3 rd rd Plant Maintenance in Middle East Plant Maintenance in Middle East January 10 - 13, 2010 – Abu Dhabi, UAE January 10 - 13, 2010 – Abu Dhabi, UAE Qadeer Ahmed Qadeer Ahmed Senior Reliability Engineer Senior Reliability Engineer Asset Management to improve Plant Reliability DELIVERING ENERGY TO THE WORLD

Ahmed Qatargas

Embed Size (px)

Citation preview

33rdrd Plant Maintenance in Middle East Plant Maintenance in Middle EastJanuary 10 - 13, 2010 – Abu Dhabi, UAEJanuary 10 - 13, 2010 – Abu Dhabi, UAE

Qadeer AhmedQadeer Ahmed

Senior Reliability EngineerSenior Reliability Engineer

Asset Management to improve Plant Reliability

DELIVERING ENERGY TO THE WORLD

DELIVERING LNG TO THE WORLD

– Introduction• Qatargas Operating Company Limited

– What is Asset & Asset Management?• Maintenance Management?• Performance Management?

– Asset Management at Qatargas• MMS, PMS, CMS

– Results / Critical Success Factors• LPE, Critical Trips, Safety

– Q&A

Agenda

DELIVERING LNG TO THE WORLD

Introduction - Qatargas

DELIVERING LNG TO THE WORLD

• Qatargas is pioneer in Qatar’s LNG production and will be the largest producer of LNG in the world

• Qatargas existing LNG capacity is approx 25.6 MTPA of LNG.

• Qatargas is going through phenomenal expansion and capacity will be 42 MTPA of LNG by 2011

• Qatargas Expansion Projects – 4 new Mega Trains (7.8 MTPA) : TR4&5 in production – Largest LNG Trains– Laffan Refinery (150K BPD): Naphta, Kerosene, Gasoil – Common Sulfur Project (12K TPD) – Granulated Sulfur– Q-Max & Q- Flex LNG Ships (Q-Flex:210,000 m3 and Q-Max:266,000 m3)

• High Availability & Reliability is a pre-requisite to meet demand– Asset Management is Important for Maintenance and Reliability

Introduction:

DELIVERING LNG TO THE WORLD

Introduction: Geographic Location

32”

North Field (80 KM)

Qatargas

DELIVERING LNG TO THE WORLD

A Glimpse - Qatargas Offshore:

LNG TRAIN 5

QATARGAS NFB COMPLEX

LNG TRAIN 4

PU

WH4 - 64 m(12 Slots)

QatargasRas Laffan Industrial City

PL434”

(91 km)

Power/Comm5-6 Power/Comm

5-4

QATARGAS NFB COMPLEX

WH6 - 56 m(15 Slots)

WH5 - 46 m(15 Slots)

PL5-616”

(800 m)

PL5-416”

(300 m)

Power/CommMain

FOC to

Shore

PL638”

(81 km)

DELIVERING LNG TO THE WORLD

A Glimpse - Qatargas Onshore:

LNG Tanks

CSP

Liquids Loading Berths

QG2 TR4 & 5QG3TR6 & QG4TR7

Laffan Refinery

QG1

Liquid Storage

LNG Loading Berths

(10 – 42 MTPA)

~150,000 BPD

12,000 TPD

DELIVERING LNG TO THE WORLD

Integrated Product Flow Offshore

QG2 (TR4/5) QG3 (TR6) QG4 (TR7)

Storage Condensate/NGL/LNG Common Sulfur Project

Refinery Berths

QG1(TR1/2/3)

(42 MTPA)

12,000 TPD

150,000 BPD

DELIVERING LNG TO THE WORLD

What is Asset Management?

• Asset:– Fixed/Capital Assets are Equipments & Plants

• Asset Management:– It is a life cycle management of assets to ensure availability,

reliability and utilization of the assets to safely meet the business objectives at optimized cost.

– Important aspects of Asset Management• Maintenance Management• Performance Management

DELIVERING LNG TO THE WORLD

Maintenance Management

• SAP is used for Maintenance Management

– Asset Register – Functional Locations Hierarchy– Maintenance Notification/Work Orders– Maintenance Plans– Maintenance Execution etc..

• Condition Monitoring – System1

DELIVERING LNG TO THE WORLD

Performance Management

• Meridium – Asset Performance Management

– KPIs Monitoring the performance– Process and Equipment Reliability– Retrieving the data from MMS to analyze– Queries MMS data for reports– Condition Assessment

DELIVERING LNG TO THE WORLD

Why Asset Management?• Focused approach to Improve Maintenance & Reliability

– Repair base to Reliability base

• Ensure High Availability– Proactive availability modeling rather knowing by incident

• Contribution to Company's Vision– Customer Satisfaction, Efficient and Reliable Operations– Financial Performance

• Provide Better Control and Sustainability– Proactively involve in monitoring and efficiently managing assets.

• Teamwork & Organization Learning– Develop strong relationship among cross-functional teams

DELIVERING LNG TO THE WORLD

Asset Management at Qatargas

DELIVERING LNG TO THE WORLD

AM Philosophy at QG:

• Asset Centric Approach using Meridium• Philosophy at Qatargas:

– Maintenance Management – SAP• Condition Monitoring: System1 & Machinery Manager

– Performance Management - Meridium• Key is Maintenance and Performance

DELIVERING LNG TO THE WORLD

Asset Centric Approach

Scorecard, KPIs

Risk Base Inspection

ReliabilityAnalytics

RCM / FMEA

RCFA

Asset

Meridium Domain SAP Domain

Interface

DELIVERING LNG TO THE WORLD

Maintenance Management

– Asset Register (Estimated 300K-400K Tags)– Functional Locations Hierarchy– Maintenance Notification/Work Orders– Spare Usage – Maintenance Plans– Maintenance Execution etc..

DELIVERING LNG TO THE WORLD

Asset Register Hierarchy in SAP:

DELIVERING LNG TO THE WORLD

Condition Monitoring System:

• CMS (Condition Monitoring System)– Primarily focused on:

• Vibration Monitoring– Online Monitoring – BN System 1– Offline Monitoring – Machinery Manager

• Lube Oil Management– Condition base– Interval base

DELIVERING LNG TO THE WORLD

Performance Management at QG:• Performance Management System using Meridium:

– Reliability Analytics: Reliability Growth, Production Weibull, etc..

– Criticality Assessment: Based on Risk Matrix

– Reliability Center Maintenance: Maintenance Strategies for System

– Failure Mode & Effect Analysis: Maintenance Strategies for Critical Equipments

– Root Cause & Failure Analysis: Critical Failures, Bad Actor Elimination

– Condition Assessment: Calibration, Inspection and Thickness Management

DELIVERING LNG TO THE WORLD

Criticality Assessment, Growth Analysis

Efficiency & Utilization Loses

Nameplat eLine

N ameplateOutput

Cut back Loss es

Process Reliab ility = 94%

Demonstrated Output (Eta) @CDF = 63.2% or R=36.8%

Product ion: Et a =1 03 63 T/ D , Be ta= 2 0

Los ses

Demons trated Weibull Production L ine

Efficiency & Utilization Loses

Nameplat eLine

N ameplateOutput

Cut back Loss es

Process Reliab ility = 94%

Demonstrated Output (Eta) @CDF = 63.2% or R=36.8%

Product ion: Et a =1 03 63 T/ D , Be ta= 2 0

Los ses

Efficiency & Utilization Loses

Nameplat eLine

N ameplateOutput

Cut back Loss es

Process Reliab ility = 94%

Demonstrated Output (Eta) @CDF = 63.2% or R=36.8%

Product ion: Et a =1 03 63 T/ D , Be ta= 2 0

Los ses

Demons trated Weibull Production L ine

Production Weibull

Reliability – Growth Analysis

DELIVERING LNG TO THE WORLD

Meridium – RCM, RCA, Record Manager

DELIVERING LNG TO THE WORLD

Challenges, Critical Success Factors & Results

DELIVERING LNG TO THE WORLD

Challenges / Critical Success Factors:

• Committed Leadership– Continuous Support and Commitment

• Adequate & Dedicated resources to Implement, Control and Sustain

• Organizational Culture – Proactive rather Reactive

• Ensure Good Quality Data– Required good quality data to produce good results

• Cross-functional teamwork• Employee Training & Workshops

DELIVERING LNG TO THE WORLD

Results

• Safety• Onshore

– Six years LTA free• Offshore

– Seven years LTA free

• Reliability – Reduced Critical Trips– Significant drop in Loss Production Events– Improved Plant Availability and Reliability

• Others Provides up-to-date database with maintenance & equipment information Proactive rather reactive approach Integration/Interface among different systems SAP/Meridium etc.

DELIVERING LNG TO THE WORLD

Finally, Asset Management is Cross-functional Activity

Operations

Process control, LPEsMonitoring

KPIs

ReliabilityRCFA

Asset Register

Mtce Strategies

Maintenance

DELIVERING LNG TO THE WORLD