Upload
rodolfo-barbosa
View
227
Download
0
Tags:
Embed Size (px)
DESCRIPTION
AUTHORIZED INSPECTON AGENCY
Citation preview
te l 1 .212.591.8500 fax 1 .212.591.8501 www.asme.org
Two Park Avenue New York, NY 10016-5990 U.S.A.
INFORMATION AND PROCEDURES FOR OBTAINING
AN ASME CERTIFICATE OF ACCREDITATION AS AN AUTHORIZED INSPECTION AGENCY
The Standard for Qualification for Authorized Inspection, ASME QAI-1, requires that ASME Authorized Inspection Agencies shall obtain a valid ASME Certificate of Accreditation In order to obtain the Certificate of Accreditation, the Applicant must demonstrate their compliance with ASME QAI-1. Compliance will be verified by an ASME Survey Team at location(s) which control the activity. The survey will be scheduled by mutual agreement with the Applicant and will consist of a review of the Applicant's rules for compliance with QAI-1 and its implementation. The Quality Manual and documentation which support understanding of the program must be in English. Any findings noted during the survey, are discussed between the Applicant and the Team, and subsequently the Team Report is submitted to ASME which either authorizes issuance of the Certificate or requests additional actions by the Applicant. The Survey Team consists of two ASME Consultants experienced in the field of quality assurance. The "Guide for ASME Survey Teams for Accreditation of Authorized Inspection Agencies " provides a checklist of the elements of a Quality Control System. The Applicant is required to indicate the corresponding cross references to the provisions in the Quality Control Manual which address these elements. The completed Guide must be provided by the Applicant to the ASME Survey Team. A fee is charged based on length of time of survey, including travel time, and travel expenses. This could range from $13,000 to $30,000 for North America and $25,000 to $55,000 for International. In addition, there will be a $3,000 three year Certificate fee. Prices are subject to change without notice. Please bear in mind that the fee ranges quoted are based on typical average surveys and that your survey could require more or less time. These estimates are not firm quotations. If your facility requires an extended survey, because of its complexity, the ranges could be exceeded. The Survey Team will make every effort to conclude their visit in a minimum length of time. The Applicant must at the time of the survey present to the Team Leader commission card(s) from the National Board of Boiler and Pressure Vessel Inspectors showing the inspector is employed by the organization whose name the Applicant wishes to appear on their Certificate of Accreditation. ASME will only issue the Certificate of Accreditation to the organization whose name appears on the AI/AIS commission card(s). If the Applicant is delegating part or all of the functions to an agent organization, then both the Applicant and the delegated organization should be represented during the survey. At the conclusion of the survey, ASME will submit an invoice for the balance of the fees and expenses of the ASME Consultants and the ASME administrative expenses. The invoice will include the Certificate fee if accreditation is recommended. The Certificate will be issued upon successful evaluation by the Subcommittee and receipt of your payment. A12.2-2/14 (1/2)LH
ASME requires an advanced deposit of $10,000 prior to establishment of survey dates. This deposit will be applied to the cost of the Survey. If the Applicant withdraws their application after the remittance is received by ASME, there is an administrative fee of $500, which will be deducted from the original remittance. This program includes a planned audit program. Accredited Organizations will be required as a condition of continuation of accreditation to accept audits as required by the QAI Subcommittee on Accreditation, including submittal of a deposit and acceptance of all fees involved in the audit. New Certificate Holders will require an audit approximately one year after issuance of their Certificate. Please submit the application through CA Connect. Jurisdictional Applicants must include as part of their application the completed Supplemental Accreditation Agreement for Jurisdictional AIAs. All new Applicants must include as part of their application the completed Form Supplemental Information for New Applicants. Please return the completed Accreditation/Certification Agreement, fees and required forms to: ASME Accreditation/Certification Processing Dept. 22 Law Drive P.O. Box 2900 Fairfield, NJ 07007-2900 In addition, it is requested that the Accreditation/Certification Agreement and forms be emailed to [email protected]. Cancellation of survey dates is subject to a monetary penalty as shown in the following schedule: $ 2,000 for cancellation after acceptance of the survey dates. $ 3,500 for cancellation within 2 months of the survey dates. $ 6,000 for cancellation within 1 month of the survey dates. In addition to the above, the Applicant will be charged for any committed travel and miscellaneous expenses associated with the scheduled survey. ASME will make every effort to conduct an evaluation of an Applicant's program at the earliest possible date after receipt of application forms and deposit. However, it should be expected that a lead time of four months is usual because of scheduled surveys of other companies. ASME can accept no liability for any consequences to the Applicant which may be the result of the survey or subsequent ASME actions. A renewal survey will be scheduled approximately two to three months prior to the current expiration date to assure continuity of the Certificate. Subscription to ASME QAI-1 is required for accreditation to assure that accredited organizations have the latest applicable rules. Also required is a subscription to all BPV Code Sections that are to be covered in the scope of the Certificate and other ASME Standards required for those sections as shown, in the brochure. Effective with the issuance of the 2007 Edition of the Boiler and Pressure Vessel Code, the electronic version, purchased from a licensed reseller is acceptable, as well as the published version by ASME. The rules published in the Standard and BPV Code Sections are subject to revision periodically and become mandatory six months after the date of publication. Additionally, interpretations of the rules are published in supplements to the Standard and BPV Code Sections. These addenda and supplements are provided to subscribers, as part of their basic subscription, to assure their awareness of the latest rules, revisions and interpretations. Reproduced documents from any source are not accepted for ASME accreditation, as they provide no assurance of completeness or that the user will be made aware of revisions and interpretations of the applicable Standard. If you have any questions, please contact the ASME Conformity Assessment Department via email [email protected]. A12.2-2/14 (2/2)
A9.54-2/14 (1/2) LH Page 1 of 2
Two Park Avenue, New York, NY 10016
ASME Application for
Accreditation/Certification
Company: ____________________________________________________________ (Company name as it will appear on the Certificate)
Division: ____________________________________________________________ (Division, department, etc., if it is to appear on the Certificate)
This application is for the following location:
Address: ____________________________________________________________ (Give full address)
____________________________________________________________
____________________________________________________________ City State Country Postal code
__ Plant __ New If renewal, complete the following:
__ Field Site __ Renewal Current Certificate Number(s): ___________________________________________
Expiration date: ___________________________________________
Check the Certificate(s) being applied for:
*N Nuclear *N3 Transportation/Storage RTP Reinforced Thermoset
*NA Nuclear Assembly Containers Plastic Vessels
*NPT Nuclear Partials NO Nuclear Owner QEI Qualification of Elevator
*NV Nuclear Safety Valves MO Material Organization, Inspectors
*NS Nuclear Supports AIA Authorized Inspection BPE BioProcessing Equipment
Agency NQA-1 Nuclear Quality Assurance
Stamps ASME is switching to a Single Certification Mark. If you are renewing an existing certificate you will be asked to return your Code Symbol Stamp by no later than January 1, 2015. For detailed information about the switch to Single Certification Mark please review the FAQs on New ASME Mark on our website www.asme.org.
Please indicate below the number of stamps of each size you would like to receive. If you currently hold stamps you may request an equal number of new certification stamps at no charge. Stamps exceeding the number you currently hold will be subject of the standard stamp fee, as will all stamps accompanying new certificate issuances
Number of Stamps Requested: _______ _________
* Important: If marked with an * you must complete the following:
The Authorized Inspection Agency performing our Code inspection is ___________________________________________________
----- Application must be signed on page 2 -----
A9.54-2/14 (2/2) Page 2 of 2
Company Abbreviation: Please indicate if the company chooses to use an abbreviation on the nameplate or in the
stamping. __ Yes __ No If yes, the abbreviation will consist of ______________________________________ Note: A Certificate Holder may use either the companys full name or the above abbreviation on the nameplate or in the stamping. The Certificate Holder must list the companys full name as listed on the ASME Certificate on the ASME Manufacturers Data Report.
Accreditation/Certification Agreement
The organization listed on the front of this Application for Accreditation/Certification (the Applicant) performs or subcontracts the design, fabrication, production, testing, assembly, construction and/or installation of items, or provides a service to the aforementioned activities, at the address given, and makes this application to The American Society of Mechanical Engineers (ASME) for the appropriate Certificate of Accreditation, Certificate of Acceptance, or Certificate of Authorization permitting use of the associated Certification Mark. The Applicant: (1) Agrees to use the Certificate and/or Stamp in accordance with the applicable ASME Code or Standard
and supplemental conformity assessment requirements governing this application. (2) Agrees to return the stamp and/or Certificate anytime ASME may so request, at the time the Applicant
discontinues the work covered, or at the time of expiration, if not renewed. (3) Accepts the conduct of announced or unannounced audits as required by the appropriate ASME
accreditation/certification body. Access to the inspection site to conduct audits, reviews or surveys, including travel to and from the site, is the responsibility of the Applicant. If access is blocked or impeded, ASME is not responsible for the Applicant failing to receive, or continue to have accreditation/certification.
(4) Agrees to indemnify and hold harmless ASME and its agents from and against any costs (including legal
fees and expenses) and any direct, indirect, incidental or consequential damages (including loss of profits or business opportunity) arising out of any claim or cause of action in any way related to this Agreement or the subject matter hereof, including but not limited to claims based on contract, tort (including negligence), strict liability or breach of warranty (express or implied).
(5) Understands that the Applicants use of the ASME mark may be allowed provisionally by ASME in its
discretion until a decision is made on an appeal of an action of an ASME subcommittee, committee or board and accepts the obligation to pay all legal fees and expenses and ASME's cost for recovering the Certificate and stamp if not returned.
(6) Agrees to pay ASME for all fees, expenses and expenditures associated with the Review/Survey/Audit
conducted by ASME. Legal Company Name: ____________________________________________________________________ Signed: ____________________________________________
Signature must be by a Company Officer or Designee Title: ____________________________________________
Date: ____________________________________________
Two Park Avenue, New York, NY 10016
Form D Company: ____________________________________________________________ (Company name as it will appear on the Certificate)
Division: ____________________________________________________________ (Division, department, etc., if it is to appear on the Certificate) Location (provide full address): Contact name: _______________________________ Fax: _____________________________________ Title: _______________________________ E-mail: ______________________________________ Telephone: _______________________________ Company Website:____________________________________ Jurisdictional Authority (if applicable): _____________________________________________________________________ Authorized Inspection Agency of record (if applicable): _________________________________________________________ Recommended hotel or motel for team (provide name, full address, and telephone numbers): Recommended airport (include city name): _________________________________________________________________ Miles from airport to lodging: _________________________ Miles from lodging to office/plant/site: ___________________ Recommended airport to lodging transfer:
___ Taxi Signed: ______________________________________ ___ Limo ___ Hotel provided limo Title: ______________________________________ ___ Rent car ___ Pickup by company Date: ______________________________________
Corporate/Mailing ______________________________
______________________________
______________________________
______________________________
Plant ________________________________
________________________________
________________________________
________________________________
Field Site _____________________________
_____________________________
_____________________________
_____________________________
First choice _______________________________________________ _______________________________________________ _______________________________________________ _______________________________________________
Second choice _______________________________________________ _______________________________________________ _______________________________________________ _______________________________________________ A4.7- 3/13 Page 1 of 1
Two Park Avenue, New York, NY 10016
Form G
_________________________________________________________________________________________________ (Company Name as it will appear on the Certificate)
_________________________________________________________________________________________________
(Department, Division, etc.) Please list below the location(s) where the survey is to be conducted and at which there is documented evidence to demonstrate implementation of the program to be accredited.
Office or Field Site Office or Field Site _____________________________________________ ____________________________________________
_____________________________________________ ____________________________________________
_____________________________________________ ____________________________________________
_____________________________________________ ____________________________________________
Telephone: ( )_____________________________ Telephone: ( )_____________________________
Contact Name:_________________________________ Contact Name:________________________________
Title:_________________________________________ Title:________________________________________
Office or Field Site Office or Field Site _____________________________________________ ____________________________________________
_____________________________________________ ____________________________________________
_____________________________________________ ____________________________________________
_____________________________________________ ____________________________________________
Telephone: ( )_____________________________ Telephone: ( )_____________________________
Contact Name:_________________________________ Contact Name:________________________________
Title:_________________________________________ Title:________________________________________
Check Applicable Code Sections: (Note: Use Additional Forms as Needed) I ________ VIII Div. 2 _________
III Div. 1 ________ VIII Div. 3 _________ Signed:______________________________________
III Div. 2 ________ X _________
III Div. 3 ________ XI _________ Title:________________________________________
IV ________ XII _________
VIII Div. 1 _________ Date:________________________________________ A12.1-1/13
te l 1 .212.591.8500 fax 1 .212.591.8501 www. asme.org
Two Park Avenue New York, NY 10016-5990 U.S.A.
SCHEDULING INFORMATION NEW/RENEWAL APPLICANTS ASME will make every effort to conduct an evaluation of an Applicant's program at the earliest possible date after receipt of the application forms and fees. However, there is an average lead time to schedule surveys, from receipt of completed application and fees of four months due to scheduled surveys of other companies. To minimize costs for Applicants, ASME tries to schedule a series of surveys in the same area of the world. Therefore, in order for ASME to schedule your survey, please answer the following two questions. Please note that if you check as soon as possible for Question 1, or a date much earlier than four months, we will in general only be able to schedule at those times, if another company in your area cancels their date. Question 1 What is the earliest date that you are available for a survey? {Note: Renewal surveys are required to be scheduled approximately 8-12 weeks prior to the current expiration date.} As soon as possible, or ________________________________________ Question 2 What weeks or dates are not acceptable to you (due to Holidays, plant shutdowns, etc.) between your first available date and eight months from the date of your application? ____________________________________________________________________________________ ____________________________________________________________________________________ _____________________________________________________________________________________ ____________________________________________________________________________________ Company__________________________________________ Signature:__________________________ Date:______________________________ Your survey will be scheduled at the earliest possible date consistent with your responses and in conjunction with other companies in your area. We, therefore, expect you to accept the dates that we assign. Lack of acceptance may result in a long delay until the next series of surveys are scheduled in your area or a substantial increase in your costs if a Team must be sent to do your survey alone. We cannot schedule your survey until the completed application, fees and this completed form are received. ASME Conformity Assessment Department A4.14E2-1/13(1/1)
Supplemental Accreditation Agreement For Jurisdictional AIAs
This Supplemental Accreditation Agreement is required to be competed by Applicants for Authorized Inspection Agency (AIA) Accreditation that are Jurisdictions as defined in the ASME QAI1 Standard. The Jurisdiction applying for accreditation must indicate whether they accept the following principles inherent in QAI1. Responses marked with an asterisk (*) require an explanation, which must be signed and included with this Supplemental Agreement. 1 Reciprocity The Enforcement Authority (Jurisdiction) agrees to accept the results of
inspections required by the ASME Boiler and Pressure Vessel Code which have been performed by an ASME accredited AIA as fulfilling ASME Code requirements for inspection.
[ ] Accepted [ ] Accepted in principle, not fully implemented* [ ] Not accepted*
2 Integrity The AIA maintains a commitment to the integrity of the inspection process and of the
ASME Code Symbol Marks, by fulfilling its obligations under the ASME Boiler and Pressure Vessel Code and by recognizing the role of the third party inspection system.
[ ] Accepted [ ] Accepted in principle, not fully implemented* [ ] Not accepted*
3 Openness The Enforcement Authority (Jurisdiction) permits ASME Certificate Holders and
Applicants for ASME Certificates of Authorization located within its Jurisdiction to select other ASME accredited AIAs.
[ ] Accepted [ ] Accepted in principle, not fully implemented* [ ] Not accepted*
4 Participation in the process The AIA agrees to participate in the development of the ASME
Boiler and Pressure Vessel Code by becoming a member of the Conference Committee or the International Interest Review Group (IIRG).
[ ] Accepted [ ] Accepted in principle, not fully implemented* [ ] Not accepted*
Signed: _________________________________________ Date: ___________________ (Signature must be by officer or designee of Jurisdiction) Jurisdiction: ____________________________________________________ Title: ________________________________________ A12.13-9/05
t e l 1 .212 .591 .8500 Two Park Avenue f ax 1 .212 .591 .8599 New York, NY www.asme.o rg
10016-5990 U.S.A.
Supplemental Information for New Applicants
To be filled out by all Applicants for New Accreditation (not Renewals)
Use additional sheets if necessary
Organization: _______________________________________________________________
Type of Organization QAI References Complete Section:
Jurisdictional Authority 1-1.1.1(a), 2-1.1.1(a), 3-1.1.1(a), 5-1.1.1(a) 1
Insurance Company 1-1.1.1(b), 2-1.1.1(b), 3-1.1.1(b), 5-1.1.1(b) 2
Independent Third-Party Inspection Organization 1-1.1.1(c), 2-1.1.1(c), 3-1.1.1(c), 5-1.1.1(c) 3
1 Jurisdictional Authorities 1.1 What is the designation of the law or regulation which documents that the jurisdiction
accepts and administers one or more construction code sections of the ASME Boiler and Pressure Vessel Code? Attach documentation.
1.2 What section(s) of the Code does the jurisdiction accept and administer? Section I Power Boilers Section IV Heating Boilers Section VIII Pressure Vessels Section X Fiber Reinforced Plastic Pressure Vessels Section XII Transport Tanks 1.3 Does the jurisdiction delegate administrative authority to one or more organizations to
act on its behalf? Yes complete 1.4 No
1
1.4 How is the delegation of authority duly authorized by the laws of the jurisdiction? Attached documentation.
2 Insurance Companies 2.1 Is the company structured with separate organizations/operations of insurance and
inspection activities? If yes, how is the relationship defined to jointly meet accreditation criteria?
2.2 List at least one state of the United States or province of Canada that the insurance
company is registered by to write boiler and pressure vessel insurance. Attach documentation.
3 Independent Third-Party Inspection Organizations 3.1 By what governmental regulatory body is the organization authorized to perform
inspection and/or design review of boilers and/or pressure vessels? Attach documentation.
3.2 How has the governmental regulatory body identified in 3.1 been given the responsibility
for the enforcement of regulations pertaining to boilers and pressure vessels? Attach documentation.
3.3 How has the applicants ability to perform inspections and design reviews for boilers
and/or pressure vessels been recognized by the governmental regulatory body identified in 3.1? Attach documentation.
2
Invoice Request FormA N I N T E R N A T I O N A L C O D E
go.asme.org/bpvc13
ASME Boiler and Pressure Vessel Code
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
________________________________________________ _______ _____________
_________________________ ______________________________________________
_________________________ ______________________________________________
___________________________________________________________________________
___________________________________________________________________________
________________________________________________ _______ _____________
_________________________ ______________________________________________
_________________________ ______________________________________________
Please complete the following Invoice Request Form; and then send to:ASME Customer Care 22 Law Drive, Box 2300 FairfieldNJ07007-2300USA Phone:+1.800.843.2763(toll-free),+1.973.882.1170 (MondaythroughFriday,8:00a.m.-5:30p.m.,EST)
Fax:+1.973.882.8113(24hours/7days) eMail: [email protected]
ASMECustomerCarethenwillsendyouaProformainvoicewithapplicablesalestaxandshipping/handlingcharges.Orderinginformation for domestic and international orders may be found below. Pricesaresubjecttochangewithoutnotice.
ASMEACCOUNTNO.(iFAvAilAblE):
Ship To:
COMPANyNAME:
ADDrESS:
CiTy/STATE/ZiPOrPOSTAlCOdE:
COUNTry: TOThEATTENTiONOF:
PhONE: EMAil:
BiLL To:
COMPANyNAME:
ADDrESS:
CiTy/STATE/ZiPOrPOSTAlCOdE:
COUNTry: TOThEATTENTiONOF:
PhONE: EMAil:
Invoice Request Form:
Publications: order no. isbn Quantity list Price (usd) line total
bPVc-2013 sections:
i,rulesforConstructionofPowerboilers 600010 9780791834503 ______ $370.00 _____________
ii, Materials:ii-A,FerrousMaterialSpecifications(twovolumes) 60002A 9780791834510 ______ $560.00 _____________
ii-b,NonferrousMaterialSpecifications 60002b 9780791834527 ______ $560.00 _____________
ii-C,SpecificationsforWeldingrods,Electrodes,andFillerMetals 60002C 9780791834534 ______ $645.00 _____________
ii-d,Properties(Customary) 60002d 9780791834541 ______ $560.00 _____________
ii-d,Properties(Metric) 6002dM 9780791834558 ______ $560.00 _____________
iii, rules for construction of nuclear Facility components:iii-NCA,Generalrequirementsfordivision1anddivision2 60003r 9780791834565 ______ $430.00 _____________
division1:iii-Nb,Class1Components 60003b 9780791834572 ______ $430.00 _____________
iii-NC,Class2Components 60003C 9780791834589 ______ $430.00 _____________
iii-Nd,Class3Components 60003d 9780791834596 ______ $430.00 _____________
iii-NE,ClassMCComponents 60003E 9780791834602 ______ $400.00 _____________
iii-NF,Supports 60003F 9780791834619 ______ $400.00 _____________
iii-NG,CoreSupportStructures 60003G 9780791834626 ______ $380.00 _____________
iii-Nh,Class1ComponentsinElevatedTemperatureService 60003h 9780791834633 ______ $400.00 _____________
iiiAppendices 60003A 9780791834640 ______ $475.00 _____________
Division 2:iii-2,CodeforConcreteContainments 600032 9780791834657 ______ $455.00 _____________
Division 3:iii-3,ContainmentsforTransportationandStorageofSpent
NuclearFuelandhighlevelradioactiveMaterialandWaste 600033 9780791834664 ______ $455.00 _____________
division5:iii-5,highTemperaturereactors 600035 9780791834671 ______ $455.00 _____________
iV, rules for construction of Heating boilers 600040 9780791834688 ______ $375.00 _____________
V, nondestructive examination 600050 9780791834695 ______ $415.00 _____________
Vi, recommended rules for the care and operation of Heating boilers 600060 9780791834701 ______ $220.00 _____________
Vii, recommended Guidelines for the care of Power boilers 600070 9780791834718 ______ $220.00 _____________
Viii, rules for construction of Pressure Vessels:viii-1,division1 600081 9780791834725 ______ $570.00 _____________
viii-2,division2,Alternativerules 600082 9780791834732 ______ $570.00 _____________
viii-3,division3,AlternativerulesforConstructionof highPressurevessels 600083 9780791834749 ______ $510.00 _____________
iX, Welding and brazing Qualifications 600090 9780791834756 ______ $425.00 _____________
X, Fiber-reinforced Plastic Pressure Vessels 600100 9780791834763 ______ $335.00 _____________
Xi, rules for inservice inspection of nuclear Power Plant components 600011 9780791834770 ______ $570.00 _____________
Xii, rules for construction and continued service of transport tanks 600012 9780791834787 ______ $380.00 _____________
CodeCases:boilersandPressurevessels 600120* 9780791834794 ______ $570.00 _____________
CodeCases:NuclearComponents 60012N* 9780791834800 ______ $570.00 _____________
binderwithlabel 600140 ______ $20.00 _____________
CompletebPvC-2013(approx.10%discountoffSuggestedlistPrice) 6X0230 9780791834817 ______ $12,700.00 _____________
CompletebPvC2013with34binders 6X0330 9780791834824 ______ $13,380.00 _____________
ASMECustomerCarethenwillsendyouaProformainvoicewithapplicablesalestaxandshipping/handlingcharges. SUbTOTAl: _____________
*Codes Cases are issued four times per year. This price reflects inclusive purchase of all Code Cases issued during the upcoming, two-year publishing cycle for BPVC-2013. However, individual Code Cases are also available for separate purchase. Visit www.asme.org or contact ASME Customer Care for details.
ASMEs Boiler and Pressure Vessel Code (BPVC) | 2013 Sections
Publications: order no. Quantity list Price (usd) line total
Product certification Packages per designator:
A(AssemblyofPowerboilers) bPvCb ______ $2,565.00 _____________
E(Electricboilers) bPvCE ______ $2,925.00 _____________
h(CastironSectionheatingboilers) bPvCh2 ______ $475.00 _____________
h(FieldAssemblyofboilers) bPvCh ______ $1,010.00 _____________
h(heatingboilers,ExceptCastiron) bPhlW ______ $3,140.00 _____________
hlW(linedPotableWaterheaters) bPhlW ______ $3,140.00 _____________
hv(heatingboilerSafetyvalves) bPvhv ______ $3,215.00 _____________
M(Miniatureboilers) bPvCM ______ $4,170.00 _____________
N,NA,NPT,NS(N-TypeCertificatesofAuthorizationandCertificatesofAccreditation) bPNPT ______ $3,160.00 _____________
Nv(NuclearSafetyandPressurereliefvalvesincludes bPvC-ii-A,Sectionii,PartA,FerrousMaterialsSpecifications) bPNvA ______ $3,235.00 _____________
Nv(NuclearSafetyandPressurereliefvalvesincludes bPvC-ii-b,Sectionii,Partb,NonferrousMaterialsSpecifications) bPNvb ______ $3,235.00 _____________
Nv(NuclearSafetyandPressurereliefvalvesincludes bPvC-ii-d,Sectionii,Partd,Properties,CustomaryorMetric) bPNvd ______ $3,235.00 _____________
N3(N-TypeCertificatesofAuthorizationandCertificatesofAccreditation) PvCN3 ______ $2,590.00 _____________
QSC(QualitySystemsCertificatesMaterialManufacturers,MaterialSuppliers) PvCMS-Contact ASME
rP(Fiber-reinforcedPlasticvessels) bPvrP ______ $425.00 _____________
S(Powerboilers)/PP(PressurePiping) bPvCA ______ $4,695.00 _____________
T(TransportTanks) bPvCT ______ $4,380.00 _____________
Td(TransportTanks,rupturediscdevices) bPvCTd ______ $3,930.00 _____________
Tv(TransportTanks,Safetyvalves) bPvCTv ______ $3,930.00 _____________
U(Pressurevessels,division1) bPvUM ______ $4,620.00 _____________
Ud(rupturediscdevices) bPvCUd ______ $4,170.00 _____________
UM(MiniaturePressurevessels) bPvUM ______ $4,620.00 _____________
Uv(Pressurevessels,SafetyvalvesincludesbPvC-viii-1,Pressurevessels,division1) bPUv1 ______ $4,170.00 _____________
Uv(Pressurevessels,SafetyvalvesincludesbPvC-viii-2,Pressurevessels,division2) bPUv2 ______ $4,170.00 _____________
U2(Pressurevessels,division2) bPvU1 ______ $4,620.00 _____________
Uv3(Pressurevessels,Safetyvalves) bPUv3 ______ $4,090.00 _____________
U3(Pressurevessels,division3) bPvU3 ______ $4,540.00 _____________
v(boilerSafetyvalves) bPvCv ______ $3,920.00 _____________
ASMECustomerCarethenwillsendyouaProformainvoicewithapplicablesalestaxandshipping/handlingcharges. SUbTOTAl: _____________
Related ASME Codes and Standards:Publications: order no. isbn Quantity list Price (usd) line total
official spanish-language translations:
bPvC-i-2010Seccion1,reglasparalaConstrucciondeCalderasdeEnergia XS0010* 9780791832998 ______ $210.00 _____________
b31.8S-2010GestindeintegridaddeSistemasdeGasoductos A21410* 9780791833667 ______ $95.00 _____________
b16 series on Valves, Fittings, Flanges and Gaskets:
b16.5-2009PipeFlangesandFlangedFittings: NPS1/2throughNPS24Metric/inchStandard M01509* 9780791831991 $210.00 _____________
b16.9-2007Factory-MadeWroughtbuttweldingFittings J10907* 0791831019 ______ $110.00 _____________
b16.11-2011ForgedFittings,Socket-WeldingandThreaded M01611* 9780791834015 ______ $65.00 _____________
b16.34-2009valvesFlanged,ThreadedandWeldingEnd J01809* 9780791832233 ______ $170.00 _____________
b16.47-2011largediameterSteelFlanges: NPS26ThroughNPS60Metric/inchStandard J12911* 9780791833773 ______ $115.00 _____________
Product Certification PackageslistpricesindicatedinthefollowingProductCertificationPackagesincludepertinentpublicationsofthe2010EditionofASMEsboiler&PressurevesselCode(bPvC).Uponofficialpublicationofthe2013EditionofthebPvConJuly1,2013,listpricesoftheseProductCertificationPackageswillberevisedaccordingly.PleasecontactASMECustomerCareforanyquestions.
Publications: order no. isbn Quantity list Price (usd) line total
b31 series on Piping:
b31.1-2012PowerPiping A05812* 9780791834169 ______ $260.00 _____________
b31.4-2009PipelineTransportationSystemsfor liquidhydrocarbonsandOtherliquids A03809* 9780791832653 ______ $160.00 _____________
b31.8-2010GasTransmissionanddistributionPipingSystems A04510* 9780791832844 ______ $205.00 _____________
b31.8S-2010ManagingSystemintegrityofGasPipelines A45S10* 9780791832851 ______ $145.00 _____________
b46.1-2009SurfaceTexture,Surfaceroughness,Wavinessandlay A14312* 9780791832622 ______ $169.00 _____________
bPE-2012bioprocessingEquipment A14309* 9780791834220 ______ $230.00 _____________
CSd-1-2012ControlsandSafetydevicesforAutomaticallyFiredboilers A09112* 9780791834107 ______ $93.00 _____________
Fss series:
APi579-1/ASMEFFS-12007Fitness-For-Service A16407 0791831027 ______ $720.00 _____________
APi579-1/ASMEFFS-12007Fitness-For-ServiceCdFormat A164C7 0791831191 ______ $752.00 _____________
FFS-1-2007Fitness-for-ServicePrintandCdPackage AX6407 ______ $1,079.00 _____________
FSS-2-2009Fitness-For-ServiceProblemManual A17408 9780791831519 ______ $180.00 _____________
nuclear:
AG-1-2009CodeonNuclearAirandGasTreatment A12209 9780791831809 ______ $350.00 _____________
N278.1-1975Self-OperatedandPower-OperatedSafety-relatedvalves FunctionalSpecificationStandard A00084* ______ $35.00 _____________
N509-2002NuclearPowerPlantAir-CleaningUnitsandComponents A08502* 0791828042 ______ $75.00 _____________
N510-2007TestingofNuclearAir-TreatmentSystems A08207* 0791831132 ______ $55.00 _____________
N511-2007in-ServiceTestingofNuclearAirTreatment,heating, ventilating,andAir-ConditioningSystems A16507* 0791831140 ______ $39.00 _____________
NOG-1-2010rulesforConstructionofOverheadandGantryCranes (Toprunningbridge,MultipleGirder) A11910* 9780791832752 ______ $153.00 _____________
NQA-1-2008QualityAssuranceProgramrequirements forNuclearFacilities A105E8 0791831272 ______ $245.00 _____________
NUM-1-2009rulesforConstructionofCranes,Monorails,andhoists (withbridgeorTrolleyorhoistoftheUnderhungType) J14309* 9780791832769 ______ $190.00 _____________
OM-2009OperationandMaintenanceofNuclearPowerPlants A13109 9780791832271 ______ $225.00 _____________
QAi-1-2010QualificationsforAuthorizedinspection J95010* 9780791832103 ______ $60.00 _____________
QME-1-2007QualificationofActiveMechanicalEquipmentUsed inNuclearPowerPlants A13607* 0791831086 ______ $95.00 _____________
rA-S-2008Standardforlevel1/largeEarlyreleaseFrequency ProbabilisticriskAssessmentforNuclearPowerPlantApplications A15308 9780791831403 ______ $235.00 _____________
Pcc series on Post construction:
PCC-1-2010GuidelinesforPressureboundary boltedFlangeJointAssembly A15010* 9780791832745 ______ $89.00 _____________
PCC-2-2011repairofPressureEquipmentandPiping A17511* 9780791833438 ______ $130.00 _____________
PCC-3-2007inspectionPlanningUsingrisk-basedMethods A16807* 9780791831281 ______ $69.00 _____________
Ptb series on Pressure Vessels:
PTb-1-2009ASMESectionviiidivision2CriteriaandCommentary A19509* 9780791832240 ______ $195.00 _____________
PTb-2-2009GuidetolifeCycleManagementof PressureEquipmentintegrity A19609* 9780791832257 ______ $95.00 _____________
PTb-3-2010ASMESectionviiidivision2ExampleProblemManual A20410* 9780791833285 ______ $175.00 _____________
PTC25-2008Pressurereliefdevices C06108* 9780791831694 ______ $95.00 _____________
PvhO-1-2012SafetyStandardforPressurevesselsforhumanOccupancy A09212* ______ $200.00 _____________
rTP-1-2011reinforcedThermosetPlasticCorrosionresistantEquipment J127E1* 9780791833568 ______ $255.00 _____________
ASMECustomerCarethenwillsendyouaProformainvoicewithapplicablesalestaxandshipping/handlingcharges. SUbTOTAl: _____________
*Also available as digital download (single-user PDF.) Visit www.asme.org or contact ASME Customer Care for details.
Related ASME Codes and Standards (continued):
For all other ASME programs -- including product / personnel certifications, training & development courses, professional conferences and publications visit: www.asme.org.
Ordering InformationWhen ordering with your company purchase order, please make sure that your ASME account number, if available, is indicated. This account number can be found on ASME invoices, packing lists and statements. CA, FL, GA, IL, KY, TX and DC purchasers will be invoiced for applicable sales tax. Canadian purchasers will be invoiced 7% GST, unless ASME is furnished with a valid tax exemption certificate.
Forinternationalfundstransfers,pleaseindicateyourASMEordernumber, invoice number, and account number. Failure to indicate your ASME order number, invoice number, and account number may delay shipment considerably.
Pleasebesuretoincludeyourbankswiretransferfeesinthetotalamount submitted.
Proformainvoicesshowingallcharges,includingshipping/handling charges, will be furnished upon receipt of order. Orders receivedwithpaymentwillbeinvoicedforshipping/handlingcharges.ASMEsstandardshipping/handlingchargesmaybeviewed here: www.asme.org/about-asme/sales-policy#chart
International OrdersAdvance payment is required for all international orders. ASME accepts most major credit cards, including MasterCard, VISA, American Express, Discover and Euro. ASME also accepts checks written in some international currencies. Contact ASME to determine which currencies are acceptable or visit: www.asme.org/membership/payment_methods.cfm.
Two Park Avenue New York, NY10016-5990 U.S.A.
ASMEs Boiler and Pressure Vessel Code (BPVC) | 2013
Prices are subject to change without notice.
Nuclear Application A9.54 1-12.pdfSigned: ____________________________________________Title: ____________________________________________Date: ____________________________________________asme.orgEngineering Standards, News and Resources - ASME
Form G A12-1.pdfOffice or Field Site Office or Field SiteOffice or Field Site Office or Field Site
Supplemental Accreditation Agreement A12-13.pdfSigned: _________________________________________ Date: ___________________Jurisdiction: ____________________________________________________
Text19: Text20: Text21: Text22: Text1: Text2:
Text3:
Text4:
Text5:
Text6:
Text7:
Text8:
Text9:
Text10:
Text11:
Text12:
Text30:
Text33:
Text31:
Text32:
Text13:
Text18:
Text14:
Text15:
Text16:
Text17:
Text24:
Text29:
Text25:
Text26:
Text27:
Text28:
Text23:
Text34: Text37: Text35: Text36: Check Box35: Check Box36: Check Box37: Check Box38: Check Box39:
Check Box40: Check Box41:
Check Box45: Check Box42:
Check Box43:
Check Box44:
Text40: Text41: Preferred dates: months from the date of your application 1: months from the date of your application 2: months from the date of your application 3: months from the date of your application 4: Company: ASAP dates: actual dates: Check Box1: Check Box3: Check Box4: Check Box6: Check Box5: Check Box7: Check Box9: Check Box8: Check Box10: Check Box12: Check Box11: Organization Name: Jursid: Insurance Co: Indep Thrd Prty: 1: 1 Jurisd: 2 Sec I-Jurisd: 2 Sec IV - Jurisd: 2 Sec VIII - Jurisd: 2 Sec X - Jurisd: 2 Sec XII - Jurisd: 3 Yes: 3 No: 4 Juris:
2: 1 Insur Co:
3: 1 Ind Third Prty Insp: 3 Ind Third Prty Insp:
Two Park Avenue New York NY 10016: Co Name: Div Name: Address 1: Address2: City: State: Country: Postal code: Certificate Numbers: Exp Date: Stamp:
AIA Inspection: Plant: New: Field site: Renewal: N: N3: RTP: NA: NPT: OWN: QEI: NV: MO: NS: AIA: BPE: NQA-1: Abbrev: Legal Co Name: Date:
Title: Yes: Check Box2: