Upload
ahmed-elsayed
View
72
Download
2
Embed Size (px)
Citation preview
Page | 1
10 IbnWaseif Shah st, SidiGaber station Alexandria, Egypt Ahmed El Sayed Ahmed
Date of Birth: 22/4/1965Nationality: Egyptian Mobile Number: (01228077356) / (01116467828)
Religion : Muslim
Marital status: Married Military status: Completed Email Address: [email protected] [email protected] Language: • Arabic: Mother Tongue.
• English: Fluently spoken and written(working experience with BGE and BP
Companies).
Objective
Looking forward to being a professional HSE advisor in the field of Oil and
Gas and building up my career in such away to be special and unique.
Academic Bachelor degree in Physical Education, Alexandria University 1987. Graduation Grade: Very Good. Computer skills
• Microsoft windows XP and windows 7 • Microsoft office (Word, Excel and Power point)
Courses with Certificates
OSHA outreach safety training program general industry
safety & health standards.
2BTechnical Training
Page | 2
OSHA outreach safety training program construction industry safety & health standards.
OSHA. Fire marshal' s Course Areas covered in the training included: 1-The fire triangle. 2- Common causes of fire. 3- Role of the fire marshal. 4- Flammable and combustible materials. 5- Fire alarm systems. 6- Automatic fire fighting systems. 7- fire risk assessment . 8- Evacuation procedures.
9- Practical use of fire extinguishers. OSHA . Scaffold competent person training inspection
& supervision of erection & dismantling of scaffolds OSHA . successfully completed the requirements of
NASP Safety diploma in workplace occupational safety and health
OSHA .health& safety courses at platinum training development, derby.
HSE Specialist Certificate.
Safety Training Course (leading with Safety) (OGS).
Page | 3
Training
Permit to Work performing authority training.
Risk Assessment training.
Fire Fighting training.
First Aid training.
Confined Space training.
Tie Off 100 % training.
Gas Tester Training.
Page | 4
Experience
Khalda Apache since November 2013
BECHTEL Company (from 2012 to2013) WND project
Under BP. (OIL & GAS).
FASTER Company (from 2011 to 2012) Elsokrymine project
to extract gold (Metal construction, electricity and
Mechanical).
BG Company from (2008 to 2011) Phase V & Phase VII.
Main compression Project.
Page | 5
Prosernat – Saqqara project. From (July 2007 until 2008) ,
Consortium between Bp and Gulf Suez petroleum.
Archirodon From June (2005 to June 2006) , Under Bechtel
Supervision Marin works.
Mitsubishi heavy industries LTD from (Feb 2004 to May
2005), ELNG tanks, IDKO project Under, Bechtel
supervision.
Murray Roberts from (Jan 2003 to Jan 2004) San Stefano
grand plaza project.
3ec- EDF Egyptian engineering company from (Jan 2001 to