Agenda School updates District wide updates
Recycling report to county- Bruce Craig Energy star update- Wade Brosius
Energy conservation project Overview- Mike Hanson, CM3 building solutions Project energy savings and environmental impact-
Wade Energy education tools- Pat Dunn
Wrap up and next steps
School Updates
Bethel High School Middle School GVES Concord
County recycling Report 32.23 tons of single stream recycling Reduction of 1 trash and 1 recycling dumpster at Bethel Springs GVES and Concord school - 2 recycling dumpsters and 1 trash
dumpster GVHS and Concord - looking into possibility of reducing the # of
trash dumpster pulls and increasing # of recycling dumpster pulls
Garage products recycled Antifreeze 720 pounds Batteries 2,435 pounds Radiators 40 pounds Oil filters 1,200 pounds Used oil 8,640 pounds
Energy Star
My Portfolio: Wade Brosius February 11, 2013 - 11:57:38
AM Total Buildings: 5
Facility Name Current Rating (1-100)
Current Site Energy Intensity
(kBtu/Sq. Ft.)
National Median Site EUI (kBtu/Sq.
Ft.)Current Total Site Energy Use (kBtu)
Change from Baseline: Adjusted
Energy Use (%)
Change from Baseline: GHG
Emissions (MtCO2e)
Bethel Springs ES 89 51.8 80.3 4,664,377.34 -38 -303.7Concord ES 58 48.3 52 6,419,078.29 -28.5 -350.93Garnet Valley ES 92 53.4 89.6 5,992,781.35 -33 -247.2Garnet Valley High School 63 64.9 73.2 17,351,602.69 -31.8 -951.62Garnet Valley Middle School 75 66.4 80.9 12,805,059.56 -25.8 -470.22Group Total 47232899.23 -2323.67
Energy Conservation Project Project Goals
Reduced Energy Consumption Reduced Operating Costs State of the Art Equipment w/ Extended Warranties Make All Buildings DDC Controlled Standardized Equipment District Wide Address Long Lingering Capital Needs
Performance Contracts
Benefits of PC – streamlined process, more GVSD control
PCs streamline process for energy projects – reduces cost & time, allows for implementing more comprehensive project w/ immediate improvement in occupant conditions
Gives on site facilities staff more input to design and better control of final product
Project lowers operating costs by reducing energy use and replacing high maintenance cost equipment
Project fully completed in 2013 with minimal disruption
Project Highlights 12,344 fixtures impacted including 536 outdoor lights Lighting based on occupancy thru sensors & energy
education New high-efficiency chillers at four schools Digital control upgrades district wide New high-efficiency water heaters
Scope HS MS GVES CES BSES
Lighting Retrofit X X X X X
Energy Education X X X X X
ATC Recommissioning X X X X X
DDC Controls X X X X X
Roof Replacement X
Building Envelope X X X X X
Chiller Replacement X X X X
Vending Machine Controls X X X X X
Water Fountain Controls X X X X X
Boiler Controls X X X X
Graphics Upgrade X X X X X
Demand Control Ventilation, VFDs
X X X X
Simplified Pumping X
DHW Replacement X X X X
Added AC X X
Gas Line X
Project Energy Savings Approx. 3.5 million kWh
2650 Metric Tons GHG
http://www.epa.gov/cleanenergy/energy-resources/calculator.html
Energy Savings ANNUAL OPERATING COSTS USING EXISTING SYSTEM ENERGY COST---------------------------------- $ 4,696 MAINTENANCE COST------------------------- $1800 TOTAL COST------------------------------------ $6496 ANNUAL OPERATING COSTS USING LED SYSTEM ENERGY COST-----------------------------------$472 MAINTENANCE COST-------------------------$0 TOTAL COST------------------------------------ $472 SAVINGS----------------------------------------- $6024
BEFORE AND AFTER:
In the auditorium of the Middle School, 150- and 250-watt incandescent quartz lamps were replaced by 17- and 24-watt LED lights. The new LEDs enhance the appearance of the auditorium and maintain or improve light levels, but will significantly cut the energy consumption while eliminating obsolete technology and reducing maintenance costs.
Middle SchoolAuditorium
District Wide Energy Education
Partnership w/ Practical Energy Solutions School specific faculty meetings Help tying your existing curriculum to project goals Monthly reporting of results to schools “Nothing Saves More Than OFF”
Next Steps
Goals for next meeting Meeting date