configuration Management toolset to control final product AND source files. (CMAD did NOT do this, and now no toolset is planned to accomplish).
Top Five AIM/CPM FRM Items• 1. (Multiple FR items): Change Compare Report –
surveillance needs are high and more costly than initial development.
• 2. (Multiple FR items): Work flow (approval) – ensures CM.
• 3. (4.2.4.3): Import open XML into LO Module from other applications – supports maintaining as designed data (LO Module) = as built data (other app).
• 4. (4.2.4.9): Import option to overwrite existing material or not – supports maintenance.
• 5. (4.2.3.41): Build NLOS from existing NLOS and maintain links to existing content AND utilize the same ELO in LO Module – supports content re-use
Points of Contact
Jamie Swaim703.313.0360 or
Richard Garrison301.685.3275 or