6
AGM Formation Water Bath From Filling to Formation in less than 15 minutes Automatic Formation Waterbath for AGM/VRLA/EFB and other types of batteries Cooling water temperature regulation ±1K Constant formation process time Consistent high quality and reliable formation Segmentation for reduced Fill-to-Form loading time Flexibility and real-time production planning maximize Return-on-Investment

AGM Formation Water Bath - digatron.com · AGM Formation Water Bath From Filling to Formation in less than 15 minutes Automatic Formation Waterbath for AGM/VRLA/EFB and other types

Embed Size (px)

Citation preview

AGM Formation Water BathFrom Filling to Formation in less than 15 minutes

Automatic Formation Waterbath for AGM/VRLA/EFB and other types of batteries

Cooling water temperature regulation ±1K

Constant formation process time

Consistent high quality and reliable formation

Segmentation for reduced Fill-to-Form loading time

Flexibility and real-time production planning maximize Return-on-Investment

Fuse Connection Box

One fuse per each polarity per circuit to protect batteries and rectifier connection cable in case of short circuit conditions

Conveniently located straight forward rectifier interface

Why this innovation matters to your AGM Batteries

2

AGM/VRLA Formation

The formation process for AGM or VRLA batteries really begins with the filling pro-cess. The introduction of electrolyte results in very high heat generation over a short period of time, thus thermal management is critical.

Heat generation can be counteracted by chilling the electrolyte and putting the filled battery into a chilled water bath.

Fill-to-Form Processing

The time gap between electrolyte filling and initiation of the formation process is more important than might be realized. The longer the delay between fill and form the more lead sulfate is formed. This facilitates the formation process, but it also increases the resistance of the unformed plates, as lead sulfate is an insulator. Longer stand times after filling can also aggravate the conditions that can initiate dendrite shorts by allowing lead sulfate to slowly dissolve and diffuse into the separator. Subsequently the batteries are put onto formation as quickly as possible after fill.

The new Digatron/Firing Circuits AGM/VRLA Water Bath

ensures fill-to-form processing times less than 15 minutes.

Gate

Pneumatically driven 2-step gate mechanism for closing and sealing

Exhausting

Water Baths are totally covered and sulfuric aerosols are exhausted to a filter

Rated to comply within allowed combustive and safety limits

Partition

Pneumatically driven PP partition for segmentation

Trapezium shape ensures positive sealing

3

Digatron/Firing Circuits AGM Water Bath Features

Segmentation

Separation into four sections Each section is loaded and

controlled individually Formation process can be started

as soon as the loading process and cabling is completed for the individual section.

Belt Conveyor

Individual driven belt conveyor per section

Designed for 3D battery cooling

Formation-Rectifier best suited for AGM Water Bath

Software & Hardware

* SCI IGBT Technology

5

Multiple Charge Rectifier

Model Designation

Current [A] Charge

Voltage [V] Charge

Circuits per

Cabinet

Total Batteries

per Cabinet

DimensionsH x W x D

[cm]

Weight approx.

[kg]

Power Supply [kVA]

Multi Charge Rectifiers

MCR 30-360-16 SCR 30 10-360 16 320 195x210x100 1800 225

MCR 40-360-16 SCR 40 10-360 16 320 195x210x100 2000 300

MCR 50-360-16 SCR 50 10-360 16 320 195x210x100 2300 375

MCR 30-360-16 SCI* 30 10-360 16 320 195x210x100 1900 210

MCR 50-360-16 SCI* 50 10-360 16 320 195x210x100 2300 352

Multiple Charge & Discharge Rectifier

Model Designation

Current [A] Charge/

Discharge

Voltage [V] Charge/ Discharge

Circuits per

Cabinet

Total Batteries

per Cabinet

DimensionsH x W x D

[cm]

Weight approx.

[kg]

Power Supply [kVA]

MCDR 30-360-16 SCR 1-30 10-360 16 320 195x210x100 1900 225

MCDR 40-360-16 SCR 1-40 10-360 16 320 195x210x100 2100 300

MCDR 50-360-16 SCR 1-50 10-360 16 320 195x210x100 2400 375

MCDR 30-360-16 SCI* 1-30 10-360 16 320 195x210x100 2000 210

MCDR 50-360-16 SCI* 1-50 10-360 16 320 195x210x100 2400 352

4

Overview - Layout and Options

Belt Conveyor

Individual driven belt conveyor per section

Designed for 3D battery cooling

Technical Data

Dimensions (HxWxL) [cm] 160x180x1340

Cooling water flow rate 16 m3/h

Cooling water process accuracy +/- 1K

Options

Acid Resistant Temperature Probe• Measures battery electrolyte or

cooling water temperature• Pt100 three-wire temperature probe

technology • Acid resistant insulated 100mm probe tip

Watherbath InterfaceThe water bath interface monitors electro-lyte temperatures and the status of digital inputs and communicates these values to the formation circuits

Charging Leads• Highly flexible and fire retardant inter-

connection cables to put batteries in series

• Colored moldings for better visual polarity recognition

• Differently shaped moldings for haptic polarity recognition

2-in-1 Switch box for paralleling circuitsAllows easy change over from two DC out-puts to one common DC output providing higher current (e.g.: from 2x30A to 1x 60A)

Portable Acid Gravity Meter• Measures battery electrolyte gravity• True one-hand operation without

arm fatigue• Large enough grip for gloved hands

L5: 2

72 B

atte

ries

L4: 3

04 B

atte

ries

A-B

: 144

Bat

teri

esL0

–L3

: 32

0 B

atte

ries

www.digatron.com

About Digatron/Firing Circuits

Digatron/Firing Circuits is an international group of companies with engineering, manufacturing and service facilities located in Germany, the United States and China. For more than 40 years Digatron/Firing Circuits has developed and manu-factured computer-controlled test and formation

equipment for all kinds of batteries, ranging from mobile phones to automotive to huge submarine batteries. Digatron/Firing Circuits also supplies highly dynamic test and load systems for electrical energy storage devices like fuel cells, supercaps and hybrid systems.

Digatron/Firing Ciruits also deliversTotal Project Engineering Complete formation systems and fully integrated turnkey projects that meet our clients expectations from the market leader: Battery Filling Battery Weighing Complete Waterbath System Layouts Formation Rectifier Finishing Line Water Cooling System Exhausting System Facility and Conveying Infrastructure Documentation

Digatron/Firing Circuits - Formation solutions from one source

6

Aachen, Germany

Tel: +49 241 168 090

Fax: +49 241 16809-19

Shelton, (CT), USA

Tel: +1 203 446 8000

Fax: +1 203 446 8015

Qingdao, China

Tel: +86 532 8608 9988

Fax: +86 532 8608 9909