64

AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014

AGENDA NOTES FOR 457th MEETING OF OPERATION amp COORDINATION SUB-COMMITTEE OF WRPC

TO BE HELD ON 11TH MARCH 2014 AT NTPC MUMBAI ITEM No 1 CONFIRMATION OF THE MINUTES

Minutes of 456TH meeting of Operation amp Coordination Sub-Committee of WRPC

held on 13th FEBRUARY 2014 at GETCO VADODARA were forwarded vide letter No

WRPCOPNOCC-Minutes2013-141741 dated 25022014

GM(OSampC) WRHQ-I NTPC Mumbai vide letter dated 05032014(copy enclosed at

annexure-1) commented on item-1A(6) regarding Technical minimum issue of ISGS

stations

OCC may like to discuss amp confirm the minutes accordingly ITEM NO2 REVIEW OF SYSTEM OPERATION DURING THE MONTH OF

FEBRUARY 2014 21 Frequency Particulars During February 2014 the system frequency profile was as below

The average frequency during the month of February was 5006 Hz The maximum

instantaneous frequency was 5071 Hz on 28th February 2014 while minimum

instantaneous frequency was 4937 Hz on 28th February 2014 The frequency

profile during February 2014 was as under

01-Feb 2014 to 16-Feb 2014

17-Feb 2014 to 28-Feb 2014

After IEGC 2nd Amendment

time time

lt 497 Hz 039 lt499 Hz 1110 IEGC Band

497- 502 Hz 8973

IEGC Band

499-5005 Hz 4014

gt 502 Hz 988 gt5005 Hz 4876

The detailed frequency particulars are enclosed at Annex- 21

The Sub-Committee may like to note

22 Operational Discipline

There was a net inter-regional export of 302000 MUs by WR against net export

schedule of 286700 MUs The Sub-Committee may like to discuss

2

457th OCCM AGENDA

23 Voltage Profile

Voltage profile at some of 765400 kV sub-stations during the month of

February 2014 furnished by WRLDC is enclosed at Annex-23

The Sub-Committee may like to discuss as above

24 UF Relay Operations

As per WRLDC records during February 2014 the system frequency didnrsquot touch

492 Hz The details of UFR operation received from constituents for the month of

February 2014 is enclosed at Annexure 24

The Sub-Committee may like to discuss

25 Power Cuts Load Restrictions

Details of Power Cuts and Regulatory measures during February 2014 as furnished

by the state utilities are given in Annex 25 The Sub-Committee may note

26 Details of Generating Units under Forced outages Details of generating units under forced outages during February 2014 are given in

Annex-26 The Sub-Committee may discuss

27 Details of Generating Units under Planned outages

The details of generating units under Planned Outages during February 2014 are given in Annex-27

The Sub-Committee may discuss

ITEM NO3 OPERATIONAL PLANNING 31 Proposed Planned maintenance programme of generating units

The proposed maintenance programme of generating units for March 2014 amp April

2014 is given in Annex 31 The Sub-Committee may discuss and finalize the outage schedule of

generating units for the above period

3

457th OCCM AGENDA

32 A Outage Programme of Transmission Lineselements

Maintenance programme for transmission lines during the months of March 2014

amp April 2014 is given in Annex 32 A amp B The Sub-Committee may discuss and finalise the maintenance

programme proposed above B Line outages planned vs implemented

In 455th OCC meeting it was decided that WRLDC shall submit the list of

planned transmission element outages vs actual availed or emergency outages

during the February 2014 WRLDC had submitted the list of emergency

outages(Attached at Annexure-32-C1)

WRLDC submitted the status of planned transmission element outages vs

actual availed or emergency outages during the February 2014 (Attached at

Annexure-32-C2)

The Sub-Committee may discuss

33 Anticipated Power Supply Position for the months ndash March 2014 amp April 2014 Details of anticipated restricted amp un-restricted demands for the months of March 2014 amp April 2014 are given in Annex 33 (A) The details of anticipated regional deficit are given below (All figures in MW)

State Region

March 2014 April 2014 Anticipated Availability

Anticipated Peak Demand

Shortage AnticipatedAvailability

Anticipated Peak Demand

Shortage

GETCO 11625 11740 115 12005 12140 135 MPPTCL 8150 8340 190 8890 9050 160 CSEB 3150 3225 75 3015 3105 90 MSETCL 17100 19050 1950 18000 19200 1200 GOA 400 425 25 410 415 5 DD 330 345 15 340 350 10 DNH 620 635 15 620 640 20 WR 39860 42076 2216 40570 43173 2603 Constituents may furnish the anticipated station wise Availability amp Energy for the months of March 2014 amp April 2014 ITEM NO 4 OPERATIONAL STATISTICS FOR THE MONTH OF FEBRUARY 2014 The details of actual generation demand drawl of power from grid exchanges etc are given in the following Annexures

4

457th OCCM AGENDA

Annex 41 - Actual Generation and Requirement for February 2014 Annex 42 - Peak Demand Schedule Vs Actual for February 2014 Annex 43 - Integrated Operation of the System and Operation of Inter State Tie lines for February 2014 Annex 47 ndash Details of level of Major Reservoirs in Western Region for February 2014

The Sub-Committee may like to note ITEM NO 5 SYSTEM DISTURBANCES IN WESTERN REGION There was no major grid disturbance in the Western Region during the month The

tripping details and Voltage profiles have to be furnished by WRLDC to WRPC on first

working day of the month as same have to be reported to MOP via GM division of

CEA Accordingly WRLDC may kindly furnish the tripping details to WRPC for

necessary action The tripping details during the month received from WRLDC is

enclosed at Annexure-5 The Sub-Committee may like to notediscuss ITEM NO 6 Healthiness status of SERsDRs of equipment in the system

Constituents have furnished the status of healthiness of SERDRs in their systems on the dates below

Sl No Name of

constituents Date of Receipt

1 PGCILWRTS-I 06032014 2 PGCILWRTS-II 08032014 3 MPPTCL 11032014 4 NTPC 05032014 5 CSPTCL 05032014 6 GETCO 11032014 7 MSETCL 11032014

Constituents of WR are requested to ensure healthiness and sent information to this

office regularly as per the recommendation of enquiry committee of Grid disturbances on

25022007 and 28022007

The sub-Committee may like to note

ITEM NO 7 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS TRANSMISSION LINES AND GENERATING UNITS IN WR

71 Status of completion of ongoing Schemes for Commissioning of reactors As per the approval of 33rd standing committee of WR and subsequently discussion in 23rd WRPC meeting the following reactors have to be installed at the various occasions in WR Accordingly the information regarding the commissioning schedule is as below

5

457th OCCM AGENDA

S No

400 kV Substn

Size (MVAR)

Implementing agency

Expected commissioning date

1 Ranchodpura 125 MVAR GETCO Commd On 8th July 2013 2 Varsana 125 MVAR GETCO Commd On 25th July 2013 3 Rajkot 125 MVAR GETCO Commd On 5th August 2013 4 Amreli 125 MVAR GETCO Commd On 12072013 5 Jetpur 63 MVAR GETCO Commd on 11072013 6 Zerda 125 MVAR GETCO Commd in July 2013 7 Kosmba 80 MVAR GETCO Commissioned on 29112013 8 Limbdi (Chornia) 125 MVAR GETCO 25th July 2013 9 Jabalpur 125 MVAR PGCIL June 2014 10 Khandwa 125 MVAR PGCIL June 2014 11 Shujalpur 125 MVAR PGCIL June 2014 12 Bhatapara 125 MVAR PGCIL June 2014 13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014 16 Sholapur 125 MVAR MSETCL 2014 17 Kolhapur 125 MVAR MSETCL 2014 18 Akola 125 MVAR MSETCL 2014 19 India bull 80mvar BR MSETCL Commissioned 26112013 20 Nagda 125 MVAR MPPTCL September 2014 21 Bhopal 80 MVAR MPPTCL March 2014 22 Damoh 125 MVAR PGCIL August 2014 23 Bachau 125 MVAR PGCIL August 2014 24 Pirana 125 MVAR PGCIL August 2014 25 Itarsi 2X125

MVAR PGCIL August 2014

26 Seoni 125 MVAR PGCIL August 2014 27 Parli 125 MVAR PGCIL August 2014 28 Raipur 125 MVAR PGCIL August 2014 29 Gwalior 125 MVAR PGCIL August 2014 30 Nagda 50 MVAR MPPTCL 2014 31 ISP 125 MVAR NHDC 2015 32 Satpura 50 MVAR MPPTCL March-2015 33 Sasan 240 Reliance

Utilities are requested to ensure that reactors are installed and commissioned according to the schedule agreed as above Utilities may give update on the status of implementation

6

457th OCCM AGENDA

72 Status of completion of 765400 kV and above on going Transmission Schemes being executedimplemented by Transmission Agencies

The updated status on various ongoing transmission schemes for the year 2013-14 as per the current information available is as follows - S No

Name of the Line Target Completion Date

Remarks

POWERGRID 1 400 kV Vapi(PG)-Navsari Commissioned on

16032013 2 400 kV Navsari - Navi Mumbai DC

Line Feb- 2014 ROW problem

3 765kV SC Satna-Gwalior line (Ckt-I) January - 2014 4 765kV SC Satna-Gwalior line

(359Km + 60Km DC Portion) Ckt-II Feb- 2014

5 765 kV Sasan-Satna-II Commissioned on 010613

GUJARAT 1 400 kV DC Kosamba-Chorania line

(Package I)(From Chorania SS to AP-54)

March -2014

2 400 kV DC Kosamba-Chorania line (Package II)(From Kosamba SS to AP-54)

March -2014

3 400 kV DC Mundra-Zerda line No 1 August -2014 4 400 kV DC Mundra-Zerda line No 2 April -2014 5 400 kV DC Vadinar-Amreli line April -2014 6 400kV Mundra-Hadala LILO to

Halvad April -2014

7 400 kV DC Amreli-Kasor line(Part-1) April -2014 8 315 MVA IInd ICT at Kosamba SS Charged on 15112013 MADHYA PRADESH 1 Malwa-TPH-Pithampur 400KV

DCDS Line 2324102013

2 Malwa TPH-Chhegaon 400 KV DCDS Line

Ckt ndashI on 22032013 Ckt-II on 11072013

3 Chhegaon-Julwania 400 KV DCDS Line

March - 2014

4 Pithampur- Indore 400KV DCDS Line March- 2014

5 Satpura TPH-Ashta 400KV DCDS Line

December ndash 2014

CSPTCL 1 400 kV Korba (W)-Khedamara

DCDS Ckt II LILOed at Marwa August 2013 Test charged on

20082013

2 400 kV Khedamara- Raita DCDS February -2014

3 400kV DCDS Marwa-Raipur(Raita) January - Test charge from Raipur

7

457th OCCM AGENDA

2014 end in August 2013 4 LILOof 400kV K(W)-Khedamara line

at Marwa (one ckt) April -2014

MAHARASHTRA(STU)

1 400KV Chandrapur- II- Warora DC Dec - 2013 end

2 400KV DC line from Koradi-II to Wardha SS(PG) DC

March - 2014

3 400 kV Chandrapur-Warora-II Commissioned on 16012014

4 400 kV Bableshwar-Sinner Ckt-II Commissioned on 27122013

5 400 kV Chandrapur-Parli-II LILO at Chandrapur-II SS

Commissioned on 16012014

MAHARASHTRA (IPTC route) by WR Transmission (Mah) Pvt Ltd

1 400 kV Parli(PG)-Pune DC Commissioned Ckt - 1 on 08112013 Commissioned Ckt - 2 on 10112013

2 400 kV Pune (PG)-Aurangabad (MSETCL) DC

November-13 Commissioned Ckt - 1 on 05122013 Commissioned Ckt - 2 on 04122013

3 LILO Lonikhand ndashKalwa at Pune(PG) Lonikhand-Pune charged on 2130 on 09072013 and Kalwa ndashPune at 2145 on 09072013

GUJARAT (IPTC route) by WR Transmission (Guj) Pvt Ltd

1 400 kV Rajgarh(PG)-Karamsad (GETCO) DC

May -2014

The Sub-Committee may notediscuss

73 Commissioning of new Generating units in Western Region and the capacity expected to be commissioned during the current year 2013-14

The status regarding Generating units commissioned expected to be commissioned during the current year 2013-14 according the available information is as below

Name of the Power Projects Unit No Capacity (MW)

Date of Commissioning Schedule Date

GUJARAT Ukai 6 500 COD on 08062013 Pipavav CCPP- GPCL amp GSPC joint venture Block-1 350

March- 2014 Made in synchronized on

8

457th OCCM AGENDA

10102013 Bhavnagar Lignite TPP-JV I 250 August 2014 II 250 August 2014 UNO SUGEN 1 3825 COD on 04042013 CHHATTISGARH Marwa TPS I 500 25122013 Korba (w) Ext-5 500 COD on 05092013 KSK Mahanadi 3 600 COD on 14082013

VEDANTA VIDYUT 1 135 Synchronized on 11082013

MAHARASHTRA

INDIABULLS (Amaravati) 1 270 Synchronized on 03062013

INDIABULLS (Amaravati) 2 270 January-2014 INDIABULLS (Sinnar) 1 270 March-2014 VIPL(Butibori) 1 300 COD on 05042013

VIPL (Butibori) 2 300

First synchronized on 02012013 Full load on 19032013

GMR EMCO 2 300 COD on 27082013 Dhariwal 1 300 Synd On 2913 Bhusawal 5 500400 COD on 03012014 MADHYA PRADESH

SINGAJI TPP 1 600

Synchronized on 31082013 Coal fired on 30092013

2 600 June-2014 Ms Jhabua Power Seoni 1 300 JANUARY ndash 2014 MB Power Anuppur 1 300 JANUARY ndash 2014 Satpura 11 250 Synchronized on 02102013 SATPURA 10 250 COD on 18082013 CENTRAL SECTOR Vindhyachal TPP IV 12 500 Feb-14 MAUDA 2 500 Feb-14

The WR utilities may intimate the current status on above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS (A) FOLLOW-UP ITEM NO 81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the Third quarter

(October 2013 to December 2013) for the year 2013-14

The Sub-Committee members may like to note and furnish details in respect of above

9

457th OCCM AGENDA

ITEM NO 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR

Status of physical amp cyber security in Power Sector for the Third quarter (October

2013 to December 2013) have not been received from some of the constituents

The Sub-Committee may like to note and furnish details in respect of above ITEM NO 83 ADMS IMPLEMENTATION STEP BY GETCO A pilot project in respect of ADMS have been successfully implemented by GETCO in

11 kV Sadhi feeder (MGVCL ) on 19022014

GETCO may like to presentation on the same ITEMS FROM WRLDC ITEM NO 91 PERFORMANCE OF WR CONSTITUENTS POST THE IMPLEMENTATION OF DEVIATION SETTLEMENT MECHANISM ON 17022014 The IEGC second amendment as well as the Deviation Settlement Mechanism is in

force wef 17022014 The performance of WR constituents during first 10 days ie

from 17th to 28th Feb 2014 comprising of 960 time blocks is illustrated below Members

may like to analyze and devise suitable measures to ensure compliance to the above

CERC regulations

10

457th OCCM AGENDA

Since the decisions in real-time are based on the SCADA data it is now important to

monitor and ensure correctness of drawal injection as seen in SCADA The chart

below indicates the difference between the drawal of constituents as seen in SCADA

and as recorded in SEM for the period of 01st Feb 2014 to 16th February 2014 It may

be seen that the significant difference between SCADA and SEM needs to be

addressed by ensuring healthiness of telemetry and periodic validation by the SCADA

team at the respective SLDCs and WRLDC

The sub committee may like to discuss the same

11

457th OCCM AGENDA

ITEM NO 92 UNDER DRAWAL BY MAHARASHTRA AND INSECURE OPERATION IN THE GRID ON 27-28 FEB 2014

During late night of 27th Feb and early morning hours of 28th Feb-14 the grid

frequency remained above 502 Hz continuously for five hours from 2252 hrs of 27-

02-2014 to 0407 hrs of 28-02-2014 The situation was caused due to demand

reduction across the WR and NR on account of widespread rains and persistent under

drawal by Maharashtra during the above period as illustrated in figure-1 below

5067

49

492

494

496

498

50

502

504

506

508

‐1000

‐850

‐700

‐550

‐400

‐250

‐100

50

200

350

500

650

800

2100

2115

2130

2145

2200

2215

2230

2245

2300

2315

2330

2345

000

015

030

045

100

115

130

145

200

215

230

245

300

315

330

345

400

415

430

445

500

515

530

545

600

615

630

645

700

716

731

746

Maharashtra Deviation from schedule vis‐a‐vis grid frequency2100 hrs of 27‐02‐2014 to 0800 hrs of 28‐02‐2014

MSEBUI FREQ

Deviation from Schedule

Frequency

MW Hz

Several messages were sent from WRLDC control room to SLDC Kalwa directing them to control their under drawal from the grid Details of these messages is tabulated below

Sl No Message sent to Ref No Message date and time

1 SLDC Maharashtra 56079 27022014 2210 hrs

2 SLDC Maharashtra 3070 27022014 2230 hrs

3 SLDC Maharashtra 3078 28022014 0125 hrs

4 SLDC Maharashtra 3079 28022014 0150 hrs

Despite the above messages the response from SLDC Kalwa was inadequate in

controlling the under drawal of Maharashtra Consequently the frequency touched

5069 Hz at 0211 hrs of 28-Feb 2014 the voltage across the grid increased sharply

and there was over injection from WR to other regions Subsequently as a

contingency measure the drawal schedule of Maharashtra was reduced by 600 MW

by suo motu revision in the requisition of Maharashtra in Korba Vindhyachal Sipat

12

457th OCCM AGENDA

and Vidhyachal STPS wef 0230 hrs to 0500 hrs of 28022014 This was later

extended up to 0700 hrs of 28022014 It was a near miss situation that could have

been avoided by adequate planning and commensurate actions in real-time It is

requested that the matter may be taken up at the highest level in MSETCL and a

separate meeting may be convened on the above subject to avoid reoccurrence of

such event in future

The sub committee may like to discuss the same

ITEM NO 93 NON AVAILABILITY OF REAL-TIME TELEMETRY FROM LARGE NUMBER OF STATIONS IN MAHARASHTRA There are 224 nodes in Maharashtra that comprising of 32 Generating stations and

192 substations Out of these 224 nodes 47 locations are yet to be integrated in the

System Out of the balance 177 the data from nearly 50 nodes are not coming since

last 6 months Thus in totality data is not available from more than 135 out of 224

stations ie 60 which is highly alarming The extremely poor status of telemetry in

the state of Maharashtra has become a security threat Maharashtra load is touching

17500 MW and there are large number of construction related outages that have to be

facilitated Further with the formation of the synchronous All India grid there is a need

for close monitoring of system parameters such as the line flows voltage and grid

frequency Inadequate telemetry is resulting in severe constraints in real time

operation as well as outage coordination There have been several instances of line

tripping on high voltage and SPS operation due to sudden increase in line flows

during hour boundary or during facilitating planned outage These events could be

minimized with better supervision if the telemetry is available

The telemetry issue in Maharashtra has been discussed in the various WRPC forums

wherein it was informed by MSETCL that the problem is due to failure of Ms Tulip

who was the service provider for the communication network During the month of

August 2013 representative from MSETCL had assured that a new contract was being

awarded and the situation would improve within one month The extracts from minutes

of 451st OCC is quoted below

QUOTE

13

457th OCCM AGENDA

ldquoMSETCL stated that they were working to resolve the issue and assured that there

would be an improvement in availability of Telemetry from Maharashtra stations within

one Monthrdquo

UNQUOTE

Representative of MSETCL may apprise the OCC regarding present status and the

likely schedule for resolution of the issue

The sub committee may like to discuss the same

ITEM NO 94 STATUS OF LINE AND BUS REACTORS AT 765 KV SASAN

The line reactor of 765 kV Sasan-Satna ckt-2 as well as the Bus reactors of 765 kV Sasan bus are yet to be commissioned at Sasan end In the absence of these reactors high voltage is experienced at Sasan and nearby stations Often one circuit of 765 kV Sasan-Satna is required to be opened for voltage regulation Consequently the reliability of evacuation of generation from two units of Sasan is affected During 456th OCC meeting the revised schedule of the above elements as informed by Ms Reliance was as under

Schedule in formed in meetings 451st OCC 455th OCC 454th OCC 1 Line reactor of 765

kV Sasan-Satna ckt-2

By Dec 2013 By April 2014 By May 2014

2 765 kV Bus-1 Reactor

Jan 2014 By Mar 2014 By June 2014

3 765 kV Bus-2 Reactor

Jan 2014 By Mar 2014 By June 2014

It was decided in 456th OCC meeting that one representative from MPPTCL would visit the SASAN site to check readiness of Line and Bus reactors Representative from MPPTCL and Sasan may apprise the OCC-members on the progress of commissioning of reactors at 765 kV Sasan OCC members may also be apprised of the tap position of the generator transformer 2 and 3

The sub committee may like to discuss the same

14

457th OCCM AGENDA

ITEM NO 95 CHARGING OF NEW TRANSMISSION ASSET IN THE GRID In order to have better coordination of the transmission utilities with RLDCNLDC during charging synchronization of new elements into the grid a communication has been received from NLDC (ref POSOSCONLDCSystem OperationOutage Planning1239) on 10022014 It has been proposed that

a Owner of the asset shall submit the request for expected chargingcommissioning of new element for the calendar month latest by 5th day of the month to the respective RLDC amp NLDC along with status of activities mentioned in the check-list

b RLDC shall study the impact of the new element commissioning and based on its assessment of the preparedness of the utility may recommend to NLDC who in turn would examine the issue independently considering pan India grid scenario

c After the above the owner of the new asset shall give its readiness to charge the new element atleast three days in advance with current status of activities mentioned in the check list

Check list is as under 1 List of elements to be charged along with the details of approval of the

transmission scheme from the Standing CommitteeCTUSTU 2 Single Line Diagram of the concerned substations along with status of

completion of each diabusbreakers 3 Availability of real-time data and communication to the designated

SLDCRLDC 4 Installation of Special Energy Meter complying with CEArsquos Regulations

(Serial number Meter number CTPT ratio to be indicated) 5 Charging Instructions by CTUSTU 6 Schedule and sequence of charging of elements 7 Availability of line bus reactors as per planning In case the transmission

system is planned to be charged without the planned line reactor requisite authorization from CTUSTU by studies

8 Connection Agreement (along with all annexures) with CTU or STU 9 Copy of Long term Access (LTA) or MTOA granted by CTU or STU as the

case may be 10 Copy of Power Purchase Agreement (PPA) 11 A signed undertaking with name and designation of the officer clarly

indicating the following a All Disturbance recorders (DR) and Event Loggers (ELs) with time

synchronization are commissioned b All protective systems have been commissioned c All statutory clearances have been obtained

12 Output of EL and DR after charging

15

457th OCCM AGENDA

Each document mentioned in check list from Sl No 1 to 10 must be attached for sake of completeness and emailed as a consolidated document to the nodal RLDC well before the new element charging date The sub-committee may like to discuss ITEM NO 96 OPENING FEEDERS WITHOUT PRIOR INTIMATION TO WRLDC

It was gathered based on the observation from WRLDC SCADA data and subsequent

discussion with MPPTCL that 220 kV Bina (MP)-Gwalior(MP) DC were taken under

shut down for LILO works at Datia at 0910hrs on 23022014 for 4 days The outage

of these lines was neither discussed in OCC and neither was there any intimation to

WRLDC before availing the outage These lines are included in the important grid

elements list of Western region and prior concurrence of WRLDC is required for

switching these lines Further these lines form the parallel path to 765 kV Bina-Gwalior

DC and with the shutdown of these lines the network upstream of WR-NR inter

regional corridor was depleted

The sub-committee may like to discuss ITEM NO 97 TRIPPING OF 765 KV LINES ON OVER VOLTAGE Recently several tripping of 765 kV lines have been reported on over voltage These are indicated below

1) 765 kV Bina-Gwalior I at 2358 hrs of 16022014 2) 765 kV Bina-Gwalior I at 2011 hrs of 14022014 3) 765 kV Satna-Gwalior at 1300 hrs of 06022014 4) 765 kV Sasan-Satna II at 0013 hrs of 18012014 5) 765 kV Jabalpur-Bina I at 2350 hrs of 10012014 6) 765 kV Jabalpur-Bina II at 0405 hrs of 06012014

It is understood that the adopted Stage-I OV setting for the above lines vary from 108 (ie 826 kV) to 110 (841 kV) As per SCADA data the bus voltage at any of the substations mentioned above had not reached 826 kV during the above incidents

POWERGRID may examine the above tripping in detail and apprise the OCC regarding the above In case of issues related with protective relays field equipment are detected these may be addressed at the earliest The sub-committee may like to discuss

16

457th OCCM AGENDA

ITEM NO 98 RGMO FGMO OF MANDATED GENERATORS IN WESTERN REGION

As per the latest information available at WRLDC there are 251 number of units with a total capacity of 57517 MW in Western Region that are mandated to operate in Restricted Free Governor Mode The need for compliance to the IEGC regulations wrt RGMOFGMO was emphasized in the 455th and 456th OCC meeting as well as during the 25th TCCWRPC meeting Subsequently it was communicated by email to all entities in WR to provide the latest status of RGMOFGMO implementation We have received updated status from MPPTCL LANCO CGPL DB Power and JPL Tamnar in Feb 2014 The latest state wise RGMOFGMO summary is given below

Name of Entity No of mandated units

RGMO FGMO available at

RGMOFGMO Not available at

Maharashtra 90 35 55 Madhya Pradesh 58 36 22 Gujarat 35 19 16 Chhattisgarh 10 3 7 CGPL 5 5 0 NCA 11 6 5 SASAN 2 1 1 NTPC 24 10 14 ESSAR_Mahan 1 1 0 NSPCL 2 2 0 KSK 1 1 0 KWPCL 1 0 1 DB POWER 1 1 0 JPL 5 4 1 LANCO 2 2 0 IEPL 1 0 1 EMCO 2 0 2 WR_Total 251 126 125

WRLDC vide its letter ref WRLDCRGMO-FGMO1-2014 dated 23012014 has issued directions under Section 29 of the Electricity Act to ensure compliance of IEGC regulations 52 (f) (g) (h) and (i) All utilities are requested to furnish the status of compliance in respect of generating units under their jurisdiction The sub-committee may like to discuss ITEM NO 99 STATUS OF TELEMETRY IN WESTERN REGION

The status of telemetry related issues in respect of WR constituents is as under

a) Chhattisgarh Data (except MW) from 500 MW Korba West extension generating station is not available Status points from 400 kV Raita pending

17

457th OCCM AGENDA

b) Madhya Pradesh Telemetry of following bus reactors is not available at WRLDC

S No

Station Name Bus Reactor

Nunber x Capacity

Total MVAR

Rated voltage

Status of Telemetry at

WRLDC1 Nagda 250 100 420 Not available2 Indore 225 50 33 Not available3 Bhopal 225 50 33 Not available4 Birsinghpur 150 50 420 Not available

c) Gujarat Data is not-availableintermittent from following stations in Gujarat

a 220 kV Nano of Tatamdash(not available) b Kansari 400 kV ss and Navsari 220 kVhellipIntermittent (PLCC Problem)

d) Goa Due to non-availability of SCADA data from Goa the difference between drawal as seen in SCADA and as recorded in SEM is as high as 572 during the period 1st Feb to 16th Feb 2014 Data from the following stations in Goa is not available at WRLDC S No Station Status

1 Amona 220 kV Not available 2 Cuncolin 220 kV Not available 3 Kadamba 110 kV Intermittent 4 Tivim 220 kV Intermittent 5 Ponda 220 kV Intermittent 6 Xeldam-220 kV Intermittent 7 Verna-110 kV Intermittent

e) Daman amp Diu

Due to non-availability of SCADA data from Daman amp Diu the difference between drawal as seen in SCADA and as recorded in SEM is as high as 571 during the period 1st Feb to 16th Feb 2014 Data from The error is mainly due to non-availability of data from 220 kV Magarwada

f) DNH Telemetry from 220 kV Kharadpara and Khadoli station is not available

g) POWERGRID The data from the following stations is not available at WRLDC

1) 765 kV Tamnar (Communication problem GPRS link is not stable)

18

457th OCCM AGENDA

Telemetry from following stations is Intermittent at WRLDC 1) 765 kV Durg (PLCC frequent problems)

2) 765 kV Kotra (communication intermittency)

3) 765 kV Gwalior (PLCC link established but still there is some

issue(Delay) in data updation at WRLDC Rectification work under

progress by Site Engineer

4) 765 kV Solapur - Redundant link established through Reliance but

the gateway connected to above link is not configured for 765 KV

data Hence when BSNL link is down 765 KV data is not updating at

WRLDC

The sub-committee may like to discuss

ITEM NO 910 COMPARISON OF DRAWAL AS SEEN IN SCADA VS SEM The IEGC second amendment and the Deviation Settlement Mechanism is in force since the 17022014 The IEGC stipulates maintaining injection drawal within the limits prescribed in the Deviation Settlement Mechanism The sub-committee may like to discuss ITEM NO 911 MOCK BLACK START EXERCISE

As per sec 58(b) of IEGC the usersSTUs etc need to conduct Black start mock

exercises in their respective systems once in every six month under intimation to

RLDC Also the all the black start Diesel Generator (DG) sets are [as per sec 58(b)

of IEGC] required to be tested weekly and the test report needs to be sent to RLDC

on quarterly basis

The following table summarizes the status of mock exercises in respect of black start

facilities in Western Region

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

GUJARAT

1 Ukai (H) 4 x 75 Hydro Diesel 500 kVA 221213 Y

2 Mini Hydro 2 x 25 Hydro Diesel 50 KW N

3 Kadana 4 x 60 Hydro Diesel 500 KVA 2413 Y (2413)

19

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

4

Dhuvaran

1 x 107 (68+39) + 1 x 112 (72+40)

Gas

Details to be furnished by Gujarat

Details to be furnished by Gujarat

N

5 GIPCL-I 3 x 32 + 1 x49

Gas Steam Diesel 141 KW

070912 Y

6 GIPCL-II 1x104+1x56 Gas Steam Diesel 500 kVA N

7

Torrent Power Stn C Stn- DEFCCPP

StnC2x30 StnD120 StnEF(110MW each)CCPP100MW

Thermal (Units-CDEF) Gas(CCPP)

Stn-C islands Diesel

StnC15kVA StnDE F and CCPP(500 kVA each)

281112

Y

8 GPEC 3x138+1x241 Thermal Natural Gas 3000 kVA N

9 Sugen 3x3825 MW Gas Diesel 2x6MVA N

Madhya Pradesh

10 Gandhisagar 5 x 23 Hydro DG set 100 kVA N

11 Birsinghpur 1 x 20 Hydro Battery 220 Volt

Battery N

12 Pench 2 x 80 Hydro DG set 250 kVA 121012 Y

13 Bargi 2 x 45 Hydro DG set 250 kVA 100212 Y

14 Bansagar Stage-I 3 x 105 Hydro DG set 250 kVA N

15 Indira Sagar 8x125 Hydro DG set 2x1000

KVA 22511 Y

Chhattisgarh 16

Hasdeo Bango 3 x 40 Hydro DG Set 250 kVA 250812 N

17

Korba(E)-phse-I

Power plant retired but Black start DG set available and on- load trial is reported to be carried out regularly

DG Set 1500 kW(33kV)

N

Maharashtra

18

Koyna I amp II

4 x 65 4 x 75 Hydro

House generator

2 MVA 231013 N

19 KDPH 2 x20 Hydro DG set 310 KW N

20 Eldari 3 x 75 Hydro DG set 6 KW N

21

Uran (Gas)

4 x 60 (GT) + 4x108 (GT)+ 2x120 WHR

Gas DG set

4 MW PH1412kVA PH2450kVA WH520kVA

161012

N

20

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

22 RGPPL

Block 1 640MW+Block 2 66354MW+Block 3 66354MW

Gas

Gas Turbine (Frame-6)

35 MW (Under testing) Details to be provided by RGPPL

N

23 Ghatghar 2x125 Hydro DG set 1x1250

kVA 51012

N

24 Khopoli 3x24+2x12 Hydro

DC Governor amp bearing oil pumps

DC power (self start)

271013 (detailed report awaited)

N

25 Bhivpuri 3 x 24 +

2 x 15 +2x12 Hydro

DC Governor amp bearing

-do-

N

26 Bhira 6 x 25 Hydro

1 Noof 500 KVA house generator with water turbine

500 kVA

201013 (detailed

report awaited)

N

27

Bhira PSS 1 x 150 Hydro DG set 500 kVA

N

28 Trombay 1 x 120 Gas

Turbine DG Set 25 MW

N

1 x 60 Steam Turbine

NTPC

21

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

29 Kawas 4 x 106 2 x 116 Gas Diesel 2850 KW 151013

N

30 Gandhar 3 x 144 + 1x225 Gas Diesel 2975 KW

N

NCA

31 SSP(RBPH amp CHPH) 6x200+550 Hydro Diesel 2x1000kVA 080412

N

Accordingly the Black start capable stations may forward their tentative plan for conducting Black start exercises in compliance to sec 58(b) of IEGC bull As per the communication for MPPTCL the tentative plan of Black start in Madhya

Pradesh system is given under SL No Name of the Station Tentative Date Remarks 1 Pench March 2014 DG set at Pench amp are Bargi

under outage 2 ISP Apr-May 2014 - 3 TONS June 2014 Governor Problem being

attended 4 Birsinghpur June 2014 -do- 5 Medikheda June 2014 -do- 6 Rjghat June 2014 -do- Other utilities may also update their tentative plan for black start

The sub-committee may like to discuss

22

457th OCCM AGENDA

ITEM NO 912 HEALTHINESS OF MAIN CIRCUIT BREAKER OF 400 KV BIRSINGPUR-KATNI-I AT KATNI END The main CB of Birsingpur-Katni-I is under shut down since 2350 hrs of 14th February 2013 Representatives from MPPTCL may kindly apprise on the progress and expected date of restoration of the Main CB of 400 kV Birsingpur-Katni-I at Katni end The sub-committee may like to discuss

ITEM NO 913 TESTING OF SPS RELATED TO TRIPPING OF BINA-GWALIOR-AGRA AT CGPL VINDHYACHAL AND KORBA

As per the information received from NTPC and CGPL the SPS for the 765 kV Bina-

Gwalior-Agra has been installed and a mock drill has to be carried out for the same

The matter was discussed in the 456th OCC and it was decided that SPS may be

tested for reduction of say 50MW for each station instead of backing down of entire

500MWs POWERGRID WRTS-2 may confirm the testing schedule so that the

same could be coordinated in from WRLDC

The sub-committee may like to discuss

ITEM NO 914 SPS AT SIPAT WRLDC vide letter No WRLDCMO-I17192013 dt 21613 requested to take up this matter with the concerned for early implementation of the SPS Status of the SPS at NTPC Sipat is as under

1 449th OCC SPS was proposed by WRLDC It was decided to have a

separate meeting to finalize the scheme 2 450th OCC Member Secretary WRPC intimated that the matter will be

discussed in 119th PCM on 3rd amp 4th September 2013 at Tarapur 3 451st OCC It was intimated that the issue of SPS of Sipat was discussed in

119th PCM held on 3rd amp 4th September 2013 at TARAPUR The tentative scheme were formulated which needed finer tuning

4 452nd OCC Matter not discussed 5 453rd OCC NTPC representative intimated proposal sent to their corporate

office for engineering approval 6 454th OCC Approval from our corporate office is yet to be obtained 7 455th OCC Approval from our corporate office is yet to be obtained 8 456th OCC Approval from corporate office has been obtained and would be

forwarded to WRPC for approval The sub-committee may like to discuss

23

457th OCCM AGENDA

ITEM NO 915 SPS AT 4X300 MW BALCO IPP The SPS at 2010 MW Balco (4x675MW + 4x135 MW + 4x300 MW) was to be commissioned by Nov 2013 before commissioning of first unit of 4x300 MW Balco IPP For the new SPS scheme envisaged for the Balco CTU connection namely the Grid Islanding and Load Management Scheme (GILMS) Balco had reported to have placed an order with Ms SEL As discussed earlier the scheme suggested by WRLDC may be implemented before commissioning of first unit of 300 MW It was intimated during the 456th OCCM by the Balco representatives that the SPS shall be commissioned by March 2014

The sub-committee may like to discuss

ITEM NO 916 ACTIONS TAKEN FOR REVIVAL OF TRANSMISSION ELEMENTS UNDER LONG OUTAGE

As per the information available at WRLDC following elements are out for a

long period

Sl No Date of

outage

Reason

ISTSIPP

1 80 MVAR BR at

ESSAR(Mahan)

231213 Oil leakage

2 125 MVAR BR at JPL 120513 Hydrogen formation

3 50 MVAR LR of Indore-Asoj-II

at Indore

190613 R phase bushing burst

4 50 MVAR LR of Birsingpur-

Damoh at Damoh(PG)

13102014 Oil Leakage

5 765 kV Durg-Kotra-I 24022014 Sparking in Isolator

6 400 kV Raipur-Raigarh-IV 18012014 Voltage Regulation

MSETCL

1 400 kV RGPPL-NrsquoKoyna-I 22012014 Voltage Regulation

2 400 kV Sholapur-

Sholapur(PG)

26022014 Tower Collapse

MPPTCL

1 400 kV Birsingpur-Katni-I 28012014 Voltage Regulation

24

457th OCCM AGENDA

2 50 MVAR LR of Indore-Asoj-II

at Indore

6012014 DGA Violation

CSPTCL

1 400220 kV Bhilai-II 24022014 Maintenance

OCC may like to be apprised of the actions being taken for expediting revival of

the above elements

The sub-committee may like to discuss

ITEM NO 917 STATUS OF 220 KV KOLHAPUR-MUDSINGHI-CHIKODI- BELGAM LINE Consent for trial operation of 220 kV Kolhapur-Mudsinghi-Chikodi- Belgam line in radial mode for supply of Karnataka load from Maharashtra side was granted after discussion in the 455th OCC meeting WRLDC is in receipt of letter from SRLDC regarding concurrence for the above arrangement SLDC Kalwa may apprise the OCC regarding the present status The sub-committee may like to discuss

ITEM NO 918 CONTRIBUTION OF GENERATORS IN VOLTAGE CONTROL The contribution of generators in WR in voltage control was analyzed during 456th OCC meeting It was noted that following units were injecting reactive power even during high voltage

1 210 MW units of Khaparkheda Koradi and Chandrapur (Maharashtra) 2 210 MW units of Satpura and Birsinghpur (Madhya Pradesh) 3 210 MW unit 23 of Korba West (Chattisgarh) 4 200 MW unit 34 of Ukai (T) in (Gujarat)

Utilities were requested to check the setting of AVRGT tap and revert back with findings Members may apprise OCC regarding the status The sub-committee may like to discuss

ITEM NO 919 REAL-TIME MONITORING OF FEEDERS SUBSTATIONS THAT ARE COVERED UNDER THE AUFLS Telemetry of feeders substations covered under the AUFLS is desirable for real-time assessment of the anticipated relief that would be available from the AUFLS scheme at any given instant of time CERC has also directed all the constituents to for

25

457th OCCM AGENDA

mapping of these feeders in the SCDA of SLDCsRLDC Members may like to deliberate further The sub-committee may like to discuss

ITEM NO 920 LOAD FORECASTING As per the amended Indian Electricity Grid Code that is effective from 17th February 2013 the SLDCs SEB distribution licensees shall always restrict the net drawal of the State from the grid within the drawal schedule keeping the deviations from the schedule within the limits specified in the Deviation settlement mechanism regulations Therefore it is imperative that adequate attention may be paid towards load forecasting The matter was discussed in the 455th and 456th OCC as well as in the 25th TCCWRPC board meeting wherein it was decided to create a task force for exploring development of a software for load forecasting Members may like to deliberate further The sub-committee may like to discuss

ITEM NO 921 IMPLEMENTATION OF THE REVISED AUFLS IN GOA DD AND DNH It was decided during the 455th and 456th OCC meeting as well as during 25th WRPC meeting that Goa DD and DNH shall complete the implementation of the revised AUFLS in Goa DD and DNH at the earliest Representatives from the Goa DD and DNH may apprise the status of the progress The sub-committee may like to discuss

ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING As per meeting roaster circulated during 452nd OCC meeting the 458th OCC Meeting

will be hosted by Maharashtra and may be scheduled on 16th amp 17th April 2014

Maharashtra may confirm the same

Anaulagnak 21

maah frvarI 2014

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5051 Hz BETWEEN 0200 Hrs amp 0300 Hrs Hrs ON 28022014

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4970 Hz BETWEEN 1800 Hrs amp 1900 Hrs Hrs ON 28022014

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 5006 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5071 Hz AT 0210 Hrs ON 28022014

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4937 Hz AT 185000 Hrs ON 28022014

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS FEBRUARY 2014 JANUARY 2014 DECEMBER 2013

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 001 005

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 041 061 188 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 1069 5423 4864 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 4014 3569 3987

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 4876 946 956

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING FEBRUARY 2014

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

Voltage Profile during the month of Feb 2014

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 421 401 426 403 409 409 408 408 415 399 414 402 424 413 417 3922 420 402 423 404 409 409 408 408 417 402 418 404 425 415 420 3993 421 399 426 400 429 405 425 402 412 399 419 408 423 410 413 3964 422 402 426 404 430 406 428 401 414 400 414 404 424 412 414 3965 420 396 423 400 409 409 408 408 413 396 415 401 424 411 415 3996 420 396 426 400 428 405 426 402 415 398 416 402 423 411 412 4007 420 394 424 399 430 402 427 401 416 399 417 402 423 409 416 3968 418 393 422 397 409 409 408 408 416 399 416 402 422 409 418 3989 418 399 423 404 409 409 408 408 417 402 417 407 419 409 419 400

व तदाब परखा फरवर 2014 स नक Annex-23

इदौर इटारसी कराड धल असोज कासोर िभलाई जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

10 419 394 423 399 409 409 408 408 416 400 415 401 420 408 417 39511 421 393 426 397 429 405 427 401 44 399 419 404 423 407 414 39912 419 395 422 400 409 409 408 408 416 401 419 407 421 410 418 39813 420 396 424 401 409 409 408 408 417 400 416 401 421 409 418 40114 421 399 424 403 430 419 428 414 417 402 415 402 421 409 417 40015 423 397 424 399 428 414 429 412 417 398 406 406 421 407 418 40016 423 397 424 400 431 404 424 401 416 401 422 409 421 409 418 40317 421 402 424 403 432 414 420 404 416 402 412 405 422 410 417 39818 420 397 423 399 409 409 408 408 416 400 414 401 422 414 416 40019 420 396 423 399 409 409 408 408 411 398 418 405 421 413 413 39920 417 397 420 402 429 406 426 401 413 399 416 404 421 413 410 39821 419 399 422 402 430 407 421 401 415 401 418 406 422 411 414 39722 419 397 422 402 432 409 423 401 416 400 413 402 423 413 414 40023 420 396 423 397 430 412 428 404 414 404 415 402 427 414 416 40324 421 399 423 401 433 411 425 400 416 398 414 402 427 415 418 40225 421 399 423 401 433 411 425 400 416 398 414 402 427 415 418 40226 420 397 423 404 431 411 428 409 411 397 415 404 424 414 412 39327 418 398 426 403 409 409 408 408 417 399 418 402 429 415 419 39128 421 400 427 406 409 409 408 408 414 400 416 403 430 415 418 401

423 393 427 397 433 402 429 400 417 396 422 401 430 407 420 391

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 424 404 415 392 424 404 431 407 766 746 797 765 800 756 804 7692 422 406 417 398 426 404 434 407 769 754 798 774 801 769 804 7773 423 405 416 402 426 401 432 410 767 750 796 768 802 773 805 7764 426 407 417 402 423 403 430 408 768 751 797 779 801 776 808 7785 422 403 415 398 423 397 430 400 768 749 797 767 798 763 797 7586 425 404 417 401 423 399 432 404 768 750 797 767 802 773 807 7707 427 401 419 397 423 396 431 404 770 741 800 763 807 769 809 7698 422 403 416 403 424 395 427 399 756 737 788 756 801 765 802 7679 422 405 416 401 424 402 427 404 755 738 786 758 804 773 804 775

10 421 400 414 396 423 398 429 403 3 88 6 98 6 801 60

वािलयर बनाBina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

बना वािलयर नागदा खडवा िसपत िसविन

10 421 400 414 396 423 398 429 403 755 737 788 765 798 765 801 76011 423 397 414 390 426 396 433 399 758 736 794 750 800 752 802 75612 420 403 414 395 423 397 428 403 757 739 787 759 801 763 798 77013 424 405 417 400 427 397 430 402 759 740 794 760 804 773 803 77214 426 410 420 406 424 400 431 405 761 740 794 766 810 780 808 78215 425 404 417 399 426 399 430 401 762 738 794 962 808 768 806 76816 426 406 422 400 427 402 429 400 759 739 792 760 815 774 811 77617 429 407 417 398 427 404 427 406 761 742 792 762 805 765 810 77418 426 404 418 395 423 399 427 404 763 748 793 768 805 759 806 76819 423 409 415 394 422 399 428 403 759 737 795 765 804 758 806 76720 421 406 410 397 420 398 426 406 765 749 795 771 791 766 799 77421 423 407 424 399 423 403 428 405 759 744 792 760 795 761 800 76722 425 406 414 398 423 400 425 404 760 743 790 762 794 762 800 76823 425 402 412 392 424 400 428 405 758 740 790 759 796 755 799 76124 425 401 411 393 423 401 427 403 760 744 796 764 792 757 798 75625 421 408 412 395 423 401 427 403 756 742 793 766 795 764 795 76926 422 405 413 390 421 399 426 402 757 739 789 760 796 750 798 76127 426 407 416 393 421 401 431 403 760 741 795 762 803 755 804 76228 428 409 414 392 423 403 432 405 762 740 795 753 809 775 803 771

429 397 424 390 427 395 434 399 770 736 800 750 815 750 811 756

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Feb-14 0 0 0 0 0 0 0 02 02-Feb-14 0 0 0 0 0 0 0 03 03-Feb-14 0 0 0 0 0 0 0 04 04-Feb-14 0 0 0 0 0 0 0 05 05-Feb-14 0 0 0 0 0 0 0 06 06-Feb-14 0 0 0 0 0 0 0 07 07-Feb-14 0 0 0 0 0 0 0 08 08-Feb-14 0 0 0 0 0 0 0 09 09-Feb-14 0 0 0 0 0 0 0 0

10 10-Feb-14 0 0 0 0 0 0 0 011 11-Feb-14 0 0 0 0 0 0 0 012 12-Feb-14 0 0 0 0 0 0 0 013 13-Feb-14 0 0 0 0 0 0 0 014 14-Feb-14 0 0 0 0 0 0 0 015 15-Feb-14 0 0 0 0 0 0 016 16-Feb-14 0 0 NIL NIL NIL 017 17-Feb-14 0 0 0 0 0 0 0 018 18-Feb-14 0 0 0 0 0 0 0 019 19-Feb-14 0 0 0 0 0 0 0 020 20-Feb-14 0 0 0 0 0 0 0 021 21-Feb-14 0 0 0 0 0 0 0 022 22-Feb-14 0 0 0 0 0 0 0 023 23-Feb-14 0 0 0 0 0 0 0 024 24-Feb-14 0 0 0 0 0 0 0 025 25-Feb-14 1 17 0 0 0 0 0 026 26-Feb-14 0 0 0 0 0 0 0 027 27-Feb-14 0 0 0 0 0 0 0 028 28-Feb-14 0 0 0 0 0 0 0 0

Max 1 17 0 0 0 00 0 0Total 1 17 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month FEBRUARY 2014

Recommonded Load relief at 492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE-25

Power CutRestrictions in Western Region for the month of February-2014 k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply(DLF)

01022014 28022014 2344 2240 2332

21 Three-Phase Supply(Irrigation)

01022014 28022014 0956 0905 0946

21 Three-Phase Supply(Mixed)

01022014 28022014 2343 2227 2330

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01022014 28022014 2353 2337 2347 32 District Head Qtrs 01022014 28022014 2355 2340 2351 33 Tehsil Head Qtrs 01022014 28022014 2349 2309 2341

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid

1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 010214 to 280214

SaUnya Nil

0-1655MW

SaUnya Nil

0000

SaUnya Nil 2400

SaUnya Nil

95 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-

2 Power supply to Agricultural Sector ivavarNa Details sao From

idnaaMk Date tk To

idnaaMk Date p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs) 21 Three-Phase Supply 01022014 28022014 1000 0800 0900

22 Single-Phase Supply 01022014 28022014 1800 1800 1800 3 Anya jaanakarI Any other information

There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

11107 (Av) of 23 days 0000(Av) 0000 (Av)

1Rural 9031(Av) for 3486 Hrs 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0666 - -

0105 -

3 HT Industries 000 (Av) for 00 Hrs 000 Total Energy Cutday 0771 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01022014 to 280214 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 2322014 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का फरवर 2014का वःता रत यौरा

Details of forced unit outages during the month ofFeb2014

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 एःसार वा डनर

ESSAR VADINAR-I

गरा विनिल GSECL

660 2156 20-Jan-14 2018 10-Feb-14 Coal shortage

2 एःसार Essar-2

गरा विनिल GSECL

172 1212 22-Feb-13 अनपल ध Still out

अनपल ध Still out

Shortage of gas

3 एसएलपीपी SLPP-1

गरा विनिल GSECL

125 1445 23-Feb-14 1237 27-Feb-14 BTL

4 एकएलट पीएसAKLTPS-1

गरा विनिल GSECL

125 1147 26-Feb-14 अनपल ध Still out

अनपल ध Still out

DCS FAIL

5 एपीएल APL - 2

अदानी ADANI

330 056 3-Feb-14 अनपल ध Still out

अनपल ध Still out

Turbine vibration bearing probl em

6 एपीएल APL-5

अदानी ADANI

660 1732 15-Feb-14 456 27-Feb-14 Turbine vibration

7 एपीएल APL - 6

अदानी ADANI

660 2049 25-Feb-14 1947 3-Mar-14 Coal mill problem

8 टाटा TATA-6

मारा वउकिल MSPGCL

500 2352 19-Jul-13 अनपल ध Still out

अनपल ध Still out

For Economy SD

9 वीआईपीएल VIPL-I

मारा वउकिल MSPGCL

300 105 2-Oct-13 अनपल ध Still out

अनपल ध Still out

Turbine bearing vibration probl em

10 टाटा TATA-8

मारा वउकिल MSPGCL

250 2255 9-Jan-14 अनपल ध Still out

अनपल ध Still out

HT due to fire near turbine generator desk

11 चिपर Chandrapur-2

मारा वउकिल MSPGCL

210 1238 14-Jan-14 1310 23-Feb-14 ID fan problem

12 कोराड KORADI-6

मारा वउकिल MSPGCL

210 651 24-Jan-14 1456 14-Feb-14 Coal bunkering problem

13 डब यपीसीएल WPCL-1

मारा वउकिल MSPGCL

135 1245 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Furnace press high

14 डब यपीसीएल WPCL-3

मारा वउकिल MSPGCL

135 421 7-Feb-14 Ready Ready Less requisition

प म ऽय भार षण कि म बई णाली चालन-ISO-I

15 चिपर CPUR - 6

मारा वउकिल MSPGCL

500 1523 11-Feb-14 2033 13-Feb-14 BTL

16 नािसक NASIK-3

मारा वउकिल MSPGCL

250 300 11-Feb-14 100 19-Feb-14 UAT problem

17 कोराड KORADI-5

मारा वउकिल MSPGCL

210 153 14-Feb-14 अनपल ध Still out

अनपल ध Still out

ID fan problem

18 ितरोडा Tiroda-I

मारा वउकिल MSPGCL

660 2059 15-Feb-14 2054 26-Feb-14 Turbine bearing problem

19 ितरोडा Tiroda-2

मारा वउकिल MSPGCL

660 1125 17-Feb-14 152 22-Feb-14 BTL

20 कोराड KORADI-6

मारा वउकिल MSPGCL

210 2357 19-Feb-14 250 23-Feb-14 BTL

21 भसावल BHUSWAL-2

मारा वउकिल MSPGCL

210 301 22-Feb-14 1706 25-Feb-14 PA fan temp High

22 खापरखड़ा KHAPERKHEDA-3

मारा वउकिल MSPGCL

250 1448 22-Feb-14 130 25-Feb-14 BTL

23 जयगड Jaigad-4

मारा वउकिल MSPGCL

300 1930 22-Feb-14 1107 4-Mar-14 Low schedule

24 कोराड Koradi-5

मारा वउकिल MSPGCL

300 404 23-Feb-14 अनपल ध Still out

अनपल ध Still out

Electrical fault

25 पल PARLI-4

मारा वउकिल MSPGCL

210 1836 28-Jan-14 1956 3-Feb-14 Air preheater problem

26 भसावल BHUSAWAL-4

मारा वउकिल MSPGCL

250 1432 28-Feb-14 1802 3-Mar-14 Ash hopper problem

27 आरजीपीपीएल RGPPL-1B

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

28 आरजीपीपीएल RGPPL-2B

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

29 आरजीपीपीएल RGPPL 3A

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

30 आरजीपीपीएल RGPPL-1A

आरजीपीपीएल RGPPL

320 1500 18-Jan-14 अनपल ध Still out

अनपल ध Still out

SRV problem

31 आरजीपीपीएल RGPPL 3B

आरजीपीपीएल RGPPL

320 1230 8-Feb-14 Ready Ready Less requisition

32 िसगाजी SINGAJI - I

म वउकिल MPPGCL

600 422 12-Feb-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

33 सातपरा SATPURA-11

म वउकिल MPPGCL

250 1913 15-Feb-14 2149 19-Feb-14 Main stream temperature low

34 सातपरा SATPURA-11

म वउकिल MPPGCL

250 542 26-Feb-14 1642 2-Mar-14 BTL

35 एःसार महान Essar-Mahan-1

एःसार ESSAR

600 000 29-Jan-14 015 18-Feb-14 Less requisi tion

36 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

37 वदना Vandana-1

वदना Vandana

135 149 12-Jan-14 अनपल ध Still out

अनपल ध Still out

BTL

प म ऽय भार षण कि म बई णाली चालन-ISO-I

38 ससान Sasan-2

आरईएल REL

660 205 16-Feb-14 1650 23-Feb-14 Problem in ash handling

39 कावास Kawas 2A

एनट पीसीNTPC 164 2018 23-Dec-13 Ready Ready Less requisition

40 गाधार Gandhar-3

एनट पीसीNTPC 144 2037 28-Dec-13 Ready Ready Less requisition

41 गाधार Gandhar-I

एनट पीसीNTPC 144 2011 1-Jan-14 Ready Ready Less requisition

42 कावास Kawas 2B

एनट पीसीNTPC 164 900 13-Jan-14 421 5-Mar-14 Maintenance

43 गाधार Gandhar-2

एनट पीसीNTPC 219 023 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Less requisition

44 कावास Kawas-1A

एनट पीसीNTPC 164 2055 4-Feb-14 712 20-Feb-14 Less requisition

45 कावास

Kawas-1B एनट पीसीNTPC 164 1951 13-Feb-14 503 20-Feb-14 Less requisition

46 कावास Kawas 1A

एनट पीसीNTPC 164 1210 21-Feb-14 Ready Ready Less requisition

47 कावास Kawas 1B

एनट पीसीNTPC 164 012 22-Feb-14 1144 26-Feb-14 Less requisition

Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का फरवर 2014 का वःता रत यौरा

Details of planned unit outages during the month of Feb2014 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Time Date

1 डब यट पीएस WTPS-3

गरा विनिल GSECL

210 212 12-Feb-14 अनपल ध Still out

अनपल ध Still out

AOH

2 पल ParlI-3

मारा वउकिल MSPGCL

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

AOH

3 चिपर Chandrapur-5

मारा वउकिल MSPGCL

500 101 14-Jul-13 841 19-Feb-14 AOH

4 कोरबा प म KORBA-(W)-4

छरा वउकिल CSPGCL

210 2226 7-Feb-14 अनपल ध Still out

अनपल ध Still out

AOH

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

NIL2

NIL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING MARCH 2014 AND APRIL 2014

Capacity Outage as per Annual Maintenance Plan

3 Craiva]kMila CSPGCL

NIL

4

NIL

5 koMd``Iya xao~ Central Sector51 VSTPS 4 210 010414 070414 AOH52 VSTPS 2 210 080414 270414 AOH53 VSTPS 1 210 300414 190514 AOH54 CGPL 10 800 280314 130514 COH

maraiva]kMila MSPGCL

Date Time Date Time1 220 Bus-1 at Mapusa 20-Mar-14 1000 20-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R

2 765 Bus-1 at Sasan 20-Mar-14 800 20-Mar-14 1800 Daily Stringing of Main bus 1 for 765 kV Vichal Pooling - Sasan feeder

Reliance WR-II C

3 400 400kV Bus-2 at Satna 20-Mar-14 800 20-Mar-14 1800 Continuous Bay extension work related to JP - Nigrie Bays POWERGRID WR-II C

4 400 400kV ICT 1 at Satna 20-Mar-14 800 20-Mar-14 1000 Continuous Bay extension work related to JP - Nigrie Bays POWERGRID WR-II C

5 400 400kV Jabalpur Itarsi 1amp2 (Dc) 20-Mar-14 1000 20-Mar-14 1400 Continuous For commissioning of Line Impedance measurement kit

POWERGRID WR-II C

6 765 3X80 MVAr Bina Line Reactor at Indore 20-Mar-14 1000 21-Mar-14 1800 Continuous For installation of online dry out amp online DGA kit

POWERGRID WR-II C

7 400kV Damoh - Bhopal 1 20-Mar-14 800 31-Mar-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

8 400 Chorania Kasor 20-Mar-14 800 20-Mar-14 1800 Daily PMM work GETCO GETCO9 400 400 KV Main Bus-I at 400 KV Ss Khedamara 20-Mar-14 900 22-Mar-14 1700 Daily Erection of Pantograph 1 Set of IP amp CVT CSPTCL CSPTCL C

10 400 400 KV Khedamara-KSTPS NTPC ckt-II at 400 KV Ss Khedamara

20-Mar-14 900 22-Mar-14 1700 Daily Erection of Pantograph CVT amp 1 Set of IP PGCIL CSPTCL C

11 400 Korba -Vandana 20-Mar-14 900 21-Mar-14 1900 days continuouTesting of LBB auto re-close M-I amp M-II relays NTPC NTPC

12 400 Korba -Vandana 20-Mar-14 900 21-Mar-14 1900 days continuouTesting of LBB auto re-close M-I amp M-II relays NTPC NTPC

13 400DC Akola-Aurangabad (MSETCL) 1 and Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

21-Mar-14 600 23-Mar-14 1800 Conti Crossing work of 400kv MC Aurangabad - Aurangabad

MSETCLWRTS-I WRTS-I C

14400 amp 220 amp 132

400KV DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 400KV Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

21-Mar-14 600 21-Mar-14 1800 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad

MSETCLWRTS-I WRTS-I C

15 400 Bhadrawati-Parli 1amp 2 21-Mar-14 900 31-Mar-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I C

16 220 Bus-1 at Pune 21-Mar-14 800 21-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R

17 400 Solapur-Kolhapur 1 amp 2 21-Mar-14 700 21-Mar-14 1800 Daily Stringing work upcoming 765 kV Solapur-Pune line

Reliance WRTS-I C

18 220 220kV DC Raigarh- Raigarh (CSPTCL) Line (if outage not avail on 13140314)

21-Mar-14 900 22-Mar-14 1700 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (040-50)

CSPTCL WRTS-I C

19 220 Bus-2 (Section-A) at Mapusa 21-Mar-14 1000 21-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R20 400 Bus-1 at Itarsi 21-Mar-14 900 21-Mar-14 1800 Daily AMP POWERGRID WR-II R21 220 Bus-1 at Gwalior 21-Mar-14 1000 21-Mar-14 1800 Daily AMP POWERGRID WR-II R22 220 Jhanor - Haldarwa 1 21-Mar-14 900 21-Mar-14 1800 Daily AMP POWERGRID WR-II R23 400 Vapi Boisar 21-Mar-14 700 22-Mar-14 1900 Continuous For crossing of 220kV Kala Khadoli TL POWERGRID WR-II C

24 765 Sasan-Satna2 21-Mar-14 800 22-Mar-14 1800 Continuous For Power Line crossing of 765kV Vindhyanchal (pooling) - Satna 2 Line

POWERGRID WR-II R

25 400 400220 ICT NO1 at Kasor 21-Mar-14 800 21-Mar-14 1800 Daily PMM work GETCO GETCO26 400 400KV Sipat-Pathadi(LANCO) line 21-Mar-14 900 22-Mar-14 1900 Continous Annual Preventive maintenance job NTPC NTPC27 400 Pune-Parli 2 50MVAr Line Reactor at Pune 22-Mar-14 800 22-Mar-14 1800 Daily AMP Work Line in service wo reactor Reliance WRTS-I R

28 765 Bus-2 at Solapur 22-Mar-14 700 22-Mar-14 1800 Daily 765KV Pune bay commissioning amp SCADA works

WRTS-I WRTS-I C

29 400 Bus-1 at Bhatapara 22-Mar-14 800 23-Mar-14 1800 Conti Bus extension work for new 125MVAr Bus Reactor at Bhatapara

WRTS-I WRTS-I C

30 220 Bus-2 (Section-B) at Mapusa 22-Mar-14 1000 22-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R31 400 Vadavi Chorania 1 22-Mar-14 900 22-Mar-14 1800 Daily AMP Reliance WR-II R32 220 Jhanor - Haldarwa 2 22-Mar-14 900 22-Mar-14 1800 Daily AMP POWERGRID WR-II R33 220 Bus-2 at Gwalior 22-Mar-14 1000 22-Mar-14 1800 Daily AMP POWERGRID WR-II R

34 765 3X80 MVAr Bus Reactor at Indore 22-Mar-14 1000 23-Mar-14 1800 Continuous For installation of online dry out amp online DGA kit

POWERGRID WR-II C

35 220 Transfer Bus at Mapusa 23-Mar-14 1000 23-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R

36 400 Raigarh- Raipur 4 amp Raigarh-Kotra PS 2 23-Mar-14 800 30-Mar-14 1800 Conti Bay shifting work for up-coming 125MVAr Bus Reactor at Raigarh

WRTS-I WRTS-I C

37 765 Bus-1 at Indore (PG) 23-Mar-14 1000 23-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

Outages Proposal of Transmission elements during the month of MARCH‐2014Type

ANNEXURE‐32A

SN KV Line From To

Basis Reason System Agency

38 220 MC Waluj-Chitegaon amp Waluj-Jalna on same tower

24-Mar-14 600 24-Mar-14 1800 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad

MSETCL WRTS-I C

39 400 Raipur-Sipat 1 amp 2 24-Mar-14 800 2-Apr-14 1800 Conti Diversion of line for Lafarge Railway trackERS removal

WRTS-I Lafarge C

40 220 Bus-2 at Pune 24-Mar-14 800 24-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R41 765 Bus-1 at Bilaspur 24-Mar-14 800 24-Mar-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R

42 400 Bus-2 at Bhatapara 24-Mar-14 800 25-Mar-14 1800 Conti Bus extension work for new 125MVAr Bus Reactor at Bhatapara

WRTS-I WRTS-I C

43 400 Kolhapur-Mapusa 2 24-Mar-14 600 24-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

44 400 Vadavi Chorania 2 24-Mar-14 900 24-Mar-14 1800 Daily AMP Reliance WR-II R45 765 Bus-2 at Indore (PG) 24-Mar-14 1000 24-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

46 765 Bus-2 at Sasan 24-Mar-14 800 24-Mar-14 1800 Daily Strining of Main Bus 2 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

47 220 KAPP - Haldarwa 1 24-Mar-14 800 24-Mar-14 1800 Daily AMP POWERGRID WR-II R48 400 Bus - 2 at Pune 25-Mar-14 800 25-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R

49 765 Bus - 1 at Wardha 25-Mar-14 800 25-Mar-14 1800 Daily Jumper connection work of 765KV Raipur-Wardha line

WRTS-I WRTS-I R

50 400 Kolhapur-Mapusa 2 25-Mar-14 600 25-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

51 220 Mapusa-Ponda line 25-Mar-14 1000 25-Mar-14 1500 Daily AMP Work GOA WRTS-I R

52 765 Bus-1 at Sasan 25-Mar-14 800 25-Mar-14 1800 Daily Jumpering of Bus 1 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

53 220 KAPP - Haldarwa 2 25-Mar-14 800 25-Mar-14 1800 Daily AMP POWERGRID WR-II R54 400 Vadavi - Kansari2 25-Mar-14 900 25-Mar-14 1800 Daily AMP Reliance WR-II R55 400 Bus-1 at Indore (PG) 25-Mar-14 1000 26-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C56 765 Bus-1 at Satna 25-Mar-14 800 25-Mar-14 1800 Continuous Bay extension work POWERGRID WR-II C57 765 Sipat 765KV 400KV 1000MVA ICT-1 25-Mar-14 900 25-Mar-14 1900 Daily SPS Protection scheme modification NTPC NTPC

58 765 Bus - 2 at Wardha 26-Mar-14 800 26-Mar-14 1800 Daily Jumper connection work of 765KV Raipur-Wardha line

WRTS-I WRTS-I R

59 400 Bhadrawati-Parli 2 63MVAr Line Reactor at Parli

26-Mar-14 800 26-Mar-14 1800 Daily AMP Work of Recator at Parli line in service wo reactor

WRTS-I WRTS-I R

60 400 Kolhapur-Mapusa 1 26-Mar-14 600 26-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

61 220 Mapusa-Amona line 26-Mar-14 1000 26-Mar-14 1500 Daily AMP Work GOA WRTS-I R62 765 Bus-2 at Satna 26-Mar-14 800 26-Mar-14 1800 Continuous Bay extension work POWERGRID WR-II C

63 765 Bus-2 at Sasan 26-Mar-14 800 26-Mar-14 1800 Daily Jumpering of bus 2 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

64 400 401 KV Main Bus-I at 400 KV Ss Khedamara 26-Mar-14 900 27-Mar-14 1700 Daily Erection of IPS Tube CSPTCL CSPTCL C

65 400 401 KV Khedamara-KSTPS NTPC ckt-II at 400 KV Ss Khedamara

26-Mar-14 900 27-Mar-14 1700 Daily Erection of IPS Tube PGCIL CSPTCL C

66 400 ACBIL-BILASPUR-CKT NO -2 26-Mar-14 900 31-Mar-14 1800 CONT FOR lilo CONNECTIVITY OF 300MW MCCPL TPP

ACBIL ACBIL C

67 765 Bus-2 at Bilaspur 27-Mar-14 800 27-Mar-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R68 220 Mapusa-Thivim 1 27-Mar-14 1000 27-Mar-14 1500 Daily AMP Work GOA WRTS-I R69 220 KAPP - Vav 2 27-Mar-14 800 27-Mar-14 1800 Daily AMP POWERGRID WR-II R70 400 Bus-2 at Indore (PG) 27-Mar-14 1000 28-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

71 765 Bus-2 at Gwalior 27-Mar-14 1000 27-Mar-14 1800 Daily Bay extension work related to Gwalior Jaipur 1 Bays

POWERGRID WR-II C

72 400 VSTPS Tie- Line-1 ( Line from Stage-III to IV Switchyard)

27-Mar-14 900 27-Mar-14 1900 Daily Basis AMP and rectification of hot spots NTPC NTPC

73 765 Sipat 765KV 400KV 1000MVA ICT-2 27-Mar-14 900 27-Mar-14 1900 Daily SPS Protection scheme modification NTPC NTPC74 765 Bus-1 at Solapur 28-Mar-14 700 30-Mar-14 1800 Daily commissioning tests amp SCADA works WRTS-I WRTS-I C75 220 Mapusa-Thivim 2 28-Mar-14 1000 28-Mar-14 1500 Daily AMP Work GOA WRTS-I R

76 400 Koradi-Satpura 28-Mar-14 1000 28-Mar-14 1400 Daily Earthwire tighting work damaged during Crossing work

WRTS-I ADANI C

77 220 Bus-1 at Dehgam 28-Mar-14 900 28-Mar-14 1800 Daily AMP POWERGRID WR-II R78 220 Kawas - Haldarwa 2 28-Mar-14 800 28-Mar-14 1800 Daily AMP POWERGRID WR-II R79 400 Chorania Amreli 28-Mar-14 800 28-Mar-14 1800 Daily PMM work GETCO GETCO

80 400DC Akola-Aurangabad (MSETCL) 1 and Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

29-Mar-14 600 30-Mar-14 1800 Conti Charging amp shifting of Akola-Abad line on MC Abad-Abad line WRTS-I WRTS-I C

81 220 Bus-2 at Dehgam 29-Mar-14 900 29-Mar-14 1800 Daily AMP POWERGRID WR-II R82 400 Bus -1 at Mapusa 30-Mar-14 1000 30-Mar-14 1500 Daily AMP Work WRTS-I WRTS-I R

83 765 765kV Bus Reactor at Solapur 31-Mar-14 700 2-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

Date Time Date Time

1 400 Bhilai-Koradi 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

2 400 DC Korba-Birsingpur 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

3 400 Korba-Bhilai 2 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

4 220 Korba-Budhipadar 3 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

5 400 Akola-Wardha 1amp 2 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

6 400 Raipur-Raigarh 1 amp Raipur-KSK-DBPL-Raigarh

1-Apr-14 800 30-Apr-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

7 400 Bhadrawati-Parli 1amp 2 1-Apr-14 900 30-Apr-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I C

8 400 400220kv ICT-1 at Pune 1-Apr-14 800 1-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R9 400 Bus-1 at Bilaspur 1-Apr-14 800 1-Apr-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R

10 400 Solapur(PG) -Karad line 1-Apr-14 700 10-Apr-14 1800 Conti Erection of 80MVAr new reactor by shifitng line equipments at Solapur

MSETCL WRTS-I C

11 400 Bus-1 at Jabalpur (pooling) 01-Apr-14 1000 01-Apr-14 1800 Daily Busbar Stability test related to Jhabua Power Bays

POWERGRID WR-II C

12 400 Shujalpur - Nagda 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

13 400 Mundra - Bhachau 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

14 400 Bina - Shujalpur 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

15 220 Omkareshwar-Khandwa Ckt 1-Apr-14 900 1-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI16 400 Sipat 400KV Bay 10 and 11 1-Apr-14 900 3-Apr-14 1900 Continous 400KV CT 3nos replacement NTPC NTPC17 400 Padgha-Nagothane ckt I 1-Apr-14 900 1-Apr-14 1700 Daily QMwork MSETCL MSETCL

18 400 Bus-2 at Jabalpur (pooling) 02-Apr-14 1000 02-Apr-14 1800 Daily Busbar Stability test related to Jhabua Power Bays

POWERGRID WR-II C

19 400 Vindhyanchal - Mahan - Korba (Section of both the line on same Dc tower)

02-Apr-14 800 03-Apr-14 1700 Continuous For Power Line crossing of 765kV Vindhyanchal (pooling) - Satna 1 Line

POWERGRID WR-II C

20 400 400kV ICT 4 at Indore MPPTCL 02-Apr-14 1000 04-Apr-14 1800 ContinuousFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

MPPTCL WR-II C

21 400 400kV Bus Coupler bay at Indore MPPTCL 02-Apr-14 1000 04-Apr-14 1800 ContinuousFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

MPPTCL WR-II C

22 400 400kV Itarsi - Indore MPPTCL 1 Line 02-Apr-14 1000 02-Apr-14 1500 DailyFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

POWERGRID WR-II C

23 400400 KV LILO Line of 400 KV SC Korba West-Khedamara to 400 KV Ss Raita (Between Loc69 amp70 near Raita Ss)

2-Apr-14 800 3-Apr-14 1700 DailyMaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

CSPTCL CSPTCL C

24 400 Chandrapur-Khaparkheda 2-Apr-14 900 2-Apr-14 1700 Daily QMwork MSETCL MSETCL

25 400 Lamboti-Solapur PG 2-Apr-14 900 2-Apr-14 1700 Daily QMwork MSETCL MSETCL

26 400 Bus-1 at Durg PS Ss 3-Apr-14 900 3-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R27 400 Bus-1 at Jabalpur 03-Apr-14 900 03-Apr-14 1800 Daily Retrofitting of Isolator arms(689A) POWERGRID WR-II R28 400 315MVA ICT2 at Khandwa 03-Apr-14 1000 03-Apr-14 1600 Daily AMP POWERGRID WR-II R29 400 Mundra - Hadala 3-Apr-14 800 3-Apr-14 1800 Daily PMM GETCO GETCO30 400 400KV Seoni -Bhilai Ckt 3-Apr-14 900 3-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I31 400 Lonikand-Chakan 3-Apr-14 900 3-Apr-14 1700 Daily QMwork MSETCL MSETCL32 400 Bus-2 at Durg PS Ss 4-Apr-14 900 4-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R33 400 Bus-1 at Jabalpur 04-Apr-14 900 04-Apr-14 1800 Daily Retrofitting of Isolator arms(2089A) POWERGRID WR-II R

34 400 400kV Itarsi - Indore MPPTCL 1 Line 04-Apr-14 1300 04-Apr-14 1800 DailyFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

POWERGRID WR-II C

35 400 Varsana - Hadala 4-Apr-14 800 4-Apr-14 1800 Daily PMM GETCO GETCO

Agency Type

ANNEXURE‐32BOutages Proposal of Transmission elements during the month of APRIL ‐2014

SN KV Line From To

Basis Reason System

36 220 Vapi - Vapi (PG) 4-Apr-14 800 4-Apr-14 1800 Daily PMM work PGCIL GETCO37 220 Haldarva - Jhanor - 1 (NTPC) 4-Apr-14 800 4-Apr-14 1800 Daily PMM amp Tan Delta testing PGCIL GETCO38 400 400KV Birsinghpur -Katni Ckt - I 4-Apr-14 800 4-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I39 220 Badod - Kota Ckt 4-Apr-14 900 4-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI40 220 Malanpur-Auriya Ckt 4-Apr-14 900 5-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI

41 400 Bhusawal-Akola 4-Apr-14 900 4-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

42 400 Deepnagar-Aurangabad II 4-Apr-14 900 4-Apr-14 1700 Daily QMwork MSETCL MSETCL43 400 Kalwa-Padgha Ckt I 4-Apr-14 900 4-Apr-14 1700 Daily QMwork MSETCL MSETCL44 765 Bus Reactor at Seoni 5-Apr-14 900 5-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R

45 400 DC Korba-KhedamaraLilo at Marwa lilo section yet to be charge 5-Apr-14 800 6-Apr-14 1800 Daily

Crossing work of upcoming 765 KV DC Raigarh-Champa (AP-48A0- AP 490)DC Korba-Khedamara is in service

CSPTCL WRTS-1 C

46 400 Bus-1 at Jabalpur 05-Apr-14 900 05-Apr-14 1800 Daily Retrofitting of Isolator arms(1689A) POWERGRID WR-II R

47 400 Mundara -Limbdi 1 05-Apr-14 800 07-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

48 220 Badod - Modak Ckt 5-Apr-14 900 5-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI49 400 Dhule-Babhleswar ckt 1 5-Apr-14 900 5-Apr-14 1700 Daily QMwork MSETCL MSETCL50 400 400220kv ICT-1 at Seoni 7-Apr-14 900 7-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R51 400 Bus-2 at Jabalpur 07-Apr-14 900 07-Apr-14 1800 Daily Retrofitting of Isolator arms(1789B) POWERGRID WR-II R52 400 315MVA ICT1 at Khandwa 07-Apr-14 1000 07-Apr-14 1600 Daily AMP POWERGRID WR-II R53 220 Chhegoan-Khandwa Ckt -II 7-Apr-14 900 7-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI54 400 Korba- Bhilai1 7-Apr-14 900 8-Apr-14 1900 days continuou Bay Maint and testing NTPC NTPC55 400 Vindhyachal - Mahan line 7-Apr-14 900 8-Apr-14 1900 Continuous Replacement of R Y and B Phase CT NTPC NTPC56 400 Bhusawal-Aurangabad 7-Apr-14 900 7-Apr-14 1700 Daily QMwork MSETCL MSETCL57 400 New Koyna-Karad ckt 2 7-Apr-14 830 7-Apr-14 1730 Daily QMwork MSETCL MSETCL

58 400 Mundara -Limbdi 2 08-Apr-14 800 10-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

59 400 Chorania Hadala 8-Apr-14 800 8-Apr-14 1800 Daily PMM GETCO GETCO60 400 Sipat 400KV Bay 23 8-Apr-14 900 9-Apr-14 1900 Continous One 400KV CT replacement NTPC NTPC61 400 Koradi-Khaparkheda I 8-Apr-14 900 8-Apr-14 1700 Daily QMwork MSETCL MSETCL62 765 765400KV ICT-1 at Kotra PS 9-Apr-14 900 9-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R63 400 Bus-2 at Jabalpur 09-Apr-14 900 09-Apr-14 1800 Daily Retrofitting of Isolator arms(489B) POWERGRID WR-II R64 400 315MVA ICT1 at Damoh 09-Apr-14 1000 09-Apr-14 1600 Daily AMP POWERGRID WR-II R65 400 Amreli-Jetpur 2 9-Apr-14 800 9-Apr-14 1800 Daily PMM GETCO GETCO66 400 SSP- Rajgarh - 1 9-Apr-14 800 9-Apr-14 1800 Daily PMM GETCOMPTCL GETCO67 220 TAPS1 amp2-TAPS 3amp4 tie line 9-Apr-14 800 9-Apr-14 1600 one day Annual maintenance Works MSETCL NPCIL68 220 TAPS TIE LIE-I 9-Apr-14 800 10-Apr-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL69 400 400 KV Indore - Nagda Ckt 9-Apr-14 900 9-Apr-14 1600 daily For maintenance work MPPTCL EHT- Mamp I70 400 400 KV Sarni - Isp Ckt 9-Apr-14 900 9-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I71 220 Mehgaon-Auriya Ckt 9-Apr-14 900 10-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI72 400 315 MVA 400220Kv X-mer III At Bhopal SS 9-Apr-14 900 10-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI73 400 Padgha-Tarapur CktII 9-Apr-14 900 9-Apr-14 1700 Daily QMwork MSETCL MSETCL74 765 Bus Reactor at Kotra PS 10-Apr-14 900 10-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R

75 765 amp 400

765400 kV ICT-I at Solapur amp 400KV Solapur-Parli 2 10-Apr-14 700 12-Apr-14 1800 Daily 765400 kV spare ICT unit Aux bus works CSD

commissioning amp Fire fighting works at Solapur WRTS-IReliance WRTS-I C

76 400 315MVA ICT2 at Damoh 10-Apr-14 1000 10-Apr-14 1600 Daily AMP POWERGRID WR-II R

77 765 Sasan-Satna 1 10-Apr-14 800 11-Apr-14 1800 Daily For AMP of line amp Line terminal Equipments Post commissioning checks

POWERGRID WR-II C

78 400 APL-Varsana 10-Apr-14 800 10-Apr-14 1800 Daily PMM GETCO GETCO79 400 400 KV Isp - Nagda Ckt 10-Apr-14 900 10-Apr-14 1600 daily For maintenance work MPPTCL EHT- Mamp I80 400 400 KV Bhopal-Itarsi(PGCIL) Ckt-I 10-Apr-14 900 11-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I81 220 Chhegoan-Khandwa Ckt -I 10-Apr-14 900 10-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI82 400 315 MVA 400220Kv X-mer At Katni SS 10-Apr-14 800 11-Apr-14 1800 continue For maintenance work MPPTCL EHT -MampI83 400 Korba- Bhilai2 10-Apr-14 900 11-Apr-14 1900 days continuou Bay Maint and testing NTPC NTPC84 400 Sipat 400KV Bay 14 10-Apr-14 900 12-Apr-14 1900 Continous 400KV CT 3nos replacement NTPC NTPC

85 400 Chandrapur II-Parli II 10-Apr-14 900 10-Apr-14 1700 Daily Providing of Arching horncorona rings Bird guards quarter pinsNut bolts

MSETCL MSETCL

86 400 Karad-Lonikand 10-Apr-14 900 10-Apr-14 1700 Daily QMwork MSETCL MSETCL87 400 Raipur-Durg PS 1 11-Apr-14 900 11-Apr-14 1700 Daily AMP Work WRTS-I WRTS-I R

88 400 Mundara -Jetpur 1 11-Apr-14 800 15-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

89 400 Varsana-Hadala Line 11-Apr-14 800 11-Apr-14 1800 Daily PMM GETCO GETCO90 220 Haldarwa Kawas-2 11-Apr-14 800 11-Apr-14 1800 Daily PMM work PGCIL GETCO91 400 400 KV Nagda-Rajgarh(PGCIL) Ckt-I 11-Apr-14 900 11-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

92 400 315 MVA 400220Kv X-mer III ampTie bay At Bhopal SS

11-Apr-14 900 11-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI

93 400 Akola-Nandgaonpeth 11-Apr-14 900 11-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

94 400 Akola-Wardha I 11-Apr-14 900 11-Apr-14 1700 Daily QMwork MSETCL MSETCL95 400 Kalwa-Lonikand 11-Apr-14 900 11-Apr-14 1700 Daily QMwork MSETCL MSETCL96 400 400220kv ICT-1 at Mapusa 12-Apr-14 900 12-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R97 400 Raipur-Durg PS 2 12-Apr-14 900 12-Apr-14 1700 Daily AMP Work WRTS-I WRTS-I R98 765 Sasan-Satna2 with line reactor 12-Apr-14 1000 12-Apr-14 1800 Daily AMP POWERGRID WR-II R99 400 400 KV Nagda-Rajgarh(PGCIL) Ckt-II 12-Apr-14 900 12-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I100 400 Deepnagar-Aurangabad I 12-Apr-14 900 12-Apr-14 1700 Daily QMwork MSETCL MSETCL101 400 Amreli-Jetpur 2 14-Apr-14 800 14-Apr-14 1800 Daily PMM GETCO GETCO102 400 Kasor - Gpec 14-Apr-14 800 14-Apr-14 1800 Daily PMM GETCO GETCO103 220 GWL(PGCIL)-Malanpur Ckt-I 14-Apr-14 900 15-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI104 400 DC Korba-Raipur 3 amp 4 15-Apr-14 800 16-Apr-14 1800 Conti Bus splitting work at Raipur WRTS-1 WRTS-1 C

105 400 Korba-Bhatapara 15-Apr-14 800 24-Apr-14 1800 Conti For raising of ground clearence for Railway track of Lafarge

WRTS-I Lafarge C

106 765 765400 kV ICT-II at Solapur 15-Apr-14 700 17-Apr-14 1800 Daily CSD commissioning amp Fire fighting works WRTS-I WRTS-I C107 400 Vindhyachal-Satna1 15-Apr-14 1000 15-Apr-14 1800 Daily AMP POWERGRID WR-II R108 400 Ssnl-Dhule-1 15-Apr-14 800 15-Apr-14 1800 Daily PMM GETCOMSETCL GETCO109 220 TAPS-Vapi 15-Apr-14 800 17-Apr-14 1900 Daily Annual maintenance Works GETCO NPCIL110 220 Pithampur-Rajgarh(PGCIL) Ckt - I 15-Apr-14 900 15-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI111 400 Sipat 400KV Bay-18 ( Ranchi-1 Main) 15-Apr-14 900 15-Apr-14 1900 Daily Annual Preventive maintenance job NTPC NTPC112 400 Karad-Kolhapur Ckt I 15-Apr-14 900 15-Apr-14 1700 Daily QMwork MSETCL MSETCL

113 400 DC Raipur-Bhadrawati 2 amp 3 16-Apr-14 800 17-Apr-14 1800 Conti Bus splitting work at Raipur WRTS-1 WRTS-1 C

114 400 Vindhyachal-Satna2 16-Apr-14 1000 16-Apr-14 1800 Daily AMP POWERGRID WR-II R

115 400 Mundara -Jetpur 2 16-Apr-14 800 20-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

116 400 Vadavi - Dehgam (Pg) - 1 16-Apr-14 800 16-Apr-14 1800 Daily PMM amp Tandelta testing GETCO GETCO117 400 Chorania Asoj-1 16-Apr-14 800 16-Apr-14 1800 Daily PMM GETCO GETCO118 220 Bhilad - TAPS 16-Apr-14 800 16-Apr-14 1800 Daily PMM work PGCIL GETCO119 220 Bhat - Pirana (PG) - 1 16-Apr-14 800 16-Apr-14 1800 Daily PMM work GETCO GETCO120 400 400 KV Bhopal-Itarsi(PGCIL) Ckt-II 16-Apr-14 900 17-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I121 220 Damoh(PGCIL) - Tikamgarh Ckt 16-Apr-14 900 16-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI

122 400 400KV SC Korba-Raipur-II (Between Korba - Bhatapara end)(Between Loc2980 amp 2990) 16-Apr-14 800 17-Apr-14 1700 Daily

MaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

PGCIL CSPTCL C

123 400 Sipat 400KV Bay-19 ( Ranchi-2 Main) 16-Apr-14 900 16-Apr-14 1900 Daily Annual Preventive maintenance job NTPC NTPC124 400 Padgha-Babhleswar ckt I 16-Apr-14 900 16-Apr-14 1700 Daily QMwork MSETCL MSETCL125 400 Vadavi - Dehgam (Pg) - 2 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCO GETCO126 400 Ssnl-Dhule-2 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCOMSETCL GETCO127 400 Vadinar-Hadala- 1 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCO GETCO128 220 Bhat - Pirana (PG) - 2 17-Apr-14 800 17-Apr-14 1800 Daily PMM work GETCO GETCO129 400 400KV Birsinghpur -Katni Ckt - II 17-Apr-14 800 17-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I130 220 Pithampur-Rajgarh(PGCIL) Ckt - II 17-Apr-14 900 17-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI131 400 Jejuri-Lonikand 17-Apr-14 900 17-Apr-14 1700 Daily QMwork MSETCL MSETCL132 400 Deepnagar-Khadka II 17-Apr-14 900 17-Apr-14 1700 Daily QMwork MSETCL MSETCL133 400 Chorania Kasor 18-Apr-14 800 18-Apr-14 1800 Daily PMM GETCO GETCO134 220 GWL(PGCIL)-Malanpur Ckt-II 18-Apr-14 900 19-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI135 400 Akola-Wardha II 18-Apr-14 900 18-Apr-14 1700 Daily QMwork MSETCL MSETCL

136 400 Koradi-Nandgaonpeth 18-Apr-14 800 18-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

137 765 765kV Pune line Reactor at Solapur 19-Apr-14 700 20-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

138 400 400KV Bina -Power(JP) Ckt 19-Apr-14 900 19-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I139 400 Dhule-SSarovar I 19-Apr-14 900 19-Apr-14 1700 Daily QMwork MSETCL MSETCL

140 400 Koradi-Khaparkheda II 19-Apr-14 900 19-Apr-14 1700 Daily QMwork MSETCL MSETCL141 220 KAPP - VAPI - 1 20-Apr-14 800 20-Apr-14 1800 Daily Isolator replacement under ASIDE scheme PGCIL GETCO

142 400 DC Bhilai-Bhadrawati amp Raipur-Bhadrawati 1 21-Apr-14 800 28-Apr-14 1800 Conti Diversion of line for Vidarbha Industrial Devlopment Corporation(VIDC)

WRTS-I VIDC C

143 400 Bhachau- Ranchhodpura 1amp2 21-Apr-14 800 27-Apr-14 1800 Continuous Tower shifting work at canal crossingInsulator replacement work

POWERGRID WR-II C

144 400 Hadala-Amreli 21-Apr-14 800 21-Apr-14 1800 Daily PMM GETCO GETCO145 400 Vadinar-Hadala- 2 21-Apr-14 800 21-Apr-14 1800 Daily PMM GETCO GETCO146 220 TAPS-Boisar 21-Apr-14 800 23-Apr-14 1900 Daily Annual maintenance Works MSETCL NPCIL147 220 Bina(PGCIL)-220 KV Bina Ckt 21-Apr-14 900 21-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI148 400 CGPL Bhachau -1 21-Apr-14 8AM 21-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL149 220 Kawas-Ichhapore 1+Bus 1 21-Apr-14 900 21-Apr-14 1800 daily RTV Coating NTPC NTPC150 400 Karad-Kolhapur Ckt II 21-Apr-14 900 21-Apr-14 1700 Daily QMwork MSETCL MSETCL151 400 New Koyna-Koyna Stg-4-1 21-Apr-14 830 21-Apr-14 1730 Daily QMwork MSETCL MSETCL152 400 Ssp - Rajgarh - 2 22-Apr-14 800 22-Apr-14 1800 Daily PMM GETCOMPTCL GETCO153 400 Vadavi-Bhachau 2 22-Apr-14 800 22-Apr-14 1800 Daily PMM amp Tan Delta testing PGCIL GETCO154 220 Bhilad - Vapi (PG) - 1 22-Apr-14 800 22-Apr-14 1800 Daily PMM work PGCIL GETCO155 400 400 KV Rajgarh(PGCIL)-Ssp Ckt-I 22-Apr-14 900 22-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I156 400 400KV Seoni -Sarni Ckt 22-Apr-14 900 23-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I157 220 Khandwa(PGCIL)-Nepanagar Ckt 22-Apr-14 900 22-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI158 220 Kawas-Ichhapore 2+Bus 1 22-Apr-14 900 22-Apr-14 1800 daily For maintenance work NTPC NTPC159 400 Karad-Jaigad II 22-Apr-14 900 22-Apr-14 1700 Daily Annual maintenance work MSETCL MSETCL160 220 Bhilad - Vapi (PG) - 2 23-Apr-14 800 23-Apr-14 1800 Daily PMM work PGCIL GETCO161 400 400KV Bina -Bhopal Ckt -I 23-Apr-14 900 24-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I162 400 400 KV Rajgarh(PGCIL)-Ssp Ckt-II 23-Apr-14 900 23-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I163 220 Bina(PGCIL)-Shivpuri Ckt 23-Apr-14 900 24-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI164 220 Damoh(PGCIL) - Damoh I C - I 23-Apr-14 900 23-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI

165 400 400 KV DCDS Sipat- Raipur (IampII) 23-Apr-14 800 24-Apr-14 1700 DailyMaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

PGCIL CSPTCL C

166 400 CGPL Bhachau - 2 23-Apr-14 8AM 23-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL

167 220 Kawas-Navsari 2 +Bus 1 23-Apr-14 900 23-Apr-14 1800 daily Insulator replcement and routine maintenance NTPC NTPC168 400 Padgha-Babhleswar ckt II 23-Apr-14 900 23-Apr-14 1700 Daily QMwork MSETCL MSETCL169 400 Kasor - SSP 24-Apr-14 800 24-Apr-14 1800 Daily PMM work GETCO GETCO170 220 Bhilad - Vapi (PG) - 3 24-Apr-14 800 24-Apr-14 1800 Daily PMM work PGCIL GETCO171 220 TAPS-Bhilad 24-Apr-14 800 26-Apr-14 1900 Daily Annual maintenance Works GETCO NPCIL172 220 Damoh(PGCIL) - Damoh I C - II 24-Apr-14 900 24-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI173 400 CGPL Jetpur- 1 24-Apr-14 8AM 24-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL

174 220 Kawas-Ichhapore 1 +Bus 2 24-Apr-14 900 24-Apr-14 1400 daily Insulator replcement and routine maintenance NTPC NTPC

175 220 Kawas-Ichhapore 2 +Bus 2 24-Apr-14 1400 24-Apr-14 1900 daily Insulator replcement and routine maintenance NTPC NTPC176 400 Padgha-Talegaon 24-Apr-14 900 24-Apr-14 1700 Daily QMwork MSETCL MSETCL

177 765 765kV Raichur 1 line Reactor at Solapur 25-Apr-14 700 27-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

178 400 400KV Bina -Bhopal Ckt -II 25-Apr-14 900 26-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I179 400 CGPL Jetpur- 2 25-Apr-14 8AM 25-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL180 400 Vindhyachal -Satna-4 Line Shunt Reactor 25-Apr-14 900 25-Apr-14 1900 Daily Basis AMP NTPC NTPC

181 400 Bhusawal-Koradi 25-Apr-14 900 25-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

182 400 Deepnagar-Khadka I 25-Apr-14 900 25-Apr-14 1700 Daily QMwork MSETCL MSETCL183 400 Soja -Kansari 26-Apr-14 800 26-Apr-14 1800 Daily PMM GETCO GETCO184 400 Raipur-Wardha 1 27-Apr-14 800 28-Apr-14 1800 Daily Balance construction work WRTS-1 WRTS-1 C185 220 KAPP - VAPI - 2 27-Apr-14 800 27-Apr-14 1800 Daily Isolator replacement under ASIDE scheme PGCIL GETCO186 400 Soja -Kansari 28-Apr-14 800 28-Apr-14 1800 Daily PMM GETCO GETCO187 220 TAPS-Boisar II 28-Apr-14 800 30-Apr-14 1900 Daily Annual maintenance Works MSETCL NPCIL188 400 400KV Damoh - Katni Ckt 28-Apr-14 900 28-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I189 400 400 KV Damoh(PGCIL)-Katni Ckt 28-Apr-14 900 28-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I190 400 New Koyna-Karad ckt 1 28-Apr-14 830 28-Apr-14 1730 Daily QMwork MSETCL MSETCL

191 400 DC Raigarh-DB Power (Tudri) - KSK 29-Apr-14 800 30-Apr-14 1800 Conti Crossing work of 765kV SC Raigrah-Champa (90 - 100)

WRTS-I WRTS-I C

192 400 Raipur-Wardha 2 29-Apr-14 800 30-Apr-14 1800 Daily Balance construction work WRTS-1 WRTS-1 C193 220 Navsari - Nasik - 1 29-Apr-14 800 29-Apr-14 1800 Daily PMM work GETCOMSETCL GETCO194 220 Seoni(PGCIL)-Chhindwara Ckt-I 29-Apr-14 900 29-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI195 220 Kawas-Vav 1+ bus 2 29-Apr-14 900 29-Apr-14 1800 daily For maintenance work NTPC NTPC196 400 Chorania Asoj-1 30-Apr-14 800 30-Apr-14 1900 Daily PMM GETCO GETCO197 220 Navsari - Nasik - 2 30-Apr-14 800 30-Apr-14 1800 Daily PMM work GETCOMSETCL GETCO198 220 Vapi - TAPS 30-Apr-14 800 30-Apr-14 1800 Daily PMM work PGCIL GETCO199 220 Seoni(PGCIL)-Chhindwara Ckt-II 30-Apr-14 900 30-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI200 220 Kawas-Vav 1+ bus 2 30-Apr-14 000 30-Apr-14 000 daily For maintenance work NTPC NTPC

Annexure-32-C1

List of Emergency Outages availed in Feb 2014

SlNo

Element kV Agency From

Date To Date

Remarks

1 SATNA‐BINA‐II 765 WRTS‐2 4‐Feb‐14

5‐Feb‐14

Hot spot attending

2 SUJALPUR‐NAGDA LR NAGDA

400 WRTS‐2 6‐Feb‐14

19‐Feb‐14

Oil leackage

3 SOLAPUR‐PARLI‐II

400 WRTS‐2 6‐Feb‐14

6‐Feb‐14

Hotspot attend at solapur

4 JABALPUR‐ITARSI‐IV LR AT ITARSI‐LR

400 WRTS‐2 7‐Feb‐14

17‐Feb‐14

Oil leackage

5 APL‐HADALA‐SC 400 GEB 7‐Feb‐14

7‐Feb‐14

Hot spot

6 SOLAPUR‐PARLI(PG)‐1

400 WRTM(REL)

9‐Feb‐14

9‐Feb‐14

Hot spot

7 BOISAR‐BOISAR(PG)‐II

220 MSETCL 9‐Feb‐14

9‐Feb‐14

Hotspots

8 NEW KOYNA‐KARAD ‐ I

400 MSETCL 10‐Feb‐14

11‐Feb‐14

Dc‐earth leakage

9 LONIKHAND ‐ KARAD

400 MSETCL 10‐Feb‐14

11‐Feb‐14

Hotspot

10 NAGDHA ICT ‐ III

400220

MPPTCL 10‐Feb‐14

10‐Feb‐14

Hotspot

11 AKOLA ‐ ABAD ‐I AKOLA

400 WRTS‐1 11‐Feb‐14

12‐Feb‐14

Oil leackage

12 AKOLA ‐ AURANGABAD ‐ I

400 WRTS‐1 11‐Feb‐14

11‐Feb‐14

Oil leackage ion lr

13 BINA‐GWALIOR 765 WRTS‐1 14‐Feb‐ 14‐Feb‐ Attend oil leakage on lr

SlNo

Element kV Agency From

Date To Date

Remarks

II 14 14

14 AKOLA‐TIRORA‐I 765 MSETCL 22‐Feb‐14

23‐Feb‐14

Sparking in LR at Tirora SYED AT TIRORA END

15 KHAEGAR‐ICT‐I 400220

MSETCL 22‐Feb‐14

22‐Feb‐14

Hot spot

16 KHANDWA‐NEPANAGR‐SC

220 MPPTCL 23‐Feb‐14

23‐Feb‐14

Hot spot

17 GWALIAR ‐SATNA ‐ I

765 WRTS‐2 24‐Feb‐14

1‐Mar‐14

Attend hot spot

18 KORBA BUS‐III 400 NTPC 25‐Feb‐14

25‐Feb‐14

Hots pot attend

19 BUS‐1 AT GWALIOR

765 WRTS‐2 13‐Feb‐14

13‐Feb‐14

Checking of blocked BB main‐1 relay

20 RAIPUR‐BWATI‐2

400 WRTS‐1 17‐Feb‐14

17‐Feb‐14

Urgent Removal of LR at Raipur end for DGA violation

21 TAPS‐PADGHE 400 TAPS‐3amp4 19‐Feb‐14

23‐Feb‐14

To attend SF‐6 leakage

22 SATNA‐GWALIOR‐1

765 WRTS‐2 24‐Feb‐14

26‐Feb‐14

To attend hot spots

23 VCHAL‐JABALPUR‐IV

400 WRTS‐2 27‐Feb‐14

27‐Feb‐14

To increase OPGW‐Top conductor clearance to avoid tripping

24 APL‐SAMI‐2 400 APL 26‐Feb‐14

26‐Feb‐14

To attend hot sopt

25 SHOLAPUR BUS‐1

765 WRTS‐1 27‐Feb‐14

27‐Feb‐14

To attend hot sopt

26 BOISAR BUS‐2 220 WRTS‐1 28‐Feb‐14

28‐Feb‐14

To attend hot sopt

Sl No KV element From To Basis Work System Agency Remarks

1220 Vapi (GETCO)‐Bhilad 1‐Feb‐14 800 2‐Feb‐14 1800 Daily Line crossing work of 400KV LILO line for

Magarwada SSGETCO POWERGRID N

2 220 Omkareshwar-Khandwa Ckt

3-Feb-14 900 3-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

3 400 New Koyna-Koyna Stg-4-1

3-Feb-14 830 3-Feb-14 1730 Daily QMwork MSETCL MSETCL N

4220 Vapi ‐ Magarwada

Ckt13‐Feb‐14 900 3‐Feb‐14 1400 Daily AMP of line amp equipment WRTS‐II POWERGRID DD may have to do load

shedding as per Reliability Suggestion

N

5 220 DC Raigarh- Raigarh 1amp 2

4-Feb-14 800 5-Feb-14 1800 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (040-50)

CSPTCL WRTS-I N

6 220 Itarsi(PGCIL)-Hoshangabad Ckt

4-Feb-14 900 4-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N

7 400 Mundra -Limbdi-2 4-Feb-14 800 4-Feb-14 1800 Daily Suspension Insulator replcement and routine maintenance

PGCIL CGPL N

8 400 400 kV DC Satna - Bina 1amp2

4-Feb-14 800 5-Feb-14 1800 Continous Crossing of Jabalpur-Bina 765 kv SC Line PGCIL JTCL N

9220 Vapi ‐ Magarwada

Ckt24‐Feb‐14 0900 4‐Feb‐14 1400 Daily AMP of line amp equipment WRTS‐II POWERGRID N

10 765 Seoni-Bina line with LR 4‐Feb‐14 800 4-Feb-14 1800 Daily AMP Work WRTS-2 WRTS-1 N

11 400 Bus I Bina 5‐Feb‐14 800 5‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

12220 Kawas ‐ Navsari (PG)

25‐Feb‐14 800 5‐Feb‐14 1800 Daily Replacement of ST insulators by Double Tension

insulator in Railway crossing spansWRTS‐II POWERGRID N

13400 Indoer (PG) ‐Indore

(MP) DC5‐Feb‐14 800 6‐Feb‐14 1800 Continou

sStringing of 765kV Indore ‐ Vadodara line WRTS‐II POWERGRID N

14 400 APL - Hadala 6-Feb-14 800 6-Feb-14 1800 Daily PMM GETCO GETCO N N

15 220 Seoni(PGCIL ) - Chhindwara CKT I

6-Feb-14 900 6-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N N

16 400 Jejuri-Koyna stg IV 6-Feb-14 900 6-Feb-14 1700 Daily QMwork MSETCL MSETCL N17 400 Akola-Nandgaonpeth 6-Feb-14 900 6-Feb-14 1700 Daily Quaterly Maintainance Work MSETCL MSETCL N18 400KV Korba-Bhatapara 6-Feb-14 900 7-Feb-14 1900 Cont Testing of LBB auto re-close M-I amp M-II relays NTPC NTPC N19 220 Haldarva - Jhanor - 2

(NTPC)6-Feb-14 900 6-Feb-14 1800 Daily PMM work GETCO N

20220 Navsar (PG) ‐Navsari

(GETCO) 16‐Feb‐14 800 6‐Feb‐14 1800 Daily Replacement of ST insulators by Double Tension

insulator in Railway crossing spansWRTS‐II POWERGRID

N

21 400 Bus‐II Bina 6‐Feb‐14 800 6‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

22400 Seoni‐Khandwa1 6‐Feb‐14 1000 6‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Khandwa end by MS ABB

WRTS‐II POWERGRID Rescheduled to 6th March N

23 400 Rajgarh-Ssp Ckt-II 7-Feb-14 900 7-Feb-14 1600 daily For maintenance work MPPTCL EHT- Mamp I N24 220 Chhegoan-Khandwa

Ckt -II7-Feb-14 900 7-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

25 220 Wardha (PG)-Wardha 7-Feb-14 800 7-Feb-14 1800 Daily AMP Work MSETCL WRTS-I N26 400 Chorania - Vadavi-2 7-Feb-14 800 7-Feb-14 1800 Daily PMM amp Tan Delta testing WRTGPL GETCO N27 400 Jabalpur‐Itarsi1 7‐Feb‐14 900 7‐Feb‐14 1400 Daily AMP OF TERMINAL EQUIPMENT WRTS‐II POWERGRID N

28220 Vapi(PG)‐ Bhilad ckt

2 amp 3 7‐Feb‐14 800 8‐Feb‐14 1800 Daily Line crossing work of 400KV LILO of Navsari‐Boisar

at MagarwadaGETCO POWERGRID N

29 220 Mapusa-Thivim 1 8-Feb-14 800 8-Feb-14 1800 Daily AMP Work GOA WRTS-I N

30400 Seoni‐Khandwa2 9‐Feb‐14 1000 9‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Khandwa end by MS ABB

WRTS‐II POWERGRID Rescheduled to 7th March N

31 220 Chhegoan-Khandwa Ckt -I

10-Feb-14 900 10-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

Annexure-32-C2OCC approved outage not availed in Feb‐2014

32132 132 kV Dhule

Dondaicha line10-Feb-14 800 11-Feb-14 1800 Cont Crossing of Dhule-Vadodara 765 kv SC Line MSETCL BDTCL subjected to sldc

clearance N

33 400132 KV

Vindhyachal ICT-1 10-Feb-14 900 14-Feb-14 1900 Cont ICT Overhauling NTPC NTPC N

34400 KV Vindhyachal - Jabalpur-

3 Line Shunt Reactor10-Feb-14 900 14-Feb-14 1900 Cont Reactor Overhauling NTPC NTPC

N

35 400 KSK-DB Power 10-Feb-14 800 13-Feb-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end WRTS-IDBKSK

KSK N36 220 Ipore-Kawas-1 10-Feb-14 800 10-Feb-14 1800 Daily PMM work GETCO N

37400 Vindhyachal‐Mahan 10‐Feb‐14 800 11‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐I WRTS‐II N

38400 Mahan‐Korba 10‐Feb‐14 800 11‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐I WRTS‐II N

39765 Jabalpur ‐ Bina 1 10‐Feb‐14 1000 10‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Jabalur end by MS ABB

WRTS‐II POWERGRID Differed by siteN

40 400 SSP - Rajgarh - 1 10-Feb-14 800 11-Feb-14 1800 Daily Basis

PMM Work GETCO N

41 400 DC Tundri (DB Power) -ksk-Raigarh

10-Feb-14 800 11-Feb-14 1800 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (092-100)

DB Power WRTS-I N42 400 Jetpur - Amreli - 1 11-Feb-14 800 12-Feb-14 1800 Daily PMM GETCO GETCO N43 400 Hadala - Vadinar-2 11-Feb-14 800 11-Feb-14 1800 Daily PMM GETCO GETCO N44 400 Nagda-Rajgarh Ckt-I 11-Feb-14 900 11-Feb-14 1800 daily For maintenance work MPPTCL EHT- Mamp I N45 220 Mehgaon-Auriya Ckt 11-Feb-14 900 11-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N46 220 Seoni(PGCIL ) -

Chhindwara CKT II11-Feb-14 900 11-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

47

765kV Main Bus-1B at SASANBay 13 - Jack Bus

11-Feb-14 900 21-Feb-14 1800 Daily Jumper Installations amp ConnectionsIsolator Allignment

PGCIL Reliance Provisional Subject to details of works done to be apprised on daily basis

N

48 220 Ipore-Kawas-2 11-Feb-14 800 11-Feb-14 1800 Daily PMM work GETCO N49 220 Navsari - Nasik - 2 11-Feb-14 900 11-Feb-14 1800 Daily PMM work GETCO N

50765 Jabalpur ‐ Bina 2 11‐Feb‐14 1000 11‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Jabalur end by MS ABB

WRTS‐II POWERGRID Deferred by siteN

51 400 Nagda-Rajgarh Ckt-II 12-Feb-14 900 12-Feb-14 1800 daily For maintenance work MPPTCL EHT- Mamp I N52 400 Karad-Solapur (PGCIL) 12-Feb-14 900 12-Feb-14 1700 Daily QMwork MSETCL MSETCL N53 400 Raipur-Sipat 1 amp 2 26-Feb-14 800 3-Mar-14 1800 Conti Diversion of line for Lafarge Railway track WRTS-I Lafarge Ori 12-16 Feb 14 Deferre N54 220 Haldarwa Kawas-2 12-Feb-14 900 12-Feb-14 1800 Daily PMM work GETCO N

55 220 Bus‐I Bina 12‐Feb‐14 800 12‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

56 400 Chorania - Hadala 13-Feb-14 800 14-Feb-14 1800 Daily PMM GETCO GETCO N57 400 Tarpur-Padghe-2 13-Feb-14 800 14-Feb-14 1800 Daily maintenance work POWERG

RIDNPCIL N

58400 Vindhyachal‐Satna1 13‐Feb‐14 1000 13‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

59 220 Bus‐II Bina 13‐Feb‐14 800 13‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

60 220 Pithampur-Rajgarh Ckt - I

14-Feb-14 900 14-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

61 220 Wardha (PG)-Badnera 14-Feb-14 800 14-Feb-14 1800 Daily AMP Work at Wardha MSETCL WRTS-I N

62 400 Bhusawal-Koradi 14-Feb-14 900 14-Feb-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL N

63 400 Raipur-KSK 14-Feb-14 800 16-Feb-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end WRTS-IKSK

KSK N

64 220 GWL(PGCIL)-Malanpur Ckt-II

15-Feb-14 900 15-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N

65 220 Pithampur-Rajgarh Ckt - II

15-Feb-14 900 15-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

66400 Vindhyachal‐Satna2 16‐Feb‐14 1000 16‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

67 220 KAPS - Haldarwa - 1 17-Feb-14 800 17-Feb-14 2000 Daily Yearly PM checks KAPS N

68400 3X105 MVA 400220Kv

X-mer I At Indore ss17-Feb-14 800 18-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI

N

69

220 SC Korba-Raigarh-Budhipadar sc(PGCIL) amp DC Korba-Budipadar both circuits (CSPTCL)

18-Feb-14 800 19-Feb-14 1800 Conti Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCLWRTS-I

WRTS-I

N

70 400 Itarsi-Bhopal Ckt-I 18-Feb-14 900 19-Feb-14 1700 daily For maintenance work MPPTCL EHT- Mamp I N71 220 Badod - Kota Ckt 18-Feb-14 900 18-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N72 220 Damoh(PGCIL) -

Damoh I C - II18-Feb-14 900 18-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

73 220 Badod - Modak Ckt 19-Feb-14 900 19-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

74220 KAPS - Ukai - Mota 19-Feb-14 800 19-Feb-14 2000 Daily Yearly PM checks KAPS Non consent from SLDC

GETCO N

75400 315 MVA 400220 KvX-

mer III At Indore ss20-Feb-14 800 21-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI

N

76 220 Seoni(PG)-Seoni 2 21-Feb-14 800 21-Feb-14 1800 Daily AMP Work MPPTCL WRTS-I Y N77 220 Bina(PGCIL)-Shivpuri

Ckt21-Feb-14 900 22-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI Y N

78 400 Koradi-Nandgaonpeth 21-Feb-14 900 21-Feb-14 1700 Daily QMwork MSETCL MSETCL N N79 220 Haldarva - Jhanor - 1

(NTPC)21-Feb-14 900 21-Feb-14 1800 Daily PMM work GETCO N

80

765kV Main Bus-2A at SASANSatna Line-2

22-Feb-14 900 28-Feb-14 1800 Contionious

Equipment ConnectionsCircuit Breaker TestingJumper MeasurementIsolator Allignment Reactor accessories erection on R-Phase

PGCIL Reliance

N

81 400 Korba-Raipur 3 amp 4 23-Feb-14 800 24-Feb-14 1800 Conti For Bus spliting work at Raipur765 KV Raigarh-Raipur and 765 Champa Raipur lines

WRTS-1 WRTS-1 N

82132 132kV Astha - Polai SC

line of MPPTCL24-Feb-14 800 25-Feb-14 1800 Continous Crossing of Bhopal -Indore 765 kv SC Line MPPTCL BDTCL subjected to sldc

clearance N

83 400 Bus-1 at Bilaspur 24-Feb-14 800 24-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I N

84400 Seoni -

Khedamara(Bhilai) Ckt25-Feb-14 900 25-Feb-14 1800 daily For maintenance workFeeder bay maintenance at

KMaraMPPTCL CSPTCLMPPT

CLNo confirmation on D-3

N

85400 Ranchi-Sipat 1 amp 2 25-Feb-14 800 26-Feb-14 1800 Conti Crossing work of upcoming 765 KV DC

Jharsuguda-Korba amp 765KV SC Ranchi-BilaspurWRTS-I WRTS-I No confirmation on D-3

N

86765 Sasan‐Satna2 25‐Feb‐14 800 26‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐II POWERGRID No confirmation on D-3 N

87400 Bus Reactor1 at Satna 25‐Feb‐14 1000 25‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

88400 400 kV DC Damoh -

Bhopal Line26-Feb-14 800 27-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL Not availed by agency for

rainsN

89400 Raipur-Bhadrawati 2 amp

327-Feb-14 800 27-Feb-14 2100 Daily For Bus spliting work at Raipur765 KV Raigarh-

Raipur and 765 Champa Raipur linesWRTS-1 WRTS-1 Subject to Telemetry from

Durg PS RaipurN

90 400 Birsinghpur‐Vandana Vidyut

27‐Feb‐14 800 27‐Feb‐14 1700 Daily AMP of Terminal Equipment amp line Reactor WRTS‐I POWERGRID Ready N

91 400 Bhusawal-Akola 28-Feb-14 900 28-Feb-14 1700 Daily QMwork MSETCL MSETCL N92 220 Bus-1 at Wardha 28-Feb-14 800 28-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I N93 400 Birsinghpur‐Balco 28‐Feb‐14 800 28‐Feb‐14 1700 Daily AMP of Terminal Equipment amp line Reactor WRTS‐I WRTS‐I Deferred by site N

94 400 Nagda‐Dehgam2 5‐Feb‐14 1000 5‐Feb‐14 1800 DailyCommissioning amp checking of CSD relay in Main CB for reactor switching at Dehgam end by MS ABB

WRTS‐II POWERGRID N

95 400 400kV Satpura Itarsi 10‐Feb‐14 900 11‐Feb‐14 1700 DailyCommissioning of new CB after dismantling of existing TELK make CB at Satpura end amp normalising of line on main CB

POWERGRID

WRTS‐II N

96 765 765 kV Satna - Bina Ckt I

6-Feb-14 800 8-Feb-14 1800 cont Stringing of Jabalpur-Bina 765 kv SC Line PGCIL JTCL Original27-28 Jan14 Def N

97 765400 765400 kV ICT-1 at Bina 20-Feb-14 90000 AM 21-Feb-13 60000 PM Continuou

sCSD commissioning for 400kV Side CB of 765400 kV ICT-1 WRTS-II POWERGRID Deferred by site N

98 400 Nagda - Dehgam 1amp2 20-Feb-14 80000 AM 28-Feb-14 1700 Daily Online PID testing to insulators in both circuits AR shall be kept in non auto mode in both circuits WRTS-II POWERGRID

N

99 220MC Waluj-Chitegaon amp Waluj-Jalna

21-Feb-14 700 21-Feb-14 1900 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad MSETCL WRTS-I

N

100 400 Bus 1 at Asoj 21-Feb-14 000 21-Feb-14 1800 Daily For checking bus stability testing of Piran 1 amp 2 bays (for charging of new line) GETCO WRTS-II N

101 400 Bus-1 at Wardha 22-Feb-14 800 22-Feb-14 1800 Daily Jumper spacers connection at Wardha WRTS-I WRTS-I N102 400 Bus-1 at Raigarh 22-Feb-14 800 22-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I Deferred by site N103 765 Bus - II at Indore 22-Feb-14 90000 AM 23-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Not availed NLDC consenN104 220 Kakrapar-Haldarwa2 22-Feb-14 1000 Hrs 22-Feb-14 1600 Hrs Daily AMP POWERG

RID WRTS-II N

105 400 Bus 2 at Asoj 22-Feb-14 000 22-Feb-14 1800 Daily For checking bus stability testing of Piran 1 amp 2 bays (for charging of new line) GETCO WRTS-II N N

106400 400 kv DC Bhopal -

Bina Line (Ckt I amp II)(Tower no 34 amp35)

23-Feb-14 800 24-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line MPPTCLBDTCL

N

107 765kV SASAN Main Bus-1BBay 10 - Jack Bus 24-Feb-14 800 Hrs 2-Mar-14 1900 Hrs Continuous Dia-4

(Bay-10) - SCCOCC Test of Unit 4 GTSasan Sasan N

108 765 Bus - I at Indore 24-Feb-14 90000 AM 25-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID N

109 765 765 KV Bina-Indore Line 24-Feb-14 0900 Hrs 24-Feb-14 1800 Hrs Daily

For taking spare reactor unit in service amp checking the scheme for spare reactor with 765 KV Bina-Indore Line Reactor at Bina

POWERGRID WRTS-II

Deferred by site N

110 400 Kasor - GPEC 24-Feb-14 800 25-Feb-14 1800 Daily PMM Work GETCO GETCO N111 40022033 315 MVA ICT2 at Kheda 24-Feb-14 900 10-Mar-14 1800 cont modification work in SS lay out CSPTCL CSPTCL N112 400 315 MVA ICT2 at

Gwalior 25-Feb-14 90000 AM 25-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID N

113 400KV V-Satna-4 Line Shunt Reactor 25-Feb-14 1000 25-Feb-14 2000 Daily

Basis AMP NTPC NTPC N

114 400 Raipur-Wardha 1 26-Feb-14 800 26-Feb-14 2000 Daily Balance construction works at Wardha end WRTS-I WRTS-IReady Ori26214 Deferred by site

N

115 400 Bus -I at Indore 26-Feb-14 90000 AM 26-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Deferred by site N116 400 315 MVA ICT3 at

Gwalior 26-Feb-14 90000 AM 26-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID N

117 400 400 kV DC Damoh - Bhopal Line

26-Feb-14 800 26-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL N

118 400 Chorania-Kasor 26-Feb-14 800 26-Feb-14 1800 Daily PMM work GETCO GETCO N119 400 Koradi-Satpura sc 26-Feb-14 800 26-Feb-14 1600 Daily 765KV Tiroda Koradi Transmission LineII crossing

worksPOWERGRID MEGPTCL Cancelled by MEGPTL N

120 400 400 kV DC Damoh - Bhopal Line

26-Feb-14 800 26-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL N

121 400 Raipur-Wardha 2 27-Feb-14 800 27-Feb-14 2000 Daily Balance construction works at Wardha end WRTS-I WRTS-I Deferred by site N122 400 Vindhyachal-Satna2 27-Feb-14 1000 27-Feb-14 1800 Daily Commissioning of CSD Relay in ABB make main

CB at Satna WRTS-II POWERGRID Deferred by site N

123 400 Bus -II at Indore 27-Feb-14 90000 AM 27-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Ready N124 400 315 MVA ICT1 at

Rajgarh 27-Feb-14 90000 AM 27-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID Ready N

125 400400 KV SC Kosamba - Asoj line(730-740)

27-Feb-14 700 27-Feb-14 1800 cont Crossing of Dhule - Vadodara 765 kv SC Line GETCOBDTCL

N

126 400 Indore (MP) -Indore (PG)-DC 27-Feb-14 700 28-Feb-14 1600 Cont Stringing of 765kV Indore - Vadodara line POWERG

RID WRTS-II Deferred by site N

Anaulagnak 33(A)

maaca- 2014 AaOr Ap`Ola 2014 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR MARCH 2014 AND APRIL 2014

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)maaca- 2014 Ap`Ola 2014 maaca- 2014 Ap`Ola 2014

MARCH 2014 APRIL 2014 MARCH 2014 APRIL 2014

1 gaujarat

saIimat 11700 12100 7750 7800

AsaIimat 11740 12140 7760 7810

2 maQya p`doSa

saIimat 8340 9050 5338 5540

AsaIimat 8340 9050 5338 5540

3 CltaIsagaZ

saIimat 3200 3075 1929 1809

AsaIimat 3225 3105 1944 1827

4 maharaYT

saIimat 19000 19150 10200 10300

AsaIimat 19050 19200 10250 10350

5 gaaovaa

saIimat 425 410 300 295

AsaIimat 425 415 310 300

6 dmana dIva

saIimat 340 345 210 205

AsaIimat 345 350 225 210

7 DI ena eca

saIimat 635 640 445 425

AsaIimat 635 640 445 425

8 piScama xao~

saIimat 41961 43047 28500 27900

AsaIimat 42076 43173 29560 28840

Diversity factor of 10401

March 2014 and April 2014

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah frvarI 2014

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 1552 75

]k[- Ukai - 2 1719 75]k[- Ukai - 3 598 75]k[- Ukai - 4 1757 75]k[- Ukai (Total) 5627 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 024 2]k[- ela baI saI eca Ukai LBCH - 2 131 3]k[- ela baI saI eca Ukai LBCH (Total) 154 5 0008

3 kDanaa Kadana - 1 000 0 0005kDanaa Kadana - 2 246 62 0000kDanaa Kadana - 3 223 62kDanaa Kadana - 4 166 63 0000kDanaa Kadana (Total) 634 63 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 431 9 0020 6 kula jalaIya TOTAL(H) 6846 225 0401

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 2060 32 21822 TaoronT pavar ilaimaToD yauinaT DI 7979 125 69803 TaoronT pavar ilaimaToD yauinaT [- 075 122 07584 TaoronT pavar ilaimaToD yauinaT ef 8023 124 66915 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 018811 Qauvarna tapIya Dhuvaran - GT 2 000 0 041912 Qauvarna tapIya Dhuvaran - STG 023 1013 ]ka[- yauinaT 1 Ukai -1 000 0 005114 ]ka[- yauinaT 2 Ukai -2 000 0 010815 ]ka[- yauinaT 3 Ukai -3 3147 200 297216 ]ka[- yauinaT 4 Ukai -4 10588 202 1002617 ]ka[- yauinaT 5 Ukai -5 9496 210 884118 ]ka[- yauinaT 6 Ukai -6 23703 500 1844819 gaaMQaInagar 1 Gandhinagar - 1 000 0 008620 gaaMQaInagar 2 Gandhinagar - 2 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 000 0 029622 gaaMQaInagar 4 Gandhinagar - 4 000 0 036223 gaaMQaInagar 5 Gandhinagar - 5 11676 212 1148924 vaNakbaaorI 1 Wanakbori - 1 10648 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 11069 21026 vaaNakbaaOrI 3 Wanakbori - 3 1891 20627 vaaNakbaaOrI 4 Wanakbori - 4 5244 21228 vaaNakbaaOrI 5 Wanakbori - 5 5531 21029 vaaNakbaaOrI 6 Wanakbori - 6 000 030 vaaNakbaaOrI 7 Wanakbori - 7 8902 20931 ]trna Utran GT 1 000 0 019832 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 000 0 024635 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 000 0 0000

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Anaulagnak 41

ACTUAL GENERATION amp AVALABILITY FOR FEBRUARY 2014Actual vaastivak

Actual vaastivak

37 isaka Sikka - 1 3696 112 439838 isaka Sikka - 2 000 0 017639 kcC ilagnaa[-T Kutch Lignite - 1 4429 71 848640 kcC ilagnaa[-T Kutch Lignite - 2 4037 7241 kcC ilagnaa[-T Kutch Lignite - 3 3646 6742 kcC ilagnaa[-T Kutch Lignite - 4 2215 66 525343 saUrt ilagnaa[-T Surat Lignite - 1 6705 131 682544 saUrt ilagnaa[-T Surat Lignite - 2 7475 131 738745 saUrt ilagnaa[-T Surat Lignite - 3 6965 130 728846 saUrt ilagnaa[-T Surat Lignite - 4 6362 130 688647 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5454 107 848648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5649 11449 jaI Aa[- pI saI ela GIPCL GT - 1 1589 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1587 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1702 3552 jaI Aa[- pI saI ela GIPCL ST - 1 2902 5153 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 020556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 000 0 000060 jaI pI [- saI GPEC GT - 2 267 156 013261 jaI pI [- saI GPEC GT - 3 143 146 002762 jaI pI [- saI GPEC STG 131 17263 jaI esa [- jaI GSEG GT - 1 000 0 098964 jaI esa [- jaI GSEG GT - 2 1181 5065 jaI esa [- jaI GSEG STG 642 2366 Sugen (GT 1 + GT 2) 1767 308 602467 saIpIpI sao Aayaat Imp from CPP+MUNDRA 269359 6881

kula tapIya Total (T) 475652 8386 302021kula jalaIya+tapIya Total (H+T) 482498 8604 302422ivaMD [najaI- Wind Energy 52123kula jalaIya+tapIya+hvaa Total (H+T+Wind) 534621 9539ivainamaya Exchanges 155314 saIimat jaa- maaMga Restricted Energy Req 689935

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 6800 194

11 gaaMQaI saagar Gandhi Sagar 3366 117 008012 raNaa p`tap sagar RPSagar 5883 172 004013 javaahr sagar Jawahar Sagar 4350 99 0050

2 ponca Pench 3052 165 00903 baargaI Bargi 4581 91 00804 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 11764 315 02806 banasaagar Bansagar-2 (Deolondh) 000 07 banasaagar Bansagar-3 (Silpara) 1236 32 00708 banasaagar Bansagar-4 (Zinaha) 1320 22 00509 maoDIKoDa Medikheda 396 63

10 ibarisaMGapur Birsingpur 040 20 002011 Tavaa Tawa 000 012 rajaGaaT Rajghat 165 12 006013 Omkareshwar 10620 402 14 [Midra saagar Indira Sagar 23077 997 0849

kula jalaIya TOTAL(H) MPPGCL 59999 2365 1273Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 6049 98 232502 AmarkMTk II AMK II Unit -2 6080 983 AmarkMTk III AMK III Unit -5 12212 219 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 06505 satpura II Satpura-II Unit 6 10323 180 165906 satpura II Satpura-II Unit 7 5926 1807 satpura II Satpura-II Unit 8 10964 195 191608 satpura II Satpura-II Unit 9 8353 1709 satpura III Satpura-III Unit 10 000 0 2080

10 satpura III Satpura-III Unit 11 9447 182 1909011 esajaITIpIesa 1 SGTPS Unit - 1 9447 182 1909012 esajaITIpIesa 2 SGTPS Unit - 2 10572 18213 esajaITIpIesa 3 SGTPS Unit - 3 9037 192 2064014 esajaITIpIesa 4 SGTPS Unit - 4 10700 18015 esajaITIpIesa 5 SGTPS Unit - 5 28804 51216 SSTPS 6864 587 8930

kula tapIya Total (T) 133714 3002 115350kula jalaIya+tapIya Total (H+T) 193713 5735 116623Injection from WIND 000 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 193713 5735ivainamaya Exchanges 193660 saIimat jaa- maaMga Rest En Req 387372

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 850 120 00902 Gangrel 475 10 00503 Mini Micro KWB 039 7

kula jalaIya TOTAL(H) CSEB 1364 137 0150tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 47 127402 kaorbaa (pU) Korba (E) Unit-2 2764 483 kaorbaa (pU) Korba (E) Unit-3 2764 484 kaorbaa (pU) Korba (E) Unit-4 2784 465 kaorbaa (pU) Korba (E) Unit -5 3685 120 253306 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 247808 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 15410

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 15839 256 1197012 KORBA(EB) Extn - 2 15876 256 11770

kula tapIya Total (T) 119907 1880 10190013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 119907 1880kula jalaIya+tapIya Total (H+T) 121271 2017 102050ivainamaya Exchanges 40207 0saIimat jaa- maaMga Rest En Req 161478 2017

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 9590 585 25142 kaoyanaa III Koyna III 5920 3203 kaoyanaa IV Koyna IV 18012 11324 kaoyanaa DIpIeca Koyna DPH 1442 385 TaTa jalaIya TATA Hydro 10242 741 28836 vaOtrNaa Vaitarna 000 07 eladarI Eldari 528 168 BaTgar AaOr vaIr Bhatgar amp Vir 915 49 pOzana Paithan 175 59

10 itlaarI Tillari 1106 6511 BaIra Tola rosa Bhira Tail Race 374 4112 GaTGar Ghatghar 5297 29313 Anya CaoTo jalaIya Small Hydro (others) 6173 0

kula jalaIya TOTAL(H) 58910 1599 5397Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 7700 1954 naaisak 4 Nasik Unit -4 10772 1965 naaisak 5 Nasik Unit -5 11160 1976 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 28827 5058 Tambao 6 Trombay Unit -6 000 09 Tambao 8 Trombay Unit -8 000 0

10 Tambao 7A gaOsa Trombay -7A (Gas) 7882 135 250411 Tambao 7ba Trombay -7B (WHR) 4499 7212 kaoraDI 5 Koradi Unit -5 5003 16013 kaoraDI 6 Koradi Unit -6 3963 19014 kaoraDI 7 Koradi Unit -7 10015 19015 Bausaavala 2 Bhusawal Unit -2 8329 17016 Bausaavala 3 Bhusawal Unit -3 9248 18017 Bausaavala 4 Bhusawal Unit -4 22734 50518 Bausaavala 4 Bhusawal Unit -5 19742 41519 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 7451 18621 parlaI 5 Parli Unit -5 10626 18022 parlaI 6 Parli Unit -6 14013 25323 parlaI 7 Parli Unit -7 13728 26024 KaprKoDa 1 Khaperkheda Unit -1 11173 20025 KaprKoDa 2 Khaperkheda Unit -2 10373 19526 KaprKoDa 3 Khaperkheda Unit -3 10998 20127 KaprKoDa 4 Khaperkheda Unit -4 12019 20728 KaprKoDa 5 Khaperkheda Unit -5 28882 50730 parsa Paras-3 14447 25731 parsa Paras-4 13504 25932 ]rna Uran (Gas) 18284 33833 ]rna Uran (WHR) 000 148 586234 caMd`pur 1 Chandrapur Unit -1 9087 17735 caMd`pur 2 Chandrapur Unit -2 1816 19436 caMd`pur 3 Chandrapur Unit -3 11737 21037 caMd`pur 4 Chandrapur Unit - 4 11843 46038 caMd`pur 5 Chandrapur Unit -5 7759 45539 caMd`pur 6 Chandrapur Unit -6 24420 44240 caMd`pur 7 Chandrapur Unit -7 23258 041 DhaNaU 1 Dahanu Unit-1 16339 250 1427842 DhaNaU 2 Dahanu Unit-2 16196 250 1427843 CPP 193651 29840044 RGPPL Share 000 0

kula tapIya Total (T) 631479 15369 329920MAH Wind + Solar Generation 16922 0kula jalaIya +tapIya Total (H+T+Wind) 707311 17451 372239

TOTAivainamaya Exchanges 324731saIimat jaa- maaMga Rest En Req 1032042

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1871 26ivainamaya Exchanges 33252saIimat jaa- maaMga Rest En Req 35123 434

C (F) dmana AaOr dIva DAMAN amp DIU 18245 298ja (G) dadra nagar hvaolaI DNH 40600 655

kula DD ampDNH (T) 58845 952Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 9600 160 1399112 tara`pur 2 TAPS Unit -2 11069 16013 tara`pur 3 TAPS Unit -3 36144 545 6584014 tara`pur 4 TAPS Unit -4 36197 54715 kakrapr 1 KAPS Unit -1 15230 545 3134216 kakrapr 2 KAPS Unit -2 14662 547

kula ena pI saI NPC Total 122901 25042 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14008 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 13913 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14076 214 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 32894 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 33204 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 33190 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33176 514

kula kaorbaa KSTPS Total 174461 2498 10394427 ivanQa esaTIpIesa 1 VSTPS Unit-1 12762 21328 ivanQa esaTIpIesa 2 VSTPS Unit-2 12708 21529 ivanQa esaTIpIesa 3 VSTPS Unit-3 12854 212210 ivanQa esaTIpIesa 4 VSTPS Unit-4 12909 214211 ivanQa esaTIpIesa 5 VSTPS Unit-5 12174 215212 ivanQa esaTIpIesa 6 VSTPS Unit-6 12625 214213 ivanQa esaTIpIesa 7 VSTPS Unit-7 31487 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 31075 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 31592 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 31488 512217 ivanQa esaTIpIesa 11 VSTPS Unit-11 30948 512

kula ivanQayaacala VSTPS Total 232623 3750 15107 31 saIpt -1 -SIPAT-1 38822 66400 32 saIpt -2 -SIPAT-2 32404 66500 33 saIpt -3 -SIPAT-3 38930 66300 34 saIpt -4 -SIPAT-4 26383 51600 35 saIpt -5 SIPAT-5 26400 51400

kula saIpt -SIPAT TOTAL 162939 285000 838941 kvaasa gaOsa 1e Kawas GT-1A 792 10742 kvaasa gaOsa 1baI Kawas GT-1B 2623 10943 kvaasa esaTI 1saI Kawas ST-1C 1571 11444 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 4986 304 222951 gaMQaar gaOsa 1 Gandhar GT-1 000 052 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 000 054 gaMQaar esaTI 4 Gandhar ST-4 000 0

kula gaMQaar GGPS Total 000 0 000061 maaOda 1 Mauda -1 19614 514 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 19614 514 1422661 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 000 31 000071 esa esa pI SSP RBPH - 1 6753 19372 esa esa pI SSP RBPH - 2 5907 19273 esa esa pI SSP RBPH - 3 5577 19574 esa esa pI SSP RBPH - 4 5513 19475 esa esa pI SSP RBPH - 5 7237 19476 esa esa pI SSP RBPH - 6 3109 19277 esa esa pI SSP CHPH - 1 1817 4078 esa esa pI SSP CHPH - 2 491 3679 esa esa pI SSP CHPH - 3 000 0710 esa esa pI SSP CHPH - 4 1639 39711 esa esa pI SSP CHPH - 5 901 37

kula esa esa pI SSP Total 38944 1312 389481 kula poMca Pench Total 3052 165 009082 Jindal Injection 38956 083 Amarkantak Lanco 15478 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2372740

(J) ]plabQata Availability 2308426 naoT ivainamaya Net Exchanges -292048 ]plabQa jaa- Energy Availability 2016379

maah frvarI 2014 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR FEBRUARY 2014 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 11532 - - - 11532 020214 1100 4993

saIimat Restricted 11700

AsaIimat Unrestricted 11740 11532 0 28 0 11560 010214 1200 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8366 8366 17022014 0500 5007

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9346 - - - 9346 120214 0900 4986

saIimat Restricted 8340

AsaIimat Unrestricted 8340 9346 0 38 0 9384 120214 0900 4986

nyaUnatma pMjaIkRt maaMga Min Registered Demand 3204 3204 270214 0200

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3210 3210 070214 1900 4989

saIimat Restricted 3200

AsaIimat Unrestricted 3225 3210 233 12 0 3246 070214 1900 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1617 1617 230214 2300 5021

maharaYT MAHARASHTRApMjaIkRt Registered 18510 - - - 18510 050214 1100 4984

saIimat Restricted 19000

AsaIimat Unrestricted 19050 17980 1655 -13 0 19622 190214 1200 5002

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12005 12005 280214 0400 5037

gaaovaa GOApMjaIkRt Registered 425 434 - - 434 130214 1400 5006

AsaIimat Unrestricted 425 434 1 -1 - 434 130214 1400 5006

nyaUnatma pMjaIkRt maaMga Min Registered Demand 311 311 100214 0300

essaar ESSAR(ESIL)pMjaIkRt Registered 487 - - 487 240214 1700 5004

AsaIimat Unrestricted 487 0 0 - 487 240214 1700 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 268 - - 268 250214 1200 5003

AsaIimat Unrestricted 268 0 0 - 268 250214 1200 5003

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 644 - - 644 260214 1200 4999

AsaIimat Unrestricted 644 0 - 644 260214 1200 4999

nyaUnatma pMjaIkRt maaMga Min Registered Demand 508 508 280214

piScama xao~ WESTERN REGIONpMjaIkRt Registered 42253 - - - 42253 110214 1100 4994

saIimat Restricted 41961

AsaIimat Unrestricted 42076 42021 850 235 0 43106 120214 1100 4994

nyaUnatma pMjaIkRt maaMga Min Registered Demand 27524 27524 280214 0400 5040 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

piScama xaoi~ya Baar p`oYaNa kond` mauumba[-

णाली चालन-ISO-I

ANNEXURE-43

माह फरवर 2014 February2014

समातरवतीय चालन PARALLELRADIAL OPERATION

TOTAL OPERATING

HOURS 1 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-NR) 66972

2 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-SR) 67200

टाई लाईन TIE LINE 1 765कवी िसवनी स वधा-I 765kV Sonito Wardha 67200 2 765कवी िसवनी स वधा-II 765kV Seonito Wardha 65247 3 400 कवी िभलाई स कोराड 400kV Bhilai to Koradi 67200

4 400 कवी िभलाई स भिावती 400kV Bhilai to Bhadravati 67200

5 400 कवी रायपर स भिावती-I 400kV Raipur to Bhadravati-I 67200

6 400 कवी रायपर स भिावतीETHII 400kV Raipur to Bhadravati-II 67139

7 400 कवी रायपर स भिावतीETHIII 400kV Raipur to Bhadravati-III 67200

8 400 कवी सातपरा स कोराड 400kV Satpura to Koradi 67200

9 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 67004 10 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 65308 11 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 66259 12 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 67200 13 400 कवी को हापर स मापसा-I 400kV Kolhapur-Mapusa-I 38740

14 400 कवी को हापर स मापसा-II 400kV Kolhapur-Mapusa-II 49532

15 400 कवी वापी स बोईसर 400kV Vapi-Boisar 67200

16 400 कवी रायगढ़ स ःटरलाइट-I 400kV Raigarh to Sterlight-I 66258

17 400 कवी रायगढ़ स ःटरलाइट-II 400kV Raigarh to Sterlight -II 67200

18 400 कवी रायगढ़ स झरसगड़ा-I 400kV Raigarh to Jharsuguda-I 67200

19 400 कवी रायगढ़ स झरसगड़ा-II 400kV Raigarh to Jharsuguda-II 67200

20 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 65028

21 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 66132

22 400 कवी रायपर स वधाETHI 400kV Raipur to Wardha-I 66836

23 400 कवी रायपर स वधाETHII 400kV Raipur to Wardha-II 67200

24 220 कवी कोरबा पव स ब पादर-III 220kV K(E) to Budhipadar-III 63853

Anaulagnak 47Annex-47

maah frvarI 2014 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39514 64944

10287 39711

Levels in Mtrs str maITr maoM

]ka[- Ukai

64392

9914

25402

25994

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF FEBRUARY 2014

ivavarNa Particulars

TRIPPING DETAILS FOR THE MONTH OF FEBRUARY 2014

Sr No Brief Details of incident (Elements Generation Tripped) Owner Utility Date amp Time Load

Gen LossCategory

1 Multiple Tripping from 400 kV New Koyna MSETClMSEGCLRGPPL 05‐02‐2014 0950 Hrs ‐ GI‐2

2Bus Bar protection mal‐operation at 400 kV Soja in Gujarat resulting in multiple Tripping

GETCO 06‐02‐2014 1755 Hrs ‐ GI‐2

ANNEXURE ‐ 5

  • annexpdf
    • 21pdf
    • 231pdf
    • 232pdf
    • 24pdf
    • 25pdf
    • 31pdf
    • 32C1pdf
    • 32C2pdf
    • 33Apdf
    • 41pdf
    • 42pdf
    • 47pdf
    • 5pdf
Page 2: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014

2

457th OCCM AGENDA

23 Voltage Profile

Voltage profile at some of 765400 kV sub-stations during the month of

February 2014 furnished by WRLDC is enclosed at Annex-23

The Sub-Committee may like to discuss as above

24 UF Relay Operations

As per WRLDC records during February 2014 the system frequency didnrsquot touch

492 Hz The details of UFR operation received from constituents for the month of

February 2014 is enclosed at Annexure 24

The Sub-Committee may like to discuss

25 Power Cuts Load Restrictions

Details of Power Cuts and Regulatory measures during February 2014 as furnished

by the state utilities are given in Annex 25 The Sub-Committee may note

26 Details of Generating Units under Forced outages Details of generating units under forced outages during February 2014 are given in

Annex-26 The Sub-Committee may discuss

27 Details of Generating Units under Planned outages

The details of generating units under Planned Outages during February 2014 are given in Annex-27

The Sub-Committee may discuss

ITEM NO3 OPERATIONAL PLANNING 31 Proposed Planned maintenance programme of generating units

The proposed maintenance programme of generating units for March 2014 amp April

2014 is given in Annex 31 The Sub-Committee may discuss and finalize the outage schedule of

generating units for the above period

3

457th OCCM AGENDA

32 A Outage Programme of Transmission Lineselements

Maintenance programme for transmission lines during the months of March 2014

amp April 2014 is given in Annex 32 A amp B The Sub-Committee may discuss and finalise the maintenance

programme proposed above B Line outages planned vs implemented

In 455th OCC meeting it was decided that WRLDC shall submit the list of

planned transmission element outages vs actual availed or emergency outages

during the February 2014 WRLDC had submitted the list of emergency

outages(Attached at Annexure-32-C1)

WRLDC submitted the status of planned transmission element outages vs

actual availed or emergency outages during the February 2014 (Attached at

Annexure-32-C2)

The Sub-Committee may discuss

33 Anticipated Power Supply Position for the months ndash March 2014 amp April 2014 Details of anticipated restricted amp un-restricted demands for the months of March 2014 amp April 2014 are given in Annex 33 (A) The details of anticipated regional deficit are given below (All figures in MW)

State Region

March 2014 April 2014 Anticipated Availability

Anticipated Peak Demand

Shortage AnticipatedAvailability

Anticipated Peak Demand

Shortage

GETCO 11625 11740 115 12005 12140 135 MPPTCL 8150 8340 190 8890 9050 160 CSEB 3150 3225 75 3015 3105 90 MSETCL 17100 19050 1950 18000 19200 1200 GOA 400 425 25 410 415 5 DD 330 345 15 340 350 10 DNH 620 635 15 620 640 20 WR 39860 42076 2216 40570 43173 2603 Constituents may furnish the anticipated station wise Availability amp Energy for the months of March 2014 amp April 2014 ITEM NO 4 OPERATIONAL STATISTICS FOR THE MONTH OF FEBRUARY 2014 The details of actual generation demand drawl of power from grid exchanges etc are given in the following Annexures

4

457th OCCM AGENDA

Annex 41 - Actual Generation and Requirement for February 2014 Annex 42 - Peak Demand Schedule Vs Actual for February 2014 Annex 43 - Integrated Operation of the System and Operation of Inter State Tie lines for February 2014 Annex 47 ndash Details of level of Major Reservoirs in Western Region for February 2014

The Sub-Committee may like to note ITEM NO 5 SYSTEM DISTURBANCES IN WESTERN REGION There was no major grid disturbance in the Western Region during the month The

tripping details and Voltage profiles have to be furnished by WRLDC to WRPC on first

working day of the month as same have to be reported to MOP via GM division of

CEA Accordingly WRLDC may kindly furnish the tripping details to WRPC for

necessary action The tripping details during the month received from WRLDC is

enclosed at Annexure-5 The Sub-Committee may like to notediscuss ITEM NO 6 Healthiness status of SERsDRs of equipment in the system

Constituents have furnished the status of healthiness of SERDRs in their systems on the dates below

Sl No Name of

constituents Date of Receipt

1 PGCILWRTS-I 06032014 2 PGCILWRTS-II 08032014 3 MPPTCL 11032014 4 NTPC 05032014 5 CSPTCL 05032014 6 GETCO 11032014 7 MSETCL 11032014

Constituents of WR are requested to ensure healthiness and sent information to this

office regularly as per the recommendation of enquiry committee of Grid disturbances on

25022007 and 28022007

The sub-Committee may like to note

ITEM NO 7 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS TRANSMISSION LINES AND GENERATING UNITS IN WR

71 Status of completion of ongoing Schemes for Commissioning of reactors As per the approval of 33rd standing committee of WR and subsequently discussion in 23rd WRPC meeting the following reactors have to be installed at the various occasions in WR Accordingly the information regarding the commissioning schedule is as below

5

457th OCCM AGENDA

S No

400 kV Substn

Size (MVAR)

Implementing agency

Expected commissioning date

1 Ranchodpura 125 MVAR GETCO Commd On 8th July 2013 2 Varsana 125 MVAR GETCO Commd On 25th July 2013 3 Rajkot 125 MVAR GETCO Commd On 5th August 2013 4 Amreli 125 MVAR GETCO Commd On 12072013 5 Jetpur 63 MVAR GETCO Commd on 11072013 6 Zerda 125 MVAR GETCO Commd in July 2013 7 Kosmba 80 MVAR GETCO Commissioned on 29112013 8 Limbdi (Chornia) 125 MVAR GETCO 25th July 2013 9 Jabalpur 125 MVAR PGCIL June 2014 10 Khandwa 125 MVAR PGCIL June 2014 11 Shujalpur 125 MVAR PGCIL June 2014 12 Bhatapara 125 MVAR PGCIL June 2014 13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014 16 Sholapur 125 MVAR MSETCL 2014 17 Kolhapur 125 MVAR MSETCL 2014 18 Akola 125 MVAR MSETCL 2014 19 India bull 80mvar BR MSETCL Commissioned 26112013 20 Nagda 125 MVAR MPPTCL September 2014 21 Bhopal 80 MVAR MPPTCL March 2014 22 Damoh 125 MVAR PGCIL August 2014 23 Bachau 125 MVAR PGCIL August 2014 24 Pirana 125 MVAR PGCIL August 2014 25 Itarsi 2X125

MVAR PGCIL August 2014

26 Seoni 125 MVAR PGCIL August 2014 27 Parli 125 MVAR PGCIL August 2014 28 Raipur 125 MVAR PGCIL August 2014 29 Gwalior 125 MVAR PGCIL August 2014 30 Nagda 50 MVAR MPPTCL 2014 31 ISP 125 MVAR NHDC 2015 32 Satpura 50 MVAR MPPTCL March-2015 33 Sasan 240 Reliance

Utilities are requested to ensure that reactors are installed and commissioned according to the schedule agreed as above Utilities may give update on the status of implementation

6

457th OCCM AGENDA

72 Status of completion of 765400 kV and above on going Transmission Schemes being executedimplemented by Transmission Agencies

The updated status on various ongoing transmission schemes for the year 2013-14 as per the current information available is as follows - S No

Name of the Line Target Completion Date

Remarks

POWERGRID 1 400 kV Vapi(PG)-Navsari Commissioned on

16032013 2 400 kV Navsari - Navi Mumbai DC

Line Feb- 2014 ROW problem

3 765kV SC Satna-Gwalior line (Ckt-I) January - 2014 4 765kV SC Satna-Gwalior line

(359Km + 60Km DC Portion) Ckt-II Feb- 2014

5 765 kV Sasan-Satna-II Commissioned on 010613

GUJARAT 1 400 kV DC Kosamba-Chorania line

(Package I)(From Chorania SS to AP-54)

March -2014

2 400 kV DC Kosamba-Chorania line (Package II)(From Kosamba SS to AP-54)

March -2014

3 400 kV DC Mundra-Zerda line No 1 August -2014 4 400 kV DC Mundra-Zerda line No 2 April -2014 5 400 kV DC Vadinar-Amreli line April -2014 6 400kV Mundra-Hadala LILO to

Halvad April -2014

7 400 kV DC Amreli-Kasor line(Part-1) April -2014 8 315 MVA IInd ICT at Kosamba SS Charged on 15112013 MADHYA PRADESH 1 Malwa-TPH-Pithampur 400KV

DCDS Line 2324102013

2 Malwa TPH-Chhegaon 400 KV DCDS Line

Ckt ndashI on 22032013 Ckt-II on 11072013

3 Chhegaon-Julwania 400 KV DCDS Line

March - 2014

4 Pithampur- Indore 400KV DCDS Line March- 2014

5 Satpura TPH-Ashta 400KV DCDS Line

December ndash 2014

CSPTCL 1 400 kV Korba (W)-Khedamara

DCDS Ckt II LILOed at Marwa August 2013 Test charged on

20082013

2 400 kV Khedamara- Raita DCDS February -2014

3 400kV DCDS Marwa-Raipur(Raita) January - Test charge from Raipur

7

457th OCCM AGENDA

2014 end in August 2013 4 LILOof 400kV K(W)-Khedamara line

at Marwa (one ckt) April -2014

MAHARASHTRA(STU)

1 400KV Chandrapur- II- Warora DC Dec - 2013 end

2 400KV DC line from Koradi-II to Wardha SS(PG) DC

March - 2014

3 400 kV Chandrapur-Warora-II Commissioned on 16012014

4 400 kV Bableshwar-Sinner Ckt-II Commissioned on 27122013

5 400 kV Chandrapur-Parli-II LILO at Chandrapur-II SS

Commissioned on 16012014

MAHARASHTRA (IPTC route) by WR Transmission (Mah) Pvt Ltd

1 400 kV Parli(PG)-Pune DC Commissioned Ckt - 1 on 08112013 Commissioned Ckt - 2 on 10112013

2 400 kV Pune (PG)-Aurangabad (MSETCL) DC

November-13 Commissioned Ckt - 1 on 05122013 Commissioned Ckt - 2 on 04122013

3 LILO Lonikhand ndashKalwa at Pune(PG) Lonikhand-Pune charged on 2130 on 09072013 and Kalwa ndashPune at 2145 on 09072013

GUJARAT (IPTC route) by WR Transmission (Guj) Pvt Ltd

1 400 kV Rajgarh(PG)-Karamsad (GETCO) DC

May -2014

The Sub-Committee may notediscuss

73 Commissioning of new Generating units in Western Region and the capacity expected to be commissioned during the current year 2013-14

The status regarding Generating units commissioned expected to be commissioned during the current year 2013-14 according the available information is as below

Name of the Power Projects Unit No Capacity (MW)

Date of Commissioning Schedule Date

GUJARAT Ukai 6 500 COD on 08062013 Pipavav CCPP- GPCL amp GSPC joint venture Block-1 350

March- 2014 Made in synchronized on

8

457th OCCM AGENDA

10102013 Bhavnagar Lignite TPP-JV I 250 August 2014 II 250 August 2014 UNO SUGEN 1 3825 COD on 04042013 CHHATTISGARH Marwa TPS I 500 25122013 Korba (w) Ext-5 500 COD on 05092013 KSK Mahanadi 3 600 COD on 14082013

VEDANTA VIDYUT 1 135 Synchronized on 11082013

MAHARASHTRA

INDIABULLS (Amaravati) 1 270 Synchronized on 03062013

INDIABULLS (Amaravati) 2 270 January-2014 INDIABULLS (Sinnar) 1 270 March-2014 VIPL(Butibori) 1 300 COD on 05042013

VIPL (Butibori) 2 300

First synchronized on 02012013 Full load on 19032013

GMR EMCO 2 300 COD on 27082013 Dhariwal 1 300 Synd On 2913 Bhusawal 5 500400 COD on 03012014 MADHYA PRADESH

SINGAJI TPP 1 600

Synchronized on 31082013 Coal fired on 30092013

2 600 June-2014 Ms Jhabua Power Seoni 1 300 JANUARY ndash 2014 MB Power Anuppur 1 300 JANUARY ndash 2014 Satpura 11 250 Synchronized on 02102013 SATPURA 10 250 COD on 18082013 CENTRAL SECTOR Vindhyachal TPP IV 12 500 Feb-14 MAUDA 2 500 Feb-14

The WR utilities may intimate the current status on above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS (A) FOLLOW-UP ITEM NO 81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the Third quarter

(October 2013 to December 2013) for the year 2013-14

The Sub-Committee members may like to note and furnish details in respect of above

9

457th OCCM AGENDA

ITEM NO 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR

Status of physical amp cyber security in Power Sector for the Third quarter (October

2013 to December 2013) have not been received from some of the constituents

The Sub-Committee may like to note and furnish details in respect of above ITEM NO 83 ADMS IMPLEMENTATION STEP BY GETCO A pilot project in respect of ADMS have been successfully implemented by GETCO in

11 kV Sadhi feeder (MGVCL ) on 19022014

GETCO may like to presentation on the same ITEMS FROM WRLDC ITEM NO 91 PERFORMANCE OF WR CONSTITUENTS POST THE IMPLEMENTATION OF DEVIATION SETTLEMENT MECHANISM ON 17022014 The IEGC second amendment as well as the Deviation Settlement Mechanism is in

force wef 17022014 The performance of WR constituents during first 10 days ie

from 17th to 28th Feb 2014 comprising of 960 time blocks is illustrated below Members

may like to analyze and devise suitable measures to ensure compliance to the above

CERC regulations

10

457th OCCM AGENDA

Since the decisions in real-time are based on the SCADA data it is now important to

monitor and ensure correctness of drawal injection as seen in SCADA The chart

below indicates the difference between the drawal of constituents as seen in SCADA

and as recorded in SEM for the period of 01st Feb 2014 to 16th February 2014 It may

be seen that the significant difference between SCADA and SEM needs to be

addressed by ensuring healthiness of telemetry and periodic validation by the SCADA

team at the respective SLDCs and WRLDC

The sub committee may like to discuss the same

11

457th OCCM AGENDA

ITEM NO 92 UNDER DRAWAL BY MAHARASHTRA AND INSECURE OPERATION IN THE GRID ON 27-28 FEB 2014

During late night of 27th Feb and early morning hours of 28th Feb-14 the grid

frequency remained above 502 Hz continuously for five hours from 2252 hrs of 27-

02-2014 to 0407 hrs of 28-02-2014 The situation was caused due to demand

reduction across the WR and NR on account of widespread rains and persistent under

drawal by Maharashtra during the above period as illustrated in figure-1 below

5067

49

492

494

496

498

50

502

504

506

508

‐1000

‐850

‐700

‐550

‐400

‐250

‐100

50

200

350

500

650

800

2100

2115

2130

2145

2200

2215

2230

2245

2300

2315

2330

2345

000

015

030

045

100

115

130

145

200

215

230

245

300

315

330

345

400

415

430

445

500

515

530

545

600

615

630

645

700

716

731

746

Maharashtra Deviation from schedule vis‐a‐vis grid frequency2100 hrs of 27‐02‐2014 to 0800 hrs of 28‐02‐2014

MSEBUI FREQ

Deviation from Schedule

Frequency

MW Hz

Several messages were sent from WRLDC control room to SLDC Kalwa directing them to control their under drawal from the grid Details of these messages is tabulated below

Sl No Message sent to Ref No Message date and time

1 SLDC Maharashtra 56079 27022014 2210 hrs

2 SLDC Maharashtra 3070 27022014 2230 hrs

3 SLDC Maharashtra 3078 28022014 0125 hrs

4 SLDC Maharashtra 3079 28022014 0150 hrs

Despite the above messages the response from SLDC Kalwa was inadequate in

controlling the under drawal of Maharashtra Consequently the frequency touched

5069 Hz at 0211 hrs of 28-Feb 2014 the voltage across the grid increased sharply

and there was over injection from WR to other regions Subsequently as a

contingency measure the drawal schedule of Maharashtra was reduced by 600 MW

by suo motu revision in the requisition of Maharashtra in Korba Vindhyachal Sipat

12

457th OCCM AGENDA

and Vidhyachal STPS wef 0230 hrs to 0500 hrs of 28022014 This was later

extended up to 0700 hrs of 28022014 It was a near miss situation that could have

been avoided by adequate planning and commensurate actions in real-time It is

requested that the matter may be taken up at the highest level in MSETCL and a

separate meeting may be convened on the above subject to avoid reoccurrence of

such event in future

The sub committee may like to discuss the same

ITEM NO 93 NON AVAILABILITY OF REAL-TIME TELEMETRY FROM LARGE NUMBER OF STATIONS IN MAHARASHTRA There are 224 nodes in Maharashtra that comprising of 32 Generating stations and

192 substations Out of these 224 nodes 47 locations are yet to be integrated in the

System Out of the balance 177 the data from nearly 50 nodes are not coming since

last 6 months Thus in totality data is not available from more than 135 out of 224

stations ie 60 which is highly alarming The extremely poor status of telemetry in

the state of Maharashtra has become a security threat Maharashtra load is touching

17500 MW and there are large number of construction related outages that have to be

facilitated Further with the formation of the synchronous All India grid there is a need

for close monitoring of system parameters such as the line flows voltage and grid

frequency Inadequate telemetry is resulting in severe constraints in real time

operation as well as outage coordination There have been several instances of line

tripping on high voltage and SPS operation due to sudden increase in line flows

during hour boundary or during facilitating planned outage These events could be

minimized with better supervision if the telemetry is available

The telemetry issue in Maharashtra has been discussed in the various WRPC forums

wherein it was informed by MSETCL that the problem is due to failure of Ms Tulip

who was the service provider for the communication network During the month of

August 2013 representative from MSETCL had assured that a new contract was being

awarded and the situation would improve within one month The extracts from minutes

of 451st OCC is quoted below

QUOTE

13

457th OCCM AGENDA

ldquoMSETCL stated that they were working to resolve the issue and assured that there

would be an improvement in availability of Telemetry from Maharashtra stations within

one Monthrdquo

UNQUOTE

Representative of MSETCL may apprise the OCC regarding present status and the

likely schedule for resolution of the issue

The sub committee may like to discuss the same

ITEM NO 94 STATUS OF LINE AND BUS REACTORS AT 765 KV SASAN

The line reactor of 765 kV Sasan-Satna ckt-2 as well as the Bus reactors of 765 kV Sasan bus are yet to be commissioned at Sasan end In the absence of these reactors high voltage is experienced at Sasan and nearby stations Often one circuit of 765 kV Sasan-Satna is required to be opened for voltage regulation Consequently the reliability of evacuation of generation from two units of Sasan is affected During 456th OCC meeting the revised schedule of the above elements as informed by Ms Reliance was as under

Schedule in formed in meetings 451st OCC 455th OCC 454th OCC 1 Line reactor of 765

kV Sasan-Satna ckt-2

By Dec 2013 By April 2014 By May 2014

2 765 kV Bus-1 Reactor

Jan 2014 By Mar 2014 By June 2014

3 765 kV Bus-2 Reactor

Jan 2014 By Mar 2014 By June 2014

It was decided in 456th OCC meeting that one representative from MPPTCL would visit the SASAN site to check readiness of Line and Bus reactors Representative from MPPTCL and Sasan may apprise the OCC-members on the progress of commissioning of reactors at 765 kV Sasan OCC members may also be apprised of the tap position of the generator transformer 2 and 3

The sub committee may like to discuss the same

14

457th OCCM AGENDA

ITEM NO 95 CHARGING OF NEW TRANSMISSION ASSET IN THE GRID In order to have better coordination of the transmission utilities with RLDCNLDC during charging synchronization of new elements into the grid a communication has been received from NLDC (ref POSOSCONLDCSystem OperationOutage Planning1239) on 10022014 It has been proposed that

a Owner of the asset shall submit the request for expected chargingcommissioning of new element for the calendar month latest by 5th day of the month to the respective RLDC amp NLDC along with status of activities mentioned in the check-list

b RLDC shall study the impact of the new element commissioning and based on its assessment of the preparedness of the utility may recommend to NLDC who in turn would examine the issue independently considering pan India grid scenario

c After the above the owner of the new asset shall give its readiness to charge the new element atleast three days in advance with current status of activities mentioned in the check list

Check list is as under 1 List of elements to be charged along with the details of approval of the

transmission scheme from the Standing CommitteeCTUSTU 2 Single Line Diagram of the concerned substations along with status of

completion of each diabusbreakers 3 Availability of real-time data and communication to the designated

SLDCRLDC 4 Installation of Special Energy Meter complying with CEArsquos Regulations

(Serial number Meter number CTPT ratio to be indicated) 5 Charging Instructions by CTUSTU 6 Schedule and sequence of charging of elements 7 Availability of line bus reactors as per planning In case the transmission

system is planned to be charged without the planned line reactor requisite authorization from CTUSTU by studies

8 Connection Agreement (along with all annexures) with CTU or STU 9 Copy of Long term Access (LTA) or MTOA granted by CTU or STU as the

case may be 10 Copy of Power Purchase Agreement (PPA) 11 A signed undertaking with name and designation of the officer clarly

indicating the following a All Disturbance recorders (DR) and Event Loggers (ELs) with time

synchronization are commissioned b All protective systems have been commissioned c All statutory clearances have been obtained

12 Output of EL and DR after charging

15

457th OCCM AGENDA

Each document mentioned in check list from Sl No 1 to 10 must be attached for sake of completeness and emailed as a consolidated document to the nodal RLDC well before the new element charging date The sub-committee may like to discuss ITEM NO 96 OPENING FEEDERS WITHOUT PRIOR INTIMATION TO WRLDC

It was gathered based on the observation from WRLDC SCADA data and subsequent

discussion with MPPTCL that 220 kV Bina (MP)-Gwalior(MP) DC were taken under

shut down for LILO works at Datia at 0910hrs on 23022014 for 4 days The outage

of these lines was neither discussed in OCC and neither was there any intimation to

WRLDC before availing the outage These lines are included in the important grid

elements list of Western region and prior concurrence of WRLDC is required for

switching these lines Further these lines form the parallel path to 765 kV Bina-Gwalior

DC and with the shutdown of these lines the network upstream of WR-NR inter

regional corridor was depleted

The sub-committee may like to discuss ITEM NO 97 TRIPPING OF 765 KV LINES ON OVER VOLTAGE Recently several tripping of 765 kV lines have been reported on over voltage These are indicated below

1) 765 kV Bina-Gwalior I at 2358 hrs of 16022014 2) 765 kV Bina-Gwalior I at 2011 hrs of 14022014 3) 765 kV Satna-Gwalior at 1300 hrs of 06022014 4) 765 kV Sasan-Satna II at 0013 hrs of 18012014 5) 765 kV Jabalpur-Bina I at 2350 hrs of 10012014 6) 765 kV Jabalpur-Bina II at 0405 hrs of 06012014

It is understood that the adopted Stage-I OV setting for the above lines vary from 108 (ie 826 kV) to 110 (841 kV) As per SCADA data the bus voltage at any of the substations mentioned above had not reached 826 kV during the above incidents

POWERGRID may examine the above tripping in detail and apprise the OCC regarding the above In case of issues related with protective relays field equipment are detected these may be addressed at the earliest The sub-committee may like to discuss

16

457th OCCM AGENDA

ITEM NO 98 RGMO FGMO OF MANDATED GENERATORS IN WESTERN REGION

As per the latest information available at WRLDC there are 251 number of units with a total capacity of 57517 MW in Western Region that are mandated to operate in Restricted Free Governor Mode The need for compliance to the IEGC regulations wrt RGMOFGMO was emphasized in the 455th and 456th OCC meeting as well as during the 25th TCCWRPC meeting Subsequently it was communicated by email to all entities in WR to provide the latest status of RGMOFGMO implementation We have received updated status from MPPTCL LANCO CGPL DB Power and JPL Tamnar in Feb 2014 The latest state wise RGMOFGMO summary is given below

Name of Entity No of mandated units

RGMO FGMO available at

RGMOFGMO Not available at

Maharashtra 90 35 55 Madhya Pradesh 58 36 22 Gujarat 35 19 16 Chhattisgarh 10 3 7 CGPL 5 5 0 NCA 11 6 5 SASAN 2 1 1 NTPC 24 10 14 ESSAR_Mahan 1 1 0 NSPCL 2 2 0 KSK 1 1 0 KWPCL 1 0 1 DB POWER 1 1 0 JPL 5 4 1 LANCO 2 2 0 IEPL 1 0 1 EMCO 2 0 2 WR_Total 251 126 125

WRLDC vide its letter ref WRLDCRGMO-FGMO1-2014 dated 23012014 has issued directions under Section 29 of the Electricity Act to ensure compliance of IEGC regulations 52 (f) (g) (h) and (i) All utilities are requested to furnish the status of compliance in respect of generating units under their jurisdiction The sub-committee may like to discuss ITEM NO 99 STATUS OF TELEMETRY IN WESTERN REGION

The status of telemetry related issues in respect of WR constituents is as under

a) Chhattisgarh Data (except MW) from 500 MW Korba West extension generating station is not available Status points from 400 kV Raita pending

17

457th OCCM AGENDA

b) Madhya Pradesh Telemetry of following bus reactors is not available at WRLDC

S No

Station Name Bus Reactor

Nunber x Capacity

Total MVAR

Rated voltage

Status of Telemetry at

WRLDC1 Nagda 250 100 420 Not available2 Indore 225 50 33 Not available3 Bhopal 225 50 33 Not available4 Birsinghpur 150 50 420 Not available

c) Gujarat Data is not-availableintermittent from following stations in Gujarat

a 220 kV Nano of Tatamdash(not available) b Kansari 400 kV ss and Navsari 220 kVhellipIntermittent (PLCC Problem)

d) Goa Due to non-availability of SCADA data from Goa the difference between drawal as seen in SCADA and as recorded in SEM is as high as 572 during the period 1st Feb to 16th Feb 2014 Data from the following stations in Goa is not available at WRLDC S No Station Status

1 Amona 220 kV Not available 2 Cuncolin 220 kV Not available 3 Kadamba 110 kV Intermittent 4 Tivim 220 kV Intermittent 5 Ponda 220 kV Intermittent 6 Xeldam-220 kV Intermittent 7 Verna-110 kV Intermittent

e) Daman amp Diu

Due to non-availability of SCADA data from Daman amp Diu the difference between drawal as seen in SCADA and as recorded in SEM is as high as 571 during the period 1st Feb to 16th Feb 2014 Data from The error is mainly due to non-availability of data from 220 kV Magarwada

f) DNH Telemetry from 220 kV Kharadpara and Khadoli station is not available

g) POWERGRID The data from the following stations is not available at WRLDC

1) 765 kV Tamnar (Communication problem GPRS link is not stable)

18

457th OCCM AGENDA

Telemetry from following stations is Intermittent at WRLDC 1) 765 kV Durg (PLCC frequent problems)

2) 765 kV Kotra (communication intermittency)

3) 765 kV Gwalior (PLCC link established but still there is some

issue(Delay) in data updation at WRLDC Rectification work under

progress by Site Engineer

4) 765 kV Solapur - Redundant link established through Reliance but

the gateway connected to above link is not configured for 765 KV

data Hence when BSNL link is down 765 KV data is not updating at

WRLDC

The sub-committee may like to discuss

ITEM NO 910 COMPARISON OF DRAWAL AS SEEN IN SCADA VS SEM The IEGC second amendment and the Deviation Settlement Mechanism is in force since the 17022014 The IEGC stipulates maintaining injection drawal within the limits prescribed in the Deviation Settlement Mechanism The sub-committee may like to discuss ITEM NO 911 MOCK BLACK START EXERCISE

As per sec 58(b) of IEGC the usersSTUs etc need to conduct Black start mock

exercises in their respective systems once in every six month under intimation to

RLDC Also the all the black start Diesel Generator (DG) sets are [as per sec 58(b)

of IEGC] required to be tested weekly and the test report needs to be sent to RLDC

on quarterly basis

The following table summarizes the status of mock exercises in respect of black start

facilities in Western Region

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

GUJARAT

1 Ukai (H) 4 x 75 Hydro Diesel 500 kVA 221213 Y

2 Mini Hydro 2 x 25 Hydro Diesel 50 KW N

3 Kadana 4 x 60 Hydro Diesel 500 KVA 2413 Y (2413)

19

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

4

Dhuvaran

1 x 107 (68+39) + 1 x 112 (72+40)

Gas

Details to be furnished by Gujarat

Details to be furnished by Gujarat

N

5 GIPCL-I 3 x 32 + 1 x49

Gas Steam Diesel 141 KW

070912 Y

6 GIPCL-II 1x104+1x56 Gas Steam Diesel 500 kVA N

7

Torrent Power Stn C Stn- DEFCCPP

StnC2x30 StnD120 StnEF(110MW each)CCPP100MW

Thermal (Units-CDEF) Gas(CCPP)

Stn-C islands Diesel

StnC15kVA StnDE F and CCPP(500 kVA each)

281112

Y

8 GPEC 3x138+1x241 Thermal Natural Gas 3000 kVA N

9 Sugen 3x3825 MW Gas Diesel 2x6MVA N

Madhya Pradesh

10 Gandhisagar 5 x 23 Hydro DG set 100 kVA N

11 Birsinghpur 1 x 20 Hydro Battery 220 Volt

Battery N

12 Pench 2 x 80 Hydro DG set 250 kVA 121012 Y

13 Bargi 2 x 45 Hydro DG set 250 kVA 100212 Y

14 Bansagar Stage-I 3 x 105 Hydro DG set 250 kVA N

15 Indira Sagar 8x125 Hydro DG set 2x1000

KVA 22511 Y

Chhattisgarh 16

Hasdeo Bango 3 x 40 Hydro DG Set 250 kVA 250812 N

17

Korba(E)-phse-I

Power plant retired but Black start DG set available and on- load trial is reported to be carried out regularly

DG Set 1500 kW(33kV)

N

Maharashtra

18

Koyna I amp II

4 x 65 4 x 75 Hydro

House generator

2 MVA 231013 N

19 KDPH 2 x20 Hydro DG set 310 KW N

20 Eldari 3 x 75 Hydro DG set 6 KW N

21

Uran (Gas)

4 x 60 (GT) + 4x108 (GT)+ 2x120 WHR

Gas DG set

4 MW PH1412kVA PH2450kVA WH520kVA

161012

N

20

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

22 RGPPL

Block 1 640MW+Block 2 66354MW+Block 3 66354MW

Gas

Gas Turbine (Frame-6)

35 MW (Under testing) Details to be provided by RGPPL

N

23 Ghatghar 2x125 Hydro DG set 1x1250

kVA 51012

N

24 Khopoli 3x24+2x12 Hydro

DC Governor amp bearing oil pumps

DC power (self start)

271013 (detailed report awaited)

N

25 Bhivpuri 3 x 24 +

2 x 15 +2x12 Hydro

DC Governor amp bearing

-do-

N

26 Bhira 6 x 25 Hydro

1 Noof 500 KVA house generator with water turbine

500 kVA

201013 (detailed

report awaited)

N

27

Bhira PSS 1 x 150 Hydro DG set 500 kVA

N

28 Trombay 1 x 120 Gas

Turbine DG Set 25 MW

N

1 x 60 Steam Turbine

NTPC

21

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

29 Kawas 4 x 106 2 x 116 Gas Diesel 2850 KW 151013

N

30 Gandhar 3 x 144 + 1x225 Gas Diesel 2975 KW

N

NCA

31 SSP(RBPH amp CHPH) 6x200+550 Hydro Diesel 2x1000kVA 080412

N

Accordingly the Black start capable stations may forward their tentative plan for conducting Black start exercises in compliance to sec 58(b) of IEGC bull As per the communication for MPPTCL the tentative plan of Black start in Madhya

Pradesh system is given under SL No Name of the Station Tentative Date Remarks 1 Pench March 2014 DG set at Pench amp are Bargi

under outage 2 ISP Apr-May 2014 - 3 TONS June 2014 Governor Problem being

attended 4 Birsinghpur June 2014 -do- 5 Medikheda June 2014 -do- 6 Rjghat June 2014 -do- Other utilities may also update their tentative plan for black start

The sub-committee may like to discuss

22

457th OCCM AGENDA

ITEM NO 912 HEALTHINESS OF MAIN CIRCUIT BREAKER OF 400 KV BIRSINGPUR-KATNI-I AT KATNI END The main CB of Birsingpur-Katni-I is under shut down since 2350 hrs of 14th February 2013 Representatives from MPPTCL may kindly apprise on the progress and expected date of restoration of the Main CB of 400 kV Birsingpur-Katni-I at Katni end The sub-committee may like to discuss

ITEM NO 913 TESTING OF SPS RELATED TO TRIPPING OF BINA-GWALIOR-AGRA AT CGPL VINDHYACHAL AND KORBA

As per the information received from NTPC and CGPL the SPS for the 765 kV Bina-

Gwalior-Agra has been installed and a mock drill has to be carried out for the same

The matter was discussed in the 456th OCC and it was decided that SPS may be

tested for reduction of say 50MW for each station instead of backing down of entire

500MWs POWERGRID WRTS-2 may confirm the testing schedule so that the

same could be coordinated in from WRLDC

The sub-committee may like to discuss

ITEM NO 914 SPS AT SIPAT WRLDC vide letter No WRLDCMO-I17192013 dt 21613 requested to take up this matter with the concerned for early implementation of the SPS Status of the SPS at NTPC Sipat is as under

1 449th OCC SPS was proposed by WRLDC It was decided to have a

separate meeting to finalize the scheme 2 450th OCC Member Secretary WRPC intimated that the matter will be

discussed in 119th PCM on 3rd amp 4th September 2013 at Tarapur 3 451st OCC It was intimated that the issue of SPS of Sipat was discussed in

119th PCM held on 3rd amp 4th September 2013 at TARAPUR The tentative scheme were formulated which needed finer tuning

4 452nd OCC Matter not discussed 5 453rd OCC NTPC representative intimated proposal sent to their corporate

office for engineering approval 6 454th OCC Approval from our corporate office is yet to be obtained 7 455th OCC Approval from our corporate office is yet to be obtained 8 456th OCC Approval from corporate office has been obtained and would be

forwarded to WRPC for approval The sub-committee may like to discuss

23

457th OCCM AGENDA

ITEM NO 915 SPS AT 4X300 MW BALCO IPP The SPS at 2010 MW Balco (4x675MW + 4x135 MW + 4x300 MW) was to be commissioned by Nov 2013 before commissioning of first unit of 4x300 MW Balco IPP For the new SPS scheme envisaged for the Balco CTU connection namely the Grid Islanding and Load Management Scheme (GILMS) Balco had reported to have placed an order with Ms SEL As discussed earlier the scheme suggested by WRLDC may be implemented before commissioning of first unit of 300 MW It was intimated during the 456th OCCM by the Balco representatives that the SPS shall be commissioned by March 2014

The sub-committee may like to discuss

ITEM NO 916 ACTIONS TAKEN FOR REVIVAL OF TRANSMISSION ELEMENTS UNDER LONG OUTAGE

As per the information available at WRLDC following elements are out for a

long period

Sl No Date of

outage

Reason

ISTSIPP

1 80 MVAR BR at

ESSAR(Mahan)

231213 Oil leakage

2 125 MVAR BR at JPL 120513 Hydrogen formation

3 50 MVAR LR of Indore-Asoj-II

at Indore

190613 R phase bushing burst

4 50 MVAR LR of Birsingpur-

Damoh at Damoh(PG)

13102014 Oil Leakage

5 765 kV Durg-Kotra-I 24022014 Sparking in Isolator

6 400 kV Raipur-Raigarh-IV 18012014 Voltage Regulation

MSETCL

1 400 kV RGPPL-NrsquoKoyna-I 22012014 Voltage Regulation

2 400 kV Sholapur-

Sholapur(PG)

26022014 Tower Collapse

MPPTCL

1 400 kV Birsingpur-Katni-I 28012014 Voltage Regulation

24

457th OCCM AGENDA

2 50 MVAR LR of Indore-Asoj-II

at Indore

6012014 DGA Violation

CSPTCL

1 400220 kV Bhilai-II 24022014 Maintenance

OCC may like to be apprised of the actions being taken for expediting revival of

the above elements

The sub-committee may like to discuss

ITEM NO 917 STATUS OF 220 KV KOLHAPUR-MUDSINGHI-CHIKODI- BELGAM LINE Consent for trial operation of 220 kV Kolhapur-Mudsinghi-Chikodi- Belgam line in radial mode for supply of Karnataka load from Maharashtra side was granted after discussion in the 455th OCC meeting WRLDC is in receipt of letter from SRLDC regarding concurrence for the above arrangement SLDC Kalwa may apprise the OCC regarding the present status The sub-committee may like to discuss

ITEM NO 918 CONTRIBUTION OF GENERATORS IN VOLTAGE CONTROL The contribution of generators in WR in voltage control was analyzed during 456th OCC meeting It was noted that following units were injecting reactive power even during high voltage

1 210 MW units of Khaparkheda Koradi and Chandrapur (Maharashtra) 2 210 MW units of Satpura and Birsinghpur (Madhya Pradesh) 3 210 MW unit 23 of Korba West (Chattisgarh) 4 200 MW unit 34 of Ukai (T) in (Gujarat)

Utilities were requested to check the setting of AVRGT tap and revert back with findings Members may apprise OCC regarding the status The sub-committee may like to discuss

ITEM NO 919 REAL-TIME MONITORING OF FEEDERS SUBSTATIONS THAT ARE COVERED UNDER THE AUFLS Telemetry of feeders substations covered under the AUFLS is desirable for real-time assessment of the anticipated relief that would be available from the AUFLS scheme at any given instant of time CERC has also directed all the constituents to for

25

457th OCCM AGENDA

mapping of these feeders in the SCDA of SLDCsRLDC Members may like to deliberate further The sub-committee may like to discuss

ITEM NO 920 LOAD FORECASTING As per the amended Indian Electricity Grid Code that is effective from 17th February 2013 the SLDCs SEB distribution licensees shall always restrict the net drawal of the State from the grid within the drawal schedule keeping the deviations from the schedule within the limits specified in the Deviation settlement mechanism regulations Therefore it is imperative that adequate attention may be paid towards load forecasting The matter was discussed in the 455th and 456th OCC as well as in the 25th TCCWRPC board meeting wherein it was decided to create a task force for exploring development of a software for load forecasting Members may like to deliberate further The sub-committee may like to discuss

ITEM NO 921 IMPLEMENTATION OF THE REVISED AUFLS IN GOA DD AND DNH It was decided during the 455th and 456th OCC meeting as well as during 25th WRPC meeting that Goa DD and DNH shall complete the implementation of the revised AUFLS in Goa DD and DNH at the earliest Representatives from the Goa DD and DNH may apprise the status of the progress The sub-committee may like to discuss

ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING As per meeting roaster circulated during 452nd OCC meeting the 458th OCC Meeting

will be hosted by Maharashtra and may be scheduled on 16th amp 17th April 2014

Maharashtra may confirm the same

Anaulagnak 21

maah frvarI 2014

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5051 Hz BETWEEN 0200 Hrs amp 0300 Hrs Hrs ON 28022014

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4970 Hz BETWEEN 1800 Hrs amp 1900 Hrs Hrs ON 28022014

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 5006 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5071 Hz AT 0210 Hrs ON 28022014

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4937 Hz AT 185000 Hrs ON 28022014

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS FEBRUARY 2014 JANUARY 2014 DECEMBER 2013

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 001 005

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 041 061 188 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 1069 5423 4864 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 4014 3569 3987

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 4876 946 956

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING FEBRUARY 2014

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

Voltage Profile during the month of Feb 2014

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 421 401 426 403 409 409 408 408 415 399 414 402 424 413 417 3922 420 402 423 404 409 409 408 408 417 402 418 404 425 415 420 3993 421 399 426 400 429 405 425 402 412 399 419 408 423 410 413 3964 422 402 426 404 430 406 428 401 414 400 414 404 424 412 414 3965 420 396 423 400 409 409 408 408 413 396 415 401 424 411 415 3996 420 396 426 400 428 405 426 402 415 398 416 402 423 411 412 4007 420 394 424 399 430 402 427 401 416 399 417 402 423 409 416 3968 418 393 422 397 409 409 408 408 416 399 416 402 422 409 418 3989 418 399 423 404 409 409 408 408 417 402 417 407 419 409 419 400

व तदाब परखा फरवर 2014 स नक Annex-23

इदौर इटारसी कराड धल असोज कासोर िभलाई जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

10 419 394 423 399 409 409 408 408 416 400 415 401 420 408 417 39511 421 393 426 397 429 405 427 401 44 399 419 404 423 407 414 39912 419 395 422 400 409 409 408 408 416 401 419 407 421 410 418 39813 420 396 424 401 409 409 408 408 417 400 416 401 421 409 418 40114 421 399 424 403 430 419 428 414 417 402 415 402 421 409 417 40015 423 397 424 399 428 414 429 412 417 398 406 406 421 407 418 40016 423 397 424 400 431 404 424 401 416 401 422 409 421 409 418 40317 421 402 424 403 432 414 420 404 416 402 412 405 422 410 417 39818 420 397 423 399 409 409 408 408 416 400 414 401 422 414 416 40019 420 396 423 399 409 409 408 408 411 398 418 405 421 413 413 39920 417 397 420 402 429 406 426 401 413 399 416 404 421 413 410 39821 419 399 422 402 430 407 421 401 415 401 418 406 422 411 414 39722 419 397 422 402 432 409 423 401 416 400 413 402 423 413 414 40023 420 396 423 397 430 412 428 404 414 404 415 402 427 414 416 40324 421 399 423 401 433 411 425 400 416 398 414 402 427 415 418 40225 421 399 423 401 433 411 425 400 416 398 414 402 427 415 418 40226 420 397 423 404 431 411 428 409 411 397 415 404 424 414 412 39327 418 398 426 403 409 409 408 408 417 399 418 402 429 415 419 39128 421 400 427 406 409 409 408 408 414 400 416 403 430 415 418 401

423 393 427 397 433 402 429 400 417 396 422 401 430 407 420 391

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 424 404 415 392 424 404 431 407 766 746 797 765 800 756 804 7692 422 406 417 398 426 404 434 407 769 754 798 774 801 769 804 7773 423 405 416 402 426 401 432 410 767 750 796 768 802 773 805 7764 426 407 417 402 423 403 430 408 768 751 797 779 801 776 808 7785 422 403 415 398 423 397 430 400 768 749 797 767 798 763 797 7586 425 404 417 401 423 399 432 404 768 750 797 767 802 773 807 7707 427 401 419 397 423 396 431 404 770 741 800 763 807 769 809 7698 422 403 416 403 424 395 427 399 756 737 788 756 801 765 802 7679 422 405 416 401 424 402 427 404 755 738 786 758 804 773 804 775

10 421 400 414 396 423 398 429 403 3 88 6 98 6 801 60

वािलयर बनाBina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

बना वािलयर नागदा खडवा िसपत िसविन

10 421 400 414 396 423 398 429 403 755 737 788 765 798 765 801 76011 423 397 414 390 426 396 433 399 758 736 794 750 800 752 802 75612 420 403 414 395 423 397 428 403 757 739 787 759 801 763 798 77013 424 405 417 400 427 397 430 402 759 740 794 760 804 773 803 77214 426 410 420 406 424 400 431 405 761 740 794 766 810 780 808 78215 425 404 417 399 426 399 430 401 762 738 794 962 808 768 806 76816 426 406 422 400 427 402 429 400 759 739 792 760 815 774 811 77617 429 407 417 398 427 404 427 406 761 742 792 762 805 765 810 77418 426 404 418 395 423 399 427 404 763 748 793 768 805 759 806 76819 423 409 415 394 422 399 428 403 759 737 795 765 804 758 806 76720 421 406 410 397 420 398 426 406 765 749 795 771 791 766 799 77421 423 407 424 399 423 403 428 405 759 744 792 760 795 761 800 76722 425 406 414 398 423 400 425 404 760 743 790 762 794 762 800 76823 425 402 412 392 424 400 428 405 758 740 790 759 796 755 799 76124 425 401 411 393 423 401 427 403 760 744 796 764 792 757 798 75625 421 408 412 395 423 401 427 403 756 742 793 766 795 764 795 76926 422 405 413 390 421 399 426 402 757 739 789 760 796 750 798 76127 426 407 416 393 421 401 431 403 760 741 795 762 803 755 804 76228 428 409 414 392 423 403 432 405 762 740 795 753 809 775 803 771

429 397 424 390 427 395 434 399 770 736 800 750 815 750 811 756

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Feb-14 0 0 0 0 0 0 0 02 02-Feb-14 0 0 0 0 0 0 0 03 03-Feb-14 0 0 0 0 0 0 0 04 04-Feb-14 0 0 0 0 0 0 0 05 05-Feb-14 0 0 0 0 0 0 0 06 06-Feb-14 0 0 0 0 0 0 0 07 07-Feb-14 0 0 0 0 0 0 0 08 08-Feb-14 0 0 0 0 0 0 0 09 09-Feb-14 0 0 0 0 0 0 0 0

10 10-Feb-14 0 0 0 0 0 0 0 011 11-Feb-14 0 0 0 0 0 0 0 012 12-Feb-14 0 0 0 0 0 0 0 013 13-Feb-14 0 0 0 0 0 0 0 014 14-Feb-14 0 0 0 0 0 0 0 015 15-Feb-14 0 0 0 0 0 0 016 16-Feb-14 0 0 NIL NIL NIL 017 17-Feb-14 0 0 0 0 0 0 0 018 18-Feb-14 0 0 0 0 0 0 0 019 19-Feb-14 0 0 0 0 0 0 0 020 20-Feb-14 0 0 0 0 0 0 0 021 21-Feb-14 0 0 0 0 0 0 0 022 22-Feb-14 0 0 0 0 0 0 0 023 23-Feb-14 0 0 0 0 0 0 0 024 24-Feb-14 0 0 0 0 0 0 0 025 25-Feb-14 1 17 0 0 0 0 0 026 26-Feb-14 0 0 0 0 0 0 0 027 27-Feb-14 0 0 0 0 0 0 0 028 28-Feb-14 0 0 0 0 0 0 0 0

Max 1 17 0 0 0 00 0 0Total 1 17 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month FEBRUARY 2014

Recommonded Load relief at 492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE-25

Power CutRestrictions in Western Region for the month of February-2014 k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply(DLF)

01022014 28022014 2344 2240 2332

21 Three-Phase Supply(Irrigation)

01022014 28022014 0956 0905 0946

21 Three-Phase Supply(Mixed)

01022014 28022014 2343 2227 2330

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01022014 28022014 2353 2337 2347 32 District Head Qtrs 01022014 28022014 2355 2340 2351 33 Tehsil Head Qtrs 01022014 28022014 2349 2309 2341

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid

1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 010214 to 280214

SaUnya Nil

0-1655MW

SaUnya Nil

0000

SaUnya Nil 2400

SaUnya Nil

95 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-

2 Power supply to Agricultural Sector ivavarNa Details sao From

idnaaMk Date tk To

idnaaMk Date p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs) 21 Three-Phase Supply 01022014 28022014 1000 0800 0900

22 Single-Phase Supply 01022014 28022014 1800 1800 1800 3 Anya jaanakarI Any other information

There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

11107 (Av) of 23 days 0000(Av) 0000 (Av)

1Rural 9031(Av) for 3486 Hrs 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0666 - -

0105 -

3 HT Industries 000 (Av) for 00 Hrs 000 Total Energy Cutday 0771 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01022014 to 280214 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 2322014 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का फरवर 2014का वःता रत यौरा

Details of forced unit outages during the month ofFeb2014

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 एःसार वा डनर

ESSAR VADINAR-I

गरा विनिल GSECL

660 2156 20-Jan-14 2018 10-Feb-14 Coal shortage

2 एःसार Essar-2

गरा विनिल GSECL

172 1212 22-Feb-13 अनपल ध Still out

अनपल ध Still out

Shortage of gas

3 एसएलपीपी SLPP-1

गरा विनिल GSECL

125 1445 23-Feb-14 1237 27-Feb-14 BTL

4 एकएलट पीएसAKLTPS-1

गरा विनिल GSECL

125 1147 26-Feb-14 अनपल ध Still out

अनपल ध Still out

DCS FAIL

5 एपीएल APL - 2

अदानी ADANI

330 056 3-Feb-14 अनपल ध Still out

अनपल ध Still out

Turbine vibration bearing probl em

6 एपीएल APL-5

अदानी ADANI

660 1732 15-Feb-14 456 27-Feb-14 Turbine vibration

7 एपीएल APL - 6

अदानी ADANI

660 2049 25-Feb-14 1947 3-Mar-14 Coal mill problem

8 टाटा TATA-6

मारा वउकिल MSPGCL

500 2352 19-Jul-13 अनपल ध Still out

अनपल ध Still out

For Economy SD

9 वीआईपीएल VIPL-I

मारा वउकिल MSPGCL

300 105 2-Oct-13 अनपल ध Still out

अनपल ध Still out

Turbine bearing vibration probl em

10 टाटा TATA-8

मारा वउकिल MSPGCL

250 2255 9-Jan-14 अनपल ध Still out

अनपल ध Still out

HT due to fire near turbine generator desk

11 चिपर Chandrapur-2

मारा वउकिल MSPGCL

210 1238 14-Jan-14 1310 23-Feb-14 ID fan problem

12 कोराड KORADI-6

मारा वउकिल MSPGCL

210 651 24-Jan-14 1456 14-Feb-14 Coal bunkering problem

13 डब यपीसीएल WPCL-1

मारा वउकिल MSPGCL

135 1245 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Furnace press high

14 डब यपीसीएल WPCL-3

मारा वउकिल MSPGCL

135 421 7-Feb-14 Ready Ready Less requisition

प म ऽय भार षण कि म बई णाली चालन-ISO-I

15 चिपर CPUR - 6

मारा वउकिल MSPGCL

500 1523 11-Feb-14 2033 13-Feb-14 BTL

16 नािसक NASIK-3

मारा वउकिल MSPGCL

250 300 11-Feb-14 100 19-Feb-14 UAT problem

17 कोराड KORADI-5

मारा वउकिल MSPGCL

210 153 14-Feb-14 अनपल ध Still out

अनपल ध Still out

ID fan problem

18 ितरोडा Tiroda-I

मारा वउकिल MSPGCL

660 2059 15-Feb-14 2054 26-Feb-14 Turbine bearing problem

19 ितरोडा Tiroda-2

मारा वउकिल MSPGCL

660 1125 17-Feb-14 152 22-Feb-14 BTL

20 कोराड KORADI-6

मारा वउकिल MSPGCL

210 2357 19-Feb-14 250 23-Feb-14 BTL

21 भसावल BHUSWAL-2

मारा वउकिल MSPGCL

210 301 22-Feb-14 1706 25-Feb-14 PA fan temp High

22 खापरखड़ा KHAPERKHEDA-3

मारा वउकिल MSPGCL

250 1448 22-Feb-14 130 25-Feb-14 BTL

23 जयगड Jaigad-4

मारा वउकिल MSPGCL

300 1930 22-Feb-14 1107 4-Mar-14 Low schedule

24 कोराड Koradi-5

मारा वउकिल MSPGCL

300 404 23-Feb-14 अनपल ध Still out

अनपल ध Still out

Electrical fault

25 पल PARLI-4

मारा वउकिल MSPGCL

210 1836 28-Jan-14 1956 3-Feb-14 Air preheater problem

26 भसावल BHUSAWAL-4

मारा वउकिल MSPGCL

250 1432 28-Feb-14 1802 3-Mar-14 Ash hopper problem

27 आरजीपीपीएल RGPPL-1B

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

28 आरजीपीपीएल RGPPL-2B

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

29 आरजीपीपीएल RGPPL 3A

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

30 आरजीपीपीएल RGPPL-1A

आरजीपीपीएल RGPPL

320 1500 18-Jan-14 अनपल ध Still out

अनपल ध Still out

SRV problem

31 आरजीपीपीएल RGPPL 3B

आरजीपीपीएल RGPPL

320 1230 8-Feb-14 Ready Ready Less requisition

32 िसगाजी SINGAJI - I

म वउकिल MPPGCL

600 422 12-Feb-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

33 सातपरा SATPURA-11

म वउकिल MPPGCL

250 1913 15-Feb-14 2149 19-Feb-14 Main stream temperature low

34 सातपरा SATPURA-11

म वउकिल MPPGCL

250 542 26-Feb-14 1642 2-Mar-14 BTL

35 एःसार महान Essar-Mahan-1

एःसार ESSAR

600 000 29-Jan-14 015 18-Feb-14 Less requisi tion

36 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

37 वदना Vandana-1

वदना Vandana

135 149 12-Jan-14 अनपल ध Still out

अनपल ध Still out

BTL

प म ऽय भार षण कि म बई णाली चालन-ISO-I

38 ससान Sasan-2

आरईएल REL

660 205 16-Feb-14 1650 23-Feb-14 Problem in ash handling

39 कावास Kawas 2A

एनट पीसीNTPC 164 2018 23-Dec-13 Ready Ready Less requisition

40 गाधार Gandhar-3

एनट पीसीNTPC 144 2037 28-Dec-13 Ready Ready Less requisition

41 गाधार Gandhar-I

एनट पीसीNTPC 144 2011 1-Jan-14 Ready Ready Less requisition

42 कावास Kawas 2B

एनट पीसीNTPC 164 900 13-Jan-14 421 5-Mar-14 Maintenance

43 गाधार Gandhar-2

एनट पीसीNTPC 219 023 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Less requisition

44 कावास Kawas-1A

एनट पीसीNTPC 164 2055 4-Feb-14 712 20-Feb-14 Less requisition

45 कावास

Kawas-1B एनट पीसीNTPC 164 1951 13-Feb-14 503 20-Feb-14 Less requisition

46 कावास Kawas 1A

एनट पीसीNTPC 164 1210 21-Feb-14 Ready Ready Less requisition

47 कावास Kawas 1B

एनट पीसीNTPC 164 012 22-Feb-14 1144 26-Feb-14 Less requisition

Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का फरवर 2014 का वःता रत यौरा

Details of planned unit outages during the month of Feb2014 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Time Date

1 डब यट पीएस WTPS-3

गरा विनिल GSECL

210 212 12-Feb-14 अनपल ध Still out

अनपल ध Still out

AOH

2 पल ParlI-3

मारा वउकिल MSPGCL

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

AOH

3 चिपर Chandrapur-5

मारा वउकिल MSPGCL

500 101 14-Jul-13 841 19-Feb-14 AOH

4 कोरबा प म KORBA-(W)-4

छरा वउकिल CSPGCL

210 2226 7-Feb-14 अनपल ध Still out

अनपल ध Still out

AOH

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

NIL2

NIL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING MARCH 2014 AND APRIL 2014

Capacity Outage as per Annual Maintenance Plan

3 Craiva]kMila CSPGCL

NIL

4

NIL

5 koMd``Iya xao~ Central Sector51 VSTPS 4 210 010414 070414 AOH52 VSTPS 2 210 080414 270414 AOH53 VSTPS 1 210 300414 190514 AOH54 CGPL 10 800 280314 130514 COH

maraiva]kMila MSPGCL

Date Time Date Time1 220 Bus-1 at Mapusa 20-Mar-14 1000 20-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R

2 765 Bus-1 at Sasan 20-Mar-14 800 20-Mar-14 1800 Daily Stringing of Main bus 1 for 765 kV Vichal Pooling - Sasan feeder

Reliance WR-II C

3 400 400kV Bus-2 at Satna 20-Mar-14 800 20-Mar-14 1800 Continuous Bay extension work related to JP - Nigrie Bays POWERGRID WR-II C

4 400 400kV ICT 1 at Satna 20-Mar-14 800 20-Mar-14 1000 Continuous Bay extension work related to JP - Nigrie Bays POWERGRID WR-II C

5 400 400kV Jabalpur Itarsi 1amp2 (Dc) 20-Mar-14 1000 20-Mar-14 1400 Continuous For commissioning of Line Impedance measurement kit

POWERGRID WR-II C

6 765 3X80 MVAr Bina Line Reactor at Indore 20-Mar-14 1000 21-Mar-14 1800 Continuous For installation of online dry out amp online DGA kit

POWERGRID WR-II C

7 400kV Damoh - Bhopal 1 20-Mar-14 800 31-Mar-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

8 400 Chorania Kasor 20-Mar-14 800 20-Mar-14 1800 Daily PMM work GETCO GETCO9 400 400 KV Main Bus-I at 400 KV Ss Khedamara 20-Mar-14 900 22-Mar-14 1700 Daily Erection of Pantograph 1 Set of IP amp CVT CSPTCL CSPTCL C

10 400 400 KV Khedamara-KSTPS NTPC ckt-II at 400 KV Ss Khedamara

20-Mar-14 900 22-Mar-14 1700 Daily Erection of Pantograph CVT amp 1 Set of IP PGCIL CSPTCL C

11 400 Korba -Vandana 20-Mar-14 900 21-Mar-14 1900 days continuouTesting of LBB auto re-close M-I amp M-II relays NTPC NTPC

12 400 Korba -Vandana 20-Mar-14 900 21-Mar-14 1900 days continuouTesting of LBB auto re-close M-I amp M-II relays NTPC NTPC

13 400DC Akola-Aurangabad (MSETCL) 1 and Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

21-Mar-14 600 23-Mar-14 1800 Conti Crossing work of 400kv MC Aurangabad - Aurangabad

MSETCLWRTS-I WRTS-I C

14400 amp 220 amp 132

400KV DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 400KV Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

21-Mar-14 600 21-Mar-14 1800 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad

MSETCLWRTS-I WRTS-I C

15 400 Bhadrawati-Parli 1amp 2 21-Mar-14 900 31-Mar-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I C

16 220 Bus-1 at Pune 21-Mar-14 800 21-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R

17 400 Solapur-Kolhapur 1 amp 2 21-Mar-14 700 21-Mar-14 1800 Daily Stringing work upcoming 765 kV Solapur-Pune line

Reliance WRTS-I C

18 220 220kV DC Raigarh- Raigarh (CSPTCL) Line (if outage not avail on 13140314)

21-Mar-14 900 22-Mar-14 1700 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (040-50)

CSPTCL WRTS-I C

19 220 Bus-2 (Section-A) at Mapusa 21-Mar-14 1000 21-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R20 400 Bus-1 at Itarsi 21-Mar-14 900 21-Mar-14 1800 Daily AMP POWERGRID WR-II R21 220 Bus-1 at Gwalior 21-Mar-14 1000 21-Mar-14 1800 Daily AMP POWERGRID WR-II R22 220 Jhanor - Haldarwa 1 21-Mar-14 900 21-Mar-14 1800 Daily AMP POWERGRID WR-II R23 400 Vapi Boisar 21-Mar-14 700 22-Mar-14 1900 Continuous For crossing of 220kV Kala Khadoli TL POWERGRID WR-II C

24 765 Sasan-Satna2 21-Mar-14 800 22-Mar-14 1800 Continuous For Power Line crossing of 765kV Vindhyanchal (pooling) - Satna 2 Line

POWERGRID WR-II R

25 400 400220 ICT NO1 at Kasor 21-Mar-14 800 21-Mar-14 1800 Daily PMM work GETCO GETCO26 400 400KV Sipat-Pathadi(LANCO) line 21-Mar-14 900 22-Mar-14 1900 Continous Annual Preventive maintenance job NTPC NTPC27 400 Pune-Parli 2 50MVAr Line Reactor at Pune 22-Mar-14 800 22-Mar-14 1800 Daily AMP Work Line in service wo reactor Reliance WRTS-I R

28 765 Bus-2 at Solapur 22-Mar-14 700 22-Mar-14 1800 Daily 765KV Pune bay commissioning amp SCADA works

WRTS-I WRTS-I C

29 400 Bus-1 at Bhatapara 22-Mar-14 800 23-Mar-14 1800 Conti Bus extension work for new 125MVAr Bus Reactor at Bhatapara

WRTS-I WRTS-I C

30 220 Bus-2 (Section-B) at Mapusa 22-Mar-14 1000 22-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R31 400 Vadavi Chorania 1 22-Mar-14 900 22-Mar-14 1800 Daily AMP Reliance WR-II R32 220 Jhanor - Haldarwa 2 22-Mar-14 900 22-Mar-14 1800 Daily AMP POWERGRID WR-II R33 220 Bus-2 at Gwalior 22-Mar-14 1000 22-Mar-14 1800 Daily AMP POWERGRID WR-II R

34 765 3X80 MVAr Bus Reactor at Indore 22-Mar-14 1000 23-Mar-14 1800 Continuous For installation of online dry out amp online DGA kit

POWERGRID WR-II C

35 220 Transfer Bus at Mapusa 23-Mar-14 1000 23-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R

36 400 Raigarh- Raipur 4 amp Raigarh-Kotra PS 2 23-Mar-14 800 30-Mar-14 1800 Conti Bay shifting work for up-coming 125MVAr Bus Reactor at Raigarh

WRTS-I WRTS-I C

37 765 Bus-1 at Indore (PG) 23-Mar-14 1000 23-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

Outages Proposal of Transmission elements during the month of MARCH‐2014Type

ANNEXURE‐32A

SN KV Line From To

Basis Reason System Agency

38 220 MC Waluj-Chitegaon amp Waluj-Jalna on same tower

24-Mar-14 600 24-Mar-14 1800 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad

MSETCL WRTS-I C

39 400 Raipur-Sipat 1 amp 2 24-Mar-14 800 2-Apr-14 1800 Conti Diversion of line for Lafarge Railway trackERS removal

WRTS-I Lafarge C

40 220 Bus-2 at Pune 24-Mar-14 800 24-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R41 765 Bus-1 at Bilaspur 24-Mar-14 800 24-Mar-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R

42 400 Bus-2 at Bhatapara 24-Mar-14 800 25-Mar-14 1800 Conti Bus extension work for new 125MVAr Bus Reactor at Bhatapara

WRTS-I WRTS-I C

43 400 Kolhapur-Mapusa 2 24-Mar-14 600 24-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

44 400 Vadavi Chorania 2 24-Mar-14 900 24-Mar-14 1800 Daily AMP Reliance WR-II R45 765 Bus-2 at Indore (PG) 24-Mar-14 1000 24-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

46 765 Bus-2 at Sasan 24-Mar-14 800 24-Mar-14 1800 Daily Strining of Main Bus 2 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

47 220 KAPP - Haldarwa 1 24-Mar-14 800 24-Mar-14 1800 Daily AMP POWERGRID WR-II R48 400 Bus - 2 at Pune 25-Mar-14 800 25-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R

49 765 Bus - 1 at Wardha 25-Mar-14 800 25-Mar-14 1800 Daily Jumper connection work of 765KV Raipur-Wardha line

WRTS-I WRTS-I R

50 400 Kolhapur-Mapusa 2 25-Mar-14 600 25-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

51 220 Mapusa-Ponda line 25-Mar-14 1000 25-Mar-14 1500 Daily AMP Work GOA WRTS-I R

52 765 Bus-1 at Sasan 25-Mar-14 800 25-Mar-14 1800 Daily Jumpering of Bus 1 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

53 220 KAPP - Haldarwa 2 25-Mar-14 800 25-Mar-14 1800 Daily AMP POWERGRID WR-II R54 400 Vadavi - Kansari2 25-Mar-14 900 25-Mar-14 1800 Daily AMP Reliance WR-II R55 400 Bus-1 at Indore (PG) 25-Mar-14 1000 26-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C56 765 Bus-1 at Satna 25-Mar-14 800 25-Mar-14 1800 Continuous Bay extension work POWERGRID WR-II C57 765 Sipat 765KV 400KV 1000MVA ICT-1 25-Mar-14 900 25-Mar-14 1900 Daily SPS Protection scheme modification NTPC NTPC

58 765 Bus - 2 at Wardha 26-Mar-14 800 26-Mar-14 1800 Daily Jumper connection work of 765KV Raipur-Wardha line

WRTS-I WRTS-I R

59 400 Bhadrawati-Parli 2 63MVAr Line Reactor at Parli

26-Mar-14 800 26-Mar-14 1800 Daily AMP Work of Recator at Parli line in service wo reactor

WRTS-I WRTS-I R

60 400 Kolhapur-Mapusa 1 26-Mar-14 600 26-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

61 220 Mapusa-Amona line 26-Mar-14 1000 26-Mar-14 1500 Daily AMP Work GOA WRTS-I R62 765 Bus-2 at Satna 26-Mar-14 800 26-Mar-14 1800 Continuous Bay extension work POWERGRID WR-II C

63 765 Bus-2 at Sasan 26-Mar-14 800 26-Mar-14 1800 Daily Jumpering of bus 2 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

64 400 401 KV Main Bus-I at 400 KV Ss Khedamara 26-Mar-14 900 27-Mar-14 1700 Daily Erection of IPS Tube CSPTCL CSPTCL C

65 400 401 KV Khedamara-KSTPS NTPC ckt-II at 400 KV Ss Khedamara

26-Mar-14 900 27-Mar-14 1700 Daily Erection of IPS Tube PGCIL CSPTCL C

66 400 ACBIL-BILASPUR-CKT NO -2 26-Mar-14 900 31-Mar-14 1800 CONT FOR lilo CONNECTIVITY OF 300MW MCCPL TPP

ACBIL ACBIL C

67 765 Bus-2 at Bilaspur 27-Mar-14 800 27-Mar-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R68 220 Mapusa-Thivim 1 27-Mar-14 1000 27-Mar-14 1500 Daily AMP Work GOA WRTS-I R69 220 KAPP - Vav 2 27-Mar-14 800 27-Mar-14 1800 Daily AMP POWERGRID WR-II R70 400 Bus-2 at Indore (PG) 27-Mar-14 1000 28-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

71 765 Bus-2 at Gwalior 27-Mar-14 1000 27-Mar-14 1800 Daily Bay extension work related to Gwalior Jaipur 1 Bays

POWERGRID WR-II C

72 400 VSTPS Tie- Line-1 ( Line from Stage-III to IV Switchyard)

27-Mar-14 900 27-Mar-14 1900 Daily Basis AMP and rectification of hot spots NTPC NTPC

73 765 Sipat 765KV 400KV 1000MVA ICT-2 27-Mar-14 900 27-Mar-14 1900 Daily SPS Protection scheme modification NTPC NTPC74 765 Bus-1 at Solapur 28-Mar-14 700 30-Mar-14 1800 Daily commissioning tests amp SCADA works WRTS-I WRTS-I C75 220 Mapusa-Thivim 2 28-Mar-14 1000 28-Mar-14 1500 Daily AMP Work GOA WRTS-I R

76 400 Koradi-Satpura 28-Mar-14 1000 28-Mar-14 1400 Daily Earthwire tighting work damaged during Crossing work

WRTS-I ADANI C

77 220 Bus-1 at Dehgam 28-Mar-14 900 28-Mar-14 1800 Daily AMP POWERGRID WR-II R78 220 Kawas - Haldarwa 2 28-Mar-14 800 28-Mar-14 1800 Daily AMP POWERGRID WR-II R79 400 Chorania Amreli 28-Mar-14 800 28-Mar-14 1800 Daily PMM work GETCO GETCO

80 400DC Akola-Aurangabad (MSETCL) 1 and Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

29-Mar-14 600 30-Mar-14 1800 Conti Charging amp shifting of Akola-Abad line on MC Abad-Abad line WRTS-I WRTS-I C

81 220 Bus-2 at Dehgam 29-Mar-14 900 29-Mar-14 1800 Daily AMP POWERGRID WR-II R82 400 Bus -1 at Mapusa 30-Mar-14 1000 30-Mar-14 1500 Daily AMP Work WRTS-I WRTS-I R

83 765 765kV Bus Reactor at Solapur 31-Mar-14 700 2-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

Date Time Date Time

1 400 Bhilai-Koradi 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

2 400 DC Korba-Birsingpur 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

3 400 Korba-Bhilai 2 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

4 220 Korba-Budhipadar 3 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

5 400 Akola-Wardha 1amp 2 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

6 400 Raipur-Raigarh 1 amp Raipur-KSK-DBPL-Raigarh

1-Apr-14 800 30-Apr-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

7 400 Bhadrawati-Parli 1amp 2 1-Apr-14 900 30-Apr-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I C

8 400 400220kv ICT-1 at Pune 1-Apr-14 800 1-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R9 400 Bus-1 at Bilaspur 1-Apr-14 800 1-Apr-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R

10 400 Solapur(PG) -Karad line 1-Apr-14 700 10-Apr-14 1800 Conti Erection of 80MVAr new reactor by shifitng line equipments at Solapur

MSETCL WRTS-I C

11 400 Bus-1 at Jabalpur (pooling) 01-Apr-14 1000 01-Apr-14 1800 Daily Busbar Stability test related to Jhabua Power Bays

POWERGRID WR-II C

12 400 Shujalpur - Nagda 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

13 400 Mundra - Bhachau 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

14 400 Bina - Shujalpur 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

15 220 Omkareshwar-Khandwa Ckt 1-Apr-14 900 1-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI16 400 Sipat 400KV Bay 10 and 11 1-Apr-14 900 3-Apr-14 1900 Continous 400KV CT 3nos replacement NTPC NTPC17 400 Padgha-Nagothane ckt I 1-Apr-14 900 1-Apr-14 1700 Daily QMwork MSETCL MSETCL

18 400 Bus-2 at Jabalpur (pooling) 02-Apr-14 1000 02-Apr-14 1800 Daily Busbar Stability test related to Jhabua Power Bays

POWERGRID WR-II C

19 400 Vindhyanchal - Mahan - Korba (Section of both the line on same Dc tower)

02-Apr-14 800 03-Apr-14 1700 Continuous For Power Line crossing of 765kV Vindhyanchal (pooling) - Satna 1 Line

POWERGRID WR-II C

20 400 400kV ICT 4 at Indore MPPTCL 02-Apr-14 1000 04-Apr-14 1800 ContinuousFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

MPPTCL WR-II C

21 400 400kV Bus Coupler bay at Indore MPPTCL 02-Apr-14 1000 04-Apr-14 1800 ContinuousFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

MPPTCL WR-II C

22 400 400kV Itarsi - Indore MPPTCL 1 Line 02-Apr-14 1000 02-Apr-14 1500 DailyFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

POWERGRID WR-II C

23 400400 KV LILO Line of 400 KV SC Korba West-Khedamara to 400 KV Ss Raita (Between Loc69 amp70 near Raita Ss)

2-Apr-14 800 3-Apr-14 1700 DailyMaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

CSPTCL CSPTCL C

24 400 Chandrapur-Khaparkheda 2-Apr-14 900 2-Apr-14 1700 Daily QMwork MSETCL MSETCL

25 400 Lamboti-Solapur PG 2-Apr-14 900 2-Apr-14 1700 Daily QMwork MSETCL MSETCL

26 400 Bus-1 at Durg PS Ss 3-Apr-14 900 3-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R27 400 Bus-1 at Jabalpur 03-Apr-14 900 03-Apr-14 1800 Daily Retrofitting of Isolator arms(689A) POWERGRID WR-II R28 400 315MVA ICT2 at Khandwa 03-Apr-14 1000 03-Apr-14 1600 Daily AMP POWERGRID WR-II R29 400 Mundra - Hadala 3-Apr-14 800 3-Apr-14 1800 Daily PMM GETCO GETCO30 400 400KV Seoni -Bhilai Ckt 3-Apr-14 900 3-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I31 400 Lonikand-Chakan 3-Apr-14 900 3-Apr-14 1700 Daily QMwork MSETCL MSETCL32 400 Bus-2 at Durg PS Ss 4-Apr-14 900 4-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R33 400 Bus-1 at Jabalpur 04-Apr-14 900 04-Apr-14 1800 Daily Retrofitting of Isolator arms(2089A) POWERGRID WR-II R

34 400 400kV Itarsi - Indore MPPTCL 1 Line 04-Apr-14 1300 04-Apr-14 1800 DailyFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

POWERGRID WR-II C

35 400 Varsana - Hadala 4-Apr-14 800 4-Apr-14 1800 Daily PMM GETCO GETCO

Agency Type

ANNEXURE‐32BOutages Proposal of Transmission elements during the month of APRIL ‐2014

SN KV Line From To

Basis Reason System

36 220 Vapi - Vapi (PG) 4-Apr-14 800 4-Apr-14 1800 Daily PMM work PGCIL GETCO37 220 Haldarva - Jhanor - 1 (NTPC) 4-Apr-14 800 4-Apr-14 1800 Daily PMM amp Tan Delta testing PGCIL GETCO38 400 400KV Birsinghpur -Katni Ckt - I 4-Apr-14 800 4-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I39 220 Badod - Kota Ckt 4-Apr-14 900 4-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI40 220 Malanpur-Auriya Ckt 4-Apr-14 900 5-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI

41 400 Bhusawal-Akola 4-Apr-14 900 4-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

42 400 Deepnagar-Aurangabad II 4-Apr-14 900 4-Apr-14 1700 Daily QMwork MSETCL MSETCL43 400 Kalwa-Padgha Ckt I 4-Apr-14 900 4-Apr-14 1700 Daily QMwork MSETCL MSETCL44 765 Bus Reactor at Seoni 5-Apr-14 900 5-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R

45 400 DC Korba-KhedamaraLilo at Marwa lilo section yet to be charge 5-Apr-14 800 6-Apr-14 1800 Daily

Crossing work of upcoming 765 KV DC Raigarh-Champa (AP-48A0- AP 490)DC Korba-Khedamara is in service

CSPTCL WRTS-1 C

46 400 Bus-1 at Jabalpur 05-Apr-14 900 05-Apr-14 1800 Daily Retrofitting of Isolator arms(1689A) POWERGRID WR-II R

47 400 Mundara -Limbdi 1 05-Apr-14 800 07-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

48 220 Badod - Modak Ckt 5-Apr-14 900 5-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI49 400 Dhule-Babhleswar ckt 1 5-Apr-14 900 5-Apr-14 1700 Daily QMwork MSETCL MSETCL50 400 400220kv ICT-1 at Seoni 7-Apr-14 900 7-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R51 400 Bus-2 at Jabalpur 07-Apr-14 900 07-Apr-14 1800 Daily Retrofitting of Isolator arms(1789B) POWERGRID WR-II R52 400 315MVA ICT1 at Khandwa 07-Apr-14 1000 07-Apr-14 1600 Daily AMP POWERGRID WR-II R53 220 Chhegoan-Khandwa Ckt -II 7-Apr-14 900 7-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI54 400 Korba- Bhilai1 7-Apr-14 900 8-Apr-14 1900 days continuou Bay Maint and testing NTPC NTPC55 400 Vindhyachal - Mahan line 7-Apr-14 900 8-Apr-14 1900 Continuous Replacement of R Y and B Phase CT NTPC NTPC56 400 Bhusawal-Aurangabad 7-Apr-14 900 7-Apr-14 1700 Daily QMwork MSETCL MSETCL57 400 New Koyna-Karad ckt 2 7-Apr-14 830 7-Apr-14 1730 Daily QMwork MSETCL MSETCL

58 400 Mundara -Limbdi 2 08-Apr-14 800 10-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

59 400 Chorania Hadala 8-Apr-14 800 8-Apr-14 1800 Daily PMM GETCO GETCO60 400 Sipat 400KV Bay 23 8-Apr-14 900 9-Apr-14 1900 Continous One 400KV CT replacement NTPC NTPC61 400 Koradi-Khaparkheda I 8-Apr-14 900 8-Apr-14 1700 Daily QMwork MSETCL MSETCL62 765 765400KV ICT-1 at Kotra PS 9-Apr-14 900 9-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R63 400 Bus-2 at Jabalpur 09-Apr-14 900 09-Apr-14 1800 Daily Retrofitting of Isolator arms(489B) POWERGRID WR-II R64 400 315MVA ICT1 at Damoh 09-Apr-14 1000 09-Apr-14 1600 Daily AMP POWERGRID WR-II R65 400 Amreli-Jetpur 2 9-Apr-14 800 9-Apr-14 1800 Daily PMM GETCO GETCO66 400 SSP- Rajgarh - 1 9-Apr-14 800 9-Apr-14 1800 Daily PMM GETCOMPTCL GETCO67 220 TAPS1 amp2-TAPS 3amp4 tie line 9-Apr-14 800 9-Apr-14 1600 one day Annual maintenance Works MSETCL NPCIL68 220 TAPS TIE LIE-I 9-Apr-14 800 10-Apr-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL69 400 400 KV Indore - Nagda Ckt 9-Apr-14 900 9-Apr-14 1600 daily For maintenance work MPPTCL EHT- Mamp I70 400 400 KV Sarni - Isp Ckt 9-Apr-14 900 9-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I71 220 Mehgaon-Auriya Ckt 9-Apr-14 900 10-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI72 400 315 MVA 400220Kv X-mer III At Bhopal SS 9-Apr-14 900 10-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI73 400 Padgha-Tarapur CktII 9-Apr-14 900 9-Apr-14 1700 Daily QMwork MSETCL MSETCL74 765 Bus Reactor at Kotra PS 10-Apr-14 900 10-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R

75 765 amp 400

765400 kV ICT-I at Solapur amp 400KV Solapur-Parli 2 10-Apr-14 700 12-Apr-14 1800 Daily 765400 kV spare ICT unit Aux bus works CSD

commissioning amp Fire fighting works at Solapur WRTS-IReliance WRTS-I C

76 400 315MVA ICT2 at Damoh 10-Apr-14 1000 10-Apr-14 1600 Daily AMP POWERGRID WR-II R

77 765 Sasan-Satna 1 10-Apr-14 800 11-Apr-14 1800 Daily For AMP of line amp Line terminal Equipments Post commissioning checks

POWERGRID WR-II C

78 400 APL-Varsana 10-Apr-14 800 10-Apr-14 1800 Daily PMM GETCO GETCO79 400 400 KV Isp - Nagda Ckt 10-Apr-14 900 10-Apr-14 1600 daily For maintenance work MPPTCL EHT- Mamp I80 400 400 KV Bhopal-Itarsi(PGCIL) Ckt-I 10-Apr-14 900 11-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I81 220 Chhegoan-Khandwa Ckt -I 10-Apr-14 900 10-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI82 400 315 MVA 400220Kv X-mer At Katni SS 10-Apr-14 800 11-Apr-14 1800 continue For maintenance work MPPTCL EHT -MampI83 400 Korba- Bhilai2 10-Apr-14 900 11-Apr-14 1900 days continuou Bay Maint and testing NTPC NTPC84 400 Sipat 400KV Bay 14 10-Apr-14 900 12-Apr-14 1900 Continous 400KV CT 3nos replacement NTPC NTPC

85 400 Chandrapur II-Parli II 10-Apr-14 900 10-Apr-14 1700 Daily Providing of Arching horncorona rings Bird guards quarter pinsNut bolts

MSETCL MSETCL

86 400 Karad-Lonikand 10-Apr-14 900 10-Apr-14 1700 Daily QMwork MSETCL MSETCL87 400 Raipur-Durg PS 1 11-Apr-14 900 11-Apr-14 1700 Daily AMP Work WRTS-I WRTS-I R

88 400 Mundara -Jetpur 1 11-Apr-14 800 15-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

89 400 Varsana-Hadala Line 11-Apr-14 800 11-Apr-14 1800 Daily PMM GETCO GETCO90 220 Haldarwa Kawas-2 11-Apr-14 800 11-Apr-14 1800 Daily PMM work PGCIL GETCO91 400 400 KV Nagda-Rajgarh(PGCIL) Ckt-I 11-Apr-14 900 11-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

92 400 315 MVA 400220Kv X-mer III ampTie bay At Bhopal SS

11-Apr-14 900 11-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI

93 400 Akola-Nandgaonpeth 11-Apr-14 900 11-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

94 400 Akola-Wardha I 11-Apr-14 900 11-Apr-14 1700 Daily QMwork MSETCL MSETCL95 400 Kalwa-Lonikand 11-Apr-14 900 11-Apr-14 1700 Daily QMwork MSETCL MSETCL96 400 400220kv ICT-1 at Mapusa 12-Apr-14 900 12-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R97 400 Raipur-Durg PS 2 12-Apr-14 900 12-Apr-14 1700 Daily AMP Work WRTS-I WRTS-I R98 765 Sasan-Satna2 with line reactor 12-Apr-14 1000 12-Apr-14 1800 Daily AMP POWERGRID WR-II R99 400 400 KV Nagda-Rajgarh(PGCIL) Ckt-II 12-Apr-14 900 12-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I100 400 Deepnagar-Aurangabad I 12-Apr-14 900 12-Apr-14 1700 Daily QMwork MSETCL MSETCL101 400 Amreli-Jetpur 2 14-Apr-14 800 14-Apr-14 1800 Daily PMM GETCO GETCO102 400 Kasor - Gpec 14-Apr-14 800 14-Apr-14 1800 Daily PMM GETCO GETCO103 220 GWL(PGCIL)-Malanpur Ckt-I 14-Apr-14 900 15-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI104 400 DC Korba-Raipur 3 amp 4 15-Apr-14 800 16-Apr-14 1800 Conti Bus splitting work at Raipur WRTS-1 WRTS-1 C

105 400 Korba-Bhatapara 15-Apr-14 800 24-Apr-14 1800 Conti For raising of ground clearence for Railway track of Lafarge

WRTS-I Lafarge C

106 765 765400 kV ICT-II at Solapur 15-Apr-14 700 17-Apr-14 1800 Daily CSD commissioning amp Fire fighting works WRTS-I WRTS-I C107 400 Vindhyachal-Satna1 15-Apr-14 1000 15-Apr-14 1800 Daily AMP POWERGRID WR-II R108 400 Ssnl-Dhule-1 15-Apr-14 800 15-Apr-14 1800 Daily PMM GETCOMSETCL GETCO109 220 TAPS-Vapi 15-Apr-14 800 17-Apr-14 1900 Daily Annual maintenance Works GETCO NPCIL110 220 Pithampur-Rajgarh(PGCIL) Ckt - I 15-Apr-14 900 15-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI111 400 Sipat 400KV Bay-18 ( Ranchi-1 Main) 15-Apr-14 900 15-Apr-14 1900 Daily Annual Preventive maintenance job NTPC NTPC112 400 Karad-Kolhapur Ckt I 15-Apr-14 900 15-Apr-14 1700 Daily QMwork MSETCL MSETCL

113 400 DC Raipur-Bhadrawati 2 amp 3 16-Apr-14 800 17-Apr-14 1800 Conti Bus splitting work at Raipur WRTS-1 WRTS-1 C

114 400 Vindhyachal-Satna2 16-Apr-14 1000 16-Apr-14 1800 Daily AMP POWERGRID WR-II R

115 400 Mundara -Jetpur 2 16-Apr-14 800 20-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

116 400 Vadavi - Dehgam (Pg) - 1 16-Apr-14 800 16-Apr-14 1800 Daily PMM amp Tandelta testing GETCO GETCO117 400 Chorania Asoj-1 16-Apr-14 800 16-Apr-14 1800 Daily PMM GETCO GETCO118 220 Bhilad - TAPS 16-Apr-14 800 16-Apr-14 1800 Daily PMM work PGCIL GETCO119 220 Bhat - Pirana (PG) - 1 16-Apr-14 800 16-Apr-14 1800 Daily PMM work GETCO GETCO120 400 400 KV Bhopal-Itarsi(PGCIL) Ckt-II 16-Apr-14 900 17-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I121 220 Damoh(PGCIL) - Tikamgarh Ckt 16-Apr-14 900 16-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI

122 400 400KV SC Korba-Raipur-II (Between Korba - Bhatapara end)(Between Loc2980 amp 2990) 16-Apr-14 800 17-Apr-14 1700 Daily

MaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

PGCIL CSPTCL C

123 400 Sipat 400KV Bay-19 ( Ranchi-2 Main) 16-Apr-14 900 16-Apr-14 1900 Daily Annual Preventive maintenance job NTPC NTPC124 400 Padgha-Babhleswar ckt I 16-Apr-14 900 16-Apr-14 1700 Daily QMwork MSETCL MSETCL125 400 Vadavi - Dehgam (Pg) - 2 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCO GETCO126 400 Ssnl-Dhule-2 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCOMSETCL GETCO127 400 Vadinar-Hadala- 1 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCO GETCO128 220 Bhat - Pirana (PG) - 2 17-Apr-14 800 17-Apr-14 1800 Daily PMM work GETCO GETCO129 400 400KV Birsinghpur -Katni Ckt - II 17-Apr-14 800 17-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I130 220 Pithampur-Rajgarh(PGCIL) Ckt - II 17-Apr-14 900 17-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI131 400 Jejuri-Lonikand 17-Apr-14 900 17-Apr-14 1700 Daily QMwork MSETCL MSETCL132 400 Deepnagar-Khadka II 17-Apr-14 900 17-Apr-14 1700 Daily QMwork MSETCL MSETCL133 400 Chorania Kasor 18-Apr-14 800 18-Apr-14 1800 Daily PMM GETCO GETCO134 220 GWL(PGCIL)-Malanpur Ckt-II 18-Apr-14 900 19-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI135 400 Akola-Wardha II 18-Apr-14 900 18-Apr-14 1700 Daily QMwork MSETCL MSETCL

136 400 Koradi-Nandgaonpeth 18-Apr-14 800 18-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

137 765 765kV Pune line Reactor at Solapur 19-Apr-14 700 20-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

138 400 400KV Bina -Power(JP) Ckt 19-Apr-14 900 19-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I139 400 Dhule-SSarovar I 19-Apr-14 900 19-Apr-14 1700 Daily QMwork MSETCL MSETCL

140 400 Koradi-Khaparkheda II 19-Apr-14 900 19-Apr-14 1700 Daily QMwork MSETCL MSETCL141 220 KAPP - VAPI - 1 20-Apr-14 800 20-Apr-14 1800 Daily Isolator replacement under ASIDE scheme PGCIL GETCO

142 400 DC Bhilai-Bhadrawati amp Raipur-Bhadrawati 1 21-Apr-14 800 28-Apr-14 1800 Conti Diversion of line for Vidarbha Industrial Devlopment Corporation(VIDC)

WRTS-I VIDC C

143 400 Bhachau- Ranchhodpura 1amp2 21-Apr-14 800 27-Apr-14 1800 Continuous Tower shifting work at canal crossingInsulator replacement work

POWERGRID WR-II C

144 400 Hadala-Amreli 21-Apr-14 800 21-Apr-14 1800 Daily PMM GETCO GETCO145 400 Vadinar-Hadala- 2 21-Apr-14 800 21-Apr-14 1800 Daily PMM GETCO GETCO146 220 TAPS-Boisar 21-Apr-14 800 23-Apr-14 1900 Daily Annual maintenance Works MSETCL NPCIL147 220 Bina(PGCIL)-220 KV Bina Ckt 21-Apr-14 900 21-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI148 400 CGPL Bhachau -1 21-Apr-14 8AM 21-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL149 220 Kawas-Ichhapore 1+Bus 1 21-Apr-14 900 21-Apr-14 1800 daily RTV Coating NTPC NTPC150 400 Karad-Kolhapur Ckt II 21-Apr-14 900 21-Apr-14 1700 Daily QMwork MSETCL MSETCL151 400 New Koyna-Koyna Stg-4-1 21-Apr-14 830 21-Apr-14 1730 Daily QMwork MSETCL MSETCL152 400 Ssp - Rajgarh - 2 22-Apr-14 800 22-Apr-14 1800 Daily PMM GETCOMPTCL GETCO153 400 Vadavi-Bhachau 2 22-Apr-14 800 22-Apr-14 1800 Daily PMM amp Tan Delta testing PGCIL GETCO154 220 Bhilad - Vapi (PG) - 1 22-Apr-14 800 22-Apr-14 1800 Daily PMM work PGCIL GETCO155 400 400 KV Rajgarh(PGCIL)-Ssp Ckt-I 22-Apr-14 900 22-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I156 400 400KV Seoni -Sarni Ckt 22-Apr-14 900 23-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I157 220 Khandwa(PGCIL)-Nepanagar Ckt 22-Apr-14 900 22-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI158 220 Kawas-Ichhapore 2+Bus 1 22-Apr-14 900 22-Apr-14 1800 daily For maintenance work NTPC NTPC159 400 Karad-Jaigad II 22-Apr-14 900 22-Apr-14 1700 Daily Annual maintenance work MSETCL MSETCL160 220 Bhilad - Vapi (PG) - 2 23-Apr-14 800 23-Apr-14 1800 Daily PMM work PGCIL GETCO161 400 400KV Bina -Bhopal Ckt -I 23-Apr-14 900 24-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I162 400 400 KV Rajgarh(PGCIL)-Ssp Ckt-II 23-Apr-14 900 23-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I163 220 Bina(PGCIL)-Shivpuri Ckt 23-Apr-14 900 24-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI164 220 Damoh(PGCIL) - Damoh I C - I 23-Apr-14 900 23-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI

165 400 400 KV DCDS Sipat- Raipur (IampII) 23-Apr-14 800 24-Apr-14 1700 DailyMaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

PGCIL CSPTCL C

166 400 CGPL Bhachau - 2 23-Apr-14 8AM 23-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL

167 220 Kawas-Navsari 2 +Bus 1 23-Apr-14 900 23-Apr-14 1800 daily Insulator replcement and routine maintenance NTPC NTPC168 400 Padgha-Babhleswar ckt II 23-Apr-14 900 23-Apr-14 1700 Daily QMwork MSETCL MSETCL169 400 Kasor - SSP 24-Apr-14 800 24-Apr-14 1800 Daily PMM work GETCO GETCO170 220 Bhilad - Vapi (PG) - 3 24-Apr-14 800 24-Apr-14 1800 Daily PMM work PGCIL GETCO171 220 TAPS-Bhilad 24-Apr-14 800 26-Apr-14 1900 Daily Annual maintenance Works GETCO NPCIL172 220 Damoh(PGCIL) - Damoh I C - II 24-Apr-14 900 24-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI173 400 CGPL Jetpur- 1 24-Apr-14 8AM 24-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL

174 220 Kawas-Ichhapore 1 +Bus 2 24-Apr-14 900 24-Apr-14 1400 daily Insulator replcement and routine maintenance NTPC NTPC

175 220 Kawas-Ichhapore 2 +Bus 2 24-Apr-14 1400 24-Apr-14 1900 daily Insulator replcement and routine maintenance NTPC NTPC176 400 Padgha-Talegaon 24-Apr-14 900 24-Apr-14 1700 Daily QMwork MSETCL MSETCL

177 765 765kV Raichur 1 line Reactor at Solapur 25-Apr-14 700 27-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

178 400 400KV Bina -Bhopal Ckt -II 25-Apr-14 900 26-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I179 400 CGPL Jetpur- 2 25-Apr-14 8AM 25-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL180 400 Vindhyachal -Satna-4 Line Shunt Reactor 25-Apr-14 900 25-Apr-14 1900 Daily Basis AMP NTPC NTPC

181 400 Bhusawal-Koradi 25-Apr-14 900 25-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

182 400 Deepnagar-Khadka I 25-Apr-14 900 25-Apr-14 1700 Daily QMwork MSETCL MSETCL183 400 Soja -Kansari 26-Apr-14 800 26-Apr-14 1800 Daily PMM GETCO GETCO184 400 Raipur-Wardha 1 27-Apr-14 800 28-Apr-14 1800 Daily Balance construction work WRTS-1 WRTS-1 C185 220 KAPP - VAPI - 2 27-Apr-14 800 27-Apr-14 1800 Daily Isolator replacement under ASIDE scheme PGCIL GETCO186 400 Soja -Kansari 28-Apr-14 800 28-Apr-14 1800 Daily PMM GETCO GETCO187 220 TAPS-Boisar II 28-Apr-14 800 30-Apr-14 1900 Daily Annual maintenance Works MSETCL NPCIL188 400 400KV Damoh - Katni Ckt 28-Apr-14 900 28-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I189 400 400 KV Damoh(PGCIL)-Katni Ckt 28-Apr-14 900 28-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I190 400 New Koyna-Karad ckt 1 28-Apr-14 830 28-Apr-14 1730 Daily QMwork MSETCL MSETCL

191 400 DC Raigarh-DB Power (Tudri) - KSK 29-Apr-14 800 30-Apr-14 1800 Conti Crossing work of 765kV SC Raigrah-Champa (90 - 100)

WRTS-I WRTS-I C

192 400 Raipur-Wardha 2 29-Apr-14 800 30-Apr-14 1800 Daily Balance construction work WRTS-1 WRTS-1 C193 220 Navsari - Nasik - 1 29-Apr-14 800 29-Apr-14 1800 Daily PMM work GETCOMSETCL GETCO194 220 Seoni(PGCIL)-Chhindwara Ckt-I 29-Apr-14 900 29-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI195 220 Kawas-Vav 1+ bus 2 29-Apr-14 900 29-Apr-14 1800 daily For maintenance work NTPC NTPC196 400 Chorania Asoj-1 30-Apr-14 800 30-Apr-14 1900 Daily PMM GETCO GETCO197 220 Navsari - Nasik - 2 30-Apr-14 800 30-Apr-14 1800 Daily PMM work GETCOMSETCL GETCO198 220 Vapi - TAPS 30-Apr-14 800 30-Apr-14 1800 Daily PMM work PGCIL GETCO199 220 Seoni(PGCIL)-Chhindwara Ckt-II 30-Apr-14 900 30-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI200 220 Kawas-Vav 1+ bus 2 30-Apr-14 000 30-Apr-14 000 daily For maintenance work NTPC NTPC

Annexure-32-C1

List of Emergency Outages availed in Feb 2014

SlNo

Element kV Agency From

Date To Date

Remarks

1 SATNA‐BINA‐II 765 WRTS‐2 4‐Feb‐14

5‐Feb‐14

Hot spot attending

2 SUJALPUR‐NAGDA LR NAGDA

400 WRTS‐2 6‐Feb‐14

19‐Feb‐14

Oil leackage

3 SOLAPUR‐PARLI‐II

400 WRTS‐2 6‐Feb‐14

6‐Feb‐14

Hotspot attend at solapur

4 JABALPUR‐ITARSI‐IV LR AT ITARSI‐LR

400 WRTS‐2 7‐Feb‐14

17‐Feb‐14

Oil leackage

5 APL‐HADALA‐SC 400 GEB 7‐Feb‐14

7‐Feb‐14

Hot spot

6 SOLAPUR‐PARLI(PG)‐1

400 WRTM(REL)

9‐Feb‐14

9‐Feb‐14

Hot spot

7 BOISAR‐BOISAR(PG)‐II

220 MSETCL 9‐Feb‐14

9‐Feb‐14

Hotspots

8 NEW KOYNA‐KARAD ‐ I

400 MSETCL 10‐Feb‐14

11‐Feb‐14

Dc‐earth leakage

9 LONIKHAND ‐ KARAD

400 MSETCL 10‐Feb‐14

11‐Feb‐14

Hotspot

10 NAGDHA ICT ‐ III

400220

MPPTCL 10‐Feb‐14

10‐Feb‐14

Hotspot

11 AKOLA ‐ ABAD ‐I AKOLA

400 WRTS‐1 11‐Feb‐14

12‐Feb‐14

Oil leackage

12 AKOLA ‐ AURANGABAD ‐ I

400 WRTS‐1 11‐Feb‐14

11‐Feb‐14

Oil leackage ion lr

13 BINA‐GWALIOR 765 WRTS‐1 14‐Feb‐ 14‐Feb‐ Attend oil leakage on lr

SlNo

Element kV Agency From

Date To Date

Remarks

II 14 14

14 AKOLA‐TIRORA‐I 765 MSETCL 22‐Feb‐14

23‐Feb‐14

Sparking in LR at Tirora SYED AT TIRORA END

15 KHAEGAR‐ICT‐I 400220

MSETCL 22‐Feb‐14

22‐Feb‐14

Hot spot

16 KHANDWA‐NEPANAGR‐SC

220 MPPTCL 23‐Feb‐14

23‐Feb‐14

Hot spot

17 GWALIAR ‐SATNA ‐ I

765 WRTS‐2 24‐Feb‐14

1‐Mar‐14

Attend hot spot

18 KORBA BUS‐III 400 NTPC 25‐Feb‐14

25‐Feb‐14

Hots pot attend

19 BUS‐1 AT GWALIOR

765 WRTS‐2 13‐Feb‐14

13‐Feb‐14

Checking of blocked BB main‐1 relay

20 RAIPUR‐BWATI‐2

400 WRTS‐1 17‐Feb‐14

17‐Feb‐14

Urgent Removal of LR at Raipur end for DGA violation

21 TAPS‐PADGHE 400 TAPS‐3amp4 19‐Feb‐14

23‐Feb‐14

To attend SF‐6 leakage

22 SATNA‐GWALIOR‐1

765 WRTS‐2 24‐Feb‐14

26‐Feb‐14

To attend hot spots

23 VCHAL‐JABALPUR‐IV

400 WRTS‐2 27‐Feb‐14

27‐Feb‐14

To increase OPGW‐Top conductor clearance to avoid tripping

24 APL‐SAMI‐2 400 APL 26‐Feb‐14

26‐Feb‐14

To attend hot sopt

25 SHOLAPUR BUS‐1

765 WRTS‐1 27‐Feb‐14

27‐Feb‐14

To attend hot sopt

26 BOISAR BUS‐2 220 WRTS‐1 28‐Feb‐14

28‐Feb‐14

To attend hot sopt

Sl No KV element From To Basis Work System Agency Remarks

1220 Vapi (GETCO)‐Bhilad 1‐Feb‐14 800 2‐Feb‐14 1800 Daily Line crossing work of 400KV LILO line for

Magarwada SSGETCO POWERGRID N

2 220 Omkareshwar-Khandwa Ckt

3-Feb-14 900 3-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

3 400 New Koyna-Koyna Stg-4-1

3-Feb-14 830 3-Feb-14 1730 Daily QMwork MSETCL MSETCL N

4220 Vapi ‐ Magarwada

Ckt13‐Feb‐14 900 3‐Feb‐14 1400 Daily AMP of line amp equipment WRTS‐II POWERGRID DD may have to do load

shedding as per Reliability Suggestion

N

5 220 DC Raigarh- Raigarh 1amp 2

4-Feb-14 800 5-Feb-14 1800 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (040-50)

CSPTCL WRTS-I N

6 220 Itarsi(PGCIL)-Hoshangabad Ckt

4-Feb-14 900 4-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N

7 400 Mundra -Limbdi-2 4-Feb-14 800 4-Feb-14 1800 Daily Suspension Insulator replcement and routine maintenance

PGCIL CGPL N

8 400 400 kV DC Satna - Bina 1amp2

4-Feb-14 800 5-Feb-14 1800 Continous Crossing of Jabalpur-Bina 765 kv SC Line PGCIL JTCL N

9220 Vapi ‐ Magarwada

Ckt24‐Feb‐14 0900 4‐Feb‐14 1400 Daily AMP of line amp equipment WRTS‐II POWERGRID N

10 765 Seoni-Bina line with LR 4‐Feb‐14 800 4-Feb-14 1800 Daily AMP Work WRTS-2 WRTS-1 N

11 400 Bus I Bina 5‐Feb‐14 800 5‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

12220 Kawas ‐ Navsari (PG)

25‐Feb‐14 800 5‐Feb‐14 1800 Daily Replacement of ST insulators by Double Tension

insulator in Railway crossing spansWRTS‐II POWERGRID N

13400 Indoer (PG) ‐Indore

(MP) DC5‐Feb‐14 800 6‐Feb‐14 1800 Continou

sStringing of 765kV Indore ‐ Vadodara line WRTS‐II POWERGRID N

14 400 APL - Hadala 6-Feb-14 800 6-Feb-14 1800 Daily PMM GETCO GETCO N N

15 220 Seoni(PGCIL ) - Chhindwara CKT I

6-Feb-14 900 6-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N N

16 400 Jejuri-Koyna stg IV 6-Feb-14 900 6-Feb-14 1700 Daily QMwork MSETCL MSETCL N17 400 Akola-Nandgaonpeth 6-Feb-14 900 6-Feb-14 1700 Daily Quaterly Maintainance Work MSETCL MSETCL N18 400KV Korba-Bhatapara 6-Feb-14 900 7-Feb-14 1900 Cont Testing of LBB auto re-close M-I amp M-II relays NTPC NTPC N19 220 Haldarva - Jhanor - 2

(NTPC)6-Feb-14 900 6-Feb-14 1800 Daily PMM work GETCO N

20220 Navsar (PG) ‐Navsari

(GETCO) 16‐Feb‐14 800 6‐Feb‐14 1800 Daily Replacement of ST insulators by Double Tension

insulator in Railway crossing spansWRTS‐II POWERGRID

N

21 400 Bus‐II Bina 6‐Feb‐14 800 6‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

22400 Seoni‐Khandwa1 6‐Feb‐14 1000 6‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Khandwa end by MS ABB

WRTS‐II POWERGRID Rescheduled to 6th March N

23 400 Rajgarh-Ssp Ckt-II 7-Feb-14 900 7-Feb-14 1600 daily For maintenance work MPPTCL EHT- Mamp I N24 220 Chhegoan-Khandwa

Ckt -II7-Feb-14 900 7-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

25 220 Wardha (PG)-Wardha 7-Feb-14 800 7-Feb-14 1800 Daily AMP Work MSETCL WRTS-I N26 400 Chorania - Vadavi-2 7-Feb-14 800 7-Feb-14 1800 Daily PMM amp Tan Delta testing WRTGPL GETCO N27 400 Jabalpur‐Itarsi1 7‐Feb‐14 900 7‐Feb‐14 1400 Daily AMP OF TERMINAL EQUIPMENT WRTS‐II POWERGRID N

28220 Vapi(PG)‐ Bhilad ckt

2 amp 3 7‐Feb‐14 800 8‐Feb‐14 1800 Daily Line crossing work of 400KV LILO of Navsari‐Boisar

at MagarwadaGETCO POWERGRID N

29 220 Mapusa-Thivim 1 8-Feb-14 800 8-Feb-14 1800 Daily AMP Work GOA WRTS-I N

30400 Seoni‐Khandwa2 9‐Feb‐14 1000 9‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Khandwa end by MS ABB

WRTS‐II POWERGRID Rescheduled to 7th March N

31 220 Chhegoan-Khandwa Ckt -I

10-Feb-14 900 10-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

Annexure-32-C2OCC approved outage not availed in Feb‐2014

32132 132 kV Dhule

Dondaicha line10-Feb-14 800 11-Feb-14 1800 Cont Crossing of Dhule-Vadodara 765 kv SC Line MSETCL BDTCL subjected to sldc

clearance N

33 400132 KV

Vindhyachal ICT-1 10-Feb-14 900 14-Feb-14 1900 Cont ICT Overhauling NTPC NTPC N

34400 KV Vindhyachal - Jabalpur-

3 Line Shunt Reactor10-Feb-14 900 14-Feb-14 1900 Cont Reactor Overhauling NTPC NTPC

N

35 400 KSK-DB Power 10-Feb-14 800 13-Feb-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end WRTS-IDBKSK

KSK N36 220 Ipore-Kawas-1 10-Feb-14 800 10-Feb-14 1800 Daily PMM work GETCO N

37400 Vindhyachal‐Mahan 10‐Feb‐14 800 11‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐I WRTS‐II N

38400 Mahan‐Korba 10‐Feb‐14 800 11‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐I WRTS‐II N

39765 Jabalpur ‐ Bina 1 10‐Feb‐14 1000 10‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Jabalur end by MS ABB

WRTS‐II POWERGRID Differed by siteN

40 400 SSP - Rajgarh - 1 10-Feb-14 800 11-Feb-14 1800 Daily Basis

PMM Work GETCO N

41 400 DC Tundri (DB Power) -ksk-Raigarh

10-Feb-14 800 11-Feb-14 1800 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (092-100)

DB Power WRTS-I N42 400 Jetpur - Amreli - 1 11-Feb-14 800 12-Feb-14 1800 Daily PMM GETCO GETCO N43 400 Hadala - Vadinar-2 11-Feb-14 800 11-Feb-14 1800 Daily PMM GETCO GETCO N44 400 Nagda-Rajgarh Ckt-I 11-Feb-14 900 11-Feb-14 1800 daily For maintenance work MPPTCL EHT- Mamp I N45 220 Mehgaon-Auriya Ckt 11-Feb-14 900 11-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N46 220 Seoni(PGCIL ) -

Chhindwara CKT II11-Feb-14 900 11-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

47

765kV Main Bus-1B at SASANBay 13 - Jack Bus

11-Feb-14 900 21-Feb-14 1800 Daily Jumper Installations amp ConnectionsIsolator Allignment

PGCIL Reliance Provisional Subject to details of works done to be apprised on daily basis

N

48 220 Ipore-Kawas-2 11-Feb-14 800 11-Feb-14 1800 Daily PMM work GETCO N49 220 Navsari - Nasik - 2 11-Feb-14 900 11-Feb-14 1800 Daily PMM work GETCO N

50765 Jabalpur ‐ Bina 2 11‐Feb‐14 1000 11‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Jabalur end by MS ABB

WRTS‐II POWERGRID Deferred by siteN

51 400 Nagda-Rajgarh Ckt-II 12-Feb-14 900 12-Feb-14 1800 daily For maintenance work MPPTCL EHT- Mamp I N52 400 Karad-Solapur (PGCIL) 12-Feb-14 900 12-Feb-14 1700 Daily QMwork MSETCL MSETCL N53 400 Raipur-Sipat 1 amp 2 26-Feb-14 800 3-Mar-14 1800 Conti Diversion of line for Lafarge Railway track WRTS-I Lafarge Ori 12-16 Feb 14 Deferre N54 220 Haldarwa Kawas-2 12-Feb-14 900 12-Feb-14 1800 Daily PMM work GETCO N

55 220 Bus‐I Bina 12‐Feb‐14 800 12‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

56 400 Chorania - Hadala 13-Feb-14 800 14-Feb-14 1800 Daily PMM GETCO GETCO N57 400 Tarpur-Padghe-2 13-Feb-14 800 14-Feb-14 1800 Daily maintenance work POWERG

RIDNPCIL N

58400 Vindhyachal‐Satna1 13‐Feb‐14 1000 13‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

59 220 Bus‐II Bina 13‐Feb‐14 800 13‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

60 220 Pithampur-Rajgarh Ckt - I

14-Feb-14 900 14-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

61 220 Wardha (PG)-Badnera 14-Feb-14 800 14-Feb-14 1800 Daily AMP Work at Wardha MSETCL WRTS-I N

62 400 Bhusawal-Koradi 14-Feb-14 900 14-Feb-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL N

63 400 Raipur-KSK 14-Feb-14 800 16-Feb-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end WRTS-IKSK

KSK N

64 220 GWL(PGCIL)-Malanpur Ckt-II

15-Feb-14 900 15-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N

65 220 Pithampur-Rajgarh Ckt - II

15-Feb-14 900 15-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

66400 Vindhyachal‐Satna2 16‐Feb‐14 1000 16‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

67 220 KAPS - Haldarwa - 1 17-Feb-14 800 17-Feb-14 2000 Daily Yearly PM checks KAPS N

68400 3X105 MVA 400220Kv

X-mer I At Indore ss17-Feb-14 800 18-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI

N

69

220 SC Korba-Raigarh-Budhipadar sc(PGCIL) amp DC Korba-Budipadar both circuits (CSPTCL)

18-Feb-14 800 19-Feb-14 1800 Conti Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCLWRTS-I

WRTS-I

N

70 400 Itarsi-Bhopal Ckt-I 18-Feb-14 900 19-Feb-14 1700 daily For maintenance work MPPTCL EHT- Mamp I N71 220 Badod - Kota Ckt 18-Feb-14 900 18-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N72 220 Damoh(PGCIL) -

Damoh I C - II18-Feb-14 900 18-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

73 220 Badod - Modak Ckt 19-Feb-14 900 19-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

74220 KAPS - Ukai - Mota 19-Feb-14 800 19-Feb-14 2000 Daily Yearly PM checks KAPS Non consent from SLDC

GETCO N

75400 315 MVA 400220 KvX-

mer III At Indore ss20-Feb-14 800 21-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI

N

76 220 Seoni(PG)-Seoni 2 21-Feb-14 800 21-Feb-14 1800 Daily AMP Work MPPTCL WRTS-I Y N77 220 Bina(PGCIL)-Shivpuri

Ckt21-Feb-14 900 22-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI Y N

78 400 Koradi-Nandgaonpeth 21-Feb-14 900 21-Feb-14 1700 Daily QMwork MSETCL MSETCL N N79 220 Haldarva - Jhanor - 1

(NTPC)21-Feb-14 900 21-Feb-14 1800 Daily PMM work GETCO N

80

765kV Main Bus-2A at SASANSatna Line-2

22-Feb-14 900 28-Feb-14 1800 Contionious

Equipment ConnectionsCircuit Breaker TestingJumper MeasurementIsolator Allignment Reactor accessories erection on R-Phase

PGCIL Reliance

N

81 400 Korba-Raipur 3 amp 4 23-Feb-14 800 24-Feb-14 1800 Conti For Bus spliting work at Raipur765 KV Raigarh-Raipur and 765 Champa Raipur lines

WRTS-1 WRTS-1 N

82132 132kV Astha - Polai SC

line of MPPTCL24-Feb-14 800 25-Feb-14 1800 Continous Crossing of Bhopal -Indore 765 kv SC Line MPPTCL BDTCL subjected to sldc

clearance N

83 400 Bus-1 at Bilaspur 24-Feb-14 800 24-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I N

84400 Seoni -

Khedamara(Bhilai) Ckt25-Feb-14 900 25-Feb-14 1800 daily For maintenance workFeeder bay maintenance at

KMaraMPPTCL CSPTCLMPPT

CLNo confirmation on D-3

N

85400 Ranchi-Sipat 1 amp 2 25-Feb-14 800 26-Feb-14 1800 Conti Crossing work of upcoming 765 KV DC

Jharsuguda-Korba amp 765KV SC Ranchi-BilaspurWRTS-I WRTS-I No confirmation on D-3

N

86765 Sasan‐Satna2 25‐Feb‐14 800 26‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐II POWERGRID No confirmation on D-3 N

87400 Bus Reactor1 at Satna 25‐Feb‐14 1000 25‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

88400 400 kV DC Damoh -

Bhopal Line26-Feb-14 800 27-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL Not availed by agency for

rainsN

89400 Raipur-Bhadrawati 2 amp

327-Feb-14 800 27-Feb-14 2100 Daily For Bus spliting work at Raipur765 KV Raigarh-

Raipur and 765 Champa Raipur linesWRTS-1 WRTS-1 Subject to Telemetry from

Durg PS RaipurN

90 400 Birsinghpur‐Vandana Vidyut

27‐Feb‐14 800 27‐Feb‐14 1700 Daily AMP of Terminal Equipment amp line Reactor WRTS‐I POWERGRID Ready N

91 400 Bhusawal-Akola 28-Feb-14 900 28-Feb-14 1700 Daily QMwork MSETCL MSETCL N92 220 Bus-1 at Wardha 28-Feb-14 800 28-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I N93 400 Birsinghpur‐Balco 28‐Feb‐14 800 28‐Feb‐14 1700 Daily AMP of Terminal Equipment amp line Reactor WRTS‐I WRTS‐I Deferred by site N

94 400 Nagda‐Dehgam2 5‐Feb‐14 1000 5‐Feb‐14 1800 DailyCommissioning amp checking of CSD relay in Main CB for reactor switching at Dehgam end by MS ABB

WRTS‐II POWERGRID N

95 400 400kV Satpura Itarsi 10‐Feb‐14 900 11‐Feb‐14 1700 DailyCommissioning of new CB after dismantling of existing TELK make CB at Satpura end amp normalising of line on main CB

POWERGRID

WRTS‐II N

96 765 765 kV Satna - Bina Ckt I

6-Feb-14 800 8-Feb-14 1800 cont Stringing of Jabalpur-Bina 765 kv SC Line PGCIL JTCL Original27-28 Jan14 Def N

97 765400 765400 kV ICT-1 at Bina 20-Feb-14 90000 AM 21-Feb-13 60000 PM Continuou

sCSD commissioning for 400kV Side CB of 765400 kV ICT-1 WRTS-II POWERGRID Deferred by site N

98 400 Nagda - Dehgam 1amp2 20-Feb-14 80000 AM 28-Feb-14 1700 Daily Online PID testing to insulators in both circuits AR shall be kept in non auto mode in both circuits WRTS-II POWERGRID

N

99 220MC Waluj-Chitegaon amp Waluj-Jalna

21-Feb-14 700 21-Feb-14 1900 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad MSETCL WRTS-I

N

100 400 Bus 1 at Asoj 21-Feb-14 000 21-Feb-14 1800 Daily For checking bus stability testing of Piran 1 amp 2 bays (for charging of new line) GETCO WRTS-II N

101 400 Bus-1 at Wardha 22-Feb-14 800 22-Feb-14 1800 Daily Jumper spacers connection at Wardha WRTS-I WRTS-I N102 400 Bus-1 at Raigarh 22-Feb-14 800 22-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I Deferred by site N103 765 Bus - II at Indore 22-Feb-14 90000 AM 23-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Not availed NLDC consenN104 220 Kakrapar-Haldarwa2 22-Feb-14 1000 Hrs 22-Feb-14 1600 Hrs Daily AMP POWERG

RID WRTS-II N

105 400 Bus 2 at Asoj 22-Feb-14 000 22-Feb-14 1800 Daily For checking bus stability testing of Piran 1 amp 2 bays (for charging of new line) GETCO WRTS-II N N

106400 400 kv DC Bhopal -

Bina Line (Ckt I amp II)(Tower no 34 amp35)

23-Feb-14 800 24-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line MPPTCLBDTCL

N

107 765kV SASAN Main Bus-1BBay 10 - Jack Bus 24-Feb-14 800 Hrs 2-Mar-14 1900 Hrs Continuous Dia-4

(Bay-10) - SCCOCC Test of Unit 4 GTSasan Sasan N

108 765 Bus - I at Indore 24-Feb-14 90000 AM 25-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID N

109 765 765 KV Bina-Indore Line 24-Feb-14 0900 Hrs 24-Feb-14 1800 Hrs Daily

For taking spare reactor unit in service amp checking the scheme for spare reactor with 765 KV Bina-Indore Line Reactor at Bina

POWERGRID WRTS-II

Deferred by site N

110 400 Kasor - GPEC 24-Feb-14 800 25-Feb-14 1800 Daily PMM Work GETCO GETCO N111 40022033 315 MVA ICT2 at Kheda 24-Feb-14 900 10-Mar-14 1800 cont modification work in SS lay out CSPTCL CSPTCL N112 400 315 MVA ICT2 at

Gwalior 25-Feb-14 90000 AM 25-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID N

113 400KV V-Satna-4 Line Shunt Reactor 25-Feb-14 1000 25-Feb-14 2000 Daily

Basis AMP NTPC NTPC N

114 400 Raipur-Wardha 1 26-Feb-14 800 26-Feb-14 2000 Daily Balance construction works at Wardha end WRTS-I WRTS-IReady Ori26214 Deferred by site

N

115 400 Bus -I at Indore 26-Feb-14 90000 AM 26-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Deferred by site N116 400 315 MVA ICT3 at

Gwalior 26-Feb-14 90000 AM 26-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID N

117 400 400 kV DC Damoh - Bhopal Line

26-Feb-14 800 26-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL N

118 400 Chorania-Kasor 26-Feb-14 800 26-Feb-14 1800 Daily PMM work GETCO GETCO N119 400 Koradi-Satpura sc 26-Feb-14 800 26-Feb-14 1600 Daily 765KV Tiroda Koradi Transmission LineII crossing

worksPOWERGRID MEGPTCL Cancelled by MEGPTL N

120 400 400 kV DC Damoh - Bhopal Line

26-Feb-14 800 26-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL N

121 400 Raipur-Wardha 2 27-Feb-14 800 27-Feb-14 2000 Daily Balance construction works at Wardha end WRTS-I WRTS-I Deferred by site N122 400 Vindhyachal-Satna2 27-Feb-14 1000 27-Feb-14 1800 Daily Commissioning of CSD Relay in ABB make main

CB at Satna WRTS-II POWERGRID Deferred by site N

123 400 Bus -II at Indore 27-Feb-14 90000 AM 27-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Ready N124 400 315 MVA ICT1 at

Rajgarh 27-Feb-14 90000 AM 27-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID Ready N

125 400400 KV SC Kosamba - Asoj line(730-740)

27-Feb-14 700 27-Feb-14 1800 cont Crossing of Dhule - Vadodara 765 kv SC Line GETCOBDTCL

N

126 400 Indore (MP) -Indore (PG)-DC 27-Feb-14 700 28-Feb-14 1600 Cont Stringing of 765kV Indore - Vadodara line POWERG

RID WRTS-II Deferred by site N

Anaulagnak 33(A)

maaca- 2014 AaOr Ap`Ola 2014 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR MARCH 2014 AND APRIL 2014

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)maaca- 2014 Ap`Ola 2014 maaca- 2014 Ap`Ola 2014

MARCH 2014 APRIL 2014 MARCH 2014 APRIL 2014

1 gaujarat

saIimat 11700 12100 7750 7800

AsaIimat 11740 12140 7760 7810

2 maQya p`doSa

saIimat 8340 9050 5338 5540

AsaIimat 8340 9050 5338 5540

3 CltaIsagaZ

saIimat 3200 3075 1929 1809

AsaIimat 3225 3105 1944 1827

4 maharaYT

saIimat 19000 19150 10200 10300

AsaIimat 19050 19200 10250 10350

5 gaaovaa

saIimat 425 410 300 295

AsaIimat 425 415 310 300

6 dmana dIva

saIimat 340 345 210 205

AsaIimat 345 350 225 210

7 DI ena eca

saIimat 635 640 445 425

AsaIimat 635 640 445 425

8 piScama xao~

saIimat 41961 43047 28500 27900

AsaIimat 42076 43173 29560 28840

Diversity factor of 10401

March 2014 and April 2014

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah frvarI 2014

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 1552 75

]k[- Ukai - 2 1719 75]k[- Ukai - 3 598 75]k[- Ukai - 4 1757 75]k[- Ukai (Total) 5627 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 024 2]k[- ela baI saI eca Ukai LBCH - 2 131 3]k[- ela baI saI eca Ukai LBCH (Total) 154 5 0008

3 kDanaa Kadana - 1 000 0 0005kDanaa Kadana - 2 246 62 0000kDanaa Kadana - 3 223 62kDanaa Kadana - 4 166 63 0000kDanaa Kadana (Total) 634 63 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 431 9 0020 6 kula jalaIya TOTAL(H) 6846 225 0401

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 2060 32 21822 TaoronT pavar ilaimaToD yauinaT DI 7979 125 69803 TaoronT pavar ilaimaToD yauinaT [- 075 122 07584 TaoronT pavar ilaimaToD yauinaT ef 8023 124 66915 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 018811 Qauvarna tapIya Dhuvaran - GT 2 000 0 041912 Qauvarna tapIya Dhuvaran - STG 023 1013 ]ka[- yauinaT 1 Ukai -1 000 0 005114 ]ka[- yauinaT 2 Ukai -2 000 0 010815 ]ka[- yauinaT 3 Ukai -3 3147 200 297216 ]ka[- yauinaT 4 Ukai -4 10588 202 1002617 ]ka[- yauinaT 5 Ukai -5 9496 210 884118 ]ka[- yauinaT 6 Ukai -6 23703 500 1844819 gaaMQaInagar 1 Gandhinagar - 1 000 0 008620 gaaMQaInagar 2 Gandhinagar - 2 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 000 0 029622 gaaMQaInagar 4 Gandhinagar - 4 000 0 036223 gaaMQaInagar 5 Gandhinagar - 5 11676 212 1148924 vaNakbaaorI 1 Wanakbori - 1 10648 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 11069 21026 vaaNakbaaOrI 3 Wanakbori - 3 1891 20627 vaaNakbaaOrI 4 Wanakbori - 4 5244 21228 vaaNakbaaOrI 5 Wanakbori - 5 5531 21029 vaaNakbaaOrI 6 Wanakbori - 6 000 030 vaaNakbaaOrI 7 Wanakbori - 7 8902 20931 ]trna Utran GT 1 000 0 019832 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 000 0 024635 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 000 0 0000

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Anaulagnak 41

ACTUAL GENERATION amp AVALABILITY FOR FEBRUARY 2014Actual vaastivak

Actual vaastivak

37 isaka Sikka - 1 3696 112 439838 isaka Sikka - 2 000 0 017639 kcC ilagnaa[-T Kutch Lignite - 1 4429 71 848640 kcC ilagnaa[-T Kutch Lignite - 2 4037 7241 kcC ilagnaa[-T Kutch Lignite - 3 3646 6742 kcC ilagnaa[-T Kutch Lignite - 4 2215 66 525343 saUrt ilagnaa[-T Surat Lignite - 1 6705 131 682544 saUrt ilagnaa[-T Surat Lignite - 2 7475 131 738745 saUrt ilagnaa[-T Surat Lignite - 3 6965 130 728846 saUrt ilagnaa[-T Surat Lignite - 4 6362 130 688647 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5454 107 848648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5649 11449 jaI Aa[- pI saI ela GIPCL GT - 1 1589 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1587 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1702 3552 jaI Aa[- pI saI ela GIPCL ST - 1 2902 5153 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 020556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 000 0 000060 jaI pI [- saI GPEC GT - 2 267 156 013261 jaI pI [- saI GPEC GT - 3 143 146 002762 jaI pI [- saI GPEC STG 131 17263 jaI esa [- jaI GSEG GT - 1 000 0 098964 jaI esa [- jaI GSEG GT - 2 1181 5065 jaI esa [- jaI GSEG STG 642 2366 Sugen (GT 1 + GT 2) 1767 308 602467 saIpIpI sao Aayaat Imp from CPP+MUNDRA 269359 6881

kula tapIya Total (T) 475652 8386 302021kula jalaIya+tapIya Total (H+T) 482498 8604 302422ivaMD [najaI- Wind Energy 52123kula jalaIya+tapIya+hvaa Total (H+T+Wind) 534621 9539ivainamaya Exchanges 155314 saIimat jaa- maaMga Restricted Energy Req 689935

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 6800 194

11 gaaMQaI saagar Gandhi Sagar 3366 117 008012 raNaa p`tap sagar RPSagar 5883 172 004013 javaahr sagar Jawahar Sagar 4350 99 0050

2 ponca Pench 3052 165 00903 baargaI Bargi 4581 91 00804 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 11764 315 02806 banasaagar Bansagar-2 (Deolondh) 000 07 banasaagar Bansagar-3 (Silpara) 1236 32 00708 banasaagar Bansagar-4 (Zinaha) 1320 22 00509 maoDIKoDa Medikheda 396 63

10 ibarisaMGapur Birsingpur 040 20 002011 Tavaa Tawa 000 012 rajaGaaT Rajghat 165 12 006013 Omkareshwar 10620 402 14 [Midra saagar Indira Sagar 23077 997 0849

kula jalaIya TOTAL(H) MPPGCL 59999 2365 1273Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 6049 98 232502 AmarkMTk II AMK II Unit -2 6080 983 AmarkMTk III AMK III Unit -5 12212 219 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 06505 satpura II Satpura-II Unit 6 10323 180 165906 satpura II Satpura-II Unit 7 5926 1807 satpura II Satpura-II Unit 8 10964 195 191608 satpura II Satpura-II Unit 9 8353 1709 satpura III Satpura-III Unit 10 000 0 2080

10 satpura III Satpura-III Unit 11 9447 182 1909011 esajaITIpIesa 1 SGTPS Unit - 1 9447 182 1909012 esajaITIpIesa 2 SGTPS Unit - 2 10572 18213 esajaITIpIesa 3 SGTPS Unit - 3 9037 192 2064014 esajaITIpIesa 4 SGTPS Unit - 4 10700 18015 esajaITIpIesa 5 SGTPS Unit - 5 28804 51216 SSTPS 6864 587 8930

kula tapIya Total (T) 133714 3002 115350kula jalaIya+tapIya Total (H+T) 193713 5735 116623Injection from WIND 000 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 193713 5735ivainamaya Exchanges 193660 saIimat jaa- maaMga Rest En Req 387372

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 850 120 00902 Gangrel 475 10 00503 Mini Micro KWB 039 7

kula jalaIya TOTAL(H) CSEB 1364 137 0150tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 47 127402 kaorbaa (pU) Korba (E) Unit-2 2764 483 kaorbaa (pU) Korba (E) Unit-3 2764 484 kaorbaa (pU) Korba (E) Unit-4 2784 465 kaorbaa (pU) Korba (E) Unit -5 3685 120 253306 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 247808 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 15410

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 15839 256 1197012 KORBA(EB) Extn - 2 15876 256 11770

kula tapIya Total (T) 119907 1880 10190013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 119907 1880kula jalaIya+tapIya Total (H+T) 121271 2017 102050ivainamaya Exchanges 40207 0saIimat jaa- maaMga Rest En Req 161478 2017

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 9590 585 25142 kaoyanaa III Koyna III 5920 3203 kaoyanaa IV Koyna IV 18012 11324 kaoyanaa DIpIeca Koyna DPH 1442 385 TaTa jalaIya TATA Hydro 10242 741 28836 vaOtrNaa Vaitarna 000 07 eladarI Eldari 528 168 BaTgar AaOr vaIr Bhatgar amp Vir 915 49 pOzana Paithan 175 59

10 itlaarI Tillari 1106 6511 BaIra Tola rosa Bhira Tail Race 374 4112 GaTGar Ghatghar 5297 29313 Anya CaoTo jalaIya Small Hydro (others) 6173 0

kula jalaIya TOTAL(H) 58910 1599 5397Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 7700 1954 naaisak 4 Nasik Unit -4 10772 1965 naaisak 5 Nasik Unit -5 11160 1976 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 28827 5058 Tambao 6 Trombay Unit -6 000 09 Tambao 8 Trombay Unit -8 000 0

10 Tambao 7A gaOsa Trombay -7A (Gas) 7882 135 250411 Tambao 7ba Trombay -7B (WHR) 4499 7212 kaoraDI 5 Koradi Unit -5 5003 16013 kaoraDI 6 Koradi Unit -6 3963 19014 kaoraDI 7 Koradi Unit -7 10015 19015 Bausaavala 2 Bhusawal Unit -2 8329 17016 Bausaavala 3 Bhusawal Unit -3 9248 18017 Bausaavala 4 Bhusawal Unit -4 22734 50518 Bausaavala 4 Bhusawal Unit -5 19742 41519 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 7451 18621 parlaI 5 Parli Unit -5 10626 18022 parlaI 6 Parli Unit -6 14013 25323 parlaI 7 Parli Unit -7 13728 26024 KaprKoDa 1 Khaperkheda Unit -1 11173 20025 KaprKoDa 2 Khaperkheda Unit -2 10373 19526 KaprKoDa 3 Khaperkheda Unit -3 10998 20127 KaprKoDa 4 Khaperkheda Unit -4 12019 20728 KaprKoDa 5 Khaperkheda Unit -5 28882 50730 parsa Paras-3 14447 25731 parsa Paras-4 13504 25932 ]rna Uran (Gas) 18284 33833 ]rna Uran (WHR) 000 148 586234 caMd`pur 1 Chandrapur Unit -1 9087 17735 caMd`pur 2 Chandrapur Unit -2 1816 19436 caMd`pur 3 Chandrapur Unit -3 11737 21037 caMd`pur 4 Chandrapur Unit - 4 11843 46038 caMd`pur 5 Chandrapur Unit -5 7759 45539 caMd`pur 6 Chandrapur Unit -6 24420 44240 caMd`pur 7 Chandrapur Unit -7 23258 041 DhaNaU 1 Dahanu Unit-1 16339 250 1427842 DhaNaU 2 Dahanu Unit-2 16196 250 1427843 CPP 193651 29840044 RGPPL Share 000 0

kula tapIya Total (T) 631479 15369 329920MAH Wind + Solar Generation 16922 0kula jalaIya +tapIya Total (H+T+Wind) 707311 17451 372239

TOTAivainamaya Exchanges 324731saIimat jaa- maaMga Rest En Req 1032042

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1871 26ivainamaya Exchanges 33252saIimat jaa- maaMga Rest En Req 35123 434

C (F) dmana AaOr dIva DAMAN amp DIU 18245 298ja (G) dadra nagar hvaolaI DNH 40600 655

kula DD ampDNH (T) 58845 952Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 9600 160 1399112 tara`pur 2 TAPS Unit -2 11069 16013 tara`pur 3 TAPS Unit -3 36144 545 6584014 tara`pur 4 TAPS Unit -4 36197 54715 kakrapr 1 KAPS Unit -1 15230 545 3134216 kakrapr 2 KAPS Unit -2 14662 547

kula ena pI saI NPC Total 122901 25042 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14008 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 13913 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14076 214 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 32894 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 33204 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 33190 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33176 514

kula kaorbaa KSTPS Total 174461 2498 10394427 ivanQa esaTIpIesa 1 VSTPS Unit-1 12762 21328 ivanQa esaTIpIesa 2 VSTPS Unit-2 12708 21529 ivanQa esaTIpIesa 3 VSTPS Unit-3 12854 212210 ivanQa esaTIpIesa 4 VSTPS Unit-4 12909 214211 ivanQa esaTIpIesa 5 VSTPS Unit-5 12174 215212 ivanQa esaTIpIesa 6 VSTPS Unit-6 12625 214213 ivanQa esaTIpIesa 7 VSTPS Unit-7 31487 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 31075 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 31592 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 31488 512217 ivanQa esaTIpIesa 11 VSTPS Unit-11 30948 512

kula ivanQayaacala VSTPS Total 232623 3750 15107 31 saIpt -1 -SIPAT-1 38822 66400 32 saIpt -2 -SIPAT-2 32404 66500 33 saIpt -3 -SIPAT-3 38930 66300 34 saIpt -4 -SIPAT-4 26383 51600 35 saIpt -5 SIPAT-5 26400 51400

kula saIpt -SIPAT TOTAL 162939 285000 838941 kvaasa gaOsa 1e Kawas GT-1A 792 10742 kvaasa gaOsa 1baI Kawas GT-1B 2623 10943 kvaasa esaTI 1saI Kawas ST-1C 1571 11444 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 4986 304 222951 gaMQaar gaOsa 1 Gandhar GT-1 000 052 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 000 054 gaMQaar esaTI 4 Gandhar ST-4 000 0

kula gaMQaar GGPS Total 000 0 000061 maaOda 1 Mauda -1 19614 514 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 19614 514 1422661 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 000 31 000071 esa esa pI SSP RBPH - 1 6753 19372 esa esa pI SSP RBPH - 2 5907 19273 esa esa pI SSP RBPH - 3 5577 19574 esa esa pI SSP RBPH - 4 5513 19475 esa esa pI SSP RBPH - 5 7237 19476 esa esa pI SSP RBPH - 6 3109 19277 esa esa pI SSP CHPH - 1 1817 4078 esa esa pI SSP CHPH - 2 491 3679 esa esa pI SSP CHPH - 3 000 0710 esa esa pI SSP CHPH - 4 1639 39711 esa esa pI SSP CHPH - 5 901 37

kula esa esa pI SSP Total 38944 1312 389481 kula poMca Pench Total 3052 165 009082 Jindal Injection 38956 083 Amarkantak Lanco 15478 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2372740

(J) ]plabQata Availability 2308426 naoT ivainamaya Net Exchanges -292048 ]plabQa jaa- Energy Availability 2016379

maah frvarI 2014 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR FEBRUARY 2014 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 11532 - - - 11532 020214 1100 4993

saIimat Restricted 11700

AsaIimat Unrestricted 11740 11532 0 28 0 11560 010214 1200 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8366 8366 17022014 0500 5007

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9346 - - - 9346 120214 0900 4986

saIimat Restricted 8340

AsaIimat Unrestricted 8340 9346 0 38 0 9384 120214 0900 4986

nyaUnatma pMjaIkRt maaMga Min Registered Demand 3204 3204 270214 0200

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3210 3210 070214 1900 4989

saIimat Restricted 3200

AsaIimat Unrestricted 3225 3210 233 12 0 3246 070214 1900 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1617 1617 230214 2300 5021

maharaYT MAHARASHTRApMjaIkRt Registered 18510 - - - 18510 050214 1100 4984

saIimat Restricted 19000

AsaIimat Unrestricted 19050 17980 1655 -13 0 19622 190214 1200 5002

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12005 12005 280214 0400 5037

gaaovaa GOApMjaIkRt Registered 425 434 - - 434 130214 1400 5006

AsaIimat Unrestricted 425 434 1 -1 - 434 130214 1400 5006

nyaUnatma pMjaIkRt maaMga Min Registered Demand 311 311 100214 0300

essaar ESSAR(ESIL)pMjaIkRt Registered 487 - - 487 240214 1700 5004

AsaIimat Unrestricted 487 0 0 - 487 240214 1700 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 268 - - 268 250214 1200 5003

AsaIimat Unrestricted 268 0 0 - 268 250214 1200 5003

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 644 - - 644 260214 1200 4999

AsaIimat Unrestricted 644 0 - 644 260214 1200 4999

nyaUnatma pMjaIkRt maaMga Min Registered Demand 508 508 280214

piScama xao~ WESTERN REGIONpMjaIkRt Registered 42253 - - - 42253 110214 1100 4994

saIimat Restricted 41961

AsaIimat Unrestricted 42076 42021 850 235 0 43106 120214 1100 4994

nyaUnatma pMjaIkRt maaMga Min Registered Demand 27524 27524 280214 0400 5040 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

piScama xaoi~ya Baar p`oYaNa kond` mauumba[-

णाली चालन-ISO-I

ANNEXURE-43

माह फरवर 2014 February2014

समातरवतीय चालन PARALLELRADIAL OPERATION

TOTAL OPERATING

HOURS 1 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-NR) 66972

2 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-SR) 67200

टाई लाईन TIE LINE 1 765कवी िसवनी स वधा-I 765kV Sonito Wardha 67200 2 765कवी िसवनी स वधा-II 765kV Seonito Wardha 65247 3 400 कवी िभलाई स कोराड 400kV Bhilai to Koradi 67200

4 400 कवी िभलाई स भिावती 400kV Bhilai to Bhadravati 67200

5 400 कवी रायपर स भिावती-I 400kV Raipur to Bhadravati-I 67200

6 400 कवी रायपर स भिावतीETHII 400kV Raipur to Bhadravati-II 67139

7 400 कवी रायपर स भिावतीETHIII 400kV Raipur to Bhadravati-III 67200

8 400 कवी सातपरा स कोराड 400kV Satpura to Koradi 67200

9 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 67004 10 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 65308 11 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 66259 12 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 67200 13 400 कवी को हापर स मापसा-I 400kV Kolhapur-Mapusa-I 38740

14 400 कवी को हापर स मापसा-II 400kV Kolhapur-Mapusa-II 49532

15 400 कवी वापी स बोईसर 400kV Vapi-Boisar 67200

16 400 कवी रायगढ़ स ःटरलाइट-I 400kV Raigarh to Sterlight-I 66258

17 400 कवी रायगढ़ स ःटरलाइट-II 400kV Raigarh to Sterlight -II 67200

18 400 कवी रायगढ़ स झरसगड़ा-I 400kV Raigarh to Jharsuguda-I 67200

19 400 कवी रायगढ़ स झरसगड़ा-II 400kV Raigarh to Jharsuguda-II 67200

20 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 65028

21 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 66132

22 400 कवी रायपर स वधाETHI 400kV Raipur to Wardha-I 66836

23 400 कवी रायपर स वधाETHII 400kV Raipur to Wardha-II 67200

24 220 कवी कोरबा पव स ब पादर-III 220kV K(E) to Budhipadar-III 63853

Anaulagnak 47Annex-47

maah frvarI 2014 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39514 64944

10287 39711

Levels in Mtrs str maITr maoM

]ka[- Ukai

64392

9914

25402

25994

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF FEBRUARY 2014

ivavarNa Particulars

TRIPPING DETAILS FOR THE MONTH OF FEBRUARY 2014

Sr No Brief Details of incident (Elements Generation Tripped) Owner Utility Date amp Time Load

Gen LossCategory

1 Multiple Tripping from 400 kV New Koyna MSETClMSEGCLRGPPL 05‐02‐2014 0950 Hrs ‐ GI‐2

2Bus Bar protection mal‐operation at 400 kV Soja in Gujarat resulting in multiple Tripping

GETCO 06‐02‐2014 1755 Hrs ‐ GI‐2

ANNEXURE ‐ 5

  • annexpdf
    • 21pdf
    • 231pdf
    • 232pdf
    • 24pdf
    • 25pdf
    • 31pdf
    • 32C1pdf
    • 32C2pdf
    • 33Apdf
    • 41pdf
    • 42pdf
    • 47pdf
    • 5pdf
Page 3: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014

3

457th OCCM AGENDA

32 A Outage Programme of Transmission Lineselements

Maintenance programme for transmission lines during the months of March 2014

amp April 2014 is given in Annex 32 A amp B The Sub-Committee may discuss and finalise the maintenance

programme proposed above B Line outages planned vs implemented

In 455th OCC meeting it was decided that WRLDC shall submit the list of

planned transmission element outages vs actual availed or emergency outages

during the February 2014 WRLDC had submitted the list of emergency

outages(Attached at Annexure-32-C1)

WRLDC submitted the status of planned transmission element outages vs

actual availed or emergency outages during the February 2014 (Attached at

Annexure-32-C2)

The Sub-Committee may discuss

33 Anticipated Power Supply Position for the months ndash March 2014 amp April 2014 Details of anticipated restricted amp un-restricted demands for the months of March 2014 amp April 2014 are given in Annex 33 (A) The details of anticipated regional deficit are given below (All figures in MW)

State Region

March 2014 April 2014 Anticipated Availability

Anticipated Peak Demand

Shortage AnticipatedAvailability

Anticipated Peak Demand

Shortage

GETCO 11625 11740 115 12005 12140 135 MPPTCL 8150 8340 190 8890 9050 160 CSEB 3150 3225 75 3015 3105 90 MSETCL 17100 19050 1950 18000 19200 1200 GOA 400 425 25 410 415 5 DD 330 345 15 340 350 10 DNH 620 635 15 620 640 20 WR 39860 42076 2216 40570 43173 2603 Constituents may furnish the anticipated station wise Availability amp Energy for the months of March 2014 amp April 2014 ITEM NO 4 OPERATIONAL STATISTICS FOR THE MONTH OF FEBRUARY 2014 The details of actual generation demand drawl of power from grid exchanges etc are given in the following Annexures

4

457th OCCM AGENDA

Annex 41 - Actual Generation and Requirement for February 2014 Annex 42 - Peak Demand Schedule Vs Actual for February 2014 Annex 43 - Integrated Operation of the System and Operation of Inter State Tie lines for February 2014 Annex 47 ndash Details of level of Major Reservoirs in Western Region for February 2014

The Sub-Committee may like to note ITEM NO 5 SYSTEM DISTURBANCES IN WESTERN REGION There was no major grid disturbance in the Western Region during the month The

tripping details and Voltage profiles have to be furnished by WRLDC to WRPC on first

working day of the month as same have to be reported to MOP via GM division of

CEA Accordingly WRLDC may kindly furnish the tripping details to WRPC for

necessary action The tripping details during the month received from WRLDC is

enclosed at Annexure-5 The Sub-Committee may like to notediscuss ITEM NO 6 Healthiness status of SERsDRs of equipment in the system

Constituents have furnished the status of healthiness of SERDRs in their systems on the dates below

Sl No Name of

constituents Date of Receipt

1 PGCILWRTS-I 06032014 2 PGCILWRTS-II 08032014 3 MPPTCL 11032014 4 NTPC 05032014 5 CSPTCL 05032014 6 GETCO 11032014 7 MSETCL 11032014

Constituents of WR are requested to ensure healthiness and sent information to this

office regularly as per the recommendation of enquiry committee of Grid disturbances on

25022007 and 28022007

The sub-Committee may like to note

ITEM NO 7 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS TRANSMISSION LINES AND GENERATING UNITS IN WR

71 Status of completion of ongoing Schemes for Commissioning of reactors As per the approval of 33rd standing committee of WR and subsequently discussion in 23rd WRPC meeting the following reactors have to be installed at the various occasions in WR Accordingly the information regarding the commissioning schedule is as below

5

457th OCCM AGENDA

S No

400 kV Substn

Size (MVAR)

Implementing agency

Expected commissioning date

1 Ranchodpura 125 MVAR GETCO Commd On 8th July 2013 2 Varsana 125 MVAR GETCO Commd On 25th July 2013 3 Rajkot 125 MVAR GETCO Commd On 5th August 2013 4 Amreli 125 MVAR GETCO Commd On 12072013 5 Jetpur 63 MVAR GETCO Commd on 11072013 6 Zerda 125 MVAR GETCO Commd in July 2013 7 Kosmba 80 MVAR GETCO Commissioned on 29112013 8 Limbdi (Chornia) 125 MVAR GETCO 25th July 2013 9 Jabalpur 125 MVAR PGCIL June 2014 10 Khandwa 125 MVAR PGCIL June 2014 11 Shujalpur 125 MVAR PGCIL June 2014 12 Bhatapara 125 MVAR PGCIL June 2014 13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014 16 Sholapur 125 MVAR MSETCL 2014 17 Kolhapur 125 MVAR MSETCL 2014 18 Akola 125 MVAR MSETCL 2014 19 India bull 80mvar BR MSETCL Commissioned 26112013 20 Nagda 125 MVAR MPPTCL September 2014 21 Bhopal 80 MVAR MPPTCL March 2014 22 Damoh 125 MVAR PGCIL August 2014 23 Bachau 125 MVAR PGCIL August 2014 24 Pirana 125 MVAR PGCIL August 2014 25 Itarsi 2X125

MVAR PGCIL August 2014

26 Seoni 125 MVAR PGCIL August 2014 27 Parli 125 MVAR PGCIL August 2014 28 Raipur 125 MVAR PGCIL August 2014 29 Gwalior 125 MVAR PGCIL August 2014 30 Nagda 50 MVAR MPPTCL 2014 31 ISP 125 MVAR NHDC 2015 32 Satpura 50 MVAR MPPTCL March-2015 33 Sasan 240 Reliance

Utilities are requested to ensure that reactors are installed and commissioned according to the schedule agreed as above Utilities may give update on the status of implementation

6

457th OCCM AGENDA

72 Status of completion of 765400 kV and above on going Transmission Schemes being executedimplemented by Transmission Agencies

The updated status on various ongoing transmission schemes for the year 2013-14 as per the current information available is as follows - S No

Name of the Line Target Completion Date

Remarks

POWERGRID 1 400 kV Vapi(PG)-Navsari Commissioned on

16032013 2 400 kV Navsari - Navi Mumbai DC

Line Feb- 2014 ROW problem

3 765kV SC Satna-Gwalior line (Ckt-I) January - 2014 4 765kV SC Satna-Gwalior line

(359Km + 60Km DC Portion) Ckt-II Feb- 2014

5 765 kV Sasan-Satna-II Commissioned on 010613

GUJARAT 1 400 kV DC Kosamba-Chorania line

(Package I)(From Chorania SS to AP-54)

March -2014

2 400 kV DC Kosamba-Chorania line (Package II)(From Kosamba SS to AP-54)

March -2014

3 400 kV DC Mundra-Zerda line No 1 August -2014 4 400 kV DC Mundra-Zerda line No 2 April -2014 5 400 kV DC Vadinar-Amreli line April -2014 6 400kV Mundra-Hadala LILO to

Halvad April -2014

7 400 kV DC Amreli-Kasor line(Part-1) April -2014 8 315 MVA IInd ICT at Kosamba SS Charged on 15112013 MADHYA PRADESH 1 Malwa-TPH-Pithampur 400KV

DCDS Line 2324102013

2 Malwa TPH-Chhegaon 400 KV DCDS Line

Ckt ndashI on 22032013 Ckt-II on 11072013

3 Chhegaon-Julwania 400 KV DCDS Line

March - 2014

4 Pithampur- Indore 400KV DCDS Line March- 2014

5 Satpura TPH-Ashta 400KV DCDS Line

December ndash 2014

CSPTCL 1 400 kV Korba (W)-Khedamara

DCDS Ckt II LILOed at Marwa August 2013 Test charged on

20082013

2 400 kV Khedamara- Raita DCDS February -2014

3 400kV DCDS Marwa-Raipur(Raita) January - Test charge from Raipur

7

457th OCCM AGENDA

2014 end in August 2013 4 LILOof 400kV K(W)-Khedamara line

at Marwa (one ckt) April -2014

MAHARASHTRA(STU)

1 400KV Chandrapur- II- Warora DC Dec - 2013 end

2 400KV DC line from Koradi-II to Wardha SS(PG) DC

March - 2014

3 400 kV Chandrapur-Warora-II Commissioned on 16012014

4 400 kV Bableshwar-Sinner Ckt-II Commissioned on 27122013

5 400 kV Chandrapur-Parli-II LILO at Chandrapur-II SS

Commissioned on 16012014

MAHARASHTRA (IPTC route) by WR Transmission (Mah) Pvt Ltd

1 400 kV Parli(PG)-Pune DC Commissioned Ckt - 1 on 08112013 Commissioned Ckt - 2 on 10112013

2 400 kV Pune (PG)-Aurangabad (MSETCL) DC

November-13 Commissioned Ckt - 1 on 05122013 Commissioned Ckt - 2 on 04122013

3 LILO Lonikhand ndashKalwa at Pune(PG) Lonikhand-Pune charged on 2130 on 09072013 and Kalwa ndashPune at 2145 on 09072013

GUJARAT (IPTC route) by WR Transmission (Guj) Pvt Ltd

1 400 kV Rajgarh(PG)-Karamsad (GETCO) DC

May -2014

The Sub-Committee may notediscuss

73 Commissioning of new Generating units in Western Region and the capacity expected to be commissioned during the current year 2013-14

The status regarding Generating units commissioned expected to be commissioned during the current year 2013-14 according the available information is as below

Name of the Power Projects Unit No Capacity (MW)

Date of Commissioning Schedule Date

GUJARAT Ukai 6 500 COD on 08062013 Pipavav CCPP- GPCL amp GSPC joint venture Block-1 350

March- 2014 Made in synchronized on

8

457th OCCM AGENDA

10102013 Bhavnagar Lignite TPP-JV I 250 August 2014 II 250 August 2014 UNO SUGEN 1 3825 COD on 04042013 CHHATTISGARH Marwa TPS I 500 25122013 Korba (w) Ext-5 500 COD on 05092013 KSK Mahanadi 3 600 COD on 14082013

VEDANTA VIDYUT 1 135 Synchronized on 11082013

MAHARASHTRA

INDIABULLS (Amaravati) 1 270 Synchronized on 03062013

INDIABULLS (Amaravati) 2 270 January-2014 INDIABULLS (Sinnar) 1 270 March-2014 VIPL(Butibori) 1 300 COD on 05042013

VIPL (Butibori) 2 300

First synchronized on 02012013 Full load on 19032013

GMR EMCO 2 300 COD on 27082013 Dhariwal 1 300 Synd On 2913 Bhusawal 5 500400 COD on 03012014 MADHYA PRADESH

SINGAJI TPP 1 600

Synchronized on 31082013 Coal fired on 30092013

2 600 June-2014 Ms Jhabua Power Seoni 1 300 JANUARY ndash 2014 MB Power Anuppur 1 300 JANUARY ndash 2014 Satpura 11 250 Synchronized on 02102013 SATPURA 10 250 COD on 18082013 CENTRAL SECTOR Vindhyachal TPP IV 12 500 Feb-14 MAUDA 2 500 Feb-14

The WR utilities may intimate the current status on above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS (A) FOLLOW-UP ITEM NO 81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the Third quarter

(October 2013 to December 2013) for the year 2013-14

The Sub-Committee members may like to note and furnish details in respect of above

9

457th OCCM AGENDA

ITEM NO 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR

Status of physical amp cyber security in Power Sector for the Third quarter (October

2013 to December 2013) have not been received from some of the constituents

The Sub-Committee may like to note and furnish details in respect of above ITEM NO 83 ADMS IMPLEMENTATION STEP BY GETCO A pilot project in respect of ADMS have been successfully implemented by GETCO in

11 kV Sadhi feeder (MGVCL ) on 19022014

GETCO may like to presentation on the same ITEMS FROM WRLDC ITEM NO 91 PERFORMANCE OF WR CONSTITUENTS POST THE IMPLEMENTATION OF DEVIATION SETTLEMENT MECHANISM ON 17022014 The IEGC second amendment as well as the Deviation Settlement Mechanism is in

force wef 17022014 The performance of WR constituents during first 10 days ie

from 17th to 28th Feb 2014 comprising of 960 time blocks is illustrated below Members

may like to analyze and devise suitable measures to ensure compliance to the above

CERC regulations

10

457th OCCM AGENDA

Since the decisions in real-time are based on the SCADA data it is now important to

monitor and ensure correctness of drawal injection as seen in SCADA The chart

below indicates the difference between the drawal of constituents as seen in SCADA

and as recorded in SEM for the period of 01st Feb 2014 to 16th February 2014 It may

be seen that the significant difference between SCADA and SEM needs to be

addressed by ensuring healthiness of telemetry and periodic validation by the SCADA

team at the respective SLDCs and WRLDC

The sub committee may like to discuss the same

11

457th OCCM AGENDA

ITEM NO 92 UNDER DRAWAL BY MAHARASHTRA AND INSECURE OPERATION IN THE GRID ON 27-28 FEB 2014

During late night of 27th Feb and early morning hours of 28th Feb-14 the grid

frequency remained above 502 Hz continuously for five hours from 2252 hrs of 27-

02-2014 to 0407 hrs of 28-02-2014 The situation was caused due to demand

reduction across the WR and NR on account of widespread rains and persistent under

drawal by Maharashtra during the above period as illustrated in figure-1 below

5067

49

492

494

496

498

50

502

504

506

508

‐1000

‐850

‐700

‐550

‐400

‐250

‐100

50

200

350

500

650

800

2100

2115

2130

2145

2200

2215

2230

2245

2300

2315

2330

2345

000

015

030

045

100

115

130

145

200

215

230

245

300

315

330

345

400

415

430

445

500

515

530

545

600

615

630

645

700

716

731

746

Maharashtra Deviation from schedule vis‐a‐vis grid frequency2100 hrs of 27‐02‐2014 to 0800 hrs of 28‐02‐2014

MSEBUI FREQ

Deviation from Schedule

Frequency

MW Hz

Several messages were sent from WRLDC control room to SLDC Kalwa directing them to control their under drawal from the grid Details of these messages is tabulated below

Sl No Message sent to Ref No Message date and time

1 SLDC Maharashtra 56079 27022014 2210 hrs

2 SLDC Maharashtra 3070 27022014 2230 hrs

3 SLDC Maharashtra 3078 28022014 0125 hrs

4 SLDC Maharashtra 3079 28022014 0150 hrs

Despite the above messages the response from SLDC Kalwa was inadequate in

controlling the under drawal of Maharashtra Consequently the frequency touched

5069 Hz at 0211 hrs of 28-Feb 2014 the voltage across the grid increased sharply

and there was over injection from WR to other regions Subsequently as a

contingency measure the drawal schedule of Maharashtra was reduced by 600 MW

by suo motu revision in the requisition of Maharashtra in Korba Vindhyachal Sipat

12

457th OCCM AGENDA

and Vidhyachal STPS wef 0230 hrs to 0500 hrs of 28022014 This was later

extended up to 0700 hrs of 28022014 It was a near miss situation that could have

been avoided by adequate planning and commensurate actions in real-time It is

requested that the matter may be taken up at the highest level in MSETCL and a

separate meeting may be convened on the above subject to avoid reoccurrence of

such event in future

The sub committee may like to discuss the same

ITEM NO 93 NON AVAILABILITY OF REAL-TIME TELEMETRY FROM LARGE NUMBER OF STATIONS IN MAHARASHTRA There are 224 nodes in Maharashtra that comprising of 32 Generating stations and

192 substations Out of these 224 nodes 47 locations are yet to be integrated in the

System Out of the balance 177 the data from nearly 50 nodes are not coming since

last 6 months Thus in totality data is not available from more than 135 out of 224

stations ie 60 which is highly alarming The extremely poor status of telemetry in

the state of Maharashtra has become a security threat Maharashtra load is touching

17500 MW and there are large number of construction related outages that have to be

facilitated Further with the formation of the synchronous All India grid there is a need

for close monitoring of system parameters such as the line flows voltage and grid

frequency Inadequate telemetry is resulting in severe constraints in real time

operation as well as outage coordination There have been several instances of line

tripping on high voltage and SPS operation due to sudden increase in line flows

during hour boundary or during facilitating planned outage These events could be

minimized with better supervision if the telemetry is available

The telemetry issue in Maharashtra has been discussed in the various WRPC forums

wherein it was informed by MSETCL that the problem is due to failure of Ms Tulip

who was the service provider for the communication network During the month of

August 2013 representative from MSETCL had assured that a new contract was being

awarded and the situation would improve within one month The extracts from minutes

of 451st OCC is quoted below

QUOTE

13

457th OCCM AGENDA

ldquoMSETCL stated that they were working to resolve the issue and assured that there

would be an improvement in availability of Telemetry from Maharashtra stations within

one Monthrdquo

UNQUOTE

Representative of MSETCL may apprise the OCC regarding present status and the

likely schedule for resolution of the issue

The sub committee may like to discuss the same

ITEM NO 94 STATUS OF LINE AND BUS REACTORS AT 765 KV SASAN

The line reactor of 765 kV Sasan-Satna ckt-2 as well as the Bus reactors of 765 kV Sasan bus are yet to be commissioned at Sasan end In the absence of these reactors high voltage is experienced at Sasan and nearby stations Often one circuit of 765 kV Sasan-Satna is required to be opened for voltage regulation Consequently the reliability of evacuation of generation from two units of Sasan is affected During 456th OCC meeting the revised schedule of the above elements as informed by Ms Reliance was as under

Schedule in formed in meetings 451st OCC 455th OCC 454th OCC 1 Line reactor of 765

kV Sasan-Satna ckt-2

By Dec 2013 By April 2014 By May 2014

2 765 kV Bus-1 Reactor

Jan 2014 By Mar 2014 By June 2014

3 765 kV Bus-2 Reactor

Jan 2014 By Mar 2014 By June 2014

It was decided in 456th OCC meeting that one representative from MPPTCL would visit the SASAN site to check readiness of Line and Bus reactors Representative from MPPTCL and Sasan may apprise the OCC-members on the progress of commissioning of reactors at 765 kV Sasan OCC members may also be apprised of the tap position of the generator transformer 2 and 3

The sub committee may like to discuss the same

14

457th OCCM AGENDA

ITEM NO 95 CHARGING OF NEW TRANSMISSION ASSET IN THE GRID In order to have better coordination of the transmission utilities with RLDCNLDC during charging synchronization of new elements into the grid a communication has been received from NLDC (ref POSOSCONLDCSystem OperationOutage Planning1239) on 10022014 It has been proposed that

a Owner of the asset shall submit the request for expected chargingcommissioning of new element for the calendar month latest by 5th day of the month to the respective RLDC amp NLDC along with status of activities mentioned in the check-list

b RLDC shall study the impact of the new element commissioning and based on its assessment of the preparedness of the utility may recommend to NLDC who in turn would examine the issue independently considering pan India grid scenario

c After the above the owner of the new asset shall give its readiness to charge the new element atleast three days in advance with current status of activities mentioned in the check list

Check list is as under 1 List of elements to be charged along with the details of approval of the

transmission scheme from the Standing CommitteeCTUSTU 2 Single Line Diagram of the concerned substations along with status of

completion of each diabusbreakers 3 Availability of real-time data and communication to the designated

SLDCRLDC 4 Installation of Special Energy Meter complying with CEArsquos Regulations

(Serial number Meter number CTPT ratio to be indicated) 5 Charging Instructions by CTUSTU 6 Schedule and sequence of charging of elements 7 Availability of line bus reactors as per planning In case the transmission

system is planned to be charged without the planned line reactor requisite authorization from CTUSTU by studies

8 Connection Agreement (along with all annexures) with CTU or STU 9 Copy of Long term Access (LTA) or MTOA granted by CTU or STU as the

case may be 10 Copy of Power Purchase Agreement (PPA) 11 A signed undertaking with name and designation of the officer clarly

indicating the following a All Disturbance recorders (DR) and Event Loggers (ELs) with time

synchronization are commissioned b All protective systems have been commissioned c All statutory clearances have been obtained

12 Output of EL and DR after charging

15

457th OCCM AGENDA

Each document mentioned in check list from Sl No 1 to 10 must be attached for sake of completeness and emailed as a consolidated document to the nodal RLDC well before the new element charging date The sub-committee may like to discuss ITEM NO 96 OPENING FEEDERS WITHOUT PRIOR INTIMATION TO WRLDC

It was gathered based on the observation from WRLDC SCADA data and subsequent

discussion with MPPTCL that 220 kV Bina (MP)-Gwalior(MP) DC were taken under

shut down for LILO works at Datia at 0910hrs on 23022014 for 4 days The outage

of these lines was neither discussed in OCC and neither was there any intimation to

WRLDC before availing the outage These lines are included in the important grid

elements list of Western region and prior concurrence of WRLDC is required for

switching these lines Further these lines form the parallel path to 765 kV Bina-Gwalior

DC and with the shutdown of these lines the network upstream of WR-NR inter

regional corridor was depleted

The sub-committee may like to discuss ITEM NO 97 TRIPPING OF 765 KV LINES ON OVER VOLTAGE Recently several tripping of 765 kV lines have been reported on over voltage These are indicated below

1) 765 kV Bina-Gwalior I at 2358 hrs of 16022014 2) 765 kV Bina-Gwalior I at 2011 hrs of 14022014 3) 765 kV Satna-Gwalior at 1300 hrs of 06022014 4) 765 kV Sasan-Satna II at 0013 hrs of 18012014 5) 765 kV Jabalpur-Bina I at 2350 hrs of 10012014 6) 765 kV Jabalpur-Bina II at 0405 hrs of 06012014

It is understood that the adopted Stage-I OV setting for the above lines vary from 108 (ie 826 kV) to 110 (841 kV) As per SCADA data the bus voltage at any of the substations mentioned above had not reached 826 kV during the above incidents

POWERGRID may examine the above tripping in detail and apprise the OCC regarding the above In case of issues related with protective relays field equipment are detected these may be addressed at the earliest The sub-committee may like to discuss

16

457th OCCM AGENDA

ITEM NO 98 RGMO FGMO OF MANDATED GENERATORS IN WESTERN REGION

As per the latest information available at WRLDC there are 251 number of units with a total capacity of 57517 MW in Western Region that are mandated to operate in Restricted Free Governor Mode The need for compliance to the IEGC regulations wrt RGMOFGMO was emphasized in the 455th and 456th OCC meeting as well as during the 25th TCCWRPC meeting Subsequently it was communicated by email to all entities in WR to provide the latest status of RGMOFGMO implementation We have received updated status from MPPTCL LANCO CGPL DB Power and JPL Tamnar in Feb 2014 The latest state wise RGMOFGMO summary is given below

Name of Entity No of mandated units

RGMO FGMO available at

RGMOFGMO Not available at

Maharashtra 90 35 55 Madhya Pradesh 58 36 22 Gujarat 35 19 16 Chhattisgarh 10 3 7 CGPL 5 5 0 NCA 11 6 5 SASAN 2 1 1 NTPC 24 10 14 ESSAR_Mahan 1 1 0 NSPCL 2 2 0 KSK 1 1 0 KWPCL 1 0 1 DB POWER 1 1 0 JPL 5 4 1 LANCO 2 2 0 IEPL 1 0 1 EMCO 2 0 2 WR_Total 251 126 125

WRLDC vide its letter ref WRLDCRGMO-FGMO1-2014 dated 23012014 has issued directions under Section 29 of the Electricity Act to ensure compliance of IEGC regulations 52 (f) (g) (h) and (i) All utilities are requested to furnish the status of compliance in respect of generating units under their jurisdiction The sub-committee may like to discuss ITEM NO 99 STATUS OF TELEMETRY IN WESTERN REGION

The status of telemetry related issues in respect of WR constituents is as under

a) Chhattisgarh Data (except MW) from 500 MW Korba West extension generating station is not available Status points from 400 kV Raita pending

17

457th OCCM AGENDA

b) Madhya Pradesh Telemetry of following bus reactors is not available at WRLDC

S No

Station Name Bus Reactor

Nunber x Capacity

Total MVAR

Rated voltage

Status of Telemetry at

WRLDC1 Nagda 250 100 420 Not available2 Indore 225 50 33 Not available3 Bhopal 225 50 33 Not available4 Birsinghpur 150 50 420 Not available

c) Gujarat Data is not-availableintermittent from following stations in Gujarat

a 220 kV Nano of Tatamdash(not available) b Kansari 400 kV ss and Navsari 220 kVhellipIntermittent (PLCC Problem)

d) Goa Due to non-availability of SCADA data from Goa the difference between drawal as seen in SCADA and as recorded in SEM is as high as 572 during the period 1st Feb to 16th Feb 2014 Data from the following stations in Goa is not available at WRLDC S No Station Status

1 Amona 220 kV Not available 2 Cuncolin 220 kV Not available 3 Kadamba 110 kV Intermittent 4 Tivim 220 kV Intermittent 5 Ponda 220 kV Intermittent 6 Xeldam-220 kV Intermittent 7 Verna-110 kV Intermittent

e) Daman amp Diu

Due to non-availability of SCADA data from Daman amp Diu the difference between drawal as seen in SCADA and as recorded in SEM is as high as 571 during the period 1st Feb to 16th Feb 2014 Data from The error is mainly due to non-availability of data from 220 kV Magarwada

f) DNH Telemetry from 220 kV Kharadpara and Khadoli station is not available

g) POWERGRID The data from the following stations is not available at WRLDC

1) 765 kV Tamnar (Communication problem GPRS link is not stable)

18

457th OCCM AGENDA

Telemetry from following stations is Intermittent at WRLDC 1) 765 kV Durg (PLCC frequent problems)

2) 765 kV Kotra (communication intermittency)

3) 765 kV Gwalior (PLCC link established but still there is some

issue(Delay) in data updation at WRLDC Rectification work under

progress by Site Engineer

4) 765 kV Solapur - Redundant link established through Reliance but

the gateway connected to above link is not configured for 765 KV

data Hence when BSNL link is down 765 KV data is not updating at

WRLDC

The sub-committee may like to discuss

ITEM NO 910 COMPARISON OF DRAWAL AS SEEN IN SCADA VS SEM The IEGC second amendment and the Deviation Settlement Mechanism is in force since the 17022014 The IEGC stipulates maintaining injection drawal within the limits prescribed in the Deviation Settlement Mechanism The sub-committee may like to discuss ITEM NO 911 MOCK BLACK START EXERCISE

As per sec 58(b) of IEGC the usersSTUs etc need to conduct Black start mock

exercises in their respective systems once in every six month under intimation to

RLDC Also the all the black start Diesel Generator (DG) sets are [as per sec 58(b)

of IEGC] required to be tested weekly and the test report needs to be sent to RLDC

on quarterly basis

The following table summarizes the status of mock exercises in respect of black start

facilities in Western Region

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

GUJARAT

1 Ukai (H) 4 x 75 Hydro Diesel 500 kVA 221213 Y

2 Mini Hydro 2 x 25 Hydro Diesel 50 KW N

3 Kadana 4 x 60 Hydro Diesel 500 KVA 2413 Y (2413)

19

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

4

Dhuvaran

1 x 107 (68+39) + 1 x 112 (72+40)

Gas

Details to be furnished by Gujarat

Details to be furnished by Gujarat

N

5 GIPCL-I 3 x 32 + 1 x49

Gas Steam Diesel 141 KW

070912 Y

6 GIPCL-II 1x104+1x56 Gas Steam Diesel 500 kVA N

7

Torrent Power Stn C Stn- DEFCCPP

StnC2x30 StnD120 StnEF(110MW each)CCPP100MW

Thermal (Units-CDEF) Gas(CCPP)

Stn-C islands Diesel

StnC15kVA StnDE F and CCPP(500 kVA each)

281112

Y

8 GPEC 3x138+1x241 Thermal Natural Gas 3000 kVA N

9 Sugen 3x3825 MW Gas Diesel 2x6MVA N

Madhya Pradesh

10 Gandhisagar 5 x 23 Hydro DG set 100 kVA N

11 Birsinghpur 1 x 20 Hydro Battery 220 Volt

Battery N

12 Pench 2 x 80 Hydro DG set 250 kVA 121012 Y

13 Bargi 2 x 45 Hydro DG set 250 kVA 100212 Y

14 Bansagar Stage-I 3 x 105 Hydro DG set 250 kVA N

15 Indira Sagar 8x125 Hydro DG set 2x1000

KVA 22511 Y

Chhattisgarh 16

Hasdeo Bango 3 x 40 Hydro DG Set 250 kVA 250812 N

17

Korba(E)-phse-I

Power plant retired but Black start DG set available and on- load trial is reported to be carried out regularly

DG Set 1500 kW(33kV)

N

Maharashtra

18

Koyna I amp II

4 x 65 4 x 75 Hydro

House generator

2 MVA 231013 N

19 KDPH 2 x20 Hydro DG set 310 KW N

20 Eldari 3 x 75 Hydro DG set 6 KW N

21

Uran (Gas)

4 x 60 (GT) + 4x108 (GT)+ 2x120 WHR

Gas DG set

4 MW PH1412kVA PH2450kVA WH520kVA

161012

N

20

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

22 RGPPL

Block 1 640MW+Block 2 66354MW+Block 3 66354MW

Gas

Gas Turbine (Frame-6)

35 MW (Under testing) Details to be provided by RGPPL

N

23 Ghatghar 2x125 Hydro DG set 1x1250

kVA 51012

N

24 Khopoli 3x24+2x12 Hydro

DC Governor amp bearing oil pumps

DC power (self start)

271013 (detailed report awaited)

N

25 Bhivpuri 3 x 24 +

2 x 15 +2x12 Hydro

DC Governor amp bearing

-do-

N

26 Bhira 6 x 25 Hydro

1 Noof 500 KVA house generator with water turbine

500 kVA

201013 (detailed

report awaited)

N

27

Bhira PSS 1 x 150 Hydro DG set 500 kVA

N

28 Trombay 1 x 120 Gas

Turbine DG Set 25 MW

N

1 x 60 Steam Turbine

NTPC

21

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

29 Kawas 4 x 106 2 x 116 Gas Diesel 2850 KW 151013

N

30 Gandhar 3 x 144 + 1x225 Gas Diesel 2975 KW

N

NCA

31 SSP(RBPH amp CHPH) 6x200+550 Hydro Diesel 2x1000kVA 080412

N

Accordingly the Black start capable stations may forward their tentative plan for conducting Black start exercises in compliance to sec 58(b) of IEGC bull As per the communication for MPPTCL the tentative plan of Black start in Madhya

Pradesh system is given under SL No Name of the Station Tentative Date Remarks 1 Pench March 2014 DG set at Pench amp are Bargi

under outage 2 ISP Apr-May 2014 - 3 TONS June 2014 Governor Problem being

attended 4 Birsinghpur June 2014 -do- 5 Medikheda June 2014 -do- 6 Rjghat June 2014 -do- Other utilities may also update their tentative plan for black start

The sub-committee may like to discuss

22

457th OCCM AGENDA

ITEM NO 912 HEALTHINESS OF MAIN CIRCUIT BREAKER OF 400 KV BIRSINGPUR-KATNI-I AT KATNI END The main CB of Birsingpur-Katni-I is under shut down since 2350 hrs of 14th February 2013 Representatives from MPPTCL may kindly apprise on the progress and expected date of restoration of the Main CB of 400 kV Birsingpur-Katni-I at Katni end The sub-committee may like to discuss

ITEM NO 913 TESTING OF SPS RELATED TO TRIPPING OF BINA-GWALIOR-AGRA AT CGPL VINDHYACHAL AND KORBA

As per the information received from NTPC and CGPL the SPS for the 765 kV Bina-

Gwalior-Agra has been installed and a mock drill has to be carried out for the same

The matter was discussed in the 456th OCC and it was decided that SPS may be

tested for reduction of say 50MW for each station instead of backing down of entire

500MWs POWERGRID WRTS-2 may confirm the testing schedule so that the

same could be coordinated in from WRLDC

The sub-committee may like to discuss

ITEM NO 914 SPS AT SIPAT WRLDC vide letter No WRLDCMO-I17192013 dt 21613 requested to take up this matter with the concerned for early implementation of the SPS Status of the SPS at NTPC Sipat is as under

1 449th OCC SPS was proposed by WRLDC It was decided to have a

separate meeting to finalize the scheme 2 450th OCC Member Secretary WRPC intimated that the matter will be

discussed in 119th PCM on 3rd amp 4th September 2013 at Tarapur 3 451st OCC It was intimated that the issue of SPS of Sipat was discussed in

119th PCM held on 3rd amp 4th September 2013 at TARAPUR The tentative scheme were formulated which needed finer tuning

4 452nd OCC Matter not discussed 5 453rd OCC NTPC representative intimated proposal sent to their corporate

office for engineering approval 6 454th OCC Approval from our corporate office is yet to be obtained 7 455th OCC Approval from our corporate office is yet to be obtained 8 456th OCC Approval from corporate office has been obtained and would be

forwarded to WRPC for approval The sub-committee may like to discuss

23

457th OCCM AGENDA

ITEM NO 915 SPS AT 4X300 MW BALCO IPP The SPS at 2010 MW Balco (4x675MW + 4x135 MW + 4x300 MW) was to be commissioned by Nov 2013 before commissioning of first unit of 4x300 MW Balco IPP For the new SPS scheme envisaged for the Balco CTU connection namely the Grid Islanding and Load Management Scheme (GILMS) Balco had reported to have placed an order with Ms SEL As discussed earlier the scheme suggested by WRLDC may be implemented before commissioning of first unit of 300 MW It was intimated during the 456th OCCM by the Balco representatives that the SPS shall be commissioned by March 2014

The sub-committee may like to discuss

ITEM NO 916 ACTIONS TAKEN FOR REVIVAL OF TRANSMISSION ELEMENTS UNDER LONG OUTAGE

As per the information available at WRLDC following elements are out for a

long period

Sl No Date of

outage

Reason

ISTSIPP

1 80 MVAR BR at

ESSAR(Mahan)

231213 Oil leakage

2 125 MVAR BR at JPL 120513 Hydrogen formation

3 50 MVAR LR of Indore-Asoj-II

at Indore

190613 R phase bushing burst

4 50 MVAR LR of Birsingpur-

Damoh at Damoh(PG)

13102014 Oil Leakage

5 765 kV Durg-Kotra-I 24022014 Sparking in Isolator

6 400 kV Raipur-Raigarh-IV 18012014 Voltage Regulation

MSETCL

1 400 kV RGPPL-NrsquoKoyna-I 22012014 Voltage Regulation

2 400 kV Sholapur-

Sholapur(PG)

26022014 Tower Collapse

MPPTCL

1 400 kV Birsingpur-Katni-I 28012014 Voltage Regulation

24

457th OCCM AGENDA

2 50 MVAR LR of Indore-Asoj-II

at Indore

6012014 DGA Violation

CSPTCL

1 400220 kV Bhilai-II 24022014 Maintenance

OCC may like to be apprised of the actions being taken for expediting revival of

the above elements

The sub-committee may like to discuss

ITEM NO 917 STATUS OF 220 KV KOLHAPUR-MUDSINGHI-CHIKODI- BELGAM LINE Consent for trial operation of 220 kV Kolhapur-Mudsinghi-Chikodi- Belgam line in radial mode for supply of Karnataka load from Maharashtra side was granted after discussion in the 455th OCC meeting WRLDC is in receipt of letter from SRLDC regarding concurrence for the above arrangement SLDC Kalwa may apprise the OCC regarding the present status The sub-committee may like to discuss

ITEM NO 918 CONTRIBUTION OF GENERATORS IN VOLTAGE CONTROL The contribution of generators in WR in voltage control was analyzed during 456th OCC meeting It was noted that following units were injecting reactive power even during high voltage

1 210 MW units of Khaparkheda Koradi and Chandrapur (Maharashtra) 2 210 MW units of Satpura and Birsinghpur (Madhya Pradesh) 3 210 MW unit 23 of Korba West (Chattisgarh) 4 200 MW unit 34 of Ukai (T) in (Gujarat)

Utilities were requested to check the setting of AVRGT tap and revert back with findings Members may apprise OCC regarding the status The sub-committee may like to discuss

ITEM NO 919 REAL-TIME MONITORING OF FEEDERS SUBSTATIONS THAT ARE COVERED UNDER THE AUFLS Telemetry of feeders substations covered under the AUFLS is desirable for real-time assessment of the anticipated relief that would be available from the AUFLS scheme at any given instant of time CERC has also directed all the constituents to for

25

457th OCCM AGENDA

mapping of these feeders in the SCDA of SLDCsRLDC Members may like to deliberate further The sub-committee may like to discuss

ITEM NO 920 LOAD FORECASTING As per the amended Indian Electricity Grid Code that is effective from 17th February 2013 the SLDCs SEB distribution licensees shall always restrict the net drawal of the State from the grid within the drawal schedule keeping the deviations from the schedule within the limits specified in the Deviation settlement mechanism regulations Therefore it is imperative that adequate attention may be paid towards load forecasting The matter was discussed in the 455th and 456th OCC as well as in the 25th TCCWRPC board meeting wherein it was decided to create a task force for exploring development of a software for load forecasting Members may like to deliberate further The sub-committee may like to discuss

ITEM NO 921 IMPLEMENTATION OF THE REVISED AUFLS IN GOA DD AND DNH It was decided during the 455th and 456th OCC meeting as well as during 25th WRPC meeting that Goa DD and DNH shall complete the implementation of the revised AUFLS in Goa DD and DNH at the earliest Representatives from the Goa DD and DNH may apprise the status of the progress The sub-committee may like to discuss

ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING As per meeting roaster circulated during 452nd OCC meeting the 458th OCC Meeting

will be hosted by Maharashtra and may be scheduled on 16th amp 17th April 2014

Maharashtra may confirm the same

Anaulagnak 21

maah frvarI 2014

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5051 Hz BETWEEN 0200 Hrs amp 0300 Hrs Hrs ON 28022014

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4970 Hz BETWEEN 1800 Hrs amp 1900 Hrs Hrs ON 28022014

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 5006 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5071 Hz AT 0210 Hrs ON 28022014

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4937 Hz AT 185000 Hrs ON 28022014

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS FEBRUARY 2014 JANUARY 2014 DECEMBER 2013

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 001 005

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 041 061 188 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 1069 5423 4864 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 4014 3569 3987

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 4876 946 956

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING FEBRUARY 2014

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

Voltage Profile during the month of Feb 2014

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 421 401 426 403 409 409 408 408 415 399 414 402 424 413 417 3922 420 402 423 404 409 409 408 408 417 402 418 404 425 415 420 3993 421 399 426 400 429 405 425 402 412 399 419 408 423 410 413 3964 422 402 426 404 430 406 428 401 414 400 414 404 424 412 414 3965 420 396 423 400 409 409 408 408 413 396 415 401 424 411 415 3996 420 396 426 400 428 405 426 402 415 398 416 402 423 411 412 4007 420 394 424 399 430 402 427 401 416 399 417 402 423 409 416 3968 418 393 422 397 409 409 408 408 416 399 416 402 422 409 418 3989 418 399 423 404 409 409 408 408 417 402 417 407 419 409 419 400

व तदाब परखा फरवर 2014 स नक Annex-23

इदौर इटारसी कराड धल असोज कासोर िभलाई जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

10 419 394 423 399 409 409 408 408 416 400 415 401 420 408 417 39511 421 393 426 397 429 405 427 401 44 399 419 404 423 407 414 39912 419 395 422 400 409 409 408 408 416 401 419 407 421 410 418 39813 420 396 424 401 409 409 408 408 417 400 416 401 421 409 418 40114 421 399 424 403 430 419 428 414 417 402 415 402 421 409 417 40015 423 397 424 399 428 414 429 412 417 398 406 406 421 407 418 40016 423 397 424 400 431 404 424 401 416 401 422 409 421 409 418 40317 421 402 424 403 432 414 420 404 416 402 412 405 422 410 417 39818 420 397 423 399 409 409 408 408 416 400 414 401 422 414 416 40019 420 396 423 399 409 409 408 408 411 398 418 405 421 413 413 39920 417 397 420 402 429 406 426 401 413 399 416 404 421 413 410 39821 419 399 422 402 430 407 421 401 415 401 418 406 422 411 414 39722 419 397 422 402 432 409 423 401 416 400 413 402 423 413 414 40023 420 396 423 397 430 412 428 404 414 404 415 402 427 414 416 40324 421 399 423 401 433 411 425 400 416 398 414 402 427 415 418 40225 421 399 423 401 433 411 425 400 416 398 414 402 427 415 418 40226 420 397 423 404 431 411 428 409 411 397 415 404 424 414 412 39327 418 398 426 403 409 409 408 408 417 399 418 402 429 415 419 39128 421 400 427 406 409 409 408 408 414 400 416 403 430 415 418 401

423 393 427 397 433 402 429 400 417 396 422 401 430 407 420 391

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 424 404 415 392 424 404 431 407 766 746 797 765 800 756 804 7692 422 406 417 398 426 404 434 407 769 754 798 774 801 769 804 7773 423 405 416 402 426 401 432 410 767 750 796 768 802 773 805 7764 426 407 417 402 423 403 430 408 768 751 797 779 801 776 808 7785 422 403 415 398 423 397 430 400 768 749 797 767 798 763 797 7586 425 404 417 401 423 399 432 404 768 750 797 767 802 773 807 7707 427 401 419 397 423 396 431 404 770 741 800 763 807 769 809 7698 422 403 416 403 424 395 427 399 756 737 788 756 801 765 802 7679 422 405 416 401 424 402 427 404 755 738 786 758 804 773 804 775

10 421 400 414 396 423 398 429 403 3 88 6 98 6 801 60

वािलयर बनाBina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

बना वािलयर नागदा खडवा िसपत िसविन

10 421 400 414 396 423 398 429 403 755 737 788 765 798 765 801 76011 423 397 414 390 426 396 433 399 758 736 794 750 800 752 802 75612 420 403 414 395 423 397 428 403 757 739 787 759 801 763 798 77013 424 405 417 400 427 397 430 402 759 740 794 760 804 773 803 77214 426 410 420 406 424 400 431 405 761 740 794 766 810 780 808 78215 425 404 417 399 426 399 430 401 762 738 794 962 808 768 806 76816 426 406 422 400 427 402 429 400 759 739 792 760 815 774 811 77617 429 407 417 398 427 404 427 406 761 742 792 762 805 765 810 77418 426 404 418 395 423 399 427 404 763 748 793 768 805 759 806 76819 423 409 415 394 422 399 428 403 759 737 795 765 804 758 806 76720 421 406 410 397 420 398 426 406 765 749 795 771 791 766 799 77421 423 407 424 399 423 403 428 405 759 744 792 760 795 761 800 76722 425 406 414 398 423 400 425 404 760 743 790 762 794 762 800 76823 425 402 412 392 424 400 428 405 758 740 790 759 796 755 799 76124 425 401 411 393 423 401 427 403 760 744 796 764 792 757 798 75625 421 408 412 395 423 401 427 403 756 742 793 766 795 764 795 76926 422 405 413 390 421 399 426 402 757 739 789 760 796 750 798 76127 426 407 416 393 421 401 431 403 760 741 795 762 803 755 804 76228 428 409 414 392 423 403 432 405 762 740 795 753 809 775 803 771

429 397 424 390 427 395 434 399 770 736 800 750 815 750 811 756

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Feb-14 0 0 0 0 0 0 0 02 02-Feb-14 0 0 0 0 0 0 0 03 03-Feb-14 0 0 0 0 0 0 0 04 04-Feb-14 0 0 0 0 0 0 0 05 05-Feb-14 0 0 0 0 0 0 0 06 06-Feb-14 0 0 0 0 0 0 0 07 07-Feb-14 0 0 0 0 0 0 0 08 08-Feb-14 0 0 0 0 0 0 0 09 09-Feb-14 0 0 0 0 0 0 0 0

10 10-Feb-14 0 0 0 0 0 0 0 011 11-Feb-14 0 0 0 0 0 0 0 012 12-Feb-14 0 0 0 0 0 0 0 013 13-Feb-14 0 0 0 0 0 0 0 014 14-Feb-14 0 0 0 0 0 0 0 015 15-Feb-14 0 0 0 0 0 0 016 16-Feb-14 0 0 NIL NIL NIL 017 17-Feb-14 0 0 0 0 0 0 0 018 18-Feb-14 0 0 0 0 0 0 0 019 19-Feb-14 0 0 0 0 0 0 0 020 20-Feb-14 0 0 0 0 0 0 0 021 21-Feb-14 0 0 0 0 0 0 0 022 22-Feb-14 0 0 0 0 0 0 0 023 23-Feb-14 0 0 0 0 0 0 0 024 24-Feb-14 0 0 0 0 0 0 0 025 25-Feb-14 1 17 0 0 0 0 0 026 26-Feb-14 0 0 0 0 0 0 0 027 27-Feb-14 0 0 0 0 0 0 0 028 28-Feb-14 0 0 0 0 0 0 0 0

Max 1 17 0 0 0 00 0 0Total 1 17 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month FEBRUARY 2014

Recommonded Load relief at 492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE-25

Power CutRestrictions in Western Region for the month of February-2014 k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply(DLF)

01022014 28022014 2344 2240 2332

21 Three-Phase Supply(Irrigation)

01022014 28022014 0956 0905 0946

21 Three-Phase Supply(Mixed)

01022014 28022014 2343 2227 2330

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01022014 28022014 2353 2337 2347 32 District Head Qtrs 01022014 28022014 2355 2340 2351 33 Tehsil Head Qtrs 01022014 28022014 2349 2309 2341

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid

1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 010214 to 280214

SaUnya Nil

0-1655MW

SaUnya Nil

0000

SaUnya Nil 2400

SaUnya Nil

95 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-

2 Power supply to Agricultural Sector ivavarNa Details sao From

idnaaMk Date tk To

idnaaMk Date p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs) 21 Three-Phase Supply 01022014 28022014 1000 0800 0900

22 Single-Phase Supply 01022014 28022014 1800 1800 1800 3 Anya jaanakarI Any other information

There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

11107 (Av) of 23 days 0000(Av) 0000 (Av)

1Rural 9031(Av) for 3486 Hrs 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0666 - -

0105 -

3 HT Industries 000 (Av) for 00 Hrs 000 Total Energy Cutday 0771 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01022014 to 280214 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 2322014 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का फरवर 2014का वःता रत यौरा

Details of forced unit outages during the month ofFeb2014

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 एःसार वा डनर

ESSAR VADINAR-I

गरा विनिल GSECL

660 2156 20-Jan-14 2018 10-Feb-14 Coal shortage

2 एःसार Essar-2

गरा विनिल GSECL

172 1212 22-Feb-13 अनपल ध Still out

अनपल ध Still out

Shortage of gas

3 एसएलपीपी SLPP-1

गरा विनिल GSECL

125 1445 23-Feb-14 1237 27-Feb-14 BTL

4 एकएलट पीएसAKLTPS-1

गरा विनिल GSECL

125 1147 26-Feb-14 अनपल ध Still out

अनपल ध Still out

DCS FAIL

5 एपीएल APL - 2

अदानी ADANI

330 056 3-Feb-14 अनपल ध Still out

अनपल ध Still out

Turbine vibration bearing probl em

6 एपीएल APL-5

अदानी ADANI

660 1732 15-Feb-14 456 27-Feb-14 Turbine vibration

7 एपीएल APL - 6

अदानी ADANI

660 2049 25-Feb-14 1947 3-Mar-14 Coal mill problem

8 टाटा TATA-6

मारा वउकिल MSPGCL

500 2352 19-Jul-13 अनपल ध Still out

अनपल ध Still out

For Economy SD

9 वीआईपीएल VIPL-I

मारा वउकिल MSPGCL

300 105 2-Oct-13 अनपल ध Still out

अनपल ध Still out

Turbine bearing vibration probl em

10 टाटा TATA-8

मारा वउकिल MSPGCL

250 2255 9-Jan-14 अनपल ध Still out

अनपल ध Still out

HT due to fire near turbine generator desk

11 चिपर Chandrapur-2

मारा वउकिल MSPGCL

210 1238 14-Jan-14 1310 23-Feb-14 ID fan problem

12 कोराड KORADI-6

मारा वउकिल MSPGCL

210 651 24-Jan-14 1456 14-Feb-14 Coal bunkering problem

13 डब यपीसीएल WPCL-1

मारा वउकिल MSPGCL

135 1245 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Furnace press high

14 डब यपीसीएल WPCL-3

मारा वउकिल MSPGCL

135 421 7-Feb-14 Ready Ready Less requisition

प म ऽय भार षण कि म बई णाली चालन-ISO-I

15 चिपर CPUR - 6

मारा वउकिल MSPGCL

500 1523 11-Feb-14 2033 13-Feb-14 BTL

16 नािसक NASIK-3

मारा वउकिल MSPGCL

250 300 11-Feb-14 100 19-Feb-14 UAT problem

17 कोराड KORADI-5

मारा वउकिल MSPGCL

210 153 14-Feb-14 अनपल ध Still out

अनपल ध Still out

ID fan problem

18 ितरोडा Tiroda-I

मारा वउकिल MSPGCL

660 2059 15-Feb-14 2054 26-Feb-14 Turbine bearing problem

19 ितरोडा Tiroda-2

मारा वउकिल MSPGCL

660 1125 17-Feb-14 152 22-Feb-14 BTL

20 कोराड KORADI-6

मारा वउकिल MSPGCL

210 2357 19-Feb-14 250 23-Feb-14 BTL

21 भसावल BHUSWAL-2

मारा वउकिल MSPGCL

210 301 22-Feb-14 1706 25-Feb-14 PA fan temp High

22 खापरखड़ा KHAPERKHEDA-3

मारा वउकिल MSPGCL

250 1448 22-Feb-14 130 25-Feb-14 BTL

23 जयगड Jaigad-4

मारा वउकिल MSPGCL

300 1930 22-Feb-14 1107 4-Mar-14 Low schedule

24 कोराड Koradi-5

मारा वउकिल MSPGCL

300 404 23-Feb-14 अनपल ध Still out

अनपल ध Still out

Electrical fault

25 पल PARLI-4

मारा वउकिल MSPGCL

210 1836 28-Jan-14 1956 3-Feb-14 Air preheater problem

26 भसावल BHUSAWAL-4

मारा वउकिल MSPGCL

250 1432 28-Feb-14 1802 3-Mar-14 Ash hopper problem

27 आरजीपीपीएल RGPPL-1B

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

28 आरजीपीपीएल RGPPL-2B

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

29 आरजीपीपीएल RGPPL 3A

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

30 आरजीपीपीएल RGPPL-1A

आरजीपीपीएल RGPPL

320 1500 18-Jan-14 अनपल ध Still out

अनपल ध Still out

SRV problem

31 आरजीपीपीएल RGPPL 3B

आरजीपीपीएल RGPPL

320 1230 8-Feb-14 Ready Ready Less requisition

32 िसगाजी SINGAJI - I

म वउकिल MPPGCL

600 422 12-Feb-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

33 सातपरा SATPURA-11

म वउकिल MPPGCL

250 1913 15-Feb-14 2149 19-Feb-14 Main stream temperature low

34 सातपरा SATPURA-11

म वउकिल MPPGCL

250 542 26-Feb-14 1642 2-Mar-14 BTL

35 एःसार महान Essar-Mahan-1

एःसार ESSAR

600 000 29-Jan-14 015 18-Feb-14 Less requisi tion

36 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

37 वदना Vandana-1

वदना Vandana

135 149 12-Jan-14 अनपल ध Still out

अनपल ध Still out

BTL

प म ऽय भार षण कि म बई णाली चालन-ISO-I

38 ससान Sasan-2

आरईएल REL

660 205 16-Feb-14 1650 23-Feb-14 Problem in ash handling

39 कावास Kawas 2A

एनट पीसीNTPC 164 2018 23-Dec-13 Ready Ready Less requisition

40 गाधार Gandhar-3

एनट पीसीNTPC 144 2037 28-Dec-13 Ready Ready Less requisition

41 गाधार Gandhar-I

एनट पीसीNTPC 144 2011 1-Jan-14 Ready Ready Less requisition

42 कावास Kawas 2B

एनट पीसीNTPC 164 900 13-Jan-14 421 5-Mar-14 Maintenance

43 गाधार Gandhar-2

एनट पीसीNTPC 219 023 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Less requisition

44 कावास Kawas-1A

एनट पीसीNTPC 164 2055 4-Feb-14 712 20-Feb-14 Less requisition

45 कावास

Kawas-1B एनट पीसीNTPC 164 1951 13-Feb-14 503 20-Feb-14 Less requisition

46 कावास Kawas 1A

एनट पीसीNTPC 164 1210 21-Feb-14 Ready Ready Less requisition

47 कावास Kawas 1B

एनट पीसीNTPC 164 012 22-Feb-14 1144 26-Feb-14 Less requisition

Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का फरवर 2014 का वःता रत यौरा

Details of planned unit outages during the month of Feb2014 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Time Date

1 डब यट पीएस WTPS-3

गरा विनिल GSECL

210 212 12-Feb-14 अनपल ध Still out

अनपल ध Still out

AOH

2 पल ParlI-3

मारा वउकिल MSPGCL

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

AOH

3 चिपर Chandrapur-5

मारा वउकिल MSPGCL

500 101 14-Jul-13 841 19-Feb-14 AOH

4 कोरबा प म KORBA-(W)-4

छरा वउकिल CSPGCL

210 2226 7-Feb-14 अनपल ध Still out

अनपल ध Still out

AOH

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

NIL2

NIL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING MARCH 2014 AND APRIL 2014

Capacity Outage as per Annual Maintenance Plan

3 Craiva]kMila CSPGCL

NIL

4

NIL

5 koMd``Iya xao~ Central Sector51 VSTPS 4 210 010414 070414 AOH52 VSTPS 2 210 080414 270414 AOH53 VSTPS 1 210 300414 190514 AOH54 CGPL 10 800 280314 130514 COH

maraiva]kMila MSPGCL

Date Time Date Time1 220 Bus-1 at Mapusa 20-Mar-14 1000 20-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R

2 765 Bus-1 at Sasan 20-Mar-14 800 20-Mar-14 1800 Daily Stringing of Main bus 1 for 765 kV Vichal Pooling - Sasan feeder

Reliance WR-II C

3 400 400kV Bus-2 at Satna 20-Mar-14 800 20-Mar-14 1800 Continuous Bay extension work related to JP - Nigrie Bays POWERGRID WR-II C

4 400 400kV ICT 1 at Satna 20-Mar-14 800 20-Mar-14 1000 Continuous Bay extension work related to JP - Nigrie Bays POWERGRID WR-II C

5 400 400kV Jabalpur Itarsi 1amp2 (Dc) 20-Mar-14 1000 20-Mar-14 1400 Continuous For commissioning of Line Impedance measurement kit

POWERGRID WR-II C

6 765 3X80 MVAr Bina Line Reactor at Indore 20-Mar-14 1000 21-Mar-14 1800 Continuous For installation of online dry out amp online DGA kit

POWERGRID WR-II C

7 400kV Damoh - Bhopal 1 20-Mar-14 800 31-Mar-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

8 400 Chorania Kasor 20-Mar-14 800 20-Mar-14 1800 Daily PMM work GETCO GETCO9 400 400 KV Main Bus-I at 400 KV Ss Khedamara 20-Mar-14 900 22-Mar-14 1700 Daily Erection of Pantograph 1 Set of IP amp CVT CSPTCL CSPTCL C

10 400 400 KV Khedamara-KSTPS NTPC ckt-II at 400 KV Ss Khedamara

20-Mar-14 900 22-Mar-14 1700 Daily Erection of Pantograph CVT amp 1 Set of IP PGCIL CSPTCL C

11 400 Korba -Vandana 20-Mar-14 900 21-Mar-14 1900 days continuouTesting of LBB auto re-close M-I amp M-II relays NTPC NTPC

12 400 Korba -Vandana 20-Mar-14 900 21-Mar-14 1900 days continuouTesting of LBB auto re-close M-I amp M-II relays NTPC NTPC

13 400DC Akola-Aurangabad (MSETCL) 1 and Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

21-Mar-14 600 23-Mar-14 1800 Conti Crossing work of 400kv MC Aurangabad - Aurangabad

MSETCLWRTS-I WRTS-I C

14400 amp 220 amp 132

400KV DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 400KV Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

21-Mar-14 600 21-Mar-14 1800 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad

MSETCLWRTS-I WRTS-I C

15 400 Bhadrawati-Parli 1amp 2 21-Mar-14 900 31-Mar-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I C

16 220 Bus-1 at Pune 21-Mar-14 800 21-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R

17 400 Solapur-Kolhapur 1 amp 2 21-Mar-14 700 21-Mar-14 1800 Daily Stringing work upcoming 765 kV Solapur-Pune line

Reliance WRTS-I C

18 220 220kV DC Raigarh- Raigarh (CSPTCL) Line (if outage not avail on 13140314)

21-Mar-14 900 22-Mar-14 1700 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (040-50)

CSPTCL WRTS-I C

19 220 Bus-2 (Section-A) at Mapusa 21-Mar-14 1000 21-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R20 400 Bus-1 at Itarsi 21-Mar-14 900 21-Mar-14 1800 Daily AMP POWERGRID WR-II R21 220 Bus-1 at Gwalior 21-Mar-14 1000 21-Mar-14 1800 Daily AMP POWERGRID WR-II R22 220 Jhanor - Haldarwa 1 21-Mar-14 900 21-Mar-14 1800 Daily AMP POWERGRID WR-II R23 400 Vapi Boisar 21-Mar-14 700 22-Mar-14 1900 Continuous For crossing of 220kV Kala Khadoli TL POWERGRID WR-II C

24 765 Sasan-Satna2 21-Mar-14 800 22-Mar-14 1800 Continuous For Power Line crossing of 765kV Vindhyanchal (pooling) - Satna 2 Line

POWERGRID WR-II R

25 400 400220 ICT NO1 at Kasor 21-Mar-14 800 21-Mar-14 1800 Daily PMM work GETCO GETCO26 400 400KV Sipat-Pathadi(LANCO) line 21-Mar-14 900 22-Mar-14 1900 Continous Annual Preventive maintenance job NTPC NTPC27 400 Pune-Parli 2 50MVAr Line Reactor at Pune 22-Mar-14 800 22-Mar-14 1800 Daily AMP Work Line in service wo reactor Reliance WRTS-I R

28 765 Bus-2 at Solapur 22-Mar-14 700 22-Mar-14 1800 Daily 765KV Pune bay commissioning amp SCADA works

WRTS-I WRTS-I C

29 400 Bus-1 at Bhatapara 22-Mar-14 800 23-Mar-14 1800 Conti Bus extension work for new 125MVAr Bus Reactor at Bhatapara

WRTS-I WRTS-I C

30 220 Bus-2 (Section-B) at Mapusa 22-Mar-14 1000 22-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R31 400 Vadavi Chorania 1 22-Mar-14 900 22-Mar-14 1800 Daily AMP Reliance WR-II R32 220 Jhanor - Haldarwa 2 22-Mar-14 900 22-Mar-14 1800 Daily AMP POWERGRID WR-II R33 220 Bus-2 at Gwalior 22-Mar-14 1000 22-Mar-14 1800 Daily AMP POWERGRID WR-II R

34 765 3X80 MVAr Bus Reactor at Indore 22-Mar-14 1000 23-Mar-14 1800 Continuous For installation of online dry out amp online DGA kit

POWERGRID WR-II C

35 220 Transfer Bus at Mapusa 23-Mar-14 1000 23-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R

36 400 Raigarh- Raipur 4 amp Raigarh-Kotra PS 2 23-Mar-14 800 30-Mar-14 1800 Conti Bay shifting work for up-coming 125MVAr Bus Reactor at Raigarh

WRTS-I WRTS-I C

37 765 Bus-1 at Indore (PG) 23-Mar-14 1000 23-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

Outages Proposal of Transmission elements during the month of MARCH‐2014Type

ANNEXURE‐32A

SN KV Line From To

Basis Reason System Agency

38 220 MC Waluj-Chitegaon amp Waluj-Jalna on same tower

24-Mar-14 600 24-Mar-14 1800 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad

MSETCL WRTS-I C

39 400 Raipur-Sipat 1 amp 2 24-Mar-14 800 2-Apr-14 1800 Conti Diversion of line for Lafarge Railway trackERS removal

WRTS-I Lafarge C

40 220 Bus-2 at Pune 24-Mar-14 800 24-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R41 765 Bus-1 at Bilaspur 24-Mar-14 800 24-Mar-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R

42 400 Bus-2 at Bhatapara 24-Mar-14 800 25-Mar-14 1800 Conti Bus extension work for new 125MVAr Bus Reactor at Bhatapara

WRTS-I WRTS-I C

43 400 Kolhapur-Mapusa 2 24-Mar-14 600 24-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

44 400 Vadavi Chorania 2 24-Mar-14 900 24-Mar-14 1800 Daily AMP Reliance WR-II R45 765 Bus-2 at Indore (PG) 24-Mar-14 1000 24-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

46 765 Bus-2 at Sasan 24-Mar-14 800 24-Mar-14 1800 Daily Strining of Main Bus 2 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

47 220 KAPP - Haldarwa 1 24-Mar-14 800 24-Mar-14 1800 Daily AMP POWERGRID WR-II R48 400 Bus - 2 at Pune 25-Mar-14 800 25-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R

49 765 Bus - 1 at Wardha 25-Mar-14 800 25-Mar-14 1800 Daily Jumper connection work of 765KV Raipur-Wardha line

WRTS-I WRTS-I R

50 400 Kolhapur-Mapusa 2 25-Mar-14 600 25-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

51 220 Mapusa-Ponda line 25-Mar-14 1000 25-Mar-14 1500 Daily AMP Work GOA WRTS-I R

52 765 Bus-1 at Sasan 25-Mar-14 800 25-Mar-14 1800 Daily Jumpering of Bus 1 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

53 220 KAPP - Haldarwa 2 25-Mar-14 800 25-Mar-14 1800 Daily AMP POWERGRID WR-II R54 400 Vadavi - Kansari2 25-Mar-14 900 25-Mar-14 1800 Daily AMP Reliance WR-II R55 400 Bus-1 at Indore (PG) 25-Mar-14 1000 26-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C56 765 Bus-1 at Satna 25-Mar-14 800 25-Mar-14 1800 Continuous Bay extension work POWERGRID WR-II C57 765 Sipat 765KV 400KV 1000MVA ICT-1 25-Mar-14 900 25-Mar-14 1900 Daily SPS Protection scheme modification NTPC NTPC

58 765 Bus - 2 at Wardha 26-Mar-14 800 26-Mar-14 1800 Daily Jumper connection work of 765KV Raipur-Wardha line

WRTS-I WRTS-I R

59 400 Bhadrawati-Parli 2 63MVAr Line Reactor at Parli

26-Mar-14 800 26-Mar-14 1800 Daily AMP Work of Recator at Parli line in service wo reactor

WRTS-I WRTS-I R

60 400 Kolhapur-Mapusa 1 26-Mar-14 600 26-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

61 220 Mapusa-Amona line 26-Mar-14 1000 26-Mar-14 1500 Daily AMP Work GOA WRTS-I R62 765 Bus-2 at Satna 26-Mar-14 800 26-Mar-14 1800 Continuous Bay extension work POWERGRID WR-II C

63 765 Bus-2 at Sasan 26-Mar-14 800 26-Mar-14 1800 Daily Jumpering of bus 2 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

64 400 401 KV Main Bus-I at 400 KV Ss Khedamara 26-Mar-14 900 27-Mar-14 1700 Daily Erection of IPS Tube CSPTCL CSPTCL C

65 400 401 KV Khedamara-KSTPS NTPC ckt-II at 400 KV Ss Khedamara

26-Mar-14 900 27-Mar-14 1700 Daily Erection of IPS Tube PGCIL CSPTCL C

66 400 ACBIL-BILASPUR-CKT NO -2 26-Mar-14 900 31-Mar-14 1800 CONT FOR lilo CONNECTIVITY OF 300MW MCCPL TPP

ACBIL ACBIL C

67 765 Bus-2 at Bilaspur 27-Mar-14 800 27-Mar-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R68 220 Mapusa-Thivim 1 27-Mar-14 1000 27-Mar-14 1500 Daily AMP Work GOA WRTS-I R69 220 KAPP - Vav 2 27-Mar-14 800 27-Mar-14 1800 Daily AMP POWERGRID WR-II R70 400 Bus-2 at Indore (PG) 27-Mar-14 1000 28-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

71 765 Bus-2 at Gwalior 27-Mar-14 1000 27-Mar-14 1800 Daily Bay extension work related to Gwalior Jaipur 1 Bays

POWERGRID WR-II C

72 400 VSTPS Tie- Line-1 ( Line from Stage-III to IV Switchyard)

27-Mar-14 900 27-Mar-14 1900 Daily Basis AMP and rectification of hot spots NTPC NTPC

73 765 Sipat 765KV 400KV 1000MVA ICT-2 27-Mar-14 900 27-Mar-14 1900 Daily SPS Protection scheme modification NTPC NTPC74 765 Bus-1 at Solapur 28-Mar-14 700 30-Mar-14 1800 Daily commissioning tests amp SCADA works WRTS-I WRTS-I C75 220 Mapusa-Thivim 2 28-Mar-14 1000 28-Mar-14 1500 Daily AMP Work GOA WRTS-I R

76 400 Koradi-Satpura 28-Mar-14 1000 28-Mar-14 1400 Daily Earthwire tighting work damaged during Crossing work

WRTS-I ADANI C

77 220 Bus-1 at Dehgam 28-Mar-14 900 28-Mar-14 1800 Daily AMP POWERGRID WR-II R78 220 Kawas - Haldarwa 2 28-Mar-14 800 28-Mar-14 1800 Daily AMP POWERGRID WR-II R79 400 Chorania Amreli 28-Mar-14 800 28-Mar-14 1800 Daily PMM work GETCO GETCO

80 400DC Akola-Aurangabad (MSETCL) 1 and Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

29-Mar-14 600 30-Mar-14 1800 Conti Charging amp shifting of Akola-Abad line on MC Abad-Abad line WRTS-I WRTS-I C

81 220 Bus-2 at Dehgam 29-Mar-14 900 29-Mar-14 1800 Daily AMP POWERGRID WR-II R82 400 Bus -1 at Mapusa 30-Mar-14 1000 30-Mar-14 1500 Daily AMP Work WRTS-I WRTS-I R

83 765 765kV Bus Reactor at Solapur 31-Mar-14 700 2-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

Date Time Date Time

1 400 Bhilai-Koradi 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

2 400 DC Korba-Birsingpur 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

3 400 Korba-Bhilai 2 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

4 220 Korba-Budhipadar 3 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

5 400 Akola-Wardha 1amp 2 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

6 400 Raipur-Raigarh 1 amp Raipur-KSK-DBPL-Raigarh

1-Apr-14 800 30-Apr-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

7 400 Bhadrawati-Parli 1amp 2 1-Apr-14 900 30-Apr-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I C

8 400 400220kv ICT-1 at Pune 1-Apr-14 800 1-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R9 400 Bus-1 at Bilaspur 1-Apr-14 800 1-Apr-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R

10 400 Solapur(PG) -Karad line 1-Apr-14 700 10-Apr-14 1800 Conti Erection of 80MVAr new reactor by shifitng line equipments at Solapur

MSETCL WRTS-I C

11 400 Bus-1 at Jabalpur (pooling) 01-Apr-14 1000 01-Apr-14 1800 Daily Busbar Stability test related to Jhabua Power Bays

POWERGRID WR-II C

12 400 Shujalpur - Nagda 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

13 400 Mundra - Bhachau 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

14 400 Bina - Shujalpur 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

15 220 Omkareshwar-Khandwa Ckt 1-Apr-14 900 1-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI16 400 Sipat 400KV Bay 10 and 11 1-Apr-14 900 3-Apr-14 1900 Continous 400KV CT 3nos replacement NTPC NTPC17 400 Padgha-Nagothane ckt I 1-Apr-14 900 1-Apr-14 1700 Daily QMwork MSETCL MSETCL

18 400 Bus-2 at Jabalpur (pooling) 02-Apr-14 1000 02-Apr-14 1800 Daily Busbar Stability test related to Jhabua Power Bays

POWERGRID WR-II C

19 400 Vindhyanchal - Mahan - Korba (Section of both the line on same Dc tower)

02-Apr-14 800 03-Apr-14 1700 Continuous For Power Line crossing of 765kV Vindhyanchal (pooling) - Satna 1 Line

POWERGRID WR-II C

20 400 400kV ICT 4 at Indore MPPTCL 02-Apr-14 1000 04-Apr-14 1800 ContinuousFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

MPPTCL WR-II C

21 400 400kV Bus Coupler bay at Indore MPPTCL 02-Apr-14 1000 04-Apr-14 1800 ContinuousFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

MPPTCL WR-II C

22 400 400kV Itarsi - Indore MPPTCL 1 Line 02-Apr-14 1000 02-Apr-14 1500 DailyFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

POWERGRID WR-II C

23 400400 KV LILO Line of 400 KV SC Korba West-Khedamara to 400 KV Ss Raita (Between Loc69 amp70 near Raita Ss)

2-Apr-14 800 3-Apr-14 1700 DailyMaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

CSPTCL CSPTCL C

24 400 Chandrapur-Khaparkheda 2-Apr-14 900 2-Apr-14 1700 Daily QMwork MSETCL MSETCL

25 400 Lamboti-Solapur PG 2-Apr-14 900 2-Apr-14 1700 Daily QMwork MSETCL MSETCL

26 400 Bus-1 at Durg PS Ss 3-Apr-14 900 3-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R27 400 Bus-1 at Jabalpur 03-Apr-14 900 03-Apr-14 1800 Daily Retrofitting of Isolator arms(689A) POWERGRID WR-II R28 400 315MVA ICT2 at Khandwa 03-Apr-14 1000 03-Apr-14 1600 Daily AMP POWERGRID WR-II R29 400 Mundra - Hadala 3-Apr-14 800 3-Apr-14 1800 Daily PMM GETCO GETCO30 400 400KV Seoni -Bhilai Ckt 3-Apr-14 900 3-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I31 400 Lonikand-Chakan 3-Apr-14 900 3-Apr-14 1700 Daily QMwork MSETCL MSETCL32 400 Bus-2 at Durg PS Ss 4-Apr-14 900 4-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R33 400 Bus-1 at Jabalpur 04-Apr-14 900 04-Apr-14 1800 Daily Retrofitting of Isolator arms(2089A) POWERGRID WR-II R

34 400 400kV Itarsi - Indore MPPTCL 1 Line 04-Apr-14 1300 04-Apr-14 1800 DailyFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

POWERGRID WR-II C

35 400 Varsana - Hadala 4-Apr-14 800 4-Apr-14 1800 Daily PMM GETCO GETCO

Agency Type

ANNEXURE‐32BOutages Proposal of Transmission elements during the month of APRIL ‐2014

SN KV Line From To

Basis Reason System

36 220 Vapi - Vapi (PG) 4-Apr-14 800 4-Apr-14 1800 Daily PMM work PGCIL GETCO37 220 Haldarva - Jhanor - 1 (NTPC) 4-Apr-14 800 4-Apr-14 1800 Daily PMM amp Tan Delta testing PGCIL GETCO38 400 400KV Birsinghpur -Katni Ckt - I 4-Apr-14 800 4-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I39 220 Badod - Kota Ckt 4-Apr-14 900 4-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI40 220 Malanpur-Auriya Ckt 4-Apr-14 900 5-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI

41 400 Bhusawal-Akola 4-Apr-14 900 4-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

42 400 Deepnagar-Aurangabad II 4-Apr-14 900 4-Apr-14 1700 Daily QMwork MSETCL MSETCL43 400 Kalwa-Padgha Ckt I 4-Apr-14 900 4-Apr-14 1700 Daily QMwork MSETCL MSETCL44 765 Bus Reactor at Seoni 5-Apr-14 900 5-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R

45 400 DC Korba-KhedamaraLilo at Marwa lilo section yet to be charge 5-Apr-14 800 6-Apr-14 1800 Daily

Crossing work of upcoming 765 KV DC Raigarh-Champa (AP-48A0- AP 490)DC Korba-Khedamara is in service

CSPTCL WRTS-1 C

46 400 Bus-1 at Jabalpur 05-Apr-14 900 05-Apr-14 1800 Daily Retrofitting of Isolator arms(1689A) POWERGRID WR-II R

47 400 Mundara -Limbdi 1 05-Apr-14 800 07-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

48 220 Badod - Modak Ckt 5-Apr-14 900 5-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI49 400 Dhule-Babhleswar ckt 1 5-Apr-14 900 5-Apr-14 1700 Daily QMwork MSETCL MSETCL50 400 400220kv ICT-1 at Seoni 7-Apr-14 900 7-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R51 400 Bus-2 at Jabalpur 07-Apr-14 900 07-Apr-14 1800 Daily Retrofitting of Isolator arms(1789B) POWERGRID WR-II R52 400 315MVA ICT1 at Khandwa 07-Apr-14 1000 07-Apr-14 1600 Daily AMP POWERGRID WR-II R53 220 Chhegoan-Khandwa Ckt -II 7-Apr-14 900 7-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI54 400 Korba- Bhilai1 7-Apr-14 900 8-Apr-14 1900 days continuou Bay Maint and testing NTPC NTPC55 400 Vindhyachal - Mahan line 7-Apr-14 900 8-Apr-14 1900 Continuous Replacement of R Y and B Phase CT NTPC NTPC56 400 Bhusawal-Aurangabad 7-Apr-14 900 7-Apr-14 1700 Daily QMwork MSETCL MSETCL57 400 New Koyna-Karad ckt 2 7-Apr-14 830 7-Apr-14 1730 Daily QMwork MSETCL MSETCL

58 400 Mundara -Limbdi 2 08-Apr-14 800 10-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

59 400 Chorania Hadala 8-Apr-14 800 8-Apr-14 1800 Daily PMM GETCO GETCO60 400 Sipat 400KV Bay 23 8-Apr-14 900 9-Apr-14 1900 Continous One 400KV CT replacement NTPC NTPC61 400 Koradi-Khaparkheda I 8-Apr-14 900 8-Apr-14 1700 Daily QMwork MSETCL MSETCL62 765 765400KV ICT-1 at Kotra PS 9-Apr-14 900 9-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R63 400 Bus-2 at Jabalpur 09-Apr-14 900 09-Apr-14 1800 Daily Retrofitting of Isolator arms(489B) POWERGRID WR-II R64 400 315MVA ICT1 at Damoh 09-Apr-14 1000 09-Apr-14 1600 Daily AMP POWERGRID WR-II R65 400 Amreli-Jetpur 2 9-Apr-14 800 9-Apr-14 1800 Daily PMM GETCO GETCO66 400 SSP- Rajgarh - 1 9-Apr-14 800 9-Apr-14 1800 Daily PMM GETCOMPTCL GETCO67 220 TAPS1 amp2-TAPS 3amp4 tie line 9-Apr-14 800 9-Apr-14 1600 one day Annual maintenance Works MSETCL NPCIL68 220 TAPS TIE LIE-I 9-Apr-14 800 10-Apr-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL69 400 400 KV Indore - Nagda Ckt 9-Apr-14 900 9-Apr-14 1600 daily For maintenance work MPPTCL EHT- Mamp I70 400 400 KV Sarni - Isp Ckt 9-Apr-14 900 9-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I71 220 Mehgaon-Auriya Ckt 9-Apr-14 900 10-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI72 400 315 MVA 400220Kv X-mer III At Bhopal SS 9-Apr-14 900 10-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI73 400 Padgha-Tarapur CktII 9-Apr-14 900 9-Apr-14 1700 Daily QMwork MSETCL MSETCL74 765 Bus Reactor at Kotra PS 10-Apr-14 900 10-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R

75 765 amp 400

765400 kV ICT-I at Solapur amp 400KV Solapur-Parli 2 10-Apr-14 700 12-Apr-14 1800 Daily 765400 kV spare ICT unit Aux bus works CSD

commissioning amp Fire fighting works at Solapur WRTS-IReliance WRTS-I C

76 400 315MVA ICT2 at Damoh 10-Apr-14 1000 10-Apr-14 1600 Daily AMP POWERGRID WR-II R

77 765 Sasan-Satna 1 10-Apr-14 800 11-Apr-14 1800 Daily For AMP of line amp Line terminal Equipments Post commissioning checks

POWERGRID WR-II C

78 400 APL-Varsana 10-Apr-14 800 10-Apr-14 1800 Daily PMM GETCO GETCO79 400 400 KV Isp - Nagda Ckt 10-Apr-14 900 10-Apr-14 1600 daily For maintenance work MPPTCL EHT- Mamp I80 400 400 KV Bhopal-Itarsi(PGCIL) Ckt-I 10-Apr-14 900 11-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I81 220 Chhegoan-Khandwa Ckt -I 10-Apr-14 900 10-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI82 400 315 MVA 400220Kv X-mer At Katni SS 10-Apr-14 800 11-Apr-14 1800 continue For maintenance work MPPTCL EHT -MampI83 400 Korba- Bhilai2 10-Apr-14 900 11-Apr-14 1900 days continuou Bay Maint and testing NTPC NTPC84 400 Sipat 400KV Bay 14 10-Apr-14 900 12-Apr-14 1900 Continous 400KV CT 3nos replacement NTPC NTPC

85 400 Chandrapur II-Parli II 10-Apr-14 900 10-Apr-14 1700 Daily Providing of Arching horncorona rings Bird guards quarter pinsNut bolts

MSETCL MSETCL

86 400 Karad-Lonikand 10-Apr-14 900 10-Apr-14 1700 Daily QMwork MSETCL MSETCL87 400 Raipur-Durg PS 1 11-Apr-14 900 11-Apr-14 1700 Daily AMP Work WRTS-I WRTS-I R

88 400 Mundara -Jetpur 1 11-Apr-14 800 15-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

89 400 Varsana-Hadala Line 11-Apr-14 800 11-Apr-14 1800 Daily PMM GETCO GETCO90 220 Haldarwa Kawas-2 11-Apr-14 800 11-Apr-14 1800 Daily PMM work PGCIL GETCO91 400 400 KV Nagda-Rajgarh(PGCIL) Ckt-I 11-Apr-14 900 11-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

92 400 315 MVA 400220Kv X-mer III ampTie bay At Bhopal SS

11-Apr-14 900 11-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI

93 400 Akola-Nandgaonpeth 11-Apr-14 900 11-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

94 400 Akola-Wardha I 11-Apr-14 900 11-Apr-14 1700 Daily QMwork MSETCL MSETCL95 400 Kalwa-Lonikand 11-Apr-14 900 11-Apr-14 1700 Daily QMwork MSETCL MSETCL96 400 400220kv ICT-1 at Mapusa 12-Apr-14 900 12-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R97 400 Raipur-Durg PS 2 12-Apr-14 900 12-Apr-14 1700 Daily AMP Work WRTS-I WRTS-I R98 765 Sasan-Satna2 with line reactor 12-Apr-14 1000 12-Apr-14 1800 Daily AMP POWERGRID WR-II R99 400 400 KV Nagda-Rajgarh(PGCIL) Ckt-II 12-Apr-14 900 12-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I100 400 Deepnagar-Aurangabad I 12-Apr-14 900 12-Apr-14 1700 Daily QMwork MSETCL MSETCL101 400 Amreli-Jetpur 2 14-Apr-14 800 14-Apr-14 1800 Daily PMM GETCO GETCO102 400 Kasor - Gpec 14-Apr-14 800 14-Apr-14 1800 Daily PMM GETCO GETCO103 220 GWL(PGCIL)-Malanpur Ckt-I 14-Apr-14 900 15-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI104 400 DC Korba-Raipur 3 amp 4 15-Apr-14 800 16-Apr-14 1800 Conti Bus splitting work at Raipur WRTS-1 WRTS-1 C

105 400 Korba-Bhatapara 15-Apr-14 800 24-Apr-14 1800 Conti For raising of ground clearence for Railway track of Lafarge

WRTS-I Lafarge C

106 765 765400 kV ICT-II at Solapur 15-Apr-14 700 17-Apr-14 1800 Daily CSD commissioning amp Fire fighting works WRTS-I WRTS-I C107 400 Vindhyachal-Satna1 15-Apr-14 1000 15-Apr-14 1800 Daily AMP POWERGRID WR-II R108 400 Ssnl-Dhule-1 15-Apr-14 800 15-Apr-14 1800 Daily PMM GETCOMSETCL GETCO109 220 TAPS-Vapi 15-Apr-14 800 17-Apr-14 1900 Daily Annual maintenance Works GETCO NPCIL110 220 Pithampur-Rajgarh(PGCIL) Ckt - I 15-Apr-14 900 15-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI111 400 Sipat 400KV Bay-18 ( Ranchi-1 Main) 15-Apr-14 900 15-Apr-14 1900 Daily Annual Preventive maintenance job NTPC NTPC112 400 Karad-Kolhapur Ckt I 15-Apr-14 900 15-Apr-14 1700 Daily QMwork MSETCL MSETCL

113 400 DC Raipur-Bhadrawati 2 amp 3 16-Apr-14 800 17-Apr-14 1800 Conti Bus splitting work at Raipur WRTS-1 WRTS-1 C

114 400 Vindhyachal-Satna2 16-Apr-14 1000 16-Apr-14 1800 Daily AMP POWERGRID WR-II R

115 400 Mundara -Jetpur 2 16-Apr-14 800 20-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

116 400 Vadavi - Dehgam (Pg) - 1 16-Apr-14 800 16-Apr-14 1800 Daily PMM amp Tandelta testing GETCO GETCO117 400 Chorania Asoj-1 16-Apr-14 800 16-Apr-14 1800 Daily PMM GETCO GETCO118 220 Bhilad - TAPS 16-Apr-14 800 16-Apr-14 1800 Daily PMM work PGCIL GETCO119 220 Bhat - Pirana (PG) - 1 16-Apr-14 800 16-Apr-14 1800 Daily PMM work GETCO GETCO120 400 400 KV Bhopal-Itarsi(PGCIL) Ckt-II 16-Apr-14 900 17-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I121 220 Damoh(PGCIL) - Tikamgarh Ckt 16-Apr-14 900 16-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI

122 400 400KV SC Korba-Raipur-II (Between Korba - Bhatapara end)(Between Loc2980 amp 2990) 16-Apr-14 800 17-Apr-14 1700 Daily

MaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

PGCIL CSPTCL C

123 400 Sipat 400KV Bay-19 ( Ranchi-2 Main) 16-Apr-14 900 16-Apr-14 1900 Daily Annual Preventive maintenance job NTPC NTPC124 400 Padgha-Babhleswar ckt I 16-Apr-14 900 16-Apr-14 1700 Daily QMwork MSETCL MSETCL125 400 Vadavi - Dehgam (Pg) - 2 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCO GETCO126 400 Ssnl-Dhule-2 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCOMSETCL GETCO127 400 Vadinar-Hadala- 1 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCO GETCO128 220 Bhat - Pirana (PG) - 2 17-Apr-14 800 17-Apr-14 1800 Daily PMM work GETCO GETCO129 400 400KV Birsinghpur -Katni Ckt - II 17-Apr-14 800 17-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I130 220 Pithampur-Rajgarh(PGCIL) Ckt - II 17-Apr-14 900 17-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI131 400 Jejuri-Lonikand 17-Apr-14 900 17-Apr-14 1700 Daily QMwork MSETCL MSETCL132 400 Deepnagar-Khadka II 17-Apr-14 900 17-Apr-14 1700 Daily QMwork MSETCL MSETCL133 400 Chorania Kasor 18-Apr-14 800 18-Apr-14 1800 Daily PMM GETCO GETCO134 220 GWL(PGCIL)-Malanpur Ckt-II 18-Apr-14 900 19-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI135 400 Akola-Wardha II 18-Apr-14 900 18-Apr-14 1700 Daily QMwork MSETCL MSETCL

136 400 Koradi-Nandgaonpeth 18-Apr-14 800 18-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

137 765 765kV Pune line Reactor at Solapur 19-Apr-14 700 20-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

138 400 400KV Bina -Power(JP) Ckt 19-Apr-14 900 19-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I139 400 Dhule-SSarovar I 19-Apr-14 900 19-Apr-14 1700 Daily QMwork MSETCL MSETCL

140 400 Koradi-Khaparkheda II 19-Apr-14 900 19-Apr-14 1700 Daily QMwork MSETCL MSETCL141 220 KAPP - VAPI - 1 20-Apr-14 800 20-Apr-14 1800 Daily Isolator replacement under ASIDE scheme PGCIL GETCO

142 400 DC Bhilai-Bhadrawati amp Raipur-Bhadrawati 1 21-Apr-14 800 28-Apr-14 1800 Conti Diversion of line for Vidarbha Industrial Devlopment Corporation(VIDC)

WRTS-I VIDC C

143 400 Bhachau- Ranchhodpura 1amp2 21-Apr-14 800 27-Apr-14 1800 Continuous Tower shifting work at canal crossingInsulator replacement work

POWERGRID WR-II C

144 400 Hadala-Amreli 21-Apr-14 800 21-Apr-14 1800 Daily PMM GETCO GETCO145 400 Vadinar-Hadala- 2 21-Apr-14 800 21-Apr-14 1800 Daily PMM GETCO GETCO146 220 TAPS-Boisar 21-Apr-14 800 23-Apr-14 1900 Daily Annual maintenance Works MSETCL NPCIL147 220 Bina(PGCIL)-220 KV Bina Ckt 21-Apr-14 900 21-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI148 400 CGPL Bhachau -1 21-Apr-14 8AM 21-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL149 220 Kawas-Ichhapore 1+Bus 1 21-Apr-14 900 21-Apr-14 1800 daily RTV Coating NTPC NTPC150 400 Karad-Kolhapur Ckt II 21-Apr-14 900 21-Apr-14 1700 Daily QMwork MSETCL MSETCL151 400 New Koyna-Koyna Stg-4-1 21-Apr-14 830 21-Apr-14 1730 Daily QMwork MSETCL MSETCL152 400 Ssp - Rajgarh - 2 22-Apr-14 800 22-Apr-14 1800 Daily PMM GETCOMPTCL GETCO153 400 Vadavi-Bhachau 2 22-Apr-14 800 22-Apr-14 1800 Daily PMM amp Tan Delta testing PGCIL GETCO154 220 Bhilad - Vapi (PG) - 1 22-Apr-14 800 22-Apr-14 1800 Daily PMM work PGCIL GETCO155 400 400 KV Rajgarh(PGCIL)-Ssp Ckt-I 22-Apr-14 900 22-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I156 400 400KV Seoni -Sarni Ckt 22-Apr-14 900 23-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I157 220 Khandwa(PGCIL)-Nepanagar Ckt 22-Apr-14 900 22-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI158 220 Kawas-Ichhapore 2+Bus 1 22-Apr-14 900 22-Apr-14 1800 daily For maintenance work NTPC NTPC159 400 Karad-Jaigad II 22-Apr-14 900 22-Apr-14 1700 Daily Annual maintenance work MSETCL MSETCL160 220 Bhilad - Vapi (PG) - 2 23-Apr-14 800 23-Apr-14 1800 Daily PMM work PGCIL GETCO161 400 400KV Bina -Bhopal Ckt -I 23-Apr-14 900 24-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I162 400 400 KV Rajgarh(PGCIL)-Ssp Ckt-II 23-Apr-14 900 23-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I163 220 Bina(PGCIL)-Shivpuri Ckt 23-Apr-14 900 24-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI164 220 Damoh(PGCIL) - Damoh I C - I 23-Apr-14 900 23-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI

165 400 400 KV DCDS Sipat- Raipur (IampII) 23-Apr-14 800 24-Apr-14 1700 DailyMaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

PGCIL CSPTCL C

166 400 CGPL Bhachau - 2 23-Apr-14 8AM 23-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL

167 220 Kawas-Navsari 2 +Bus 1 23-Apr-14 900 23-Apr-14 1800 daily Insulator replcement and routine maintenance NTPC NTPC168 400 Padgha-Babhleswar ckt II 23-Apr-14 900 23-Apr-14 1700 Daily QMwork MSETCL MSETCL169 400 Kasor - SSP 24-Apr-14 800 24-Apr-14 1800 Daily PMM work GETCO GETCO170 220 Bhilad - Vapi (PG) - 3 24-Apr-14 800 24-Apr-14 1800 Daily PMM work PGCIL GETCO171 220 TAPS-Bhilad 24-Apr-14 800 26-Apr-14 1900 Daily Annual maintenance Works GETCO NPCIL172 220 Damoh(PGCIL) - Damoh I C - II 24-Apr-14 900 24-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI173 400 CGPL Jetpur- 1 24-Apr-14 8AM 24-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL

174 220 Kawas-Ichhapore 1 +Bus 2 24-Apr-14 900 24-Apr-14 1400 daily Insulator replcement and routine maintenance NTPC NTPC

175 220 Kawas-Ichhapore 2 +Bus 2 24-Apr-14 1400 24-Apr-14 1900 daily Insulator replcement and routine maintenance NTPC NTPC176 400 Padgha-Talegaon 24-Apr-14 900 24-Apr-14 1700 Daily QMwork MSETCL MSETCL

177 765 765kV Raichur 1 line Reactor at Solapur 25-Apr-14 700 27-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

178 400 400KV Bina -Bhopal Ckt -II 25-Apr-14 900 26-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I179 400 CGPL Jetpur- 2 25-Apr-14 8AM 25-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL180 400 Vindhyachal -Satna-4 Line Shunt Reactor 25-Apr-14 900 25-Apr-14 1900 Daily Basis AMP NTPC NTPC

181 400 Bhusawal-Koradi 25-Apr-14 900 25-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

182 400 Deepnagar-Khadka I 25-Apr-14 900 25-Apr-14 1700 Daily QMwork MSETCL MSETCL183 400 Soja -Kansari 26-Apr-14 800 26-Apr-14 1800 Daily PMM GETCO GETCO184 400 Raipur-Wardha 1 27-Apr-14 800 28-Apr-14 1800 Daily Balance construction work WRTS-1 WRTS-1 C185 220 KAPP - VAPI - 2 27-Apr-14 800 27-Apr-14 1800 Daily Isolator replacement under ASIDE scheme PGCIL GETCO186 400 Soja -Kansari 28-Apr-14 800 28-Apr-14 1800 Daily PMM GETCO GETCO187 220 TAPS-Boisar II 28-Apr-14 800 30-Apr-14 1900 Daily Annual maintenance Works MSETCL NPCIL188 400 400KV Damoh - Katni Ckt 28-Apr-14 900 28-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I189 400 400 KV Damoh(PGCIL)-Katni Ckt 28-Apr-14 900 28-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I190 400 New Koyna-Karad ckt 1 28-Apr-14 830 28-Apr-14 1730 Daily QMwork MSETCL MSETCL

191 400 DC Raigarh-DB Power (Tudri) - KSK 29-Apr-14 800 30-Apr-14 1800 Conti Crossing work of 765kV SC Raigrah-Champa (90 - 100)

WRTS-I WRTS-I C

192 400 Raipur-Wardha 2 29-Apr-14 800 30-Apr-14 1800 Daily Balance construction work WRTS-1 WRTS-1 C193 220 Navsari - Nasik - 1 29-Apr-14 800 29-Apr-14 1800 Daily PMM work GETCOMSETCL GETCO194 220 Seoni(PGCIL)-Chhindwara Ckt-I 29-Apr-14 900 29-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI195 220 Kawas-Vav 1+ bus 2 29-Apr-14 900 29-Apr-14 1800 daily For maintenance work NTPC NTPC196 400 Chorania Asoj-1 30-Apr-14 800 30-Apr-14 1900 Daily PMM GETCO GETCO197 220 Navsari - Nasik - 2 30-Apr-14 800 30-Apr-14 1800 Daily PMM work GETCOMSETCL GETCO198 220 Vapi - TAPS 30-Apr-14 800 30-Apr-14 1800 Daily PMM work PGCIL GETCO199 220 Seoni(PGCIL)-Chhindwara Ckt-II 30-Apr-14 900 30-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI200 220 Kawas-Vav 1+ bus 2 30-Apr-14 000 30-Apr-14 000 daily For maintenance work NTPC NTPC

Annexure-32-C1

List of Emergency Outages availed in Feb 2014

SlNo

Element kV Agency From

Date To Date

Remarks

1 SATNA‐BINA‐II 765 WRTS‐2 4‐Feb‐14

5‐Feb‐14

Hot spot attending

2 SUJALPUR‐NAGDA LR NAGDA

400 WRTS‐2 6‐Feb‐14

19‐Feb‐14

Oil leackage

3 SOLAPUR‐PARLI‐II

400 WRTS‐2 6‐Feb‐14

6‐Feb‐14

Hotspot attend at solapur

4 JABALPUR‐ITARSI‐IV LR AT ITARSI‐LR

400 WRTS‐2 7‐Feb‐14

17‐Feb‐14

Oil leackage

5 APL‐HADALA‐SC 400 GEB 7‐Feb‐14

7‐Feb‐14

Hot spot

6 SOLAPUR‐PARLI(PG)‐1

400 WRTM(REL)

9‐Feb‐14

9‐Feb‐14

Hot spot

7 BOISAR‐BOISAR(PG)‐II

220 MSETCL 9‐Feb‐14

9‐Feb‐14

Hotspots

8 NEW KOYNA‐KARAD ‐ I

400 MSETCL 10‐Feb‐14

11‐Feb‐14

Dc‐earth leakage

9 LONIKHAND ‐ KARAD

400 MSETCL 10‐Feb‐14

11‐Feb‐14

Hotspot

10 NAGDHA ICT ‐ III

400220

MPPTCL 10‐Feb‐14

10‐Feb‐14

Hotspot

11 AKOLA ‐ ABAD ‐I AKOLA

400 WRTS‐1 11‐Feb‐14

12‐Feb‐14

Oil leackage

12 AKOLA ‐ AURANGABAD ‐ I

400 WRTS‐1 11‐Feb‐14

11‐Feb‐14

Oil leackage ion lr

13 BINA‐GWALIOR 765 WRTS‐1 14‐Feb‐ 14‐Feb‐ Attend oil leakage on lr

SlNo

Element kV Agency From

Date To Date

Remarks

II 14 14

14 AKOLA‐TIRORA‐I 765 MSETCL 22‐Feb‐14

23‐Feb‐14

Sparking in LR at Tirora SYED AT TIRORA END

15 KHAEGAR‐ICT‐I 400220

MSETCL 22‐Feb‐14

22‐Feb‐14

Hot spot

16 KHANDWA‐NEPANAGR‐SC

220 MPPTCL 23‐Feb‐14

23‐Feb‐14

Hot spot

17 GWALIAR ‐SATNA ‐ I

765 WRTS‐2 24‐Feb‐14

1‐Mar‐14

Attend hot spot

18 KORBA BUS‐III 400 NTPC 25‐Feb‐14

25‐Feb‐14

Hots pot attend

19 BUS‐1 AT GWALIOR

765 WRTS‐2 13‐Feb‐14

13‐Feb‐14

Checking of blocked BB main‐1 relay

20 RAIPUR‐BWATI‐2

400 WRTS‐1 17‐Feb‐14

17‐Feb‐14

Urgent Removal of LR at Raipur end for DGA violation

21 TAPS‐PADGHE 400 TAPS‐3amp4 19‐Feb‐14

23‐Feb‐14

To attend SF‐6 leakage

22 SATNA‐GWALIOR‐1

765 WRTS‐2 24‐Feb‐14

26‐Feb‐14

To attend hot spots

23 VCHAL‐JABALPUR‐IV

400 WRTS‐2 27‐Feb‐14

27‐Feb‐14

To increase OPGW‐Top conductor clearance to avoid tripping

24 APL‐SAMI‐2 400 APL 26‐Feb‐14

26‐Feb‐14

To attend hot sopt

25 SHOLAPUR BUS‐1

765 WRTS‐1 27‐Feb‐14

27‐Feb‐14

To attend hot sopt

26 BOISAR BUS‐2 220 WRTS‐1 28‐Feb‐14

28‐Feb‐14

To attend hot sopt

Sl No KV element From To Basis Work System Agency Remarks

1220 Vapi (GETCO)‐Bhilad 1‐Feb‐14 800 2‐Feb‐14 1800 Daily Line crossing work of 400KV LILO line for

Magarwada SSGETCO POWERGRID N

2 220 Omkareshwar-Khandwa Ckt

3-Feb-14 900 3-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

3 400 New Koyna-Koyna Stg-4-1

3-Feb-14 830 3-Feb-14 1730 Daily QMwork MSETCL MSETCL N

4220 Vapi ‐ Magarwada

Ckt13‐Feb‐14 900 3‐Feb‐14 1400 Daily AMP of line amp equipment WRTS‐II POWERGRID DD may have to do load

shedding as per Reliability Suggestion

N

5 220 DC Raigarh- Raigarh 1amp 2

4-Feb-14 800 5-Feb-14 1800 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (040-50)

CSPTCL WRTS-I N

6 220 Itarsi(PGCIL)-Hoshangabad Ckt

4-Feb-14 900 4-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N

7 400 Mundra -Limbdi-2 4-Feb-14 800 4-Feb-14 1800 Daily Suspension Insulator replcement and routine maintenance

PGCIL CGPL N

8 400 400 kV DC Satna - Bina 1amp2

4-Feb-14 800 5-Feb-14 1800 Continous Crossing of Jabalpur-Bina 765 kv SC Line PGCIL JTCL N

9220 Vapi ‐ Magarwada

Ckt24‐Feb‐14 0900 4‐Feb‐14 1400 Daily AMP of line amp equipment WRTS‐II POWERGRID N

10 765 Seoni-Bina line with LR 4‐Feb‐14 800 4-Feb-14 1800 Daily AMP Work WRTS-2 WRTS-1 N

11 400 Bus I Bina 5‐Feb‐14 800 5‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

12220 Kawas ‐ Navsari (PG)

25‐Feb‐14 800 5‐Feb‐14 1800 Daily Replacement of ST insulators by Double Tension

insulator in Railway crossing spansWRTS‐II POWERGRID N

13400 Indoer (PG) ‐Indore

(MP) DC5‐Feb‐14 800 6‐Feb‐14 1800 Continou

sStringing of 765kV Indore ‐ Vadodara line WRTS‐II POWERGRID N

14 400 APL - Hadala 6-Feb-14 800 6-Feb-14 1800 Daily PMM GETCO GETCO N N

15 220 Seoni(PGCIL ) - Chhindwara CKT I

6-Feb-14 900 6-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N N

16 400 Jejuri-Koyna stg IV 6-Feb-14 900 6-Feb-14 1700 Daily QMwork MSETCL MSETCL N17 400 Akola-Nandgaonpeth 6-Feb-14 900 6-Feb-14 1700 Daily Quaterly Maintainance Work MSETCL MSETCL N18 400KV Korba-Bhatapara 6-Feb-14 900 7-Feb-14 1900 Cont Testing of LBB auto re-close M-I amp M-II relays NTPC NTPC N19 220 Haldarva - Jhanor - 2

(NTPC)6-Feb-14 900 6-Feb-14 1800 Daily PMM work GETCO N

20220 Navsar (PG) ‐Navsari

(GETCO) 16‐Feb‐14 800 6‐Feb‐14 1800 Daily Replacement of ST insulators by Double Tension

insulator in Railway crossing spansWRTS‐II POWERGRID

N

21 400 Bus‐II Bina 6‐Feb‐14 800 6‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

22400 Seoni‐Khandwa1 6‐Feb‐14 1000 6‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Khandwa end by MS ABB

WRTS‐II POWERGRID Rescheduled to 6th March N

23 400 Rajgarh-Ssp Ckt-II 7-Feb-14 900 7-Feb-14 1600 daily For maintenance work MPPTCL EHT- Mamp I N24 220 Chhegoan-Khandwa

Ckt -II7-Feb-14 900 7-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

25 220 Wardha (PG)-Wardha 7-Feb-14 800 7-Feb-14 1800 Daily AMP Work MSETCL WRTS-I N26 400 Chorania - Vadavi-2 7-Feb-14 800 7-Feb-14 1800 Daily PMM amp Tan Delta testing WRTGPL GETCO N27 400 Jabalpur‐Itarsi1 7‐Feb‐14 900 7‐Feb‐14 1400 Daily AMP OF TERMINAL EQUIPMENT WRTS‐II POWERGRID N

28220 Vapi(PG)‐ Bhilad ckt

2 amp 3 7‐Feb‐14 800 8‐Feb‐14 1800 Daily Line crossing work of 400KV LILO of Navsari‐Boisar

at MagarwadaGETCO POWERGRID N

29 220 Mapusa-Thivim 1 8-Feb-14 800 8-Feb-14 1800 Daily AMP Work GOA WRTS-I N

30400 Seoni‐Khandwa2 9‐Feb‐14 1000 9‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Khandwa end by MS ABB

WRTS‐II POWERGRID Rescheduled to 7th March N

31 220 Chhegoan-Khandwa Ckt -I

10-Feb-14 900 10-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

Annexure-32-C2OCC approved outage not availed in Feb‐2014

32132 132 kV Dhule

Dondaicha line10-Feb-14 800 11-Feb-14 1800 Cont Crossing of Dhule-Vadodara 765 kv SC Line MSETCL BDTCL subjected to sldc

clearance N

33 400132 KV

Vindhyachal ICT-1 10-Feb-14 900 14-Feb-14 1900 Cont ICT Overhauling NTPC NTPC N

34400 KV Vindhyachal - Jabalpur-

3 Line Shunt Reactor10-Feb-14 900 14-Feb-14 1900 Cont Reactor Overhauling NTPC NTPC

N

35 400 KSK-DB Power 10-Feb-14 800 13-Feb-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end WRTS-IDBKSK

KSK N36 220 Ipore-Kawas-1 10-Feb-14 800 10-Feb-14 1800 Daily PMM work GETCO N

37400 Vindhyachal‐Mahan 10‐Feb‐14 800 11‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐I WRTS‐II N

38400 Mahan‐Korba 10‐Feb‐14 800 11‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐I WRTS‐II N

39765 Jabalpur ‐ Bina 1 10‐Feb‐14 1000 10‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Jabalur end by MS ABB

WRTS‐II POWERGRID Differed by siteN

40 400 SSP - Rajgarh - 1 10-Feb-14 800 11-Feb-14 1800 Daily Basis

PMM Work GETCO N

41 400 DC Tundri (DB Power) -ksk-Raigarh

10-Feb-14 800 11-Feb-14 1800 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (092-100)

DB Power WRTS-I N42 400 Jetpur - Amreli - 1 11-Feb-14 800 12-Feb-14 1800 Daily PMM GETCO GETCO N43 400 Hadala - Vadinar-2 11-Feb-14 800 11-Feb-14 1800 Daily PMM GETCO GETCO N44 400 Nagda-Rajgarh Ckt-I 11-Feb-14 900 11-Feb-14 1800 daily For maintenance work MPPTCL EHT- Mamp I N45 220 Mehgaon-Auriya Ckt 11-Feb-14 900 11-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N46 220 Seoni(PGCIL ) -

Chhindwara CKT II11-Feb-14 900 11-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

47

765kV Main Bus-1B at SASANBay 13 - Jack Bus

11-Feb-14 900 21-Feb-14 1800 Daily Jumper Installations amp ConnectionsIsolator Allignment

PGCIL Reliance Provisional Subject to details of works done to be apprised on daily basis

N

48 220 Ipore-Kawas-2 11-Feb-14 800 11-Feb-14 1800 Daily PMM work GETCO N49 220 Navsari - Nasik - 2 11-Feb-14 900 11-Feb-14 1800 Daily PMM work GETCO N

50765 Jabalpur ‐ Bina 2 11‐Feb‐14 1000 11‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Jabalur end by MS ABB

WRTS‐II POWERGRID Deferred by siteN

51 400 Nagda-Rajgarh Ckt-II 12-Feb-14 900 12-Feb-14 1800 daily For maintenance work MPPTCL EHT- Mamp I N52 400 Karad-Solapur (PGCIL) 12-Feb-14 900 12-Feb-14 1700 Daily QMwork MSETCL MSETCL N53 400 Raipur-Sipat 1 amp 2 26-Feb-14 800 3-Mar-14 1800 Conti Diversion of line for Lafarge Railway track WRTS-I Lafarge Ori 12-16 Feb 14 Deferre N54 220 Haldarwa Kawas-2 12-Feb-14 900 12-Feb-14 1800 Daily PMM work GETCO N

55 220 Bus‐I Bina 12‐Feb‐14 800 12‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

56 400 Chorania - Hadala 13-Feb-14 800 14-Feb-14 1800 Daily PMM GETCO GETCO N57 400 Tarpur-Padghe-2 13-Feb-14 800 14-Feb-14 1800 Daily maintenance work POWERG

RIDNPCIL N

58400 Vindhyachal‐Satna1 13‐Feb‐14 1000 13‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

59 220 Bus‐II Bina 13‐Feb‐14 800 13‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

60 220 Pithampur-Rajgarh Ckt - I

14-Feb-14 900 14-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

61 220 Wardha (PG)-Badnera 14-Feb-14 800 14-Feb-14 1800 Daily AMP Work at Wardha MSETCL WRTS-I N

62 400 Bhusawal-Koradi 14-Feb-14 900 14-Feb-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL N

63 400 Raipur-KSK 14-Feb-14 800 16-Feb-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end WRTS-IKSK

KSK N

64 220 GWL(PGCIL)-Malanpur Ckt-II

15-Feb-14 900 15-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N

65 220 Pithampur-Rajgarh Ckt - II

15-Feb-14 900 15-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

66400 Vindhyachal‐Satna2 16‐Feb‐14 1000 16‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

67 220 KAPS - Haldarwa - 1 17-Feb-14 800 17-Feb-14 2000 Daily Yearly PM checks KAPS N

68400 3X105 MVA 400220Kv

X-mer I At Indore ss17-Feb-14 800 18-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI

N

69

220 SC Korba-Raigarh-Budhipadar sc(PGCIL) amp DC Korba-Budipadar both circuits (CSPTCL)

18-Feb-14 800 19-Feb-14 1800 Conti Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCLWRTS-I

WRTS-I

N

70 400 Itarsi-Bhopal Ckt-I 18-Feb-14 900 19-Feb-14 1700 daily For maintenance work MPPTCL EHT- Mamp I N71 220 Badod - Kota Ckt 18-Feb-14 900 18-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N72 220 Damoh(PGCIL) -

Damoh I C - II18-Feb-14 900 18-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

73 220 Badod - Modak Ckt 19-Feb-14 900 19-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

74220 KAPS - Ukai - Mota 19-Feb-14 800 19-Feb-14 2000 Daily Yearly PM checks KAPS Non consent from SLDC

GETCO N

75400 315 MVA 400220 KvX-

mer III At Indore ss20-Feb-14 800 21-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI

N

76 220 Seoni(PG)-Seoni 2 21-Feb-14 800 21-Feb-14 1800 Daily AMP Work MPPTCL WRTS-I Y N77 220 Bina(PGCIL)-Shivpuri

Ckt21-Feb-14 900 22-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI Y N

78 400 Koradi-Nandgaonpeth 21-Feb-14 900 21-Feb-14 1700 Daily QMwork MSETCL MSETCL N N79 220 Haldarva - Jhanor - 1

(NTPC)21-Feb-14 900 21-Feb-14 1800 Daily PMM work GETCO N

80

765kV Main Bus-2A at SASANSatna Line-2

22-Feb-14 900 28-Feb-14 1800 Contionious

Equipment ConnectionsCircuit Breaker TestingJumper MeasurementIsolator Allignment Reactor accessories erection on R-Phase

PGCIL Reliance

N

81 400 Korba-Raipur 3 amp 4 23-Feb-14 800 24-Feb-14 1800 Conti For Bus spliting work at Raipur765 KV Raigarh-Raipur and 765 Champa Raipur lines

WRTS-1 WRTS-1 N

82132 132kV Astha - Polai SC

line of MPPTCL24-Feb-14 800 25-Feb-14 1800 Continous Crossing of Bhopal -Indore 765 kv SC Line MPPTCL BDTCL subjected to sldc

clearance N

83 400 Bus-1 at Bilaspur 24-Feb-14 800 24-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I N

84400 Seoni -

Khedamara(Bhilai) Ckt25-Feb-14 900 25-Feb-14 1800 daily For maintenance workFeeder bay maintenance at

KMaraMPPTCL CSPTCLMPPT

CLNo confirmation on D-3

N

85400 Ranchi-Sipat 1 amp 2 25-Feb-14 800 26-Feb-14 1800 Conti Crossing work of upcoming 765 KV DC

Jharsuguda-Korba amp 765KV SC Ranchi-BilaspurWRTS-I WRTS-I No confirmation on D-3

N

86765 Sasan‐Satna2 25‐Feb‐14 800 26‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐II POWERGRID No confirmation on D-3 N

87400 Bus Reactor1 at Satna 25‐Feb‐14 1000 25‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

88400 400 kV DC Damoh -

Bhopal Line26-Feb-14 800 27-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL Not availed by agency for

rainsN

89400 Raipur-Bhadrawati 2 amp

327-Feb-14 800 27-Feb-14 2100 Daily For Bus spliting work at Raipur765 KV Raigarh-

Raipur and 765 Champa Raipur linesWRTS-1 WRTS-1 Subject to Telemetry from

Durg PS RaipurN

90 400 Birsinghpur‐Vandana Vidyut

27‐Feb‐14 800 27‐Feb‐14 1700 Daily AMP of Terminal Equipment amp line Reactor WRTS‐I POWERGRID Ready N

91 400 Bhusawal-Akola 28-Feb-14 900 28-Feb-14 1700 Daily QMwork MSETCL MSETCL N92 220 Bus-1 at Wardha 28-Feb-14 800 28-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I N93 400 Birsinghpur‐Balco 28‐Feb‐14 800 28‐Feb‐14 1700 Daily AMP of Terminal Equipment amp line Reactor WRTS‐I WRTS‐I Deferred by site N

94 400 Nagda‐Dehgam2 5‐Feb‐14 1000 5‐Feb‐14 1800 DailyCommissioning amp checking of CSD relay in Main CB for reactor switching at Dehgam end by MS ABB

WRTS‐II POWERGRID N

95 400 400kV Satpura Itarsi 10‐Feb‐14 900 11‐Feb‐14 1700 DailyCommissioning of new CB after dismantling of existing TELK make CB at Satpura end amp normalising of line on main CB

POWERGRID

WRTS‐II N

96 765 765 kV Satna - Bina Ckt I

6-Feb-14 800 8-Feb-14 1800 cont Stringing of Jabalpur-Bina 765 kv SC Line PGCIL JTCL Original27-28 Jan14 Def N

97 765400 765400 kV ICT-1 at Bina 20-Feb-14 90000 AM 21-Feb-13 60000 PM Continuou

sCSD commissioning for 400kV Side CB of 765400 kV ICT-1 WRTS-II POWERGRID Deferred by site N

98 400 Nagda - Dehgam 1amp2 20-Feb-14 80000 AM 28-Feb-14 1700 Daily Online PID testing to insulators in both circuits AR shall be kept in non auto mode in both circuits WRTS-II POWERGRID

N

99 220MC Waluj-Chitegaon amp Waluj-Jalna

21-Feb-14 700 21-Feb-14 1900 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad MSETCL WRTS-I

N

100 400 Bus 1 at Asoj 21-Feb-14 000 21-Feb-14 1800 Daily For checking bus stability testing of Piran 1 amp 2 bays (for charging of new line) GETCO WRTS-II N

101 400 Bus-1 at Wardha 22-Feb-14 800 22-Feb-14 1800 Daily Jumper spacers connection at Wardha WRTS-I WRTS-I N102 400 Bus-1 at Raigarh 22-Feb-14 800 22-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I Deferred by site N103 765 Bus - II at Indore 22-Feb-14 90000 AM 23-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Not availed NLDC consenN104 220 Kakrapar-Haldarwa2 22-Feb-14 1000 Hrs 22-Feb-14 1600 Hrs Daily AMP POWERG

RID WRTS-II N

105 400 Bus 2 at Asoj 22-Feb-14 000 22-Feb-14 1800 Daily For checking bus stability testing of Piran 1 amp 2 bays (for charging of new line) GETCO WRTS-II N N

106400 400 kv DC Bhopal -

Bina Line (Ckt I amp II)(Tower no 34 amp35)

23-Feb-14 800 24-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line MPPTCLBDTCL

N

107 765kV SASAN Main Bus-1BBay 10 - Jack Bus 24-Feb-14 800 Hrs 2-Mar-14 1900 Hrs Continuous Dia-4

(Bay-10) - SCCOCC Test of Unit 4 GTSasan Sasan N

108 765 Bus - I at Indore 24-Feb-14 90000 AM 25-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID N

109 765 765 KV Bina-Indore Line 24-Feb-14 0900 Hrs 24-Feb-14 1800 Hrs Daily

For taking spare reactor unit in service amp checking the scheme for spare reactor with 765 KV Bina-Indore Line Reactor at Bina

POWERGRID WRTS-II

Deferred by site N

110 400 Kasor - GPEC 24-Feb-14 800 25-Feb-14 1800 Daily PMM Work GETCO GETCO N111 40022033 315 MVA ICT2 at Kheda 24-Feb-14 900 10-Mar-14 1800 cont modification work in SS lay out CSPTCL CSPTCL N112 400 315 MVA ICT2 at

Gwalior 25-Feb-14 90000 AM 25-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID N

113 400KV V-Satna-4 Line Shunt Reactor 25-Feb-14 1000 25-Feb-14 2000 Daily

Basis AMP NTPC NTPC N

114 400 Raipur-Wardha 1 26-Feb-14 800 26-Feb-14 2000 Daily Balance construction works at Wardha end WRTS-I WRTS-IReady Ori26214 Deferred by site

N

115 400 Bus -I at Indore 26-Feb-14 90000 AM 26-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Deferred by site N116 400 315 MVA ICT3 at

Gwalior 26-Feb-14 90000 AM 26-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID N

117 400 400 kV DC Damoh - Bhopal Line

26-Feb-14 800 26-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL N

118 400 Chorania-Kasor 26-Feb-14 800 26-Feb-14 1800 Daily PMM work GETCO GETCO N119 400 Koradi-Satpura sc 26-Feb-14 800 26-Feb-14 1600 Daily 765KV Tiroda Koradi Transmission LineII crossing

worksPOWERGRID MEGPTCL Cancelled by MEGPTL N

120 400 400 kV DC Damoh - Bhopal Line

26-Feb-14 800 26-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL N

121 400 Raipur-Wardha 2 27-Feb-14 800 27-Feb-14 2000 Daily Balance construction works at Wardha end WRTS-I WRTS-I Deferred by site N122 400 Vindhyachal-Satna2 27-Feb-14 1000 27-Feb-14 1800 Daily Commissioning of CSD Relay in ABB make main

CB at Satna WRTS-II POWERGRID Deferred by site N

123 400 Bus -II at Indore 27-Feb-14 90000 AM 27-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Ready N124 400 315 MVA ICT1 at

Rajgarh 27-Feb-14 90000 AM 27-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID Ready N

125 400400 KV SC Kosamba - Asoj line(730-740)

27-Feb-14 700 27-Feb-14 1800 cont Crossing of Dhule - Vadodara 765 kv SC Line GETCOBDTCL

N

126 400 Indore (MP) -Indore (PG)-DC 27-Feb-14 700 28-Feb-14 1600 Cont Stringing of 765kV Indore - Vadodara line POWERG

RID WRTS-II Deferred by site N

Anaulagnak 33(A)

maaca- 2014 AaOr Ap`Ola 2014 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR MARCH 2014 AND APRIL 2014

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)maaca- 2014 Ap`Ola 2014 maaca- 2014 Ap`Ola 2014

MARCH 2014 APRIL 2014 MARCH 2014 APRIL 2014

1 gaujarat

saIimat 11700 12100 7750 7800

AsaIimat 11740 12140 7760 7810

2 maQya p`doSa

saIimat 8340 9050 5338 5540

AsaIimat 8340 9050 5338 5540

3 CltaIsagaZ

saIimat 3200 3075 1929 1809

AsaIimat 3225 3105 1944 1827

4 maharaYT

saIimat 19000 19150 10200 10300

AsaIimat 19050 19200 10250 10350

5 gaaovaa

saIimat 425 410 300 295

AsaIimat 425 415 310 300

6 dmana dIva

saIimat 340 345 210 205

AsaIimat 345 350 225 210

7 DI ena eca

saIimat 635 640 445 425

AsaIimat 635 640 445 425

8 piScama xao~

saIimat 41961 43047 28500 27900

AsaIimat 42076 43173 29560 28840

Diversity factor of 10401

March 2014 and April 2014

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah frvarI 2014

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 1552 75

]k[- Ukai - 2 1719 75]k[- Ukai - 3 598 75]k[- Ukai - 4 1757 75]k[- Ukai (Total) 5627 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 024 2]k[- ela baI saI eca Ukai LBCH - 2 131 3]k[- ela baI saI eca Ukai LBCH (Total) 154 5 0008

3 kDanaa Kadana - 1 000 0 0005kDanaa Kadana - 2 246 62 0000kDanaa Kadana - 3 223 62kDanaa Kadana - 4 166 63 0000kDanaa Kadana (Total) 634 63 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 431 9 0020 6 kula jalaIya TOTAL(H) 6846 225 0401

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 2060 32 21822 TaoronT pavar ilaimaToD yauinaT DI 7979 125 69803 TaoronT pavar ilaimaToD yauinaT [- 075 122 07584 TaoronT pavar ilaimaToD yauinaT ef 8023 124 66915 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 018811 Qauvarna tapIya Dhuvaran - GT 2 000 0 041912 Qauvarna tapIya Dhuvaran - STG 023 1013 ]ka[- yauinaT 1 Ukai -1 000 0 005114 ]ka[- yauinaT 2 Ukai -2 000 0 010815 ]ka[- yauinaT 3 Ukai -3 3147 200 297216 ]ka[- yauinaT 4 Ukai -4 10588 202 1002617 ]ka[- yauinaT 5 Ukai -5 9496 210 884118 ]ka[- yauinaT 6 Ukai -6 23703 500 1844819 gaaMQaInagar 1 Gandhinagar - 1 000 0 008620 gaaMQaInagar 2 Gandhinagar - 2 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 000 0 029622 gaaMQaInagar 4 Gandhinagar - 4 000 0 036223 gaaMQaInagar 5 Gandhinagar - 5 11676 212 1148924 vaNakbaaorI 1 Wanakbori - 1 10648 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 11069 21026 vaaNakbaaOrI 3 Wanakbori - 3 1891 20627 vaaNakbaaOrI 4 Wanakbori - 4 5244 21228 vaaNakbaaOrI 5 Wanakbori - 5 5531 21029 vaaNakbaaOrI 6 Wanakbori - 6 000 030 vaaNakbaaOrI 7 Wanakbori - 7 8902 20931 ]trna Utran GT 1 000 0 019832 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 000 0 024635 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 000 0 0000

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Anaulagnak 41

ACTUAL GENERATION amp AVALABILITY FOR FEBRUARY 2014Actual vaastivak

Actual vaastivak

37 isaka Sikka - 1 3696 112 439838 isaka Sikka - 2 000 0 017639 kcC ilagnaa[-T Kutch Lignite - 1 4429 71 848640 kcC ilagnaa[-T Kutch Lignite - 2 4037 7241 kcC ilagnaa[-T Kutch Lignite - 3 3646 6742 kcC ilagnaa[-T Kutch Lignite - 4 2215 66 525343 saUrt ilagnaa[-T Surat Lignite - 1 6705 131 682544 saUrt ilagnaa[-T Surat Lignite - 2 7475 131 738745 saUrt ilagnaa[-T Surat Lignite - 3 6965 130 728846 saUrt ilagnaa[-T Surat Lignite - 4 6362 130 688647 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5454 107 848648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5649 11449 jaI Aa[- pI saI ela GIPCL GT - 1 1589 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1587 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1702 3552 jaI Aa[- pI saI ela GIPCL ST - 1 2902 5153 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 020556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 000 0 000060 jaI pI [- saI GPEC GT - 2 267 156 013261 jaI pI [- saI GPEC GT - 3 143 146 002762 jaI pI [- saI GPEC STG 131 17263 jaI esa [- jaI GSEG GT - 1 000 0 098964 jaI esa [- jaI GSEG GT - 2 1181 5065 jaI esa [- jaI GSEG STG 642 2366 Sugen (GT 1 + GT 2) 1767 308 602467 saIpIpI sao Aayaat Imp from CPP+MUNDRA 269359 6881

kula tapIya Total (T) 475652 8386 302021kula jalaIya+tapIya Total (H+T) 482498 8604 302422ivaMD [najaI- Wind Energy 52123kula jalaIya+tapIya+hvaa Total (H+T+Wind) 534621 9539ivainamaya Exchanges 155314 saIimat jaa- maaMga Restricted Energy Req 689935

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 6800 194

11 gaaMQaI saagar Gandhi Sagar 3366 117 008012 raNaa p`tap sagar RPSagar 5883 172 004013 javaahr sagar Jawahar Sagar 4350 99 0050

2 ponca Pench 3052 165 00903 baargaI Bargi 4581 91 00804 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 11764 315 02806 banasaagar Bansagar-2 (Deolondh) 000 07 banasaagar Bansagar-3 (Silpara) 1236 32 00708 banasaagar Bansagar-4 (Zinaha) 1320 22 00509 maoDIKoDa Medikheda 396 63

10 ibarisaMGapur Birsingpur 040 20 002011 Tavaa Tawa 000 012 rajaGaaT Rajghat 165 12 006013 Omkareshwar 10620 402 14 [Midra saagar Indira Sagar 23077 997 0849

kula jalaIya TOTAL(H) MPPGCL 59999 2365 1273Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 6049 98 232502 AmarkMTk II AMK II Unit -2 6080 983 AmarkMTk III AMK III Unit -5 12212 219 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 06505 satpura II Satpura-II Unit 6 10323 180 165906 satpura II Satpura-II Unit 7 5926 1807 satpura II Satpura-II Unit 8 10964 195 191608 satpura II Satpura-II Unit 9 8353 1709 satpura III Satpura-III Unit 10 000 0 2080

10 satpura III Satpura-III Unit 11 9447 182 1909011 esajaITIpIesa 1 SGTPS Unit - 1 9447 182 1909012 esajaITIpIesa 2 SGTPS Unit - 2 10572 18213 esajaITIpIesa 3 SGTPS Unit - 3 9037 192 2064014 esajaITIpIesa 4 SGTPS Unit - 4 10700 18015 esajaITIpIesa 5 SGTPS Unit - 5 28804 51216 SSTPS 6864 587 8930

kula tapIya Total (T) 133714 3002 115350kula jalaIya+tapIya Total (H+T) 193713 5735 116623Injection from WIND 000 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 193713 5735ivainamaya Exchanges 193660 saIimat jaa- maaMga Rest En Req 387372

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 850 120 00902 Gangrel 475 10 00503 Mini Micro KWB 039 7

kula jalaIya TOTAL(H) CSEB 1364 137 0150tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 47 127402 kaorbaa (pU) Korba (E) Unit-2 2764 483 kaorbaa (pU) Korba (E) Unit-3 2764 484 kaorbaa (pU) Korba (E) Unit-4 2784 465 kaorbaa (pU) Korba (E) Unit -5 3685 120 253306 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 247808 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 15410

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 15839 256 1197012 KORBA(EB) Extn - 2 15876 256 11770

kula tapIya Total (T) 119907 1880 10190013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 119907 1880kula jalaIya+tapIya Total (H+T) 121271 2017 102050ivainamaya Exchanges 40207 0saIimat jaa- maaMga Rest En Req 161478 2017

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 9590 585 25142 kaoyanaa III Koyna III 5920 3203 kaoyanaa IV Koyna IV 18012 11324 kaoyanaa DIpIeca Koyna DPH 1442 385 TaTa jalaIya TATA Hydro 10242 741 28836 vaOtrNaa Vaitarna 000 07 eladarI Eldari 528 168 BaTgar AaOr vaIr Bhatgar amp Vir 915 49 pOzana Paithan 175 59

10 itlaarI Tillari 1106 6511 BaIra Tola rosa Bhira Tail Race 374 4112 GaTGar Ghatghar 5297 29313 Anya CaoTo jalaIya Small Hydro (others) 6173 0

kula jalaIya TOTAL(H) 58910 1599 5397Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 7700 1954 naaisak 4 Nasik Unit -4 10772 1965 naaisak 5 Nasik Unit -5 11160 1976 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 28827 5058 Tambao 6 Trombay Unit -6 000 09 Tambao 8 Trombay Unit -8 000 0

10 Tambao 7A gaOsa Trombay -7A (Gas) 7882 135 250411 Tambao 7ba Trombay -7B (WHR) 4499 7212 kaoraDI 5 Koradi Unit -5 5003 16013 kaoraDI 6 Koradi Unit -6 3963 19014 kaoraDI 7 Koradi Unit -7 10015 19015 Bausaavala 2 Bhusawal Unit -2 8329 17016 Bausaavala 3 Bhusawal Unit -3 9248 18017 Bausaavala 4 Bhusawal Unit -4 22734 50518 Bausaavala 4 Bhusawal Unit -5 19742 41519 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 7451 18621 parlaI 5 Parli Unit -5 10626 18022 parlaI 6 Parli Unit -6 14013 25323 parlaI 7 Parli Unit -7 13728 26024 KaprKoDa 1 Khaperkheda Unit -1 11173 20025 KaprKoDa 2 Khaperkheda Unit -2 10373 19526 KaprKoDa 3 Khaperkheda Unit -3 10998 20127 KaprKoDa 4 Khaperkheda Unit -4 12019 20728 KaprKoDa 5 Khaperkheda Unit -5 28882 50730 parsa Paras-3 14447 25731 parsa Paras-4 13504 25932 ]rna Uran (Gas) 18284 33833 ]rna Uran (WHR) 000 148 586234 caMd`pur 1 Chandrapur Unit -1 9087 17735 caMd`pur 2 Chandrapur Unit -2 1816 19436 caMd`pur 3 Chandrapur Unit -3 11737 21037 caMd`pur 4 Chandrapur Unit - 4 11843 46038 caMd`pur 5 Chandrapur Unit -5 7759 45539 caMd`pur 6 Chandrapur Unit -6 24420 44240 caMd`pur 7 Chandrapur Unit -7 23258 041 DhaNaU 1 Dahanu Unit-1 16339 250 1427842 DhaNaU 2 Dahanu Unit-2 16196 250 1427843 CPP 193651 29840044 RGPPL Share 000 0

kula tapIya Total (T) 631479 15369 329920MAH Wind + Solar Generation 16922 0kula jalaIya +tapIya Total (H+T+Wind) 707311 17451 372239

TOTAivainamaya Exchanges 324731saIimat jaa- maaMga Rest En Req 1032042

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1871 26ivainamaya Exchanges 33252saIimat jaa- maaMga Rest En Req 35123 434

C (F) dmana AaOr dIva DAMAN amp DIU 18245 298ja (G) dadra nagar hvaolaI DNH 40600 655

kula DD ampDNH (T) 58845 952Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 9600 160 1399112 tara`pur 2 TAPS Unit -2 11069 16013 tara`pur 3 TAPS Unit -3 36144 545 6584014 tara`pur 4 TAPS Unit -4 36197 54715 kakrapr 1 KAPS Unit -1 15230 545 3134216 kakrapr 2 KAPS Unit -2 14662 547

kula ena pI saI NPC Total 122901 25042 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14008 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 13913 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14076 214 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 32894 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 33204 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 33190 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33176 514

kula kaorbaa KSTPS Total 174461 2498 10394427 ivanQa esaTIpIesa 1 VSTPS Unit-1 12762 21328 ivanQa esaTIpIesa 2 VSTPS Unit-2 12708 21529 ivanQa esaTIpIesa 3 VSTPS Unit-3 12854 212210 ivanQa esaTIpIesa 4 VSTPS Unit-4 12909 214211 ivanQa esaTIpIesa 5 VSTPS Unit-5 12174 215212 ivanQa esaTIpIesa 6 VSTPS Unit-6 12625 214213 ivanQa esaTIpIesa 7 VSTPS Unit-7 31487 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 31075 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 31592 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 31488 512217 ivanQa esaTIpIesa 11 VSTPS Unit-11 30948 512

kula ivanQayaacala VSTPS Total 232623 3750 15107 31 saIpt -1 -SIPAT-1 38822 66400 32 saIpt -2 -SIPAT-2 32404 66500 33 saIpt -3 -SIPAT-3 38930 66300 34 saIpt -4 -SIPAT-4 26383 51600 35 saIpt -5 SIPAT-5 26400 51400

kula saIpt -SIPAT TOTAL 162939 285000 838941 kvaasa gaOsa 1e Kawas GT-1A 792 10742 kvaasa gaOsa 1baI Kawas GT-1B 2623 10943 kvaasa esaTI 1saI Kawas ST-1C 1571 11444 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 4986 304 222951 gaMQaar gaOsa 1 Gandhar GT-1 000 052 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 000 054 gaMQaar esaTI 4 Gandhar ST-4 000 0

kula gaMQaar GGPS Total 000 0 000061 maaOda 1 Mauda -1 19614 514 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 19614 514 1422661 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 000 31 000071 esa esa pI SSP RBPH - 1 6753 19372 esa esa pI SSP RBPH - 2 5907 19273 esa esa pI SSP RBPH - 3 5577 19574 esa esa pI SSP RBPH - 4 5513 19475 esa esa pI SSP RBPH - 5 7237 19476 esa esa pI SSP RBPH - 6 3109 19277 esa esa pI SSP CHPH - 1 1817 4078 esa esa pI SSP CHPH - 2 491 3679 esa esa pI SSP CHPH - 3 000 0710 esa esa pI SSP CHPH - 4 1639 39711 esa esa pI SSP CHPH - 5 901 37

kula esa esa pI SSP Total 38944 1312 389481 kula poMca Pench Total 3052 165 009082 Jindal Injection 38956 083 Amarkantak Lanco 15478 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2372740

(J) ]plabQata Availability 2308426 naoT ivainamaya Net Exchanges -292048 ]plabQa jaa- Energy Availability 2016379

maah frvarI 2014 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR FEBRUARY 2014 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 11532 - - - 11532 020214 1100 4993

saIimat Restricted 11700

AsaIimat Unrestricted 11740 11532 0 28 0 11560 010214 1200 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8366 8366 17022014 0500 5007

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9346 - - - 9346 120214 0900 4986

saIimat Restricted 8340

AsaIimat Unrestricted 8340 9346 0 38 0 9384 120214 0900 4986

nyaUnatma pMjaIkRt maaMga Min Registered Demand 3204 3204 270214 0200

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3210 3210 070214 1900 4989

saIimat Restricted 3200

AsaIimat Unrestricted 3225 3210 233 12 0 3246 070214 1900 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1617 1617 230214 2300 5021

maharaYT MAHARASHTRApMjaIkRt Registered 18510 - - - 18510 050214 1100 4984

saIimat Restricted 19000

AsaIimat Unrestricted 19050 17980 1655 -13 0 19622 190214 1200 5002

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12005 12005 280214 0400 5037

gaaovaa GOApMjaIkRt Registered 425 434 - - 434 130214 1400 5006

AsaIimat Unrestricted 425 434 1 -1 - 434 130214 1400 5006

nyaUnatma pMjaIkRt maaMga Min Registered Demand 311 311 100214 0300

essaar ESSAR(ESIL)pMjaIkRt Registered 487 - - 487 240214 1700 5004

AsaIimat Unrestricted 487 0 0 - 487 240214 1700 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 268 - - 268 250214 1200 5003

AsaIimat Unrestricted 268 0 0 - 268 250214 1200 5003

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 644 - - 644 260214 1200 4999

AsaIimat Unrestricted 644 0 - 644 260214 1200 4999

nyaUnatma pMjaIkRt maaMga Min Registered Demand 508 508 280214

piScama xao~ WESTERN REGIONpMjaIkRt Registered 42253 - - - 42253 110214 1100 4994

saIimat Restricted 41961

AsaIimat Unrestricted 42076 42021 850 235 0 43106 120214 1100 4994

nyaUnatma pMjaIkRt maaMga Min Registered Demand 27524 27524 280214 0400 5040 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

piScama xaoi~ya Baar p`oYaNa kond` mauumba[-

णाली चालन-ISO-I

ANNEXURE-43

माह फरवर 2014 February2014

समातरवतीय चालन PARALLELRADIAL OPERATION

TOTAL OPERATING

HOURS 1 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-NR) 66972

2 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-SR) 67200

टाई लाईन TIE LINE 1 765कवी िसवनी स वधा-I 765kV Sonito Wardha 67200 2 765कवी िसवनी स वधा-II 765kV Seonito Wardha 65247 3 400 कवी िभलाई स कोराड 400kV Bhilai to Koradi 67200

4 400 कवी िभलाई स भिावती 400kV Bhilai to Bhadravati 67200

5 400 कवी रायपर स भिावती-I 400kV Raipur to Bhadravati-I 67200

6 400 कवी रायपर स भिावतीETHII 400kV Raipur to Bhadravati-II 67139

7 400 कवी रायपर स भिावतीETHIII 400kV Raipur to Bhadravati-III 67200

8 400 कवी सातपरा स कोराड 400kV Satpura to Koradi 67200

9 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 67004 10 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 65308 11 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 66259 12 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 67200 13 400 कवी को हापर स मापसा-I 400kV Kolhapur-Mapusa-I 38740

14 400 कवी को हापर स मापसा-II 400kV Kolhapur-Mapusa-II 49532

15 400 कवी वापी स बोईसर 400kV Vapi-Boisar 67200

16 400 कवी रायगढ़ स ःटरलाइट-I 400kV Raigarh to Sterlight-I 66258

17 400 कवी रायगढ़ स ःटरलाइट-II 400kV Raigarh to Sterlight -II 67200

18 400 कवी रायगढ़ स झरसगड़ा-I 400kV Raigarh to Jharsuguda-I 67200

19 400 कवी रायगढ़ स झरसगड़ा-II 400kV Raigarh to Jharsuguda-II 67200

20 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 65028

21 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 66132

22 400 कवी रायपर स वधाETHI 400kV Raipur to Wardha-I 66836

23 400 कवी रायपर स वधाETHII 400kV Raipur to Wardha-II 67200

24 220 कवी कोरबा पव स ब पादर-III 220kV K(E) to Budhipadar-III 63853

Anaulagnak 47Annex-47

maah frvarI 2014 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39514 64944

10287 39711

Levels in Mtrs str maITr maoM

]ka[- Ukai

64392

9914

25402

25994

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF FEBRUARY 2014

ivavarNa Particulars

TRIPPING DETAILS FOR THE MONTH OF FEBRUARY 2014

Sr No Brief Details of incident (Elements Generation Tripped) Owner Utility Date amp Time Load

Gen LossCategory

1 Multiple Tripping from 400 kV New Koyna MSETClMSEGCLRGPPL 05‐02‐2014 0950 Hrs ‐ GI‐2

2Bus Bar protection mal‐operation at 400 kV Soja in Gujarat resulting in multiple Tripping

GETCO 06‐02‐2014 1755 Hrs ‐ GI‐2

ANNEXURE ‐ 5

  • annexpdf
    • 21pdf
    • 231pdf
    • 232pdf
    • 24pdf
    • 25pdf
    • 31pdf
    • 32C1pdf
    • 32C2pdf
    • 33Apdf
    • 41pdf
    • 42pdf
    • 47pdf
    • 5pdf
Page 4: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014

4

457th OCCM AGENDA

Annex 41 - Actual Generation and Requirement for February 2014 Annex 42 - Peak Demand Schedule Vs Actual for February 2014 Annex 43 - Integrated Operation of the System and Operation of Inter State Tie lines for February 2014 Annex 47 ndash Details of level of Major Reservoirs in Western Region for February 2014

The Sub-Committee may like to note ITEM NO 5 SYSTEM DISTURBANCES IN WESTERN REGION There was no major grid disturbance in the Western Region during the month The

tripping details and Voltage profiles have to be furnished by WRLDC to WRPC on first

working day of the month as same have to be reported to MOP via GM division of

CEA Accordingly WRLDC may kindly furnish the tripping details to WRPC for

necessary action The tripping details during the month received from WRLDC is

enclosed at Annexure-5 The Sub-Committee may like to notediscuss ITEM NO 6 Healthiness status of SERsDRs of equipment in the system

Constituents have furnished the status of healthiness of SERDRs in their systems on the dates below

Sl No Name of

constituents Date of Receipt

1 PGCILWRTS-I 06032014 2 PGCILWRTS-II 08032014 3 MPPTCL 11032014 4 NTPC 05032014 5 CSPTCL 05032014 6 GETCO 11032014 7 MSETCL 11032014

Constituents of WR are requested to ensure healthiness and sent information to this

office regularly as per the recommendation of enquiry committee of Grid disturbances on

25022007 and 28022007

The sub-Committee may like to note

ITEM NO 7 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS TRANSMISSION LINES AND GENERATING UNITS IN WR

71 Status of completion of ongoing Schemes for Commissioning of reactors As per the approval of 33rd standing committee of WR and subsequently discussion in 23rd WRPC meeting the following reactors have to be installed at the various occasions in WR Accordingly the information regarding the commissioning schedule is as below

5

457th OCCM AGENDA

S No

400 kV Substn

Size (MVAR)

Implementing agency

Expected commissioning date

1 Ranchodpura 125 MVAR GETCO Commd On 8th July 2013 2 Varsana 125 MVAR GETCO Commd On 25th July 2013 3 Rajkot 125 MVAR GETCO Commd On 5th August 2013 4 Amreli 125 MVAR GETCO Commd On 12072013 5 Jetpur 63 MVAR GETCO Commd on 11072013 6 Zerda 125 MVAR GETCO Commd in July 2013 7 Kosmba 80 MVAR GETCO Commissioned on 29112013 8 Limbdi (Chornia) 125 MVAR GETCO 25th July 2013 9 Jabalpur 125 MVAR PGCIL June 2014 10 Khandwa 125 MVAR PGCIL June 2014 11 Shujalpur 125 MVAR PGCIL June 2014 12 Bhatapara 125 MVAR PGCIL June 2014 13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014 16 Sholapur 125 MVAR MSETCL 2014 17 Kolhapur 125 MVAR MSETCL 2014 18 Akola 125 MVAR MSETCL 2014 19 India bull 80mvar BR MSETCL Commissioned 26112013 20 Nagda 125 MVAR MPPTCL September 2014 21 Bhopal 80 MVAR MPPTCL March 2014 22 Damoh 125 MVAR PGCIL August 2014 23 Bachau 125 MVAR PGCIL August 2014 24 Pirana 125 MVAR PGCIL August 2014 25 Itarsi 2X125

MVAR PGCIL August 2014

26 Seoni 125 MVAR PGCIL August 2014 27 Parli 125 MVAR PGCIL August 2014 28 Raipur 125 MVAR PGCIL August 2014 29 Gwalior 125 MVAR PGCIL August 2014 30 Nagda 50 MVAR MPPTCL 2014 31 ISP 125 MVAR NHDC 2015 32 Satpura 50 MVAR MPPTCL March-2015 33 Sasan 240 Reliance

Utilities are requested to ensure that reactors are installed and commissioned according to the schedule agreed as above Utilities may give update on the status of implementation

6

457th OCCM AGENDA

72 Status of completion of 765400 kV and above on going Transmission Schemes being executedimplemented by Transmission Agencies

The updated status on various ongoing transmission schemes for the year 2013-14 as per the current information available is as follows - S No

Name of the Line Target Completion Date

Remarks

POWERGRID 1 400 kV Vapi(PG)-Navsari Commissioned on

16032013 2 400 kV Navsari - Navi Mumbai DC

Line Feb- 2014 ROW problem

3 765kV SC Satna-Gwalior line (Ckt-I) January - 2014 4 765kV SC Satna-Gwalior line

(359Km + 60Km DC Portion) Ckt-II Feb- 2014

5 765 kV Sasan-Satna-II Commissioned on 010613

GUJARAT 1 400 kV DC Kosamba-Chorania line

(Package I)(From Chorania SS to AP-54)

March -2014

2 400 kV DC Kosamba-Chorania line (Package II)(From Kosamba SS to AP-54)

March -2014

3 400 kV DC Mundra-Zerda line No 1 August -2014 4 400 kV DC Mundra-Zerda line No 2 April -2014 5 400 kV DC Vadinar-Amreli line April -2014 6 400kV Mundra-Hadala LILO to

Halvad April -2014

7 400 kV DC Amreli-Kasor line(Part-1) April -2014 8 315 MVA IInd ICT at Kosamba SS Charged on 15112013 MADHYA PRADESH 1 Malwa-TPH-Pithampur 400KV

DCDS Line 2324102013

2 Malwa TPH-Chhegaon 400 KV DCDS Line

Ckt ndashI on 22032013 Ckt-II on 11072013

3 Chhegaon-Julwania 400 KV DCDS Line

March - 2014

4 Pithampur- Indore 400KV DCDS Line March- 2014

5 Satpura TPH-Ashta 400KV DCDS Line

December ndash 2014

CSPTCL 1 400 kV Korba (W)-Khedamara

DCDS Ckt II LILOed at Marwa August 2013 Test charged on

20082013

2 400 kV Khedamara- Raita DCDS February -2014

3 400kV DCDS Marwa-Raipur(Raita) January - Test charge from Raipur

7

457th OCCM AGENDA

2014 end in August 2013 4 LILOof 400kV K(W)-Khedamara line

at Marwa (one ckt) April -2014

MAHARASHTRA(STU)

1 400KV Chandrapur- II- Warora DC Dec - 2013 end

2 400KV DC line from Koradi-II to Wardha SS(PG) DC

March - 2014

3 400 kV Chandrapur-Warora-II Commissioned on 16012014

4 400 kV Bableshwar-Sinner Ckt-II Commissioned on 27122013

5 400 kV Chandrapur-Parli-II LILO at Chandrapur-II SS

Commissioned on 16012014

MAHARASHTRA (IPTC route) by WR Transmission (Mah) Pvt Ltd

1 400 kV Parli(PG)-Pune DC Commissioned Ckt - 1 on 08112013 Commissioned Ckt - 2 on 10112013

2 400 kV Pune (PG)-Aurangabad (MSETCL) DC

November-13 Commissioned Ckt - 1 on 05122013 Commissioned Ckt - 2 on 04122013

3 LILO Lonikhand ndashKalwa at Pune(PG) Lonikhand-Pune charged on 2130 on 09072013 and Kalwa ndashPune at 2145 on 09072013

GUJARAT (IPTC route) by WR Transmission (Guj) Pvt Ltd

1 400 kV Rajgarh(PG)-Karamsad (GETCO) DC

May -2014

The Sub-Committee may notediscuss

73 Commissioning of new Generating units in Western Region and the capacity expected to be commissioned during the current year 2013-14

The status regarding Generating units commissioned expected to be commissioned during the current year 2013-14 according the available information is as below

Name of the Power Projects Unit No Capacity (MW)

Date of Commissioning Schedule Date

GUJARAT Ukai 6 500 COD on 08062013 Pipavav CCPP- GPCL amp GSPC joint venture Block-1 350

March- 2014 Made in synchronized on

8

457th OCCM AGENDA

10102013 Bhavnagar Lignite TPP-JV I 250 August 2014 II 250 August 2014 UNO SUGEN 1 3825 COD on 04042013 CHHATTISGARH Marwa TPS I 500 25122013 Korba (w) Ext-5 500 COD on 05092013 KSK Mahanadi 3 600 COD on 14082013

VEDANTA VIDYUT 1 135 Synchronized on 11082013

MAHARASHTRA

INDIABULLS (Amaravati) 1 270 Synchronized on 03062013

INDIABULLS (Amaravati) 2 270 January-2014 INDIABULLS (Sinnar) 1 270 March-2014 VIPL(Butibori) 1 300 COD on 05042013

VIPL (Butibori) 2 300

First synchronized on 02012013 Full load on 19032013

GMR EMCO 2 300 COD on 27082013 Dhariwal 1 300 Synd On 2913 Bhusawal 5 500400 COD on 03012014 MADHYA PRADESH

SINGAJI TPP 1 600

Synchronized on 31082013 Coal fired on 30092013

2 600 June-2014 Ms Jhabua Power Seoni 1 300 JANUARY ndash 2014 MB Power Anuppur 1 300 JANUARY ndash 2014 Satpura 11 250 Synchronized on 02102013 SATPURA 10 250 COD on 18082013 CENTRAL SECTOR Vindhyachal TPP IV 12 500 Feb-14 MAUDA 2 500 Feb-14

The WR utilities may intimate the current status on above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS (A) FOLLOW-UP ITEM NO 81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the Third quarter

(October 2013 to December 2013) for the year 2013-14

The Sub-Committee members may like to note and furnish details in respect of above

9

457th OCCM AGENDA

ITEM NO 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR

Status of physical amp cyber security in Power Sector for the Third quarter (October

2013 to December 2013) have not been received from some of the constituents

The Sub-Committee may like to note and furnish details in respect of above ITEM NO 83 ADMS IMPLEMENTATION STEP BY GETCO A pilot project in respect of ADMS have been successfully implemented by GETCO in

11 kV Sadhi feeder (MGVCL ) on 19022014

GETCO may like to presentation on the same ITEMS FROM WRLDC ITEM NO 91 PERFORMANCE OF WR CONSTITUENTS POST THE IMPLEMENTATION OF DEVIATION SETTLEMENT MECHANISM ON 17022014 The IEGC second amendment as well as the Deviation Settlement Mechanism is in

force wef 17022014 The performance of WR constituents during first 10 days ie

from 17th to 28th Feb 2014 comprising of 960 time blocks is illustrated below Members

may like to analyze and devise suitable measures to ensure compliance to the above

CERC regulations

10

457th OCCM AGENDA

Since the decisions in real-time are based on the SCADA data it is now important to

monitor and ensure correctness of drawal injection as seen in SCADA The chart

below indicates the difference between the drawal of constituents as seen in SCADA

and as recorded in SEM for the period of 01st Feb 2014 to 16th February 2014 It may

be seen that the significant difference between SCADA and SEM needs to be

addressed by ensuring healthiness of telemetry and periodic validation by the SCADA

team at the respective SLDCs and WRLDC

The sub committee may like to discuss the same

11

457th OCCM AGENDA

ITEM NO 92 UNDER DRAWAL BY MAHARASHTRA AND INSECURE OPERATION IN THE GRID ON 27-28 FEB 2014

During late night of 27th Feb and early morning hours of 28th Feb-14 the grid

frequency remained above 502 Hz continuously for five hours from 2252 hrs of 27-

02-2014 to 0407 hrs of 28-02-2014 The situation was caused due to demand

reduction across the WR and NR on account of widespread rains and persistent under

drawal by Maharashtra during the above period as illustrated in figure-1 below

5067

49

492

494

496

498

50

502

504

506

508

‐1000

‐850

‐700

‐550

‐400

‐250

‐100

50

200

350

500

650

800

2100

2115

2130

2145

2200

2215

2230

2245

2300

2315

2330

2345

000

015

030

045

100

115

130

145

200

215

230

245

300

315

330

345

400

415

430

445

500

515

530

545

600

615

630

645

700

716

731

746

Maharashtra Deviation from schedule vis‐a‐vis grid frequency2100 hrs of 27‐02‐2014 to 0800 hrs of 28‐02‐2014

MSEBUI FREQ

Deviation from Schedule

Frequency

MW Hz

Several messages were sent from WRLDC control room to SLDC Kalwa directing them to control their under drawal from the grid Details of these messages is tabulated below

Sl No Message sent to Ref No Message date and time

1 SLDC Maharashtra 56079 27022014 2210 hrs

2 SLDC Maharashtra 3070 27022014 2230 hrs

3 SLDC Maharashtra 3078 28022014 0125 hrs

4 SLDC Maharashtra 3079 28022014 0150 hrs

Despite the above messages the response from SLDC Kalwa was inadequate in

controlling the under drawal of Maharashtra Consequently the frequency touched

5069 Hz at 0211 hrs of 28-Feb 2014 the voltage across the grid increased sharply

and there was over injection from WR to other regions Subsequently as a

contingency measure the drawal schedule of Maharashtra was reduced by 600 MW

by suo motu revision in the requisition of Maharashtra in Korba Vindhyachal Sipat

12

457th OCCM AGENDA

and Vidhyachal STPS wef 0230 hrs to 0500 hrs of 28022014 This was later

extended up to 0700 hrs of 28022014 It was a near miss situation that could have

been avoided by adequate planning and commensurate actions in real-time It is

requested that the matter may be taken up at the highest level in MSETCL and a

separate meeting may be convened on the above subject to avoid reoccurrence of

such event in future

The sub committee may like to discuss the same

ITEM NO 93 NON AVAILABILITY OF REAL-TIME TELEMETRY FROM LARGE NUMBER OF STATIONS IN MAHARASHTRA There are 224 nodes in Maharashtra that comprising of 32 Generating stations and

192 substations Out of these 224 nodes 47 locations are yet to be integrated in the

System Out of the balance 177 the data from nearly 50 nodes are not coming since

last 6 months Thus in totality data is not available from more than 135 out of 224

stations ie 60 which is highly alarming The extremely poor status of telemetry in

the state of Maharashtra has become a security threat Maharashtra load is touching

17500 MW and there are large number of construction related outages that have to be

facilitated Further with the formation of the synchronous All India grid there is a need

for close monitoring of system parameters such as the line flows voltage and grid

frequency Inadequate telemetry is resulting in severe constraints in real time

operation as well as outage coordination There have been several instances of line

tripping on high voltage and SPS operation due to sudden increase in line flows

during hour boundary or during facilitating planned outage These events could be

minimized with better supervision if the telemetry is available

The telemetry issue in Maharashtra has been discussed in the various WRPC forums

wherein it was informed by MSETCL that the problem is due to failure of Ms Tulip

who was the service provider for the communication network During the month of

August 2013 representative from MSETCL had assured that a new contract was being

awarded and the situation would improve within one month The extracts from minutes

of 451st OCC is quoted below

QUOTE

13

457th OCCM AGENDA

ldquoMSETCL stated that they were working to resolve the issue and assured that there

would be an improvement in availability of Telemetry from Maharashtra stations within

one Monthrdquo

UNQUOTE

Representative of MSETCL may apprise the OCC regarding present status and the

likely schedule for resolution of the issue

The sub committee may like to discuss the same

ITEM NO 94 STATUS OF LINE AND BUS REACTORS AT 765 KV SASAN

The line reactor of 765 kV Sasan-Satna ckt-2 as well as the Bus reactors of 765 kV Sasan bus are yet to be commissioned at Sasan end In the absence of these reactors high voltage is experienced at Sasan and nearby stations Often one circuit of 765 kV Sasan-Satna is required to be opened for voltage regulation Consequently the reliability of evacuation of generation from two units of Sasan is affected During 456th OCC meeting the revised schedule of the above elements as informed by Ms Reliance was as under

Schedule in formed in meetings 451st OCC 455th OCC 454th OCC 1 Line reactor of 765

kV Sasan-Satna ckt-2

By Dec 2013 By April 2014 By May 2014

2 765 kV Bus-1 Reactor

Jan 2014 By Mar 2014 By June 2014

3 765 kV Bus-2 Reactor

Jan 2014 By Mar 2014 By June 2014

It was decided in 456th OCC meeting that one representative from MPPTCL would visit the SASAN site to check readiness of Line and Bus reactors Representative from MPPTCL and Sasan may apprise the OCC-members on the progress of commissioning of reactors at 765 kV Sasan OCC members may also be apprised of the tap position of the generator transformer 2 and 3

The sub committee may like to discuss the same

14

457th OCCM AGENDA

ITEM NO 95 CHARGING OF NEW TRANSMISSION ASSET IN THE GRID In order to have better coordination of the transmission utilities with RLDCNLDC during charging synchronization of new elements into the grid a communication has been received from NLDC (ref POSOSCONLDCSystem OperationOutage Planning1239) on 10022014 It has been proposed that

a Owner of the asset shall submit the request for expected chargingcommissioning of new element for the calendar month latest by 5th day of the month to the respective RLDC amp NLDC along with status of activities mentioned in the check-list

b RLDC shall study the impact of the new element commissioning and based on its assessment of the preparedness of the utility may recommend to NLDC who in turn would examine the issue independently considering pan India grid scenario

c After the above the owner of the new asset shall give its readiness to charge the new element atleast three days in advance with current status of activities mentioned in the check list

Check list is as under 1 List of elements to be charged along with the details of approval of the

transmission scheme from the Standing CommitteeCTUSTU 2 Single Line Diagram of the concerned substations along with status of

completion of each diabusbreakers 3 Availability of real-time data and communication to the designated

SLDCRLDC 4 Installation of Special Energy Meter complying with CEArsquos Regulations

(Serial number Meter number CTPT ratio to be indicated) 5 Charging Instructions by CTUSTU 6 Schedule and sequence of charging of elements 7 Availability of line bus reactors as per planning In case the transmission

system is planned to be charged without the planned line reactor requisite authorization from CTUSTU by studies

8 Connection Agreement (along with all annexures) with CTU or STU 9 Copy of Long term Access (LTA) or MTOA granted by CTU or STU as the

case may be 10 Copy of Power Purchase Agreement (PPA) 11 A signed undertaking with name and designation of the officer clarly

indicating the following a All Disturbance recorders (DR) and Event Loggers (ELs) with time

synchronization are commissioned b All protective systems have been commissioned c All statutory clearances have been obtained

12 Output of EL and DR after charging

15

457th OCCM AGENDA

Each document mentioned in check list from Sl No 1 to 10 must be attached for sake of completeness and emailed as a consolidated document to the nodal RLDC well before the new element charging date The sub-committee may like to discuss ITEM NO 96 OPENING FEEDERS WITHOUT PRIOR INTIMATION TO WRLDC

It was gathered based on the observation from WRLDC SCADA data and subsequent

discussion with MPPTCL that 220 kV Bina (MP)-Gwalior(MP) DC were taken under

shut down for LILO works at Datia at 0910hrs on 23022014 for 4 days The outage

of these lines was neither discussed in OCC and neither was there any intimation to

WRLDC before availing the outage These lines are included in the important grid

elements list of Western region and prior concurrence of WRLDC is required for

switching these lines Further these lines form the parallel path to 765 kV Bina-Gwalior

DC and with the shutdown of these lines the network upstream of WR-NR inter

regional corridor was depleted

The sub-committee may like to discuss ITEM NO 97 TRIPPING OF 765 KV LINES ON OVER VOLTAGE Recently several tripping of 765 kV lines have been reported on over voltage These are indicated below

1) 765 kV Bina-Gwalior I at 2358 hrs of 16022014 2) 765 kV Bina-Gwalior I at 2011 hrs of 14022014 3) 765 kV Satna-Gwalior at 1300 hrs of 06022014 4) 765 kV Sasan-Satna II at 0013 hrs of 18012014 5) 765 kV Jabalpur-Bina I at 2350 hrs of 10012014 6) 765 kV Jabalpur-Bina II at 0405 hrs of 06012014

It is understood that the adopted Stage-I OV setting for the above lines vary from 108 (ie 826 kV) to 110 (841 kV) As per SCADA data the bus voltage at any of the substations mentioned above had not reached 826 kV during the above incidents

POWERGRID may examine the above tripping in detail and apprise the OCC regarding the above In case of issues related with protective relays field equipment are detected these may be addressed at the earliest The sub-committee may like to discuss

16

457th OCCM AGENDA

ITEM NO 98 RGMO FGMO OF MANDATED GENERATORS IN WESTERN REGION

As per the latest information available at WRLDC there are 251 number of units with a total capacity of 57517 MW in Western Region that are mandated to operate in Restricted Free Governor Mode The need for compliance to the IEGC regulations wrt RGMOFGMO was emphasized in the 455th and 456th OCC meeting as well as during the 25th TCCWRPC meeting Subsequently it was communicated by email to all entities in WR to provide the latest status of RGMOFGMO implementation We have received updated status from MPPTCL LANCO CGPL DB Power and JPL Tamnar in Feb 2014 The latest state wise RGMOFGMO summary is given below

Name of Entity No of mandated units

RGMO FGMO available at

RGMOFGMO Not available at

Maharashtra 90 35 55 Madhya Pradesh 58 36 22 Gujarat 35 19 16 Chhattisgarh 10 3 7 CGPL 5 5 0 NCA 11 6 5 SASAN 2 1 1 NTPC 24 10 14 ESSAR_Mahan 1 1 0 NSPCL 2 2 0 KSK 1 1 0 KWPCL 1 0 1 DB POWER 1 1 0 JPL 5 4 1 LANCO 2 2 0 IEPL 1 0 1 EMCO 2 0 2 WR_Total 251 126 125

WRLDC vide its letter ref WRLDCRGMO-FGMO1-2014 dated 23012014 has issued directions under Section 29 of the Electricity Act to ensure compliance of IEGC regulations 52 (f) (g) (h) and (i) All utilities are requested to furnish the status of compliance in respect of generating units under their jurisdiction The sub-committee may like to discuss ITEM NO 99 STATUS OF TELEMETRY IN WESTERN REGION

The status of telemetry related issues in respect of WR constituents is as under

a) Chhattisgarh Data (except MW) from 500 MW Korba West extension generating station is not available Status points from 400 kV Raita pending

17

457th OCCM AGENDA

b) Madhya Pradesh Telemetry of following bus reactors is not available at WRLDC

S No

Station Name Bus Reactor

Nunber x Capacity

Total MVAR

Rated voltage

Status of Telemetry at

WRLDC1 Nagda 250 100 420 Not available2 Indore 225 50 33 Not available3 Bhopal 225 50 33 Not available4 Birsinghpur 150 50 420 Not available

c) Gujarat Data is not-availableintermittent from following stations in Gujarat

a 220 kV Nano of Tatamdash(not available) b Kansari 400 kV ss and Navsari 220 kVhellipIntermittent (PLCC Problem)

d) Goa Due to non-availability of SCADA data from Goa the difference between drawal as seen in SCADA and as recorded in SEM is as high as 572 during the period 1st Feb to 16th Feb 2014 Data from the following stations in Goa is not available at WRLDC S No Station Status

1 Amona 220 kV Not available 2 Cuncolin 220 kV Not available 3 Kadamba 110 kV Intermittent 4 Tivim 220 kV Intermittent 5 Ponda 220 kV Intermittent 6 Xeldam-220 kV Intermittent 7 Verna-110 kV Intermittent

e) Daman amp Diu

Due to non-availability of SCADA data from Daman amp Diu the difference between drawal as seen in SCADA and as recorded in SEM is as high as 571 during the period 1st Feb to 16th Feb 2014 Data from The error is mainly due to non-availability of data from 220 kV Magarwada

f) DNH Telemetry from 220 kV Kharadpara and Khadoli station is not available

g) POWERGRID The data from the following stations is not available at WRLDC

1) 765 kV Tamnar (Communication problem GPRS link is not stable)

18

457th OCCM AGENDA

Telemetry from following stations is Intermittent at WRLDC 1) 765 kV Durg (PLCC frequent problems)

2) 765 kV Kotra (communication intermittency)

3) 765 kV Gwalior (PLCC link established but still there is some

issue(Delay) in data updation at WRLDC Rectification work under

progress by Site Engineer

4) 765 kV Solapur - Redundant link established through Reliance but

the gateway connected to above link is not configured for 765 KV

data Hence when BSNL link is down 765 KV data is not updating at

WRLDC

The sub-committee may like to discuss

ITEM NO 910 COMPARISON OF DRAWAL AS SEEN IN SCADA VS SEM The IEGC second amendment and the Deviation Settlement Mechanism is in force since the 17022014 The IEGC stipulates maintaining injection drawal within the limits prescribed in the Deviation Settlement Mechanism The sub-committee may like to discuss ITEM NO 911 MOCK BLACK START EXERCISE

As per sec 58(b) of IEGC the usersSTUs etc need to conduct Black start mock

exercises in their respective systems once in every six month under intimation to

RLDC Also the all the black start Diesel Generator (DG) sets are [as per sec 58(b)

of IEGC] required to be tested weekly and the test report needs to be sent to RLDC

on quarterly basis

The following table summarizes the status of mock exercises in respect of black start

facilities in Western Region

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

GUJARAT

1 Ukai (H) 4 x 75 Hydro Diesel 500 kVA 221213 Y

2 Mini Hydro 2 x 25 Hydro Diesel 50 KW N

3 Kadana 4 x 60 Hydro Diesel 500 KVA 2413 Y (2413)

19

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

4

Dhuvaran

1 x 107 (68+39) + 1 x 112 (72+40)

Gas

Details to be furnished by Gujarat

Details to be furnished by Gujarat

N

5 GIPCL-I 3 x 32 + 1 x49

Gas Steam Diesel 141 KW

070912 Y

6 GIPCL-II 1x104+1x56 Gas Steam Diesel 500 kVA N

7

Torrent Power Stn C Stn- DEFCCPP

StnC2x30 StnD120 StnEF(110MW each)CCPP100MW

Thermal (Units-CDEF) Gas(CCPP)

Stn-C islands Diesel

StnC15kVA StnDE F and CCPP(500 kVA each)

281112

Y

8 GPEC 3x138+1x241 Thermal Natural Gas 3000 kVA N

9 Sugen 3x3825 MW Gas Diesel 2x6MVA N

Madhya Pradesh

10 Gandhisagar 5 x 23 Hydro DG set 100 kVA N

11 Birsinghpur 1 x 20 Hydro Battery 220 Volt

Battery N

12 Pench 2 x 80 Hydro DG set 250 kVA 121012 Y

13 Bargi 2 x 45 Hydro DG set 250 kVA 100212 Y

14 Bansagar Stage-I 3 x 105 Hydro DG set 250 kVA N

15 Indira Sagar 8x125 Hydro DG set 2x1000

KVA 22511 Y

Chhattisgarh 16

Hasdeo Bango 3 x 40 Hydro DG Set 250 kVA 250812 N

17

Korba(E)-phse-I

Power plant retired but Black start DG set available and on- load trial is reported to be carried out regularly

DG Set 1500 kW(33kV)

N

Maharashtra

18

Koyna I amp II

4 x 65 4 x 75 Hydro

House generator

2 MVA 231013 N

19 KDPH 2 x20 Hydro DG set 310 KW N

20 Eldari 3 x 75 Hydro DG set 6 KW N

21

Uran (Gas)

4 x 60 (GT) + 4x108 (GT)+ 2x120 WHR

Gas DG set

4 MW PH1412kVA PH2450kVA WH520kVA

161012

N

20

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

22 RGPPL

Block 1 640MW+Block 2 66354MW+Block 3 66354MW

Gas

Gas Turbine (Frame-6)

35 MW (Under testing) Details to be provided by RGPPL

N

23 Ghatghar 2x125 Hydro DG set 1x1250

kVA 51012

N

24 Khopoli 3x24+2x12 Hydro

DC Governor amp bearing oil pumps

DC power (self start)

271013 (detailed report awaited)

N

25 Bhivpuri 3 x 24 +

2 x 15 +2x12 Hydro

DC Governor amp bearing

-do-

N

26 Bhira 6 x 25 Hydro

1 Noof 500 KVA house generator with water turbine

500 kVA

201013 (detailed

report awaited)

N

27

Bhira PSS 1 x 150 Hydro DG set 500 kVA

N

28 Trombay 1 x 120 Gas

Turbine DG Set 25 MW

N

1 x 60 Steam Turbine

NTPC

21

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

29 Kawas 4 x 106 2 x 116 Gas Diesel 2850 KW 151013

N

30 Gandhar 3 x 144 + 1x225 Gas Diesel 2975 KW

N

NCA

31 SSP(RBPH amp CHPH) 6x200+550 Hydro Diesel 2x1000kVA 080412

N

Accordingly the Black start capable stations may forward their tentative plan for conducting Black start exercises in compliance to sec 58(b) of IEGC bull As per the communication for MPPTCL the tentative plan of Black start in Madhya

Pradesh system is given under SL No Name of the Station Tentative Date Remarks 1 Pench March 2014 DG set at Pench amp are Bargi

under outage 2 ISP Apr-May 2014 - 3 TONS June 2014 Governor Problem being

attended 4 Birsinghpur June 2014 -do- 5 Medikheda June 2014 -do- 6 Rjghat June 2014 -do- Other utilities may also update their tentative plan for black start

The sub-committee may like to discuss

22

457th OCCM AGENDA

ITEM NO 912 HEALTHINESS OF MAIN CIRCUIT BREAKER OF 400 KV BIRSINGPUR-KATNI-I AT KATNI END The main CB of Birsingpur-Katni-I is under shut down since 2350 hrs of 14th February 2013 Representatives from MPPTCL may kindly apprise on the progress and expected date of restoration of the Main CB of 400 kV Birsingpur-Katni-I at Katni end The sub-committee may like to discuss

ITEM NO 913 TESTING OF SPS RELATED TO TRIPPING OF BINA-GWALIOR-AGRA AT CGPL VINDHYACHAL AND KORBA

As per the information received from NTPC and CGPL the SPS for the 765 kV Bina-

Gwalior-Agra has been installed and a mock drill has to be carried out for the same

The matter was discussed in the 456th OCC and it was decided that SPS may be

tested for reduction of say 50MW for each station instead of backing down of entire

500MWs POWERGRID WRTS-2 may confirm the testing schedule so that the

same could be coordinated in from WRLDC

The sub-committee may like to discuss

ITEM NO 914 SPS AT SIPAT WRLDC vide letter No WRLDCMO-I17192013 dt 21613 requested to take up this matter with the concerned for early implementation of the SPS Status of the SPS at NTPC Sipat is as under

1 449th OCC SPS was proposed by WRLDC It was decided to have a

separate meeting to finalize the scheme 2 450th OCC Member Secretary WRPC intimated that the matter will be

discussed in 119th PCM on 3rd amp 4th September 2013 at Tarapur 3 451st OCC It was intimated that the issue of SPS of Sipat was discussed in

119th PCM held on 3rd amp 4th September 2013 at TARAPUR The tentative scheme were formulated which needed finer tuning

4 452nd OCC Matter not discussed 5 453rd OCC NTPC representative intimated proposal sent to their corporate

office for engineering approval 6 454th OCC Approval from our corporate office is yet to be obtained 7 455th OCC Approval from our corporate office is yet to be obtained 8 456th OCC Approval from corporate office has been obtained and would be

forwarded to WRPC for approval The sub-committee may like to discuss

23

457th OCCM AGENDA

ITEM NO 915 SPS AT 4X300 MW BALCO IPP The SPS at 2010 MW Balco (4x675MW + 4x135 MW + 4x300 MW) was to be commissioned by Nov 2013 before commissioning of first unit of 4x300 MW Balco IPP For the new SPS scheme envisaged for the Balco CTU connection namely the Grid Islanding and Load Management Scheme (GILMS) Balco had reported to have placed an order with Ms SEL As discussed earlier the scheme suggested by WRLDC may be implemented before commissioning of first unit of 300 MW It was intimated during the 456th OCCM by the Balco representatives that the SPS shall be commissioned by March 2014

The sub-committee may like to discuss

ITEM NO 916 ACTIONS TAKEN FOR REVIVAL OF TRANSMISSION ELEMENTS UNDER LONG OUTAGE

As per the information available at WRLDC following elements are out for a

long period

Sl No Date of

outage

Reason

ISTSIPP

1 80 MVAR BR at

ESSAR(Mahan)

231213 Oil leakage

2 125 MVAR BR at JPL 120513 Hydrogen formation

3 50 MVAR LR of Indore-Asoj-II

at Indore

190613 R phase bushing burst

4 50 MVAR LR of Birsingpur-

Damoh at Damoh(PG)

13102014 Oil Leakage

5 765 kV Durg-Kotra-I 24022014 Sparking in Isolator

6 400 kV Raipur-Raigarh-IV 18012014 Voltage Regulation

MSETCL

1 400 kV RGPPL-NrsquoKoyna-I 22012014 Voltage Regulation

2 400 kV Sholapur-

Sholapur(PG)

26022014 Tower Collapse

MPPTCL

1 400 kV Birsingpur-Katni-I 28012014 Voltage Regulation

24

457th OCCM AGENDA

2 50 MVAR LR of Indore-Asoj-II

at Indore

6012014 DGA Violation

CSPTCL

1 400220 kV Bhilai-II 24022014 Maintenance

OCC may like to be apprised of the actions being taken for expediting revival of

the above elements

The sub-committee may like to discuss

ITEM NO 917 STATUS OF 220 KV KOLHAPUR-MUDSINGHI-CHIKODI- BELGAM LINE Consent for trial operation of 220 kV Kolhapur-Mudsinghi-Chikodi- Belgam line in radial mode for supply of Karnataka load from Maharashtra side was granted after discussion in the 455th OCC meeting WRLDC is in receipt of letter from SRLDC regarding concurrence for the above arrangement SLDC Kalwa may apprise the OCC regarding the present status The sub-committee may like to discuss

ITEM NO 918 CONTRIBUTION OF GENERATORS IN VOLTAGE CONTROL The contribution of generators in WR in voltage control was analyzed during 456th OCC meeting It was noted that following units were injecting reactive power even during high voltage

1 210 MW units of Khaparkheda Koradi and Chandrapur (Maharashtra) 2 210 MW units of Satpura and Birsinghpur (Madhya Pradesh) 3 210 MW unit 23 of Korba West (Chattisgarh) 4 200 MW unit 34 of Ukai (T) in (Gujarat)

Utilities were requested to check the setting of AVRGT tap and revert back with findings Members may apprise OCC regarding the status The sub-committee may like to discuss

ITEM NO 919 REAL-TIME MONITORING OF FEEDERS SUBSTATIONS THAT ARE COVERED UNDER THE AUFLS Telemetry of feeders substations covered under the AUFLS is desirable for real-time assessment of the anticipated relief that would be available from the AUFLS scheme at any given instant of time CERC has also directed all the constituents to for

25

457th OCCM AGENDA

mapping of these feeders in the SCDA of SLDCsRLDC Members may like to deliberate further The sub-committee may like to discuss

ITEM NO 920 LOAD FORECASTING As per the amended Indian Electricity Grid Code that is effective from 17th February 2013 the SLDCs SEB distribution licensees shall always restrict the net drawal of the State from the grid within the drawal schedule keeping the deviations from the schedule within the limits specified in the Deviation settlement mechanism regulations Therefore it is imperative that adequate attention may be paid towards load forecasting The matter was discussed in the 455th and 456th OCC as well as in the 25th TCCWRPC board meeting wherein it was decided to create a task force for exploring development of a software for load forecasting Members may like to deliberate further The sub-committee may like to discuss

ITEM NO 921 IMPLEMENTATION OF THE REVISED AUFLS IN GOA DD AND DNH It was decided during the 455th and 456th OCC meeting as well as during 25th WRPC meeting that Goa DD and DNH shall complete the implementation of the revised AUFLS in Goa DD and DNH at the earliest Representatives from the Goa DD and DNH may apprise the status of the progress The sub-committee may like to discuss

ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING As per meeting roaster circulated during 452nd OCC meeting the 458th OCC Meeting

will be hosted by Maharashtra and may be scheduled on 16th amp 17th April 2014

Maharashtra may confirm the same

Anaulagnak 21

maah frvarI 2014

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5051 Hz BETWEEN 0200 Hrs amp 0300 Hrs Hrs ON 28022014

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4970 Hz BETWEEN 1800 Hrs amp 1900 Hrs Hrs ON 28022014

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 5006 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5071 Hz AT 0210 Hrs ON 28022014

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4937 Hz AT 185000 Hrs ON 28022014

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS FEBRUARY 2014 JANUARY 2014 DECEMBER 2013

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 001 005

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 041 061 188 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 1069 5423 4864 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 4014 3569 3987

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 4876 946 956

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING FEBRUARY 2014

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

Voltage Profile during the month of Feb 2014

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 421 401 426 403 409 409 408 408 415 399 414 402 424 413 417 3922 420 402 423 404 409 409 408 408 417 402 418 404 425 415 420 3993 421 399 426 400 429 405 425 402 412 399 419 408 423 410 413 3964 422 402 426 404 430 406 428 401 414 400 414 404 424 412 414 3965 420 396 423 400 409 409 408 408 413 396 415 401 424 411 415 3996 420 396 426 400 428 405 426 402 415 398 416 402 423 411 412 4007 420 394 424 399 430 402 427 401 416 399 417 402 423 409 416 3968 418 393 422 397 409 409 408 408 416 399 416 402 422 409 418 3989 418 399 423 404 409 409 408 408 417 402 417 407 419 409 419 400

व तदाब परखा फरवर 2014 स नक Annex-23

इदौर इटारसी कराड धल असोज कासोर िभलाई जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

10 419 394 423 399 409 409 408 408 416 400 415 401 420 408 417 39511 421 393 426 397 429 405 427 401 44 399 419 404 423 407 414 39912 419 395 422 400 409 409 408 408 416 401 419 407 421 410 418 39813 420 396 424 401 409 409 408 408 417 400 416 401 421 409 418 40114 421 399 424 403 430 419 428 414 417 402 415 402 421 409 417 40015 423 397 424 399 428 414 429 412 417 398 406 406 421 407 418 40016 423 397 424 400 431 404 424 401 416 401 422 409 421 409 418 40317 421 402 424 403 432 414 420 404 416 402 412 405 422 410 417 39818 420 397 423 399 409 409 408 408 416 400 414 401 422 414 416 40019 420 396 423 399 409 409 408 408 411 398 418 405 421 413 413 39920 417 397 420 402 429 406 426 401 413 399 416 404 421 413 410 39821 419 399 422 402 430 407 421 401 415 401 418 406 422 411 414 39722 419 397 422 402 432 409 423 401 416 400 413 402 423 413 414 40023 420 396 423 397 430 412 428 404 414 404 415 402 427 414 416 40324 421 399 423 401 433 411 425 400 416 398 414 402 427 415 418 40225 421 399 423 401 433 411 425 400 416 398 414 402 427 415 418 40226 420 397 423 404 431 411 428 409 411 397 415 404 424 414 412 39327 418 398 426 403 409 409 408 408 417 399 418 402 429 415 419 39128 421 400 427 406 409 409 408 408 414 400 416 403 430 415 418 401

423 393 427 397 433 402 429 400 417 396 422 401 430 407 420 391

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 424 404 415 392 424 404 431 407 766 746 797 765 800 756 804 7692 422 406 417 398 426 404 434 407 769 754 798 774 801 769 804 7773 423 405 416 402 426 401 432 410 767 750 796 768 802 773 805 7764 426 407 417 402 423 403 430 408 768 751 797 779 801 776 808 7785 422 403 415 398 423 397 430 400 768 749 797 767 798 763 797 7586 425 404 417 401 423 399 432 404 768 750 797 767 802 773 807 7707 427 401 419 397 423 396 431 404 770 741 800 763 807 769 809 7698 422 403 416 403 424 395 427 399 756 737 788 756 801 765 802 7679 422 405 416 401 424 402 427 404 755 738 786 758 804 773 804 775

10 421 400 414 396 423 398 429 403 3 88 6 98 6 801 60

वािलयर बनाBina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

बना वािलयर नागदा खडवा िसपत िसविन

10 421 400 414 396 423 398 429 403 755 737 788 765 798 765 801 76011 423 397 414 390 426 396 433 399 758 736 794 750 800 752 802 75612 420 403 414 395 423 397 428 403 757 739 787 759 801 763 798 77013 424 405 417 400 427 397 430 402 759 740 794 760 804 773 803 77214 426 410 420 406 424 400 431 405 761 740 794 766 810 780 808 78215 425 404 417 399 426 399 430 401 762 738 794 962 808 768 806 76816 426 406 422 400 427 402 429 400 759 739 792 760 815 774 811 77617 429 407 417 398 427 404 427 406 761 742 792 762 805 765 810 77418 426 404 418 395 423 399 427 404 763 748 793 768 805 759 806 76819 423 409 415 394 422 399 428 403 759 737 795 765 804 758 806 76720 421 406 410 397 420 398 426 406 765 749 795 771 791 766 799 77421 423 407 424 399 423 403 428 405 759 744 792 760 795 761 800 76722 425 406 414 398 423 400 425 404 760 743 790 762 794 762 800 76823 425 402 412 392 424 400 428 405 758 740 790 759 796 755 799 76124 425 401 411 393 423 401 427 403 760 744 796 764 792 757 798 75625 421 408 412 395 423 401 427 403 756 742 793 766 795 764 795 76926 422 405 413 390 421 399 426 402 757 739 789 760 796 750 798 76127 426 407 416 393 421 401 431 403 760 741 795 762 803 755 804 76228 428 409 414 392 423 403 432 405 762 740 795 753 809 775 803 771

429 397 424 390 427 395 434 399 770 736 800 750 815 750 811 756

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Feb-14 0 0 0 0 0 0 0 02 02-Feb-14 0 0 0 0 0 0 0 03 03-Feb-14 0 0 0 0 0 0 0 04 04-Feb-14 0 0 0 0 0 0 0 05 05-Feb-14 0 0 0 0 0 0 0 06 06-Feb-14 0 0 0 0 0 0 0 07 07-Feb-14 0 0 0 0 0 0 0 08 08-Feb-14 0 0 0 0 0 0 0 09 09-Feb-14 0 0 0 0 0 0 0 0

10 10-Feb-14 0 0 0 0 0 0 0 011 11-Feb-14 0 0 0 0 0 0 0 012 12-Feb-14 0 0 0 0 0 0 0 013 13-Feb-14 0 0 0 0 0 0 0 014 14-Feb-14 0 0 0 0 0 0 0 015 15-Feb-14 0 0 0 0 0 0 016 16-Feb-14 0 0 NIL NIL NIL 017 17-Feb-14 0 0 0 0 0 0 0 018 18-Feb-14 0 0 0 0 0 0 0 019 19-Feb-14 0 0 0 0 0 0 0 020 20-Feb-14 0 0 0 0 0 0 0 021 21-Feb-14 0 0 0 0 0 0 0 022 22-Feb-14 0 0 0 0 0 0 0 023 23-Feb-14 0 0 0 0 0 0 0 024 24-Feb-14 0 0 0 0 0 0 0 025 25-Feb-14 1 17 0 0 0 0 0 026 26-Feb-14 0 0 0 0 0 0 0 027 27-Feb-14 0 0 0 0 0 0 0 028 28-Feb-14 0 0 0 0 0 0 0 0

Max 1 17 0 0 0 00 0 0Total 1 17 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month FEBRUARY 2014

Recommonded Load relief at 492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE-25

Power CutRestrictions in Western Region for the month of February-2014 k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply(DLF)

01022014 28022014 2344 2240 2332

21 Three-Phase Supply(Irrigation)

01022014 28022014 0956 0905 0946

21 Three-Phase Supply(Mixed)

01022014 28022014 2343 2227 2330

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01022014 28022014 2353 2337 2347 32 District Head Qtrs 01022014 28022014 2355 2340 2351 33 Tehsil Head Qtrs 01022014 28022014 2349 2309 2341

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid

1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 010214 to 280214

SaUnya Nil

0-1655MW

SaUnya Nil

0000

SaUnya Nil 2400

SaUnya Nil

95 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-

2 Power supply to Agricultural Sector ivavarNa Details sao From

idnaaMk Date tk To

idnaaMk Date p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs) 21 Three-Phase Supply 01022014 28022014 1000 0800 0900

22 Single-Phase Supply 01022014 28022014 1800 1800 1800 3 Anya jaanakarI Any other information

There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

11107 (Av) of 23 days 0000(Av) 0000 (Av)

1Rural 9031(Av) for 3486 Hrs 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0666 - -

0105 -

3 HT Industries 000 (Av) for 00 Hrs 000 Total Energy Cutday 0771 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01022014 to 280214 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 2322014 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का फरवर 2014का वःता रत यौरा

Details of forced unit outages during the month ofFeb2014

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 एःसार वा डनर

ESSAR VADINAR-I

गरा विनिल GSECL

660 2156 20-Jan-14 2018 10-Feb-14 Coal shortage

2 एःसार Essar-2

गरा विनिल GSECL

172 1212 22-Feb-13 अनपल ध Still out

अनपल ध Still out

Shortage of gas

3 एसएलपीपी SLPP-1

गरा विनिल GSECL

125 1445 23-Feb-14 1237 27-Feb-14 BTL

4 एकएलट पीएसAKLTPS-1

गरा विनिल GSECL

125 1147 26-Feb-14 अनपल ध Still out

अनपल ध Still out

DCS FAIL

5 एपीएल APL - 2

अदानी ADANI

330 056 3-Feb-14 अनपल ध Still out

अनपल ध Still out

Turbine vibration bearing probl em

6 एपीएल APL-5

अदानी ADANI

660 1732 15-Feb-14 456 27-Feb-14 Turbine vibration

7 एपीएल APL - 6

अदानी ADANI

660 2049 25-Feb-14 1947 3-Mar-14 Coal mill problem

8 टाटा TATA-6

मारा वउकिल MSPGCL

500 2352 19-Jul-13 अनपल ध Still out

अनपल ध Still out

For Economy SD

9 वीआईपीएल VIPL-I

मारा वउकिल MSPGCL

300 105 2-Oct-13 अनपल ध Still out

अनपल ध Still out

Turbine bearing vibration probl em

10 टाटा TATA-8

मारा वउकिल MSPGCL

250 2255 9-Jan-14 अनपल ध Still out

अनपल ध Still out

HT due to fire near turbine generator desk

11 चिपर Chandrapur-2

मारा वउकिल MSPGCL

210 1238 14-Jan-14 1310 23-Feb-14 ID fan problem

12 कोराड KORADI-6

मारा वउकिल MSPGCL

210 651 24-Jan-14 1456 14-Feb-14 Coal bunkering problem

13 डब यपीसीएल WPCL-1

मारा वउकिल MSPGCL

135 1245 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Furnace press high

14 डब यपीसीएल WPCL-3

मारा वउकिल MSPGCL

135 421 7-Feb-14 Ready Ready Less requisition

प म ऽय भार षण कि म बई णाली चालन-ISO-I

15 चिपर CPUR - 6

मारा वउकिल MSPGCL

500 1523 11-Feb-14 2033 13-Feb-14 BTL

16 नािसक NASIK-3

मारा वउकिल MSPGCL

250 300 11-Feb-14 100 19-Feb-14 UAT problem

17 कोराड KORADI-5

मारा वउकिल MSPGCL

210 153 14-Feb-14 अनपल ध Still out

अनपल ध Still out

ID fan problem

18 ितरोडा Tiroda-I

मारा वउकिल MSPGCL

660 2059 15-Feb-14 2054 26-Feb-14 Turbine bearing problem

19 ितरोडा Tiroda-2

मारा वउकिल MSPGCL

660 1125 17-Feb-14 152 22-Feb-14 BTL

20 कोराड KORADI-6

मारा वउकिल MSPGCL

210 2357 19-Feb-14 250 23-Feb-14 BTL

21 भसावल BHUSWAL-2

मारा वउकिल MSPGCL

210 301 22-Feb-14 1706 25-Feb-14 PA fan temp High

22 खापरखड़ा KHAPERKHEDA-3

मारा वउकिल MSPGCL

250 1448 22-Feb-14 130 25-Feb-14 BTL

23 जयगड Jaigad-4

मारा वउकिल MSPGCL

300 1930 22-Feb-14 1107 4-Mar-14 Low schedule

24 कोराड Koradi-5

मारा वउकिल MSPGCL

300 404 23-Feb-14 अनपल ध Still out

अनपल ध Still out

Electrical fault

25 पल PARLI-4

मारा वउकिल MSPGCL

210 1836 28-Jan-14 1956 3-Feb-14 Air preheater problem

26 भसावल BHUSAWAL-4

मारा वउकिल MSPGCL

250 1432 28-Feb-14 1802 3-Mar-14 Ash hopper problem

27 आरजीपीपीएल RGPPL-1B

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

28 आरजीपीपीएल RGPPL-2B

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

29 आरजीपीपीएल RGPPL 3A

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

30 आरजीपीपीएल RGPPL-1A

आरजीपीपीएल RGPPL

320 1500 18-Jan-14 अनपल ध Still out

अनपल ध Still out

SRV problem

31 आरजीपीपीएल RGPPL 3B

आरजीपीपीएल RGPPL

320 1230 8-Feb-14 Ready Ready Less requisition

32 िसगाजी SINGAJI - I

म वउकिल MPPGCL

600 422 12-Feb-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

33 सातपरा SATPURA-11

म वउकिल MPPGCL

250 1913 15-Feb-14 2149 19-Feb-14 Main stream temperature low

34 सातपरा SATPURA-11

म वउकिल MPPGCL

250 542 26-Feb-14 1642 2-Mar-14 BTL

35 एःसार महान Essar-Mahan-1

एःसार ESSAR

600 000 29-Jan-14 015 18-Feb-14 Less requisi tion

36 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

37 वदना Vandana-1

वदना Vandana

135 149 12-Jan-14 अनपल ध Still out

अनपल ध Still out

BTL

प म ऽय भार षण कि म बई णाली चालन-ISO-I

38 ससान Sasan-2

आरईएल REL

660 205 16-Feb-14 1650 23-Feb-14 Problem in ash handling

39 कावास Kawas 2A

एनट पीसीNTPC 164 2018 23-Dec-13 Ready Ready Less requisition

40 गाधार Gandhar-3

एनट पीसीNTPC 144 2037 28-Dec-13 Ready Ready Less requisition

41 गाधार Gandhar-I

एनट पीसीNTPC 144 2011 1-Jan-14 Ready Ready Less requisition

42 कावास Kawas 2B

एनट पीसीNTPC 164 900 13-Jan-14 421 5-Mar-14 Maintenance

43 गाधार Gandhar-2

एनट पीसीNTPC 219 023 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Less requisition

44 कावास Kawas-1A

एनट पीसीNTPC 164 2055 4-Feb-14 712 20-Feb-14 Less requisition

45 कावास

Kawas-1B एनट पीसीNTPC 164 1951 13-Feb-14 503 20-Feb-14 Less requisition

46 कावास Kawas 1A

एनट पीसीNTPC 164 1210 21-Feb-14 Ready Ready Less requisition

47 कावास Kawas 1B

एनट पीसीNTPC 164 012 22-Feb-14 1144 26-Feb-14 Less requisition

Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का फरवर 2014 का वःता रत यौरा

Details of planned unit outages during the month of Feb2014 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Time Date

1 डब यट पीएस WTPS-3

गरा विनिल GSECL

210 212 12-Feb-14 अनपल ध Still out

अनपल ध Still out

AOH

2 पल ParlI-3

मारा वउकिल MSPGCL

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

AOH

3 चिपर Chandrapur-5

मारा वउकिल MSPGCL

500 101 14-Jul-13 841 19-Feb-14 AOH

4 कोरबा प म KORBA-(W)-4

छरा वउकिल CSPGCL

210 2226 7-Feb-14 अनपल ध Still out

अनपल ध Still out

AOH

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

NIL2

NIL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING MARCH 2014 AND APRIL 2014

Capacity Outage as per Annual Maintenance Plan

3 Craiva]kMila CSPGCL

NIL

4

NIL

5 koMd``Iya xao~ Central Sector51 VSTPS 4 210 010414 070414 AOH52 VSTPS 2 210 080414 270414 AOH53 VSTPS 1 210 300414 190514 AOH54 CGPL 10 800 280314 130514 COH

maraiva]kMila MSPGCL

Date Time Date Time1 220 Bus-1 at Mapusa 20-Mar-14 1000 20-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R

2 765 Bus-1 at Sasan 20-Mar-14 800 20-Mar-14 1800 Daily Stringing of Main bus 1 for 765 kV Vichal Pooling - Sasan feeder

Reliance WR-II C

3 400 400kV Bus-2 at Satna 20-Mar-14 800 20-Mar-14 1800 Continuous Bay extension work related to JP - Nigrie Bays POWERGRID WR-II C

4 400 400kV ICT 1 at Satna 20-Mar-14 800 20-Mar-14 1000 Continuous Bay extension work related to JP - Nigrie Bays POWERGRID WR-II C

5 400 400kV Jabalpur Itarsi 1amp2 (Dc) 20-Mar-14 1000 20-Mar-14 1400 Continuous For commissioning of Line Impedance measurement kit

POWERGRID WR-II C

6 765 3X80 MVAr Bina Line Reactor at Indore 20-Mar-14 1000 21-Mar-14 1800 Continuous For installation of online dry out amp online DGA kit

POWERGRID WR-II C

7 400kV Damoh - Bhopal 1 20-Mar-14 800 31-Mar-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

8 400 Chorania Kasor 20-Mar-14 800 20-Mar-14 1800 Daily PMM work GETCO GETCO9 400 400 KV Main Bus-I at 400 KV Ss Khedamara 20-Mar-14 900 22-Mar-14 1700 Daily Erection of Pantograph 1 Set of IP amp CVT CSPTCL CSPTCL C

10 400 400 KV Khedamara-KSTPS NTPC ckt-II at 400 KV Ss Khedamara

20-Mar-14 900 22-Mar-14 1700 Daily Erection of Pantograph CVT amp 1 Set of IP PGCIL CSPTCL C

11 400 Korba -Vandana 20-Mar-14 900 21-Mar-14 1900 days continuouTesting of LBB auto re-close M-I amp M-II relays NTPC NTPC

12 400 Korba -Vandana 20-Mar-14 900 21-Mar-14 1900 days continuouTesting of LBB auto re-close M-I amp M-II relays NTPC NTPC

13 400DC Akola-Aurangabad (MSETCL) 1 and Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

21-Mar-14 600 23-Mar-14 1800 Conti Crossing work of 400kv MC Aurangabad - Aurangabad

MSETCLWRTS-I WRTS-I C

14400 amp 220 amp 132

400KV DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 400KV Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

21-Mar-14 600 21-Mar-14 1800 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad

MSETCLWRTS-I WRTS-I C

15 400 Bhadrawati-Parli 1amp 2 21-Mar-14 900 31-Mar-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I C

16 220 Bus-1 at Pune 21-Mar-14 800 21-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R

17 400 Solapur-Kolhapur 1 amp 2 21-Mar-14 700 21-Mar-14 1800 Daily Stringing work upcoming 765 kV Solapur-Pune line

Reliance WRTS-I C

18 220 220kV DC Raigarh- Raigarh (CSPTCL) Line (if outage not avail on 13140314)

21-Mar-14 900 22-Mar-14 1700 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (040-50)

CSPTCL WRTS-I C

19 220 Bus-2 (Section-A) at Mapusa 21-Mar-14 1000 21-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R20 400 Bus-1 at Itarsi 21-Mar-14 900 21-Mar-14 1800 Daily AMP POWERGRID WR-II R21 220 Bus-1 at Gwalior 21-Mar-14 1000 21-Mar-14 1800 Daily AMP POWERGRID WR-II R22 220 Jhanor - Haldarwa 1 21-Mar-14 900 21-Mar-14 1800 Daily AMP POWERGRID WR-II R23 400 Vapi Boisar 21-Mar-14 700 22-Mar-14 1900 Continuous For crossing of 220kV Kala Khadoli TL POWERGRID WR-II C

24 765 Sasan-Satna2 21-Mar-14 800 22-Mar-14 1800 Continuous For Power Line crossing of 765kV Vindhyanchal (pooling) - Satna 2 Line

POWERGRID WR-II R

25 400 400220 ICT NO1 at Kasor 21-Mar-14 800 21-Mar-14 1800 Daily PMM work GETCO GETCO26 400 400KV Sipat-Pathadi(LANCO) line 21-Mar-14 900 22-Mar-14 1900 Continous Annual Preventive maintenance job NTPC NTPC27 400 Pune-Parli 2 50MVAr Line Reactor at Pune 22-Mar-14 800 22-Mar-14 1800 Daily AMP Work Line in service wo reactor Reliance WRTS-I R

28 765 Bus-2 at Solapur 22-Mar-14 700 22-Mar-14 1800 Daily 765KV Pune bay commissioning amp SCADA works

WRTS-I WRTS-I C

29 400 Bus-1 at Bhatapara 22-Mar-14 800 23-Mar-14 1800 Conti Bus extension work for new 125MVAr Bus Reactor at Bhatapara

WRTS-I WRTS-I C

30 220 Bus-2 (Section-B) at Mapusa 22-Mar-14 1000 22-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R31 400 Vadavi Chorania 1 22-Mar-14 900 22-Mar-14 1800 Daily AMP Reliance WR-II R32 220 Jhanor - Haldarwa 2 22-Mar-14 900 22-Mar-14 1800 Daily AMP POWERGRID WR-II R33 220 Bus-2 at Gwalior 22-Mar-14 1000 22-Mar-14 1800 Daily AMP POWERGRID WR-II R

34 765 3X80 MVAr Bus Reactor at Indore 22-Mar-14 1000 23-Mar-14 1800 Continuous For installation of online dry out amp online DGA kit

POWERGRID WR-II C

35 220 Transfer Bus at Mapusa 23-Mar-14 1000 23-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R

36 400 Raigarh- Raipur 4 amp Raigarh-Kotra PS 2 23-Mar-14 800 30-Mar-14 1800 Conti Bay shifting work for up-coming 125MVAr Bus Reactor at Raigarh

WRTS-I WRTS-I C

37 765 Bus-1 at Indore (PG) 23-Mar-14 1000 23-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

Outages Proposal of Transmission elements during the month of MARCH‐2014Type

ANNEXURE‐32A

SN KV Line From To

Basis Reason System Agency

38 220 MC Waluj-Chitegaon amp Waluj-Jalna on same tower

24-Mar-14 600 24-Mar-14 1800 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad

MSETCL WRTS-I C

39 400 Raipur-Sipat 1 amp 2 24-Mar-14 800 2-Apr-14 1800 Conti Diversion of line for Lafarge Railway trackERS removal

WRTS-I Lafarge C

40 220 Bus-2 at Pune 24-Mar-14 800 24-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R41 765 Bus-1 at Bilaspur 24-Mar-14 800 24-Mar-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R

42 400 Bus-2 at Bhatapara 24-Mar-14 800 25-Mar-14 1800 Conti Bus extension work for new 125MVAr Bus Reactor at Bhatapara

WRTS-I WRTS-I C

43 400 Kolhapur-Mapusa 2 24-Mar-14 600 24-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

44 400 Vadavi Chorania 2 24-Mar-14 900 24-Mar-14 1800 Daily AMP Reliance WR-II R45 765 Bus-2 at Indore (PG) 24-Mar-14 1000 24-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

46 765 Bus-2 at Sasan 24-Mar-14 800 24-Mar-14 1800 Daily Strining of Main Bus 2 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

47 220 KAPP - Haldarwa 1 24-Mar-14 800 24-Mar-14 1800 Daily AMP POWERGRID WR-II R48 400 Bus - 2 at Pune 25-Mar-14 800 25-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R

49 765 Bus - 1 at Wardha 25-Mar-14 800 25-Mar-14 1800 Daily Jumper connection work of 765KV Raipur-Wardha line

WRTS-I WRTS-I R

50 400 Kolhapur-Mapusa 2 25-Mar-14 600 25-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

51 220 Mapusa-Ponda line 25-Mar-14 1000 25-Mar-14 1500 Daily AMP Work GOA WRTS-I R

52 765 Bus-1 at Sasan 25-Mar-14 800 25-Mar-14 1800 Daily Jumpering of Bus 1 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

53 220 KAPP - Haldarwa 2 25-Mar-14 800 25-Mar-14 1800 Daily AMP POWERGRID WR-II R54 400 Vadavi - Kansari2 25-Mar-14 900 25-Mar-14 1800 Daily AMP Reliance WR-II R55 400 Bus-1 at Indore (PG) 25-Mar-14 1000 26-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C56 765 Bus-1 at Satna 25-Mar-14 800 25-Mar-14 1800 Continuous Bay extension work POWERGRID WR-II C57 765 Sipat 765KV 400KV 1000MVA ICT-1 25-Mar-14 900 25-Mar-14 1900 Daily SPS Protection scheme modification NTPC NTPC

58 765 Bus - 2 at Wardha 26-Mar-14 800 26-Mar-14 1800 Daily Jumper connection work of 765KV Raipur-Wardha line

WRTS-I WRTS-I R

59 400 Bhadrawati-Parli 2 63MVAr Line Reactor at Parli

26-Mar-14 800 26-Mar-14 1800 Daily AMP Work of Recator at Parli line in service wo reactor

WRTS-I WRTS-I R

60 400 Kolhapur-Mapusa 1 26-Mar-14 600 26-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

61 220 Mapusa-Amona line 26-Mar-14 1000 26-Mar-14 1500 Daily AMP Work GOA WRTS-I R62 765 Bus-2 at Satna 26-Mar-14 800 26-Mar-14 1800 Continuous Bay extension work POWERGRID WR-II C

63 765 Bus-2 at Sasan 26-Mar-14 800 26-Mar-14 1800 Daily Jumpering of bus 2 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

64 400 401 KV Main Bus-I at 400 KV Ss Khedamara 26-Mar-14 900 27-Mar-14 1700 Daily Erection of IPS Tube CSPTCL CSPTCL C

65 400 401 KV Khedamara-KSTPS NTPC ckt-II at 400 KV Ss Khedamara

26-Mar-14 900 27-Mar-14 1700 Daily Erection of IPS Tube PGCIL CSPTCL C

66 400 ACBIL-BILASPUR-CKT NO -2 26-Mar-14 900 31-Mar-14 1800 CONT FOR lilo CONNECTIVITY OF 300MW MCCPL TPP

ACBIL ACBIL C

67 765 Bus-2 at Bilaspur 27-Mar-14 800 27-Mar-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R68 220 Mapusa-Thivim 1 27-Mar-14 1000 27-Mar-14 1500 Daily AMP Work GOA WRTS-I R69 220 KAPP - Vav 2 27-Mar-14 800 27-Mar-14 1800 Daily AMP POWERGRID WR-II R70 400 Bus-2 at Indore (PG) 27-Mar-14 1000 28-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

71 765 Bus-2 at Gwalior 27-Mar-14 1000 27-Mar-14 1800 Daily Bay extension work related to Gwalior Jaipur 1 Bays

POWERGRID WR-II C

72 400 VSTPS Tie- Line-1 ( Line from Stage-III to IV Switchyard)

27-Mar-14 900 27-Mar-14 1900 Daily Basis AMP and rectification of hot spots NTPC NTPC

73 765 Sipat 765KV 400KV 1000MVA ICT-2 27-Mar-14 900 27-Mar-14 1900 Daily SPS Protection scheme modification NTPC NTPC74 765 Bus-1 at Solapur 28-Mar-14 700 30-Mar-14 1800 Daily commissioning tests amp SCADA works WRTS-I WRTS-I C75 220 Mapusa-Thivim 2 28-Mar-14 1000 28-Mar-14 1500 Daily AMP Work GOA WRTS-I R

76 400 Koradi-Satpura 28-Mar-14 1000 28-Mar-14 1400 Daily Earthwire tighting work damaged during Crossing work

WRTS-I ADANI C

77 220 Bus-1 at Dehgam 28-Mar-14 900 28-Mar-14 1800 Daily AMP POWERGRID WR-II R78 220 Kawas - Haldarwa 2 28-Mar-14 800 28-Mar-14 1800 Daily AMP POWERGRID WR-II R79 400 Chorania Amreli 28-Mar-14 800 28-Mar-14 1800 Daily PMM work GETCO GETCO

80 400DC Akola-Aurangabad (MSETCL) 1 and Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

29-Mar-14 600 30-Mar-14 1800 Conti Charging amp shifting of Akola-Abad line on MC Abad-Abad line WRTS-I WRTS-I C

81 220 Bus-2 at Dehgam 29-Mar-14 900 29-Mar-14 1800 Daily AMP POWERGRID WR-II R82 400 Bus -1 at Mapusa 30-Mar-14 1000 30-Mar-14 1500 Daily AMP Work WRTS-I WRTS-I R

83 765 765kV Bus Reactor at Solapur 31-Mar-14 700 2-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

Date Time Date Time

1 400 Bhilai-Koradi 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

2 400 DC Korba-Birsingpur 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

3 400 Korba-Bhilai 2 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

4 220 Korba-Budhipadar 3 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

5 400 Akola-Wardha 1amp 2 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

6 400 Raipur-Raigarh 1 amp Raipur-KSK-DBPL-Raigarh

1-Apr-14 800 30-Apr-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

7 400 Bhadrawati-Parli 1amp 2 1-Apr-14 900 30-Apr-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I C

8 400 400220kv ICT-1 at Pune 1-Apr-14 800 1-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R9 400 Bus-1 at Bilaspur 1-Apr-14 800 1-Apr-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R

10 400 Solapur(PG) -Karad line 1-Apr-14 700 10-Apr-14 1800 Conti Erection of 80MVAr new reactor by shifitng line equipments at Solapur

MSETCL WRTS-I C

11 400 Bus-1 at Jabalpur (pooling) 01-Apr-14 1000 01-Apr-14 1800 Daily Busbar Stability test related to Jhabua Power Bays

POWERGRID WR-II C

12 400 Shujalpur - Nagda 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

13 400 Mundra - Bhachau 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

14 400 Bina - Shujalpur 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

15 220 Omkareshwar-Khandwa Ckt 1-Apr-14 900 1-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI16 400 Sipat 400KV Bay 10 and 11 1-Apr-14 900 3-Apr-14 1900 Continous 400KV CT 3nos replacement NTPC NTPC17 400 Padgha-Nagothane ckt I 1-Apr-14 900 1-Apr-14 1700 Daily QMwork MSETCL MSETCL

18 400 Bus-2 at Jabalpur (pooling) 02-Apr-14 1000 02-Apr-14 1800 Daily Busbar Stability test related to Jhabua Power Bays

POWERGRID WR-II C

19 400 Vindhyanchal - Mahan - Korba (Section of both the line on same Dc tower)

02-Apr-14 800 03-Apr-14 1700 Continuous For Power Line crossing of 765kV Vindhyanchal (pooling) - Satna 1 Line

POWERGRID WR-II C

20 400 400kV ICT 4 at Indore MPPTCL 02-Apr-14 1000 04-Apr-14 1800 ContinuousFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

MPPTCL WR-II C

21 400 400kV Bus Coupler bay at Indore MPPTCL 02-Apr-14 1000 04-Apr-14 1800 ContinuousFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

MPPTCL WR-II C

22 400 400kV Itarsi - Indore MPPTCL 1 Line 02-Apr-14 1000 02-Apr-14 1500 DailyFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

POWERGRID WR-II C

23 400400 KV LILO Line of 400 KV SC Korba West-Khedamara to 400 KV Ss Raita (Between Loc69 amp70 near Raita Ss)

2-Apr-14 800 3-Apr-14 1700 DailyMaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

CSPTCL CSPTCL C

24 400 Chandrapur-Khaparkheda 2-Apr-14 900 2-Apr-14 1700 Daily QMwork MSETCL MSETCL

25 400 Lamboti-Solapur PG 2-Apr-14 900 2-Apr-14 1700 Daily QMwork MSETCL MSETCL

26 400 Bus-1 at Durg PS Ss 3-Apr-14 900 3-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R27 400 Bus-1 at Jabalpur 03-Apr-14 900 03-Apr-14 1800 Daily Retrofitting of Isolator arms(689A) POWERGRID WR-II R28 400 315MVA ICT2 at Khandwa 03-Apr-14 1000 03-Apr-14 1600 Daily AMP POWERGRID WR-II R29 400 Mundra - Hadala 3-Apr-14 800 3-Apr-14 1800 Daily PMM GETCO GETCO30 400 400KV Seoni -Bhilai Ckt 3-Apr-14 900 3-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I31 400 Lonikand-Chakan 3-Apr-14 900 3-Apr-14 1700 Daily QMwork MSETCL MSETCL32 400 Bus-2 at Durg PS Ss 4-Apr-14 900 4-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R33 400 Bus-1 at Jabalpur 04-Apr-14 900 04-Apr-14 1800 Daily Retrofitting of Isolator arms(2089A) POWERGRID WR-II R

34 400 400kV Itarsi - Indore MPPTCL 1 Line 04-Apr-14 1300 04-Apr-14 1800 DailyFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

POWERGRID WR-II C

35 400 Varsana - Hadala 4-Apr-14 800 4-Apr-14 1800 Daily PMM GETCO GETCO

Agency Type

ANNEXURE‐32BOutages Proposal of Transmission elements during the month of APRIL ‐2014

SN KV Line From To

Basis Reason System

36 220 Vapi - Vapi (PG) 4-Apr-14 800 4-Apr-14 1800 Daily PMM work PGCIL GETCO37 220 Haldarva - Jhanor - 1 (NTPC) 4-Apr-14 800 4-Apr-14 1800 Daily PMM amp Tan Delta testing PGCIL GETCO38 400 400KV Birsinghpur -Katni Ckt - I 4-Apr-14 800 4-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I39 220 Badod - Kota Ckt 4-Apr-14 900 4-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI40 220 Malanpur-Auriya Ckt 4-Apr-14 900 5-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI

41 400 Bhusawal-Akola 4-Apr-14 900 4-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

42 400 Deepnagar-Aurangabad II 4-Apr-14 900 4-Apr-14 1700 Daily QMwork MSETCL MSETCL43 400 Kalwa-Padgha Ckt I 4-Apr-14 900 4-Apr-14 1700 Daily QMwork MSETCL MSETCL44 765 Bus Reactor at Seoni 5-Apr-14 900 5-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R

45 400 DC Korba-KhedamaraLilo at Marwa lilo section yet to be charge 5-Apr-14 800 6-Apr-14 1800 Daily

Crossing work of upcoming 765 KV DC Raigarh-Champa (AP-48A0- AP 490)DC Korba-Khedamara is in service

CSPTCL WRTS-1 C

46 400 Bus-1 at Jabalpur 05-Apr-14 900 05-Apr-14 1800 Daily Retrofitting of Isolator arms(1689A) POWERGRID WR-II R

47 400 Mundara -Limbdi 1 05-Apr-14 800 07-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

48 220 Badod - Modak Ckt 5-Apr-14 900 5-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI49 400 Dhule-Babhleswar ckt 1 5-Apr-14 900 5-Apr-14 1700 Daily QMwork MSETCL MSETCL50 400 400220kv ICT-1 at Seoni 7-Apr-14 900 7-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R51 400 Bus-2 at Jabalpur 07-Apr-14 900 07-Apr-14 1800 Daily Retrofitting of Isolator arms(1789B) POWERGRID WR-II R52 400 315MVA ICT1 at Khandwa 07-Apr-14 1000 07-Apr-14 1600 Daily AMP POWERGRID WR-II R53 220 Chhegoan-Khandwa Ckt -II 7-Apr-14 900 7-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI54 400 Korba- Bhilai1 7-Apr-14 900 8-Apr-14 1900 days continuou Bay Maint and testing NTPC NTPC55 400 Vindhyachal - Mahan line 7-Apr-14 900 8-Apr-14 1900 Continuous Replacement of R Y and B Phase CT NTPC NTPC56 400 Bhusawal-Aurangabad 7-Apr-14 900 7-Apr-14 1700 Daily QMwork MSETCL MSETCL57 400 New Koyna-Karad ckt 2 7-Apr-14 830 7-Apr-14 1730 Daily QMwork MSETCL MSETCL

58 400 Mundara -Limbdi 2 08-Apr-14 800 10-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

59 400 Chorania Hadala 8-Apr-14 800 8-Apr-14 1800 Daily PMM GETCO GETCO60 400 Sipat 400KV Bay 23 8-Apr-14 900 9-Apr-14 1900 Continous One 400KV CT replacement NTPC NTPC61 400 Koradi-Khaparkheda I 8-Apr-14 900 8-Apr-14 1700 Daily QMwork MSETCL MSETCL62 765 765400KV ICT-1 at Kotra PS 9-Apr-14 900 9-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R63 400 Bus-2 at Jabalpur 09-Apr-14 900 09-Apr-14 1800 Daily Retrofitting of Isolator arms(489B) POWERGRID WR-II R64 400 315MVA ICT1 at Damoh 09-Apr-14 1000 09-Apr-14 1600 Daily AMP POWERGRID WR-II R65 400 Amreli-Jetpur 2 9-Apr-14 800 9-Apr-14 1800 Daily PMM GETCO GETCO66 400 SSP- Rajgarh - 1 9-Apr-14 800 9-Apr-14 1800 Daily PMM GETCOMPTCL GETCO67 220 TAPS1 amp2-TAPS 3amp4 tie line 9-Apr-14 800 9-Apr-14 1600 one day Annual maintenance Works MSETCL NPCIL68 220 TAPS TIE LIE-I 9-Apr-14 800 10-Apr-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL69 400 400 KV Indore - Nagda Ckt 9-Apr-14 900 9-Apr-14 1600 daily For maintenance work MPPTCL EHT- Mamp I70 400 400 KV Sarni - Isp Ckt 9-Apr-14 900 9-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I71 220 Mehgaon-Auriya Ckt 9-Apr-14 900 10-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI72 400 315 MVA 400220Kv X-mer III At Bhopal SS 9-Apr-14 900 10-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI73 400 Padgha-Tarapur CktII 9-Apr-14 900 9-Apr-14 1700 Daily QMwork MSETCL MSETCL74 765 Bus Reactor at Kotra PS 10-Apr-14 900 10-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R

75 765 amp 400

765400 kV ICT-I at Solapur amp 400KV Solapur-Parli 2 10-Apr-14 700 12-Apr-14 1800 Daily 765400 kV spare ICT unit Aux bus works CSD

commissioning amp Fire fighting works at Solapur WRTS-IReliance WRTS-I C

76 400 315MVA ICT2 at Damoh 10-Apr-14 1000 10-Apr-14 1600 Daily AMP POWERGRID WR-II R

77 765 Sasan-Satna 1 10-Apr-14 800 11-Apr-14 1800 Daily For AMP of line amp Line terminal Equipments Post commissioning checks

POWERGRID WR-II C

78 400 APL-Varsana 10-Apr-14 800 10-Apr-14 1800 Daily PMM GETCO GETCO79 400 400 KV Isp - Nagda Ckt 10-Apr-14 900 10-Apr-14 1600 daily For maintenance work MPPTCL EHT- Mamp I80 400 400 KV Bhopal-Itarsi(PGCIL) Ckt-I 10-Apr-14 900 11-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I81 220 Chhegoan-Khandwa Ckt -I 10-Apr-14 900 10-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI82 400 315 MVA 400220Kv X-mer At Katni SS 10-Apr-14 800 11-Apr-14 1800 continue For maintenance work MPPTCL EHT -MampI83 400 Korba- Bhilai2 10-Apr-14 900 11-Apr-14 1900 days continuou Bay Maint and testing NTPC NTPC84 400 Sipat 400KV Bay 14 10-Apr-14 900 12-Apr-14 1900 Continous 400KV CT 3nos replacement NTPC NTPC

85 400 Chandrapur II-Parli II 10-Apr-14 900 10-Apr-14 1700 Daily Providing of Arching horncorona rings Bird guards quarter pinsNut bolts

MSETCL MSETCL

86 400 Karad-Lonikand 10-Apr-14 900 10-Apr-14 1700 Daily QMwork MSETCL MSETCL87 400 Raipur-Durg PS 1 11-Apr-14 900 11-Apr-14 1700 Daily AMP Work WRTS-I WRTS-I R

88 400 Mundara -Jetpur 1 11-Apr-14 800 15-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

89 400 Varsana-Hadala Line 11-Apr-14 800 11-Apr-14 1800 Daily PMM GETCO GETCO90 220 Haldarwa Kawas-2 11-Apr-14 800 11-Apr-14 1800 Daily PMM work PGCIL GETCO91 400 400 KV Nagda-Rajgarh(PGCIL) Ckt-I 11-Apr-14 900 11-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

92 400 315 MVA 400220Kv X-mer III ampTie bay At Bhopal SS

11-Apr-14 900 11-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI

93 400 Akola-Nandgaonpeth 11-Apr-14 900 11-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

94 400 Akola-Wardha I 11-Apr-14 900 11-Apr-14 1700 Daily QMwork MSETCL MSETCL95 400 Kalwa-Lonikand 11-Apr-14 900 11-Apr-14 1700 Daily QMwork MSETCL MSETCL96 400 400220kv ICT-1 at Mapusa 12-Apr-14 900 12-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R97 400 Raipur-Durg PS 2 12-Apr-14 900 12-Apr-14 1700 Daily AMP Work WRTS-I WRTS-I R98 765 Sasan-Satna2 with line reactor 12-Apr-14 1000 12-Apr-14 1800 Daily AMP POWERGRID WR-II R99 400 400 KV Nagda-Rajgarh(PGCIL) Ckt-II 12-Apr-14 900 12-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I100 400 Deepnagar-Aurangabad I 12-Apr-14 900 12-Apr-14 1700 Daily QMwork MSETCL MSETCL101 400 Amreli-Jetpur 2 14-Apr-14 800 14-Apr-14 1800 Daily PMM GETCO GETCO102 400 Kasor - Gpec 14-Apr-14 800 14-Apr-14 1800 Daily PMM GETCO GETCO103 220 GWL(PGCIL)-Malanpur Ckt-I 14-Apr-14 900 15-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI104 400 DC Korba-Raipur 3 amp 4 15-Apr-14 800 16-Apr-14 1800 Conti Bus splitting work at Raipur WRTS-1 WRTS-1 C

105 400 Korba-Bhatapara 15-Apr-14 800 24-Apr-14 1800 Conti For raising of ground clearence for Railway track of Lafarge

WRTS-I Lafarge C

106 765 765400 kV ICT-II at Solapur 15-Apr-14 700 17-Apr-14 1800 Daily CSD commissioning amp Fire fighting works WRTS-I WRTS-I C107 400 Vindhyachal-Satna1 15-Apr-14 1000 15-Apr-14 1800 Daily AMP POWERGRID WR-II R108 400 Ssnl-Dhule-1 15-Apr-14 800 15-Apr-14 1800 Daily PMM GETCOMSETCL GETCO109 220 TAPS-Vapi 15-Apr-14 800 17-Apr-14 1900 Daily Annual maintenance Works GETCO NPCIL110 220 Pithampur-Rajgarh(PGCIL) Ckt - I 15-Apr-14 900 15-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI111 400 Sipat 400KV Bay-18 ( Ranchi-1 Main) 15-Apr-14 900 15-Apr-14 1900 Daily Annual Preventive maintenance job NTPC NTPC112 400 Karad-Kolhapur Ckt I 15-Apr-14 900 15-Apr-14 1700 Daily QMwork MSETCL MSETCL

113 400 DC Raipur-Bhadrawati 2 amp 3 16-Apr-14 800 17-Apr-14 1800 Conti Bus splitting work at Raipur WRTS-1 WRTS-1 C

114 400 Vindhyachal-Satna2 16-Apr-14 1000 16-Apr-14 1800 Daily AMP POWERGRID WR-II R

115 400 Mundara -Jetpur 2 16-Apr-14 800 20-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

116 400 Vadavi - Dehgam (Pg) - 1 16-Apr-14 800 16-Apr-14 1800 Daily PMM amp Tandelta testing GETCO GETCO117 400 Chorania Asoj-1 16-Apr-14 800 16-Apr-14 1800 Daily PMM GETCO GETCO118 220 Bhilad - TAPS 16-Apr-14 800 16-Apr-14 1800 Daily PMM work PGCIL GETCO119 220 Bhat - Pirana (PG) - 1 16-Apr-14 800 16-Apr-14 1800 Daily PMM work GETCO GETCO120 400 400 KV Bhopal-Itarsi(PGCIL) Ckt-II 16-Apr-14 900 17-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I121 220 Damoh(PGCIL) - Tikamgarh Ckt 16-Apr-14 900 16-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI

122 400 400KV SC Korba-Raipur-II (Between Korba - Bhatapara end)(Between Loc2980 amp 2990) 16-Apr-14 800 17-Apr-14 1700 Daily

MaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

PGCIL CSPTCL C

123 400 Sipat 400KV Bay-19 ( Ranchi-2 Main) 16-Apr-14 900 16-Apr-14 1900 Daily Annual Preventive maintenance job NTPC NTPC124 400 Padgha-Babhleswar ckt I 16-Apr-14 900 16-Apr-14 1700 Daily QMwork MSETCL MSETCL125 400 Vadavi - Dehgam (Pg) - 2 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCO GETCO126 400 Ssnl-Dhule-2 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCOMSETCL GETCO127 400 Vadinar-Hadala- 1 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCO GETCO128 220 Bhat - Pirana (PG) - 2 17-Apr-14 800 17-Apr-14 1800 Daily PMM work GETCO GETCO129 400 400KV Birsinghpur -Katni Ckt - II 17-Apr-14 800 17-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I130 220 Pithampur-Rajgarh(PGCIL) Ckt - II 17-Apr-14 900 17-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI131 400 Jejuri-Lonikand 17-Apr-14 900 17-Apr-14 1700 Daily QMwork MSETCL MSETCL132 400 Deepnagar-Khadka II 17-Apr-14 900 17-Apr-14 1700 Daily QMwork MSETCL MSETCL133 400 Chorania Kasor 18-Apr-14 800 18-Apr-14 1800 Daily PMM GETCO GETCO134 220 GWL(PGCIL)-Malanpur Ckt-II 18-Apr-14 900 19-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI135 400 Akola-Wardha II 18-Apr-14 900 18-Apr-14 1700 Daily QMwork MSETCL MSETCL

136 400 Koradi-Nandgaonpeth 18-Apr-14 800 18-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

137 765 765kV Pune line Reactor at Solapur 19-Apr-14 700 20-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

138 400 400KV Bina -Power(JP) Ckt 19-Apr-14 900 19-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I139 400 Dhule-SSarovar I 19-Apr-14 900 19-Apr-14 1700 Daily QMwork MSETCL MSETCL

140 400 Koradi-Khaparkheda II 19-Apr-14 900 19-Apr-14 1700 Daily QMwork MSETCL MSETCL141 220 KAPP - VAPI - 1 20-Apr-14 800 20-Apr-14 1800 Daily Isolator replacement under ASIDE scheme PGCIL GETCO

142 400 DC Bhilai-Bhadrawati amp Raipur-Bhadrawati 1 21-Apr-14 800 28-Apr-14 1800 Conti Diversion of line for Vidarbha Industrial Devlopment Corporation(VIDC)

WRTS-I VIDC C

143 400 Bhachau- Ranchhodpura 1amp2 21-Apr-14 800 27-Apr-14 1800 Continuous Tower shifting work at canal crossingInsulator replacement work

POWERGRID WR-II C

144 400 Hadala-Amreli 21-Apr-14 800 21-Apr-14 1800 Daily PMM GETCO GETCO145 400 Vadinar-Hadala- 2 21-Apr-14 800 21-Apr-14 1800 Daily PMM GETCO GETCO146 220 TAPS-Boisar 21-Apr-14 800 23-Apr-14 1900 Daily Annual maintenance Works MSETCL NPCIL147 220 Bina(PGCIL)-220 KV Bina Ckt 21-Apr-14 900 21-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI148 400 CGPL Bhachau -1 21-Apr-14 8AM 21-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL149 220 Kawas-Ichhapore 1+Bus 1 21-Apr-14 900 21-Apr-14 1800 daily RTV Coating NTPC NTPC150 400 Karad-Kolhapur Ckt II 21-Apr-14 900 21-Apr-14 1700 Daily QMwork MSETCL MSETCL151 400 New Koyna-Koyna Stg-4-1 21-Apr-14 830 21-Apr-14 1730 Daily QMwork MSETCL MSETCL152 400 Ssp - Rajgarh - 2 22-Apr-14 800 22-Apr-14 1800 Daily PMM GETCOMPTCL GETCO153 400 Vadavi-Bhachau 2 22-Apr-14 800 22-Apr-14 1800 Daily PMM amp Tan Delta testing PGCIL GETCO154 220 Bhilad - Vapi (PG) - 1 22-Apr-14 800 22-Apr-14 1800 Daily PMM work PGCIL GETCO155 400 400 KV Rajgarh(PGCIL)-Ssp Ckt-I 22-Apr-14 900 22-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I156 400 400KV Seoni -Sarni Ckt 22-Apr-14 900 23-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I157 220 Khandwa(PGCIL)-Nepanagar Ckt 22-Apr-14 900 22-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI158 220 Kawas-Ichhapore 2+Bus 1 22-Apr-14 900 22-Apr-14 1800 daily For maintenance work NTPC NTPC159 400 Karad-Jaigad II 22-Apr-14 900 22-Apr-14 1700 Daily Annual maintenance work MSETCL MSETCL160 220 Bhilad - Vapi (PG) - 2 23-Apr-14 800 23-Apr-14 1800 Daily PMM work PGCIL GETCO161 400 400KV Bina -Bhopal Ckt -I 23-Apr-14 900 24-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I162 400 400 KV Rajgarh(PGCIL)-Ssp Ckt-II 23-Apr-14 900 23-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I163 220 Bina(PGCIL)-Shivpuri Ckt 23-Apr-14 900 24-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI164 220 Damoh(PGCIL) - Damoh I C - I 23-Apr-14 900 23-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI

165 400 400 KV DCDS Sipat- Raipur (IampII) 23-Apr-14 800 24-Apr-14 1700 DailyMaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

PGCIL CSPTCL C

166 400 CGPL Bhachau - 2 23-Apr-14 8AM 23-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL

167 220 Kawas-Navsari 2 +Bus 1 23-Apr-14 900 23-Apr-14 1800 daily Insulator replcement and routine maintenance NTPC NTPC168 400 Padgha-Babhleswar ckt II 23-Apr-14 900 23-Apr-14 1700 Daily QMwork MSETCL MSETCL169 400 Kasor - SSP 24-Apr-14 800 24-Apr-14 1800 Daily PMM work GETCO GETCO170 220 Bhilad - Vapi (PG) - 3 24-Apr-14 800 24-Apr-14 1800 Daily PMM work PGCIL GETCO171 220 TAPS-Bhilad 24-Apr-14 800 26-Apr-14 1900 Daily Annual maintenance Works GETCO NPCIL172 220 Damoh(PGCIL) - Damoh I C - II 24-Apr-14 900 24-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI173 400 CGPL Jetpur- 1 24-Apr-14 8AM 24-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL

174 220 Kawas-Ichhapore 1 +Bus 2 24-Apr-14 900 24-Apr-14 1400 daily Insulator replcement and routine maintenance NTPC NTPC

175 220 Kawas-Ichhapore 2 +Bus 2 24-Apr-14 1400 24-Apr-14 1900 daily Insulator replcement and routine maintenance NTPC NTPC176 400 Padgha-Talegaon 24-Apr-14 900 24-Apr-14 1700 Daily QMwork MSETCL MSETCL

177 765 765kV Raichur 1 line Reactor at Solapur 25-Apr-14 700 27-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

178 400 400KV Bina -Bhopal Ckt -II 25-Apr-14 900 26-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I179 400 CGPL Jetpur- 2 25-Apr-14 8AM 25-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL180 400 Vindhyachal -Satna-4 Line Shunt Reactor 25-Apr-14 900 25-Apr-14 1900 Daily Basis AMP NTPC NTPC

181 400 Bhusawal-Koradi 25-Apr-14 900 25-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

182 400 Deepnagar-Khadka I 25-Apr-14 900 25-Apr-14 1700 Daily QMwork MSETCL MSETCL183 400 Soja -Kansari 26-Apr-14 800 26-Apr-14 1800 Daily PMM GETCO GETCO184 400 Raipur-Wardha 1 27-Apr-14 800 28-Apr-14 1800 Daily Balance construction work WRTS-1 WRTS-1 C185 220 KAPP - VAPI - 2 27-Apr-14 800 27-Apr-14 1800 Daily Isolator replacement under ASIDE scheme PGCIL GETCO186 400 Soja -Kansari 28-Apr-14 800 28-Apr-14 1800 Daily PMM GETCO GETCO187 220 TAPS-Boisar II 28-Apr-14 800 30-Apr-14 1900 Daily Annual maintenance Works MSETCL NPCIL188 400 400KV Damoh - Katni Ckt 28-Apr-14 900 28-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I189 400 400 KV Damoh(PGCIL)-Katni Ckt 28-Apr-14 900 28-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I190 400 New Koyna-Karad ckt 1 28-Apr-14 830 28-Apr-14 1730 Daily QMwork MSETCL MSETCL

191 400 DC Raigarh-DB Power (Tudri) - KSK 29-Apr-14 800 30-Apr-14 1800 Conti Crossing work of 765kV SC Raigrah-Champa (90 - 100)

WRTS-I WRTS-I C

192 400 Raipur-Wardha 2 29-Apr-14 800 30-Apr-14 1800 Daily Balance construction work WRTS-1 WRTS-1 C193 220 Navsari - Nasik - 1 29-Apr-14 800 29-Apr-14 1800 Daily PMM work GETCOMSETCL GETCO194 220 Seoni(PGCIL)-Chhindwara Ckt-I 29-Apr-14 900 29-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI195 220 Kawas-Vav 1+ bus 2 29-Apr-14 900 29-Apr-14 1800 daily For maintenance work NTPC NTPC196 400 Chorania Asoj-1 30-Apr-14 800 30-Apr-14 1900 Daily PMM GETCO GETCO197 220 Navsari - Nasik - 2 30-Apr-14 800 30-Apr-14 1800 Daily PMM work GETCOMSETCL GETCO198 220 Vapi - TAPS 30-Apr-14 800 30-Apr-14 1800 Daily PMM work PGCIL GETCO199 220 Seoni(PGCIL)-Chhindwara Ckt-II 30-Apr-14 900 30-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI200 220 Kawas-Vav 1+ bus 2 30-Apr-14 000 30-Apr-14 000 daily For maintenance work NTPC NTPC

Annexure-32-C1

List of Emergency Outages availed in Feb 2014

SlNo

Element kV Agency From

Date To Date

Remarks

1 SATNA‐BINA‐II 765 WRTS‐2 4‐Feb‐14

5‐Feb‐14

Hot spot attending

2 SUJALPUR‐NAGDA LR NAGDA

400 WRTS‐2 6‐Feb‐14

19‐Feb‐14

Oil leackage

3 SOLAPUR‐PARLI‐II

400 WRTS‐2 6‐Feb‐14

6‐Feb‐14

Hotspot attend at solapur

4 JABALPUR‐ITARSI‐IV LR AT ITARSI‐LR

400 WRTS‐2 7‐Feb‐14

17‐Feb‐14

Oil leackage

5 APL‐HADALA‐SC 400 GEB 7‐Feb‐14

7‐Feb‐14

Hot spot

6 SOLAPUR‐PARLI(PG)‐1

400 WRTM(REL)

9‐Feb‐14

9‐Feb‐14

Hot spot

7 BOISAR‐BOISAR(PG)‐II

220 MSETCL 9‐Feb‐14

9‐Feb‐14

Hotspots

8 NEW KOYNA‐KARAD ‐ I

400 MSETCL 10‐Feb‐14

11‐Feb‐14

Dc‐earth leakage

9 LONIKHAND ‐ KARAD

400 MSETCL 10‐Feb‐14

11‐Feb‐14

Hotspot

10 NAGDHA ICT ‐ III

400220

MPPTCL 10‐Feb‐14

10‐Feb‐14

Hotspot

11 AKOLA ‐ ABAD ‐I AKOLA

400 WRTS‐1 11‐Feb‐14

12‐Feb‐14

Oil leackage

12 AKOLA ‐ AURANGABAD ‐ I

400 WRTS‐1 11‐Feb‐14

11‐Feb‐14

Oil leackage ion lr

13 BINA‐GWALIOR 765 WRTS‐1 14‐Feb‐ 14‐Feb‐ Attend oil leakage on lr

SlNo

Element kV Agency From

Date To Date

Remarks

II 14 14

14 AKOLA‐TIRORA‐I 765 MSETCL 22‐Feb‐14

23‐Feb‐14

Sparking in LR at Tirora SYED AT TIRORA END

15 KHAEGAR‐ICT‐I 400220

MSETCL 22‐Feb‐14

22‐Feb‐14

Hot spot

16 KHANDWA‐NEPANAGR‐SC

220 MPPTCL 23‐Feb‐14

23‐Feb‐14

Hot spot

17 GWALIAR ‐SATNA ‐ I

765 WRTS‐2 24‐Feb‐14

1‐Mar‐14

Attend hot spot

18 KORBA BUS‐III 400 NTPC 25‐Feb‐14

25‐Feb‐14

Hots pot attend

19 BUS‐1 AT GWALIOR

765 WRTS‐2 13‐Feb‐14

13‐Feb‐14

Checking of blocked BB main‐1 relay

20 RAIPUR‐BWATI‐2

400 WRTS‐1 17‐Feb‐14

17‐Feb‐14

Urgent Removal of LR at Raipur end for DGA violation

21 TAPS‐PADGHE 400 TAPS‐3amp4 19‐Feb‐14

23‐Feb‐14

To attend SF‐6 leakage

22 SATNA‐GWALIOR‐1

765 WRTS‐2 24‐Feb‐14

26‐Feb‐14

To attend hot spots

23 VCHAL‐JABALPUR‐IV

400 WRTS‐2 27‐Feb‐14

27‐Feb‐14

To increase OPGW‐Top conductor clearance to avoid tripping

24 APL‐SAMI‐2 400 APL 26‐Feb‐14

26‐Feb‐14

To attend hot sopt

25 SHOLAPUR BUS‐1

765 WRTS‐1 27‐Feb‐14

27‐Feb‐14

To attend hot sopt

26 BOISAR BUS‐2 220 WRTS‐1 28‐Feb‐14

28‐Feb‐14

To attend hot sopt

Sl No KV element From To Basis Work System Agency Remarks

1220 Vapi (GETCO)‐Bhilad 1‐Feb‐14 800 2‐Feb‐14 1800 Daily Line crossing work of 400KV LILO line for

Magarwada SSGETCO POWERGRID N

2 220 Omkareshwar-Khandwa Ckt

3-Feb-14 900 3-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

3 400 New Koyna-Koyna Stg-4-1

3-Feb-14 830 3-Feb-14 1730 Daily QMwork MSETCL MSETCL N

4220 Vapi ‐ Magarwada

Ckt13‐Feb‐14 900 3‐Feb‐14 1400 Daily AMP of line amp equipment WRTS‐II POWERGRID DD may have to do load

shedding as per Reliability Suggestion

N

5 220 DC Raigarh- Raigarh 1amp 2

4-Feb-14 800 5-Feb-14 1800 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (040-50)

CSPTCL WRTS-I N

6 220 Itarsi(PGCIL)-Hoshangabad Ckt

4-Feb-14 900 4-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N

7 400 Mundra -Limbdi-2 4-Feb-14 800 4-Feb-14 1800 Daily Suspension Insulator replcement and routine maintenance

PGCIL CGPL N

8 400 400 kV DC Satna - Bina 1amp2

4-Feb-14 800 5-Feb-14 1800 Continous Crossing of Jabalpur-Bina 765 kv SC Line PGCIL JTCL N

9220 Vapi ‐ Magarwada

Ckt24‐Feb‐14 0900 4‐Feb‐14 1400 Daily AMP of line amp equipment WRTS‐II POWERGRID N

10 765 Seoni-Bina line with LR 4‐Feb‐14 800 4-Feb-14 1800 Daily AMP Work WRTS-2 WRTS-1 N

11 400 Bus I Bina 5‐Feb‐14 800 5‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

12220 Kawas ‐ Navsari (PG)

25‐Feb‐14 800 5‐Feb‐14 1800 Daily Replacement of ST insulators by Double Tension

insulator in Railway crossing spansWRTS‐II POWERGRID N

13400 Indoer (PG) ‐Indore

(MP) DC5‐Feb‐14 800 6‐Feb‐14 1800 Continou

sStringing of 765kV Indore ‐ Vadodara line WRTS‐II POWERGRID N

14 400 APL - Hadala 6-Feb-14 800 6-Feb-14 1800 Daily PMM GETCO GETCO N N

15 220 Seoni(PGCIL ) - Chhindwara CKT I

6-Feb-14 900 6-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N N

16 400 Jejuri-Koyna stg IV 6-Feb-14 900 6-Feb-14 1700 Daily QMwork MSETCL MSETCL N17 400 Akola-Nandgaonpeth 6-Feb-14 900 6-Feb-14 1700 Daily Quaterly Maintainance Work MSETCL MSETCL N18 400KV Korba-Bhatapara 6-Feb-14 900 7-Feb-14 1900 Cont Testing of LBB auto re-close M-I amp M-II relays NTPC NTPC N19 220 Haldarva - Jhanor - 2

(NTPC)6-Feb-14 900 6-Feb-14 1800 Daily PMM work GETCO N

20220 Navsar (PG) ‐Navsari

(GETCO) 16‐Feb‐14 800 6‐Feb‐14 1800 Daily Replacement of ST insulators by Double Tension

insulator in Railway crossing spansWRTS‐II POWERGRID

N

21 400 Bus‐II Bina 6‐Feb‐14 800 6‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

22400 Seoni‐Khandwa1 6‐Feb‐14 1000 6‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Khandwa end by MS ABB

WRTS‐II POWERGRID Rescheduled to 6th March N

23 400 Rajgarh-Ssp Ckt-II 7-Feb-14 900 7-Feb-14 1600 daily For maintenance work MPPTCL EHT- Mamp I N24 220 Chhegoan-Khandwa

Ckt -II7-Feb-14 900 7-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

25 220 Wardha (PG)-Wardha 7-Feb-14 800 7-Feb-14 1800 Daily AMP Work MSETCL WRTS-I N26 400 Chorania - Vadavi-2 7-Feb-14 800 7-Feb-14 1800 Daily PMM amp Tan Delta testing WRTGPL GETCO N27 400 Jabalpur‐Itarsi1 7‐Feb‐14 900 7‐Feb‐14 1400 Daily AMP OF TERMINAL EQUIPMENT WRTS‐II POWERGRID N

28220 Vapi(PG)‐ Bhilad ckt

2 amp 3 7‐Feb‐14 800 8‐Feb‐14 1800 Daily Line crossing work of 400KV LILO of Navsari‐Boisar

at MagarwadaGETCO POWERGRID N

29 220 Mapusa-Thivim 1 8-Feb-14 800 8-Feb-14 1800 Daily AMP Work GOA WRTS-I N

30400 Seoni‐Khandwa2 9‐Feb‐14 1000 9‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Khandwa end by MS ABB

WRTS‐II POWERGRID Rescheduled to 7th March N

31 220 Chhegoan-Khandwa Ckt -I

10-Feb-14 900 10-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

Annexure-32-C2OCC approved outage not availed in Feb‐2014

32132 132 kV Dhule

Dondaicha line10-Feb-14 800 11-Feb-14 1800 Cont Crossing of Dhule-Vadodara 765 kv SC Line MSETCL BDTCL subjected to sldc

clearance N

33 400132 KV

Vindhyachal ICT-1 10-Feb-14 900 14-Feb-14 1900 Cont ICT Overhauling NTPC NTPC N

34400 KV Vindhyachal - Jabalpur-

3 Line Shunt Reactor10-Feb-14 900 14-Feb-14 1900 Cont Reactor Overhauling NTPC NTPC

N

35 400 KSK-DB Power 10-Feb-14 800 13-Feb-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end WRTS-IDBKSK

KSK N36 220 Ipore-Kawas-1 10-Feb-14 800 10-Feb-14 1800 Daily PMM work GETCO N

37400 Vindhyachal‐Mahan 10‐Feb‐14 800 11‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐I WRTS‐II N

38400 Mahan‐Korba 10‐Feb‐14 800 11‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐I WRTS‐II N

39765 Jabalpur ‐ Bina 1 10‐Feb‐14 1000 10‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Jabalur end by MS ABB

WRTS‐II POWERGRID Differed by siteN

40 400 SSP - Rajgarh - 1 10-Feb-14 800 11-Feb-14 1800 Daily Basis

PMM Work GETCO N

41 400 DC Tundri (DB Power) -ksk-Raigarh

10-Feb-14 800 11-Feb-14 1800 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (092-100)

DB Power WRTS-I N42 400 Jetpur - Amreli - 1 11-Feb-14 800 12-Feb-14 1800 Daily PMM GETCO GETCO N43 400 Hadala - Vadinar-2 11-Feb-14 800 11-Feb-14 1800 Daily PMM GETCO GETCO N44 400 Nagda-Rajgarh Ckt-I 11-Feb-14 900 11-Feb-14 1800 daily For maintenance work MPPTCL EHT- Mamp I N45 220 Mehgaon-Auriya Ckt 11-Feb-14 900 11-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N46 220 Seoni(PGCIL ) -

Chhindwara CKT II11-Feb-14 900 11-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

47

765kV Main Bus-1B at SASANBay 13 - Jack Bus

11-Feb-14 900 21-Feb-14 1800 Daily Jumper Installations amp ConnectionsIsolator Allignment

PGCIL Reliance Provisional Subject to details of works done to be apprised on daily basis

N

48 220 Ipore-Kawas-2 11-Feb-14 800 11-Feb-14 1800 Daily PMM work GETCO N49 220 Navsari - Nasik - 2 11-Feb-14 900 11-Feb-14 1800 Daily PMM work GETCO N

50765 Jabalpur ‐ Bina 2 11‐Feb‐14 1000 11‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Jabalur end by MS ABB

WRTS‐II POWERGRID Deferred by siteN

51 400 Nagda-Rajgarh Ckt-II 12-Feb-14 900 12-Feb-14 1800 daily For maintenance work MPPTCL EHT- Mamp I N52 400 Karad-Solapur (PGCIL) 12-Feb-14 900 12-Feb-14 1700 Daily QMwork MSETCL MSETCL N53 400 Raipur-Sipat 1 amp 2 26-Feb-14 800 3-Mar-14 1800 Conti Diversion of line for Lafarge Railway track WRTS-I Lafarge Ori 12-16 Feb 14 Deferre N54 220 Haldarwa Kawas-2 12-Feb-14 900 12-Feb-14 1800 Daily PMM work GETCO N

55 220 Bus‐I Bina 12‐Feb‐14 800 12‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

56 400 Chorania - Hadala 13-Feb-14 800 14-Feb-14 1800 Daily PMM GETCO GETCO N57 400 Tarpur-Padghe-2 13-Feb-14 800 14-Feb-14 1800 Daily maintenance work POWERG

RIDNPCIL N

58400 Vindhyachal‐Satna1 13‐Feb‐14 1000 13‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

59 220 Bus‐II Bina 13‐Feb‐14 800 13‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

60 220 Pithampur-Rajgarh Ckt - I

14-Feb-14 900 14-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

61 220 Wardha (PG)-Badnera 14-Feb-14 800 14-Feb-14 1800 Daily AMP Work at Wardha MSETCL WRTS-I N

62 400 Bhusawal-Koradi 14-Feb-14 900 14-Feb-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL N

63 400 Raipur-KSK 14-Feb-14 800 16-Feb-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end WRTS-IKSK

KSK N

64 220 GWL(PGCIL)-Malanpur Ckt-II

15-Feb-14 900 15-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N

65 220 Pithampur-Rajgarh Ckt - II

15-Feb-14 900 15-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

66400 Vindhyachal‐Satna2 16‐Feb‐14 1000 16‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

67 220 KAPS - Haldarwa - 1 17-Feb-14 800 17-Feb-14 2000 Daily Yearly PM checks KAPS N

68400 3X105 MVA 400220Kv

X-mer I At Indore ss17-Feb-14 800 18-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI

N

69

220 SC Korba-Raigarh-Budhipadar sc(PGCIL) amp DC Korba-Budipadar both circuits (CSPTCL)

18-Feb-14 800 19-Feb-14 1800 Conti Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCLWRTS-I

WRTS-I

N

70 400 Itarsi-Bhopal Ckt-I 18-Feb-14 900 19-Feb-14 1700 daily For maintenance work MPPTCL EHT- Mamp I N71 220 Badod - Kota Ckt 18-Feb-14 900 18-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N72 220 Damoh(PGCIL) -

Damoh I C - II18-Feb-14 900 18-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

73 220 Badod - Modak Ckt 19-Feb-14 900 19-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

74220 KAPS - Ukai - Mota 19-Feb-14 800 19-Feb-14 2000 Daily Yearly PM checks KAPS Non consent from SLDC

GETCO N

75400 315 MVA 400220 KvX-

mer III At Indore ss20-Feb-14 800 21-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI

N

76 220 Seoni(PG)-Seoni 2 21-Feb-14 800 21-Feb-14 1800 Daily AMP Work MPPTCL WRTS-I Y N77 220 Bina(PGCIL)-Shivpuri

Ckt21-Feb-14 900 22-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI Y N

78 400 Koradi-Nandgaonpeth 21-Feb-14 900 21-Feb-14 1700 Daily QMwork MSETCL MSETCL N N79 220 Haldarva - Jhanor - 1

(NTPC)21-Feb-14 900 21-Feb-14 1800 Daily PMM work GETCO N

80

765kV Main Bus-2A at SASANSatna Line-2

22-Feb-14 900 28-Feb-14 1800 Contionious

Equipment ConnectionsCircuit Breaker TestingJumper MeasurementIsolator Allignment Reactor accessories erection on R-Phase

PGCIL Reliance

N

81 400 Korba-Raipur 3 amp 4 23-Feb-14 800 24-Feb-14 1800 Conti For Bus spliting work at Raipur765 KV Raigarh-Raipur and 765 Champa Raipur lines

WRTS-1 WRTS-1 N

82132 132kV Astha - Polai SC

line of MPPTCL24-Feb-14 800 25-Feb-14 1800 Continous Crossing of Bhopal -Indore 765 kv SC Line MPPTCL BDTCL subjected to sldc

clearance N

83 400 Bus-1 at Bilaspur 24-Feb-14 800 24-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I N

84400 Seoni -

Khedamara(Bhilai) Ckt25-Feb-14 900 25-Feb-14 1800 daily For maintenance workFeeder bay maintenance at

KMaraMPPTCL CSPTCLMPPT

CLNo confirmation on D-3

N

85400 Ranchi-Sipat 1 amp 2 25-Feb-14 800 26-Feb-14 1800 Conti Crossing work of upcoming 765 KV DC

Jharsuguda-Korba amp 765KV SC Ranchi-BilaspurWRTS-I WRTS-I No confirmation on D-3

N

86765 Sasan‐Satna2 25‐Feb‐14 800 26‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐II POWERGRID No confirmation on D-3 N

87400 Bus Reactor1 at Satna 25‐Feb‐14 1000 25‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

88400 400 kV DC Damoh -

Bhopal Line26-Feb-14 800 27-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL Not availed by agency for

rainsN

89400 Raipur-Bhadrawati 2 amp

327-Feb-14 800 27-Feb-14 2100 Daily For Bus spliting work at Raipur765 KV Raigarh-

Raipur and 765 Champa Raipur linesWRTS-1 WRTS-1 Subject to Telemetry from

Durg PS RaipurN

90 400 Birsinghpur‐Vandana Vidyut

27‐Feb‐14 800 27‐Feb‐14 1700 Daily AMP of Terminal Equipment amp line Reactor WRTS‐I POWERGRID Ready N

91 400 Bhusawal-Akola 28-Feb-14 900 28-Feb-14 1700 Daily QMwork MSETCL MSETCL N92 220 Bus-1 at Wardha 28-Feb-14 800 28-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I N93 400 Birsinghpur‐Balco 28‐Feb‐14 800 28‐Feb‐14 1700 Daily AMP of Terminal Equipment amp line Reactor WRTS‐I WRTS‐I Deferred by site N

94 400 Nagda‐Dehgam2 5‐Feb‐14 1000 5‐Feb‐14 1800 DailyCommissioning amp checking of CSD relay in Main CB for reactor switching at Dehgam end by MS ABB

WRTS‐II POWERGRID N

95 400 400kV Satpura Itarsi 10‐Feb‐14 900 11‐Feb‐14 1700 DailyCommissioning of new CB after dismantling of existing TELK make CB at Satpura end amp normalising of line on main CB

POWERGRID

WRTS‐II N

96 765 765 kV Satna - Bina Ckt I

6-Feb-14 800 8-Feb-14 1800 cont Stringing of Jabalpur-Bina 765 kv SC Line PGCIL JTCL Original27-28 Jan14 Def N

97 765400 765400 kV ICT-1 at Bina 20-Feb-14 90000 AM 21-Feb-13 60000 PM Continuou

sCSD commissioning for 400kV Side CB of 765400 kV ICT-1 WRTS-II POWERGRID Deferred by site N

98 400 Nagda - Dehgam 1amp2 20-Feb-14 80000 AM 28-Feb-14 1700 Daily Online PID testing to insulators in both circuits AR shall be kept in non auto mode in both circuits WRTS-II POWERGRID

N

99 220MC Waluj-Chitegaon amp Waluj-Jalna

21-Feb-14 700 21-Feb-14 1900 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad MSETCL WRTS-I

N

100 400 Bus 1 at Asoj 21-Feb-14 000 21-Feb-14 1800 Daily For checking bus stability testing of Piran 1 amp 2 bays (for charging of new line) GETCO WRTS-II N

101 400 Bus-1 at Wardha 22-Feb-14 800 22-Feb-14 1800 Daily Jumper spacers connection at Wardha WRTS-I WRTS-I N102 400 Bus-1 at Raigarh 22-Feb-14 800 22-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I Deferred by site N103 765 Bus - II at Indore 22-Feb-14 90000 AM 23-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Not availed NLDC consenN104 220 Kakrapar-Haldarwa2 22-Feb-14 1000 Hrs 22-Feb-14 1600 Hrs Daily AMP POWERG

RID WRTS-II N

105 400 Bus 2 at Asoj 22-Feb-14 000 22-Feb-14 1800 Daily For checking bus stability testing of Piran 1 amp 2 bays (for charging of new line) GETCO WRTS-II N N

106400 400 kv DC Bhopal -

Bina Line (Ckt I amp II)(Tower no 34 amp35)

23-Feb-14 800 24-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line MPPTCLBDTCL

N

107 765kV SASAN Main Bus-1BBay 10 - Jack Bus 24-Feb-14 800 Hrs 2-Mar-14 1900 Hrs Continuous Dia-4

(Bay-10) - SCCOCC Test of Unit 4 GTSasan Sasan N

108 765 Bus - I at Indore 24-Feb-14 90000 AM 25-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID N

109 765 765 KV Bina-Indore Line 24-Feb-14 0900 Hrs 24-Feb-14 1800 Hrs Daily

For taking spare reactor unit in service amp checking the scheme for spare reactor with 765 KV Bina-Indore Line Reactor at Bina

POWERGRID WRTS-II

Deferred by site N

110 400 Kasor - GPEC 24-Feb-14 800 25-Feb-14 1800 Daily PMM Work GETCO GETCO N111 40022033 315 MVA ICT2 at Kheda 24-Feb-14 900 10-Mar-14 1800 cont modification work in SS lay out CSPTCL CSPTCL N112 400 315 MVA ICT2 at

Gwalior 25-Feb-14 90000 AM 25-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID N

113 400KV V-Satna-4 Line Shunt Reactor 25-Feb-14 1000 25-Feb-14 2000 Daily

Basis AMP NTPC NTPC N

114 400 Raipur-Wardha 1 26-Feb-14 800 26-Feb-14 2000 Daily Balance construction works at Wardha end WRTS-I WRTS-IReady Ori26214 Deferred by site

N

115 400 Bus -I at Indore 26-Feb-14 90000 AM 26-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Deferred by site N116 400 315 MVA ICT3 at

Gwalior 26-Feb-14 90000 AM 26-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID N

117 400 400 kV DC Damoh - Bhopal Line

26-Feb-14 800 26-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL N

118 400 Chorania-Kasor 26-Feb-14 800 26-Feb-14 1800 Daily PMM work GETCO GETCO N119 400 Koradi-Satpura sc 26-Feb-14 800 26-Feb-14 1600 Daily 765KV Tiroda Koradi Transmission LineII crossing

worksPOWERGRID MEGPTCL Cancelled by MEGPTL N

120 400 400 kV DC Damoh - Bhopal Line

26-Feb-14 800 26-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL N

121 400 Raipur-Wardha 2 27-Feb-14 800 27-Feb-14 2000 Daily Balance construction works at Wardha end WRTS-I WRTS-I Deferred by site N122 400 Vindhyachal-Satna2 27-Feb-14 1000 27-Feb-14 1800 Daily Commissioning of CSD Relay in ABB make main

CB at Satna WRTS-II POWERGRID Deferred by site N

123 400 Bus -II at Indore 27-Feb-14 90000 AM 27-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Ready N124 400 315 MVA ICT1 at

Rajgarh 27-Feb-14 90000 AM 27-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID Ready N

125 400400 KV SC Kosamba - Asoj line(730-740)

27-Feb-14 700 27-Feb-14 1800 cont Crossing of Dhule - Vadodara 765 kv SC Line GETCOBDTCL

N

126 400 Indore (MP) -Indore (PG)-DC 27-Feb-14 700 28-Feb-14 1600 Cont Stringing of 765kV Indore - Vadodara line POWERG

RID WRTS-II Deferred by site N

Anaulagnak 33(A)

maaca- 2014 AaOr Ap`Ola 2014 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR MARCH 2014 AND APRIL 2014

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)maaca- 2014 Ap`Ola 2014 maaca- 2014 Ap`Ola 2014

MARCH 2014 APRIL 2014 MARCH 2014 APRIL 2014

1 gaujarat

saIimat 11700 12100 7750 7800

AsaIimat 11740 12140 7760 7810

2 maQya p`doSa

saIimat 8340 9050 5338 5540

AsaIimat 8340 9050 5338 5540

3 CltaIsagaZ

saIimat 3200 3075 1929 1809

AsaIimat 3225 3105 1944 1827

4 maharaYT

saIimat 19000 19150 10200 10300

AsaIimat 19050 19200 10250 10350

5 gaaovaa

saIimat 425 410 300 295

AsaIimat 425 415 310 300

6 dmana dIva

saIimat 340 345 210 205

AsaIimat 345 350 225 210

7 DI ena eca

saIimat 635 640 445 425

AsaIimat 635 640 445 425

8 piScama xao~

saIimat 41961 43047 28500 27900

AsaIimat 42076 43173 29560 28840

Diversity factor of 10401

March 2014 and April 2014

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah frvarI 2014

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 1552 75

]k[- Ukai - 2 1719 75]k[- Ukai - 3 598 75]k[- Ukai - 4 1757 75]k[- Ukai (Total) 5627 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 024 2]k[- ela baI saI eca Ukai LBCH - 2 131 3]k[- ela baI saI eca Ukai LBCH (Total) 154 5 0008

3 kDanaa Kadana - 1 000 0 0005kDanaa Kadana - 2 246 62 0000kDanaa Kadana - 3 223 62kDanaa Kadana - 4 166 63 0000kDanaa Kadana (Total) 634 63 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 431 9 0020 6 kula jalaIya TOTAL(H) 6846 225 0401

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 2060 32 21822 TaoronT pavar ilaimaToD yauinaT DI 7979 125 69803 TaoronT pavar ilaimaToD yauinaT [- 075 122 07584 TaoronT pavar ilaimaToD yauinaT ef 8023 124 66915 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 018811 Qauvarna tapIya Dhuvaran - GT 2 000 0 041912 Qauvarna tapIya Dhuvaran - STG 023 1013 ]ka[- yauinaT 1 Ukai -1 000 0 005114 ]ka[- yauinaT 2 Ukai -2 000 0 010815 ]ka[- yauinaT 3 Ukai -3 3147 200 297216 ]ka[- yauinaT 4 Ukai -4 10588 202 1002617 ]ka[- yauinaT 5 Ukai -5 9496 210 884118 ]ka[- yauinaT 6 Ukai -6 23703 500 1844819 gaaMQaInagar 1 Gandhinagar - 1 000 0 008620 gaaMQaInagar 2 Gandhinagar - 2 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 000 0 029622 gaaMQaInagar 4 Gandhinagar - 4 000 0 036223 gaaMQaInagar 5 Gandhinagar - 5 11676 212 1148924 vaNakbaaorI 1 Wanakbori - 1 10648 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 11069 21026 vaaNakbaaOrI 3 Wanakbori - 3 1891 20627 vaaNakbaaOrI 4 Wanakbori - 4 5244 21228 vaaNakbaaOrI 5 Wanakbori - 5 5531 21029 vaaNakbaaOrI 6 Wanakbori - 6 000 030 vaaNakbaaOrI 7 Wanakbori - 7 8902 20931 ]trna Utran GT 1 000 0 019832 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 000 0 024635 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 000 0 0000

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Anaulagnak 41

ACTUAL GENERATION amp AVALABILITY FOR FEBRUARY 2014Actual vaastivak

Actual vaastivak

37 isaka Sikka - 1 3696 112 439838 isaka Sikka - 2 000 0 017639 kcC ilagnaa[-T Kutch Lignite - 1 4429 71 848640 kcC ilagnaa[-T Kutch Lignite - 2 4037 7241 kcC ilagnaa[-T Kutch Lignite - 3 3646 6742 kcC ilagnaa[-T Kutch Lignite - 4 2215 66 525343 saUrt ilagnaa[-T Surat Lignite - 1 6705 131 682544 saUrt ilagnaa[-T Surat Lignite - 2 7475 131 738745 saUrt ilagnaa[-T Surat Lignite - 3 6965 130 728846 saUrt ilagnaa[-T Surat Lignite - 4 6362 130 688647 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5454 107 848648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5649 11449 jaI Aa[- pI saI ela GIPCL GT - 1 1589 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1587 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1702 3552 jaI Aa[- pI saI ela GIPCL ST - 1 2902 5153 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 020556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 000 0 000060 jaI pI [- saI GPEC GT - 2 267 156 013261 jaI pI [- saI GPEC GT - 3 143 146 002762 jaI pI [- saI GPEC STG 131 17263 jaI esa [- jaI GSEG GT - 1 000 0 098964 jaI esa [- jaI GSEG GT - 2 1181 5065 jaI esa [- jaI GSEG STG 642 2366 Sugen (GT 1 + GT 2) 1767 308 602467 saIpIpI sao Aayaat Imp from CPP+MUNDRA 269359 6881

kula tapIya Total (T) 475652 8386 302021kula jalaIya+tapIya Total (H+T) 482498 8604 302422ivaMD [najaI- Wind Energy 52123kula jalaIya+tapIya+hvaa Total (H+T+Wind) 534621 9539ivainamaya Exchanges 155314 saIimat jaa- maaMga Restricted Energy Req 689935

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 6800 194

11 gaaMQaI saagar Gandhi Sagar 3366 117 008012 raNaa p`tap sagar RPSagar 5883 172 004013 javaahr sagar Jawahar Sagar 4350 99 0050

2 ponca Pench 3052 165 00903 baargaI Bargi 4581 91 00804 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 11764 315 02806 banasaagar Bansagar-2 (Deolondh) 000 07 banasaagar Bansagar-3 (Silpara) 1236 32 00708 banasaagar Bansagar-4 (Zinaha) 1320 22 00509 maoDIKoDa Medikheda 396 63

10 ibarisaMGapur Birsingpur 040 20 002011 Tavaa Tawa 000 012 rajaGaaT Rajghat 165 12 006013 Omkareshwar 10620 402 14 [Midra saagar Indira Sagar 23077 997 0849

kula jalaIya TOTAL(H) MPPGCL 59999 2365 1273Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 6049 98 232502 AmarkMTk II AMK II Unit -2 6080 983 AmarkMTk III AMK III Unit -5 12212 219 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 06505 satpura II Satpura-II Unit 6 10323 180 165906 satpura II Satpura-II Unit 7 5926 1807 satpura II Satpura-II Unit 8 10964 195 191608 satpura II Satpura-II Unit 9 8353 1709 satpura III Satpura-III Unit 10 000 0 2080

10 satpura III Satpura-III Unit 11 9447 182 1909011 esajaITIpIesa 1 SGTPS Unit - 1 9447 182 1909012 esajaITIpIesa 2 SGTPS Unit - 2 10572 18213 esajaITIpIesa 3 SGTPS Unit - 3 9037 192 2064014 esajaITIpIesa 4 SGTPS Unit - 4 10700 18015 esajaITIpIesa 5 SGTPS Unit - 5 28804 51216 SSTPS 6864 587 8930

kula tapIya Total (T) 133714 3002 115350kula jalaIya+tapIya Total (H+T) 193713 5735 116623Injection from WIND 000 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 193713 5735ivainamaya Exchanges 193660 saIimat jaa- maaMga Rest En Req 387372

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 850 120 00902 Gangrel 475 10 00503 Mini Micro KWB 039 7

kula jalaIya TOTAL(H) CSEB 1364 137 0150tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 47 127402 kaorbaa (pU) Korba (E) Unit-2 2764 483 kaorbaa (pU) Korba (E) Unit-3 2764 484 kaorbaa (pU) Korba (E) Unit-4 2784 465 kaorbaa (pU) Korba (E) Unit -5 3685 120 253306 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 247808 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 15410

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 15839 256 1197012 KORBA(EB) Extn - 2 15876 256 11770

kula tapIya Total (T) 119907 1880 10190013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 119907 1880kula jalaIya+tapIya Total (H+T) 121271 2017 102050ivainamaya Exchanges 40207 0saIimat jaa- maaMga Rest En Req 161478 2017

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 9590 585 25142 kaoyanaa III Koyna III 5920 3203 kaoyanaa IV Koyna IV 18012 11324 kaoyanaa DIpIeca Koyna DPH 1442 385 TaTa jalaIya TATA Hydro 10242 741 28836 vaOtrNaa Vaitarna 000 07 eladarI Eldari 528 168 BaTgar AaOr vaIr Bhatgar amp Vir 915 49 pOzana Paithan 175 59

10 itlaarI Tillari 1106 6511 BaIra Tola rosa Bhira Tail Race 374 4112 GaTGar Ghatghar 5297 29313 Anya CaoTo jalaIya Small Hydro (others) 6173 0

kula jalaIya TOTAL(H) 58910 1599 5397Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 7700 1954 naaisak 4 Nasik Unit -4 10772 1965 naaisak 5 Nasik Unit -5 11160 1976 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 28827 5058 Tambao 6 Trombay Unit -6 000 09 Tambao 8 Trombay Unit -8 000 0

10 Tambao 7A gaOsa Trombay -7A (Gas) 7882 135 250411 Tambao 7ba Trombay -7B (WHR) 4499 7212 kaoraDI 5 Koradi Unit -5 5003 16013 kaoraDI 6 Koradi Unit -6 3963 19014 kaoraDI 7 Koradi Unit -7 10015 19015 Bausaavala 2 Bhusawal Unit -2 8329 17016 Bausaavala 3 Bhusawal Unit -3 9248 18017 Bausaavala 4 Bhusawal Unit -4 22734 50518 Bausaavala 4 Bhusawal Unit -5 19742 41519 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 7451 18621 parlaI 5 Parli Unit -5 10626 18022 parlaI 6 Parli Unit -6 14013 25323 parlaI 7 Parli Unit -7 13728 26024 KaprKoDa 1 Khaperkheda Unit -1 11173 20025 KaprKoDa 2 Khaperkheda Unit -2 10373 19526 KaprKoDa 3 Khaperkheda Unit -3 10998 20127 KaprKoDa 4 Khaperkheda Unit -4 12019 20728 KaprKoDa 5 Khaperkheda Unit -5 28882 50730 parsa Paras-3 14447 25731 parsa Paras-4 13504 25932 ]rna Uran (Gas) 18284 33833 ]rna Uran (WHR) 000 148 586234 caMd`pur 1 Chandrapur Unit -1 9087 17735 caMd`pur 2 Chandrapur Unit -2 1816 19436 caMd`pur 3 Chandrapur Unit -3 11737 21037 caMd`pur 4 Chandrapur Unit - 4 11843 46038 caMd`pur 5 Chandrapur Unit -5 7759 45539 caMd`pur 6 Chandrapur Unit -6 24420 44240 caMd`pur 7 Chandrapur Unit -7 23258 041 DhaNaU 1 Dahanu Unit-1 16339 250 1427842 DhaNaU 2 Dahanu Unit-2 16196 250 1427843 CPP 193651 29840044 RGPPL Share 000 0

kula tapIya Total (T) 631479 15369 329920MAH Wind + Solar Generation 16922 0kula jalaIya +tapIya Total (H+T+Wind) 707311 17451 372239

TOTAivainamaya Exchanges 324731saIimat jaa- maaMga Rest En Req 1032042

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1871 26ivainamaya Exchanges 33252saIimat jaa- maaMga Rest En Req 35123 434

C (F) dmana AaOr dIva DAMAN amp DIU 18245 298ja (G) dadra nagar hvaolaI DNH 40600 655

kula DD ampDNH (T) 58845 952Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 9600 160 1399112 tara`pur 2 TAPS Unit -2 11069 16013 tara`pur 3 TAPS Unit -3 36144 545 6584014 tara`pur 4 TAPS Unit -4 36197 54715 kakrapr 1 KAPS Unit -1 15230 545 3134216 kakrapr 2 KAPS Unit -2 14662 547

kula ena pI saI NPC Total 122901 25042 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14008 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 13913 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14076 214 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 32894 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 33204 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 33190 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33176 514

kula kaorbaa KSTPS Total 174461 2498 10394427 ivanQa esaTIpIesa 1 VSTPS Unit-1 12762 21328 ivanQa esaTIpIesa 2 VSTPS Unit-2 12708 21529 ivanQa esaTIpIesa 3 VSTPS Unit-3 12854 212210 ivanQa esaTIpIesa 4 VSTPS Unit-4 12909 214211 ivanQa esaTIpIesa 5 VSTPS Unit-5 12174 215212 ivanQa esaTIpIesa 6 VSTPS Unit-6 12625 214213 ivanQa esaTIpIesa 7 VSTPS Unit-7 31487 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 31075 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 31592 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 31488 512217 ivanQa esaTIpIesa 11 VSTPS Unit-11 30948 512

kula ivanQayaacala VSTPS Total 232623 3750 15107 31 saIpt -1 -SIPAT-1 38822 66400 32 saIpt -2 -SIPAT-2 32404 66500 33 saIpt -3 -SIPAT-3 38930 66300 34 saIpt -4 -SIPAT-4 26383 51600 35 saIpt -5 SIPAT-5 26400 51400

kula saIpt -SIPAT TOTAL 162939 285000 838941 kvaasa gaOsa 1e Kawas GT-1A 792 10742 kvaasa gaOsa 1baI Kawas GT-1B 2623 10943 kvaasa esaTI 1saI Kawas ST-1C 1571 11444 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 4986 304 222951 gaMQaar gaOsa 1 Gandhar GT-1 000 052 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 000 054 gaMQaar esaTI 4 Gandhar ST-4 000 0

kula gaMQaar GGPS Total 000 0 000061 maaOda 1 Mauda -1 19614 514 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 19614 514 1422661 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 000 31 000071 esa esa pI SSP RBPH - 1 6753 19372 esa esa pI SSP RBPH - 2 5907 19273 esa esa pI SSP RBPH - 3 5577 19574 esa esa pI SSP RBPH - 4 5513 19475 esa esa pI SSP RBPH - 5 7237 19476 esa esa pI SSP RBPH - 6 3109 19277 esa esa pI SSP CHPH - 1 1817 4078 esa esa pI SSP CHPH - 2 491 3679 esa esa pI SSP CHPH - 3 000 0710 esa esa pI SSP CHPH - 4 1639 39711 esa esa pI SSP CHPH - 5 901 37

kula esa esa pI SSP Total 38944 1312 389481 kula poMca Pench Total 3052 165 009082 Jindal Injection 38956 083 Amarkantak Lanco 15478 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2372740

(J) ]plabQata Availability 2308426 naoT ivainamaya Net Exchanges -292048 ]plabQa jaa- Energy Availability 2016379

maah frvarI 2014 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR FEBRUARY 2014 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 11532 - - - 11532 020214 1100 4993

saIimat Restricted 11700

AsaIimat Unrestricted 11740 11532 0 28 0 11560 010214 1200 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8366 8366 17022014 0500 5007

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9346 - - - 9346 120214 0900 4986

saIimat Restricted 8340

AsaIimat Unrestricted 8340 9346 0 38 0 9384 120214 0900 4986

nyaUnatma pMjaIkRt maaMga Min Registered Demand 3204 3204 270214 0200

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3210 3210 070214 1900 4989

saIimat Restricted 3200

AsaIimat Unrestricted 3225 3210 233 12 0 3246 070214 1900 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1617 1617 230214 2300 5021

maharaYT MAHARASHTRApMjaIkRt Registered 18510 - - - 18510 050214 1100 4984

saIimat Restricted 19000

AsaIimat Unrestricted 19050 17980 1655 -13 0 19622 190214 1200 5002

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12005 12005 280214 0400 5037

gaaovaa GOApMjaIkRt Registered 425 434 - - 434 130214 1400 5006

AsaIimat Unrestricted 425 434 1 -1 - 434 130214 1400 5006

nyaUnatma pMjaIkRt maaMga Min Registered Demand 311 311 100214 0300

essaar ESSAR(ESIL)pMjaIkRt Registered 487 - - 487 240214 1700 5004

AsaIimat Unrestricted 487 0 0 - 487 240214 1700 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 268 - - 268 250214 1200 5003

AsaIimat Unrestricted 268 0 0 - 268 250214 1200 5003

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 644 - - 644 260214 1200 4999

AsaIimat Unrestricted 644 0 - 644 260214 1200 4999

nyaUnatma pMjaIkRt maaMga Min Registered Demand 508 508 280214

piScama xao~ WESTERN REGIONpMjaIkRt Registered 42253 - - - 42253 110214 1100 4994

saIimat Restricted 41961

AsaIimat Unrestricted 42076 42021 850 235 0 43106 120214 1100 4994

nyaUnatma pMjaIkRt maaMga Min Registered Demand 27524 27524 280214 0400 5040 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

piScama xaoi~ya Baar p`oYaNa kond` mauumba[-

णाली चालन-ISO-I

ANNEXURE-43

माह फरवर 2014 February2014

समातरवतीय चालन PARALLELRADIAL OPERATION

TOTAL OPERATING

HOURS 1 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-NR) 66972

2 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-SR) 67200

टाई लाईन TIE LINE 1 765कवी िसवनी स वधा-I 765kV Sonito Wardha 67200 2 765कवी िसवनी स वधा-II 765kV Seonito Wardha 65247 3 400 कवी िभलाई स कोराड 400kV Bhilai to Koradi 67200

4 400 कवी िभलाई स भिावती 400kV Bhilai to Bhadravati 67200

5 400 कवी रायपर स भिावती-I 400kV Raipur to Bhadravati-I 67200

6 400 कवी रायपर स भिावतीETHII 400kV Raipur to Bhadravati-II 67139

7 400 कवी रायपर स भिावतीETHIII 400kV Raipur to Bhadravati-III 67200

8 400 कवी सातपरा स कोराड 400kV Satpura to Koradi 67200

9 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 67004 10 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 65308 11 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 66259 12 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 67200 13 400 कवी को हापर स मापसा-I 400kV Kolhapur-Mapusa-I 38740

14 400 कवी को हापर स मापसा-II 400kV Kolhapur-Mapusa-II 49532

15 400 कवी वापी स बोईसर 400kV Vapi-Boisar 67200

16 400 कवी रायगढ़ स ःटरलाइट-I 400kV Raigarh to Sterlight-I 66258

17 400 कवी रायगढ़ स ःटरलाइट-II 400kV Raigarh to Sterlight -II 67200

18 400 कवी रायगढ़ स झरसगड़ा-I 400kV Raigarh to Jharsuguda-I 67200

19 400 कवी रायगढ़ स झरसगड़ा-II 400kV Raigarh to Jharsuguda-II 67200

20 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 65028

21 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 66132

22 400 कवी रायपर स वधाETHI 400kV Raipur to Wardha-I 66836

23 400 कवी रायपर स वधाETHII 400kV Raipur to Wardha-II 67200

24 220 कवी कोरबा पव स ब पादर-III 220kV K(E) to Budhipadar-III 63853

Anaulagnak 47Annex-47

maah frvarI 2014 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39514 64944

10287 39711

Levels in Mtrs str maITr maoM

]ka[- Ukai

64392

9914

25402

25994

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF FEBRUARY 2014

ivavarNa Particulars

TRIPPING DETAILS FOR THE MONTH OF FEBRUARY 2014

Sr No Brief Details of incident (Elements Generation Tripped) Owner Utility Date amp Time Load

Gen LossCategory

1 Multiple Tripping from 400 kV New Koyna MSETClMSEGCLRGPPL 05‐02‐2014 0950 Hrs ‐ GI‐2

2Bus Bar protection mal‐operation at 400 kV Soja in Gujarat resulting in multiple Tripping

GETCO 06‐02‐2014 1755 Hrs ‐ GI‐2

ANNEXURE ‐ 5

  • annexpdf
    • 21pdf
    • 231pdf
    • 232pdf
    • 24pdf
    • 25pdf
    • 31pdf
    • 32C1pdf
    • 32C2pdf
    • 33Apdf
    • 41pdf
    • 42pdf
    • 47pdf
    • 5pdf
Page 5: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014

5

457th OCCM AGENDA

S No

400 kV Substn

Size (MVAR)

Implementing agency

Expected commissioning date

1 Ranchodpura 125 MVAR GETCO Commd On 8th July 2013 2 Varsana 125 MVAR GETCO Commd On 25th July 2013 3 Rajkot 125 MVAR GETCO Commd On 5th August 2013 4 Amreli 125 MVAR GETCO Commd On 12072013 5 Jetpur 63 MVAR GETCO Commd on 11072013 6 Zerda 125 MVAR GETCO Commd in July 2013 7 Kosmba 80 MVAR GETCO Commissioned on 29112013 8 Limbdi (Chornia) 125 MVAR GETCO 25th July 2013 9 Jabalpur 125 MVAR PGCIL June 2014 10 Khandwa 125 MVAR PGCIL June 2014 11 Shujalpur 125 MVAR PGCIL June 2014 12 Bhatapara 125 MVAR PGCIL June 2014 13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014 16 Sholapur 125 MVAR MSETCL 2014 17 Kolhapur 125 MVAR MSETCL 2014 18 Akola 125 MVAR MSETCL 2014 19 India bull 80mvar BR MSETCL Commissioned 26112013 20 Nagda 125 MVAR MPPTCL September 2014 21 Bhopal 80 MVAR MPPTCL March 2014 22 Damoh 125 MVAR PGCIL August 2014 23 Bachau 125 MVAR PGCIL August 2014 24 Pirana 125 MVAR PGCIL August 2014 25 Itarsi 2X125

MVAR PGCIL August 2014

26 Seoni 125 MVAR PGCIL August 2014 27 Parli 125 MVAR PGCIL August 2014 28 Raipur 125 MVAR PGCIL August 2014 29 Gwalior 125 MVAR PGCIL August 2014 30 Nagda 50 MVAR MPPTCL 2014 31 ISP 125 MVAR NHDC 2015 32 Satpura 50 MVAR MPPTCL March-2015 33 Sasan 240 Reliance

Utilities are requested to ensure that reactors are installed and commissioned according to the schedule agreed as above Utilities may give update on the status of implementation

6

457th OCCM AGENDA

72 Status of completion of 765400 kV and above on going Transmission Schemes being executedimplemented by Transmission Agencies

The updated status on various ongoing transmission schemes for the year 2013-14 as per the current information available is as follows - S No

Name of the Line Target Completion Date

Remarks

POWERGRID 1 400 kV Vapi(PG)-Navsari Commissioned on

16032013 2 400 kV Navsari - Navi Mumbai DC

Line Feb- 2014 ROW problem

3 765kV SC Satna-Gwalior line (Ckt-I) January - 2014 4 765kV SC Satna-Gwalior line

(359Km + 60Km DC Portion) Ckt-II Feb- 2014

5 765 kV Sasan-Satna-II Commissioned on 010613

GUJARAT 1 400 kV DC Kosamba-Chorania line

(Package I)(From Chorania SS to AP-54)

March -2014

2 400 kV DC Kosamba-Chorania line (Package II)(From Kosamba SS to AP-54)

March -2014

3 400 kV DC Mundra-Zerda line No 1 August -2014 4 400 kV DC Mundra-Zerda line No 2 April -2014 5 400 kV DC Vadinar-Amreli line April -2014 6 400kV Mundra-Hadala LILO to

Halvad April -2014

7 400 kV DC Amreli-Kasor line(Part-1) April -2014 8 315 MVA IInd ICT at Kosamba SS Charged on 15112013 MADHYA PRADESH 1 Malwa-TPH-Pithampur 400KV

DCDS Line 2324102013

2 Malwa TPH-Chhegaon 400 KV DCDS Line

Ckt ndashI on 22032013 Ckt-II on 11072013

3 Chhegaon-Julwania 400 KV DCDS Line

March - 2014

4 Pithampur- Indore 400KV DCDS Line March- 2014

5 Satpura TPH-Ashta 400KV DCDS Line

December ndash 2014

CSPTCL 1 400 kV Korba (W)-Khedamara

DCDS Ckt II LILOed at Marwa August 2013 Test charged on

20082013

2 400 kV Khedamara- Raita DCDS February -2014

3 400kV DCDS Marwa-Raipur(Raita) January - Test charge from Raipur

7

457th OCCM AGENDA

2014 end in August 2013 4 LILOof 400kV K(W)-Khedamara line

at Marwa (one ckt) April -2014

MAHARASHTRA(STU)

1 400KV Chandrapur- II- Warora DC Dec - 2013 end

2 400KV DC line from Koradi-II to Wardha SS(PG) DC

March - 2014

3 400 kV Chandrapur-Warora-II Commissioned on 16012014

4 400 kV Bableshwar-Sinner Ckt-II Commissioned on 27122013

5 400 kV Chandrapur-Parli-II LILO at Chandrapur-II SS

Commissioned on 16012014

MAHARASHTRA (IPTC route) by WR Transmission (Mah) Pvt Ltd

1 400 kV Parli(PG)-Pune DC Commissioned Ckt - 1 on 08112013 Commissioned Ckt - 2 on 10112013

2 400 kV Pune (PG)-Aurangabad (MSETCL) DC

November-13 Commissioned Ckt - 1 on 05122013 Commissioned Ckt - 2 on 04122013

3 LILO Lonikhand ndashKalwa at Pune(PG) Lonikhand-Pune charged on 2130 on 09072013 and Kalwa ndashPune at 2145 on 09072013

GUJARAT (IPTC route) by WR Transmission (Guj) Pvt Ltd

1 400 kV Rajgarh(PG)-Karamsad (GETCO) DC

May -2014

The Sub-Committee may notediscuss

73 Commissioning of new Generating units in Western Region and the capacity expected to be commissioned during the current year 2013-14

The status regarding Generating units commissioned expected to be commissioned during the current year 2013-14 according the available information is as below

Name of the Power Projects Unit No Capacity (MW)

Date of Commissioning Schedule Date

GUJARAT Ukai 6 500 COD on 08062013 Pipavav CCPP- GPCL amp GSPC joint venture Block-1 350

March- 2014 Made in synchronized on

8

457th OCCM AGENDA

10102013 Bhavnagar Lignite TPP-JV I 250 August 2014 II 250 August 2014 UNO SUGEN 1 3825 COD on 04042013 CHHATTISGARH Marwa TPS I 500 25122013 Korba (w) Ext-5 500 COD on 05092013 KSK Mahanadi 3 600 COD on 14082013

VEDANTA VIDYUT 1 135 Synchronized on 11082013

MAHARASHTRA

INDIABULLS (Amaravati) 1 270 Synchronized on 03062013

INDIABULLS (Amaravati) 2 270 January-2014 INDIABULLS (Sinnar) 1 270 March-2014 VIPL(Butibori) 1 300 COD on 05042013

VIPL (Butibori) 2 300

First synchronized on 02012013 Full load on 19032013

GMR EMCO 2 300 COD on 27082013 Dhariwal 1 300 Synd On 2913 Bhusawal 5 500400 COD on 03012014 MADHYA PRADESH

SINGAJI TPP 1 600

Synchronized on 31082013 Coal fired on 30092013

2 600 June-2014 Ms Jhabua Power Seoni 1 300 JANUARY ndash 2014 MB Power Anuppur 1 300 JANUARY ndash 2014 Satpura 11 250 Synchronized on 02102013 SATPURA 10 250 COD on 18082013 CENTRAL SECTOR Vindhyachal TPP IV 12 500 Feb-14 MAUDA 2 500 Feb-14

The WR utilities may intimate the current status on above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS (A) FOLLOW-UP ITEM NO 81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the Third quarter

(October 2013 to December 2013) for the year 2013-14

The Sub-Committee members may like to note and furnish details in respect of above

9

457th OCCM AGENDA

ITEM NO 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR

Status of physical amp cyber security in Power Sector for the Third quarter (October

2013 to December 2013) have not been received from some of the constituents

The Sub-Committee may like to note and furnish details in respect of above ITEM NO 83 ADMS IMPLEMENTATION STEP BY GETCO A pilot project in respect of ADMS have been successfully implemented by GETCO in

11 kV Sadhi feeder (MGVCL ) on 19022014

GETCO may like to presentation on the same ITEMS FROM WRLDC ITEM NO 91 PERFORMANCE OF WR CONSTITUENTS POST THE IMPLEMENTATION OF DEVIATION SETTLEMENT MECHANISM ON 17022014 The IEGC second amendment as well as the Deviation Settlement Mechanism is in

force wef 17022014 The performance of WR constituents during first 10 days ie

from 17th to 28th Feb 2014 comprising of 960 time blocks is illustrated below Members

may like to analyze and devise suitable measures to ensure compliance to the above

CERC regulations

10

457th OCCM AGENDA

Since the decisions in real-time are based on the SCADA data it is now important to

monitor and ensure correctness of drawal injection as seen in SCADA The chart

below indicates the difference between the drawal of constituents as seen in SCADA

and as recorded in SEM for the period of 01st Feb 2014 to 16th February 2014 It may

be seen that the significant difference between SCADA and SEM needs to be

addressed by ensuring healthiness of telemetry and periodic validation by the SCADA

team at the respective SLDCs and WRLDC

The sub committee may like to discuss the same

11

457th OCCM AGENDA

ITEM NO 92 UNDER DRAWAL BY MAHARASHTRA AND INSECURE OPERATION IN THE GRID ON 27-28 FEB 2014

During late night of 27th Feb and early morning hours of 28th Feb-14 the grid

frequency remained above 502 Hz continuously for five hours from 2252 hrs of 27-

02-2014 to 0407 hrs of 28-02-2014 The situation was caused due to demand

reduction across the WR and NR on account of widespread rains and persistent under

drawal by Maharashtra during the above period as illustrated in figure-1 below

5067

49

492

494

496

498

50

502

504

506

508

‐1000

‐850

‐700

‐550

‐400

‐250

‐100

50

200

350

500

650

800

2100

2115

2130

2145

2200

2215

2230

2245

2300

2315

2330

2345

000

015

030

045

100

115

130

145

200

215

230

245

300

315

330

345

400

415

430

445

500

515

530

545

600

615

630

645

700

716

731

746

Maharashtra Deviation from schedule vis‐a‐vis grid frequency2100 hrs of 27‐02‐2014 to 0800 hrs of 28‐02‐2014

MSEBUI FREQ

Deviation from Schedule

Frequency

MW Hz

Several messages were sent from WRLDC control room to SLDC Kalwa directing them to control their under drawal from the grid Details of these messages is tabulated below

Sl No Message sent to Ref No Message date and time

1 SLDC Maharashtra 56079 27022014 2210 hrs

2 SLDC Maharashtra 3070 27022014 2230 hrs

3 SLDC Maharashtra 3078 28022014 0125 hrs

4 SLDC Maharashtra 3079 28022014 0150 hrs

Despite the above messages the response from SLDC Kalwa was inadequate in

controlling the under drawal of Maharashtra Consequently the frequency touched

5069 Hz at 0211 hrs of 28-Feb 2014 the voltage across the grid increased sharply

and there was over injection from WR to other regions Subsequently as a

contingency measure the drawal schedule of Maharashtra was reduced by 600 MW

by suo motu revision in the requisition of Maharashtra in Korba Vindhyachal Sipat

12

457th OCCM AGENDA

and Vidhyachal STPS wef 0230 hrs to 0500 hrs of 28022014 This was later

extended up to 0700 hrs of 28022014 It was a near miss situation that could have

been avoided by adequate planning and commensurate actions in real-time It is

requested that the matter may be taken up at the highest level in MSETCL and a

separate meeting may be convened on the above subject to avoid reoccurrence of

such event in future

The sub committee may like to discuss the same

ITEM NO 93 NON AVAILABILITY OF REAL-TIME TELEMETRY FROM LARGE NUMBER OF STATIONS IN MAHARASHTRA There are 224 nodes in Maharashtra that comprising of 32 Generating stations and

192 substations Out of these 224 nodes 47 locations are yet to be integrated in the

System Out of the balance 177 the data from nearly 50 nodes are not coming since

last 6 months Thus in totality data is not available from more than 135 out of 224

stations ie 60 which is highly alarming The extremely poor status of telemetry in

the state of Maharashtra has become a security threat Maharashtra load is touching

17500 MW and there are large number of construction related outages that have to be

facilitated Further with the formation of the synchronous All India grid there is a need

for close monitoring of system parameters such as the line flows voltage and grid

frequency Inadequate telemetry is resulting in severe constraints in real time

operation as well as outage coordination There have been several instances of line

tripping on high voltage and SPS operation due to sudden increase in line flows

during hour boundary or during facilitating planned outage These events could be

minimized with better supervision if the telemetry is available

The telemetry issue in Maharashtra has been discussed in the various WRPC forums

wherein it was informed by MSETCL that the problem is due to failure of Ms Tulip

who was the service provider for the communication network During the month of

August 2013 representative from MSETCL had assured that a new contract was being

awarded and the situation would improve within one month The extracts from minutes

of 451st OCC is quoted below

QUOTE

13

457th OCCM AGENDA

ldquoMSETCL stated that they were working to resolve the issue and assured that there

would be an improvement in availability of Telemetry from Maharashtra stations within

one Monthrdquo

UNQUOTE

Representative of MSETCL may apprise the OCC regarding present status and the

likely schedule for resolution of the issue

The sub committee may like to discuss the same

ITEM NO 94 STATUS OF LINE AND BUS REACTORS AT 765 KV SASAN

The line reactor of 765 kV Sasan-Satna ckt-2 as well as the Bus reactors of 765 kV Sasan bus are yet to be commissioned at Sasan end In the absence of these reactors high voltage is experienced at Sasan and nearby stations Often one circuit of 765 kV Sasan-Satna is required to be opened for voltage regulation Consequently the reliability of evacuation of generation from two units of Sasan is affected During 456th OCC meeting the revised schedule of the above elements as informed by Ms Reliance was as under

Schedule in formed in meetings 451st OCC 455th OCC 454th OCC 1 Line reactor of 765

kV Sasan-Satna ckt-2

By Dec 2013 By April 2014 By May 2014

2 765 kV Bus-1 Reactor

Jan 2014 By Mar 2014 By June 2014

3 765 kV Bus-2 Reactor

Jan 2014 By Mar 2014 By June 2014

It was decided in 456th OCC meeting that one representative from MPPTCL would visit the SASAN site to check readiness of Line and Bus reactors Representative from MPPTCL and Sasan may apprise the OCC-members on the progress of commissioning of reactors at 765 kV Sasan OCC members may also be apprised of the tap position of the generator transformer 2 and 3

The sub committee may like to discuss the same

14

457th OCCM AGENDA

ITEM NO 95 CHARGING OF NEW TRANSMISSION ASSET IN THE GRID In order to have better coordination of the transmission utilities with RLDCNLDC during charging synchronization of new elements into the grid a communication has been received from NLDC (ref POSOSCONLDCSystem OperationOutage Planning1239) on 10022014 It has been proposed that

a Owner of the asset shall submit the request for expected chargingcommissioning of new element for the calendar month latest by 5th day of the month to the respective RLDC amp NLDC along with status of activities mentioned in the check-list

b RLDC shall study the impact of the new element commissioning and based on its assessment of the preparedness of the utility may recommend to NLDC who in turn would examine the issue independently considering pan India grid scenario

c After the above the owner of the new asset shall give its readiness to charge the new element atleast three days in advance with current status of activities mentioned in the check list

Check list is as under 1 List of elements to be charged along with the details of approval of the

transmission scheme from the Standing CommitteeCTUSTU 2 Single Line Diagram of the concerned substations along with status of

completion of each diabusbreakers 3 Availability of real-time data and communication to the designated

SLDCRLDC 4 Installation of Special Energy Meter complying with CEArsquos Regulations

(Serial number Meter number CTPT ratio to be indicated) 5 Charging Instructions by CTUSTU 6 Schedule and sequence of charging of elements 7 Availability of line bus reactors as per planning In case the transmission

system is planned to be charged without the planned line reactor requisite authorization from CTUSTU by studies

8 Connection Agreement (along with all annexures) with CTU or STU 9 Copy of Long term Access (LTA) or MTOA granted by CTU or STU as the

case may be 10 Copy of Power Purchase Agreement (PPA) 11 A signed undertaking with name and designation of the officer clarly

indicating the following a All Disturbance recorders (DR) and Event Loggers (ELs) with time

synchronization are commissioned b All protective systems have been commissioned c All statutory clearances have been obtained

12 Output of EL and DR after charging

15

457th OCCM AGENDA

Each document mentioned in check list from Sl No 1 to 10 must be attached for sake of completeness and emailed as a consolidated document to the nodal RLDC well before the new element charging date The sub-committee may like to discuss ITEM NO 96 OPENING FEEDERS WITHOUT PRIOR INTIMATION TO WRLDC

It was gathered based on the observation from WRLDC SCADA data and subsequent

discussion with MPPTCL that 220 kV Bina (MP)-Gwalior(MP) DC were taken under

shut down for LILO works at Datia at 0910hrs on 23022014 for 4 days The outage

of these lines was neither discussed in OCC and neither was there any intimation to

WRLDC before availing the outage These lines are included in the important grid

elements list of Western region and prior concurrence of WRLDC is required for

switching these lines Further these lines form the parallel path to 765 kV Bina-Gwalior

DC and with the shutdown of these lines the network upstream of WR-NR inter

regional corridor was depleted

The sub-committee may like to discuss ITEM NO 97 TRIPPING OF 765 KV LINES ON OVER VOLTAGE Recently several tripping of 765 kV lines have been reported on over voltage These are indicated below

1) 765 kV Bina-Gwalior I at 2358 hrs of 16022014 2) 765 kV Bina-Gwalior I at 2011 hrs of 14022014 3) 765 kV Satna-Gwalior at 1300 hrs of 06022014 4) 765 kV Sasan-Satna II at 0013 hrs of 18012014 5) 765 kV Jabalpur-Bina I at 2350 hrs of 10012014 6) 765 kV Jabalpur-Bina II at 0405 hrs of 06012014

It is understood that the adopted Stage-I OV setting for the above lines vary from 108 (ie 826 kV) to 110 (841 kV) As per SCADA data the bus voltage at any of the substations mentioned above had not reached 826 kV during the above incidents

POWERGRID may examine the above tripping in detail and apprise the OCC regarding the above In case of issues related with protective relays field equipment are detected these may be addressed at the earliest The sub-committee may like to discuss

16

457th OCCM AGENDA

ITEM NO 98 RGMO FGMO OF MANDATED GENERATORS IN WESTERN REGION

As per the latest information available at WRLDC there are 251 number of units with a total capacity of 57517 MW in Western Region that are mandated to operate in Restricted Free Governor Mode The need for compliance to the IEGC regulations wrt RGMOFGMO was emphasized in the 455th and 456th OCC meeting as well as during the 25th TCCWRPC meeting Subsequently it was communicated by email to all entities in WR to provide the latest status of RGMOFGMO implementation We have received updated status from MPPTCL LANCO CGPL DB Power and JPL Tamnar in Feb 2014 The latest state wise RGMOFGMO summary is given below

Name of Entity No of mandated units

RGMO FGMO available at

RGMOFGMO Not available at

Maharashtra 90 35 55 Madhya Pradesh 58 36 22 Gujarat 35 19 16 Chhattisgarh 10 3 7 CGPL 5 5 0 NCA 11 6 5 SASAN 2 1 1 NTPC 24 10 14 ESSAR_Mahan 1 1 0 NSPCL 2 2 0 KSK 1 1 0 KWPCL 1 0 1 DB POWER 1 1 0 JPL 5 4 1 LANCO 2 2 0 IEPL 1 0 1 EMCO 2 0 2 WR_Total 251 126 125

WRLDC vide its letter ref WRLDCRGMO-FGMO1-2014 dated 23012014 has issued directions under Section 29 of the Electricity Act to ensure compliance of IEGC regulations 52 (f) (g) (h) and (i) All utilities are requested to furnish the status of compliance in respect of generating units under their jurisdiction The sub-committee may like to discuss ITEM NO 99 STATUS OF TELEMETRY IN WESTERN REGION

The status of telemetry related issues in respect of WR constituents is as under

a) Chhattisgarh Data (except MW) from 500 MW Korba West extension generating station is not available Status points from 400 kV Raita pending

17

457th OCCM AGENDA

b) Madhya Pradesh Telemetry of following bus reactors is not available at WRLDC

S No

Station Name Bus Reactor

Nunber x Capacity

Total MVAR

Rated voltage

Status of Telemetry at

WRLDC1 Nagda 250 100 420 Not available2 Indore 225 50 33 Not available3 Bhopal 225 50 33 Not available4 Birsinghpur 150 50 420 Not available

c) Gujarat Data is not-availableintermittent from following stations in Gujarat

a 220 kV Nano of Tatamdash(not available) b Kansari 400 kV ss and Navsari 220 kVhellipIntermittent (PLCC Problem)

d) Goa Due to non-availability of SCADA data from Goa the difference between drawal as seen in SCADA and as recorded in SEM is as high as 572 during the period 1st Feb to 16th Feb 2014 Data from the following stations in Goa is not available at WRLDC S No Station Status

1 Amona 220 kV Not available 2 Cuncolin 220 kV Not available 3 Kadamba 110 kV Intermittent 4 Tivim 220 kV Intermittent 5 Ponda 220 kV Intermittent 6 Xeldam-220 kV Intermittent 7 Verna-110 kV Intermittent

e) Daman amp Diu

Due to non-availability of SCADA data from Daman amp Diu the difference between drawal as seen in SCADA and as recorded in SEM is as high as 571 during the period 1st Feb to 16th Feb 2014 Data from The error is mainly due to non-availability of data from 220 kV Magarwada

f) DNH Telemetry from 220 kV Kharadpara and Khadoli station is not available

g) POWERGRID The data from the following stations is not available at WRLDC

1) 765 kV Tamnar (Communication problem GPRS link is not stable)

18

457th OCCM AGENDA

Telemetry from following stations is Intermittent at WRLDC 1) 765 kV Durg (PLCC frequent problems)

2) 765 kV Kotra (communication intermittency)

3) 765 kV Gwalior (PLCC link established but still there is some

issue(Delay) in data updation at WRLDC Rectification work under

progress by Site Engineer

4) 765 kV Solapur - Redundant link established through Reliance but

the gateway connected to above link is not configured for 765 KV

data Hence when BSNL link is down 765 KV data is not updating at

WRLDC

The sub-committee may like to discuss

ITEM NO 910 COMPARISON OF DRAWAL AS SEEN IN SCADA VS SEM The IEGC second amendment and the Deviation Settlement Mechanism is in force since the 17022014 The IEGC stipulates maintaining injection drawal within the limits prescribed in the Deviation Settlement Mechanism The sub-committee may like to discuss ITEM NO 911 MOCK BLACK START EXERCISE

As per sec 58(b) of IEGC the usersSTUs etc need to conduct Black start mock

exercises in their respective systems once in every six month under intimation to

RLDC Also the all the black start Diesel Generator (DG) sets are [as per sec 58(b)

of IEGC] required to be tested weekly and the test report needs to be sent to RLDC

on quarterly basis

The following table summarizes the status of mock exercises in respect of black start

facilities in Western Region

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

GUJARAT

1 Ukai (H) 4 x 75 Hydro Diesel 500 kVA 221213 Y

2 Mini Hydro 2 x 25 Hydro Diesel 50 KW N

3 Kadana 4 x 60 Hydro Diesel 500 KVA 2413 Y (2413)

19

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

4

Dhuvaran

1 x 107 (68+39) + 1 x 112 (72+40)

Gas

Details to be furnished by Gujarat

Details to be furnished by Gujarat

N

5 GIPCL-I 3 x 32 + 1 x49

Gas Steam Diesel 141 KW

070912 Y

6 GIPCL-II 1x104+1x56 Gas Steam Diesel 500 kVA N

7

Torrent Power Stn C Stn- DEFCCPP

StnC2x30 StnD120 StnEF(110MW each)CCPP100MW

Thermal (Units-CDEF) Gas(CCPP)

Stn-C islands Diesel

StnC15kVA StnDE F and CCPP(500 kVA each)

281112

Y

8 GPEC 3x138+1x241 Thermal Natural Gas 3000 kVA N

9 Sugen 3x3825 MW Gas Diesel 2x6MVA N

Madhya Pradesh

10 Gandhisagar 5 x 23 Hydro DG set 100 kVA N

11 Birsinghpur 1 x 20 Hydro Battery 220 Volt

Battery N

12 Pench 2 x 80 Hydro DG set 250 kVA 121012 Y

13 Bargi 2 x 45 Hydro DG set 250 kVA 100212 Y

14 Bansagar Stage-I 3 x 105 Hydro DG set 250 kVA N

15 Indira Sagar 8x125 Hydro DG set 2x1000

KVA 22511 Y

Chhattisgarh 16

Hasdeo Bango 3 x 40 Hydro DG Set 250 kVA 250812 N

17

Korba(E)-phse-I

Power plant retired but Black start DG set available and on- load trial is reported to be carried out regularly

DG Set 1500 kW(33kV)

N

Maharashtra

18

Koyna I amp II

4 x 65 4 x 75 Hydro

House generator

2 MVA 231013 N

19 KDPH 2 x20 Hydro DG set 310 KW N

20 Eldari 3 x 75 Hydro DG set 6 KW N

21

Uran (Gas)

4 x 60 (GT) + 4x108 (GT)+ 2x120 WHR

Gas DG set

4 MW PH1412kVA PH2450kVA WH520kVA

161012

N

20

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

22 RGPPL

Block 1 640MW+Block 2 66354MW+Block 3 66354MW

Gas

Gas Turbine (Frame-6)

35 MW (Under testing) Details to be provided by RGPPL

N

23 Ghatghar 2x125 Hydro DG set 1x1250

kVA 51012

N

24 Khopoli 3x24+2x12 Hydro

DC Governor amp bearing oil pumps

DC power (self start)

271013 (detailed report awaited)

N

25 Bhivpuri 3 x 24 +

2 x 15 +2x12 Hydro

DC Governor amp bearing

-do-

N

26 Bhira 6 x 25 Hydro

1 Noof 500 KVA house generator with water turbine

500 kVA

201013 (detailed

report awaited)

N

27

Bhira PSS 1 x 150 Hydro DG set 500 kVA

N

28 Trombay 1 x 120 Gas

Turbine DG Set 25 MW

N

1 x 60 Steam Turbine

NTPC

21

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

29 Kawas 4 x 106 2 x 116 Gas Diesel 2850 KW 151013

N

30 Gandhar 3 x 144 + 1x225 Gas Diesel 2975 KW

N

NCA

31 SSP(RBPH amp CHPH) 6x200+550 Hydro Diesel 2x1000kVA 080412

N

Accordingly the Black start capable stations may forward their tentative plan for conducting Black start exercises in compliance to sec 58(b) of IEGC bull As per the communication for MPPTCL the tentative plan of Black start in Madhya

Pradesh system is given under SL No Name of the Station Tentative Date Remarks 1 Pench March 2014 DG set at Pench amp are Bargi

under outage 2 ISP Apr-May 2014 - 3 TONS June 2014 Governor Problem being

attended 4 Birsinghpur June 2014 -do- 5 Medikheda June 2014 -do- 6 Rjghat June 2014 -do- Other utilities may also update their tentative plan for black start

The sub-committee may like to discuss

22

457th OCCM AGENDA

ITEM NO 912 HEALTHINESS OF MAIN CIRCUIT BREAKER OF 400 KV BIRSINGPUR-KATNI-I AT KATNI END The main CB of Birsingpur-Katni-I is under shut down since 2350 hrs of 14th February 2013 Representatives from MPPTCL may kindly apprise on the progress and expected date of restoration of the Main CB of 400 kV Birsingpur-Katni-I at Katni end The sub-committee may like to discuss

ITEM NO 913 TESTING OF SPS RELATED TO TRIPPING OF BINA-GWALIOR-AGRA AT CGPL VINDHYACHAL AND KORBA

As per the information received from NTPC and CGPL the SPS for the 765 kV Bina-

Gwalior-Agra has been installed and a mock drill has to be carried out for the same

The matter was discussed in the 456th OCC and it was decided that SPS may be

tested for reduction of say 50MW for each station instead of backing down of entire

500MWs POWERGRID WRTS-2 may confirm the testing schedule so that the

same could be coordinated in from WRLDC

The sub-committee may like to discuss

ITEM NO 914 SPS AT SIPAT WRLDC vide letter No WRLDCMO-I17192013 dt 21613 requested to take up this matter with the concerned for early implementation of the SPS Status of the SPS at NTPC Sipat is as under

1 449th OCC SPS was proposed by WRLDC It was decided to have a

separate meeting to finalize the scheme 2 450th OCC Member Secretary WRPC intimated that the matter will be

discussed in 119th PCM on 3rd amp 4th September 2013 at Tarapur 3 451st OCC It was intimated that the issue of SPS of Sipat was discussed in

119th PCM held on 3rd amp 4th September 2013 at TARAPUR The tentative scheme were formulated which needed finer tuning

4 452nd OCC Matter not discussed 5 453rd OCC NTPC representative intimated proposal sent to their corporate

office for engineering approval 6 454th OCC Approval from our corporate office is yet to be obtained 7 455th OCC Approval from our corporate office is yet to be obtained 8 456th OCC Approval from corporate office has been obtained and would be

forwarded to WRPC for approval The sub-committee may like to discuss

23

457th OCCM AGENDA

ITEM NO 915 SPS AT 4X300 MW BALCO IPP The SPS at 2010 MW Balco (4x675MW + 4x135 MW + 4x300 MW) was to be commissioned by Nov 2013 before commissioning of first unit of 4x300 MW Balco IPP For the new SPS scheme envisaged for the Balco CTU connection namely the Grid Islanding and Load Management Scheme (GILMS) Balco had reported to have placed an order with Ms SEL As discussed earlier the scheme suggested by WRLDC may be implemented before commissioning of first unit of 300 MW It was intimated during the 456th OCCM by the Balco representatives that the SPS shall be commissioned by March 2014

The sub-committee may like to discuss

ITEM NO 916 ACTIONS TAKEN FOR REVIVAL OF TRANSMISSION ELEMENTS UNDER LONG OUTAGE

As per the information available at WRLDC following elements are out for a

long period

Sl No Date of

outage

Reason

ISTSIPP

1 80 MVAR BR at

ESSAR(Mahan)

231213 Oil leakage

2 125 MVAR BR at JPL 120513 Hydrogen formation

3 50 MVAR LR of Indore-Asoj-II

at Indore

190613 R phase bushing burst

4 50 MVAR LR of Birsingpur-

Damoh at Damoh(PG)

13102014 Oil Leakage

5 765 kV Durg-Kotra-I 24022014 Sparking in Isolator

6 400 kV Raipur-Raigarh-IV 18012014 Voltage Regulation

MSETCL

1 400 kV RGPPL-NrsquoKoyna-I 22012014 Voltage Regulation

2 400 kV Sholapur-

Sholapur(PG)

26022014 Tower Collapse

MPPTCL

1 400 kV Birsingpur-Katni-I 28012014 Voltage Regulation

24

457th OCCM AGENDA

2 50 MVAR LR of Indore-Asoj-II

at Indore

6012014 DGA Violation

CSPTCL

1 400220 kV Bhilai-II 24022014 Maintenance

OCC may like to be apprised of the actions being taken for expediting revival of

the above elements

The sub-committee may like to discuss

ITEM NO 917 STATUS OF 220 KV KOLHAPUR-MUDSINGHI-CHIKODI- BELGAM LINE Consent for trial operation of 220 kV Kolhapur-Mudsinghi-Chikodi- Belgam line in radial mode for supply of Karnataka load from Maharashtra side was granted after discussion in the 455th OCC meeting WRLDC is in receipt of letter from SRLDC regarding concurrence for the above arrangement SLDC Kalwa may apprise the OCC regarding the present status The sub-committee may like to discuss

ITEM NO 918 CONTRIBUTION OF GENERATORS IN VOLTAGE CONTROL The contribution of generators in WR in voltage control was analyzed during 456th OCC meeting It was noted that following units were injecting reactive power even during high voltage

1 210 MW units of Khaparkheda Koradi and Chandrapur (Maharashtra) 2 210 MW units of Satpura and Birsinghpur (Madhya Pradesh) 3 210 MW unit 23 of Korba West (Chattisgarh) 4 200 MW unit 34 of Ukai (T) in (Gujarat)

Utilities were requested to check the setting of AVRGT tap and revert back with findings Members may apprise OCC regarding the status The sub-committee may like to discuss

ITEM NO 919 REAL-TIME MONITORING OF FEEDERS SUBSTATIONS THAT ARE COVERED UNDER THE AUFLS Telemetry of feeders substations covered under the AUFLS is desirable for real-time assessment of the anticipated relief that would be available from the AUFLS scheme at any given instant of time CERC has also directed all the constituents to for

25

457th OCCM AGENDA

mapping of these feeders in the SCDA of SLDCsRLDC Members may like to deliberate further The sub-committee may like to discuss

ITEM NO 920 LOAD FORECASTING As per the amended Indian Electricity Grid Code that is effective from 17th February 2013 the SLDCs SEB distribution licensees shall always restrict the net drawal of the State from the grid within the drawal schedule keeping the deviations from the schedule within the limits specified in the Deviation settlement mechanism regulations Therefore it is imperative that adequate attention may be paid towards load forecasting The matter was discussed in the 455th and 456th OCC as well as in the 25th TCCWRPC board meeting wherein it was decided to create a task force for exploring development of a software for load forecasting Members may like to deliberate further The sub-committee may like to discuss

ITEM NO 921 IMPLEMENTATION OF THE REVISED AUFLS IN GOA DD AND DNH It was decided during the 455th and 456th OCC meeting as well as during 25th WRPC meeting that Goa DD and DNH shall complete the implementation of the revised AUFLS in Goa DD and DNH at the earliest Representatives from the Goa DD and DNH may apprise the status of the progress The sub-committee may like to discuss

ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING As per meeting roaster circulated during 452nd OCC meeting the 458th OCC Meeting

will be hosted by Maharashtra and may be scheduled on 16th amp 17th April 2014

Maharashtra may confirm the same

Anaulagnak 21

maah frvarI 2014

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5051 Hz BETWEEN 0200 Hrs amp 0300 Hrs Hrs ON 28022014

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4970 Hz BETWEEN 1800 Hrs amp 1900 Hrs Hrs ON 28022014

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 5006 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5071 Hz AT 0210 Hrs ON 28022014

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4937 Hz AT 185000 Hrs ON 28022014

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS FEBRUARY 2014 JANUARY 2014 DECEMBER 2013

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 001 005

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 041 061 188 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 1069 5423 4864 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 4014 3569 3987

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 4876 946 956

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING FEBRUARY 2014

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

Voltage Profile during the month of Feb 2014

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 421 401 426 403 409 409 408 408 415 399 414 402 424 413 417 3922 420 402 423 404 409 409 408 408 417 402 418 404 425 415 420 3993 421 399 426 400 429 405 425 402 412 399 419 408 423 410 413 3964 422 402 426 404 430 406 428 401 414 400 414 404 424 412 414 3965 420 396 423 400 409 409 408 408 413 396 415 401 424 411 415 3996 420 396 426 400 428 405 426 402 415 398 416 402 423 411 412 4007 420 394 424 399 430 402 427 401 416 399 417 402 423 409 416 3968 418 393 422 397 409 409 408 408 416 399 416 402 422 409 418 3989 418 399 423 404 409 409 408 408 417 402 417 407 419 409 419 400

व तदाब परखा फरवर 2014 स नक Annex-23

इदौर इटारसी कराड धल असोज कासोर िभलाई जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

10 419 394 423 399 409 409 408 408 416 400 415 401 420 408 417 39511 421 393 426 397 429 405 427 401 44 399 419 404 423 407 414 39912 419 395 422 400 409 409 408 408 416 401 419 407 421 410 418 39813 420 396 424 401 409 409 408 408 417 400 416 401 421 409 418 40114 421 399 424 403 430 419 428 414 417 402 415 402 421 409 417 40015 423 397 424 399 428 414 429 412 417 398 406 406 421 407 418 40016 423 397 424 400 431 404 424 401 416 401 422 409 421 409 418 40317 421 402 424 403 432 414 420 404 416 402 412 405 422 410 417 39818 420 397 423 399 409 409 408 408 416 400 414 401 422 414 416 40019 420 396 423 399 409 409 408 408 411 398 418 405 421 413 413 39920 417 397 420 402 429 406 426 401 413 399 416 404 421 413 410 39821 419 399 422 402 430 407 421 401 415 401 418 406 422 411 414 39722 419 397 422 402 432 409 423 401 416 400 413 402 423 413 414 40023 420 396 423 397 430 412 428 404 414 404 415 402 427 414 416 40324 421 399 423 401 433 411 425 400 416 398 414 402 427 415 418 40225 421 399 423 401 433 411 425 400 416 398 414 402 427 415 418 40226 420 397 423 404 431 411 428 409 411 397 415 404 424 414 412 39327 418 398 426 403 409 409 408 408 417 399 418 402 429 415 419 39128 421 400 427 406 409 409 408 408 414 400 416 403 430 415 418 401

423 393 427 397 433 402 429 400 417 396 422 401 430 407 420 391

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 424 404 415 392 424 404 431 407 766 746 797 765 800 756 804 7692 422 406 417 398 426 404 434 407 769 754 798 774 801 769 804 7773 423 405 416 402 426 401 432 410 767 750 796 768 802 773 805 7764 426 407 417 402 423 403 430 408 768 751 797 779 801 776 808 7785 422 403 415 398 423 397 430 400 768 749 797 767 798 763 797 7586 425 404 417 401 423 399 432 404 768 750 797 767 802 773 807 7707 427 401 419 397 423 396 431 404 770 741 800 763 807 769 809 7698 422 403 416 403 424 395 427 399 756 737 788 756 801 765 802 7679 422 405 416 401 424 402 427 404 755 738 786 758 804 773 804 775

10 421 400 414 396 423 398 429 403 3 88 6 98 6 801 60

वािलयर बनाBina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

बना वािलयर नागदा खडवा िसपत िसविन

10 421 400 414 396 423 398 429 403 755 737 788 765 798 765 801 76011 423 397 414 390 426 396 433 399 758 736 794 750 800 752 802 75612 420 403 414 395 423 397 428 403 757 739 787 759 801 763 798 77013 424 405 417 400 427 397 430 402 759 740 794 760 804 773 803 77214 426 410 420 406 424 400 431 405 761 740 794 766 810 780 808 78215 425 404 417 399 426 399 430 401 762 738 794 962 808 768 806 76816 426 406 422 400 427 402 429 400 759 739 792 760 815 774 811 77617 429 407 417 398 427 404 427 406 761 742 792 762 805 765 810 77418 426 404 418 395 423 399 427 404 763 748 793 768 805 759 806 76819 423 409 415 394 422 399 428 403 759 737 795 765 804 758 806 76720 421 406 410 397 420 398 426 406 765 749 795 771 791 766 799 77421 423 407 424 399 423 403 428 405 759 744 792 760 795 761 800 76722 425 406 414 398 423 400 425 404 760 743 790 762 794 762 800 76823 425 402 412 392 424 400 428 405 758 740 790 759 796 755 799 76124 425 401 411 393 423 401 427 403 760 744 796 764 792 757 798 75625 421 408 412 395 423 401 427 403 756 742 793 766 795 764 795 76926 422 405 413 390 421 399 426 402 757 739 789 760 796 750 798 76127 426 407 416 393 421 401 431 403 760 741 795 762 803 755 804 76228 428 409 414 392 423 403 432 405 762 740 795 753 809 775 803 771

429 397 424 390 427 395 434 399 770 736 800 750 815 750 811 756

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Feb-14 0 0 0 0 0 0 0 02 02-Feb-14 0 0 0 0 0 0 0 03 03-Feb-14 0 0 0 0 0 0 0 04 04-Feb-14 0 0 0 0 0 0 0 05 05-Feb-14 0 0 0 0 0 0 0 06 06-Feb-14 0 0 0 0 0 0 0 07 07-Feb-14 0 0 0 0 0 0 0 08 08-Feb-14 0 0 0 0 0 0 0 09 09-Feb-14 0 0 0 0 0 0 0 0

10 10-Feb-14 0 0 0 0 0 0 0 011 11-Feb-14 0 0 0 0 0 0 0 012 12-Feb-14 0 0 0 0 0 0 0 013 13-Feb-14 0 0 0 0 0 0 0 014 14-Feb-14 0 0 0 0 0 0 0 015 15-Feb-14 0 0 0 0 0 0 016 16-Feb-14 0 0 NIL NIL NIL 017 17-Feb-14 0 0 0 0 0 0 0 018 18-Feb-14 0 0 0 0 0 0 0 019 19-Feb-14 0 0 0 0 0 0 0 020 20-Feb-14 0 0 0 0 0 0 0 021 21-Feb-14 0 0 0 0 0 0 0 022 22-Feb-14 0 0 0 0 0 0 0 023 23-Feb-14 0 0 0 0 0 0 0 024 24-Feb-14 0 0 0 0 0 0 0 025 25-Feb-14 1 17 0 0 0 0 0 026 26-Feb-14 0 0 0 0 0 0 0 027 27-Feb-14 0 0 0 0 0 0 0 028 28-Feb-14 0 0 0 0 0 0 0 0

Max 1 17 0 0 0 00 0 0Total 1 17 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month FEBRUARY 2014

Recommonded Load relief at 492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE-25

Power CutRestrictions in Western Region for the month of February-2014 k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply(DLF)

01022014 28022014 2344 2240 2332

21 Three-Phase Supply(Irrigation)

01022014 28022014 0956 0905 0946

21 Three-Phase Supply(Mixed)

01022014 28022014 2343 2227 2330

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01022014 28022014 2353 2337 2347 32 District Head Qtrs 01022014 28022014 2355 2340 2351 33 Tehsil Head Qtrs 01022014 28022014 2349 2309 2341

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid

1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 010214 to 280214

SaUnya Nil

0-1655MW

SaUnya Nil

0000

SaUnya Nil 2400

SaUnya Nil

95 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-

2 Power supply to Agricultural Sector ivavarNa Details sao From

idnaaMk Date tk To

idnaaMk Date p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs) 21 Three-Phase Supply 01022014 28022014 1000 0800 0900

22 Single-Phase Supply 01022014 28022014 1800 1800 1800 3 Anya jaanakarI Any other information

There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

11107 (Av) of 23 days 0000(Av) 0000 (Av)

1Rural 9031(Av) for 3486 Hrs 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0666 - -

0105 -

3 HT Industries 000 (Av) for 00 Hrs 000 Total Energy Cutday 0771 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01022014 to 280214 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 2322014 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का फरवर 2014का वःता रत यौरा

Details of forced unit outages during the month ofFeb2014

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 एःसार वा डनर

ESSAR VADINAR-I

गरा विनिल GSECL

660 2156 20-Jan-14 2018 10-Feb-14 Coal shortage

2 एःसार Essar-2

गरा विनिल GSECL

172 1212 22-Feb-13 अनपल ध Still out

अनपल ध Still out

Shortage of gas

3 एसएलपीपी SLPP-1

गरा विनिल GSECL

125 1445 23-Feb-14 1237 27-Feb-14 BTL

4 एकएलट पीएसAKLTPS-1

गरा विनिल GSECL

125 1147 26-Feb-14 अनपल ध Still out

अनपल ध Still out

DCS FAIL

5 एपीएल APL - 2

अदानी ADANI

330 056 3-Feb-14 अनपल ध Still out

अनपल ध Still out

Turbine vibration bearing probl em

6 एपीएल APL-5

अदानी ADANI

660 1732 15-Feb-14 456 27-Feb-14 Turbine vibration

7 एपीएल APL - 6

अदानी ADANI

660 2049 25-Feb-14 1947 3-Mar-14 Coal mill problem

8 टाटा TATA-6

मारा वउकिल MSPGCL

500 2352 19-Jul-13 अनपल ध Still out

अनपल ध Still out

For Economy SD

9 वीआईपीएल VIPL-I

मारा वउकिल MSPGCL

300 105 2-Oct-13 अनपल ध Still out

अनपल ध Still out

Turbine bearing vibration probl em

10 टाटा TATA-8

मारा वउकिल MSPGCL

250 2255 9-Jan-14 अनपल ध Still out

अनपल ध Still out

HT due to fire near turbine generator desk

11 चिपर Chandrapur-2

मारा वउकिल MSPGCL

210 1238 14-Jan-14 1310 23-Feb-14 ID fan problem

12 कोराड KORADI-6

मारा वउकिल MSPGCL

210 651 24-Jan-14 1456 14-Feb-14 Coal bunkering problem

13 डब यपीसीएल WPCL-1

मारा वउकिल MSPGCL

135 1245 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Furnace press high

14 डब यपीसीएल WPCL-3

मारा वउकिल MSPGCL

135 421 7-Feb-14 Ready Ready Less requisition

प म ऽय भार षण कि म बई णाली चालन-ISO-I

15 चिपर CPUR - 6

मारा वउकिल MSPGCL

500 1523 11-Feb-14 2033 13-Feb-14 BTL

16 नािसक NASIK-3

मारा वउकिल MSPGCL

250 300 11-Feb-14 100 19-Feb-14 UAT problem

17 कोराड KORADI-5

मारा वउकिल MSPGCL

210 153 14-Feb-14 अनपल ध Still out

अनपल ध Still out

ID fan problem

18 ितरोडा Tiroda-I

मारा वउकिल MSPGCL

660 2059 15-Feb-14 2054 26-Feb-14 Turbine bearing problem

19 ितरोडा Tiroda-2

मारा वउकिल MSPGCL

660 1125 17-Feb-14 152 22-Feb-14 BTL

20 कोराड KORADI-6

मारा वउकिल MSPGCL

210 2357 19-Feb-14 250 23-Feb-14 BTL

21 भसावल BHUSWAL-2

मारा वउकिल MSPGCL

210 301 22-Feb-14 1706 25-Feb-14 PA fan temp High

22 खापरखड़ा KHAPERKHEDA-3

मारा वउकिल MSPGCL

250 1448 22-Feb-14 130 25-Feb-14 BTL

23 जयगड Jaigad-4

मारा वउकिल MSPGCL

300 1930 22-Feb-14 1107 4-Mar-14 Low schedule

24 कोराड Koradi-5

मारा वउकिल MSPGCL

300 404 23-Feb-14 अनपल ध Still out

अनपल ध Still out

Electrical fault

25 पल PARLI-4

मारा वउकिल MSPGCL

210 1836 28-Jan-14 1956 3-Feb-14 Air preheater problem

26 भसावल BHUSAWAL-4

मारा वउकिल MSPGCL

250 1432 28-Feb-14 1802 3-Mar-14 Ash hopper problem

27 आरजीपीपीएल RGPPL-1B

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

28 आरजीपीपीएल RGPPL-2B

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

29 आरजीपीपीएल RGPPL 3A

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

30 आरजीपीपीएल RGPPL-1A

आरजीपीपीएल RGPPL

320 1500 18-Jan-14 अनपल ध Still out

अनपल ध Still out

SRV problem

31 आरजीपीपीएल RGPPL 3B

आरजीपीपीएल RGPPL

320 1230 8-Feb-14 Ready Ready Less requisition

32 िसगाजी SINGAJI - I

म वउकिल MPPGCL

600 422 12-Feb-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

33 सातपरा SATPURA-11

म वउकिल MPPGCL

250 1913 15-Feb-14 2149 19-Feb-14 Main stream temperature low

34 सातपरा SATPURA-11

म वउकिल MPPGCL

250 542 26-Feb-14 1642 2-Mar-14 BTL

35 एःसार महान Essar-Mahan-1

एःसार ESSAR

600 000 29-Jan-14 015 18-Feb-14 Less requisi tion

36 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

37 वदना Vandana-1

वदना Vandana

135 149 12-Jan-14 अनपल ध Still out

अनपल ध Still out

BTL

प म ऽय भार षण कि म बई णाली चालन-ISO-I

38 ससान Sasan-2

आरईएल REL

660 205 16-Feb-14 1650 23-Feb-14 Problem in ash handling

39 कावास Kawas 2A

एनट पीसीNTPC 164 2018 23-Dec-13 Ready Ready Less requisition

40 गाधार Gandhar-3

एनट पीसीNTPC 144 2037 28-Dec-13 Ready Ready Less requisition

41 गाधार Gandhar-I

एनट पीसीNTPC 144 2011 1-Jan-14 Ready Ready Less requisition

42 कावास Kawas 2B

एनट पीसीNTPC 164 900 13-Jan-14 421 5-Mar-14 Maintenance

43 गाधार Gandhar-2

एनट पीसीNTPC 219 023 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Less requisition

44 कावास Kawas-1A

एनट पीसीNTPC 164 2055 4-Feb-14 712 20-Feb-14 Less requisition

45 कावास

Kawas-1B एनट पीसीNTPC 164 1951 13-Feb-14 503 20-Feb-14 Less requisition

46 कावास Kawas 1A

एनट पीसीNTPC 164 1210 21-Feb-14 Ready Ready Less requisition

47 कावास Kawas 1B

एनट पीसीNTPC 164 012 22-Feb-14 1144 26-Feb-14 Less requisition

Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का फरवर 2014 का वःता रत यौरा

Details of planned unit outages during the month of Feb2014 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Time Date

1 डब यट पीएस WTPS-3

गरा विनिल GSECL

210 212 12-Feb-14 अनपल ध Still out

अनपल ध Still out

AOH

2 पल ParlI-3

मारा वउकिल MSPGCL

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

AOH

3 चिपर Chandrapur-5

मारा वउकिल MSPGCL

500 101 14-Jul-13 841 19-Feb-14 AOH

4 कोरबा प म KORBA-(W)-4

छरा वउकिल CSPGCL

210 2226 7-Feb-14 अनपल ध Still out

अनपल ध Still out

AOH

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

NIL2

NIL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING MARCH 2014 AND APRIL 2014

Capacity Outage as per Annual Maintenance Plan

3 Craiva]kMila CSPGCL

NIL

4

NIL

5 koMd``Iya xao~ Central Sector51 VSTPS 4 210 010414 070414 AOH52 VSTPS 2 210 080414 270414 AOH53 VSTPS 1 210 300414 190514 AOH54 CGPL 10 800 280314 130514 COH

maraiva]kMila MSPGCL

Date Time Date Time1 220 Bus-1 at Mapusa 20-Mar-14 1000 20-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R

2 765 Bus-1 at Sasan 20-Mar-14 800 20-Mar-14 1800 Daily Stringing of Main bus 1 for 765 kV Vichal Pooling - Sasan feeder

Reliance WR-II C

3 400 400kV Bus-2 at Satna 20-Mar-14 800 20-Mar-14 1800 Continuous Bay extension work related to JP - Nigrie Bays POWERGRID WR-II C

4 400 400kV ICT 1 at Satna 20-Mar-14 800 20-Mar-14 1000 Continuous Bay extension work related to JP - Nigrie Bays POWERGRID WR-II C

5 400 400kV Jabalpur Itarsi 1amp2 (Dc) 20-Mar-14 1000 20-Mar-14 1400 Continuous For commissioning of Line Impedance measurement kit

POWERGRID WR-II C

6 765 3X80 MVAr Bina Line Reactor at Indore 20-Mar-14 1000 21-Mar-14 1800 Continuous For installation of online dry out amp online DGA kit

POWERGRID WR-II C

7 400kV Damoh - Bhopal 1 20-Mar-14 800 31-Mar-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

8 400 Chorania Kasor 20-Mar-14 800 20-Mar-14 1800 Daily PMM work GETCO GETCO9 400 400 KV Main Bus-I at 400 KV Ss Khedamara 20-Mar-14 900 22-Mar-14 1700 Daily Erection of Pantograph 1 Set of IP amp CVT CSPTCL CSPTCL C

10 400 400 KV Khedamara-KSTPS NTPC ckt-II at 400 KV Ss Khedamara

20-Mar-14 900 22-Mar-14 1700 Daily Erection of Pantograph CVT amp 1 Set of IP PGCIL CSPTCL C

11 400 Korba -Vandana 20-Mar-14 900 21-Mar-14 1900 days continuouTesting of LBB auto re-close M-I amp M-II relays NTPC NTPC

12 400 Korba -Vandana 20-Mar-14 900 21-Mar-14 1900 days continuouTesting of LBB auto re-close M-I amp M-II relays NTPC NTPC

13 400DC Akola-Aurangabad (MSETCL) 1 and Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

21-Mar-14 600 23-Mar-14 1800 Conti Crossing work of 400kv MC Aurangabad - Aurangabad

MSETCLWRTS-I WRTS-I C

14400 amp 220 amp 132

400KV DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 400KV Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

21-Mar-14 600 21-Mar-14 1800 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad

MSETCLWRTS-I WRTS-I C

15 400 Bhadrawati-Parli 1amp 2 21-Mar-14 900 31-Mar-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I C

16 220 Bus-1 at Pune 21-Mar-14 800 21-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R

17 400 Solapur-Kolhapur 1 amp 2 21-Mar-14 700 21-Mar-14 1800 Daily Stringing work upcoming 765 kV Solapur-Pune line

Reliance WRTS-I C

18 220 220kV DC Raigarh- Raigarh (CSPTCL) Line (if outage not avail on 13140314)

21-Mar-14 900 22-Mar-14 1700 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (040-50)

CSPTCL WRTS-I C

19 220 Bus-2 (Section-A) at Mapusa 21-Mar-14 1000 21-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R20 400 Bus-1 at Itarsi 21-Mar-14 900 21-Mar-14 1800 Daily AMP POWERGRID WR-II R21 220 Bus-1 at Gwalior 21-Mar-14 1000 21-Mar-14 1800 Daily AMP POWERGRID WR-II R22 220 Jhanor - Haldarwa 1 21-Mar-14 900 21-Mar-14 1800 Daily AMP POWERGRID WR-II R23 400 Vapi Boisar 21-Mar-14 700 22-Mar-14 1900 Continuous For crossing of 220kV Kala Khadoli TL POWERGRID WR-II C

24 765 Sasan-Satna2 21-Mar-14 800 22-Mar-14 1800 Continuous For Power Line crossing of 765kV Vindhyanchal (pooling) - Satna 2 Line

POWERGRID WR-II R

25 400 400220 ICT NO1 at Kasor 21-Mar-14 800 21-Mar-14 1800 Daily PMM work GETCO GETCO26 400 400KV Sipat-Pathadi(LANCO) line 21-Mar-14 900 22-Mar-14 1900 Continous Annual Preventive maintenance job NTPC NTPC27 400 Pune-Parli 2 50MVAr Line Reactor at Pune 22-Mar-14 800 22-Mar-14 1800 Daily AMP Work Line in service wo reactor Reliance WRTS-I R

28 765 Bus-2 at Solapur 22-Mar-14 700 22-Mar-14 1800 Daily 765KV Pune bay commissioning amp SCADA works

WRTS-I WRTS-I C

29 400 Bus-1 at Bhatapara 22-Mar-14 800 23-Mar-14 1800 Conti Bus extension work for new 125MVAr Bus Reactor at Bhatapara

WRTS-I WRTS-I C

30 220 Bus-2 (Section-B) at Mapusa 22-Mar-14 1000 22-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R31 400 Vadavi Chorania 1 22-Mar-14 900 22-Mar-14 1800 Daily AMP Reliance WR-II R32 220 Jhanor - Haldarwa 2 22-Mar-14 900 22-Mar-14 1800 Daily AMP POWERGRID WR-II R33 220 Bus-2 at Gwalior 22-Mar-14 1000 22-Mar-14 1800 Daily AMP POWERGRID WR-II R

34 765 3X80 MVAr Bus Reactor at Indore 22-Mar-14 1000 23-Mar-14 1800 Continuous For installation of online dry out amp online DGA kit

POWERGRID WR-II C

35 220 Transfer Bus at Mapusa 23-Mar-14 1000 23-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R

36 400 Raigarh- Raipur 4 amp Raigarh-Kotra PS 2 23-Mar-14 800 30-Mar-14 1800 Conti Bay shifting work for up-coming 125MVAr Bus Reactor at Raigarh

WRTS-I WRTS-I C

37 765 Bus-1 at Indore (PG) 23-Mar-14 1000 23-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

Outages Proposal of Transmission elements during the month of MARCH‐2014Type

ANNEXURE‐32A

SN KV Line From To

Basis Reason System Agency

38 220 MC Waluj-Chitegaon amp Waluj-Jalna on same tower

24-Mar-14 600 24-Mar-14 1800 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad

MSETCL WRTS-I C

39 400 Raipur-Sipat 1 amp 2 24-Mar-14 800 2-Apr-14 1800 Conti Diversion of line for Lafarge Railway trackERS removal

WRTS-I Lafarge C

40 220 Bus-2 at Pune 24-Mar-14 800 24-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R41 765 Bus-1 at Bilaspur 24-Mar-14 800 24-Mar-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R

42 400 Bus-2 at Bhatapara 24-Mar-14 800 25-Mar-14 1800 Conti Bus extension work for new 125MVAr Bus Reactor at Bhatapara

WRTS-I WRTS-I C

43 400 Kolhapur-Mapusa 2 24-Mar-14 600 24-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

44 400 Vadavi Chorania 2 24-Mar-14 900 24-Mar-14 1800 Daily AMP Reliance WR-II R45 765 Bus-2 at Indore (PG) 24-Mar-14 1000 24-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

46 765 Bus-2 at Sasan 24-Mar-14 800 24-Mar-14 1800 Daily Strining of Main Bus 2 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

47 220 KAPP - Haldarwa 1 24-Mar-14 800 24-Mar-14 1800 Daily AMP POWERGRID WR-II R48 400 Bus - 2 at Pune 25-Mar-14 800 25-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R

49 765 Bus - 1 at Wardha 25-Mar-14 800 25-Mar-14 1800 Daily Jumper connection work of 765KV Raipur-Wardha line

WRTS-I WRTS-I R

50 400 Kolhapur-Mapusa 2 25-Mar-14 600 25-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

51 220 Mapusa-Ponda line 25-Mar-14 1000 25-Mar-14 1500 Daily AMP Work GOA WRTS-I R

52 765 Bus-1 at Sasan 25-Mar-14 800 25-Mar-14 1800 Daily Jumpering of Bus 1 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

53 220 KAPP - Haldarwa 2 25-Mar-14 800 25-Mar-14 1800 Daily AMP POWERGRID WR-II R54 400 Vadavi - Kansari2 25-Mar-14 900 25-Mar-14 1800 Daily AMP Reliance WR-II R55 400 Bus-1 at Indore (PG) 25-Mar-14 1000 26-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C56 765 Bus-1 at Satna 25-Mar-14 800 25-Mar-14 1800 Continuous Bay extension work POWERGRID WR-II C57 765 Sipat 765KV 400KV 1000MVA ICT-1 25-Mar-14 900 25-Mar-14 1900 Daily SPS Protection scheme modification NTPC NTPC

58 765 Bus - 2 at Wardha 26-Mar-14 800 26-Mar-14 1800 Daily Jumper connection work of 765KV Raipur-Wardha line

WRTS-I WRTS-I R

59 400 Bhadrawati-Parli 2 63MVAr Line Reactor at Parli

26-Mar-14 800 26-Mar-14 1800 Daily AMP Work of Recator at Parli line in service wo reactor

WRTS-I WRTS-I R

60 400 Kolhapur-Mapusa 1 26-Mar-14 600 26-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

61 220 Mapusa-Amona line 26-Mar-14 1000 26-Mar-14 1500 Daily AMP Work GOA WRTS-I R62 765 Bus-2 at Satna 26-Mar-14 800 26-Mar-14 1800 Continuous Bay extension work POWERGRID WR-II C

63 765 Bus-2 at Sasan 26-Mar-14 800 26-Mar-14 1800 Daily Jumpering of bus 2 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

64 400 401 KV Main Bus-I at 400 KV Ss Khedamara 26-Mar-14 900 27-Mar-14 1700 Daily Erection of IPS Tube CSPTCL CSPTCL C

65 400 401 KV Khedamara-KSTPS NTPC ckt-II at 400 KV Ss Khedamara

26-Mar-14 900 27-Mar-14 1700 Daily Erection of IPS Tube PGCIL CSPTCL C

66 400 ACBIL-BILASPUR-CKT NO -2 26-Mar-14 900 31-Mar-14 1800 CONT FOR lilo CONNECTIVITY OF 300MW MCCPL TPP

ACBIL ACBIL C

67 765 Bus-2 at Bilaspur 27-Mar-14 800 27-Mar-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R68 220 Mapusa-Thivim 1 27-Mar-14 1000 27-Mar-14 1500 Daily AMP Work GOA WRTS-I R69 220 KAPP - Vav 2 27-Mar-14 800 27-Mar-14 1800 Daily AMP POWERGRID WR-II R70 400 Bus-2 at Indore (PG) 27-Mar-14 1000 28-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

71 765 Bus-2 at Gwalior 27-Mar-14 1000 27-Mar-14 1800 Daily Bay extension work related to Gwalior Jaipur 1 Bays

POWERGRID WR-II C

72 400 VSTPS Tie- Line-1 ( Line from Stage-III to IV Switchyard)

27-Mar-14 900 27-Mar-14 1900 Daily Basis AMP and rectification of hot spots NTPC NTPC

73 765 Sipat 765KV 400KV 1000MVA ICT-2 27-Mar-14 900 27-Mar-14 1900 Daily SPS Protection scheme modification NTPC NTPC74 765 Bus-1 at Solapur 28-Mar-14 700 30-Mar-14 1800 Daily commissioning tests amp SCADA works WRTS-I WRTS-I C75 220 Mapusa-Thivim 2 28-Mar-14 1000 28-Mar-14 1500 Daily AMP Work GOA WRTS-I R

76 400 Koradi-Satpura 28-Mar-14 1000 28-Mar-14 1400 Daily Earthwire tighting work damaged during Crossing work

WRTS-I ADANI C

77 220 Bus-1 at Dehgam 28-Mar-14 900 28-Mar-14 1800 Daily AMP POWERGRID WR-II R78 220 Kawas - Haldarwa 2 28-Mar-14 800 28-Mar-14 1800 Daily AMP POWERGRID WR-II R79 400 Chorania Amreli 28-Mar-14 800 28-Mar-14 1800 Daily PMM work GETCO GETCO

80 400DC Akola-Aurangabad (MSETCL) 1 and Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

29-Mar-14 600 30-Mar-14 1800 Conti Charging amp shifting of Akola-Abad line on MC Abad-Abad line WRTS-I WRTS-I C

81 220 Bus-2 at Dehgam 29-Mar-14 900 29-Mar-14 1800 Daily AMP POWERGRID WR-II R82 400 Bus -1 at Mapusa 30-Mar-14 1000 30-Mar-14 1500 Daily AMP Work WRTS-I WRTS-I R

83 765 765kV Bus Reactor at Solapur 31-Mar-14 700 2-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

Date Time Date Time

1 400 Bhilai-Koradi 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

2 400 DC Korba-Birsingpur 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

3 400 Korba-Bhilai 2 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

4 220 Korba-Budhipadar 3 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

5 400 Akola-Wardha 1amp 2 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

6 400 Raipur-Raigarh 1 amp Raipur-KSK-DBPL-Raigarh

1-Apr-14 800 30-Apr-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

7 400 Bhadrawati-Parli 1amp 2 1-Apr-14 900 30-Apr-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I C

8 400 400220kv ICT-1 at Pune 1-Apr-14 800 1-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R9 400 Bus-1 at Bilaspur 1-Apr-14 800 1-Apr-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R

10 400 Solapur(PG) -Karad line 1-Apr-14 700 10-Apr-14 1800 Conti Erection of 80MVAr new reactor by shifitng line equipments at Solapur

MSETCL WRTS-I C

11 400 Bus-1 at Jabalpur (pooling) 01-Apr-14 1000 01-Apr-14 1800 Daily Busbar Stability test related to Jhabua Power Bays

POWERGRID WR-II C

12 400 Shujalpur - Nagda 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

13 400 Mundra - Bhachau 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

14 400 Bina - Shujalpur 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

15 220 Omkareshwar-Khandwa Ckt 1-Apr-14 900 1-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI16 400 Sipat 400KV Bay 10 and 11 1-Apr-14 900 3-Apr-14 1900 Continous 400KV CT 3nos replacement NTPC NTPC17 400 Padgha-Nagothane ckt I 1-Apr-14 900 1-Apr-14 1700 Daily QMwork MSETCL MSETCL

18 400 Bus-2 at Jabalpur (pooling) 02-Apr-14 1000 02-Apr-14 1800 Daily Busbar Stability test related to Jhabua Power Bays

POWERGRID WR-II C

19 400 Vindhyanchal - Mahan - Korba (Section of both the line on same Dc tower)

02-Apr-14 800 03-Apr-14 1700 Continuous For Power Line crossing of 765kV Vindhyanchal (pooling) - Satna 1 Line

POWERGRID WR-II C

20 400 400kV ICT 4 at Indore MPPTCL 02-Apr-14 1000 04-Apr-14 1800 ContinuousFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

MPPTCL WR-II C

21 400 400kV Bus Coupler bay at Indore MPPTCL 02-Apr-14 1000 04-Apr-14 1800 ContinuousFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

MPPTCL WR-II C

22 400 400kV Itarsi - Indore MPPTCL 1 Line 02-Apr-14 1000 02-Apr-14 1500 DailyFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

POWERGRID WR-II C

23 400400 KV LILO Line of 400 KV SC Korba West-Khedamara to 400 KV Ss Raita (Between Loc69 amp70 near Raita Ss)

2-Apr-14 800 3-Apr-14 1700 DailyMaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

CSPTCL CSPTCL C

24 400 Chandrapur-Khaparkheda 2-Apr-14 900 2-Apr-14 1700 Daily QMwork MSETCL MSETCL

25 400 Lamboti-Solapur PG 2-Apr-14 900 2-Apr-14 1700 Daily QMwork MSETCL MSETCL

26 400 Bus-1 at Durg PS Ss 3-Apr-14 900 3-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R27 400 Bus-1 at Jabalpur 03-Apr-14 900 03-Apr-14 1800 Daily Retrofitting of Isolator arms(689A) POWERGRID WR-II R28 400 315MVA ICT2 at Khandwa 03-Apr-14 1000 03-Apr-14 1600 Daily AMP POWERGRID WR-II R29 400 Mundra - Hadala 3-Apr-14 800 3-Apr-14 1800 Daily PMM GETCO GETCO30 400 400KV Seoni -Bhilai Ckt 3-Apr-14 900 3-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I31 400 Lonikand-Chakan 3-Apr-14 900 3-Apr-14 1700 Daily QMwork MSETCL MSETCL32 400 Bus-2 at Durg PS Ss 4-Apr-14 900 4-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R33 400 Bus-1 at Jabalpur 04-Apr-14 900 04-Apr-14 1800 Daily Retrofitting of Isolator arms(2089A) POWERGRID WR-II R

34 400 400kV Itarsi - Indore MPPTCL 1 Line 04-Apr-14 1300 04-Apr-14 1800 DailyFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

POWERGRID WR-II C

35 400 Varsana - Hadala 4-Apr-14 800 4-Apr-14 1800 Daily PMM GETCO GETCO

Agency Type

ANNEXURE‐32BOutages Proposal of Transmission elements during the month of APRIL ‐2014

SN KV Line From To

Basis Reason System

36 220 Vapi - Vapi (PG) 4-Apr-14 800 4-Apr-14 1800 Daily PMM work PGCIL GETCO37 220 Haldarva - Jhanor - 1 (NTPC) 4-Apr-14 800 4-Apr-14 1800 Daily PMM amp Tan Delta testing PGCIL GETCO38 400 400KV Birsinghpur -Katni Ckt - I 4-Apr-14 800 4-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I39 220 Badod - Kota Ckt 4-Apr-14 900 4-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI40 220 Malanpur-Auriya Ckt 4-Apr-14 900 5-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI

41 400 Bhusawal-Akola 4-Apr-14 900 4-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

42 400 Deepnagar-Aurangabad II 4-Apr-14 900 4-Apr-14 1700 Daily QMwork MSETCL MSETCL43 400 Kalwa-Padgha Ckt I 4-Apr-14 900 4-Apr-14 1700 Daily QMwork MSETCL MSETCL44 765 Bus Reactor at Seoni 5-Apr-14 900 5-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R

45 400 DC Korba-KhedamaraLilo at Marwa lilo section yet to be charge 5-Apr-14 800 6-Apr-14 1800 Daily

Crossing work of upcoming 765 KV DC Raigarh-Champa (AP-48A0- AP 490)DC Korba-Khedamara is in service

CSPTCL WRTS-1 C

46 400 Bus-1 at Jabalpur 05-Apr-14 900 05-Apr-14 1800 Daily Retrofitting of Isolator arms(1689A) POWERGRID WR-II R

47 400 Mundara -Limbdi 1 05-Apr-14 800 07-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

48 220 Badod - Modak Ckt 5-Apr-14 900 5-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI49 400 Dhule-Babhleswar ckt 1 5-Apr-14 900 5-Apr-14 1700 Daily QMwork MSETCL MSETCL50 400 400220kv ICT-1 at Seoni 7-Apr-14 900 7-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R51 400 Bus-2 at Jabalpur 07-Apr-14 900 07-Apr-14 1800 Daily Retrofitting of Isolator arms(1789B) POWERGRID WR-II R52 400 315MVA ICT1 at Khandwa 07-Apr-14 1000 07-Apr-14 1600 Daily AMP POWERGRID WR-II R53 220 Chhegoan-Khandwa Ckt -II 7-Apr-14 900 7-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI54 400 Korba- Bhilai1 7-Apr-14 900 8-Apr-14 1900 days continuou Bay Maint and testing NTPC NTPC55 400 Vindhyachal - Mahan line 7-Apr-14 900 8-Apr-14 1900 Continuous Replacement of R Y and B Phase CT NTPC NTPC56 400 Bhusawal-Aurangabad 7-Apr-14 900 7-Apr-14 1700 Daily QMwork MSETCL MSETCL57 400 New Koyna-Karad ckt 2 7-Apr-14 830 7-Apr-14 1730 Daily QMwork MSETCL MSETCL

58 400 Mundara -Limbdi 2 08-Apr-14 800 10-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

59 400 Chorania Hadala 8-Apr-14 800 8-Apr-14 1800 Daily PMM GETCO GETCO60 400 Sipat 400KV Bay 23 8-Apr-14 900 9-Apr-14 1900 Continous One 400KV CT replacement NTPC NTPC61 400 Koradi-Khaparkheda I 8-Apr-14 900 8-Apr-14 1700 Daily QMwork MSETCL MSETCL62 765 765400KV ICT-1 at Kotra PS 9-Apr-14 900 9-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R63 400 Bus-2 at Jabalpur 09-Apr-14 900 09-Apr-14 1800 Daily Retrofitting of Isolator arms(489B) POWERGRID WR-II R64 400 315MVA ICT1 at Damoh 09-Apr-14 1000 09-Apr-14 1600 Daily AMP POWERGRID WR-II R65 400 Amreli-Jetpur 2 9-Apr-14 800 9-Apr-14 1800 Daily PMM GETCO GETCO66 400 SSP- Rajgarh - 1 9-Apr-14 800 9-Apr-14 1800 Daily PMM GETCOMPTCL GETCO67 220 TAPS1 amp2-TAPS 3amp4 tie line 9-Apr-14 800 9-Apr-14 1600 one day Annual maintenance Works MSETCL NPCIL68 220 TAPS TIE LIE-I 9-Apr-14 800 10-Apr-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL69 400 400 KV Indore - Nagda Ckt 9-Apr-14 900 9-Apr-14 1600 daily For maintenance work MPPTCL EHT- Mamp I70 400 400 KV Sarni - Isp Ckt 9-Apr-14 900 9-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I71 220 Mehgaon-Auriya Ckt 9-Apr-14 900 10-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI72 400 315 MVA 400220Kv X-mer III At Bhopal SS 9-Apr-14 900 10-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI73 400 Padgha-Tarapur CktII 9-Apr-14 900 9-Apr-14 1700 Daily QMwork MSETCL MSETCL74 765 Bus Reactor at Kotra PS 10-Apr-14 900 10-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R

75 765 amp 400

765400 kV ICT-I at Solapur amp 400KV Solapur-Parli 2 10-Apr-14 700 12-Apr-14 1800 Daily 765400 kV spare ICT unit Aux bus works CSD

commissioning amp Fire fighting works at Solapur WRTS-IReliance WRTS-I C

76 400 315MVA ICT2 at Damoh 10-Apr-14 1000 10-Apr-14 1600 Daily AMP POWERGRID WR-II R

77 765 Sasan-Satna 1 10-Apr-14 800 11-Apr-14 1800 Daily For AMP of line amp Line terminal Equipments Post commissioning checks

POWERGRID WR-II C

78 400 APL-Varsana 10-Apr-14 800 10-Apr-14 1800 Daily PMM GETCO GETCO79 400 400 KV Isp - Nagda Ckt 10-Apr-14 900 10-Apr-14 1600 daily For maintenance work MPPTCL EHT- Mamp I80 400 400 KV Bhopal-Itarsi(PGCIL) Ckt-I 10-Apr-14 900 11-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I81 220 Chhegoan-Khandwa Ckt -I 10-Apr-14 900 10-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI82 400 315 MVA 400220Kv X-mer At Katni SS 10-Apr-14 800 11-Apr-14 1800 continue For maintenance work MPPTCL EHT -MampI83 400 Korba- Bhilai2 10-Apr-14 900 11-Apr-14 1900 days continuou Bay Maint and testing NTPC NTPC84 400 Sipat 400KV Bay 14 10-Apr-14 900 12-Apr-14 1900 Continous 400KV CT 3nos replacement NTPC NTPC

85 400 Chandrapur II-Parli II 10-Apr-14 900 10-Apr-14 1700 Daily Providing of Arching horncorona rings Bird guards quarter pinsNut bolts

MSETCL MSETCL

86 400 Karad-Lonikand 10-Apr-14 900 10-Apr-14 1700 Daily QMwork MSETCL MSETCL87 400 Raipur-Durg PS 1 11-Apr-14 900 11-Apr-14 1700 Daily AMP Work WRTS-I WRTS-I R

88 400 Mundara -Jetpur 1 11-Apr-14 800 15-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

89 400 Varsana-Hadala Line 11-Apr-14 800 11-Apr-14 1800 Daily PMM GETCO GETCO90 220 Haldarwa Kawas-2 11-Apr-14 800 11-Apr-14 1800 Daily PMM work PGCIL GETCO91 400 400 KV Nagda-Rajgarh(PGCIL) Ckt-I 11-Apr-14 900 11-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

92 400 315 MVA 400220Kv X-mer III ampTie bay At Bhopal SS

11-Apr-14 900 11-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI

93 400 Akola-Nandgaonpeth 11-Apr-14 900 11-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

94 400 Akola-Wardha I 11-Apr-14 900 11-Apr-14 1700 Daily QMwork MSETCL MSETCL95 400 Kalwa-Lonikand 11-Apr-14 900 11-Apr-14 1700 Daily QMwork MSETCL MSETCL96 400 400220kv ICT-1 at Mapusa 12-Apr-14 900 12-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R97 400 Raipur-Durg PS 2 12-Apr-14 900 12-Apr-14 1700 Daily AMP Work WRTS-I WRTS-I R98 765 Sasan-Satna2 with line reactor 12-Apr-14 1000 12-Apr-14 1800 Daily AMP POWERGRID WR-II R99 400 400 KV Nagda-Rajgarh(PGCIL) Ckt-II 12-Apr-14 900 12-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I100 400 Deepnagar-Aurangabad I 12-Apr-14 900 12-Apr-14 1700 Daily QMwork MSETCL MSETCL101 400 Amreli-Jetpur 2 14-Apr-14 800 14-Apr-14 1800 Daily PMM GETCO GETCO102 400 Kasor - Gpec 14-Apr-14 800 14-Apr-14 1800 Daily PMM GETCO GETCO103 220 GWL(PGCIL)-Malanpur Ckt-I 14-Apr-14 900 15-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI104 400 DC Korba-Raipur 3 amp 4 15-Apr-14 800 16-Apr-14 1800 Conti Bus splitting work at Raipur WRTS-1 WRTS-1 C

105 400 Korba-Bhatapara 15-Apr-14 800 24-Apr-14 1800 Conti For raising of ground clearence for Railway track of Lafarge

WRTS-I Lafarge C

106 765 765400 kV ICT-II at Solapur 15-Apr-14 700 17-Apr-14 1800 Daily CSD commissioning amp Fire fighting works WRTS-I WRTS-I C107 400 Vindhyachal-Satna1 15-Apr-14 1000 15-Apr-14 1800 Daily AMP POWERGRID WR-II R108 400 Ssnl-Dhule-1 15-Apr-14 800 15-Apr-14 1800 Daily PMM GETCOMSETCL GETCO109 220 TAPS-Vapi 15-Apr-14 800 17-Apr-14 1900 Daily Annual maintenance Works GETCO NPCIL110 220 Pithampur-Rajgarh(PGCIL) Ckt - I 15-Apr-14 900 15-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI111 400 Sipat 400KV Bay-18 ( Ranchi-1 Main) 15-Apr-14 900 15-Apr-14 1900 Daily Annual Preventive maintenance job NTPC NTPC112 400 Karad-Kolhapur Ckt I 15-Apr-14 900 15-Apr-14 1700 Daily QMwork MSETCL MSETCL

113 400 DC Raipur-Bhadrawati 2 amp 3 16-Apr-14 800 17-Apr-14 1800 Conti Bus splitting work at Raipur WRTS-1 WRTS-1 C

114 400 Vindhyachal-Satna2 16-Apr-14 1000 16-Apr-14 1800 Daily AMP POWERGRID WR-II R

115 400 Mundara -Jetpur 2 16-Apr-14 800 20-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

116 400 Vadavi - Dehgam (Pg) - 1 16-Apr-14 800 16-Apr-14 1800 Daily PMM amp Tandelta testing GETCO GETCO117 400 Chorania Asoj-1 16-Apr-14 800 16-Apr-14 1800 Daily PMM GETCO GETCO118 220 Bhilad - TAPS 16-Apr-14 800 16-Apr-14 1800 Daily PMM work PGCIL GETCO119 220 Bhat - Pirana (PG) - 1 16-Apr-14 800 16-Apr-14 1800 Daily PMM work GETCO GETCO120 400 400 KV Bhopal-Itarsi(PGCIL) Ckt-II 16-Apr-14 900 17-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I121 220 Damoh(PGCIL) - Tikamgarh Ckt 16-Apr-14 900 16-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI

122 400 400KV SC Korba-Raipur-II (Between Korba - Bhatapara end)(Between Loc2980 amp 2990) 16-Apr-14 800 17-Apr-14 1700 Daily

MaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

PGCIL CSPTCL C

123 400 Sipat 400KV Bay-19 ( Ranchi-2 Main) 16-Apr-14 900 16-Apr-14 1900 Daily Annual Preventive maintenance job NTPC NTPC124 400 Padgha-Babhleswar ckt I 16-Apr-14 900 16-Apr-14 1700 Daily QMwork MSETCL MSETCL125 400 Vadavi - Dehgam (Pg) - 2 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCO GETCO126 400 Ssnl-Dhule-2 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCOMSETCL GETCO127 400 Vadinar-Hadala- 1 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCO GETCO128 220 Bhat - Pirana (PG) - 2 17-Apr-14 800 17-Apr-14 1800 Daily PMM work GETCO GETCO129 400 400KV Birsinghpur -Katni Ckt - II 17-Apr-14 800 17-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I130 220 Pithampur-Rajgarh(PGCIL) Ckt - II 17-Apr-14 900 17-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI131 400 Jejuri-Lonikand 17-Apr-14 900 17-Apr-14 1700 Daily QMwork MSETCL MSETCL132 400 Deepnagar-Khadka II 17-Apr-14 900 17-Apr-14 1700 Daily QMwork MSETCL MSETCL133 400 Chorania Kasor 18-Apr-14 800 18-Apr-14 1800 Daily PMM GETCO GETCO134 220 GWL(PGCIL)-Malanpur Ckt-II 18-Apr-14 900 19-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI135 400 Akola-Wardha II 18-Apr-14 900 18-Apr-14 1700 Daily QMwork MSETCL MSETCL

136 400 Koradi-Nandgaonpeth 18-Apr-14 800 18-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

137 765 765kV Pune line Reactor at Solapur 19-Apr-14 700 20-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

138 400 400KV Bina -Power(JP) Ckt 19-Apr-14 900 19-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I139 400 Dhule-SSarovar I 19-Apr-14 900 19-Apr-14 1700 Daily QMwork MSETCL MSETCL

140 400 Koradi-Khaparkheda II 19-Apr-14 900 19-Apr-14 1700 Daily QMwork MSETCL MSETCL141 220 KAPP - VAPI - 1 20-Apr-14 800 20-Apr-14 1800 Daily Isolator replacement under ASIDE scheme PGCIL GETCO

142 400 DC Bhilai-Bhadrawati amp Raipur-Bhadrawati 1 21-Apr-14 800 28-Apr-14 1800 Conti Diversion of line for Vidarbha Industrial Devlopment Corporation(VIDC)

WRTS-I VIDC C

143 400 Bhachau- Ranchhodpura 1amp2 21-Apr-14 800 27-Apr-14 1800 Continuous Tower shifting work at canal crossingInsulator replacement work

POWERGRID WR-II C

144 400 Hadala-Amreli 21-Apr-14 800 21-Apr-14 1800 Daily PMM GETCO GETCO145 400 Vadinar-Hadala- 2 21-Apr-14 800 21-Apr-14 1800 Daily PMM GETCO GETCO146 220 TAPS-Boisar 21-Apr-14 800 23-Apr-14 1900 Daily Annual maintenance Works MSETCL NPCIL147 220 Bina(PGCIL)-220 KV Bina Ckt 21-Apr-14 900 21-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI148 400 CGPL Bhachau -1 21-Apr-14 8AM 21-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL149 220 Kawas-Ichhapore 1+Bus 1 21-Apr-14 900 21-Apr-14 1800 daily RTV Coating NTPC NTPC150 400 Karad-Kolhapur Ckt II 21-Apr-14 900 21-Apr-14 1700 Daily QMwork MSETCL MSETCL151 400 New Koyna-Koyna Stg-4-1 21-Apr-14 830 21-Apr-14 1730 Daily QMwork MSETCL MSETCL152 400 Ssp - Rajgarh - 2 22-Apr-14 800 22-Apr-14 1800 Daily PMM GETCOMPTCL GETCO153 400 Vadavi-Bhachau 2 22-Apr-14 800 22-Apr-14 1800 Daily PMM amp Tan Delta testing PGCIL GETCO154 220 Bhilad - Vapi (PG) - 1 22-Apr-14 800 22-Apr-14 1800 Daily PMM work PGCIL GETCO155 400 400 KV Rajgarh(PGCIL)-Ssp Ckt-I 22-Apr-14 900 22-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I156 400 400KV Seoni -Sarni Ckt 22-Apr-14 900 23-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I157 220 Khandwa(PGCIL)-Nepanagar Ckt 22-Apr-14 900 22-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI158 220 Kawas-Ichhapore 2+Bus 1 22-Apr-14 900 22-Apr-14 1800 daily For maintenance work NTPC NTPC159 400 Karad-Jaigad II 22-Apr-14 900 22-Apr-14 1700 Daily Annual maintenance work MSETCL MSETCL160 220 Bhilad - Vapi (PG) - 2 23-Apr-14 800 23-Apr-14 1800 Daily PMM work PGCIL GETCO161 400 400KV Bina -Bhopal Ckt -I 23-Apr-14 900 24-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I162 400 400 KV Rajgarh(PGCIL)-Ssp Ckt-II 23-Apr-14 900 23-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I163 220 Bina(PGCIL)-Shivpuri Ckt 23-Apr-14 900 24-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI164 220 Damoh(PGCIL) - Damoh I C - I 23-Apr-14 900 23-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI

165 400 400 KV DCDS Sipat- Raipur (IampII) 23-Apr-14 800 24-Apr-14 1700 DailyMaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

PGCIL CSPTCL C

166 400 CGPL Bhachau - 2 23-Apr-14 8AM 23-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL

167 220 Kawas-Navsari 2 +Bus 1 23-Apr-14 900 23-Apr-14 1800 daily Insulator replcement and routine maintenance NTPC NTPC168 400 Padgha-Babhleswar ckt II 23-Apr-14 900 23-Apr-14 1700 Daily QMwork MSETCL MSETCL169 400 Kasor - SSP 24-Apr-14 800 24-Apr-14 1800 Daily PMM work GETCO GETCO170 220 Bhilad - Vapi (PG) - 3 24-Apr-14 800 24-Apr-14 1800 Daily PMM work PGCIL GETCO171 220 TAPS-Bhilad 24-Apr-14 800 26-Apr-14 1900 Daily Annual maintenance Works GETCO NPCIL172 220 Damoh(PGCIL) - Damoh I C - II 24-Apr-14 900 24-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI173 400 CGPL Jetpur- 1 24-Apr-14 8AM 24-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL

174 220 Kawas-Ichhapore 1 +Bus 2 24-Apr-14 900 24-Apr-14 1400 daily Insulator replcement and routine maintenance NTPC NTPC

175 220 Kawas-Ichhapore 2 +Bus 2 24-Apr-14 1400 24-Apr-14 1900 daily Insulator replcement and routine maintenance NTPC NTPC176 400 Padgha-Talegaon 24-Apr-14 900 24-Apr-14 1700 Daily QMwork MSETCL MSETCL

177 765 765kV Raichur 1 line Reactor at Solapur 25-Apr-14 700 27-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

178 400 400KV Bina -Bhopal Ckt -II 25-Apr-14 900 26-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I179 400 CGPL Jetpur- 2 25-Apr-14 8AM 25-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL180 400 Vindhyachal -Satna-4 Line Shunt Reactor 25-Apr-14 900 25-Apr-14 1900 Daily Basis AMP NTPC NTPC

181 400 Bhusawal-Koradi 25-Apr-14 900 25-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

182 400 Deepnagar-Khadka I 25-Apr-14 900 25-Apr-14 1700 Daily QMwork MSETCL MSETCL183 400 Soja -Kansari 26-Apr-14 800 26-Apr-14 1800 Daily PMM GETCO GETCO184 400 Raipur-Wardha 1 27-Apr-14 800 28-Apr-14 1800 Daily Balance construction work WRTS-1 WRTS-1 C185 220 KAPP - VAPI - 2 27-Apr-14 800 27-Apr-14 1800 Daily Isolator replacement under ASIDE scheme PGCIL GETCO186 400 Soja -Kansari 28-Apr-14 800 28-Apr-14 1800 Daily PMM GETCO GETCO187 220 TAPS-Boisar II 28-Apr-14 800 30-Apr-14 1900 Daily Annual maintenance Works MSETCL NPCIL188 400 400KV Damoh - Katni Ckt 28-Apr-14 900 28-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I189 400 400 KV Damoh(PGCIL)-Katni Ckt 28-Apr-14 900 28-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I190 400 New Koyna-Karad ckt 1 28-Apr-14 830 28-Apr-14 1730 Daily QMwork MSETCL MSETCL

191 400 DC Raigarh-DB Power (Tudri) - KSK 29-Apr-14 800 30-Apr-14 1800 Conti Crossing work of 765kV SC Raigrah-Champa (90 - 100)

WRTS-I WRTS-I C

192 400 Raipur-Wardha 2 29-Apr-14 800 30-Apr-14 1800 Daily Balance construction work WRTS-1 WRTS-1 C193 220 Navsari - Nasik - 1 29-Apr-14 800 29-Apr-14 1800 Daily PMM work GETCOMSETCL GETCO194 220 Seoni(PGCIL)-Chhindwara Ckt-I 29-Apr-14 900 29-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI195 220 Kawas-Vav 1+ bus 2 29-Apr-14 900 29-Apr-14 1800 daily For maintenance work NTPC NTPC196 400 Chorania Asoj-1 30-Apr-14 800 30-Apr-14 1900 Daily PMM GETCO GETCO197 220 Navsari - Nasik - 2 30-Apr-14 800 30-Apr-14 1800 Daily PMM work GETCOMSETCL GETCO198 220 Vapi - TAPS 30-Apr-14 800 30-Apr-14 1800 Daily PMM work PGCIL GETCO199 220 Seoni(PGCIL)-Chhindwara Ckt-II 30-Apr-14 900 30-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI200 220 Kawas-Vav 1+ bus 2 30-Apr-14 000 30-Apr-14 000 daily For maintenance work NTPC NTPC

Annexure-32-C1

List of Emergency Outages availed in Feb 2014

SlNo

Element kV Agency From

Date To Date

Remarks

1 SATNA‐BINA‐II 765 WRTS‐2 4‐Feb‐14

5‐Feb‐14

Hot spot attending

2 SUJALPUR‐NAGDA LR NAGDA

400 WRTS‐2 6‐Feb‐14

19‐Feb‐14

Oil leackage

3 SOLAPUR‐PARLI‐II

400 WRTS‐2 6‐Feb‐14

6‐Feb‐14

Hotspot attend at solapur

4 JABALPUR‐ITARSI‐IV LR AT ITARSI‐LR

400 WRTS‐2 7‐Feb‐14

17‐Feb‐14

Oil leackage

5 APL‐HADALA‐SC 400 GEB 7‐Feb‐14

7‐Feb‐14

Hot spot

6 SOLAPUR‐PARLI(PG)‐1

400 WRTM(REL)

9‐Feb‐14

9‐Feb‐14

Hot spot

7 BOISAR‐BOISAR(PG)‐II

220 MSETCL 9‐Feb‐14

9‐Feb‐14

Hotspots

8 NEW KOYNA‐KARAD ‐ I

400 MSETCL 10‐Feb‐14

11‐Feb‐14

Dc‐earth leakage

9 LONIKHAND ‐ KARAD

400 MSETCL 10‐Feb‐14

11‐Feb‐14

Hotspot

10 NAGDHA ICT ‐ III

400220

MPPTCL 10‐Feb‐14

10‐Feb‐14

Hotspot

11 AKOLA ‐ ABAD ‐I AKOLA

400 WRTS‐1 11‐Feb‐14

12‐Feb‐14

Oil leackage

12 AKOLA ‐ AURANGABAD ‐ I

400 WRTS‐1 11‐Feb‐14

11‐Feb‐14

Oil leackage ion lr

13 BINA‐GWALIOR 765 WRTS‐1 14‐Feb‐ 14‐Feb‐ Attend oil leakage on lr

SlNo

Element kV Agency From

Date To Date

Remarks

II 14 14

14 AKOLA‐TIRORA‐I 765 MSETCL 22‐Feb‐14

23‐Feb‐14

Sparking in LR at Tirora SYED AT TIRORA END

15 KHAEGAR‐ICT‐I 400220

MSETCL 22‐Feb‐14

22‐Feb‐14

Hot spot

16 KHANDWA‐NEPANAGR‐SC

220 MPPTCL 23‐Feb‐14

23‐Feb‐14

Hot spot

17 GWALIAR ‐SATNA ‐ I

765 WRTS‐2 24‐Feb‐14

1‐Mar‐14

Attend hot spot

18 KORBA BUS‐III 400 NTPC 25‐Feb‐14

25‐Feb‐14

Hots pot attend

19 BUS‐1 AT GWALIOR

765 WRTS‐2 13‐Feb‐14

13‐Feb‐14

Checking of blocked BB main‐1 relay

20 RAIPUR‐BWATI‐2

400 WRTS‐1 17‐Feb‐14

17‐Feb‐14

Urgent Removal of LR at Raipur end for DGA violation

21 TAPS‐PADGHE 400 TAPS‐3amp4 19‐Feb‐14

23‐Feb‐14

To attend SF‐6 leakage

22 SATNA‐GWALIOR‐1

765 WRTS‐2 24‐Feb‐14

26‐Feb‐14

To attend hot spots

23 VCHAL‐JABALPUR‐IV

400 WRTS‐2 27‐Feb‐14

27‐Feb‐14

To increase OPGW‐Top conductor clearance to avoid tripping

24 APL‐SAMI‐2 400 APL 26‐Feb‐14

26‐Feb‐14

To attend hot sopt

25 SHOLAPUR BUS‐1

765 WRTS‐1 27‐Feb‐14

27‐Feb‐14

To attend hot sopt

26 BOISAR BUS‐2 220 WRTS‐1 28‐Feb‐14

28‐Feb‐14

To attend hot sopt

Sl No KV element From To Basis Work System Agency Remarks

1220 Vapi (GETCO)‐Bhilad 1‐Feb‐14 800 2‐Feb‐14 1800 Daily Line crossing work of 400KV LILO line for

Magarwada SSGETCO POWERGRID N

2 220 Omkareshwar-Khandwa Ckt

3-Feb-14 900 3-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

3 400 New Koyna-Koyna Stg-4-1

3-Feb-14 830 3-Feb-14 1730 Daily QMwork MSETCL MSETCL N

4220 Vapi ‐ Magarwada

Ckt13‐Feb‐14 900 3‐Feb‐14 1400 Daily AMP of line amp equipment WRTS‐II POWERGRID DD may have to do load

shedding as per Reliability Suggestion

N

5 220 DC Raigarh- Raigarh 1amp 2

4-Feb-14 800 5-Feb-14 1800 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (040-50)

CSPTCL WRTS-I N

6 220 Itarsi(PGCIL)-Hoshangabad Ckt

4-Feb-14 900 4-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N

7 400 Mundra -Limbdi-2 4-Feb-14 800 4-Feb-14 1800 Daily Suspension Insulator replcement and routine maintenance

PGCIL CGPL N

8 400 400 kV DC Satna - Bina 1amp2

4-Feb-14 800 5-Feb-14 1800 Continous Crossing of Jabalpur-Bina 765 kv SC Line PGCIL JTCL N

9220 Vapi ‐ Magarwada

Ckt24‐Feb‐14 0900 4‐Feb‐14 1400 Daily AMP of line amp equipment WRTS‐II POWERGRID N

10 765 Seoni-Bina line with LR 4‐Feb‐14 800 4-Feb-14 1800 Daily AMP Work WRTS-2 WRTS-1 N

11 400 Bus I Bina 5‐Feb‐14 800 5‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

12220 Kawas ‐ Navsari (PG)

25‐Feb‐14 800 5‐Feb‐14 1800 Daily Replacement of ST insulators by Double Tension

insulator in Railway crossing spansWRTS‐II POWERGRID N

13400 Indoer (PG) ‐Indore

(MP) DC5‐Feb‐14 800 6‐Feb‐14 1800 Continou

sStringing of 765kV Indore ‐ Vadodara line WRTS‐II POWERGRID N

14 400 APL - Hadala 6-Feb-14 800 6-Feb-14 1800 Daily PMM GETCO GETCO N N

15 220 Seoni(PGCIL ) - Chhindwara CKT I

6-Feb-14 900 6-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N N

16 400 Jejuri-Koyna stg IV 6-Feb-14 900 6-Feb-14 1700 Daily QMwork MSETCL MSETCL N17 400 Akola-Nandgaonpeth 6-Feb-14 900 6-Feb-14 1700 Daily Quaterly Maintainance Work MSETCL MSETCL N18 400KV Korba-Bhatapara 6-Feb-14 900 7-Feb-14 1900 Cont Testing of LBB auto re-close M-I amp M-II relays NTPC NTPC N19 220 Haldarva - Jhanor - 2

(NTPC)6-Feb-14 900 6-Feb-14 1800 Daily PMM work GETCO N

20220 Navsar (PG) ‐Navsari

(GETCO) 16‐Feb‐14 800 6‐Feb‐14 1800 Daily Replacement of ST insulators by Double Tension

insulator in Railway crossing spansWRTS‐II POWERGRID

N

21 400 Bus‐II Bina 6‐Feb‐14 800 6‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

22400 Seoni‐Khandwa1 6‐Feb‐14 1000 6‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Khandwa end by MS ABB

WRTS‐II POWERGRID Rescheduled to 6th March N

23 400 Rajgarh-Ssp Ckt-II 7-Feb-14 900 7-Feb-14 1600 daily For maintenance work MPPTCL EHT- Mamp I N24 220 Chhegoan-Khandwa

Ckt -II7-Feb-14 900 7-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

25 220 Wardha (PG)-Wardha 7-Feb-14 800 7-Feb-14 1800 Daily AMP Work MSETCL WRTS-I N26 400 Chorania - Vadavi-2 7-Feb-14 800 7-Feb-14 1800 Daily PMM amp Tan Delta testing WRTGPL GETCO N27 400 Jabalpur‐Itarsi1 7‐Feb‐14 900 7‐Feb‐14 1400 Daily AMP OF TERMINAL EQUIPMENT WRTS‐II POWERGRID N

28220 Vapi(PG)‐ Bhilad ckt

2 amp 3 7‐Feb‐14 800 8‐Feb‐14 1800 Daily Line crossing work of 400KV LILO of Navsari‐Boisar

at MagarwadaGETCO POWERGRID N

29 220 Mapusa-Thivim 1 8-Feb-14 800 8-Feb-14 1800 Daily AMP Work GOA WRTS-I N

30400 Seoni‐Khandwa2 9‐Feb‐14 1000 9‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Khandwa end by MS ABB

WRTS‐II POWERGRID Rescheduled to 7th March N

31 220 Chhegoan-Khandwa Ckt -I

10-Feb-14 900 10-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

Annexure-32-C2OCC approved outage not availed in Feb‐2014

32132 132 kV Dhule

Dondaicha line10-Feb-14 800 11-Feb-14 1800 Cont Crossing of Dhule-Vadodara 765 kv SC Line MSETCL BDTCL subjected to sldc

clearance N

33 400132 KV

Vindhyachal ICT-1 10-Feb-14 900 14-Feb-14 1900 Cont ICT Overhauling NTPC NTPC N

34400 KV Vindhyachal - Jabalpur-

3 Line Shunt Reactor10-Feb-14 900 14-Feb-14 1900 Cont Reactor Overhauling NTPC NTPC

N

35 400 KSK-DB Power 10-Feb-14 800 13-Feb-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end WRTS-IDBKSK

KSK N36 220 Ipore-Kawas-1 10-Feb-14 800 10-Feb-14 1800 Daily PMM work GETCO N

37400 Vindhyachal‐Mahan 10‐Feb‐14 800 11‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐I WRTS‐II N

38400 Mahan‐Korba 10‐Feb‐14 800 11‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐I WRTS‐II N

39765 Jabalpur ‐ Bina 1 10‐Feb‐14 1000 10‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Jabalur end by MS ABB

WRTS‐II POWERGRID Differed by siteN

40 400 SSP - Rajgarh - 1 10-Feb-14 800 11-Feb-14 1800 Daily Basis

PMM Work GETCO N

41 400 DC Tundri (DB Power) -ksk-Raigarh

10-Feb-14 800 11-Feb-14 1800 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (092-100)

DB Power WRTS-I N42 400 Jetpur - Amreli - 1 11-Feb-14 800 12-Feb-14 1800 Daily PMM GETCO GETCO N43 400 Hadala - Vadinar-2 11-Feb-14 800 11-Feb-14 1800 Daily PMM GETCO GETCO N44 400 Nagda-Rajgarh Ckt-I 11-Feb-14 900 11-Feb-14 1800 daily For maintenance work MPPTCL EHT- Mamp I N45 220 Mehgaon-Auriya Ckt 11-Feb-14 900 11-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N46 220 Seoni(PGCIL ) -

Chhindwara CKT II11-Feb-14 900 11-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

47

765kV Main Bus-1B at SASANBay 13 - Jack Bus

11-Feb-14 900 21-Feb-14 1800 Daily Jumper Installations amp ConnectionsIsolator Allignment

PGCIL Reliance Provisional Subject to details of works done to be apprised on daily basis

N

48 220 Ipore-Kawas-2 11-Feb-14 800 11-Feb-14 1800 Daily PMM work GETCO N49 220 Navsari - Nasik - 2 11-Feb-14 900 11-Feb-14 1800 Daily PMM work GETCO N

50765 Jabalpur ‐ Bina 2 11‐Feb‐14 1000 11‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Jabalur end by MS ABB

WRTS‐II POWERGRID Deferred by siteN

51 400 Nagda-Rajgarh Ckt-II 12-Feb-14 900 12-Feb-14 1800 daily For maintenance work MPPTCL EHT- Mamp I N52 400 Karad-Solapur (PGCIL) 12-Feb-14 900 12-Feb-14 1700 Daily QMwork MSETCL MSETCL N53 400 Raipur-Sipat 1 amp 2 26-Feb-14 800 3-Mar-14 1800 Conti Diversion of line for Lafarge Railway track WRTS-I Lafarge Ori 12-16 Feb 14 Deferre N54 220 Haldarwa Kawas-2 12-Feb-14 900 12-Feb-14 1800 Daily PMM work GETCO N

55 220 Bus‐I Bina 12‐Feb‐14 800 12‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

56 400 Chorania - Hadala 13-Feb-14 800 14-Feb-14 1800 Daily PMM GETCO GETCO N57 400 Tarpur-Padghe-2 13-Feb-14 800 14-Feb-14 1800 Daily maintenance work POWERG

RIDNPCIL N

58400 Vindhyachal‐Satna1 13‐Feb‐14 1000 13‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

59 220 Bus‐II Bina 13‐Feb‐14 800 13‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

60 220 Pithampur-Rajgarh Ckt - I

14-Feb-14 900 14-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

61 220 Wardha (PG)-Badnera 14-Feb-14 800 14-Feb-14 1800 Daily AMP Work at Wardha MSETCL WRTS-I N

62 400 Bhusawal-Koradi 14-Feb-14 900 14-Feb-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL N

63 400 Raipur-KSK 14-Feb-14 800 16-Feb-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end WRTS-IKSK

KSK N

64 220 GWL(PGCIL)-Malanpur Ckt-II

15-Feb-14 900 15-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N

65 220 Pithampur-Rajgarh Ckt - II

15-Feb-14 900 15-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

66400 Vindhyachal‐Satna2 16‐Feb‐14 1000 16‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

67 220 KAPS - Haldarwa - 1 17-Feb-14 800 17-Feb-14 2000 Daily Yearly PM checks KAPS N

68400 3X105 MVA 400220Kv

X-mer I At Indore ss17-Feb-14 800 18-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI

N

69

220 SC Korba-Raigarh-Budhipadar sc(PGCIL) amp DC Korba-Budipadar both circuits (CSPTCL)

18-Feb-14 800 19-Feb-14 1800 Conti Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCLWRTS-I

WRTS-I

N

70 400 Itarsi-Bhopal Ckt-I 18-Feb-14 900 19-Feb-14 1700 daily For maintenance work MPPTCL EHT- Mamp I N71 220 Badod - Kota Ckt 18-Feb-14 900 18-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N72 220 Damoh(PGCIL) -

Damoh I C - II18-Feb-14 900 18-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

73 220 Badod - Modak Ckt 19-Feb-14 900 19-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

74220 KAPS - Ukai - Mota 19-Feb-14 800 19-Feb-14 2000 Daily Yearly PM checks KAPS Non consent from SLDC

GETCO N

75400 315 MVA 400220 KvX-

mer III At Indore ss20-Feb-14 800 21-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI

N

76 220 Seoni(PG)-Seoni 2 21-Feb-14 800 21-Feb-14 1800 Daily AMP Work MPPTCL WRTS-I Y N77 220 Bina(PGCIL)-Shivpuri

Ckt21-Feb-14 900 22-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI Y N

78 400 Koradi-Nandgaonpeth 21-Feb-14 900 21-Feb-14 1700 Daily QMwork MSETCL MSETCL N N79 220 Haldarva - Jhanor - 1

(NTPC)21-Feb-14 900 21-Feb-14 1800 Daily PMM work GETCO N

80

765kV Main Bus-2A at SASANSatna Line-2

22-Feb-14 900 28-Feb-14 1800 Contionious

Equipment ConnectionsCircuit Breaker TestingJumper MeasurementIsolator Allignment Reactor accessories erection on R-Phase

PGCIL Reliance

N

81 400 Korba-Raipur 3 amp 4 23-Feb-14 800 24-Feb-14 1800 Conti For Bus spliting work at Raipur765 KV Raigarh-Raipur and 765 Champa Raipur lines

WRTS-1 WRTS-1 N

82132 132kV Astha - Polai SC

line of MPPTCL24-Feb-14 800 25-Feb-14 1800 Continous Crossing of Bhopal -Indore 765 kv SC Line MPPTCL BDTCL subjected to sldc

clearance N

83 400 Bus-1 at Bilaspur 24-Feb-14 800 24-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I N

84400 Seoni -

Khedamara(Bhilai) Ckt25-Feb-14 900 25-Feb-14 1800 daily For maintenance workFeeder bay maintenance at

KMaraMPPTCL CSPTCLMPPT

CLNo confirmation on D-3

N

85400 Ranchi-Sipat 1 amp 2 25-Feb-14 800 26-Feb-14 1800 Conti Crossing work of upcoming 765 KV DC

Jharsuguda-Korba amp 765KV SC Ranchi-BilaspurWRTS-I WRTS-I No confirmation on D-3

N

86765 Sasan‐Satna2 25‐Feb‐14 800 26‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐II POWERGRID No confirmation on D-3 N

87400 Bus Reactor1 at Satna 25‐Feb‐14 1000 25‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

88400 400 kV DC Damoh -

Bhopal Line26-Feb-14 800 27-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL Not availed by agency for

rainsN

89400 Raipur-Bhadrawati 2 amp

327-Feb-14 800 27-Feb-14 2100 Daily For Bus spliting work at Raipur765 KV Raigarh-

Raipur and 765 Champa Raipur linesWRTS-1 WRTS-1 Subject to Telemetry from

Durg PS RaipurN

90 400 Birsinghpur‐Vandana Vidyut

27‐Feb‐14 800 27‐Feb‐14 1700 Daily AMP of Terminal Equipment amp line Reactor WRTS‐I POWERGRID Ready N

91 400 Bhusawal-Akola 28-Feb-14 900 28-Feb-14 1700 Daily QMwork MSETCL MSETCL N92 220 Bus-1 at Wardha 28-Feb-14 800 28-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I N93 400 Birsinghpur‐Balco 28‐Feb‐14 800 28‐Feb‐14 1700 Daily AMP of Terminal Equipment amp line Reactor WRTS‐I WRTS‐I Deferred by site N

94 400 Nagda‐Dehgam2 5‐Feb‐14 1000 5‐Feb‐14 1800 DailyCommissioning amp checking of CSD relay in Main CB for reactor switching at Dehgam end by MS ABB

WRTS‐II POWERGRID N

95 400 400kV Satpura Itarsi 10‐Feb‐14 900 11‐Feb‐14 1700 DailyCommissioning of new CB after dismantling of existing TELK make CB at Satpura end amp normalising of line on main CB

POWERGRID

WRTS‐II N

96 765 765 kV Satna - Bina Ckt I

6-Feb-14 800 8-Feb-14 1800 cont Stringing of Jabalpur-Bina 765 kv SC Line PGCIL JTCL Original27-28 Jan14 Def N

97 765400 765400 kV ICT-1 at Bina 20-Feb-14 90000 AM 21-Feb-13 60000 PM Continuou

sCSD commissioning for 400kV Side CB of 765400 kV ICT-1 WRTS-II POWERGRID Deferred by site N

98 400 Nagda - Dehgam 1amp2 20-Feb-14 80000 AM 28-Feb-14 1700 Daily Online PID testing to insulators in both circuits AR shall be kept in non auto mode in both circuits WRTS-II POWERGRID

N

99 220MC Waluj-Chitegaon amp Waluj-Jalna

21-Feb-14 700 21-Feb-14 1900 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad MSETCL WRTS-I

N

100 400 Bus 1 at Asoj 21-Feb-14 000 21-Feb-14 1800 Daily For checking bus stability testing of Piran 1 amp 2 bays (for charging of new line) GETCO WRTS-II N

101 400 Bus-1 at Wardha 22-Feb-14 800 22-Feb-14 1800 Daily Jumper spacers connection at Wardha WRTS-I WRTS-I N102 400 Bus-1 at Raigarh 22-Feb-14 800 22-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I Deferred by site N103 765 Bus - II at Indore 22-Feb-14 90000 AM 23-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Not availed NLDC consenN104 220 Kakrapar-Haldarwa2 22-Feb-14 1000 Hrs 22-Feb-14 1600 Hrs Daily AMP POWERG

RID WRTS-II N

105 400 Bus 2 at Asoj 22-Feb-14 000 22-Feb-14 1800 Daily For checking bus stability testing of Piran 1 amp 2 bays (for charging of new line) GETCO WRTS-II N N

106400 400 kv DC Bhopal -

Bina Line (Ckt I amp II)(Tower no 34 amp35)

23-Feb-14 800 24-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line MPPTCLBDTCL

N

107 765kV SASAN Main Bus-1BBay 10 - Jack Bus 24-Feb-14 800 Hrs 2-Mar-14 1900 Hrs Continuous Dia-4

(Bay-10) - SCCOCC Test of Unit 4 GTSasan Sasan N

108 765 Bus - I at Indore 24-Feb-14 90000 AM 25-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID N

109 765 765 KV Bina-Indore Line 24-Feb-14 0900 Hrs 24-Feb-14 1800 Hrs Daily

For taking spare reactor unit in service amp checking the scheme for spare reactor with 765 KV Bina-Indore Line Reactor at Bina

POWERGRID WRTS-II

Deferred by site N

110 400 Kasor - GPEC 24-Feb-14 800 25-Feb-14 1800 Daily PMM Work GETCO GETCO N111 40022033 315 MVA ICT2 at Kheda 24-Feb-14 900 10-Mar-14 1800 cont modification work in SS lay out CSPTCL CSPTCL N112 400 315 MVA ICT2 at

Gwalior 25-Feb-14 90000 AM 25-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID N

113 400KV V-Satna-4 Line Shunt Reactor 25-Feb-14 1000 25-Feb-14 2000 Daily

Basis AMP NTPC NTPC N

114 400 Raipur-Wardha 1 26-Feb-14 800 26-Feb-14 2000 Daily Balance construction works at Wardha end WRTS-I WRTS-IReady Ori26214 Deferred by site

N

115 400 Bus -I at Indore 26-Feb-14 90000 AM 26-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Deferred by site N116 400 315 MVA ICT3 at

Gwalior 26-Feb-14 90000 AM 26-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID N

117 400 400 kV DC Damoh - Bhopal Line

26-Feb-14 800 26-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL N

118 400 Chorania-Kasor 26-Feb-14 800 26-Feb-14 1800 Daily PMM work GETCO GETCO N119 400 Koradi-Satpura sc 26-Feb-14 800 26-Feb-14 1600 Daily 765KV Tiroda Koradi Transmission LineII crossing

worksPOWERGRID MEGPTCL Cancelled by MEGPTL N

120 400 400 kV DC Damoh - Bhopal Line

26-Feb-14 800 26-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL N

121 400 Raipur-Wardha 2 27-Feb-14 800 27-Feb-14 2000 Daily Balance construction works at Wardha end WRTS-I WRTS-I Deferred by site N122 400 Vindhyachal-Satna2 27-Feb-14 1000 27-Feb-14 1800 Daily Commissioning of CSD Relay in ABB make main

CB at Satna WRTS-II POWERGRID Deferred by site N

123 400 Bus -II at Indore 27-Feb-14 90000 AM 27-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Ready N124 400 315 MVA ICT1 at

Rajgarh 27-Feb-14 90000 AM 27-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID Ready N

125 400400 KV SC Kosamba - Asoj line(730-740)

27-Feb-14 700 27-Feb-14 1800 cont Crossing of Dhule - Vadodara 765 kv SC Line GETCOBDTCL

N

126 400 Indore (MP) -Indore (PG)-DC 27-Feb-14 700 28-Feb-14 1600 Cont Stringing of 765kV Indore - Vadodara line POWERG

RID WRTS-II Deferred by site N

Anaulagnak 33(A)

maaca- 2014 AaOr Ap`Ola 2014 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR MARCH 2014 AND APRIL 2014

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)maaca- 2014 Ap`Ola 2014 maaca- 2014 Ap`Ola 2014

MARCH 2014 APRIL 2014 MARCH 2014 APRIL 2014

1 gaujarat

saIimat 11700 12100 7750 7800

AsaIimat 11740 12140 7760 7810

2 maQya p`doSa

saIimat 8340 9050 5338 5540

AsaIimat 8340 9050 5338 5540

3 CltaIsagaZ

saIimat 3200 3075 1929 1809

AsaIimat 3225 3105 1944 1827

4 maharaYT

saIimat 19000 19150 10200 10300

AsaIimat 19050 19200 10250 10350

5 gaaovaa

saIimat 425 410 300 295

AsaIimat 425 415 310 300

6 dmana dIva

saIimat 340 345 210 205

AsaIimat 345 350 225 210

7 DI ena eca

saIimat 635 640 445 425

AsaIimat 635 640 445 425

8 piScama xao~

saIimat 41961 43047 28500 27900

AsaIimat 42076 43173 29560 28840

Diversity factor of 10401

March 2014 and April 2014

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah frvarI 2014

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 1552 75

]k[- Ukai - 2 1719 75]k[- Ukai - 3 598 75]k[- Ukai - 4 1757 75]k[- Ukai (Total) 5627 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 024 2]k[- ela baI saI eca Ukai LBCH - 2 131 3]k[- ela baI saI eca Ukai LBCH (Total) 154 5 0008

3 kDanaa Kadana - 1 000 0 0005kDanaa Kadana - 2 246 62 0000kDanaa Kadana - 3 223 62kDanaa Kadana - 4 166 63 0000kDanaa Kadana (Total) 634 63 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 431 9 0020 6 kula jalaIya TOTAL(H) 6846 225 0401

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 2060 32 21822 TaoronT pavar ilaimaToD yauinaT DI 7979 125 69803 TaoronT pavar ilaimaToD yauinaT [- 075 122 07584 TaoronT pavar ilaimaToD yauinaT ef 8023 124 66915 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 018811 Qauvarna tapIya Dhuvaran - GT 2 000 0 041912 Qauvarna tapIya Dhuvaran - STG 023 1013 ]ka[- yauinaT 1 Ukai -1 000 0 005114 ]ka[- yauinaT 2 Ukai -2 000 0 010815 ]ka[- yauinaT 3 Ukai -3 3147 200 297216 ]ka[- yauinaT 4 Ukai -4 10588 202 1002617 ]ka[- yauinaT 5 Ukai -5 9496 210 884118 ]ka[- yauinaT 6 Ukai -6 23703 500 1844819 gaaMQaInagar 1 Gandhinagar - 1 000 0 008620 gaaMQaInagar 2 Gandhinagar - 2 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 000 0 029622 gaaMQaInagar 4 Gandhinagar - 4 000 0 036223 gaaMQaInagar 5 Gandhinagar - 5 11676 212 1148924 vaNakbaaorI 1 Wanakbori - 1 10648 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 11069 21026 vaaNakbaaOrI 3 Wanakbori - 3 1891 20627 vaaNakbaaOrI 4 Wanakbori - 4 5244 21228 vaaNakbaaOrI 5 Wanakbori - 5 5531 21029 vaaNakbaaOrI 6 Wanakbori - 6 000 030 vaaNakbaaOrI 7 Wanakbori - 7 8902 20931 ]trna Utran GT 1 000 0 019832 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 000 0 024635 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 000 0 0000

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Anaulagnak 41

ACTUAL GENERATION amp AVALABILITY FOR FEBRUARY 2014Actual vaastivak

Actual vaastivak

37 isaka Sikka - 1 3696 112 439838 isaka Sikka - 2 000 0 017639 kcC ilagnaa[-T Kutch Lignite - 1 4429 71 848640 kcC ilagnaa[-T Kutch Lignite - 2 4037 7241 kcC ilagnaa[-T Kutch Lignite - 3 3646 6742 kcC ilagnaa[-T Kutch Lignite - 4 2215 66 525343 saUrt ilagnaa[-T Surat Lignite - 1 6705 131 682544 saUrt ilagnaa[-T Surat Lignite - 2 7475 131 738745 saUrt ilagnaa[-T Surat Lignite - 3 6965 130 728846 saUrt ilagnaa[-T Surat Lignite - 4 6362 130 688647 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5454 107 848648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5649 11449 jaI Aa[- pI saI ela GIPCL GT - 1 1589 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1587 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1702 3552 jaI Aa[- pI saI ela GIPCL ST - 1 2902 5153 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 020556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 000 0 000060 jaI pI [- saI GPEC GT - 2 267 156 013261 jaI pI [- saI GPEC GT - 3 143 146 002762 jaI pI [- saI GPEC STG 131 17263 jaI esa [- jaI GSEG GT - 1 000 0 098964 jaI esa [- jaI GSEG GT - 2 1181 5065 jaI esa [- jaI GSEG STG 642 2366 Sugen (GT 1 + GT 2) 1767 308 602467 saIpIpI sao Aayaat Imp from CPP+MUNDRA 269359 6881

kula tapIya Total (T) 475652 8386 302021kula jalaIya+tapIya Total (H+T) 482498 8604 302422ivaMD [najaI- Wind Energy 52123kula jalaIya+tapIya+hvaa Total (H+T+Wind) 534621 9539ivainamaya Exchanges 155314 saIimat jaa- maaMga Restricted Energy Req 689935

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 6800 194

11 gaaMQaI saagar Gandhi Sagar 3366 117 008012 raNaa p`tap sagar RPSagar 5883 172 004013 javaahr sagar Jawahar Sagar 4350 99 0050

2 ponca Pench 3052 165 00903 baargaI Bargi 4581 91 00804 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 11764 315 02806 banasaagar Bansagar-2 (Deolondh) 000 07 banasaagar Bansagar-3 (Silpara) 1236 32 00708 banasaagar Bansagar-4 (Zinaha) 1320 22 00509 maoDIKoDa Medikheda 396 63

10 ibarisaMGapur Birsingpur 040 20 002011 Tavaa Tawa 000 012 rajaGaaT Rajghat 165 12 006013 Omkareshwar 10620 402 14 [Midra saagar Indira Sagar 23077 997 0849

kula jalaIya TOTAL(H) MPPGCL 59999 2365 1273Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 6049 98 232502 AmarkMTk II AMK II Unit -2 6080 983 AmarkMTk III AMK III Unit -5 12212 219 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 06505 satpura II Satpura-II Unit 6 10323 180 165906 satpura II Satpura-II Unit 7 5926 1807 satpura II Satpura-II Unit 8 10964 195 191608 satpura II Satpura-II Unit 9 8353 1709 satpura III Satpura-III Unit 10 000 0 2080

10 satpura III Satpura-III Unit 11 9447 182 1909011 esajaITIpIesa 1 SGTPS Unit - 1 9447 182 1909012 esajaITIpIesa 2 SGTPS Unit - 2 10572 18213 esajaITIpIesa 3 SGTPS Unit - 3 9037 192 2064014 esajaITIpIesa 4 SGTPS Unit - 4 10700 18015 esajaITIpIesa 5 SGTPS Unit - 5 28804 51216 SSTPS 6864 587 8930

kula tapIya Total (T) 133714 3002 115350kula jalaIya+tapIya Total (H+T) 193713 5735 116623Injection from WIND 000 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 193713 5735ivainamaya Exchanges 193660 saIimat jaa- maaMga Rest En Req 387372

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 850 120 00902 Gangrel 475 10 00503 Mini Micro KWB 039 7

kula jalaIya TOTAL(H) CSEB 1364 137 0150tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 47 127402 kaorbaa (pU) Korba (E) Unit-2 2764 483 kaorbaa (pU) Korba (E) Unit-3 2764 484 kaorbaa (pU) Korba (E) Unit-4 2784 465 kaorbaa (pU) Korba (E) Unit -5 3685 120 253306 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 247808 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 15410

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 15839 256 1197012 KORBA(EB) Extn - 2 15876 256 11770

kula tapIya Total (T) 119907 1880 10190013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 119907 1880kula jalaIya+tapIya Total (H+T) 121271 2017 102050ivainamaya Exchanges 40207 0saIimat jaa- maaMga Rest En Req 161478 2017

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 9590 585 25142 kaoyanaa III Koyna III 5920 3203 kaoyanaa IV Koyna IV 18012 11324 kaoyanaa DIpIeca Koyna DPH 1442 385 TaTa jalaIya TATA Hydro 10242 741 28836 vaOtrNaa Vaitarna 000 07 eladarI Eldari 528 168 BaTgar AaOr vaIr Bhatgar amp Vir 915 49 pOzana Paithan 175 59

10 itlaarI Tillari 1106 6511 BaIra Tola rosa Bhira Tail Race 374 4112 GaTGar Ghatghar 5297 29313 Anya CaoTo jalaIya Small Hydro (others) 6173 0

kula jalaIya TOTAL(H) 58910 1599 5397Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 7700 1954 naaisak 4 Nasik Unit -4 10772 1965 naaisak 5 Nasik Unit -5 11160 1976 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 28827 5058 Tambao 6 Trombay Unit -6 000 09 Tambao 8 Trombay Unit -8 000 0

10 Tambao 7A gaOsa Trombay -7A (Gas) 7882 135 250411 Tambao 7ba Trombay -7B (WHR) 4499 7212 kaoraDI 5 Koradi Unit -5 5003 16013 kaoraDI 6 Koradi Unit -6 3963 19014 kaoraDI 7 Koradi Unit -7 10015 19015 Bausaavala 2 Bhusawal Unit -2 8329 17016 Bausaavala 3 Bhusawal Unit -3 9248 18017 Bausaavala 4 Bhusawal Unit -4 22734 50518 Bausaavala 4 Bhusawal Unit -5 19742 41519 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 7451 18621 parlaI 5 Parli Unit -5 10626 18022 parlaI 6 Parli Unit -6 14013 25323 parlaI 7 Parli Unit -7 13728 26024 KaprKoDa 1 Khaperkheda Unit -1 11173 20025 KaprKoDa 2 Khaperkheda Unit -2 10373 19526 KaprKoDa 3 Khaperkheda Unit -3 10998 20127 KaprKoDa 4 Khaperkheda Unit -4 12019 20728 KaprKoDa 5 Khaperkheda Unit -5 28882 50730 parsa Paras-3 14447 25731 parsa Paras-4 13504 25932 ]rna Uran (Gas) 18284 33833 ]rna Uran (WHR) 000 148 586234 caMd`pur 1 Chandrapur Unit -1 9087 17735 caMd`pur 2 Chandrapur Unit -2 1816 19436 caMd`pur 3 Chandrapur Unit -3 11737 21037 caMd`pur 4 Chandrapur Unit - 4 11843 46038 caMd`pur 5 Chandrapur Unit -5 7759 45539 caMd`pur 6 Chandrapur Unit -6 24420 44240 caMd`pur 7 Chandrapur Unit -7 23258 041 DhaNaU 1 Dahanu Unit-1 16339 250 1427842 DhaNaU 2 Dahanu Unit-2 16196 250 1427843 CPP 193651 29840044 RGPPL Share 000 0

kula tapIya Total (T) 631479 15369 329920MAH Wind + Solar Generation 16922 0kula jalaIya +tapIya Total (H+T+Wind) 707311 17451 372239

TOTAivainamaya Exchanges 324731saIimat jaa- maaMga Rest En Req 1032042

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1871 26ivainamaya Exchanges 33252saIimat jaa- maaMga Rest En Req 35123 434

C (F) dmana AaOr dIva DAMAN amp DIU 18245 298ja (G) dadra nagar hvaolaI DNH 40600 655

kula DD ampDNH (T) 58845 952Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 9600 160 1399112 tara`pur 2 TAPS Unit -2 11069 16013 tara`pur 3 TAPS Unit -3 36144 545 6584014 tara`pur 4 TAPS Unit -4 36197 54715 kakrapr 1 KAPS Unit -1 15230 545 3134216 kakrapr 2 KAPS Unit -2 14662 547

kula ena pI saI NPC Total 122901 25042 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14008 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 13913 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14076 214 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 32894 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 33204 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 33190 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33176 514

kula kaorbaa KSTPS Total 174461 2498 10394427 ivanQa esaTIpIesa 1 VSTPS Unit-1 12762 21328 ivanQa esaTIpIesa 2 VSTPS Unit-2 12708 21529 ivanQa esaTIpIesa 3 VSTPS Unit-3 12854 212210 ivanQa esaTIpIesa 4 VSTPS Unit-4 12909 214211 ivanQa esaTIpIesa 5 VSTPS Unit-5 12174 215212 ivanQa esaTIpIesa 6 VSTPS Unit-6 12625 214213 ivanQa esaTIpIesa 7 VSTPS Unit-7 31487 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 31075 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 31592 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 31488 512217 ivanQa esaTIpIesa 11 VSTPS Unit-11 30948 512

kula ivanQayaacala VSTPS Total 232623 3750 15107 31 saIpt -1 -SIPAT-1 38822 66400 32 saIpt -2 -SIPAT-2 32404 66500 33 saIpt -3 -SIPAT-3 38930 66300 34 saIpt -4 -SIPAT-4 26383 51600 35 saIpt -5 SIPAT-5 26400 51400

kula saIpt -SIPAT TOTAL 162939 285000 838941 kvaasa gaOsa 1e Kawas GT-1A 792 10742 kvaasa gaOsa 1baI Kawas GT-1B 2623 10943 kvaasa esaTI 1saI Kawas ST-1C 1571 11444 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 4986 304 222951 gaMQaar gaOsa 1 Gandhar GT-1 000 052 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 000 054 gaMQaar esaTI 4 Gandhar ST-4 000 0

kula gaMQaar GGPS Total 000 0 000061 maaOda 1 Mauda -1 19614 514 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 19614 514 1422661 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 000 31 000071 esa esa pI SSP RBPH - 1 6753 19372 esa esa pI SSP RBPH - 2 5907 19273 esa esa pI SSP RBPH - 3 5577 19574 esa esa pI SSP RBPH - 4 5513 19475 esa esa pI SSP RBPH - 5 7237 19476 esa esa pI SSP RBPH - 6 3109 19277 esa esa pI SSP CHPH - 1 1817 4078 esa esa pI SSP CHPH - 2 491 3679 esa esa pI SSP CHPH - 3 000 0710 esa esa pI SSP CHPH - 4 1639 39711 esa esa pI SSP CHPH - 5 901 37

kula esa esa pI SSP Total 38944 1312 389481 kula poMca Pench Total 3052 165 009082 Jindal Injection 38956 083 Amarkantak Lanco 15478 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2372740

(J) ]plabQata Availability 2308426 naoT ivainamaya Net Exchanges -292048 ]plabQa jaa- Energy Availability 2016379

maah frvarI 2014 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR FEBRUARY 2014 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 11532 - - - 11532 020214 1100 4993

saIimat Restricted 11700

AsaIimat Unrestricted 11740 11532 0 28 0 11560 010214 1200 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8366 8366 17022014 0500 5007

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9346 - - - 9346 120214 0900 4986

saIimat Restricted 8340

AsaIimat Unrestricted 8340 9346 0 38 0 9384 120214 0900 4986

nyaUnatma pMjaIkRt maaMga Min Registered Demand 3204 3204 270214 0200

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3210 3210 070214 1900 4989

saIimat Restricted 3200

AsaIimat Unrestricted 3225 3210 233 12 0 3246 070214 1900 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1617 1617 230214 2300 5021

maharaYT MAHARASHTRApMjaIkRt Registered 18510 - - - 18510 050214 1100 4984

saIimat Restricted 19000

AsaIimat Unrestricted 19050 17980 1655 -13 0 19622 190214 1200 5002

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12005 12005 280214 0400 5037

gaaovaa GOApMjaIkRt Registered 425 434 - - 434 130214 1400 5006

AsaIimat Unrestricted 425 434 1 -1 - 434 130214 1400 5006

nyaUnatma pMjaIkRt maaMga Min Registered Demand 311 311 100214 0300

essaar ESSAR(ESIL)pMjaIkRt Registered 487 - - 487 240214 1700 5004

AsaIimat Unrestricted 487 0 0 - 487 240214 1700 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 268 - - 268 250214 1200 5003

AsaIimat Unrestricted 268 0 0 - 268 250214 1200 5003

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 644 - - 644 260214 1200 4999

AsaIimat Unrestricted 644 0 - 644 260214 1200 4999

nyaUnatma pMjaIkRt maaMga Min Registered Demand 508 508 280214

piScama xao~ WESTERN REGIONpMjaIkRt Registered 42253 - - - 42253 110214 1100 4994

saIimat Restricted 41961

AsaIimat Unrestricted 42076 42021 850 235 0 43106 120214 1100 4994

nyaUnatma pMjaIkRt maaMga Min Registered Demand 27524 27524 280214 0400 5040 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

piScama xaoi~ya Baar p`oYaNa kond` mauumba[-

णाली चालन-ISO-I

ANNEXURE-43

माह फरवर 2014 February2014

समातरवतीय चालन PARALLELRADIAL OPERATION

TOTAL OPERATING

HOURS 1 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-NR) 66972

2 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-SR) 67200

टाई लाईन TIE LINE 1 765कवी िसवनी स वधा-I 765kV Sonito Wardha 67200 2 765कवी िसवनी स वधा-II 765kV Seonito Wardha 65247 3 400 कवी िभलाई स कोराड 400kV Bhilai to Koradi 67200

4 400 कवी िभलाई स भिावती 400kV Bhilai to Bhadravati 67200

5 400 कवी रायपर स भिावती-I 400kV Raipur to Bhadravati-I 67200

6 400 कवी रायपर स भिावतीETHII 400kV Raipur to Bhadravati-II 67139

7 400 कवी रायपर स भिावतीETHIII 400kV Raipur to Bhadravati-III 67200

8 400 कवी सातपरा स कोराड 400kV Satpura to Koradi 67200

9 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 67004 10 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 65308 11 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 66259 12 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 67200 13 400 कवी को हापर स मापसा-I 400kV Kolhapur-Mapusa-I 38740

14 400 कवी को हापर स मापसा-II 400kV Kolhapur-Mapusa-II 49532

15 400 कवी वापी स बोईसर 400kV Vapi-Boisar 67200

16 400 कवी रायगढ़ स ःटरलाइट-I 400kV Raigarh to Sterlight-I 66258

17 400 कवी रायगढ़ स ःटरलाइट-II 400kV Raigarh to Sterlight -II 67200

18 400 कवी रायगढ़ स झरसगड़ा-I 400kV Raigarh to Jharsuguda-I 67200

19 400 कवी रायगढ़ स झरसगड़ा-II 400kV Raigarh to Jharsuguda-II 67200

20 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 65028

21 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 66132

22 400 कवी रायपर स वधाETHI 400kV Raipur to Wardha-I 66836

23 400 कवी रायपर स वधाETHII 400kV Raipur to Wardha-II 67200

24 220 कवी कोरबा पव स ब पादर-III 220kV K(E) to Budhipadar-III 63853

Anaulagnak 47Annex-47

maah frvarI 2014 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39514 64944

10287 39711

Levels in Mtrs str maITr maoM

]ka[- Ukai

64392

9914

25402

25994

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF FEBRUARY 2014

ivavarNa Particulars

TRIPPING DETAILS FOR THE MONTH OF FEBRUARY 2014

Sr No Brief Details of incident (Elements Generation Tripped) Owner Utility Date amp Time Load

Gen LossCategory

1 Multiple Tripping from 400 kV New Koyna MSETClMSEGCLRGPPL 05‐02‐2014 0950 Hrs ‐ GI‐2

2Bus Bar protection mal‐operation at 400 kV Soja in Gujarat resulting in multiple Tripping

GETCO 06‐02‐2014 1755 Hrs ‐ GI‐2

ANNEXURE ‐ 5

  • annexpdf
    • 21pdf
    • 231pdf
    • 232pdf
    • 24pdf
    • 25pdf
    • 31pdf
    • 32C1pdf
    • 32C2pdf
    • 33Apdf
    • 41pdf
    • 42pdf
    • 47pdf
    • 5pdf
Page 6: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014

6

457th OCCM AGENDA

72 Status of completion of 765400 kV and above on going Transmission Schemes being executedimplemented by Transmission Agencies

The updated status on various ongoing transmission schemes for the year 2013-14 as per the current information available is as follows - S No

Name of the Line Target Completion Date

Remarks

POWERGRID 1 400 kV Vapi(PG)-Navsari Commissioned on

16032013 2 400 kV Navsari - Navi Mumbai DC

Line Feb- 2014 ROW problem

3 765kV SC Satna-Gwalior line (Ckt-I) January - 2014 4 765kV SC Satna-Gwalior line

(359Km + 60Km DC Portion) Ckt-II Feb- 2014

5 765 kV Sasan-Satna-II Commissioned on 010613

GUJARAT 1 400 kV DC Kosamba-Chorania line

(Package I)(From Chorania SS to AP-54)

March -2014

2 400 kV DC Kosamba-Chorania line (Package II)(From Kosamba SS to AP-54)

March -2014

3 400 kV DC Mundra-Zerda line No 1 August -2014 4 400 kV DC Mundra-Zerda line No 2 April -2014 5 400 kV DC Vadinar-Amreli line April -2014 6 400kV Mundra-Hadala LILO to

Halvad April -2014

7 400 kV DC Amreli-Kasor line(Part-1) April -2014 8 315 MVA IInd ICT at Kosamba SS Charged on 15112013 MADHYA PRADESH 1 Malwa-TPH-Pithampur 400KV

DCDS Line 2324102013

2 Malwa TPH-Chhegaon 400 KV DCDS Line

Ckt ndashI on 22032013 Ckt-II on 11072013

3 Chhegaon-Julwania 400 KV DCDS Line

March - 2014

4 Pithampur- Indore 400KV DCDS Line March- 2014

5 Satpura TPH-Ashta 400KV DCDS Line

December ndash 2014

CSPTCL 1 400 kV Korba (W)-Khedamara

DCDS Ckt II LILOed at Marwa August 2013 Test charged on

20082013

2 400 kV Khedamara- Raita DCDS February -2014

3 400kV DCDS Marwa-Raipur(Raita) January - Test charge from Raipur

7

457th OCCM AGENDA

2014 end in August 2013 4 LILOof 400kV K(W)-Khedamara line

at Marwa (one ckt) April -2014

MAHARASHTRA(STU)

1 400KV Chandrapur- II- Warora DC Dec - 2013 end

2 400KV DC line from Koradi-II to Wardha SS(PG) DC

March - 2014

3 400 kV Chandrapur-Warora-II Commissioned on 16012014

4 400 kV Bableshwar-Sinner Ckt-II Commissioned on 27122013

5 400 kV Chandrapur-Parli-II LILO at Chandrapur-II SS

Commissioned on 16012014

MAHARASHTRA (IPTC route) by WR Transmission (Mah) Pvt Ltd

1 400 kV Parli(PG)-Pune DC Commissioned Ckt - 1 on 08112013 Commissioned Ckt - 2 on 10112013

2 400 kV Pune (PG)-Aurangabad (MSETCL) DC

November-13 Commissioned Ckt - 1 on 05122013 Commissioned Ckt - 2 on 04122013

3 LILO Lonikhand ndashKalwa at Pune(PG) Lonikhand-Pune charged on 2130 on 09072013 and Kalwa ndashPune at 2145 on 09072013

GUJARAT (IPTC route) by WR Transmission (Guj) Pvt Ltd

1 400 kV Rajgarh(PG)-Karamsad (GETCO) DC

May -2014

The Sub-Committee may notediscuss

73 Commissioning of new Generating units in Western Region and the capacity expected to be commissioned during the current year 2013-14

The status regarding Generating units commissioned expected to be commissioned during the current year 2013-14 according the available information is as below

Name of the Power Projects Unit No Capacity (MW)

Date of Commissioning Schedule Date

GUJARAT Ukai 6 500 COD on 08062013 Pipavav CCPP- GPCL amp GSPC joint venture Block-1 350

March- 2014 Made in synchronized on

8

457th OCCM AGENDA

10102013 Bhavnagar Lignite TPP-JV I 250 August 2014 II 250 August 2014 UNO SUGEN 1 3825 COD on 04042013 CHHATTISGARH Marwa TPS I 500 25122013 Korba (w) Ext-5 500 COD on 05092013 KSK Mahanadi 3 600 COD on 14082013

VEDANTA VIDYUT 1 135 Synchronized on 11082013

MAHARASHTRA

INDIABULLS (Amaravati) 1 270 Synchronized on 03062013

INDIABULLS (Amaravati) 2 270 January-2014 INDIABULLS (Sinnar) 1 270 March-2014 VIPL(Butibori) 1 300 COD on 05042013

VIPL (Butibori) 2 300

First synchronized on 02012013 Full load on 19032013

GMR EMCO 2 300 COD on 27082013 Dhariwal 1 300 Synd On 2913 Bhusawal 5 500400 COD on 03012014 MADHYA PRADESH

SINGAJI TPP 1 600

Synchronized on 31082013 Coal fired on 30092013

2 600 June-2014 Ms Jhabua Power Seoni 1 300 JANUARY ndash 2014 MB Power Anuppur 1 300 JANUARY ndash 2014 Satpura 11 250 Synchronized on 02102013 SATPURA 10 250 COD on 18082013 CENTRAL SECTOR Vindhyachal TPP IV 12 500 Feb-14 MAUDA 2 500 Feb-14

The WR utilities may intimate the current status on above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS (A) FOLLOW-UP ITEM NO 81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the Third quarter

(October 2013 to December 2013) for the year 2013-14

The Sub-Committee members may like to note and furnish details in respect of above

9

457th OCCM AGENDA

ITEM NO 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR

Status of physical amp cyber security in Power Sector for the Third quarter (October

2013 to December 2013) have not been received from some of the constituents

The Sub-Committee may like to note and furnish details in respect of above ITEM NO 83 ADMS IMPLEMENTATION STEP BY GETCO A pilot project in respect of ADMS have been successfully implemented by GETCO in

11 kV Sadhi feeder (MGVCL ) on 19022014

GETCO may like to presentation on the same ITEMS FROM WRLDC ITEM NO 91 PERFORMANCE OF WR CONSTITUENTS POST THE IMPLEMENTATION OF DEVIATION SETTLEMENT MECHANISM ON 17022014 The IEGC second amendment as well as the Deviation Settlement Mechanism is in

force wef 17022014 The performance of WR constituents during first 10 days ie

from 17th to 28th Feb 2014 comprising of 960 time blocks is illustrated below Members

may like to analyze and devise suitable measures to ensure compliance to the above

CERC regulations

10

457th OCCM AGENDA

Since the decisions in real-time are based on the SCADA data it is now important to

monitor and ensure correctness of drawal injection as seen in SCADA The chart

below indicates the difference between the drawal of constituents as seen in SCADA

and as recorded in SEM for the period of 01st Feb 2014 to 16th February 2014 It may

be seen that the significant difference between SCADA and SEM needs to be

addressed by ensuring healthiness of telemetry and periodic validation by the SCADA

team at the respective SLDCs and WRLDC

The sub committee may like to discuss the same

11

457th OCCM AGENDA

ITEM NO 92 UNDER DRAWAL BY MAHARASHTRA AND INSECURE OPERATION IN THE GRID ON 27-28 FEB 2014

During late night of 27th Feb and early morning hours of 28th Feb-14 the grid

frequency remained above 502 Hz continuously for five hours from 2252 hrs of 27-

02-2014 to 0407 hrs of 28-02-2014 The situation was caused due to demand

reduction across the WR and NR on account of widespread rains and persistent under

drawal by Maharashtra during the above period as illustrated in figure-1 below

5067

49

492

494

496

498

50

502

504

506

508

‐1000

‐850

‐700

‐550

‐400

‐250

‐100

50

200

350

500

650

800

2100

2115

2130

2145

2200

2215

2230

2245

2300

2315

2330

2345

000

015

030

045

100

115

130

145

200

215

230

245

300

315

330

345

400

415

430

445

500

515

530

545

600

615

630

645

700

716

731

746

Maharashtra Deviation from schedule vis‐a‐vis grid frequency2100 hrs of 27‐02‐2014 to 0800 hrs of 28‐02‐2014

MSEBUI FREQ

Deviation from Schedule

Frequency

MW Hz

Several messages were sent from WRLDC control room to SLDC Kalwa directing them to control their under drawal from the grid Details of these messages is tabulated below

Sl No Message sent to Ref No Message date and time

1 SLDC Maharashtra 56079 27022014 2210 hrs

2 SLDC Maharashtra 3070 27022014 2230 hrs

3 SLDC Maharashtra 3078 28022014 0125 hrs

4 SLDC Maharashtra 3079 28022014 0150 hrs

Despite the above messages the response from SLDC Kalwa was inadequate in

controlling the under drawal of Maharashtra Consequently the frequency touched

5069 Hz at 0211 hrs of 28-Feb 2014 the voltage across the grid increased sharply

and there was over injection from WR to other regions Subsequently as a

contingency measure the drawal schedule of Maharashtra was reduced by 600 MW

by suo motu revision in the requisition of Maharashtra in Korba Vindhyachal Sipat

12

457th OCCM AGENDA

and Vidhyachal STPS wef 0230 hrs to 0500 hrs of 28022014 This was later

extended up to 0700 hrs of 28022014 It was a near miss situation that could have

been avoided by adequate planning and commensurate actions in real-time It is

requested that the matter may be taken up at the highest level in MSETCL and a

separate meeting may be convened on the above subject to avoid reoccurrence of

such event in future

The sub committee may like to discuss the same

ITEM NO 93 NON AVAILABILITY OF REAL-TIME TELEMETRY FROM LARGE NUMBER OF STATIONS IN MAHARASHTRA There are 224 nodes in Maharashtra that comprising of 32 Generating stations and

192 substations Out of these 224 nodes 47 locations are yet to be integrated in the

System Out of the balance 177 the data from nearly 50 nodes are not coming since

last 6 months Thus in totality data is not available from more than 135 out of 224

stations ie 60 which is highly alarming The extremely poor status of telemetry in

the state of Maharashtra has become a security threat Maharashtra load is touching

17500 MW and there are large number of construction related outages that have to be

facilitated Further with the formation of the synchronous All India grid there is a need

for close monitoring of system parameters such as the line flows voltage and grid

frequency Inadequate telemetry is resulting in severe constraints in real time

operation as well as outage coordination There have been several instances of line

tripping on high voltage and SPS operation due to sudden increase in line flows

during hour boundary or during facilitating planned outage These events could be

minimized with better supervision if the telemetry is available

The telemetry issue in Maharashtra has been discussed in the various WRPC forums

wherein it was informed by MSETCL that the problem is due to failure of Ms Tulip

who was the service provider for the communication network During the month of

August 2013 representative from MSETCL had assured that a new contract was being

awarded and the situation would improve within one month The extracts from minutes

of 451st OCC is quoted below

QUOTE

13

457th OCCM AGENDA

ldquoMSETCL stated that they were working to resolve the issue and assured that there

would be an improvement in availability of Telemetry from Maharashtra stations within

one Monthrdquo

UNQUOTE

Representative of MSETCL may apprise the OCC regarding present status and the

likely schedule for resolution of the issue

The sub committee may like to discuss the same

ITEM NO 94 STATUS OF LINE AND BUS REACTORS AT 765 KV SASAN

The line reactor of 765 kV Sasan-Satna ckt-2 as well as the Bus reactors of 765 kV Sasan bus are yet to be commissioned at Sasan end In the absence of these reactors high voltage is experienced at Sasan and nearby stations Often one circuit of 765 kV Sasan-Satna is required to be opened for voltage regulation Consequently the reliability of evacuation of generation from two units of Sasan is affected During 456th OCC meeting the revised schedule of the above elements as informed by Ms Reliance was as under

Schedule in formed in meetings 451st OCC 455th OCC 454th OCC 1 Line reactor of 765

kV Sasan-Satna ckt-2

By Dec 2013 By April 2014 By May 2014

2 765 kV Bus-1 Reactor

Jan 2014 By Mar 2014 By June 2014

3 765 kV Bus-2 Reactor

Jan 2014 By Mar 2014 By June 2014

It was decided in 456th OCC meeting that one representative from MPPTCL would visit the SASAN site to check readiness of Line and Bus reactors Representative from MPPTCL and Sasan may apprise the OCC-members on the progress of commissioning of reactors at 765 kV Sasan OCC members may also be apprised of the tap position of the generator transformer 2 and 3

The sub committee may like to discuss the same

14

457th OCCM AGENDA

ITEM NO 95 CHARGING OF NEW TRANSMISSION ASSET IN THE GRID In order to have better coordination of the transmission utilities with RLDCNLDC during charging synchronization of new elements into the grid a communication has been received from NLDC (ref POSOSCONLDCSystem OperationOutage Planning1239) on 10022014 It has been proposed that

a Owner of the asset shall submit the request for expected chargingcommissioning of new element for the calendar month latest by 5th day of the month to the respective RLDC amp NLDC along with status of activities mentioned in the check-list

b RLDC shall study the impact of the new element commissioning and based on its assessment of the preparedness of the utility may recommend to NLDC who in turn would examine the issue independently considering pan India grid scenario

c After the above the owner of the new asset shall give its readiness to charge the new element atleast three days in advance with current status of activities mentioned in the check list

Check list is as under 1 List of elements to be charged along with the details of approval of the

transmission scheme from the Standing CommitteeCTUSTU 2 Single Line Diagram of the concerned substations along with status of

completion of each diabusbreakers 3 Availability of real-time data and communication to the designated

SLDCRLDC 4 Installation of Special Energy Meter complying with CEArsquos Regulations

(Serial number Meter number CTPT ratio to be indicated) 5 Charging Instructions by CTUSTU 6 Schedule and sequence of charging of elements 7 Availability of line bus reactors as per planning In case the transmission

system is planned to be charged without the planned line reactor requisite authorization from CTUSTU by studies

8 Connection Agreement (along with all annexures) with CTU or STU 9 Copy of Long term Access (LTA) or MTOA granted by CTU or STU as the

case may be 10 Copy of Power Purchase Agreement (PPA) 11 A signed undertaking with name and designation of the officer clarly

indicating the following a All Disturbance recorders (DR) and Event Loggers (ELs) with time

synchronization are commissioned b All protective systems have been commissioned c All statutory clearances have been obtained

12 Output of EL and DR after charging

15

457th OCCM AGENDA

Each document mentioned in check list from Sl No 1 to 10 must be attached for sake of completeness and emailed as a consolidated document to the nodal RLDC well before the new element charging date The sub-committee may like to discuss ITEM NO 96 OPENING FEEDERS WITHOUT PRIOR INTIMATION TO WRLDC

It was gathered based on the observation from WRLDC SCADA data and subsequent

discussion with MPPTCL that 220 kV Bina (MP)-Gwalior(MP) DC were taken under

shut down for LILO works at Datia at 0910hrs on 23022014 for 4 days The outage

of these lines was neither discussed in OCC and neither was there any intimation to

WRLDC before availing the outage These lines are included in the important grid

elements list of Western region and prior concurrence of WRLDC is required for

switching these lines Further these lines form the parallel path to 765 kV Bina-Gwalior

DC and with the shutdown of these lines the network upstream of WR-NR inter

regional corridor was depleted

The sub-committee may like to discuss ITEM NO 97 TRIPPING OF 765 KV LINES ON OVER VOLTAGE Recently several tripping of 765 kV lines have been reported on over voltage These are indicated below

1) 765 kV Bina-Gwalior I at 2358 hrs of 16022014 2) 765 kV Bina-Gwalior I at 2011 hrs of 14022014 3) 765 kV Satna-Gwalior at 1300 hrs of 06022014 4) 765 kV Sasan-Satna II at 0013 hrs of 18012014 5) 765 kV Jabalpur-Bina I at 2350 hrs of 10012014 6) 765 kV Jabalpur-Bina II at 0405 hrs of 06012014

It is understood that the adopted Stage-I OV setting for the above lines vary from 108 (ie 826 kV) to 110 (841 kV) As per SCADA data the bus voltage at any of the substations mentioned above had not reached 826 kV during the above incidents

POWERGRID may examine the above tripping in detail and apprise the OCC regarding the above In case of issues related with protective relays field equipment are detected these may be addressed at the earliest The sub-committee may like to discuss

16

457th OCCM AGENDA

ITEM NO 98 RGMO FGMO OF MANDATED GENERATORS IN WESTERN REGION

As per the latest information available at WRLDC there are 251 number of units with a total capacity of 57517 MW in Western Region that are mandated to operate in Restricted Free Governor Mode The need for compliance to the IEGC regulations wrt RGMOFGMO was emphasized in the 455th and 456th OCC meeting as well as during the 25th TCCWRPC meeting Subsequently it was communicated by email to all entities in WR to provide the latest status of RGMOFGMO implementation We have received updated status from MPPTCL LANCO CGPL DB Power and JPL Tamnar in Feb 2014 The latest state wise RGMOFGMO summary is given below

Name of Entity No of mandated units

RGMO FGMO available at

RGMOFGMO Not available at

Maharashtra 90 35 55 Madhya Pradesh 58 36 22 Gujarat 35 19 16 Chhattisgarh 10 3 7 CGPL 5 5 0 NCA 11 6 5 SASAN 2 1 1 NTPC 24 10 14 ESSAR_Mahan 1 1 0 NSPCL 2 2 0 KSK 1 1 0 KWPCL 1 0 1 DB POWER 1 1 0 JPL 5 4 1 LANCO 2 2 0 IEPL 1 0 1 EMCO 2 0 2 WR_Total 251 126 125

WRLDC vide its letter ref WRLDCRGMO-FGMO1-2014 dated 23012014 has issued directions under Section 29 of the Electricity Act to ensure compliance of IEGC regulations 52 (f) (g) (h) and (i) All utilities are requested to furnish the status of compliance in respect of generating units under their jurisdiction The sub-committee may like to discuss ITEM NO 99 STATUS OF TELEMETRY IN WESTERN REGION

The status of telemetry related issues in respect of WR constituents is as under

a) Chhattisgarh Data (except MW) from 500 MW Korba West extension generating station is not available Status points from 400 kV Raita pending

17

457th OCCM AGENDA

b) Madhya Pradesh Telemetry of following bus reactors is not available at WRLDC

S No

Station Name Bus Reactor

Nunber x Capacity

Total MVAR

Rated voltage

Status of Telemetry at

WRLDC1 Nagda 250 100 420 Not available2 Indore 225 50 33 Not available3 Bhopal 225 50 33 Not available4 Birsinghpur 150 50 420 Not available

c) Gujarat Data is not-availableintermittent from following stations in Gujarat

a 220 kV Nano of Tatamdash(not available) b Kansari 400 kV ss and Navsari 220 kVhellipIntermittent (PLCC Problem)

d) Goa Due to non-availability of SCADA data from Goa the difference between drawal as seen in SCADA and as recorded in SEM is as high as 572 during the period 1st Feb to 16th Feb 2014 Data from the following stations in Goa is not available at WRLDC S No Station Status

1 Amona 220 kV Not available 2 Cuncolin 220 kV Not available 3 Kadamba 110 kV Intermittent 4 Tivim 220 kV Intermittent 5 Ponda 220 kV Intermittent 6 Xeldam-220 kV Intermittent 7 Verna-110 kV Intermittent

e) Daman amp Diu

Due to non-availability of SCADA data from Daman amp Diu the difference between drawal as seen in SCADA and as recorded in SEM is as high as 571 during the period 1st Feb to 16th Feb 2014 Data from The error is mainly due to non-availability of data from 220 kV Magarwada

f) DNH Telemetry from 220 kV Kharadpara and Khadoli station is not available

g) POWERGRID The data from the following stations is not available at WRLDC

1) 765 kV Tamnar (Communication problem GPRS link is not stable)

18

457th OCCM AGENDA

Telemetry from following stations is Intermittent at WRLDC 1) 765 kV Durg (PLCC frequent problems)

2) 765 kV Kotra (communication intermittency)

3) 765 kV Gwalior (PLCC link established but still there is some

issue(Delay) in data updation at WRLDC Rectification work under

progress by Site Engineer

4) 765 kV Solapur - Redundant link established through Reliance but

the gateway connected to above link is not configured for 765 KV

data Hence when BSNL link is down 765 KV data is not updating at

WRLDC

The sub-committee may like to discuss

ITEM NO 910 COMPARISON OF DRAWAL AS SEEN IN SCADA VS SEM The IEGC second amendment and the Deviation Settlement Mechanism is in force since the 17022014 The IEGC stipulates maintaining injection drawal within the limits prescribed in the Deviation Settlement Mechanism The sub-committee may like to discuss ITEM NO 911 MOCK BLACK START EXERCISE

As per sec 58(b) of IEGC the usersSTUs etc need to conduct Black start mock

exercises in their respective systems once in every six month under intimation to

RLDC Also the all the black start Diesel Generator (DG) sets are [as per sec 58(b)

of IEGC] required to be tested weekly and the test report needs to be sent to RLDC

on quarterly basis

The following table summarizes the status of mock exercises in respect of black start

facilities in Western Region

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

GUJARAT

1 Ukai (H) 4 x 75 Hydro Diesel 500 kVA 221213 Y

2 Mini Hydro 2 x 25 Hydro Diesel 50 KW N

3 Kadana 4 x 60 Hydro Diesel 500 KVA 2413 Y (2413)

19

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

4

Dhuvaran

1 x 107 (68+39) + 1 x 112 (72+40)

Gas

Details to be furnished by Gujarat

Details to be furnished by Gujarat

N

5 GIPCL-I 3 x 32 + 1 x49

Gas Steam Diesel 141 KW

070912 Y

6 GIPCL-II 1x104+1x56 Gas Steam Diesel 500 kVA N

7

Torrent Power Stn C Stn- DEFCCPP

StnC2x30 StnD120 StnEF(110MW each)CCPP100MW

Thermal (Units-CDEF) Gas(CCPP)

Stn-C islands Diesel

StnC15kVA StnDE F and CCPP(500 kVA each)

281112

Y

8 GPEC 3x138+1x241 Thermal Natural Gas 3000 kVA N

9 Sugen 3x3825 MW Gas Diesel 2x6MVA N

Madhya Pradesh

10 Gandhisagar 5 x 23 Hydro DG set 100 kVA N

11 Birsinghpur 1 x 20 Hydro Battery 220 Volt

Battery N

12 Pench 2 x 80 Hydro DG set 250 kVA 121012 Y

13 Bargi 2 x 45 Hydro DG set 250 kVA 100212 Y

14 Bansagar Stage-I 3 x 105 Hydro DG set 250 kVA N

15 Indira Sagar 8x125 Hydro DG set 2x1000

KVA 22511 Y

Chhattisgarh 16

Hasdeo Bango 3 x 40 Hydro DG Set 250 kVA 250812 N

17

Korba(E)-phse-I

Power plant retired but Black start DG set available and on- load trial is reported to be carried out regularly

DG Set 1500 kW(33kV)

N

Maharashtra

18

Koyna I amp II

4 x 65 4 x 75 Hydro

House generator

2 MVA 231013 N

19 KDPH 2 x20 Hydro DG set 310 KW N

20 Eldari 3 x 75 Hydro DG set 6 KW N

21

Uran (Gas)

4 x 60 (GT) + 4x108 (GT)+ 2x120 WHR

Gas DG set

4 MW PH1412kVA PH2450kVA WH520kVA

161012

N

20

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

22 RGPPL

Block 1 640MW+Block 2 66354MW+Block 3 66354MW

Gas

Gas Turbine (Frame-6)

35 MW (Under testing) Details to be provided by RGPPL

N

23 Ghatghar 2x125 Hydro DG set 1x1250

kVA 51012

N

24 Khopoli 3x24+2x12 Hydro

DC Governor amp bearing oil pumps

DC power (self start)

271013 (detailed report awaited)

N

25 Bhivpuri 3 x 24 +

2 x 15 +2x12 Hydro

DC Governor amp bearing

-do-

N

26 Bhira 6 x 25 Hydro

1 Noof 500 KVA house generator with water turbine

500 kVA

201013 (detailed

report awaited)

N

27

Bhira PSS 1 x 150 Hydro DG set 500 kVA

N

28 Trombay 1 x 120 Gas

Turbine DG Set 25 MW

N

1 x 60 Steam Turbine

NTPC

21

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

29 Kawas 4 x 106 2 x 116 Gas Diesel 2850 KW 151013

N

30 Gandhar 3 x 144 + 1x225 Gas Diesel 2975 KW

N

NCA

31 SSP(RBPH amp CHPH) 6x200+550 Hydro Diesel 2x1000kVA 080412

N

Accordingly the Black start capable stations may forward their tentative plan for conducting Black start exercises in compliance to sec 58(b) of IEGC bull As per the communication for MPPTCL the tentative plan of Black start in Madhya

Pradesh system is given under SL No Name of the Station Tentative Date Remarks 1 Pench March 2014 DG set at Pench amp are Bargi

under outage 2 ISP Apr-May 2014 - 3 TONS June 2014 Governor Problem being

attended 4 Birsinghpur June 2014 -do- 5 Medikheda June 2014 -do- 6 Rjghat June 2014 -do- Other utilities may also update their tentative plan for black start

The sub-committee may like to discuss

22

457th OCCM AGENDA

ITEM NO 912 HEALTHINESS OF MAIN CIRCUIT BREAKER OF 400 KV BIRSINGPUR-KATNI-I AT KATNI END The main CB of Birsingpur-Katni-I is under shut down since 2350 hrs of 14th February 2013 Representatives from MPPTCL may kindly apprise on the progress and expected date of restoration of the Main CB of 400 kV Birsingpur-Katni-I at Katni end The sub-committee may like to discuss

ITEM NO 913 TESTING OF SPS RELATED TO TRIPPING OF BINA-GWALIOR-AGRA AT CGPL VINDHYACHAL AND KORBA

As per the information received from NTPC and CGPL the SPS for the 765 kV Bina-

Gwalior-Agra has been installed and a mock drill has to be carried out for the same

The matter was discussed in the 456th OCC and it was decided that SPS may be

tested for reduction of say 50MW for each station instead of backing down of entire

500MWs POWERGRID WRTS-2 may confirm the testing schedule so that the

same could be coordinated in from WRLDC

The sub-committee may like to discuss

ITEM NO 914 SPS AT SIPAT WRLDC vide letter No WRLDCMO-I17192013 dt 21613 requested to take up this matter with the concerned for early implementation of the SPS Status of the SPS at NTPC Sipat is as under

1 449th OCC SPS was proposed by WRLDC It was decided to have a

separate meeting to finalize the scheme 2 450th OCC Member Secretary WRPC intimated that the matter will be

discussed in 119th PCM on 3rd amp 4th September 2013 at Tarapur 3 451st OCC It was intimated that the issue of SPS of Sipat was discussed in

119th PCM held on 3rd amp 4th September 2013 at TARAPUR The tentative scheme were formulated which needed finer tuning

4 452nd OCC Matter not discussed 5 453rd OCC NTPC representative intimated proposal sent to their corporate

office for engineering approval 6 454th OCC Approval from our corporate office is yet to be obtained 7 455th OCC Approval from our corporate office is yet to be obtained 8 456th OCC Approval from corporate office has been obtained and would be

forwarded to WRPC for approval The sub-committee may like to discuss

23

457th OCCM AGENDA

ITEM NO 915 SPS AT 4X300 MW BALCO IPP The SPS at 2010 MW Balco (4x675MW + 4x135 MW + 4x300 MW) was to be commissioned by Nov 2013 before commissioning of first unit of 4x300 MW Balco IPP For the new SPS scheme envisaged for the Balco CTU connection namely the Grid Islanding and Load Management Scheme (GILMS) Balco had reported to have placed an order with Ms SEL As discussed earlier the scheme suggested by WRLDC may be implemented before commissioning of first unit of 300 MW It was intimated during the 456th OCCM by the Balco representatives that the SPS shall be commissioned by March 2014

The sub-committee may like to discuss

ITEM NO 916 ACTIONS TAKEN FOR REVIVAL OF TRANSMISSION ELEMENTS UNDER LONG OUTAGE

As per the information available at WRLDC following elements are out for a

long period

Sl No Date of

outage

Reason

ISTSIPP

1 80 MVAR BR at

ESSAR(Mahan)

231213 Oil leakage

2 125 MVAR BR at JPL 120513 Hydrogen formation

3 50 MVAR LR of Indore-Asoj-II

at Indore

190613 R phase bushing burst

4 50 MVAR LR of Birsingpur-

Damoh at Damoh(PG)

13102014 Oil Leakage

5 765 kV Durg-Kotra-I 24022014 Sparking in Isolator

6 400 kV Raipur-Raigarh-IV 18012014 Voltage Regulation

MSETCL

1 400 kV RGPPL-NrsquoKoyna-I 22012014 Voltage Regulation

2 400 kV Sholapur-

Sholapur(PG)

26022014 Tower Collapse

MPPTCL

1 400 kV Birsingpur-Katni-I 28012014 Voltage Regulation

24

457th OCCM AGENDA

2 50 MVAR LR of Indore-Asoj-II

at Indore

6012014 DGA Violation

CSPTCL

1 400220 kV Bhilai-II 24022014 Maintenance

OCC may like to be apprised of the actions being taken for expediting revival of

the above elements

The sub-committee may like to discuss

ITEM NO 917 STATUS OF 220 KV KOLHAPUR-MUDSINGHI-CHIKODI- BELGAM LINE Consent for trial operation of 220 kV Kolhapur-Mudsinghi-Chikodi- Belgam line in radial mode for supply of Karnataka load from Maharashtra side was granted after discussion in the 455th OCC meeting WRLDC is in receipt of letter from SRLDC regarding concurrence for the above arrangement SLDC Kalwa may apprise the OCC regarding the present status The sub-committee may like to discuss

ITEM NO 918 CONTRIBUTION OF GENERATORS IN VOLTAGE CONTROL The contribution of generators in WR in voltage control was analyzed during 456th OCC meeting It was noted that following units were injecting reactive power even during high voltage

1 210 MW units of Khaparkheda Koradi and Chandrapur (Maharashtra) 2 210 MW units of Satpura and Birsinghpur (Madhya Pradesh) 3 210 MW unit 23 of Korba West (Chattisgarh) 4 200 MW unit 34 of Ukai (T) in (Gujarat)

Utilities were requested to check the setting of AVRGT tap and revert back with findings Members may apprise OCC regarding the status The sub-committee may like to discuss

ITEM NO 919 REAL-TIME MONITORING OF FEEDERS SUBSTATIONS THAT ARE COVERED UNDER THE AUFLS Telemetry of feeders substations covered under the AUFLS is desirable for real-time assessment of the anticipated relief that would be available from the AUFLS scheme at any given instant of time CERC has also directed all the constituents to for

25

457th OCCM AGENDA

mapping of these feeders in the SCDA of SLDCsRLDC Members may like to deliberate further The sub-committee may like to discuss

ITEM NO 920 LOAD FORECASTING As per the amended Indian Electricity Grid Code that is effective from 17th February 2013 the SLDCs SEB distribution licensees shall always restrict the net drawal of the State from the grid within the drawal schedule keeping the deviations from the schedule within the limits specified in the Deviation settlement mechanism regulations Therefore it is imperative that adequate attention may be paid towards load forecasting The matter was discussed in the 455th and 456th OCC as well as in the 25th TCCWRPC board meeting wherein it was decided to create a task force for exploring development of a software for load forecasting Members may like to deliberate further The sub-committee may like to discuss

ITEM NO 921 IMPLEMENTATION OF THE REVISED AUFLS IN GOA DD AND DNH It was decided during the 455th and 456th OCC meeting as well as during 25th WRPC meeting that Goa DD and DNH shall complete the implementation of the revised AUFLS in Goa DD and DNH at the earliest Representatives from the Goa DD and DNH may apprise the status of the progress The sub-committee may like to discuss

ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING As per meeting roaster circulated during 452nd OCC meeting the 458th OCC Meeting

will be hosted by Maharashtra and may be scheduled on 16th amp 17th April 2014

Maharashtra may confirm the same

Anaulagnak 21

maah frvarI 2014

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5051 Hz BETWEEN 0200 Hrs amp 0300 Hrs Hrs ON 28022014

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4970 Hz BETWEEN 1800 Hrs amp 1900 Hrs Hrs ON 28022014

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 5006 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5071 Hz AT 0210 Hrs ON 28022014

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4937 Hz AT 185000 Hrs ON 28022014

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS FEBRUARY 2014 JANUARY 2014 DECEMBER 2013

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 001 005

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 041 061 188 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 1069 5423 4864 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 4014 3569 3987

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 4876 946 956

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING FEBRUARY 2014

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

Voltage Profile during the month of Feb 2014

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 421 401 426 403 409 409 408 408 415 399 414 402 424 413 417 3922 420 402 423 404 409 409 408 408 417 402 418 404 425 415 420 3993 421 399 426 400 429 405 425 402 412 399 419 408 423 410 413 3964 422 402 426 404 430 406 428 401 414 400 414 404 424 412 414 3965 420 396 423 400 409 409 408 408 413 396 415 401 424 411 415 3996 420 396 426 400 428 405 426 402 415 398 416 402 423 411 412 4007 420 394 424 399 430 402 427 401 416 399 417 402 423 409 416 3968 418 393 422 397 409 409 408 408 416 399 416 402 422 409 418 3989 418 399 423 404 409 409 408 408 417 402 417 407 419 409 419 400

व तदाब परखा फरवर 2014 स नक Annex-23

इदौर इटारसी कराड धल असोज कासोर िभलाई जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

10 419 394 423 399 409 409 408 408 416 400 415 401 420 408 417 39511 421 393 426 397 429 405 427 401 44 399 419 404 423 407 414 39912 419 395 422 400 409 409 408 408 416 401 419 407 421 410 418 39813 420 396 424 401 409 409 408 408 417 400 416 401 421 409 418 40114 421 399 424 403 430 419 428 414 417 402 415 402 421 409 417 40015 423 397 424 399 428 414 429 412 417 398 406 406 421 407 418 40016 423 397 424 400 431 404 424 401 416 401 422 409 421 409 418 40317 421 402 424 403 432 414 420 404 416 402 412 405 422 410 417 39818 420 397 423 399 409 409 408 408 416 400 414 401 422 414 416 40019 420 396 423 399 409 409 408 408 411 398 418 405 421 413 413 39920 417 397 420 402 429 406 426 401 413 399 416 404 421 413 410 39821 419 399 422 402 430 407 421 401 415 401 418 406 422 411 414 39722 419 397 422 402 432 409 423 401 416 400 413 402 423 413 414 40023 420 396 423 397 430 412 428 404 414 404 415 402 427 414 416 40324 421 399 423 401 433 411 425 400 416 398 414 402 427 415 418 40225 421 399 423 401 433 411 425 400 416 398 414 402 427 415 418 40226 420 397 423 404 431 411 428 409 411 397 415 404 424 414 412 39327 418 398 426 403 409 409 408 408 417 399 418 402 429 415 419 39128 421 400 427 406 409 409 408 408 414 400 416 403 430 415 418 401

423 393 427 397 433 402 429 400 417 396 422 401 430 407 420 391

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 424 404 415 392 424 404 431 407 766 746 797 765 800 756 804 7692 422 406 417 398 426 404 434 407 769 754 798 774 801 769 804 7773 423 405 416 402 426 401 432 410 767 750 796 768 802 773 805 7764 426 407 417 402 423 403 430 408 768 751 797 779 801 776 808 7785 422 403 415 398 423 397 430 400 768 749 797 767 798 763 797 7586 425 404 417 401 423 399 432 404 768 750 797 767 802 773 807 7707 427 401 419 397 423 396 431 404 770 741 800 763 807 769 809 7698 422 403 416 403 424 395 427 399 756 737 788 756 801 765 802 7679 422 405 416 401 424 402 427 404 755 738 786 758 804 773 804 775

10 421 400 414 396 423 398 429 403 3 88 6 98 6 801 60

वािलयर बनाBina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

बना वािलयर नागदा खडवा िसपत िसविन

10 421 400 414 396 423 398 429 403 755 737 788 765 798 765 801 76011 423 397 414 390 426 396 433 399 758 736 794 750 800 752 802 75612 420 403 414 395 423 397 428 403 757 739 787 759 801 763 798 77013 424 405 417 400 427 397 430 402 759 740 794 760 804 773 803 77214 426 410 420 406 424 400 431 405 761 740 794 766 810 780 808 78215 425 404 417 399 426 399 430 401 762 738 794 962 808 768 806 76816 426 406 422 400 427 402 429 400 759 739 792 760 815 774 811 77617 429 407 417 398 427 404 427 406 761 742 792 762 805 765 810 77418 426 404 418 395 423 399 427 404 763 748 793 768 805 759 806 76819 423 409 415 394 422 399 428 403 759 737 795 765 804 758 806 76720 421 406 410 397 420 398 426 406 765 749 795 771 791 766 799 77421 423 407 424 399 423 403 428 405 759 744 792 760 795 761 800 76722 425 406 414 398 423 400 425 404 760 743 790 762 794 762 800 76823 425 402 412 392 424 400 428 405 758 740 790 759 796 755 799 76124 425 401 411 393 423 401 427 403 760 744 796 764 792 757 798 75625 421 408 412 395 423 401 427 403 756 742 793 766 795 764 795 76926 422 405 413 390 421 399 426 402 757 739 789 760 796 750 798 76127 426 407 416 393 421 401 431 403 760 741 795 762 803 755 804 76228 428 409 414 392 423 403 432 405 762 740 795 753 809 775 803 771

429 397 424 390 427 395 434 399 770 736 800 750 815 750 811 756

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Feb-14 0 0 0 0 0 0 0 02 02-Feb-14 0 0 0 0 0 0 0 03 03-Feb-14 0 0 0 0 0 0 0 04 04-Feb-14 0 0 0 0 0 0 0 05 05-Feb-14 0 0 0 0 0 0 0 06 06-Feb-14 0 0 0 0 0 0 0 07 07-Feb-14 0 0 0 0 0 0 0 08 08-Feb-14 0 0 0 0 0 0 0 09 09-Feb-14 0 0 0 0 0 0 0 0

10 10-Feb-14 0 0 0 0 0 0 0 011 11-Feb-14 0 0 0 0 0 0 0 012 12-Feb-14 0 0 0 0 0 0 0 013 13-Feb-14 0 0 0 0 0 0 0 014 14-Feb-14 0 0 0 0 0 0 0 015 15-Feb-14 0 0 0 0 0 0 016 16-Feb-14 0 0 NIL NIL NIL 017 17-Feb-14 0 0 0 0 0 0 0 018 18-Feb-14 0 0 0 0 0 0 0 019 19-Feb-14 0 0 0 0 0 0 0 020 20-Feb-14 0 0 0 0 0 0 0 021 21-Feb-14 0 0 0 0 0 0 0 022 22-Feb-14 0 0 0 0 0 0 0 023 23-Feb-14 0 0 0 0 0 0 0 024 24-Feb-14 0 0 0 0 0 0 0 025 25-Feb-14 1 17 0 0 0 0 0 026 26-Feb-14 0 0 0 0 0 0 0 027 27-Feb-14 0 0 0 0 0 0 0 028 28-Feb-14 0 0 0 0 0 0 0 0

Max 1 17 0 0 0 00 0 0Total 1 17 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month FEBRUARY 2014

Recommonded Load relief at 492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE-25

Power CutRestrictions in Western Region for the month of February-2014 k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply(DLF)

01022014 28022014 2344 2240 2332

21 Three-Phase Supply(Irrigation)

01022014 28022014 0956 0905 0946

21 Three-Phase Supply(Mixed)

01022014 28022014 2343 2227 2330

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01022014 28022014 2353 2337 2347 32 District Head Qtrs 01022014 28022014 2355 2340 2351 33 Tehsil Head Qtrs 01022014 28022014 2349 2309 2341

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid

1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 010214 to 280214

SaUnya Nil

0-1655MW

SaUnya Nil

0000

SaUnya Nil 2400

SaUnya Nil

95 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-

2 Power supply to Agricultural Sector ivavarNa Details sao From

idnaaMk Date tk To

idnaaMk Date p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs) 21 Three-Phase Supply 01022014 28022014 1000 0800 0900

22 Single-Phase Supply 01022014 28022014 1800 1800 1800 3 Anya jaanakarI Any other information

There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

11107 (Av) of 23 days 0000(Av) 0000 (Av)

1Rural 9031(Av) for 3486 Hrs 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0666 - -

0105 -

3 HT Industries 000 (Av) for 00 Hrs 000 Total Energy Cutday 0771 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01022014 to 280214 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 2322014 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का फरवर 2014का वःता रत यौरा

Details of forced unit outages during the month ofFeb2014

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 एःसार वा डनर

ESSAR VADINAR-I

गरा विनिल GSECL

660 2156 20-Jan-14 2018 10-Feb-14 Coal shortage

2 एःसार Essar-2

गरा विनिल GSECL

172 1212 22-Feb-13 अनपल ध Still out

अनपल ध Still out

Shortage of gas

3 एसएलपीपी SLPP-1

गरा विनिल GSECL

125 1445 23-Feb-14 1237 27-Feb-14 BTL

4 एकएलट पीएसAKLTPS-1

गरा विनिल GSECL

125 1147 26-Feb-14 अनपल ध Still out

अनपल ध Still out

DCS FAIL

5 एपीएल APL - 2

अदानी ADANI

330 056 3-Feb-14 अनपल ध Still out

अनपल ध Still out

Turbine vibration bearing probl em

6 एपीएल APL-5

अदानी ADANI

660 1732 15-Feb-14 456 27-Feb-14 Turbine vibration

7 एपीएल APL - 6

अदानी ADANI

660 2049 25-Feb-14 1947 3-Mar-14 Coal mill problem

8 टाटा TATA-6

मारा वउकिल MSPGCL

500 2352 19-Jul-13 अनपल ध Still out

अनपल ध Still out

For Economy SD

9 वीआईपीएल VIPL-I

मारा वउकिल MSPGCL

300 105 2-Oct-13 अनपल ध Still out

अनपल ध Still out

Turbine bearing vibration probl em

10 टाटा TATA-8

मारा वउकिल MSPGCL

250 2255 9-Jan-14 अनपल ध Still out

अनपल ध Still out

HT due to fire near turbine generator desk

11 चिपर Chandrapur-2

मारा वउकिल MSPGCL

210 1238 14-Jan-14 1310 23-Feb-14 ID fan problem

12 कोराड KORADI-6

मारा वउकिल MSPGCL

210 651 24-Jan-14 1456 14-Feb-14 Coal bunkering problem

13 डब यपीसीएल WPCL-1

मारा वउकिल MSPGCL

135 1245 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Furnace press high

14 डब यपीसीएल WPCL-3

मारा वउकिल MSPGCL

135 421 7-Feb-14 Ready Ready Less requisition

प म ऽय भार षण कि म बई णाली चालन-ISO-I

15 चिपर CPUR - 6

मारा वउकिल MSPGCL

500 1523 11-Feb-14 2033 13-Feb-14 BTL

16 नािसक NASIK-3

मारा वउकिल MSPGCL

250 300 11-Feb-14 100 19-Feb-14 UAT problem

17 कोराड KORADI-5

मारा वउकिल MSPGCL

210 153 14-Feb-14 अनपल ध Still out

अनपल ध Still out

ID fan problem

18 ितरोडा Tiroda-I

मारा वउकिल MSPGCL

660 2059 15-Feb-14 2054 26-Feb-14 Turbine bearing problem

19 ितरोडा Tiroda-2

मारा वउकिल MSPGCL

660 1125 17-Feb-14 152 22-Feb-14 BTL

20 कोराड KORADI-6

मारा वउकिल MSPGCL

210 2357 19-Feb-14 250 23-Feb-14 BTL

21 भसावल BHUSWAL-2

मारा वउकिल MSPGCL

210 301 22-Feb-14 1706 25-Feb-14 PA fan temp High

22 खापरखड़ा KHAPERKHEDA-3

मारा वउकिल MSPGCL

250 1448 22-Feb-14 130 25-Feb-14 BTL

23 जयगड Jaigad-4

मारा वउकिल MSPGCL

300 1930 22-Feb-14 1107 4-Mar-14 Low schedule

24 कोराड Koradi-5

मारा वउकिल MSPGCL

300 404 23-Feb-14 अनपल ध Still out

अनपल ध Still out

Electrical fault

25 पल PARLI-4

मारा वउकिल MSPGCL

210 1836 28-Jan-14 1956 3-Feb-14 Air preheater problem

26 भसावल BHUSAWAL-4

मारा वउकिल MSPGCL

250 1432 28-Feb-14 1802 3-Mar-14 Ash hopper problem

27 आरजीपीपीएल RGPPL-1B

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

28 आरजीपीपीएल RGPPL-2B

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

29 आरजीपीपीएल RGPPL 3A

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

30 आरजीपीपीएल RGPPL-1A

आरजीपीपीएल RGPPL

320 1500 18-Jan-14 अनपल ध Still out

अनपल ध Still out

SRV problem

31 आरजीपीपीएल RGPPL 3B

आरजीपीपीएल RGPPL

320 1230 8-Feb-14 Ready Ready Less requisition

32 िसगाजी SINGAJI - I

म वउकिल MPPGCL

600 422 12-Feb-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

33 सातपरा SATPURA-11

म वउकिल MPPGCL

250 1913 15-Feb-14 2149 19-Feb-14 Main stream temperature low

34 सातपरा SATPURA-11

म वउकिल MPPGCL

250 542 26-Feb-14 1642 2-Mar-14 BTL

35 एःसार महान Essar-Mahan-1

एःसार ESSAR

600 000 29-Jan-14 015 18-Feb-14 Less requisi tion

36 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

37 वदना Vandana-1

वदना Vandana

135 149 12-Jan-14 अनपल ध Still out

अनपल ध Still out

BTL

प म ऽय भार षण कि म बई णाली चालन-ISO-I

38 ससान Sasan-2

आरईएल REL

660 205 16-Feb-14 1650 23-Feb-14 Problem in ash handling

39 कावास Kawas 2A

एनट पीसीNTPC 164 2018 23-Dec-13 Ready Ready Less requisition

40 गाधार Gandhar-3

एनट पीसीNTPC 144 2037 28-Dec-13 Ready Ready Less requisition

41 गाधार Gandhar-I

एनट पीसीNTPC 144 2011 1-Jan-14 Ready Ready Less requisition

42 कावास Kawas 2B

एनट पीसीNTPC 164 900 13-Jan-14 421 5-Mar-14 Maintenance

43 गाधार Gandhar-2

एनट पीसीNTPC 219 023 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Less requisition

44 कावास Kawas-1A

एनट पीसीNTPC 164 2055 4-Feb-14 712 20-Feb-14 Less requisition

45 कावास

Kawas-1B एनट पीसीNTPC 164 1951 13-Feb-14 503 20-Feb-14 Less requisition

46 कावास Kawas 1A

एनट पीसीNTPC 164 1210 21-Feb-14 Ready Ready Less requisition

47 कावास Kawas 1B

एनट पीसीNTPC 164 012 22-Feb-14 1144 26-Feb-14 Less requisition

Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का फरवर 2014 का वःता रत यौरा

Details of planned unit outages during the month of Feb2014 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Time Date

1 डब यट पीएस WTPS-3

गरा विनिल GSECL

210 212 12-Feb-14 अनपल ध Still out

अनपल ध Still out

AOH

2 पल ParlI-3

मारा वउकिल MSPGCL

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

AOH

3 चिपर Chandrapur-5

मारा वउकिल MSPGCL

500 101 14-Jul-13 841 19-Feb-14 AOH

4 कोरबा प म KORBA-(W)-4

छरा वउकिल CSPGCL

210 2226 7-Feb-14 अनपल ध Still out

अनपल ध Still out

AOH

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

NIL2

NIL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING MARCH 2014 AND APRIL 2014

Capacity Outage as per Annual Maintenance Plan

3 Craiva]kMila CSPGCL

NIL

4

NIL

5 koMd``Iya xao~ Central Sector51 VSTPS 4 210 010414 070414 AOH52 VSTPS 2 210 080414 270414 AOH53 VSTPS 1 210 300414 190514 AOH54 CGPL 10 800 280314 130514 COH

maraiva]kMila MSPGCL

Date Time Date Time1 220 Bus-1 at Mapusa 20-Mar-14 1000 20-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R

2 765 Bus-1 at Sasan 20-Mar-14 800 20-Mar-14 1800 Daily Stringing of Main bus 1 for 765 kV Vichal Pooling - Sasan feeder

Reliance WR-II C

3 400 400kV Bus-2 at Satna 20-Mar-14 800 20-Mar-14 1800 Continuous Bay extension work related to JP - Nigrie Bays POWERGRID WR-II C

4 400 400kV ICT 1 at Satna 20-Mar-14 800 20-Mar-14 1000 Continuous Bay extension work related to JP - Nigrie Bays POWERGRID WR-II C

5 400 400kV Jabalpur Itarsi 1amp2 (Dc) 20-Mar-14 1000 20-Mar-14 1400 Continuous For commissioning of Line Impedance measurement kit

POWERGRID WR-II C

6 765 3X80 MVAr Bina Line Reactor at Indore 20-Mar-14 1000 21-Mar-14 1800 Continuous For installation of online dry out amp online DGA kit

POWERGRID WR-II C

7 400kV Damoh - Bhopal 1 20-Mar-14 800 31-Mar-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

8 400 Chorania Kasor 20-Mar-14 800 20-Mar-14 1800 Daily PMM work GETCO GETCO9 400 400 KV Main Bus-I at 400 KV Ss Khedamara 20-Mar-14 900 22-Mar-14 1700 Daily Erection of Pantograph 1 Set of IP amp CVT CSPTCL CSPTCL C

10 400 400 KV Khedamara-KSTPS NTPC ckt-II at 400 KV Ss Khedamara

20-Mar-14 900 22-Mar-14 1700 Daily Erection of Pantograph CVT amp 1 Set of IP PGCIL CSPTCL C

11 400 Korba -Vandana 20-Mar-14 900 21-Mar-14 1900 days continuouTesting of LBB auto re-close M-I amp M-II relays NTPC NTPC

12 400 Korba -Vandana 20-Mar-14 900 21-Mar-14 1900 days continuouTesting of LBB auto re-close M-I amp M-II relays NTPC NTPC

13 400DC Akola-Aurangabad (MSETCL) 1 and Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

21-Mar-14 600 23-Mar-14 1800 Conti Crossing work of 400kv MC Aurangabad - Aurangabad

MSETCLWRTS-I WRTS-I C

14400 amp 220 amp 132

400KV DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 400KV Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

21-Mar-14 600 21-Mar-14 1800 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad

MSETCLWRTS-I WRTS-I C

15 400 Bhadrawati-Parli 1amp 2 21-Mar-14 900 31-Mar-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I C

16 220 Bus-1 at Pune 21-Mar-14 800 21-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R

17 400 Solapur-Kolhapur 1 amp 2 21-Mar-14 700 21-Mar-14 1800 Daily Stringing work upcoming 765 kV Solapur-Pune line

Reliance WRTS-I C

18 220 220kV DC Raigarh- Raigarh (CSPTCL) Line (if outage not avail on 13140314)

21-Mar-14 900 22-Mar-14 1700 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (040-50)

CSPTCL WRTS-I C

19 220 Bus-2 (Section-A) at Mapusa 21-Mar-14 1000 21-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R20 400 Bus-1 at Itarsi 21-Mar-14 900 21-Mar-14 1800 Daily AMP POWERGRID WR-II R21 220 Bus-1 at Gwalior 21-Mar-14 1000 21-Mar-14 1800 Daily AMP POWERGRID WR-II R22 220 Jhanor - Haldarwa 1 21-Mar-14 900 21-Mar-14 1800 Daily AMP POWERGRID WR-II R23 400 Vapi Boisar 21-Mar-14 700 22-Mar-14 1900 Continuous For crossing of 220kV Kala Khadoli TL POWERGRID WR-II C

24 765 Sasan-Satna2 21-Mar-14 800 22-Mar-14 1800 Continuous For Power Line crossing of 765kV Vindhyanchal (pooling) - Satna 2 Line

POWERGRID WR-II R

25 400 400220 ICT NO1 at Kasor 21-Mar-14 800 21-Mar-14 1800 Daily PMM work GETCO GETCO26 400 400KV Sipat-Pathadi(LANCO) line 21-Mar-14 900 22-Mar-14 1900 Continous Annual Preventive maintenance job NTPC NTPC27 400 Pune-Parli 2 50MVAr Line Reactor at Pune 22-Mar-14 800 22-Mar-14 1800 Daily AMP Work Line in service wo reactor Reliance WRTS-I R

28 765 Bus-2 at Solapur 22-Mar-14 700 22-Mar-14 1800 Daily 765KV Pune bay commissioning amp SCADA works

WRTS-I WRTS-I C

29 400 Bus-1 at Bhatapara 22-Mar-14 800 23-Mar-14 1800 Conti Bus extension work for new 125MVAr Bus Reactor at Bhatapara

WRTS-I WRTS-I C

30 220 Bus-2 (Section-B) at Mapusa 22-Mar-14 1000 22-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R31 400 Vadavi Chorania 1 22-Mar-14 900 22-Mar-14 1800 Daily AMP Reliance WR-II R32 220 Jhanor - Haldarwa 2 22-Mar-14 900 22-Mar-14 1800 Daily AMP POWERGRID WR-II R33 220 Bus-2 at Gwalior 22-Mar-14 1000 22-Mar-14 1800 Daily AMP POWERGRID WR-II R

34 765 3X80 MVAr Bus Reactor at Indore 22-Mar-14 1000 23-Mar-14 1800 Continuous For installation of online dry out amp online DGA kit

POWERGRID WR-II C

35 220 Transfer Bus at Mapusa 23-Mar-14 1000 23-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R

36 400 Raigarh- Raipur 4 amp Raigarh-Kotra PS 2 23-Mar-14 800 30-Mar-14 1800 Conti Bay shifting work for up-coming 125MVAr Bus Reactor at Raigarh

WRTS-I WRTS-I C

37 765 Bus-1 at Indore (PG) 23-Mar-14 1000 23-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

Outages Proposal of Transmission elements during the month of MARCH‐2014Type

ANNEXURE‐32A

SN KV Line From To

Basis Reason System Agency

38 220 MC Waluj-Chitegaon amp Waluj-Jalna on same tower

24-Mar-14 600 24-Mar-14 1800 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad

MSETCL WRTS-I C

39 400 Raipur-Sipat 1 amp 2 24-Mar-14 800 2-Apr-14 1800 Conti Diversion of line for Lafarge Railway trackERS removal

WRTS-I Lafarge C

40 220 Bus-2 at Pune 24-Mar-14 800 24-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R41 765 Bus-1 at Bilaspur 24-Mar-14 800 24-Mar-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R

42 400 Bus-2 at Bhatapara 24-Mar-14 800 25-Mar-14 1800 Conti Bus extension work for new 125MVAr Bus Reactor at Bhatapara

WRTS-I WRTS-I C

43 400 Kolhapur-Mapusa 2 24-Mar-14 600 24-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

44 400 Vadavi Chorania 2 24-Mar-14 900 24-Mar-14 1800 Daily AMP Reliance WR-II R45 765 Bus-2 at Indore (PG) 24-Mar-14 1000 24-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

46 765 Bus-2 at Sasan 24-Mar-14 800 24-Mar-14 1800 Daily Strining of Main Bus 2 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

47 220 KAPP - Haldarwa 1 24-Mar-14 800 24-Mar-14 1800 Daily AMP POWERGRID WR-II R48 400 Bus - 2 at Pune 25-Mar-14 800 25-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R

49 765 Bus - 1 at Wardha 25-Mar-14 800 25-Mar-14 1800 Daily Jumper connection work of 765KV Raipur-Wardha line

WRTS-I WRTS-I R

50 400 Kolhapur-Mapusa 2 25-Mar-14 600 25-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

51 220 Mapusa-Ponda line 25-Mar-14 1000 25-Mar-14 1500 Daily AMP Work GOA WRTS-I R

52 765 Bus-1 at Sasan 25-Mar-14 800 25-Mar-14 1800 Daily Jumpering of Bus 1 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

53 220 KAPP - Haldarwa 2 25-Mar-14 800 25-Mar-14 1800 Daily AMP POWERGRID WR-II R54 400 Vadavi - Kansari2 25-Mar-14 900 25-Mar-14 1800 Daily AMP Reliance WR-II R55 400 Bus-1 at Indore (PG) 25-Mar-14 1000 26-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C56 765 Bus-1 at Satna 25-Mar-14 800 25-Mar-14 1800 Continuous Bay extension work POWERGRID WR-II C57 765 Sipat 765KV 400KV 1000MVA ICT-1 25-Mar-14 900 25-Mar-14 1900 Daily SPS Protection scheme modification NTPC NTPC

58 765 Bus - 2 at Wardha 26-Mar-14 800 26-Mar-14 1800 Daily Jumper connection work of 765KV Raipur-Wardha line

WRTS-I WRTS-I R

59 400 Bhadrawati-Parli 2 63MVAr Line Reactor at Parli

26-Mar-14 800 26-Mar-14 1800 Daily AMP Work of Recator at Parli line in service wo reactor

WRTS-I WRTS-I R

60 400 Kolhapur-Mapusa 1 26-Mar-14 600 26-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

61 220 Mapusa-Amona line 26-Mar-14 1000 26-Mar-14 1500 Daily AMP Work GOA WRTS-I R62 765 Bus-2 at Satna 26-Mar-14 800 26-Mar-14 1800 Continuous Bay extension work POWERGRID WR-II C

63 765 Bus-2 at Sasan 26-Mar-14 800 26-Mar-14 1800 Daily Jumpering of bus 2 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

64 400 401 KV Main Bus-I at 400 KV Ss Khedamara 26-Mar-14 900 27-Mar-14 1700 Daily Erection of IPS Tube CSPTCL CSPTCL C

65 400 401 KV Khedamara-KSTPS NTPC ckt-II at 400 KV Ss Khedamara

26-Mar-14 900 27-Mar-14 1700 Daily Erection of IPS Tube PGCIL CSPTCL C

66 400 ACBIL-BILASPUR-CKT NO -2 26-Mar-14 900 31-Mar-14 1800 CONT FOR lilo CONNECTIVITY OF 300MW MCCPL TPP

ACBIL ACBIL C

67 765 Bus-2 at Bilaspur 27-Mar-14 800 27-Mar-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R68 220 Mapusa-Thivim 1 27-Mar-14 1000 27-Mar-14 1500 Daily AMP Work GOA WRTS-I R69 220 KAPP - Vav 2 27-Mar-14 800 27-Mar-14 1800 Daily AMP POWERGRID WR-II R70 400 Bus-2 at Indore (PG) 27-Mar-14 1000 28-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

71 765 Bus-2 at Gwalior 27-Mar-14 1000 27-Mar-14 1800 Daily Bay extension work related to Gwalior Jaipur 1 Bays

POWERGRID WR-II C

72 400 VSTPS Tie- Line-1 ( Line from Stage-III to IV Switchyard)

27-Mar-14 900 27-Mar-14 1900 Daily Basis AMP and rectification of hot spots NTPC NTPC

73 765 Sipat 765KV 400KV 1000MVA ICT-2 27-Mar-14 900 27-Mar-14 1900 Daily SPS Protection scheme modification NTPC NTPC74 765 Bus-1 at Solapur 28-Mar-14 700 30-Mar-14 1800 Daily commissioning tests amp SCADA works WRTS-I WRTS-I C75 220 Mapusa-Thivim 2 28-Mar-14 1000 28-Mar-14 1500 Daily AMP Work GOA WRTS-I R

76 400 Koradi-Satpura 28-Mar-14 1000 28-Mar-14 1400 Daily Earthwire tighting work damaged during Crossing work

WRTS-I ADANI C

77 220 Bus-1 at Dehgam 28-Mar-14 900 28-Mar-14 1800 Daily AMP POWERGRID WR-II R78 220 Kawas - Haldarwa 2 28-Mar-14 800 28-Mar-14 1800 Daily AMP POWERGRID WR-II R79 400 Chorania Amreli 28-Mar-14 800 28-Mar-14 1800 Daily PMM work GETCO GETCO

80 400DC Akola-Aurangabad (MSETCL) 1 and Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

29-Mar-14 600 30-Mar-14 1800 Conti Charging amp shifting of Akola-Abad line on MC Abad-Abad line WRTS-I WRTS-I C

81 220 Bus-2 at Dehgam 29-Mar-14 900 29-Mar-14 1800 Daily AMP POWERGRID WR-II R82 400 Bus -1 at Mapusa 30-Mar-14 1000 30-Mar-14 1500 Daily AMP Work WRTS-I WRTS-I R

83 765 765kV Bus Reactor at Solapur 31-Mar-14 700 2-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

Date Time Date Time

1 400 Bhilai-Koradi 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

2 400 DC Korba-Birsingpur 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

3 400 Korba-Bhilai 2 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

4 220 Korba-Budhipadar 3 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

5 400 Akola-Wardha 1amp 2 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

6 400 Raipur-Raigarh 1 amp Raipur-KSK-DBPL-Raigarh

1-Apr-14 800 30-Apr-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

7 400 Bhadrawati-Parli 1amp 2 1-Apr-14 900 30-Apr-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I C

8 400 400220kv ICT-1 at Pune 1-Apr-14 800 1-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R9 400 Bus-1 at Bilaspur 1-Apr-14 800 1-Apr-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R

10 400 Solapur(PG) -Karad line 1-Apr-14 700 10-Apr-14 1800 Conti Erection of 80MVAr new reactor by shifitng line equipments at Solapur

MSETCL WRTS-I C

11 400 Bus-1 at Jabalpur (pooling) 01-Apr-14 1000 01-Apr-14 1800 Daily Busbar Stability test related to Jhabua Power Bays

POWERGRID WR-II C

12 400 Shujalpur - Nagda 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

13 400 Mundra - Bhachau 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

14 400 Bina - Shujalpur 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

15 220 Omkareshwar-Khandwa Ckt 1-Apr-14 900 1-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI16 400 Sipat 400KV Bay 10 and 11 1-Apr-14 900 3-Apr-14 1900 Continous 400KV CT 3nos replacement NTPC NTPC17 400 Padgha-Nagothane ckt I 1-Apr-14 900 1-Apr-14 1700 Daily QMwork MSETCL MSETCL

18 400 Bus-2 at Jabalpur (pooling) 02-Apr-14 1000 02-Apr-14 1800 Daily Busbar Stability test related to Jhabua Power Bays

POWERGRID WR-II C

19 400 Vindhyanchal - Mahan - Korba (Section of both the line on same Dc tower)

02-Apr-14 800 03-Apr-14 1700 Continuous For Power Line crossing of 765kV Vindhyanchal (pooling) - Satna 1 Line

POWERGRID WR-II C

20 400 400kV ICT 4 at Indore MPPTCL 02-Apr-14 1000 04-Apr-14 1800 ContinuousFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

MPPTCL WR-II C

21 400 400kV Bus Coupler bay at Indore MPPTCL 02-Apr-14 1000 04-Apr-14 1800 ContinuousFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

MPPTCL WR-II C

22 400 400kV Itarsi - Indore MPPTCL 1 Line 02-Apr-14 1000 02-Apr-14 1500 DailyFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

POWERGRID WR-II C

23 400400 KV LILO Line of 400 KV SC Korba West-Khedamara to 400 KV Ss Raita (Between Loc69 amp70 near Raita Ss)

2-Apr-14 800 3-Apr-14 1700 DailyMaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

CSPTCL CSPTCL C

24 400 Chandrapur-Khaparkheda 2-Apr-14 900 2-Apr-14 1700 Daily QMwork MSETCL MSETCL

25 400 Lamboti-Solapur PG 2-Apr-14 900 2-Apr-14 1700 Daily QMwork MSETCL MSETCL

26 400 Bus-1 at Durg PS Ss 3-Apr-14 900 3-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R27 400 Bus-1 at Jabalpur 03-Apr-14 900 03-Apr-14 1800 Daily Retrofitting of Isolator arms(689A) POWERGRID WR-II R28 400 315MVA ICT2 at Khandwa 03-Apr-14 1000 03-Apr-14 1600 Daily AMP POWERGRID WR-II R29 400 Mundra - Hadala 3-Apr-14 800 3-Apr-14 1800 Daily PMM GETCO GETCO30 400 400KV Seoni -Bhilai Ckt 3-Apr-14 900 3-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I31 400 Lonikand-Chakan 3-Apr-14 900 3-Apr-14 1700 Daily QMwork MSETCL MSETCL32 400 Bus-2 at Durg PS Ss 4-Apr-14 900 4-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R33 400 Bus-1 at Jabalpur 04-Apr-14 900 04-Apr-14 1800 Daily Retrofitting of Isolator arms(2089A) POWERGRID WR-II R

34 400 400kV Itarsi - Indore MPPTCL 1 Line 04-Apr-14 1300 04-Apr-14 1800 DailyFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

POWERGRID WR-II C

35 400 Varsana - Hadala 4-Apr-14 800 4-Apr-14 1800 Daily PMM GETCO GETCO

Agency Type

ANNEXURE‐32BOutages Proposal of Transmission elements during the month of APRIL ‐2014

SN KV Line From To

Basis Reason System

36 220 Vapi - Vapi (PG) 4-Apr-14 800 4-Apr-14 1800 Daily PMM work PGCIL GETCO37 220 Haldarva - Jhanor - 1 (NTPC) 4-Apr-14 800 4-Apr-14 1800 Daily PMM amp Tan Delta testing PGCIL GETCO38 400 400KV Birsinghpur -Katni Ckt - I 4-Apr-14 800 4-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I39 220 Badod - Kota Ckt 4-Apr-14 900 4-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI40 220 Malanpur-Auriya Ckt 4-Apr-14 900 5-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI

41 400 Bhusawal-Akola 4-Apr-14 900 4-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

42 400 Deepnagar-Aurangabad II 4-Apr-14 900 4-Apr-14 1700 Daily QMwork MSETCL MSETCL43 400 Kalwa-Padgha Ckt I 4-Apr-14 900 4-Apr-14 1700 Daily QMwork MSETCL MSETCL44 765 Bus Reactor at Seoni 5-Apr-14 900 5-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R

45 400 DC Korba-KhedamaraLilo at Marwa lilo section yet to be charge 5-Apr-14 800 6-Apr-14 1800 Daily

Crossing work of upcoming 765 KV DC Raigarh-Champa (AP-48A0- AP 490)DC Korba-Khedamara is in service

CSPTCL WRTS-1 C

46 400 Bus-1 at Jabalpur 05-Apr-14 900 05-Apr-14 1800 Daily Retrofitting of Isolator arms(1689A) POWERGRID WR-II R

47 400 Mundara -Limbdi 1 05-Apr-14 800 07-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

48 220 Badod - Modak Ckt 5-Apr-14 900 5-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI49 400 Dhule-Babhleswar ckt 1 5-Apr-14 900 5-Apr-14 1700 Daily QMwork MSETCL MSETCL50 400 400220kv ICT-1 at Seoni 7-Apr-14 900 7-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R51 400 Bus-2 at Jabalpur 07-Apr-14 900 07-Apr-14 1800 Daily Retrofitting of Isolator arms(1789B) POWERGRID WR-II R52 400 315MVA ICT1 at Khandwa 07-Apr-14 1000 07-Apr-14 1600 Daily AMP POWERGRID WR-II R53 220 Chhegoan-Khandwa Ckt -II 7-Apr-14 900 7-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI54 400 Korba- Bhilai1 7-Apr-14 900 8-Apr-14 1900 days continuou Bay Maint and testing NTPC NTPC55 400 Vindhyachal - Mahan line 7-Apr-14 900 8-Apr-14 1900 Continuous Replacement of R Y and B Phase CT NTPC NTPC56 400 Bhusawal-Aurangabad 7-Apr-14 900 7-Apr-14 1700 Daily QMwork MSETCL MSETCL57 400 New Koyna-Karad ckt 2 7-Apr-14 830 7-Apr-14 1730 Daily QMwork MSETCL MSETCL

58 400 Mundara -Limbdi 2 08-Apr-14 800 10-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

59 400 Chorania Hadala 8-Apr-14 800 8-Apr-14 1800 Daily PMM GETCO GETCO60 400 Sipat 400KV Bay 23 8-Apr-14 900 9-Apr-14 1900 Continous One 400KV CT replacement NTPC NTPC61 400 Koradi-Khaparkheda I 8-Apr-14 900 8-Apr-14 1700 Daily QMwork MSETCL MSETCL62 765 765400KV ICT-1 at Kotra PS 9-Apr-14 900 9-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R63 400 Bus-2 at Jabalpur 09-Apr-14 900 09-Apr-14 1800 Daily Retrofitting of Isolator arms(489B) POWERGRID WR-II R64 400 315MVA ICT1 at Damoh 09-Apr-14 1000 09-Apr-14 1600 Daily AMP POWERGRID WR-II R65 400 Amreli-Jetpur 2 9-Apr-14 800 9-Apr-14 1800 Daily PMM GETCO GETCO66 400 SSP- Rajgarh - 1 9-Apr-14 800 9-Apr-14 1800 Daily PMM GETCOMPTCL GETCO67 220 TAPS1 amp2-TAPS 3amp4 tie line 9-Apr-14 800 9-Apr-14 1600 one day Annual maintenance Works MSETCL NPCIL68 220 TAPS TIE LIE-I 9-Apr-14 800 10-Apr-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL69 400 400 KV Indore - Nagda Ckt 9-Apr-14 900 9-Apr-14 1600 daily For maintenance work MPPTCL EHT- Mamp I70 400 400 KV Sarni - Isp Ckt 9-Apr-14 900 9-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I71 220 Mehgaon-Auriya Ckt 9-Apr-14 900 10-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI72 400 315 MVA 400220Kv X-mer III At Bhopal SS 9-Apr-14 900 10-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI73 400 Padgha-Tarapur CktII 9-Apr-14 900 9-Apr-14 1700 Daily QMwork MSETCL MSETCL74 765 Bus Reactor at Kotra PS 10-Apr-14 900 10-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R

75 765 amp 400

765400 kV ICT-I at Solapur amp 400KV Solapur-Parli 2 10-Apr-14 700 12-Apr-14 1800 Daily 765400 kV spare ICT unit Aux bus works CSD

commissioning amp Fire fighting works at Solapur WRTS-IReliance WRTS-I C

76 400 315MVA ICT2 at Damoh 10-Apr-14 1000 10-Apr-14 1600 Daily AMP POWERGRID WR-II R

77 765 Sasan-Satna 1 10-Apr-14 800 11-Apr-14 1800 Daily For AMP of line amp Line terminal Equipments Post commissioning checks

POWERGRID WR-II C

78 400 APL-Varsana 10-Apr-14 800 10-Apr-14 1800 Daily PMM GETCO GETCO79 400 400 KV Isp - Nagda Ckt 10-Apr-14 900 10-Apr-14 1600 daily For maintenance work MPPTCL EHT- Mamp I80 400 400 KV Bhopal-Itarsi(PGCIL) Ckt-I 10-Apr-14 900 11-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I81 220 Chhegoan-Khandwa Ckt -I 10-Apr-14 900 10-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI82 400 315 MVA 400220Kv X-mer At Katni SS 10-Apr-14 800 11-Apr-14 1800 continue For maintenance work MPPTCL EHT -MampI83 400 Korba- Bhilai2 10-Apr-14 900 11-Apr-14 1900 days continuou Bay Maint and testing NTPC NTPC84 400 Sipat 400KV Bay 14 10-Apr-14 900 12-Apr-14 1900 Continous 400KV CT 3nos replacement NTPC NTPC

85 400 Chandrapur II-Parli II 10-Apr-14 900 10-Apr-14 1700 Daily Providing of Arching horncorona rings Bird guards quarter pinsNut bolts

MSETCL MSETCL

86 400 Karad-Lonikand 10-Apr-14 900 10-Apr-14 1700 Daily QMwork MSETCL MSETCL87 400 Raipur-Durg PS 1 11-Apr-14 900 11-Apr-14 1700 Daily AMP Work WRTS-I WRTS-I R

88 400 Mundara -Jetpur 1 11-Apr-14 800 15-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

89 400 Varsana-Hadala Line 11-Apr-14 800 11-Apr-14 1800 Daily PMM GETCO GETCO90 220 Haldarwa Kawas-2 11-Apr-14 800 11-Apr-14 1800 Daily PMM work PGCIL GETCO91 400 400 KV Nagda-Rajgarh(PGCIL) Ckt-I 11-Apr-14 900 11-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

92 400 315 MVA 400220Kv X-mer III ampTie bay At Bhopal SS

11-Apr-14 900 11-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI

93 400 Akola-Nandgaonpeth 11-Apr-14 900 11-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

94 400 Akola-Wardha I 11-Apr-14 900 11-Apr-14 1700 Daily QMwork MSETCL MSETCL95 400 Kalwa-Lonikand 11-Apr-14 900 11-Apr-14 1700 Daily QMwork MSETCL MSETCL96 400 400220kv ICT-1 at Mapusa 12-Apr-14 900 12-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R97 400 Raipur-Durg PS 2 12-Apr-14 900 12-Apr-14 1700 Daily AMP Work WRTS-I WRTS-I R98 765 Sasan-Satna2 with line reactor 12-Apr-14 1000 12-Apr-14 1800 Daily AMP POWERGRID WR-II R99 400 400 KV Nagda-Rajgarh(PGCIL) Ckt-II 12-Apr-14 900 12-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I100 400 Deepnagar-Aurangabad I 12-Apr-14 900 12-Apr-14 1700 Daily QMwork MSETCL MSETCL101 400 Amreli-Jetpur 2 14-Apr-14 800 14-Apr-14 1800 Daily PMM GETCO GETCO102 400 Kasor - Gpec 14-Apr-14 800 14-Apr-14 1800 Daily PMM GETCO GETCO103 220 GWL(PGCIL)-Malanpur Ckt-I 14-Apr-14 900 15-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI104 400 DC Korba-Raipur 3 amp 4 15-Apr-14 800 16-Apr-14 1800 Conti Bus splitting work at Raipur WRTS-1 WRTS-1 C

105 400 Korba-Bhatapara 15-Apr-14 800 24-Apr-14 1800 Conti For raising of ground clearence for Railway track of Lafarge

WRTS-I Lafarge C

106 765 765400 kV ICT-II at Solapur 15-Apr-14 700 17-Apr-14 1800 Daily CSD commissioning amp Fire fighting works WRTS-I WRTS-I C107 400 Vindhyachal-Satna1 15-Apr-14 1000 15-Apr-14 1800 Daily AMP POWERGRID WR-II R108 400 Ssnl-Dhule-1 15-Apr-14 800 15-Apr-14 1800 Daily PMM GETCOMSETCL GETCO109 220 TAPS-Vapi 15-Apr-14 800 17-Apr-14 1900 Daily Annual maintenance Works GETCO NPCIL110 220 Pithampur-Rajgarh(PGCIL) Ckt - I 15-Apr-14 900 15-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI111 400 Sipat 400KV Bay-18 ( Ranchi-1 Main) 15-Apr-14 900 15-Apr-14 1900 Daily Annual Preventive maintenance job NTPC NTPC112 400 Karad-Kolhapur Ckt I 15-Apr-14 900 15-Apr-14 1700 Daily QMwork MSETCL MSETCL

113 400 DC Raipur-Bhadrawati 2 amp 3 16-Apr-14 800 17-Apr-14 1800 Conti Bus splitting work at Raipur WRTS-1 WRTS-1 C

114 400 Vindhyachal-Satna2 16-Apr-14 1000 16-Apr-14 1800 Daily AMP POWERGRID WR-II R

115 400 Mundara -Jetpur 2 16-Apr-14 800 20-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

116 400 Vadavi - Dehgam (Pg) - 1 16-Apr-14 800 16-Apr-14 1800 Daily PMM amp Tandelta testing GETCO GETCO117 400 Chorania Asoj-1 16-Apr-14 800 16-Apr-14 1800 Daily PMM GETCO GETCO118 220 Bhilad - TAPS 16-Apr-14 800 16-Apr-14 1800 Daily PMM work PGCIL GETCO119 220 Bhat - Pirana (PG) - 1 16-Apr-14 800 16-Apr-14 1800 Daily PMM work GETCO GETCO120 400 400 KV Bhopal-Itarsi(PGCIL) Ckt-II 16-Apr-14 900 17-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I121 220 Damoh(PGCIL) - Tikamgarh Ckt 16-Apr-14 900 16-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI

122 400 400KV SC Korba-Raipur-II (Between Korba - Bhatapara end)(Between Loc2980 amp 2990) 16-Apr-14 800 17-Apr-14 1700 Daily

MaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

PGCIL CSPTCL C

123 400 Sipat 400KV Bay-19 ( Ranchi-2 Main) 16-Apr-14 900 16-Apr-14 1900 Daily Annual Preventive maintenance job NTPC NTPC124 400 Padgha-Babhleswar ckt I 16-Apr-14 900 16-Apr-14 1700 Daily QMwork MSETCL MSETCL125 400 Vadavi - Dehgam (Pg) - 2 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCO GETCO126 400 Ssnl-Dhule-2 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCOMSETCL GETCO127 400 Vadinar-Hadala- 1 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCO GETCO128 220 Bhat - Pirana (PG) - 2 17-Apr-14 800 17-Apr-14 1800 Daily PMM work GETCO GETCO129 400 400KV Birsinghpur -Katni Ckt - II 17-Apr-14 800 17-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I130 220 Pithampur-Rajgarh(PGCIL) Ckt - II 17-Apr-14 900 17-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI131 400 Jejuri-Lonikand 17-Apr-14 900 17-Apr-14 1700 Daily QMwork MSETCL MSETCL132 400 Deepnagar-Khadka II 17-Apr-14 900 17-Apr-14 1700 Daily QMwork MSETCL MSETCL133 400 Chorania Kasor 18-Apr-14 800 18-Apr-14 1800 Daily PMM GETCO GETCO134 220 GWL(PGCIL)-Malanpur Ckt-II 18-Apr-14 900 19-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI135 400 Akola-Wardha II 18-Apr-14 900 18-Apr-14 1700 Daily QMwork MSETCL MSETCL

136 400 Koradi-Nandgaonpeth 18-Apr-14 800 18-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

137 765 765kV Pune line Reactor at Solapur 19-Apr-14 700 20-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

138 400 400KV Bina -Power(JP) Ckt 19-Apr-14 900 19-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I139 400 Dhule-SSarovar I 19-Apr-14 900 19-Apr-14 1700 Daily QMwork MSETCL MSETCL

140 400 Koradi-Khaparkheda II 19-Apr-14 900 19-Apr-14 1700 Daily QMwork MSETCL MSETCL141 220 KAPP - VAPI - 1 20-Apr-14 800 20-Apr-14 1800 Daily Isolator replacement under ASIDE scheme PGCIL GETCO

142 400 DC Bhilai-Bhadrawati amp Raipur-Bhadrawati 1 21-Apr-14 800 28-Apr-14 1800 Conti Diversion of line for Vidarbha Industrial Devlopment Corporation(VIDC)

WRTS-I VIDC C

143 400 Bhachau- Ranchhodpura 1amp2 21-Apr-14 800 27-Apr-14 1800 Continuous Tower shifting work at canal crossingInsulator replacement work

POWERGRID WR-II C

144 400 Hadala-Amreli 21-Apr-14 800 21-Apr-14 1800 Daily PMM GETCO GETCO145 400 Vadinar-Hadala- 2 21-Apr-14 800 21-Apr-14 1800 Daily PMM GETCO GETCO146 220 TAPS-Boisar 21-Apr-14 800 23-Apr-14 1900 Daily Annual maintenance Works MSETCL NPCIL147 220 Bina(PGCIL)-220 KV Bina Ckt 21-Apr-14 900 21-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI148 400 CGPL Bhachau -1 21-Apr-14 8AM 21-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL149 220 Kawas-Ichhapore 1+Bus 1 21-Apr-14 900 21-Apr-14 1800 daily RTV Coating NTPC NTPC150 400 Karad-Kolhapur Ckt II 21-Apr-14 900 21-Apr-14 1700 Daily QMwork MSETCL MSETCL151 400 New Koyna-Koyna Stg-4-1 21-Apr-14 830 21-Apr-14 1730 Daily QMwork MSETCL MSETCL152 400 Ssp - Rajgarh - 2 22-Apr-14 800 22-Apr-14 1800 Daily PMM GETCOMPTCL GETCO153 400 Vadavi-Bhachau 2 22-Apr-14 800 22-Apr-14 1800 Daily PMM amp Tan Delta testing PGCIL GETCO154 220 Bhilad - Vapi (PG) - 1 22-Apr-14 800 22-Apr-14 1800 Daily PMM work PGCIL GETCO155 400 400 KV Rajgarh(PGCIL)-Ssp Ckt-I 22-Apr-14 900 22-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I156 400 400KV Seoni -Sarni Ckt 22-Apr-14 900 23-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I157 220 Khandwa(PGCIL)-Nepanagar Ckt 22-Apr-14 900 22-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI158 220 Kawas-Ichhapore 2+Bus 1 22-Apr-14 900 22-Apr-14 1800 daily For maintenance work NTPC NTPC159 400 Karad-Jaigad II 22-Apr-14 900 22-Apr-14 1700 Daily Annual maintenance work MSETCL MSETCL160 220 Bhilad - Vapi (PG) - 2 23-Apr-14 800 23-Apr-14 1800 Daily PMM work PGCIL GETCO161 400 400KV Bina -Bhopal Ckt -I 23-Apr-14 900 24-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I162 400 400 KV Rajgarh(PGCIL)-Ssp Ckt-II 23-Apr-14 900 23-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I163 220 Bina(PGCIL)-Shivpuri Ckt 23-Apr-14 900 24-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI164 220 Damoh(PGCIL) - Damoh I C - I 23-Apr-14 900 23-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI

165 400 400 KV DCDS Sipat- Raipur (IampII) 23-Apr-14 800 24-Apr-14 1700 DailyMaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

PGCIL CSPTCL C

166 400 CGPL Bhachau - 2 23-Apr-14 8AM 23-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL

167 220 Kawas-Navsari 2 +Bus 1 23-Apr-14 900 23-Apr-14 1800 daily Insulator replcement and routine maintenance NTPC NTPC168 400 Padgha-Babhleswar ckt II 23-Apr-14 900 23-Apr-14 1700 Daily QMwork MSETCL MSETCL169 400 Kasor - SSP 24-Apr-14 800 24-Apr-14 1800 Daily PMM work GETCO GETCO170 220 Bhilad - Vapi (PG) - 3 24-Apr-14 800 24-Apr-14 1800 Daily PMM work PGCIL GETCO171 220 TAPS-Bhilad 24-Apr-14 800 26-Apr-14 1900 Daily Annual maintenance Works GETCO NPCIL172 220 Damoh(PGCIL) - Damoh I C - II 24-Apr-14 900 24-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI173 400 CGPL Jetpur- 1 24-Apr-14 8AM 24-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL

174 220 Kawas-Ichhapore 1 +Bus 2 24-Apr-14 900 24-Apr-14 1400 daily Insulator replcement and routine maintenance NTPC NTPC

175 220 Kawas-Ichhapore 2 +Bus 2 24-Apr-14 1400 24-Apr-14 1900 daily Insulator replcement and routine maintenance NTPC NTPC176 400 Padgha-Talegaon 24-Apr-14 900 24-Apr-14 1700 Daily QMwork MSETCL MSETCL

177 765 765kV Raichur 1 line Reactor at Solapur 25-Apr-14 700 27-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

178 400 400KV Bina -Bhopal Ckt -II 25-Apr-14 900 26-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I179 400 CGPL Jetpur- 2 25-Apr-14 8AM 25-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL180 400 Vindhyachal -Satna-4 Line Shunt Reactor 25-Apr-14 900 25-Apr-14 1900 Daily Basis AMP NTPC NTPC

181 400 Bhusawal-Koradi 25-Apr-14 900 25-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

182 400 Deepnagar-Khadka I 25-Apr-14 900 25-Apr-14 1700 Daily QMwork MSETCL MSETCL183 400 Soja -Kansari 26-Apr-14 800 26-Apr-14 1800 Daily PMM GETCO GETCO184 400 Raipur-Wardha 1 27-Apr-14 800 28-Apr-14 1800 Daily Balance construction work WRTS-1 WRTS-1 C185 220 KAPP - VAPI - 2 27-Apr-14 800 27-Apr-14 1800 Daily Isolator replacement under ASIDE scheme PGCIL GETCO186 400 Soja -Kansari 28-Apr-14 800 28-Apr-14 1800 Daily PMM GETCO GETCO187 220 TAPS-Boisar II 28-Apr-14 800 30-Apr-14 1900 Daily Annual maintenance Works MSETCL NPCIL188 400 400KV Damoh - Katni Ckt 28-Apr-14 900 28-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I189 400 400 KV Damoh(PGCIL)-Katni Ckt 28-Apr-14 900 28-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I190 400 New Koyna-Karad ckt 1 28-Apr-14 830 28-Apr-14 1730 Daily QMwork MSETCL MSETCL

191 400 DC Raigarh-DB Power (Tudri) - KSK 29-Apr-14 800 30-Apr-14 1800 Conti Crossing work of 765kV SC Raigrah-Champa (90 - 100)

WRTS-I WRTS-I C

192 400 Raipur-Wardha 2 29-Apr-14 800 30-Apr-14 1800 Daily Balance construction work WRTS-1 WRTS-1 C193 220 Navsari - Nasik - 1 29-Apr-14 800 29-Apr-14 1800 Daily PMM work GETCOMSETCL GETCO194 220 Seoni(PGCIL)-Chhindwara Ckt-I 29-Apr-14 900 29-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI195 220 Kawas-Vav 1+ bus 2 29-Apr-14 900 29-Apr-14 1800 daily For maintenance work NTPC NTPC196 400 Chorania Asoj-1 30-Apr-14 800 30-Apr-14 1900 Daily PMM GETCO GETCO197 220 Navsari - Nasik - 2 30-Apr-14 800 30-Apr-14 1800 Daily PMM work GETCOMSETCL GETCO198 220 Vapi - TAPS 30-Apr-14 800 30-Apr-14 1800 Daily PMM work PGCIL GETCO199 220 Seoni(PGCIL)-Chhindwara Ckt-II 30-Apr-14 900 30-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI200 220 Kawas-Vav 1+ bus 2 30-Apr-14 000 30-Apr-14 000 daily For maintenance work NTPC NTPC

Annexure-32-C1

List of Emergency Outages availed in Feb 2014

SlNo

Element kV Agency From

Date To Date

Remarks

1 SATNA‐BINA‐II 765 WRTS‐2 4‐Feb‐14

5‐Feb‐14

Hot spot attending

2 SUJALPUR‐NAGDA LR NAGDA

400 WRTS‐2 6‐Feb‐14

19‐Feb‐14

Oil leackage

3 SOLAPUR‐PARLI‐II

400 WRTS‐2 6‐Feb‐14

6‐Feb‐14

Hotspot attend at solapur

4 JABALPUR‐ITARSI‐IV LR AT ITARSI‐LR

400 WRTS‐2 7‐Feb‐14

17‐Feb‐14

Oil leackage

5 APL‐HADALA‐SC 400 GEB 7‐Feb‐14

7‐Feb‐14

Hot spot

6 SOLAPUR‐PARLI(PG)‐1

400 WRTM(REL)

9‐Feb‐14

9‐Feb‐14

Hot spot

7 BOISAR‐BOISAR(PG)‐II

220 MSETCL 9‐Feb‐14

9‐Feb‐14

Hotspots

8 NEW KOYNA‐KARAD ‐ I

400 MSETCL 10‐Feb‐14

11‐Feb‐14

Dc‐earth leakage

9 LONIKHAND ‐ KARAD

400 MSETCL 10‐Feb‐14

11‐Feb‐14

Hotspot

10 NAGDHA ICT ‐ III

400220

MPPTCL 10‐Feb‐14

10‐Feb‐14

Hotspot

11 AKOLA ‐ ABAD ‐I AKOLA

400 WRTS‐1 11‐Feb‐14

12‐Feb‐14

Oil leackage

12 AKOLA ‐ AURANGABAD ‐ I

400 WRTS‐1 11‐Feb‐14

11‐Feb‐14

Oil leackage ion lr

13 BINA‐GWALIOR 765 WRTS‐1 14‐Feb‐ 14‐Feb‐ Attend oil leakage on lr

SlNo

Element kV Agency From

Date To Date

Remarks

II 14 14

14 AKOLA‐TIRORA‐I 765 MSETCL 22‐Feb‐14

23‐Feb‐14

Sparking in LR at Tirora SYED AT TIRORA END

15 KHAEGAR‐ICT‐I 400220

MSETCL 22‐Feb‐14

22‐Feb‐14

Hot spot

16 KHANDWA‐NEPANAGR‐SC

220 MPPTCL 23‐Feb‐14

23‐Feb‐14

Hot spot

17 GWALIAR ‐SATNA ‐ I

765 WRTS‐2 24‐Feb‐14

1‐Mar‐14

Attend hot spot

18 KORBA BUS‐III 400 NTPC 25‐Feb‐14

25‐Feb‐14

Hots pot attend

19 BUS‐1 AT GWALIOR

765 WRTS‐2 13‐Feb‐14

13‐Feb‐14

Checking of blocked BB main‐1 relay

20 RAIPUR‐BWATI‐2

400 WRTS‐1 17‐Feb‐14

17‐Feb‐14

Urgent Removal of LR at Raipur end for DGA violation

21 TAPS‐PADGHE 400 TAPS‐3amp4 19‐Feb‐14

23‐Feb‐14

To attend SF‐6 leakage

22 SATNA‐GWALIOR‐1

765 WRTS‐2 24‐Feb‐14

26‐Feb‐14

To attend hot spots

23 VCHAL‐JABALPUR‐IV

400 WRTS‐2 27‐Feb‐14

27‐Feb‐14

To increase OPGW‐Top conductor clearance to avoid tripping

24 APL‐SAMI‐2 400 APL 26‐Feb‐14

26‐Feb‐14

To attend hot sopt

25 SHOLAPUR BUS‐1

765 WRTS‐1 27‐Feb‐14

27‐Feb‐14

To attend hot sopt

26 BOISAR BUS‐2 220 WRTS‐1 28‐Feb‐14

28‐Feb‐14

To attend hot sopt

Sl No KV element From To Basis Work System Agency Remarks

1220 Vapi (GETCO)‐Bhilad 1‐Feb‐14 800 2‐Feb‐14 1800 Daily Line crossing work of 400KV LILO line for

Magarwada SSGETCO POWERGRID N

2 220 Omkareshwar-Khandwa Ckt

3-Feb-14 900 3-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

3 400 New Koyna-Koyna Stg-4-1

3-Feb-14 830 3-Feb-14 1730 Daily QMwork MSETCL MSETCL N

4220 Vapi ‐ Magarwada

Ckt13‐Feb‐14 900 3‐Feb‐14 1400 Daily AMP of line amp equipment WRTS‐II POWERGRID DD may have to do load

shedding as per Reliability Suggestion

N

5 220 DC Raigarh- Raigarh 1amp 2

4-Feb-14 800 5-Feb-14 1800 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (040-50)

CSPTCL WRTS-I N

6 220 Itarsi(PGCIL)-Hoshangabad Ckt

4-Feb-14 900 4-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N

7 400 Mundra -Limbdi-2 4-Feb-14 800 4-Feb-14 1800 Daily Suspension Insulator replcement and routine maintenance

PGCIL CGPL N

8 400 400 kV DC Satna - Bina 1amp2

4-Feb-14 800 5-Feb-14 1800 Continous Crossing of Jabalpur-Bina 765 kv SC Line PGCIL JTCL N

9220 Vapi ‐ Magarwada

Ckt24‐Feb‐14 0900 4‐Feb‐14 1400 Daily AMP of line amp equipment WRTS‐II POWERGRID N

10 765 Seoni-Bina line with LR 4‐Feb‐14 800 4-Feb-14 1800 Daily AMP Work WRTS-2 WRTS-1 N

11 400 Bus I Bina 5‐Feb‐14 800 5‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

12220 Kawas ‐ Navsari (PG)

25‐Feb‐14 800 5‐Feb‐14 1800 Daily Replacement of ST insulators by Double Tension

insulator in Railway crossing spansWRTS‐II POWERGRID N

13400 Indoer (PG) ‐Indore

(MP) DC5‐Feb‐14 800 6‐Feb‐14 1800 Continou

sStringing of 765kV Indore ‐ Vadodara line WRTS‐II POWERGRID N

14 400 APL - Hadala 6-Feb-14 800 6-Feb-14 1800 Daily PMM GETCO GETCO N N

15 220 Seoni(PGCIL ) - Chhindwara CKT I

6-Feb-14 900 6-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N N

16 400 Jejuri-Koyna stg IV 6-Feb-14 900 6-Feb-14 1700 Daily QMwork MSETCL MSETCL N17 400 Akola-Nandgaonpeth 6-Feb-14 900 6-Feb-14 1700 Daily Quaterly Maintainance Work MSETCL MSETCL N18 400KV Korba-Bhatapara 6-Feb-14 900 7-Feb-14 1900 Cont Testing of LBB auto re-close M-I amp M-II relays NTPC NTPC N19 220 Haldarva - Jhanor - 2

(NTPC)6-Feb-14 900 6-Feb-14 1800 Daily PMM work GETCO N

20220 Navsar (PG) ‐Navsari

(GETCO) 16‐Feb‐14 800 6‐Feb‐14 1800 Daily Replacement of ST insulators by Double Tension

insulator in Railway crossing spansWRTS‐II POWERGRID

N

21 400 Bus‐II Bina 6‐Feb‐14 800 6‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

22400 Seoni‐Khandwa1 6‐Feb‐14 1000 6‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Khandwa end by MS ABB

WRTS‐II POWERGRID Rescheduled to 6th March N

23 400 Rajgarh-Ssp Ckt-II 7-Feb-14 900 7-Feb-14 1600 daily For maintenance work MPPTCL EHT- Mamp I N24 220 Chhegoan-Khandwa

Ckt -II7-Feb-14 900 7-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

25 220 Wardha (PG)-Wardha 7-Feb-14 800 7-Feb-14 1800 Daily AMP Work MSETCL WRTS-I N26 400 Chorania - Vadavi-2 7-Feb-14 800 7-Feb-14 1800 Daily PMM amp Tan Delta testing WRTGPL GETCO N27 400 Jabalpur‐Itarsi1 7‐Feb‐14 900 7‐Feb‐14 1400 Daily AMP OF TERMINAL EQUIPMENT WRTS‐II POWERGRID N

28220 Vapi(PG)‐ Bhilad ckt

2 amp 3 7‐Feb‐14 800 8‐Feb‐14 1800 Daily Line crossing work of 400KV LILO of Navsari‐Boisar

at MagarwadaGETCO POWERGRID N

29 220 Mapusa-Thivim 1 8-Feb-14 800 8-Feb-14 1800 Daily AMP Work GOA WRTS-I N

30400 Seoni‐Khandwa2 9‐Feb‐14 1000 9‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Khandwa end by MS ABB

WRTS‐II POWERGRID Rescheduled to 7th March N

31 220 Chhegoan-Khandwa Ckt -I

10-Feb-14 900 10-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

Annexure-32-C2OCC approved outage not availed in Feb‐2014

32132 132 kV Dhule

Dondaicha line10-Feb-14 800 11-Feb-14 1800 Cont Crossing of Dhule-Vadodara 765 kv SC Line MSETCL BDTCL subjected to sldc

clearance N

33 400132 KV

Vindhyachal ICT-1 10-Feb-14 900 14-Feb-14 1900 Cont ICT Overhauling NTPC NTPC N

34400 KV Vindhyachal - Jabalpur-

3 Line Shunt Reactor10-Feb-14 900 14-Feb-14 1900 Cont Reactor Overhauling NTPC NTPC

N

35 400 KSK-DB Power 10-Feb-14 800 13-Feb-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end WRTS-IDBKSK

KSK N36 220 Ipore-Kawas-1 10-Feb-14 800 10-Feb-14 1800 Daily PMM work GETCO N

37400 Vindhyachal‐Mahan 10‐Feb‐14 800 11‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐I WRTS‐II N

38400 Mahan‐Korba 10‐Feb‐14 800 11‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐I WRTS‐II N

39765 Jabalpur ‐ Bina 1 10‐Feb‐14 1000 10‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Jabalur end by MS ABB

WRTS‐II POWERGRID Differed by siteN

40 400 SSP - Rajgarh - 1 10-Feb-14 800 11-Feb-14 1800 Daily Basis

PMM Work GETCO N

41 400 DC Tundri (DB Power) -ksk-Raigarh

10-Feb-14 800 11-Feb-14 1800 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (092-100)

DB Power WRTS-I N42 400 Jetpur - Amreli - 1 11-Feb-14 800 12-Feb-14 1800 Daily PMM GETCO GETCO N43 400 Hadala - Vadinar-2 11-Feb-14 800 11-Feb-14 1800 Daily PMM GETCO GETCO N44 400 Nagda-Rajgarh Ckt-I 11-Feb-14 900 11-Feb-14 1800 daily For maintenance work MPPTCL EHT- Mamp I N45 220 Mehgaon-Auriya Ckt 11-Feb-14 900 11-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N46 220 Seoni(PGCIL ) -

Chhindwara CKT II11-Feb-14 900 11-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

47

765kV Main Bus-1B at SASANBay 13 - Jack Bus

11-Feb-14 900 21-Feb-14 1800 Daily Jumper Installations amp ConnectionsIsolator Allignment

PGCIL Reliance Provisional Subject to details of works done to be apprised on daily basis

N

48 220 Ipore-Kawas-2 11-Feb-14 800 11-Feb-14 1800 Daily PMM work GETCO N49 220 Navsari - Nasik - 2 11-Feb-14 900 11-Feb-14 1800 Daily PMM work GETCO N

50765 Jabalpur ‐ Bina 2 11‐Feb‐14 1000 11‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Jabalur end by MS ABB

WRTS‐II POWERGRID Deferred by siteN

51 400 Nagda-Rajgarh Ckt-II 12-Feb-14 900 12-Feb-14 1800 daily For maintenance work MPPTCL EHT- Mamp I N52 400 Karad-Solapur (PGCIL) 12-Feb-14 900 12-Feb-14 1700 Daily QMwork MSETCL MSETCL N53 400 Raipur-Sipat 1 amp 2 26-Feb-14 800 3-Mar-14 1800 Conti Diversion of line for Lafarge Railway track WRTS-I Lafarge Ori 12-16 Feb 14 Deferre N54 220 Haldarwa Kawas-2 12-Feb-14 900 12-Feb-14 1800 Daily PMM work GETCO N

55 220 Bus‐I Bina 12‐Feb‐14 800 12‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

56 400 Chorania - Hadala 13-Feb-14 800 14-Feb-14 1800 Daily PMM GETCO GETCO N57 400 Tarpur-Padghe-2 13-Feb-14 800 14-Feb-14 1800 Daily maintenance work POWERG

RIDNPCIL N

58400 Vindhyachal‐Satna1 13‐Feb‐14 1000 13‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

59 220 Bus‐II Bina 13‐Feb‐14 800 13‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

60 220 Pithampur-Rajgarh Ckt - I

14-Feb-14 900 14-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

61 220 Wardha (PG)-Badnera 14-Feb-14 800 14-Feb-14 1800 Daily AMP Work at Wardha MSETCL WRTS-I N

62 400 Bhusawal-Koradi 14-Feb-14 900 14-Feb-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL N

63 400 Raipur-KSK 14-Feb-14 800 16-Feb-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end WRTS-IKSK

KSK N

64 220 GWL(PGCIL)-Malanpur Ckt-II

15-Feb-14 900 15-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N

65 220 Pithampur-Rajgarh Ckt - II

15-Feb-14 900 15-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

66400 Vindhyachal‐Satna2 16‐Feb‐14 1000 16‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

67 220 KAPS - Haldarwa - 1 17-Feb-14 800 17-Feb-14 2000 Daily Yearly PM checks KAPS N

68400 3X105 MVA 400220Kv

X-mer I At Indore ss17-Feb-14 800 18-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI

N

69

220 SC Korba-Raigarh-Budhipadar sc(PGCIL) amp DC Korba-Budipadar both circuits (CSPTCL)

18-Feb-14 800 19-Feb-14 1800 Conti Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCLWRTS-I

WRTS-I

N

70 400 Itarsi-Bhopal Ckt-I 18-Feb-14 900 19-Feb-14 1700 daily For maintenance work MPPTCL EHT- Mamp I N71 220 Badod - Kota Ckt 18-Feb-14 900 18-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N72 220 Damoh(PGCIL) -

Damoh I C - II18-Feb-14 900 18-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

73 220 Badod - Modak Ckt 19-Feb-14 900 19-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

74220 KAPS - Ukai - Mota 19-Feb-14 800 19-Feb-14 2000 Daily Yearly PM checks KAPS Non consent from SLDC

GETCO N

75400 315 MVA 400220 KvX-

mer III At Indore ss20-Feb-14 800 21-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI

N

76 220 Seoni(PG)-Seoni 2 21-Feb-14 800 21-Feb-14 1800 Daily AMP Work MPPTCL WRTS-I Y N77 220 Bina(PGCIL)-Shivpuri

Ckt21-Feb-14 900 22-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI Y N

78 400 Koradi-Nandgaonpeth 21-Feb-14 900 21-Feb-14 1700 Daily QMwork MSETCL MSETCL N N79 220 Haldarva - Jhanor - 1

(NTPC)21-Feb-14 900 21-Feb-14 1800 Daily PMM work GETCO N

80

765kV Main Bus-2A at SASANSatna Line-2

22-Feb-14 900 28-Feb-14 1800 Contionious

Equipment ConnectionsCircuit Breaker TestingJumper MeasurementIsolator Allignment Reactor accessories erection on R-Phase

PGCIL Reliance

N

81 400 Korba-Raipur 3 amp 4 23-Feb-14 800 24-Feb-14 1800 Conti For Bus spliting work at Raipur765 KV Raigarh-Raipur and 765 Champa Raipur lines

WRTS-1 WRTS-1 N

82132 132kV Astha - Polai SC

line of MPPTCL24-Feb-14 800 25-Feb-14 1800 Continous Crossing of Bhopal -Indore 765 kv SC Line MPPTCL BDTCL subjected to sldc

clearance N

83 400 Bus-1 at Bilaspur 24-Feb-14 800 24-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I N

84400 Seoni -

Khedamara(Bhilai) Ckt25-Feb-14 900 25-Feb-14 1800 daily For maintenance workFeeder bay maintenance at

KMaraMPPTCL CSPTCLMPPT

CLNo confirmation on D-3

N

85400 Ranchi-Sipat 1 amp 2 25-Feb-14 800 26-Feb-14 1800 Conti Crossing work of upcoming 765 KV DC

Jharsuguda-Korba amp 765KV SC Ranchi-BilaspurWRTS-I WRTS-I No confirmation on D-3

N

86765 Sasan‐Satna2 25‐Feb‐14 800 26‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐II POWERGRID No confirmation on D-3 N

87400 Bus Reactor1 at Satna 25‐Feb‐14 1000 25‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

88400 400 kV DC Damoh -

Bhopal Line26-Feb-14 800 27-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL Not availed by agency for

rainsN

89400 Raipur-Bhadrawati 2 amp

327-Feb-14 800 27-Feb-14 2100 Daily For Bus spliting work at Raipur765 KV Raigarh-

Raipur and 765 Champa Raipur linesWRTS-1 WRTS-1 Subject to Telemetry from

Durg PS RaipurN

90 400 Birsinghpur‐Vandana Vidyut

27‐Feb‐14 800 27‐Feb‐14 1700 Daily AMP of Terminal Equipment amp line Reactor WRTS‐I POWERGRID Ready N

91 400 Bhusawal-Akola 28-Feb-14 900 28-Feb-14 1700 Daily QMwork MSETCL MSETCL N92 220 Bus-1 at Wardha 28-Feb-14 800 28-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I N93 400 Birsinghpur‐Balco 28‐Feb‐14 800 28‐Feb‐14 1700 Daily AMP of Terminal Equipment amp line Reactor WRTS‐I WRTS‐I Deferred by site N

94 400 Nagda‐Dehgam2 5‐Feb‐14 1000 5‐Feb‐14 1800 DailyCommissioning amp checking of CSD relay in Main CB for reactor switching at Dehgam end by MS ABB

WRTS‐II POWERGRID N

95 400 400kV Satpura Itarsi 10‐Feb‐14 900 11‐Feb‐14 1700 DailyCommissioning of new CB after dismantling of existing TELK make CB at Satpura end amp normalising of line on main CB

POWERGRID

WRTS‐II N

96 765 765 kV Satna - Bina Ckt I

6-Feb-14 800 8-Feb-14 1800 cont Stringing of Jabalpur-Bina 765 kv SC Line PGCIL JTCL Original27-28 Jan14 Def N

97 765400 765400 kV ICT-1 at Bina 20-Feb-14 90000 AM 21-Feb-13 60000 PM Continuou

sCSD commissioning for 400kV Side CB of 765400 kV ICT-1 WRTS-II POWERGRID Deferred by site N

98 400 Nagda - Dehgam 1amp2 20-Feb-14 80000 AM 28-Feb-14 1700 Daily Online PID testing to insulators in both circuits AR shall be kept in non auto mode in both circuits WRTS-II POWERGRID

N

99 220MC Waluj-Chitegaon amp Waluj-Jalna

21-Feb-14 700 21-Feb-14 1900 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad MSETCL WRTS-I

N

100 400 Bus 1 at Asoj 21-Feb-14 000 21-Feb-14 1800 Daily For checking bus stability testing of Piran 1 amp 2 bays (for charging of new line) GETCO WRTS-II N

101 400 Bus-1 at Wardha 22-Feb-14 800 22-Feb-14 1800 Daily Jumper spacers connection at Wardha WRTS-I WRTS-I N102 400 Bus-1 at Raigarh 22-Feb-14 800 22-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I Deferred by site N103 765 Bus - II at Indore 22-Feb-14 90000 AM 23-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Not availed NLDC consenN104 220 Kakrapar-Haldarwa2 22-Feb-14 1000 Hrs 22-Feb-14 1600 Hrs Daily AMP POWERG

RID WRTS-II N

105 400 Bus 2 at Asoj 22-Feb-14 000 22-Feb-14 1800 Daily For checking bus stability testing of Piran 1 amp 2 bays (for charging of new line) GETCO WRTS-II N N

106400 400 kv DC Bhopal -

Bina Line (Ckt I amp II)(Tower no 34 amp35)

23-Feb-14 800 24-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line MPPTCLBDTCL

N

107 765kV SASAN Main Bus-1BBay 10 - Jack Bus 24-Feb-14 800 Hrs 2-Mar-14 1900 Hrs Continuous Dia-4

(Bay-10) - SCCOCC Test of Unit 4 GTSasan Sasan N

108 765 Bus - I at Indore 24-Feb-14 90000 AM 25-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID N

109 765 765 KV Bina-Indore Line 24-Feb-14 0900 Hrs 24-Feb-14 1800 Hrs Daily

For taking spare reactor unit in service amp checking the scheme for spare reactor with 765 KV Bina-Indore Line Reactor at Bina

POWERGRID WRTS-II

Deferred by site N

110 400 Kasor - GPEC 24-Feb-14 800 25-Feb-14 1800 Daily PMM Work GETCO GETCO N111 40022033 315 MVA ICT2 at Kheda 24-Feb-14 900 10-Mar-14 1800 cont modification work in SS lay out CSPTCL CSPTCL N112 400 315 MVA ICT2 at

Gwalior 25-Feb-14 90000 AM 25-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID N

113 400KV V-Satna-4 Line Shunt Reactor 25-Feb-14 1000 25-Feb-14 2000 Daily

Basis AMP NTPC NTPC N

114 400 Raipur-Wardha 1 26-Feb-14 800 26-Feb-14 2000 Daily Balance construction works at Wardha end WRTS-I WRTS-IReady Ori26214 Deferred by site

N

115 400 Bus -I at Indore 26-Feb-14 90000 AM 26-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Deferred by site N116 400 315 MVA ICT3 at

Gwalior 26-Feb-14 90000 AM 26-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID N

117 400 400 kV DC Damoh - Bhopal Line

26-Feb-14 800 26-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL N

118 400 Chorania-Kasor 26-Feb-14 800 26-Feb-14 1800 Daily PMM work GETCO GETCO N119 400 Koradi-Satpura sc 26-Feb-14 800 26-Feb-14 1600 Daily 765KV Tiroda Koradi Transmission LineII crossing

worksPOWERGRID MEGPTCL Cancelled by MEGPTL N

120 400 400 kV DC Damoh - Bhopal Line

26-Feb-14 800 26-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL N

121 400 Raipur-Wardha 2 27-Feb-14 800 27-Feb-14 2000 Daily Balance construction works at Wardha end WRTS-I WRTS-I Deferred by site N122 400 Vindhyachal-Satna2 27-Feb-14 1000 27-Feb-14 1800 Daily Commissioning of CSD Relay in ABB make main

CB at Satna WRTS-II POWERGRID Deferred by site N

123 400 Bus -II at Indore 27-Feb-14 90000 AM 27-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Ready N124 400 315 MVA ICT1 at

Rajgarh 27-Feb-14 90000 AM 27-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID Ready N

125 400400 KV SC Kosamba - Asoj line(730-740)

27-Feb-14 700 27-Feb-14 1800 cont Crossing of Dhule - Vadodara 765 kv SC Line GETCOBDTCL

N

126 400 Indore (MP) -Indore (PG)-DC 27-Feb-14 700 28-Feb-14 1600 Cont Stringing of 765kV Indore - Vadodara line POWERG

RID WRTS-II Deferred by site N

Anaulagnak 33(A)

maaca- 2014 AaOr Ap`Ola 2014 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR MARCH 2014 AND APRIL 2014

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)maaca- 2014 Ap`Ola 2014 maaca- 2014 Ap`Ola 2014

MARCH 2014 APRIL 2014 MARCH 2014 APRIL 2014

1 gaujarat

saIimat 11700 12100 7750 7800

AsaIimat 11740 12140 7760 7810

2 maQya p`doSa

saIimat 8340 9050 5338 5540

AsaIimat 8340 9050 5338 5540

3 CltaIsagaZ

saIimat 3200 3075 1929 1809

AsaIimat 3225 3105 1944 1827

4 maharaYT

saIimat 19000 19150 10200 10300

AsaIimat 19050 19200 10250 10350

5 gaaovaa

saIimat 425 410 300 295

AsaIimat 425 415 310 300

6 dmana dIva

saIimat 340 345 210 205

AsaIimat 345 350 225 210

7 DI ena eca

saIimat 635 640 445 425

AsaIimat 635 640 445 425

8 piScama xao~

saIimat 41961 43047 28500 27900

AsaIimat 42076 43173 29560 28840

Diversity factor of 10401

March 2014 and April 2014

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah frvarI 2014

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 1552 75

]k[- Ukai - 2 1719 75]k[- Ukai - 3 598 75]k[- Ukai - 4 1757 75]k[- Ukai (Total) 5627 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 024 2]k[- ela baI saI eca Ukai LBCH - 2 131 3]k[- ela baI saI eca Ukai LBCH (Total) 154 5 0008

3 kDanaa Kadana - 1 000 0 0005kDanaa Kadana - 2 246 62 0000kDanaa Kadana - 3 223 62kDanaa Kadana - 4 166 63 0000kDanaa Kadana (Total) 634 63 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 431 9 0020 6 kula jalaIya TOTAL(H) 6846 225 0401

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 2060 32 21822 TaoronT pavar ilaimaToD yauinaT DI 7979 125 69803 TaoronT pavar ilaimaToD yauinaT [- 075 122 07584 TaoronT pavar ilaimaToD yauinaT ef 8023 124 66915 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 018811 Qauvarna tapIya Dhuvaran - GT 2 000 0 041912 Qauvarna tapIya Dhuvaran - STG 023 1013 ]ka[- yauinaT 1 Ukai -1 000 0 005114 ]ka[- yauinaT 2 Ukai -2 000 0 010815 ]ka[- yauinaT 3 Ukai -3 3147 200 297216 ]ka[- yauinaT 4 Ukai -4 10588 202 1002617 ]ka[- yauinaT 5 Ukai -5 9496 210 884118 ]ka[- yauinaT 6 Ukai -6 23703 500 1844819 gaaMQaInagar 1 Gandhinagar - 1 000 0 008620 gaaMQaInagar 2 Gandhinagar - 2 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 000 0 029622 gaaMQaInagar 4 Gandhinagar - 4 000 0 036223 gaaMQaInagar 5 Gandhinagar - 5 11676 212 1148924 vaNakbaaorI 1 Wanakbori - 1 10648 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 11069 21026 vaaNakbaaOrI 3 Wanakbori - 3 1891 20627 vaaNakbaaOrI 4 Wanakbori - 4 5244 21228 vaaNakbaaOrI 5 Wanakbori - 5 5531 21029 vaaNakbaaOrI 6 Wanakbori - 6 000 030 vaaNakbaaOrI 7 Wanakbori - 7 8902 20931 ]trna Utran GT 1 000 0 019832 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 000 0 024635 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 000 0 0000

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Anaulagnak 41

ACTUAL GENERATION amp AVALABILITY FOR FEBRUARY 2014Actual vaastivak

Actual vaastivak

37 isaka Sikka - 1 3696 112 439838 isaka Sikka - 2 000 0 017639 kcC ilagnaa[-T Kutch Lignite - 1 4429 71 848640 kcC ilagnaa[-T Kutch Lignite - 2 4037 7241 kcC ilagnaa[-T Kutch Lignite - 3 3646 6742 kcC ilagnaa[-T Kutch Lignite - 4 2215 66 525343 saUrt ilagnaa[-T Surat Lignite - 1 6705 131 682544 saUrt ilagnaa[-T Surat Lignite - 2 7475 131 738745 saUrt ilagnaa[-T Surat Lignite - 3 6965 130 728846 saUrt ilagnaa[-T Surat Lignite - 4 6362 130 688647 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5454 107 848648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5649 11449 jaI Aa[- pI saI ela GIPCL GT - 1 1589 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1587 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1702 3552 jaI Aa[- pI saI ela GIPCL ST - 1 2902 5153 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 020556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 000 0 000060 jaI pI [- saI GPEC GT - 2 267 156 013261 jaI pI [- saI GPEC GT - 3 143 146 002762 jaI pI [- saI GPEC STG 131 17263 jaI esa [- jaI GSEG GT - 1 000 0 098964 jaI esa [- jaI GSEG GT - 2 1181 5065 jaI esa [- jaI GSEG STG 642 2366 Sugen (GT 1 + GT 2) 1767 308 602467 saIpIpI sao Aayaat Imp from CPP+MUNDRA 269359 6881

kula tapIya Total (T) 475652 8386 302021kula jalaIya+tapIya Total (H+T) 482498 8604 302422ivaMD [najaI- Wind Energy 52123kula jalaIya+tapIya+hvaa Total (H+T+Wind) 534621 9539ivainamaya Exchanges 155314 saIimat jaa- maaMga Restricted Energy Req 689935

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 6800 194

11 gaaMQaI saagar Gandhi Sagar 3366 117 008012 raNaa p`tap sagar RPSagar 5883 172 004013 javaahr sagar Jawahar Sagar 4350 99 0050

2 ponca Pench 3052 165 00903 baargaI Bargi 4581 91 00804 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 11764 315 02806 banasaagar Bansagar-2 (Deolondh) 000 07 banasaagar Bansagar-3 (Silpara) 1236 32 00708 banasaagar Bansagar-4 (Zinaha) 1320 22 00509 maoDIKoDa Medikheda 396 63

10 ibarisaMGapur Birsingpur 040 20 002011 Tavaa Tawa 000 012 rajaGaaT Rajghat 165 12 006013 Omkareshwar 10620 402 14 [Midra saagar Indira Sagar 23077 997 0849

kula jalaIya TOTAL(H) MPPGCL 59999 2365 1273Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 6049 98 232502 AmarkMTk II AMK II Unit -2 6080 983 AmarkMTk III AMK III Unit -5 12212 219 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 06505 satpura II Satpura-II Unit 6 10323 180 165906 satpura II Satpura-II Unit 7 5926 1807 satpura II Satpura-II Unit 8 10964 195 191608 satpura II Satpura-II Unit 9 8353 1709 satpura III Satpura-III Unit 10 000 0 2080

10 satpura III Satpura-III Unit 11 9447 182 1909011 esajaITIpIesa 1 SGTPS Unit - 1 9447 182 1909012 esajaITIpIesa 2 SGTPS Unit - 2 10572 18213 esajaITIpIesa 3 SGTPS Unit - 3 9037 192 2064014 esajaITIpIesa 4 SGTPS Unit - 4 10700 18015 esajaITIpIesa 5 SGTPS Unit - 5 28804 51216 SSTPS 6864 587 8930

kula tapIya Total (T) 133714 3002 115350kula jalaIya+tapIya Total (H+T) 193713 5735 116623Injection from WIND 000 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 193713 5735ivainamaya Exchanges 193660 saIimat jaa- maaMga Rest En Req 387372

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 850 120 00902 Gangrel 475 10 00503 Mini Micro KWB 039 7

kula jalaIya TOTAL(H) CSEB 1364 137 0150tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 47 127402 kaorbaa (pU) Korba (E) Unit-2 2764 483 kaorbaa (pU) Korba (E) Unit-3 2764 484 kaorbaa (pU) Korba (E) Unit-4 2784 465 kaorbaa (pU) Korba (E) Unit -5 3685 120 253306 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 247808 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 15410

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 15839 256 1197012 KORBA(EB) Extn - 2 15876 256 11770

kula tapIya Total (T) 119907 1880 10190013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 119907 1880kula jalaIya+tapIya Total (H+T) 121271 2017 102050ivainamaya Exchanges 40207 0saIimat jaa- maaMga Rest En Req 161478 2017

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 9590 585 25142 kaoyanaa III Koyna III 5920 3203 kaoyanaa IV Koyna IV 18012 11324 kaoyanaa DIpIeca Koyna DPH 1442 385 TaTa jalaIya TATA Hydro 10242 741 28836 vaOtrNaa Vaitarna 000 07 eladarI Eldari 528 168 BaTgar AaOr vaIr Bhatgar amp Vir 915 49 pOzana Paithan 175 59

10 itlaarI Tillari 1106 6511 BaIra Tola rosa Bhira Tail Race 374 4112 GaTGar Ghatghar 5297 29313 Anya CaoTo jalaIya Small Hydro (others) 6173 0

kula jalaIya TOTAL(H) 58910 1599 5397Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 7700 1954 naaisak 4 Nasik Unit -4 10772 1965 naaisak 5 Nasik Unit -5 11160 1976 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 28827 5058 Tambao 6 Trombay Unit -6 000 09 Tambao 8 Trombay Unit -8 000 0

10 Tambao 7A gaOsa Trombay -7A (Gas) 7882 135 250411 Tambao 7ba Trombay -7B (WHR) 4499 7212 kaoraDI 5 Koradi Unit -5 5003 16013 kaoraDI 6 Koradi Unit -6 3963 19014 kaoraDI 7 Koradi Unit -7 10015 19015 Bausaavala 2 Bhusawal Unit -2 8329 17016 Bausaavala 3 Bhusawal Unit -3 9248 18017 Bausaavala 4 Bhusawal Unit -4 22734 50518 Bausaavala 4 Bhusawal Unit -5 19742 41519 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 7451 18621 parlaI 5 Parli Unit -5 10626 18022 parlaI 6 Parli Unit -6 14013 25323 parlaI 7 Parli Unit -7 13728 26024 KaprKoDa 1 Khaperkheda Unit -1 11173 20025 KaprKoDa 2 Khaperkheda Unit -2 10373 19526 KaprKoDa 3 Khaperkheda Unit -3 10998 20127 KaprKoDa 4 Khaperkheda Unit -4 12019 20728 KaprKoDa 5 Khaperkheda Unit -5 28882 50730 parsa Paras-3 14447 25731 parsa Paras-4 13504 25932 ]rna Uran (Gas) 18284 33833 ]rna Uran (WHR) 000 148 586234 caMd`pur 1 Chandrapur Unit -1 9087 17735 caMd`pur 2 Chandrapur Unit -2 1816 19436 caMd`pur 3 Chandrapur Unit -3 11737 21037 caMd`pur 4 Chandrapur Unit - 4 11843 46038 caMd`pur 5 Chandrapur Unit -5 7759 45539 caMd`pur 6 Chandrapur Unit -6 24420 44240 caMd`pur 7 Chandrapur Unit -7 23258 041 DhaNaU 1 Dahanu Unit-1 16339 250 1427842 DhaNaU 2 Dahanu Unit-2 16196 250 1427843 CPP 193651 29840044 RGPPL Share 000 0

kula tapIya Total (T) 631479 15369 329920MAH Wind + Solar Generation 16922 0kula jalaIya +tapIya Total (H+T+Wind) 707311 17451 372239

TOTAivainamaya Exchanges 324731saIimat jaa- maaMga Rest En Req 1032042

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1871 26ivainamaya Exchanges 33252saIimat jaa- maaMga Rest En Req 35123 434

C (F) dmana AaOr dIva DAMAN amp DIU 18245 298ja (G) dadra nagar hvaolaI DNH 40600 655

kula DD ampDNH (T) 58845 952Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 9600 160 1399112 tara`pur 2 TAPS Unit -2 11069 16013 tara`pur 3 TAPS Unit -3 36144 545 6584014 tara`pur 4 TAPS Unit -4 36197 54715 kakrapr 1 KAPS Unit -1 15230 545 3134216 kakrapr 2 KAPS Unit -2 14662 547

kula ena pI saI NPC Total 122901 25042 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14008 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 13913 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14076 214 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 32894 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 33204 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 33190 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33176 514

kula kaorbaa KSTPS Total 174461 2498 10394427 ivanQa esaTIpIesa 1 VSTPS Unit-1 12762 21328 ivanQa esaTIpIesa 2 VSTPS Unit-2 12708 21529 ivanQa esaTIpIesa 3 VSTPS Unit-3 12854 212210 ivanQa esaTIpIesa 4 VSTPS Unit-4 12909 214211 ivanQa esaTIpIesa 5 VSTPS Unit-5 12174 215212 ivanQa esaTIpIesa 6 VSTPS Unit-6 12625 214213 ivanQa esaTIpIesa 7 VSTPS Unit-7 31487 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 31075 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 31592 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 31488 512217 ivanQa esaTIpIesa 11 VSTPS Unit-11 30948 512

kula ivanQayaacala VSTPS Total 232623 3750 15107 31 saIpt -1 -SIPAT-1 38822 66400 32 saIpt -2 -SIPAT-2 32404 66500 33 saIpt -3 -SIPAT-3 38930 66300 34 saIpt -4 -SIPAT-4 26383 51600 35 saIpt -5 SIPAT-5 26400 51400

kula saIpt -SIPAT TOTAL 162939 285000 838941 kvaasa gaOsa 1e Kawas GT-1A 792 10742 kvaasa gaOsa 1baI Kawas GT-1B 2623 10943 kvaasa esaTI 1saI Kawas ST-1C 1571 11444 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 4986 304 222951 gaMQaar gaOsa 1 Gandhar GT-1 000 052 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 000 054 gaMQaar esaTI 4 Gandhar ST-4 000 0

kula gaMQaar GGPS Total 000 0 000061 maaOda 1 Mauda -1 19614 514 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 19614 514 1422661 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 000 31 000071 esa esa pI SSP RBPH - 1 6753 19372 esa esa pI SSP RBPH - 2 5907 19273 esa esa pI SSP RBPH - 3 5577 19574 esa esa pI SSP RBPH - 4 5513 19475 esa esa pI SSP RBPH - 5 7237 19476 esa esa pI SSP RBPH - 6 3109 19277 esa esa pI SSP CHPH - 1 1817 4078 esa esa pI SSP CHPH - 2 491 3679 esa esa pI SSP CHPH - 3 000 0710 esa esa pI SSP CHPH - 4 1639 39711 esa esa pI SSP CHPH - 5 901 37

kula esa esa pI SSP Total 38944 1312 389481 kula poMca Pench Total 3052 165 009082 Jindal Injection 38956 083 Amarkantak Lanco 15478 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2372740

(J) ]plabQata Availability 2308426 naoT ivainamaya Net Exchanges -292048 ]plabQa jaa- Energy Availability 2016379

maah frvarI 2014 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR FEBRUARY 2014 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 11532 - - - 11532 020214 1100 4993

saIimat Restricted 11700

AsaIimat Unrestricted 11740 11532 0 28 0 11560 010214 1200 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8366 8366 17022014 0500 5007

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9346 - - - 9346 120214 0900 4986

saIimat Restricted 8340

AsaIimat Unrestricted 8340 9346 0 38 0 9384 120214 0900 4986

nyaUnatma pMjaIkRt maaMga Min Registered Demand 3204 3204 270214 0200

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3210 3210 070214 1900 4989

saIimat Restricted 3200

AsaIimat Unrestricted 3225 3210 233 12 0 3246 070214 1900 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1617 1617 230214 2300 5021

maharaYT MAHARASHTRApMjaIkRt Registered 18510 - - - 18510 050214 1100 4984

saIimat Restricted 19000

AsaIimat Unrestricted 19050 17980 1655 -13 0 19622 190214 1200 5002

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12005 12005 280214 0400 5037

gaaovaa GOApMjaIkRt Registered 425 434 - - 434 130214 1400 5006

AsaIimat Unrestricted 425 434 1 -1 - 434 130214 1400 5006

nyaUnatma pMjaIkRt maaMga Min Registered Demand 311 311 100214 0300

essaar ESSAR(ESIL)pMjaIkRt Registered 487 - - 487 240214 1700 5004

AsaIimat Unrestricted 487 0 0 - 487 240214 1700 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 268 - - 268 250214 1200 5003

AsaIimat Unrestricted 268 0 0 - 268 250214 1200 5003

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 644 - - 644 260214 1200 4999

AsaIimat Unrestricted 644 0 - 644 260214 1200 4999

nyaUnatma pMjaIkRt maaMga Min Registered Demand 508 508 280214

piScama xao~ WESTERN REGIONpMjaIkRt Registered 42253 - - - 42253 110214 1100 4994

saIimat Restricted 41961

AsaIimat Unrestricted 42076 42021 850 235 0 43106 120214 1100 4994

nyaUnatma pMjaIkRt maaMga Min Registered Demand 27524 27524 280214 0400 5040 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

piScama xaoi~ya Baar p`oYaNa kond` mauumba[-

णाली चालन-ISO-I

ANNEXURE-43

माह फरवर 2014 February2014

समातरवतीय चालन PARALLELRADIAL OPERATION

TOTAL OPERATING

HOURS 1 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-NR) 66972

2 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-SR) 67200

टाई लाईन TIE LINE 1 765कवी िसवनी स वधा-I 765kV Sonito Wardha 67200 2 765कवी िसवनी स वधा-II 765kV Seonito Wardha 65247 3 400 कवी िभलाई स कोराड 400kV Bhilai to Koradi 67200

4 400 कवी िभलाई स भिावती 400kV Bhilai to Bhadravati 67200

5 400 कवी रायपर स भिावती-I 400kV Raipur to Bhadravati-I 67200

6 400 कवी रायपर स भिावतीETHII 400kV Raipur to Bhadravati-II 67139

7 400 कवी रायपर स भिावतीETHIII 400kV Raipur to Bhadravati-III 67200

8 400 कवी सातपरा स कोराड 400kV Satpura to Koradi 67200

9 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 67004 10 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 65308 11 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 66259 12 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 67200 13 400 कवी को हापर स मापसा-I 400kV Kolhapur-Mapusa-I 38740

14 400 कवी को हापर स मापसा-II 400kV Kolhapur-Mapusa-II 49532

15 400 कवी वापी स बोईसर 400kV Vapi-Boisar 67200

16 400 कवी रायगढ़ स ःटरलाइट-I 400kV Raigarh to Sterlight-I 66258

17 400 कवी रायगढ़ स ःटरलाइट-II 400kV Raigarh to Sterlight -II 67200

18 400 कवी रायगढ़ स झरसगड़ा-I 400kV Raigarh to Jharsuguda-I 67200

19 400 कवी रायगढ़ स झरसगड़ा-II 400kV Raigarh to Jharsuguda-II 67200

20 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 65028

21 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 66132

22 400 कवी रायपर स वधाETHI 400kV Raipur to Wardha-I 66836

23 400 कवी रायपर स वधाETHII 400kV Raipur to Wardha-II 67200

24 220 कवी कोरबा पव स ब पादर-III 220kV K(E) to Budhipadar-III 63853

Anaulagnak 47Annex-47

maah frvarI 2014 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39514 64944

10287 39711

Levels in Mtrs str maITr maoM

]ka[- Ukai

64392

9914

25402

25994

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF FEBRUARY 2014

ivavarNa Particulars

TRIPPING DETAILS FOR THE MONTH OF FEBRUARY 2014

Sr No Brief Details of incident (Elements Generation Tripped) Owner Utility Date amp Time Load

Gen LossCategory

1 Multiple Tripping from 400 kV New Koyna MSETClMSEGCLRGPPL 05‐02‐2014 0950 Hrs ‐ GI‐2

2Bus Bar protection mal‐operation at 400 kV Soja in Gujarat resulting in multiple Tripping

GETCO 06‐02‐2014 1755 Hrs ‐ GI‐2

ANNEXURE ‐ 5

  • annexpdf
    • 21pdf
    • 231pdf
    • 232pdf
    • 24pdf
    • 25pdf
    • 31pdf
    • 32C1pdf
    • 32C2pdf
    • 33Apdf
    • 41pdf
    • 42pdf
    • 47pdf
    • 5pdf
Page 7: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014

7

457th OCCM AGENDA

2014 end in August 2013 4 LILOof 400kV K(W)-Khedamara line

at Marwa (one ckt) April -2014

MAHARASHTRA(STU)

1 400KV Chandrapur- II- Warora DC Dec - 2013 end

2 400KV DC line from Koradi-II to Wardha SS(PG) DC

March - 2014

3 400 kV Chandrapur-Warora-II Commissioned on 16012014

4 400 kV Bableshwar-Sinner Ckt-II Commissioned on 27122013

5 400 kV Chandrapur-Parli-II LILO at Chandrapur-II SS

Commissioned on 16012014

MAHARASHTRA (IPTC route) by WR Transmission (Mah) Pvt Ltd

1 400 kV Parli(PG)-Pune DC Commissioned Ckt - 1 on 08112013 Commissioned Ckt - 2 on 10112013

2 400 kV Pune (PG)-Aurangabad (MSETCL) DC

November-13 Commissioned Ckt - 1 on 05122013 Commissioned Ckt - 2 on 04122013

3 LILO Lonikhand ndashKalwa at Pune(PG) Lonikhand-Pune charged on 2130 on 09072013 and Kalwa ndashPune at 2145 on 09072013

GUJARAT (IPTC route) by WR Transmission (Guj) Pvt Ltd

1 400 kV Rajgarh(PG)-Karamsad (GETCO) DC

May -2014

The Sub-Committee may notediscuss

73 Commissioning of new Generating units in Western Region and the capacity expected to be commissioned during the current year 2013-14

The status regarding Generating units commissioned expected to be commissioned during the current year 2013-14 according the available information is as below

Name of the Power Projects Unit No Capacity (MW)

Date of Commissioning Schedule Date

GUJARAT Ukai 6 500 COD on 08062013 Pipavav CCPP- GPCL amp GSPC joint venture Block-1 350

March- 2014 Made in synchronized on

8

457th OCCM AGENDA

10102013 Bhavnagar Lignite TPP-JV I 250 August 2014 II 250 August 2014 UNO SUGEN 1 3825 COD on 04042013 CHHATTISGARH Marwa TPS I 500 25122013 Korba (w) Ext-5 500 COD on 05092013 KSK Mahanadi 3 600 COD on 14082013

VEDANTA VIDYUT 1 135 Synchronized on 11082013

MAHARASHTRA

INDIABULLS (Amaravati) 1 270 Synchronized on 03062013

INDIABULLS (Amaravati) 2 270 January-2014 INDIABULLS (Sinnar) 1 270 March-2014 VIPL(Butibori) 1 300 COD on 05042013

VIPL (Butibori) 2 300

First synchronized on 02012013 Full load on 19032013

GMR EMCO 2 300 COD on 27082013 Dhariwal 1 300 Synd On 2913 Bhusawal 5 500400 COD on 03012014 MADHYA PRADESH

SINGAJI TPP 1 600

Synchronized on 31082013 Coal fired on 30092013

2 600 June-2014 Ms Jhabua Power Seoni 1 300 JANUARY ndash 2014 MB Power Anuppur 1 300 JANUARY ndash 2014 Satpura 11 250 Synchronized on 02102013 SATPURA 10 250 COD on 18082013 CENTRAL SECTOR Vindhyachal TPP IV 12 500 Feb-14 MAUDA 2 500 Feb-14

The WR utilities may intimate the current status on above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS (A) FOLLOW-UP ITEM NO 81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the Third quarter

(October 2013 to December 2013) for the year 2013-14

The Sub-Committee members may like to note and furnish details in respect of above

9

457th OCCM AGENDA

ITEM NO 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR

Status of physical amp cyber security in Power Sector for the Third quarter (October

2013 to December 2013) have not been received from some of the constituents

The Sub-Committee may like to note and furnish details in respect of above ITEM NO 83 ADMS IMPLEMENTATION STEP BY GETCO A pilot project in respect of ADMS have been successfully implemented by GETCO in

11 kV Sadhi feeder (MGVCL ) on 19022014

GETCO may like to presentation on the same ITEMS FROM WRLDC ITEM NO 91 PERFORMANCE OF WR CONSTITUENTS POST THE IMPLEMENTATION OF DEVIATION SETTLEMENT MECHANISM ON 17022014 The IEGC second amendment as well as the Deviation Settlement Mechanism is in

force wef 17022014 The performance of WR constituents during first 10 days ie

from 17th to 28th Feb 2014 comprising of 960 time blocks is illustrated below Members

may like to analyze and devise suitable measures to ensure compliance to the above

CERC regulations

10

457th OCCM AGENDA

Since the decisions in real-time are based on the SCADA data it is now important to

monitor and ensure correctness of drawal injection as seen in SCADA The chart

below indicates the difference between the drawal of constituents as seen in SCADA

and as recorded in SEM for the period of 01st Feb 2014 to 16th February 2014 It may

be seen that the significant difference between SCADA and SEM needs to be

addressed by ensuring healthiness of telemetry and periodic validation by the SCADA

team at the respective SLDCs and WRLDC

The sub committee may like to discuss the same

11

457th OCCM AGENDA

ITEM NO 92 UNDER DRAWAL BY MAHARASHTRA AND INSECURE OPERATION IN THE GRID ON 27-28 FEB 2014

During late night of 27th Feb and early morning hours of 28th Feb-14 the grid

frequency remained above 502 Hz continuously for five hours from 2252 hrs of 27-

02-2014 to 0407 hrs of 28-02-2014 The situation was caused due to demand

reduction across the WR and NR on account of widespread rains and persistent under

drawal by Maharashtra during the above period as illustrated in figure-1 below

5067

49

492

494

496

498

50

502

504

506

508

‐1000

‐850

‐700

‐550

‐400

‐250

‐100

50

200

350

500

650

800

2100

2115

2130

2145

2200

2215

2230

2245

2300

2315

2330

2345

000

015

030

045

100

115

130

145

200

215

230

245

300

315

330

345

400

415

430

445

500

515

530

545

600

615

630

645

700

716

731

746

Maharashtra Deviation from schedule vis‐a‐vis grid frequency2100 hrs of 27‐02‐2014 to 0800 hrs of 28‐02‐2014

MSEBUI FREQ

Deviation from Schedule

Frequency

MW Hz

Several messages were sent from WRLDC control room to SLDC Kalwa directing them to control their under drawal from the grid Details of these messages is tabulated below

Sl No Message sent to Ref No Message date and time

1 SLDC Maharashtra 56079 27022014 2210 hrs

2 SLDC Maharashtra 3070 27022014 2230 hrs

3 SLDC Maharashtra 3078 28022014 0125 hrs

4 SLDC Maharashtra 3079 28022014 0150 hrs

Despite the above messages the response from SLDC Kalwa was inadequate in

controlling the under drawal of Maharashtra Consequently the frequency touched

5069 Hz at 0211 hrs of 28-Feb 2014 the voltage across the grid increased sharply

and there was over injection from WR to other regions Subsequently as a

contingency measure the drawal schedule of Maharashtra was reduced by 600 MW

by suo motu revision in the requisition of Maharashtra in Korba Vindhyachal Sipat

12

457th OCCM AGENDA

and Vidhyachal STPS wef 0230 hrs to 0500 hrs of 28022014 This was later

extended up to 0700 hrs of 28022014 It was a near miss situation that could have

been avoided by adequate planning and commensurate actions in real-time It is

requested that the matter may be taken up at the highest level in MSETCL and a

separate meeting may be convened on the above subject to avoid reoccurrence of

such event in future

The sub committee may like to discuss the same

ITEM NO 93 NON AVAILABILITY OF REAL-TIME TELEMETRY FROM LARGE NUMBER OF STATIONS IN MAHARASHTRA There are 224 nodes in Maharashtra that comprising of 32 Generating stations and

192 substations Out of these 224 nodes 47 locations are yet to be integrated in the

System Out of the balance 177 the data from nearly 50 nodes are not coming since

last 6 months Thus in totality data is not available from more than 135 out of 224

stations ie 60 which is highly alarming The extremely poor status of telemetry in

the state of Maharashtra has become a security threat Maharashtra load is touching

17500 MW and there are large number of construction related outages that have to be

facilitated Further with the formation of the synchronous All India grid there is a need

for close monitoring of system parameters such as the line flows voltage and grid

frequency Inadequate telemetry is resulting in severe constraints in real time

operation as well as outage coordination There have been several instances of line

tripping on high voltage and SPS operation due to sudden increase in line flows

during hour boundary or during facilitating planned outage These events could be

minimized with better supervision if the telemetry is available

The telemetry issue in Maharashtra has been discussed in the various WRPC forums

wherein it was informed by MSETCL that the problem is due to failure of Ms Tulip

who was the service provider for the communication network During the month of

August 2013 representative from MSETCL had assured that a new contract was being

awarded and the situation would improve within one month The extracts from minutes

of 451st OCC is quoted below

QUOTE

13

457th OCCM AGENDA

ldquoMSETCL stated that they were working to resolve the issue and assured that there

would be an improvement in availability of Telemetry from Maharashtra stations within

one Monthrdquo

UNQUOTE

Representative of MSETCL may apprise the OCC regarding present status and the

likely schedule for resolution of the issue

The sub committee may like to discuss the same

ITEM NO 94 STATUS OF LINE AND BUS REACTORS AT 765 KV SASAN

The line reactor of 765 kV Sasan-Satna ckt-2 as well as the Bus reactors of 765 kV Sasan bus are yet to be commissioned at Sasan end In the absence of these reactors high voltage is experienced at Sasan and nearby stations Often one circuit of 765 kV Sasan-Satna is required to be opened for voltage regulation Consequently the reliability of evacuation of generation from two units of Sasan is affected During 456th OCC meeting the revised schedule of the above elements as informed by Ms Reliance was as under

Schedule in formed in meetings 451st OCC 455th OCC 454th OCC 1 Line reactor of 765

kV Sasan-Satna ckt-2

By Dec 2013 By April 2014 By May 2014

2 765 kV Bus-1 Reactor

Jan 2014 By Mar 2014 By June 2014

3 765 kV Bus-2 Reactor

Jan 2014 By Mar 2014 By June 2014

It was decided in 456th OCC meeting that one representative from MPPTCL would visit the SASAN site to check readiness of Line and Bus reactors Representative from MPPTCL and Sasan may apprise the OCC-members on the progress of commissioning of reactors at 765 kV Sasan OCC members may also be apprised of the tap position of the generator transformer 2 and 3

The sub committee may like to discuss the same

14

457th OCCM AGENDA

ITEM NO 95 CHARGING OF NEW TRANSMISSION ASSET IN THE GRID In order to have better coordination of the transmission utilities with RLDCNLDC during charging synchronization of new elements into the grid a communication has been received from NLDC (ref POSOSCONLDCSystem OperationOutage Planning1239) on 10022014 It has been proposed that

a Owner of the asset shall submit the request for expected chargingcommissioning of new element for the calendar month latest by 5th day of the month to the respective RLDC amp NLDC along with status of activities mentioned in the check-list

b RLDC shall study the impact of the new element commissioning and based on its assessment of the preparedness of the utility may recommend to NLDC who in turn would examine the issue independently considering pan India grid scenario

c After the above the owner of the new asset shall give its readiness to charge the new element atleast three days in advance with current status of activities mentioned in the check list

Check list is as under 1 List of elements to be charged along with the details of approval of the

transmission scheme from the Standing CommitteeCTUSTU 2 Single Line Diagram of the concerned substations along with status of

completion of each diabusbreakers 3 Availability of real-time data and communication to the designated

SLDCRLDC 4 Installation of Special Energy Meter complying with CEArsquos Regulations

(Serial number Meter number CTPT ratio to be indicated) 5 Charging Instructions by CTUSTU 6 Schedule and sequence of charging of elements 7 Availability of line bus reactors as per planning In case the transmission

system is planned to be charged without the planned line reactor requisite authorization from CTUSTU by studies

8 Connection Agreement (along with all annexures) with CTU or STU 9 Copy of Long term Access (LTA) or MTOA granted by CTU or STU as the

case may be 10 Copy of Power Purchase Agreement (PPA) 11 A signed undertaking with name and designation of the officer clarly

indicating the following a All Disturbance recorders (DR) and Event Loggers (ELs) with time

synchronization are commissioned b All protective systems have been commissioned c All statutory clearances have been obtained

12 Output of EL and DR after charging

15

457th OCCM AGENDA

Each document mentioned in check list from Sl No 1 to 10 must be attached for sake of completeness and emailed as a consolidated document to the nodal RLDC well before the new element charging date The sub-committee may like to discuss ITEM NO 96 OPENING FEEDERS WITHOUT PRIOR INTIMATION TO WRLDC

It was gathered based on the observation from WRLDC SCADA data and subsequent

discussion with MPPTCL that 220 kV Bina (MP)-Gwalior(MP) DC were taken under

shut down for LILO works at Datia at 0910hrs on 23022014 for 4 days The outage

of these lines was neither discussed in OCC and neither was there any intimation to

WRLDC before availing the outage These lines are included in the important grid

elements list of Western region and prior concurrence of WRLDC is required for

switching these lines Further these lines form the parallel path to 765 kV Bina-Gwalior

DC and with the shutdown of these lines the network upstream of WR-NR inter

regional corridor was depleted

The sub-committee may like to discuss ITEM NO 97 TRIPPING OF 765 KV LINES ON OVER VOLTAGE Recently several tripping of 765 kV lines have been reported on over voltage These are indicated below

1) 765 kV Bina-Gwalior I at 2358 hrs of 16022014 2) 765 kV Bina-Gwalior I at 2011 hrs of 14022014 3) 765 kV Satna-Gwalior at 1300 hrs of 06022014 4) 765 kV Sasan-Satna II at 0013 hrs of 18012014 5) 765 kV Jabalpur-Bina I at 2350 hrs of 10012014 6) 765 kV Jabalpur-Bina II at 0405 hrs of 06012014

It is understood that the adopted Stage-I OV setting for the above lines vary from 108 (ie 826 kV) to 110 (841 kV) As per SCADA data the bus voltage at any of the substations mentioned above had not reached 826 kV during the above incidents

POWERGRID may examine the above tripping in detail and apprise the OCC regarding the above In case of issues related with protective relays field equipment are detected these may be addressed at the earliest The sub-committee may like to discuss

16

457th OCCM AGENDA

ITEM NO 98 RGMO FGMO OF MANDATED GENERATORS IN WESTERN REGION

As per the latest information available at WRLDC there are 251 number of units with a total capacity of 57517 MW in Western Region that are mandated to operate in Restricted Free Governor Mode The need for compliance to the IEGC regulations wrt RGMOFGMO was emphasized in the 455th and 456th OCC meeting as well as during the 25th TCCWRPC meeting Subsequently it was communicated by email to all entities in WR to provide the latest status of RGMOFGMO implementation We have received updated status from MPPTCL LANCO CGPL DB Power and JPL Tamnar in Feb 2014 The latest state wise RGMOFGMO summary is given below

Name of Entity No of mandated units

RGMO FGMO available at

RGMOFGMO Not available at

Maharashtra 90 35 55 Madhya Pradesh 58 36 22 Gujarat 35 19 16 Chhattisgarh 10 3 7 CGPL 5 5 0 NCA 11 6 5 SASAN 2 1 1 NTPC 24 10 14 ESSAR_Mahan 1 1 0 NSPCL 2 2 0 KSK 1 1 0 KWPCL 1 0 1 DB POWER 1 1 0 JPL 5 4 1 LANCO 2 2 0 IEPL 1 0 1 EMCO 2 0 2 WR_Total 251 126 125

WRLDC vide its letter ref WRLDCRGMO-FGMO1-2014 dated 23012014 has issued directions under Section 29 of the Electricity Act to ensure compliance of IEGC regulations 52 (f) (g) (h) and (i) All utilities are requested to furnish the status of compliance in respect of generating units under their jurisdiction The sub-committee may like to discuss ITEM NO 99 STATUS OF TELEMETRY IN WESTERN REGION

The status of telemetry related issues in respect of WR constituents is as under

a) Chhattisgarh Data (except MW) from 500 MW Korba West extension generating station is not available Status points from 400 kV Raita pending

17

457th OCCM AGENDA

b) Madhya Pradesh Telemetry of following bus reactors is not available at WRLDC

S No

Station Name Bus Reactor

Nunber x Capacity

Total MVAR

Rated voltage

Status of Telemetry at

WRLDC1 Nagda 250 100 420 Not available2 Indore 225 50 33 Not available3 Bhopal 225 50 33 Not available4 Birsinghpur 150 50 420 Not available

c) Gujarat Data is not-availableintermittent from following stations in Gujarat

a 220 kV Nano of Tatamdash(not available) b Kansari 400 kV ss and Navsari 220 kVhellipIntermittent (PLCC Problem)

d) Goa Due to non-availability of SCADA data from Goa the difference between drawal as seen in SCADA and as recorded in SEM is as high as 572 during the period 1st Feb to 16th Feb 2014 Data from the following stations in Goa is not available at WRLDC S No Station Status

1 Amona 220 kV Not available 2 Cuncolin 220 kV Not available 3 Kadamba 110 kV Intermittent 4 Tivim 220 kV Intermittent 5 Ponda 220 kV Intermittent 6 Xeldam-220 kV Intermittent 7 Verna-110 kV Intermittent

e) Daman amp Diu

Due to non-availability of SCADA data from Daman amp Diu the difference between drawal as seen in SCADA and as recorded in SEM is as high as 571 during the period 1st Feb to 16th Feb 2014 Data from The error is mainly due to non-availability of data from 220 kV Magarwada

f) DNH Telemetry from 220 kV Kharadpara and Khadoli station is not available

g) POWERGRID The data from the following stations is not available at WRLDC

1) 765 kV Tamnar (Communication problem GPRS link is not stable)

18

457th OCCM AGENDA

Telemetry from following stations is Intermittent at WRLDC 1) 765 kV Durg (PLCC frequent problems)

2) 765 kV Kotra (communication intermittency)

3) 765 kV Gwalior (PLCC link established but still there is some

issue(Delay) in data updation at WRLDC Rectification work under

progress by Site Engineer

4) 765 kV Solapur - Redundant link established through Reliance but

the gateway connected to above link is not configured for 765 KV

data Hence when BSNL link is down 765 KV data is not updating at

WRLDC

The sub-committee may like to discuss

ITEM NO 910 COMPARISON OF DRAWAL AS SEEN IN SCADA VS SEM The IEGC second amendment and the Deviation Settlement Mechanism is in force since the 17022014 The IEGC stipulates maintaining injection drawal within the limits prescribed in the Deviation Settlement Mechanism The sub-committee may like to discuss ITEM NO 911 MOCK BLACK START EXERCISE

As per sec 58(b) of IEGC the usersSTUs etc need to conduct Black start mock

exercises in their respective systems once in every six month under intimation to

RLDC Also the all the black start Diesel Generator (DG) sets are [as per sec 58(b)

of IEGC] required to be tested weekly and the test report needs to be sent to RLDC

on quarterly basis

The following table summarizes the status of mock exercises in respect of black start

facilities in Western Region

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

GUJARAT

1 Ukai (H) 4 x 75 Hydro Diesel 500 kVA 221213 Y

2 Mini Hydro 2 x 25 Hydro Diesel 50 KW N

3 Kadana 4 x 60 Hydro Diesel 500 KVA 2413 Y (2413)

19

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

4

Dhuvaran

1 x 107 (68+39) + 1 x 112 (72+40)

Gas

Details to be furnished by Gujarat

Details to be furnished by Gujarat

N

5 GIPCL-I 3 x 32 + 1 x49

Gas Steam Diesel 141 KW

070912 Y

6 GIPCL-II 1x104+1x56 Gas Steam Diesel 500 kVA N

7

Torrent Power Stn C Stn- DEFCCPP

StnC2x30 StnD120 StnEF(110MW each)CCPP100MW

Thermal (Units-CDEF) Gas(CCPP)

Stn-C islands Diesel

StnC15kVA StnDE F and CCPP(500 kVA each)

281112

Y

8 GPEC 3x138+1x241 Thermal Natural Gas 3000 kVA N

9 Sugen 3x3825 MW Gas Diesel 2x6MVA N

Madhya Pradesh

10 Gandhisagar 5 x 23 Hydro DG set 100 kVA N

11 Birsinghpur 1 x 20 Hydro Battery 220 Volt

Battery N

12 Pench 2 x 80 Hydro DG set 250 kVA 121012 Y

13 Bargi 2 x 45 Hydro DG set 250 kVA 100212 Y

14 Bansagar Stage-I 3 x 105 Hydro DG set 250 kVA N

15 Indira Sagar 8x125 Hydro DG set 2x1000

KVA 22511 Y

Chhattisgarh 16

Hasdeo Bango 3 x 40 Hydro DG Set 250 kVA 250812 N

17

Korba(E)-phse-I

Power plant retired but Black start DG set available and on- load trial is reported to be carried out regularly

DG Set 1500 kW(33kV)

N

Maharashtra

18

Koyna I amp II

4 x 65 4 x 75 Hydro

House generator

2 MVA 231013 N

19 KDPH 2 x20 Hydro DG set 310 KW N

20 Eldari 3 x 75 Hydro DG set 6 KW N

21

Uran (Gas)

4 x 60 (GT) + 4x108 (GT)+ 2x120 WHR

Gas DG set

4 MW PH1412kVA PH2450kVA WH520kVA

161012

N

20

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

22 RGPPL

Block 1 640MW+Block 2 66354MW+Block 3 66354MW

Gas

Gas Turbine (Frame-6)

35 MW (Under testing) Details to be provided by RGPPL

N

23 Ghatghar 2x125 Hydro DG set 1x1250

kVA 51012

N

24 Khopoli 3x24+2x12 Hydro

DC Governor amp bearing oil pumps

DC power (self start)

271013 (detailed report awaited)

N

25 Bhivpuri 3 x 24 +

2 x 15 +2x12 Hydro

DC Governor amp bearing

-do-

N

26 Bhira 6 x 25 Hydro

1 Noof 500 KVA house generator with water turbine

500 kVA

201013 (detailed

report awaited)

N

27

Bhira PSS 1 x 150 Hydro DG set 500 kVA

N

28 Trombay 1 x 120 Gas

Turbine DG Set 25 MW

N

1 x 60 Steam Turbine

NTPC

21

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

29 Kawas 4 x 106 2 x 116 Gas Diesel 2850 KW 151013

N

30 Gandhar 3 x 144 + 1x225 Gas Diesel 2975 KW

N

NCA

31 SSP(RBPH amp CHPH) 6x200+550 Hydro Diesel 2x1000kVA 080412

N

Accordingly the Black start capable stations may forward their tentative plan for conducting Black start exercises in compliance to sec 58(b) of IEGC bull As per the communication for MPPTCL the tentative plan of Black start in Madhya

Pradesh system is given under SL No Name of the Station Tentative Date Remarks 1 Pench March 2014 DG set at Pench amp are Bargi

under outage 2 ISP Apr-May 2014 - 3 TONS June 2014 Governor Problem being

attended 4 Birsinghpur June 2014 -do- 5 Medikheda June 2014 -do- 6 Rjghat June 2014 -do- Other utilities may also update their tentative plan for black start

The sub-committee may like to discuss

22

457th OCCM AGENDA

ITEM NO 912 HEALTHINESS OF MAIN CIRCUIT BREAKER OF 400 KV BIRSINGPUR-KATNI-I AT KATNI END The main CB of Birsingpur-Katni-I is under shut down since 2350 hrs of 14th February 2013 Representatives from MPPTCL may kindly apprise on the progress and expected date of restoration of the Main CB of 400 kV Birsingpur-Katni-I at Katni end The sub-committee may like to discuss

ITEM NO 913 TESTING OF SPS RELATED TO TRIPPING OF BINA-GWALIOR-AGRA AT CGPL VINDHYACHAL AND KORBA

As per the information received from NTPC and CGPL the SPS for the 765 kV Bina-

Gwalior-Agra has been installed and a mock drill has to be carried out for the same

The matter was discussed in the 456th OCC and it was decided that SPS may be

tested for reduction of say 50MW for each station instead of backing down of entire

500MWs POWERGRID WRTS-2 may confirm the testing schedule so that the

same could be coordinated in from WRLDC

The sub-committee may like to discuss

ITEM NO 914 SPS AT SIPAT WRLDC vide letter No WRLDCMO-I17192013 dt 21613 requested to take up this matter with the concerned for early implementation of the SPS Status of the SPS at NTPC Sipat is as under

1 449th OCC SPS was proposed by WRLDC It was decided to have a

separate meeting to finalize the scheme 2 450th OCC Member Secretary WRPC intimated that the matter will be

discussed in 119th PCM on 3rd amp 4th September 2013 at Tarapur 3 451st OCC It was intimated that the issue of SPS of Sipat was discussed in

119th PCM held on 3rd amp 4th September 2013 at TARAPUR The tentative scheme were formulated which needed finer tuning

4 452nd OCC Matter not discussed 5 453rd OCC NTPC representative intimated proposal sent to their corporate

office for engineering approval 6 454th OCC Approval from our corporate office is yet to be obtained 7 455th OCC Approval from our corporate office is yet to be obtained 8 456th OCC Approval from corporate office has been obtained and would be

forwarded to WRPC for approval The sub-committee may like to discuss

23

457th OCCM AGENDA

ITEM NO 915 SPS AT 4X300 MW BALCO IPP The SPS at 2010 MW Balco (4x675MW + 4x135 MW + 4x300 MW) was to be commissioned by Nov 2013 before commissioning of first unit of 4x300 MW Balco IPP For the new SPS scheme envisaged for the Balco CTU connection namely the Grid Islanding and Load Management Scheme (GILMS) Balco had reported to have placed an order with Ms SEL As discussed earlier the scheme suggested by WRLDC may be implemented before commissioning of first unit of 300 MW It was intimated during the 456th OCCM by the Balco representatives that the SPS shall be commissioned by March 2014

The sub-committee may like to discuss

ITEM NO 916 ACTIONS TAKEN FOR REVIVAL OF TRANSMISSION ELEMENTS UNDER LONG OUTAGE

As per the information available at WRLDC following elements are out for a

long period

Sl No Date of

outage

Reason

ISTSIPP

1 80 MVAR BR at

ESSAR(Mahan)

231213 Oil leakage

2 125 MVAR BR at JPL 120513 Hydrogen formation

3 50 MVAR LR of Indore-Asoj-II

at Indore

190613 R phase bushing burst

4 50 MVAR LR of Birsingpur-

Damoh at Damoh(PG)

13102014 Oil Leakage

5 765 kV Durg-Kotra-I 24022014 Sparking in Isolator

6 400 kV Raipur-Raigarh-IV 18012014 Voltage Regulation

MSETCL

1 400 kV RGPPL-NrsquoKoyna-I 22012014 Voltage Regulation

2 400 kV Sholapur-

Sholapur(PG)

26022014 Tower Collapse

MPPTCL

1 400 kV Birsingpur-Katni-I 28012014 Voltage Regulation

24

457th OCCM AGENDA

2 50 MVAR LR of Indore-Asoj-II

at Indore

6012014 DGA Violation

CSPTCL

1 400220 kV Bhilai-II 24022014 Maintenance

OCC may like to be apprised of the actions being taken for expediting revival of

the above elements

The sub-committee may like to discuss

ITEM NO 917 STATUS OF 220 KV KOLHAPUR-MUDSINGHI-CHIKODI- BELGAM LINE Consent for trial operation of 220 kV Kolhapur-Mudsinghi-Chikodi- Belgam line in radial mode for supply of Karnataka load from Maharashtra side was granted after discussion in the 455th OCC meeting WRLDC is in receipt of letter from SRLDC regarding concurrence for the above arrangement SLDC Kalwa may apprise the OCC regarding the present status The sub-committee may like to discuss

ITEM NO 918 CONTRIBUTION OF GENERATORS IN VOLTAGE CONTROL The contribution of generators in WR in voltage control was analyzed during 456th OCC meeting It was noted that following units were injecting reactive power even during high voltage

1 210 MW units of Khaparkheda Koradi and Chandrapur (Maharashtra) 2 210 MW units of Satpura and Birsinghpur (Madhya Pradesh) 3 210 MW unit 23 of Korba West (Chattisgarh) 4 200 MW unit 34 of Ukai (T) in (Gujarat)

Utilities were requested to check the setting of AVRGT tap and revert back with findings Members may apprise OCC regarding the status The sub-committee may like to discuss

ITEM NO 919 REAL-TIME MONITORING OF FEEDERS SUBSTATIONS THAT ARE COVERED UNDER THE AUFLS Telemetry of feeders substations covered under the AUFLS is desirable for real-time assessment of the anticipated relief that would be available from the AUFLS scheme at any given instant of time CERC has also directed all the constituents to for

25

457th OCCM AGENDA

mapping of these feeders in the SCDA of SLDCsRLDC Members may like to deliberate further The sub-committee may like to discuss

ITEM NO 920 LOAD FORECASTING As per the amended Indian Electricity Grid Code that is effective from 17th February 2013 the SLDCs SEB distribution licensees shall always restrict the net drawal of the State from the grid within the drawal schedule keeping the deviations from the schedule within the limits specified in the Deviation settlement mechanism regulations Therefore it is imperative that adequate attention may be paid towards load forecasting The matter was discussed in the 455th and 456th OCC as well as in the 25th TCCWRPC board meeting wherein it was decided to create a task force for exploring development of a software for load forecasting Members may like to deliberate further The sub-committee may like to discuss

ITEM NO 921 IMPLEMENTATION OF THE REVISED AUFLS IN GOA DD AND DNH It was decided during the 455th and 456th OCC meeting as well as during 25th WRPC meeting that Goa DD and DNH shall complete the implementation of the revised AUFLS in Goa DD and DNH at the earliest Representatives from the Goa DD and DNH may apprise the status of the progress The sub-committee may like to discuss

ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING As per meeting roaster circulated during 452nd OCC meeting the 458th OCC Meeting

will be hosted by Maharashtra and may be scheduled on 16th amp 17th April 2014

Maharashtra may confirm the same

Anaulagnak 21

maah frvarI 2014

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5051 Hz BETWEEN 0200 Hrs amp 0300 Hrs Hrs ON 28022014

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4970 Hz BETWEEN 1800 Hrs amp 1900 Hrs Hrs ON 28022014

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 5006 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5071 Hz AT 0210 Hrs ON 28022014

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4937 Hz AT 185000 Hrs ON 28022014

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS FEBRUARY 2014 JANUARY 2014 DECEMBER 2013

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 001 005

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 041 061 188 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 1069 5423 4864 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 4014 3569 3987

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 4876 946 956

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING FEBRUARY 2014

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

Voltage Profile during the month of Feb 2014

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 421 401 426 403 409 409 408 408 415 399 414 402 424 413 417 3922 420 402 423 404 409 409 408 408 417 402 418 404 425 415 420 3993 421 399 426 400 429 405 425 402 412 399 419 408 423 410 413 3964 422 402 426 404 430 406 428 401 414 400 414 404 424 412 414 3965 420 396 423 400 409 409 408 408 413 396 415 401 424 411 415 3996 420 396 426 400 428 405 426 402 415 398 416 402 423 411 412 4007 420 394 424 399 430 402 427 401 416 399 417 402 423 409 416 3968 418 393 422 397 409 409 408 408 416 399 416 402 422 409 418 3989 418 399 423 404 409 409 408 408 417 402 417 407 419 409 419 400

व तदाब परखा फरवर 2014 स नक Annex-23

इदौर इटारसी कराड धल असोज कासोर िभलाई जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

10 419 394 423 399 409 409 408 408 416 400 415 401 420 408 417 39511 421 393 426 397 429 405 427 401 44 399 419 404 423 407 414 39912 419 395 422 400 409 409 408 408 416 401 419 407 421 410 418 39813 420 396 424 401 409 409 408 408 417 400 416 401 421 409 418 40114 421 399 424 403 430 419 428 414 417 402 415 402 421 409 417 40015 423 397 424 399 428 414 429 412 417 398 406 406 421 407 418 40016 423 397 424 400 431 404 424 401 416 401 422 409 421 409 418 40317 421 402 424 403 432 414 420 404 416 402 412 405 422 410 417 39818 420 397 423 399 409 409 408 408 416 400 414 401 422 414 416 40019 420 396 423 399 409 409 408 408 411 398 418 405 421 413 413 39920 417 397 420 402 429 406 426 401 413 399 416 404 421 413 410 39821 419 399 422 402 430 407 421 401 415 401 418 406 422 411 414 39722 419 397 422 402 432 409 423 401 416 400 413 402 423 413 414 40023 420 396 423 397 430 412 428 404 414 404 415 402 427 414 416 40324 421 399 423 401 433 411 425 400 416 398 414 402 427 415 418 40225 421 399 423 401 433 411 425 400 416 398 414 402 427 415 418 40226 420 397 423 404 431 411 428 409 411 397 415 404 424 414 412 39327 418 398 426 403 409 409 408 408 417 399 418 402 429 415 419 39128 421 400 427 406 409 409 408 408 414 400 416 403 430 415 418 401

423 393 427 397 433 402 429 400 417 396 422 401 430 407 420 391

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 424 404 415 392 424 404 431 407 766 746 797 765 800 756 804 7692 422 406 417 398 426 404 434 407 769 754 798 774 801 769 804 7773 423 405 416 402 426 401 432 410 767 750 796 768 802 773 805 7764 426 407 417 402 423 403 430 408 768 751 797 779 801 776 808 7785 422 403 415 398 423 397 430 400 768 749 797 767 798 763 797 7586 425 404 417 401 423 399 432 404 768 750 797 767 802 773 807 7707 427 401 419 397 423 396 431 404 770 741 800 763 807 769 809 7698 422 403 416 403 424 395 427 399 756 737 788 756 801 765 802 7679 422 405 416 401 424 402 427 404 755 738 786 758 804 773 804 775

10 421 400 414 396 423 398 429 403 3 88 6 98 6 801 60

वािलयर बनाBina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

बना वािलयर नागदा खडवा िसपत िसविन

10 421 400 414 396 423 398 429 403 755 737 788 765 798 765 801 76011 423 397 414 390 426 396 433 399 758 736 794 750 800 752 802 75612 420 403 414 395 423 397 428 403 757 739 787 759 801 763 798 77013 424 405 417 400 427 397 430 402 759 740 794 760 804 773 803 77214 426 410 420 406 424 400 431 405 761 740 794 766 810 780 808 78215 425 404 417 399 426 399 430 401 762 738 794 962 808 768 806 76816 426 406 422 400 427 402 429 400 759 739 792 760 815 774 811 77617 429 407 417 398 427 404 427 406 761 742 792 762 805 765 810 77418 426 404 418 395 423 399 427 404 763 748 793 768 805 759 806 76819 423 409 415 394 422 399 428 403 759 737 795 765 804 758 806 76720 421 406 410 397 420 398 426 406 765 749 795 771 791 766 799 77421 423 407 424 399 423 403 428 405 759 744 792 760 795 761 800 76722 425 406 414 398 423 400 425 404 760 743 790 762 794 762 800 76823 425 402 412 392 424 400 428 405 758 740 790 759 796 755 799 76124 425 401 411 393 423 401 427 403 760 744 796 764 792 757 798 75625 421 408 412 395 423 401 427 403 756 742 793 766 795 764 795 76926 422 405 413 390 421 399 426 402 757 739 789 760 796 750 798 76127 426 407 416 393 421 401 431 403 760 741 795 762 803 755 804 76228 428 409 414 392 423 403 432 405 762 740 795 753 809 775 803 771

429 397 424 390 427 395 434 399 770 736 800 750 815 750 811 756

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Feb-14 0 0 0 0 0 0 0 02 02-Feb-14 0 0 0 0 0 0 0 03 03-Feb-14 0 0 0 0 0 0 0 04 04-Feb-14 0 0 0 0 0 0 0 05 05-Feb-14 0 0 0 0 0 0 0 06 06-Feb-14 0 0 0 0 0 0 0 07 07-Feb-14 0 0 0 0 0 0 0 08 08-Feb-14 0 0 0 0 0 0 0 09 09-Feb-14 0 0 0 0 0 0 0 0

10 10-Feb-14 0 0 0 0 0 0 0 011 11-Feb-14 0 0 0 0 0 0 0 012 12-Feb-14 0 0 0 0 0 0 0 013 13-Feb-14 0 0 0 0 0 0 0 014 14-Feb-14 0 0 0 0 0 0 0 015 15-Feb-14 0 0 0 0 0 0 016 16-Feb-14 0 0 NIL NIL NIL 017 17-Feb-14 0 0 0 0 0 0 0 018 18-Feb-14 0 0 0 0 0 0 0 019 19-Feb-14 0 0 0 0 0 0 0 020 20-Feb-14 0 0 0 0 0 0 0 021 21-Feb-14 0 0 0 0 0 0 0 022 22-Feb-14 0 0 0 0 0 0 0 023 23-Feb-14 0 0 0 0 0 0 0 024 24-Feb-14 0 0 0 0 0 0 0 025 25-Feb-14 1 17 0 0 0 0 0 026 26-Feb-14 0 0 0 0 0 0 0 027 27-Feb-14 0 0 0 0 0 0 0 028 28-Feb-14 0 0 0 0 0 0 0 0

Max 1 17 0 0 0 00 0 0Total 1 17 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month FEBRUARY 2014

Recommonded Load relief at 492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE-25

Power CutRestrictions in Western Region for the month of February-2014 k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply(DLF)

01022014 28022014 2344 2240 2332

21 Three-Phase Supply(Irrigation)

01022014 28022014 0956 0905 0946

21 Three-Phase Supply(Mixed)

01022014 28022014 2343 2227 2330

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01022014 28022014 2353 2337 2347 32 District Head Qtrs 01022014 28022014 2355 2340 2351 33 Tehsil Head Qtrs 01022014 28022014 2349 2309 2341

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid

1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 010214 to 280214

SaUnya Nil

0-1655MW

SaUnya Nil

0000

SaUnya Nil 2400

SaUnya Nil

95 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-

2 Power supply to Agricultural Sector ivavarNa Details sao From

idnaaMk Date tk To

idnaaMk Date p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs) 21 Three-Phase Supply 01022014 28022014 1000 0800 0900

22 Single-Phase Supply 01022014 28022014 1800 1800 1800 3 Anya jaanakarI Any other information

There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

11107 (Av) of 23 days 0000(Av) 0000 (Av)

1Rural 9031(Av) for 3486 Hrs 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0666 - -

0105 -

3 HT Industries 000 (Av) for 00 Hrs 000 Total Energy Cutday 0771 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01022014 to 280214 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 2322014 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का फरवर 2014का वःता रत यौरा

Details of forced unit outages during the month ofFeb2014

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 एःसार वा डनर

ESSAR VADINAR-I

गरा विनिल GSECL

660 2156 20-Jan-14 2018 10-Feb-14 Coal shortage

2 एःसार Essar-2

गरा विनिल GSECL

172 1212 22-Feb-13 अनपल ध Still out

अनपल ध Still out

Shortage of gas

3 एसएलपीपी SLPP-1

गरा विनिल GSECL

125 1445 23-Feb-14 1237 27-Feb-14 BTL

4 एकएलट पीएसAKLTPS-1

गरा विनिल GSECL

125 1147 26-Feb-14 अनपल ध Still out

अनपल ध Still out

DCS FAIL

5 एपीएल APL - 2

अदानी ADANI

330 056 3-Feb-14 अनपल ध Still out

अनपल ध Still out

Turbine vibration bearing probl em

6 एपीएल APL-5

अदानी ADANI

660 1732 15-Feb-14 456 27-Feb-14 Turbine vibration

7 एपीएल APL - 6

अदानी ADANI

660 2049 25-Feb-14 1947 3-Mar-14 Coal mill problem

8 टाटा TATA-6

मारा वउकिल MSPGCL

500 2352 19-Jul-13 अनपल ध Still out

अनपल ध Still out

For Economy SD

9 वीआईपीएल VIPL-I

मारा वउकिल MSPGCL

300 105 2-Oct-13 अनपल ध Still out

अनपल ध Still out

Turbine bearing vibration probl em

10 टाटा TATA-8

मारा वउकिल MSPGCL

250 2255 9-Jan-14 अनपल ध Still out

अनपल ध Still out

HT due to fire near turbine generator desk

11 चिपर Chandrapur-2

मारा वउकिल MSPGCL

210 1238 14-Jan-14 1310 23-Feb-14 ID fan problem

12 कोराड KORADI-6

मारा वउकिल MSPGCL

210 651 24-Jan-14 1456 14-Feb-14 Coal bunkering problem

13 डब यपीसीएल WPCL-1

मारा वउकिल MSPGCL

135 1245 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Furnace press high

14 डब यपीसीएल WPCL-3

मारा वउकिल MSPGCL

135 421 7-Feb-14 Ready Ready Less requisition

प म ऽय भार षण कि म बई णाली चालन-ISO-I

15 चिपर CPUR - 6

मारा वउकिल MSPGCL

500 1523 11-Feb-14 2033 13-Feb-14 BTL

16 नािसक NASIK-3

मारा वउकिल MSPGCL

250 300 11-Feb-14 100 19-Feb-14 UAT problem

17 कोराड KORADI-5

मारा वउकिल MSPGCL

210 153 14-Feb-14 अनपल ध Still out

अनपल ध Still out

ID fan problem

18 ितरोडा Tiroda-I

मारा वउकिल MSPGCL

660 2059 15-Feb-14 2054 26-Feb-14 Turbine bearing problem

19 ितरोडा Tiroda-2

मारा वउकिल MSPGCL

660 1125 17-Feb-14 152 22-Feb-14 BTL

20 कोराड KORADI-6

मारा वउकिल MSPGCL

210 2357 19-Feb-14 250 23-Feb-14 BTL

21 भसावल BHUSWAL-2

मारा वउकिल MSPGCL

210 301 22-Feb-14 1706 25-Feb-14 PA fan temp High

22 खापरखड़ा KHAPERKHEDA-3

मारा वउकिल MSPGCL

250 1448 22-Feb-14 130 25-Feb-14 BTL

23 जयगड Jaigad-4

मारा वउकिल MSPGCL

300 1930 22-Feb-14 1107 4-Mar-14 Low schedule

24 कोराड Koradi-5

मारा वउकिल MSPGCL

300 404 23-Feb-14 अनपल ध Still out

अनपल ध Still out

Electrical fault

25 पल PARLI-4

मारा वउकिल MSPGCL

210 1836 28-Jan-14 1956 3-Feb-14 Air preheater problem

26 भसावल BHUSAWAL-4

मारा वउकिल MSPGCL

250 1432 28-Feb-14 1802 3-Mar-14 Ash hopper problem

27 आरजीपीपीएल RGPPL-1B

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

28 आरजीपीपीएल RGPPL-2B

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

29 आरजीपीपीएल RGPPL 3A

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

30 आरजीपीपीएल RGPPL-1A

आरजीपीपीएल RGPPL

320 1500 18-Jan-14 अनपल ध Still out

अनपल ध Still out

SRV problem

31 आरजीपीपीएल RGPPL 3B

आरजीपीपीएल RGPPL

320 1230 8-Feb-14 Ready Ready Less requisition

32 िसगाजी SINGAJI - I

म वउकिल MPPGCL

600 422 12-Feb-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

33 सातपरा SATPURA-11

म वउकिल MPPGCL

250 1913 15-Feb-14 2149 19-Feb-14 Main stream temperature low

34 सातपरा SATPURA-11

म वउकिल MPPGCL

250 542 26-Feb-14 1642 2-Mar-14 BTL

35 एःसार महान Essar-Mahan-1

एःसार ESSAR

600 000 29-Jan-14 015 18-Feb-14 Less requisi tion

36 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

37 वदना Vandana-1

वदना Vandana

135 149 12-Jan-14 अनपल ध Still out

अनपल ध Still out

BTL

प म ऽय भार षण कि म बई णाली चालन-ISO-I

38 ससान Sasan-2

आरईएल REL

660 205 16-Feb-14 1650 23-Feb-14 Problem in ash handling

39 कावास Kawas 2A

एनट पीसीNTPC 164 2018 23-Dec-13 Ready Ready Less requisition

40 गाधार Gandhar-3

एनट पीसीNTPC 144 2037 28-Dec-13 Ready Ready Less requisition

41 गाधार Gandhar-I

एनट पीसीNTPC 144 2011 1-Jan-14 Ready Ready Less requisition

42 कावास Kawas 2B

एनट पीसीNTPC 164 900 13-Jan-14 421 5-Mar-14 Maintenance

43 गाधार Gandhar-2

एनट पीसीNTPC 219 023 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Less requisition

44 कावास Kawas-1A

एनट पीसीNTPC 164 2055 4-Feb-14 712 20-Feb-14 Less requisition

45 कावास

Kawas-1B एनट पीसीNTPC 164 1951 13-Feb-14 503 20-Feb-14 Less requisition

46 कावास Kawas 1A

एनट पीसीNTPC 164 1210 21-Feb-14 Ready Ready Less requisition

47 कावास Kawas 1B

एनट पीसीNTPC 164 012 22-Feb-14 1144 26-Feb-14 Less requisition

Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का फरवर 2014 का वःता रत यौरा

Details of planned unit outages during the month of Feb2014 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Time Date

1 डब यट पीएस WTPS-3

गरा विनिल GSECL

210 212 12-Feb-14 अनपल ध Still out

अनपल ध Still out

AOH

2 पल ParlI-3

मारा वउकिल MSPGCL

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

AOH

3 चिपर Chandrapur-5

मारा वउकिल MSPGCL

500 101 14-Jul-13 841 19-Feb-14 AOH

4 कोरबा प म KORBA-(W)-4

छरा वउकिल CSPGCL

210 2226 7-Feb-14 अनपल ध Still out

अनपल ध Still out

AOH

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

NIL2

NIL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING MARCH 2014 AND APRIL 2014

Capacity Outage as per Annual Maintenance Plan

3 Craiva]kMila CSPGCL

NIL

4

NIL

5 koMd``Iya xao~ Central Sector51 VSTPS 4 210 010414 070414 AOH52 VSTPS 2 210 080414 270414 AOH53 VSTPS 1 210 300414 190514 AOH54 CGPL 10 800 280314 130514 COH

maraiva]kMila MSPGCL

Date Time Date Time1 220 Bus-1 at Mapusa 20-Mar-14 1000 20-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R

2 765 Bus-1 at Sasan 20-Mar-14 800 20-Mar-14 1800 Daily Stringing of Main bus 1 for 765 kV Vichal Pooling - Sasan feeder

Reliance WR-II C

3 400 400kV Bus-2 at Satna 20-Mar-14 800 20-Mar-14 1800 Continuous Bay extension work related to JP - Nigrie Bays POWERGRID WR-II C

4 400 400kV ICT 1 at Satna 20-Mar-14 800 20-Mar-14 1000 Continuous Bay extension work related to JP - Nigrie Bays POWERGRID WR-II C

5 400 400kV Jabalpur Itarsi 1amp2 (Dc) 20-Mar-14 1000 20-Mar-14 1400 Continuous For commissioning of Line Impedance measurement kit

POWERGRID WR-II C

6 765 3X80 MVAr Bina Line Reactor at Indore 20-Mar-14 1000 21-Mar-14 1800 Continuous For installation of online dry out amp online DGA kit

POWERGRID WR-II C

7 400kV Damoh - Bhopal 1 20-Mar-14 800 31-Mar-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

8 400 Chorania Kasor 20-Mar-14 800 20-Mar-14 1800 Daily PMM work GETCO GETCO9 400 400 KV Main Bus-I at 400 KV Ss Khedamara 20-Mar-14 900 22-Mar-14 1700 Daily Erection of Pantograph 1 Set of IP amp CVT CSPTCL CSPTCL C

10 400 400 KV Khedamara-KSTPS NTPC ckt-II at 400 KV Ss Khedamara

20-Mar-14 900 22-Mar-14 1700 Daily Erection of Pantograph CVT amp 1 Set of IP PGCIL CSPTCL C

11 400 Korba -Vandana 20-Mar-14 900 21-Mar-14 1900 days continuouTesting of LBB auto re-close M-I amp M-II relays NTPC NTPC

12 400 Korba -Vandana 20-Mar-14 900 21-Mar-14 1900 days continuouTesting of LBB auto re-close M-I amp M-II relays NTPC NTPC

13 400DC Akola-Aurangabad (MSETCL) 1 and Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

21-Mar-14 600 23-Mar-14 1800 Conti Crossing work of 400kv MC Aurangabad - Aurangabad

MSETCLWRTS-I WRTS-I C

14400 amp 220 amp 132

400KV DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 400KV Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

21-Mar-14 600 21-Mar-14 1800 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad

MSETCLWRTS-I WRTS-I C

15 400 Bhadrawati-Parli 1amp 2 21-Mar-14 900 31-Mar-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I C

16 220 Bus-1 at Pune 21-Mar-14 800 21-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R

17 400 Solapur-Kolhapur 1 amp 2 21-Mar-14 700 21-Mar-14 1800 Daily Stringing work upcoming 765 kV Solapur-Pune line

Reliance WRTS-I C

18 220 220kV DC Raigarh- Raigarh (CSPTCL) Line (if outage not avail on 13140314)

21-Mar-14 900 22-Mar-14 1700 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (040-50)

CSPTCL WRTS-I C

19 220 Bus-2 (Section-A) at Mapusa 21-Mar-14 1000 21-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R20 400 Bus-1 at Itarsi 21-Mar-14 900 21-Mar-14 1800 Daily AMP POWERGRID WR-II R21 220 Bus-1 at Gwalior 21-Mar-14 1000 21-Mar-14 1800 Daily AMP POWERGRID WR-II R22 220 Jhanor - Haldarwa 1 21-Mar-14 900 21-Mar-14 1800 Daily AMP POWERGRID WR-II R23 400 Vapi Boisar 21-Mar-14 700 22-Mar-14 1900 Continuous For crossing of 220kV Kala Khadoli TL POWERGRID WR-II C

24 765 Sasan-Satna2 21-Mar-14 800 22-Mar-14 1800 Continuous For Power Line crossing of 765kV Vindhyanchal (pooling) - Satna 2 Line

POWERGRID WR-II R

25 400 400220 ICT NO1 at Kasor 21-Mar-14 800 21-Mar-14 1800 Daily PMM work GETCO GETCO26 400 400KV Sipat-Pathadi(LANCO) line 21-Mar-14 900 22-Mar-14 1900 Continous Annual Preventive maintenance job NTPC NTPC27 400 Pune-Parli 2 50MVAr Line Reactor at Pune 22-Mar-14 800 22-Mar-14 1800 Daily AMP Work Line in service wo reactor Reliance WRTS-I R

28 765 Bus-2 at Solapur 22-Mar-14 700 22-Mar-14 1800 Daily 765KV Pune bay commissioning amp SCADA works

WRTS-I WRTS-I C

29 400 Bus-1 at Bhatapara 22-Mar-14 800 23-Mar-14 1800 Conti Bus extension work for new 125MVAr Bus Reactor at Bhatapara

WRTS-I WRTS-I C

30 220 Bus-2 (Section-B) at Mapusa 22-Mar-14 1000 22-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R31 400 Vadavi Chorania 1 22-Mar-14 900 22-Mar-14 1800 Daily AMP Reliance WR-II R32 220 Jhanor - Haldarwa 2 22-Mar-14 900 22-Mar-14 1800 Daily AMP POWERGRID WR-II R33 220 Bus-2 at Gwalior 22-Mar-14 1000 22-Mar-14 1800 Daily AMP POWERGRID WR-II R

34 765 3X80 MVAr Bus Reactor at Indore 22-Mar-14 1000 23-Mar-14 1800 Continuous For installation of online dry out amp online DGA kit

POWERGRID WR-II C

35 220 Transfer Bus at Mapusa 23-Mar-14 1000 23-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R

36 400 Raigarh- Raipur 4 amp Raigarh-Kotra PS 2 23-Mar-14 800 30-Mar-14 1800 Conti Bay shifting work for up-coming 125MVAr Bus Reactor at Raigarh

WRTS-I WRTS-I C

37 765 Bus-1 at Indore (PG) 23-Mar-14 1000 23-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

Outages Proposal of Transmission elements during the month of MARCH‐2014Type

ANNEXURE‐32A

SN KV Line From To

Basis Reason System Agency

38 220 MC Waluj-Chitegaon amp Waluj-Jalna on same tower

24-Mar-14 600 24-Mar-14 1800 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad

MSETCL WRTS-I C

39 400 Raipur-Sipat 1 amp 2 24-Mar-14 800 2-Apr-14 1800 Conti Diversion of line for Lafarge Railway trackERS removal

WRTS-I Lafarge C

40 220 Bus-2 at Pune 24-Mar-14 800 24-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R41 765 Bus-1 at Bilaspur 24-Mar-14 800 24-Mar-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R

42 400 Bus-2 at Bhatapara 24-Mar-14 800 25-Mar-14 1800 Conti Bus extension work for new 125MVAr Bus Reactor at Bhatapara

WRTS-I WRTS-I C

43 400 Kolhapur-Mapusa 2 24-Mar-14 600 24-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

44 400 Vadavi Chorania 2 24-Mar-14 900 24-Mar-14 1800 Daily AMP Reliance WR-II R45 765 Bus-2 at Indore (PG) 24-Mar-14 1000 24-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

46 765 Bus-2 at Sasan 24-Mar-14 800 24-Mar-14 1800 Daily Strining of Main Bus 2 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

47 220 KAPP - Haldarwa 1 24-Mar-14 800 24-Mar-14 1800 Daily AMP POWERGRID WR-II R48 400 Bus - 2 at Pune 25-Mar-14 800 25-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R

49 765 Bus - 1 at Wardha 25-Mar-14 800 25-Mar-14 1800 Daily Jumper connection work of 765KV Raipur-Wardha line

WRTS-I WRTS-I R

50 400 Kolhapur-Mapusa 2 25-Mar-14 600 25-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

51 220 Mapusa-Ponda line 25-Mar-14 1000 25-Mar-14 1500 Daily AMP Work GOA WRTS-I R

52 765 Bus-1 at Sasan 25-Mar-14 800 25-Mar-14 1800 Daily Jumpering of Bus 1 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

53 220 KAPP - Haldarwa 2 25-Mar-14 800 25-Mar-14 1800 Daily AMP POWERGRID WR-II R54 400 Vadavi - Kansari2 25-Mar-14 900 25-Mar-14 1800 Daily AMP Reliance WR-II R55 400 Bus-1 at Indore (PG) 25-Mar-14 1000 26-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C56 765 Bus-1 at Satna 25-Mar-14 800 25-Mar-14 1800 Continuous Bay extension work POWERGRID WR-II C57 765 Sipat 765KV 400KV 1000MVA ICT-1 25-Mar-14 900 25-Mar-14 1900 Daily SPS Protection scheme modification NTPC NTPC

58 765 Bus - 2 at Wardha 26-Mar-14 800 26-Mar-14 1800 Daily Jumper connection work of 765KV Raipur-Wardha line

WRTS-I WRTS-I R

59 400 Bhadrawati-Parli 2 63MVAr Line Reactor at Parli

26-Mar-14 800 26-Mar-14 1800 Daily AMP Work of Recator at Parli line in service wo reactor

WRTS-I WRTS-I R

60 400 Kolhapur-Mapusa 1 26-Mar-14 600 26-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

61 220 Mapusa-Amona line 26-Mar-14 1000 26-Mar-14 1500 Daily AMP Work GOA WRTS-I R62 765 Bus-2 at Satna 26-Mar-14 800 26-Mar-14 1800 Continuous Bay extension work POWERGRID WR-II C

63 765 Bus-2 at Sasan 26-Mar-14 800 26-Mar-14 1800 Daily Jumpering of bus 2 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

64 400 401 KV Main Bus-I at 400 KV Ss Khedamara 26-Mar-14 900 27-Mar-14 1700 Daily Erection of IPS Tube CSPTCL CSPTCL C

65 400 401 KV Khedamara-KSTPS NTPC ckt-II at 400 KV Ss Khedamara

26-Mar-14 900 27-Mar-14 1700 Daily Erection of IPS Tube PGCIL CSPTCL C

66 400 ACBIL-BILASPUR-CKT NO -2 26-Mar-14 900 31-Mar-14 1800 CONT FOR lilo CONNECTIVITY OF 300MW MCCPL TPP

ACBIL ACBIL C

67 765 Bus-2 at Bilaspur 27-Mar-14 800 27-Mar-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R68 220 Mapusa-Thivim 1 27-Mar-14 1000 27-Mar-14 1500 Daily AMP Work GOA WRTS-I R69 220 KAPP - Vav 2 27-Mar-14 800 27-Mar-14 1800 Daily AMP POWERGRID WR-II R70 400 Bus-2 at Indore (PG) 27-Mar-14 1000 28-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

71 765 Bus-2 at Gwalior 27-Mar-14 1000 27-Mar-14 1800 Daily Bay extension work related to Gwalior Jaipur 1 Bays

POWERGRID WR-II C

72 400 VSTPS Tie- Line-1 ( Line from Stage-III to IV Switchyard)

27-Mar-14 900 27-Mar-14 1900 Daily Basis AMP and rectification of hot spots NTPC NTPC

73 765 Sipat 765KV 400KV 1000MVA ICT-2 27-Mar-14 900 27-Mar-14 1900 Daily SPS Protection scheme modification NTPC NTPC74 765 Bus-1 at Solapur 28-Mar-14 700 30-Mar-14 1800 Daily commissioning tests amp SCADA works WRTS-I WRTS-I C75 220 Mapusa-Thivim 2 28-Mar-14 1000 28-Mar-14 1500 Daily AMP Work GOA WRTS-I R

76 400 Koradi-Satpura 28-Mar-14 1000 28-Mar-14 1400 Daily Earthwire tighting work damaged during Crossing work

WRTS-I ADANI C

77 220 Bus-1 at Dehgam 28-Mar-14 900 28-Mar-14 1800 Daily AMP POWERGRID WR-II R78 220 Kawas - Haldarwa 2 28-Mar-14 800 28-Mar-14 1800 Daily AMP POWERGRID WR-II R79 400 Chorania Amreli 28-Mar-14 800 28-Mar-14 1800 Daily PMM work GETCO GETCO

80 400DC Akola-Aurangabad (MSETCL) 1 and Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

29-Mar-14 600 30-Mar-14 1800 Conti Charging amp shifting of Akola-Abad line on MC Abad-Abad line WRTS-I WRTS-I C

81 220 Bus-2 at Dehgam 29-Mar-14 900 29-Mar-14 1800 Daily AMP POWERGRID WR-II R82 400 Bus -1 at Mapusa 30-Mar-14 1000 30-Mar-14 1500 Daily AMP Work WRTS-I WRTS-I R

83 765 765kV Bus Reactor at Solapur 31-Mar-14 700 2-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

Date Time Date Time

1 400 Bhilai-Koradi 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

2 400 DC Korba-Birsingpur 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

3 400 Korba-Bhilai 2 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

4 220 Korba-Budhipadar 3 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

5 400 Akola-Wardha 1amp 2 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

6 400 Raipur-Raigarh 1 amp Raipur-KSK-DBPL-Raigarh

1-Apr-14 800 30-Apr-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

7 400 Bhadrawati-Parli 1amp 2 1-Apr-14 900 30-Apr-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I C

8 400 400220kv ICT-1 at Pune 1-Apr-14 800 1-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R9 400 Bus-1 at Bilaspur 1-Apr-14 800 1-Apr-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R

10 400 Solapur(PG) -Karad line 1-Apr-14 700 10-Apr-14 1800 Conti Erection of 80MVAr new reactor by shifitng line equipments at Solapur

MSETCL WRTS-I C

11 400 Bus-1 at Jabalpur (pooling) 01-Apr-14 1000 01-Apr-14 1800 Daily Busbar Stability test related to Jhabua Power Bays

POWERGRID WR-II C

12 400 Shujalpur - Nagda 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

13 400 Mundra - Bhachau 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

14 400 Bina - Shujalpur 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

15 220 Omkareshwar-Khandwa Ckt 1-Apr-14 900 1-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI16 400 Sipat 400KV Bay 10 and 11 1-Apr-14 900 3-Apr-14 1900 Continous 400KV CT 3nos replacement NTPC NTPC17 400 Padgha-Nagothane ckt I 1-Apr-14 900 1-Apr-14 1700 Daily QMwork MSETCL MSETCL

18 400 Bus-2 at Jabalpur (pooling) 02-Apr-14 1000 02-Apr-14 1800 Daily Busbar Stability test related to Jhabua Power Bays

POWERGRID WR-II C

19 400 Vindhyanchal - Mahan - Korba (Section of both the line on same Dc tower)

02-Apr-14 800 03-Apr-14 1700 Continuous For Power Line crossing of 765kV Vindhyanchal (pooling) - Satna 1 Line

POWERGRID WR-II C

20 400 400kV ICT 4 at Indore MPPTCL 02-Apr-14 1000 04-Apr-14 1800 ContinuousFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

MPPTCL WR-II C

21 400 400kV Bus Coupler bay at Indore MPPTCL 02-Apr-14 1000 04-Apr-14 1800 ContinuousFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

MPPTCL WR-II C

22 400 400kV Itarsi - Indore MPPTCL 1 Line 02-Apr-14 1000 02-Apr-14 1500 DailyFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

POWERGRID WR-II C

23 400400 KV LILO Line of 400 KV SC Korba West-Khedamara to 400 KV Ss Raita (Between Loc69 amp70 near Raita Ss)

2-Apr-14 800 3-Apr-14 1700 DailyMaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

CSPTCL CSPTCL C

24 400 Chandrapur-Khaparkheda 2-Apr-14 900 2-Apr-14 1700 Daily QMwork MSETCL MSETCL

25 400 Lamboti-Solapur PG 2-Apr-14 900 2-Apr-14 1700 Daily QMwork MSETCL MSETCL

26 400 Bus-1 at Durg PS Ss 3-Apr-14 900 3-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R27 400 Bus-1 at Jabalpur 03-Apr-14 900 03-Apr-14 1800 Daily Retrofitting of Isolator arms(689A) POWERGRID WR-II R28 400 315MVA ICT2 at Khandwa 03-Apr-14 1000 03-Apr-14 1600 Daily AMP POWERGRID WR-II R29 400 Mundra - Hadala 3-Apr-14 800 3-Apr-14 1800 Daily PMM GETCO GETCO30 400 400KV Seoni -Bhilai Ckt 3-Apr-14 900 3-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I31 400 Lonikand-Chakan 3-Apr-14 900 3-Apr-14 1700 Daily QMwork MSETCL MSETCL32 400 Bus-2 at Durg PS Ss 4-Apr-14 900 4-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R33 400 Bus-1 at Jabalpur 04-Apr-14 900 04-Apr-14 1800 Daily Retrofitting of Isolator arms(2089A) POWERGRID WR-II R

34 400 400kV Itarsi - Indore MPPTCL 1 Line 04-Apr-14 1300 04-Apr-14 1800 DailyFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

POWERGRID WR-II C

35 400 Varsana - Hadala 4-Apr-14 800 4-Apr-14 1800 Daily PMM GETCO GETCO

Agency Type

ANNEXURE‐32BOutages Proposal of Transmission elements during the month of APRIL ‐2014

SN KV Line From To

Basis Reason System

36 220 Vapi - Vapi (PG) 4-Apr-14 800 4-Apr-14 1800 Daily PMM work PGCIL GETCO37 220 Haldarva - Jhanor - 1 (NTPC) 4-Apr-14 800 4-Apr-14 1800 Daily PMM amp Tan Delta testing PGCIL GETCO38 400 400KV Birsinghpur -Katni Ckt - I 4-Apr-14 800 4-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I39 220 Badod - Kota Ckt 4-Apr-14 900 4-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI40 220 Malanpur-Auriya Ckt 4-Apr-14 900 5-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI

41 400 Bhusawal-Akola 4-Apr-14 900 4-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

42 400 Deepnagar-Aurangabad II 4-Apr-14 900 4-Apr-14 1700 Daily QMwork MSETCL MSETCL43 400 Kalwa-Padgha Ckt I 4-Apr-14 900 4-Apr-14 1700 Daily QMwork MSETCL MSETCL44 765 Bus Reactor at Seoni 5-Apr-14 900 5-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R

45 400 DC Korba-KhedamaraLilo at Marwa lilo section yet to be charge 5-Apr-14 800 6-Apr-14 1800 Daily

Crossing work of upcoming 765 KV DC Raigarh-Champa (AP-48A0- AP 490)DC Korba-Khedamara is in service

CSPTCL WRTS-1 C

46 400 Bus-1 at Jabalpur 05-Apr-14 900 05-Apr-14 1800 Daily Retrofitting of Isolator arms(1689A) POWERGRID WR-II R

47 400 Mundara -Limbdi 1 05-Apr-14 800 07-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

48 220 Badod - Modak Ckt 5-Apr-14 900 5-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI49 400 Dhule-Babhleswar ckt 1 5-Apr-14 900 5-Apr-14 1700 Daily QMwork MSETCL MSETCL50 400 400220kv ICT-1 at Seoni 7-Apr-14 900 7-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R51 400 Bus-2 at Jabalpur 07-Apr-14 900 07-Apr-14 1800 Daily Retrofitting of Isolator arms(1789B) POWERGRID WR-II R52 400 315MVA ICT1 at Khandwa 07-Apr-14 1000 07-Apr-14 1600 Daily AMP POWERGRID WR-II R53 220 Chhegoan-Khandwa Ckt -II 7-Apr-14 900 7-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI54 400 Korba- Bhilai1 7-Apr-14 900 8-Apr-14 1900 days continuou Bay Maint and testing NTPC NTPC55 400 Vindhyachal - Mahan line 7-Apr-14 900 8-Apr-14 1900 Continuous Replacement of R Y and B Phase CT NTPC NTPC56 400 Bhusawal-Aurangabad 7-Apr-14 900 7-Apr-14 1700 Daily QMwork MSETCL MSETCL57 400 New Koyna-Karad ckt 2 7-Apr-14 830 7-Apr-14 1730 Daily QMwork MSETCL MSETCL

58 400 Mundara -Limbdi 2 08-Apr-14 800 10-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

59 400 Chorania Hadala 8-Apr-14 800 8-Apr-14 1800 Daily PMM GETCO GETCO60 400 Sipat 400KV Bay 23 8-Apr-14 900 9-Apr-14 1900 Continous One 400KV CT replacement NTPC NTPC61 400 Koradi-Khaparkheda I 8-Apr-14 900 8-Apr-14 1700 Daily QMwork MSETCL MSETCL62 765 765400KV ICT-1 at Kotra PS 9-Apr-14 900 9-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R63 400 Bus-2 at Jabalpur 09-Apr-14 900 09-Apr-14 1800 Daily Retrofitting of Isolator arms(489B) POWERGRID WR-II R64 400 315MVA ICT1 at Damoh 09-Apr-14 1000 09-Apr-14 1600 Daily AMP POWERGRID WR-II R65 400 Amreli-Jetpur 2 9-Apr-14 800 9-Apr-14 1800 Daily PMM GETCO GETCO66 400 SSP- Rajgarh - 1 9-Apr-14 800 9-Apr-14 1800 Daily PMM GETCOMPTCL GETCO67 220 TAPS1 amp2-TAPS 3amp4 tie line 9-Apr-14 800 9-Apr-14 1600 one day Annual maintenance Works MSETCL NPCIL68 220 TAPS TIE LIE-I 9-Apr-14 800 10-Apr-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL69 400 400 KV Indore - Nagda Ckt 9-Apr-14 900 9-Apr-14 1600 daily For maintenance work MPPTCL EHT- Mamp I70 400 400 KV Sarni - Isp Ckt 9-Apr-14 900 9-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I71 220 Mehgaon-Auriya Ckt 9-Apr-14 900 10-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI72 400 315 MVA 400220Kv X-mer III At Bhopal SS 9-Apr-14 900 10-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI73 400 Padgha-Tarapur CktII 9-Apr-14 900 9-Apr-14 1700 Daily QMwork MSETCL MSETCL74 765 Bus Reactor at Kotra PS 10-Apr-14 900 10-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R

75 765 amp 400

765400 kV ICT-I at Solapur amp 400KV Solapur-Parli 2 10-Apr-14 700 12-Apr-14 1800 Daily 765400 kV spare ICT unit Aux bus works CSD

commissioning amp Fire fighting works at Solapur WRTS-IReliance WRTS-I C

76 400 315MVA ICT2 at Damoh 10-Apr-14 1000 10-Apr-14 1600 Daily AMP POWERGRID WR-II R

77 765 Sasan-Satna 1 10-Apr-14 800 11-Apr-14 1800 Daily For AMP of line amp Line terminal Equipments Post commissioning checks

POWERGRID WR-II C

78 400 APL-Varsana 10-Apr-14 800 10-Apr-14 1800 Daily PMM GETCO GETCO79 400 400 KV Isp - Nagda Ckt 10-Apr-14 900 10-Apr-14 1600 daily For maintenance work MPPTCL EHT- Mamp I80 400 400 KV Bhopal-Itarsi(PGCIL) Ckt-I 10-Apr-14 900 11-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I81 220 Chhegoan-Khandwa Ckt -I 10-Apr-14 900 10-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI82 400 315 MVA 400220Kv X-mer At Katni SS 10-Apr-14 800 11-Apr-14 1800 continue For maintenance work MPPTCL EHT -MampI83 400 Korba- Bhilai2 10-Apr-14 900 11-Apr-14 1900 days continuou Bay Maint and testing NTPC NTPC84 400 Sipat 400KV Bay 14 10-Apr-14 900 12-Apr-14 1900 Continous 400KV CT 3nos replacement NTPC NTPC

85 400 Chandrapur II-Parli II 10-Apr-14 900 10-Apr-14 1700 Daily Providing of Arching horncorona rings Bird guards quarter pinsNut bolts

MSETCL MSETCL

86 400 Karad-Lonikand 10-Apr-14 900 10-Apr-14 1700 Daily QMwork MSETCL MSETCL87 400 Raipur-Durg PS 1 11-Apr-14 900 11-Apr-14 1700 Daily AMP Work WRTS-I WRTS-I R

88 400 Mundara -Jetpur 1 11-Apr-14 800 15-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

89 400 Varsana-Hadala Line 11-Apr-14 800 11-Apr-14 1800 Daily PMM GETCO GETCO90 220 Haldarwa Kawas-2 11-Apr-14 800 11-Apr-14 1800 Daily PMM work PGCIL GETCO91 400 400 KV Nagda-Rajgarh(PGCIL) Ckt-I 11-Apr-14 900 11-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

92 400 315 MVA 400220Kv X-mer III ampTie bay At Bhopal SS

11-Apr-14 900 11-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI

93 400 Akola-Nandgaonpeth 11-Apr-14 900 11-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

94 400 Akola-Wardha I 11-Apr-14 900 11-Apr-14 1700 Daily QMwork MSETCL MSETCL95 400 Kalwa-Lonikand 11-Apr-14 900 11-Apr-14 1700 Daily QMwork MSETCL MSETCL96 400 400220kv ICT-1 at Mapusa 12-Apr-14 900 12-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R97 400 Raipur-Durg PS 2 12-Apr-14 900 12-Apr-14 1700 Daily AMP Work WRTS-I WRTS-I R98 765 Sasan-Satna2 with line reactor 12-Apr-14 1000 12-Apr-14 1800 Daily AMP POWERGRID WR-II R99 400 400 KV Nagda-Rajgarh(PGCIL) Ckt-II 12-Apr-14 900 12-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I100 400 Deepnagar-Aurangabad I 12-Apr-14 900 12-Apr-14 1700 Daily QMwork MSETCL MSETCL101 400 Amreli-Jetpur 2 14-Apr-14 800 14-Apr-14 1800 Daily PMM GETCO GETCO102 400 Kasor - Gpec 14-Apr-14 800 14-Apr-14 1800 Daily PMM GETCO GETCO103 220 GWL(PGCIL)-Malanpur Ckt-I 14-Apr-14 900 15-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI104 400 DC Korba-Raipur 3 amp 4 15-Apr-14 800 16-Apr-14 1800 Conti Bus splitting work at Raipur WRTS-1 WRTS-1 C

105 400 Korba-Bhatapara 15-Apr-14 800 24-Apr-14 1800 Conti For raising of ground clearence for Railway track of Lafarge

WRTS-I Lafarge C

106 765 765400 kV ICT-II at Solapur 15-Apr-14 700 17-Apr-14 1800 Daily CSD commissioning amp Fire fighting works WRTS-I WRTS-I C107 400 Vindhyachal-Satna1 15-Apr-14 1000 15-Apr-14 1800 Daily AMP POWERGRID WR-II R108 400 Ssnl-Dhule-1 15-Apr-14 800 15-Apr-14 1800 Daily PMM GETCOMSETCL GETCO109 220 TAPS-Vapi 15-Apr-14 800 17-Apr-14 1900 Daily Annual maintenance Works GETCO NPCIL110 220 Pithampur-Rajgarh(PGCIL) Ckt - I 15-Apr-14 900 15-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI111 400 Sipat 400KV Bay-18 ( Ranchi-1 Main) 15-Apr-14 900 15-Apr-14 1900 Daily Annual Preventive maintenance job NTPC NTPC112 400 Karad-Kolhapur Ckt I 15-Apr-14 900 15-Apr-14 1700 Daily QMwork MSETCL MSETCL

113 400 DC Raipur-Bhadrawati 2 amp 3 16-Apr-14 800 17-Apr-14 1800 Conti Bus splitting work at Raipur WRTS-1 WRTS-1 C

114 400 Vindhyachal-Satna2 16-Apr-14 1000 16-Apr-14 1800 Daily AMP POWERGRID WR-II R

115 400 Mundara -Jetpur 2 16-Apr-14 800 20-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

116 400 Vadavi - Dehgam (Pg) - 1 16-Apr-14 800 16-Apr-14 1800 Daily PMM amp Tandelta testing GETCO GETCO117 400 Chorania Asoj-1 16-Apr-14 800 16-Apr-14 1800 Daily PMM GETCO GETCO118 220 Bhilad - TAPS 16-Apr-14 800 16-Apr-14 1800 Daily PMM work PGCIL GETCO119 220 Bhat - Pirana (PG) - 1 16-Apr-14 800 16-Apr-14 1800 Daily PMM work GETCO GETCO120 400 400 KV Bhopal-Itarsi(PGCIL) Ckt-II 16-Apr-14 900 17-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I121 220 Damoh(PGCIL) - Tikamgarh Ckt 16-Apr-14 900 16-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI

122 400 400KV SC Korba-Raipur-II (Between Korba - Bhatapara end)(Between Loc2980 amp 2990) 16-Apr-14 800 17-Apr-14 1700 Daily

MaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

PGCIL CSPTCL C

123 400 Sipat 400KV Bay-19 ( Ranchi-2 Main) 16-Apr-14 900 16-Apr-14 1900 Daily Annual Preventive maintenance job NTPC NTPC124 400 Padgha-Babhleswar ckt I 16-Apr-14 900 16-Apr-14 1700 Daily QMwork MSETCL MSETCL125 400 Vadavi - Dehgam (Pg) - 2 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCO GETCO126 400 Ssnl-Dhule-2 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCOMSETCL GETCO127 400 Vadinar-Hadala- 1 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCO GETCO128 220 Bhat - Pirana (PG) - 2 17-Apr-14 800 17-Apr-14 1800 Daily PMM work GETCO GETCO129 400 400KV Birsinghpur -Katni Ckt - II 17-Apr-14 800 17-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I130 220 Pithampur-Rajgarh(PGCIL) Ckt - II 17-Apr-14 900 17-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI131 400 Jejuri-Lonikand 17-Apr-14 900 17-Apr-14 1700 Daily QMwork MSETCL MSETCL132 400 Deepnagar-Khadka II 17-Apr-14 900 17-Apr-14 1700 Daily QMwork MSETCL MSETCL133 400 Chorania Kasor 18-Apr-14 800 18-Apr-14 1800 Daily PMM GETCO GETCO134 220 GWL(PGCIL)-Malanpur Ckt-II 18-Apr-14 900 19-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI135 400 Akola-Wardha II 18-Apr-14 900 18-Apr-14 1700 Daily QMwork MSETCL MSETCL

136 400 Koradi-Nandgaonpeth 18-Apr-14 800 18-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

137 765 765kV Pune line Reactor at Solapur 19-Apr-14 700 20-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

138 400 400KV Bina -Power(JP) Ckt 19-Apr-14 900 19-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I139 400 Dhule-SSarovar I 19-Apr-14 900 19-Apr-14 1700 Daily QMwork MSETCL MSETCL

140 400 Koradi-Khaparkheda II 19-Apr-14 900 19-Apr-14 1700 Daily QMwork MSETCL MSETCL141 220 KAPP - VAPI - 1 20-Apr-14 800 20-Apr-14 1800 Daily Isolator replacement under ASIDE scheme PGCIL GETCO

142 400 DC Bhilai-Bhadrawati amp Raipur-Bhadrawati 1 21-Apr-14 800 28-Apr-14 1800 Conti Diversion of line for Vidarbha Industrial Devlopment Corporation(VIDC)

WRTS-I VIDC C

143 400 Bhachau- Ranchhodpura 1amp2 21-Apr-14 800 27-Apr-14 1800 Continuous Tower shifting work at canal crossingInsulator replacement work

POWERGRID WR-II C

144 400 Hadala-Amreli 21-Apr-14 800 21-Apr-14 1800 Daily PMM GETCO GETCO145 400 Vadinar-Hadala- 2 21-Apr-14 800 21-Apr-14 1800 Daily PMM GETCO GETCO146 220 TAPS-Boisar 21-Apr-14 800 23-Apr-14 1900 Daily Annual maintenance Works MSETCL NPCIL147 220 Bina(PGCIL)-220 KV Bina Ckt 21-Apr-14 900 21-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI148 400 CGPL Bhachau -1 21-Apr-14 8AM 21-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL149 220 Kawas-Ichhapore 1+Bus 1 21-Apr-14 900 21-Apr-14 1800 daily RTV Coating NTPC NTPC150 400 Karad-Kolhapur Ckt II 21-Apr-14 900 21-Apr-14 1700 Daily QMwork MSETCL MSETCL151 400 New Koyna-Koyna Stg-4-1 21-Apr-14 830 21-Apr-14 1730 Daily QMwork MSETCL MSETCL152 400 Ssp - Rajgarh - 2 22-Apr-14 800 22-Apr-14 1800 Daily PMM GETCOMPTCL GETCO153 400 Vadavi-Bhachau 2 22-Apr-14 800 22-Apr-14 1800 Daily PMM amp Tan Delta testing PGCIL GETCO154 220 Bhilad - Vapi (PG) - 1 22-Apr-14 800 22-Apr-14 1800 Daily PMM work PGCIL GETCO155 400 400 KV Rajgarh(PGCIL)-Ssp Ckt-I 22-Apr-14 900 22-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I156 400 400KV Seoni -Sarni Ckt 22-Apr-14 900 23-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I157 220 Khandwa(PGCIL)-Nepanagar Ckt 22-Apr-14 900 22-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI158 220 Kawas-Ichhapore 2+Bus 1 22-Apr-14 900 22-Apr-14 1800 daily For maintenance work NTPC NTPC159 400 Karad-Jaigad II 22-Apr-14 900 22-Apr-14 1700 Daily Annual maintenance work MSETCL MSETCL160 220 Bhilad - Vapi (PG) - 2 23-Apr-14 800 23-Apr-14 1800 Daily PMM work PGCIL GETCO161 400 400KV Bina -Bhopal Ckt -I 23-Apr-14 900 24-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I162 400 400 KV Rajgarh(PGCIL)-Ssp Ckt-II 23-Apr-14 900 23-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I163 220 Bina(PGCIL)-Shivpuri Ckt 23-Apr-14 900 24-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI164 220 Damoh(PGCIL) - Damoh I C - I 23-Apr-14 900 23-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI

165 400 400 KV DCDS Sipat- Raipur (IampII) 23-Apr-14 800 24-Apr-14 1700 DailyMaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

PGCIL CSPTCL C

166 400 CGPL Bhachau - 2 23-Apr-14 8AM 23-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL

167 220 Kawas-Navsari 2 +Bus 1 23-Apr-14 900 23-Apr-14 1800 daily Insulator replcement and routine maintenance NTPC NTPC168 400 Padgha-Babhleswar ckt II 23-Apr-14 900 23-Apr-14 1700 Daily QMwork MSETCL MSETCL169 400 Kasor - SSP 24-Apr-14 800 24-Apr-14 1800 Daily PMM work GETCO GETCO170 220 Bhilad - Vapi (PG) - 3 24-Apr-14 800 24-Apr-14 1800 Daily PMM work PGCIL GETCO171 220 TAPS-Bhilad 24-Apr-14 800 26-Apr-14 1900 Daily Annual maintenance Works GETCO NPCIL172 220 Damoh(PGCIL) - Damoh I C - II 24-Apr-14 900 24-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI173 400 CGPL Jetpur- 1 24-Apr-14 8AM 24-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL

174 220 Kawas-Ichhapore 1 +Bus 2 24-Apr-14 900 24-Apr-14 1400 daily Insulator replcement and routine maintenance NTPC NTPC

175 220 Kawas-Ichhapore 2 +Bus 2 24-Apr-14 1400 24-Apr-14 1900 daily Insulator replcement and routine maintenance NTPC NTPC176 400 Padgha-Talegaon 24-Apr-14 900 24-Apr-14 1700 Daily QMwork MSETCL MSETCL

177 765 765kV Raichur 1 line Reactor at Solapur 25-Apr-14 700 27-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

178 400 400KV Bina -Bhopal Ckt -II 25-Apr-14 900 26-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I179 400 CGPL Jetpur- 2 25-Apr-14 8AM 25-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL180 400 Vindhyachal -Satna-4 Line Shunt Reactor 25-Apr-14 900 25-Apr-14 1900 Daily Basis AMP NTPC NTPC

181 400 Bhusawal-Koradi 25-Apr-14 900 25-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

182 400 Deepnagar-Khadka I 25-Apr-14 900 25-Apr-14 1700 Daily QMwork MSETCL MSETCL183 400 Soja -Kansari 26-Apr-14 800 26-Apr-14 1800 Daily PMM GETCO GETCO184 400 Raipur-Wardha 1 27-Apr-14 800 28-Apr-14 1800 Daily Balance construction work WRTS-1 WRTS-1 C185 220 KAPP - VAPI - 2 27-Apr-14 800 27-Apr-14 1800 Daily Isolator replacement under ASIDE scheme PGCIL GETCO186 400 Soja -Kansari 28-Apr-14 800 28-Apr-14 1800 Daily PMM GETCO GETCO187 220 TAPS-Boisar II 28-Apr-14 800 30-Apr-14 1900 Daily Annual maintenance Works MSETCL NPCIL188 400 400KV Damoh - Katni Ckt 28-Apr-14 900 28-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I189 400 400 KV Damoh(PGCIL)-Katni Ckt 28-Apr-14 900 28-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I190 400 New Koyna-Karad ckt 1 28-Apr-14 830 28-Apr-14 1730 Daily QMwork MSETCL MSETCL

191 400 DC Raigarh-DB Power (Tudri) - KSK 29-Apr-14 800 30-Apr-14 1800 Conti Crossing work of 765kV SC Raigrah-Champa (90 - 100)

WRTS-I WRTS-I C

192 400 Raipur-Wardha 2 29-Apr-14 800 30-Apr-14 1800 Daily Balance construction work WRTS-1 WRTS-1 C193 220 Navsari - Nasik - 1 29-Apr-14 800 29-Apr-14 1800 Daily PMM work GETCOMSETCL GETCO194 220 Seoni(PGCIL)-Chhindwara Ckt-I 29-Apr-14 900 29-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI195 220 Kawas-Vav 1+ bus 2 29-Apr-14 900 29-Apr-14 1800 daily For maintenance work NTPC NTPC196 400 Chorania Asoj-1 30-Apr-14 800 30-Apr-14 1900 Daily PMM GETCO GETCO197 220 Navsari - Nasik - 2 30-Apr-14 800 30-Apr-14 1800 Daily PMM work GETCOMSETCL GETCO198 220 Vapi - TAPS 30-Apr-14 800 30-Apr-14 1800 Daily PMM work PGCIL GETCO199 220 Seoni(PGCIL)-Chhindwara Ckt-II 30-Apr-14 900 30-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI200 220 Kawas-Vav 1+ bus 2 30-Apr-14 000 30-Apr-14 000 daily For maintenance work NTPC NTPC

Annexure-32-C1

List of Emergency Outages availed in Feb 2014

SlNo

Element kV Agency From

Date To Date

Remarks

1 SATNA‐BINA‐II 765 WRTS‐2 4‐Feb‐14

5‐Feb‐14

Hot spot attending

2 SUJALPUR‐NAGDA LR NAGDA

400 WRTS‐2 6‐Feb‐14

19‐Feb‐14

Oil leackage

3 SOLAPUR‐PARLI‐II

400 WRTS‐2 6‐Feb‐14

6‐Feb‐14

Hotspot attend at solapur

4 JABALPUR‐ITARSI‐IV LR AT ITARSI‐LR

400 WRTS‐2 7‐Feb‐14

17‐Feb‐14

Oil leackage

5 APL‐HADALA‐SC 400 GEB 7‐Feb‐14

7‐Feb‐14

Hot spot

6 SOLAPUR‐PARLI(PG)‐1

400 WRTM(REL)

9‐Feb‐14

9‐Feb‐14

Hot spot

7 BOISAR‐BOISAR(PG)‐II

220 MSETCL 9‐Feb‐14

9‐Feb‐14

Hotspots

8 NEW KOYNA‐KARAD ‐ I

400 MSETCL 10‐Feb‐14

11‐Feb‐14

Dc‐earth leakage

9 LONIKHAND ‐ KARAD

400 MSETCL 10‐Feb‐14

11‐Feb‐14

Hotspot

10 NAGDHA ICT ‐ III

400220

MPPTCL 10‐Feb‐14

10‐Feb‐14

Hotspot

11 AKOLA ‐ ABAD ‐I AKOLA

400 WRTS‐1 11‐Feb‐14

12‐Feb‐14

Oil leackage

12 AKOLA ‐ AURANGABAD ‐ I

400 WRTS‐1 11‐Feb‐14

11‐Feb‐14

Oil leackage ion lr

13 BINA‐GWALIOR 765 WRTS‐1 14‐Feb‐ 14‐Feb‐ Attend oil leakage on lr

SlNo

Element kV Agency From

Date To Date

Remarks

II 14 14

14 AKOLA‐TIRORA‐I 765 MSETCL 22‐Feb‐14

23‐Feb‐14

Sparking in LR at Tirora SYED AT TIRORA END

15 KHAEGAR‐ICT‐I 400220

MSETCL 22‐Feb‐14

22‐Feb‐14

Hot spot

16 KHANDWA‐NEPANAGR‐SC

220 MPPTCL 23‐Feb‐14

23‐Feb‐14

Hot spot

17 GWALIAR ‐SATNA ‐ I

765 WRTS‐2 24‐Feb‐14

1‐Mar‐14

Attend hot spot

18 KORBA BUS‐III 400 NTPC 25‐Feb‐14

25‐Feb‐14

Hots pot attend

19 BUS‐1 AT GWALIOR

765 WRTS‐2 13‐Feb‐14

13‐Feb‐14

Checking of blocked BB main‐1 relay

20 RAIPUR‐BWATI‐2

400 WRTS‐1 17‐Feb‐14

17‐Feb‐14

Urgent Removal of LR at Raipur end for DGA violation

21 TAPS‐PADGHE 400 TAPS‐3amp4 19‐Feb‐14

23‐Feb‐14

To attend SF‐6 leakage

22 SATNA‐GWALIOR‐1

765 WRTS‐2 24‐Feb‐14

26‐Feb‐14

To attend hot spots

23 VCHAL‐JABALPUR‐IV

400 WRTS‐2 27‐Feb‐14

27‐Feb‐14

To increase OPGW‐Top conductor clearance to avoid tripping

24 APL‐SAMI‐2 400 APL 26‐Feb‐14

26‐Feb‐14

To attend hot sopt

25 SHOLAPUR BUS‐1

765 WRTS‐1 27‐Feb‐14

27‐Feb‐14

To attend hot sopt

26 BOISAR BUS‐2 220 WRTS‐1 28‐Feb‐14

28‐Feb‐14

To attend hot sopt

Sl No KV element From To Basis Work System Agency Remarks

1220 Vapi (GETCO)‐Bhilad 1‐Feb‐14 800 2‐Feb‐14 1800 Daily Line crossing work of 400KV LILO line for

Magarwada SSGETCO POWERGRID N

2 220 Omkareshwar-Khandwa Ckt

3-Feb-14 900 3-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

3 400 New Koyna-Koyna Stg-4-1

3-Feb-14 830 3-Feb-14 1730 Daily QMwork MSETCL MSETCL N

4220 Vapi ‐ Magarwada

Ckt13‐Feb‐14 900 3‐Feb‐14 1400 Daily AMP of line amp equipment WRTS‐II POWERGRID DD may have to do load

shedding as per Reliability Suggestion

N

5 220 DC Raigarh- Raigarh 1amp 2

4-Feb-14 800 5-Feb-14 1800 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (040-50)

CSPTCL WRTS-I N

6 220 Itarsi(PGCIL)-Hoshangabad Ckt

4-Feb-14 900 4-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N

7 400 Mundra -Limbdi-2 4-Feb-14 800 4-Feb-14 1800 Daily Suspension Insulator replcement and routine maintenance

PGCIL CGPL N

8 400 400 kV DC Satna - Bina 1amp2

4-Feb-14 800 5-Feb-14 1800 Continous Crossing of Jabalpur-Bina 765 kv SC Line PGCIL JTCL N

9220 Vapi ‐ Magarwada

Ckt24‐Feb‐14 0900 4‐Feb‐14 1400 Daily AMP of line amp equipment WRTS‐II POWERGRID N

10 765 Seoni-Bina line with LR 4‐Feb‐14 800 4-Feb-14 1800 Daily AMP Work WRTS-2 WRTS-1 N

11 400 Bus I Bina 5‐Feb‐14 800 5‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

12220 Kawas ‐ Navsari (PG)

25‐Feb‐14 800 5‐Feb‐14 1800 Daily Replacement of ST insulators by Double Tension

insulator in Railway crossing spansWRTS‐II POWERGRID N

13400 Indoer (PG) ‐Indore

(MP) DC5‐Feb‐14 800 6‐Feb‐14 1800 Continou

sStringing of 765kV Indore ‐ Vadodara line WRTS‐II POWERGRID N

14 400 APL - Hadala 6-Feb-14 800 6-Feb-14 1800 Daily PMM GETCO GETCO N N

15 220 Seoni(PGCIL ) - Chhindwara CKT I

6-Feb-14 900 6-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N N

16 400 Jejuri-Koyna stg IV 6-Feb-14 900 6-Feb-14 1700 Daily QMwork MSETCL MSETCL N17 400 Akola-Nandgaonpeth 6-Feb-14 900 6-Feb-14 1700 Daily Quaterly Maintainance Work MSETCL MSETCL N18 400KV Korba-Bhatapara 6-Feb-14 900 7-Feb-14 1900 Cont Testing of LBB auto re-close M-I amp M-II relays NTPC NTPC N19 220 Haldarva - Jhanor - 2

(NTPC)6-Feb-14 900 6-Feb-14 1800 Daily PMM work GETCO N

20220 Navsar (PG) ‐Navsari

(GETCO) 16‐Feb‐14 800 6‐Feb‐14 1800 Daily Replacement of ST insulators by Double Tension

insulator in Railway crossing spansWRTS‐II POWERGRID

N

21 400 Bus‐II Bina 6‐Feb‐14 800 6‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

22400 Seoni‐Khandwa1 6‐Feb‐14 1000 6‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Khandwa end by MS ABB

WRTS‐II POWERGRID Rescheduled to 6th March N

23 400 Rajgarh-Ssp Ckt-II 7-Feb-14 900 7-Feb-14 1600 daily For maintenance work MPPTCL EHT- Mamp I N24 220 Chhegoan-Khandwa

Ckt -II7-Feb-14 900 7-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

25 220 Wardha (PG)-Wardha 7-Feb-14 800 7-Feb-14 1800 Daily AMP Work MSETCL WRTS-I N26 400 Chorania - Vadavi-2 7-Feb-14 800 7-Feb-14 1800 Daily PMM amp Tan Delta testing WRTGPL GETCO N27 400 Jabalpur‐Itarsi1 7‐Feb‐14 900 7‐Feb‐14 1400 Daily AMP OF TERMINAL EQUIPMENT WRTS‐II POWERGRID N

28220 Vapi(PG)‐ Bhilad ckt

2 amp 3 7‐Feb‐14 800 8‐Feb‐14 1800 Daily Line crossing work of 400KV LILO of Navsari‐Boisar

at MagarwadaGETCO POWERGRID N

29 220 Mapusa-Thivim 1 8-Feb-14 800 8-Feb-14 1800 Daily AMP Work GOA WRTS-I N

30400 Seoni‐Khandwa2 9‐Feb‐14 1000 9‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Khandwa end by MS ABB

WRTS‐II POWERGRID Rescheduled to 7th March N

31 220 Chhegoan-Khandwa Ckt -I

10-Feb-14 900 10-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

Annexure-32-C2OCC approved outage not availed in Feb‐2014

32132 132 kV Dhule

Dondaicha line10-Feb-14 800 11-Feb-14 1800 Cont Crossing of Dhule-Vadodara 765 kv SC Line MSETCL BDTCL subjected to sldc

clearance N

33 400132 KV

Vindhyachal ICT-1 10-Feb-14 900 14-Feb-14 1900 Cont ICT Overhauling NTPC NTPC N

34400 KV Vindhyachal - Jabalpur-

3 Line Shunt Reactor10-Feb-14 900 14-Feb-14 1900 Cont Reactor Overhauling NTPC NTPC

N

35 400 KSK-DB Power 10-Feb-14 800 13-Feb-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end WRTS-IDBKSK

KSK N36 220 Ipore-Kawas-1 10-Feb-14 800 10-Feb-14 1800 Daily PMM work GETCO N

37400 Vindhyachal‐Mahan 10‐Feb‐14 800 11‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐I WRTS‐II N

38400 Mahan‐Korba 10‐Feb‐14 800 11‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐I WRTS‐II N

39765 Jabalpur ‐ Bina 1 10‐Feb‐14 1000 10‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Jabalur end by MS ABB

WRTS‐II POWERGRID Differed by siteN

40 400 SSP - Rajgarh - 1 10-Feb-14 800 11-Feb-14 1800 Daily Basis

PMM Work GETCO N

41 400 DC Tundri (DB Power) -ksk-Raigarh

10-Feb-14 800 11-Feb-14 1800 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (092-100)

DB Power WRTS-I N42 400 Jetpur - Amreli - 1 11-Feb-14 800 12-Feb-14 1800 Daily PMM GETCO GETCO N43 400 Hadala - Vadinar-2 11-Feb-14 800 11-Feb-14 1800 Daily PMM GETCO GETCO N44 400 Nagda-Rajgarh Ckt-I 11-Feb-14 900 11-Feb-14 1800 daily For maintenance work MPPTCL EHT- Mamp I N45 220 Mehgaon-Auriya Ckt 11-Feb-14 900 11-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N46 220 Seoni(PGCIL ) -

Chhindwara CKT II11-Feb-14 900 11-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

47

765kV Main Bus-1B at SASANBay 13 - Jack Bus

11-Feb-14 900 21-Feb-14 1800 Daily Jumper Installations amp ConnectionsIsolator Allignment

PGCIL Reliance Provisional Subject to details of works done to be apprised on daily basis

N

48 220 Ipore-Kawas-2 11-Feb-14 800 11-Feb-14 1800 Daily PMM work GETCO N49 220 Navsari - Nasik - 2 11-Feb-14 900 11-Feb-14 1800 Daily PMM work GETCO N

50765 Jabalpur ‐ Bina 2 11‐Feb‐14 1000 11‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Jabalur end by MS ABB

WRTS‐II POWERGRID Deferred by siteN

51 400 Nagda-Rajgarh Ckt-II 12-Feb-14 900 12-Feb-14 1800 daily For maintenance work MPPTCL EHT- Mamp I N52 400 Karad-Solapur (PGCIL) 12-Feb-14 900 12-Feb-14 1700 Daily QMwork MSETCL MSETCL N53 400 Raipur-Sipat 1 amp 2 26-Feb-14 800 3-Mar-14 1800 Conti Diversion of line for Lafarge Railway track WRTS-I Lafarge Ori 12-16 Feb 14 Deferre N54 220 Haldarwa Kawas-2 12-Feb-14 900 12-Feb-14 1800 Daily PMM work GETCO N

55 220 Bus‐I Bina 12‐Feb‐14 800 12‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

56 400 Chorania - Hadala 13-Feb-14 800 14-Feb-14 1800 Daily PMM GETCO GETCO N57 400 Tarpur-Padghe-2 13-Feb-14 800 14-Feb-14 1800 Daily maintenance work POWERG

RIDNPCIL N

58400 Vindhyachal‐Satna1 13‐Feb‐14 1000 13‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

59 220 Bus‐II Bina 13‐Feb‐14 800 13‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

60 220 Pithampur-Rajgarh Ckt - I

14-Feb-14 900 14-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

61 220 Wardha (PG)-Badnera 14-Feb-14 800 14-Feb-14 1800 Daily AMP Work at Wardha MSETCL WRTS-I N

62 400 Bhusawal-Koradi 14-Feb-14 900 14-Feb-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL N

63 400 Raipur-KSK 14-Feb-14 800 16-Feb-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end WRTS-IKSK

KSK N

64 220 GWL(PGCIL)-Malanpur Ckt-II

15-Feb-14 900 15-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N

65 220 Pithampur-Rajgarh Ckt - II

15-Feb-14 900 15-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

66400 Vindhyachal‐Satna2 16‐Feb‐14 1000 16‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

67 220 KAPS - Haldarwa - 1 17-Feb-14 800 17-Feb-14 2000 Daily Yearly PM checks KAPS N

68400 3X105 MVA 400220Kv

X-mer I At Indore ss17-Feb-14 800 18-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI

N

69

220 SC Korba-Raigarh-Budhipadar sc(PGCIL) amp DC Korba-Budipadar both circuits (CSPTCL)

18-Feb-14 800 19-Feb-14 1800 Conti Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCLWRTS-I

WRTS-I

N

70 400 Itarsi-Bhopal Ckt-I 18-Feb-14 900 19-Feb-14 1700 daily For maintenance work MPPTCL EHT- Mamp I N71 220 Badod - Kota Ckt 18-Feb-14 900 18-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N72 220 Damoh(PGCIL) -

Damoh I C - II18-Feb-14 900 18-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

73 220 Badod - Modak Ckt 19-Feb-14 900 19-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

74220 KAPS - Ukai - Mota 19-Feb-14 800 19-Feb-14 2000 Daily Yearly PM checks KAPS Non consent from SLDC

GETCO N

75400 315 MVA 400220 KvX-

mer III At Indore ss20-Feb-14 800 21-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI

N

76 220 Seoni(PG)-Seoni 2 21-Feb-14 800 21-Feb-14 1800 Daily AMP Work MPPTCL WRTS-I Y N77 220 Bina(PGCIL)-Shivpuri

Ckt21-Feb-14 900 22-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI Y N

78 400 Koradi-Nandgaonpeth 21-Feb-14 900 21-Feb-14 1700 Daily QMwork MSETCL MSETCL N N79 220 Haldarva - Jhanor - 1

(NTPC)21-Feb-14 900 21-Feb-14 1800 Daily PMM work GETCO N

80

765kV Main Bus-2A at SASANSatna Line-2

22-Feb-14 900 28-Feb-14 1800 Contionious

Equipment ConnectionsCircuit Breaker TestingJumper MeasurementIsolator Allignment Reactor accessories erection on R-Phase

PGCIL Reliance

N

81 400 Korba-Raipur 3 amp 4 23-Feb-14 800 24-Feb-14 1800 Conti For Bus spliting work at Raipur765 KV Raigarh-Raipur and 765 Champa Raipur lines

WRTS-1 WRTS-1 N

82132 132kV Astha - Polai SC

line of MPPTCL24-Feb-14 800 25-Feb-14 1800 Continous Crossing of Bhopal -Indore 765 kv SC Line MPPTCL BDTCL subjected to sldc

clearance N

83 400 Bus-1 at Bilaspur 24-Feb-14 800 24-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I N

84400 Seoni -

Khedamara(Bhilai) Ckt25-Feb-14 900 25-Feb-14 1800 daily For maintenance workFeeder bay maintenance at

KMaraMPPTCL CSPTCLMPPT

CLNo confirmation on D-3

N

85400 Ranchi-Sipat 1 amp 2 25-Feb-14 800 26-Feb-14 1800 Conti Crossing work of upcoming 765 KV DC

Jharsuguda-Korba amp 765KV SC Ranchi-BilaspurWRTS-I WRTS-I No confirmation on D-3

N

86765 Sasan‐Satna2 25‐Feb‐14 800 26‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐II POWERGRID No confirmation on D-3 N

87400 Bus Reactor1 at Satna 25‐Feb‐14 1000 25‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

88400 400 kV DC Damoh -

Bhopal Line26-Feb-14 800 27-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL Not availed by agency for

rainsN

89400 Raipur-Bhadrawati 2 amp

327-Feb-14 800 27-Feb-14 2100 Daily For Bus spliting work at Raipur765 KV Raigarh-

Raipur and 765 Champa Raipur linesWRTS-1 WRTS-1 Subject to Telemetry from

Durg PS RaipurN

90 400 Birsinghpur‐Vandana Vidyut

27‐Feb‐14 800 27‐Feb‐14 1700 Daily AMP of Terminal Equipment amp line Reactor WRTS‐I POWERGRID Ready N

91 400 Bhusawal-Akola 28-Feb-14 900 28-Feb-14 1700 Daily QMwork MSETCL MSETCL N92 220 Bus-1 at Wardha 28-Feb-14 800 28-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I N93 400 Birsinghpur‐Balco 28‐Feb‐14 800 28‐Feb‐14 1700 Daily AMP of Terminal Equipment amp line Reactor WRTS‐I WRTS‐I Deferred by site N

94 400 Nagda‐Dehgam2 5‐Feb‐14 1000 5‐Feb‐14 1800 DailyCommissioning amp checking of CSD relay in Main CB for reactor switching at Dehgam end by MS ABB

WRTS‐II POWERGRID N

95 400 400kV Satpura Itarsi 10‐Feb‐14 900 11‐Feb‐14 1700 DailyCommissioning of new CB after dismantling of existing TELK make CB at Satpura end amp normalising of line on main CB

POWERGRID

WRTS‐II N

96 765 765 kV Satna - Bina Ckt I

6-Feb-14 800 8-Feb-14 1800 cont Stringing of Jabalpur-Bina 765 kv SC Line PGCIL JTCL Original27-28 Jan14 Def N

97 765400 765400 kV ICT-1 at Bina 20-Feb-14 90000 AM 21-Feb-13 60000 PM Continuou

sCSD commissioning for 400kV Side CB of 765400 kV ICT-1 WRTS-II POWERGRID Deferred by site N

98 400 Nagda - Dehgam 1amp2 20-Feb-14 80000 AM 28-Feb-14 1700 Daily Online PID testing to insulators in both circuits AR shall be kept in non auto mode in both circuits WRTS-II POWERGRID

N

99 220MC Waluj-Chitegaon amp Waluj-Jalna

21-Feb-14 700 21-Feb-14 1900 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad MSETCL WRTS-I

N

100 400 Bus 1 at Asoj 21-Feb-14 000 21-Feb-14 1800 Daily For checking bus stability testing of Piran 1 amp 2 bays (for charging of new line) GETCO WRTS-II N

101 400 Bus-1 at Wardha 22-Feb-14 800 22-Feb-14 1800 Daily Jumper spacers connection at Wardha WRTS-I WRTS-I N102 400 Bus-1 at Raigarh 22-Feb-14 800 22-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I Deferred by site N103 765 Bus - II at Indore 22-Feb-14 90000 AM 23-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Not availed NLDC consenN104 220 Kakrapar-Haldarwa2 22-Feb-14 1000 Hrs 22-Feb-14 1600 Hrs Daily AMP POWERG

RID WRTS-II N

105 400 Bus 2 at Asoj 22-Feb-14 000 22-Feb-14 1800 Daily For checking bus stability testing of Piran 1 amp 2 bays (for charging of new line) GETCO WRTS-II N N

106400 400 kv DC Bhopal -

Bina Line (Ckt I amp II)(Tower no 34 amp35)

23-Feb-14 800 24-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line MPPTCLBDTCL

N

107 765kV SASAN Main Bus-1BBay 10 - Jack Bus 24-Feb-14 800 Hrs 2-Mar-14 1900 Hrs Continuous Dia-4

(Bay-10) - SCCOCC Test of Unit 4 GTSasan Sasan N

108 765 Bus - I at Indore 24-Feb-14 90000 AM 25-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID N

109 765 765 KV Bina-Indore Line 24-Feb-14 0900 Hrs 24-Feb-14 1800 Hrs Daily

For taking spare reactor unit in service amp checking the scheme for spare reactor with 765 KV Bina-Indore Line Reactor at Bina

POWERGRID WRTS-II

Deferred by site N

110 400 Kasor - GPEC 24-Feb-14 800 25-Feb-14 1800 Daily PMM Work GETCO GETCO N111 40022033 315 MVA ICT2 at Kheda 24-Feb-14 900 10-Mar-14 1800 cont modification work in SS lay out CSPTCL CSPTCL N112 400 315 MVA ICT2 at

Gwalior 25-Feb-14 90000 AM 25-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID N

113 400KV V-Satna-4 Line Shunt Reactor 25-Feb-14 1000 25-Feb-14 2000 Daily

Basis AMP NTPC NTPC N

114 400 Raipur-Wardha 1 26-Feb-14 800 26-Feb-14 2000 Daily Balance construction works at Wardha end WRTS-I WRTS-IReady Ori26214 Deferred by site

N

115 400 Bus -I at Indore 26-Feb-14 90000 AM 26-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Deferred by site N116 400 315 MVA ICT3 at

Gwalior 26-Feb-14 90000 AM 26-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID N

117 400 400 kV DC Damoh - Bhopal Line

26-Feb-14 800 26-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL N

118 400 Chorania-Kasor 26-Feb-14 800 26-Feb-14 1800 Daily PMM work GETCO GETCO N119 400 Koradi-Satpura sc 26-Feb-14 800 26-Feb-14 1600 Daily 765KV Tiroda Koradi Transmission LineII crossing

worksPOWERGRID MEGPTCL Cancelled by MEGPTL N

120 400 400 kV DC Damoh - Bhopal Line

26-Feb-14 800 26-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL N

121 400 Raipur-Wardha 2 27-Feb-14 800 27-Feb-14 2000 Daily Balance construction works at Wardha end WRTS-I WRTS-I Deferred by site N122 400 Vindhyachal-Satna2 27-Feb-14 1000 27-Feb-14 1800 Daily Commissioning of CSD Relay in ABB make main

CB at Satna WRTS-II POWERGRID Deferred by site N

123 400 Bus -II at Indore 27-Feb-14 90000 AM 27-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Ready N124 400 315 MVA ICT1 at

Rajgarh 27-Feb-14 90000 AM 27-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID Ready N

125 400400 KV SC Kosamba - Asoj line(730-740)

27-Feb-14 700 27-Feb-14 1800 cont Crossing of Dhule - Vadodara 765 kv SC Line GETCOBDTCL

N

126 400 Indore (MP) -Indore (PG)-DC 27-Feb-14 700 28-Feb-14 1600 Cont Stringing of 765kV Indore - Vadodara line POWERG

RID WRTS-II Deferred by site N

Anaulagnak 33(A)

maaca- 2014 AaOr Ap`Ola 2014 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR MARCH 2014 AND APRIL 2014

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)maaca- 2014 Ap`Ola 2014 maaca- 2014 Ap`Ola 2014

MARCH 2014 APRIL 2014 MARCH 2014 APRIL 2014

1 gaujarat

saIimat 11700 12100 7750 7800

AsaIimat 11740 12140 7760 7810

2 maQya p`doSa

saIimat 8340 9050 5338 5540

AsaIimat 8340 9050 5338 5540

3 CltaIsagaZ

saIimat 3200 3075 1929 1809

AsaIimat 3225 3105 1944 1827

4 maharaYT

saIimat 19000 19150 10200 10300

AsaIimat 19050 19200 10250 10350

5 gaaovaa

saIimat 425 410 300 295

AsaIimat 425 415 310 300

6 dmana dIva

saIimat 340 345 210 205

AsaIimat 345 350 225 210

7 DI ena eca

saIimat 635 640 445 425

AsaIimat 635 640 445 425

8 piScama xao~

saIimat 41961 43047 28500 27900

AsaIimat 42076 43173 29560 28840

Diversity factor of 10401

March 2014 and April 2014

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah frvarI 2014

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 1552 75

]k[- Ukai - 2 1719 75]k[- Ukai - 3 598 75]k[- Ukai - 4 1757 75]k[- Ukai (Total) 5627 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 024 2]k[- ela baI saI eca Ukai LBCH - 2 131 3]k[- ela baI saI eca Ukai LBCH (Total) 154 5 0008

3 kDanaa Kadana - 1 000 0 0005kDanaa Kadana - 2 246 62 0000kDanaa Kadana - 3 223 62kDanaa Kadana - 4 166 63 0000kDanaa Kadana (Total) 634 63 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 431 9 0020 6 kula jalaIya TOTAL(H) 6846 225 0401

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 2060 32 21822 TaoronT pavar ilaimaToD yauinaT DI 7979 125 69803 TaoronT pavar ilaimaToD yauinaT [- 075 122 07584 TaoronT pavar ilaimaToD yauinaT ef 8023 124 66915 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 018811 Qauvarna tapIya Dhuvaran - GT 2 000 0 041912 Qauvarna tapIya Dhuvaran - STG 023 1013 ]ka[- yauinaT 1 Ukai -1 000 0 005114 ]ka[- yauinaT 2 Ukai -2 000 0 010815 ]ka[- yauinaT 3 Ukai -3 3147 200 297216 ]ka[- yauinaT 4 Ukai -4 10588 202 1002617 ]ka[- yauinaT 5 Ukai -5 9496 210 884118 ]ka[- yauinaT 6 Ukai -6 23703 500 1844819 gaaMQaInagar 1 Gandhinagar - 1 000 0 008620 gaaMQaInagar 2 Gandhinagar - 2 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 000 0 029622 gaaMQaInagar 4 Gandhinagar - 4 000 0 036223 gaaMQaInagar 5 Gandhinagar - 5 11676 212 1148924 vaNakbaaorI 1 Wanakbori - 1 10648 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 11069 21026 vaaNakbaaOrI 3 Wanakbori - 3 1891 20627 vaaNakbaaOrI 4 Wanakbori - 4 5244 21228 vaaNakbaaOrI 5 Wanakbori - 5 5531 21029 vaaNakbaaOrI 6 Wanakbori - 6 000 030 vaaNakbaaOrI 7 Wanakbori - 7 8902 20931 ]trna Utran GT 1 000 0 019832 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 000 0 024635 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 000 0 0000

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Anaulagnak 41

ACTUAL GENERATION amp AVALABILITY FOR FEBRUARY 2014Actual vaastivak

Actual vaastivak

37 isaka Sikka - 1 3696 112 439838 isaka Sikka - 2 000 0 017639 kcC ilagnaa[-T Kutch Lignite - 1 4429 71 848640 kcC ilagnaa[-T Kutch Lignite - 2 4037 7241 kcC ilagnaa[-T Kutch Lignite - 3 3646 6742 kcC ilagnaa[-T Kutch Lignite - 4 2215 66 525343 saUrt ilagnaa[-T Surat Lignite - 1 6705 131 682544 saUrt ilagnaa[-T Surat Lignite - 2 7475 131 738745 saUrt ilagnaa[-T Surat Lignite - 3 6965 130 728846 saUrt ilagnaa[-T Surat Lignite - 4 6362 130 688647 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5454 107 848648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5649 11449 jaI Aa[- pI saI ela GIPCL GT - 1 1589 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1587 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1702 3552 jaI Aa[- pI saI ela GIPCL ST - 1 2902 5153 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 020556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 000 0 000060 jaI pI [- saI GPEC GT - 2 267 156 013261 jaI pI [- saI GPEC GT - 3 143 146 002762 jaI pI [- saI GPEC STG 131 17263 jaI esa [- jaI GSEG GT - 1 000 0 098964 jaI esa [- jaI GSEG GT - 2 1181 5065 jaI esa [- jaI GSEG STG 642 2366 Sugen (GT 1 + GT 2) 1767 308 602467 saIpIpI sao Aayaat Imp from CPP+MUNDRA 269359 6881

kula tapIya Total (T) 475652 8386 302021kula jalaIya+tapIya Total (H+T) 482498 8604 302422ivaMD [najaI- Wind Energy 52123kula jalaIya+tapIya+hvaa Total (H+T+Wind) 534621 9539ivainamaya Exchanges 155314 saIimat jaa- maaMga Restricted Energy Req 689935

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 6800 194

11 gaaMQaI saagar Gandhi Sagar 3366 117 008012 raNaa p`tap sagar RPSagar 5883 172 004013 javaahr sagar Jawahar Sagar 4350 99 0050

2 ponca Pench 3052 165 00903 baargaI Bargi 4581 91 00804 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 11764 315 02806 banasaagar Bansagar-2 (Deolondh) 000 07 banasaagar Bansagar-3 (Silpara) 1236 32 00708 banasaagar Bansagar-4 (Zinaha) 1320 22 00509 maoDIKoDa Medikheda 396 63

10 ibarisaMGapur Birsingpur 040 20 002011 Tavaa Tawa 000 012 rajaGaaT Rajghat 165 12 006013 Omkareshwar 10620 402 14 [Midra saagar Indira Sagar 23077 997 0849

kula jalaIya TOTAL(H) MPPGCL 59999 2365 1273Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 6049 98 232502 AmarkMTk II AMK II Unit -2 6080 983 AmarkMTk III AMK III Unit -5 12212 219 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 06505 satpura II Satpura-II Unit 6 10323 180 165906 satpura II Satpura-II Unit 7 5926 1807 satpura II Satpura-II Unit 8 10964 195 191608 satpura II Satpura-II Unit 9 8353 1709 satpura III Satpura-III Unit 10 000 0 2080

10 satpura III Satpura-III Unit 11 9447 182 1909011 esajaITIpIesa 1 SGTPS Unit - 1 9447 182 1909012 esajaITIpIesa 2 SGTPS Unit - 2 10572 18213 esajaITIpIesa 3 SGTPS Unit - 3 9037 192 2064014 esajaITIpIesa 4 SGTPS Unit - 4 10700 18015 esajaITIpIesa 5 SGTPS Unit - 5 28804 51216 SSTPS 6864 587 8930

kula tapIya Total (T) 133714 3002 115350kula jalaIya+tapIya Total (H+T) 193713 5735 116623Injection from WIND 000 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 193713 5735ivainamaya Exchanges 193660 saIimat jaa- maaMga Rest En Req 387372

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 850 120 00902 Gangrel 475 10 00503 Mini Micro KWB 039 7

kula jalaIya TOTAL(H) CSEB 1364 137 0150tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 47 127402 kaorbaa (pU) Korba (E) Unit-2 2764 483 kaorbaa (pU) Korba (E) Unit-3 2764 484 kaorbaa (pU) Korba (E) Unit-4 2784 465 kaorbaa (pU) Korba (E) Unit -5 3685 120 253306 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 247808 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 15410

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 15839 256 1197012 KORBA(EB) Extn - 2 15876 256 11770

kula tapIya Total (T) 119907 1880 10190013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 119907 1880kula jalaIya+tapIya Total (H+T) 121271 2017 102050ivainamaya Exchanges 40207 0saIimat jaa- maaMga Rest En Req 161478 2017

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 9590 585 25142 kaoyanaa III Koyna III 5920 3203 kaoyanaa IV Koyna IV 18012 11324 kaoyanaa DIpIeca Koyna DPH 1442 385 TaTa jalaIya TATA Hydro 10242 741 28836 vaOtrNaa Vaitarna 000 07 eladarI Eldari 528 168 BaTgar AaOr vaIr Bhatgar amp Vir 915 49 pOzana Paithan 175 59

10 itlaarI Tillari 1106 6511 BaIra Tola rosa Bhira Tail Race 374 4112 GaTGar Ghatghar 5297 29313 Anya CaoTo jalaIya Small Hydro (others) 6173 0

kula jalaIya TOTAL(H) 58910 1599 5397Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 7700 1954 naaisak 4 Nasik Unit -4 10772 1965 naaisak 5 Nasik Unit -5 11160 1976 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 28827 5058 Tambao 6 Trombay Unit -6 000 09 Tambao 8 Trombay Unit -8 000 0

10 Tambao 7A gaOsa Trombay -7A (Gas) 7882 135 250411 Tambao 7ba Trombay -7B (WHR) 4499 7212 kaoraDI 5 Koradi Unit -5 5003 16013 kaoraDI 6 Koradi Unit -6 3963 19014 kaoraDI 7 Koradi Unit -7 10015 19015 Bausaavala 2 Bhusawal Unit -2 8329 17016 Bausaavala 3 Bhusawal Unit -3 9248 18017 Bausaavala 4 Bhusawal Unit -4 22734 50518 Bausaavala 4 Bhusawal Unit -5 19742 41519 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 7451 18621 parlaI 5 Parli Unit -5 10626 18022 parlaI 6 Parli Unit -6 14013 25323 parlaI 7 Parli Unit -7 13728 26024 KaprKoDa 1 Khaperkheda Unit -1 11173 20025 KaprKoDa 2 Khaperkheda Unit -2 10373 19526 KaprKoDa 3 Khaperkheda Unit -3 10998 20127 KaprKoDa 4 Khaperkheda Unit -4 12019 20728 KaprKoDa 5 Khaperkheda Unit -5 28882 50730 parsa Paras-3 14447 25731 parsa Paras-4 13504 25932 ]rna Uran (Gas) 18284 33833 ]rna Uran (WHR) 000 148 586234 caMd`pur 1 Chandrapur Unit -1 9087 17735 caMd`pur 2 Chandrapur Unit -2 1816 19436 caMd`pur 3 Chandrapur Unit -3 11737 21037 caMd`pur 4 Chandrapur Unit - 4 11843 46038 caMd`pur 5 Chandrapur Unit -5 7759 45539 caMd`pur 6 Chandrapur Unit -6 24420 44240 caMd`pur 7 Chandrapur Unit -7 23258 041 DhaNaU 1 Dahanu Unit-1 16339 250 1427842 DhaNaU 2 Dahanu Unit-2 16196 250 1427843 CPP 193651 29840044 RGPPL Share 000 0

kula tapIya Total (T) 631479 15369 329920MAH Wind + Solar Generation 16922 0kula jalaIya +tapIya Total (H+T+Wind) 707311 17451 372239

TOTAivainamaya Exchanges 324731saIimat jaa- maaMga Rest En Req 1032042

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1871 26ivainamaya Exchanges 33252saIimat jaa- maaMga Rest En Req 35123 434

C (F) dmana AaOr dIva DAMAN amp DIU 18245 298ja (G) dadra nagar hvaolaI DNH 40600 655

kula DD ampDNH (T) 58845 952Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 9600 160 1399112 tara`pur 2 TAPS Unit -2 11069 16013 tara`pur 3 TAPS Unit -3 36144 545 6584014 tara`pur 4 TAPS Unit -4 36197 54715 kakrapr 1 KAPS Unit -1 15230 545 3134216 kakrapr 2 KAPS Unit -2 14662 547

kula ena pI saI NPC Total 122901 25042 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14008 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 13913 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14076 214 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 32894 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 33204 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 33190 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33176 514

kula kaorbaa KSTPS Total 174461 2498 10394427 ivanQa esaTIpIesa 1 VSTPS Unit-1 12762 21328 ivanQa esaTIpIesa 2 VSTPS Unit-2 12708 21529 ivanQa esaTIpIesa 3 VSTPS Unit-3 12854 212210 ivanQa esaTIpIesa 4 VSTPS Unit-4 12909 214211 ivanQa esaTIpIesa 5 VSTPS Unit-5 12174 215212 ivanQa esaTIpIesa 6 VSTPS Unit-6 12625 214213 ivanQa esaTIpIesa 7 VSTPS Unit-7 31487 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 31075 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 31592 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 31488 512217 ivanQa esaTIpIesa 11 VSTPS Unit-11 30948 512

kula ivanQayaacala VSTPS Total 232623 3750 15107 31 saIpt -1 -SIPAT-1 38822 66400 32 saIpt -2 -SIPAT-2 32404 66500 33 saIpt -3 -SIPAT-3 38930 66300 34 saIpt -4 -SIPAT-4 26383 51600 35 saIpt -5 SIPAT-5 26400 51400

kula saIpt -SIPAT TOTAL 162939 285000 838941 kvaasa gaOsa 1e Kawas GT-1A 792 10742 kvaasa gaOsa 1baI Kawas GT-1B 2623 10943 kvaasa esaTI 1saI Kawas ST-1C 1571 11444 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 4986 304 222951 gaMQaar gaOsa 1 Gandhar GT-1 000 052 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 000 054 gaMQaar esaTI 4 Gandhar ST-4 000 0

kula gaMQaar GGPS Total 000 0 000061 maaOda 1 Mauda -1 19614 514 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 19614 514 1422661 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 000 31 000071 esa esa pI SSP RBPH - 1 6753 19372 esa esa pI SSP RBPH - 2 5907 19273 esa esa pI SSP RBPH - 3 5577 19574 esa esa pI SSP RBPH - 4 5513 19475 esa esa pI SSP RBPH - 5 7237 19476 esa esa pI SSP RBPH - 6 3109 19277 esa esa pI SSP CHPH - 1 1817 4078 esa esa pI SSP CHPH - 2 491 3679 esa esa pI SSP CHPH - 3 000 0710 esa esa pI SSP CHPH - 4 1639 39711 esa esa pI SSP CHPH - 5 901 37

kula esa esa pI SSP Total 38944 1312 389481 kula poMca Pench Total 3052 165 009082 Jindal Injection 38956 083 Amarkantak Lanco 15478 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2372740

(J) ]plabQata Availability 2308426 naoT ivainamaya Net Exchanges -292048 ]plabQa jaa- Energy Availability 2016379

maah frvarI 2014 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR FEBRUARY 2014 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 11532 - - - 11532 020214 1100 4993

saIimat Restricted 11700

AsaIimat Unrestricted 11740 11532 0 28 0 11560 010214 1200 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8366 8366 17022014 0500 5007

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9346 - - - 9346 120214 0900 4986

saIimat Restricted 8340

AsaIimat Unrestricted 8340 9346 0 38 0 9384 120214 0900 4986

nyaUnatma pMjaIkRt maaMga Min Registered Demand 3204 3204 270214 0200

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3210 3210 070214 1900 4989

saIimat Restricted 3200

AsaIimat Unrestricted 3225 3210 233 12 0 3246 070214 1900 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1617 1617 230214 2300 5021

maharaYT MAHARASHTRApMjaIkRt Registered 18510 - - - 18510 050214 1100 4984

saIimat Restricted 19000

AsaIimat Unrestricted 19050 17980 1655 -13 0 19622 190214 1200 5002

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12005 12005 280214 0400 5037

gaaovaa GOApMjaIkRt Registered 425 434 - - 434 130214 1400 5006

AsaIimat Unrestricted 425 434 1 -1 - 434 130214 1400 5006

nyaUnatma pMjaIkRt maaMga Min Registered Demand 311 311 100214 0300

essaar ESSAR(ESIL)pMjaIkRt Registered 487 - - 487 240214 1700 5004

AsaIimat Unrestricted 487 0 0 - 487 240214 1700 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 268 - - 268 250214 1200 5003

AsaIimat Unrestricted 268 0 0 - 268 250214 1200 5003

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 644 - - 644 260214 1200 4999

AsaIimat Unrestricted 644 0 - 644 260214 1200 4999

nyaUnatma pMjaIkRt maaMga Min Registered Demand 508 508 280214

piScama xao~ WESTERN REGIONpMjaIkRt Registered 42253 - - - 42253 110214 1100 4994

saIimat Restricted 41961

AsaIimat Unrestricted 42076 42021 850 235 0 43106 120214 1100 4994

nyaUnatma pMjaIkRt maaMga Min Registered Demand 27524 27524 280214 0400 5040 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

piScama xaoi~ya Baar p`oYaNa kond` mauumba[-

णाली चालन-ISO-I

ANNEXURE-43

माह फरवर 2014 February2014

समातरवतीय चालन PARALLELRADIAL OPERATION

TOTAL OPERATING

HOURS 1 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-NR) 66972

2 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-SR) 67200

टाई लाईन TIE LINE 1 765कवी िसवनी स वधा-I 765kV Sonito Wardha 67200 2 765कवी िसवनी स वधा-II 765kV Seonito Wardha 65247 3 400 कवी िभलाई स कोराड 400kV Bhilai to Koradi 67200

4 400 कवी िभलाई स भिावती 400kV Bhilai to Bhadravati 67200

5 400 कवी रायपर स भिावती-I 400kV Raipur to Bhadravati-I 67200

6 400 कवी रायपर स भिावतीETHII 400kV Raipur to Bhadravati-II 67139

7 400 कवी रायपर स भिावतीETHIII 400kV Raipur to Bhadravati-III 67200

8 400 कवी सातपरा स कोराड 400kV Satpura to Koradi 67200

9 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 67004 10 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 65308 11 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 66259 12 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 67200 13 400 कवी को हापर स मापसा-I 400kV Kolhapur-Mapusa-I 38740

14 400 कवी को हापर स मापसा-II 400kV Kolhapur-Mapusa-II 49532

15 400 कवी वापी स बोईसर 400kV Vapi-Boisar 67200

16 400 कवी रायगढ़ स ःटरलाइट-I 400kV Raigarh to Sterlight-I 66258

17 400 कवी रायगढ़ स ःटरलाइट-II 400kV Raigarh to Sterlight -II 67200

18 400 कवी रायगढ़ स झरसगड़ा-I 400kV Raigarh to Jharsuguda-I 67200

19 400 कवी रायगढ़ स झरसगड़ा-II 400kV Raigarh to Jharsuguda-II 67200

20 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 65028

21 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 66132

22 400 कवी रायपर स वधाETHI 400kV Raipur to Wardha-I 66836

23 400 कवी रायपर स वधाETHII 400kV Raipur to Wardha-II 67200

24 220 कवी कोरबा पव स ब पादर-III 220kV K(E) to Budhipadar-III 63853

Anaulagnak 47Annex-47

maah frvarI 2014 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39514 64944

10287 39711

Levels in Mtrs str maITr maoM

]ka[- Ukai

64392

9914

25402

25994

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF FEBRUARY 2014

ivavarNa Particulars

TRIPPING DETAILS FOR THE MONTH OF FEBRUARY 2014

Sr No Brief Details of incident (Elements Generation Tripped) Owner Utility Date amp Time Load

Gen LossCategory

1 Multiple Tripping from 400 kV New Koyna MSETClMSEGCLRGPPL 05‐02‐2014 0950 Hrs ‐ GI‐2

2Bus Bar protection mal‐operation at 400 kV Soja in Gujarat resulting in multiple Tripping

GETCO 06‐02‐2014 1755 Hrs ‐ GI‐2

ANNEXURE ‐ 5

  • annexpdf
    • 21pdf
    • 231pdf
    • 232pdf
    • 24pdf
    • 25pdf
    • 31pdf
    • 32C1pdf
    • 32C2pdf
    • 33Apdf
    • 41pdf
    • 42pdf
    • 47pdf
    • 5pdf
Page 8: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014

8

457th OCCM AGENDA

10102013 Bhavnagar Lignite TPP-JV I 250 August 2014 II 250 August 2014 UNO SUGEN 1 3825 COD on 04042013 CHHATTISGARH Marwa TPS I 500 25122013 Korba (w) Ext-5 500 COD on 05092013 KSK Mahanadi 3 600 COD on 14082013

VEDANTA VIDYUT 1 135 Synchronized on 11082013

MAHARASHTRA

INDIABULLS (Amaravati) 1 270 Synchronized on 03062013

INDIABULLS (Amaravati) 2 270 January-2014 INDIABULLS (Sinnar) 1 270 March-2014 VIPL(Butibori) 1 300 COD on 05042013

VIPL (Butibori) 2 300

First synchronized on 02012013 Full load on 19032013

GMR EMCO 2 300 COD on 27082013 Dhariwal 1 300 Synd On 2913 Bhusawal 5 500400 COD on 03012014 MADHYA PRADESH

SINGAJI TPP 1 600

Synchronized on 31082013 Coal fired on 30092013

2 600 June-2014 Ms Jhabua Power Seoni 1 300 JANUARY ndash 2014 MB Power Anuppur 1 300 JANUARY ndash 2014 Satpura 11 250 Synchronized on 02102013 SATPURA 10 250 COD on 18082013 CENTRAL SECTOR Vindhyachal TPP IV 12 500 Feb-14 MAUDA 2 500 Feb-14

The WR utilities may intimate the current status on above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS (A) FOLLOW-UP ITEM NO 81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the Third quarter

(October 2013 to December 2013) for the year 2013-14

The Sub-Committee members may like to note and furnish details in respect of above

9

457th OCCM AGENDA

ITEM NO 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR

Status of physical amp cyber security in Power Sector for the Third quarter (October

2013 to December 2013) have not been received from some of the constituents

The Sub-Committee may like to note and furnish details in respect of above ITEM NO 83 ADMS IMPLEMENTATION STEP BY GETCO A pilot project in respect of ADMS have been successfully implemented by GETCO in

11 kV Sadhi feeder (MGVCL ) on 19022014

GETCO may like to presentation on the same ITEMS FROM WRLDC ITEM NO 91 PERFORMANCE OF WR CONSTITUENTS POST THE IMPLEMENTATION OF DEVIATION SETTLEMENT MECHANISM ON 17022014 The IEGC second amendment as well as the Deviation Settlement Mechanism is in

force wef 17022014 The performance of WR constituents during first 10 days ie

from 17th to 28th Feb 2014 comprising of 960 time blocks is illustrated below Members

may like to analyze and devise suitable measures to ensure compliance to the above

CERC regulations

10

457th OCCM AGENDA

Since the decisions in real-time are based on the SCADA data it is now important to

monitor and ensure correctness of drawal injection as seen in SCADA The chart

below indicates the difference between the drawal of constituents as seen in SCADA

and as recorded in SEM for the period of 01st Feb 2014 to 16th February 2014 It may

be seen that the significant difference between SCADA and SEM needs to be

addressed by ensuring healthiness of telemetry and periodic validation by the SCADA

team at the respective SLDCs and WRLDC

The sub committee may like to discuss the same

11

457th OCCM AGENDA

ITEM NO 92 UNDER DRAWAL BY MAHARASHTRA AND INSECURE OPERATION IN THE GRID ON 27-28 FEB 2014

During late night of 27th Feb and early morning hours of 28th Feb-14 the grid

frequency remained above 502 Hz continuously for five hours from 2252 hrs of 27-

02-2014 to 0407 hrs of 28-02-2014 The situation was caused due to demand

reduction across the WR and NR on account of widespread rains and persistent under

drawal by Maharashtra during the above period as illustrated in figure-1 below

5067

49

492

494

496

498

50

502

504

506

508

‐1000

‐850

‐700

‐550

‐400

‐250

‐100

50

200

350

500

650

800

2100

2115

2130

2145

2200

2215

2230

2245

2300

2315

2330

2345

000

015

030

045

100

115

130

145

200

215

230

245

300

315

330

345

400

415

430

445

500

515

530

545

600

615

630

645

700

716

731

746

Maharashtra Deviation from schedule vis‐a‐vis grid frequency2100 hrs of 27‐02‐2014 to 0800 hrs of 28‐02‐2014

MSEBUI FREQ

Deviation from Schedule

Frequency

MW Hz

Several messages were sent from WRLDC control room to SLDC Kalwa directing them to control their under drawal from the grid Details of these messages is tabulated below

Sl No Message sent to Ref No Message date and time

1 SLDC Maharashtra 56079 27022014 2210 hrs

2 SLDC Maharashtra 3070 27022014 2230 hrs

3 SLDC Maharashtra 3078 28022014 0125 hrs

4 SLDC Maharashtra 3079 28022014 0150 hrs

Despite the above messages the response from SLDC Kalwa was inadequate in

controlling the under drawal of Maharashtra Consequently the frequency touched

5069 Hz at 0211 hrs of 28-Feb 2014 the voltage across the grid increased sharply

and there was over injection from WR to other regions Subsequently as a

contingency measure the drawal schedule of Maharashtra was reduced by 600 MW

by suo motu revision in the requisition of Maharashtra in Korba Vindhyachal Sipat

12

457th OCCM AGENDA

and Vidhyachal STPS wef 0230 hrs to 0500 hrs of 28022014 This was later

extended up to 0700 hrs of 28022014 It was a near miss situation that could have

been avoided by adequate planning and commensurate actions in real-time It is

requested that the matter may be taken up at the highest level in MSETCL and a

separate meeting may be convened on the above subject to avoid reoccurrence of

such event in future

The sub committee may like to discuss the same

ITEM NO 93 NON AVAILABILITY OF REAL-TIME TELEMETRY FROM LARGE NUMBER OF STATIONS IN MAHARASHTRA There are 224 nodes in Maharashtra that comprising of 32 Generating stations and

192 substations Out of these 224 nodes 47 locations are yet to be integrated in the

System Out of the balance 177 the data from nearly 50 nodes are not coming since

last 6 months Thus in totality data is not available from more than 135 out of 224

stations ie 60 which is highly alarming The extremely poor status of telemetry in

the state of Maharashtra has become a security threat Maharashtra load is touching

17500 MW and there are large number of construction related outages that have to be

facilitated Further with the formation of the synchronous All India grid there is a need

for close monitoring of system parameters such as the line flows voltage and grid

frequency Inadequate telemetry is resulting in severe constraints in real time

operation as well as outage coordination There have been several instances of line

tripping on high voltage and SPS operation due to sudden increase in line flows

during hour boundary or during facilitating planned outage These events could be

minimized with better supervision if the telemetry is available

The telemetry issue in Maharashtra has been discussed in the various WRPC forums

wherein it was informed by MSETCL that the problem is due to failure of Ms Tulip

who was the service provider for the communication network During the month of

August 2013 representative from MSETCL had assured that a new contract was being

awarded and the situation would improve within one month The extracts from minutes

of 451st OCC is quoted below

QUOTE

13

457th OCCM AGENDA

ldquoMSETCL stated that they were working to resolve the issue and assured that there

would be an improvement in availability of Telemetry from Maharashtra stations within

one Monthrdquo

UNQUOTE

Representative of MSETCL may apprise the OCC regarding present status and the

likely schedule for resolution of the issue

The sub committee may like to discuss the same

ITEM NO 94 STATUS OF LINE AND BUS REACTORS AT 765 KV SASAN

The line reactor of 765 kV Sasan-Satna ckt-2 as well as the Bus reactors of 765 kV Sasan bus are yet to be commissioned at Sasan end In the absence of these reactors high voltage is experienced at Sasan and nearby stations Often one circuit of 765 kV Sasan-Satna is required to be opened for voltage regulation Consequently the reliability of evacuation of generation from two units of Sasan is affected During 456th OCC meeting the revised schedule of the above elements as informed by Ms Reliance was as under

Schedule in formed in meetings 451st OCC 455th OCC 454th OCC 1 Line reactor of 765

kV Sasan-Satna ckt-2

By Dec 2013 By April 2014 By May 2014

2 765 kV Bus-1 Reactor

Jan 2014 By Mar 2014 By June 2014

3 765 kV Bus-2 Reactor

Jan 2014 By Mar 2014 By June 2014

It was decided in 456th OCC meeting that one representative from MPPTCL would visit the SASAN site to check readiness of Line and Bus reactors Representative from MPPTCL and Sasan may apprise the OCC-members on the progress of commissioning of reactors at 765 kV Sasan OCC members may also be apprised of the tap position of the generator transformer 2 and 3

The sub committee may like to discuss the same

14

457th OCCM AGENDA

ITEM NO 95 CHARGING OF NEW TRANSMISSION ASSET IN THE GRID In order to have better coordination of the transmission utilities with RLDCNLDC during charging synchronization of new elements into the grid a communication has been received from NLDC (ref POSOSCONLDCSystem OperationOutage Planning1239) on 10022014 It has been proposed that

a Owner of the asset shall submit the request for expected chargingcommissioning of new element for the calendar month latest by 5th day of the month to the respective RLDC amp NLDC along with status of activities mentioned in the check-list

b RLDC shall study the impact of the new element commissioning and based on its assessment of the preparedness of the utility may recommend to NLDC who in turn would examine the issue independently considering pan India grid scenario

c After the above the owner of the new asset shall give its readiness to charge the new element atleast three days in advance with current status of activities mentioned in the check list

Check list is as under 1 List of elements to be charged along with the details of approval of the

transmission scheme from the Standing CommitteeCTUSTU 2 Single Line Diagram of the concerned substations along with status of

completion of each diabusbreakers 3 Availability of real-time data and communication to the designated

SLDCRLDC 4 Installation of Special Energy Meter complying with CEArsquos Regulations

(Serial number Meter number CTPT ratio to be indicated) 5 Charging Instructions by CTUSTU 6 Schedule and sequence of charging of elements 7 Availability of line bus reactors as per planning In case the transmission

system is planned to be charged without the planned line reactor requisite authorization from CTUSTU by studies

8 Connection Agreement (along with all annexures) with CTU or STU 9 Copy of Long term Access (LTA) or MTOA granted by CTU or STU as the

case may be 10 Copy of Power Purchase Agreement (PPA) 11 A signed undertaking with name and designation of the officer clarly

indicating the following a All Disturbance recorders (DR) and Event Loggers (ELs) with time

synchronization are commissioned b All protective systems have been commissioned c All statutory clearances have been obtained

12 Output of EL and DR after charging

15

457th OCCM AGENDA

Each document mentioned in check list from Sl No 1 to 10 must be attached for sake of completeness and emailed as a consolidated document to the nodal RLDC well before the new element charging date The sub-committee may like to discuss ITEM NO 96 OPENING FEEDERS WITHOUT PRIOR INTIMATION TO WRLDC

It was gathered based on the observation from WRLDC SCADA data and subsequent

discussion with MPPTCL that 220 kV Bina (MP)-Gwalior(MP) DC were taken under

shut down for LILO works at Datia at 0910hrs on 23022014 for 4 days The outage

of these lines was neither discussed in OCC and neither was there any intimation to

WRLDC before availing the outage These lines are included in the important grid

elements list of Western region and prior concurrence of WRLDC is required for

switching these lines Further these lines form the parallel path to 765 kV Bina-Gwalior

DC and with the shutdown of these lines the network upstream of WR-NR inter

regional corridor was depleted

The sub-committee may like to discuss ITEM NO 97 TRIPPING OF 765 KV LINES ON OVER VOLTAGE Recently several tripping of 765 kV lines have been reported on over voltage These are indicated below

1) 765 kV Bina-Gwalior I at 2358 hrs of 16022014 2) 765 kV Bina-Gwalior I at 2011 hrs of 14022014 3) 765 kV Satna-Gwalior at 1300 hrs of 06022014 4) 765 kV Sasan-Satna II at 0013 hrs of 18012014 5) 765 kV Jabalpur-Bina I at 2350 hrs of 10012014 6) 765 kV Jabalpur-Bina II at 0405 hrs of 06012014

It is understood that the adopted Stage-I OV setting for the above lines vary from 108 (ie 826 kV) to 110 (841 kV) As per SCADA data the bus voltage at any of the substations mentioned above had not reached 826 kV during the above incidents

POWERGRID may examine the above tripping in detail and apprise the OCC regarding the above In case of issues related with protective relays field equipment are detected these may be addressed at the earliest The sub-committee may like to discuss

16

457th OCCM AGENDA

ITEM NO 98 RGMO FGMO OF MANDATED GENERATORS IN WESTERN REGION

As per the latest information available at WRLDC there are 251 number of units with a total capacity of 57517 MW in Western Region that are mandated to operate in Restricted Free Governor Mode The need for compliance to the IEGC regulations wrt RGMOFGMO was emphasized in the 455th and 456th OCC meeting as well as during the 25th TCCWRPC meeting Subsequently it was communicated by email to all entities in WR to provide the latest status of RGMOFGMO implementation We have received updated status from MPPTCL LANCO CGPL DB Power and JPL Tamnar in Feb 2014 The latest state wise RGMOFGMO summary is given below

Name of Entity No of mandated units

RGMO FGMO available at

RGMOFGMO Not available at

Maharashtra 90 35 55 Madhya Pradesh 58 36 22 Gujarat 35 19 16 Chhattisgarh 10 3 7 CGPL 5 5 0 NCA 11 6 5 SASAN 2 1 1 NTPC 24 10 14 ESSAR_Mahan 1 1 0 NSPCL 2 2 0 KSK 1 1 0 KWPCL 1 0 1 DB POWER 1 1 0 JPL 5 4 1 LANCO 2 2 0 IEPL 1 0 1 EMCO 2 0 2 WR_Total 251 126 125

WRLDC vide its letter ref WRLDCRGMO-FGMO1-2014 dated 23012014 has issued directions under Section 29 of the Electricity Act to ensure compliance of IEGC regulations 52 (f) (g) (h) and (i) All utilities are requested to furnish the status of compliance in respect of generating units under their jurisdiction The sub-committee may like to discuss ITEM NO 99 STATUS OF TELEMETRY IN WESTERN REGION

The status of telemetry related issues in respect of WR constituents is as under

a) Chhattisgarh Data (except MW) from 500 MW Korba West extension generating station is not available Status points from 400 kV Raita pending

17

457th OCCM AGENDA

b) Madhya Pradesh Telemetry of following bus reactors is not available at WRLDC

S No

Station Name Bus Reactor

Nunber x Capacity

Total MVAR

Rated voltage

Status of Telemetry at

WRLDC1 Nagda 250 100 420 Not available2 Indore 225 50 33 Not available3 Bhopal 225 50 33 Not available4 Birsinghpur 150 50 420 Not available

c) Gujarat Data is not-availableintermittent from following stations in Gujarat

a 220 kV Nano of Tatamdash(not available) b Kansari 400 kV ss and Navsari 220 kVhellipIntermittent (PLCC Problem)

d) Goa Due to non-availability of SCADA data from Goa the difference between drawal as seen in SCADA and as recorded in SEM is as high as 572 during the period 1st Feb to 16th Feb 2014 Data from the following stations in Goa is not available at WRLDC S No Station Status

1 Amona 220 kV Not available 2 Cuncolin 220 kV Not available 3 Kadamba 110 kV Intermittent 4 Tivim 220 kV Intermittent 5 Ponda 220 kV Intermittent 6 Xeldam-220 kV Intermittent 7 Verna-110 kV Intermittent

e) Daman amp Diu

Due to non-availability of SCADA data from Daman amp Diu the difference between drawal as seen in SCADA and as recorded in SEM is as high as 571 during the period 1st Feb to 16th Feb 2014 Data from The error is mainly due to non-availability of data from 220 kV Magarwada

f) DNH Telemetry from 220 kV Kharadpara and Khadoli station is not available

g) POWERGRID The data from the following stations is not available at WRLDC

1) 765 kV Tamnar (Communication problem GPRS link is not stable)

18

457th OCCM AGENDA

Telemetry from following stations is Intermittent at WRLDC 1) 765 kV Durg (PLCC frequent problems)

2) 765 kV Kotra (communication intermittency)

3) 765 kV Gwalior (PLCC link established but still there is some

issue(Delay) in data updation at WRLDC Rectification work under

progress by Site Engineer

4) 765 kV Solapur - Redundant link established through Reliance but

the gateway connected to above link is not configured for 765 KV

data Hence when BSNL link is down 765 KV data is not updating at

WRLDC

The sub-committee may like to discuss

ITEM NO 910 COMPARISON OF DRAWAL AS SEEN IN SCADA VS SEM The IEGC second amendment and the Deviation Settlement Mechanism is in force since the 17022014 The IEGC stipulates maintaining injection drawal within the limits prescribed in the Deviation Settlement Mechanism The sub-committee may like to discuss ITEM NO 911 MOCK BLACK START EXERCISE

As per sec 58(b) of IEGC the usersSTUs etc need to conduct Black start mock

exercises in their respective systems once in every six month under intimation to

RLDC Also the all the black start Diesel Generator (DG) sets are [as per sec 58(b)

of IEGC] required to be tested weekly and the test report needs to be sent to RLDC

on quarterly basis

The following table summarizes the status of mock exercises in respect of black start

facilities in Western Region

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

GUJARAT

1 Ukai (H) 4 x 75 Hydro Diesel 500 kVA 221213 Y

2 Mini Hydro 2 x 25 Hydro Diesel 50 KW N

3 Kadana 4 x 60 Hydro Diesel 500 KVA 2413 Y (2413)

19

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

4

Dhuvaran

1 x 107 (68+39) + 1 x 112 (72+40)

Gas

Details to be furnished by Gujarat

Details to be furnished by Gujarat

N

5 GIPCL-I 3 x 32 + 1 x49

Gas Steam Diesel 141 KW

070912 Y

6 GIPCL-II 1x104+1x56 Gas Steam Diesel 500 kVA N

7

Torrent Power Stn C Stn- DEFCCPP

StnC2x30 StnD120 StnEF(110MW each)CCPP100MW

Thermal (Units-CDEF) Gas(CCPP)

Stn-C islands Diesel

StnC15kVA StnDE F and CCPP(500 kVA each)

281112

Y

8 GPEC 3x138+1x241 Thermal Natural Gas 3000 kVA N

9 Sugen 3x3825 MW Gas Diesel 2x6MVA N

Madhya Pradesh

10 Gandhisagar 5 x 23 Hydro DG set 100 kVA N

11 Birsinghpur 1 x 20 Hydro Battery 220 Volt

Battery N

12 Pench 2 x 80 Hydro DG set 250 kVA 121012 Y

13 Bargi 2 x 45 Hydro DG set 250 kVA 100212 Y

14 Bansagar Stage-I 3 x 105 Hydro DG set 250 kVA N

15 Indira Sagar 8x125 Hydro DG set 2x1000

KVA 22511 Y

Chhattisgarh 16

Hasdeo Bango 3 x 40 Hydro DG Set 250 kVA 250812 N

17

Korba(E)-phse-I

Power plant retired but Black start DG set available and on- load trial is reported to be carried out regularly

DG Set 1500 kW(33kV)

N

Maharashtra

18

Koyna I amp II

4 x 65 4 x 75 Hydro

House generator

2 MVA 231013 N

19 KDPH 2 x20 Hydro DG set 310 KW N

20 Eldari 3 x 75 Hydro DG set 6 KW N

21

Uran (Gas)

4 x 60 (GT) + 4x108 (GT)+ 2x120 WHR

Gas DG set

4 MW PH1412kVA PH2450kVA WH520kVA

161012

N

20

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

22 RGPPL

Block 1 640MW+Block 2 66354MW+Block 3 66354MW

Gas

Gas Turbine (Frame-6)

35 MW (Under testing) Details to be provided by RGPPL

N

23 Ghatghar 2x125 Hydro DG set 1x1250

kVA 51012

N

24 Khopoli 3x24+2x12 Hydro

DC Governor amp bearing oil pumps

DC power (self start)

271013 (detailed report awaited)

N

25 Bhivpuri 3 x 24 +

2 x 15 +2x12 Hydro

DC Governor amp bearing

-do-

N

26 Bhira 6 x 25 Hydro

1 Noof 500 KVA house generator with water turbine

500 kVA

201013 (detailed

report awaited)

N

27

Bhira PSS 1 x 150 Hydro DG set 500 kVA

N

28 Trombay 1 x 120 Gas

Turbine DG Set 25 MW

N

1 x 60 Steam Turbine

NTPC

21

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

29 Kawas 4 x 106 2 x 116 Gas Diesel 2850 KW 151013

N

30 Gandhar 3 x 144 + 1x225 Gas Diesel 2975 KW

N

NCA

31 SSP(RBPH amp CHPH) 6x200+550 Hydro Diesel 2x1000kVA 080412

N

Accordingly the Black start capable stations may forward their tentative plan for conducting Black start exercises in compliance to sec 58(b) of IEGC bull As per the communication for MPPTCL the tentative plan of Black start in Madhya

Pradesh system is given under SL No Name of the Station Tentative Date Remarks 1 Pench March 2014 DG set at Pench amp are Bargi

under outage 2 ISP Apr-May 2014 - 3 TONS June 2014 Governor Problem being

attended 4 Birsinghpur June 2014 -do- 5 Medikheda June 2014 -do- 6 Rjghat June 2014 -do- Other utilities may also update their tentative plan for black start

The sub-committee may like to discuss

22

457th OCCM AGENDA

ITEM NO 912 HEALTHINESS OF MAIN CIRCUIT BREAKER OF 400 KV BIRSINGPUR-KATNI-I AT KATNI END The main CB of Birsingpur-Katni-I is under shut down since 2350 hrs of 14th February 2013 Representatives from MPPTCL may kindly apprise on the progress and expected date of restoration of the Main CB of 400 kV Birsingpur-Katni-I at Katni end The sub-committee may like to discuss

ITEM NO 913 TESTING OF SPS RELATED TO TRIPPING OF BINA-GWALIOR-AGRA AT CGPL VINDHYACHAL AND KORBA

As per the information received from NTPC and CGPL the SPS for the 765 kV Bina-

Gwalior-Agra has been installed and a mock drill has to be carried out for the same

The matter was discussed in the 456th OCC and it was decided that SPS may be

tested for reduction of say 50MW for each station instead of backing down of entire

500MWs POWERGRID WRTS-2 may confirm the testing schedule so that the

same could be coordinated in from WRLDC

The sub-committee may like to discuss

ITEM NO 914 SPS AT SIPAT WRLDC vide letter No WRLDCMO-I17192013 dt 21613 requested to take up this matter with the concerned for early implementation of the SPS Status of the SPS at NTPC Sipat is as under

1 449th OCC SPS was proposed by WRLDC It was decided to have a

separate meeting to finalize the scheme 2 450th OCC Member Secretary WRPC intimated that the matter will be

discussed in 119th PCM on 3rd amp 4th September 2013 at Tarapur 3 451st OCC It was intimated that the issue of SPS of Sipat was discussed in

119th PCM held on 3rd amp 4th September 2013 at TARAPUR The tentative scheme were formulated which needed finer tuning

4 452nd OCC Matter not discussed 5 453rd OCC NTPC representative intimated proposal sent to their corporate

office for engineering approval 6 454th OCC Approval from our corporate office is yet to be obtained 7 455th OCC Approval from our corporate office is yet to be obtained 8 456th OCC Approval from corporate office has been obtained and would be

forwarded to WRPC for approval The sub-committee may like to discuss

23

457th OCCM AGENDA

ITEM NO 915 SPS AT 4X300 MW BALCO IPP The SPS at 2010 MW Balco (4x675MW + 4x135 MW + 4x300 MW) was to be commissioned by Nov 2013 before commissioning of first unit of 4x300 MW Balco IPP For the new SPS scheme envisaged for the Balco CTU connection namely the Grid Islanding and Load Management Scheme (GILMS) Balco had reported to have placed an order with Ms SEL As discussed earlier the scheme suggested by WRLDC may be implemented before commissioning of first unit of 300 MW It was intimated during the 456th OCCM by the Balco representatives that the SPS shall be commissioned by March 2014

The sub-committee may like to discuss

ITEM NO 916 ACTIONS TAKEN FOR REVIVAL OF TRANSMISSION ELEMENTS UNDER LONG OUTAGE

As per the information available at WRLDC following elements are out for a

long period

Sl No Date of

outage

Reason

ISTSIPP

1 80 MVAR BR at

ESSAR(Mahan)

231213 Oil leakage

2 125 MVAR BR at JPL 120513 Hydrogen formation

3 50 MVAR LR of Indore-Asoj-II

at Indore

190613 R phase bushing burst

4 50 MVAR LR of Birsingpur-

Damoh at Damoh(PG)

13102014 Oil Leakage

5 765 kV Durg-Kotra-I 24022014 Sparking in Isolator

6 400 kV Raipur-Raigarh-IV 18012014 Voltage Regulation

MSETCL

1 400 kV RGPPL-NrsquoKoyna-I 22012014 Voltage Regulation

2 400 kV Sholapur-

Sholapur(PG)

26022014 Tower Collapse

MPPTCL

1 400 kV Birsingpur-Katni-I 28012014 Voltage Regulation

24

457th OCCM AGENDA

2 50 MVAR LR of Indore-Asoj-II

at Indore

6012014 DGA Violation

CSPTCL

1 400220 kV Bhilai-II 24022014 Maintenance

OCC may like to be apprised of the actions being taken for expediting revival of

the above elements

The sub-committee may like to discuss

ITEM NO 917 STATUS OF 220 KV KOLHAPUR-MUDSINGHI-CHIKODI- BELGAM LINE Consent for trial operation of 220 kV Kolhapur-Mudsinghi-Chikodi- Belgam line in radial mode for supply of Karnataka load from Maharashtra side was granted after discussion in the 455th OCC meeting WRLDC is in receipt of letter from SRLDC regarding concurrence for the above arrangement SLDC Kalwa may apprise the OCC regarding the present status The sub-committee may like to discuss

ITEM NO 918 CONTRIBUTION OF GENERATORS IN VOLTAGE CONTROL The contribution of generators in WR in voltage control was analyzed during 456th OCC meeting It was noted that following units were injecting reactive power even during high voltage

1 210 MW units of Khaparkheda Koradi and Chandrapur (Maharashtra) 2 210 MW units of Satpura and Birsinghpur (Madhya Pradesh) 3 210 MW unit 23 of Korba West (Chattisgarh) 4 200 MW unit 34 of Ukai (T) in (Gujarat)

Utilities were requested to check the setting of AVRGT tap and revert back with findings Members may apprise OCC regarding the status The sub-committee may like to discuss

ITEM NO 919 REAL-TIME MONITORING OF FEEDERS SUBSTATIONS THAT ARE COVERED UNDER THE AUFLS Telemetry of feeders substations covered under the AUFLS is desirable for real-time assessment of the anticipated relief that would be available from the AUFLS scheme at any given instant of time CERC has also directed all the constituents to for

25

457th OCCM AGENDA

mapping of these feeders in the SCDA of SLDCsRLDC Members may like to deliberate further The sub-committee may like to discuss

ITEM NO 920 LOAD FORECASTING As per the amended Indian Electricity Grid Code that is effective from 17th February 2013 the SLDCs SEB distribution licensees shall always restrict the net drawal of the State from the grid within the drawal schedule keeping the deviations from the schedule within the limits specified in the Deviation settlement mechanism regulations Therefore it is imperative that adequate attention may be paid towards load forecasting The matter was discussed in the 455th and 456th OCC as well as in the 25th TCCWRPC board meeting wherein it was decided to create a task force for exploring development of a software for load forecasting Members may like to deliberate further The sub-committee may like to discuss

ITEM NO 921 IMPLEMENTATION OF THE REVISED AUFLS IN GOA DD AND DNH It was decided during the 455th and 456th OCC meeting as well as during 25th WRPC meeting that Goa DD and DNH shall complete the implementation of the revised AUFLS in Goa DD and DNH at the earliest Representatives from the Goa DD and DNH may apprise the status of the progress The sub-committee may like to discuss

ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING As per meeting roaster circulated during 452nd OCC meeting the 458th OCC Meeting

will be hosted by Maharashtra and may be scheduled on 16th amp 17th April 2014

Maharashtra may confirm the same

Anaulagnak 21

maah frvarI 2014

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5051 Hz BETWEEN 0200 Hrs amp 0300 Hrs Hrs ON 28022014

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4970 Hz BETWEEN 1800 Hrs amp 1900 Hrs Hrs ON 28022014

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 5006 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5071 Hz AT 0210 Hrs ON 28022014

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4937 Hz AT 185000 Hrs ON 28022014

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS FEBRUARY 2014 JANUARY 2014 DECEMBER 2013

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 001 005

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 041 061 188 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 1069 5423 4864 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 4014 3569 3987

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 4876 946 956

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING FEBRUARY 2014

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

Voltage Profile during the month of Feb 2014

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 421 401 426 403 409 409 408 408 415 399 414 402 424 413 417 3922 420 402 423 404 409 409 408 408 417 402 418 404 425 415 420 3993 421 399 426 400 429 405 425 402 412 399 419 408 423 410 413 3964 422 402 426 404 430 406 428 401 414 400 414 404 424 412 414 3965 420 396 423 400 409 409 408 408 413 396 415 401 424 411 415 3996 420 396 426 400 428 405 426 402 415 398 416 402 423 411 412 4007 420 394 424 399 430 402 427 401 416 399 417 402 423 409 416 3968 418 393 422 397 409 409 408 408 416 399 416 402 422 409 418 3989 418 399 423 404 409 409 408 408 417 402 417 407 419 409 419 400

व तदाब परखा फरवर 2014 स नक Annex-23

इदौर इटारसी कराड धल असोज कासोर िभलाई जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

10 419 394 423 399 409 409 408 408 416 400 415 401 420 408 417 39511 421 393 426 397 429 405 427 401 44 399 419 404 423 407 414 39912 419 395 422 400 409 409 408 408 416 401 419 407 421 410 418 39813 420 396 424 401 409 409 408 408 417 400 416 401 421 409 418 40114 421 399 424 403 430 419 428 414 417 402 415 402 421 409 417 40015 423 397 424 399 428 414 429 412 417 398 406 406 421 407 418 40016 423 397 424 400 431 404 424 401 416 401 422 409 421 409 418 40317 421 402 424 403 432 414 420 404 416 402 412 405 422 410 417 39818 420 397 423 399 409 409 408 408 416 400 414 401 422 414 416 40019 420 396 423 399 409 409 408 408 411 398 418 405 421 413 413 39920 417 397 420 402 429 406 426 401 413 399 416 404 421 413 410 39821 419 399 422 402 430 407 421 401 415 401 418 406 422 411 414 39722 419 397 422 402 432 409 423 401 416 400 413 402 423 413 414 40023 420 396 423 397 430 412 428 404 414 404 415 402 427 414 416 40324 421 399 423 401 433 411 425 400 416 398 414 402 427 415 418 40225 421 399 423 401 433 411 425 400 416 398 414 402 427 415 418 40226 420 397 423 404 431 411 428 409 411 397 415 404 424 414 412 39327 418 398 426 403 409 409 408 408 417 399 418 402 429 415 419 39128 421 400 427 406 409 409 408 408 414 400 416 403 430 415 418 401

423 393 427 397 433 402 429 400 417 396 422 401 430 407 420 391

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 424 404 415 392 424 404 431 407 766 746 797 765 800 756 804 7692 422 406 417 398 426 404 434 407 769 754 798 774 801 769 804 7773 423 405 416 402 426 401 432 410 767 750 796 768 802 773 805 7764 426 407 417 402 423 403 430 408 768 751 797 779 801 776 808 7785 422 403 415 398 423 397 430 400 768 749 797 767 798 763 797 7586 425 404 417 401 423 399 432 404 768 750 797 767 802 773 807 7707 427 401 419 397 423 396 431 404 770 741 800 763 807 769 809 7698 422 403 416 403 424 395 427 399 756 737 788 756 801 765 802 7679 422 405 416 401 424 402 427 404 755 738 786 758 804 773 804 775

10 421 400 414 396 423 398 429 403 3 88 6 98 6 801 60

वािलयर बनाBina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

बना वािलयर नागदा खडवा िसपत िसविन

10 421 400 414 396 423 398 429 403 755 737 788 765 798 765 801 76011 423 397 414 390 426 396 433 399 758 736 794 750 800 752 802 75612 420 403 414 395 423 397 428 403 757 739 787 759 801 763 798 77013 424 405 417 400 427 397 430 402 759 740 794 760 804 773 803 77214 426 410 420 406 424 400 431 405 761 740 794 766 810 780 808 78215 425 404 417 399 426 399 430 401 762 738 794 962 808 768 806 76816 426 406 422 400 427 402 429 400 759 739 792 760 815 774 811 77617 429 407 417 398 427 404 427 406 761 742 792 762 805 765 810 77418 426 404 418 395 423 399 427 404 763 748 793 768 805 759 806 76819 423 409 415 394 422 399 428 403 759 737 795 765 804 758 806 76720 421 406 410 397 420 398 426 406 765 749 795 771 791 766 799 77421 423 407 424 399 423 403 428 405 759 744 792 760 795 761 800 76722 425 406 414 398 423 400 425 404 760 743 790 762 794 762 800 76823 425 402 412 392 424 400 428 405 758 740 790 759 796 755 799 76124 425 401 411 393 423 401 427 403 760 744 796 764 792 757 798 75625 421 408 412 395 423 401 427 403 756 742 793 766 795 764 795 76926 422 405 413 390 421 399 426 402 757 739 789 760 796 750 798 76127 426 407 416 393 421 401 431 403 760 741 795 762 803 755 804 76228 428 409 414 392 423 403 432 405 762 740 795 753 809 775 803 771

429 397 424 390 427 395 434 399 770 736 800 750 815 750 811 756

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Feb-14 0 0 0 0 0 0 0 02 02-Feb-14 0 0 0 0 0 0 0 03 03-Feb-14 0 0 0 0 0 0 0 04 04-Feb-14 0 0 0 0 0 0 0 05 05-Feb-14 0 0 0 0 0 0 0 06 06-Feb-14 0 0 0 0 0 0 0 07 07-Feb-14 0 0 0 0 0 0 0 08 08-Feb-14 0 0 0 0 0 0 0 09 09-Feb-14 0 0 0 0 0 0 0 0

10 10-Feb-14 0 0 0 0 0 0 0 011 11-Feb-14 0 0 0 0 0 0 0 012 12-Feb-14 0 0 0 0 0 0 0 013 13-Feb-14 0 0 0 0 0 0 0 014 14-Feb-14 0 0 0 0 0 0 0 015 15-Feb-14 0 0 0 0 0 0 016 16-Feb-14 0 0 NIL NIL NIL 017 17-Feb-14 0 0 0 0 0 0 0 018 18-Feb-14 0 0 0 0 0 0 0 019 19-Feb-14 0 0 0 0 0 0 0 020 20-Feb-14 0 0 0 0 0 0 0 021 21-Feb-14 0 0 0 0 0 0 0 022 22-Feb-14 0 0 0 0 0 0 0 023 23-Feb-14 0 0 0 0 0 0 0 024 24-Feb-14 0 0 0 0 0 0 0 025 25-Feb-14 1 17 0 0 0 0 0 026 26-Feb-14 0 0 0 0 0 0 0 027 27-Feb-14 0 0 0 0 0 0 0 028 28-Feb-14 0 0 0 0 0 0 0 0

Max 1 17 0 0 0 00 0 0Total 1 17 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month FEBRUARY 2014

Recommonded Load relief at 492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE-25

Power CutRestrictions in Western Region for the month of February-2014 k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply(DLF)

01022014 28022014 2344 2240 2332

21 Three-Phase Supply(Irrigation)

01022014 28022014 0956 0905 0946

21 Three-Phase Supply(Mixed)

01022014 28022014 2343 2227 2330

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01022014 28022014 2353 2337 2347 32 District Head Qtrs 01022014 28022014 2355 2340 2351 33 Tehsil Head Qtrs 01022014 28022014 2349 2309 2341

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid

1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 010214 to 280214

SaUnya Nil

0-1655MW

SaUnya Nil

0000

SaUnya Nil 2400

SaUnya Nil

95 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-

2 Power supply to Agricultural Sector ivavarNa Details sao From

idnaaMk Date tk To

idnaaMk Date p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs) 21 Three-Phase Supply 01022014 28022014 1000 0800 0900

22 Single-Phase Supply 01022014 28022014 1800 1800 1800 3 Anya jaanakarI Any other information

There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

11107 (Av) of 23 days 0000(Av) 0000 (Av)

1Rural 9031(Av) for 3486 Hrs 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0666 - -

0105 -

3 HT Industries 000 (Av) for 00 Hrs 000 Total Energy Cutday 0771 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01022014 to 280214 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 2322014 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का फरवर 2014का वःता रत यौरा

Details of forced unit outages during the month ofFeb2014

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 एःसार वा डनर

ESSAR VADINAR-I

गरा विनिल GSECL

660 2156 20-Jan-14 2018 10-Feb-14 Coal shortage

2 एःसार Essar-2

गरा विनिल GSECL

172 1212 22-Feb-13 अनपल ध Still out

अनपल ध Still out

Shortage of gas

3 एसएलपीपी SLPP-1

गरा विनिल GSECL

125 1445 23-Feb-14 1237 27-Feb-14 BTL

4 एकएलट पीएसAKLTPS-1

गरा विनिल GSECL

125 1147 26-Feb-14 अनपल ध Still out

अनपल ध Still out

DCS FAIL

5 एपीएल APL - 2

अदानी ADANI

330 056 3-Feb-14 अनपल ध Still out

अनपल ध Still out

Turbine vibration bearing probl em

6 एपीएल APL-5

अदानी ADANI

660 1732 15-Feb-14 456 27-Feb-14 Turbine vibration

7 एपीएल APL - 6

अदानी ADANI

660 2049 25-Feb-14 1947 3-Mar-14 Coal mill problem

8 टाटा TATA-6

मारा वउकिल MSPGCL

500 2352 19-Jul-13 अनपल ध Still out

अनपल ध Still out

For Economy SD

9 वीआईपीएल VIPL-I

मारा वउकिल MSPGCL

300 105 2-Oct-13 अनपल ध Still out

अनपल ध Still out

Turbine bearing vibration probl em

10 टाटा TATA-8

मारा वउकिल MSPGCL

250 2255 9-Jan-14 अनपल ध Still out

अनपल ध Still out

HT due to fire near turbine generator desk

11 चिपर Chandrapur-2

मारा वउकिल MSPGCL

210 1238 14-Jan-14 1310 23-Feb-14 ID fan problem

12 कोराड KORADI-6

मारा वउकिल MSPGCL

210 651 24-Jan-14 1456 14-Feb-14 Coal bunkering problem

13 डब यपीसीएल WPCL-1

मारा वउकिल MSPGCL

135 1245 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Furnace press high

14 डब यपीसीएल WPCL-3

मारा वउकिल MSPGCL

135 421 7-Feb-14 Ready Ready Less requisition

प म ऽय भार षण कि म बई णाली चालन-ISO-I

15 चिपर CPUR - 6

मारा वउकिल MSPGCL

500 1523 11-Feb-14 2033 13-Feb-14 BTL

16 नािसक NASIK-3

मारा वउकिल MSPGCL

250 300 11-Feb-14 100 19-Feb-14 UAT problem

17 कोराड KORADI-5

मारा वउकिल MSPGCL

210 153 14-Feb-14 अनपल ध Still out

अनपल ध Still out

ID fan problem

18 ितरोडा Tiroda-I

मारा वउकिल MSPGCL

660 2059 15-Feb-14 2054 26-Feb-14 Turbine bearing problem

19 ितरोडा Tiroda-2

मारा वउकिल MSPGCL

660 1125 17-Feb-14 152 22-Feb-14 BTL

20 कोराड KORADI-6

मारा वउकिल MSPGCL

210 2357 19-Feb-14 250 23-Feb-14 BTL

21 भसावल BHUSWAL-2

मारा वउकिल MSPGCL

210 301 22-Feb-14 1706 25-Feb-14 PA fan temp High

22 खापरखड़ा KHAPERKHEDA-3

मारा वउकिल MSPGCL

250 1448 22-Feb-14 130 25-Feb-14 BTL

23 जयगड Jaigad-4

मारा वउकिल MSPGCL

300 1930 22-Feb-14 1107 4-Mar-14 Low schedule

24 कोराड Koradi-5

मारा वउकिल MSPGCL

300 404 23-Feb-14 अनपल ध Still out

अनपल ध Still out

Electrical fault

25 पल PARLI-4

मारा वउकिल MSPGCL

210 1836 28-Jan-14 1956 3-Feb-14 Air preheater problem

26 भसावल BHUSAWAL-4

मारा वउकिल MSPGCL

250 1432 28-Feb-14 1802 3-Mar-14 Ash hopper problem

27 आरजीपीपीएल RGPPL-1B

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

28 आरजीपीपीएल RGPPL-2B

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

29 आरजीपीपीएल RGPPL 3A

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

30 आरजीपीपीएल RGPPL-1A

आरजीपीपीएल RGPPL

320 1500 18-Jan-14 अनपल ध Still out

अनपल ध Still out

SRV problem

31 आरजीपीपीएल RGPPL 3B

आरजीपीपीएल RGPPL

320 1230 8-Feb-14 Ready Ready Less requisition

32 िसगाजी SINGAJI - I

म वउकिल MPPGCL

600 422 12-Feb-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

33 सातपरा SATPURA-11

म वउकिल MPPGCL

250 1913 15-Feb-14 2149 19-Feb-14 Main stream temperature low

34 सातपरा SATPURA-11

म वउकिल MPPGCL

250 542 26-Feb-14 1642 2-Mar-14 BTL

35 एःसार महान Essar-Mahan-1

एःसार ESSAR

600 000 29-Jan-14 015 18-Feb-14 Less requisi tion

36 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

37 वदना Vandana-1

वदना Vandana

135 149 12-Jan-14 अनपल ध Still out

अनपल ध Still out

BTL

प म ऽय भार षण कि म बई णाली चालन-ISO-I

38 ससान Sasan-2

आरईएल REL

660 205 16-Feb-14 1650 23-Feb-14 Problem in ash handling

39 कावास Kawas 2A

एनट पीसीNTPC 164 2018 23-Dec-13 Ready Ready Less requisition

40 गाधार Gandhar-3

एनट पीसीNTPC 144 2037 28-Dec-13 Ready Ready Less requisition

41 गाधार Gandhar-I

एनट पीसीNTPC 144 2011 1-Jan-14 Ready Ready Less requisition

42 कावास Kawas 2B

एनट पीसीNTPC 164 900 13-Jan-14 421 5-Mar-14 Maintenance

43 गाधार Gandhar-2

एनट पीसीNTPC 219 023 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Less requisition

44 कावास Kawas-1A

एनट पीसीNTPC 164 2055 4-Feb-14 712 20-Feb-14 Less requisition

45 कावास

Kawas-1B एनट पीसीNTPC 164 1951 13-Feb-14 503 20-Feb-14 Less requisition

46 कावास Kawas 1A

एनट पीसीNTPC 164 1210 21-Feb-14 Ready Ready Less requisition

47 कावास Kawas 1B

एनट पीसीNTPC 164 012 22-Feb-14 1144 26-Feb-14 Less requisition

Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का फरवर 2014 का वःता रत यौरा

Details of planned unit outages during the month of Feb2014 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Time Date

1 डब यट पीएस WTPS-3

गरा विनिल GSECL

210 212 12-Feb-14 अनपल ध Still out

अनपल ध Still out

AOH

2 पल ParlI-3

मारा वउकिल MSPGCL

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

AOH

3 चिपर Chandrapur-5

मारा वउकिल MSPGCL

500 101 14-Jul-13 841 19-Feb-14 AOH

4 कोरबा प म KORBA-(W)-4

छरा वउकिल CSPGCL

210 2226 7-Feb-14 अनपल ध Still out

अनपल ध Still out

AOH

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

NIL2

NIL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING MARCH 2014 AND APRIL 2014

Capacity Outage as per Annual Maintenance Plan

3 Craiva]kMila CSPGCL

NIL

4

NIL

5 koMd``Iya xao~ Central Sector51 VSTPS 4 210 010414 070414 AOH52 VSTPS 2 210 080414 270414 AOH53 VSTPS 1 210 300414 190514 AOH54 CGPL 10 800 280314 130514 COH

maraiva]kMila MSPGCL

Date Time Date Time1 220 Bus-1 at Mapusa 20-Mar-14 1000 20-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R

2 765 Bus-1 at Sasan 20-Mar-14 800 20-Mar-14 1800 Daily Stringing of Main bus 1 for 765 kV Vichal Pooling - Sasan feeder

Reliance WR-II C

3 400 400kV Bus-2 at Satna 20-Mar-14 800 20-Mar-14 1800 Continuous Bay extension work related to JP - Nigrie Bays POWERGRID WR-II C

4 400 400kV ICT 1 at Satna 20-Mar-14 800 20-Mar-14 1000 Continuous Bay extension work related to JP - Nigrie Bays POWERGRID WR-II C

5 400 400kV Jabalpur Itarsi 1amp2 (Dc) 20-Mar-14 1000 20-Mar-14 1400 Continuous For commissioning of Line Impedance measurement kit

POWERGRID WR-II C

6 765 3X80 MVAr Bina Line Reactor at Indore 20-Mar-14 1000 21-Mar-14 1800 Continuous For installation of online dry out amp online DGA kit

POWERGRID WR-II C

7 400kV Damoh - Bhopal 1 20-Mar-14 800 31-Mar-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

8 400 Chorania Kasor 20-Mar-14 800 20-Mar-14 1800 Daily PMM work GETCO GETCO9 400 400 KV Main Bus-I at 400 KV Ss Khedamara 20-Mar-14 900 22-Mar-14 1700 Daily Erection of Pantograph 1 Set of IP amp CVT CSPTCL CSPTCL C

10 400 400 KV Khedamara-KSTPS NTPC ckt-II at 400 KV Ss Khedamara

20-Mar-14 900 22-Mar-14 1700 Daily Erection of Pantograph CVT amp 1 Set of IP PGCIL CSPTCL C

11 400 Korba -Vandana 20-Mar-14 900 21-Mar-14 1900 days continuouTesting of LBB auto re-close M-I amp M-II relays NTPC NTPC

12 400 Korba -Vandana 20-Mar-14 900 21-Mar-14 1900 days continuouTesting of LBB auto re-close M-I amp M-II relays NTPC NTPC

13 400DC Akola-Aurangabad (MSETCL) 1 and Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

21-Mar-14 600 23-Mar-14 1800 Conti Crossing work of 400kv MC Aurangabad - Aurangabad

MSETCLWRTS-I WRTS-I C

14400 amp 220 amp 132

400KV DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 400KV Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

21-Mar-14 600 21-Mar-14 1800 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad

MSETCLWRTS-I WRTS-I C

15 400 Bhadrawati-Parli 1amp 2 21-Mar-14 900 31-Mar-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I C

16 220 Bus-1 at Pune 21-Mar-14 800 21-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R

17 400 Solapur-Kolhapur 1 amp 2 21-Mar-14 700 21-Mar-14 1800 Daily Stringing work upcoming 765 kV Solapur-Pune line

Reliance WRTS-I C

18 220 220kV DC Raigarh- Raigarh (CSPTCL) Line (if outage not avail on 13140314)

21-Mar-14 900 22-Mar-14 1700 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (040-50)

CSPTCL WRTS-I C

19 220 Bus-2 (Section-A) at Mapusa 21-Mar-14 1000 21-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R20 400 Bus-1 at Itarsi 21-Mar-14 900 21-Mar-14 1800 Daily AMP POWERGRID WR-II R21 220 Bus-1 at Gwalior 21-Mar-14 1000 21-Mar-14 1800 Daily AMP POWERGRID WR-II R22 220 Jhanor - Haldarwa 1 21-Mar-14 900 21-Mar-14 1800 Daily AMP POWERGRID WR-II R23 400 Vapi Boisar 21-Mar-14 700 22-Mar-14 1900 Continuous For crossing of 220kV Kala Khadoli TL POWERGRID WR-II C

24 765 Sasan-Satna2 21-Mar-14 800 22-Mar-14 1800 Continuous For Power Line crossing of 765kV Vindhyanchal (pooling) - Satna 2 Line

POWERGRID WR-II R

25 400 400220 ICT NO1 at Kasor 21-Mar-14 800 21-Mar-14 1800 Daily PMM work GETCO GETCO26 400 400KV Sipat-Pathadi(LANCO) line 21-Mar-14 900 22-Mar-14 1900 Continous Annual Preventive maintenance job NTPC NTPC27 400 Pune-Parli 2 50MVAr Line Reactor at Pune 22-Mar-14 800 22-Mar-14 1800 Daily AMP Work Line in service wo reactor Reliance WRTS-I R

28 765 Bus-2 at Solapur 22-Mar-14 700 22-Mar-14 1800 Daily 765KV Pune bay commissioning amp SCADA works

WRTS-I WRTS-I C

29 400 Bus-1 at Bhatapara 22-Mar-14 800 23-Mar-14 1800 Conti Bus extension work for new 125MVAr Bus Reactor at Bhatapara

WRTS-I WRTS-I C

30 220 Bus-2 (Section-B) at Mapusa 22-Mar-14 1000 22-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R31 400 Vadavi Chorania 1 22-Mar-14 900 22-Mar-14 1800 Daily AMP Reliance WR-II R32 220 Jhanor - Haldarwa 2 22-Mar-14 900 22-Mar-14 1800 Daily AMP POWERGRID WR-II R33 220 Bus-2 at Gwalior 22-Mar-14 1000 22-Mar-14 1800 Daily AMP POWERGRID WR-II R

34 765 3X80 MVAr Bus Reactor at Indore 22-Mar-14 1000 23-Mar-14 1800 Continuous For installation of online dry out amp online DGA kit

POWERGRID WR-II C

35 220 Transfer Bus at Mapusa 23-Mar-14 1000 23-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R

36 400 Raigarh- Raipur 4 amp Raigarh-Kotra PS 2 23-Mar-14 800 30-Mar-14 1800 Conti Bay shifting work for up-coming 125MVAr Bus Reactor at Raigarh

WRTS-I WRTS-I C

37 765 Bus-1 at Indore (PG) 23-Mar-14 1000 23-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

Outages Proposal of Transmission elements during the month of MARCH‐2014Type

ANNEXURE‐32A

SN KV Line From To

Basis Reason System Agency

38 220 MC Waluj-Chitegaon amp Waluj-Jalna on same tower

24-Mar-14 600 24-Mar-14 1800 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad

MSETCL WRTS-I C

39 400 Raipur-Sipat 1 amp 2 24-Mar-14 800 2-Apr-14 1800 Conti Diversion of line for Lafarge Railway trackERS removal

WRTS-I Lafarge C

40 220 Bus-2 at Pune 24-Mar-14 800 24-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R41 765 Bus-1 at Bilaspur 24-Mar-14 800 24-Mar-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R

42 400 Bus-2 at Bhatapara 24-Mar-14 800 25-Mar-14 1800 Conti Bus extension work for new 125MVAr Bus Reactor at Bhatapara

WRTS-I WRTS-I C

43 400 Kolhapur-Mapusa 2 24-Mar-14 600 24-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

44 400 Vadavi Chorania 2 24-Mar-14 900 24-Mar-14 1800 Daily AMP Reliance WR-II R45 765 Bus-2 at Indore (PG) 24-Mar-14 1000 24-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

46 765 Bus-2 at Sasan 24-Mar-14 800 24-Mar-14 1800 Daily Strining of Main Bus 2 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

47 220 KAPP - Haldarwa 1 24-Mar-14 800 24-Mar-14 1800 Daily AMP POWERGRID WR-II R48 400 Bus - 2 at Pune 25-Mar-14 800 25-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R

49 765 Bus - 1 at Wardha 25-Mar-14 800 25-Mar-14 1800 Daily Jumper connection work of 765KV Raipur-Wardha line

WRTS-I WRTS-I R

50 400 Kolhapur-Mapusa 2 25-Mar-14 600 25-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

51 220 Mapusa-Ponda line 25-Mar-14 1000 25-Mar-14 1500 Daily AMP Work GOA WRTS-I R

52 765 Bus-1 at Sasan 25-Mar-14 800 25-Mar-14 1800 Daily Jumpering of Bus 1 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

53 220 KAPP - Haldarwa 2 25-Mar-14 800 25-Mar-14 1800 Daily AMP POWERGRID WR-II R54 400 Vadavi - Kansari2 25-Mar-14 900 25-Mar-14 1800 Daily AMP Reliance WR-II R55 400 Bus-1 at Indore (PG) 25-Mar-14 1000 26-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C56 765 Bus-1 at Satna 25-Mar-14 800 25-Mar-14 1800 Continuous Bay extension work POWERGRID WR-II C57 765 Sipat 765KV 400KV 1000MVA ICT-1 25-Mar-14 900 25-Mar-14 1900 Daily SPS Protection scheme modification NTPC NTPC

58 765 Bus - 2 at Wardha 26-Mar-14 800 26-Mar-14 1800 Daily Jumper connection work of 765KV Raipur-Wardha line

WRTS-I WRTS-I R

59 400 Bhadrawati-Parli 2 63MVAr Line Reactor at Parli

26-Mar-14 800 26-Mar-14 1800 Daily AMP Work of Recator at Parli line in service wo reactor

WRTS-I WRTS-I R

60 400 Kolhapur-Mapusa 1 26-Mar-14 600 26-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

61 220 Mapusa-Amona line 26-Mar-14 1000 26-Mar-14 1500 Daily AMP Work GOA WRTS-I R62 765 Bus-2 at Satna 26-Mar-14 800 26-Mar-14 1800 Continuous Bay extension work POWERGRID WR-II C

63 765 Bus-2 at Sasan 26-Mar-14 800 26-Mar-14 1800 Daily Jumpering of bus 2 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

64 400 401 KV Main Bus-I at 400 KV Ss Khedamara 26-Mar-14 900 27-Mar-14 1700 Daily Erection of IPS Tube CSPTCL CSPTCL C

65 400 401 KV Khedamara-KSTPS NTPC ckt-II at 400 KV Ss Khedamara

26-Mar-14 900 27-Mar-14 1700 Daily Erection of IPS Tube PGCIL CSPTCL C

66 400 ACBIL-BILASPUR-CKT NO -2 26-Mar-14 900 31-Mar-14 1800 CONT FOR lilo CONNECTIVITY OF 300MW MCCPL TPP

ACBIL ACBIL C

67 765 Bus-2 at Bilaspur 27-Mar-14 800 27-Mar-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R68 220 Mapusa-Thivim 1 27-Mar-14 1000 27-Mar-14 1500 Daily AMP Work GOA WRTS-I R69 220 KAPP - Vav 2 27-Mar-14 800 27-Mar-14 1800 Daily AMP POWERGRID WR-II R70 400 Bus-2 at Indore (PG) 27-Mar-14 1000 28-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

71 765 Bus-2 at Gwalior 27-Mar-14 1000 27-Mar-14 1800 Daily Bay extension work related to Gwalior Jaipur 1 Bays

POWERGRID WR-II C

72 400 VSTPS Tie- Line-1 ( Line from Stage-III to IV Switchyard)

27-Mar-14 900 27-Mar-14 1900 Daily Basis AMP and rectification of hot spots NTPC NTPC

73 765 Sipat 765KV 400KV 1000MVA ICT-2 27-Mar-14 900 27-Mar-14 1900 Daily SPS Protection scheme modification NTPC NTPC74 765 Bus-1 at Solapur 28-Mar-14 700 30-Mar-14 1800 Daily commissioning tests amp SCADA works WRTS-I WRTS-I C75 220 Mapusa-Thivim 2 28-Mar-14 1000 28-Mar-14 1500 Daily AMP Work GOA WRTS-I R

76 400 Koradi-Satpura 28-Mar-14 1000 28-Mar-14 1400 Daily Earthwire tighting work damaged during Crossing work

WRTS-I ADANI C

77 220 Bus-1 at Dehgam 28-Mar-14 900 28-Mar-14 1800 Daily AMP POWERGRID WR-II R78 220 Kawas - Haldarwa 2 28-Mar-14 800 28-Mar-14 1800 Daily AMP POWERGRID WR-II R79 400 Chorania Amreli 28-Mar-14 800 28-Mar-14 1800 Daily PMM work GETCO GETCO

80 400DC Akola-Aurangabad (MSETCL) 1 and Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

29-Mar-14 600 30-Mar-14 1800 Conti Charging amp shifting of Akola-Abad line on MC Abad-Abad line WRTS-I WRTS-I C

81 220 Bus-2 at Dehgam 29-Mar-14 900 29-Mar-14 1800 Daily AMP POWERGRID WR-II R82 400 Bus -1 at Mapusa 30-Mar-14 1000 30-Mar-14 1500 Daily AMP Work WRTS-I WRTS-I R

83 765 765kV Bus Reactor at Solapur 31-Mar-14 700 2-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

Date Time Date Time

1 400 Bhilai-Koradi 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

2 400 DC Korba-Birsingpur 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

3 400 Korba-Bhilai 2 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

4 220 Korba-Budhipadar 3 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

5 400 Akola-Wardha 1amp 2 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

6 400 Raipur-Raigarh 1 amp Raipur-KSK-DBPL-Raigarh

1-Apr-14 800 30-Apr-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

7 400 Bhadrawati-Parli 1amp 2 1-Apr-14 900 30-Apr-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I C

8 400 400220kv ICT-1 at Pune 1-Apr-14 800 1-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R9 400 Bus-1 at Bilaspur 1-Apr-14 800 1-Apr-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R

10 400 Solapur(PG) -Karad line 1-Apr-14 700 10-Apr-14 1800 Conti Erection of 80MVAr new reactor by shifitng line equipments at Solapur

MSETCL WRTS-I C

11 400 Bus-1 at Jabalpur (pooling) 01-Apr-14 1000 01-Apr-14 1800 Daily Busbar Stability test related to Jhabua Power Bays

POWERGRID WR-II C

12 400 Shujalpur - Nagda 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

13 400 Mundra - Bhachau 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

14 400 Bina - Shujalpur 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

15 220 Omkareshwar-Khandwa Ckt 1-Apr-14 900 1-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI16 400 Sipat 400KV Bay 10 and 11 1-Apr-14 900 3-Apr-14 1900 Continous 400KV CT 3nos replacement NTPC NTPC17 400 Padgha-Nagothane ckt I 1-Apr-14 900 1-Apr-14 1700 Daily QMwork MSETCL MSETCL

18 400 Bus-2 at Jabalpur (pooling) 02-Apr-14 1000 02-Apr-14 1800 Daily Busbar Stability test related to Jhabua Power Bays

POWERGRID WR-II C

19 400 Vindhyanchal - Mahan - Korba (Section of both the line on same Dc tower)

02-Apr-14 800 03-Apr-14 1700 Continuous For Power Line crossing of 765kV Vindhyanchal (pooling) - Satna 1 Line

POWERGRID WR-II C

20 400 400kV ICT 4 at Indore MPPTCL 02-Apr-14 1000 04-Apr-14 1800 ContinuousFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

MPPTCL WR-II C

21 400 400kV Bus Coupler bay at Indore MPPTCL 02-Apr-14 1000 04-Apr-14 1800 ContinuousFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

MPPTCL WR-II C

22 400 400kV Itarsi - Indore MPPTCL 1 Line 02-Apr-14 1000 02-Apr-14 1500 DailyFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

POWERGRID WR-II C

23 400400 KV LILO Line of 400 KV SC Korba West-Khedamara to 400 KV Ss Raita (Between Loc69 amp70 near Raita Ss)

2-Apr-14 800 3-Apr-14 1700 DailyMaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

CSPTCL CSPTCL C

24 400 Chandrapur-Khaparkheda 2-Apr-14 900 2-Apr-14 1700 Daily QMwork MSETCL MSETCL

25 400 Lamboti-Solapur PG 2-Apr-14 900 2-Apr-14 1700 Daily QMwork MSETCL MSETCL

26 400 Bus-1 at Durg PS Ss 3-Apr-14 900 3-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R27 400 Bus-1 at Jabalpur 03-Apr-14 900 03-Apr-14 1800 Daily Retrofitting of Isolator arms(689A) POWERGRID WR-II R28 400 315MVA ICT2 at Khandwa 03-Apr-14 1000 03-Apr-14 1600 Daily AMP POWERGRID WR-II R29 400 Mundra - Hadala 3-Apr-14 800 3-Apr-14 1800 Daily PMM GETCO GETCO30 400 400KV Seoni -Bhilai Ckt 3-Apr-14 900 3-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I31 400 Lonikand-Chakan 3-Apr-14 900 3-Apr-14 1700 Daily QMwork MSETCL MSETCL32 400 Bus-2 at Durg PS Ss 4-Apr-14 900 4-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R33 400 Bus-1 at Jabalpur 04-Apr-14 900 04-Apr-14 1800 Daily Retrofitting of Isolator arms(2089A) POWERGRID WR-II R

34 400 400kV Itarsi - Indore MPPTCL 1 Line 04-Apr-14 1300 04-Apr-14 1800 DailyFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

POWERGRID WR-II C

35 400 Varsana - Hadala 4-Apr-14 800 4-Apr-14 1800 Daily PMM GETCO GETCO

Agency Type

ANNEXURE‐32BOutages Proposal of Transmission elements during the month of APRIL ‐2014

SN KV Line From To

Basis Reason System

36 220 Vapi - Vapi (PG) 4-Apr-14 800 4-Apr-14 1800 Daily PMM work PGCIL GETCO37 220 Haldarva - Jhanor - 1 (NTPC) 4-Apr-14 800 4-Apr-14 1800 Daily PMM amp Tan Delta testing PGCIL GETCO38 400 400KV Birsinghpur -Katni Ckt - I 4-Apr-14 800 4-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I39 220 Badod - Kota Ckt 4-Apr-14 900 4-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI40 220 Malanpur-Auriya Ckt 4-Apr-14 900 5-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI

41 400 Bhusawal-Akola 4-Apr-14 900 4-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

42 400 Deepnagar-Aurangabad II 4-Apr-14 900 4-Apr-14 1700 Daily QMwork MSETCL MSETCL43 400 Kalwa-Padgha Ckt I 4-Apr-14 900 4-Apr-14 1700 Daily QMwork MSETCL MSETCL44 765 Bus Reactor at Seoni 5-Apr-14 900 5-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R

45 400 DC Korba-KhedamaraLilo at Marwa lilo section yet to be charge 5-Apr-14 800 6-Apr-14 1800 Daily

Crossing work of upcoming 765 KV DC Raigarh-Champa (AP-48A0- AP 490)DC Korba-Khedamara is in service

CSPTCL WRTS-1 C

46 400 Bus-1 at Jabalpur 05-Apr-14 900 05-Apr-14 1800 Daily Retrofitting of Isolator arms(1689A) POWERGRID WR-II R

47 400 Mundara -Limbdi 1 05-Apr-14 800 07-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

48 220 Badod - Modak Ckt 5-Apr-14 900 5-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI49 400 Dhule-Babhleswar ckt 1 5-Apr-14 900 5-Apr-14 1700 Daily QMwork MSETCL MSETCL50 400 400220kv ICT-1 at Seoni 7-Apr-14 900 7-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R51 400 Bus-2 at Jabalpur 07-Apr-14 900 07-Apr-14 1800 Daily Retrofitting of Isolator arms(1789B) POWERGRID WR-II R52 400 315MVA ICT1 at Khandwa 07-Apr-14 1000 07-Apr-14 1600 Daily AMP POWERGRID WR-II R53 220 Chhegoan-Khandwa Ckt -II 7-Apr-14 900 7-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI54 400 Korba- Bhilai1 7-Apr-14 900 8-Apr-14 1900 days continuou Bay Maint and testing NTPC NTPC55 400 Vindhyachal - Mahan line 7-Apr-14 900 8-Apr-14 1900 Continuous Replacement of R Y and B Phase CT NTPC NTPC56 400 Bhusawal-Aurangabad 7-Apr-14 900 7-Apr-14 1700 Daily QMwork MSETCL MSETCL57 400 New Koyna-Karad ckt 2 7-Apr-14 830 7-Apr-14 1730 Daily QMwork MSETCL MSETCL

58 400 Mundara -Limbdi 2 08-Apr-14 800 10-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

59 400 Chorania Hadala 8-Apr-14 800 8-Apr-14 1800 Daily PMM GETCO GETCO60 400 Sipat 400KV Bay 23 8-Apr-14 900 9-Apr-14 1900 Continous One 400KV CT replacement NTPC NTPC61 400 Koradi-Khaparkheda I 8-Apr-14 900 8-Apr-14 1700 Daily QMwork MSETCL MSETCL62 765 765400KV ICT-1 at Kotra PS 9-Apr-14 900 9-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R63 400 Bus-2 at Jabalpur 09-Apr-14 900 09-Apr-14 1800 Daily Retrofitting of Isolator arms(489B) POWERGRID WR-II R64 400 315MVA ICT1 at Damoh 09-Apr-14 1000 09-Apr-14 1600 Daily AMP POWERGRID WR-II R65 400 Amreli-Jetpur 2 9-Apr-14 800 9-Apr-14 1800 Daily PMM GETCO GETCO66 400 SSP- Rajgarh - 1 9-Apr-14 800 9-Apr-14 1800 Daily PMM GETCOMPTCL GETCO67 220 TAPS1 amp2-TAPS 3amp4 tie line 9-Apr-14 800 9-Apr-14 1600 one day Annual maintenance Works MSETCL NPCIL68 220 TAPS TIE LIE-I 9-Apr-14 800 10-Apr-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL69 400 400 KV Indore - Nagda Ckt 9-Apr-14 900 9-Apr-14 1600 daily For maintenance work MPPTCL EHT- Mamp I70 400 400 KV Sarni - Isp Ckt 9-Apr-14 900 9-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I71 220 Mehgaon-Auriya Ckt 9-Apr-14 900 10-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI72 400 315 MVA 400220Kv X-mer III At Bhopal SS 9-Apr-14 900 10-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI73 400 Padgha-Tarapur CktII 9-Apr-14 900 9-Apr-14 1700 Daily QMwork MSETCL MSETCL74 765 Bus Reactor at Kotra PS 10-Apr-14 900 10-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R

75 765 amp 400

765400 kV ICT-I at Solapur amp 400KV Solapur-Parli 2 10-Apr-14 700 12-Apr-14 1800 Daily 765400 kV spare ICT unit Aux bus works CSD

commissioning amp Fire fighting works at Solapur WRTS-IReliance WRTS-I C

76 400 315MVA ICT2 at Damoh 10-Apr-14 1000 10-Apr-14 1600 Daily AMP POWERGRID WR-II R

77 765 Sasan-Satna 1 10-Apr-14 800 11-Apr-14 1800 Daily For AMP of line amp Line terminal Equipments Post commissioning checks

POWERGRID WR-II C

78 400 APL-Varsana 10-Apr-14 800 10-Apr-14 1800 Daily PMM GETCO GETCO79 400 400 KV Isp - Nagda Ckt 10-Apr-14 900 10-Apr-14 1600 daily For maintenance work MPPTCL EHT- Mamp I80 400 400 KV Bhopal-Itarsi(PGCIL) Ckt-I 10-Apr-14 900 11-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I81 220 Chhegoan-Khandwa Ckt -I 10-Apr-14 900 10-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI82 400 315 MVA 400220Kv X-mer At Katni SS 10-Apr-14 800 11-Apr-14 1800 continue For maintenance work MPPTCL EHT -MampI83 400 Korba- Bhilai2 10-Apr-14 900 11-Apr-14 1900 days continuou Bay Maint and testing NTPC NTPC84 400 Sipat 400KV Bay 14 10-Apr-14 900 12-Apr-14 1900 Continous 400KV CT 3nos replacement NTPC NTPC

85 400 Chandrapur II-Parli II 10-Apr-14 900 10-Apr-14 1700 Daily Providing of Arching horncorona rings Bird guards quarter pinsNut bolts

MSETCL MSETCL

86 400 Karad-Lonikand 10-Apr-14 900 10-Apr-14 1700 Daily QMwork MSETCL MSETCL87 400 Raipur-Durg PS 1 11-Apr-14 900 11-Apr-14 1700 Daily AMP Work WRTS-I WRTS-I R

88 400 Mundara -Jetpur 1 11-Apr-14 800 15-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

89 400 Varsana-Hadala Line 11-Apr-14 800 11-Apr-14 1800 Daily PMM GETCO GETCO90 220 Haldarwa Kawas-2 11-Apr-14 800 11-Apr-14 1800 Daily PMM work PGCIL GETCO91 400 400 KV Nagda-Rajgarh(PGCIL) Ckt-I 11-Apr-14 900 11-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

92 400 315 MVA 400220Kv X-mer III ampTie bay At Bhopal SS

11-Apr-14 900 11-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI

93 400 Akola-Nandgaonpeth 11-Apr-14 900 11-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

94 400 Akola-Wardha I 11-Apr-14 900 11-Apr-14 1700 Daily QMwork MSETCL MSETCL95 400 Kalwa-Lonikand 11-Apr-14 900 11-Apr-14 1700 Daily QMwork MSETCL MSETCL96 400 400220kv ICT-1 at Mapusa 12-Apr-14 900 12-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R97 400 Raipur-Durg PS 2 12-Apr-14 900 12-Apr-14 1700 Daily AMP Work WRTS-I WRTS-I R98 765 Sasan-Satna2 with line reactor 12-Apr-14 1000 12-Apr-14 1800 Daily AMP POWERGRID WR-II R99 400 400 KV Nagda-Rajgarh(PGCIL) Ckt-II 12-Apr-14 900 12-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I100 400 Deepnagar-Aurangabad I 12-Apr-14 900 12-Apr-14 1700 Daily QMwork MSETCL MSETCL101 400 Amreli-Jetpur 2 14-Apr-14 800 14-Apr-14 1800 Daily PMM GETCO GETCO102 400 Kasor - Gpec 14-Apr-14 800 14-Apr-14 1800 Daily PMM GETCO GETCO103 220 GWL(PGCIL)-Malanpur Ckt-I 14-Apr-14 900 15-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI104 400 DC Korba-Raipur 3 amp 4 15-Apr-14 800 16-Apr-14 1800 Conti Bus splitting work at Raipur WRTS-1 WRTS-1 C

105 400 Korba-Bhatapara 15-Apr-14 800 24-Apr-14 1800 Conti For raising of ground clearence for Railway track of Lafarge

WRTS-I Lafarge C

106 765 765400 kV ICT-II at Solapur 15-Apr-14 700 17-Apr-14 1800 Daily CSD commissioning amp Fire fighting works WRTS-I WRTS-I C107 400 Vindhyachal-Satna1 15-Apr-14 1000 15-Apr-14 1800 Daily AMP POWERGRID WR-II R108 400 Ssnl-Dhule-1 15-Apr-14 800 15-Apr-14 1800 Daily PMM GETCOMSETCL GETCO109 220 TAPS-Vapi 15-Apr-14 800 17-Apr-14 1900 Daily Annual maintenance Works GETCO NPCIL110 220 Pithampur-Rajgarh(PGCIL) Ckt - I 15-Apr-14 900 15-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI111 400 Sipat 400KV Bay-18 ( Ranchi-1 Main) 15-Apr-14 900 15-Apr-14 1900 Daily Annual Preventive maintenance job NTPC NTPC112 400 Karad-Kolhapur Ckt I 15-Apr-14 900 15-Apr-14 1700 Daily QMwork MSETCL MSETCL

113 400 DC Raipur-Bhadrawati 2 amp 3 16-Apr-14 800 17-Apr-14 1800 Conti Bus splitting work at Raipur WRTS-1 WRTS-1 C

114 400 Vindhyachal-Satna2 16-Apr-14 1000 16-Apr-14 1800 Daily AMP POWERGRID WR-II R

115 400 Mundara -Jetpur 2 16-Apr-14 800 20-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

116 400 Vadavi - Dehgam (Pg) - 1 16-Apr-14 800 16-Apr-14 1800 Daily PMM amp Tandelta testing GETCO GETCO117 400 Chorania Asoj-1 16-Apr-14 800 16-Apr-14 1800 Daily PMM GETCO GETCO118 220 Bhilad - TAPS 16-Apr-14 800 16-Apr-14 1800 Daily PMM work PGCIL GETCO119 220 Bhat - Pirana (PG) - 1 16-Apr-14 800 16-Apr-14 1800 Daily PMM work GETCO GETCO120 400 400 KV Bhopal-Itarsi(PGCIL) Ckt-II 16-Apr-14 900 17-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I121 220 Damoh(PGCIL) - Tikamgarh Ckt 16-Apr-14 900 16-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI

122 400 400KV SC Korba-Raipur-II (Between Korba - Bhatapara end)(Between Loc2980 amp 2990) 16-Apr-14 800 17-Apr-14 1700 Daily

MaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

PGCIL CSPTCL C

123 400 Sipat 400KV Bay-19 ( Ranchi-2 Main) 16-Apr-14 900 16-Apr-14 1900 Daily Annual Preventive maintenance job NTPC NTPC124 400 Padgha-Babhleswar ckt I 16-Apr-14 900 16-Apr-14 1700 Daily QMwork MSETCL MSETCL125 400 Vadavi - Dehgam (Pg) - 2 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCO GETCO126 400 Ssnl-Dhule-2 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCOMSETCL GETCO127 400 Vadinar-Hadala- 1 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCO GETCO128 220 Bhat - Pirana (PG) - 2 17-Apr-14 800 17-Apr-14 1800 Daily PMM work GETCO GETCO129 400 400KV Birsinghpur -Katni Ckt - II 17-Apr-14 800 17-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I130 220 Pithampur-Rajgarh(PGCIL) Ckt - II 17-Apr-14 900 17-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI131 400 Jejuri-Lonikand 17-Apr-14 900 17-Apr-14 1700 Daily QMwork MSETCL MSETCL132 400 Deepnagar-Khadka II 17-Apr-14 900 17-Apr-14 1700 Daily QMwork MSETCL MSETCL133 400 Chorania Kasor 18-Apr-14 800 18-Apr-14 1800 Daily PMM GETCO GETCO134 220 GWL(PGCIL)-Malanpur Ckt-II 18-Apr-14 900 19-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI135 400 Akola-Wardha II 18-Apr-14 900 18-Apr-14 1700 Daily QMwork MSETCL MSETCL

136 400 Koradi-Nandgaonpeth 18-Apr-14 800 18-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

137 765 765kV Pune line Reactor at Solapur 19-Apr-14 700 20-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

138 400 400KV Bina -Power(JP) Ckt 19-Apr-14 900 19-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I139 400 Dhule-SSarovar I 19-Apr-14 900 19-Apr-14 1700 Daily QMwork MSETCL MSETCL

140 400 Koradi-Khaparkheda II 19-Apr-14 900 19-Apr-14 1700 Daily QMwork MSETCL MSETCL141 220 KAPP - VAPI - 1 20-Apr-14 800 20-Apr-14 1800 Daily Isolator replacement under ASIDE scheme PGCIL GETCO

142 400 DC Bhilai-Bhadrawati amp Raipur-Bhadrawati 1 21-Apr-14 800 28-Apr-14 1800 Conti Diversion of line for Vidarbha Industrial Devlopment Corporation(VIDC)

WRTS-I VIDC C

143 400 Bhachau- Ranchhodpura 1amp2 21-Apr-14 800 27-Apr-14 1800 Continuous Tower shifting work at canal crossingInsulator replacement work

POWERGRID WR-II C

144 400 Hadala-Amreli 21-Apr-14 800 21-Apr-14 1800 Daily PMM GETCO GETCO145 400 Vadinar-Hadala- 2 21-Apr-14 800 21-Apr-14 1800 Daily PMM GETCO GETCO146 220 TAPS-Boisar 21-Apr-14 800 23-Apr-14 1900 Daily Annual maintenance Works MSETCL NPCIL147 220 Bina(PGCIL)-220 KV Bina Ckt 21-Apr-14 900 21-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI148 400 CGPL Bhachau -1 21-Apr-14 8AM 21-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL149 220 Kawas-Ichhapore 1+Bus 1 21-Apr-14 900 21-Apr-14 1800 daily RTV Coating NTPC NTPC150 400 Karad-Kolhapur Ckt II 21-Apr-14 900 21-Apr-14 1700 Daily QMwork MSETCL MSETCL151 400 New Koyna-Koyna Stg-4-1 21-Apr-14 830 21-Apr-14 1730 Daily QMwork MSETCL MSETCL152 400 Ssp - Rajgarh - 2 22-Apr-14 800 22-Apr-14 1800 Daily PMM GETCOMPTCL GETCO153 400 Vadavi-Bhachau 2 22-Apr-14 800 22-Apr-14 1800 Daily PMM amp Tan Delta testing PGCIL GETCO154 220 Bhilad - Vapi (PG) - 1 22-Apr-14 800 22-Apr-14 1800 Daily PMM work PGCIL GETCO155 400 400 KV Rajgarh(PGCIL)-Ssp Ckt-I 22-Apr-14 900 22-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I156 400 400KV Seoni -Sarni Ckt 22-Apr-14 900 23-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I157 220 Khandwa(PGCIL)-Nepanagar Ckt 22-Apr-14 900 22-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI158 220 Kawas-Ichhapore 2+Bus 1 22-Apr-14 900 22-Apr-14 1800 daily For maintenance work NTPC NTPC159 400 Karad-Jaigad II 22-Apr-14 900 22-Apr-14 1700 Daily Annual maintenance work MSETCL MSETCL160 220 Bhilad - Vapi (PG) - 2 23-Apr-14 800 23-Apr-14 1800 Daily PMM work PGCIL GETCO161 400 400KV Bina -Bhopal Ckt -I 23-Apr-14 900 24-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I162 400 400 KV Rajgarh(PGCIL)-Ssp Ckt-II 23-Apr-14 900 23-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I163 220 Bina(PGCIL)-Shivpuri Ckt 23-Apr-14 900 24-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI164 220 Damoh(PGCIL) - Damoh I C - I 23-Apr-14 900 23-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI

165 400 400 KV DCDS Sipat- Raipur (IampII) 23-Apr-14 800 24-Apr-14 1700 DailyMaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

PGCIL CSPTCL C

166 400 CGPL Bhachau - 2 23-Apr-14 8AM 23-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL

167 220 Kawas-Navsari 2 +Bus 1 23-Apr-14 900 23-Apr-14 1800 daily Insulator replcement and routine maintenance NTPC NTPC168 400 Padgha-Babhleswar ckt II 23-Apr-14 900 23-Apr-14 1700 Daily QMwork MSETCL MSETCL169 400 Kasor - SSP 24-Apr-14 800 24-Apr-14 1800 Daily PMM work GETCO GETCO170 220 Bhilad - Vapi (PG) - 3 24-Apr-14 800 24-Apr-14 1800 Daily PMM work PGCIL GETCO171 220 TAPS-Bhilad 24-Apr-14 800 26-Apr-14 1900 Daily Annual maintenance Works GETCO NPCIL172 220 Damoh(PGCIL) - Damoh I C - II 24-Apr-14 900 24-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI173 400 CGPL Jetpur- 1 24-Apr-14 8AM 24-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL

174 220 Kawas-Ichhapore 1 +Bus 2 24-Apr-14 900 24-Apr-14 1400 daily Insulator replcement and routine maintenance NTPC NTPC

175 220 Kawas-Ichhapore 2 +Bus 2 24-Apr-14 1400 24-Apr-14 1900 daily Insulator replcement and routine maintenance NTPC NTPC176 400 Padgha-Talegaon 24-Apr-14 900 24-Apr-14 1700 Daily QMwork MSETCL MSETCL

177 765 765kV Raichur 1 line Reactor at Solapur 25-Apr-14 700 27-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

178 400 400KV Bina -Bhopal Ckt -II 25-Apr-14 900 26-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I179 400 CGPL Jetpur- 2 25-Apr-14 8AM 25-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL180 400 Vindhyachal -Satna-4 Line Shunt Reactor 25-Apr-14 900 25-Apr-14 1900 Daily Basis AMP NTPC NTPC

181 400 Bhusawal-Koradi 25-Apr-14 900 25-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

182 400 Deepnagar-Khadka I 25-Apr-14 900 25-Apr-14 1700 Daily QMwork MSETCL MSETCL183 400 Soja -Kansari 26-Apr-14 800 26-Apr-14 1800 Daily PMM GETCO GETCO184 400 Raipur-Wardha 1 27-Apr-14 800 28-Apr-14 1800 Daily Balance construction work WRTS-1 WRTS-1 C185 220 KAPP - VAPI - 2 27-Apr-14 800 27-Apr-14 1800 Daily Isolator replacement under ASIDE scheme PGCIL GETCO186 400 Soja -Kansari 28-Apr-14 800 28-Apr-14 1800 Daily PMM GETCO GETCO187 220 TAPS-Boisar II 28-Apr-14 800 30-Apr-14 1900 Daily Annual maintenance Works MSETCL NPCIL188 400 400KV Damoh - Katni Ckt 28-Apr-14 900 28-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I189 400 400 KV Damoh(PGCIL)-Katni Ckt 28-Apr-14 900 28-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I190 400 New Koyna-Karad ckt 1 28-Apr-14 830 28-Apr-14 1730 Daily QMwork MSETCL MSETCL

191 400 DC Raigarh-DB Power (Tudri) - KSK 29-Apr-14 800 30-Apr-14 1800 Conti Crossing work of 765kV SC Raigrah-Champa (90 - 100)

WRTS-I WRTS-I C

192 400 Raipur-Wardha 2 29-Apr-14 800 30-Apr-14 1800 Daily Balance construction work WRTS-1 WRTS-1 C193 220 Navsari - Nasik - 1 29-Apr-14 800 29-Apr-14 1800 Daily PMM work GETCOMSETCL GETCO194 220 Seoni(PGCIL)-Chhindwara Ckt-I 29-Apr-14 900 29-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI195 220 Kawas-Vav 1+ bus 2 29-Apr-14 900 29-Apr-14 1800 daily For maintenance work NTPC NTPC196 400 Chorania Asoj-1 30-Apr-14 800 30-Apr-14 1900 Daily PMM GETCO GETCO197 220 Navsari - Nasik - 2 30-Apr-14 800 30-Apr-14 1800 Daily PMM work GETCOMSETCL GETCO198 220 Vapi - TAPS 30-Apr-14 800 30-Apr-14 1800 Daily PMM work PGCIL GETCO199 220 Seoni(PGCIL)-Chhindwara Ckt-II 30-Apr-14 900 30-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI200 220 Kawas-Vav 1+ bus 2 30-Apr-14 000 30-Apr-14 000 daily For maintenance work NTPC NTPC

Annexure-32-C1

List of Emergency Outages availed in Feb 2014

SlNo

Element kV Agency From

Date To Date

Remarks

1 SATNA‐BINA‐II 765 WRTS‐2 4‐Feb‐14

5‐Feb‐14

Hot spot attending

2 SUJALPUR‐NAGDA LR NAGDA

400 WRTS‐2 6‐Feb‐14

19‐Feb‐14

Oil leackage

3 SOLAPUR‐PARLI‐II

400 WRTS‐2 6‐Feb‐14

6‐Feb‐14

Hotspot attend at solapur

4 JABALPUR‐ITARSI‐IV LR AT ITARSI‐LR

400 WRTS‐2 7‐Feb‐14

17‐Feb‐14

Oil leackage

5 APL‐HADALA‐SC 400 GEB 7‐Feb‐14

7‐Feb‐14

Hot spot

6 SOLAPUR‐PARLI(PG)‐1

400 WRTM(REL)

9‐Feb‐14

9‐Feb‐14

Hot spot

7 BOISAR‐BOISAR(PG)‐II

220 MSETCL 9‐Feb‐14

9‐Feb‐14

Hotspots

8 NEW KOYNA‐KARAD ‐ I

400 MSETCL 10‐Feb‐14

11‐Feb‐14

Dc‐earth leakage

9 LONIKHAND ‐ KARAD

400 MSETCL 10‐Feb‐14

11‐Feb‐14

Hotspot

10 NAGDHA ICT ‐ III

400220

MPPTCL 10‐Feb‐14

10‐Feb‐14

Hotspot

11 AKOLA ‐ ABAD ‐I AKOLA

400 WRTS‐1 11‐Feb‐14

12‐Feb‐14

Oil leackage

12 AKOLA ‐ AURANGABAD ‐ I

400 WRTS‐1 11‐Feb‐14

11‐Feb‐14

Oil leackage ion lr

13 BINA‐GWALIOR 765 WRTS‐1 14‐Feb‐ 14‐Feb‐ Attend oil leakage on lr

SlNo

Element kV Agency From

Date To Date

Remarks

II 14 14

14 AKOLA‐TIRORA‐I 765 MSETCL 22‐Feb‐14

23‐Feb‐14

Sparking in LR at Tirora SYED AT TIRORA END

15 KHAEGAR‐ICT‐I 400220

MSETCL 22‐Feb‐14

22‐Feb‐14

Hot spot

16 KHANDWA‐NEPANAGR‐SC

220 MPPTCL 23‐Feb‐14

23‐Feb‐14

Hot spot

17 GWALIAR ‐SATNA ‐ I

765 WRTS‐2 24‐Feb‐14

1‐Mar‐14

Attend hot spot

18 KORBA BUS‐III 400 NTPC 25‐Feb‐14

25‐Feb‐14

Hots pot attend

19 BUS‐1 AT GWALIOR

765 WRTS‐2 13‐Feb‐14

13‐Feb‐14

Checking of blocked BB main‐1 relay

20 RAIPUR‐BWATI‐2

400 WRTS‐1 17‐Feb‐14

17‐Feb‐14

Urgent Removal of LR at Raipur end for DGA violation

21 TAPS‐PADGHE 400 TAPS‐3amp4 19‐Feb‐14

23‐Feb‐14

To attend SF‐6 leakage

22 SATNA‐GWALIOR‐1

765 WRTS‐2 24‐Feb‐14

26‐Feb‐14

To attend hot spots

23 VCHAL‐JABALPUR‐IV

400 WRTS‐2 27‐Feb‐14

27‐Feb‐14

To increase OPGW‐Top conductor clearance to avoid tripping

24 APL‐SAMI‐2 400 APL 26‐Feb‐14

26‐Feb‐14

To attend hot sopt

25 SHOLAPUR BUS‐1

765 WRTS‐1 27‐Feb‐14

27‐Feb‐14

To attend hot sopt

26 BOISAR BUS‐2 220 WRTS‐1 28‐Feb‐14

28‐Feb‐14

To attend hot sopt

Sl No KV element From To Basis Work System Agency Remarks

1220 Vapi (GETCO)‐Bhilad 1‐Feb‐14 800 2‐Feb‐14 1800 Daily Line crossing work of 400KV LILO line for

Magarwada SSGETCO POWERGRID N

2 220 Omkareshwar-Khandwa Ckt

3-Feb-14 900 3-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

3 400 New Koyna-Koyna Stg-4-1

3-Feb-14 830 3-Feb-14 1730 Daily QMwork MSETCL MSETCL N

4220 Vapi ‐ Magarwada

Ckt13‐Feb‐14 900 3‐Feb‐14 1400 Daily AMP of line amp equipment WRTS‐II POWERGRID DD may have to do load

shedding as per Reliability Suggestion

N

5 220 DC Raigarh- Raigarh 1amp 2

4-Feb-14 800 5-Feb-14 1800 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (040-50)

CSPTCL WRTS-I N

6 220 Itarsi(PGCIL)-Hoshangabad Ckt

4-Feb-14 900 4-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N

7 400 Mundra -Limbdi-2 4-Feb-14 800 4-Feb-14 1800 Daily Suspension Insulator replcement and routine maintenance

PGCIL CGPL N

8 400 400 kV DC Satna - Bina 1amp2

4-Feb-14 800 5-Feb-14 1800 Continous Crossing of Jabalpur-Bina 765 kv SC Line PGCIL JTCL N

9220 Vapi ‐ Magarwada

Ckt24‐Feb‐14 0900 4‐Feb‐14 1400 Daily AMP of line amp equipment WRTS‐II POWERGRID N

10 765 Seoni-Bina line with LR 4‐Feb‐14 800 4-Feb-14 1800 Daily AMP Work WRTS-2 WRTS-1 N

11 400 Bus I Bina 5‐Feb‐14 800 5‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

12220 Kawas ‐ Navsari (PG)

25‐Feb‐14 800 5‐Feb‐14 1800 Daily Replacement of ST insulators by Double Tension

insulator in Railway crossing spansWRTS‐II POWERGRID N

13400 Indoer (PG) ‐Indore

(MP) DC5‐Feb‐14 800 6‐Feb‐14 1800 Continou

sStringing of 765kV Indore ‐ Vadodara line WRTS‐II POWERGRID N

14 400 APL - Hadala 6-Feb-14 800 6-Feb-14 1800 Daily PMM GETCO GETCO N N

15 220 Seoni(PGCIL ) - Chhindwara CKT I

6-Feb-14 900 6-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N N

16 400 Jejuri-Koyna stg IV 6-Feb-14 900 6-Feb-14 1700 Daily QMwork MSETCL MSETCL N17 400 Akola-Nandgaonpeth 6-Feb-14 900 6-Feb-14 1700 Daily Quaterly Maintainance Work MSETCL MSETCL N18 400KV Korba-Bhatapara 6-Feb-14 900 7-Feb-14 1900 Cont Testing of LBB auto re-close M-I amp M-II relays NTPC NTPC N19 220 Haldarva - Jhanor - 2

(NTPC)6-Feb-14 900 6-Feb-14 1800 Daily PMM work GETCO N

20220 Navsar (PG) ‐Navsari

(GETCO) 16‐Feb‐14 800 6‐Feb‐14 1800 Daily Replacement of ST insulators by Double Tension

insulator in Railway crossing spansWRTS‐II POWERGRID

N

21 400 Bus‐II Bina 6‐Feb‐14 800 6‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

22400 Seoni‐Khandwa1 6‐Feb‐14 1000 6‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Khandwa end by MS ABB

WRTS‐II POWERGRID Rescheduled to 6th March N

23 400 Rajgarh-Ssp Ckt-II 7-Feb-14 900 7-Feb-14 1600 daily For maintenance work MPPTCL EHT- Mamp I N24 220 Chhegoan-Khandwa

Ckt -II7-Feb-14 900 7-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

25 220 Wardha (PG)-Wardha 7-Feb-14 800 7-Feb-14 1800 Daily AMP Work MSETCL WRTS-I N26 400 Chorania - Vadavi-2 7-Feb-14 800 7-Feb-14 1800 Daily PMM amp Tan Delta testing WRTGPL GETCO N27 400 Jabalpur‐Itarsi1 7‐Feb‐14 900 7‐Feb‐14 1400 Daily AMP OF TERMINAL EQUIPMENT WRTS‐II POWERGRID N

28220 Vapi(PG)‐ Bhilad ckt

2 amp 3 7‐Feb‐14 800 8‐Feb‐14 1800 Daily Line crossing work of 400KV LILO of Navsari‐Boisar

at MagarwadaGETCO POWERGRID N

29 220 Mapusa-Thivim 1 8-Feb-14 800 8-Feb-14 1800 Daily AMP Work GOA WRTS-I N

30400 Seoni‐Khandwa2 9‐Feb‐14 1000 9‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Khandwa end by MS ABB

WRTS‐II POWERGRID Rescheduled to 7th March N

31 220 Chhegoan-Khandwa Ckt -I

10-Feb-14 900 10-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

Annexure-32-C2OCC approved outage not availed in Feb‐2014

32132 132 kV Dhule

Dondaicha line10-Feb-14 800 11-Feb-14 1800 Cont Crossing of Dhule-Vadodara 765 kv SC Line MSETCL BDTCL subjected to sldc

clearance N

33 400132 KV

Vindhyachal ICT-1 10-Feb-14 900 14-Feb-14 1900 Cont ICT Overhauling NTPC NTPC N

34400 KV Vindhyachal - Jabalpur-

3 Line Shunt Reactor10-Feb-14 900 14-Feb-14 1900 Cont Reactor Overhauling NTPC NTPC

N

35 400 KSK-DB Power 10-Feb-14 800 13-Feb-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end WRTS-IDBKSK

KSK N36 220 Ipore-Kawas-1 10-Feb-14 800 10-Feb-14 1800 Daily PMM work GETCO N

37400 Vindhyachal‐Mahan 10‐Feb‐14 800 11‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐I WRTS‐II N

38400 Mahan‐Korba 10‐Feb‐14 800 11‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐I WRTS‐II N

39765 Jabalpur ‐ Bina 1 10‐Feb‐14 1000 10‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Jabalur end by MS ABB

WRTS‐II POWERGRID Differed by siteN

40 400 SSP - Rajgarh - 1 10-Feb-14 800 11-Feb-14 1800 Daily Basis

PMM Work GETCO N

41 400 DC Tundri (DB Power) -ksk-Raigarh

10-Feb-14 800 11-Feb-14 1800 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (092-100)

DB Power WRTS-I N42 400 Jetpur - Amreli - 1 11-Feb-14 800 12-Feb-14 1800 Daily PMM GETCO GETCO N43 400 Hadala - Vadinar-2 11-Feb-14 800 11-Feb-14 1800 Daily PMM GETCO GETCO N44 400 Nagda-Rajgarh Ckt-I 11-Feb-14 900 11-Feb-14 1800 daily For maintenance work MPPTCL EHT- Mamp I N45 220 Mehgaon-Auriya Ckt 11-Feb-14 900 11-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N46 220 Seoni(PGCIL ) -

Chhindwara CKT II11-Feb-14 900 11-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

47

765kV Main Bus-1B at SASANBay 13 - Jack Bus

11-Feb-14 900 21-Feb-14 1800 Daily Jumper Installations amp ConnectionsIsolator Allignment

PGCIL Reliance Provisional Subject to details of works done to be apprised on daily basis

N

48 220 Ipore-Kawas-2 11-Feb-14 800 11-Feb-14 1800 Daily PMM work GETCO N49 220 Navsari - Nasik - 2 11-Feb-14 900 11-Feb-14 1800 Daily PMM work GETCO N

50765 Jabalpur ‐ Bina 2 11‐Feb‐14 1000 11‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Jabalur end by MS ABB

WRTS‐II POWERGRID Deferred by siteN

51 400 Nagda-Rajgarh Ckt-II 12-Feb-14 900 12-Feb-14 1800 daily For maintenance work MPPTCL EHT- Mamp I N52 400 Karad-Solapur (PGCIL) 12-Feb-14 900 12-Feb-14 1700 Daily QMwork MSETCL MSETCL N53 400 Raipur-Sipat 1 amp 2 26-Feb-14 800 3-Mar-14 1800 Conti Diversion of line for Lafarge Railway track WRTS-I Lafarge Ori 12-16 Feb 14 Deferre N54 220 Haldarwa Kawas-2 12-Feb-14 900 12-Feb-14 1800 Daily PMM work GETCO N

55 220 Bus‐I Bina 12‐Feb‐14 800 12‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

56 400 Chorania - Hadala 13-Feb-14 800 14-Feb-14 1800 Daily PMM GETCO GETCO N57 400 Tarpur-Padghe-2 13-Feb-14 800 14-Feb-14 1800 Daily maintenance work POWERG

RIDNPCIL N

58400 Vindhyachal‐Satna1 13‐Feb‐14 1000 13‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

59 220 Bus‐II Bina 13‐Feb‐14 800 13‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

60 220 Pithampur-Rajgarh Ckt - I

14-Feb-14 900 14-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

61 220 Wardha (PG)-Badnera 14-Feb-14 800 14-Feb-14 1800 Daily AMP Work at Wardha MSETCL WRTS-I N

62 400 Bhusawal-Koradi 14-Feb-14 900 14-Feb-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL N

63 400 Raipur-KSK 14-Feb-14 800 16-Feb-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end WRTS-IKSK

KSK N

64 220 GWL(PGCIL)-Malanpur Ckt-II

15-Feb-14 900 15-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N

65 220 Pithampur-Rajgarh Ckt - II

15-Feb-14 900 15-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

66400 Vindhyachal‐Satna2 16‐Feb‐14 1000 16‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

67 220 KAPS - Haldarwa - 1 17-Feb-14 800 17-Feb-14 2000 Daily Yearly PM checks KAPS N

68400 3X105 MVA 400220Kv

X-mer I At Indore ss17-Feb-14 800 18-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI

N

69

220 SC Korba-Raigarh-Budhipadar sc(PGCIL) amp DC Korba-Budipadar both circuits (CSPTCL)

18-Feb-14 800 19-Feb-14 1800 Conti Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCLWRTS-I

WRTS-I

N

70 400 Itarsi-Bhopal Ckt-I 18-Feb-14 900 19-Feb-14 1700 daily For maintenance work MPPTCL EHT- Mamp I N71 220 Badod - Kota Ckt 18-Feb-14 900 18-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N72 220 Damoh(PGCIL) -

Damoh I C - II18-Feb-14 900 18-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

73 220 Badod - Modak Ckt 19-Feb-14 900 19-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

74220 KAPS - Ukai - Mota 19-Feb-14 800 19-Feb-14 2000 Daily Yearly PM checks KAPS Non consent from SLDC

GETCO N

75400 315 MVA 400220 KvX-

mer III At Indore ss20-Feb-14 800 21-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI

N

76 220 Seoni(PG)-Seoni 2 21-Feb-14 800 21-Feb-14 1800 Daily AMP Work MPPTCL WRTS-I Y N77 220 Bina(PGCIL)-Shivpuri

Ckt21-Feb-14 900 22-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI Y N

78 400 Koradi-Nandgaonpeth 21-Feb-14 900 21-Feb-14 1700 Daily QMwork MSETCL MSETCL N N79 220 Haldarva - Jhanor - 1

(NTPC)21-Feb-14 900 21-Feb-14 1800 Daily PMM work GETCO N

80

765kV Main Bus-2A at SASANSatna Line-2

22-Feb-14 900 28-Feb-14 1800 Contionious

Equipment ConnectionsCircuit Breaker TestingJumper MeasurementIsolator Allignment Reactor accessories erection on R-Phase

PGCIL Reliance

N

81 400 Korba-Raipur 3 amp 4 23-Feb-14 800 24-Feb-14 1800 Conti For Bus spliting work at Raipur765 KV Raigarh-Raipur and 765 Champa Raipur lines

WRTS-1 WRTS-1 N

82132 132kV Astha - Polai SC

line of MPPTCL24-Feb-14 800 25-Feb-14 1800 Continous Crossing of Bhopal -Indore 765 kv SC Line MPPTCL BDTCL subjected to sldc

clearance N

83 400 Bus-1 at Bilaspur 24-Feb-14 800 24-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I N

84400 Seoni -

Khedamara(Bhilai) Ckt25-Feb-14 900 25-Feb-14 1800 daily For maintenance workFeeder bay maintenance at

KMaraMPPTCL CSPTCLMPPT

CLNo confirmation on D-3

N

85400 Ranchi-Sipat 1 amp 2 25-Feb-14 800 26-Feb-14 1800 Conti Crossing work of upcoming 765 KV DC

Jharsuguda-Korba amp 765KV SC Ranchi-BilaspurWRTS-I WRTS-I No confirmation on D-3

N

86765 Sasan‐Satna2 25‐Feb‐14 800 26‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐II POWERGRID No confirmation on D-3 N

87400 Bus Reactor1 at Satna 25‐Feb‐14 1000 25‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

88400 400 kV DC Damoh -

Bhopal Line26-Feb-14 800 27-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL Not availed by agency for

rainsN

89400 Raipur-Bhadrawati 2 amp

327-Feb-14 800 27-Feb-14 2100 Daily For Bus spliting work at Raipur765 KV Raigarh-

Raipur and 765 Champa Raipur linesWRTS-1 WRTS-1 Subject to Telemetry from

Durg PS RaipurN

90 400 Birsinghpur‐Vandana Vidyut

27‐Feb‐14 800 27‐Feb‐14 1700 Daily AMP of Terminal Equipment amp line Reactor WRTS‐I POWERGRID Ready N

91 400 Bhusawal-Akola 28-Feb-14 900 28-Feb-14 1700 Daily QMwork MSETCL MSETCL N92 220 Bus-1 at Wardha 28-Feb-14 800 28-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I N93 400 Birsinghpur‐Balco 28‐Feb‐14 800 28‐Feb‐14 1700 Daily AMP of Terminal Equipment amp line Reactor WRTS‐I WRTS‐I Deferred by site N

94 400 Nagda‐Dehgam2 5‐Feb‐14 1000 5‐Feb‐14 1800 DailyCommissioning amp checking of CSD relay in Main CB for reactor switching at Dehgam end by MS ABB

WRTS‐II POWERGRID N

95 400 400kV Satpura Itarsi 10‐Feb‐14 900 11‐Feb‐14 1700 DailyCommissioning of new CB after dismantling of existing TELK make CB at Satpura end amp normalising of line on main CB

POWERGRID

WRTS‐II N

96 765 765 kV Satna - Bina Ckt I

6-Feb-14 800 8-Feb-14 1800 cont Stringing of Jabalpur-Bina 765 kv SC Line PGCIL JTCL Original27-28 Jan14 Def N

97 765400 765400 kV ICT-1 at Bina 20-Feb-14 90000 AM 21-Feb-13 60000 PM Continuou

sCSD commissioning for 400kV Side CB of 765400 kV ICT-1 WRTS-II POWERGRID Deferred by site N

98 400 Nagda - Dehgam 1amp2 20-Feb-14 80000 AM 28-Feb-14 1700 Daily Online PID testing to insulators in both circuits AR shall be kept in non auto mode in both circuits WRTS-II POWERGRID

N

99 220MC Waluj-Chitegaon amp Waluj-Jalna

21-Feb-14 700 21-Feb-14 1900 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad MSETCL WRTS-I

N

100 400 Bus 1 at Asoj 21-Feb-14 000 21-Feb-14 1800 Daily For checking bus stability testing of Piran 1 amp 2 bays (for charging of new line) GETCO WRTS-II N

101 400 Bus-1 at Wardha 22-Feb-14 800 22-Feb-14 1800 Daily Jumper spacers connection at Wardha WRTS-I WRTS-I N102 400 Bus-1 at Raigarh 22-Feb-14 800 22-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I Deferred by site N103 765 Bus - II at Indore 22-Feb-14 90000 AM 23-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Not availed NLDC consenN104 220 Kakrapar-Haldarwa2 22-Feb-14 1000 Hrs 22-Feb-14 1600 Hrs Daily AMP POWERG

RID WRTS-II N

105 400 Bus 2 at Asoj 22-Feb-14 000 22-Feb-14 1800 Daily For checking bus stability testing of Piran 1 amp 2 bays (for charging of new line) GETCO WRTS-II N N

106400 400 kv DC Bhopal -

Bina Line (Ckt I amp II)(Tower no 34 amp35)

23-Feb-14 800 24-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line MPPTCLBDTCL

N

107 765kV SASAN Main Bus-1BBay 10 - Jack Bus 24-Feb-14 800 Hrs 2-Mar-14 1900 Hrs Continuous Dia-4

(Bay-10) - SCCOCC Test of Unit 4 GTSasan Sasan N

108 765 Bus - I at Indore 24-Feb-14 90000 AM 25-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID N

109 765 765 KV Bina-Indore Line 24-Feb-14 0900 Hrs 24-Feb-14 1800 Hrs Daily

For taking spare reactor unit in service amp checking the scheme for spare reactor with 765 KV Bina-Indore Line Reactor at Bina

POWERGRID WRTS-II

Deferred by site N

110 400 Kasor - GPEC 24-Feb-14 800 25-Feb-14 1800 Daily PMM Work GETCO GETCO N111 40022033 315 MVA ICT2 at Kheda 24-Feb-14 900 10-Mar-14 1800 cont modification work in SS lay out CSPTCL CSPTCL N112 400 315 MVA ICT2 at

Gwalior 25-Feb-14 90000 AM 25-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID N

113 400KV V-Satna-4 Line Shunt Reactor 25-Feb-14 1000 25-Feb-14 2000 Daily

Basis AMP NTPC NTPC N

114 400 Raipur-Wardha 1 26-Feb-14 800 26-Feb-14 2000 Daily Balance construction works at Wardha end WRTS-I WRTS-IReady Ori26214 Deferred by site

N

115 400 Bus -I at Indore 26-Feb-14 90000 AM 26-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Deferred by site N116 400 315 MVA ICT3 at

Gwalior 26-Feb-14 90000 AM 26-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID N

117 400 400 kV DC Damoh - Bhopal Line

26-Feb-14 800 26-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL N

118 400 Chorania-Kasor 26-Feb-14 800 26-Feb-14 1800 Daily PMM work GETCO GETCO N119 400 Koradi-Satpura sc 26-Feb-14 800 26-Feb-14 1600 Daily 765KV Tiroda Koradi Transmission LineII crossing

worksPOWERGRID MEGPTCL Cancelled by MEGPTL N

120 400 400 kV DC Damoh - Bhopal Line

26-Feb-14 800 26-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL N

121 400 Raipur-Wardha 2 27-Feb-14 800 27-Feb-14 2000 Daily Balance construction works at Wardha end WRTS-I WRTS-I Deferred by site N122 400 Vindhyachal-Satna2 27-Feb-14 1000 27-Feb-14 1800 Daily Commissioning of CSD Relay in ABB make main

CB at Satna WRTS-II POWERGRID Deferred by site N

123 400 Bus -II at Indore 27-Feb-14 90000 AM 27-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Ready N124 400 315 MVA ICT1 at

Rajgarh 27-Feb-14 90000 AM 27-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID Ready N

125 400400 KV SC Kosamba - Asoj line(730-740)

27-Feb-14 700 27-Feb-14 1800 cont Crossing of Dhule - Vadodara 765 kv SC Line GETCOBDTCL

N

126 400 Indore (MP) -Indore (PG)-DC 27-Feb-14 700 28-Feb-14 1600 Cont Stringing of 765kV Indore - Vadodara line POWERG

RID WRTS-II Deferred by site N

Anaulagnak 33(A)

maaca- 2014 AaOr Ap`Ola 2014 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR MARCH 2014 AND APRIL 2014

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)maaca- 2014 Ap`Ola 2014 maaca- 2014 Ap`Ola 2014

MARCH 2014 APRIL 2014 MARCH 2014 APRIL 2014

1 gaujarat

saIimat 11700 12100 7750 7800

AsaIimat 11740 12140 7760 7810

2 maQya p`doSa

saIimat 8340 9050 5338 5540

AsaIimat 8340 9050 5338 5540

3 CltaIsagaZ

saIimat 3200 3075 1929 1809

AsaIimat 3225 3105 1944 1827

4 maharaYT

saIimat 19000 19150 10200 10300

AsaIimat 19050 19200 10250 10350

5 gaaovaa

saIimat 425 410 300 295

AsaIimat 425 415 310 300

6 dmana dIva

saIimat 340 345 210 205

AsaIimat 345 350 225 210

7 DI ena eca

saIimat 635 640 445 425

AsaIimat 635 640 445 425

8 piScama xao~

saIimat 41961 43047 28500 27900

AsaIimat 42076 43173 29560 28840

Diversity factor of 10401

March 2014 and April 2014

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah frvarI 2014

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 1552 75

]k[- Ukai - 2 1719 75]k[- Ukai - 3 598 75]k[- Ukai - 4 1757 75]k[- Ukai (Total) 5627 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 024 2]k[- ela baI saI eca Ukai LBCH - 2 131 3]k[- ela baI saI eca Ukai LBCH (Total) 154 5 0008

3 kDanaa Kadana - 1 000 0 0005kDanaa Kadana - 2 246 62 0000kDanaa Kadana - 3 223 62kDanaa Kadana - 4 166 63 0000kDanaa Kadana (Total) 634 63 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 431 9 0020 6 kula jalaIya TOTAL(H) 6846 225 0401

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 2060 32 21822 TaoronT pavar ilaimaToD yauinaT DI 7979 125 69803 TaoronT pavar ilaimaToD yauinaT [- 075 122 07584 TaoronT pavar ilaimaToD yauinaT ef 8023 124 66915 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 018811 Qauvarna tapIya Dhuvaran - GT 2 000 0 041912 Qauvarna tapIya Dhuvaran - STG 023 1013 ]ka[- yauinaT 1 Ukai -1 000 0 005114 ]ka[- yauinaT 2 Ukai -2 000 0 010815 ]ka[- yauinaT 3 Ukai -3 3147 200 297216 ]ka[- yauinaT 4 Ukai -4 10588 202 1002617 ]ka[- yauinaT 5 Ukai -5 9496 210 884118 ]ka[- yauinaT 6 Ukai -6 23703 500 1844819 gaaMQaInagar 1 Gandhinagar - 1 000 0 008620 gaaMQaInagar 2 Gandhinagar - 2 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 000 0 029622 gaaMQaInagar 4 Gandhinagar - 4 000 0 036223 gaaMQaInagar 5 Gandhinagar - 5 11676 212 1148924 vaNakbaaorI 1 Wanakbori - 1 10648 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 11069 21026 vaaNakbaaOrI 3 Wanakbori - 3 1891 20627 vaaNakbaaOrI 4 Wanakbori - 4 5244 21228 vaaNakbaaOrI 5 Wanakbori - 5 5531 21029 vaaNakbaaOrI 6 Wanakbori - 6 000 030 vaaNakbaaOrI 7 Wanakbori - 7 8902 20931 ]trna Utran GT 1 000 0 019832 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 000 0 024635 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 000 0 0000

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Anaulagnak 41

ACTUAL GENERATION amp AVALABILITY FOR FEBRUARY 2014Actual vaastivak

Actual vaastivak

37 isaka Sikka - 1 3696 112 439838 isaka Sikka - 2 000 0 017639 kcC ilagnaa[-T Kutch Lignite - 1 4429 71 848640 kcC ilagnaa[-T Kutch Lignite - 2 4037 7241 kcC ilagnaa[-T Kutch Lignite - 3 3646 6742 kcC ilagnaa[-T Kutch Lignite - 4 2215 66 525343 saUrt ilagnaa[-T Surat Lignite - 1 6705 131 682544 saUrt ilagnaa[-T Surat Lignite - 2 7475 131 738745 saUrt ilagnaa[-T Surat Lignite - 3 6965 130 728846 saUrt ilagnaa[-T Surat Lignite - 4 6362 130 688647 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5454 107 848648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5649 11449 jaI Aa[- pI saI ela GIPCL GT - 1 1589 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1587 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1702 3552 jaI Aa[- pI saI ela GIPCL ST - 1 2902 5153 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 020556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 000 0 000060 jaI pI [- saI GPEC GT - 2 267 156 013261 jaI pI [- saI GPEC GT - 3 143 146 002762 jaI pI [- saI GPEC STG 131 17263 jaI esa [- jaI GSEG GT - 1 000 0 098964 jaI esa [- jaI GSEG GT - 2 1181 5065 jaI esa [- jaI GSEG STG 642 2366 Sugen (GT 1 + GT 2) 1767 308 602467 saIpIpI sao Aayaat Imp from CPP+MUNDRA 269359 6881

kula tapIya Total (T) 475652 8386 302021kula jalaIya+tapIya Total (H+T) 482498 8604 302422ivaMD [najaI- Wind Energy 52123kula jalaIya+tapIya+hvaa Total (H+T+Wind) 534621 9539ivainamaya Exchanges 155314 saIimat jaa- maaMga Restricted Energy Req 689935

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 6800 194

11 gaaMQaI saagar Gandhi Sagar 3366 117 008012 raNaa p`tap sagar RPSagar 5883 172 004013 javaahr sagar Jawahar Sagar 4350 99 0050

2 ponca Pench 3052 165 00903 baargaI Bargi 4581 91 00804 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 11764 315 02806 banasaagar Bansagar-2 (Deolondh) 000 07 banasaagar Bansagar-3 (Silpara) 1236 32 00708 banasaagar Bansagar-4 (Zinaha) 1320 22 00509 maoDIKoDa Medikheda 396 63

10 ibarisaMGapur Birsingpur 040 20 002011 Tavaa Tawa 000 012 rajaGaaT Rajghat 165 12 006013 Omkareshwar 10620 402 14 [Midra saagar Indira Sagar 23077 997 0849

kula jalaIya TOTAL(H) MPPGCL 59999 2365 1273Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 6049 98 232502 AmarkMTk II AMK II Unit -2 6080 983 AmarkMTk III AMK III Unit -5 12212 219 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 06505 satpura II Satpura-II Unit 6 10323 180 165906 satpura II Satpura-II Unit 7 5926 1807 satpura II Satpura-II Unit 8 10964 195 191608 satpura II Satpura-II Unit 9 8353 1709 satpura III Satpura-III Unit 10 000 0 2080

10 satpura III Satpura-III Unit 11 9447 182 1909011 esajaITIpIesa 1 SGTPS Unit - 1 9447 182 1909012 esajaITIpIesa 2 SGTPS Unit - 2 10572 18213 esajaITIpIesa 3 SGTPS Unit - 3 9037 192 2064014 esajaITIpIesa 4 SGTPS Unit - 4 10700 18015 esajaITIpIesa 5 SGTPS Unit - 5 28804 51216 SSTPS 6864 587 8930

kula tapIya Total (T) 133714 3002 115350kula jalaIya+tapIya Total (H+T) 193713 5735 116623Injection from WIND 000 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 193713 5735ivainamaya Exchanges 193660 saIimat jaa- maaMga Rest En Req 387372

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 850 120 00902 Gangrel 475 10 00503 Mini Micro KWB 039 7

kula jalaIya TOTAL(H) CSEB 1364 137 0150tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 47 127402 kaorbaa (pU) Korba (E) Unit-2 2764 483 kaorbaa (pU) Korba (E) Unit-3 2764 484 kaorbaa (pU) Korba (E) Unit-4 2784 465 kaorbaa (pU) Korba (E) Unit -5 3685 120 253306 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 247808 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 15410

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 15839 256 1197012 KORBA(EB) Extn - 2 15876 256 11770

kula tapIya Total (T) 119907 1880 10190013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 119907 1880kula jalaIya+tapIya Total (H+T) 121271 2017 102050ivainamaya Exchanges 40207 0saIimat jaa- maaMga Rest En Req 161478 2017

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 9590 585 25142 kaoyanaa III Koyna III 5920 3203 kaoyanaa IV Koyna IV 18012 11324 kaoyanaa DIpIeca Koyna DPH 1442 385 TaTa jalaIya TATA Hydro 10242 741 28836 vaOtrNaa Vaitarna 000 07 eladarI Eldari 528 168 BaTgar AaOr vaIr Bhatgar amp Vir 915 49 pOzana Paithan 175 59

10 itlaarI Tillari 1106 6511 BaIra Tola rosa Bhira Tail Race 374 4112 GaTGar Ghatghar 5297 29313 Anya CaoTo jalaIya Small Hydro (others) 6173 0

kula jalaIya TOTAL(H) 58910 1599 5397Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 7700 1954 naaisak 4 Nasik Unit -4 10772 1965 naaisak 5 Nasik Unit -5 11160 1976 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 28827 5058 Tambao 6 Trombay Unit -6 000 09 Tambao 8 Trombay Unit -8 000 0

10 Tambao 7A gaOsa Trombay -7A (Gas) 7882 135 250411 Tambao 7ba Trombay -7B (WHR) 4499 7212 kaoraDI 5 Koradi Unit -5 5003 16013 kaoraDI 6 Koradi Unit -6 3963 19014 kaoraDI 7 Koradi Unit -7 10015 19015 Bausaavala 2 Bhusawal Unit -2 8329 17016 Bausaavala 3 Bhusawal Unit -3 9248 18017 Bausaavala 4 Bhusawal Unit -4 22734 50518 Bausaavala 4 Bhusawal Unit -5 19742 41519 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 7451 18621 parlaI 5 Parli Unit -5 10626 18022 parlaI 6 Parli Unit -6 14013 25323 parlaI 7 Parli Unit -7 13728 26024 KaprKoDa 1 Khaperkheda Unit -1 11173 20025 KaprKoDa 2 Khaperkheda Unit -2 10373 19526 KaprKoDa 3 Khaperkheda Unit -3 10998 20127 KaprKoDa 4 Khaperkheda Unit -4 12019 20728 KaprKoDa 5 Khaperkheda Unit -5 28882 50730 parsa Paras-3 14447 25731 parsa Paras-4 13504 25932 ]rna Uran (Gas) 18284 33833 ]rna Uran (WHR) 000 148 586234 caMd`pur 1 Chandrapur Unit -1 9087 17735 caMd`pur 2 Chandrapur Unit -2 1816 19436 caMd`pur 3 Chandrapur Unit -3 11737 21037 caMd`pur 4 Chandrapur Unit - 4 11843 46038 caMd`pur 5 Chandrapur Unit -5 7759 45539 caMd`pur 6 Chandrapur Unit -6 24420 44240 caMd`pur 7 Chandrapur Unit -7 23258 041 DhaNaU 1 Dahanu Unit-1 16339 250 1427842 DhaNaU 2 Dahanu Unit-2 16196 250 1427843 CPP 193651 29840044 RGPPL Share 000 0

kula tapIya Total (T) 631479 15369 329920MAH Wind + Solar Generation 16922 0kula jalaIya +tapIya Total (H+T+Wind) 707311 17451 372239

TOTAivainamaya Exchanges 324731saIimat jaa- maaMga Rest En Req 1032042

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1871 26ivainamaya Exchanges 33252saIimat jaa- maaMga Rest En Req 35123 434

C (F) dmana AaOr dIva DAMAN amp DIU 18245 298ja (G) dadra nagar hvaolaI DNH 40600 655

kula DD ampDNH (T) 58845 952Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 9600 160 1399112 tara`pur 2 TAPS Unit -2 11069 16013 tara`pur 3 TAPS Unit -3 36144 545 6584014 tara`pur 4 TAPS Unit -4 36197 54715 kakrapr 1 KAPS Unit -1 15230 545 3134216 kakrapr 2 KAPS Unit -2 14662 547

kula ena pI saI NPC Total 122901 25042 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14008 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 13913 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14076 214 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 32894 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 33204 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 33190 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33176 514

kula kaorbaa KSTPS Total 174461 2498 10394427 ivanQa esaTIpIesa 1 VSTPS Unit-1 12762 21328 ivanQa esaTIpIesa 2 VSTPS Unit-2 12708 21529 ivanQa esaTIpIesa 3 VSTPS Unit-3 12854 212210 ivanQa esaTIpIesa 4 VSTPS Unit-4 12909 214211 ivanQa esaTIpIesa 5 VSTPS Unit-5 12174 215212 ivanQa esaTIpIesa 6 VSTPS Unit-6 12625 214213 ivanQa esaTIpIesa 7 VSTPS Unit-7 31487 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 31075 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 31592 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 31488 512217 ivanQa esaTIpIesa 11 VSTPS Unit-11 30948 512

kula ivanQayaacala VSTPS Total 232623 3750 15107 31 saIpt -1 -SIPAT-1 38822 66400 32 saIpt -2 -SIPAT-2 32404 66500 33 saIpt -3 -SIPAT-3 38930 66300 34 saIpt -4 -SIPAT-4 26383 51600 35 saIpt -5 SIPAT-5 26400 51400

kula saIpt -SIPAT TOTAL 162939 285000 838941 kvaasa gaOsa 1e Kawas GT-1A 792 10742 kvaasa gaOsa 1baI Kawas GT-1B 2623 10943 kvaasa esaTI 1saI Kawas ST-1C 1571 11444 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 4986 304 222951 gaMQaar gaOsa 1 Gandhar GT-1 000 052 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 000 054 gaMQaar esaTI 4 Gandhar ST-4 000 0

kula gaMQaar GGPS Total 000 0 000061 maaOda 1 Mauda -1 19614 514 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 19614 514 1422661 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 000 31 000071 esa esa pI SSP RBPH - 1 6753 19372 esa esa pI SSP RBPH - 2 5907 19273 esa esa pI SSP RBPH - 3 5577 19574 esa esa pI SSP RBPH - 4 5513 19475 esa esa pI SSP RBPH - 5 7237 19476 esa esa pI SSP RBPH - 6 3109 19277 esa esa pI SSP CHPH - 1 1817 4078 esa esa pI SSP CHPH - 2 491 3679 esa esa pI SSP CHPH - 3 000 0710 esa esa pI SSP CHPH - 4 1639 39711 esa esa pI SSP CHPH - 5 901 37

kula esa esa pI SSP Total 38944 1312 389481 kula poMca Pench Total 3052 165 009082 Jindal Injection 38956 083 Amarkantak Lanco 15478 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2372740

(J) ]plabQata Availability 2308426 naoT ivainamaya Net Exchanges -292048 ]plabQa jaa- Energy Availability 2016379

maah frvarI 2014 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR FEBRUARY 2014 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 11532 - - - 11532 020214 1100 4993

saIimat Restricted 11700

AsaIimat Unrestricted 11740 11532 0 28 0 11560 010214 1200 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8366 8366 17022014 0500 5007

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9346 - - - 9346 120214 0900 4986

saIimat Restricted 8340

AsaIimat Unrestricted 8340 9346 0 38 0 9384 120214 0900 4986

nyaUnatma pMjaIkRt maaMga Min Registered Demand 3204 3204 270214 0200

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3210 3210 070214 1900 4989

saIimat Restricted 3200

AsaIimat Unrestricted 3225 3210 233 12 0 3246 070214 1900 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1617 1617 230214 2300 5021

maharaYT MAHARASHTRApMjaIkRt Registered 18510 - - - 18510 050214 1100 4984

saIimat Restricted 19000

AsaIimat Unrestricted 19050 17980 1655 -13 0 19622 190214 1200 5002

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12005 12005 280214 0400 5037

gaaovaa GOApMjaIkRt Registered 425 434 - - 434 130214 1400 5006

AsaIimat Unrestricted 425 434 1 -1 - 434 130214 1400 5006

nyaUnatma pMjaIkRt maaMga Min Registered Demand 311 311 100214 0300

essaar ESSAR(ESIL)pMjaIkRt Registered 487 - - 487 240214 1700 5004

AsaIimat Unrestricted 487 0 0 - 487 240214 1700 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 268 - - 268 250214 1200 5003

AsaIimat Unrestricted 268 0 0 - 268 250214 1200 5003

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 644 - - 644 260214 1200 4999

AsaIimat Unrestricted 644 0 - 644 260214 1200 4999

nyaUnatma pMjaIkRt maaMga Min Registered Demand 508 508 280214

piScama xao~ WESTERN REGIONpMjaIkRt Registered 42253 - - - 42253 110214 1100 4994

saIimat Restricted 41961

AsaIimat Unrestricted 42076 42021 850 235 0 43106 120214 1100 4994

nyaUnatma pMjaIkRt maaMga Min Registered Demand 27524 27524 280214 0400 5040 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

piScama xaoi~ya Baar p`oYaNa kond` mauumba[-

णाली चालन-ISO-I

ANNEXURE-43

माह फरवर 2014 February2014

समातरवतीय चालन PARALLELRADIAL OPERATION

TOTAL OPERATING

HOURS 1 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-NR) 66972

2 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-SR) 67200

टाई लाईन TIE LINE 1 765कवी िसवनी स वधा-I 765kV Sonito Wardha 67200 2 765कवी िसवनी स वधा-II 765kV Seonito Wardha 65247 3 400 कवी िभलाई स कोराड 400kV Bhilai to Koradi 67200

4 400 कवी िभलाई स भिावती 400kV Bhilai to Bhadravati 67200

5 400 कवी रायपर स भिावती-I 400kV Raipur to Bhadravati-I 67200

6 400 कवी रायपर स भिावतीETHII 400kV Raipur to Bhadravati-II 67139

7 400 कवी रायपर स भिावतीETHIII 400kV Raipur to Bhadravati-III 67200

8 400 कवी सातपरा स कोराड 400kV Satpura to Koradi 67200

9 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 67004 10 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 65308 11 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 66259 12 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 67200 13 400 कवी को हापर स मापसा-I 400kV Kolhapur-Mapusa-I 38740

14 400 कवी को हापर स मापसा-II 400kV Kolhapur-Mapusa-II 49532

15 400 कवी वापी स बोईसर 400kV Vapi-Boisar 67200

16 400 कवी रायगढ़ स ःटरलाइट-I 400kV Raigarh to Sterlight-I 66258

17 400 कवी रायगढ़ स ःटरलाइट-II 400kV Raigarh to Sterlight -II 67200

18 400 कवी रायगढ़ स झरसगड़ा-I 400kV Raigarh to Jharsuguda-I 67200

19 400 कवी रायगढ़ स झरसगड़ा-II 400kV Raigarh to Jharsuguda-II 67200

20 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 65028

21 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 66132

22 400 कवी रायपर स वधाETHI 400kV Raipur to Wardha-I 66836

23 400 कवी रायपर स वधाETHII 400kV Raipur to Wardha-II 67200

24 220 कवी कोरबा पव स ब पादर-III 220kV K(E) to Budhipadar-III 63853

Anaulagnak 47Annex-47

maah frvarI 2014 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39514 64944

10287 39711

Levels in Mtrs str maITr maoM

]ka[- Ukai

64392

9914

25402

25994

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF FEBRUARY 2014

ivavarNa Particulars

TRIPPING DETAILS FOR THE MONTH OF FEBRUARY 2014

Sr No Brief Details of incident (Elements Generation Tripped) Owner Utility Date amp Time Load

Gen LossCategory

1 Multiple Tripping from 400 kV New Koyna MSETClMSEGCLRGPPL 05‐02‐2014 0950 Hrs ‐ GI‐2

2Bus Bar protection mal‐operation at 400 kV Soja in Gujarat resulting in multiple Tripping

GETCO 06‐02‐2014 1755 Hrs ‐ GI‐2

ANNEXURE ‐ 5

  • annexpdf
    • 21pdf
    • 231pdf
    • 232pdf
    • 24pdf
    • 25pdf
    • 31pdf
    • 32C1pdf
    • 32C2pdf
    • 33Apdf
    • 41pdf
    • 42pdf
    • 47pdf
    • 5pdf
Page 9: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014

9

457th OCCM AGENDA

ITEM NO 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR

Status of physical amp cyber security in Power Sector for the Third quarter (October

2013 to December 2013) have not been received from some of the constituents

The Sub-Committee may like to note and furnish details in respect of above ITEM NO 83 ADMS IMPLEMENTATION STEP BY GETCO A pilot project in respect of ADMS have been successfully implemented by GETCO in

11 kV Sadhi feeder (MGVCL ) on 19022014

GETCO may like to presentation on the same ITEMS FROM WRLDC ITEM NO 91 PERFORMANCE OF WR CONSTITUENTS POST THE IMPLEMENTATION OF DEVIATION SETTLEMENT MECHANISM ON 17022014 The IEGC second amendment as well as the Deviation Settlement Mechanism is in

force wef 17022014 The performance of WR constituents during first 10 days ie

from 17th to 28th Feb 2014 comprising of 960 time blocks is illustrated below Members

may like to analyze and devise suitable measures to ensure compliance to the above

CERC regulations

10

457th OCCM AGENDA

Since the decisions in real-time are based on the SCADA data it is now important to

monitor and ensure correctness of drawal injection as seen in SCADA The chart

below indicates the difference between the drawal of constituents as seen in SCADA

and as recorded in SEM for the period of 01st Feb 2014 to 16th February 2014 It may

be seen that the significant difference between SCADA and SEM needs to be

addressed by ensuring healthiness of telemetry and periodic validation by the SCADA

team at the respective SLDCs and WRLDC

The sub committee may like to discuss the same

11

457th OCCM AGENDA

ITEM NO 92 UNDER DRAWAL BY MAHARASHTRA AND INSECURE OPERATION IN THE GRID ON 27-28 FEB 2014

During late night of 27th Feb and early morning hours of 28th Feb-14 the grid

frequency remained above 502 Hz continuously for five hours from 2252 hrs of 27-

02-2014 to 0407 hrs of 28-02-2014 The situation was caused due to demand

reduction across the WR and NR on account of widespread rains and persistent under

drawal by Maharashtra during the above period as illustrated in figure-1 below

5067

49

492

494

496

498

50

502

504

506

508

‐1000

‐850

‐700

‐550

‐400

‐250

‐100

50

200

350

500

650

800

2100

2115

2130

2145

2200

2215

2230

2245

2300

2315

2330

2345

000

015

030

045

100

115

130

145

200

215

230

245

300

315

330

345

400

415

430

445

500

515

530

545

600

615

630

645

700

716

731

746

Maharashtra Deviation from schedule vis‐a‐vis grid frequency2100 hrs of 27‐02‐2014 to 0800 hrs of 28‐02‐2014

MSEBUI FREQ

Deviation from Schedule

Frequency

MW Hz

Several messages were sent from WRLDC control room to SLDC Kalwa directing them to control their under drawal from the grid Details of these messages is tabulated below

Sl No Message sent to Ref No Message date and time

1 SLDC Maharashtra 56079 27022014 2210 hrs

2 SLDC Maharashtra 3070 27022014 2230 hrs

3 SLDC Maharashtra 3078 28022014 0125 hrs

4 SLDC Maharashtra 3079 28022014 0150 hrs

Despite the above messages the response from SLDC Kalwa was inadequate in

controlling the under drawal of Maharashtra Consequently the frequency touched

5069 Hz at 0211 hrs of 28-Feb 2014 the voltage across the grid increased sharply

and there was over injection from WR to other regions Subsequently as a

contingency measure the drawal schedule of Maharashtra was reduced by 600 MW

by suo motu revision in the requisition of Maharashtra in Korba Vindhyachal Sipat

12

457th OCCM AGENDA

and Vidhyachal STPS wef 0230 hrs to 0500 hrs of 28022014 This was later

extended up to 0700 hrs of 28022014 It was a near miss situation that could have

been avoided by adequate planning and commensurate actions in real-time It is

requested that the matter may be taken up at the highest level in MSETCL and a

separate meeting may be convened on the above subject to avoid reoccurrence of

such event in future

The sub committee may like to discuss the same

ITEM NO 93 NON AVAILABILITY OF REAL-TIME TELEMETRY FROM LARGE NUMBER OF STATIONS IN MAHARASHTRA There are 224 nodes in Maharashtra that comprising of 32 Generating stations and

192 substations Out of these 224 nodes 47 locations are yet to be integrated in the

System Out of the balance 177 the data from nearly 50 nodes are not coming since

last 6 months Thus in totality data is not available from more than 135 out of 224

stations ie 60 which is highly alarming The extremely poor status of telemetry in

the state of Maharashtra has become a security threat Maharashtra load is touching

17500 MW and there are large number of construction related outages that have to be

facilitated Further with the formation of the synchronous All India grid there is a need

for close monitoring of system parameters such as the line flows voltage and grid

frequency Inadequate telemetry is resulting in severe constraints in real time

operation as well as outage coordination There have been several instances of line

tripping on high voltage and SPS operation due to sudden increase in line flows

during hour boundary or during facilitating planned outage These events could be

minimized with better supervision if the telemetry is available

The telemetry issue in Maharashtra has been discussed in the various WRPC forums

wherein it was informed by MSETCL that the problem is due to failure of Ms Tulip

who was the service provider for the communication network During the month of

August 2013 representative from MSETCL had assured that a new contract was being

awarded and the situation would improve within one month The extracts from minutes

of 451st OCC is quoted below

QUOTE

13

457th OCCM AGENDA

ldquoMSETCL stated that they were working to resolve the issue and assured that there

would be an improvement in availability of Telemetry from Maharashtra stations within

one Monthrdquo

UNQUOTE

Representative of MSETCL may apprise the OCC regarding present status and the

likely schedule for resolution of the issue

The sub committee may like to discuss the same

ITEM NO 94 STATUS OF LINE AND BUS REACTORS AT 765 KV SASAN

The line reactor of 765 kV Sasan-Satna ckt-2 as well as the Bus reactors of 765 kV Sasan bus are yet to be commissioned at Sasan end In the absence of these reactors high voltage is experienced at Sasan and nearby stations Often one circuit of 765 kV Sasan-Satna is required to be opened for voltage regulation Consequently the reliability of evacuation of generation from two units of Sasan is affected During 456th OCC meeting the revised schedule of the above elements as informed by Ms Reliance was as under

Schedule in formed in meetings 451st OCC 455th OCC 454th OCC 1 Line reactor of 765

kV Sasan-Satna ckt-2

By Dec 2013 By April 2014 By May 2014

2 765 kV Bus-1 Reactor

Jan 2014 By Mar 2014 By June 2014

3 765 kV Bus-2 Reactor

Jan 2014 By Mar 2014 By June 2014

It was decided in 456th OCC meeting that one representative from MPPTCL would visit the SASAN site to check readiness of Line and Bus reactors Representative from MPPTCL and Sasan may apprise the OCC-members on the progress of commissioning of reactors at 765 kV Sasan OCC members may also be apprised of the tap position of the generator transformer 2 and 3

The sub committee may like to discuss the same

14

457th OCCM AGENDA

ITEM NO 95 CHARGING OF NEW TRANSMISSION ASSET IN THE GRID In order to have better coordination of the transmission utilities with RLDCNLDC during charging synchronization of new elements into the grid a communication has been received from NLDC (ref POSOSCONLDCSystem OperationOutage Planning1239) on 10022014 It has been proposed that

a Owner of the asset shall submit the request for expected chargingcommissioning of new element for the calendar month latest by 5th day of the month to the respective RLDC amp NLDC along with status of activities mentioned in the check-list

b RLDC shall study the impact of the new element commissioning and based on its assessment of the preparedness of the utility may recommend to NLDC who in turn would examine the issue independently considering pan India grid scenario

c After the above the owner of the new asset shall give its readiness to charge the new element atleast three days in advance with current status of activities mentioned in the check list

Check list is as under 1 List of elements to be charged along with the details of approval of the

transmission scheme from the Standing CommitteeCTUSTU 2 Single Line Diagram of the concerned substations along with status of

completion of each diabusbreakers 3 Availability of real-time data and communication to the designated

SLDCRLDC 4 Installation of Special Energy Meter complying with CEArsquos Regulations

(Serial number Meter number CTPT ratio to be indicated) 5 Charging Instructions by CTUSTU 6 Schedule and sequence of charging of elements 7 Availability of line bus reactors as per planning In case the transmission

system is planned to be charged without the planned line reactor requisite authorization from CTUSTU by studies

8 Connection Agreement (along with all annexures) with CTU or STU 9 Copy of Long term Access (LTA) or MTOA granted by CTU or STU as the

case may be 10 Copy of Power Purchase Agreement (PPA) 11 A signed undertaking with name and designation of the officer clarly

indicating the following a All Disturbance recorders (DR) and Event Loggers (ELs) with time

synchronization are commissioned b All protective systems have been commissioned c All statutory clearances have been obtained

12 Output of EL and DR after charging

15

457th OCCM AGENDA

Each document mentioned in check list from Sl No 1 to 10 must be attached for sake of completeness and emailed as a consolidated document to the nodal RLDC well before the new element charging date The sub-committee may like to discuss ITEM NO 96 OPENING FEEDERS WITHOUT PRIOR INTIMATION TO WRLDC

It was gathered based on the observation from WRLDC SCADA data and subsequent

discussion with MPPTCL that 220 kV Bina (MP)-Gwalior(MP) DC were taken under

shut down for LILO works at Datia at 0910hrs on 23022014 for 4 days The outage

of these lines was neither discussed in OCC and neither was there any intimation to

WRLDC before availing the outage These lines are included in the important grid

elements list of Western region and prior concurrence of WRLDC is required for

switching these lines Further these lines form the parallel path to 765 kV Bina-Gwalior

DC and with the shutdown of these lines the network upstream of WR-NR inter

regional corridor was depleted

The sub-committee may like to discuss ITEM NO 97 TRIPPING OF 765 KV LINES ON OVER VOLTAGE Recently several tripping of 765 kV lines have been reported on over voltage These are indicated below

1) 765 kV Bina-Gwalior I at 2358 hrs of 16022014 2) 765 kV Bina-Gwalior I at 2011 hrs of 14022014 3) 765 kV Satna-Gwalior at 1300 hrs of 06022014 4) 765 kV Sasan-Satna II at 0013 hrs of 18012014 5) 765 kV Jabalpur-Bina I at 2350 hrs of 10012014 6) 765 kV Jabalpur-Bina II at 0405 hrs of 06012014

It is understood that the adopted Stage-I OV setting for the above lines vary from 108 (ie 826 kV) to 110 (841 kV) As per SCADA data the bus voltage at any of the substations mentioned above had not reached 826 kV during the above incidents

POWERGRID may examine the above tripping in detail and apprise the OCC regarding the above In case of issues related with protective relays field equipment are detected these may be addressed at the earliest The sub-committee may like to discuss

16

457th OCCM AGENDA

ITEM NO 98 RGMO FGMO OF MANDATED GENERATORS IN WESTERN REGION

As per the latest information available at WRLDC there are 251 number of units with a total capacity of 57517 MW in Western Region that are mandated to operate in Restricted Free Governor Mode The need for compliance to the IEGC regulations wrt RGMOFGMO was emphasized in the 455th and 456th OCC meeting as well as during the 25th TCCWRPC meeting Subsequently it was communicated by email to all entities in WR to provide the latest status of RGMOFGMO implementation We have received updated status from MPPTCL LANCO CGPL DB Power and JPL Tamnar in Feb 2014 The latest state wise RGMOFGMO summary is given below

Name of Entity No of mandated units

RGMO FGMO available at

RGMOFGMO Not available at

Maharashtra 90 35 55 Madhya Pradesh 58 36 22 Gujarat 35 19 16 Chhattisgarh 10 3 7 CGPL 5 5 0 NCA 11 6 5 SASAN 2 1 1 NTPC 24 10 14 ESSAR_Mahan 1 1 0 NSPCL 2 2 0 KSK 1 1 0 KWPCL 1 0 1 DB POWER 1 1 0 JPL 5 4 1 LANCO 2 2 0 IEPL 1 0 1 EMCO 2 0 2 WR_Total 251 126 125

WRLDC vide its letter ref WRLDCRGMO-FGMO1-2014 dated 23012014 has issued directions under Section 29 of the Electricity Act to ensure compliance of IEGC regulations 52 (f) (g) (h) and (i) All utilities are requested to furnish the status of compliance in respect of generating units under their jurisdiction The sub-committee may like to discuss ITEM NO 99 STATUS OF TELEMETRY IN WESTERN REGION

The status of telemetry related issues in respect of WR constituents is as under

a) Chhattisgarh Data (except MW) from 500 MW Korba West extension generating station is not available Status points from 400 kV Raita pending

17

457th OCCM AGENDA

b) Madhya Pradesh Telemetry of following bus reactors is not available at WRLDC

S No

Station Name Bus Reactor

Nunber x Capacity

Total MVAR

Rated voltage

Status of Telemetry at

WRLDC1 Nagda 250 100 420 Not available2 Indore 225 50 33 Not available3 Bhopal 225 50 33 Not available4 Birsinghpur 150 50 420 Not available

c) Gujarat Data is not-availableintermittent from following stations in Gujarat

a 220 kV Nano of Tatamdash(not available) b Kansari 400 kV ss and Navsari 220 kVhellipIntermittent (PLCC Problem)

d) Goa Due to non-availability of SCADA data from Goa the difference between drawal as seen in SCADA and as recorded in SEM is as high as 572 during the period 1st Feb to 16th Feb 2014 Data from the following stations in Goa is not available at WRLDC S No Station Status

1 Amona 220 kV Not available 2 Cuncolin 220 kV Not available 3 Kadamba 110 kV Intermittent 4 Tivim 220 kV Intermittent 5 Ponda 220 kV Intermittent 6 Xeldam-220 kV Intermittent 7 Verna-110 kV Intermittent

e) Daman amp Diu

Due to non-availability of SCADA data from Daman amp Diu the difference between drawal as seen in SCADA and as recorded in SEM is as high as 571 during the period 1st Feb to 16th Feb 2014 Data from The error is mainly due to non-availability of data from 220 kV Magarwada

f) DNH Telemetry from 220 kV Kharadpara and Khadoli station is not available

g) POWERGRID The data from the following stations is not available at WRLDC

1) 765 kV Tamnar (Communication problem GPRS link is not stable)

18

457th OCCM AGENDA

Telemetry from following stations is Intermittent at WRLDC 1) 765 kV Durg (PLCC frequent problems)

2) 765 kV Kotra (communication intermittency)

3) 765 kV Gwalior (PLCC link established but still there is some

issue(Delay) in data updation at WRLDC Rectification work under

progress by Site Engineer

4) 765 kV Solapur - Redundant link established through Reliance but

the gateway connected to above link is not configured for 765 KV

data Hence when BSNL link is down 765 KV data is not updating at

WRLDC

The sub-committee may like to discuss

ITEM NO 910 COMPARISON OF DRAWAL AS SEEN IN SCADA VS SEM The IEGC second amendment and the Deviation Settlement Mechanism is in force since the 17022014 The IEGC stipulates maintaining injection drawal within the limits prescribed in the Deviation Settlement Mechanism The sub-committee may like to discuss ITEM NO 911 MOCK BLACK START EXERCISE

As per sec 58(b) of IEGC the usersSTUs etc need to conduct Black start mock

exercises in their respective systems once in every six month under intimation to

RLDC Also the all the black start Diesel Generator (DG) sets are [as per sec 58(b)

of IEGC] required to be tested weekly and the test report needs to be sent to RLDC

on quarterly basis

The following table summarizes the status of mock exercises in respect of black start

facilities in Western Region

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

GUJARAT

1 Ukai (H) 4 x 75 Hydro Diesel 500 kVA 221213 Y

2 Mini Hydro 2 x 25 Hydro Diesel 50 KW N

3 Kadana 4 x 60 Hydro Diesel 500 KVA 2413 Y (2413)

19

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

4

Dhuvaran

1 x 107 (68+39) + 1 x 112 (72+40)

Gas

Details to be furnished by Gujarat

Details to be furnished by Gujarat

N

5 GIPCL-I 3 x 32 + 1 x49

Gas Steam Diesel 141 KW

070912 Y

6 GIPCL-II 1x104+1x56 Gas Steam Diesel 500 kVA N

7

Torrent Power Stn C Stn- DEFCCPP

StnC2x30 StnD120 StnEF(110MW each)CCPP100MW

Thermal (Units-CDEF) Gas(CCPP)

Stn-C islands Diesel

StnC15kVA StnDE F and CCPP(500 kVA each)

281112

Y

8 GPEC 3x138+1x241 Thermal Natural Gas 3000 kVA N

9 Sugen 3x3825 MW Gas Diesel 2x6MVA N

Madhya Pradesh

10 Gandhisagar 5 x 23 Hydro DG set 100 kVA N

11 Birsinghpur 1 x 20 Hydro Battery 220 Volt

Battery N

12 Pench 2 x 80 Hydro DG set 250 kVA 121012 Y

13 Bargi 2 x 45 Hydro DG set 250 kVA 100212 Y

14 Bansagar Stage-I 3 x 105 Hydro DG set 250 kVA N

15 Indira Sagar 8x125 Hydro DG set 2x1000

KVA 22511 Y

Chhattisgarh 16

Hasdeo Bango 3 x 40 Hydro DG Set 250 kVA 250812 N

17

Korba(E)-phse-I

Power plant retired but Black start DG set available and on- load trial is reported to be carried out regularly

DG Set 1500 kW(33kV)

N

Maharashtra

18

Koyna I amp II

4 x 65 4 x 75 Hydro

House generator

2 MVA 231013 N

19 KDPH 2 x20 Hydro DG set 310 KW N

20 Eldari 3 x 75 Hydro DG set 6 KW N

21

Uran (Gas)

4 x 60 (GT) + 4x108 (GT)+ 2x120 WHR

Gas DG set

4 MW PH1412kVA PH2450kVA WH520kVA

161012

N

20

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

22 RGPPL

Block 1 640MW+Block 2 66354MW+Block 3 66354MW

Gas

Gas Turbine (Frame-6)

35 MW (Under testing) Details to be provided by RGPPL

N

23 Ghatghar 2x125 Hydro DG set 1x1250

kVA 51012

N

24 Khopoli 3x24+2x12 Hydro

DC Governor amp bearing oil pumps

DC power (self start)

271013 (detailed report awaited)

N

25 Bhivpuri 3 x 24 +

2 x 15 +2x12 Hydro

DC Governor amp bearing

-do-

N

26 Bhira 6 x 25 Hydro

1 Noof 500 KVA house generator with water turbine

500 kVA

201013 (detailed

report awaited)

N

27

Bhira PSS 1 x 150 Hydro DG set 500 kVA

N

28 Trombay 1 x 120 Gas

Turbine DG Set 25 MW

N

1 x 60 Steam Turbine

NTPC

21

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

29 Kawas 4 x 106 2 x 116 Gas Diesel 2850 KW 151013

N

30 Gandhar 3 x 144 + 1x225 Gas Diesel 2975 KW

N

NCA

31 SSP(RBPH amp CHPH) 6x200+550 Hydro Diesel 2x1000kVA 080412

N

Accordingly the Black start capable stations may forward their tentative plan for conducting Black start exercises in compliance to sec 58(b) of IEGC bull As per the communication for MPPTCL the tentative plan of Black start in Madhya

Pradesh system is given under SL No Name of the Station Tentative Date Remarks 1 Pench March 2014 DG set at Pench amp are Bargi

under outage 2 ISP Apr-May 2014 - 3 TONS June 2014 Governor Problem being

attended 4 Birsinghpur June 2014 -do- 5 Medikheda June 2014 -do- 6 Rjghat June 2014 -do- Other utilities may also update their tentative plan for black start

The sub-committee may like to discuss

22

457th OCCM AGENDA

ITEM NO 912 HEALTHINESS OF MAIN CIRCUIT BREAKER OF 400 KV BIRSINGPUR-KATNI-I AT KATNI END The main CB of Birsingpur-Katni-I is under shut down since 2350 hrs of 14th February 2013 Representatives from MPPTCL may kindly apprise on the progress and expected date of restoration of the Main CB of 400 kV Birsingpur-Katni-I at Katni end The sub-committee may like to discuss

ITEM NO 913 TESTING OF SPS RELATED TO TRIPPING OF BINA-GWALIOR-AGRA AT CGPL VINDHYACHAL AND KORBA

As per the information received from NTPC and CGPL the SPS for the 765 kV Bina-

Gwalior-Agra has been installed and a mock drill has to be carried out for the same

The matter was discussed in the 456th OCC and it was decided that SPS may be

tested for reduction of say 50MW for each station instead of backing down of entire

500MWs POWERGRID WRTS-2 may confirm the testing schedule so that the

same could be coordinated in from WRLDC

The sub-committee may like to discuss

ITEM NO 914 SPS AT SIPAT WRLDC vide letter No WRLDCMO-I17192013 dt 21613 requested to take up this matter with the concerned for early implementation of the SPS Status of the SPS at NTPC Sipat is as under

1 449th OCC SPS was proposed by WRLDC It was decided to have a

separate meeting to finalize the scheme 2 450th OCC Member Secretary WRPC intimated that the matter will be

discussed in 119th PCM on 3rd amp 4th September 2013 at Tarapur 3 451st OCC It was intimated that the issue of SPS of Sipat was discussed in

119th PCM held on 3rd amp 4th September 2013 at TARAPUR The tentative scheme were formulated which needed finer tuning

4 452nd OCC Matter not discussed 5 453rd OCC NTPC representative intimated proposal sent to their corporate

office for engineering approval 6 454th OCC Approval from our corporate office is yet to be obtained 7 455th OCC Approval from our corporate office is yet to be obtained 8 456th OCC Approval from corporate office has been obtained and would be

forwarded to WRPC for approval The sub-committee may like to discuss

23

457th OCCM AGENDA

ITEM NO 915 SPS AT 4X300 MW BALCO IPP The SPS at 2010 MW Balco (4x675MW + 4x135 MW + 4x300 MW) was to be commissioned by Nov 2013 before commissioning of first unit of 4x300 MW Balco IPP For the new SPS scheme envisaged for the Balco CTU connection namely the Grid Islanding and Load Management Scheme (GILMS) Balco had reported to have placed an order with Ms SEL As discussed earlier the scheme suggested by WRLDC may be implemented before commissioning of first unit of 300 MW It was intimated during the 456th OCCM by the Balco representatives that the SPS shall be commissioned by March 2014

The sub-committee may like to discuss

ITEM NO 916 ACTIONS TAKEN FOR REVIVAL OF TRANSMISSION ELEMENTS UNDER LONG OUTAGE

As per the information available at WRLDC following elements are out for a

long period

Sl No Date of

outage

Reason

ISTSIPP

1 80 MVAR BR at

ESSAR(Mahan)

231213 Oil leakage

2 125 MVAR BR at JPL 120513 Hydrogen formation

3 50 MVAR LR of Indore-Asoj-II

at Indore

190613 R phase bushing burst

4 50 MVAR LR of Birsingpur-

Damoh at Damoh(PG)

13102014 Oil Leakage

5 765 kV Durg-Kotra-I 24022014 Sparking in Isolator

6 400 kV Raipur-Raigarh-IV 18012014 Voltage Regulation

MSETCL

1 400 kV RGPPL-NrsquoKoyna-I 22012014 Voltage Regulation

2 400 kV Sholapur-

Sholapur(PG)

26022014 Tower Collapse

MPPTCL

1 400 kV Birsingpur-Katni-I 28012014 Voltage Regulation

24

457th OCCM AGENDA

2 50 MVAR LR of Indore-Asoj-II

at Indore

6012014 DGA Violation

CSPTCL

1 400220 kV Bhilai-II 24022014 Maintenance

OCC may like to be apprised of the actions being taken for expediting revival of

the above elements

The sub-committee may like to discuss

ITEM NO 917 STATUS OF 220 KV KOLHAPUR-MUDSINGHI-CHIKODI- BELGAM LINE Consent for trial operation of 220 kV Kolhapur-Mudsinghi-Chikodi- Belgam line in radial mode for supply of Karnataka load from Maharashtra side was granted after discussion in the 455th OCC meeting WRLDC is in receipt of letter from SRLDC regarding concurrence for the above arrangement SLDC Kalwa may apprise the OCC regarding the present status The sub-committee may like to discuss

ITEM NO 918 CONTRIBUTION OF GENERATORS IN VOLTAGE CONTROL The contribution of generators in WR in voltage control was analyzed during 456th OCC meeting It was noted that following units were injecting reactive power even during high voltage

1 210 MW units of Khaparkheda Koradi and Chandrapur (Maharashtra) 2 210 MW units of Satpura and Birsinghpur (Madhya Pradesh) 3 210 MW unit 23 of Korba West (Chattisgarh) 4 200 MW unit 34 of Ukai (T) in (Gujarat)

Utilities were requested to check the setting of AVRGT tap and revert back with findings Members may apprise OCC regarding the status The sub-committee may like to discuss

ITEM NO 919 REAL-TIME MONITORING OF FEEDERS SUBSTATIONS THAT ARE COVERED UNDER THE AUFLS Telemetry of feeders substations covered under the AUFLS is desirable for real-time assessment of the anticipated relief that would be available from the AUFLS scheme at any given instant of time CERC has also directed all the constituents to for

25

457th OCCM AGENDA

mapping of these feeders in the SCDA of SLDCsRLDC Members may like to deliberate further The sub-committee may like to discuss

ITEM NO 920 LOAD FORECASTING As per the amended Indian Electricity Grid Code that is effective from 17th February 2013 the SLDCs SEB distribution licensees shall always restrict the net drawal of the State from the grid within the drawal schedule keeping the deviations from the schedule within the limits specified in the Deviation settlement mechanism regulations Therefore it is imperative that adequate attention may be paid towards load forecasting The matter was discussed in the 455th and 456th OCC as well as in the 25th TCCWRPC board meeting wherein it was decided to create a task force for exploring development of a software for load forecasting Members may like to deliberate further The sub-committee may like to discuss

ITEM NO 921 IMPLEMENTATION OF THE REVISED AUFLS IN GOA DD AND DNH It was decided during the 455th and 456th OCC meeting as well as during 25th WRPC meeting that Goa DD and DNH shall complete the implementation of the revised AUFLS in Goa DD and DNH at the earliest Representatives from the Goa DD and DNH may apprise the status of the progress The sub-committee may like to discuss

ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING As per meeting roaster circulated during 452nd OCC meeting the 458th OCC Meeting

will be hosted by Maharashtra and may be scheduled on 16th amp 17th April 2014

Maharashtra may confirm the same

Anaulagnak 21

maah frvarI 2014

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5051 Hz BETWEEN 0200 Hrs amp 0300 Hrs Hrs ON 28022014

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4970 Hz BETWEEN 1800 Hrs amp 1900 Hrs Hrs ON 28022014

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 5006 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5071 Hz AT 0210 Hrs ON 28022014

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4937 Hz AT 185000 Hrs ON 28022014

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS FEBRUARY 2014 JANUARY 2014 DECEMBER 2013

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 001 005

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 041 061 188 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 1069 5423 4864 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 4014 3569 3987

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 4876 946 956

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING FEBRUARY 2014

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

Voltage Profile during the month of Feb 2014

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 421 401 426 403 409 409 408 408 415 399 414 402 424 413 417 3922 420 402 423 404 409 409 408 408 417 402 418 404 425 415 420 3993 421 399 426 400 429 405 425 402 412 399 419 408 423 410 413 3964 422 402 426 404 430 406 428 401 414 400 414 404 424 412 414 3965 420 396 423 400 409 409 408 408 413 396 415 401 424 411 415 3996 420 396 426 400 428 405 426 402 415 398 416 402 423 411 412 4007 420 394 424 399 430 402 427 401 416 399 417 402 423 409 416 3968 418 393 422 397 409 409 408 408 416 399 416 402 422 409 418 3989 418 399 423 404 409 409 408 408 417 402 417 407 419 409 419 400

व तदाब परखा फरवर 2014 स नक Annex-23

इदौर इटारसी कराड धल असोज कासोर िभलाई जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

10 419 394 423 399 409 409 408 408 416 400 415 401 420 408 417 39511 421 393 426 397 429 405 427 401 44 399 419 404 423 407 414 39912 419 395 422 400 409 409 408 408 416 401 419 407 421 410 418 39813 420 396 424 401 409 409 408 408 417 400 416 401 421 409 418 40114 421 399 424 403 430 419 428 414 417 402 415 402 421 409 417 40015 423 397 424 399 428 414 429 412 417 398 406 406 421 407 418 40016 423 397 424 400 431 404 424 401 416 401 422 409 421 409 418 40317 421 402 424 403 432 414 420 404 416 402 412 405 422 410 417 39818 420 397 423 399 409 409 408 408 416 400 414 401 422 414 416 40019 420 396 423 399 409 409 408 408 411 398 418 405 421 413 413 39920 417 397 420 402 429 406 426 401 413 399 416 404 421 413 410 39821 419 399 422 402 430 407 421 401 415 401 418 406 422 411 414 39722 419 397 422 402 432 409 423 401 416 400 413 402 423 413 414 40023 420 396 423 397 430 412 428 404 414 404 415 402 427 414 416 40324 421 399 423 401 433 411 425 400 416 398 414 402 427 415 418 40225 421 399 423 401 433 411 425 400 416 398 414 402 427 415 418 40226 420 397 423 404 431 411 428 409 411 397 415 404 424 414 412 39327 418 398 426 403 409 409 408 408 417 399 418 402 429 415 419 39128 421 400 427 406 409 409 408 408 414 400 416 403 430 415 418 401

423 393 427 397 433 402 429 400 417 396 422 401 430 407 420 391

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 424 404 415 392 424 404 431 407 766 746 797 765 800 756 804 7692 422 406 417 398 426 404 434 407 769 754 798 774 801 769 804 7773 423 405 416 402 426 401 432 410 767 750 796 768 802 773 805 7764 426 407 417 402 423 403 430 408 768 751 797 779 801 776 808 7785 422 403 415 398 423 397 430 400 768 749 797 767 798 763 797 7586 425 404 417 401 423 399 432 404 768 750 797 767 802 773 807 7707 427 401 419 397 423 396 431 404 770 741 800 763 807 769 809 7698 422 403 416 403 424 395 427 399 756 737 788 756 801 765 802 7679 422 405 416 401 424 402 427 404 755 738 786 758 804 773 804 775

10 421 400 414 396 423 398 429 403 3 88 6 98 6 801 60

वािलयर बनाBina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

बना वािलयर नागदा खडवा िसपत िसविन

10 421 400 414 396 423 398 429 403 755 737 788 765 798 765 801 76011 423 397 414 390 426 396 433 399 758 736 794 750 800 752 802 75612 420 403 414 395 423 397 428 403 757 739 787 759 801 763 798 77013 424 405 417 400 427 397 430 402 759 740 794 760 804 773 803 77214 426 410 420 406 424 400 431 405 761 740 794 766 810 780 808 78215 425 404 417 399 426 399 430 401 762 738 794 962 808 768 806 76816 426 406 422 400 427 402 429 400 759 739 792 760 815 774 811 77617 429 407 417 398 427 404 427 406 761 742 792 762 805 765 810 77418 426 404 418 395 423 399 427 404 763 748 793 768 805 759 806 76819 423 409 415 394 422 399 428 403 759 737 795 765 804 758 806 76720 421 406 410 397 420 398 426 406 765 749 795 771 791 766 799 77421 423 407 424 399 423 403 428 405 759 744 792 760 795 761 800 76722 425 406 414 398 423 400 425 404 760 743 790 762 794 762 800 76823 425 402 412 392 424 400 428 405 758 740 790 759 796 755 799 76124 425 401 411 393 423 401 427 403 760 744 796 764 792 757 798 75625 421 408 412 395 423 401 427 403 756 742 793 766 795 764 795 76926 422 405 413 390 421 399 426 402 757 739 789 760 796 750 798 76127 426 407 416 393 421 401 431 403 760 741 795 762 803 755 804 76228 428 409 414 392 423 403 432 405 762 740 795 753 809 775 803 771

429 397 424 390 427 395 434 399 770 736 800 750 815 750 811 756

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Feb-14 0 0 0 0 0 0 0 02 02-Feb-14 0 0 0 0 0 0 0 03 03-Feb-14 0 0 0 0 0 0 0 04 04-Feb-14 0 0 0 0 0 0 0 05 05-Feb-14 0 0 0 0 0 0 0 06 06-Feb-14 0 0 0 0 0 0 0 07 07-Feb-14 0 0 0 0 0 0 0 08 08-Feb-14 0 0 0 0 0 0 0 09 09-Feb-14 0 0 0 0 0 0 0 0

10 10-Feb-14 0 0 0 0 0 0 0 011 11-Feb-14 0 0 0 0 0 0 0 012 12-Feb-14 0 0 0 0 0 0 0 013 13-Feb-14 0 0 0 0 0 0 0 014 14-Feb-14 0 0 0 0 0 0 0 015 15-Feb-14 0 0 0 0 0 0 016 16-Feb-14 0 0 NIL NIL NIL 017 17-Feb-14 0 0 0 0 0 0 0 018 18-Feb-14 0 0 0 0 0 0 0 019 19-Feb-14 0 0 0 0 0 0 0 020 20-Feb-14 0 0 0 0 0 0 0 021 21-Feb-14 0 0 0 0 0 0 0 022 22-Feb-14 0 0 0 0 0 0 0 023 23-Feb-14 0 0 0 0 0 0 0 024 24-Feb-14 0 0 0 0 0 0 0 025 25-Feb-14 1 17 0 0 0 0 0 026 26-Feb-14 0 0 0 0 0 0 0 027 27-Feb-14 0 0 0 0 0 0 0 028 28-Feb-14 0 0 0 0 0 0 0 0

Max 1 17 0 0 0 00 0 0Total 1 17 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month FEBRUARY 2014

Recommonded Load relief at 492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE-25

Power CutRestrictions in Western Region for the month of February-2014 k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply(DLF)

01022014 28022014 2344 2240 2332

21 Three-Phase Supply(Irrigation)

01022014 28022014 0956 0905 0946

21 Three-Phase Supply(Mixed)

01022014 28022014 2343 2227 2330

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01022014 28022014 2353 2337 2347 32 District Head Qtrs 01022014 28022014 2355 2340 2351 33 Tehsil Head Qtrs 01022014 28022014 2349 2309 2341

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid

1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 010214 to 280214

SaUnya Nil

0-1655MW

SaUnya Nil

0000

SaUnya Nil 2400

SaUnya Nil

95 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-

2 Power supply to Agricultural Sector ivavarNa Details sao From

idnaaMk Date tk To

idnaaMk Date p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs) 21 Three-Phase Supply 01022014 28022014 1000 0800 0900

22 Single-Phase Supply 01022014 28022014 1800 1800 1800 3 Anya jaanakarI Any other information

There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

11107 (Av) of 23 days 0000(Av) 0000 (Av)

1Rural 9031(Av) for 3486 Hrs 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0666 - -

0105 -

3 HT Industries 000 (Av) for 00 Hrs 000 Total Energy Cutday 0771 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01022014 to 280214 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 2322014 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का फरवर 2014का वःता रत यौरा

Details of forced unit outages during the month ofFeb2014

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 एःसार वा डनर

ESSAR VADINAR-I

गरा विनिल GSECL

660 2156 20-Jan-14 2018 10-Feb-14 Coal shortage

2 एःसार Essar-2

गरा विनिल GSECL

172 1212 22-Feb-13 अनपल ध Still out

अनपल ध Still out

Shortage of gas

3 एसएलपीपी SLPP-1

गरा विनिल GSECL

125 1445 23-Feb-14 1237 27-Feb-14 BTL

4 एकएलट पीएसAKLTPS-1

गरा विनिल GSECL

125 1147 26-Feb-14 अनपल ध Still out

अनपल ध Still out

DCS FAIL

5 एपीएल APL - 2

अदानी ADANI

330 056 3-Feb-14 अनपल ध Still out

अनपल ध Still out

Turbine vibration bearing probl em

6 एपीएल APL-5

अदानी ADANI

660 1732 15-Feb-14 456 27-Feb-14 Turbine vibration

7 एपीएल APL - 6

अदानी ADANI

660 2049 25-Feb-14 1947 3-Mar-14 Coal mill problem

8 टाटा TATA-6

मारा वउकिल MSPGCL

500 2352 19-Jul-13 अनपल ध Still out

अनपल ध Still out

For Economy SD

9 वीआईपीएल VIPL-I

मारा वउकिल MSPGCL

300 105 2-Oct-13 अनपल ध Still out

अनपल ध Still out

Turbine bearing vibration probl em

10 टाटा TATA-8

मारा वउकिल MSPGCL

250 2255 9-Jan-14 अनपल ध Still out

अनपल ध Still out

HT due to fire near turbine generator desk

11 चिपर Chandrapur-2

मारा वउकिल MSPGCL

210 1238 14-Jan-14 1310 23-Feb-14 ID fan problem

12 कोराड KORADI-6

मारा वउकिल MSPGCL

210 651 24-Jan-14 1456 14-Feb-14 Coal bunkering problem

13 डब यपीसीएल WPCL-1

मारा वउकिल MSPGCL

135 1245 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Furnace press high

14 डब यपीसीएल WPCL-3

मारा वउकिल MSPGCL

135 421 7-Feb-14 Ready Ready Less requisition

प म ऽय भार षण कि म बई णाली चालन-ISO-I

15 चिपर CPUR - 6

मारा वउकिल MSPGCL

500 1523 11-Feb-14 2033 13-Feb-14 BTL

16 नािसक NASIK-3

मारा वउकिल MSPGCL

250 300 11-Feb-14 100 19-Feb-14 UAT problem

17 कोराड KORADI-5

मारा वउकिल MSPGCL

210 153 14-Feb-14 अनपल ध Still out

अनपल ध Still out

ID fan problem

18 ितरोडा Tiroda-I

मारा वउकिल MSPGCL

660 2059 15-Feb-14 2054 26-Feb-14 Turbine bearing problem

19 ितरोडा Tiroda-2

मारा वउकिल MSPGCL

660 1125 17-Feb-14 152 22-Feb-14 BTL

20 कोराड KORADI-6

मारा वउकिल MSPGCL

210 2357 19-Feb-14 250 23-Feb-14 BTL

21 भसावल BHUSWAL-2

मारा वउकिल MSPGCL

210 301 22-Feb-14 1706 25-Feb-14 PA fan temp High

22 खापरखड़ा KHAPERKHEDA-3

मारा वउकिल MSPGCL

250 1448 22-Feb-14 130 25-Feb-14 BTL

23 जयगड Jaigad-4

मारा वउकिल MSPGCL

300 1930 22-Feb-14 1107 4-Mar-14 Low schedule

24 कोराड Koradi-5

मारा वउकिल MSPGCL

300 404 23-Feb-14 अनपल ध Still out

अनपल ध Still out

Electrical fault

25 पल PARLI-4

मारा वउकिल MSPGCL

210 1836 28-Jan-14 1956 3-Feb-14 Air preheater problem

26 भसावल BHUSAWAL-4

मारा वउकिल MSPGCL

250 1432 28-Feb-14 1802 3-Mar-14 Ash hopper problem

27 आरजीपीपीएल RGPPL-1B

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

28 आरजीपीपीएल RGPPL-2B

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

29 आरजीपीपीएल RGPPL 3A

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

30 आरजीपीपीएल RGPPL-1A

आरजीपीपीएल RGPPL

320 1500 18-Jan-14 अनपल ध Still out

अनपल ध Still out

SRV problem

31 आरजीपीपीएल RGPPL 3B

आरजीपीपीएल RGPPL

320 1230 8-Feb-14 Ready Ready Less requisition

32 िसगाजी SINGAJI - I

म वउकिल MPPGCL

600 422 12-Feb-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

33 सातपरा SATPURA-11

म वउकिल MPPGCL

250 1913 15-Feb-14 2149 19-Feb-14 Main stream temperature low

34 सातपरा SATPURA-11

म वउकिल MPPGCL

250 542 26-Feb-14 1642 2-Mar-14 BTL

35 एःसार महान Essar-Mahan-1

एःसार ESSAR

600 000 29-Jan-14 015 18-Feb-14 Less requisi tion

36 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

37 वदना Vandana-1

वदना Vandana

135 149 12-Jan-14 अनपल ध Still out

अनपल ध Still out

BTL

प म ऽय भार षण कि म बई णाली चालन-ISO-I

38 ससान Sasan-2

आरईएल REL

660 205 16-Feb-14 1650 23-Feb-14 Problem in ash handling

39 कावास Kawas 2A

एनट पीसीNTPC 164 2018 23-Dec-13 Ready Ready Less requisition

40 गाधार Gandhar-3

एनट पीसीNTPC 144 2037 28-Dec-13 Ready Ready Less requisition

41 गाधार Gandhar-I

एनट पीसीNTPC 144 2011 1-Jan-14 Ready Ready Less requisition

42 कावास Kawas 2B

एनट पीसीNTPC 164 900 13-Jan-14 421 5-Mar-14 Maintenance

43 गाधार Gandhar-2

एनट पीसीNTPC 219 023 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Less requisition

44 कावास Kawas-1A

एनट पीसीNTPC 164 2055 4-Feb-14 712 20-Feb-14 Less requisition

45 कावास

Kawas-1B एनट पीसीNTPC 164 1951 13-Feb-14 503 20-Feb-14 Less requisition

46 कावास Kawas 1A

एनट पीसीNTPC 164 1210 21-Feb-14 Ready Ready Less requisition

47 कावास Kawas 1B

एनट पीसीNTPC 164 012 22-Feb-14 1144 26-Feb-14 Less requisition

Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का फरवर 2014 का वःता रत यौरा

Details of planned unit outages during the month of Feb2014 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Time Date

1 डब यट पीएस WTPS-3

गरा विनिल GSECL

210 212 12-Feb-14 अनपल ध Still out

अनपल ध Still out

AOH

2 पल ParlI-3

मारा वउकिल MSPGCL

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

AOH

3 चिपर Chandrapur-5

मारा वउकिल MSPGCL

500 101 14-Jul-13 841 19-Feb-14 AOH

4 कोरबा प म KORBA-(W)-4

छरा वउकिल CSPGCL

210 2226 7-Feb-14 अनपल ध Still out

अनपल ध Still out

AOH

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

NIL2

NIL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING MARCH 2014 AND APRIL 2014

Capacity Outage as per Annual Maintenance Plan

3 Craiva]kMila CSPGCL

NIL

4

NIL

5 koMd``Iya xao~ Central Sector51 VSTPS 4 210 010414 070414 AOH52 VSTPS 2 210 080414 270414 AOH53 VSTPS 1 210 300414 190514 AOH54 CGPL 10 800 280314 130514 COH

maraiva]kMila MSPGCL

Date Time Date Time1 220 Bus-1 at Mapusa 20-Mar-14 1000 20-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R

2 765 Bus-1 at Sasan 20-Mar-14 800 20-Mar-14 1800 Daily Stringing of Main bus 1 for 765 kV Vichal Pooling - Sasan feeder

Reliance WR-II C

3 400 400kV Bus-2 at Satna 20-Mar-14 800 20-Mar-14 1800 Continuous Bay extension work related to JP - Nigrie Bays POWERGRID WR-II C

4 400 400kV ICT 1 at Satna 20-Mar-14 800 20-Mar-14 1000 Continuous Bay extension work related to JP - Nigrie Bays POWERGRID WR-II C

5 400 400kV Jabalpur Itarsi 1amp2 (Dc) 20-Mar-14 1000 20-Mar-14 1400 Continuous For commissioning of Line Impedance measurement kit

POWERGRID WR-II C

6 765 3X80 MVAr Bina Line Reactor at Indore 20-Mar-14 1000 21-Mar-14 1800 Continuous For installation of online dry out amp online DGA kit

POWERGRID WR-II C

7 400kV Damoh - Bhopal 1 20-Mar-14 800 31-Mar-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

8 400 Chorania Kasor 20-Mar-14 800 20-Mar-14 1800 Daily PMM work GETCO GETCO9 400 400 KV Main Bus-I at 400 KV Ss Khedamara 20-Mar-14 900 22-Mar-14 1700 Daily Erection of Pantograph 1 Set of IP amp CVT CSPTCL CSPTCL C

10 400 400 KV Khedamara-KSTPS NTPC ckt-II at 400 KV Ss Khedamara

20-Mar-14 900 22-Mar-14 1700 Daily Erection of Pantograph CVT amp 1 Set of IP PGCIL CSPTCL C

11 400 Korba -Vandana 20-Mar-14 900 21-Mar-14 1900 days continuouTesting of LBB auto re-close M-I amp M-II relays NTPC NTPC

12 400 Korba -Vandana 20-Mar-14 900 21-Mar-14 1900 days continuouTesting of LBB auto re-close M-I amp M-II relays NTPC NTPC

13 400DC Akola-Aurangabad (MSETCL) 1 and Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

21-Mar-14 600 23-Mar-14 1800 Conti Crossing work of 400kv MC Aurangabad - Aurangabad

MSETCLWRTS-I WRTS-I C

14400 amp 220 amp 132

400KV DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 400KV Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

21-Mar-14 600 21-Mar-14 1800 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad

MSETCLWRTS-I WRTS-I C

15 400 Bhadrawati-Parli 1amp 2 21-Mar-14 900 31-Mar-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I C

16 220 Bus-1 at Pune 21-Mar-14 800 21-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R

17 400 Solapur-Kolhapur 1 amp 2 21-Mar-14 700 21-Mar-14 1800 Daily Stringing work upcoming 765 kV Solapur-Pune line

Reliance WRTS-I C

18 220 220kV DC Raigarh- Raigarh (CSPTCL) Line (if outage not avail on 13140314)

21-Mar-14 900 22-Mar-14 1700 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (040-50)

CSPTCL WRTS-I C

19 220 Bus-2 (Section-A) at Mapusa 21-Mar-14 1000 21-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R20 400 Bus-1 at Itarsi 21-Mar-14 900 21-Mar-14 1800 Daily AMP POWERGRID WR-II R21 220 Bus-1 at Gwalior 21-Mar-14 1000 21-Mar-14 1800 Daily AMP POWERGRID WR-II R22 220 Jhanor - Haldarwa 1 21-Mar-14 900 21-Mar-14 1800 Daily AMP POWERGRID WR-II R23 400 Vapi Boisar 21-Mar-14 700 22-Mar-14 1900 Continuous For crossing of 220kV Kala Khadoli TL POWERGRID WR-II C

24 765 Sasan-Satna2 21-Mar-14 800 22-Mar-14 1800 Continuous For Power Line crossing of 765kV Vindhyanchal (pooling) - Satna 2 Line

POWERGRID WR-II R

25 400 400220 ICT NO1 at Kasor 21-Mar-14 800 21-Mar-14 1800 Daily PMM work GETCO GETCO26 400 400KV Sipat-Pathadi(LANCO) line 21-Mar-14 900 22-Mar-14 1900 Continous Annual Preventive maintenance job NTPC NTPC27 400 Pune-Parli 2 50MVAr Line Reactor at Pune 22-Mar-14 800 22-Mar-14 1800 Daily AMP Work Line in service wo reactor Reliance WRTS-I R

28 765 Bus-2 at Solapur 22-Mar-14 700 22-Mar-14 1800 Daily 765KV Pune bay commissioning amp SCADA works

WRTS-I WRTS-I C

29 400 Bus-1 at Bhatapara 22-Mar-14 800 23-Mar-14 1800 Conti Bus extension work for new 125MVAr Bus Reactor at Bhatapara

WRTS-I WRTS-I C

30 220 Bus-2 (Section-B) at Mapusa 22-Mar-14 1000 22-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R31 400 Vadavi Chorania 1 22-Mar-14 900 22-Mar-14 1800 Daily AMP Reliance WR-II R32 220 Jhanor - Haldarwa 2 22-Mar-14 900 22-Mar-14 1800 Daily AMP POWERGRID WR-II R33 220 Bus-2 at Gwalior 22-Mar-14 1000 22-Mar-14 1800 Daily AMP POWERGRID WR-II R

34 765 3X80 MVAr Bus Reactor at Indore 22-Mar-14 1000 23-Mar-14 1800 Continuous For installation of online dry out amp online DGA kit

POWERGRID WR-II C

35 220 Transfer Bus at Mapusa 23-Mar-14 1000 23-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R

36 400 Raigarh- Raipur 4 amp Raigarh-Kotra PS 2 23-Mar-14 800 30-Mar-14 1800 Conti Bay shifting work for up-coming 125MVAr Bus Reactor at Raigarh

WRTS-I WRTS-I C

37 765 Bus-1 at Indore (PG) 23-Mar-14 1000 23-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

Outages Proposal of Transmission elements during the month of MARCH‐2014Type

ANNEXURE‐32A

SN KV Line From To

Basis Reason System Agency

38 220 MC Waluj-Chitegaon amp Waluj-Jalna on same tower

24-Mar-14 600 24-Mar-14 1800 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad

MSETCL WRTS-I C

39 400 Raipur-Sipat 1 amp 2 24-Mar-14 800 2-Apr-14 1800 Conti Diversion of line for Lafarge Railway trackERS removal

WRTS-I Lafarge C

40 220 Bus-2 at Pune 24-Mar-14 800 24-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R41 765 Bus-1 at Bilaspur 24-Mar-14 800 24-Mar-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R

42 400 Bus-2 at Bhatapara 24-Mar-14 800 25-Mar-14 1800 Conti Bus extension work for new 125MVAr Bus Reactor at Bhatapara

WRTS-I WRTS-I C

43 400 Kolhapur-Mapusa 2 24-Mar-14 600 24-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

44 400 Vadavi Chorania 2 24-Mar-14 900 24-Mar-14 1800 Daily AMP Reliance WR-II R45 765 Bus-2 at Indore (PG) 24-Mar-14 1000 24-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

46 765 Bus-2 at Sasan 24-Mar-14 800 24-Mar-14 1800 Daily Strining of Main Bus 2 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

47 220 KAPP - Haldarwa 1 24-Mar-14 800 24-Mar-14 1800 Daily AMP POWERGRID WR-II R48 400 Bus - 2 at Pune 25-Mar-14 800 25-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R

49 765 Bus - 1 at Wardha 25-Mar-14 800 25-Mar-14 1800 Daily Jumper connection work of 765KV Raipur-Wardha line

WRTS-I WRTS-I R

50 400 Kolhapur-Mapusa 2 25-Mar-14 600 25-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

51 220 Mapusa-Ponda line 25-Mar-14 1000 25-Mar-14 1500 Daily AMP Work GOA WRTS-I R

52 765 Bus-1 at Sasan 25-Mar-14 800 25-Mar-14 1800 Daily Jumpering of Bus 1 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

53 220 KAPP - Haldarwa 2 25-Mar-14 800 25-Mar-14 1800 Daily AMP POWERGRID WR-II R54 400 Vadavi - Kansari2 25-Mar-14 900 25-Mar-14 1800 Daily AMP Reliance WR-II R55 400 Bus-1 at Indore (PG) 25-Mar-14 1000 26-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C56 765 Bus-1 at Satna 25-Mar-14 800 25-Mar-14 1800 Continuous Bay extension work POWERGRID WR-II C57 765 Sipat 765KV 400KV 1000MVA ICT-1 25-Mar-14 900 25-Mar-14 1900 Daily SPS Protection scheme modification NTPC NTPC

58 765 Bus - 2 at Wardha 26-Mar-14 800 26-Mar-14 1800 Daily Jumper connection work of 765KV Raipur-Wardha line

WRTS-I WRTS-I R

59 400 Bhadrawati-Parli 2 63MVAr Line Reactor at Parli

26-Mar-14 800 26-Mar-14 1800 Daily AMP Work of Recator at Parli line in service wo reactor

WRTS-I WRTS-I R

60 400 Kolhapur-Mapusa 1 26-Mar-14 600 26-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

61 220 Mapusa-Amona line 26-Mar-14 1000 26-Mar-14 1500 Daily AMP Work GOA WRTS-I R62 765 Bus-2 at Satna 26-Mar-14 800 26-Mar-14 1800 Continuous Bay extension work POWERGRID WR-II C

63 765 Bus-2 at Sasan 26-Mar-14 800 26-Mar-14 1800 Daily Jumpering of bus 2 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

64 400 401 KV Main Bus-I at 400 KV Ss Khedamara 26-Mar-14 900 27-Mar-14 1700 Daily Erection of IPS Tube CSPTCL CSPTCL C

65 400 401 KV Khedamara-KSTPS NTPC ckt-II at 400 KV Ss Khedamara

26-Mar-14 900 27-Mar-14 1700 Daily Erection of IPS Tube PGCIL CSPTCL C

66 400 ACBIL-BILASPUR-CKT NO -2 26-Mar-14 900 31-Mar-14 1800 CONT FOR lilo CONNECTIVITY OF 300MW MCCPL TPP

ACBIL ACBIL C

67 765 Bus-2 at Bilaspur 27-Mar-14 800 27-Mar-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R68 220 Mapusa-Thivim 1 27-Mar-14 1000 27-Mar-14 1500 Daily AMP Work GOA WRTS-I R69 220 KAPP - Vav 2 27-Mar-14 800 27-Mar-14 1800 Daily AMP POWERGRID WR-II R70 400 Bus-2 at Indore (PG) 27-Mar-14 1000 28-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

71 765 Bus-2 at Gwalior 27-Mar-14 1000 27-Mar-14 1800 Daily Bay extension work related to Gwalior Jaipur 1 Bays

POWERGRID WR-II C

72 400 VSTPS Tie- Line-1 ( Line from Stage-III to IV Switchyard)

27-Mar-14 900 27-Mar-14 1900 Daily Basis AMP and rectification of hot spots NTPC NTPC

73 765 Sipat 765KV 400KV 1000MVA ICT-2 27-Mar-14 900 27-Mar-14 1900 Daily SPS Protection scheme modification NTPC NTPC74 765 Bus-1 at Solapur 28-Mar-14 700 30-Mar-14 1800 Daily commissioning tests amp SCADA works WRTS-I WRTS-I C75 220 Mapusa-Thivim 2 28-Mar-14 1000 28-Mar-14 1500 Daily AMP Work GOA WRTS-I R

76 400 Koradi-Satpura 28-Mar-14 1000 28-Mar-14 1400 Daily Earthwire tighting work damaged during Crossing work

WRTS-I ADANI C

77 220 Bus-1 at Dehgam 28-Mar-14 900 28-Mar-14 1800 Daily AMP POWERGRID WR-II R78 220 Kawas - Haldarwa 2 28-Mar-14 800 28-Mar-14 1800 Daily AMP POWERGRID WR-II R79 400 Chorania Amreli 28-Mar-14 800 28-Mar-14 1800 Daily PMM work GETCO GETCO

80 400DC Akola-Aurangabad (MSETCL) 1 and Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

29-Mar-14 600 30-Mar-14 1800 Conti Charging amp shifting of Akola-Abad line on MC Abad-Abad line WRTS-I WRTS-I C

81 220 Bus-2 at Dehgam 29-Mar-14 900 29-Mar-14 1800 Daily AMP POWERGRID WR-II R82 400 Bus -1 at Mapusa 30-Mar-14 1000 30-Mar-14 1500 Daily AMP Work WRTS-I WRTS-I R

83 765 765kV Bus Reactor at Solapur 31-Mar-14 700 2-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

Date Time Date Time

1 400 Bhilai-Koradi 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

2 400 DC Korba-Birsingpur 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

3 400 Korba-Bhilai 2 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

4 220 Korba-Budhipadar 3 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

5 400 Akola-Wardha 1amp 2 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

6 400 Raipur-Raigarh 1 amp Raipur-KSK-DBPL-Raigarh

1-Apr-14 800 30-Apr-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

7 400 Bhadrawati-Parli 1amp 2 1-Apr-14 900 30-Apr-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I C

8 400 400220kv ICT-1 at Pune 1-Apr-14 800 1-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R9 400 Bus-1 at Bilaspur 1-Apr-14 800 1-Apr-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R

10 400 Solapur(PG) -Karad line 1-Apr-14 700 10-Apr-14 1800 Conti Erection of 80MVAr new reactor by shifitng line equipments at Solapur

MSETCL WRTS-I C

11 400 Bus-1 at Jabalpur (pooling) 01-Apr-14 1000 01-Apr-14 1800 Daily Busbar Stability test related to Jhabua Power Bays

POWERGRID WR-II C

12 400 Shujalpur - Nagda 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

13 400 Mundra - Bhachau 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

14 400 Bina - Shujalpur 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

15 220 Omkareshwar-Khandwa Ckt 1-Apr-14 900 1-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI16 400 Sipat 400KV Bay 10 and 11 1-Apr-14 900 3-Apr-14 1900 Continous 400KV CT 3nos replacement NTPC NTPC17 400 Padgha-Nagothane ckt I 1-Apr-14 900 1-Apr-14 1700 Daily QMwork MSETCL MSETCL

18 400 Bus-2 at Jabalpur (pooling) 02-Apr-14 1000 02-Apr-14 1800 Daily Busbar Stability test related to Jhabua Power Bays

POWERGRID WR-II C

19 400 Vindhyanchal - Mahan - Korba (Section of both the line on same Dc tower)

02-Apr-14 800 03-Apr-14 1700 Continuous For Power Line crossing of 765kV Vindhyanchal (pooling) - Satna 1 Line

POWERGRID WR-II C

20 400 400kV ICT 4 at Indore MPPTCL 02-Apr-14 1000 04-Apr-14 1800 ContinuousFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

MPPTCL WR-II C

21 400 400kV Bus Coupler bay at Indore MPPTCL 02-Apr-14 1000 04-Apr-14 1800 ContinuousFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

MPPTCL WR-II C

22 400 400kV Itarsi - Indore MPPTCL 1 Line 02-Apr-14 1000 02-Apr-14 1500 DailyFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

POWERGRID WR-II C

23 400400 KV LILO Line of 400 KV SC Korba West-Khedamara to 400 KV Ss Raita (Between Loc69 amp70 near Raita Ss)

2-Apr-14 800 3-Apr-14 1700 DailyMaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

CSPTCL CSPTCL C

24 400 Chandrapur-Khaparkheda 2-Apr-14 900 2-Apr-14 1700 Daily QMwork MSETCL MSETCL

25 400 Lamboti-Solapur PG 2-Apr-14 900 2-Apr-14 1700 Daily QMwork MSETCL MSETCL

26 400 Bus-1 at Durg PS Ss 3-Apr-14 900 3-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R27 400 Bus-1 at Jabalpur 03-Apr-14 900 03-Apr-14 1800 Daily Retrofitting of Isolator arms(689A) POWERGRID WR-II R28 400 315MVA ICT2 at Khandwa 03-Apr-14 1000 03-Apr-14 1600 Daily AMP POWERGRID WR-II R29 400 Mundra - Hadala 3-Apr-14 800 3-Apr-14 1800 Daily PMM GETCO GETCO30 400 400KV Seoni -Bhilai Ckt 3-Apr-14 900 3-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I31 400 Lonikand-Chakan 3-Apr-14 900 3-Apr-14 1700 Daily QMwork MSETCL MSETCL32 400 Bus-2 at Durg PS Ss 4-Apr-14 900 4-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R33 400 Bus-1 at Jabalpur 04-Apr-14 900 04-Apr-14 1800 Daily Retrofitting of Isolator arms(2089A) POWERGRID WR-II R

34 400 400kV Itarsi - Indore MPPTCL 1 Line 04-Apr-14 1300 04-Apr-14 1800 DailyFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

POWERGRID WR-II C

35 400 Varsana - Hadala 4-Apr-14 800 4-Apr-14 1800 Daily PMM GETCO GETCO

Agency Type

ANNEXURE‐32BOutages Proposal of Transmission elements during the month of APRIL ‐2014

SN KV Line From To

Basis Reason System

36 220 Vapi - Vapi (PG) 4-Apr-14 800 4-Apr-14 1800 Daily PMM work PGCIL GETCO37 220 Haldarva - Jhanor - 1 (NTPC) 4-Apr-14 800 4-Apr-14 1800 Daily PMM amp Tan Delta testing PGCIL GETCO38 400 400KV Birsinghpur -Katni Ckt - I 4-Apr-14 800 4-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I39 220 Badod - Kota Ckt 4-Apr-14 900 4-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI40 220 Malanpur-Auriya Ckt 4-Apr-14 900 5-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI

41 400 Bhusawal-Akola 4-Apr-14 900 4-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

42 400 Deepnagar-Aurangabad II 4-Apr-14 900 4-Apr-14 1700 Daily QMwork MSETCL MSETCL43 400 Kalwa-Padgha Ckt I 4-Apr-14 900 4-Apr-14 1700 Daily QMwork MSETCL MSETCL44 765 Bus Reactor at Seoni 5-Apr-14 900 5-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R

45 400 DC Korba-KhedamaraLilo at Marwa lilo section yet to be charge 5-Apr-14 800 6-Apr-14 1800 Daily

Crossing work of upcoming 765 KV DC Raigarh-Champa (AP-48A0- AP 490)DC Korba-Khedamara is in service

CSPTCL WRTS-1 C

46 400 Bus-1 at Jabalpur 05-Apr-14 900 05-Apr-14 1800 Daily Retrofitting of Isolator arms(1689A) POWERGRID WR-II R

47 400 Mundara -Limbdi 1 05-Apr-14 800 07-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

48 220 Badod - Modak Ckt 5-Apr-14 900 5-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI49 400 Dhule-Babhleswar ckt 1 5-Apr-14 900 5-Apr-14 1700 Daily QMwork MSETCL MSETCL50 400 400220kv ICT-1 at Seoni 7-Apr-14 900 7-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R51 400 Bus-2 at Jabalpur 07-Apr-14 900 07-Apr-14 1800 Daily Retrofitting of Isolator arms(1789B) POWERGRID WR-II R52 400 315MVA ICT1 at Khandwa 07-Apr-14 1000 07-Apr-14 1600 Daily AMP POWERGRID WR-II R53 220 Chhegoan-Khandwa Ckt -II 7-Apr-14 900 7-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI54 400 Korba- Bhilai1 7-Apr-14 900 8-Apr-14 1900 days continuou Bay Maint and testing NTPC NTPC55 400 Vindhyachal - Mahan line 7-Apr-14 900 8-Apr-14 1900 Continuous Replacement of R Y and B Phase CT NTPC NTPC56 400 Bhusawal-Aurangabad 7-Apr-14 900 7-Apr-14 1700 Daily QMwork MSETCL MSETCL57 400 New Koyna-Karad ckt 2 7-Apr-14 830 7-Apr-14 1730 Daily QMwork MSETCL MSETCL

58 400 Mundara -Limbdi 2 08-Apr-14 800 10-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

59 400 Chorania Hadala 8-Apr-14 800 8-Apr-14 1800 Daily PMM GETCO GETCO60 400 Sipat 400KV Bay 23 8-Apr-14 900 9-Apr-14 1900 Continous One 400KV CT replacement NTPC NTPC61 400 Koradi-Khaparkheda I 8-Apr-14 900 8-Apr-14 1700 Daily QMwork MSETCL MSETCL62 765 765400KV ICT-1 at Kotra PS 9-Apr-14 900 9-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R63 400 Bus-2 at Jabalpur 09-Apr-14 900 09-Apr-14 1800 Daily Retrofitting of Isolator arms(489B) POWERGRID WR-II R64 400 315MVA ICT1 at Damoh 09-Apr-14 1000 09-Apr-14 1600 Daily AMP POWERGRID WR-II R65 400 Amreli-Jetpur 2 9-Apr-14 800 9-Apr-14 1800 Daily PMM GETCO GETCO66 400 SSP- Rajgarh - 1 9-Apr-14 800 9-Apr-14 1800 Daily PMM GETCOMPTCL GETCO67 220 TAPS1 amp2-TAPS 3amp4 tie line 9-Apr-14 800 9-Apr-14 1600 one day Annual maintenance Works MSETCL NPCIL68 220 TAPS TIE LIE-I 9-Apr-14 800 10-Apr-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL69 400 400 KV Indore - Nagda Ckt 9-Apr-14 900 9-Apr-14 1600 daily For maintenance work MPPTCL EHT- Mamp I70 400 400 KV Sarni - Isp Ckt 9-Apr-14 900 9-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I71 220 Mehgaon-Auriya Ckt 9-Apr-14 900 10-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI72 400 315 MVA 400220Kv X-mer III At Bhopal SS 9-Apr-14 900 10-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI73 400 Padgha-Tarapur CktII 9-Apr-14 900 9-Apr-14 1700 Daily QMwork MSETCL MSETCL74 765 Bus Reactor at Kotra PS 10-Apr-14 900 10-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R

75 765 amp 400

765400 kV ICT-I at Solapur amp 400KV Solapur-Parli 2 10-Apr-14 700 12-Apr-14 1800 Daily 765400 kV spare ICT unit Aux bus works CSD

commissioning amp Fire fighting works at Solapur WRTS-IReliance WRTS-I C

76 400 315MVA ICT2 at Damoh 10-Apr-14 1000 10-Apr-14 1600 Daily AMP POWERGRID WR-II R

77 765 Sasan-Satna 1 10-Apr-14 800 11-Apr-14 1800 Daily For AMP of line amp Line terminal Equipments Post commissioning checks

POWERGRID WR-II C

78 400 APL-Varsana 10-Apr-14 800 10-Apr-14 1800 Daily PMM GETCO GETCO79 400 400 KV Isp - Nagda Ckt 10-Apr-14 900 10-Apr-14 1600 daily For maintenance work MPPTCL EHT- Mamp I80 400 400 KV Bhopal-Itarsi(PGCIL) Ckt-I 10-Apr-14 900 11-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I81 220 Chhegoan-Khandwa Ckt -I 10-Apr-14 900 10-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI82 400 315 MVA 400220Kv X-mer At Katni SS 10-Apr-14 800 11-Apr-14 1800 continue For maintenance work MPPTCL EHT -MampI83 400 Korba- Bhilai2 10-Apr-14 900 11-Apr-14 1900 days continuou Bay Maint and testing NTPC NTPC84 400 Sipat 400KV Bay 14 10-Apr-14 900 12-Apr-14 1900 Continous 400KV CT 3nos replacement NTPC NTPC

85 400 Chandrapur II-Parli II 10-Apr-14 900 10-Apr-14 1700 Daily Providing of Arching horncorona rings Bird guards quarter pinsNut bolts

MSETCL MSETCL

86 400 Karad-Lonikand 10-Apr-14 900 10-Apr-14 1700 Daily QMwork MSETCL MSETCL87 400 Raipur-Durg PS 1 11-Apr-14 900 11-Apr-14 1700 Daily AMP Work WRTS-I WRTS-I R

88 400 Mundara -Jetpur 1 11-Apr-14 800 15-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

89 400 Varsana-Hadala Line 11-Apr-14 800 11-Apr-14 1800 Daily PMM GETCO GETCO90 220 Haldarwa Kawas-2 11-Apr-14 800 11-Apr-14 1800 Daily PMM work PGCIL GETCO91 400 400 KV Nagda-Rajgarh(PGCIL) Ckt-I 11-Apr-14 900 11-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

92 400 315 MVA 400220Kv X-mer III ampTie bay At Bhopal SS

11-Apr-14 900 11-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI

93 400 Akola-Nandgaonpeth 11-Apr-14 900 11-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

94 400 Akola-Wardha I 11-Apr-14 900 11-Apr-14 1700 Daily QMwork MSETCL MSETCL95 400 Kalwa-Lonikand 11-Apr-14 900 11-Apr-14 1700 Daily QMwork MSETCL MSETCL96 400 400220kv ICT-1 at Mapusa 12-Apr-14 900 12-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R97 400 Raipur-Durg PS 2 12-Apr-14 900 12-Apr-14 1700 Daily AMP Work WRTS-I WRTS-I R98 765 Sasan-Satna2 with line reactor 12-Apr-14 1000 12-Apr-14 1800 Daily AMP POWERGRID WR-II R99 400 400 KV Nagda-Rajgarh(PGCIL) Ckt-II 12-Apr-14 900 12-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I100 400 Deepnagar-Aurangabad I 12-Apr-14 900 12-Apr-14 1700 Daily QMwork MSETCL MSETCL101 400 Amreli-Jetpur 2 14-Apr-14 800 14-Apr-14 1800 Daily PMM GETCO GETCO102 400 Kasor - Gpec 14-Apr-14 800 14-Apr-14 1800 Daily PMM GETCO GETCO103 220 GWL(PGCIL)-Malanpur Ckt-I 14-Apr-14 900 15-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI104 400 DC Korba-Raipur 3 amp 4 15-Apr-14 800 16-Apr-14 1800 Conti Bus splitting work at Raipur WRTS-1 WRTS-1 C

105 400 Korba-Bhatapara 15-Apr-14 800 24-Apr-14 1800 Conti For raising of ground clearence for Railway track of Lafarge

WRTS-I Lafarge C

106 765 765400 kV ICT-II at Solapur 15-Apr-14 700 17-Apr-14 1800 Daily CSD commissioning amp Fire fighting works WRTS-I WRTS-I C107 400 Vindhyachal-Satna1 15-Apr-14 1000 15-Apr-14 1800 Daily AMP POWERGRID WR-II R108 400 Ssnl-Dhule-1 15-Apr-14 800 15-Apr-14 1800 Daily PMM GETCOMSETCL GETCO109 220 TAPS-Vapi 15-Apr-14 800 17-Apr-14 1900 Daily Annual maintenance Works GETCO NPCIL110 220 Pithampur-Rajgarh(PGCIL) Ckt - I 15-Apr-14 900 15-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI111 400 Sipat 400KV Bay-18 ( Ranchi-1 Main) 15-Apr-14 900 15-Apr-14 1900 Daily Annual Preventive maintenance job NTPC NTPC112 400 Karad-Kolhapur Ckt I 15-Apr-14 900 15-Apr-14 1700 Daily QMwork MSETCL MSETCL

113 400 DC Raipur-Bhadrawati 2 amp 3 16-Apr-14 800 17-Apr-14 1800 Conti Bus splitting work at Raipur WRTS-1 WRTS-1 C

114 400 Vindhyachal-Satna2 16-Apr-14 1000 16-Apr-14 1800 Daily AMP POWERGRID WR-II R

115 400 Mundara -Jetpur 2 16-Apr-14 800 20-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

116 400 Vadavi - Dehgam (Pg) - 1 16-Apr-14 800 16-Apr-14 1800 Daily PMM amp Tandelta testing GETCO GETCO117 400 Chorania Asoj-1 16-Apr-14 800 16-Apr-14 1800 Daily PMM GETCO GETCO118 220 Bhilad - TAPS 16-Apr-14 800 16-Apr-14 1800 Daily PMM work PGCIL GETCO119 220 Bhat - Pirana (PG) - 1 16-Apr-14 800 16-Apr-14 1800 Daily PMM work GETCO GETCO120 400 400 KV Bhopal-Itarsi(PGCIL) Ckt-II 16-Apr-14 900 17-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I121 220 Damoh(PGCIL) - Tikamgarh Ckt 16-Apr-14 900 16-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI

122 400 400KV SC Korba-Raipur-II (Between Korba - Bhatapara end)(Between Loc2980 amp 2990) 16-Apr-14 800 17-Apr-14 1700 Daily

MaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

PGCIL CSPTCL C

123 400 Sipat 400KV Bay-19 ( Ranchi-2 Main) 16-Apr-14 900 16-Apr-14 1900 Daily Annual Preventive maintenance job NTPC NTPC124 400 Padgha-Babhleswar ckt I 16-Apr-14 900 16-Apr-14 1700 Daily QMwork MSETCL MSETCL125 400 Vadavi - Dehgam (Pg) - 2 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCO GETCO126 400 Ssnl-Dhule-2 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCOMSETCL GETCO127 400 Vadinar-Hadala- 1 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCO GETCO128 220 Bhat - Pirana (PG) - 2 17-Apr-14 800 17-Apr-14 1800 Daily PMM work GETCO GETCO129 400 400KV Birsinghpur -Katni Ckt - II 17-Apr-14 800 17-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I130 220 Pithampur-Rajgarh(PGCIL) Ckt - II 17-Apr-14 900 17-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI131 400 Jejuri-Lonikand 17-Apr-14 900 17-Apr-14 1700 Daily QMwork MSETCL MSETCL132 400 Deepnagar-Khadka II 17-Apr-14 900 17-Apr-14 1700 Daily QMwork MSETCL MSETCL133 400 Chorania Kasor 18-Apr-14 800 18-Apr-14 1800 Daily PMM GETCO GETCO134 220 GWL(PGCIL)-Malanpur Ckt-II 18-Apr-14 900 19-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI135 400 Akola-Wardha II 18-Apr-14 900 18-Apr-14 1700 Daily QMwork MSETCL MSETCL

136 400 Koradi-Nandgaonpeth 18-Apr-14 800 18-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

137 765 765kV Pune line Reactor at Solapur 19-Apr-14 700 20-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

138 400 400KV Bina -Power(JP) Ckt 19-Apr-14 900 19-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I139 400 Dhule-SSarovar I 19-Apr-14 900 19-Apr-14 1700 Daily QMwork MSETCL MSETCL

140 400 Koradi-Khaparkheda II 19-Apr-14 900 19-Apr-14 1700 Daily QMwork MSETCL MSETCL141 220 KAPP - VAPI - 1 20-Apr-14 800 20-Apr-14 1800 Daily Isolator replacement under ASIDE scheme PGCIL GETCO

142 400 DC Bhilai-Bhadrawati amp Raipur-Bhadrawati 1 21-Apr-14 800 28-Apr-14 1800 Conti Diversion of line for Vidarbha Industrial Devlopment Corporation(VIDC)

WRTS-I VIDC C

143 400 Bhachau- Ranchhodpura 1amp2 21-Apr-14 800 27-Apr-14 1800 Continuous Tower shifting work at canal crossingInsulator replacement work

POWERGRID WR-II C

144 400 Hadala-Amreli 21-Apr-14 800 21-Apr-14 1800 Daily PMM GETCO GETCO145 400 Vadinar-Hadala- 2 21-Apr-14 800 21-Apr-14 1800 Daily PMM GETCO GETCO146 220 TAPS-Boisar 21-Apr-14 800 23-Apr-14 1900 Daily Annual maintenance Works MSETCL NPCIL147 220 Bina(PGCIL)-220 KV Bina Ckt 21-Apr-14 900 21-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI148 400 CGPL Bhachau -1 21-Apr-14 8AM 21-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL149 220 Kawas-Ichhapore 1+Bus 1 21-Apr-14 900 21-Apr-14 1800 daily RTV Coating NTPC NTPC150 400 Karad-Kolhapur Ckt II 21-Apr-14 900 21-Apr-14 1700 Daily QMwork MSETCL MSETCL151 400 New Koyna-Koyna Stg-4-1 21-Apr-14 830 21-Apr-14 1730 Daily QMwork MSETCL MSETCL152 400 Ssp - Rajgarh - 2 22-Apr-14 800 22-Apr-14 1800 Daily PMM GETCOMPTCL GETCO153 400 Vadavi-Bhachau 2 22-Apr-14 800 22-Apr-14 1800 Daily PMM amp Tan Delta testing PGCIL GETCO154 220 Bhilad - Vapi (PG) - 1 22-Apr-14 800 22-Apr-14 1800 Daily PMM work PGCIL GETCO155 400 400 KV Rajgarh(PGCIL)-Ssp Ckt-I 22-Apr-14 900 22-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I156 400 400KV Seoni -Sarni Ckt 22-Apr-14 900 23-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I157 220 Khandwa(PGCIL)-Nepanagar Ckt 22-Apr-14 900 22-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI158 220 Kawas-Ichhapore 2+Bus 1 22-Apr-14 900 22-Apr-14 1800 daily For maintenance work NTPC NTPC159 400 Karad-Jaigad II 22-Apr-14 900 22-Apr-14 1700 Daily Annual maintenance work MSETCL MSETCL160 220 Bhilad - Vapi (PG) - 2 23-Apr-14 800 23-Apr-14 1800 Daily PMM work PGCIL GETCO161 400 400KV Bina -Bhopal Ckt -I 23-Apr-14 900 24-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I162 400 400 KV Rajgarh(PGCIL)-Ssp Ckt-II 23-Apr-14 900 23-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I163 220 Bina(PGCIL)-Shivpuri Ckt 23-Apr-14 900 24-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI164 220 Damoh(PGCIL) - Damoh I C - I 23-Apr-14 900 23-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI

165 400 400 KV DCDS Sipat- Raipur (IampII) 23-Apr-14 800 24-Apr-14 1700 DailyMaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

PGCIL CSPTCL C

166 400 CGPL Bhachau - 2 23-Apr-14 8AM 23-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL

167 220 Kawas-Navsari 2 +Bus 1 23-Apr-14 900 23-Apr-14 1800 daily Insulator replcement and routine maintenance NTPC NTPC168 400 Padgha-Babhleswar ckt II 23-Apr-14 900 23-Apr-14 1700 Daily QMwork MSETCL MSETCL169 400 Kasor - SSP 24-Apr-14 800 24-Apr-14 1800 Daily PMM work GETCO GETCO170 220 Bhilad - Vapi (PG) - 3 24-Apr-14 800 24-Apr-14 1800 Daily PMM work PGCIL GETCO171 220 TAPS-Bhilad 24-Apr-14 800 26-Apr-14 1900 Daily Annual maintenance Works GETCO NPCIL172 220 Damoh(PGCIL) - Damoh I C - II 24-Apr-14 900 24-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI173 400 CGPL Jetpur- 1 24-Apr-14 8AM 24-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL

174 220 Kawas-Ichhapore 1 +Bus 2 24-Apr-14 900 24-Apr-14 1400 daily Insulator replcement and routine maintenance NTPC NTPC

175 220 Kawas-Ichhapore 2 +Bus 2 24-Apr-14 1400 24-Apr-14 1900 daily Insulator replcement and routine maintenance NTPC NTPC176 400 Padgha-Talegaon 24-Apr-14 900 24-Apr-14 1700 Daily QMwork MSETCL MSETCL

177 765 765kV Raichur 1 line Reactor at Solapur 25-Apr-14 700 27-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

178 400 400KV Bina -Bhopal Ckt -II 25-Apr-14 900 26-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I179 400 CGPL Jetpur- 2 25-Apr-14 8AM 25-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL180 400 Vindhyachal -Satna-4 Line Shunt Reactor 25-Apr-14 900 25-Apr-14 1900 Daily Basis AMP NTPC NTPC

181 400 Bhusawal-Koradi 25-Apr-14 900 25-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

182 400 Deepnagar-Khadka I 25-Apr-14 900 25-Apr-14 1700 Daily QMwork MSETCL MSETCL183 400 Soja -Kansari 26-Apr-14 800 26-Apr-14 1800 Daily PMM GETCO GETCO184 400 Raipur-Wardha 1 27-Apr-14 800 28-Apr-14 1800 Daily Balance construction work WRTS-1 WRTS-1 C185 220 KAPP - VAPI - 2 27-Apr-14 800 27-Apr-14 1800 Daily Isolator replacement under ASIDE scheme PGCIL GETCO186 400 Soja -Kansari 28-Apr-14 800 28-Apr-14 1800 Daily PMM GETCO GETCO187 220 TAPS-Boisar II 28-Apr-14 800 30-Apr-14 1900 Daily Annual maintenance Works MSETCL NPCIL188 400 400KV Damoh - Katni Ckt 28-Apr-14 900 28-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I189 400 400 KV Damoh(PGCIL)-Katni Ckt 28-Apr-14 900 28-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I190 400 New Koyna-Karad ckt 1 28-Apr-14 830 28-Apr-14 1730 Daily QMwork MSETCL MSETCL

191 400 DC Raigarh-DB Power (Tudri) - KSK 29-Apr-14 800 30-Apr-14 1800 Conti Crossing work of 765kV SC Raigrah-Champa (90 - 100)

WRTS-I WRTS-I C

192 400 Raipur-Wardha 2 29-Apr-14 800 30-Apr-14 1800 Daily Balance construction work WRTS-1 WRTS-1 C193 220 Navsari - Nasik - 1 29-Apr-14 800 29-Apr-14 1800 Daily PMM work GETCOMSETCL GETCO194 220 Seoni(PGCIL)-Chhindwara Ckt-I 29-Apr-14 900 29-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI195 220 Kawas-Vav 1+ bus 2 29-Apr-14 900 29-Apr-14 1800 daily For maintenance work NTPC NTPC196 400 Chorania Asoj-1 30-Apr-14 800 30-Apr-14 1900 Daily PMM GETCO GETCO197 220 Navsari - Nasik - 2 30-Apr-14 800 30-Apr-14 1800 Daily PMM work GETCOMSETCL GETCO198 220 Vapi - TAPS 30-Apr-14 800 30-Apr-14 1800 Daily PMM work PGCIL GETCO199 220 Seoni(PGCIL)-Chhindwara Ckt-II 30-Apr-14 900 30-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI200 220 Kawas-Vav 1+ bus 2 30-Apr-14 000 30-Apr-14 000 daily For maintenance work NTPC NTPC

Annexure-32-C1

List of Emergency Outages availed in Feb 2014

SlNo

Element kV Agency From

Date To Date

Remarks

1 SATNA‐BINA‐II 765 WRTS‐2 4‐Feb‐14

5‐Feb‐14

Hot spot attending

2 SUJALPUR‐NAGDA LR NAGDA

400 WRTS‐2 6‐Feb‐14

19‐Feb‐14

Oil leackage

3 SOLAPUR‐PARLI‐II

400 WRTS‐2 6‐Feb‐14

6‐Feb‐14

Hotspot attend at solapur

4 JABALPUR‐ITARSI‐IV LR AT ITARSI‐LR

400 WRTS‐2 7‐Feb‐14

17‐Feb‐14

Oil leackage

5 APL‐HADALA‐SC 400 GEB 7‐Feb‐14

7‐Feb‐14

Hot spot

6 SOLAPUR‐PARLI(PG)‐1

400 WRTM(REL)

9‐Feb‐14

9‐Feb‐14

Hot spot

7 BOISAR‐BOISAR(PG)‐II

220 MSETCL 9‐Feb‐14

9‐Feb‐14

Hotspots

8 NEW KOYNA‐KARAD ‐ I

400 MSETCL 10‐Feb‐14

11‐Feb‐14

Dc‐earth leakage

9 LONIKHAND ‐ KARAD

400 MSETCL 10‐Feb‐14

11‐Feb‐14

Hotspot

10 NAGDHA ICT ‐ III

400220

MPPTCL 10‐Feb‐14

10‐Feb‐14

Hotspot

11 AKOLA ‐ ABAD ‐I AKOLA

400 WRTS‐1 11‐Feb‐14

12‐Feb‐14

Oil leackage

12 AKOLA ‐ AURANGABAD ‐ I

400 WRTS‐1 11‐Feb‐14

11‐Feb‐14

Oil leackage ion lr

13 BINA‐GWALIOR 765 WRTS‐1 14‐Feb‐ 14‐Feb‐ Attend oil leakage on lr

SlNo

Element kV Agency From

Date To Date

Remarks

II 14 14

14 AKOLA‐TIRORA‐I 765 MSETCL 22‐Feb‐14

23‐Feb‐14

Sparking in LR at Tirora SYED AT TIRORA END

15 KHAEGAR‐ICT‐I 400220

MSETCL 22‐Feb‐14

22‐Feb‐14

Hot spot

16 KHANDWA‐NEPANAGR‐SC

220 MPPTCL 23‐Feb‐14

23‐Feb‐14

Hot spot

17 GWALIAR ‐SATNA ‐ I

765 WRTS‐2 24‐Feb‐14

1‐Mar‐14

Attend hot spot

18 KORBA BUS‐III 400 NTPC 25‐Feb‐14

25‐Feb‐14

Hots pot attend

19 BUS‐1 AT GWALIOR

765 WRTS‐2 13‐Feb‐14

13‐Feb‐14

Checking of blocked BB main‐1 relay

20 RAIPUR‐BWATI‐2

400 WRTS‐1 17‐Feb‐14

17‐Feb‐14

Urgent Removal of LR at Raipur end for DGA violation

21 TAPS‐PADGHE 400 TAPS‐3amp4 19‐Feb‐14

23‐Feb‐14

To attend SF‐6 leakage

22 SATNA‐GWALIOR‐1

765 WRTS‐2 24‐Feb‐14

26‐Feb‐14

To attend hot spots

23 VCHAL‐JABALPUR‐IV

400 WRTS‐2 27‐Feb‐14

27‐Feb‐14

To increase OPGW‐Top conductor clearance to avoid tripping

24 APL‐SAMI‐2 400 APL 26‐Feb‐14

26‐Feb‐14

To attend hot sopt

25 SHOLAPUR BUS‐1

765 WRTS‐1 27‐Feb‐14

27‐Feb‐14

To attend hot sopt

26 BOISAR BUS‐2 220 WRTS‐1 28‐Feb‐14

28‐Feb‐14

To attend hot sopt

Sl No KV element From To Basis Work System Agency Remarks

1220 Vapi (GETCO)‐Bhilad 1‐Feb‐14 800 2‐Feb‐14 1800 Daily Line crossing work of 400KV LILO line for

Magarwada SSGETCO POWERGRID N

2 220 Omkareshwar-Khandwa Ckt

3-Feb-14 900 3-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

3 400 New Koyna-Koyna Stg-4-1

3-Feb-14 830 3-Feb-14 1730 Daily QMwork MSETCL MSETCL N

4220 Vapi ‐ Magarwada

Ckt13‐Feb‐14 900 3‐Feb‐14 1400 Daily AMP of line amp equipment WRTS‐II POWERGRID DD may have to do load

shedding as per Reliability Suggestion

N

5 220 DC Raigarh- Raigarh 1amp 2

4-Feb-14 800 5-Feb-14 1800 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (040-50)

CSPTCL WRTS-I N

6 220 Itarsi(PGCIL)-Hoshangabad Ckt

4-Feb-14 900 4-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N

7 400 Mundra -Limbdi-2 4-Feb-14 800 4-Feb-14 1800 Daily Suspension Insulator replcement and routine maintenance

PGCIL CGPL N

8 400 400 kV DC Satna - Bina 1amp2

4-Feb-14 800 5-Feb-14 1800 Continous Crossing of Jabalpur-Bina 765 kv SC Line PGCIL JTCL N

9220 Vapi ‐ Magarwada

Ckt24‐Feb‐14 0900 4‐Feb‐14 1400 Daily AMP of line amp equipment WRTS‐II POWERGRID N

10 765 Seoni-Bina line with LR 4‐Feb‐14 800 4-Feb-14 1800 Daily AMP Work WRTS-2 WRTS-1 N

11 400 Bus I Bina 5‐Feb‐14 800 5‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

12220 Kawas ‐ Navsari (PG)

25‐Feb‐14 800 5‐Feb‐14 1800 Daily Replacement of ST insulators by Double Tension

insulator in Railway crossing spansWRTS‐II POWERGRID N

13400 Indoer (PG) ‐Indore

(MP) DC5‐Feb‐14 800 6‐Feb‐14 1800 Continou

sStringing of 765kV Indore ‐ Vadodara line WRTS‐II POWERGRID N

14 400 APL - Hadala 6-Feb-14 800 6-Feb-14 1800 Daily PMM GETCO GETCO N N

15 220 Seoni(PGCIL ) - Chhindwara CKT I

6-Feb-14 900 6-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N N

16 400 Jejuri-Koyna stg IV 6-Feb-14 900 6-Feb-14 1700 Daily QMwork MSETCL MSETCL N17 400 Akola-Nandgaonpeth 6-Feb-14 900 6-Feb-14 1700 Daily Quaterly Maintainance Work MSETCL MSETCL N18 400KV Korba-Bhatapara 6-Feb-14 900 7-Feb-14 1900 Cont Testing of LBB auto re-close M-I amp M-II relays NTPC NTPC N19 220 Haldarva - Jhanor - 2

(NTPC)6-Feb-14 900 6-Feb-14 1800 Daily PMM work GETCO N

20220 Navsar (PG) ‐Navsari

(GETCO) 16‐Feb‐14 800 6‐Feb‐14 1800 Daily Replacement of ST insulators by Double Tension

insulator in Railway crossing spansWRTS‐II POWERGRID

N

21 400 Bus‐II Bina 6‐Feb‐14 800 6‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

22400 Seoni‐Khandwa1 6‐Feb‐14 1000 6‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Khandwa end by MS ABB

WRTS‐II POWERGRID Rescheduled to 6th March N

23 400 Rajgarh-Ssp Ckt-II 7-Feb-14 900 7-Feb-14 1600 daily For maintenance work MPPTCL EHT- Mamp I N24 220 Chhegoan-Khandwa

Ckt -II7-Feb-14 900 7-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

25 220 Wardha (PG)-Wardha 7-Feb-14 800 7-Feb-14 1800 Daily AMP Work MSETCL WRTS-I N26 400 Chorania - Vadavi-2 7-Feb-14 800 7-Feb-14 1800 Daily PMM amp Tan Delta testing WRTGPL GETCO N27 400 Jabalpur‐Itarsi1 7‐Feb‐14 900 7‐Feb‐14 1400 Daily AMP OF TERMINAL EQUIPMENT WRTS‐II POWERGRID N

28220 Vapi(PG)‐ Bhilad ckt

2 amp 3 7‐Feb‐14 800 8‐Feb‐14 1800 Daily Line crossing work of 400KV LILO of Navsari‐Boisar

at MagarwadaGETCO POWERGRID N

29 220 Mapusa-Thivim 1 8-Feb-14 800 8-Feb-14 1800 Daily AMP Work GOA WRTS-I N

30400 Seoni‐Khandwa2 9‐Feb‐14 1000 9‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Khandwa end by MS ABB

WRTS‐II POWERGRID Rescheduled to 7th March N

31 220 Chhegoan-Khandwa Ckt -I

10-Feb-14 900 10-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

Annexure-32-C2OCC approved outage not availed in Feb‐2014

32132 132 kV Dhule

Dondaicha line10-Feb-14 800 11-Feb-14 1800 Cont Crossing of Dhule-Vadodara 765 kv SC Line MSETCL BDTCL subjected to sldc

clearance N

33 400132 KV

Vindhyachal ICT-1 10-Feb-14 900 14-Feb-14 1900 Cont ICT Overhauling NTPC NTPC N

34400 KV Vindhyachal - Jabalpur-

3 Line Shunt Reactor10-Feb-14 900 14-Feb-14 1900 Cont Reactor Overhauling NTPC NTPC

N

35 400 KSK-DB Power 10-Feb-14 800 13-Feb-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end WRTS-IDBKSK

KSK N36 220 Ipore-Kawas-1 10-Feb-14 800 10-Feb-14 1800 Daily PMM work GETCO N

37400 Vindhyachal‐Mahan 10‐Feb‐14 800 11‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐I WRTS‐II N

38400 Mahan‐Korba 10‐Feb‐14 800 11‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐I WRTS‐II N

39765 Jabalpur ‐ Bina 1 10‐Feb‐14 1000 10‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Jabalur end by MS ABB

WRTS‐II POWERGRID Differed by siteN

40 400 SSP - Rajgarh - 1 10-Feb-14 800 11-Feb-14 1800 Daily Basis

PMM Work GETCO N

41 400 DC Tundri (DB Power) -ksk-Raigarh

10-Feb-14 800 11-Feb-14 1800 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (092-100)

DB Power WRTS-I N42 400 Jetpur - Amreli - 1 11-Feb-14 800 12-Feb-14 1800 Daily PMM GETCO GETCO N43 400 Hadala - Vadinar-2 11-Feb-14 800 11-Feb-14 1800 Daily PMM GETCO GETCO N44 400 Nagda-Rajgarh Ckt-I 11-Feb-14 900 11-Feb-14 1800 daily For maintenance work MPPTCL EHT- Mamp I N45 220 Mehgaon-Auriya Ckt 11-Feb-14 900 11-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N46 220 Seoni(PGCIL ) -

Chhindwara CKT II11-Feb-14 900 11-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

47

765kV Main Bus-1B at SASANBay 13 - Jack Bus

11-Feb-14 900 21-Feb-14 1800 Daily Jumper Installations amp ConnectionsIsolator Allignment

PGCIL Reliance Provisional Subject to details of works done to be apprised on daily basis

N

48 220 Ipore-Kawas-2 11-Feb-14 800 11-Feb-14 1800 Daily PMM work GETCO N49 220 Navsari - Nasik - 2 11-Feb-14 900 11-Feb-14 1800 Daily PMM work GETCO N

50765 Jabalpur ‐ Bina 2 11‐Feb‐14 1000 11‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Jabalur end by MS ABB

WRTS‐II POWERGRID Deferred by siteN

51 400 Nagda-Rajgarh Ckt-II 12-Feb-14 900 12-Feb-14 1800 daily For maintenance work MPPTCL EHT- Mamp I N52 400 Karad-Solapur (PGCIL) 12-Feb-14 900 12-Feb-14 1700 Daily QMwork MSETCL MSETCL N53 400 Raipur-Sipat 1 amp 2 26-Feb-14 800 3-Mar-14 1800 Conti Diversion of line for Lafarge Railway track WRTS-I Lafarge Ori 12-16 Feb 14 Deferre N54 220 Haldarwa Kawas-2 12-Feb-14 900 12-Feb-14 1800 Daily PMM work GETCO N

55 220 Bus‐I Bina 12‐Feb‐14 800 12‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

56 400 Chorania - Hadala 13-Feb-14 800 14-Feb-14 1800 Daily PMM GETCO GETCO N57 400 Tarpur-Padghe-2 13-Feb-14 800 14-Feb-14 1800 Daily maintenance work POWERG

RIDNPCIL N

58400 Vindhyachal‐Satna1 13‐Feb‐14 1000 13‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

59 220 Bus‐II Bina 13‐Feb‐14 800 13‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

60 220 Pithampur-Rajgarh Ckt - I

14-Feb-14 900 14-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

61 220 Wardha (PG)-Badnera 14-Feb-14 800 14-Feb-14 1800 Daily AMP Work at Wardha MSETCL WRTS-I N

62 400 Bhusawal-Koradi 14-Feb-14 900 14-Feb-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL N

63 400 Raipur-KSK 14-Feb-14 800 16-Feb-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end WRTS-IKSK

KSK N

64 220 GWL(PGCIL)-Malanpur Ckt-II

15-Feb-14 900 15-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N

65 220 Pithampur-Rajgarh Ckt - II

15-Feb-14 900 15-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

66400 Vindhyachal‐Satna2 16‐Feb‐14 1000 16‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

67 220 KAPS - Haldarwa - 1 17-Feb-14 800 17-Feb-14 2000 Daily Yearly PM checks KAPS N

68400 3X105 MVA 400220Kv

X-mer I At Indore ss17-Feb-14 800 18-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI

N

69

220 SC Korba-Raigarh-Budhipadar sc(PGCIL) amp DC Korba-Budipadar both circuits (CSPTCL)

18-Feb-14 800 19-Feb-14 1800 Conti Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCLWRTS-I

WRTS-I

N

70 400 Itarsi-Bhopal Ckt-I 18-Feb-14 900 19-Feb-14 1700 daily For maintenance work MPPTCL EHT- Mamp I N71 220 Badod - Kota Ckt 18-Feb-14 900 18-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N72 220 Damoh(PGCIL) -

Damoh I C - II18-Feb-14 900 18-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

73 220 Badod - Modak Ckt 19-Feb-14 900 19-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

74220 KAPS - Ukai - Mota 19-Feb-14 800 19-Feb-14 2000 Daily Yearly PM checks KAPS Non consent from SLDC

GETCO N

75400 315 MVA 400220 KvX-

mer III At Indore ss20-Feb-14 800 21-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI

N

76 220 Seoni(PG)-Seoni 2 21-Feb-14 800 21-Feb-14 1800 Daily AMP Work MPPTCL WRTS-I Y N77 220 Bina(PGCIL)-Shivpuri

Ckt21-Feb-14 900 22-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI Y N

78 400 Koradi-Nandgaonpeth 21-Feb-14 900 21-Feb-14 1700 Daily QMwork MSETCL MSETCL N N79 220 Haldarva - Jhanor - 1

(NTPC)21-Feb-14 900 21-Feb-14 1800 Daily PMM work GETCO N

80

765kV Main Bus-2A at SASANSatna Line-2

22-Feb-14 900 28-Feb-14 1800 Contionious

Equipment ConnectionsCircuit Breaker TestingJumper MeasurementIsolator Allignment Reactor accessories erection on R-Phase

PGCIL Reliance

N

81 400 Korba-Raipur 3 amp 4 23-Feb-14 800 24-Feb-14 1800 Conti For Bus spliting work at Raipur765 KV Raigarh-Raipur and 765 Champa Raipur lines

WRTS-1 WRTS-1 N

82132 132kV Astha - Polai SC

line of MPPTCL24-Feb-14 800 25-Feb-14 1800 Continous Crossing of Bhopal -Indore 765 kv SC Line MPPTCL BDTCL subjected to sldc

clearance N

83 400 Bus-1 at Bilaspur 24-Feb-14 800 24-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I N

84400 Seoni -

Khedamara(Bhilai) Ckt25-Feb-14 900 25-Feb-14 1800 daily For maintenance workFeeder bay maintenance at

KMaraMPPTCL CSPTCLMPPT

CLNo confirmation on D-3

N

85400 Ranchi-Sipat 1 amp 2 25-Feb-14 800 26-Feb-14 1800 Conti Crossing work of upcoming 765 KV DC

Jharsuguda-Korba amp 765KV SC Ranchi-BilaspurWRTS-I WRTS-I No confirmation on D-3

N

86765 Sasan‐Satna2 25‐Feb‐14 800 26‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐II POWERGRID No confirmation on D-3 N

87400 Bus Reactor1 at Satna 25‐Feb‐14 1000 25‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

88400 400 kV DC Damoh -

Bhopal Line26-Feb-14 800 27-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL Not availed by agency for

rainsN

89400 Raipur-Bhadrawati 2 amp

327-Feb-14 800 27-Feb-14 2100 Daily For Bus spliting work at Raipur765 KV Raigarh-

Raipur and 765 Champa Raipur linesWRTS-1 WRTS-1 Subject to Telemetry from

Durg PS RaipurN

90 400 Birsinghpur‐Vandana Vidyut

27‐Feb‐14 800 27‐Feb‐14 1700 Daily AMP of Terminal Equipment amp line Reactor WRTS‐I POWERGRID Ready N

91 400 Bhusawal-Akola 28-Feb-14 900 28-Feb-14 1700 Daily QMwork MSETCL MSETCL N92 220 Bus-1 at Wardha 28-Feb-14 800 28-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I N93 400 Birsinghpur‐Balco 28‐Feb‐14 800 28‐Feb‐14 1700 Daily AMP of Terminal Equipment amp line Reactor WRTS‐I WRTS‐I Deferred by site N

94 400 Nagda‐Dehgam2 5‐Feb‐14 1000 5‐Feb‐14 1800 DailyCommissioning amp checking of CSD relay in Main CB for reactor switching at Dehgam end by MS ABB

WRTS‐II POWERGRID N

95 400 400kV Satpura Itarsi 10‐Feb‐14 900 11‐Feb‐14 1700 DailyCommissioning of new CB after dismantling of existing TELK make CB at Satpura end amp normalising of line on main CB

POWERGRID

WRTS‐II N

96 765 765 kV Satna - Bina Ckt I

6-Feb-14 800 8-Feb-14 1800 cont Stringing of Jabalpur-Bina 765 kv SC Line PGCIL JTCL Original27-28 Jan14 Def N

97 765400 765400 kV ICT-1 at Bina 20-Feb-14 90000 AM 21-Feb-13 60000 PM Continuou

sCSD commissioning for 400kV Side CB of 765400 kV ICT-1 WRTS-II POWERGRID Deferred by site N

98 400 Nagda - Dehgam 1amp2 20-Feb-14 80000 AM 28-Feb-14 1700 Daily Online PID testing to insulators in both circuits AR shall be kept in non auto mode in both circuits WRTS-II POWERGRID

N

99 220MC Waluj-Chitegaon amp Waluj-Jalna

21-Feb-14 700 21-Feb-14 1900 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad MSETCL WRTS-I

N

100 400 Bus 1 at Asoj 21-Feb-14 000 21-Feb-14 1800 Daily For checking bus stability testing of Piran 1 amp 2 bays (for charging of new line) GETCO WRTS-II N

101 400 Bus-1 at Wardha 22-Feb-14 800 22-Feb-14 1800 Daily Jumper spacers connection at Wardha WRTS-I WRTS-I N102 400 Bus-1 at Raigarh 22-Feb-14 800 22-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I Deferred by site N103 765 Bus - II at Indore 22-Feb-14 90000 AM 23-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Not availed NLDC consenN104 220 Kakrapar-Haldarwa2 22-Feb-14 1000 Hrs 22-Feb-14 1600 Hrs Daily AMP POWERG

RID WRTS-II N

105 400 Bus 2 at Asoj 22-Feb-14 000 22-Feb-14 1800 Daily For checking bus stability testing of Piran 1 amp 2 bays (for charging of new line) GETCO WRTS-II N N

106400 400 kv DC Bhopal -

Bina Line (Ckt I amp II)(Tower no 34 amp35)

23-Feb-14 800 24-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line MPPTCLBDTCL

N

107 765kV SASAN Main Bus-1BBay 10 - Jack Bus 24-Feb-14 800 Hrs 2-Mar-14 1900 Hrs Continuous Dia-4

(Bay-10) - SCCOCC Test of Unit 4 GTSasan Sasan N

108 765 Bus - I at Indore 24-Feb-14 90000 AM 25-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID N

109 765 765 KV Bina-Indore Line 24-Feb-14 0900 Hrs 24-Feb-14 1800 Hrs Daily

For taking spare reactor unit in service amp checking the scheme for spare reactor with 765 KV Bina-Indore Line Reactor at Bina

POWERGRID WRTS-II

Deferred by site N

110 400 Kasor - GPEC 24-Feb-14 800 25-Feb-14 1800 Daily PMM Work GETCO GETCO N111 40022033 315 MVA ICT2 at Kheda 24-Feb-14 900 10-Mar-14 1800 cont modification work in SS lay out CSPTCL CSPTCL N112 400 315 MVA ICT2 at

Gwalior 25-Feb-14 90000 AM 25-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID N

113 400KV V-Satna-4 Line Shunt Reactor 25-Feb-14 1000 25-Feb-14 2000 Daily

Basis AMP NTPC NTPC N

114 400 Raipur-Wardha 1 26-Feb-14 800 26-Feb-14 2000 Daily Balance construction works at Wardha end WRTS-I WRTS-IReady Ori26214 Deferred by site

N

115 400 Bus -I at Indore 26-Feb-14 90000 AM 26-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Deferred by site N116 400 315 MVA ICT3 at

Gwalior 26-Feb-14 90000 AM 26-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID N

117 400 400 kV DC Damoh - Bhopal Line

26-Feb-14 800 26-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL N

118 400 Chorania-Kasor 26-Feb-14 800 26-Feb-14 1800 Daily PMM work GETCO GETCO N119 400 Koradi-Satpura sc 26-Feb-14 800 26-Feb-14 1600 Daily 765KV Tiroda Koradi Transmission LineII crossing

worksPOWERGRID MEGPTCL Cancelled by MEGPTL N

120 400 400 kV DC Damoh - Bhopal Line

26-Feb-14 800 26-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL N

121 400 Raipur-Wardha 2 27-Feb-14 800 27-Feb-14 2000 Daily Balance construction works at Wardha end WRTS-I WRTS-I Deferred by site N122 400 Vindhyachal-Satna2 27-Feb-14 1000 27-Feb-14 1800 Daily Commissioning of CSD Relay in ABB make main

CB at Satna WRTS-II POWERGRID Deferred by site N

123 400 Bus -II at Indore 27-Feb-14 90000 AM 27-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Ready N124 400 315 MVA ICT1 at

Rajgarh 27-Feb-14 90000 AM 27-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID Ready N

125 400400 KV SC Kosamba - Asoj line(730-740)

27-Feb-14 700 27-Feb-14 1800 cont Crossing of Dhule - Vadodara 765 kv SC Line GETCOBDTCL

N

126 400 Indore (MP) -Indore (PG)-DC 27-Feb-14 700 28-Feb-14 1600 Cont Stringing of 765kV Indore - Vadodara line POWERG

RID WRTS-II Deferred by site N

Anaulagnak 33(A)

maaca- 2014 AaOr Ap`Ola 2014 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR MARCH 2014 AND APRIL 2014

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)maaca- 2014 Ap`Ola 2014 maaca- 2014 Ap`Ola 2014

MARCH 2014 APRIL 2014 MARCH 2014 APRIL 2014

1 gaujarat

saIimat 11700 12100 7750 7800

AsaIimat 11740 12140 7760 7810

2 maQya p`doSa

saIimat 8340 9050 5338 5540

AsaIimat 8340 9050 5338 5540

3 CltaIsagaZ

saIimat 3200 3075 1929 1809

AsaIimat 3225 3105 1944 1827

4 maharaYT

saIimat 19000 19150 10200 10300

AsaIimat 19050 19200 10250 10350

5 gaaovaa

saIimat 425 410 300 295

AsaIimat 425 415 310 300

6 dmana dIva

saIimat 340 345 210 205

AsaIimat 345 350 225 210

7 DI ena eca

saIimat 635 640 445 425

AsaIimat 635 640 445 425

8 piScama xao~

saIimat 41961 43047 28500 27900

AsaIimat 42076 43173 29560 28840

Diversity factor of 10401

March 2014 and April 2014

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah frvarI 2014

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 1552 75

]k[- Ukai - 2 1719 75]k[- Ukai - 3 598 75]k[- Ukai - 4 1757 75]k[- Ukai (Total) 5627 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 024 2]k[- ela baI saI eca Ukai LBCH - 2 131 3]k[- ela baI saI eca Ukai LBCH (Total) 154 5 0008

3 kDanaa Kadana - 1 000 0 0005kDanaa Kadana - 2 246 62 0000kDanaa Kadana - 3 223 62kDanaa Kadana - 4 166 63 0000kDanaa Kadana (Total) 634 63 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 431 9 0020 6 kula jalaIya TOTAL(H) 6846 225 0401

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 2060 32 21822 TaoronT pavar ilaimaToD yauinaT DI 7979 125 69803 TaoronT pavar ilaimaToD yauinaT [- 075 122 07584 TaoronT pavar ilaimaToD yauinaT ef 8023 124 66915 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 018811 Qauvarna tapIya Dhuvaran - GT 2 000 0 041912 Qauvarna tapIya Dhuvaran - STG 023 1013 ]ka[- yauinaT 1 Ukai -1 000 0 005114 ]ka[- yauinaT 2 Ukai -2 000 0 010815 ]ka[- yauinaT 3 Ukai -3 3147 200 297216 ]ka[- yauinaT 4 Ukai -4 10588 202 1002617 ]ka[- yauinaT 5 Ukai -5 9496 210 884118 ]ka[- yauinaT 6 Ukai -6 23703 500 1844819 gaaMQaInagar 1 Gandhinagar - 1 000 0 008620 gaaMQaInagar 2 Gandhinagar - 2 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 000 0 029622 gaaMQaInagar 4 Gandhinagar - 4 000 0 036223 gaaMQaInagar 5 Gandhinagar - 5 11676 212 1148924 vaNakbaaorI 1 Wanakbori - 1 10648 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 11069 21026 vaaNakbaaOrI 3 Wanakbori - 3 1891 20627 vaaNakbaaOrI 4 Wanakbori - 4 5244 21228 vaaNakbaaOrI 5 Wanakbori - 5 5531 21029 vaaNakbaaOrI 6 Wanakbori - 6 000 030 vaaNakbaaOrI 7 Wanakbori - 7 8902 20931 ]trna Utran GT 1 000 0 019832 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 000 0 024635 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 000 0 0000

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Anaulagnak 41

ACTUAL GENERATION amp AVALABILITY FOR FEBRUARY 2014Actual vaastivak

Actual vaastivak

37 isaka Sikka - 1 3696 112 439838 isaka Sikka - 2 000 0 017639 kcC ilagnaa[-T Kutch Lignite - 1 4429 71 848640 kcC ilagnaa[-T Kutch Lignite - 2 4037 7241 kcC ilagnaa[-T Kutch Lignite - 3 3646 6742 kcC ilagnaa[-T Kutch Lignite - 4 2215 66 525343 saUrt ilagnaa[-T Surat Lignite - 1 6705 131 682544 saUrt ilagnaa[-T Surat Lignite - 2 7475 131 738745 saUrt ilagnaa[-T Surat Lignite - 3 6965 130 728846 saUrt ilagnaa[-T Surat Lignite - 4 6362 130 688647 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5454 107 848648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5649 11449 jaI Aa[- pI saI ela GIPCL GT - 1 1589 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1587 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1702 3552 jaI Aa[- pI saI ela GIPCL ST - 1 2902 5153 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 020556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 000 0 000060 jaI pI [- saI GPEC GT - 2 267 156 013261 jaI pI [- saI GPEC GT - 3 143 146 002762 jaI pI [- saI GPEC STG 131 17263 jaI esa [- jaI GSEG GT - 1 000 0 098964 jaI esa [- jaI GSEG GT - 2 1181 5065 jaI esa [- jaI GSEG STG 642 2366 Sugen (GT 1 + GT 2) 1767 308 602467 saIpIpI sao Aayaat Imp from CPP+MUNDRA 269359 6881

kula tapIya Total (T) 475652 8386 302021kula jalaIya+tapIya Total (H+T) 482498 8604 302422ivaMD [najaI- Wind Energy 52123kula jalaIya+tapIya+hvaa Total (H+T+Wind) 534621 9539ivainamaya Exchanges 155314 saIimat jaa- maaMga Restricted Energy Req 689935

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 6800 194

11 gaaMQaI saagar Gandhi Sagar 3366 117 008012 raNaa p`tap sagar RPSagar 5883 172 004013 javaahr sagar Jawahar Sagar 4350 99 0050

2 ponca Pench 3052 165 00903 baargaI Bargi 4581 91 00804 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 11764 315 02806 banasaagar Bansagar-2 (Deolondh) 000 07 banasaagar Bansagar-3 (Silpara) 1236 32 00708 banasaagar Bansagar-4 (Zinaha) 1320 22 00509 maoDIKoDa Medikheda 396 63

10 ibarisaMGapur Birsingpur 040 20 002011 Tavaa Tawa 000 012 rajaGaaT Rajghat 165 12 006013 Omkareshwar 10620 402 14 [Midra saagar Indira Sagar 23077 997 0849

kula jalaIya TOTAL(H) MPPGCL 59999 2365 1273Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 6049 98 232502 AmarkMTk II AMK II Unit -2 6080 983 AmarkMTk III AMK III Unit -5 12212 219 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 06505 satpura II Satpura-II Unit 6 10323 180 165906 satpura II Satpura-II Unit 7 5926 1807 satpura II Satpura-II Unit 8 10964 195 191608 satpura II Satpura-II Unit 9 8353 1709 satpura III Satpura-III Unit 10 000 0 2080

10 satpura III Satpura-III Unit 11 9447 182 1909011 esajaITIpIesa 1 SGTPS Unit - 1 9447 182 1909012 esajaITIpIesa 2 SGTPS Unit - 2 10572 18213 esajaITIpIesa 3 SGTPS Unit - 3 9037 192 2064014 esajaITIpIesa 4 SGTPS Unit - 4 10700 18015 esajaITIpIesa 5 SGTPS Unit - 5 28804 51216 SSTPS 6864 587 8930

kula tapIya Total (T) 133714 3002 115350kula jalaIya+tapIya Total (H+T) 193713 5735 116623Injection from WIND 000 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 193713 5735ivainamaya Exchanges 193660 saIimat jaa- maaMga Rest En Req 387372

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 850 120 00902 Gangrel 475 10 00503 Mini Micro KWB 039 7

kula jalaIya TOTAL(H) CSEB 1364 137 0150tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 47 127402 kaorbaa (pU) Korba (E) Unit-2 2764 483 kaorbaa (pU) Korba (E) Unit-3 2764 484 kaorbaa (pU) Korba (E) Unit-4 2784 465 kaorbaa (pU) Korba (E) Unit -5 3685 120 253306 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 247808 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 15410

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 15839 256 1197012 KORBA(EB) Extn - 2 15876 256 11770

kula tapIya Total (T) 119907 1880 10190013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 119907 1880kula jalaIya+tapIya Total (H+T) 121271 2017 102050ivainamaya Exchanges 40207 0saIimat jaa- maaMga Rest En Req 161478 2017

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 9590 585 25142 kaoyanaa III Koyna III 5920 3203 kaoyanaa IV Koyna IV 18012 11324 kaoyanaa DIpIeca Koyna DPH 1442 385 TaTa jalaIya TATA Hydro 10242 741 28836 vaOtrNaa Vaitarna 000 07 eladarI Eldari 528 168 BaTgar AaOr vaIr Bhatgar amp Vir 915 49 pOzana Paithan 175 59

10 itlaarI Tillari 1106 6511 BaIra Tola rosa Bhira Tail Race 374 4112 GaTGar Ghatghar 5297 29313 Anya CaoTo jalaIya Small Hydro (others) 6173 0

kula jalaIya TOTAL(H) 58910 1599 5397Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 7700 1954 naaisak 4 Nasik Unit -4 10772 1965 naaisak 5 Nasik Unit -5 11160 1976 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 28827 5058 Tambao 6 Trombay Unit -6 000 09 Tambao 8 Trombay Unit -8 000 0

10 Tambao 7A gaOsa Trombay -7A (Gas) 7882 135 250411 Tambao 7ba Trombay -7B (WHR) 4499 7212 kaoraDI 5 Koradi Unit -5 5003 16013 kaoraDI 6 Koradi Unit -6 3963 19014 kaoraDI 7 Koradi Unit -7 10015 19015 Bausaavala 2 Bhusawal Unit -2 8329 17016 Bausaavala 3 Bhusawal Unit -3 9248 18017 Bausaavala 4 Bhusawal Unit -4 22734 50518 Bausaavala 4 Bhusawal Unit -5 19742 41519 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 7451 18621 parlaI 5 Parli Unit -5 10626 18022 parlaI 6 Parli Unit -6 14013 25323 parlaI 7 Parli Unit -7 13728 26024 KaprKoDa 1 Khaperkheda Unit -1 11173 20025 KaprKoDa 2 Khaperkheda Unit -2 10373 19526 KaprKoDa 3 Khaperkheda Unit -3 10998 20127 KaprKoDa 4 Khaperkheda Unit -4 12019 20728 KaprKoDa 5 Khaperkheda Unit -5 28882 50730 parsa Paras-3 14447 25731 parsa Paras-4 13504 25932 ]rna Uran (Gas) 18284 33833 ]rna Uran (WHR) 000 148 586234 caMd`pur 1 Chandrapur Unit -1 9087 17735 caMd`pur 2 Chandrapur Unit -2 1816 19436 caMd`pur 3 Chandrapur Unit -3 11737 21037 caMd`pur 4 Chandrapur Unit - 4 11843 46038 caMd`pur 5 Chandrapur Unit -5 7759 45539 caMd`pur 6 Chandrapur Unit -6 24420 44240 caMd`pur 7 Chandrapur Unit -7 23258 041 DhaNaU 1 Dahanu Unit-1 16339 250 1427842 DhaNaU 2 Dahanu Unit-2 16196 250 1427843 CPP 193651 29840044 RGPPL Share 000 0

kula tapIya Total (T) 631479 15369 329920MAH Wind + Solar Generation 16922 0kula jalaIya +tapIya Total (H+T+Wind) 707311 17451 372239

TOTAivainamaya Exchanges 324731saIimat jaa- maaMga Rest En Req 1032042

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1871 26ivainamaya Exchanges 33252saIimat jaa- maaMga Rest En Req 35123 434

C (F) dmana AaOr dIva DAMAN amp DIU 18245 298ja (G) dadra nagar hvaolaI DNH 40600 655

kula DD ampDNH (T) 58845 952Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 9600 160 1399112 tara`pur 2 TAPS Unit -2 11069 16013 tara`pur 3 TAPS Unit -3 36144 545 6584014 tara`pur 4 TAPS Unit -4 36197 54715 kakrapr 1 KAPS Unit -1 15230 545 3134216 kakrapr 2 KAPS Unit -2 14662 547

kula ena pI saI NPC Total 122901 25042 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14008 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 13913 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14076 214 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 32894 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 33204 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 33190 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33176 514

kula kaorbaa KSTPS Total 174461 2498 10394427 ivanQa esaTIpIesa 1 VSTPS Unit-1 12762 21328 ivanQa esaTIpIesa 2 VSTPS Unit-2 12708 21529 ivanQa esaTIpIesa 3 VSTPS Unit-3 12854 212210 ivanQa esaTIpIesa 4 VSTPS Unit-4 12909 214211 ivanQa esaTIpIesa 5 VSTPS Unit-5 12174 215212 ivanQa esaTIpIesa 6 VSTPS Unit-6 12625 214213 ivanQa esaTIpIesa 7 VSTPS Unit-7 31487 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 31075 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 31592 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 31488 512217 ivanQa esaTIpIesa 11 VSTPS Unit-11 30948 512

kula ivanQayaacala VSTPS Total 232623 3750 15107 31 saIpt -1 -SIPAT-1 38822 66400 32 saIpt -2 -SIPAT-2 32404 66500 33 saIpt -3 -SIPAT-3 38930 66300 34 saIpt -4 -SIPAT-4 26383 51600 35 saIpt -5 SIPAT-5 26400 51400

kula saIpt -SIPAT TOTAL 162939 285000 838941 kvaasa gaOsa 1e Kawas GT-1A 792 10742 kvaasa gaOsa 1baI Kawas GT-1B 2623 10943 kvaasa esaTI 1saI Kawas ST-1C 1571 11444 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 4986 304 222951 gaMQaar gaOsa 1 Gandhar GT-1 000 052 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 000 054 gaMQaar esaTI 4 Gandhar ST-4 000 0

kula gaMQaar GGPS Total 000 0 000061 maaOda 1 Mauda -1 19614 514 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 19614 514 1422661 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 000 31 000071 esa esa pI SSP RBPH - 1 6753 19372 esa esa pI SSP RBPH - 2 5907 19273 esa esa pI SSP RBPH - 3 5577 19574 esa esa pI SSP RBPH - 4 5513 19475 esa esa pI SSP RBPH - 5 7237 19476 esa esa pI SSP RBPH - 6 3109 19277 esa esa pI SSP CHPH - 1 1817 4078 esa esa pI SSP CHPH - 2 491 3679 esa esa pI SSP CHPH - 3 000 0710 esa esa pI SSP CHPH - 4 1639 39711 esa esa pI SSP CHPH - 5 901 37

kula esa esa pI SSP Total 38944 1312 389481 kula poMca Pench Total 3052 165 009082 Jindal Injection 38956 083 Amarkantak Lanco 15478 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2372740

(J) ]plabQata Availability 2308426 naoT ivainamaya Net Exchanges -292048 ]plabQa jaa- Energy Availability 2016379

maah frvarI 2014 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR FEBRUARY 2014 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 11532 - - - 11532 020214 1100 4993

saIimat Restricted 11700

AsaIimat Unrestricted 11740 11532 0 28 0 11560 010214 1200 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8366 8366 17022014 0500 5007

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9346 - - - 9346 120214 0900 4986

saIimat Restricted 8340

AsaIimat Unrestricted 8340 9346 0 38 0 9384 120214 0900 4986

nyaUnatma pMjaIkRt maaMga Min Registered Demand 3204 3204 270214 0200

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3210 3210 070214 1900 4989

saIimat Restricted 3200

AsaIimat Unrestricted 3225 3210 233 12 0 3246 070214 1900 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1617 1617 230214 2300 5021

maharaYT MAHARASHTRApMjaIkRt Registered 18510 - - - 18510 050214 1100 4984

saIimat Restricted 19000

AsaIimat Unrestricted 19050 17980 1655 -13 0 19622 190214 1200 5002

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12005 12005 280214 0400 5037

gaaovaa GOApMjaIkRt Registered 425 434 - - 434 130214 1400 5006

AsaIimat Unrestricted 425 434 1 -1 - 434 130214 1400 5006

nyaUnatma pMjaIkRt maaMga Min Registered Demand 311 311 100214 0300

essaar ESSAR(ESIL)pMjaIkRt Registered 487 - - 487 240214 1700 5004

AsaIimat Unrestricted 487 0 0 - 487 240214 1700 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 268 - - 268 250214 1200 5003

AsaIimat Unrestricted 268 0 0 - 268 250214 1200 5003

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 644 - - 644 260214 1200 4999

AsaIimat Unrestricted 644 0 - 644 260214 1200 4999

nyaUnatma pMjaIkRt maaMga Min Registered Demand 508 508 280214

piScama xao~ WESTERN REGIONpMjaIkRt Registered 42253 - - - 42253 110214 1100 4994

saIimat Restricted 41961

AsaIimat Unrestricted 42076 42021 850 235 0 43106 120214 1100 4994

nyaUnatma pMjaIkRt maaMga Min Registered Demand 27524 27524 280214 0400 5040 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

piScama xaoi~ya Baar p`oYaNa kond` mauumba[-

णाली चालन-ISO-I

ANNEXURE-43

माह फरवर 2014 February2014

समातरवतीय चालन PARALLELRADIAL OPERATION

TOTAL OPERATING

HOURS 1 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-NR) 66972

2 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-SR) 67200

टाई लाईन TIE LINE 1 765कवी िसवनी स वधा-I 765kV Sonito Wardha 67200 2 765कवी िसवनी स वधा-II 765kV Seonito Wardha 65247 3 400 कवी िभलाई स कोराड 400kV Bhilai to Koradi 67200

4 400 कवी िभलाई स भिावती 400kV Bhilai to Bhadravati 67200

5 400 कवी रायपर स भिावती-I 400kV Raipur to Bhadravati-I 67200

6 400 कवी रायपर स भिावतीETHII 400kV Raipur to Bhadravati-II 67139

7 400 कवी रायपर स भिावतीETHIII 400kV Raipur to Bhadravati-III 67200

8 400 कवी सातपरा स कोराड 400kV Satpura to Koradi 67200

9 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 67004 10 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 65308 11 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 66259 12 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 67200 13 400 कवी को हापर स मापसा-I 400kV Kolhapur-Mapusa-I 38740

14 400 कवी को हापर स मापसा-II 400kV Kolhapur-Mapusa-II 49532

15 400 कवी वापी स बोईसर 400kV Vapi-Boisar 67200

16 400 कवी रायगढ़ स ःटरलाइट-I 400kV Raigarh to Sterlight-I 66258

17 400 कवी रायगढ़ स ःटरलाइट-II 400kV Raigarh to Sterlight -II 67200

18 400 कवी रायगढ़ स झरसगड़ा-I 400kV Raigarh to Jharsuguda-I 67200

19 400 कवी रायगढ़ स झरसगड़ा-II 400kV Raigarh to Jharsuguda-II 67200

20 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 65028

21 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 66132

22 400 कवी रायपर स वधाETHI 400kV Raipur to Wardha-I 66836

23 400 कवी रायपर स वधाETHII 400kV Raipur to Wardha-II 67200

24 220 कवी कोरबा पव स ब पादर-III 220kV K(E) to Budhipadar-III 63853

Anaulagnak 47Annex-47

maah frvarI 2014 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39514 64944

10287 39711

Levels in Mtrs str maITr maoM

]ka[- Ukai

64392

9914

25402

25994

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF FEBRUARY 2014

ivavarNa Particulars

TRIPPING DETAILS FOR THE MONTH OF FEBRUARY 2014

Sr No Brief Details of incident (Elements Generation Tripped) Owner Utility Date amp Time Load

Gen LossCategory

1 Multiple Tripping from 400 kV New Koyna MSETClMSEGCLRGPPL 05‐02‐2014 0950 Hrs ‐ GI‐2

2Bus Bar protection mal‐operation at 400 kV Soja in Gujarat resulting in multiple Tripping

GETCO 06‐02‐2014 1755 Hrs ‐ GI‐2

ANNEXURE ‐ 5

  • annexpdf
    • 21pdf
    • 231pdf
    • 232pdf
    • 24pdf
    • 25pdf
    • 31pdf
    • 32C1pdf
    • 32C2pdf
    • 33Apdf
    • 41pdf
    • 42pdf
    • 47pdf
    • 5pdf
Page 10: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014

10

457th OCCM AGENDA

Since the decisions in real-time are based on the SCADA data it is now important to

monitor and ensure correctness of drawal injection as seen in SCADA The chart

below indicates the difference between the drawal of constituents as seen in SCADA

and as recorded in SEM for the period of 01st Feb 2014 to 16th February 2014 It may

be seen that the significant difference between SCADA and SEM needs to be

addressed by ensuring healthiness of telemetry and periodic validation by the SCADA

team at the respective SLDCs and WRLDC

The sub committee may like to discuss the same

11

457th OCCM AGENDA

ITEM NO 92 UNDER DRAWAL BY MAHARASHTRA AND INSECURE OPERATION IN THE GRID ON 27-28 FEB 2014

During late night of 27th Feb and early morning hours of 28th Feb-14 the grid

frequency remained above 502 Hz continuously for five hours from 2252 hrs of 27-

02-2014 to 0407 hrs of 28-02-2014 The situation was caused due to demand

reduction across the WR and NR on account of widespread rains and persistent under

drawal by Maharashtra during the above period as illustrated in figure-1 below

5067

49

492

494

496

498

50

502

504

506

508

‐1000

‐850

‐700

‐550

‐400

‐250

‐100

50

200

350

500

650

800

2100

2115

2130

2145

2200

2215

2230

2245

2300

2315

2330

2345

000

015

030

045

100

115

130

145

200

215

230

245

300

315

330

345

400

415

430

445

500

515

530

545

600

615

630

645

700

716

731

746

Maharashtra Deviation from schedule vis‐a‐vis grid frequency2100 hrs of 27‐02‐2014 to 0800 hrs of 28‐02‐2014

MSEBUI FREQ

Deviation from Schedule

Frequency

MW Hz

Several messages were sent from WRLDC control room to SLDC Kalwa directing them to control their under drawal from the grid Details of these messages is tabulated below

Sl No Message sent to Ref No Message date and time

1 SLDC Maharashtra 56079 27022014 2210 hrs

2 SLDC Maharashtra 3070 27022014 2230 hrs

3 SLDC Maharashtra 3078 28022014 0125 hrs

4 SLDC Maharashtra 3079 28022014 0150 hrs

Despite the above messages the response from SLDC Kalwa was inadequate in

controlling the under drawal of Maharashtra Consequently the frequency touched

5069 Hz at 0211 hrs of 28-Feb 2014 the voltage across the grid increased sharply

and there was over injection from WR to other regions Subsequently as a

contingency measure the drawal schedule of Maharashtra was reduced by 600 MW

by suo motu revision in the requisition of Maharashtra in Korba Vindhyachal Sipat

12

457th OCCM AGENDA

and Vidhyachal STPS wef 0230 hrs to 0500 hrs of 28022014 This was later

extended up to 0700 hrs of 28022014 It was a near miss situation that could have

been avoided by adequate planning and commensurate actions in real-time It is

requested that the matter may be taken up at the highest level in MSETCL and a

separate meeting may be convened on the above subject to avoid reoccurrence of

such event in future

The sub committee may like to discuss the same

ITEM NO 93 NON AVAILABILITY OF REAL-TIME TELEMETRY FROM LARGE NUMBER OF STATIONS IN MAHARASHTRA There are 224 nodes in Maharashtra that comprising of 32 Generating stations and

192 substations Out of these 224 nodes 47 locations are yet to be integrated in the

System Out of the balance 177 the data from nearly 50 nodes are not coming since

last 6 months Thus in totality data is not available from more than 135 out of 224

stations ie 60 which is highly alarming The extremely poor status of telemetry in

the state of Maharashtra has become a security threat Maharashtra load is touching

17500 MW and there are large number of construction related outages that have to be

facilitated Further with the formation of the synchronous All India grid there is a need

for close monitoring of system parameters such as the line flows voltage and grid

frequency Inadequate telemetry is resulting in severe constraints in real time

operation as well as outage coordination There have been several instances of line

tripping on high voltage and SPS operation due to sudden increase in line flows

during hour boundary or during facilitating planned outage These events could be

minimized with better supervision if the telemetry is available

The telemetry issue in Maharashtra has been discussed in the various WRPC forums

wherein it was informed by MSETCL that the problem is due to failure of Ms Tulip

who was the service provider for the communication network During the month of

August 2013 representative from MSETCL had assured that a new contract was being

awarded and the situation would improve within one month The extracts from minutes

of 451st OCC is quoted below

QUOTE

13

457th OCCM AGENDA

ldquoMSETCL stated that they were working to resolve the issue and assured that there

would be an improvement in availability of Telemetry from Maharashtra stations within

one Monthrdquo

UNQUOTE

Representative of MSETCL may apprise the OCC regarding present status and the

likely schedule for resolution of the issue

The sub committee may like to discuss the same

ITEM NO 94 STATUS OF LINE AND BUS REACTORS AT 765 KV SASAN

The line reactor of 765 kV Sasan-Satna ckt-2 as well as the Bus reactors of 765 kV Sasan bus are yet to be commissioned at Sasan end In the absence of these reactors high voltage is experienced at Sasan and nearby stations Often one circuit of 765 kV Sasan-Satna is required to be opened for voltage regulation Consequently the reliability of evacuation of generation from two units of Sasan is affected During 456th OCC meeting the revised schedule of the above elements as informed by Ms Reliance was as under

Schedule in formed in meetings 451st OCC 455th OCC 454th OCC 1 Line reactor of 765

kV Sasan-Satna ckt-2

By Dec 2013 By April 2014 By May 2014

2 765 kV Bus-1 Reactor

Jan 2014 By Mar 2014 By June 2014

3 765 kV Bus-2 Reactor

Jan 2014 By Mar 2014 By June 2014

It was decided in 456th OCC meeting that one representative from MPPTCL would visit the SASAN site to check readiness of Line and Bus reactors Representative from MPPTCL and Sasan may apprise the OCC-members on the progress of commissioning of reactors at 765 kV Sasan OCC members may also be apprised of the tap position of the generator transformer 2 and 3

The sub committee may like to discuss the same

14

457th OCCM AGENDA

ITEM NO 95 CHARGING OF NEW TRANSMISSION ASSET IN THE GRID In order to have better coordination of the transmission utilities with RLDCNLDC during charging synchronization of new elements into the grid a communication has been received from NLDC (ref POSOSCONLDCSystem OperationOutage Planning1239) on 10022014 It has been proposed that

a Owner of the asset shall submit the request for expected chargingcommissioning of new element for the calendar month latest by 5th day of the month to the respective RLDC amp NLDC along with status of activities mentioned in the check-list

b RLDC shall study the impact of the new element commissioning and based on its assessment of the preparedness of the utility may recommend to NLDC who in turn would examine the issue independently considering pan India grid scenario

c After the above the owner of the new asset shall give its readiness to charge the new element atleast three days in advance with current status of activities mentioned in the check list

Check list is as under 1 List of elements to be charged along with the details of approval of the

transmission scheme from the Standing CommitteeCTUSTU 2 Single Line Diagram of the concerned substations along with status of

completion of each diabusbreakers 3 Availability of real-time data and communication to the designated

SLDCRLDC 4 Installation of Special Energy Meter complying with CEArsquos Regulations

(Serial number Meter number CTPT ratio to be indicated) 5 Charging Instructions by CTUSTU 6 Schedule and sequence of charging of elements 7 Availability of line bus reactors as per planning In case the transmission

system is planned to be charged without the planned line reactor requisite authorization from CTUSTU by studies

8 Connection Agreement (along with all annexures) with CTU or STU 9 Copy of Long term Access (LTA) or MTOA granted by CTU or STU as the

case may be 10 Copy of Power Purchase Agreement (PPA) 11 A signed undertaking with name and designation of the officer clarly

indicating the following a All Disturbance recorders (DR) and Event Loggers (ELs) with time

synchronization are commissioned b All protective systems have been commissioned c All statutory clearances have been obtained

12 Output of EL and DR after charging

15

457th OCCM AGENDA

Each document mentioned in check list from Sl No 1 to 10 must be attached for sake of completeness and emailed as a consolidated document to the nodal RLDC well before the new element charging date The sub-committee may like to discuss ITEM NO 96 OPENING FEEDERS WITHOUT PRIOR INTIMATION TO WRLDC

It was gathered based on the observation from WRLDC SCADA data and subsequent

discussion with MPPTCL that 220 kV Bina (MP)-Gwalior(MP) DC were taken under

shut down for LILO works at Datia at 0910hrs on 23022014 for 4 days The outage

of these lines was neither discussed in OCC and neither was there any intimation to

WRLDC before availing the outage These lines are included in the important grid

elements list of Western region and prior concurrence of WRLDC is required for

switching these lines Further these lines form the parallel path to 765 kV Bina-Gwalior

DC and with the shutdown of these lines the network upstream of WR-NR inter

regional corridor was depleted

The sub-committee may like to discuss ITEM NO 97 TRIPPING OF 765 KV LINES ON OVER VOLTAGE Recently several tripping of 765 kV lines have been reported on over voltage These are indicated below

1) 765 kV Bina-Gwalior I at 2358 hrs of 16022014 2) 765 kV Bina-Gwalior I at 2011 hrs of 14022014 3) 765 kV Satna-Gwalior at 1300 hrs of 06022014 4) 765 kV Sasan-Satna II at 0013 hrs of 18012014 5) 765 kV Jabalpur-Bina I at 2350 hrs of 10012014 6) 765 kV Jabalpur-Bina II at 0405 hrs of 06012014

It is understood that the adopted Stage-I OV setting for the above lines vary from 108 (ie 826 kV) to 110 (841 kV) As per SCADA data the bus voltage at any of the substations mentioned above had not reached 826 kV during the above incidents

POWERGRID may examine the above tripping in detail and apprise the OCC regarding the above In case of issues related with protective relays field equipment are detected these may be addressed at the earliest The sub-committee may like to discuss

16

457th OCCM AGENDA

ITEM NO 98 RGMO FGMO OF MANDATED GENERATORS IN WESTERN REGION

As per the latest information available at WRLDC there are 251 number of units with a total capacity of 57517 MW in Western Region that are mandated to operate in Restricted Free Governor Mode The need for compliance to the IEGC regulations wrt RGMOFGMO was emphasized in the 455th and 456th OCC meeting as well as during the 25th TCCWRPC meeting Subsequently it was communicated by email to all entities in WR to provide the latest status of RGMOFGMO implementation We have received updated status from MPPTCL LANCO CGPL DB Power and JPL Tamnar in Feb 2014 The latest state wise RGMOFGMO summary is given below

Name of Entity No of mandated units

RGMO FGMO available at

RGMOFGMO Not available at

Maharashtra 90 35 55 Madhya Pradesh 58 36 22 Gujarat 35 19 16 Chhattisgarh 10 3 7 CGPL 5 5 0 NCA 11 6 5 SASAN 2 1 1 NTPC 24 10 14 ESSAR_Mahan 1 1 0 NSPCL 2 2 0 KSK 1 1 0 KWPCL 1 0 1 DB POWER 1 1 0 JPL 5 4 1 LANCO 2 2 0 IEPL 1 0 1 EMCO 2 0 2 WR_Total 251 126 125

WRLDC vide its letter ref WRLDCRGMO-FGMO1-2014 dated 23012014 has issued directions under Section 29 of the Electricity Act to ensure compliance of IEGC regulations 52 (f) (g) (h) and (i) All utilities are requested to furnish the status of compliance in respect of generating units under their jurisdiction The sub-committee may like to discuss ITEM NO 99 STATUS OF TELEMETRY IN WESTERN REGION

The status of telemetry related issues in respect of WR constituents is as under

a) Chhattisgarh Data (except MW) from 500 MW Korba West extension generating station is not available Status points from 400 kV Raita pending

17

457th OCCM AGENDA

b) Madhya Pradesh Telemetry of following bus reactors is not available at WRLDC

S No

Station Name Bus Reactor

Nunber x Capacity

Total MVAR

Rated voltage

Status of Telemetry at

WRLDC1 Nagda 250 100 420 Not available2 Indore 225 50 33 Not available3 Bhopal 225 50 33 Not available4 Birsinghpur 150 50 420 Not available

c) Gujarat Data is not-availableintermittent from following stations in Gujarat

a 220 kV Nano of Tatamdash(not available) b Kansari 400 kV ss and Navsari 220 kVhellipIntermittent (PLCC Problem)

d) Goa Due to non-availability of SCADA data from Goa the difference between drawal as seen in SCADA and as recorded in SEM is as high as 572 during the period 1st Feb to 16th Feb 2014 Data from the following stations in Goa is not available at WRLDC S No Station Status

1 Amona 220 kV Not available 2 Cuncolin 220 kV Not available 3 Kadamba 110 kV Intermittent 4 Tivim 220 kV Intermittent 5 Ponda 220 kV Intermittent 6 Xeldam-220 kV Intermittent 7 Verna-110 kV Intermittent

e) Daman amp Diu

Due to non-availability of SCADA data from Daman amp Diu the difference between drawal as seen in SCADA and as recorded in SEM is as high as 571 during the period 1st Feb to 16th Feb 2014 Data from The error is mainly due to non-availability of data from 220 kV Magarwada

f) DNH Telemetry from 220 kV Kharadpara and Khadoli station is not available

g) POWERGRID The data from the following stations is not available at WRLDC

1) 765 kV Tamnar (Communication problem GPRS link is not stable)

18

457th OCCM AGENDA

Telemetry from following stations is Intermittent at WRLDC 1) 765 kV Durg (PLCC frequent problems)

2) 765 kV Kotra (communication intermittency)

3) 765 kV Gwalior (PLCC link established but still there is some

issue(Delay) in data updation at WRLDC Rectification work under

progress by Site Engineer

4) 765 kV Solapur - Redundant link established through Reliance but

the gateway connected to above link is not configured for 765 KV

data Hence when BSNL link is down 765 KV data is not updating at

WRLDC

The sub-committee may like to discuss

ITEM NO 910 COMPARISON OF DRAWAL AS SEEN IN SCADA VS SEM The IEGC second amendment and the Deviation Settlement Mechanism is in force since the 17022014 The IEGC stipulates maintaining injection drawal within the limits prescribed in the Deviation Settlement Mechanism The sub-committee may like to discuss ITEM NO 911 MOCK BLACK START EXERCISE

As per sec 58(b) of IEGC the usersSTUs etc need to conduct Black start mock

exercises in their respective systems once in every six month under intimation to

RLDC Also the all the black start Diesel Generator (DG) sets are [as per sec 58(b)

of IEGC] required to be tested weekly and the test report needs to be sent to RLDC

on quarterly basis

The following table summarizes the status of mock exercises in respect of black start

facilities in Western Region

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

GUJARAT

1 Ukai (H) 4 x 75 Hydro Diesel 500 kVA 221213 Y

2 Mini Hydro 2 x 25 Hydro Diesel 50 KW N

3 Kadana 4 x 60 Hydro Diesel 500 KVA 2413 Y (2413)

19

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

4

Dhuvaran

1 x 107 (68+39) + 1 x 112 (72+40)

Gas

Details to be furnished by Gujarat

Details to be furnished by Gujarat

N

5 GIPCL-I 3 x 32 + 1 x49

Gas Steam Diesel 141 KW

070912 Y

6 GIPCL-II 1x104+1x56 Gas Steam Diesel 500 kVA N

7

Torrent Power Stn C Stn- DEFCCPP

StnC2x30 StnD120 StnEF(110MW each)CCPP100MW

Thermal (Units-CDEF) Gas(CCPP)

Stn-C islands Diesel

StnC15kVA StnDE F and CCPP(500 kVA each)

281112

Y

8 GPEC 3x138+1x241 Thermal Natural Gas 3000 kVA N

9 Sugen 3x3825 MW Gas Diesel 2x6MVA N

Madhya Pradesh

10 Gandhisagar 5 x 23 Hydro DG set 100 kVA N

11 Birsinghpur 1 x 20 Hydro Battery 220 Volt

Battery N

12 Pench 2 x 80 Hydro DG set 250 kVA 121012 Y

13 Bargi 2 x 45 Hydro DG set 250 kVA 100212 Y

14 Bansagar Stage-I 3 x 105 Hydro DG set 250 kVA N

15 Indira Sagar 8x125 Hydro DG set 2x1000

KVA 22511 Y

Chhattisgarh 16

Hasdeo Bango 3 x 40 Hydro DG Set 250 kVA 250812 N

17

Korba(E)-phse-I

Power plant retired but Black start DG set available and on- load trial is reported to be carried out regularly

DG Set 1500 kW(33kV)

N

Maharashtra

18

Koyna I amp II

4 x 65 4 x 75 Hydro

House generator

2 MVA 231013 N

19 KDPH 2 x20 Hydro DG set 310 KW N

20 Eldari 3 x 75 Hydro DG set 6 KW N

21

Uran (Gas)

4 x 60 (GT) + 4x108 (GT)+ 2x120 WHR

Gas DG set

4 MW PH1412kVA PH2450kVA WH520kVA

161012

N

20

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

22 RGPPL

Block 1 640MW+Block 2 66354MW+Block 3 66354MW

Gas

Gas Turbine (Frame-6)

35 MW (Under testing) Details to be provided by RGPPL

N

23 Ghatghar 2x125 Hydro DG set 1x1250

kVA 51012

N

24 Khopoli 3x24+2x12 Hydro

DC Governor amp bearing oil pumps

DC power (self start)

271013 (detailed report awaited)

N

25 Bhivpuri 3 x 24 +

2 x 15 +2x12 Hydro

DC Governor amp bearing

-do-

N

26 Bhira 6 x 25 Hydro

1 Noof 500 KVA house generator with water turbine

500 kVA

201013 (detailed

report awaited)

N

27

Bhira PSS 1 x 150 Hydro DG set 500 kVA

N

28 Trombay 1 x 120 Gas

Turbine DG Set 25 MW

N

1 x 60 Steam Turbine

NTPC

21

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

29 Kawas 4 x 106 2 x 116 Gas Diesel 2850 KW 151013

N

30 Gandhar 3 x 144 + 1x225 Gas Diesel 2975 KW

N

NCA

31 SSP(RBPH amp CHPH) 6x200+550 Hydro Diesel 2x1000kVA 080412

N

Accordingly the Black start capable stations may forward their tentative plan for conducting Black start exercises in compliance to sec 58(b) of IEGC bull As per the communication for MPPTCL the tentative plan of Black start in Madhya

Pradesh system is given under SL No Name of the Station Tentative Date Remarks 1 Pench March 2014 DG set at Pench amp are Bargi

under outage 2 ISP Apr-May 2014 - 3 TONS June 2014 Governor Problem being

attended 4 Birsinghpur June 2014 -do- 5 Medikheda June 2014 -do- 6 Rjghat June 2014 -do- Other utilities may also update their tentative plan for black start

The sub-committee may like to discuss

22

457th OCCM AGENDA

ITEM NO 912 HEALTHINESS OF MAIN CIRCUIT BREAKER OF 400 KV BIRSINGPUR-KATNI-I AT KATNI END The main CB of Birsingpur-Katni-I is under shut down since 2350 hrs of 14th February 2013 Representatives from MPPTCL may kindly apprise on the progress and expected date of restoration of the Main CB of 400 kV Birsingpur-Katni-I at Katni end The sub-committee may like to discuss

ITEM NO 913 TESTING OF SPS RELATED TO TRIPPING OF BINA-GWALIOR-AGRA AT CGPL VINDHYACHAL AND KORBA

As per the information received from NTPC and CGPL the SPS for the 765 kV Bina-

Gwalior-Agra has been installed and a mock drill has to be carried out for the same

The matter was discussed in the 456th OCC and it was decided that SPS may be

tested for reduction of say 50MW for each station instead of backing down of entire

500MWs POWERGRID WRTS-2 may confirm the testing schedule so that the

same could be coordinated in from WRLDC

The sub-committee may like to discuss

ITEM NO 914 SPS AT SIPAT WRLDC vide letter No WRLDCMO-I17192013 dt 21613 requested to take up this matter with the concerned for early implementation of the SPS Status of the SPS at NTPC Sipat is as under

1 449th OCC SPS was proposed by WRLDC It was decided to have a

separate meeting to finalize the scheme 2 450th OCC Member Secretary WRPC intimated that the matter will be

discussed in 119th PCM on 3rd amp 4th September 2013 at Tarapur 3 451st OCC It was intimated that the issue of SPS of Sipat was discussed in

119th PCM held on 3rd amp 4th September 2013 at TARAPUR The tentative scheme were formulated which needed finer tuning

4 452nd OCC Matter not discussed 5 453rd OCC NTPC representative intimated proposal sent to their corporate

office for engineering approval 6 454th OCC Approval from our corporate office is yet to be obtained 7 455th OCC Approval from our corporate office is yet to be obtained 8 456th OCC Approval from corporate office has been obtained and would be

forwarded to WRPC for approval The sub-committee may like to discuss

23

457th OCCM AGENDA

ITEM NO 915 SPS AT 4X300 MW BALCO IPP The SPS at 2010 MW Balco (4x675MW + 4x135 MW + 4x300 MW) was to be commissioned by Nov 2013 before commissioning of first unit of 4x300 MW Balco IPP For the new SPS scheme envisaged for the Balco CTU connection namely the Grid Islanding and Load Management Scheme (GILMS) Balco had reported to have placed an order with Ms SEL As discussed earlier the scheme suggested by WRLDC may be implemented before commissioning of first unit of 300 MW It was intimated during the 456th OCCM by the Balco representatives that the SPS shall be commissioned by March 2014

The sub-committee may like to discuss

ITEM NO 916 ACTIONS TAKEN FOR REVIVAL OF TRANSMISSION ELEMENTS UNDER LONG OUTAGE

As per the information available at WRLDC following elements are out for a

long period

Sl No Date of

outage

Reason

ISTSIPP

1 80 MVAR BR at

ESSAR(Mahan)

231213 Oil leakage

2 125 MVAR BR at JPL 120513 Hydrogen formation

3 50 MVAR LR of Indore-Asoj-II

at Indore

190613 R phase bushing burst

4 50 MVAR LR of Birsingpur-

Damoh at Damoh(PG)

13102014 Oil Leakage

5 765 kV Durg-Kotra-I 24022014 Sparking in Isolator

6 400 kV Raipur-Raigarh-IV 18012014 Voltage Regulation

MSETCL

1 400 kV RGPPL-NrsquoKoyna-I 22012014 Voltage Regulation

2 400 kV Sholapur-

Sholapur(PG)

26022014 Tower Collapse

MPPTCL

1 400 kV Birsingpur-Katni-I 28012014 Voltage Regulation

24

457th OCCM AGENDA

2 50 MVAR LR of Indore-Asoj-II

at Indore

6012014 DGA Violation

CSPTCL

1 400220 kV Bhilai-II 24022014 Maintenance

OCC may like to be apprised of the actions being taken for expediting revival of

the above elements

The sub-committee may like to discuss

ITEM NO 917 STATUS OF 220 KV KOLHAPUR-MUDSINGHI-CHIKODI- BELGAM LINE Consent for trial operation of 220 kV Kolhapur-Mudsinghi-Chikodi- Belgam line in radial mode for supply of Karnataka load from Maharashtra side was granted after discussion in the 455th OCC meeting WRLDC is in receipt of letter from SRLDC regarding concurrence for the above arrangement SLDC Kalwa may apprise the OCC regarding the present status The sub-committee may like to discuss

ITEM NO 918 CONTRIBUTION OF GENERATORS IN VOLTAGE CONTROL The contribution of generators in WR in voltage control was analyzed during 456th OCC meeting It was noted that following units were injecting reactive power even during high voltage

1 210 MW units of Khaparkheda Koradi and Chandrapur (Maharashtra) 2 210 MW units of Satpura and Birsinghpur (Madhya Pradesh) 3 210 MW unit 23 of Korba West (Chattisgarh) 4 200 MW unit 34 of Ukai (T) in (Gujarat)

Utilities were requested to check the setting of AVRGT tap and revert back with findings Members may apprise OCC regarding the status The sub-committee may like to discuss

ITEM NO 919 REAL-TIME MONITORING OF FEEDERS SUBSTATIONS THAT ARE COVERED UNDER THE AUFLS Telemetry of feeders substations covered under the AUFLS is desirable for real-time assessment of the anticipated relief that would be available from the AUFLS scheme at any given instant of time CERC has also directed all the constituents to for

25

457th OCCM AGENDA

mapping of these feeders in the SCDA of SLDCsRLDC Members may like to deliberate further The sub-committee may like to discuss

ITEM NO 920 LOAD FORECASTING As per the amended Indian Electricity Grid Code that is effective from 17th February 2013 the SLDCs SEB distribution licensees shall always restrict the net drawal of the State from the grid within the drawal schedule keeping the deviations from the schedule within the limits specified in the Deviation settlement mechanism regulations Therefore it is imperative that adequate attention may be paid towards load forecasting The matter was discussed in the 455th and 456th OCC as well as in the 25th TCCWRPC board meeting wherein it was decided to create a task force for exploring development of a software for load forecasting Members may like to deliberate further The sub-committee may like to discuss

ITEM NO 921 IMPLEMENTATION OF THE REVISED AUFLS IN GOA DD AND DNH It was decided during the 455th and 456th OCC meeting as well as during 25th WRPC meeting that Goa DD and DNH shall complete the implementation of the revised AUFLS in Goa DD and DNH at the earliest Representatives from the Goa DD and DNH may apprise the status of the progress The sub-committee may like to discuss

ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING As per meeting roaster circulated during 452nd OCC meeting the 458th OCC Meeting

will be hosted by Maharashtra and may be scheduled on 16th amp 17th April 2014

Maharashtra may confirm the same

Anaulagnak 21

maah frvarI 2014

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5051 Hz BETWEEN 0200 Hrs amp 0300 Hrs Hrs ON 28022014

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4970 Hz BETWEEN 1800 Hrs amp 1900 Hrs Hrs ON 28022014

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 5006 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5071 Hz AT 0210 Hrs ON 28022014

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4937 Hz AT 185000 Hrs ON 28022014

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS FEBRUARY 2014 JANUARY 2014 DECEMBER 2013

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 001 005

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 041 061 188 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 1069 5423 4864 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 4014 3569 3987

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 4876 946 956

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING FEBRUARY 2014

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

Voltage Profile during the month of Feb 2014

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 421 401 426 403 409 409 408 408 415 399 414 402 424 413 417 3922 420 402 423 404 409 409 408 408 417 402 418 404 425 415 420 3993 421 399 426 400 429 405 425 402 412 399 419 408 423 410 413 3964 422 402 426 404 430 406 428 401 414 400 414 404 424 412 414 3965 420 396 423 400 409 409 408 408 413 396 415 401 424 411 415 3996 420 396 426 400 428 405 426 402 415 398 416 402 423 411 412 4007 420 394 424 399 430 402 427 401 416 399 417 402 423 409 416 3968 418 393 422 397 409 409 408 408 416 399 416 402 422 409 418 3989 418 399 423 404 409 409 408 408 417 402 417 407 419 409 419 400

व तदाब परखा फरवर 2014 स नक Annex-23

इदौर इटारसी कराड धल असोज कासोर िभलाई जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

10 419 394 423 399 409 409 408 408 416 400 415 401 420 408 417 39511 421 393 426 397 429 405 427 401 44 399 419 404 423 407 414 39912 419 395 422 400 409 409 408 408 416 401 419 407 421 410 418 39813 420 396 424 401 409 409 408 408 417 400 416 401 421 409 418 40114 421 399 424 403 430 419 428 414 417 402 415 402 421 409 417 40015 423 397 424 399 428 414 429 412 417 398 406 406 421 407 418 40016 423 397 424 400 431 404 424 401 416 401 422 409 421 409 418 40317 421 402 424 403 432 414 420 404 416 402 412 405 422 410 417 39818 420 397 423 399 409 409 408 408 416 400 414 401 422 414 416 40019 420 396 423 399 409 409 408 408 411 398 418 405 421 413 413 39920 417 397 420 402 429 406 426 401 413 399 416 404 421 413 410 39821 419 399 422 402 430 407 421 401 415 401 418 406 422 411 414 39722 419 397 422 402 432 409 423 401 416 400 413 402 423 413 414 40023 420 396 423 397 430 412 428 404 414 404 415 402 427 414 416 40324 421 399 423 401 433 411 425 400 416 398 414 402 427 415 418 40225 421 399 423 401 433 411 425 400 416 398 414 402 427 415 418 40226 420 397 423 404 431 411 428 409 411 397 415 404 424 414 412 39327 418 398 426 403 409 409 408 408 417 399 418 402 429 415 419 39128 421 400 427 406 409 409 408 408 414 400 416 403 430 415 418 401

423 393 427 397 433 402 429 400 417 396 422 401 430 407 420 391

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 424 404 415 392 424 404 431 407 766 746 797 765 800 756 804 7692 422 406 417 398 426 404 434 407 769 754 798 774 801 769 804 7773 423 405 416 402 426 401 432 410 767 750 796 768 802 773 805 7764 426 407 417 402 423 403 430 408 768 751 797 779 801 776 808 7785 422 403 415 398 423 397 430 400 768 749 797 767 798 763 797 7586 425 404 417 401 423 399 432 404 768 750 797 767 802 773 807 7707 427 401 419 397 423 396 431 404 770 741 800 763 807 769 809 7698 422 403 416 403 424 395 427 399 756 737 788 756 801 765 802 7679 422 405 416 401 424 402 427 404 755 738 786 758 804 773 804 775

10 421 400 414 396 423 398 429 403 3 88 6 98 6 801 60

वािलयर बनाBina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

बना वािलयर नागदा खडवा िसपत िसविन

10 421 400 414 396 423 398 429 403 755 737 788 765 798 765 801 76011 423 397 414 390 426 396 433 399 758 736 794 750 800 752 802 75612 420 403 414 395 423 397 428 403 757 739 787 759 801 763 798 77013 424 405 417 400 427 397 430 402 759 740 794 760 804 773 803 77214 426 410 420 406 424 400 431 405 761 740 794 766 810 780 808 78215 425 404 417 399 426 399 430 401 762 738 794 962 808 768 806 76816 426 406 422 400 427 402 429 400 759 739 792 760 815 774 811 77617 429 407 417 398 427 404 427 406 761 742 792 762 805 765 810 77418 426 404 418 395 423 399 427 404 763 748 793 768 805 759 806 76819 423 409 415 394 422 399 428 403 759 737 795 765 804 758 806 76720 421 406 410 397 420 398 426 406 765 749 795 771 791 766 799 77421 423 407 424 399 423 403 428 405 759 744 792 760 795 761 800 76722 425 406 414 398 423 400 425 404 760 743 790 762 794 762 800 76823 425 402 412 392 424 400 428 405 758 740 790 759 796 755 799 76124 425 401 411 393 423 401 427 403 760 744 796 764 792 757 798 75625 421 408 412 395 423 401 427 403 756 742 793 766 795 764 795 76926 422 405 413 390 421 399 426 402 757 739 789 760 796 750 798 76127 426 407 416 393 421 401 431 403 760 741 795 762 803 755 804 76228 428 409 414 392 423 403 432 405 762 740 795 753 809 775 803 771

429 397 424 390 427 395 434 399 770 736 800 750 815 750 811 756

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Feb-14 0 0 0 0 0 0 0 02 02-Feb-14 0 0 0 0 0 0 0 03 03-Feb-14 0 0 0 0 0 0 0 04 04-Feb-14 0 0 0 0 0 0 0 05 05-Feb-14 0 0 0 0 0 0 0 06 06-Feb-14 0 0 0 0 0 0 0 07 07-Feb-14 0 0 0 0 0 0 0 08 08-Feb-14 0 0 0 0 0 0 0 09 09-Feb-14 0 0 0 0 0 0 0 0

10 10-Feb-14 0 0 0 0 0 0 0 011 11-Feb-14 0 0 0 0 0 0 0 012 12-Feb-14 0 0 0 0 0 0 0 013 13-Feb-14 0 0 0 0 0 0 0 014 14-Feb-14 0 0 0 0 0 0 0 015 15-Feb-14 0 0 0 0 0 0 016 16-Feb-14 0 0 NIL NIL NIL 017 17-Feb-14 0 0 0 0 0 0 0 018 18-Feb-14 0 0 0 0 0 0 0 019 19-Feb-14 0 0 0 0 0 0 0 020 20-Feb-14 0 0 0 0 0 0 0 021 21-Feb-14 0 0 0 0 0 0 0 022 22-Feb-14 0 0 0 0 0 0 0 023 23-Feb-14 0 0 0 0 0 0 0 024 24-Feb-14 0 0 0 0 0 0 0 025 25-Feb-14 1 17 0 0 0 0 0 026 26-Feb-14 0 0 0 0 0 0 0 027 27-Feb-14 0 0 0 0 0 0 0 028 28-Feb-14 0 0 0 0 0 0 0 0

Max 1 17 0 0 0 00 0 0Total 1 17 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month FEBRUARY 2014

Recommonded Load relief at 492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE-25

Power CutRestrictions in Western Region for the month of February-2014 k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply(DLF)

01022014 28022014 2344 2240 2332

21 Three-Phase Supply(Irrigation)

01022014 28022014 0956 0905 0946

21 Three-Phase Supply(Mixed)

01022014 28022014 2343 2227 2330

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01022014 28022014 2353 2337 2347 32 District Head Qtrs 01022014 28022014 2355 2340 2351 33 Tehsil Head Qtrs 01022014 28022014 2349 2309 2341

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid

1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 010214 to 280214

SaUnya Nil

0-1655MW

SaUnya Nil

0000

SaUnya Nil 2400

SaUnya Nil

95 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-

2 Power supply to Agricultural Sector ivavarNa Details sao From

idnaaMk Date tk To

idnaaMk Date p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs) 21 Three-Phase Supply 01022014 28022014 1000 0800 0900

22 Single-Phase Supply 01022014 28022014 1800 1800 1800 3 Anya jaanakarI Any other information

There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

11107 (Av) of 23 days 0000(Av) 0000 (Av)

1Rural 9031(Av) for 3486 Hrs 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0666 - -

0105 -

3 HT Industries 000 (Av) for 00 Hrs 000 Total Energy Cutday 0771 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01022014 to 280214 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 2322014 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का फरवर 2014का वःता रत यौरा

Details of forced unit outages during the month ofFeb2014

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 एःसार वा डनर

ESSAR VADINAR-I

गरा विनिल GSECL

660 2156 20-Jan-14 2018 10-Feb-14 Coal shortage

2 एःसार Essar-2

गरा विनिल GSECL

172 1212 22-Feb-13 अनपल ध Still out

अनपल ध Still out

Shortage of gas

3 एसएलपीपी SLPP-1

गरा विनिल GSECL

125 1445 23-Feb-14 1237 27-Feb-14 BTL

4 एकएलट पीएसAKLTPS-1

गरा विनिल GSECL

125 1147 26-Feb-14 अनपल ध Still out

अनपल ध Still out

DCS FAIL

5 एपीएल APL - 2

अदानी ADANI

330 056 3-Feb-14 अनपल ध Still out

अनपल ध Still out

Turbine vibration bearing probl em

6 एपीएल APL-5

अदानी ADANI

660 1732 15-Feb-14 456 27-Feb-14 Turbine vibration

7 एपीएल APL - 6

अदानी ADANI

660 2049 25-Feb-14 1947 3-Mar-14 Coal mill problem

8 टाटा TATA-6

मारा वउकिल MSPGCL

500 2352 19-Jul-13 अनपल ध Still out

अनपल ध Still out

For Economy SD

9 वीआईपीएल VIPL-I

मारा वउकिल MSPGCL

300 105 2-Oct-13 अनपल ध Still out

अनपल ध Still out

Turbine bearing vibration probl em

10 टाटा TATA-8

मारा वउकिल MSPGCL

250 2255 9-Jan-14 अनपल ध Still out

अनपल ध Still out

HT due to fire near turbine generator desk

11 चिपर Chandrapur-2

मारा वउकिल MSPGCL

210 1238 14-Jan-14 1310 23-Feb-14 ID fan problem

12 कोराड KORADI-6

मारा वउकिल MSPGCL

210 651 24-Jan-14 1456 14-Feb-14 Coal bunkering problem

13 डब यपीसीएल WPCL-1

मारा वउकिल MSPGCL

135 1245 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Furnace press high

14 डब यपीसीएल WPCL-3

मारा वउकिल MSPGCL

135 421 7-Feb-14 Ready Ready Less requisition

प म ऽय भार षण कि म बई णाली चालन-ISO-I

15 चिपर CPUR - 6

मारा वउकिल MSPGCL

500 1523 11-Feb-14 2033 13-Feb-14 BTL

16 नािसक NASIK-3

मारा वउकिल MSPGCL

250 300 11-Feb-14 100 19-Feb-14 UAT problem

17 कोराड KORADI-5

मारा वउकिल MSPGCL

210 153 14-Feb-14 अनपल ध Still out

अनपल ध Still out

ID fan problem

18 ितरोडा Tiroda-I

मारा वउकिल MSPGCL

660 2059 15-Feb-14 2054 26-Feb-14 Turbine bearing problem

19 ितरोडा Tiroda-2

मारा वउकिल MSPGCL

660 1125 17-Feb-14 152 22-Feb-14 BTL

20 कोराड KORADI-6

मारा वउकिल MSPGCL

210 2357 19-Feb-14 250 23-Feb-14 BTL

21 भसावल BHUSWAL-2

मारा वउकिल MSPGCL

210 301 22-Feb-14 1706 25-Feb-14 PA fan temp High

22 खापरखड़ा KHAPERKHEDA-3

मारा वउकिल MSPGCL

250 1448 22-Feb-14 130 25-Feb-14 BTL

23 जयगड Jaigad-4

मारा वउकिल MSPGCL

300 1930 22-Feb-14 1107 4-Mar-14 Low schedule

24 कोराड Koradi-5

मारा वउकिल MSPGCL

300 404 23-Feb-14 अनपल ध Still out

अनपल ध Still out

Electrical fault

25 पल PARLI-4

मारा वउकिल MSPGCL

210 1836 28-Jan-14 1956 3-Feb-14 Air preheater problem

26 भसावल BHUSAWAL-4

मारा वउकिल MSPGCL

250 1432 28-Feb-14 1802 3-Mar-14 Ash hopper problem

27 आरजीपीपीएल RGPPL-1B

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

28 आरजीपीपीएल RGPPL-2B

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

29 आरजीपीपीएल RGPPL 3A

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

30 आरजीपीपीएल RGPPL-1A

आरजीपीपीएल RGPPL

320 1500 18-Jan-14 अनपल ध Still out

अनपल ध Still out

SRV problem

31 आरजीपीपीएल RGPPL 3B

आरजीपीपीएल RGPPL

320 1230 8-Feb-14 Ready Ready Less requisition

32 िसगाजी SINGAJI - I

म वउकिल MPPGCL

600 422 12-Feb-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

33 सातपरा SATPURA-11

म वउकिल MPPGCL

250 1913 15-Feb-14 2149 19-Feb-14 Main stream temperature low

34 सातपरा SATPURA-11

म वउकिल MPPGCL

250 542 26-Feb-14 1642 2-Mar-14 BTL

35 एःसार महान Essar-Mahan-1

एःसार ESSAR

600 000 29-Jan-14 015 18-Feb-14 Less requisi tion

36 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

37 वदना Vandana-1

वदना Vandana

135 149 12-Jan-14 अनपल ध Still out

अनपल ध Still out

BTL

प म ऽय भार षण कि म बई णाली चालन-ISO-I

38 ससान Sasan-2

आरईएल REL

660 205 16-Feb-14 1650 23-Feb-14 Problem in ash handling

39 कावास Kawas 2A

एनट पीसीNTPC 164 2018 23-Dec-13 Ready Ready Less requisition

40 गाधार Gandhar-3

एनट पीसीNTPC 144 2037 28-Dec-13 Ready Ready Less requisition

41 गाधार Gandhar-I

एनट पीसीNTPC 144 2011 1-Jan-14 Ready Ready Less requisition

42 कावास Kawas 2B

एनट पीसीNTPC 164 900 13-Jan-14 421 5-Mar-14 Maintenance

43 गाधार Gandhar-2

एनट पीसीNTPC 219 023 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Less requisition

44 कावास Kawas-1A

एनट पीसीNTPC 164 2055 4-Feb-14 712 20-Feb-14 Less requisition

45 कावास

Kawas-1B एनट पीसीNTPC 164 1951 13-Feb-14 503 20-Feb-14 Less requisition

46 कावास Kawas 1A

एनट पीसीNTPC 164 1210 21-Feb-14 Ready Ready Less requisition

47 कावास Kawas 1B

एनट पीसीNTPC 164 012 22-Feb-14 1144 26-Feb-14 Less requisition

Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का फरवर 2014 का वःता रत यौरा

Details of planned unit outages during the month of Feb2014 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Time Date

1 डब यट पीएस WTPS-3

गरा विनिल GSECL

210 212 12-Feb-14 अनपल ध Still out

अनपल ध Still out

AOH

2 पल ParlI-3

मारा वउकिल MSPGCL

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

AOH

3 चिपर Chandrapur-5

मारा वउकिल MSPGCL

500 101 14-Jul-13 841 19-Feb-14 AOH

4 कोरबा प म KORBA-(W)-4

छरा वउकिल CSPGCL

210 2226 7-Feb-14 अनपल ध Still out

अनपल ध Still out

AOH

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

NIL2

NIL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING MARCH 2014 AND APRIL 2014

Capacity Outage as per Annual Maintenance Plan

3 Craiva]kMila CSPGCL

NIL

4

NIL

5 koMd``Iya xao~ Central Sector51 VSTPS 4 210 010414 070414 AOH52 VSTPS 2 210 080414 270414 AOH53 VSTPS 1 210 300414 190514 AOH54 CGPL 10 800 280314 130514 COH

maraiva]kMila MSPGCL

Date Time Date Time1 220 Bus-1 at Mapusa 20-Mar-14 1000 20-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R

2 765 Bus-1 at Sasan 20-Mar-14 800 20-Mar-14 1800 Daily Stringing of Main bus 1 for 765 kV Vichal Pooling - Sasan feeder

Reliance WR-II C

3 400 400kV Bus-2 at Satna 20-Mar-14 800 20-Mar-14 1800 Continuous Bay extension work related to JP - Nigrie Bays POWERGRID WR-II C

4 400 400kV ICT 1 at Satna 20-Mar-14 800 20-Mar-14 1000 Continuous Bay extension work related to JP - Nigrie Bays POWERGRID WR-II C

5 400 400kV Jabalpur Itarsi 1amp2 (Dc) 20-Mar-14 1000 20-Mar-14 1400 Continuous For commissioning of Line Impedance measurement kit

POWERGRID WR-II C

6 765 3X80 MVAr Bina Line Reactor at Indore 20-Mar-14 1000 21-Mar-14 1800 Continuous For installation of online dry out amp online DGA kit

POWERGRID WR-II C

7 400kV Damoh - Bhopal 1 20-Mar-14 800 31-Mar-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

8 400 Chorania Kasor 20-Mar-14 800 20-Mar-14 1800 Daily PMM work GETCO GETCO9 400 400 KV Main Bus-I at 400 KV Ss Khedamara 20-Mar-14 900 22-Mar-14 1700 Daily Erection of Pantograph 1 Set of IP amp CVT CSPTCL CSPTCL C

10 400 400 KV Khedamara-KSTPS NTPC ckt-II at 400 KV Ss Khedamara

20-Mar-14 900 22-Mar-14 1700 Daily Erection of Pantograph CVT amp 1 Set of IP PGCIL CSPTCL C

11 400 Korba -Vandana 20-Mar-14 900 21-Mar-14 1900 days continuouTesting of LBB auto re-close M-I amp M-II relays NTPC NTPC

12 400 Korba -Vandana 20-Mar-14 900 21-Mar-14 1900 days continuouTesting of LBB auto re-close M-I amp M-II relays NTPC NTPC

13 400DC Akola-Aurangabad (MSETCL) 1 and Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

21-Mar-14 600 23-Mar-14 1800 Conti Crossing work of 400kv MC Aurangabad - Aurangabad

MSETCLWRTS-I WRTS-I C

14400 amp 220 amp 132

400KV DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 400KV Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

21-Mar-14 600 21-Mar-14 1800 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad

MSETCLWRTS-I WRTS-I C

15 400 Bhadrawati-Parli 1amp 2 21-Mar-14 900 31-Mar-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I C

16 220 Bus-1 at Pune 21-Mar-14 800 21-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R

17 400 Solapur-Kolhapur 1 amp 2 21-Mar-14 700 21-Mar-14 1800 Daily Stringing work upcoming 765 kV Solapur-Pune line

Reliance WRTS-I C

18 220 220kV DC Raigarh- Raigarh (CSPTCL) Line (if outage not avail on 13140314)

21-Mar-14 900 22-Mar-14 1700 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (040-50)

CSPTCL WRTS-I C

19 220 Bus-2 (Section-A) at Mapusa 21-Mar-14 1000 21-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R20 400 Bus-1 at Itarsi 21-Mar-14 900 21-Mar-14 1800 Daily AMP POWERGRID WR-II R21 220 Bus-1 at Gwalior 21-Mar-14 1000 21-Mar-14 1800 Daily AMP POWERGRID WR-II R22 220 Jhanor - Haldarwa 1 21-Mar-14 900 21-Mar-14 1800 Daily AMP POWERGRID WR-II R23 400 Vapi Boisar 21-Mar-14 700 22-Mar-14 1900 Continuous For crossing of 220kV Kala Khadoli TL POWERGRID WR-II C

24 765 Sasan-Satna2 21-Mar-14 800 22-Mar-14 1800 Continuous For Power Line crossing of 765kV Vindhyanchal (pooling) - Satna 2 Line

POWERGRID WR-II R

25 400 400220 ICT NO1 at Kasor 21-Mar-14 800 21-Mar-14 1800 Daily PMM work GETCO GETCO26 400 400KV Sipat-Pathadi(LANCO) line 21-Mar-14 900 22-Mar-14 1900 Continous Annual Preventive maintenance job NTPC NTPC27 400 Pune-Parli 2 50MVAr Line Reactor at Pune 22-Mar-14 800 22-Mar-14 1800 Daily AMP Work Line in service wo reactor Reliance WRTS-I R

28 765 Bus-2 at Solapur 22-Mar-14 700 22-Mar-14 1800 Daily 765KV Pune bay commissioning amp SCADA works

WRTS-I WRTS-I C

29 400 Bus-1 at Bhatapara 22-Mar-14 800 23-Mar-14 1800 Conti Bus extension work for new 125MVAr Bus Reactor at Bhatapara

WRTS-I WRTS-I C

30 220 Bus-2 (Section-B) at Mapusa 22-Mar-14 1000 22-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R31 400 Vadavi Chorania 1 22-Mar-14 900 22-Mar-14 1800 Daily AMP Reliance WR-II R32 220 Jhanor - Haldarwa 2 22-Mar-14 900 22-Mar-14 1800 Daily AMP POWERGRID WR-II R33 220 Bus-2 at Gwalior 22-Mar-14 1000 22-Mar-14 1800 Daily AMP POWERGRID WR-II R

34 765 3X80 MVAr Bus Reactor at Indore 22-Mar-14 1000 23-Mar-14 1800 Continuous For installation of online dry out amp online DGA kit

POWERGRID WR-II C

35 220 Transfer Bus at Mapusa 23-Mar-14 1000 23-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R

36 400 Raigarh- Raipur 4 amp Raigarh-Kotra PS 2 23-Mar-14 800 30-Mar-14 1800 Conti Bay shifting work for up-coming 125MVAr Bus Reactor at Raigarh

WRTS-I WRTS-I C

37 765 Bus-1 at Indore (PG) 23-Mar-14 1000 23-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

Outages Proposal of Transmission elements during the month of MARCH‐2014Type

ANNEXURE‐32A

SN KV Line From To

Basis Reason System Agency

38 220 MC Waluj-Chitegaon amp Waluj-Jalna on same tower

24-Mar-14 600 24-Mar-14 1800 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad

MSETCL WRTS-I C

39 400 Raipur-Sipat 1 amp 2 24-Mar-14 800 2-Apr-14 1800 Conti Diversion of line for Lafarge Railway trackERS removal

WRTS-I Lafarge C

40 220 Bus-2 at Pune 24-Mar-14 800 24-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R41 765 Bus-1 at Bilaspur 24-Mar-14 800 24-Mar-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R

42 400 Bus-2 at Bhatapara 24-Mar-14 800 25-Mar-14 1800 Conti Bus extension work for new 125MVAr Bus Reactor at Bhatapara

WRTS-I WRTS-I C

43 400 Kolhapur-Mapusa 2 24-Mar-14 600 24-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

44 400 Vadavi Chorania 2 24-Mar-14 900 24-Mar-14 1800 Daily AMP Reliance WR-II R45 765 Bus-2 at Indore (PG) 24-Mar-14 1000 24-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

46 765 Bus-2 at Sasan 24-Mar-14 800 24-Mar-14 1800 Daily Strining of Main Bus 2 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

47 220 KAPP - Haldarwa 1 24-Mar-14 800 24-Mar-14 1800 Daily AMP POWERGRID WR-II R48 400 Bus - 2 at Pune 25-Mar-14 800 25-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R

49 765 Bus - 1 at Wardha 25-Mar-14 800 25-Mar-14 1800 Daily Jumper connection work of 765KV Raipur-Wardha line

WRTS-I WRTS-I R

50 400 Kolhapur-Mapusa 2 25-Mar-14 600 25-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

51 220 Mapusa-Ponda line 25-Mar-14 1000 25-Mar-14 1500 Daily AMP Work GOA WRTS-I R

52 765 Bus-1 at Sasan 25-Mar-14 800 25-Mar-14 1800 Daily Jumpering of Bus 1 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

53 220 KAPP - Haldarwa 2 25-Mar-14 800 25-Mar-14 1800 Daily AMP POWERGRID WR-II R54 400 Vadavi - Kansari2 25-Mar-14 900 25-Mar-14 1800 Daily AMP Reliance WR-II R55 400 Bus-1 at Indore (PG) 25-Mar-14 1000 26-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C56 765 Bus-1 at Satna 25-Mar-14 800 25-Mar-14 1800 Continuous Bay extension work POWERGRID WR-II C57 765 Sipat 765KV 400KV 1000MVA ICT-1 25-Mar-14 900 25-Mar-14 1900 Daily SPS Protection scheme modification NTPC NTPC

58 765 Bus - 2 at Wardha 26-Mar-14 800 26-Mar-14 1800 Daily Jumper connection work of 765KV Raipur-Wardha line

WRTS-I WRTS-I R

59 400 Bhadrawati-Parli 2 63MVAr Line Reactor at Parli

26-Mar-14 800 26-Mar-14 1800 Daily AMP Work of Recator at Parli line in service wo reactor

WRTS-I WRTS-I R

60 400 Kolhapur-Mapusa 1 26-Mar-14 600 26-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

61 220 Mapusa-Amona line 26-Mar-14 1000 26-Mar-14 1500 Daily AMP Work GOA WRTS-I R62 765 Bus-2 at Satna 26-Mar-14 800 26-Mar-14 1800 Continuous Bay extension work POWERGRID WR-II C

63 765 Bus-2 at Sasan 26-Mar-14 800 26-Mar-14 1800 Daily Jumpering of bus 2 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

64 400 401 KV Main Bus-I at 400 KV Ss Khedamara 26-Mar-14 900 27-Mar-14 1700 Daily Erection of IPS Tube CSPTCL CSPTCL C

65 400 401 KV Khedamara-KSTPS NTPC ckt-II at 400 KV Ss Khedamara

26-Mar-14 900 27-Mar-14 1700 Daily Erection of IPS Tube PGCIL CSPTCL C

66 400 ACBIL-BILASPUR-CKT NO -2 26-Mar-14 900 31-Mar-14 1800 CONT FOR lilo CONNECTIVITY OF 300MW MCCPL TPP

ACBIL ACBIL C

67 765 Bus-2 at Bilaspur 27-Mar-14 800 27-Mar-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R68 220 Mapusa-Thivim 1 27-Mar-14 1000 27-Mar-14 1500 Daily AMP Work GOA WRTS-I R69 220 KAPP - Vav 2 27-Mar-14 800 27-Mar-14 1800 Daily AMP POWERGRID WR-II R70 400 Bus-2 at Indore (PG) 27-Mar-14 1000 28-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

71 765 Bus-2 at Gwalior 27-Mar-14 1000 27-Mar-14 1800 Daily Bay extension work related to Gwalior Jaipur 1 Bays

POWERGRID WR-II C

72 400 VSTPS Tie- Line-1 ( Line from Stage-III to IV Switchyard)

27-Mar-14 900 27-Mar-14 1900 Daily Basis AMP and rectification of hot spots NTPC NTPC

73 765 Sipat 765KV 400KV 1000MVA ICT-2 27-Mar-14 900 27-Mar-14 1900 Daily SPS Protection scheme modification NTPC NTPC74 765 Bus-1 at Solapur 28-Mar-14 700 30-Mar-14 1800 Daily commissioning tests amp SCADA works WRTS-I WRTS-I C75 220 Mapusa-Thivim 2 28-Mar-14 1000 28-Mar-14 1500 Daily AMP Work GOA WRTS-I R

76 400 Koradi-Satpura 28-Mar-14 1000 28-Mar-14 1400 Daily Earthwire tighting work damaged during Crossing work

WRTS-I ADANI C

77 220 Bus-1 at Dehgam 28-Mar-14 900 28-Mar-14 1800 Daily AMP POWERGRID WR-II R78 220 Kawas - Haldarwa 2 28-Mar-14 800 28-Mar-14 1800 Daily AMP POWERGRID WR-II R79 400 Chorania Amreli 28-Mar-14 800 28-Mar-14 1800 Daily PMM work GETCO GETCO

80 400DC Akola-Aurangabad (MSETCL) 1 and Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

29-Mar-14 600 30-Mar-14 1800 Conti Charging amp shifting of Akola-Abad line on MC Abad-Abad line WRTS-I WRTS-I C

81 220 Bus-2 at Dehgam 29-Mar-14 900 29-Mar-14 1800 Daily AMP POWERGRID WR-II R82 400 Bus -1 at Mapusa 30-Mar-14 1000 30-Mar-14 1500 Daily AMP Work WRTS-I WRTS-I R

83 765 765kV Bus Reactor at Solapur 31-Mar-14 700 2-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

Date Time Date Time

1 400 Bhilai-Koradi 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

2 400 DC Korba-Birsingpur 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

3 400 Korba-Bhilai 2 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

4 220 Korba-Budhipadar 3 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

5 400 Akola-Wardha 1amp 2 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

6 400 Raipur-Raigarh 1 amp Raipur-KSK-DBPL-Raigarh

1-Apr-14 800 30-Apr-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

7 400 Bhadrawati-Parli 1amp 2 1-Apr-14 900 30-Apr-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I C

8 400 400220kv ICT-1 at Pune 1-Apr-14 800 1-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R9 400 Bus-1 at Bilaspur 1-Apr-14 800 1-Apr-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R

10 400 Solapur(PG) -Karad line 1-Apr-14 700 10-Apr-14 1800 Conti Erection of 80MVAr new reactor by shifitng line equipments at Solapur

MSETCL WRTS-I C

11 400 Bus-1 at Jabalpur (pooling) 01-Apr-14 1000 01-Apr-14 1800 Daily Busbar Stability test related to Jhabua Power Bays

POWERGRID WR-II C

12 400 Shujalpur - Nagda 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

13 400 Mundra - Bhachau 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

14 400 Bina - Shujalpur 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

15 220 Omkareshwar-Khandwa Ckt 1-Apr-14 900 1-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI16 400 Sipat 400KV Bay 10 and 11 1-Apr-14 900 3-Apr-14 1900 Continous 400KV CT 3nos replacement NTPC NTPC17 400 Padgha-Nagothane ckt I 1-Apr-14 900 1-Apr-14 1700 Daily QMwork MSETCL MSETCL

18 400 Bus-2 at Jabalpur (pooling) 02-Apr-14 1000 02-Apr-14 1800 Daily Busbar Stability test related to Jhabua Power Bays

POWERGRID WR-II C

19 400 Vindhyanchal - Mahan - Korba (Section of both the line on same Dc tower)

02-Apr-14 800 03-Apr-14 1700 Continuous For Power Line crossing of 765kV Vindhyanchal (pooling) - Satna 1 Line

POWERGRID WR-II C

20 400 400kV ICT 4 at Indore MPPTCL 02-Apr-14 1000 04-Apr-14 1800 ContinuousFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

MPPTCL WR-II C

21 400 400kV Bus Coupler bay at Indore MPPTCL 02-Apr-14 1000 04-Apr-14 1800 ContinuousFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

MPPTCL WR-II C

22 400 400kV Itarsi - Indore MPPTCL 1 Line 02-Apr-14 1000 02-Apr-14 1500 DailyFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

POWERGRID WR-II C

23 400400 KV LILO Line of 400 KV SC Korba West-Khedamara to 400 KV Ss Raita (Between Loc69 amp70 near Raita Ss)

2-Apr-14 800 3-Apr-14 1700 DailyMaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

CSPTCL CSPTCL C

24 400 Chandrapur-Khaparkheda 2-Apr-14 900 2-Apr-14 1700 Daily QMwork MSETCL MSETCL

25 400 Lamboti-Solapur PG 2-Apr-14 900 2-Apr-14 1700 Daily QMwork MSETCL MSETCL

26 400 Bus-1 at Durg PS Ss 3-Apr-14 900 3-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R27 400 Bus-1 at Jabalpur 03-Apr-14 900 03-Apr-14 1800 Daily Retrofitting of Isolator arms(689A) POWERGRID WR-II R28 400 315MVA ICT2 at Khandwa 03-Apr-14 1000 03-Apr-14 1600 Daily AMP POWERGRID WR-II R29 400 Mundra - Hadala 3-Apr-14 800 3-Apr-14 1800 Daily PMM GETCO GETCO30 400 400KV Seoni -Bhilai Ckt 3-Apr-14 900 3-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I31 400 Lonikand-Chakan 3-Apr-14 900 3-Apr-14 1700 Daily QMwork MSETCL MSETCL32 400 Bus-2 at Durg PS Ss 4-Apr-14 900 4-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R33 400 Bus-1 at Jabalpur 04-Apr-14 900 04-Apr-14 1800 Daily Retrofitting of Isolator arms(2089A) POWERGRID WR-II R

34 400 400kV Itarsi - Indore MPPTCL 1 Line 04-Apr-14 1300 04-Apr-14 1800 DailyFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

POWERGRID WR-II C

35 400 Varsana - Hadala 4-Apr-14 800 4-Apr-14 1800 Daily PMM GETCO GETCO

Agency Type

ANNEXURE‐32BOutages Proposal of Transmission elements during the month of APRIL ‐2014

SN KV Line From To

Basis Reason System

36 220 Vapi - Vapi (PG) 4-Apr-14 800 4-Apr-14 1800 Daily PMM work PGCIL GETCO37 220 Haldarva - Jhanor - 1 (NTPC) 4-Apr-14 800 4-Apr-14 1800 Daily PMM amp Tan Delta testing PGCIL GETCO38 400 400KV Birsinghpur -Katni Ckt - I 4-Apr-14 800 4-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I39 220 Badod - Kota Ckt 4-Apr-14 900 4-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI40 220 Malanpur-Auriya Ckt 4-Apr-14 900 5-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI

41 400 Bhusawal-Akola 4-Apr-14 900 4-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

42 400 Deepnagar-Aurangabad II 4-Apr-14 900 4-Apr-14 1700 Daily QMwork MSETCL MSETCL43 400 Kalwa-Padgha Ckt I 4-Apr-14 900 4-Apr-14 1700 Daily QMwork MSETCL MSETCL44 765 Bus Reactor at Seoni 5-Apr-14 900 5-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R

45 400 DC Korba-KhedamaraLilo at Marwa lilo section yet to be charge 5-Apr-14 800 6-Apr-14 1800 Daily

Crossing work of upcoming 765 KV DC Raigarh-Champa (AP-48A0- AP 490)DC Korba-Khedamara is in service

CSPTCL WRTS-1 C

46 400 Bus-1 at Jabalpur 05-Apr-14 900 05-Apr-14 1800 Daily Retrofitting of Isolator arms(1689A) POWERGRID WR-II R

47 400 Mundara -Limbdi 1 05-Apr-14 800 07-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

48 220 Badod - Modak Ckt 5-Apr-14 900 5-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI49 400 Dhule-Babhleswar ckt 1 5-Apr-14 900 5-Apr-14 1700 Daily QMwork MSETCL MSETCL50 400 400220kv ICT-1 at Seoni 7-Apr-14 900 7-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R51 400 Bus-2 at Jabalpur 07-Apr-14 900 07-Apr-14 1800 Daily Retrofitting of Isolator arms(1789B) POWERGRID WR-II R52 400 315MVA ICT1 at Khandwa 07-Apr-14 1000 07-Apr-14 1600 Daily AMP POWERGRID WR-II R53 220 Chhegoan-Khandwa Ckt -II 7-Apr-14 900 7-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI54 400 Korba- Bhilai1 7-Apr-14 900 8-Apr-14 1900 days continuou Bay Maint and testing NTPC NTPC55 400 Vindhyachal - Mahan line 7-Apr-14 900 8-Apr-14 1900 Continuous Replacement of R Y and B Phase CT NTPC NTPC56 400 Bhusawal-Aurangabad 7-Apr-14 900 7-Apr-14 1700 Daily QMwork MSETCL MSETCL57 400 New Koyna-Karad ckt 2 7-Apr-14 830 7-Apr-14 1730 Daily QMwork MSETCL MSETCL

58 400 Mundara -Limbdi 2 08-Apr-14 800 10-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

59 400 Chorania Hadala 8-Apr-14 800 8-Apr-14 1800 Daily PMM GETCO GETCO60 400 Sipat 400KV Bay 23 8-Apr-14 900 9-Apr-14 1900 Continous One 400KV CT replacement NTPC NTPC61 400 Koradi-Khaparkheda I 8-Apr-14 900 8-Apr-14 1700 Daily QMwork MSETCL MSETCL62 765 765400KV ICT-1 at Kotra PS 9-Apr-14 900 9-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R63 400 Bus-2 at Jabalpur 09-Apr-14 900 09-Apr-14 1800 Daily Retrofitting of Isolator arms(489B) POWERGRID WR-II R64 400 315MVA ICT1 at Damoh 09-Apr-14 1000 09-Apr-14 1600 Daily AMP POWERGRID WR-II R65 400 Amreli-Jetpur 2 9-Apr-14 800 9-Apr-14 1800 Daily PMM GETCO GETCO66 400 SSP- Rajgarh - 1 9-Apr-14 800 9-Apr-14 1800 Daily PMM GETCOMPTCL GETCO67 220 TAPS1 amp2-TAPS 3amp4 tie line 9-Apr-14 800 9-Apr-14 1600 one day Annual maintenance Works MSETCL NPCIL68 220 TAPS TIE LIE-I 9-Apr-14 800 10-Apr-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL69 400 400 KV Indore - Nagda Ckt 9-Apr-14 900 9-Apr-14 1600 daily For maintenance work MPPTCL EHT- Mamp I70 400 400 KV Sarni - Isp Ckt 9-Apr-14 900 9-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I71 220 Mehgaon-Auriya Ckt 9-Apr-14 900 10-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI72 400 315 MVA 400220Kv X-mer III At Bhopal SS 9-Apr-14 900 10-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI73 400 Padgha-Tarapur CktII 9-Apr-14 900 9-Apr-14 1700 Daily QMwork MSETCL MSETCL74 765 Bus Reactor at Kotra PS 10-Apr-14 900 10-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R

75 765 amp 400

765400 kV ICT-I at Solapur amp 400KV Solapur-Parli 2 10-Apr-14 700 12-Apr-14 1800 Daily 765400 kV spare ICT unit Aux bus works CSD

commissioning amp Fire fighting works at Solapur WRTS-IReliance WRTS-I C

76 400 315MVA ICT2 at Damoh 10-Apr-14 1000 10-Apr-14 1600 Daily AMP POWERGRID WR-II R

77 765 Sasan-Satna 1 10-Apr-14 800 11-Apr-14 1800 Daily For AMP of line amp Line terminal Equipments Post commissioning checks

POWERGRID WR-II C

78 400 APL-Varsana 10-Apr-14 800 10-Apr-14 1800 Daily PMM GETCO GETCO79 400 400 KV Isp - Nagda Ckt 10-Apr-14 900 10-Apr-14 1600 daily For maintenance work MPPTCL EHT- Mamp I80 400 400 KV Bhopal-Itarsi(PGCIL) Ckt-I 10-Apr-14 900 11-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I81 220 Chhegoan-Khandwa Ckt -I 10-Apr-14 900 10-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI82 400 315 MVA 400220Kv X-mer At Katni SS 10-Apr-14 800 11-Apr-14 1800 continue For maintenance work MPPTCL EHT -MampI83 400 Korba- Bhilai2 10-Apr-14 900 11-Apr-14 1900 days continuou Bay Maint and testing NTPC NTPC84 400 Sipat 400KV Bay 14 10-Apr-14 900 12-Apr-14 1900 Continous 400KV CT 3nos replacement NTPC NTPC

85 400 Chandrapur II-Parli II 10-Apr-14 900 10-Apr-14 1700 Daily Providing of Arching horncorona rings Bird guards quarter pinsNut bolts

MSETCL MSETCL

86 400 Karad-Lonikand 10-Apr-14 900 10-Apr-14 1700 Daily QMwork MSETCL MSETCL87 400 Raipur-Durg PS 1 11-Apr-14 900 11-Apr-14 1700 Daily AMP Work WRTS-I WRTS-I R

88 400 Mundara -Jetpur 1 11-Apr-14 800 15-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

89 400 Varsana-Hadala Line 11-Apr-14 800 11-Apr-14 1800 Daily PMM GETCO GETCO90 220 Haldarwa Kawas-2 11-Apr-14 800 11-Apr-14 1800 Daily PMM work PGCIL GETCO91 400 400 KV Nagda-Rajgarh(PGCIL) Ckt-I 11-Apr-14 900 11-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

92 400 315 MVA 400220Kv X-mer III ampTie bay At Bhopal SS

11-Apr-14 900 11-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI

93 400 Akola-Nandgaonpeth 11-Apr-14 900 11-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

94 400 Akola-Wardha I 11-Apr-14 900 11-Apr-14 1700 Daily QMwork MSETCL MSETCL95 400 Kalwa-Lonikand 11-Apr-14 900 11-Apr-14 1700 Daily QMwork MSETCL MSETCL96 400 400220kv ICT-1 at Mapusa 12-Apr-14 900 12-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R97 400 Raipur-Durg PS 2 12-Apr-14 900 12-Apr-14 1700 Daily AMP Work WRTS-I WRTS-I R98 765 Sasan-Satna2 with line reactor 12-Apr-14 1000 12-Apr-14 1800 Daily AMP POWERGRID WR-II R99 400 400 KV Nagda-Rajgarh(PGCIL) Ckt-II 12-Apr-14 900 12-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I100 400 Deepnagar-Aurangabad I 12-Apr-14 900 12-Apr-14 1700 Daily QMwork MSETCL MSETCL101 400 Amreli-Jetpur 2 14-Apr-14 800 14-Apr-14 1800 Daily PMM GETCO GETCO102 400 Kasor - Gpec 14-Apr-14 800 14-Apr-14 1800 Daily PMM GETCO GETCO103 220 GWL(PGCIL)-Malanpur Ckt-I 14-Apr-14 900 15-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI104 400 DC Korba-Raipur 3 amp 4 15-Apr-14 800 16-Apr-14 1800 Conti Bus splitting work at Raipur WRTS-1 WRTS-1 C

105 400 Korba-Bhatapara 15-Apr-14 800 24-Apr-14 1800 Conti For raising of ground clearence for Railway track of Lafarge

WRTS-I Lafarge C

106 765 765400 kV ICT-II at Solapur 15-Apr-14 700 17-Apr-14 1800 Daily CSD commissioning amp Fire fighting works WRTS-I WRTS-I C107 400 Vindhyachal-Satna1 15-Apr-14 1000 15-Apr-14 1800 Daily AMP POWERGRID WR-II R108 400 Ssnl-Dhule-1 15-Apr-14 800 15-Apr-14 1800 Daily PMM GETCOMSETCL GETCO109 220 TAPS-Vapi 15-Apr-14 800 17-Apr-14 1900 Daily Annual maintenance Works GETCO NPCIL110 220 Pithampur-Rajgarh(PGCIL) Ckt - I 15-Apr-14 900 15-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI111 400 Sipat 400KV Bay-18 ( Ranchi-1 Main) 15-Apr-14 900 15-Apr-14 1900 Daily Annual Preventive maintenance job NTPC NTPC112 400 Karad-Kolhapur Ckt I 15-Apr-14 900 15-Apr-14 1700 Daily QMwork MSETCL MSETCL

113 400 DC Raipur-Bhadrawati 2 amp 3 16-Apr-14 800 17-Apr-14 1800 Conti Bus splitting work at Raipur WRTS-1 WRTS-1 C

114 400 Vindhyachal-Satna2 16-Apr-14 1000 16-Apr-14 1800 Daily AMP POWERGRID WR-II R

115 400 Mundara -Jetpur 2 16-Apr-14 800 20-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

116 400 Vadavi - Dehgam (Pg) - 1 16-Apr-14 800 16-Apr-14 1800 Daily PMM amp Tandelta testing GETCO GETCO117 400 Chorania Asoj-1 16-Apr-14 800 16-Apr-14 1800 Daily PMM GETCO GETCO118 220 Bhilad - TAPS 16-Apr-14 800 16-Apr-14 1800 Daily PMM work PGCIL GETCO119 220 Bhat - Pirana (PG) - 1 16-Apr-14 800 16-Apr-14 1800 Daily PMM work GETCO GETCO120 400 400 KV Bhopal-Itarsi(PGCIL) Ckt-II 16-Apr-14 900 17-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I121 220 Damoh(PGCIL) - Tikamgarh Ckt 16-Apr-14 900 16-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI

122 400 400KV SC Korba-Raipur-II (Between Korba - Bhatapara end)(Between Loc2980 amp 2990) 16-Apr-14 800 17-Apr-14 1700 Daily

MaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

PGCIL CSPTCL C

123 400 Sipat 400KV Bay-19 ( Ranchi-2 Main) 16-Apr-14 900 16-Apr-14 1900 Daily Annual Preventive maintenance job NTPC NTPC124 400 Padgha-Babhleswar ckt I 16-Apr-14 900 16-Apr-14 1700 Daily QMwork MSETCL MSETCL125 400 Vadavi - Dehgam (Pg) - 2 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCO GETCO126 400 Ssnl-Dhule-2 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCOMSETCL GETCO127 400 Vadinar-Hadala- 1 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCO GETCO128 220 Bhat - Pirana (PG) - 2 17-Apr-14 800 17-Apr-14 1800 Daily PMM work GETCO GETCO129 400 400KV Birsinghpur -Katni Ckt - II 17-Apr-14 800 17-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I130 220 Pithampur-Rajgarh(PGCIL) Ckt - II 17-Apr-14 900 17-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI131 400 Jejuri-Lonikand 17-Apr-14 900 17-Apr-14 1700 Daily QMwork MSETCL MSETCL132 400 Deepnagar-Khadka II 17-Apr-14 900 17-Apr-14 1700 Daily QMwork MSETCL MSETCL133 400 Chorania Kasor 18-Apr-14 800 18-Apr-14 1800 Daily PMM GETCO GETCO134 220 GWL(PGCIL)-Malanpur Ckt-II 18-Apr-14 900 19-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI135 400 Akola-Wardha II 18-Apr-14 900 18-Apr-14 1700 Daily QMwork MSETCL MSETCL

136 400 Koradi-Nandgaonpeth 18-Apr-14 800 18-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

137 765 765kV Pune line Reactor at Solapur 19-Apr-14 700 20-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

138 400 400KV Bina -Power(JP) Ckt 19-Apr-14 900 19-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I139 400 Dhule-SSarovar I 19-Apr-14 900 19-Apr-14 1700 Daily QMwork MSETCL MSETCL

140 400 Koradi-Khaparkheda II 19-Apr-14 900 19-Apr-14 1700 Daily QMwork MSETCL MSETCL141 220 KAPP - VAPI - 1 20-Apr-14 800 20-Apr-14 1800 Daily Isolator replacement under ASIDE scheme PGCIL GETCO

142 400 DC Bhilai-Bhadrawati amp Raipur-Bhadrawati 1 21-Apr-14 800 28-Apr-14 1800 Conti Diversion of line for Vidarbha Industrial Devlopment Corporation(VIDC)

WRTS-I VIDC C

143 400 Bhachau- Ranchhodpura 1amp2 21-Apr-14 800 27-Apr-14 1800 Continuous Tower shifting work at canal crossingInsulator replacement work

POWERGRID WR-II C

144 400 Hadala-Amreli 21-Apr-14 800 21-Apr-14 1800 Daily PMM GETCO GETCO145 400 Vadinar-Hadala- 2 21-Apr-14 800 21-Apr-14 1800 Daily PMM GETCO GETCO146 220 TAPS-Boisar 21-Apr-14 800 23-Apr-14 1900 Daily Annual maintenance Works MSETCL NPCIL147 220 Bina(PGCIL)-220 KV Bina Ckt 21-Apr-14 900 21-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI148 400 CGPL Bhachau -1 21-Apr-14 8AM 21-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL149 220 Kawas-Ichhapore 1+Bus 1 21-Apr-14 900 21-Apr-14 1800 daily RTV Coating NTPC NTPC150 400 Karad-Kolhapur Ckt II 21-Apr-14 900 21-Apr-14 1700 Daily QMwork MSETCL MSETCL151 400 New Koyna-Koyna Stg-4-1 21-Apr-14 830 21-Apr-14 1730 Daily QMwork MSETCL MSETCL152 400 Ssp - Rajgarh - 2 22-Apr-14 800 22-Apr-14 1800 Daily PMM GETCOMPTCL GETCO153 400 Vadavi-Bhachau 2 22-Apr-14 800 22-Apr-14 1800 Daily PMM amp Tan Delta testing PGCIL GETCO154 220 Bhilad - Vapi (PG) - 1 22-Apr-14 800 22-Apr-14 1800 Daily PMM work PGCIL GETCO155 400 400 KV Rajgarh(PGCIL)-Ssp Ckt-I 22-Apr-14 900 22-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I156 400 400KV Seoni -Sarni Ckt 22-Apr-14 900 23-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I157 220 Khandwa(PGCIL)-Nepanagar Ckt 22-Apr-14 900 22-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI158 220 Kawas-Ichhapore 2+Bus 1 22-Apr-14 900 22-Apr-14 1800 daily For maintenance work NTPC NTPC159 400 Karad-Jaigad II 22-Apr-14 900 22-Apr-14 1700 Daily Annual maintenance work MSETCL MSETCL160 220 Bhilad - Vapi (PG) - 2 23-Apr-14 800 23-Apr-14 1800 Daily PMM work PGCIL GETCO161 400 400KV Bina -Bhopal Ckt -I 23-Apr-14 900 24-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I162 400 400 KV Rajgarh(PGCIL)-Ssp Ckt-II 23-Apr-14 900 23-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I163 220 Bina(PGCIL)-Shivpuri Ckt 23-Apr-14 900 24-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI164 220 Damoh(PGCIL) - Damoh I C - I 23-Apr-14 900 23-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI

165 400 400 KV DCDS Sipat- Raipur (IampII) 23-Apr-14 800 24-Apr-14 1700 DailyMaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

PGCIL CSPTCL C

166 400 CGPL Bhachau - 2 23-Apr-14 8AM 23-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL

167 220 Kawas-Navsari 2 +Bus 1 23-Apr-14 900 23-Apr-14 1800 daily Insulator replcement and routine maintenance NTPC NTPC168 400 Padgha-Babhleswar ckt II 23-Apr-14 900 23-Apr-14 1700 Daily QMwork MSETCL MSETCL169 400 Kasor - SSP 24-Apr-14 800 24-Apr-14 1800 Daily PMM work GETCO GETCO170 220 Bhilad - Vapi (PG) - 3 24-Apr-14 800 24-Apr-14 1800 Daily PMM work PGCIL GETCO171 220 TAPS-Bhilad 24-Apr-14 800 26-Apr-14 1900 Daily Annual maintenance Works GETCO NPCIL172 220 Damoh(PGCIL) - Damoh I C - II 24-Apr-14 900 24-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI173 400 CGPL Jetpur- 1 24-Apr-14 8AM 24-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL

174 220 Kawas-Ichhapore 1 +Bus 2 24-Apr-14 900 24-Apr-14 1400 daily Insulator replcement and routine maintenance NTPC NTPC

175 220 Kawas-Ichhapore 2 +Bus 2 24-Apr-14 1400 24-Apr-14 1900 daily Insulator replcement and routine maintenance NTPC NTPC176 400 Padgha-Talegaon 24-Apr-14 900 24-Apr-14 1700 Daily QMwork MSETCL MSETCL

177 765 765kV Raichur 1 line Reactor at Solapur 25-Apr-14 700 27-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

178 400 400KV Bina -Bhopal Ckt -II 25-Apr-14 900 26-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I179 400 CGPL Jetpur- 2 25-Apr-14 8AM 25-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL180 400 Vindhyachal -Satna-4 Line Shunt Reactor 25-Apr-14 900 25-Apr-14 1900 Daily Basis AMP NTPC NTPC

181 400 Bhusawal-Koradi 25-Apr-14 900 25-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

182 400 Deepnagar-Khadka I 25-Apr-14 900 25-Apr-14 1700 Daily QMwork MSETCL MSETCL183 400 Soja -Kansari 26-Apr-14 800 26-Apr-14 1800 Daily PMM GETCO GETCO184 400 Raipur-Wardha 1 27-Apr-14 800 28-Apr-14 1800 Daily Balance construction work WRTS-1 WRTS-1 C185 220 KAPP - VAPI - 2 27-Apr-14 800 27-Apr-14 1800 Daily Isolator replacement under ASIDE scheme PGCIL GETCO186 400 Soja -Kansari 28-Apr-14 800 28-Apr-14 1800 Daily PMM GETCO GETCO187 220 TAPS-Boisar II 28-Apr-14 800 30-Apr-14 1900 Daily Annual maintenance Works MSETCL NPCIL188 400 400KV Damoh - Katni Ckt 28-Apr-14 900 28-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I189 400 400 KV Damoh(PGCIL)-Katni Ckt 28-Apr-14 900 28-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I190 400 New Koyna-Karad ckt 1 28-Apr-14 830 28-Apr-14 1730 Daily QMwork MSETCL MSETCL

191 400 DC Raigarh-DB Power (Tudri) - KSK 29-Apr-14 800 30-Apr-14 1800 Conti Crossing work of 765kV SC Raigrah-Champa (90 - 100)

WRTS-I WRTS-I C

192 400 Raipur-Wardha 2 29-Apr-14 800 30-Apr-14 1800 Daily Balance construction work WRTS-1 WRTS-1 C193 220 Navsari - Nasik - 1 29-Apr-14 800 29-Apr-14 1800 Daily PMM work GETCOMSETCL GETCO194 220 Seoni(PGCIL)-Chhindwara Ckt-I 29-Apr-14 900 29-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI195 220 Kawas-Vav 1+ bus 2 29-Apr-14 900 29-Apr-14 1800 daily For maintenance work NTPC NTPC196 400 Chorania Asoj-1 30-Apr-14 800 30-Apr-14 1900 Daily PMM GETCO GETCO197 220 Navsari - Nasik - 2 30-Apr-14 800 30-Apr-14 1800 Daily PMM work GETCOMSETCL GETCO198 220 Vapi - TAPS 30-Apr-14 800 30-Apr-14 1800 Daily PMM work PGCIL GETCO199 220 Seoni(PGCIL)-Chhindwara Ckt-II 30-Apr-14 900 30-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI200 220 Kawas-Vav 1+ bus 2 30-Apr-14 000 30-Apr-14 000 daily For maintenance work NTPC NTPC

Annexure-32-C1

List of Emergency Outages availed in Feb 2014

SlNo

Element kV Agency From

Date To Date

Remarks

1 SATNA‐BINA‐II 765 WRTS‐2 4‐Feb‐14

5‐Feb‐14

Hot spot attending

2 SUJALPUR‐NAGDA LR NAGDA

400 WRTS‐2 6‐Feb‐14

19‐Feb‐14

Oil leackage

3 SOLAPUR‐PARLI‐II

400 WRTS‐2 6‐Feb‐14

6‐Feb‐14

Hotspot attend at solapur

4 JABALPUR‐ITARSI‐IV LR AT ITARSI‐LR

400 WRTS‐2 7‐Feb‐14

17‐Feb‐14

Oil leackage

5 APL‐HADALA‐SC 400 GEB 7‐Feb‐14

7‐Feb‐14

Hot spot

6 SOLAPUR‐PARLI(PG)‐1

400 WRTM(REL)

9‐Feb‐14

9‐Feb‐14

Hot spot

7 BOISAR‐BOISAR(PG)‐II

220 MSETCL 9‐Feb‐14

9‐Feb‐14

Hotspots

8 NEW KOYNA‐KARAD ‐ I

400 MSETCL 10‐Feb‐14

11‐Feb‐14

Dc‐earth leakage

9 LONIKHAND ‐ KARAD

400 MSETCL 10‐Feb‐14

11‐Feb‐14

Hotspot

10 NAGDHA ICT ‐ III

400220

MPPTCL 10‐Feb‐14

10‐Feb‐14

Hotspot

11 AKOLA ‐ ABAD ‐I AKOLA

400 WRTS‐1 11‐Feb‐14

12‐Feb‐14

Oil leackage

12 AKOLA ‐ AURANGABAD ‐ I

400 WRTS‐1 11‐Feb‐14

11‐Feb‐14

Oil leackage ion lr

13 BINA‐GWALIOR 765 WRTS‐1 14‐Feb‐ 14‐Feb‐ Attend oil leakage on lr

SlNo

Element kV Agency From

Date To Date

Remarks

II 14 14

14 AKOLA‐TIRORA‐I 765 MSETCL 22‐Feb‐14

23‐Feb‐14

Sparking in LR at Tirora SYED AT TIRORA END

15 KHAEGAR‐ICT‐I 400220

MSETCL 22‐Feb‐14

22‐Feb‐14

Hot spot

16 KHANDWA‐NEPANAGR‐SC

220 MPPTCL 23‐Feb‐14

23‐Feb‐14

Hot spot

17 GWALIAR ‐SATNA ‐ I

765 WRTS‐2 24‐Feb‐14

1‐Mar‐14

Attend hot spot

18 KORBA BUS‐III 400 NTPC 25‐Feb‐14

25‐Feb‐14

Hots pot attend

19 BUS‐1 AT GWALIOR

765 WRTS‐2 13‐Feb‐14

13‐Feb‐14

Checking of blocked BB main‐1 relay

20 RAIPUR‐BWATI‐2

400 WRTS‐1 17‐Feb‐14

17‐Feb‐14

Urgent Removal of LR at Raipur end for DGA violation

21 TAPS‐PADGHE 400 TAPS‐3amp4 19‐Feb‐14

23‐Feb‐14

To attend SF‐6 leakage

22 SATNA‐GWALIOR‐1

765 WRTS‐2 24‐Feb‐14

26‐Feb‐14

To attend hot spots

23 VCHAL‐JABALPUR‐IV

400 WRTS‐2 27‐Feb‐14

27‐Feb‐14

To increase OPGW‐Top conductor clearance to avoid tripping

24 APL‐SAMI‐2 400 APL 26‐Feb‐14

26‐Feb‐14

To attend hot sopt

25 SHOLAPUR BUS‐1

765 WRTS‐1 27‐Feb‐14

27‐Feb‐14

To attend hot sopt

26 BOISAR BUS‐2 220 WRTS‐1 28‐Feb‐14

28‐Feb‐14

To attend hot sopt

Sl No KV element From To Basis Work System Agency Remarks

1220 Vapi (GETCO)‐Bhilad 1‐Feb‐14 800 2‐Feb‐14 1800 Daily Line crossing work of 400KV LILO line for

Magarwada SSGETCO POWERGRID N

2 220 Omkareshwar-Khandwa Ckt

3-Feb-14 900 3-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

3 400 New Koyna-Koyna Stg-4-1

3-Feb-14 830 3-Feb-14 1730 Daily QMwork MSETCL MSETCL N

4220 Vapi ‐ Magarwada

Ckt13‐Feb‐14 900 3‐Feb‐14 1400 Daily AMP of line amp equipment WRTS‐II POWERGRID DD may have to do load

shedding as per Reliability Suggestion

N

5 220 DC Raigarh- Raigarh 1amp 2

4-Feb-14 800 5-Feb-14 1800 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (040-50)

CSPTCL WRTS-I N

6 220 Itarsi(PGCIL)-Hoshangabad Ckt

4-Feb-14 900 4-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N

7 400 Mundra -Limbdi-2 4-Feb-14 800 4-Feb-14 1800 Daily Suspension Insulator replcement and routine maintenance

PGCIL CGPL N

8 400 400 kV DC Satna - Bina 1amp2

4-Feb-14 800 5-Feb-14 1800 Continous Crossing of Jabalpur-Bina 765 kv SC Line PGCIL JTCL N

9220 Vapi ‐ Magarwada

Ckt24‐Feb‐14 0900 4‐Feb‐14 1400 Daily AMP of line amp equipment WRTS‐II POWERGRID N

10 765 Seoni-Bina line with LR 4‐Feb‐14 800 4-Feb-14 1800 Daily AMP Work WRTS-2 WRTS-1 N

11 400 Bus I Bina 5‐Feb‐14 800 5‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

12220 Kawas ‐ Navsari (PG)

25‐Feb‐14 800 5‐Feb‐14 1800 Daily Replacement of ST insulators by Double Tension

insulator in Railway crossing spansWRTS‐II POWERGRID N

13400 Indoer (PG) ‐Indore

(MP) DC5‐Feb‐14 800 6‐Feb‐14 1800 Continou

sStringing of 765kV Indore ‐ Vadodara line WRTS‐II POWERGRID N

14 400 APL - Hadala 6-Feb-14 800 6-Feb-14 1800 Daily PMM GETCO GETCO N N

15 220 Seoni(PGCIL ) - Chhindwara CKT I

6-Feb-14 900 6-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N N

16 400 Jejuri-Koyna stg IV 6-Feb-14 900 6-Feb-14 1700 Daily QMwork MSETCL MSETCL N17 400 Akola-Nandgaonpeth 6-Feb-14 900 6-Feb-14 1700 Daily Quaterly Maintainance Work MSETCL MSETCL N18 400KV Korba-Bhatapara 6-Feb-14 900 7-Feb-14 1900 Cont Testing of LBB auto re-close M-I amp M-II relays NTPC NTPC N19 220 Haldarva - Jhanor - 2

(NTPC)6-Feb-14 900 6-Feb-14 1800 Daily PMM work GETCO N

20220 Navsar (PG) ‐Navsari

(GETCO) 16‐Feb‐14 800 6‐Feb‐14 1800 Daily Replacement of ST insulators by Double Tension

insulator in Railway crossing spansWRTS‐II POWERGRID

N

21 400 Bus‐II Bina 6‐Feb‐14 800 6‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

22400 Seoni‐Khandwa1 6‐Feb‐14 1000 6‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Khandwa end by MS ABB

WRTS‐II POWERGRID Rescheduled to 6th March N

23 400 Rajgarh-Ssp Ckt-II 7-Feb-14 900 7-Feb-14 1600 daily For maintenance work MPPTCL EHT- Mamp I N24 220 Chhegoan-Khandwa

Ckt -II7-Feb-14 900 7-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

25 220 Wardha (PG)-Wardha 7-Feb-14 800 7-Feb-14 1800 Daily AMP Work MSETCL WRTS-I N26 400 Chorania - Vadavi-2 7-Feb-14 800 7-Feb-14 1800 Daily PMM amp Tan Delta testing WRTGPL GETCO N27 400 Jabalpur‐Itarsi1 7‐Feb‐14 900 7‐Feb‐14 1400 Daily AMP OF TERMINAL EQUIPMENT WRTS‐II POWERGRID N

28220 Vapi(PG)‐ Bhilad ckt

2 amp 3 7‐Feb‐14 800 8‐Feb‐14 1800 Daily Line crossing work of 400KV LILO of Navsari‐Boisar

at MagarwadaGETCO POWERGRID N

29 220 Mapusa-Thivim 1 8-Feb-14 800 8-Feb-14 1800 Daily AMP Work GOA WRTS-I N

30400 Seoni‐Khandwa2 9‐Feb‐14 1000 9‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Khandwa end by MS ABB

WRTS‐II POWERGRID Rescheduled to 7th March N

31 220 Chhegoan-Khandwa Ckt -I

10-Feb-14 900 10-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

Annexure-32-C2OCC approved outage not availed in Feb‐2014

32132 132 kV Dhule

Dondaicha line10-Feb-14 800 11-Feb-14 1800 Cont Crossing of Dhule-Vadodara 765 kv SC Line MSETCL BDTCL subjected to sldc

clearance N

33 400132 KV

Vindhyachal ICT-1 10-Feb-14 900 14-Feb-14 1900 Cont ICT Overhauling NTPC NTPC N

34400 KV Vindhyachal - Jabalpur-

3 Line Shunt Reactor10-Feb-14 900 14-Feb-14 1900 Cont Reactor Overhauling NTPC NTPC

N

35 400 KSK-DB Power 10-Feb-14 800 13-Feb-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end WRTS-IDBKSK

KSK N36 220 Ipore-Kawas-1 10-Feb-14 800 10-Feb-14 1800 Daily PMM work GETCO N

37400 Vindhyachal‐Mahan 10‐Feb‐14 800 11‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐I WRTS‐II N

38400 Mahan‐Korba 10‐Feb‐14 800 11‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐I WRTS‐II N

39765 Jabalpur ‐ Bina 1 10‐Feb‐14 1000 10‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Jabalur end by MS ABB

WRTS‐II POWERGRID Differed by siteN

40 400 SSP - Rajgarh - 1 10-Feb-14 800 11-Feb-14 1800 Daily Basis

PMM Work GETCO N

41 400 DC Tundri (DB Power) -ksk-Raigarh

10-Feb-14 800 11-Feb-14 1800 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (092-100)

DB Power WRTS-I N42 400 Jetpur - Amreli - 1 11-Feb-14 800 12-Feb-14 1800 Daily PMM GETCO GETCO N43 400 Hadala - Vadinar-2 11-Feb-14 800 11-Feb-14 1800 Daily PMM GETCO GETCO N44 400 Nagda-Rajgarh Ckt-I 11-Feb-14 900 11-Feb-14 1800 daily For maintenance work MPPTCL EHT- Mamp I N45 220 Mehgaon-Auriya Ckt 11-Feb-14 900 11-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N46 220 Seoni(PGCIL ) -

Chhindwara CKT II11-Feb-14 900 11-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

47

765kV Main Bus-1B at SASANBay 13 - Jack Bus

11-Feb-14 900 21-Feb-14 1800 Daily Jumper Installations amp ConnectionsIsolator Allignment

PGCIL Reliance Provisional Subject to details of works done to be apprised on daily basis

N

48 220 Ipore-Kawas-2 11-Feb-14 800 11-Feb-14 1800 Daily PMM work GETCO N49 220 Navsari - Nasik - 2 11-Feb-14 900 11-Feb-14 1800 Daily PMM work GETCO N

50765 Jabalpur ‐ Bina 2 11‐Feb‐14 1000 11‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Jabalur end by MS ABB

WRTS‐II POWERGRID Deferred by siteN

51 400 Nagda-Rajgarh Ckt-II 12-Feb-14 900 12-Feb-14 1800 daily For maintenance work MPPTCL EHT- Mamp I N52 400 Karad-Solapur (PGCIL) 12-Feb-14 900 12-Feb-14 1700 Daily QMwork MSETCL MSETCL N53 400 Raipur-Sipat 1 amp 2 26-Feb-14 800 3-Mar-14 1800 Conti Diversion of line for Lafarge Railway track WRTS-I Lafarge Ori 12-16 Feb 14 Deferre N54 220 Haldarwa Kawas-2 12-Feb-14 900 12-Feb-14 1800 Daily PMM work GETCO N

55 220 Bus‐I Bina 12‐Feb‐14 800 12‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

56 400 Chorania - Hadala 13-Feb-14 800 14-Feb-14 1800 Daily PMM GETCO GETCO N57 400 Tarpur-Padghe-2 13-Feb-14 800 14-Feb-14 1800 Daily maintenance work POWERG

RIDNPCIL N

58400 Vindhyachal‐Satna1 13‐Feb‐14 1000 13‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

59 220 Bus‐II Bina 13‐Feb‐14 800 13‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

60 220 Pithampur-Rajgarh Ckt - I

14-Feb-14 900 14-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

61 220 Wardha (PG)-Badnera 14-Feb-14 800 14-Feb-14 1800 Daily AMP Work at Wardha MSETCL WRTS-I N

62 400 Bhusawal-Koradi 14-Feb-14 900 14-Feb-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL N

63 400 Raipur-KSK 14-Feb-14 800 16-Feb-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end WRTS-IKSK

KSK N

64 220 GWL(PGCIL)-Malanpur Ckt-II

15-Feb-14 900 15-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N

65 220 Pithampur-Rajgarh Ckt - II

15-Feb-14 900 15-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

66400 Vindhyachal‐Satna2 16‐Feb‐14 1000 16‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

67 220 KAPS - Haldarwa - 1 17-Feb-14 800 17-Feb-14 2000 Daily Yearly PM checks KAPS N

68400 3X105 MVA 400220Kv

X-mer I At Indore ss17-Feb-14 800 18-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI

N

69

220 SC Korba-Raigarh-Budhipadar sc(PGCIL) amp DC Korba-Budipadar both circuits (CSPTCL)

18-Feb-14 800 19-Feb-14 1800 Conti Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCLWRTS-I

WRTS-I

N

70 400 Itarsi-Bhopal Ckt-I 18-Feb-14 900 19-Feb-14 1700 daily For maintenance work MPPTCL EHT- Mamp I N71 220 Badod - Kota Ckt 18-Feb-14 900 18-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N72 220 Damoh(PGCIL) -

Damoh I C - II18-Feb-14 900 18-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

73 220 Badod - Modak Ckt 19-Feb-14 900 19-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

74220 KAPS - Ukai - Mota 19-Feb-14 800 19-Feb-14 2000 Daily Yearly PM checks KAPS Non consent from SLDC

GETCO N

75400 315 MVA 400220 KvX-

mer III At Indore ss20-Feb-14 800 21-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI

N

76 220 Seoni(PG)-Seoni 2 21-Feb-14 800 21-Feb-14 1800 Daily AMP Work MPPTCL WRTS-I Y N77 220 Bina(PGCIL)-Shivpuri

Ckt21-Feb-14 900 22-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI Y N

78 400 Koradi-Nandgaonpeth 21-Feb-14 900 21-Feb-14 1700 Daily QMwork MSETCL MSETCL N N79 220 Haldarva - Jhanor - 1

(NTPC)21-Feb-14 900 21-Feb-14 1800 Daily PMM work GETCO N

80

765kV Main Bus-2A at SASANSatna Line-2

22-Feb-14 900 28-Feb-14 1800 Contionious

Equipment ConnectionsCircuit Breaker TestingJumper MeasurementIsolator Allignment Reactor accessories erection on R-Phase

PGCIL Reliance

N

81 400 Korba-Raipur 3 amp 4 23-Feb-14 800 24-Feb-14 1800 Conti For Bus spliting work at Raipur765 KV Raigarh-Raipur and 765 Champa Raipur lines

WRTS-1 WRTS-1 N

82132 132kV Astha - Polai SC

line of MPPTCL24-Feb-14 800 25-Feb-14 1800 Continous Crossing of Bhopal -Indore 765 kv SC Line MPPTCL BDTCL subjected to sldc

clearance N

83 400 Bus-1 at Bilaspur 24-Feb-14 800 24-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I N

84400 Seoni -

Khedamara(Bhilai) Ckt25-Feb-14 900 25-Feb-14 1800 daily For maintenance workFeeder bay maintenance at

KMaraMPPTCL CSPTCLMPPT

CLNo confirmation on D-3

N

85400 Ranchi-Sipat 1 amp 2 25-Feb-14 800 26-Feb-14 1800 Conti Crossing work of upcoming 765 KV DC

Jharsuguda-Korba amp 765KV SC Ranchi-BilaspurWRTS-I WRTS-I No confirmation on D-3

N

86765 Sasan‐Satna2 25‐Feb‐14 800 26‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐II POWERGRID No confirmation on D-3 N

87400 Bus Reactor1 at Satna 25‐Feb‐14 1000 25‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

88400 400 kV DC Damoh -

Bhopal Line26-Feb-14 800 27-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL Not availed by agency for

rainsN

89400 Raipur-Bhadrawati 2 amp

327-Feb-14 800 27-Feb-14 2100 Daily For Bus spliting work at Raipur765 KV Raigarh-

Raipur and 765 Champa Raipur linesWRTS-1 WRTS-1 Subject to Telemetry from

Durg PS RaipurN

90 400 Birsinghpur‐Vandana Vidyut

27‐Feb‐14 800 27‐Feb‐14 1700 Daily AMP of Terminal Equipment amp line Reactor WRTS‐I POWERGRID Ready N

91 400 Bhusawal-Akola 28-Feb-14 900 28-Feb-14 1700 Daily QMwork MSETCL MSETCL N92 220 Bus-1 at Wardha 28-Feb-14 800 28-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I N93 400 Birsinghpur‐Balco 28‐Feb‐14 800 28‐Feb‐14 1700 Daily AMP of Terminal Equipment amp line Reactor WRTS‐I WRTS‐I Deferred by site N

94 400 Nagda‐Dehgam2 5‐Feb‐14 1000 5‐Feb‐14 1800 DailyCommissioning amp checking of CSD relay in Main CB for reactor switching at Dehgam end by MS ABB

WRTS‐II POWERGRID N

95 400 400kV Satpura Itarsi 10‐Feb‐14 900 11‐Feb‐14 1700 DailyCommissioning of new CB after dismantling of existing TELK make CB at Satpura end amp normalising of line on main CB

POWERGRID

WRTS‐II N

96 765 765 kV Satna - Bina Ckt I

6-Feb-14 800 8-Feb-14 1800 cont Stringing of Jabalpur-Bina 765 kv SC Line PGCIL JTCL Original27-28 Jan14 Def N

97 765400 765400 kV ICT-1 at Bina 20-Feb-14 90000 AM 21-Feb-13 60000 PM Continuou

sCSD commissioning for 400kV Side CB of 765400 kV ICT-1 WRTS-II POWERGRID Deferred by site N

98 400 Nagda - Dehgam 1amp2 20-Feb-14 80000 AM 28-Feb-14 1700 Daily Online PID testing to insulators in both circuits AR shall be kept in non auto mode in both circuits WRTS-II POWERGRID

N

99 220MC Waluj-Chitegaon amp Waluj-Jalna

21-Feb-14 700 21-Feb-14 1900 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad MSETCL WRTS-I

N

100 400 Bus 1 at Asoj 21-Feb-14 000 21-Feb-14 1800 Daily For checking bus stability testing of Piran 1 amp 2 bays (for charging of new line) GETCO WRTS-II N

101 400 Bus-1 at Wardha 22-Feb-14 800 22-Feb-14 1800 Daily Jumper spacers connection at Wardha WRTS-I WRTS-I N102 400 Bus-1 at Raigarh 22-Feb-14 800 22-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I Deferred by site N103 765 Bus - II at Indore 22-Feb-14 90000 AM 23-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Not availed NLDC consenN104 220 Kakrapar-Haldarwa2 22-Feb-14 1000 Hrs 22-Feb-14 1600 Hrs Daily AMP POWERG

RID WRTS-II N

105 400 Bus 2 at Asoj 22-Feb-14 000 22-Feb-14 1800 Daily For checking bus stability testing of Piran 1 amp 2 bays (for charging of new line) GETCO WRTS-II N N

106400 400 kv DC Bhopal -

Bina Line (Ckt I amp II)(Tower no 34 amp35)

23-Feb-14 800 24-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line MPPTCLBDTCL

N

107 765kV SASAN Main Bus-1BBay 10 - Jack Bus 24-Feb-14 800 Hrs 2-Mar-14 1900 Hrs Continuous Dia-4

(Bay-10) - SCCOCC Test of Unit 4 GTSasan Sasan N

108 765 Bus - I at Indore 24-Feb-14 90000 AM 25-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID N

109 765 765 KV Bina-Indore Line 24-Feb-14 0900 Hrs 24-Feb-14 1800 Hrs Daily

For taking spare reactor unit in service amp checking the scheme for spare reactor with 765 KV Bina-Indore Line Reactor at Bina

POWERGRID WRTS-II

Deferred by site N

110 400 Kasor - GPEC 24-Feb-14 800 25-Feb-14 1800 Daily PMM Work GETCO GETCO N111 40022033 315 MVA ICT2 at Kheda 24-Feb-14 900 10-Mar-14 1800 cont modification work in SS lay out CSPTCL CSPTCL N112 400 315 MVA ICT2 at

Gwalior 25-Feb-14 90000 AM 25-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID N

113 400KV V-Satna-4 Line Shunt Reactor 25-Feb-14 1000 25-Feb-14 2000 Daily

Basis AMP NTPC NTPC N

114 400 Raipur-Wardha 1 26-Feb-14 800 26-Feb-14 2000 Daily Balance construction works at Wardha end WRTS-I WRTS-IReady Ori26214 Deferred by site

N

115 400 Bus -I at Indore 26-Feb-14 90000 AM 26-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Deferred by site N116 400 315 MVA ICT3 at

Gwalior 26-Feb-14 90000 AM 26-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID N

117 400 400 kV DC Damoh - Bhopal Line

26-Feb-14 800 26-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL N

118 400 Chorania-Kasor 26-Feb-14 800 26-Feb-14 1800 Daily PMM work GETCO GETCO N119 400 Koradi-Satpura sc 26-Feb-14 800 26-Feb-14 1600 Daily 765KV Tiroda Koradi Transmission LineII crossing

worksPOWERGRID MEGPTCL Cancelled by MEGPTL N

120 400 400 kV DC Damoh - Bhopal Line

26-Feb-14 800 26-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL N

121 400 Raipur-Wardha 2 27-Feb-14 800 27-Feb-14 2000 Daily Balance construction works at Wardha end WRTS-I WRTS-I Deferred by site N122 400 Vindhyachal-Satna2 27-Feb-14 1000 27-Feb-14 1800 Daily Commissioning of CSD Relay in ABB make main

CB at Satna WRTS-II POWERGRID Deferred by site N

123 400 Bus -II at Indore 27-Feb-14 90000 AM 27-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Ready N124 400 315 MVA ICT1 at

Rajgarh 27-Feb-14 90000 AM 27-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID Ready N

125 400400 KV SC Kosamba - Asoj line(730-740)

27-Feb-14 700 27-Feb-14 1800 cont Crossing of Dhule - Vadodara 765 kv SC Line GETCOBDTCL

N

126 400 Indore (MP) -Indore (PG)-DC 27-Feb-14 700 28-Feb-14 1600 Cont Stringing of 765kV Indore - Vadodara line POWERG

RID WRTS-II Deferred by site N

Anaulagnak 33(A)

maaca- 2014 AaOr Ap`Ola 2014 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR MARCH 2014 AND APRIL 2014

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)maaca- 2014 Ap`Ola 2014 maaca- 2014 Ap`Ola 2014

MARCH 2014 APRIL 2014 MARCH 2014 APRIL 2014

1 gaujarat

saIimat 11700 12100 7750 7800

AsaIimat 11740 12140 7760 7810

2 maQya p`doSa

saIimat 8340 9050 5338 5540

AsaIimat 8340 9050 5338 5540

3 CltaIsagaZ

saIimat 3200 3075 1929 1809

AsaIimat 3225 3105 1944 1827

4 maharaYT

saIimat 19000 19150 10200 10300

AsaIimat 19050 19200 10250 10350

5 gaaovaa

saIimat 425 410 300 295

AsaIimat 425 415 310 300

6 dmana dIva

saIimat 340 345 210 205

AsaIimat 345 350 225 210

7 DI ena eca

saIimat 635 640 445 425

AsaIimat 635 640 445 425

8 piScama xao~

saIimat 41961 43047 28500 27900

AsaIimat 42076 43173 29560 28840

Diversity factor of 10401

March 2014 and April 2014

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah frvarI 2014

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 1552 75

]k[- Ukai - 2 1719 75]k[- Ukai - 3 598 75]k[- Ukai - 4 1757 75]k[- Ukai (Total) 5627 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 024 2]k[- ela baI saI eca Ukai LBCH - 2 131 3]k[- ela baI saI eca Ukai LBCH (Total) 154 5 0008

3 kDanaa Kadana - 1 000 0 0005kDanaa Kadana - 2 246 62 0000kDanaa Kadana - 3 223 62kDanaa Kadana - 4 166 63 0000kDanaa Kadana (Total) 634 63 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 431 9 0020 6 kula jalaIya TOTAL(H) 6846 225 0401

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 2060 32 21822 TaoronT pavar ilaimaToD yauinaT DI 7979 125 69803 TaoronT pavar ilaimaToD yauinaT [- 075 122 07584 TaoronT pavar ilaimaToD yauinaT ef 8023 124 66915 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 018811 Qauvarna tapIya Dhuvaran - GT 2 000 0 041912 Qauvarna tapIya Dhuvaran - STG 023 1013 ]ka[- yauinaT 1 Ukai -1 000 0 005114 ]ka[- yauinaT 2 Ukai -2 000 0 010815 ]ka[- yauinaT 3 Ukai -3 3147 200 297216 ]ka[- yauinaT 4 Ukai -4 10588 202 1002617 ]ka[- yauinaT 5 Ukai -5 9496 210 884118 ]ka[- yauinaT 6 Ukai -6 23703 500 1844819 gaaMQaInagar 1 Gandhinagar - 1 000 0 008620 gaaMQaInagar 2 Gandhinagar - 2 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 000 0 029622 gaaMQaInagar 4 Gandhinagar - 4 000 0 036223 gaaMQaInagar 5 Gandhinagar - 5 11676 212 1148924 vaNakbaaorI 1 Wanakbori - 1 10648 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 11069 21026 vaaNakbaaOrI 3 Wanakbori - 3 1891 20627 vaaNakbaaOrI 4 Wanakbori - 4 5244 21228 vaaNakbaaOrI 5 Wanakbori - 5 5531 21029 vaaNakbaaOrI 6 Wanakbori - 6 000 030 vaaNakbaaOrI 7 Wanakbori - 7 8902 20931 ]trna Utran GT 1 000 0 019832 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 000 0 024635 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 000 0 0000

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Anaulagnak 41

ACTUAL GENERATION amp AVALABILITY FOR FEBRUARY 2014Actual vaastivak

Actual vaastivak

37 isaka Sikka - 1 3696 112 439838 isaka Sikka - 2 000 0 017639 kcC ilagnaa[-T Kutch Lignite - 1 4429 71 848640 kcC ilagnaa[-T Kutch Lignite - 2 4037 7241 kcC ilagnaa[-T Kutch Lignite - 3 3646 6742 kcC ilagnaa[-T Kutch Lignite - 4 2215 66 525343 saUrt ilagnaa[-T Surat Lignite - 1 6705 131 682544 saUrt ilagnaa[-T Surat Lignite - 2 7475 131 738745 saUrt ilagnaa[-T Surat Lignite - 3 6965 130 728846 saUrt ilagnaa[-T Surat Lignite - 4 6362 130 688647 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5454 107 848648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5649 11449 jaI Aa[- pI saI ela GIPCL GT - 1 1589 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1587 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1702 3552 jaI Aa[- pI saI ela GIPCL ST - 1 2902 5153 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 020556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 000 0 000060 jaI pI [- saI GPEC GT - 2 267 156 013261 jaI pI [- saI GPEC GT - 3 143 146 002762 jaI pI [- saI GPEC STG 131 17263 jaI esa [- jaI GSEG GT - 1 000 0 098964 jaI esa [- jaI GSEG GT - 2 1181 5065 jaI esa [- jaI GSEG STG 642 2366 Sugen (GT 1 + GT 2) 1767 308 602467 saIpIpI sao Aayaat Imp from CPP+MUNDRA 269359 6881

kula tapIya Total (T) 475652 8386 302021kula jalaIya+tapIya Total (H+T) 482498 8604 302422ivaMD [najaI- Wind Energy 52123kula jalaIya+tapIya+hvaa Total (H+T+Wind) 534621 9539ivainamaya Exchanges 155314 saIimat jaa- maaMga Restricted Energy Req 689935

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 6800 194

11 gaaMQaI saagar Gandhi Sagar 3366 117 008012 raNaa p`tap sagar RPSagar 5883 172 004013 javaahr sagar Jawahar Sagar 4350 99 0050

2 ponca Pench 3052 165 00903 baargaI Bargi 4581 91 00804 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 11764 315 02806 banasaagar Bansagar-2 (Deolondh) 000 07 banasaagar Bansagar-3 (Silpara) 1236 32 00708 banasaagar Bansagar-4 (Zinaha) 1320 22 00509 maoDIKoDa Medikheda 396 63

10 ibarisaMGapur Birsingpur 040 20 002011 Tavaa Tawa 000 012 rajaGaaT Rajghat 165 12 006013 Omkareshwar 10620 402 14 [Midra saagar Indira Sagar 23077 997 0849

kula jalaIya TOTAL(H) MPPGCL 59999 2365 1273Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 6049 98 232502 AmarkMTk II AMK II Unit -2 6080 983 AmarkMTk III AMK III Unit -5 12212 219 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 06505 satpura II Satpura-II Unit 6 10323 180 165906 satpura II Satpura-II Unit 7 5926 1807 satpura II Satpura-II Unit 8 10964 195 191608 satpura II Satpura-II Unit 9 8353 1709 satpura III Satpura-III Unit 10 000 0 2080

10 satpura III Satpura-III Unit 11 9447 182 1909011 esajaITIpIesa 1 SGTPS Unit - 1 9447 182 1909012 esajaITIpIesa 2 SGTPS Unit - 2 10572 18213 esajaITIpIesa 3 SGTPS Unit - 3 9037 192 2064014 esajaITIpIesa 4 SGTPS Unit - 4 10700 18015 esajaITIpIesa 5 SGTPS Unit - 5 28804 51216 SSTPS 6864 587 8930

kula tapIya Total (T) 133714 3002 115350kula jalaIya+tapIya Total (H+T) 193713 5735 116623Injection from WIND 000 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 193713 5735ivainamaya Exchanges 193660 saIimat jaa- maaMga Rest En Req 387372

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 850 120 00902 Gangrel 475 10 00503 Mini Micro KWB 039 7

kula jalaIya TOTAL(H) CSEB 1364 137 0150tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 47 127402 kaorbaa (pU) Korba (E) Unit-2 2764 483 kaorbaa (pU) Korba (E) Unit-3 2764 484 kaorbaa (pU) Korba (E) Unit-4 2784 465 kaorbaa (pU) Korba (E) Unit -5 3685 120 253306 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 247808 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 15410

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 15839 256 1197012 KORBA(EB) Extn - 2 15876 256 11770

kula tapIya Total (T) 119907 1880 10190013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 119907 1880kula jalaIya+tapIya Total (H+T) 121271 2017 102050ivainamaya Exchanges 40207 0saIimat jaa- maaMga Rest En Req 161478 2017

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 9590 585 25142 kaoyanaa III Koyna III 5920 3203 kaoyanaa IV Koyna IV 18012 11324 kaoyanaa DIpIeca Koyna DPH 1442 385 TaTa jalaIya TATA Hydro 10242 741 28836 vaOtrNaa Vaitarna 000 07 eladarI Eldari 528 168 BaTgar AaOr vaIr Bhatgar amp Vir 915 49 pOzana Paithan 175 59

10 itlaarI Tillari 1106 6511 BaIra Tola rosa Bhira Tail Race 374 4112 GaTGar Ghatghar 5297 29313 Anya CaoTo jalaIya Small Hydro (others) 6173 0

kula jalaIya TOTAL(H) 58910 1599 5397Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 7700 1954 naaisak 4 Nasik Unit -4 10772 1965 naaisak 5 Nasik Unit -5 11160 1976 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 28827 5058 Tambao 6 Trombay Unit -6 000 09 Tambao 8 Trombay Unit -8 000 0

10 Tambao 7A gaOsa Trombay -7A (Gas) 7882 135 250411 Tambao 7ba Trombay -7B (WHR) 4499 7212 kaoraDI 5 Koradi Unit -5 5003 16013 kaoraDI 6 Koradi Unit -6 3963 19014 kaoraDI 7 Koradi Unit -7 10015 19015 Bausaavala 2 Bhusawal Unit -2 8329 17016 Bausaavala 3 Bhusawal Unit -3 9248 18017 Bausaavala 4 Bhusawal Unit -4 22734 50518 Bausaavala 4 Bhusawal Unit -5 19742 41519 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 7451 18621 parlaI 5 Parli Unit -5 10626 18022 parlaI 6 Parli Unit -6 14013 25323 parlaI 7 Parli Unit -7 13728 26024 KaprKoDa 1 Khaperkheda Unit -1 11173 20025 KaprKoDa 2 Khaperkheda Unit -2 10373 19526 KaprKoDa 3 Khaperkheda Unit -3 10998 20127 KaprKoDa 4 Khaperkheda Unit -4 12019 20728 KaprKoDa 5 Khaperkheda Unit -5 28882 50730 parsa Paras-3 14447 25731 parsa Paras-4 13504 25932 ]rna Uran (Gas) 18284 33833 ]rna Uran (WHR) 000 148 586234 caMd`pur 1 Chandrapur Unit -1 9087 17735 caMd`pur 2 Chandrapur Unit -2 1816 19436 caMd`pur 3 Chandrapur Unit -3 11737 21037 caMd`pur 4 Chandrapur Unit - 4 11843 46038 caMd`pur 5 Chandrapur Unit -5 7759 45539 caMd`pur 6 Chandrapur Unit -6 24420 44240 caMd`pur 7 Chandrapur Unit -7 23258 041 DhaNaU 1 Dahanu Unit-1 16339 250 1427842 DhaNaU 2 Dahanu Unit-2 16196 250 1427843 CPP 193651 29840044 RGPPL Share 000 0

kula tapIya Total (T) 631479 15369 329920MAH Wind + Solar Generation 16922 0kula jalaIya +tapIya Total (H+T+Wind) 707311 17451 372239

TOTAivainamaya Exchanges 324731saIimat jaa- maaMga Rest En Req 1032042

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1871 26ivainamaya Exchanges 33252saIimat jaa- maaMga Rest En Req 35123 434

C (F) dmana AaOr dIva DAMAN amp DIU 18245 298ja (G) dadra nagar hvaolaI DNH 40600 655

kula DD ampDNH (T) 58845 952Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 9600 160 1399112 tara`pur 2 TAPS Unit -2 11069 16013 tara`pur 3 TAPS Unit -3 36144 545 6584014 tara`pur 4 TAPS Unit -4 36197 54715 kakrapr 1 KAPS Unit -1 15230 545 3134216 kakrapr 2 KAPS Unit -2 14662 547

kula ena pI saI NPC Total 122901 25042 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14008 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 13913 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14076 214 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 32894 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 33204 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 33190 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33176 514

kula kaorbaa KSTPS Total 174461 2498 10394427 ivanQa esaTIpIesa 1 VSTPS Unit-1 12762 21328 ivanQa esaTIpIesa 2 VSTPS Unit-2 12708 21529 ivanQa esaTIpIesa 3 VSTPS Unit-3 12854 212210 ivanQa esaTIpIesa 4 VSTPS Unit-4 12909 214211 ivanQa esaTIpIesa 5 VSTPS Unit-5 12174 215212 ivanQa esaTIpIesa 6 VSTPS Unit-6 12625 214213 ivanQa esaTIpIesa 7 VSTPS Unit-7 31487 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 31075 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 31592 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 31488 512217 ivanQa esaTIpIesa 11 VSTPS Unit-11 30948 512

kula ivanQayaacala VSTPS Total 232623 3750 15107 31 saIpt -1 -SIPAT-1 38822 66400 32 saIpt -2 -SIPAT-2 32404 66500 33 saIpt -3 -SIPAT-3 38930 66300 34 saIpt -4 -SIPAT-4 26383 51600 35 saIpt -5 SIPAT-5 26400 51400

kula saIpt -SIPAT TOTAL 162939 285000 838941 kvaasa gaOsa 1e Kawas GT-1A 792 10742 kvaasa gaOsa 1baI Kawas GT-1B 2623 10943 kvaasa esaTI 1saI Kawas ST-1C 1571 11444 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 4986 304 222951 gaMQaar gaOsa 1 Gandhar GT-1 000 052 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 000 054 gaMQaar esaTI 4 Gandhar ST-4 000 0

kula gaMQaar GGPS Total 000 0 000061 maaOda 1 Mauda -1 19614 514 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 19614 514 1422661 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 000 31 000071 esa esa pI SSP RBPH - 1 6753 19372 esa esa pI SSP RBPH - 2 5907 19273 esa esa pI SSP RBPH - 3 5577 19574 esa esa pI SSP RBPH - 4 5513 19475 esa esa pI SSP RBPH - 5 7237 19476 esa esa pI SSP RBPH - 6 3109 19277 esa esa pI SSP CHPH - 1 1817 4078 esa esa pI SSP CHPH - 2 491 3679 esa esa pI SSP CHPH - 3 000 0710 esa esa pI SSP CHPH - 4 1639 39711 esa esa pI SSP CHPH - 5 901 37

kula esa esa pI SSP Total 38944 1312 389481 kula poMca Pench Total 3052 165 009082 Jindal Injection 38956 083 Amarkantak Lanco 15478 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2372740

(J) ]plabQata Availability 2308426 naoT ivainamaya Net Exchanges -292048 ]plabQa jaa- Energy Availability 2016379

maah frvarI 2014 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR FEBRUARY 2014 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 11532 - - - 11532 020214 1100 4993

saIimat Restricted 11700

AsaIimat Unrestricted 11740 11532 0 28 0 11560 010214 1200 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8366 8366 17022014 0500 5007

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9346 - - - 9346 120214 0900 4986

saIimat Restricted 8340

AsaIimat Unrestricted 8340 9346 0 38 0 9384 120214 0900 4986

nyaUnatma pMjaIkRt maaMga Min Registered Demand 3204 3204 270214 0200

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3210 3210 070214 1900 4989

saIimat Restricted 3200

AsaIimat Unrestricted 3225 3210 233 12 0 3246 070214 1900 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1617 1617 230214 2300 5021

maharaYT MAHARASHTRApMjaIkRt Registered 18510 - - - 18510 050214 1100 4984

saIimat Restricted 19000

AsaIimat Unrestricted 19050 17980 1655 -13 0 19622 190214 1200 5002

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12005 12005 280214 0400 5037

gaaovaa GOApMjaIkRt Registered 425 434 - - 434 130214 1400 5006

AsaIimat Unrestricted 425 434 1 -1 - 434 130214 1400 5006

nyaUnatma pMjaIkRt maaMga Min Registered Demand 311 311 100214 0300

essaar ESSAR(ESIL)pMjaIkRt Registered 487 - - 487 240214 1700 5004

AsaIimat Unrestricted 487 0 0 - 487 240214 1700 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 268 - - 268 250214 1200 5003

AsaIimat Unrestricted 268 0 0 - 268 250214 1200 5003

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 644 - - 644 260214 1200 4999

AsaIimat Unrestricted 644 0 - 644 260214 1200 4999

nyaUnatma pMjaIkRt maaMga Min Registered Demand 508 508 280214

piScama xao~ WESTERN REGIONpMjaIkRt Registered 42253 - - - 42253 110214 1100 4994

saIimat Restricted 41961

AsaIimat Unrestricted 42076 42021 850 235 0 43106 120214 1100 4994

nyaUnatma pMjaIkRt maaMga Min Registered Demand 27524 27524 280214 0400 5040 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

piScama xaoi~ya Baar p`oYaNa kond` mauumba[-

णाली चालन-ISO-I

ANNEXURE-43

माह फरवर 2014 February2014

समातरवतीय चालन PARALLELRADIAL OPERATION

TOTAL OPERATING

HOURS 1 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-NR) 66972

2 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-SR) 67200

टाई लाईन TIE LINE 1 765कवी िसवनी स वधा-I 765kV Sonito Wardha 67200 2 765कवी िसवनी स वधा-II 765kV Seonito Wardha 65247 3 400 कवी िभलाई स कोराड 400kV Bhilai to Koradi 67200

4 400 कवी िभलाई स भिावती 400kV Bhilai to Bhadravati 67200

5 400 कवी रायपर स भिावती-I 400kV Raipur to Bhadravati-I 67200

6 400 कवी रायपर स भिावतीETHII 400kV Raipur to Bhadravati-II 67139

7 400 कवी रायपर स भिावतीETHIII 400kV Raipur to Bhadravati-III 67200

8 400 कवी सातपरा स कोराड 400kV Satpura to Koradi 67200

9 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 67004 10 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 65308 11 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 66259 12 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 67200 13 400 कवी को हापर स मापसा-I 400kV Kolhapur-Mapusa-I 38740

14 400 कवी को हापर स मापसा-II 400kV Kolhapur-Mapusa-II 49532

15 400 कवी वापी स बोईसर 400kV Vapi-Boisar 67200

16 400 कवी रायगढ़ स ःटरलाइट-I 400kV Raigarh to Sterlight-I 66258

17 400 कवी रायगढ़ स ःटरलाइट-II 400kV Raigarh to Sterlight -II 67200

18 400 कवी रायगढ़ स झरसगड़ा-I 400kV Raigarh to Jharsuguda-I 67200

19 400 कवी रायगढ़ स झरसगड़ा-II 400kV Raigarh to Jharsuguda-II 67200

20 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 65028

21 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 66132

22 400 कवी रायपर स वधाETHI 400kV Raipur to Wardha-I 66836

23 400 कवी रायपर स वधाETHII 400kV Raipur to Wardha-II 67200

24 220 कवी कोरबा पव स ब पादर-III 220kV K(E) to Budhipadar-III 63853

Anaulagnak 47Annex-47

maah frvarI 2014 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39514 64944

10287 39711

Levels in Mtrs str maITr maoM

]ka[- Ukai

64392

9914

25402

25994

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF FEBRUARY 2014

ivavarNa Particulars

TRIPPING DETAILS FOR THE MONTH OF FEBRUARY 2014

Sr No Brief Details of incident (Elements Generation Tripped) Owner Utility Date amp Time Load

Gen LossCategory

1 Multiple Tripping from 400 kV New Koyna MSETClMSEGCLRGPPL 05‐02‐2014 0950 Hrs ‐ GI‐2

2Bus Bar protection mal‐operation at 400 kV Soja in Gujarat resulting in multiple Tripping

GETCO 06‐02‐2014 1755 Hrs ‐ GI‐2

ANNEXURE ‐ 5

  • annexpdf
    • 21pdf
    • 231pdf
    • 232pdf
    • 24pdf
    • 25pdf
    • 31pdf
    • 32C1pdf
    • 32C2pdf
    • 33Apdf
    • 41pdf
    • 42pdf
    • 47pdf
    • 5pdf
Page 11: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014

11

457th OCCM AGENDA

ITEM NO 92 UNDER DRAWAL BY MAHARASHTRA AND INSECURE OPERATION IN THE GRID ON 27-28 FEB 2014

During late night of 27th Feb and early morning hours of 28th Feb-14 the grid

frequency remained above 502 Hz continuously for five hours from 2252 hrs of 27-

02-2014 to 0407 hrs of 28-02-2014 The situation was caused due to demand

reduction across the WR and NR on account of widespread rains and persistent under

drawal by Maharashtra during the above period as illustrated in figure-1 below

5067

49

492

494

496

498

50

502

504

506

508

‐1000

‐850

‐700

‐550

‐400

‐250

‐100

50

200

350

500

650

800

2100

2115

2130

2145

2200

2215

2230

2245

2300

2315

2330

2345

000

015

030

045

100

115

130

145

200

215

230

245

300

315

330

345

400

415

430

445

500

515

530

545

600

615

630

645

700

716

731

746

Maharashtra Deviation from schedule vis‐a‐vis grid frequency2100 hrs of 27‐02‐2014 to 0800 hrs of 28‐02‐2014

MSEBUI FREQ

Deviation from Schedule

Frequency

MW Hz

Several messages were sent from WRLDC control room to SLDC Kalwa directing them to control their under drawal from the grid Details of these messages is tabulated below

Sl No Message sent to Ref No Message date and time

1 SLDC Maharashtra 56079 27022014 2210 hrs

2 SLDC Maharashtra 3070 27022014 2230 hrs

3 SLDC Maharashtra 3078 28022014 0125 hrs

4 SLDC Maharashtra 3079 28022014 0150 hrs

Despite the above messages the response from SLDC Kalwa was inadequate in

controlling the under drawal of Maharashtra Consequently the frequency touched

5069 Hz at 0211 hrs of 28-Feb 2014 the voltage across the grid increased sharply

and there was over injection from WR to other regions Subsequently as a

contingency measure the drawal schedule of Maharashtra was reduced by 600 MW

by suo motu revision in the requisition of Maharashtra in Korba Vindhyachal Sipat

12

457th OCCM AGENDA

and Vidhyachal STPS wef 0230 hrs to 0500 hrs of 28022014 This was later

extended up to 0700 hrs of 28022014 It was a near miss situation that could have

been avoided by adequate planning and commensurate actions in real-time It is

requested that the matter may be taken up at the highest level in MSETCL and a

separate meeting may be convened on the above subject to avoid reoccurrence of

such event in future

The sub committee may like to discuss the same

ITEM NO 93 NON AVAILABILITY OF REAL-TIME TELEMETRY FROM LARGE NUMBER OF STATIONS IN MAHARASHTRA There are 224 nodes in Maharashtra that comprising of 32 Generating stations and

192 substations Out of these 224 nodes 47 locations are yet to be integrated in the

System Out of the balance 177 the data from nearly 50 nodes are not coming since

last 6 months Thus in totality data is not available from more than 135 out of 224

stations ie 60 which is highly alarming The extremely poor status of telemetry in

the state of Maharashtra has become a security threat Maharashtra load is touching

17500 MW and there are large number of construction related outages that have to be

facilitated Further with the formation of the synchronous All India grid there is a need

for close monitoring of system parameters such as the line flows voltage and grid

frequency Inadequate telemetry is resulting in severe constraints in real time

operation as well as outage coordination There have been several instances of line

tripping on high voltage and SPS operation due to sudden increase in line flows

during hour boundary or during facilitating planned outage These events could be

minimized with better supervision if the telemetry is available

The telemetry issue in Maharashtra has been discussed in the various WRPC forums

wherein it was informed by MSETCL that the problem is due to failure of Ms Tulip

who was the service provider for the communication network During the month of

August 2013 representative from MSETCL had assured that a new contract was being

awarded and the situation would improve within one month The extracts from minutes

of 451st OCC is quoted below

QUOTE

13

457th OCCM AGENDA

ldquoMSETCL stated that they were working to resolve the issue and assured that there

would be an improvement in availability of Telemetry from Maharashtra stations within

one Monthrdquo

UNQUOTE

Representative of MSETCL may apprise the OCC regarding present status and the

likely schedule for resolution of the issue

The sub committee may like to discuss the same

ITEM NO 94 STATUS OF LINE AND BUS REACTORS AT 765 KV SASAN

The line reactor of 765 kV Sasan-Satna ckt-2 as well as the Bus reactors of 765 kV Sasan bus are yet to be commissioned at Sasan end In the absence of these reactors high voltage is experienced at Sasan and nearby stations Often one circuit of 765 kV Sasan-Satna is required to be opened for voltage regulation Consequently the reliability of evacuation of generation from two units of Sasan is affected During 456th OCC meeting the revised schedule of the above elements as informed by Ms Reliance was as under

Schedule in formed in meetings 451st OCC 455th OCC 454th OCC 1 Line reactor of 765

kV Sasan-Satna ckt-2

By Dec 2013 By April 2014 By May 2014

2 765 kV Bus-1 Reactor

Jan 2014 By Mar 2014 By June 2014

3 765 kV Bus-2 Reactor

Jan 2014 By Mar 2014 By June 2014

It was decided in 456th OCC meeting that one representative from MPPTCL would visit the SASAN site to check readiness of Line and Bus reactors Representative from MPPTCL and Sasan may apprise the OCC-members on the progress of commissioning of reactors at 765 kV Sasan OCC members may also be apprised of the tap position of the generator transformer 2 and 3

The sub committee may like to discuss the same

14

457th OCCM AGENDA

ITEM NO 95 CHARGING OF NEW TRANSMISSION ASSET IN THE GRID In order to have better coordination of the transmission utilities with RLDCNLDC during charging synchronization of new elements into the grid a communication has been received from NLDC (ref POSOSCONLDCSystem OperationOutage Planning1239) on 10022014 It has been proposed that

a Owner of the asset shall submit the request for expected chargingcommissioning of new element for the calendar month latest by 5th day of the month to the respective RLDC amp NLDC along with status of activities mentioned in the check-list

b RLDC shall study the impact of the new element commissioning and based on its assessment of the preparedness of the utility may recommend to NLDC who in turn would examine the issue independently considering pan India grid scenario

c After the above the owner of the new asset shall give its readiness to charge the new element atleast three days in advance with current status of activities mentioned in the check list

Check list is as under 1 List of elements to be charged along with the details of approval of the

transmission scheme from the Standing CommitteeCTUSTU 2 Single Line Diagram of the concerned substations along with status of

completion of each diabusbreakers 3 Availability of real-time data and communication to the designated

SLDCRLDC 4 Installation of Special Energy Meter complying with CEArsquos Regulations

(Serial number Meter number CTPT ratio to be indicated) 5 Charging Instructions by CTUSTU 6 Schedule and sequence of charging of elements 7 Availability of line bus reactors as per planning In case the transmission

system is planned to be charged without the planned line reactor requisite authorization from CTUSTU by studies

8 Connection Agreement (along with all annexures) with CTU or STU 9 Copy of Long term Access (LTA) or MTOA granted by CTU or STU as the

case may be 10 Copy of Power Purchase Agreement (PPA) 11 A signed undertaking with name and designation of the officer clarly

indicating the following a All Disturbance recorders (DR) and Event Loggers (ELs) with time

synchronization are commissioned b All protective systems have been commissioned c All statutory clearances have been obtained

12 Output of EL and DR after charging

15

457th OCCM AGENDA

Each document mentioned in check list from Sl No 1 to 10 must be attached for sake of completeness and emailed as a consolidated document to the nodal RLDC well before the new element charging date The sub-committee may like to discuss ITEM NO 96 OPENING FEEDERS WITHOUT PRIOR INTIMATION TO WRLDC

It was gathered based on the observation from WRLDC SCADA data and subsequent

discussion with MPPTCL that 220 kV Bina (MP)-Gwalior(MP) DC were taken under

shut down for LILO works at Datia at 0910hrs on 23022014 for 4 days The outage

of these lines was neither discussed in OCC and neither was there any intimation to

WRLDC before availing the outage These lines are included in the important grid

elements list of Western region and prior concurrence of WRLDC is required for

switching these lines Further these lines form the parallel path to 765 kV Bina-Gwalior

DC and with the shutdown of these lines the network upstream of WR-NR inter

regional corridor was depleted

The sub-committee may like to discuss ITEM NO 97 TRIPPING OF 765 KV LINES ON OVER VOLTAGE Recently several tripping of 765 kV lines have been reported on over voltage These are indicated below

1) 765 kV Bina-Gwalior I at 2358 hrs of 16022014 2) 765 kV Bina-Gwalior I at 2011 hrs of 14022014 3) 765 kV Satna-Gwalior at 1300 hrs of 06022014 4) 765 kV Sasan-Satna II at 0013 hrs of 18012014 5) 765 kV Jabalpur-Bina I at 2350 hrs of 10012014 6) 765 kV Jabalpur-Bina II at 0405 hrs of 06012014

It is understood that the adopted Stage-I OV setting for the above lines vary from 108 (ie 826 kV) to 110 (841 kV) As per SCADA data the bus voltage at any of the substations mentioned above had not reached 826 kV during the above incidents

POWERGRID may examine the above tripping in detail and apprise the OCC regarding the above In case of issues related with protective relays field equipment are detected these may be addressed at the earliest The sub-committee may like to discuss

16

457th OCCM AGENDA

ITEM NO 98 RGMO FGMO OF MANDATED GENERATORS IN WESTERN REGION

As per the latest information available at WRLDC there are 251 number of units with a total capacity of 57517 MW in Western Region that are mandated to operate in Restricted Free Governor Mode The need for compliance to the IEGC regulations wrt RGMOFGMO was emphasized in the 455th and 456th OCC meeting as well as during the 25th TCCWRPC meeting Subsequently it was communicated by email to all entities in WR to provide the latest status of RGMOFGMO implementation We have received updated status from MPPTCL LANCO CGPL DB Power and JPL Tamnar in Feb 2014 The latest state wise RGMOFGMO summary is given below

Name of Entity No of mandated units

RGMO FGMO available at

RGMOFGMO Not available at

Maharashtra 90 35 55 Madhya Pradesh 58 36 22 Gujarat 35 19 16 Chhattisgarh 10 3 7 CGPL 5 5 0 NCA 11 6 5 SASAN 2 1 1 NTPC 24 10 14 ESSAR_Mahan 1 1 0 NSPCL 2 2 0 KSK 1 1 0 KWPCL 1 0 1 DB POWER 1 1 0 JPL 5 4 1 LANCO 2 2 0 IEPL 1 0 1 EMCO 2 0 2 WR_Total 251 126 125

WRLDC vide its letter ref WRLDCRGMO-FGMO1-2014 dated 23012014 has issued directions under Section 29 of the Electricity Act to ensure compliance of IEGC regulations 52 (f) (g) (h) and (i) All utilities are requested to furnish the status of compliance in respect of generating units under their jurisdiction The sub-committee may like to discuss ITEM NO 99 STATUS OF TELEMETRY IN WESTERN REGION

The status of telemetry related issues in respect of WR constituents is as under

a) Chhattisgarh Data (except MW) from 500 MW Korba West extension generating station is not available Status points from 400 kV Raita pending

17

457th OCCM AGENDA

b) Madhya Pradesh Telemetry of following bus reactors is not available at WRLDC

S No

Station Name Bus Reactor

Nunber x Capacity

Total MVAR

Rated voltage

Status of Telemetry at

WRLDC1 Nagda 250 100 420 Not available2 Indore 225 50 33 Not available3 Bhopal 225 50 33 Not available4 Birsinghpur 150 50 420 Not available

c) Gujarat Data is not-availableintermittent from following stations in Gujarat

a 220 kV Nano of Tatamdash(not available) b Kansari 400 kV ss and Navsari 220 kVhellipIntermittent (PLCC Problem)

d) Goa Due to non-availability of SCADA data from Goa the difference between drawal as seen in SCADA and as recorded in SEM is as high as 572 during the period 1st Feb to 16th Feb 2014 Data from the following stations in Goa is not available at WRLDC S No Station Status

1 Amona 220 kV Not available 2 Cuncolin 220 kV Not available 3 Kadamba 110 kV Intermittent 4 Tivim 220 kV Intermittent 5 Ponda 220 kV Intermittent 6 Xeldam-220 kV Intermittent 7 Verna-110 kV Intermittent

e) Daman amp Diu

Due to non-availability of SCADA data from Daman amp Diu the difference between drawal as seen in SCADA and as recorded in SEM is as high as 571 during the period 1st Feb to 16th Feb 2014 Data from The error is mainly due to non-availability of data from 220 kV Magarwada

f) DNH Telemetry from 220 kV Kharadpara and Khadoli station is not available

g) POWERGRID The data from the following stations is not available at WRLDC

1) 765 kV Tamnar (Communication problem GPRS link is not stable)

18

457th OCCM AGENDA

Telemetry from following stations is Intermittent at WRLDC 1) 765 kV Durg (PLCC frequent problems)

2) 765 kV Kotra (communication intermittency)

3) 765 kV Gwalior (PLCC link established but still there is some

issue(Delay) in data updation at WRLDC Rectification work under

progress by Site Engineer

4) 765 kV Solapur - Redundant link established through Reliance but

the gateway connected to above link is not configured for 765 KV

data Hence when BSNL link is down 765 KV data is not updating at

WRLDC

The sub-committee may like to discuss

ITEM NO 910 COMPARISON OF DRAWAL AS SEEN IN SCADA VS SEM The IEGC second amendment and the Deviation Settlement Mechanism is in force since the 17022014 The IEGC stipulates maintaining injection drawal within the limits prescribed in the Deviation Settlement Mechanism The sub-committee may like to discuss ITEM NO 911 MOCK BLACK START EXERCISE

As per sec 58(b) of IEGC the usersSTUs etc need to conduct Black start mock

exercises in their respective systems once in every six month under intimation to

RLDC Also the all the black start Diesel Generator (DG) sets are [as per sec 58(b)

of IEGC] required to be tested weekly and the test report needs to be sent to RLDC

on quarterly basis

The following table summarizes the status of mock exercises in respect of black start

facilities in Western Region

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

GUJARAT

1 Ukai (H) 4 x 75 Hydro Diesel 500 kVA 221213 Y

2 Mini Hydro 2 x 25 Hydro Diesel 50 KW N

3 Kadana 4 x 60 Hydro Diesel 500 KVA 2413 Y (2413)

19

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

4

Dhuvaran

1 x 107 (68+39) + 1 x 112 (72+40)

Gas

Details to be furnished by Gujarat

Details to be furnished by Gujarat

N

5 GIPCL-I 3 x 32 + 1 x49

Gas Steam Diesel 141 KW

070912 Y

6 GIPCL-II 1x104+1x56 Gas Steam Diesel 500 kVA N

7

Torrent Power Stn C Stn- DEFCCPP

StnC2x30 StnD120 StnEF(110MW each)CCPP100MW

Thermal (Units-CDEF) Gas(CCPP)

Stn-C islands Diesel

StnC15kVA StnDE F and CCPP(500 kVA each)

281112

Y

8 GPEC 3x138+1x241 Thermal Natural Gas 3000 kVA N

9 Sugen 3x3825 MW Gas Diesel 2x6MVA N

Madhya Pradesh

10 Gandhisagar 5 x 23 Hydro DG set 100 kVA N

11 Birsinghpur 1 x 20 Hydro Battery 220 Volt

Battery N

12 Pench 2 x 80 Hydro DG set 250 kVA 121012 Y

13 Bargi 2 x 45 Hydro DG set 250 kVA 100212 Y

14 Bansagar Stage-I 3 x 105 Hydro DG set 250 kVA N

15 Indira Sagar 8x125 Hydro DG set 2x1000

KVA 22511 Y

Chhattisgarh 16

Hasdeo Bango 3 x 40 Hydro DG Set 250 kVA 250812 N

17

Korba(E)-phse-I

Power plant retired but Black start DG set available and on- load trial is reported to be carried out regularly

DG Set 1500 kW(33kV)

N

Maharashtra

18

Koyna I amp II

4 x 65 4 x 75 Hydro

House generator

2 MVA 231013 N

19 KDPH 2 x20 Hydro DG set 310 KW N

20 Eldari 3 x 75 Hydro DG set 6 KW N

21

Uran (Gas)

4 x 60 (GT) + 4x108 (GT)+ 2x120 WHR

Gas DG set

4 MW PH1412kVA PH2450kVA WH520kVA

161012

N

20

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

22 RGPPL

Block 1 640MW+Block 2 66354MW+Block 3 66354MW

Gas

Gas Turbine (Frame-6)

35 MW (Under testing) Details to be provided by RGPPL

N

23 Ghatghar 2x125 Hydro DG set 1x1250

kVA 51012

N

24 Khopoli 3x24+2x12 Hydro

DC Governor amp bearing oil pumps

DC power (self start)

271013 (detailed report awaited)

N

25 Bhivpuri 3 x 24 +

2 x 15 +2x12 Hydro

DC Governor amp bearing

-do-

N

26 Bhira 6 x 25 Hydro

1 Noof 500 KVA house generator with water turbine

500 kVA

201013 (detailed

report awaited)

N

27

Bhira PSS 1 x 150 Hydro DG set 500 kVA

N

28 Trombay 1 x 120 Gas

Turbine DG Set 25 MW

N

1 x 60 Steam Turbine

NTPC

21

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

29 Kawas 4 x 106 2 x 116 Gas Diesel 2850 KW 151013

N

30 Gandhar 3 x 144 + 1x225 Gas Diesel 2975 KW

N

NCA

31 SSP(RBPH amp CHPH) 6x200+550 Hydro Diesel 2x1000kVA 080412

N

Accordingly the Black start capable stations may forward their tentative plan for conducting Black start exercises in compliance to sec 58(b) of IEGC bull As per the communication for MPPTCL the tentative plan of Black start in Madhya

Pradesh system is given under SL No Name of the Station Tentative Date Remarks 1 Pench March 2014 DG set at Pench amp are Bargi

under outage 2 ISP Apr-May 2014 - 3 TONS June 2014 Governor Problem being

attended 4 Birsinghpur June 2014 -do- 5 Medikheda June 2014 -do- 6 Rjghat June 2014 -do- Other utilities may also update their tentative plan for black start

The sub-committee may like to discuss

22

457th OCCM AGENDA

ITEM NO 912 HEALTHINESS OF MAIN CIRCUIT BREAKER OF 400 KV BIRSINGPUR-KATNI-I AT KATNI END The main CB of Birsingpur-Katni-I is under shut down since 2350 hrs of 14th February 2013 Representatives from MPPTCL may kindly apprise on the progress and expected date of restoration of the Main CB of 400 kV Birsingpur-Katni-I at Katni end The sub-committee may like to discuss

ITEM NO 913 TESTING OF SPS RELATED TO TRIPPING OF BINA-GWALIOR-AGRA AT CGPL VINDHYACHAL AND KORBA

As per the information received from NTPC and CGPL the SPS for the 765 kV Bina-

Gwalior-Agra has been installed and a mock drill has to be carried out for the same

The matter was discussed in the 456th OCC and it was decided that SPS may be

tested for reduction of say 50MW for each station instead of backing down of entire

500MWs POWERGRID WRTS-2 may confirm the testing schedule so that the

same could be coordinated in from WRLDC

The sub-committee may like to discuss

ITEM NO 914 SPS AT SIPAT WRLDC vide letter No WRLDCMO-I17192013 dt 21613 requested to take up this matter with the concerned for early implementation of the SPS Status of the SPS at NTPC Sipat is as under

1 449th OCC SPS was proposed by WRLDC It was decided to have a

separate meeting to finalize the scheme 2 450th OCC Member Secretary WRPC intimated that the matter will be

discussed in 119th PCM on 3rd amp 4th September 2013 at Tarapur 3 451st OCC It was intimated that the issue of SPS of Sipat was discussed in

119th PCM held on 3rd amp 4th September 2013 at TARAPUR The tentative scheme were formulated which needed finer tuning

4 452nd OCC Matter not discussed 5 453rd OCC NTPC representative intimated proposal sent to their corporate

office for engineering approval 6 454th OCC Approval from our corporate office is yet to be obtained 7 455th OCC Approval from our corporate office is yet to be obtained 8 456th OCC Approval from corporate office has been obtained and would be

forwarded to WRPC for approval The sub-committee may like to discuss

23

457th OCCM AGENDA

ITEM NO 915 SPS AT 4X300 MW BALCO IPP The SPS at 2010 MW Balco (4x675MW + 4x135 MW + 4x300 MW) was to be commissioned by Nov 2013 before commissioning of first unit of 4x300 MW Balco IPP For the new SPS scheme envisaged for the Balco CTU connection namely the Grid Islanding and Load Management Scheme (GILMS) Balco had reported to have placed an order with Ms SEL As discussed earlier the scheme suggested by WRLDC may be implemented before commissioning of first unit of 300 MW It was intimated during the 456th OCCM by the Balco representatives that the SPS shall be commissioned by March 2014

The sub-committee may like to discuss

ITEM NO 916 ACTIONS TAKEN FOR REVIVAL OF TRANSMISSION ELEMENTS UNDER LONG OUTAGE

As per the information available at WRLDC following elements are out for a

long period

Sl No Date of

outage

Reason

ISTSIPP

1 80 MVAR BR at

ESSAR(Mahan)

231213 Oil leakage

2 125 MVAR BR at JPL 120513 Hydrogen formation

3 50 MVAR LR of Indore-Asoj-II

at Indore

190613 R phase bushing burst

4 50 MVAR LR of Birsingpur-

Damoh at Damoh(PG)

13102014 Oil Leakage

5 765 kV Durg-Kotra-I 24022014 Sparking in Isolator

6 400 kV Raipur-Raigarh-IV 18012014 Voltage Regulation

MSETCL

1 400 kV RGPPL-NrsquoKoyna-I 22012014 Voltage Regulation

2 400 kV Sholapur-

Sholapur(PG)

26022014 Tower Collapse

MPPTCL

1 400 kV Birsingpur-Katni-I 28012014 Voltage Regulation

24

457th OCCM AGENDA

2 50 MVAR LR of Indore-Asoj-II

at Indore

6012014 DGA Violation

CSPTCL

1 400220 kV Bhilai-II 24022014 Maintenance

OCC may like to be apprised of the actions being taken for expediting revival of

the above elements

The sub-committee may like to discuss

ITEM NO 917 STATUS OF 220 KV KOLHAPUR-MUDSINGHI-CHIKODI- BELGAM LINE Consent for trial operation of 220 kV Kolhapur-Mudsinghi-Chikodi- Belgam line in radial mode for supply of Karnataka load from Maharashtra side was granted after discussion in the 455th OCC meeting WRLDC is in receipt of letter from SRLDC regarding concurrence for the above arrangement SLDC Kalwa may apprise the OCC regarding the present status The sub-committee may like to discuss

ITEM NO 918 CONTRIBUTION OF GENERATORS IN VOLTAGE CONTROL The contribution of generators in WR in voltage control was analyzed during 456th OCC meeting It was noted that following units were injecting reactive power even during high voltage

1 210 MW units of Khaparkheda Koradi and Chandrapur (Maharashtra) 2 210 MW units of Satpura and Birsinghpur (Madhya Pradesh) 3 210 MW unit 23 of Korba West (Chattisgarh) 4 200 MW unit 34 of Ukai (T) in (Gujarat)

Utilities were requested to check the setting of AVRGT tap and revert back with findings Members may apprise OCC regarding the status The sub-committee may like to discuss

ITEM NO 919 REAL-TIME MONITORING OF FEEDERS SUBSTATIONS THAT ARE COVERED UNDER THE AUFLS Telemetry of feeders substations covered under the AUFLS is desirable for real-time assessment of the anticipated relief that would be available from the AUFLS scheme at any given instant of time CERC has also directed all the constituents to for

25

457th OCCM AGENDA

mapping of these feeders in the SCDA of SLDCsRLDC Members may like to deliberate further The sub-committee may like to discuss

ITEM NO 920 LOAD FORECASTING As per the amended Indian Electricity Grid Code that is effective from 17th February 2013 the SLDCs SEB distribution licensees shall always restrict the net drawal of the State from the grid within the drawal schedule keeping the deviations from the schedule within the limits specified in the Deviation settlement mechanism regulations Therefore it is imperative that adequate attention may be paid towards load forecasting The matter was discussed in the 455th and 456th OCC as well as in the 25th TCCWRPC board meeting wherein it was decided to create a task force for exploring development of a software for load forecasting Members may like to deliberate further The sub-committee may like to discuss

ITEM NO 921 IMPLEMENTATION OF THE REVISED AUFLS IN GOA DD AND DNH It was decided during the 455th and 456th OCC meeting as well as during 25th WRPC meeting that Goa DD and DNH shall complete the implementation of the revised AUFLS in Goa DD and DNH at the earliest Representatives from the Goa DD and DNH may apprise the status of the progress The sub-committee may like to discuss

ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING As per meeting roaster circulated during 452nd OCC meeting the 458th OCC Meeting

will be hosted by Maharashtra and may be scheduled on 16th amp 17th April 2014

Maharashtra may confirm the same

Anaulagnak 21

maah frvarI 2014

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5051 Hz BETWEEN 0200 Hrs amp 0300 Hrs Hrs ON 28022014

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4970 Hz BETWEEN 1800 Hrs amp 1900 Hrs Hrs ON 28022014

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 5006 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5071 Hz AT 0210 Hrs ON 28022014

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4937 Hz AT 185000 Hrs ON 28022014

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS FEBRUARY 2014 JANUARY 2014 DECEMBER 2013

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 001 005

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 041 061 188 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 1069 5423 4864 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 4014 3569 3987

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 4876 946 956

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING FEBRUARY 2014

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

Voltage Profile during the month of Feb 2014

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 421 401 426 403 409 409 408 408 415 399 414 402 424 413 417 3922 420 402 423 404 409 409 408 408 417 402 418 404 425 415 420 3993 421 399 426 400 429 405 425 402 412 399 419 408 423 410 413 3964 422 402 426 404 430 406 428 401 414 400 414 404 424 412 414 3965 420 396 423 400 409 409 408 408 413 396 415 401 424 411 415 3996 420 396 426 400 428 405 426 402 415 398 416 402 423 411 412 4007 420 394 424 399 430 402 427 401 416 399 417 402 423 409 416 3968 418 393 422 397 409 409 408 408 416 399 416 402 422 409 418 3989 418 399 423 404 409 409 408 408 417 402 417 407 419 409 419 400

व तदाब परखा फरवर 2014 स नक Annex-23

इदौर इटारसी कराड धल असोज कासोर िभलाई जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

10 419 394 423 399 409 409 408 408 416 400 415 401 420 408 417 39511 421 393 426 397 429 405 427 401 44 399 419 404 423 407 414 39912 419 395 422 400 409 409 408 408 416 401 419 407 421 410 418 39813 420 396 424 401 409 409 408 408 417 400 416 401 421 409 418 40114 421 399 424 403 430 419 428 414 417 402 415 402 421 409 417 40015 423 397 424 399 428 414 429 412 417 398 406 406 421 407 418 40016 423 397 424 400 431 404 424 401 416 401 422 409 421 409 418 40317 421 402 424 403 432 414 420 404 416 402 412 405 422 410 417 39818 420 397 423 399 409 409 408 408 416 400 414 401 422 414 416 40019 420 396 423 399 409 409 408 408 411 398 418 405 421 413 413 39920 417 397 420 402 429 406 426 401 413 399 416 404 421 413 410 39821 419 399 422 402 430 407 421 401 415 401 418 406 422 411 414 39722 419 397 422 402 432 409 423 401 416 400 413 402 423 413 414 40023 420 396 423 397 430 412 428 404 414 404 415 402 427 414 416 40324 421 399 423 401 433 411 425 400 416 398 414 402 427 415 418 40225 421 399 423 401 433 411 425 400 416 398 414 402 427 415 418 40226 420 397 423 404 431 411 428 409 411 397 415 404 424 414 412 39327 418 398 426 403 409 409 408 408 417 399 418 402 429 415 419 39128 421 400 427 406 409 409 408 408 414 400 416 403 430 415 418 401

423 393 427 397 433 402 429 400 417 396 422 401 430 407 420 391

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 424 404 415 392 424 404 431 407 766 746 797 765 800 756 804 7692 422 406 417 398 426 404 434 407 769 754 798 774 801 769 804 7773 423 405 416 402 426 401 432 410 767 750 796 768 802 773 805 7764 426 407 417 402 423 403 430 408 768 751 797 779 801 776 808 7785 422 403 415 398 423 397 430 400 768 749 797 767 798 763 797 7586 425 404 417 401 423 399 432 404 768 750 797 767 802 773 807 7707 427 401 419 397 423 396 431 404 770 741 800 763 807 769 809 7698 422 403 416 403 424 395 427 399 756 737 788 756 801 765 802 7679 422 405 416 401 424 402 427 404 755 738 786 758 804 773 804 775

10 421 400 414 396 423 398 429 403 3 88 6 98 6 801 60

वािलयर बनाBina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

बना वािलयर नागदा खडवा िसपत िसविन

10 421 400 414 396 423 398 429 403 755 737 788 765 798 765 801 76011 423 397 414 390 426 396 433 399 758 736 794 750 800 752 802 75612 420 403 414 395 423 397 428 403 757 739 787 759 801 763 798 77013 424 405 417 400 427 397 430 402 759 740 794 760 804 773 803 77214 426 410 420 406 424 400 431 405 761 740 794 766 810 780 808 78215 425 404 417 399 426 399 430 401 762 738 794 962 808 768 806 76816 426 406 422 400 427 402 429 400 759 739 792 760 815 774 811 77617 429 407 417 398 427 404 427 406 761 742 792 762 805 765 810 77418 426 404 418 395 423 399 427 404 763 748 793 768 805 759 806 76819 423 409 415 394 422 399 428 403 759 737 795 765 804 758 806 76720 421 406 410 397 420 398 426 406 765 749 795 771 791 766 799 77421 423 407 424 399 423 403 428 405 759 744 792 760 795 761 800 76722 425 406 414 398 423 400 425 404 760 743 790 762 794 762 800 76823 425 402 412 392 424 400 428 405 758 740 790 759 796 755 799 76124 425 401 411 393 423 401 427 403 760 744 796 764 792 757 798 75625 421 408 412 395 423 401 427 403 756 742 793 766 795 764 795 76926 422 405 413 390 421 399 426 402 757 739 789 760 796 750 798 76127 426 407 416 393 421 401 431 403 760 741 795 762 803 755 804 76228 428 409 414 392 423 403 432 405 762 740 795 753 809 775 803 771

429 397 424 390 427 395 434 399 770 736 800 750 815 750 811 756

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Feb-14 0 0 0 0 0 0 0 02 02-Feb-14 0 0 0 0 0 0 0 03 03-Feb-14 0 0 0 0 0 0 0 04 04-Feb-14 0 0 0 0 0 0 0 05 05-Feb-14 0 0 0 0 0 0 0 06 06-Feb-14 0 0 0 0 0 0 0 07 07-Feb-14 0 0 0 0 0 0 0 08 08-Feb-14 0 0 0 0 0 0 0 09 09-Feb-14 0 0 0 0 0 0 0 0

10 10-Feb-14 0 0 0 0 0 0 0 011 11-Feb-14 0 0 0 0 0 0 0 012 12-Feb-14 0 0 0 0 0 0 0 013 13-Feb-14 0 0 0 0 0 0 0 014 14-Feb-14 0 0 0 0 0 0 0 015 15-Feb-14 0 0 0 0 0 0 016 16-Feb-14 0 0 NIL NIL NIL 017 17-Feb-14 0 0 0 0 0 0 0 018 18-Feb-14 0 0 0 0 0 0 0 019 19-Feb-14 0 0 0 0 0 0 0 020 20-Feb-14 0 0 0 0 0 0 0 021 21-Feb-14 0 0 0 0 0 0 0 022 22-Feb-14 0 0 0 0 0 0 0 023 23-Feb-14 0 0 0 0 0 0 0 024 24-Feb-14 0 0 0 0 0 0 0 025 25-Feb-14 1 17 0 0 0 0 0 026 26-Feb-14 0 0 0 0 0 0 0 027 27-Feb-14 0 0 0 0 0 0 0 028 28-Feb-14 0 0 0 0 0 0 0 0

Max 1 17 0 0 0 00 0 0Total 1 17 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month FEBRUARY 2014

Recommonded Load relief at 492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE-25

Power CutRestrictions in Western Region for the month of February-2014 k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply(DLF)

01022014 28022014 2344 2240 2332

21 Three-Phase Supply(Irrigation)

01022014 28022014 0956 0905 0946

21 Three-Phase Supply(Mixed)

01022014 28022014 2343 2227 2330

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01022014 28022014 2353 2337 2347 32 District Head Qtrs 01022014 28022014 2355 2340 2351 33 Tehsil Head Qtrs 01022014 28022014 2349 2309 2341

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid

1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 010214 to 280214

SaUnya Nil

0-1655MW

SaUnya Nil

0000

SaUnya Nil 2400

SaUnya Nil

95 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-

2 Power supply to Agricultural Sector ivavarNa Details sao From

idnaaMk Date tk To

idnaaMk Date p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs) 21 Three-Phase Supply 01022014 28022014 1000 0800 0900

22 Single-Phase Supply 01022014 28022014 1800 1800 1800 3 Anya jaanakarI Any other information

There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

11107 (Av) of 23 days 0000(Av) 0000 (Av)

1Rural 9031(Av) for 3486 Hrs 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0666 - -

0105 -

3 HT Industries 000 (Av) for 00 Hrs 000 Total Energy Cutday 0771 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01022014 to 280214 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 2322014 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का फरवर 2014का वःता रत यौरा

Details of forced unit outages during the month ofFeb2014

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 एःसार वा डनर

ESSAR VADINAR-I

गरा विनिल GSECL

660 2156 20-Jan-14 2018 10-Feb-14 Coal shortage

2 एःसार Essar-2

गरा विनिल GSECL

172 1212 22-Feb-13 अनपल ध Still out

अनपल ध Still out

Shortage of gas

3 एसएलपीपी SLPP-1

गरा विनिल GSECL

125 1445 23-Feb-14 1237 27-Feb-14 BTL

4 एकएलट पीएसAKLTPS-1

गरा विनिल GSECL

125 1147 26-Feb-14 अनपल ध Still out

अनपल ध Still out

DCS FAIL

5 एपीएल APL - 2

अदानी ADANI

330 056 3-Feb-14 अनपल ध Still out

अनपल ध Still out

Turbine vibration bearing probl em

6 एपीएल APL-5

अदानी ADANI

660 1732 15-Feb-14 456 27-Feb-14 Turbine vibration

7 एपीएल APL - 6

अदानी ADANI

660 2049 25-Feb-14 1947 3-Mar-14 Coal mill problem

8 टाटा TATA-6

मारा वउकिल MSPGCL

500 2352 19-Jul-13 अनपल ध Still out

अनपल ध Still out

For Economy SD

9 वीआईपीएल VIPL-I

मारा वउकिल MSPGCL

300 105 2-Oct-13 अनपल ध Still out

अनपल ध Still out

Turbine bearing vibration probl em

10 टाटा TATA-8

मारा वउकिल MSPGCL

250 2255 9-Jan-14 अनपल ध Still out

अनपल ध Still out

HT due to fire near turbine generator desk

11 चिपर Chandrapur-2

मारा वउकिल MSPGCL

210 1238 14-Jan-14 1310 23-Feb-14 ID fan problem

12 कोराड KORADI-6

मारा वउकिल MSPGCL

210 651 24-Jan-14 1456 14-Feb-14 Coal bunkering problem

13 डब यपीसीएल WPCL-1

मारा वउकिल MSPGCL

135 1245 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Furnace press high

14 डब यपीसीएल WPCL-3

मारा वउकिल MSPGCL

135 421 7-Feb-14 Ready Ready Less requisition

प म ऽय भार षण कि म बई णाली चालन-ISO-I

15 चिपर CPUR - 6

मारा वउकिल MSPGCL

500 1523 11-Feb-14 2033 13-Feb-14 BTL

16 नािसक NASIK-3

मारा वउकिल MSPGCL

250 300 11-Feb-14 100 19-Feb-14 UAT problem

17 कोराड KORADI-5

मारा वउकिल MSPGCL

210 153 14-Feb-14 अनपल ध Still out

अनपल ध Still out

ID fan problem

18 ितरोडा Tiroda-I

मारा वउकिल MSPGCL

660 2059 15-Feb-14 2054 26-Feb-14 Turbine bearing problem

19 ितरोडा Tiroda-2

मारा वउकिल MSPGCL

660 1125 17-Feb-14 152 22-Feb-14 BTL

20 कोराड KORADI-6

मारा वउकिल MSPGCL

210 2357 19-Feb-14 250 23-Feb-14 BTL

21 भसावल BHUSWAL-2

मारा वउकिल MSPGCL

210 301 22-Feb-14 1706 25-Feb-14 PA fan temp High

22 खापरखड़ा KHAPERKHEDA-3

मारा वउकिल MSPGCL

250 1448 22-Feb-14 130 25-Feb-14 BTL

23 जयगड Jaigad-4

मारा वउकिल MSPGCL

300 1930 22-Feb-14 1107 4-Mar-14 Low schedule

24 कोराड Koradi-5

मारा वउकिल MSPGCL

300 404 23-Feb-14 अनपल ध Still out

अनपल ध Still out

Electrical fault

25 पल PARLI-4

मारा वउकिल MSPGCL

210 1836 28-Jan-14 1956 3-Feb-14 Air preheater problem

26 भसावल BHUSAWAL-4

मारा वउकिल MSPGCL

250 1432 28-Feb-14 1802 3-Mar-14 Ash hopper problem

27 आरजीपीपीएल RGPPL-1B

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

28 आरजीपीपीएल RGPPL-2B

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

29 आरजीपीपीएल RGPPL 3A

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

30 आरजीपीपीएल RGPPL-1A

आरजीपीपीएल RGPPL

320 1500 18-Jan-14 अनपल ध Still out

अनपल ध Still out

SRV problem

31 आरजीपीपीएल RGPPL 3B

आरजीपीपीएल RGPPL

320 1230 8-Feb-14 Ready Ready Less requisition

32 िसगाजी SINGAJI - I

म वउकिल MPPGCL

600 422 12-Feb-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

33 सातपरा SATPURA-11

म वउकिल MPPGCL

250 1913 15-Feb-14 2149 19-Feb-14 Main stream temperature low

34 सातपरा SATPURA-11

म वउकिल MPPGCL

250 542 26-Feb-14 1642 2-Mar-14 BTL

35 एःसार महान Essar-Mahan-1

एःसार ESSAR

600 000 29-Jan-14 015 18-Feb-14 Less requisi tion

36 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

37 वदना Vandana-1

वदना Vandana

135 149 12-Jan-14 अनपल ध Still out

अनपल ध Still out

BTL

प म ऽय भार षण कि म बई णाली चालन-ISO-I

38 ससान Sasan-2

आरईएल REL

660 205 16-Feb-14 1650 23-Feb-14 Problem in ash handling

39 कावास Kawas 2A

एनट पीसीNTPC 164 2018 23-Dec-13 Ready Ready Less requisition

40 गाधार Gandhar-3

एनट पीसीNTPC 144 2037 28-Dec-13 Ready Ready Less requisition

41 गाधार Gandhar-I

एनट पीसीNTPC 144 2011 1-Jan-14 Ready Ready Less requisition

42 कावास Kawas 2B

एनट पीसीNTPC 164 900 13-Jan-14 421 5-Mar-14 Maintenance

43 गाधार Gandhar-2

एनट पीसीNTPC 219 023 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Less requisition

44 कावास Kawas-1A

एनट पीसीNTPC 164 2055 4-Feb-14 712 20-Feb-14 Less requisition

45 कावास

Kawas-1B एनट पीसीNTPC 164 1951 13-Feb-14 503 20-Feb-14 Less requisition

46 कावास Kawas 1A

एनट पीसीNTPC 164 1210 21-Feb-14 Ready Ready Less requisition

47 कावास Kawas 1B

एनट पीसीNTPC 164 012 22-Feb-14 1144 26-Feb-14 Less requisition

Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का फरवर 2014 का वःता रत यौरा

Details of planned unit outages during the month of Feb2014 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Time Date

1 डब यट पीएस WTPS-3

गरा विनिल GSECL

210 212 12-Feb-14 अनपल ध Still out

अनपल ध Still out

AOH

2 पल ParlI-3

मारा वउकिल MSPGCL

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

AOH

3 चिपर Chandrapur-5

मारा वउकिल MSPGCL

500 101 14-Jul-13 841 19-Feb-14 AOH

4 कोरबा प म KORBA-(W)-4

छरा वउकिल CSPGCL

210 2226 7-Feb-14 अनपल ध Still out

अनपल ध Still out

AOH

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

NIL2

NIL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING MARCH 2014 AND APRIL 2014

Capacity Outage as per Annual Maintenance Plan

3 Craiva]kMila CSPGCL

NIL

4

NIL

5 koMd``Iya xao~ Central Sector51 VSTPS 4 210 010414 070414 AOH52 VSTPS 2 210 080414 270414 AOH53 VSTPS 1 210 300414 190514 AOH54 CGPL 10 800 280314 130514 COH

maraiva]kMila MSPGCL

Date Time Date Time1 220 Bus-1 at Mapusa 20-Mar-14 1000 20-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R

2 765 Bus-1 at Sasan 20-Mar-14 800 20-Mar-14 1800 Daily Stringing of Main bus 1 for 765 kV Vichal Pooling - Sasan feeder

Reliance WR-II C

3 400 400kV Bus-2 at Satna 20-Mar-14 800 20-Mar-14 1800 Continuous Bay extension work related to JP - Nigrie Bays POWERGRID WR-II C

4 400 400kV ICT 1 at Satna 20-Mar-14 800 20-Mar-14 1000 Continuous Bay extension work related to JP - Nigrie Bays POWERGRID WR-II C

5 400 400kV Jabalpur Itarsi 1amp2 (Dc) 20-Mar-14 1000 20-Mar-14 1400 Continuous For commissioning of Line Impedance measurement kit

POWERGRID WR-II C

6 765 3X80 MVAr Bina Line Reactor at Indore 20-Mar-14 1000 21-Mar-14 1800 Continuous For installation of online dry out amp online DGA kit

POWERGRID WR-II C

7 400kV Damoh - Bhopal 1 20-Mar-14 800 31-Mar-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

8 400 Chorania Kasor 20-Mar-14 800 20-Mar-14 1800 Daily PMM work GETCO GETCO9 400 400 KV Main Bus-I at 400 KV Ss Khedamara 20-Mar-14 900 22-Mar-14 1700 Daily Erection of Pantograph 1 Set of IP amp CVT CSPTCL CSPTCL C

10 400 400 KV Khedamara-KSTPS NTPC ckt-II at 400 KV Ss Khedamara

20-Mar-14 900 22-Mar-14 1700 Daily Erection of Pantograph CVT amp 1 Set of IP PGCIL CSPTCL C

11 400 Korba -Vandana 20-Mar-14 900 21-Mar-14 1900 days continuouTesting of LBB auto re-close M-I amp M-II relays NTPC NTPC

12 400 Korba -Vandana 20-Mar-14 900 21-Mar-14 1900 days continuouTesting of LBB auto re-close M-I amp M-II relays NTPC NTPC

13 400DC Akola-Aurangabad (MSETCL) 1 and Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

21-Mar-14 600 23-Mar-14 1800 Conti Crossing work of 400kv MC Aurangabad - Aurangabad

MSETCLWRTS-I WRTS-I C

14400 amp 220 amp 132

400KV DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 400KV Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

21-Mar-14 600 21-Mar-14 1800 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad

MSETCLWRTS-I WRTS-I C

15 400 Bhadrawati-Parli 1amp 2 21-Mar-14 900 31-Mar-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I C

16 220 Bus-1 at Pune 21-Mar-14 800 21-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R

17 400 Solapur-Kolhapur 1 amp 2 21-Mar-14 700 21-Mar-14 1800 Daily Stringing work upcoming 765 kV Solapur-Pune line

Reliance WRTS-I C

18 220 220kV DC Raigarh- Raigarh (CSPTCL) Line (if outage not avail on 13140314)

21-Mar-14 900 22-Mar-14 1700 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (040-50)

CSPTCL WRTS-I C

19 220 Bus-2 (Section-A) at Mapusa 21-Mar-14 1000 21-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R20 400 Bus-1 at Itarsi 21-Mar-14 900 21-Mar-14 1800 Daily AMP POWERGRID WR-II R21 220 Bus-1 at Gwalior 21-Mar-14 1000 21-Mar-14 1800 Daily AMP POWERGRID WR-II R22 220 Jhanor - Haldarwa 1 21-Mar-14 900 21-Mar-14 1800 Daily AMP POWERGRID WR-II R23 400 Vapi Boisar 21-Mar-14 700 22-Mar-14 1900 Continuous For crossing of 220kV Kala Khadoli TL POWERGRID WR-II C

24 765 Sasan-Satna2 21-Mar-14 800 22-Mar-14 1800 Continuous For Power Line crossing of 765kV Vindhyanchal (pooling) - Satna 2 Line

POWERGRID WR-II R

25 400 400220 ICT NO1 at Kasor 21-Mar-14 800 21-Mar-14 1800 Daily PMM work GETCO GETCO26 400 400KV Sipat-Pathadi(LANCO) line 21-Mar-14 900 22-Mar-14 1900 Continous Annual Preventive maintenance job NTPC NTPC27 400 Pune-Parli 2 50MVAr Line Reactor at Pune 22-Mar-14 800 22-Mar-14 1800 Daily AMP Work Line in service wo reactor Reliance WRTS-I R

28 765 Bus-2 at Solapur 22-Mar-14 700 22-Mar-14 1800 Daily 765KV Pune bay commissioning amp SCADA works

WRTS-I WRTS-I C

29 400 Bus-1 at Bhatapara 22-Mar-14 800 23-Mar-14 1800 Conti Bus extension work for new 125MVAr Bus Reactor at Bhatapara

WRTS-I WRTS-I C

30 220 Bus-2 (Section-B) at Mapusa 22-Mar-14 1000 22-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R31 400 Vadavi Chorania 1 22-Mar-14 900 22-Mar-14 1800 Daily AMP Reliance WR-II R32 220 Jhanor - Haldarwa 2 22-Mar-14 900 22-Mar-14 1800 Daily AMP POWERGRID WR-II R33 220 Bus-2 at Gwalior 22-Mar-14 1000 22-Mar-14 1800 Daily AMP POWERGRID WR-II R

34 765 3X80 MVAr Bus Reactor at Indore 22-Mar-14 1000 23-Mar-14 1800 Continuous For installation of online dry out amp online DGA kit

POWERGRID WR-II C

35 220 Transfer Bus at Mapusa 23-Mar-14 1000 23-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R

36 400 Raigarh- Raipur 4 amp Raigarh-Kotra PS 2 23-Mar-14 800 30-Mar-14 1800 Conti Bay shifting work for up-coming 125MVAr Bus Reactor at Raigarh

WRTS-I WRTS-I C

37 765 Bus-1 at Indore (PG) 23-Mar-14 1000 23-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

Outages Proposal of Transmission elements during the month of MARCH‐2014Type

ANNEXURE‐32A

SN KV Line From To

Basis Reason System Agency

38 220 MC Waluj-Chitegaon amp Waluj-Jalna on same tower

24-Mar-14 600 24-Mar-14 1800 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad

MSETCL WRTS-I C

39 400 Raipur-Sipat 1 amp 2 24-Mar-14 800 2-Apr-14 1800 Conti Diversion of line for Lafarge Railway trackERS removal

WRTS-I Lafarge C

40 220 Bus-2 at Pune 24-Mar-14 800 24-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R41 765 Bus-1 at Bilaspur 24-Mar-14 800 24-Mar-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R

42 400 Bus-2 at Bhatapara 24-Mar-14 800 25-Mar-14 1800 Conti Bus extension work for new 125MVAr Bus Reactor at Bhatapara

WRTS-I WRTS-I C

43 400 Kolhapur-Mapusa 2 24-Mar-14 600 24-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

44 400 Vadavi Chorania 2 24-Mar-14 900 24-Mar-14 1800 Daily AMP Reliance WR-II R45 765 Bus-2 at Indore (PG) 24-Mar-14 1000 24-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

46 765 Bus-2 at Sasan 24-Mar-14 800 24-Mar-14 1800 Daily Strining of Main Bus 2 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

47 220 KAPP - Haldarwa 1 24-Mar-14 800 24-Mar-14 1800 Daily AMP POWERGRID WR-II R48 400 Bus - 2 at Pune 25-Mar-14 800 25-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R

49 765 Bus - 1 at Wardha 25-Mar-14 800 25-Mar-14 1800 Daily Jumper connection work of 765KV Raipur-Wardha line

WRTS-I WRTS-I R

50 400 Kolhapur-Mapusa 2 25-Mar-14 600 25-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

51 220 Mapusa-Ponda line 25-Mar-14 1000 25-Mar-14 1500 Daily AMP Work GOA WRTS-I R

52 765 Bus-1 at Sasan 25-Mar-14 800 25-Mar-14 1800 Daily Jumpering of Bus 1 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

53 220 KAPP - Haldarwa 2 25-Mar-14 800 25-Mar-14 1800 Daily AMP POWERGRID WR-II R54 400 Vadavi - Kansari2 25-Mar-14 900 25-Mar-14 1800 Daily AMP Reliance WR-II R55 400 Bus-1 at Indore (PG) 25-Mar-14 1000 26-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C56 765 Bus-1 at Satna 25-Mar-14 800 25-Mar-14 1800 Continuous Bay extension work POWERGRID WR-II C57 765 Sipat 765KV 400KV 1000MVA ICT-1 25-Mar-14 900 25-Mar-14 1900 Daily SPS Protection scheme modification NTPC NTPC

58 765 Bus - 2 at Wardha 26-Mar-14 800 26-Mar-14 1800 Daily Jumper connection work of 765KV Raipur-Wardha line

WRTS-I WRTS-I R

59 400 Bhadrawati-Parli 2 63MVAr Line Reactor at Parli

26-Mar-14 800 26-Mar-14 1800 Daily AMP Work of Recator at Parli line in service wo reactor

WRTS-I WRTS-I R

60 400 Kolhapur-Mapusa 1 26-Mar-14 600 26-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

61 220 Mapusa-Amona line 26-Mar-14 1000 26-Mar-14 1500 Daily AMP Work GOA WRTS-I R62 765 Bus-2 at Satna 26-Mar-14 800 26-Mar-14 1800 Continuous Bay extension work POWERGRID WR-II C

63 765 Bus-2 at Sasan 26-Mar-14 800 26-Mar-14 1800 Daily Jumpering of bus 2 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

64 400 401 KV Main Bus-I at 400 KV Ss Khedamara 26-Mar-14 900 27-Mar-14 1700 Daily Erection of IPS Tube CSPTCL CSPTCL C

65 400 401 KV Khedamara-KSTPS NTPC ckt-II at 400 KV Ss Khedamara

26-Mar-14 900 27-Mar-14 1700 Daily Erection of IPS Tube PGCIL CSPTCL C

66 400 ACBIL-BILASPUR-CKT NO -2 26-Mar-14 900 31-Mar-14 1800 CONT FOR lilo CONNECTIVITY OF 300MW MCCPL TPP

ACBIL ACBIL C

67 765 Bus-2 at Bilaspur 27-Mar-14 800 27-Mar-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R68 220 Mapusa-Thivim 1 27-Mar-14 1000 27-Mar-14 1500 Daily AMP Work GOA WRTS-I R69 220 KAPP - Vav 2 27-Mar-14 800 27-Mar-14 1800 Daily AMP POWERGRID WR-II R70 400 Bus-2 at Indore (PG) 27-Mar-14 1000 28-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

71 765 Bus-2 at Gwalior 27-Mar-14 1000 27-Mar-14 1800 Daily Bay extension work related to Gwalior Jaipur 1 Bays

POWERGRID WR-II C

72 400 VSTPS Tie- Line-1 ( Line from Stage-III to IV Switchyard)

27-Mar-14 900 27-Mar-14 1900 Daily Basis AMP and rectification of hot spots NTPC NTPC

73 765 Sipat 765KV 400KV 1000MVA ICT-2 27-Mar-14 900 27-Mar-14 1900 Daily SPS Protection scheme modification NTPC NTPC74 765 Bus-1 at Solapur 28-Mar-14 700 30-Mar-14 1800 Daily commissioning tests amp SCADA works WRTS-I WRTS-I C75 220 Mapusa-Thivim 2 28-Mar-14 1000 28-Mar-14 1500 Daily AMP Work GOA WRTS-I R

76 400 Koradi-Satpura 28-Mar-14 1000 28-Mar-14 1400 Daily Earthwire tighting work damaged during Crossing work

WRTS-I ADANI C

77 220 Bus-1 at Dehgam 28-Mar-14 900 28-Mar-14 1800 Daily AMP POWERGRID WR-II R78 220 Kawas - Haldarwa 2 28-Mar-14 800 28-Mar-14 1800 Daily AMP POWERGRID WR-II R79 400 Chorania Amreli 28-Mar-14 800 28-Mar-14 1800 Daily PMM work GETCO GETCO

80 400DC Akola-Aurangabad (MSETCL) 1 and Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

29-Mar-14 600 30-Mar-14 1800 Conti Charging amp shifting of Akola-Abad line on MC Abad-Abad line WRTS-I WRTS-I C

81 220 Bus-2 at Dehgam 29-Mar-14 900 29-Mar-14 1800 Daily AMP POWERGRID WR-II R82 400 Bus -1 at Mapusa 30-Mar-14 1000 30-Mar-14 1500 Daily AMP Work WRTS-I WRTS-I R

83 765 765kV Bus Reactor at Solapur 31-Mar-14 700 2-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

Date Time Date Time

1 400 Bhilai-Koradi 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

2 400 DC Korba-Birsingpur 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

3 400 Korba-Bhilai 2 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

4 220 Korba-Budhipadar 3 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

5 400 Akola-Wardha 1amp 2 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

6 400 Raipur-Raigarh 1 amp Raipur-KSK-DBPL-Raigarh

1-Apr-14 800 30-Apr-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

7 400 Bhadrawati-Parli 1amp 2 1-Apr-14 900 30-Apr-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I C

8 400 400220kv ICT-1 at Pune 1-Apr-14 800 1-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R9 400 Bus-1 at Bilaspur 1-Apr-14 800 1-Apr-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R

10 400 Solapur(PG) -Karad line 1-Apr-14 700 10-Apr-14 1800 Conti Erection of 80MVAr new reactor by shifitng line equipments at Solapur

MSETCL WRTS-I C

11 400 Bus-1 at Jabalpur (pooling) 01-Apr-14 1000 01-Apr-14 1800 Daily Busbar Stability test related to Jhabua Power Bays

POWERGRID WR-II C

12 400 Shujalpur - Nagda 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

13 400 Mundra - Bhachau 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

14 400 Bina - Shujalpur 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

15 220 Omkareshwar-Khandwa Ckt 1-Apr-14 900 1-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI16 400 Sipat 400KV Bay 10 and 11 1-Apr-14 900 3-Apr-14 1900 Continous 400KV CT 3nos replacement NTPC NTPC17 400 Padgha-Nagothane ckt I 1-Apr-14 900 1-Apr-14 1700 Daily QMwork MSETCL MSETCL

18 400 Bus-2 at Jabalpur (pooling) 02-Apr-14 1000 02-Apr-14 1800 Daily Busbar Stability test related to Jhabua Power Bays

POWERGRID WR-II C

19 400 Vindhyanchal - Mahan - Korba (Section of both the line on same Dc tower)

02-Apr-14 800 03-Apr-14 1700 Continuous For Power Line crossing of 765kV Vindhyanchal (pooling) - Satna 1 Line

POWERGRID WR-II C

20 400 400kV ICT 4 at Indore MPPTCL 02-Apr-14 1000 04-Apr-14 1800 ContinuousFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

MPPTCL WR-II C

21 400 400kV Bus Coupler bay at Indore MPPTCL 02-Apr-14 1000 04-Apr-14 1800 ContinuousFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

MPPTCL WR-II C

22 400 400kV Itarsi - Indore MPPTCL 1 Line 02-Apr-14 1000 02-Apr-14 1500 DailyFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

POWERGRID WR-II C

23 400400 KV LILO Line of 400 KV SC Korba West-Khedamara to 400 KV Ss Raita (Between Loc69 amp70 near Raita Ss)

2-Apr-14 800 3-Apr-14 1700 DailyMaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

CSPTCL CSPTCL C

24 400 Chandrapur-Khaparkheda 2-Apr-14 900 2-Apr-14 1700 Daily QMwork MSETCL MSETCL

25 400 Lamboti-Solapur PG 2-Apr-14 900 2-Apr-14 1700 Daily QMwork MSETCL MSETCL

26 400 Bus-1 at Durg PS Ss 3-Apr-14 900 3-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R27 400 Bus-1 at Jabalpur 03-Apr-14 900 03-Apr-14 1800 Daily Retrofitting of Isolator arms(689A) POWERGRID WR-II R28 400 315MVA ICT2 at Khandwa 03-Apr-14 1000 03-Apr-14 1600 Daily AMP POWERGRID WR-II R29 400 Mundra - Hadala 3-Apr-14 800 3-Apr-14 1800 Daily PMM GETCO GETCO30 400 400KV Seoni -Bhilai Ckt 3-Apr-14 900 3-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I31 400 Lonikand-Chakan 3-Apr-14 900 3-Apr-14 1700 Daily QMwork MSETCL MSETCL32 400 Bus-2 at Durg PS Ss 4-Apr-14 900 4-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R33 400 Bus-1 at Jabalpur 04-Apr-14 900 04-Apr-14 1800 Daily Retrofitting of Isolator arms(2089A) POWERGRID WR-II R

34 400 400kV Itarsi - Indore MPPTCL 1 Line 04-Apr-14 1300 04-Apr-14 1800 DailyFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

POWERGRID WR-II C

35 400 Varsana - Hadala 4-Apr-14 800 4-Apr-14 1800 Daily PMM GETCO GETCO

Agency Type

ANNEXURE‐32BOutages Proposal of Transmission elements during the month of APRIL ‐2014

SN KV Line From To

Basis Reason System

36 220 Vapi - Vapi (PG) 4-Apr-14 800 4-Apr-14 1800 Daily PMM work PGCIL GETCO37 220 Haldarva - Jhanor - 1 (NTPC) 4-Apr-14 800 4-Apr-14 1800 Daily PMM amp Tan Delta testing PGCIL GETCO38 400 400KV Birsinghpur -Katni Ckt - I 4-Apr-14 800 4-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I39 220 Badod - Kota Ckt 4-Apr-14 900 4-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI40 220 Malanpur-Auriya Ckt 4-Apr-14 900 5-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI

41 400 Bhusawal-Akola 4-Apr-14 900 4-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

42 400 Deepnagar-Aurangabad II 4-Apr-14 900 4-Apr-14 1700 Daily QMwork MSETCL MSETCL43 400 Kalwa-Padgha Ckt I 4-Apr-14 900 4-Apr-14 1700 Daily QMwork MSETCL MSETCL44 765 Bus Reactor at Seoni 5-Apr-14 900 5-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R

45 400 DC Korba-KhedamaraLilo at Marwa lilo section yet to be charge 5-Apr-14 800 6-Apr-14 1800 Daily

Crossing work of upcoming 765 KV DC Raigarh-Champa (AP-48A0- AP 490)DC Korba-Khedamara is in service

CSPTCL WRTS-1 C

46 400 Bus-1 at Jabalpur 05-Apr-14 900 05-Apr-14 1800 Daily Retrofitting of Isolator arms(1689A) POWERGRID WR-II R

47 400 Mundara -Limbdi 1 05-Apr-14 800 07-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

48 220 Badod - Modak Ckt 5-Apr-14 900 5-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI49 400 Dhule-Babhleswar ckt 1 5-Apr-14 900 5-Apr-14 1700 Daily QMwork MSETCL MSETCL50 400 400220kv ICT-1 at Seoni 7-Apr-14 900 7-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R51 400 Bus-2 at Jabalpur 07-Apr-14 900 07-Apr-14 1800 Daily Retrofitting of Isolator arms(1789B) POWERGRID WR-II R52 400 315MVA ICT1 at Khandwa 07-Apr-14 1000 07-Apr-14 1600 Daily AMP POWERGRID WR-II R53 220 Chhegoan-Khandwa Ckt -II 7-Apr-14 900 7-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI54 400 Korba- Bhilai1 7-Apr-14 900 8-Apr-14 1900 days continuou Bay Maint and testing NTPC NTPC55 400 Vindhyachal - Mahan line 7-Apr-14 900 8-Apr-14 1900 Continuous Replacement of R Y and B Phase CT NTPC NTPC56 400 Bhusawal-Aurangabad 7-Apr-14 900 7-Apr-14 1700 Daily QMwork MSETCL MSETCL57 400 New Koyna-Karad ckt 2 7-Apr-14 830 7-Apr-14 1730 Daily QMwork MSETCL MSETCL

58 400 Mundara -Limbdi 2 08-Apr-14 800 10-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

59 400 Chorania Hadala 8-Apr-14 800 8-Apr-14 1800 Daily PMM GETCO GETCO60 400 Sipat 400KV Bay 23 8-Apr-14 900 9-Apr-14 1900 Continous One 400KV CT replacement NTPC NTPC61 400 Koradi-Khaparkheda I 8-Apr-14 900 8-Apr-14 1700 Daily QMwork MSETCL MSETCL62 765 765400KV ICT-1 at Kotra PS 9-Apr-14 900 9-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R63 400 Bus-2 at Jabalpur 09-Apr-14 900 09-Apr-14 1800 Daily Retrofitting of Isolator arms(489B) POWERGRID WR-II R64 400 315MVA ICT1 at Damoh 09-Apr-14 1000 09-Apr-14 1600 Daily AMP POWERGRID WR-II R65 400 Amreli-Jetpur 2 9-Apr-14 800 9-Apr-14 1800 Daily PMM GETCO GETCO66 400 SSP- Rajgarh - 1 9-Apr-14 800 9-Apr-14 1800 Daily PMM GETCOMPTCL GETCO67 220 TAPS1 amp2-TAPS 3amp4 tie line 9-Apr-14 800 9-Apr-14 1600 one day Annual maintenance Works MSETCL NPCIL68 220 TAPS TIE LIE-I 9-Apr-14 800 10-Apr-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL69 400 400 KV Indore - Nagda Ckt 9-Apr-14 900 9-Apr-14 1600 daily For maintenance work MPPTCL EHT- Mamp I70 400 400 KV Sarni - Isp Ckt 9-Apr-14 900 9-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I71 220 Mehgaon-Auriya Ckt 9-Apr-14 900 10-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI72 400 315 MVA 400220Kv X-mer III At Bhopal SS 9-Apr-14 900 10-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI73 400 Padgha-Tarapur CktII 9-Apr-14 900 9-Apr-14 1700 Daily QMwork MSETCL MSETCL74 765 Bus Reactor at Kotra PS 10-Apr-14 900 10-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R

75 765 amp 400

765400 kV ICT-I at Solapur amp 400KV Solapur-Parli 2 10-Apr-14 700 12-Apr-14 1800 Daily 765400 kV spare ICT unit Aux bus works CSD

commissioning amp Fire fighting works at Solapur WRTS-IReliance WRTS-I C

76 400 315MVA ICT2 at Damoh 10-Apr-14 1000 10-Apr-14 1600 Daily AMP POWERGRID WR-II R

77 765 Sasan-Satna 1 10-Apr-14 800 11-Apr-14 1800 Daily For AMP of line amp Line terminal Equipments Post commissioning checks

POWERGRID WR-II C

78 400 APL-Varsana 10-Apr-14 800 10-Apr-14 1800 Daily PMM GETCO GETCO79 400 400 KV Isp - Nagda Ckt 10-Apr-14 900 10-Apr-14 1600 daily For maintenance work MPPTCL EHT- Mamp I80 400 400 KV Bhopal-Itarsi(PGCIL) Ckt-I 10-Apr-14 900 11-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I81 220 Chhegoan-Khandwa Ckt -I 10-Apr-14 900 10-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI82 400 315 MVA 400220Kv X-mer At Katni SS 10-Apr-14 800 11-Apr-14 1800 continue For maintenance work MPPTCL EHT -MampI83 400 Korba- Bhilai2 10-Apr-14 900 11-Apr-14 1900 days continuou Bay Maint and testing NTPC NTPC84 400 Sipat 400KV Bay 14 10-Apr-14 900 12-Apr-14 1900 Continous 400KV CT 3nos replacement NTPC NTPC

85 400 Chandrapur II-Parli II 10-Apr-14 900 10-Apr-14 1700 Daily Providing of Arching horncorona rings Bird guards quarter pinsNut bolts

MSETCL MSETCL

86 400 Karad-Lonikand 10-Apr-14 900 10-Apr-14 1700 Daily QMwork MSETCL MSETCL87 400 Raipur-Durg PS 1 11-Apr-14 900 11-Apr-14 1700 Daily AMP Work WRTS-I WRTS-I R

88 400 Mundara -Jetpur 1 11-Apr-14 800 15-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

89 400 Varsana-Hadala Line 11-Apr-14 800 11-Apr-14 1800 Daily PMM GETCO GETCO90 220 Haldarwa Kawas-2 11-Apr-14 800 11-Apr-14 1800 Daily PMM work PGCIL GETCO91 400 400 KV Nagda-Rajgarh(PGCIL) Ckt-I 11-Apr-14 900 11-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

92 400 315 MVA 400220Kv X-mer III ampTie bay At Bhopal SS

11-Apr-14 900 11-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI

93 400 Akola-Nandgaonpeth 11-Apr-14 900 11-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

94 400 Akola-Wardha I 11-Apr-14 900 11-Apr-14 1700 Daily QMwork MSETCL MSETCL95 400 Kalwa-Lonikand 11-Apr-14 900 11-Apr-14 1700 Daily QMwork MSETCL MSETCL96 400 400220kv ICT-1 at Mapusa 12-Apr-14 900 12-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R97 400 Raipur-Durg PS 2 12-Apr-14 900 12-Apr-14 1700 Daily AMP Work WRTS-I WRTS-I R98 765 Sasan-Satna2 with line reactor 12-Apr-14 1000 12-Apr-14 1800 Daily AMP POWERGRID WR-II R99 400 400 KV Nagda-Rajgarh(PGCIL) Ckt-II 12-Apr-14 900 12-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I100 400 Deepnagar-Aurangabad I 12-Apr-14 900 12-Apr-14 1700 Daily QMwork MSETCL MSETCL101 400 Amreli-Jetpur 2 14-Apr-14 800 14-Apr-14 1800 Daily PMM GETCO GETCO102 400 Kasor - Gpec 14-Apr-14 800 14-Apr-14 1800 Daily PMM GETCO GETCO103 220 GWL(PGCIL)-Malanpur Ckt-I 14-Apr-14 900 15-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI104 400 DC Korba-Raipur 3 amp 4 15-Apr-14 800 16-Apr-14 1800 Conti Bus splitting work at Raipur WRTS-1 WRTS-1 C

105 400 Korba-Bhatapara 15-Apr-14 800 24-Apr-14 1800 Conti For raising of ground clearence for Railway track of Lafarge

WRTS-I Lafarge C

106 765 765400 kV ICT-II at Solapur 15-Apr-14 700 17-Apr-14 1800 Daily CSD commissioning amp Fire fighting works WRTS-I WRTS-I C107 400 Vindhyachal-Satna1 15-Apr-14 1000 15-Apr-14 1800 Daily AMP POWERGRID WR-II R108 400 Ssnl-Dhule-1 15-Apr-14 800 15-Apr-14 1800 Daily PMM GETCOMSETCL GETCO109 220 TAPS-Vapi 15-Apr-14 800 17-Apr-14 1900 Daily Annual maintenance Works GETCO NPCIL110 220 Pithampur-Rajgarh(PGCIL) Ckt - I 15-Apr-14 900 15-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI111 400 Sipat 400KV Bay-18 ( Ranchi-1 Main) 15-Apr-14 900 15-Apr-14 1900 Daily Annual Preventive maintenance job NTPC NTPC112 400 Karad-Kolhapur Ckt I 15-Apr-14 900 15-Apr-14 1700 Daily QMwork MSETCL MSETCL

113 400 DC Raipur-Bhadrawati 2 amp 3 16-Apr-14 800 17-Apr-14 1800 Conti Bus splitting work at Raipur WRTS-1 WRTS-1 C

114 400 Vindhyachal-Satna2 16-Apr-14 1000 16-Apr-14 1800 Daily AMP POWERGRID WR-II R

115 400 Mundara -Jetpur 2 16-Apr-14 800 20-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

116 400 Vadavi - Dehgam (Pg) - 1 16-Apr-14 800 16-Apr-14 1800 Daily PMM amp Tandelta testing GETCO GETCO117 400 Chorania Asoj-1 16-Apr-14 800 16-Apr-14 1800 Daily PMM GETCO GETCO118 220 Bhilad - TAPS 16-Apr-14 800 16-Apr-14 1800 Daily PMM work PGCIL GETCO119 220 Bhat - Pirana (PG) - 1 16-Apr-14 800 16-Apr-14 1800 Daily PMM work GETCO GETCO120 400 400 KV Bhopal-Itarsi(PGCIL) Ckt-II 16-Apr-14 900 17-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I121 220 Damoh(PGCIL) - Tikamgarh Ckt 16-Apr-14 900 16-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI

122 400 400KV SC Korba-Raipur-II (Between Korba - Bhatapara end)(Between Loc2980 amp 2990) 16-Apr-14 800 17-Apr-14 1700 Daily

MaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

PGCIL CSPTCL C

123 400 Sipat 400KV Bay-19 ( Ranchi-2 Main) 16-Apr-14 900 16-Apr-14 1900 Daily Annual Preventive maintenance job NTPC NTPC124 400 Padgha-Babhleswar ckt I 16-Apr-14 900 16-Apr-14 1700 Daily QMwork MSETCL MSETCL125 400 Vadavi - Dehgam (Pg) - 2 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCO GETCO126 400 Ssnl-Dhule-2 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCOMSETCL GETCO127 400 Vadinar-Hadala- 1 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCO GETCO128 220 Bhat - Pirana (PG) - 2 17-Apr-14 800 17-Apr-14 1800 Daily PMM work GETCO GETCO129 400 400KV Birsinghpur -Katni Ckt - II 17-Apr-14 800 17-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I130 220 Pithampur-Rajgarh(PGCIL) Ckt - II 17-Apr-14 900 17-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI131 400 Jejuri-Lonikand 17-Apr-14 900 17-Apr-14 1700 Daily QMwork MSETCL MSETCL132 400 Deepnagar-Khadka II 17-Apr-14 900 17-Apr-14 1700 Daily QMwork MSETCL MSETCL133 400 Chorania Kasor 18-Apr-14 800 18-Apr-14 1800 Daily PMM GETCO GETCO134 220 GWL(PGCIL)-Malanpur Ckt-II 18-Apr-14 900 19-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI135 400 Akola-Wardha II 18-Apr-14 900 18-Apr-14 1700 Daily QMwork MSETCL MSETCL

136 400 Koradi-Nandgaonpeth 18-Apr-14 800 18-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

137 765 765kV Pune line Reactor at Solapur 19-Apr-14 700 20-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

138 400 400KV Bina -Power(JP) Ckt 19-Apr-14 900 19-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I139 400 Dhule-SSarovar I 19-Apr-14 900 19-Apr-14 1700 Daily QMwork MSETCL MSETCL

140 400 Koradi-Khaparkheda II 19-Apr-14 900 19-Apr-14 1700 Daily QMwork MSETCL MSETCL141 220 KAPP - VAPI - 1 20-Apr-14 800 20-Apr-14 1800 Daily Isolator replacement under ASIDE scheme PGCIL GETCO

142 400 DC Bhilai-Bhadrawati amp Raipur-Bhadrawati 1 21-Apr-14 800 28-Apr-14 1800 Conti Diversion of line for Vidarbha Industrial Devlopment Corporation(VIDC)

WRTS-I VIDC C

143 400 Bhachau- Ranchhodpura 1amp2 21-Apr-14 800 27-Apr-14 1800 Continuous Tower shifting work at canal crossingInsulator replacement work

POWERGRID WR-II C

144 400 Hadala-Amreli 21-Apr-14 800 21-Apr-14 1800 Daily PMM GETCO GETCO145 400 Vadinar-Hadala- 2 21-Apr-14 800 21-Apr-14 1800 Daily PMM GETCO GETCO146 220 TAPS-Boisar 21-Apr-14 800 23-Apr-14 1900 Daily Annual maintenance Works MSETCL NPCIL147 220 Bina(PGCIL)-220 KV Bina Ckt 21-Apr-14 900 21-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI148 400 CGPL Bhachau -1 21-Apr-14 8AM 21-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL149 220 Kawas-Ichhapore 1+Bus 1 21-Apr-14 900 21-Apr-14 1800 daily RTV Coating NTPC NTPC150 400 Karad-Kolhapur Ckt II 21-Apr-14 900 21-Apr-14 1700 Daily QMwork MSETCL MSETCL151 400 New Koyna-Koyna Stg-4-1 21-Apr-14 830 21-Apr-14 1730 Daily QMwork MSETCL MSETCL152 400 Ssp - Rajgarh - 2 22-Apr-14 800 22-Apr-14 1800 Daily PMM GETCOMPTCL GETCO153 400 Vadavi-Bhachau 2 22-Apr-14 800 22-Apr-14 1800 Daily PMM amp Tan Delta testing PGCIL GETCO154 220 Bhilad - Vapi (PG) - 1 22-Apr-14 800 22-Apr-14 1800 Daily PMM work PGCIL GETCO155 400 400 KV Rajgarh(PGCIL)-Ssp Ckt-I 22-Apr-14 900 22-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I156 400 400KV Seoni -Sarni Ckt 22-Apr-14 900 23-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I157 220 Khandwa(PGCIL)-Nepanagar Ckt 22-Apr-14 900 22-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI158 220 Kawas-Ichhapore 2+Bus 1 22-Apr-14 900 22-Apr-14 1800 daily For maintenance work NTPC NTPC159 400 Karad-Jaigad II 22-Apr-14 900 22-Apr-14 1700 Daily Annual maintenance work MSETCL MSETCL160 220 Bhilad - Vapi (PG) - 2 23-Apr-14 800 23-Apr-14 1800 Daily PMM work PGCIL GETCO161 400 400KV Bina -Bhopal Ckt -I 23-Apr-14 900 24-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I162 400 400 KV Rajgarh(PGCIL)-Ssp Ckt-II 23-Apr-14 900 23-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I163 220 Bina(PGCIL)-Shivpuri Ckt 23-Apr-14 900 24-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI164 220 Damoh(PGCIL) - Damoh I C - I 23-Apr-14 900 23-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI

165 400 400 KV DCDS Sipat- Raipur (IampII) 23-Apr-14 800 24-Apr-14 1700 DailyMaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

PGCIL CSPTCL C

166 400 CGPL Bhachau - 2 23-Apr-14 8AM 23-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL

167 220 Kawas-Navsari 2 +Bus 1 23-Apr-14 900 23-Apr-14 1800 daily Insulator replcement and routine maintenance NTPC NTPC168 400 Padgha-Babhleswar ckt II 23-Apr-14 900 23-Apr-14 1700 Daily QMwork MSETCL MSETCL169 400 Kasor - SSP 24-Apr-14 800 24-Apr-14 1800 Daily PMM work GETCO GETCO170 220 Bhilad - Vapi (PG) - 3 24-Apr-14 800 24-Apr-14 1800 Daily PMM work PGCIL GETCO171 220 TAPS-Bhilad 24-Apr-14 800 26-Apr-14 1900 Daily Annual maintenance Works GETCO NPCIL172 220 Damoh(PGCIL) - Damoh I C - II 24-Apr-14 900 24-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI173 400 CGPL Jetpur- 1 24-Apr-14 8AM 24-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL

174 220 Kawas-Ichhapore 1 +Bus 2 24-Apr-14 900 24-Apr-14 1400 daily Insulator replcement and routine maintenance NTPC NTPC

175 220 Kawas-Ichhapore 2 +Bus 2 24-Apr-14 1400 24-Apr-14 1900 daily Insulator replcement and routine maintenance NTPC NTPC176 400 Padgha-Talegaon 24-Apr-14 900 24-Apr-14 1700 Daily QMwork MSETCL MSETCL

177 765 765kV Raichur 1 line Reactor at Solapur 25-Apr-14 700 27-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

178 400 400KV Bina -Bhopal Ckt -II 25-Apr-14 900 26-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I179 400 CGPL Jetpur- 2 25-Apr-14 8AM 25-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL180 400 Vindhyachal -Satna-4 Line Shunt Reactor 25-Apr-14 900 25-Apr-14 1900 Daily Basis AMP NTPC NTPC

181 400 Bhusawal-Koradi 25-Apr-14 900 25-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

182 400 Deepnagar-Khadka I 25-Apr-14 900 25-Apr-14 1700 Daily QMwork MSETCL MSETCL183 400 Soja -Kansari 26-Apr-14 800 26-Apr-14 1800 Daily PMM GETCO GETCO184 400 Raipur-Wardha 1 27-Apr-14 800 28-Apr-14 1800 Daily Balance construction work WRTS-1 WRTS-1 C185 220 KAPP - VAPI - 2 27-Apr-14 800 27-Apr-14 1800 Daily Isolator replacement under ASIDE scheme PGCIL GETCO186 400 Soja -Kansari 28-Apr-14 800 28-Apr-14 1800 Daily PMM GETCO GETCO187 220 TAPS-Boisar II 28-Apr-14 800 30-Apr-14 1900 Daily Annual maintenance Works MSETCL NPCIL188 400 400KV Damoh - Katni Ckt 28-Apr-14 900 28-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I189 400 400 KV Damoh(PGCIL)-Katni Ckt 28-Apr-14 900 28-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I190 400 New Koyna-Karad ckt 1 28-Apr-14 830 28-Apr-14 1730 Daily QMwork MSETCL MSETCL

191 400 DC Raigarh-DB Power (Tudri) - KSK 29-Apr-14 800 30-Apr-14 1800 Conti Crossing work of 765kV SC Raigrah-Champa (90 - 100)

WRTS-I WRTS-I C

192 400 Raipur-Wardha 2 29-Apr-14 800 30-Apr-14 1800 Daily Balance construction work WRTS-1 WRTS-1 C193 220 Navsari - Nasik - 1 29-Apr-14 800 29-Apr-14 1800 Daily PMM work GETCOMSETCL GETCO194 220 Seoni(PGCIL)-Chhindwara Ckt-I 29-Apr-14 900 29-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI195 220 Kawas-Vav 1+ bus 2 29-Apr-14 900 29-Apr-14 1800 daily For maintenance work NTPC NTPC196 400 Chorania Asoj-1 30-Apr-14 800 30-Apr-14 1900 Daily PMM GETCO GETCO197 220 Navsari - Nasik - 2 30-Apr-14 800 30-Apr-14 1800 Daily PMM work GETCOMSETCL GETCO198 220 Vapi - TAPS 30-Apr-14 800 30-Apr-14 1800 Daily PMM work PGCIL GETCO199 220 Seoni(PGCIL)-Chhindwara Ckt-II 30-Apr-14 900 30-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI200 220 Kawas-Vav 1+ bus 2 30-Apr-14 000 30-Apr-14 000 daily For maintenance work NTPC NTPC

Annexure-32-C1

List of Emergency Outages availed in Feb 2014

SlNo

Element kV Agency From

Date To Date

Remarks

1 SATNA‐BINA‐II 765 WRTS‐2 4‐Feb‐14

5‐Feb‐14

Hot spot attending

2 SUJALPUR‐NAGDA LR NAGDA

400 WRTS‐2 6‐Feb‐14

19‐Feb‐14

Oil leackage

3 SOLAPUR‐PARLI‐II

400 WRTS‐2 6‐Feb‐14

6‐Feb‐14

Hotspot attend at solapur

4 JABALPUR‐ITARSI‐IV LR AT ITARSI‐LR

400 WRTS‐2 7‐Feb‐14

17‐Feb‐14

Oil leackage

5 APL‐HADALA‐SC 400 GEB 7‐Feb‐14

7‐Feb‐14

Hot spot

6 SOLAPUR‐PARLI(PG)‐1

400 WRTM(REL)

9‐Feb‐14

9‐Feb‐14

Hot spot

7 BOISAR‐BOISAR(PG)‐II

220 MSETCL 9‐Feb‐14

9‐Feb‐14

Hotspots

8 NEW KOYNA‐KARAD ‐ I

400 MSETCL 10‐Feb‐14

11‐Feb‐14

Dc‐earth leakage

9 LONIKHAND ‐ KARAD

400 MSETCL 10‐Feb‐14

11‐Feb‐14

Hotspot

10 NAGDHA ICT ‐ III

400220

MPPTCL 10‐Feb‐14

10‐Feb‐14

Hotspot

11 AKOLA ‐ ABAD ‐I AKOLA

400 WRTS‐1 11‐Feb‐14

12‐Feb‐14

Oil leackage

12 AKOLA ‐ AURANGABAD ‐ I

400 WRTS‐1 11‐Feb‐14

11‐Feb‐14

Oil leackage ion lr

13 BINA‐GWALIOR 765 WRTS‐1 14‐Feb‐ 14‐Feb‐ Attend oil leakage on lr

SlNo

Element kV Agency From

Date To Date

Remarks

II 14 14

14 AKOLA‐TIRORA‐I 765 MSETCL 22‐Feb‐14

23‐Feb‐14

Sparking in LR at Tirora SYED AT TIRORA END

15 KHAEGAR‐ICT‐I 400220

MSETCL 22‐Feb‐14

22‐Feb‐14

Hot spot

16 KHANDWA‐NEPANAGR‐SC

220 MPPTCL 23‐Feb‐14

23‐Feb‐14

Hot spot

17 GWALIAR ‐SATNA ‐ I

765 WRTS‐2 24‐Feb‐14

1‐Mar‐14

Attend hot spot

18 KORBA BUS‐III 400 NTPC 25‐Feb‐14

25‐Feb‐14

Hots pot attend

19 BUS‐1 AT GWALIOR

765 WRTS‐2 13‐Feb‐14

13‐Feb‐14

Checking of blocked BB main‐1 relay

20 RAIPUR‐BWATI‐2

400 WRTS‐1 17‐Feb‐14

17‐Feb‐14

Urgent Removal of LR at Raipur end for DGA violation

21 TAPS‐PADGHE 400 TAPS‐3amp4 19‐Feb‐14

23‐Feb‐14

To attend SF‐6 leakage

22 SATNA‐GWALIOR‐1

765 WRTS‐2 24‐Feb‐14

26‐Feb‐14

To attend hot spots

23 VCHAL‐JABALPUR‐IV

400 WRTS‐2 27‐Feb‐14

27‐Feb‐14

To increase OPGW‐Top conductor clearance to avoid tripping

24 APL‐SAMI‐2 400 APL 26‐Feb‐14

26‐Feb‐14

To attend hot sopt

25 SHOLAPUR BUS‐1

765 WRTS‐1 27‐Feb‐14

27‐Feb‐14

To attend hot sopt

26 BOISAR BUS‐2 220 WRTS‐1 28‐Feb‐14

28‐Feb‐14

To attend hot sopt

Sl No KV element From To Basis Work System Agency Remarks

1220 Vapi (GETCO)‐Bhilad 1‐Feb‐14 800 2‐Feb‐14 1800 Daily Line crossing work of 400KV LILO line for

Magarwada SSGETCO POWERGRID N

2 220 Omkareshwar-Khandwa Ckt

3-Feb-14 900 3-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

3 400 New Koyna-Koyna Stg-4-1

3-Feb-14 830 3-Feb-14 1730 Daily QMwork MSETCL MSETCL N

4220 Vapi ‐ Magarwada

Ckt13‐Feb‐14 900 3‐Feb‐14 1400 Daily AMP of line amp equipment WRTS‐II POWERGRID DD may have to do load

shedding as per Reliability Suggestion

N

5 220 DC Raigarh- Raigarh 1amp 2

4-Feb-14 800 5-Feb-14 1800 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (040-50)

CSPTCL WRTS-I N

6 220 Itarsi(PGCIL)-Hoshangabad Ckt

4-Feb-14 900 4-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N

7 400 Mundra -Limbdi-2 4-Feb-14 800 4-Feb-14 1800 Daily Suspension Insulator replcement and routine maintenance

PGCIL CGPL N

8 400 400 kV DC Satna - Bina 1amp2

4-Feb-14 800 5-Feb-14 1800 Continous Crossing of Jabalpur-Bina 765 kv SC Line PGCIL JTCL N

9220 Vapi ‐ Magarwada

Ckt24‐Feb‐14 0900 4‐Feb‐14 1400 Daily AMP of line amp equipment WRTS‐II POWERGRID N

10 765 Seoni-Bina line with LR 4‐Feb‐14 800 4-Feb-14 1800 Daily AMP Work WRTS-2 WRTS-1 N

11 400 Bus I Bina 5‐Feb‐14 800 5‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

12220 Kawas ‐ Navsari (PG)

25‐Feb‐14 800 5‐Feb‐14 1800 Daily Replacement of ST insulators by Double Tension

insulator in Railway crossing spansWRTS‐II POWERGRID N

13400 Indoer (PG) ‐Indore

(MP) DC5‐Feb‐14 800 6‐Feb‐14 1800 Continou

sStringing of 765kV Indore ‐ Vadodara line WRTS‐II POWERGRID N

14 400 APL - Hadala 6-Feb-14 800 6-Feb-14 1800 Daily PMM GETCO GETCO N N

15 220 Seoni(PGCIL ) - Chhindwara CKT I

6-Feb-14 900 6-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N N

16 400 Jejuri-Koyna stg IV 6-Feb-14 900 6-Feb-14 1700 Daily QMwork MSETCL MSETCL N17 400 Akola-Nandgaonpeth 6-Feb-14 900 6-Feb-14 1700 Daily Quaterly Maintainance Work MSETCL MSETCL N18 400KV Korba-Bhatapara 6-Feb-14 900 7-Feb-14 1900 Cont Testing of LBB auto re-close M-I amp M-II relays NTPC NTPC N19 220 Haldarva - Jhanor - 2

(NTPC)6-Feb-14 900 6-Feb-14 1800 Daily PMM work GETCO N

20220 Navsar (PG) ‐Navsari

(GETCO) 16‐Feb‐14 800 6‐Feb‐14 1800 Daily Replacement of ST insulators by Double Tension

insulator in Railway crossing spansWRTS‐II POWERGRID

N

21 400 Bus‐II Bina 6‐Feb‐14 800 6‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

22400 Seoni‐Khandwa1 6‐Feb‐14 1000 6‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Khandwa end by MS ABB

WRTS‐II POWERGRID Rescheduled to 6th March N

23 400 Rajgarh-Ssp Ckt-II 7-Feb-14 900 7-Feb-14 1600 daily For maintenance work MPPTCL EHT- Mamp I N24 220 Chhegoan-Khandwa

Ckt -II7-Feb-14 900 7-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

25 220 Wardha (PG)-Wardha 7-Feb-14 800 7-Feb-14 1800 Daily AMP Work MSETCL WRTS-I N26 400 Chorania - Vadavi-2 7-Feb-14 800 7-Feb-14 1800 Daily PMM amp Tan Delta testing WRTGPL GETCO N27 400 Jabalpur‐Itarsi1 7‐Feb‐14 900 7‐Feb‐14 1400 Daily AMP OF TERMINAL EQUIPMENT WRTS‐II POWERGRID N

28220 Vapi(PG)‐ Bhilad ckt

2 amp 3 7‐Feb‐14 800 8‐Feb‐14 1800 Daily Line crossing work of 400KV LILO of Navsari‐Boisar

at MagarwadaGETCO POWERGRID N

29 220 Mapusa-Thivim 1 8-Feb-14 800 8-Feb-14 1800 Daily AMP Work GOA WRTS-I N

30400 Seoni‐Khandwa2 9‐Feb‐14 1000 9‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Khandwa end by MS ABB

WRTS‐II POWERGRID Rescheduled to 7th March N

31 220 Chhegoan-Khandwa Ckt -I

10-Feb-14 900 10-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

Annexure-32-C2OCC approved outage not availed in Feb‐2014

32132 132 kV Dhule

Dondaicha line10-Feb-14 800 11-Feb-14 1800 Cont Crossing of Dhule-Vadodara 765 kv SC Line MSETCL BDTCL subjected to sldc

clearance N

33 400132 KV

Vindhyachal ICT-1 10-Feb-14 900 14-Feb-14 1900 Cont ICT Overhauling NTPC NTPC N

34400 KV Vindhyachal - Jabalpur-

3 Line Shunt Reactor10-Feb-14 900 14-Feb-14 1900 Cont Reactor Overhauling NTPC NTPC

N

35 400 KSK-DB Power 10-Feb-14 800 13-Feb-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end WRTS-IDBKSK

KSK N36 220 Ipore-Kawas-1 10-Feb-14 800 10-Feb-14 1800 Daily PMM work GETCO N

37400 Vindhyachal‐Mahan 10‐Feb‐14 800 11‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐I WRTS‐II N

38400 Mahan‐Korba 10‐Feb‐14 800 11‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐I WRTS‐II N

39765 Jabalpur ‐ Bina 1 10‐Feb‐14 1000 10‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Jabalur end by MS ABB

WRTS‐II POWERGRID Differed by siteN

40 400 SSP - Rajgarh - 1 10-Feb-14 800 11-Feb-14 1800 Daily Basis

PMM Work GETCO N

41 400 DC Tundri (DB Power) -ksk-Raigarh

10-Feb-14 800 11-Feb-14 1800 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (092-100)

DB Power WRTS-I N42 400 Jetpur - Amreli - 1 11-Feb-14 800 12-Feb-14 1800 Daily PMM GETCO GETCO N43 400 Hadala - Vadinar-2 11-Feb-14 800 11-Feb-14 1800 Daily PMM GETCO GETCO N44 400 Nagda-Rajgarh Ckt-I 11-Feb-14 900 11-Feb-14 1800 daily For maintenance work MPPTCL EHT- Mamp I N45 220 Mehgaon-Auriya Ckt 11-Feb-14 900 11-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N46 220 Seoni(PGCIL ) -

Chhindwara CKT II11-Feb-14 900 11-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

47

765kV Main Bus-1B at SASANBay 13 - Jack Bus

11-Feb-14 900 21-Feb-14 1800 Daily Jumper Installations amp ConnectionsIsolator Allignment

PGCIL Reliance Provisional Subject to details of works done to be apprised on daily basis

N

48 220 Ipore-Kawas-2 11-Feb-14 800 11-Feb-14 1800 Daily PMM work GETCO N49 220 Navsari - Nasik - 2 11-Feb-14 900 11-Feb-14 1800 Daily PMM work GETCO N

50765 Jabalpur ‐ Bina 2 11‐Feb‐14 1000 11‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Jabalur end by MS ABB

WRTS‐II POWERGRID Deferred by siteN

51 400 Nagda-Rajgarh Ckt-II 12-Feb-14 900 12-Feb-14 1800 daily For maintenance work MPPTCL EHT- Mamp I N52 400 Karad-Solapur (PGCIL) 12-Feb-14 900 12-Feb-14 1700 Daily QMwork MSETCL MSETCL N53 400 Raipur-Sipat 1 amp 2 26-Feb-14 800 3-Mar-14 1800 Conti Diversion of line for Lafarge Railway track WRTS-I Lafarge Ori 12-16 Feb 14 Deferre N54 220 Haldarwa Kawas-2 12-Feb-14 900 12-Feb-14 1800 Daily PMM work GETCO N

55 220 Bus‐I Bina 12‐Feb‐14 800 12‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

56 400 Chorania - Hadala 13-Feb-14 800 14-Feb-14 1800 Daily PMM GETCO GETCO N57 400 Tarpur-Padghe-2 13-Feb-14 800 14-Feb-14 1800 Daily maintenance work POWERG

RIDNPCIL N

58400 Vindhyachal‐Satna1 13‐Feb‐14 1000 13‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

59 220 Bus‐II Bina 13‐Feb‐14 800 13‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

60 220 Pithampur-Rajgarh Ckt - I

14-Feb-14 900 14-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

61 220 Wardha (PG)-Badnera 14-Feb-14 800 14-Feb-14 1800 Daily AMP Work at Wardha MSETCL WRTS-I N

62 400 Bhusawal-Koradi 14-Feb-14 900 14-Feb-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL N

63 400 Raipur-KSK 14-Feb-14 800 16-Feb-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end WRTS-IKSK

KSK N

64 220 GWL(PGCIL)-Malanpur Ckt-II

15-Feb-14 900 15-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N

65 220 Pithampur-Rajgarh Ckt - II

15-Feb-14 900 15-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

66400 Vindhyachal‐Satna2 16‐Feb‐14 1000 16‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

67 220 KAPS - Haldarwa - 1 17-Feb-14 800 17-Feb-14 2000 Daily Yearly PM checks KAPS N

68400 3X105 MVA 400220Kv

X-mer I At Indore ss17-Feb-14 800 18-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI

N

69

220 SC Korba-Raigarh-Budhipadar sc(PGCIL) amp DC Korba-Budipadar both circuits (CSPTCL)

18-Feb-14 800 19-Feb-14 1800 Conti Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCLWRTS-I

WRTS-I

N

70 400 Itarsi-Bhopal Ckt-I 18-Feb-14 900 19-Feb-14 1700 daily For maintenance work MPPTCL EHT- Mamp I N71 220 Badod - Kota Ckt 18-Feb-14 900 18-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N72 220 Damoh(PGCIL) -

Damoh I C - II18-Feb-14 900 18-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

73 220 Badod - Modak Ckt 19-Feb-14 900 19-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

74220 KAPS - Ukai - Mota 19-Feb-14 800 19-Feb-14 2000 Daily Yearly PM checks KAPS Non consent from SLDC

GETCO N

75400 315 MVA 400220 KvX-

mer III At Indore ss20-Feb-14 800 21-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI

N

76 220 Seoni(PG)-Seoni 2 21-Feb-14 800 21-Feb-14 1800 Daily AMP Work MPPTCL WRTS-I Y N77 220 Bina(PGCIL)-Shivpuri

Ckt21-Feb-14 900 22-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI Y N

78 400 Koradi-Nandgaonpeth 21-Feb-14 900 21-Feb-14 1700 Daily QMwork MSETCL MSETCL N N79 220 Haldarva - Jhanor - 1

(NTPC)21-Feb-14 900 21-Feb-14 1800 Daily PMM work GETCO N

80

765kV Main Bus-2A at SASANSatna Line-2

22-Feb-14 900 28-Feb-14 1800 Contionious

Equipment ConnectionsCircuit Breaker TestingJumper MeasurementIsolator Allignment Reactor accessories erection on R-Phase

PGCIL Reliance

N

81 400 Korba-Raipur 3 amp 4 23-Feb-14 800 24-Feb-14 1800 Conti For Bus spliting work at Raipur765 KV Raigarh-Raipur and 765 Champa Raipur lines

WRTS-1 WRTS-1 N

82132 132kV Astha - Polai SC

line of MPPTCL24-Feb-14 800 25-Feb-14 1800 Continous Crossing of Bhopal -Indore 765 kv SC Line MPPTCL BDTCL subjected to sldc

clearance N

83 400 Bus-1 at Bilaspur 24-Feb-14 800 24-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I N

84400 Seoni -

Khedamara(Bhilai) Ckt25-Feb-14 900 25-Feb-14 1800 daily For maintenance workFeeder bay maintenance at

KMaraMPPTCL CSPTCLMPPT

CLNo confirmation on D-3

N

85400 Ranchi-Sipat 1 amp 2 25-Feb-14 800 26-Feb-14 1800 Conti Crossing work of upcoming 765 KV DC

Jharsuguda-Korba amp 765KV SC Ranchi-BilaspurWRTS-I WRTS-I No confirmation on D-3

N

86765 Sasan‐Satna2 25‐Feb‐14 800 26‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐II POWERGRID No confirmation on D-3 N

87400 Bus Reactor1 at Satna 25‐Feb‐14 1000 25‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

88400 400 kV DC Damoh -

Bhopal Line26-Feb-14 800 27-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL Not availed by agency for

rainsN

89400 Raipur-Bhadrawati 2 amp

327-Feb-14 800 27-Feb-14 2100 Daily For Bus spliting work at Raipur765 KV Raigarh-

Raipur and 765 Champa Raipur linesWRTS-1 WRTS-1 Subject to Telemetry from

Durg PS RaipurN

90 400 Birsinghpur‐Vandana Vidyut

27‐Feb‐14 800 27‐Feb‐14 1700 Daily AMP of Terminal Equipment amp line Reactor WRTS‐I POWERGRID Ready N

91 400 Bhusawal-Akola 28-Feb-14 900 28-Feb-14 1700 Daily QMwork MSETCL MSETCL N92 220 Bus-1 at Wardha 28-Feb-14 800 28-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I N93 400 Birsinghpur‐Balco 28‐Feb‐14 800 28‐Feb‐14 1700 Daily AMP of Terminal Equipment amp line Reactor WRTS‐I WRTS‐I Deferred by site N

94 400 Nagda‐Dehgam2 5‐Feb‐14 1000 5‐Feb‐14 1800 DailyCommissioning amp checking of CSD relay in Main CB for reactor switching at Dehgam end by MS ABB

WRTS‐II POWERGRID N

95 400 400kV Satpura Itarsi 10‐Feb‐14 900 11‐Feb‐14 1700 DailyCommissioning of new CB after dismantling of existing TELK make CB at Satpura end amp normalising of line on main CB

POWERGRID

WRTS‐II N

96 765 765 kV Satna - Bina Ckt I

6-Feb-14 800 8-Feb-14 1800 cont Stringing of Jabalpur-Bina 765 kv SC Line PGCIL JTCL Original27-28 Jan14 Def N

97 765400 765400 kV ICT-1 at Bina 20-Feb-14 90000 AM 21-Feb-13 60000 PM Continuou

sCSD commissioning for 400kV Side CB of 765400 kV ICT-1 WRTS-II POWERGRID Deferred by site N

98 400 Nagda - Dehgam 1amp2 20-Feb-14 80000 AM 28-Feb-14 1700 Daily Online PID testing to insulators in both circuits AR shall be kept in non auto mode in both circuits WRTS-II POWERGRID

N

99 220MC Waluj-Chitegaon amp Waluj-Jalna

21-Feb-14 700 21-Feb-14 1900 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad MSETCL WRTS-I

N

100 400 Bus 1 at Asoj 21-Feb-14 000 21-Feb-14 1800 Daily For checking bus stability testing of Piran 1 amp 2 bays (for charging of new line) GETCO WRTS-II N

101 400 Bus-1 at Wardha 22-Feb-14 800 22-Feb-14 1800 Daily Jumper spacers connection at Wardha WRTS-I WRTS-I N102 400 Bus-1 at Raigarh 22-Feb-14 800 22-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I Deferred by site N103 765 Bus - II at Indore 22-Feb-14 90000 AM 23-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Not availed NLDC consenN104 220 Kakrapar-Haldarwa2 22-Feb-14 1000 Hrs 22-Feb-14 1600 Hrs Daily AMP POWERG

RID WRTS-II N

105 400 Bus 2 at Asoj 22-Feb-14 000 22-Feb-14 1800 Daily For checking bus stability testing of Piran 1 amp 2 bays (for charging of new line) GETCO WRTS-II N N

106400 400 kv DC Bhopal -

Bina Line (Ckt I amp II)(Tower no 34 amp35)

23-Feb-14 800 24-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line MPPTCLBDTCL

N

107 765kV SASAN Main Bus-1BBay 10 - Jack Bus 24-Feb-14 800 Hrs 2-Mar-14 1900 Hrs Continuous Dia-4

(Bay-10) - SCCOCC Test of Unit 4 GTSasan Sasan N

108 765 Bus - I at Indore 24-Feb-14 90000 AM 25-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID N

109 765 765 KV Bina-Indore Line 24-Feb-14 0900 Hrs 24-Feb-14 1800 Hrs Daily

For taking spare reactor unit in service amp checking the scheme for spare reactor with 765 KV Bina-Indore Line Reactor at Bina

POWERGRID WRTS-II

Deferred by site N

110 400 Kasor - GPEC 24-Feb-14 800 25-Feb-14 1800 Daily PMM Work GETCO GETCO N111 40022033 315 MVA ICT2 at Kheda 24-Feb-14 900 10-Mar-14 1800 cont modification work in SS lay out CSPTCL CSPTCL N112 400 315 MVA ICT2 at

Gwalior 25-Feb-14 90000 AM 25-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID N

113 400KV V-Satna-4 Line Shunt Reactor 25-Feb-14 1000 25-Feb-14 2000 Daily

Basis AMP NTPC NTPC N

114 400 Raipur-Wardha 1 26-Feb-14 800 26-Feb-14 2000 Daily Balance construction works at Wardha end WRTS-I WRTS-IReady Ori26214 Deferred by site

N

115 400 Bus -I at Indore 26-Feb-14 90000 AM 26-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Deferred by site N116 400 315 MVA ICT3 at

Gwalior 26-Feb-14 90000 AM 26-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID N

117 400 400 kV DC Damoh - Bhopal Line

26-Feb-14 800 26-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL N

118 400 Chorania-Kasor 26-Feb-14 800 26-Feb-14 1800 Daily PMM work GETCO GETCO N119 400 Koradi-Satpura sc 26-Feb-14 800 26-Feb-14 1600 Daily 765KV Tiroda Koradi Transmission LineII crossing

worksPOWERGRID MEGPTCL Cancelled by MEGPTL N

120 400 400 kV DC Damoh - Bhopal Line

26-Feb-14 800 26-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL N

121 400 Raipur-Wardha 2 27-Feb-14 800 27-Feb-14 2000 Daily Balance construction works at Wardha end WRTS-I WRTS-I Deferred by site N122 400 Vindhyachal-Satna2 27-Feb-14 1000 27-Feb-14 1800 Daily Commissioning of CSD Relay in ABB make main

CB at Satna WRTS-II POWERGRID Deferred by site N

123 400 Bus -II at Indore 27-Feb-14 90000 AM 27-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Ready N124 400 315 MVA ICT1 at

Rajgarh 27-Feb-14 90000 AM 27-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID Ready N

125 400400 KV SC Kosamba - Asoj line(730-740)

27-Feb-14 700 27-Feb-14 1800 cont Crossing of Dhule - Vadodara 765 kv SC Line GETCOBDTCL

N

126 400 Indore (MP) -Indore (PG)-DC 27-Feb-14 700 28-Feb-14 1600 Cont Stringing of 765kV Indore - Vadodara line POWERG

RID WRTS-II Deferred by site N

Anaulagnak 33(A)

maaca- 2014 AaOr Ap`Ola 2014 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR MARCH 2014 AND APRIL 2014

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)maaca- 2014 Ap`Ola 2014 maaca- 2014 Ap`Ola 2014

MARCH 2014 APRIL 2014 MARCH 2014 APRIL 2014

1 gaujarat

saIimat 11700 12100 7750 7800

AsaIimat 11740 12140 7760 7810

2 maQya p`doSa

saIimat 8340 9050 5338 5540

AsaIimat 8340 9050 5338 5540

3 CltaIsagaZ

saIimat 3200 3075 1929 1809

AsaIimat 3225 3105 1944 1827

4 maharaYT

saIimat 19000 19150 10200 10300

AsaIimat 19050 19200 10250 10350

5 gaaovaa

saIimat 425 410 300 295

AsaIimat 425 415 310 300

6 dmana dIva

saIimat 340 345 210 205

AsaIimat 345 350 225 210

7 DI ena eca

saIimat 635 640 445 425

AsaIimat 635 640 445 425

8 piScama xao~

saIimat 41961 43047 28500 27900

AsaIimat 42076 43173 29560 28840

Diversity factor of 10401

March 2014 and April 2014

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah frvarI 2014

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 1552 75

]k[- Ukai - 2 1719 75]k[- Ukai - 3 598 75]k[- Ukai - 4 1757 75]k[- Ukai (Total) 5627 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 024 2]k[- ela baI saI eca Ukai LBCH - 2 131 3]k[- ela baI saI eca Ukai LBCH (Total) 154 5 0008

3 kDanaa Kadana - 1 000 0 0005kDanaa Kadana - 2 246 62 0000kDanaa Kadana - 3 223 62kDanaa Kadana - 4 166 63 0000kDanaa Kadana (Total) 634 63 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 431 9 0020 6 kula jalaIya TOTAL(H) 6846 225 0401

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 2060 32 21822 TaoronT pavar ilaimaToD yauinaT DI 7979 125 69803 TaoronT pavar ilaimaToD yauinaT [- 075 122 07584 TaoronT pavar ilaimaToD yauinaT ef 8023 124 66915 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 018811 Qauvarna tapIya Dhuvaran - GT 2 000 0 041912 Qauvarna tapIya Dhuvaran - STG 023 1013 ]ka[- yauinaT 1 Ukai -1 000 0 005114 ]ka[- yauinaT 2 Ukai -2 000 0 010815 ]ka[- yauinaT 3 Ukai -3 3147 200 297216 ]ka[- yauinaT 4 Ukai -4 10588 202 1002617 ]ka[- yauinaT 5 Ukai -5 9496 210 884118 ]ka[- yauinaT 6 Ukai -6 23703 500 1844819 gaaMQaInagar 1 Gandhinagar - 1 000 0 008620 gaaMQaInagar 2 Gandhinagar - 2 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 000 0 029622 gaaMQaInagar 4 Gandhinagar - 4 000 0 036223 gaaMQaInagar 5 Gandhinagar - 5 11676 212 1148924 vaNakbaaorI 1 Wanakbori - 1 10648 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 11069 21026 vaaNakbaaOrI 3 Wanakbori - 3 1891 20627 vaaNakbaaOrI 4 Wanakbori - 4 5244 21228 vaaNakbaaOrI 5 Wanakbori - 5 5531 21029 vaaNakbaaOrI 6 Wanakbori - 6 000 030 vaaNakbaaOrI 7 Wanakbori - 7 8902 20931 ]trna Utran GT 1 000 0 019832 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 000 0 024635 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 000 0 0000

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Anaulagnak 41

ACTUAL GENERATION amp AVALABILITY FOR FEBRUARY 2014Actual vaastivak

Actual vaastivak

37 isaka Sikka - 1 3696 112 439838 isaka Sikka - 2 000 0 017639 kcC ilagnaa[-T Kutch Lignite - 1 4429 71 848640 kcC ilagnaa[-T Kutch Lignite - 2 4037 7241 kcC ilagnaa[-T Kutch Lignite - 3 3646 6742 kcC ilagnaa[-T Kutch Lignite - 4 2215 66 525343 saUrt ilagnaa[-T Surat Lignite - 1 6705 131 682544 saUrt ilagnaa[-T Surat Lignite - 2 7475 131 738745 saUrt ilagnaa[-T Surat Lignite - 3 6965 130 728846 saUrt ilagnaa[-T Surat Lignite - 4 6362 130 688647 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5454 107 848648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5649 11449 jaI Aa[- pI saI ela GIPCL GT - 1 1589 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1587 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1702 3552 jaI Aa[- pI saI ela GIPCL ST - 1 2902 5153 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 020556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 000 0 000060 jaI pI [- saI GPEC GT - 2 267 156 013261 jaI pI [- saI GPEC GT - 3 143 146 002762 jaI pI [- saI GPEC STG 131 17263 jaI esa [- jaI GSEG GT - 1 000 0 098964 jaI esa [- jaI GSEG GT - 2 1181 5065 jaI esa [- jaI GSEG STG 642 2366 Sugen (GT 1 + GT 2) 1767 308 602467 saIpIpI sao Aayaat Imp from CPP+MUNDRA 269359 6881

kula tapIya Total (T) 475652 8386 302021kula jalaIya+tapIya Total (H+T) 482498 8604 302422ivaMD [najaI- Wind Energy 52123kula jalaIya+tapIya+hvaa Total (H+T+Wind) 534621 9539ivainamaya Exchanges 155314 saIimat jaa- maaMga Restricted Energy Req 689935

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 6800 194

11 gaaMQaI saagar Gandhi Sagar 3366 117 008012 raNaa p`tap sagar RPSagar 5883 172 004013 javaahr sagar Jawahar Sagar 4350 99 0050

2 ponca Pench 3052 165 00903 baargaI Bargi 4581 91 00804 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 11764 315 02806 banasaagar Bansagar-2 (Deolondh) 000 07 banasaagar Bansagar-3 (Silpara) 1236 32 00708 banasaagar Bansagar-4 (Zinaha) 1320 22 00509 maoDIKoDa Medikheda 396 63

10 ibarisaMGapur Birsingpur 040 20 002011 Tavaa Tawa 000 012 rajaGaaT Rajghat 165 12 006013 Omkareshwar 10620 402 14 [Midra saagar Indira Sagar 23077 997 0849

kula jalaIya TOTAL(H) MPPGCL 59999 2365 1273Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 6049 98 232502 AmarkMTk II AMK II Unit -2 6080 983 AmarkMTk III AMK III Unit -5 12212 219 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 06505 satpura II Satpura-II Unit 6 10323 180 165906 satpura II Satpura-II Unit 7 5926 1807 satpura II Satpura-II Unit 8 10964 195 191608 satpura II Satpura-II Unit 9 8353 1709 satpura III Satpura-III Unit 10 000 0 2080

10 satpura III Satpura-III Unit 11 9447 182 1909011 esajaITIpIesa 1 SGTPS Unit - 1 9447 182 1909012 esajaITIpIesa 2 SGTPS Unit - 2 10572 18213 esajaITIpIesa 3 SGTPS Unit - 3 9037 192 2064014 esajaITIpIesa 4 SGTPS Unit - 4 10700 18015 esajaITIpIesa 5 SGTPS Unit - 5 28804 51216 SSTPS 6864 587 8930

kula tapIya Total (T) 133714 3002 115350kula jalaIya+tapIya Total (H+T) 193713 5735 116623Injection from WIND 000 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 193713 5735ivainamaya Exchanges 193660 saIimat jaa- maaMga Rest En Req 387372

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 850 120 00902 Gangrel 475 10 00503 Mini Micro KWB 039 7

kula jalaIya TOTAL(H) CSEB 1364 137 0150tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 47 127402 kaorbaa (pU) Korba (E) Unit-2 2764 483 kaorbaa (pU) Korba (E) Unit-3 2764 484 kaorbaa (pU) Korba (E) Unit-4 2784 465 kaorbaa (pU) Korba (E) Unit -5 3685 120 253306 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 247808 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 15410

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 15839 256 1197012 KORBA(EB) Extn - 2 15876 256 11770

kula tapIya Total (T) 119907 1880 10190013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 119907 1880kula jalaIya+tapIya Total (H+T) 121271 2017 102050ivainamaya Exchanges 40207 0saIimat jaa- maaMga Rest En Req 161478 2017

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 9590 585 25142 kaoyanaa III Koyna III 5920 3203 kaoyanaa IV Koyna IV 18012 11324 kaoyanaa DIpIeca Koyna DPH 1442 385 TaTa jalaIya TATA Hydro 10242 741 28836 vaOtrNaa Vaitarna 000 07 eladarI Eldari 528 168 BaTgar AaOr vaIr Bhatgar amp Vir 915 49 pOzana Paithan 175 59

10 itlaarI Tillari 1106 6511 BaIra Tola rosa Bhira Tail Race 374 4112 GaTGar Ghatghar 5297 29313 Anya CaoTo jalaIya Small Hydro (others) 6173 0

kula jalaIya TOTAL(H) 58910 1599 5397Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 7700 1954 naaisak 4 Nasik Unit -4 10772 1965 naaisak 5 Nasik Unit -5 11160 1976 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 28827 5058 Tambao 6 Trombay Unit -6 000 09 Tambao 8 Trombay Unit -8 000 0

10 Tambao 7A gaOsa Trombay -7A (Gas) 7882 135 250411 Tambao 7ba Trombay -7B (WHR) 4499 7212 kaoraDI 5 Koradi Unit -5 5003 16013 kaoraDI 6 Koradi Unit -6 3963 19014 kaoraDI 7 Koradi Unit -7 10015 19015 Bausaavala 2 Bhusawal Unit -2 8329 17016 Bausaavala 3 Bhusawal Unit -3 9248 18017 Bausaavala 4 Bhusawal Unit -4 22734 50518 Bausaavala 4 Bhusawal Unit -5 19742 41519 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 7451 18621 parlaI 5 Parli Unit -5 10626 18022 parlaI 6 Parli Unit -6 14013 25323 parlaI 7 Parli Unit -7 13728 26024 KaprKoDa 1 Khaperkheda Unit -1 11173 20025 KaprKoDa 2 Khaperkheda Unit -2 10373 19526 KaprKoDa 3 Khaperkheda Unit -3 10998 20127 KaprKoDa 4 Khaperkheda Unit -4 12019 20728 KaprKoDa 5 Khaperkheda Unit -5 28882 50730 parsa Paras-3 14447 25731 parsa Paras-4 13504 25932 ]rna Uran (Gas) 18284 33833 ]rna Uran (WHR) 000 148 586234 caMd`pur 1 Chandrapur Unit -1 9087 17735 caMd`pur 2 Chandrapur Unit -2 1816 19436 caMd`pur 3 Chandrapur Unit -3 11737 21037 caMd`pur 4 Chandrapur Unit - 4 11843 46038 caMd`pur 5 Chandrapur Unit -5 7759 45539 caMd`pur 6 Chandrapur Unit -6 24420 44240 caMd`pur 7 Chandrapur Unit -7 23258 041 DhaNaU 1 Dahanu Unit-1 16339 250 1427842 DhaNaU 2 Dahanu Unit-2 16196 250 1427843 CPP 193651 29840044 RGPPL Share 000 0

kula tapIya Total (T) 631479 15369 329920MAH Wind + Solar Generation 16922 0kula jalaIya +tapIya Total (H+T+Wind) 707311 17451 372239

TOTAivainamaya Exchanges 324731saIimat jaa- maaMga Rest En Req 1032042

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1871 26ivainamaya Exchanges 33252saIimat jaa- maaMga Rest En Req 35123 434

C (F) dmana AaOr dIva DAMAN amp DIU 18245 298ja (G) dadra nagar hvaolaI DNH 40600 655

kula DD ampDNH (T) 58845 952Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 9600 160 1399112 tara`pur 2 TAPS Unit -2 11069 16013 tara`pur 3 TAPS Unit -3 36144 545 6584014 tara`pur 4 TAPS Unit -4 36197 54715 kakrapr 1 KAPS Unit -1 15230 545 3134216 kakrapr 2 KAPS Unit -2 14662 547

kula ena pI saI NPC Total 122901 25042 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14008 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 13913 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14076 214 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 32894 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 33204 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 33190 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33176 514

kula kaorbaa KSTPS Total 174461 2498 10394427 ivanQa esaTIpIesa 1 VSTPS Unit-1 12762 21328 ivanQa esaTIpIesa 2 VSTPS Unit-2 12708 21529 ivanQa esaTIpIesa 3 VSTPS Unit-3 12854 212210 ivanQa esaTIpIesa 4 VSTPS Unit-4 12909 214211 ivanQa esaTIpIesa 5 VSTPS Unit-5 12174 215212 ivanQa esaTIpIesa 6 VSTPS Unit-6 12625 214213 ivanQa esaTIpIesa 7 VSTPS Unit-7 31487 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 31075 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 31592 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 31488 512217 ivanQa esaTIpIesa 11 VSTPS Unit-11 30948 512

kula ivanQayaacala VSTPS Total 232623 3750 15107 31 saIpt -1 -SIPAT-1 38822 66400 32 saIpt -2 -SIPAT-2 32404 66500 33 saIpt -3 -SIPAT-3 38930 66300 34 saIpt -4 -SIPAT-4 26383 51600 35 saIpt -5 SIPAT-5 26400 51400

kula saIpt -SIPAT TOTAL 162939 285000 838941 kvaasa gaOsa 1e Kawas GT-1A 792 10742 kvaasa gaOsa 1baI Kawas GT-1B 2623 10943 kvaasa esaTI 1saI Kawas ST-1C 1571 11444 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 4986 304 222951 gaMQaar gaOsa 1 Gandhar GT-1 000 052 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 000 054 gaMQaar esaTI 4 Gandhar ST-4 000 0

kula gaMQaar GGPS Total 000 0 000061 maaOda 1 Mauda -1 19614 514 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 19614 514 1422661 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 000 31 000071 esa esa pI SSP RBPH - 1 6753 19372 esa esa pI SSP RBPH - 2 5907 19273 esa esa pI SSP RBPH - 3 5577 19574 esa esa pI SSP RBPH - 4 5513 19475 esa esa pI SSP RBPH - 5 7237 19476 esa esa pI SSP RBPH - 6 3109 19277 esa esa pI SSP CHPH - 1 1817 4078 esa esa pI SSP CHPH - 2 491 3679 esa esa pI SSP CHPH - 3 000 0710 esa esa pI SSP CHPH - 4 1639 39711 esa esa pI SSP CHPH - 5 901 37

kula esa esa pI SSP Total 38944 1312 389481 kula poMca Pench Total 3052 165 009082 Jindal Injection 38956 083 Amarkantak Lanco 15478 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2372740

(J) ]plabQata Availability 2308426 naoT ivainamaya Net Exchanges -292048 ]plabQa jaa- Energy Availability 2016379

maah frvarI 2014 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR FEBRUARY 2014 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 11532 - - - 11532 020214 1100 4993

saIimat Restricted 11700

AsaIimat Unrestricted 11740 11532 0 28 0 11560 010214 1200 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8366 8366 17022014 0500 5007

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9346 - - - 9346 120214 0900 4986

saIimat Restricted 8340

AsaIimat Unrestricted 8340 9346 0 38 0 9384 120214 0900 4986

nyaUnatma pMjaIkRt maaMga Min Registered Demand 3204 3204 270214 0200

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3210 3210 070214 1900 4989

saIimat Restricted 3200

AsaIimat Unrestricted 3225 3210 233 12 0 3246 070214 1900 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1617 1617 230214 2300 5021

maharaYT MAHARASHTRApMjaIkRt Registered 18510 - - - 18510 050214 1100 4984

saIimat Restricted 19000

AsaIimat Unrestricted 19050 17980 1655 -13 0 19622 190214 1200 5002

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12005 12005 280214 0400 5037

gaaovaa GOApMjaIkRt Registered 425 434 - - 434 130214 1400 5006

AsaIimat Unrestricted 425 434 1 -1 - 434 130214 1400 5006

nyaUnatma pMjaIkRt maaMga Min Registered Demand 311 311 100214 0300

essaar ESSAR(ESIL)pMjaIkRt Registered 487 - - 487 240214 1700 5004

AsaIimat Unrestricted 487 0 0 - 487 240214 1700 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 268 - - 268 250214 1200 5003

AsaIimat Unrestricted 268 0 0 - 268 250214 1200 5003

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 644 - - 644 260214 1200 4999

AsaIimat Unrestricted 644 0 - 644 260214 1200 4999

nyaUnatma pMjaIkRt maaMga Min Registered Demand 508 508 280214

piScama xao~ WESTERN REGIONpMjaIkRt Registered 42253 - - - 42253 110214 1100 4994

saIimat Restricted 41961

AsaIimat Unrestricted 42076 42021 850 235 0 43106 120214 1100 4994

nyaUnatma pMjaIkRt maaMga Min Registered Demand 27524 27524 280214 0400 5040 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

piScama xaoi~ya Baar p`oYaNa kond` mauumba[-

णाली चालन-ISO-I

ANNEXURE-43

माह फरवर 2014 February2014

समातरवतीय चालन PARALLELRADIAL OPERATION

TOTAL OPERATING

HOURS 1 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-NR) 66972

2 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-SR) 67200

टाई लाईन TIE LINE 1 765कवी िसवनी स वधा-I 765kV Sonito Wardha 67200 2 765कवी िसवनी स वधा-II 765kV Seonito Wardha 65247 3 400 कवी िभलाई स कोराड 400kV Bhilai to Koradi 67200

4 400 कवी िभलाई स भिावती 400kV Bhilai to Bhadravati 67200

5 400 कवी रायपर स भिावती-I 400kV Raipur to Bhadravati-I 67200

6 400 कवी रायपर स भिावतीETHII 400kV Raipur to Bhadravati-II 67139

7 400 कवी रायपर स भिावतीETHIII 400kV Raipur to Bhadravati-III 67200

8 400 कवी सातपरा स कोराड 400kV Satpura to Koradi 67200

9 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 67004 10 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 65308 11 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 66259 12 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 67200 13 400 कवी को हापर स मापसा-I 400kV Kolhapur-Mapusa-I 38740

14 400 कवी को हापर स मापसा-II 400kV Kolhapur-Mapusa-II 49532

15 400 कवी वापी स बोईसर 400kV Vapi-Boisar 67200

16 400 कवी रायगढ़ स ःटरलाइट-I 400kV Raigarh to Sterlight-I 66258

17 400 कवी रायगढ़ स ःटरलाइट-II 400kV Raigarh to Sterlight -II 67200

18 400 कवी रायगढ़ स झरसगड़ा-I 400kV Raigarh to Jharsuguda-I 67200

19 400 कवी रायगढ़ स झरसगड़ा-II 400kV Raigarh to Jharsuguda-II 67200

20 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 65028

21 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 66132

22 400 कवी रायपर स वधाETHI 400kV Raipur to Wardha-I 66836

23 400 कवी रायपर स वधाETHII 400kV Raipur to Wardha-II 67200

24 220 कवी कोरबा पव स ब पादर-III 220kV K(E) to Budhipadar-III 63853

Anaulagnak 47Annex-47

maah frvarI 2014 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39514 64944

10287 39711

Levels in Mtrs str maITr maoM

]ka[- Ukai

64392

9914

25402

25994

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF FEBRUARY 2014

ivavarNa Particulars

TRIPPING DETAILS FOR THE MONTH OF FEBRUARY 2014

Sr No Brief Details of incident (Elements Generation Tripped) Owner Utility Date amp Time Load

Gen LossCategory

1 Multiple Tripping from 400 kV New Koyna MSETClMSEGCLRGPPL 05‐02‐2014 0950 Hrs ‐ GI‐2

2Bus Bar protection mal‐operation at 400 kV Soja in Gujarat resulting in multiple Tripping

GETCO 06‐02‐2014 1755 Hrs ‐ GI‐2

ANNEXURE ‐ 5

  • annexpdf
    • 21pdf
    • 231pdf
    • 232pdf
    • 24pdf
    • 25pdf
    • 31pdf
    • 32C1pdf
    • 32C2pdf
    • 33Apdf
    • 41pdf
    • 42pdf
    • 47pdf
    • 5pdf
Page 12: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014

12

457th OCCM AGENDA

and Vidhyachal STPS wef 0230 hrs to 0500 hrs of 28022014 This was later

extended up to 0700 hrs of 28022014 It was a near miss situation that could have

been avoided by adequate planning and commensurate actions in real-time It is

requested that the matter may be taken up at the highest level in MSETCL and a

separate meeting may be convened on the above subject to avoid reoccurrence of

such event in future

The sub committee may like to discuss the same

ITEM NO 93 NON AVAILABILITY OF REAL-TIME TELEMETRY FROM LARGE NUMBER OF STATIONS IN MAHARASHTRA There are 224 nodes in Maharashtra that comprising of 32 Generating stations and

192 substations Out of these 224 nodes 47 locations are yet to be integrated in the

System Out of the balance 177 the data from nearly 50 nodes are not coming since

last 6 months Thus in totality data is not available from more than 135 out of 224

stations ie 60 which is highly alarming The extremely poor status of telemetry in

the state of Maharashtra has become a security threat Maharashtra load is touching

17500 MW and there are large number of construction related outages that have to be

facilitated Further with the formation of the synchronous All India grid there is a need

for close monitoring of system parameters such as the line flows voltage and grid

frequency Inadequate telemetry is resulting in severe constraints in real time

operation as well as outage coordination There have been several instances of line

tripping on high voltage and SPS operation due to sudden increase in line flows

during hour boundary or during facilitating planned outage These events could be

minimized with better supervision if the telemetry is available

The telemetry issue in Maharashtra has been discussed in the various WRPC forums

wherein it was informed by MSETCL that the problem is due to failure of Ms Tulip

who was the service provider for the communication network During the month of

August 2013 representative from MSETCL had assured that a new contract was being

awarded and the situation would improve within one month The extracts from minutes

of 451st OCC is quoted below

QUOTE

13

457th OCCM AGENDA

ldquoMSETCL stated that they were working to resolve the issue and assured that there

would be an improvement in availability of Telemetry from Maharashtra stations within

one Monthrdquo

UNQUOTE

Representative of MSETCL may apprise the OCC regarding present status and the

likely schedule for resolution of the issue

The sub committee may like to discuss the same

ITEM NO 94 STATUS OF LINE AND BUS REACTORS AT 765 KV SASAN

The line reactor of 765 kV Sasan-Satna ckt-2 as well as the Bus reactors of 765 kV Sasan bus are yet to be commissioned at Sasan end In the absence of these reactors high voltage is experienced at Sasan and nearby stations Often one circuit of 765 kV Sasan-Satna is required to be opened for voltage regulation Consequently the reliability of evacuation of generation from two units of Sasan is affected During 456th OCC meeting the revised schedule of the above elements as informed by Ms Reliance was as under

Schedule in formed in meetings 451st OCC 455th OCC 454th OCC 1 Line reactor of 765

kV Sasan-Satna ckt-2

By Dec 2013 By April 2014 By May 2014

2 765 kV Bus-1 Reactor

Jan 2014 By Mar 2014 By June 2014

3 765 kV Bus-2 Reactor

Jan 2014 By Mar 2014 By June 2014

It was decided in 456th OCC meeting that one representative from MPPTCL would visit the SASAN site to check readiness of Line and Bus reactors Representative from MPPTCL and Sasan may apprise the OCC-members on the progress of commissioning of reactors at 765 kV Sasan OCC members may also be apprised of the tap position of the generator transformer 2 and 3

The sub committee may like to discuss the same

14

457th OCCM AGENDA

ITEM NO 95 CHARGING OF NEW TRANSMISSION ASSET IN THE GRID In order to have better coordination of the transmission utilities with RLDCNLDC during charging synchronization of new elements into the grid a communication has been received from NLDC (ref POSOSCONLDCSystem OperationOutage Planning1239) on 10022014 It has been proposed that

a Owner of the asset shall submit the request for expected chargingcommissioning of new element for the calendar month latest by 5th day of the month to the respective RLDC amp NLDC along with status of activities mentioned in the check-list

b RLDC shall study the impact of the new element commissioning and based on its assessment of the preparedness of the utility may recommend to NLDC who in turn would examine the issue independently considering pan India grid scenario

c After the above the owner of the new asset shall give its readiness to charge the new element atleast three days in advance with current status of activities mentioned in the check list

Check list is as under 1 List of elements to be charged along with the details of approval of the

transmission scheme from the Standing CommitteeCTUSTU 2 Single Line Diagram of the concerned substations along with status of

completion of each diabusbreakers 3 Availability of real-time data and communication to the designated

SLDCRLDC 4 Installation of Special Energy Meter complying with CEArsquos Regulations

(Serial number Meter number CTPT ratio to be indicated) 5 Charging Instructions by CTUSTU 6 Schedule and sequence of charging of elements 7 Availability of line bus reactors as per planning In case the transmission

system is planned to be charged without the planned line reactor requisite authorization from CTUSTU by studies

8 Connection Agreement (along with all annexures) with CTU or STU 9 Copy of Long term Access (LTA) or MTOA granted by CTU or STU as the

case may be 10 Copy of Power Purchase Agreement (PPA) 11 A signed undertaking with name and designation of the officer clarly

indicating the following a All Disturbance recorders (DR) and Event Loggers (ELs) with time

synchronization are commissioned b All protective systems have been commissioned c All statutory clearances have been obtained

12 Output of EL and DR after charging

15

457th OCCM AGENDA

Each document mentioned in check list from Sl No 1 to 10 must be attached for sake of completeness and emailed as a consolidated document to the nodal RLDC well before the new element charging date The sub-committee may like to discuss ITEM NO 96 OPENING FEEDERS WITHOUT PRIOR INTIMATION TO WRLDC

It was gathered based on the observation from WRLDC SCADA data and subsequent

discussion with MPPTCL that 220 kV Bina (MP)-Gwalior(MP) DC were taken under

shut down for LILO works at Datia at 0910hrs on 23022014 for 4 days The outage

of these lines was neither discussed in OCC and neither was there any intimation to

WRLDC before availing the outage These lines are included in the important grid

elements list of Western region and prior concurrence of WRLDC is required for

switching these lines Further these lines form the parallel path to 765 kV Bina-Gwalior

DC and with the shutdown of these lines the network upstream of WR-NR inter

regional corridor was depleted

The sub-committee may like to discuss ITEM NO 97 TRIPPING OF 765 KV LINES ON OVER VOLTAGE Recently several tripping of 765 kV lines have been reported on over voltage These are indicated below

1) 765 kV Bina-Gwalior I at 2358 hrs of 16022014 2) 765 kV Bina-Gwalior I at 2011 hrs of 14022014 3) 765 kV Satna-Gwalior at 1300 hrs of 06022014 4) 765 kV Sasan-Satna II at 0013 hrs of 18012014 5) 765 kV Jabalpur-Bina I at 2350 hrs of 10012014 6) 765 kV Jabalpur-Bina II at 0405 hrs of 06012014

It is understood that the adopted Stage-I OV setting for the above lines vary from 108 (ie 826 kV) to 110 (841 kV) As per SCADA data the bus voltage at any of the substations mentioned above had not reached 826 kV during the above incidents

POWERGRID may examine the above tripping in detail and apprise the OCC regarding the above In case of issues related with protective relays field equipment are detected these may be addressed at the earliest The sub-committee may like to discuss

16

457th OCCM AGENDA

ITEM NO 98 RGMO FGMO OF MANDATED GENERATORS IN WESTERN REGION

As per the latest information available at WRLDC there are 251 number of units with a total capacity of 57517 MW in Western Region that are mandated to operate in Restricted Free Governor Mode The need for compliance to the IEGC regulations wrt RGMOFGMO was emphasized in the 455th and 456th OCC meeting as well as during the 25th TCCWRPC meeting Subsequently it was communicated by email to all entities in WR to provide the latest status of RGMOFGMO implementation We have received updated status from MPPTCL LANCO CGPL DB Power and JPL Tamnar in Feb 2014 The latest state wise RGMOFGMO summary is given below

Name of Entity No of mandated units

RGMO FGMO available at

RGMOFGMO Not available at

Maharashtra 90 35 55 Madhya Pradesh 58 36 22 Gujarat 35 19 16 Chhattisgarh 10 3 7 CGPL 5 5 0 NCA 11 6 5 SASAN 2 1 1 NTPC 24 10 14 ESSAR_Mahan 1 1 0 NSPCL 2 2 0 KSK 1 1 0 KWPCL 1 0 1 DB POWER 1 1 0 JPL 5 4 1 LANCO 2 2 0 IEPL 1 0 1 EMCO 2 0 2 WR_Total 251 126 125

WRLDC vide its letter ref WRLDCRGMO-FGMO1-2014 dated 23012014 has issued directions under Section 29 of the Electricity Act to ensure compliance of IEGC regulations 52 (f) (g) (h) and (i) All utilities are requested to furnish the status of compliance in respect of generating units under their jurisdiction The sub-committee may like to discuss ITEM NO 99 STATUS OF TELEMETRY IN WESTERN REGION

The status of telemetry related issues in respect of WR constituents is as under

a) Chhattisgarh Data (except MW) from 500 MW Korba West extension generating station is not available Status points from 400 kV Raita pending

17

457th OCCM AGENDA

b) Madhya Pradesh Telemetry of following bus reactors is not available at WRLDC

S No

Station Name Bus Reactor

Nunber x Capacity

Total MVAR

Rated voltage

Status of Telemetry at

WRLDC1 Nagda 250 100 420 Not available2 Indore 225 50 33 Not available3 Bhopal 225 50 33 Not available4 Birsinghpur 150 50 420 Not available

c) Gujarat Data is not-availableintermittent from following stations in Gujarat

a 220 kV Nano of Tatamdash(not available) b Kansari 400 kV ss and Navsari 220 kVhellipIntermittent (PLCC Problem)

d) Goa Due to non-availability of SCADA data from Goa the difference between drawal as seen in SCADA and as recorded in SEM is as high as 572 during the period 1st Feb to 16th Feb 2014 Data from the following stations in Goa is not available at WRLDC S No Station Status

1 Amona 220 kV Not available 2 Cuncolin 220 kV Not available 3 Kadamba 110 kV Intermittent 4 Tivim 220 kV Intermittent 5 Ponda 220 kV Intermittent 6 Xeldam-220 kV Intermittent 7 Verna-110 kV Intermittent

e) Daman amp Diu

Due to non-availability of SCADA data from Daman amp Diu the difference between drawal as seen in SCADA and as recorded in SEM is as high as 571 during the period 1st Feb to 16th Feb 2014 Data from The error is mainly due to non-availability of data from 220 kV Magarwada

f) DNH Telemetry from 220 kV Kharadpara and Khadoli station is not available

g) POWERGRID The data from the following stations is not available at WRLDC

1) 765 kV Tamnar (Communication problem GPRS link is not stable)

18

457th OCCM AGENDA

Telemetry from following stations is Intermittent at WRLDC 1) 765 kV Durg (PLCC frequent problems)

2) 765 kV Kotra (communication intermittency)

3) 765 kV Gwalior (PLCC link established but still there is some

issue(Delay) in data updation at WRLDC Rectification work under

progress by Site Engineer

4) 765 kV Solapur - Redundant link established through Reliance but

the gateway connected to above link is not configured for 765 KV

data Hence when BSNL link is down 765 KV data is not updating at

WRLDC

The sub-committee may like to discuss

ITEM NO 910 COMPARISON OF DRAWAL AS SEEN IN SCADA VS SEM The IEGC second amendment and the Deviation Settlement Mechanism is in force since the 17022014 The IEGC stipulates maintaining injection drawal within the limits prescribed in the Deviation Settlement Mechanism The sub-committee may like to discuss ITEM NO 911 MOCK BLACK START EXERCISE

As per sec 58(b) of IEGC the usersSTUs etc need to conduct Black start mock

exercises in their respective systems once in every six month under intimation to

RLDC Also the all the black start Diesel Generator (DG) sets are [as per sec 58(b)

of IEGC] required to be tested weekly and the test report needs to be sent to RLDC

on quarterly basis

The following table summarizes the status of mock exercises in respect of black start

facilities in Western Region

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

GUJARAT

1 Ukai (H) 4 x 75 Hydro Diesel 500 kVA 221213 Y

2 Mini Hydro 2 x 25 Hydro Diesel 50 KW N

3 Kadana 4 x 60 Hydro Diesel 500 KVA 2413 Y (2413)

19

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

4

Dhuvaran

1 x 107 (68+39) + 1 x 112 (72+40)

Gas

Details to be furnished by Gujarat

Details to be furnished by Gujarat

N

5 GIPCL-I 3 x 32 + 1 x49

Gas Steam Diesel 141 KW

070912 Y

6 GIPCL-II 1x104+1x56 Gas Steam Diesel 500 kVA N

7

Torrent Power Stn C Stn- DEFCCPP

StnC2x30 StnD120 StnEF(110MW each)CCPP100MW

Thermal (Units-CDEF) Gas(CCPP)

Stn-C islands Diesel

StnC15kVA StnDE F and CCPP(500 kVA each)

281112

Y

8 GPEC 3x138+1x241 Thermal Natural Gas 3000 kVA N

9 Sugen 3x3825 MW Gas Diesel 2x6MVA N

Madhya Pradesh

10 Gandhisagar 5 x 23 Hydro DG set 100 kVA N

11 Birsinghpur 1 x 20 Hydro Battery 220 Volt

Battery N

12 Pench 2 x 80 Hydro DG set 250 kVA 121012 Y

13 Bargi 2 x 45 Hydro DG set 250 kVA 100212 Y

14 Bansagar Stage-I 3 x 105 Hydro DG set 250 kVA N

15 Indira Sagar 8x125 Hydro DG set 2x1000

KVA 22511 Y

Chhattisgarh 16

Hasdeo Bango 3 x 40 Hydro DG Set 250 kVA 250812 N

17

Korba(E)-phse-I

Power plant retired but Black start DG set available and on- load trial is reported to be carried out regularly

DG Set 1500 kW(33kV)

N

Maharashtra

18

Koyna I amp II

4 x 65 4 x 75 Hydro

House generator

2 MVA 231013 N

19 KDPH 2 x20 Hydro DG set 310 KW N

20 Eldari 3 x 75 Hydro DG set 6 KW N

21

Uran (Gas)

4 x 60 (GT) + 4x108 (GT)+ 2x120 WHR

Gas DG set

4 MW PH1412kVA PH2450kVA WH520kVA

161012

N

20

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

22 RGPPL

Block 1 640MW+Block 2 66354MW+Block 3 66354MW

Gas

Gas Turbine (Frame-6)

35 MW (Under testing) Details to be provided by RGPPL

N

23 Ghatghar 2x125 Hydro DG set 1x1250

kVA 51012

N

24 Khopoli 3x24+2x12 Hydro

DC Governor amp bearing oil pumps

DC power (self start)

271013 (detailed report awaited)

N

25 Bhivpuri 3 x 24 +

2 x 15 +2x12 Hydro

DC Governor amp bearing

-do-

N

26 Bhira 6 x 25 Hydro

1 Noof 500 KVA house generator with water turbine

500 kVA

201013 (detailed

report awaited)

N

27

Bhira PSS 1 x 150 Hydro DG set 500 kVA

N

28 Trombay 1 x 120 Gas

Turbine DG Set 25 MW

N

1 x 60 Steam Turbine

NTPC

21

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

29 Kawas 4 x 106 2 x 116 Gas Diesel 2850 KW 151013

N

30 Gandhar 3 x 144 + 1x225 Gas Diesel 2975 KW

N

NCA

31 SSP(RBPH amp CHPH) 6x200+550 Hydro Diesel 2x1000kVA 080412

N

Accordingly the Black start capable stations may forward their tentative plan for conducting Black start exercises in compliance to sec 58(b) of IEGC bull As per the communication for MPPTCL the tentative plan of Black start in Madhya

Pradesh system is given under SL No Name of the Station Tentative Date Remarks 1 Pench March 2014 DG set at Pench amp are Bargi

under outage 2 ISP Apr-May 2014 - 3 TONS June 2014 Governor Problem being

attended 4 Birsinghpur June 2014 -do- 5 Medikheda June 2014 -do- 6 Rjghat June 2014 -do- Other utilities may also update their tentative plan for black start

The sub-committee may like to discuss

22

457th OCCM AGENDA

ITEM NO 912 HEALTHINESS OF MAIN CIRCUIT BREAKER OF 400 KV BIRSINGPUR-KATNI-I AT KATNI END The main CB of Birsingpur-Katni-I is under shut down since 2350 hrs of 14th February 2013 Representatives from MPPTCL may kindly apprise on the progress and expected date of restoration of the Main CB of 400 kV Birsingpur-Katni-I at Katni end The sub-committee may like to discuss

ITEM NO 913 TESTING OF SPS RELATED TO TRIPPING OF BINA-GWALIOR-AGRA AT CGPL VINDHYACHAL AND KORBA

As per the information received from NTPC and CGPL the SPS for the 765 kV Bina-

Gwalior-Agra has been installed and a mock drill has to be carried out for the same

The matter was discussed in the 456th OCC and it was decided that SPS may be

tested for reduction of say 50MW for each station instead of backing down of entire

500MWs POWERGRID WRTS-2 may confirm the testing schedule so that the

same could be coordinated in from WRLDC

The sub-committee may like to discuss

ITEM NO 914 SPS AT SIPAT WRLDC vide letter No WRLDCMO-I17192013 dt 21613 requested to take up this matter with the concerned for early implementation of the SPS Status of the SPS at NTPC Sipat is as under

1 449th OCC SPS was proposed by WRLDC It was decided to have a

separate meeting to finalize the scheme 2 450th OCC Member Secretary WRPC intimated that the matter will be

discussed in 119th PCM on 3rd amp 4th September 2013 at Tarapur 3 451st OCC It was intimated that the issue of SPS of Sipat was discussed in

119th PCM held on 3rd amp 4th September 2013 at TARAPUR The tentative scheme were formulated which needed finer tuning

4 452nd OCC Matter not discussed 5 453rd OCC NTPC representative intimated proposal sent to their corporate

office for engineering approval 6 454th OCC Approval from our corporate office is yet to be obtained 7 455th OCC Approval from our corporate office is yet to be obtained 8 456th OCC Approval from corporate office has been obtained and would be

forwarded to WRPC for approval The sub-committee may like to discuss

23

457th OCCM AGENDA

ITEM NO 915 SPS AT 4X300 MW BALCO IPP The SPS at 2010 MW Balco (4x675MW + 4x135 MW + 4x300 MW) was to be commissioned by Nov 2013 before commissioning of first unit of 4x300 MW Balco IPP For the new SPS scheme envisaged for the Balco CTU connection namely the Grid Islanding and Load Management Scheme (GILMS) Balco had reported to have placed an order with Ms SEL As discussed earlier the scheme suggested by WRLDC may be implemented before commissioning of first unit of 300 MW It was intimated during the 456th OCCM by the Balco representatives that the SPS shall be commissioned by March 2014

The sub-committee may like to discuss

ITEM NO 916 ACTIONS TAKEN FOR REVIVAL OF TRANSMISSION ELEMENTS UNDER LONG OUTAGE

As per the information available at WRLDC following elements are out for a

long period

Sl No Date of

outage

Reason

ISTSIPP

1 80 MVAR BR at

ESSAR(Mahan)

231213 Oil leakage

2 125 MVAR BR at JPL 120513 Hydrogen formation

3 50 MVAR LR of Indore-Asoj-II

at Indore

190613 R phase bushing burst

4 50 MVAR LR of Birsingpur-

Damoh at Damoh(PG)

13102014 Oil Leakage

5 765 kV Durg-Kotra-I 24022014 Sparking in Isolator

6 400 kV Raipur-Raigarh-IV 18012014 Voltage Regulation

MSETCL

1 400 kV RGPPL-NrsquoKoyna-I 22012014 Voltage Regulation

2 400 kV Sholapur-

Sholapur(PG)

26022014 Tower Collapse

MPPTCL

1 400 kV Birsingpur-Katni-I 28012014 Voltage Regulation

24

457th OCCM AGENDA

2 50 MVAR LR of Indore-Asoj-II

at Indore

6012014 DGA Violation

CSPTCL

1 400220 kV Bhilai-II 24022014 Maintenance

OCC may like to be apprised of the actions being taken for expediting revival of

the above elements

The sub-committee may like to discuss

ITEM NO 917 STATUS OF 220 KV KOLHAPUR-MUDSINGHI-CHIKODI- BELGAM LINE Consent for trial operation of 220 kV Kolhapur-Mudsinghi-Chikodi- Belgam line in radial mode for supply of Karnataka load from Maharashtra side was granted after discussion in the 455th OCC meeting WRLDC is in receipt of letter from SRLDC regarding concurrence for the above arrangement SLDC Kalwa may apprise the OCC regarding the present status The sub-committee may like to discuss

ITEM NO 918 CONTRIBUTION OF GENERATORS IN VOLTAGE CONTROL The contribution of generators in WR in voltage control was analyzed during 456th OCC meeting It was noted that following units were injecting reactive power even during high voltage

1 210 MW units of Khaparkheda Koradi and Chandrapur (Maharashtra) 2 210 MW units of Satpura and Birsinghpur (Madhya Pradesh) 3 210 MW unit 23 of Korba West (Chattisgarh) 4 200 MW unit 34 of Ukai (T) in (Gujarat)

Utilities were requested to check the setting of AVRGT tap and revert back with findings Members may apprise OCC regarding the status The sub-committee may like to discuss

ITEM NO 919 REAL-TIME MONITORING OF FEEDERS SUBSTATIONS THAT ARE COVERED UNDER THE AUFLS Telemetry of feeders substations covered under the AUFLS is desirable for real-time assessment of the anticipated relief that would be available from the AUFLS scheme at any given instant of time CERC has also directed all the constituents to for

25

457th OCCM AGENDA

mapping of these feeders in the SCDA of SLDCsRLDC Members may like to deliberate further The sub-committee may like to discuss

ITEM NO 920 LOAD FORECASTING As per the amended Indian Electricity Grid Code that is effective from 17th February 2013 the SLDCs SEB distribution licensees shall always restrict the net drawal of the State from the grid within the drawal schedule keeping the deviations from the schedule within the limits specified in the Deviation settlement mechanism regulations Therefore it is imperative that adequate attention may be paid towards load forecasting The matter was discussed in the 455th and 456th OCC as well as in the 25th TCCWRPC board meeting wherein it was decided to create a task force for exploring development of a software for load forecasting Members may like to deliberate further The sub-committee may like to discuss

ITEM NO 921 IMPLEMENTATION OF THE REVISED AUFLS IN GOA DD AND DNH It was decided during the 455th and 456th OCC meeting as well as during 25th WRPC meeting that Goa DD and DNH shall complete the implementation of the revised AUFLS in Goa DD and DNH at the earliest Representatives from the Goa DD and DNH may apprise the status of the progress The sub-committee may like to discuss

ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING As per meeting roaster circulated during 452nd OCC meeting the 458th OCC Meeting

will be hosted by Maharashtra and may be scheduled on 16th amp 17th April 2014

Maharashtra may confirm the same

Anaulagnak 21

maah frvarI 2014

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5051 Hz BETWEEN 0200 Hrs amp 0300 Hrs Hrs ON 28022014

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4970 Hz BETWEEN 1800 Hrs amp 1900 Hrs Hrs ON 28022014

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 5006 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5071 Hz AT 0210 Hrs ON 28022014

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4937 Hz AT 185000 Hrs ON 28022014

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS FEBRUARY 2014 JANUARY 2014 DECEMBER 2013

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 001 005

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 041 061 188 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 1069 5423 4864 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 4014 3569 3987

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 4876 946 956

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING FEBRUARY 2014

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

Voltage Profile during the month of Feb 2014

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 421 401 426 403 409 409 408 408 415 399 414 402 424 413 417 3922 420 402 423 404 409 409 408 408 417 402 418 404 425 415 420 3993 421 399 426 400 429 405 425 402 412 399 419 408 423 410 413 3964 422 402 426 404 430 406 428 401 414 400 414 404 424 412 414 3965 420 396 423 400 409 409 408 408 413 396 415 401 424 411 415 3996 420 396 426 400 428 405 426 402 415 398 416 402 423 411 412 4007 420 394 424 399 430 402 427 401 416 399 417 402 423 409 416 3968 418 393 422 397 409 409 408 408 416 399 416 402 422 409 418 3989 418 399 423 404 409 409 408 408 417 402 417 407 419 409 419 400

व तदाब परखा फरवर 2014 स नक Annex-23

इदौर इटारसी कराड धल असोज कासोर िभलाई जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

10 419 394 423 399 409 409 408 408 416 400 415 401 420 408 417 39511 421 393 426 397 429 405 427 401 44 399 419 404 423 407 414 39912 419 395 422 400 409 409 408 408 416 401 419 407 421 410 418 39813 420 396 424 401 409 409 408 408 417 400 416 401 421 409 418 40114 421 399 424 403 430 419 428 414 417 402 415 402 421 409 417 40015 423 397 424 399 428 414 429 412 417 398 406 406 421 407 418 40016 423 397 424 400 431 404 424 401 416 401 422 409 421 409 418 40317 421 402 424 403 432 414 420 404 416 402 412 405 422 410 417 39818 420 397 423 399 409 409 408 408 416 400 414 401 422 414 416 40019 420 396 423 399 409 409 408 408 411 398 418 405 421 413 413 39920 417 397 420 402 429 406 426 401 413 399 416 404 421 413 410 39821 419 399 422 402 430 407 421 401 415 401 418 406 422 411 414 39722 419 397 422 402 432 409 423 401 416 400 413 402 423 413 414 40023 420 396 423 397 430 412 428 404 414 404 415 402 427 414 416 40324 421 399 423 401 433 411 425 400 416 398 414 402 427 415 418 40225 421 399 423 401 433 411 425 400 416 398 414 402 427 415 418 40226 420 397 423 404 431 411 428 409 411 397 415 404 424 414 412 39327 418 398 426 403 409 409 408 408 417 399 418 402 429 415 419 39128 421 400 427 406 409 409 408 408 414 400 416 403 430 415 418 401

423 393 427 397 433 402 429 400 417 396 422 401 430 407 420 391

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 424 404 415 392 424 404 431 407 766 746 797 765 800 756 804 7692 422 406 417 398 426 404 434 407 769 754 798 774 801 769 804 7773 423 405 416 402 426 401 432 410 767 750 796 768 802 773 805 7764 426 407 417 402 423 403 430 408 768 751 797 779 801 776 808 7785 422 403 415 398 423 397 430 400 768 749 797 767 798 763 797 7586 425 404 417 401 423 399 432 404 768 750 797 767 802 773 807 7707 427 401 419 397 423 396 431 404 770 741 800 763 807 769 809 7698 422 403 416 403 424 395 427 399 756 737 788 756 801 765 802 7679 422 405 416 401 424 402 427 404 755 738 786 758 804 773 804 775

10 421 400 414 396 423 398 429 403 3 88 6 98 6 801 60

वािलयर बनाBina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

बना वािलयर नागदा खडवा िसपत िसविन

10 421 400 414 396 423 398 429 403 755 737 788 765 798 765 801 76011 423 397 414 390 426 396 433 399 758 736 794 750 800 752 802 75612 420 403 414 395 423 397 428 403 757 739 787 759 801 763 798 77013 424 405 417 400 427 397 430 402 759 740 794 760 804 773 803 77214 426 410 420 406 424 400 431 405 761 740 794 766 810 780 808 78215 425 404 417 399 426 399 430 401 762 738 794 962 808 768 806 76816 426 406 422 400 427 402 429 400 759 739 792 760 815 774 811 77617 429 407 417 398 427 404 427 406 761 742 792 762 805 765 810 77418 426 404 418 395 423 399 427 404 763 748 793 768 805 759 806 76819 423 409 415 394 422 399 428 403 759 737 795 765 804 758 806 76720 421 406 410 397 420 398 426 406 765 749 795 771 791 766 799 77421 423 407 424 399 423 403 428 405 759 744 792 760 795 761 800 76722 425 406 414 398 423 400 425 404 760 743 790 762 794 762 800 76823 425 402 412 392 424 400 428 405 758 740 790 759 796 755 799 76124 425 401 411 393 423 401 427 403 760 744 796 764 792 757 798 75625 421 408 412 395 423 401 427 403 756 742 793 766 795 764 795 76926 422 405 413 390 421 399 426 402 757 739 789 760 796 750 798 76127 426 407 416 393 421 401 431 403 760 741 795 762 803 755 804 76228 428 409 414 392 423 403 432 405 762 740 795 753 809 775 803 771

429 397 424 390 427 395 434 399 770 736 800 750 815 750 811 756

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Feb-14 0 0 0 0 0 0 0 02 02-Feb-14 0 0 0 0 0 0 0 03 03-Feb-14 0 0 0 0 0 0 0 04 04-Feb-14 0 0 0 0 0 0 0 05 05-Feb-14 0 0 0 0 0 0 0 06 06-Feb-14 0 0 0 0 0 0 0 07 07-Feb-14 0 0 0 0 0 0 0 08 08-Feb-14 0 0 0 0 0 0 0 09 09-Feb-14 0 0 0 0 0 0 0 0

10 10-Feb-14 0 0 0 0 0 0 0 011 11-Feb-14 0 0 0 0 0 0 0 012 12-Feb-14 0 0 0 0 0 0 0 013 13-Feb-14 0 0 0 0 0 0 0 014 14-Feb-14 0 0 0 0 0 0 0 015 15-Feb-14 0 0 0 0 0 0 016 16-Feb-14 0 0 NIL NIL NIL 017 17-Feb-14 0 0 0 0 0 0 0 018 18-Feb-14 0 0 0 0 0 0 0 019 19-Feb-14 0 0 0 0 0 0 0 020 20-Feb-14 0 0 0 0 0 0 0 021 21-Feb-14 0 0 0 0 0 0 0 022 22-Feb-14 0 0 0 0 0 0 0 023 23-Feb-14 0 0 0 0 0 0 0 024 24-Feb-14 0 0 0 0 0 0 0 025 25-Feb-14 1 17 0 0 0 0 0 026 26-Feb-14 0 0 0 0 0 0 0 027 27-Feb-14 0 0 0 0 0 0 0 028 28-Feb-14 0 0 0 0 0 0 0 0

Max 1 17 0 0 0 00 0 0Total 1 17 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month FEBRUARY 2014

Recommonded Load relief at 492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE-25

Power CutRestrictions in Western Region for the month of February-2014 k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply(DLF)

01022014 28022014 2344 2240 2332

21 Three-Phase Supply(Irrigation)

01022014 28022014 0956 0905 0946

21 Three-Phase Supply(Mixed)

01022014 28022014 2343 2227 2330

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01022014 28022014 2353 2337 2347 32 District Head Qtrs 01022014 28022014 2355 2340 2351 33 Tehsil Head Qtrs 01022014 28022014 2349 2309 2341

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid

1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 010214 to 280214

SaUnya Nil

0-1655MW

SaUnya Nil

0000

SaUnya Nil 2400

SaUnya Nil

95 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-

2 Power supply to Agricultural Sector ivavarNa Details sao From

idnaaMk Date tk To

idnaaMk Date p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs) 21 Three-Phase Supply 01022014 28022014 1000 0800 0900

22 Single-Phase Supply 01022014 28022014 1800 1800 1800 3 Anya jaanakarI Any other information

There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

11107 (Av) of 23 days 0000(Av) 0000 (Av)

1Rural 9031(Av) for 3486 Hrs 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0666 - -

0105 -

3 HT Industries 000 (Av) for 00 Hrs 000 Total Energy Cutday 0771 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01022014 to 280214 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 2322014 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का फरवर 2014का वःता रत यौरा

Details of forced unit outages during the month ofFeb2014

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 एःसार वा डनर

ESSAR VADINAR-I

गरा विनिल GSECL

660 2156 20-Jan-14 2018 10-Feb-14 Coal shortage

2 एःसार Essar-2

गरा विनिल GSECL

172 1212 22-Feb-13 अनपल ध Still out

अनपल ध Still out

Shortage of gas

3 एसएलपीपी SLPP-1

गरा विनिल GSECL

125 1445 23-Feb-14 1237 27-Feb-14 BTL

4 एकएलट पीएसAKLTPS-1

गरा विनिल GSECL

125 1147 26-Feb-14 अनपल ध Still out

अनपल ध Still out

DCS FAIL

5 एपीएल APL - 2

अदानी ADANI

330 056 3-Feb-14 अनपल ध Still out

अनपल ध Still out

Turbine vibration bearing probl em

6 एपीएल APL-5

अदानी ADANI

660 1732 15-Feb-14 456 27-Feb-14 Turbine vibration

7 एपीएल APL - 6

अदानी ADANI

660 2049 25-Feb-14 1947 3-Mar-14 Coal mill problem

8 टाटा TATA-6

मारा वउकिल MSPGCL

500 2352 19-Jul-13 अनपल ध Still out

अनपल ध Still out

For Economy SD

9 वीआईपीएल VIPL-I

मारा वउकिल MSPGCL

300 105 2-Oct-13 अनपल ध Still out

अनपल ध Still out

Turbine bearing vibration probl em

10 टाटा TATA-8

मारा वउकिल MSPGCL

250 2255 9-Jan-14 अनपल ध Still out

अनपल ध Still out

HT due to fire near turbine generator desk

11 चिपर Chandrapur-2

मारा वउकिल MSPGCL

210 1238 14-Jan-14 1310 23-Feb-14 ID fan problem

12 कोराड KORADI-6

मारा वउकिल MSPGCL

210 651 24-Jan-14 1456 14-Feb-14 Coal bunkering problem

13 डब यपीसीएल WPCL-1

मारा वउकिल MSPGCL

135 1245 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Furnace press high

14 डब यपीसीएल WPCL-3

मारा वउकिल MSPGCL

135 421 7-Feb-14 Ready Ready Less requisition

प म ऽय भार षण कि म बई णाली चालन-ISO-I

15 चिपर CPUR - 6

मारा वउकिल MSPGCL

500 1523 11-Feb-14 2033 13-Feb-14 BTL

16 नािसक NASIK-3

मारा वउकिल MSPGCL

250 300 11-Feb-14 100 19-Feb-14 UAT problem

17 कोराड KORADI-5

मारा वउकिल MSPGCL

210 153 14-Feb-14 अनपल ध Still out

अनपल ध Still out

ID fan problem

18 ितरोडा Tiroda-I

मारा वउकिल MSPGCL

660 2059 15-Feb-14 2054 26-Feb-14 Turbine bearing problem

19 ितरोडा Tiroda-2

मारा वउकिल MSPGCL

660 1125 17-Feb-14 152 22-Feb-14 BTL

20 कोराड KORADI-6

मारा वउकिल MSPGCL

210 2357 19-Feb-14 250 23-Feb-14 BTL

21 भसावल BHUSWAL-2

मारा वउकिल MSPGCL

210 301 22-Feb-14 1706 25-Feb-14 PA fan temp High

22 खापरखड़ा KHAPERKHEDA-3

मारा वउकिल MSPGCL

250 1448 22-Feb-14 130 25-Feb-14 BTL

23 जयगड Jaigad-4

मारा वउकिल MSPGCL

300 1930 22-Feb-14 1107 4-Mar-14 Low schedule

24 कोराड Koradi-5

मारा वउकिल MSPGCL

300 404 23-Feb-14 अनपल ध Still out

अनपल ध Still out

Electrical fault

25 पल PARLI-4

मारा वउकिल MSPGCL

210 1836 28-Jan-14 1956 3-Feb-14 Air preheater problem

26 भसावल BHUSAWAL-4

मारा वउकिल MSPGCL

250 1432 28-Feb-14 1802 3-Mar-14 Ash hopper problem

27 आरजीपीपीएल RGPPL-1B

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

28 आरजीपीपीएल RGPPL-2B

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

29 आरजीपीपीएल RGPPL 3A

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

30 आरजीपीपीएल RGPPL-1A

आरजीपीपीएल RGPPL

320 1500 18-Jan-14 अनपल ध Still out

अनपल ध Still out

SRV problem

31 आरजीपीपीएल RGPPL 3B

आरजीपीपीएल RGPPL

320 1230 8-Feb-14 Ready Ready Less requisition

32 िसगाजी SINGAJI - I

म वउकिल MPPGCL

600 422 12-Feb-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

33 सातपरा SATPURA-11

म वउकिल MPPGCL

250 1913 15-Feb-14 2149 19-Feb-14 Main stream temperature low

34 सातपरा SATPURA-11

म वउकिल MPPGCL

250 542 26-Feb-14 1642 2-Mar-14 BTL

35 एःसार महान Essar-Mahan-1

एःसार ESSAR

600 000 29-Jan-14 015 18-Feb-14 Less requisi tion

36 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

37 वदना Vandana-1

वदना Vandana

135 149 12-Jan-14 अनपल ध Still out

अनपल ध Still out

BTL

प म ऽय भार षण कि म बई णाली चालन-ISO-I

38 ससान Sasan-2

आरईएल REL

660 205 16-Feb-14 1650 23-Feb-14 Problem in ash handling

39 कावास Kawas 2A

एनट पीसीNTPC 164 2018 23-Dec-13 Ready Ready Less requisition

40 गाधार Gandhar-3

एनट पीसीNTPC 144 2037 28-Dec-13 Ready Ready Less requisition

41 गाधार Gandhar-I

एनट पीसीNTPC 144 2011 1-Jan-14 Ready Ready Less requisition

42 कावास Kawas 2B

एनट पीसीNTPC 164 900 13-Jan-14 421 5-Mar-14 Maintenance

43 गाधार Gandhar-2

एनट पीसीNTPC 219 023 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Less requisition

44 कावास Kawas-1A

एनट पीसीNTPC 164 2055 4-Feb-14 712 20-Feb-14 Less requisition

45 कावास

Kawas-1B एनट पीसीNTPC 164 1951 13-Feb-14 503 20-Feb-14 Less requisition

46 कावास Kawas 1A

एनट पीसीNTPC 164 1210 21-Feb-14 Ready Ready Less requisition

47 कावास Kawas 1B

एनट पीसीNTPC 164 012 22-Feb-14 1144 26-Feb-14 Less requisition

Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का फरवर 2014 का वःता रत यौरा

Details of planned unit outages during the month of Feb2014 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Time Date

1 डब यट पीएस WTPS-3

गरा विनिल GSECL

210 212 12-Feb-14 अनपल ध Still out

अनपल ध Still out

AOH

2 पल ParlI-3

मारा वउकिल MSPGCL

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

AOH

3 चिपर Chandrapur-5

मारा वउकिल MSPGCL

500 101 14-Jul-13 841 19-Feb-14 AOH

4 कोरबा प म KORBA-(W)-4

छरा वउकिल CSPGCL

210 2226 7-Feb-14 अनपल ध Still out

अनपल ध Still out

AOH

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

NIL2

NIL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING MARCH 2014 AND APRIL 2014

Capacity Outage as per Annual Maintenance Plan

3 Craiva]kMila CSPGCL

NIL

4

NIL

5 koMd``Iya xao~ Central Sector51 VSTPS 4 210 010414 070414 AOH52 VSTPS 2 210 080414 270414 AOH53 VSTPS 1 210 300414 190514 AOH54 CGPL 10 800 280314 130514 COH

maraiva]kMila MSPGCL

Date Time Date Time1 220 Bus-1 at Mapusa 20-Mar-14 1000 20-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R

2 765 Bus-1 at Sasan 20-Mar-14 800 20-Mar-14 1800 Daily Stringing of Main bus 1 for 765 kV Vichal Pooling - Sasan feeder

Reliance WR-II C

3 400 400kV Bus-2 at Satna 20-Mar-14 800 20-Mar-14 1800 Continuous Bay extension work related to JP - Nigrie Bays POWERGRID WR-II C

4 400 400kV ICT 1 at Satna 20-Mar-14 800 20-Mar-14 1000 Continuous Bay extension work related to JP - Nigrie Bays POWERGRID WR-II C

5 400 400kV Jabalpur Itarsi 1amp2 (Dc) 20-Mar-14 1000 20-Mar-14 1400 Continuous For commissioning of Line Impedance measurement kit

POWERGRID WR-II C

6 765 3X80 MVAr Bina Line Reactor at Indore 20-Mar-14 1000 21-Mar-14 1800 Continuous For installation of online dry out amp online DGA kit

POWERGRID WR-II C

7 400kV Damoh - Bhopal 1 20-Mar-14 800 31-Mar-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

8 400 Chorania Kasor 20-Mar-14 800 20-Mar-14 1800 Daily PMM work GETCO GETCO9 400 400 KV Main Bus-I at 400 KV Ss Khedamara 20-Mar-14 900 22-Mar-14 1700 Daily Erection of Pantograph 1 Set of IP amp CVT CSPTCL CSPTCL C

10 400 400 KV Khedamara-KSTPS NTPC ckt-II at 400 KV Ss Khedamara

20-Mar-14 900 22-Mar-14 1700 Daily Erection of Pantograph CVT amp 1 Set of IP PGCIL CSPTCL C

11 400 Korba -Vandana 20-Mar-14 900 21-Mar-14 1900 days continuouTesting of LBB auto re-close M-I amp M-II relays NTPC NTPC

12 400 Korba -Vandana 20-Mar-14 900 21-Mar-14 1900 days continuouTesting of LBB auto re-close M-I amp M-II relays NTPC NTPC

13 400DC Akola-Aurangabad (MSETCL) 1 and Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

21-Mar-14 600 23-Mar-14 1800 Conti Crossing work of 400kv MC Aurangabad - Aurangabad

MSETCLWRTS-I WRTS-I C

14400 amp 220 amp 132

400KV DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 400KV Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

21-Mar-14 600 21-Mar-14 1800 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad

MSETCLWRTS-I WRTS-I C

15 400 Bhadrawati-Parli 1amp 2 21-Mar-14 900 31-Mar-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I C

16 220 Bus-1 at Pune 21-Mar-14 800 21-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R

17 400 Solapur-Kolhapur 1 amp 2 21-Mar-14 700 21-Mar-14 1800 Daily Stringing work upcoming 765 kV Solapur-Pune line

Reliance WRTS-I C

18 220 220kV DC Raigarh- Raigarh (CSPTCL) Line (if outage not avail on 13140314)

21-Mar-14 900 22-Mar-14 1700 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (040-50)

CSPTCL WRTS-I C

19 220 Bus-2 (Section-A) at Mapusa 21-Mar-14 1000 21-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R20 400 Bus-1 at Itarsi 21-Mar-14 900 21-Mar-14 1800 Daily AMP POWERGRID WR-II R21 220 Bus-1 at Gwalior 21-Mar-14 1000 21-Mar-14 1800 Daily AMP POWERGRID WR-II R22 220 Jhanor - Haldarwa 1 21-Mar-14 900 21-Mar-14 1800 Daily AMP POWERGRID WR-II R23 400 Vapi Boisar 21-Mar-14 700 22-Mar-14 1900 Continuous For crossing of 220kV Kala Khadoli TL POWERGRID WR-II C

24 765 Sasan-Satna2 21-Mar-14 800 22-Mar-14 1800 Continuous For Power Line crossing of 765kV Vindhyanchal (pooling) - Satna 2 Line

POWERGRID WR-II R

25 400 400220 ICT NO1 at Kasor 21-Mar-14 800 21-Mar-14 1800 Daily PMM work GETCO GETCO26 400 400KV Sipat-Pathadi(LANCO) line 21-Mar-14 900 22-Mar-14 1900 Continous Annual Preventive maintenance job NTPC NTPC27 400 Pune-Parli 2 50MVAr Line Reactor at Pune 22-Mar-14 800 22-Mar-14 1800 Daily AMP Work Line in service wo reactor Reliance WRTS-I R

28 765 Bus-2 at Solapur 22-Mar-14 700 22-Mar-14 1800 Daily 765KV Pune bay commissioning amp SCADA works

WRTS-I WRTS-I C

29 400 Bus-1 at Bhatapara 22-Mar-14 800 23-Mar-14 1800 Conti Bus extension work for new 125MVAr Bus Reactor at Bhatapara

WRTS-I WRTS-I C

30 220 Bus-2 (Section-B) at Mapusa 22-Mar-14 1000 22-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R31 400 Vadavi Chorania 1 22-Mar-14 900 22-Mar-14 1800 Daily AMP Reliance WR-II R32 220 Jhanor - Haldarwa 2 22-Mar-14 900 22-Mar-14 1800 Daily AMP POWERGRID WR-II R33 220 Bus-2 at Gwalior 22-Mar-14 1000 22-Mar-14 1800 Daily AMP POWERGRID WR-II R

34 765 3X80 MVAr Bus Reactor at Indore 22-Mar-14 1000 23-Mar-14 1800 Continuous For installation of online dry out amp online DGA kit

POWERGRID WR-II C

35 220 Transfer Bus at Mapusa 23-Mar-14 1000 23-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R

36 400 Raigarh- Raipur 4 amp Raigarh-Kotra PS 2 23-Mar-14 800 30-Mar-14 1800 Conti Bay shifting work for up-coming 125MVAr Bus Reactor at Raigarh

WRTS-I WRTS-I C

37 765 Bus-1 at Indore (PG) 23-Mar-14 1000 23-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

Outages Proposal of Transmission elements during the month of MARCH‐2014Type

ANNEXURE‐32A

SN KV Line From To

Basis Reason System Agency

38 220 MC Waluj-Chitegaon amp Waluj-Jalna on same tower

24-Mar-14 600 24-Mar-14 1800 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad

MSETCL WRTS-I C

39 400 Raipur-Sipat 1 amp 2 24-Mar-14 800 2-Apr-14 1800 Conti Diversion of line for Lafarge Railway trackERS removal

WRTS-I Lafarge C

40 220 Bus-2 at Pune 24-Mar-14 800 24-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R41 765 Bus-1 at Bilaspur 24-Mar-14 800 24-Mar-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R

42 400 Bus-2 at Bhatapara 24-Mar-14 800 25-Mar-14 1800 Conti Bus extension work for new 125MVAr Bus Reactor at Bhatapara

WRTS-I WRTS-I C

43 400 Kolhapur-Mapusa 2 24-Mar-14 600 24-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

44 400 Vadavi Chorania 2 24-Mar-14 900 24-Mar-14 1800 Daily AMP Reliance WR-II R45 765 Bus-2 at Indore (PG) 24-Mar-14 1000 24-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

46 765 Bus-2 at Sasan 24-Mar-14 800 24-Mar-14 1800 Daily Strining of Main Bus 2 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

47 220 KAPP - Haldarwa 1 24-Mar-14 800 24-Mar-14 1800 Daily AMP POWERGRID WR-II R48 400 Bus - 2 at Pune 25-Mar-14 800 25-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R

49 765 Bus - 1 at Wardha 25-Mar-14 800 25-Mar-14 1800 Daily Jumper connection work of 765KV Raipur-Wardha line

WRTS-I WRTS-I R

50 400 Kolhapur-Mapusa 2 25-Mar-14 600 25-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

51 220 Mapusa-Ponda line 25-Mar-14 1000 25-Mar-14 1500 Daily AMP Work GOA WRTS-I R

52 765 Bus-1 at Sasan 25-Mar-14 800 25-Mar-14 1800 Daily Jumpering of Bus 1 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

53 220 KAPP - Haldarwa 2 25-Mar-14 800 25-Mar-14 1800 Daily AMP POWERGRID WR-II R54 400 Vadavi - Kansari2 25-Mar-14 900 25-Mar-14 1800 Daily AMP Reliance WR-II R55 400 Bus-1 at Indore (PG) 25-Mar-14 1000 26-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C56 765 Bus-1 at Satna 25-Mar-14 800 25-Mar-14 1800 Continuous Bay extension work POWERGRID WR-II C57 765 Sipat 765KV 400KV 1000MVA ICT-1 25-Mar-14 900 25-Mar-14 1900 Daily SPS Protection scheme modification NTPC NTPC

58 765 Bus - 2 at Wardha 26-Mar-14 800 26-Mar-14 1800 Daily Jumper connection work of 765KV Raipur-Wardha line

WRTS-I WRTS-I R

59 400 Bhadrawati-Parli 2 63MVAr Line Reactor at Parli

26-Mar-14 800 26-Mar-14 1800 Daily AMP Work of Recator at Parli line in service wo reactor

WRTS-I WRTS-I R

60 400 Kolhapur-Mapusa 1 26-Mar-14 600 26-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

61 220 Mapusa-Amona line 26-Mar-14 1000 26-Mar-14 1500 Daily AMP Work GOA WRTS-I R62 765 Bus-2 at Satna 26-Mar-14 800 26-Mar-14 1800 Continuous Bay extension work POWERGRID WR-II C

63 765 Bus-2 at Sasan 26-Mar-14 800 26-Mar-14 1800 Daily Jumpering of bus 2 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

64 400 401 KV Main Bus-I at 400 KV Ss Khedamara 26-Mar-14 900 27-Mar-14 1700 Daily Erection of IPS Tube CSPTCL CSPTCL C

65 400 401 KV Khedamara-KSTPS NTPC ckt-II at 400 KV Ss Khedamara

26-Mar-14 900 27-Mar-14 1700 Daily Erection of IPS Tube PGCIL CSPTCL C

66 400 ACBIL-BILASPUR-CKT NO -2 26-Mar-14 900 31-Mar-14 1800 CONT FOR lilo CONNECTIVITY OF 300MW MCCPL TPP

ACBIL ACBIL C

67 765 Bus-2 at Bilaspur 27-Mar-14 800 27-Mar-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R68 220 Mapusa-Thivim 1 27-Mar-14 1000 27-Mar-14 1500 Daily AMP Work GOA WRTS-I R69 220 KAPP - Vav 2 27-Mar-14 800 27-Mar-14 1800 Daily AMP POWERGRID WR-II R70 400 Bus-2 at Indore (PG) 27-Mar-14 1000 28-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

71 765 Bus-2 at Gwalior 27-Mar-14 1000 27-Mar-14 1800 Daily Bay extension work related to Gwalior Jaipur 1 Bays

POWERGRID WR-II C

72 400 VSTPS Tie- Line-1 ( Line from Stage-III to IV Switchyard)

27-Mar-14 900 27-Mar-14 1900 Daily Basis AMP and rectification of hot spots NTPC NTPC

73 765 Sipat 765KV 400KV 1000MVA ICT-2 27-Mar-14 900 27-Mar-14 1900 Daily SPS Protection scheme modification NTPC NTPC74 765 Bus-1 at Solapur 28-Mar-14 700 30-Mar-14 1800 Daily commissioning tests amp SCADA works WRTS-I WRTS-I C75 220 Mapusa-Thivim 2 28-Mar-14 1000 28-Mar-14 1500 Daily AMP Work GOA WRTS-I R

76 400 Koradi-Satpura 28-Mar-14 1000 28-Mar-14 1400 Daily Earthwire tighting work damaged during Crossing work

WRTS-I ADANI C

77 220 Bus-1 at Dehgam 28-Mar-14 900 28-Mar-14 1800 Daily AMP POWERGRID WR-II R78 220 Kawas - Haldarwa 2 28-Mar-14 800 28-Mar-14 1800 Daily AMP POWERGRID WR-II R79 400 Chorania Amreli 28-Mar-14 800 28-Mar-14 1800 Daily PMM work GETCO GETCO

80 400DC Akola-Aurangabad (MSETCL) 1 and Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

29-Mar-14 600 30-Mar-14 1800 Conti Charging amp shifting of Akola-Abad line on MC Abad-Abad line WRTS-I WRTS-I C

81 220 Bus-2 at Dehgam 29-Mar-14 900 29-Mar-14 1800 Daily AMP POWERGRID WR-II R82 400 Bus -1 at Mapusa 30-Mar-14 1000 30-Mar-14 1500 Daily AMP Work WRTS-I WRTS-I R

83 765 765kV Bus Reactor at Solapur 31-Mar-14 700 2-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

Date Time Date Time

1 400 Bhilai-Koradi 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

2 400 DC Korba-Birsingpur 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

3 400 Korba-Bhilai 2 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

4 220 Korba-Budhipadar 3 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

5 400 Akola-Wardha 1amp 2 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

6 400 Raipur-Raigarh 1 amp Raipur-KSK-DBPL-Raigarh

1-Apr-14 800 30-Apr-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

7 400 Bhadrawati-Parli 1amp 2 1-Apr-14 900 30-Apr-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I C

8 400 400220kv ICT-1 at Pune 1-Apr-14 800 1-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R9 400 Bus-1 at Bilaspur 1-Apr-14 800 1-Apr-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R

10 400 Solapur(PG) -Karad line 1-Apr-14 700 10-Apr-14 1800 Conti Erection of 80MVAr new reactor by shifitng line equipments at Solapur

MSETCL WRTS-I C

11 400 Bus-1 at Jabalpur (pooling) 01-Apr-14 1000 01-Apr-14 1800 Daily Busbar Stability test related to Jhabua Power Bays

POWERGRID WR-II C

12 400 Shujalpur - Nagda 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

13 400 Mundra - Bhachau 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

14 400 Bina - Shujalpur 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

15 220 Omkareshwar-Khandwa Ckt 1-Apr-14 900 1-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI16 400 Sipat 400KV Bay 10 and 11 1-Apr-14 900 3-Apr-14 1900 Continous 400KV CT 3nos replacement NTPC NTPC17 400 Padgha-Nagothane ckt I 1-Apr-14 900 1-Apr-14 1700 Daily QMwork MSETCL MSETCL

18 400 Bus-2 at Jabalpur (pooling) 02-Apr-14 1000 02-Apr-14 1800 Daily Busbar Stability test related to Jhabua Power Bays

POWERGRID WR-II C

19 400 Vindhyanchal - Mahan - Korba (Section of both the line on same Dc tower)

02-Apr-14 800 03-Apr-14 1700 Continuous For Power Line crossing of 765kV Vindhyanchal (pooling) - Satna 1 Line

POWERGRID WR-II C

20 400 400kV ICT 4 at Indore MPPTCL 02-Apr-14 1000 04-Apr-14 1800 ContinuousFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

MPPTCL WR-II C

21 400 400kV Bus Coupler bay at Indore MPPTCL 02-Apr-14 1000 04-Apr-14 1800 ContinuousFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

MPPTCL WR-II C

22 400 400kV Itarsi - Indore MPPTCL 1 Line 02-Apr-14 1000 02-Apr-14 1500 DailyFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

POWERGRID WR-II C

23 400400 KV LILO Line of 400 KV SC Korba West-Khedamara to 400 KV Ss Raita (Between Loc69 amp70 near Raita Ss)

2-Apr-14 800 3-Apr-14 1700 DailyMaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

CSPTCL CSPTCL C

24 400 Chandrapur-Khaparkheda 2-Apr-14 900 2-Apr-14 1700 Daily QMwork MSETCL MSETCL

25 400 Lamboti-Solapur PG 2-Apr-14 900 2-Apr-14 1700 Daily QMwork MSETCL MSETCL

26 400 Bus-1 at Durg PS Ss 3-Apr-14 900 3-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R27 400 Bus-1 at Jabalpur 03-Apr-14 900 03-Apr-14 1800 Daily Retrofitting of Isolator arms(689A) POWERGRID WR-II R28 400 315MVA ICT2 at Khandwa 03-Apr-14 1000 03-Apr-14 1600 Daily AMP POWERGRID WR-II R29 400 Mundra - Hadala 3-Apr-14 800 3-Apr-14 1800 Daily PMM GETCO GETCO30 400 400KV Seoni -Bhilai Ckt 3-Apr-14 900 3-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I31 400 Lonikand-Chakan 3-Apr-14 900 3-Apr-14 1700 Daily QMwork MSETCL MSETCL32 400 Bus-2 at Durg PS Ss 4-Apr-14 900 4-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R33 400 Bus-1 at Jabalpur 04-Apr-14 900 04-Apr-14 1800 Daily Retrofitting of Isolator arms(2089A) POWERGRID WR-II R

34 400 400kV Itarsi - Indore MPPTCL 1 Line 04-Apr-14 1300 04-Apr-14 1800 DailyFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

POWERGRID WR-II C

35 400 Varsana - Hadala 4-Apr-14 800 4-Apr-14 1800 Daily PMM GETCO GETCO

Agency Type

ANNEXURE‐32BOutages Proposal of Transmission elements during the month of APRIL ‐2014

SN KV Line From To

Basis Reason System

36 220 Vapi - Vapi (PG) 4-Apr-14 800 4-Apr-14 1800 Daily PMM work PGCIL GETCO37 220 Haldarva - Jhanor - 1 (NTPC) 4-Apr-14 800 4-Apr-14 1800 Daily PMM amp Tan Delta testing PGCIL GETCO38 400 400KV Birsinghpur -Katni Ckt - I 4-Apr-14 800 4-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I39 220 Badod - Kota Ckt 4-Apr-14 900 4-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI40 220 Malanpur-Auriya Ckt 4-Apr-14 900 5-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI

41 400 Bhusawal-Akola 4-Apr-14 900 4-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

42 400 Deepnagar-Aurangabad II 4-Apr-14 900 4-Apr-14 1700 Daily QMwork MSETCL MSETCL43 400 Kalwa-Padgha Ckt I 4-Apr-14 900 4-Apr-14 1700 Daily QMwork MSETCL MSETCL44 765 Bus Reactor at Seoni 5-Apr-14 900 5-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R

45 400 DC Korba-KhedamaraLilo at Marwa lilo section yet to be charge 5-Apr-14 800 6-Apr-14 1800 Daily

Crossing work of upcoming 765 KV DC Raigarh-Champa (AP-48A0- AP 490)DC Korba-Khedamara is in service

CSPTCL WRTS-1 C

46 400 Bus-1 at Jabalpur 05-Apr-14 900 05-Apr-14 1800 Daily Retrofitting of Isolator arms(1689A) POWERGRID WR-II R

47 400 Mundara -Limbdi 1 05-Apr-14 800 07-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

48 220 Badod - Modak Ckt 5-Apr-14 900 5-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI49 400 Dhule-Babhleswar ckt 1 5-Apr-14 900 5-Apr-14 1700 Daily QMwork MSETCL MSETCL50 400 400220kv ICT-1 at Seoni 7-Apr-14 900 7-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R51 400 Bus-2 at Jabalpur 07-Apr-14 900 07-Apr-14 1800 Daily Retrofitting of Isolator arms(1789B) POWERGRID WR-II R52 400 315MVA ICT1 at Khandwa 07-Apr-14 1000 07-Apr-14 1600 Daily AMP POWERGRID WR-II R53 220 Chhegoan-Khandwa Ckt -II 7-Apr-14 900 7-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI54 400 Korba- Bhilai1 7-Apr-14 900 8-Apr-14 1900 days continuou Bay Maint and testing NTPC NTPC55 400 Vindhyachal - Mahan line 7-Apr-14 900 8-Apr-14 1900 Continuous Replacement of R Y and B Phase CT NTPC NTPC56 400 Bhusawal-Aurangabad 7-Apr-14 900 7-Apr-14 1700 Daily QMwork MSETCL MSETCL57 400 New Koyna-Karad ckt 2 7-Apr-14 830 7-Apr-14 1730 Daily QMwork MSETCL MSETCL

58 400 Mundara -Limbdi 2 08-Apr-14 800 10-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

59 400 Chorania Hadala 8-Apr-14 800 8-Apr-14 1800 Daily PMM GETCO GETCO60 400 Sipat 400KV Bay 23 8-Apr-14 900 9-Apr-14 1900 Continous One 400KV CT replacement NTPC NTPC61 400 Koradi-Khaparkheda I 8-Apr-14 900 8-Apr-14 1700 Daily QMwork MSETCL MSETCL62 765 765400KV ICT-1 at Kotra PS 9-Apr-14 900 9-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R63 400 Bus-2 at Jabalpur 09-Apr-14 900 09-Apr-14 1800 Daily Retrofitting of Isolator arms(489B) POWERGRID WR-II R64 400 315MVA ICT1 at Damoh 09-Apr-14 1000 09-Apr-14 1600 Daily AMP POWERGRID WR-II R65 400 Amreli-Jetpur 2 9-Apr-14 800 9-Apr-14 1800 Daily PMM GETCO GETCO66 400 SSP- Rajgarh - 1 9-Apr-14 800 9-Apr-14 1800 Daily PMM GETCOMPTCL GETCO67 220 TAPS1 amp2-TAPS 3amp4 tie line 9-Apr-14 800 9-Apr-14 1600 one day Annual maintenance Works MSETCL NPCIL68 220 TAPS TIE LIE-I 9-Apr-14 800 10-Apr-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL69 400 400 KV Indore - Nagda Ckt 9-Apr-14 900 9-Apr-14 1600 daily For maintenance work MPPTCL EHT- Mamp I70 400 400 KV Sarni - Isp Ckt 9-Apr-14 900 9-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I71 220 Mehgaon-Auriya Ckt 9-Apr-14 900 10-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI72 400 315 MVA 400220Kv X-mer III At Bhopal SS 9-Apr-14 900 10-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI73 400 Padgha-Tarapur CktII 9-Apr-14 900 9-Apr-14 1700 Daily QMwork MSETCL MSETCL74 765 Bus Reactor at Kotra PS 10-Apr-14 900 10-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R

75 765 amp 400

765400 kV ICT-I at Solapur amp 400KV Solapur-Parli 2 10-Apr-14 700 12-Apr-14 1800 Daily 765400 kV spare ICT unit Aux bus works CSD

commissioning amp Fire fighting works at Solapur WRTS-IReliance WRTS-I C

76 400 315MVA ICT2 at Damoh 10-Apr-14 1000 10-Apr-14 1600 Daily AMP POWERGRID WR-II R

77 765 Sasan-Satna 1 10-Apr-14 800 11-Apr-14 1800 Daily For AMP of line amp Line terminal Equipments Post commissioning checks

POWERGRID WR-II C

78 400 APL-Varsana 10-Apr-14 800 10-Apr-14 1800 Daily PMM GETCO GETCO79 400 400 KV Isp - Nagda Ckt 10-Apr-14 900 10-Apr-14 1600 daily For maintenance work MPPTCL EHT- Mamp I80 400 400 KV Bhopal-Itarsi(PGCIL) Ckt-I 10-Apr-14 900 11-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I81 220 Chhegoan-Khandwa Ckt -I 10-Apr-14 900 10-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI82 400 315 MVA 400220Kv X-mer At Katni SS 10-Apr-14 800 11-Apr-14 1800 continue For maintenance work MPPTCL EHT -MampI83 400 Korba- Bhilai2 10-Apr-14 900 11-Apr-14 1900 days continuou Bay Maint and testing NTPC NTPC84 400 Sipat 400KV Bay 14 10-Apr-14 900 12-Apr-14 1900 Continous 400KV CT 3nos replacement NTPC NTPC

85 400 Chandrapur II-Parli II 10-Apr-14 900 10-Apr-14 1700 Daily Providing of Arching horncorona rings Bird guards quarter pinsNut bolts

MSETCL MSETCL

86 400 Karad-Lonikand 10-Apr-14 900 10-Apr-14 1700 Daily QMwork MSETCL MSETCL87 400 Raipur-Durg PS 1 11-Apr-14 900 11-Apr-14 1700 Daily AMP Work WRTS-I WRTS-I R

88 400 Mundara -Jetpur 1 11-Apr-14 800 15-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

89 400 Varsana-Hadala Line 11-Apr-14 800 11-Apr-14 1800 Daily PMM GETCO GETCO90 220 Haldarwa Kawas-2 11-Apr-14 800 11-Apr-14 1800 Daily PMM work PGCIL GETCO91 400 400 KV Nagda-Rajgarh(PGCIL) Ckt-I 11-Apr-14 900 11-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

92 400 315 MVA 400220Kv X-mer III ampTie bay At Bhopal SS

11-Apr-14 900 11-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI

93 400 Akola-Nandgaonpeth 11-Apr-14 900 11-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

94 400 Akola-Wardha I 11-Apr-14 900 11-Apr-14 1700 Daily QMwork MSETCL MSETCL95 400 Kalwa-Lonikand 11-Apr-14 900 11-Apr-14 1700 Daily QMwork MSETCL MSETCL96 400 400220kv ICT-1 at Mapusa 12-Apr-14 900 12-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R97 400 Raipur-Durg PS 2 12-Apr-14 900 12-Apr-14 1700 Daily AMP Work WRTS-I WRTS-I R98 765 Sasan-Satna2 with line reactor 12-Apr-14 1000 12-Apr-14 1800 Daily AMP POWERGRID WR-II R99 400 400 KV Nagda-Rajgarh(PGCIL) Ckt-II 12-Apr-14 900 12-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I100 400 Deepnagar-Aurangabad I 12-Apr-14 900 12-Apr-14 1700 Daily QMwork MSETCL MSETCL101 400 Amreli-Jetpur 2 14-Apr-14 800 14-Apr-14 1800 Daily PMM GETCO GETCO102 400 Kasor - Gpec 14-Apr-14 800 14-Apr-14 1800 Daily PMM GETCO GETCO103 220 GWL(PGCIL)-Malanpur Ckt-I 14-Apr-14 900 15-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI104 400 DC Korba-Raipur 3 amp 4 15-Apr-14 800 16-Apr-14 1800 Conti Bus splitting work at Raipur WRTS-1 WRTS-1 C

105 400 Korba-Bhatapara 15-Apr-14 800 24-Apr-14 1800 Conti For raising of ground clearence for Railway track of Lafarge

WRTS-I Lafarge C

106 765 765400 kV ICT-II at Solapur 15-Apr-14 700 17-Apr-14 1800 Daily CSD commissioning amp Fire fighting works WRTS-I WRTS-I C107 400 Vindhyachal-Satna1 15-Apr-14 1000 15-Apr-14 1800 Daily AMP POWERGRID WR-II R108 400 Ssnl-Dhule-1 15-Apr-14 800 15-Apr-14 1800 Daily PMM GETCOMSETCL GETCO109 220 TAPS-Vapi 15-Apr-14 800 17-Apr-14 1900 Daily Annual maintenance Works GETCO NPCIL110 220 Pithampur-Rajgarh(PGCIL) Ckt - I 15-Apr-14 900 15-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI111 400 Sipat 400KV Bay-18 ( Ranchi-1 Main) 15-Apr-14 900 15-Apr-14 1900 Daily Annual Preventive maintenance job NTPC NTPC112 400 Karad-Kolhapur Ckt I 15-Apr-14 900 15-Apr-14 1700 Daily QMwork MSETCL MSETCL

113 400 DC Raipur-Bhadrawati 2 amp 3 16-Apr-14 800 17-Apr-14 1800 Conti Bus splitting work at Raipur WRTS-1 WRTS-1 C

114 400 Vindhyachal-Satna2 16-Apr-14 1000 16-Apr-14 1800 Daily AMP POWERGRID WR-II R

115 400 Mundara -Jetpur 2 16-Apr-14 800 20-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

116 400 Vadavi - Dehgam (Pg) - 1 16-Apr-14 800 16-Apr-14 1800 Daily PMM amp Tandelta testing GETCO GETCO117 400 Chorania Asoj-1 16-Apr-14 800 16-Apr-14 1800 Daily PMM GETCO GETCO118 220 Bhilad - TAPS 16-Apr-14 800 16-Apr-14 1800 Daily PMM work PGCIL GETCO119 220 Bhat - Pirana (PG) - 1 16-Apr-14 800 16-Apr-14 1800 Daily PMM work GETCO GETCO120 400 400 KV Bhopal-Itarsi(PGCIL) Ckt-II 16-Apr-14 900 17-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I121 220 Damoh(PGCIL) - Tikamgarh Ckt 16-Apr-14 900 16-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI

122 400 400KV SC Korba-Raipur-II (Between Korba - Bhatapara end)(Between Loc2980 amp 2990) 16-Apr-14 800 17-Apr-14 1700 Daily

MaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

PGCIL CSPTCL C

123 400 Sipat 400KV Bay-19 ( Ranchi-2 Main) 16-Apr-14 900 16-Apr-14 1900 Daily Annual Preventive maintenance job NTPC NTPC124 400 Padgha-Babhleswar ckt I 16-Apr-14 900 16-Apr-14 1700 Daily QMwork MSETCL MSETCL125 400 Vadavi - Dehgam (Pg) - 2 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCO GETCO126 400 Ssnl-Dhule-2 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCOMSETCL GETCO127 400 Vadinar-Hadala- 1 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCO GETCO128 220 Bhat - Pirana (PG) - 2 17-Apr-14 800 17-Apr-14 1800 Daily PMM work GETCO GETCO129 400 400KV Birsinghpur -Katni Ckt - II 17-Apr-14 800 17-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I130 220 Pithampur-Rajgarh(PGCIL) Ckt - II 17-Apr-14 900 17-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI131 400 Jejuri-Lonikand 17-Apr-14 900 17-Apr-14 1700 Daily QMwork MSETCL MSETCL132 400 Deepnagar-Khadka II 17-Apr-14 900 17-Apr-14 1700 Daily QMwork MSETCL MSETCL133 400 Chorania Kasor 18-Apr-14 800 18-Apr-14 1800 Daily PMM GETCO GETCO134 220 GWL(PGCIL)-Malanpur Ckt-II 18-Apr-14 900 19-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI135 400 Akola-Wardha II 18-Apr-14 900 18-Apr-14 1700 Daily QMwork MSETCL MSETCL

136 400 Koradi-Nandgaonpeth 18-Apr-14 800 18-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

137 765 765kV Pune line Reactor at Solapur 19-Apr-14 700 20-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

138 400 400KV Bina -Power(JP) Ckt 19-Apr-14 900 19-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I139 400 Dhule-SSarovar I 19-Apr-14 900 19-Apr-14 1700 Daily QMwork MSETCL MSETCL

140 400 Koradi-Khaparkheda II 19-Apr-14 900 19-Apr-14 1700 Daily QMwork MSETCL MSETCL141 220 KAPP - VAPI - 1 20-Apr-14 800 20-Apr-14 1800 Daily Isolator replacement under ASIDE scheme PGCIL GETCO

142 400 DC Bhilai-Bhadrawati amp Raipur-Bhadrawati 1 21-Apr-14 800 28-Apr-14 1800 Conti Diversion of line for Vidarbha Industrial Devlopment Corporation(VIDC)

WRTS-I VIDC C

143 400 Bhachau- Ranchhodpura 1amp2 21-Apr-14 800 27-Apr-14 1800 Continuous Tower shifting work at canal crossingInsulator replacement work

POWERGRID WR-II C

144 400 Hadala-Amreli 21-Apr-14 800 21-Apr-14 1800 Daily PMM GETCO GETCO145 400 Vadinar-Hadala- 2 21-Apr-14 800 21-Apr-14 1800 Daily PMM GETCO GETCO146 220 TAPS-Boisar 21-Apr-14 800 23-Apr-14 1900 Daily Annual maintenance Works MSETCL NPCIL147 220 Bina(PGCIL)-220 KV Bina Ckt 21-Apr-14 900 21-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI148 400 CGPL Bhachau -1 21-Apr-14 8AM 21-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL149 220 Kawas-Ichhapore 1+Bus 1 21-Apr-14 900 21-Apr-14 1800 daily RTV Coating NTPC NTPC150 400 Karad-Kolhapur Ckt II 21-Apr-14 900 21-Apr-14 1700 Daily QMwork MSETCL MSETCL151 400 New Koyna-Koyna Stg-4-1 21-Apr-14 830 21-Apr-14 1730 Daily QMwork MSETCL MSETCL152 400 Ssp - Rajgarh - 2 22-Apr-14 800 22-Apr-14 1800 Daily PMM GETCOMPTCL GETCO153 400 Vadavi-Bhachau 2 22-Apr-14 800 22-Apr-14 1800 Daily PMM amp Tan Delta testing PGCIL GETCO154 220 Bhilad - Vapi (PG) - 1 22-Apr-14 800 22-Apr-14 1800 Daily PMM work PGCIL GETCO155 400 400 KV Rajgarh(PGCIL)-Ssp Ckt-I 22-Apr-14 900 22-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I156 400 400KV Seoni -Sarni Ckt 22-Apr-14 900 23-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I157 220 Khandwa(PGCIL)-Nepanagar Ckt 22-Apr-14 900 22-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI158 220 Kawas-Ichhapore 2+Bus 1 22-Apr-14 900 22-Apr-14 1800 daily For maintenance work NTPC NTPC159 400 Karad-Jaigad II 22-Apr-14 900 22-Apr-14 1700 Daily Annual maintenance work MSETCL MSETCL160 220 Bhilad - Vapi (PG) - 2 23-Apr-14 800 23-Apr-14 1800 Daily PMM work PGCIL GETCO161 400 400KV Bina -Bhopal Ckt -I 23-Apr-14 900 24-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I162 400 400 KV Rajgarh(PGCIL)-Ssp Ckt-II 23-Apr-14 900 23-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I163 220 Bina(PGCIL)-Shivpuri Ckt 23-Apr-14 900 24-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI164 220 Damoh(PGCIL) - Damoh I C - I 23-Apr-14 900 23-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI

165 400 400 KV DCDS Sipat- Raipur (IampII) 23-Apr-14 800 24-Apr-14 1700 DailyMaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

PGCIL CSPTCL C

166 400 CGPL Bhachau - 2 23-Apr-14 8AM 23-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL

167 220 Kawas-Navsari 2 +Bus 1 23-Apr-14 900 23-Apr-14 1800 daily Insulator replcement and routine maintenance NTPC NTPC168 400 Padgha-Babhleswar ckt II 23-Apr-14 900 23-Apr-14 1700 Daily QMwork MSETCL MSETCL169 400 Kasor - SSP 24-Apr-14 800 24-Apr-14 1800 Daily PMM work GETCO GETCO170 220 Bhilad - Vapi (PG) - 3 24-Apr-14 800 24-Apr-14 1800 Daily PMM work PGCIL GETCO171 220 TAPS-Bhilad 24-Apr-14 800 26-Apr-14 1900 Daily Annual maintenance Works GETCO NPCIL172 220 Damoh(PGCIL) - Damoh I C - II 24-Apr-14 900 24-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI173 400 CGPL Jetpur- 1 24-Apr-14 8AM 24-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL

174 220 Kawas-Ichhapore 1 +Bus 2 24-Apr-14 900 24-Apr-14 1400 daily Insulator replcement and routine maintenance NTPC NTPC

175 220 Kawas-Ichhapore 2 +Bus 2 24-Apr-14 1400 24-Apr-14 1900 daily Insulator replcement and routine maintenance NTPC NTPC176 400 Padgha-Talegaon 24-Apr-14 900 24-Apr-14 1700 Daily QMwork MSETCL MSETCL

177 765 765kV Raichur 1 line Reactor at Solapur 25-Apr-14 700 27-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

178 400 400KV Bina -Bhopal Ckt -II 25-Apr-14 900 26-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I179 400 CGPL Jetpur- 2 25-Apr-14 8AM 25-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL180 400 Vindhyachal -Satna-4 Line Shunt Reactor 25-Apr-14 900 25-Apr-14 1900 Daily Basis AMP NTPC NTPC

181 400 Bhusawal-Koradi 25-Apr-14 900 25-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

182 400 Deepnagar-Khadka I 25-Apr-14 900 25-Apr-14 1700 Daily QMwork MSETCL MSETCL183 400 Soja -Kansari 26-Apr-14 800 26-Apr-14 1800 Daily PMM GETCO GETCO184 400 Raipur-Wardha 1 27-Apr-14 800 28-Apr-14 1800 Daily Balance construction work WRTS-1 WRTS-1 C185 220 KAPP - VAPI - 2 27-Apr-14 800 27-Apr-14 1800 Daily Isolator replacement under ASIDE scheme PGCIL GETCO186 400 Soja -Kansari 28-Apr-14 800 28-Apr-14 1800 Daily PMM GETCO GETCO187 220 TAPS-Boisar II 28-Apr-14 800 30-Apr-14 1900 Daily Annual maintenance Works MSETCL NPCIL188 400 400KV Damoh - Katni Ckt 28-Apr-14 900 28-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I189 400 400 KV Damoh(PGCIL)-Katni Ckt 28-Apr-14 900 28-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I190 400 New Koyna-Karad ckt 1 28-Apr-14 830 28-Apr-14 1730 Daily QMwork MSETCL MSETCL

191 400 DC Raigarh-DB Power (Tudri) - KSK 29-Apr-14 800 30-Apr-14 1800 Conti Crossing work of 765kV SC Raigrah-Champa (90 - 100)

WRTS-I WRTS-I C

192 400 Raipur-Wardha 2 29-Apr-14 800 30-Apr-14 1800 Daily Balance construction work WRTS-1 WRTS-1 C193 220 Navsari - Nasik - 1 29-Apr-14 800 29-Apr-14 1800 Daily PMM work GETCOMSETCL GETCO194 220 Seoni(PGCIL)-Chhindwara Ckt-I 29-Apr-14 900 29-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI195 220 Kawas-Vav 1+ bus 2 29-Apr-14 900 29-Apr-14 1800 daily For maintenance work NTPC NTPC196 400 Chorania Asoj-1 30-Apr-14 800 30-Apr-14 1900 Daily PMM GETCO GETCO197 220 Navsari - Nasik - 2 30-Apr-14 800 30-Apr-14 1800 Daily PMM work GETCOMSETCL GETCO198 220 Vapi - TAPS 30-Apr-14 800 30-Apr-14 1800 Daily PMM work PGCIL GETCO199 220 Seoni(PGCIL)-Chhindwara Ckt-II 30-Apr-14 900 30-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI200 220 Kawas-Vav 1+ bus 2 30-Apr-14 000 30-Apr-14 000 daily For maintenance work NTPC NTPC

Annexure-32-C1

List of Emergency Outages availed in Feb 2014

SlNo

Element kV Agency From

Date To Date

Remarks

1 SATNA‐BINA‐II 765 WRTS‐2 4‐Feb‐14

5‐Feb‐14

Hot spot attending

2 SUJALPUR‐NAGDA LR NAGDA

400 WRTS‐2 6‐Feb‐14

19‐Feb‐14

Oil leackage

3 SOLAPUR‐PARLI‐II

400 WRTS‐2 6‐Feb‐14

6‐Feb‐14

Hotspot attend at solapur

4 JABALPUR‐ITARSI‐IV LR AT ITARSI‐LR

400 WRTS‐2 7‐Feb‐14

17‐Feb‐14

Oil leackage

5 APL‐HADALA‐SC 400 GEB 7‐Feb‐14

7‐Feb‐14

Hot spot

6 SOLAPUR‐PARLI(PG)‐1

400 WRTM(REL)

9‐Feb‐14

9‐Feb‐14

Hot spot

7 BOISAR‐BOISAR(PG)‐II

220 MSETCL 9‐Feb‐14

9‐Feb‐14

Hotspots

8 NEW KOYNA‐KARAD ‐ I

400 MSETCL 10‐Feb‐14

11‐Feb‐14

Dc‐earth leakage

9 LONIKHAND ‐ KARAD

400 MSETCL 10‐Feb‐14

11‐Feb‐14

Hotspot

10 NAGDHA ICT ‐ III

400220

MPPTCL 10‐Feb‐14

10‐Feb‐14

Hotspot

11 AKOLA ‐ ABAD ‐I AKOLA

400 WRTS‐1 11‐Feb‐14

12‐Feb‐14

Oil leackage

12 AKOLA ‐ AURANGABAD ‐ I

400 WRTS‐1 11‐Feb‐14

11‐Feb‐14

Oil leackage ion lr

13 BINA‐GWALIOR 765 WRTS‐1 14‐Feb‐ 14‐Feb‐ Attend oil leakage on lr

SlNo

Element kV Agency From

Date To Date

Remarks

II 14 14

14 AKOLA‐TIRORA‐I 765 MSETCL 22‐Feb‐14

23‐Feb‐14

Sparking in LR at Tirora SYED AT TIRORA END

15 KHAEGAR‐ICT‐I 400220

MSETCL 22‐Feb‐14

22‐Feb‐14

Hot spot

16 KHANDWA‐NEPANAGR‐SC

220 MPPTCL 23‐Feb‐14

23‐Feb‐14

Hot spot

17 GWALIAR ‐SATNA ‐ I

765 WRTS‐2 24‐Feb‐14

1‐Mar‐14

Attend hot spot

18 KORBA BUS‐III 400 NTPC 25‐Feb‐14

25‐Feb‐14

Hots pot attend

19 BUS‐1 AT GWALIOR

765 WRTS‐2 13‐Feb‐14

13‐Feb‐14

Checking of blocked BB main‐1 relay

20 RAIPUR‐BWATI‐2

400 WRTS‐1 17‐Feb‐14

17‐Feb‐14

Urgent Removal of LR at Raipur end for DGA violation

21 TAPS‐PADGHE 400 TAPS‐3amp4 19‐Feb‐14

23‐Feb‐14

To attend SF‐6 leakage

22 SATNA‐GWALIOR‐1

765 WRTS‐2 24‐Feb‐14

26‐Feb‐14

To attend hot spots

23 VCHAL‐JABALPUR‐IV

400 WRTS‐2 27‐Feb‐14

27‐Feb‐14

To increase OPGW‐Top conductor clearance to avoid tripping

24 APL‐SAMI‐2 400 APL 26‐Feb‐14

26‐Feb‐14

To attend hot sopt

25 SHOLAPUR BUS‐1

765 WRTS‐1 27‐Feb‐14

27‐Feb‐14

To attend hot sopt

26 BOISAR BUS‐2 220 WRTS‐1 28‐Feb‐14

28‐Feb‐14

To attend hot sopt

Sl No KV element From To Basis Work System Agency Remarks

1220 Vapi (GETCO)‐Bhilad 1‐Feb‐14 800 2‐Feb‐14 1800 Daily Line crossing work of 400KV LILO line for

Magarwada SSGETCO POWERGRID N

2 220 Omkareshwar-Khandwa Ckt

3-Feb-14 900 3-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

3 400 New Koyna-Koyna Stg-4-1

3-Feb-14 830 3-Feb-14 1730 Daily QMwork MSETCL MSETCL N

4220 Vapi ‐ Magarwada

Ckt13‐Feb‐14 900 3‐Feb‐14 1400 Daily AMP of line amp equipment WRTS‐II POWERGRID DD may have to do load

shedding as per Reliability Suggestion

N

5 220 DC Raigarh- Raigarh 1amp 2

4-Feb-14 800 5-Feb-14 1800 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (040-50)

CSPTCL WRTS-I N

6 220 Itarsi(PGCIL)-Hoshangabad Ckt

4-Feb-14 900 4-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N

7 400 Mundra -Limbdi-2 4-Feb-14 800 4-Feb-14 1800 Daily Suspension Insulator replcement and routine maintenance

PGCIL CGPL N

8 400 400 kV DC Satna - Bina 1amp2

4-Feb-14 800 5-Feb-14 1800 Continous Crossing of Jabalpur-Bina 765 kv SC Line PGCIL JTCL N

9220 Vapi ‐ Magarwada

Ckt24‐Feb‐14 0900 4‐Feb‐14 1400 Daily AMP of line amp equipment WRTS‐II POWERGRID N

10 765 Seoni-Bina line with LR 4‐Feb‐14 800 4-Feb-14 1800 Daily AMP Work WRTS-2 WRTS-1 N

11 400 Bus I Bina 5‐Feb‐14 800 5‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

12220 Kawas ‐ Navsari (PG)

25‐Feb‐14 800 5‐Feb‐14 1800 Daily Replacement of ST insulators by Double Tension

insulator in Railway crossing spansWRTS‐II POWERGRID N

13400 Indoer (PG) ‐Indore

(MP) DC5‐Feb‐14 800 6‐Feb‐14 1800 Continou

sStringing of 765kV Indore ‐ Vadodara line WRTS‐II POWERGRID N

14 400 APL - Hadala 6-Feb-14 800 6-Feb-14 1800 Daily PMM GETCO GETCO N N

15 220 Seoni(PGCIL ) - Chhindwara CKT I

6-Feb-14 900 6-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N N

16 400 Jejuri-Koyna stg IV 6-Feb-14 900 6-Feb-14 1700 Daily QMwork MSETCL MSETCL N17 400 Akola-Nandgaonpeth 6-Feb-14 900 6-Feb-14 1700 Daily Quaterly Maintainance Work MSETCL MSETCL N18 400KV Korba-Bhatapara 6-Feb-14 900 7-Feb-14 1900 Cont Testing of LBB auto re-close M-I amp M-II relays NTPC NTPC N19 220 Haldarva - Jhanor - 2

(NTPC)6-Feb-14 900 6-Feb-14 1800 Daily PMM work GETCO N

20220 Navsar (PG) ‐Navsari

(GETCO) 16‐Feb‐14 800 6‐Feb‐14 1800 Daily Replacement of ST insulators by Double Tension

insulator in Railway crossing spansWRTS‐II POWERGRID

N

21 400 Bus‐II Bina 6‐Feb‐14 800 6‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

22400 Seoni‐Khandwa1 6‐Feb‐14 1000 6‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Khandwa end by MS ABB

WRTS‐II POWERGRID Rescheduled to 6th March N

23 400 Rajgarh-Ssp Ckt-II 7-Feb-14 900 7-Feb-14 1600 daily For maintenance work MPPTCL EHT- Mamp I N24 220 Chhegoan-Khandwa

Ckt -II7-Feb-14 900 7-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

25 220 Wardha (PG)-Wardha 7-Feb-14 800 7-Feb-14 1800 Daily AMP Work MSETCL WRTS-I N26 400 Chorania - Vadavi-2 7-Feb-14 800 7-Feb-14 1800 Daily PMM amp Tan Delta testing WRTGPL GETCO N27 400 Jabalpur‐Itarsi1 7‐Feb‐14 900 7‐Feb‐14 1400 Daily AMP OF TERMINAL EQUIPMENT WRTS‐II POWERGRID N

28220 Vapi(PG)‐ Bhilad ckt

2 amp 3 7‐Feb‐14 800 8‐Feb‐14 1800 Daily Line crossing work of 400KV LILO of Navsari‐Boisar

at MagarwadaGETCO POWERGRID N

29 220 Mapusa-Thivim 1 8-Feb-14 800 8-Feb-14 1800 Daily AMP Work GOA WRTS-I N

30400 Seoni‐Khandwa2 9‐Feb‐14 1000 9‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Khandwa end by MS ABB

WRTS‐II POWERGRID Rescheduled to 7th March N

31 220 Chhegoan-Khandwa Ckt -I

10-Feb-14 900 10-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

Annexure-32-C2OCC approved outage not availed in Feb‐2014

32132 132 kV Dhule

Dondaicha line10-Feb-14 800 11-Feb-14 1800 Cont Crossing of Dhule-Vadodara 765 kv SC Line MSETCL BDTCL subjected to sldc

clearance N

33 400132 KV

Vindhyachal ICT-1 10-Feb-14 900 14-Feb-14 1900 Cont ICT Overhauling NTPC NTPC N

34400 KV Vindhyachal - Jabalpur-

3 Line Shunt Reactor10-Feb-14 900 14-Feb-14 1900 Cont Reactor Overhauling NTPC NTPC

N

35 400 KSK-DB Power 10-Feb-14 800 13-Feb-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end WRTS-IDBKSK

KSK N36 220 Ipore-Kawas-1 10-Feb-14 800 10-Feb-14 1800 Daily PMM work GETCO N

37400 Vindhyachal‐Mahan 10‐Feb‐14 800 11‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐I WRTS‐II N

38400 Mahan‐Korba 10‐Feb‐14 800 11‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐I WRTS‐II N

39765 Jabalpur ‐ Bina 1 10‐Feb‐14 1000 10‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Jabalur end by MS ABB

WRTS‐II POWERGRID Differed by siteN

40 400 SSP - Rajgarh - 1 10-Feb-14 800 11-Feb-14 1800 Daily Basis

PMM Work GETCO N

41 400 DC Tundri (DB Power) -ksk-Raigarh

10-Feb-14 800 11-Feb-14 1800 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (092-100)

DB Power WRTS-I N42 400 Jetpur - Amreli - 1 11-Feb-14 800 12-Feb-14 1800 Daily PMM GETCO GETCO N43 400 Hadala - Vadinar-2 11-Feb-14 800 11-Feb-14 1800 Daily PMM GETCO GETCO N44 400 Nagda-Rajgarh Ckt-I 11-Feb-14 900 11-Feb-14 1800 daily For maintenance work MPPTCL EHT- Mamp I N45 220 Mehgaon-Auriya Ckt 11-Feb-14 900 11-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N46 220 Seoni(PGCIL ) -

Chhindwara CKT II11-Feb-14 900 11-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

47

765kV Main Bus-1B at SASANBay 13 - Jack Bus

11-Feb-14 900 21-Feb-14 1800 Daily Jumper Installations amp ConnectionsIsolator Allignment

PGCIL Reliance Provisional Subject to details of works done to be apprised on daily basis

N

48 220 Ipore-Kawas-2 11-Feb-14 800 11-Feb-14 1800 Daily PMM work GETCO N49 220 Navsari - Nasik - 2 11-Feb-14 900 11-Feb-14 1800 Daily PMM work GETCO N

50765 Jabalpur ‐ Bina 2 11‐Feb‐14 1000 11‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Jabalur end by MS ABB

WRTS‐II POWERGRID Deferred by siteN

51 400 Nagda-Rajgarh Ckt-II 12-Feb-14 900 12-Feb-14 1800 daily For maintenance work MPPTCL EHT- Mamp I N52 400 Karad-Solapur (PGCIL) 12-Feb-14 900 12-Feb-14 1700 Daily QMwork MSETCL MSETCL N53 400 Raipur-Sipat 1 amp 2 26-Feb-14 800 3-Mar-14 1800 Conti Diversion of line for Lafarge Railway track WRTS-I Lafarge Ori 12-16 Feb 14 Deferre N54 220 Haldarwa Kawas-2 12-Feb-14 900 12-Feb-14 1800 Daily PMM work GETCO N

55 220 Bus‐I Bina 12‐Feb‐14 800 12‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

56 400 Chorania - Hadala 13-Feb-14 800 14-Feb-14 1800 Daily PMM GETCO GETCO N57 400 Tarpur-Padghe-2 13-Feb-14 800 14-Feb-14 1800 Daily maintenance work POWERG

RIDNPCIL N

58400 Vindhyachal‐Satna1 13‐Feb‐14 1000 13‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

59 220 Bus‐II Bina 13‐Feb‐14 800 13‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

60 220 Pithampur-Rajgarh Ckt - I

14-Feb-14 900 14-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

61 220 Wardha (PG)-Badnera 14-Feb-14 800 14-Feb-14 1800 Daily AMP Work at Wardha MSETCL WRTS-I N

62 400 Bhusawal-Koradi 14-Feb-14 900 14-Feb-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL N

63 400 Raipur-KSK 14-Feb-14 800 16-Feb-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end WRTS-IKSK

KSK N

64 220 GWL(PGCIL)-Malanpur Ckt-II

15-Feb-14 900 15-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N

65 220 Pithampur-Rajgarh Ckt - II

15-Feb-14 900 15-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

66400 Vindhyachal‐Satna2 16‐Feb‐14 1000 16‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

67 220 KAPS - Haldarwa - 1 17-Feb-14 800 17-Feb-14 2000 Daily Yearly PM checks KAPS N

68400 3X105 MVA 400220Kv

X-mer I At Indore ss17-Feb-14 800 18-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI

N

69

220 SC Korba-Raigarh-Budhipadar sc(PGCIL) amp DC Korba-Budipadar both circuits (CSPTCL)

18-Feb-14 800 19-Feb-14 1800 Conti Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCLWRTS-I

WRTS-I

N

70 400 Itarsi-Bhopal Ckt-I 18-Feb-14 900 19-Feb-14 1700 daily For maintenance work MPPTCL EHT- Mamp I N71 220 Badod - Kota Ckt 18-Feb-14 900 18-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N72 220 Damoh(PGCIL) -

Damoh I C - II18-Feb-14 900 18-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

73 220 Badod - Modak Ckt 19-Feb-14 900 19-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

74220 KAPS - Ukai - Mota 19-Feb-14 800 19-Feb-14 2000 Daily Yearly PM checks KAPS Non consent from SLDC

GETCO N

75400 315 MVA 400220 KvX-

mer III At Indore ss20-Feb-14 800 21-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI

N

76 220 Seoni(PG)-Seoni 2 21-Feb-14 800 21-Feb-14 1800 Daily AMP Work MPPTCL WRTS-I Y N77 220 Bina(PGCIL)-Shivpuri

Ckt21-Feb-14 900 22-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI Y N

78 400 Koradi-Nandgaonpeth 21-Feb-14 900 21-Feb-14 1700 Daily QMwork MSETCL MSETCL N N79 220 Haldarva - Jhanor - 1

(NTPC)21-Feb-14 900 21-Feb-14 1800 Daily PMM work GETCO N

80

765kV Main Bus-2A at SASANSatna Line-2

22-Feb-14 900 28-Feb-14 1800 Contionious

Equipment ConnectionsCircuit Breaker TestingJumper MeasurementIsolator Allignment Reactor accessories erection on R-Phase

PGCIL Reliance

N

81 400 Korba-Raipur 3 amp 4 23-Feb-14 800 24-Feb-14 1800 Conti For Bus spliting work at Raipur765 KV Raigarh-Raipur and 765 Champa Raipur lines

WRTS-1 WRTS-1 N

82132 132kV Astha - Polai SC

line of MPPTCL24-Feb-14 800 25-Feb-14 1800 Continous Crossing of Bhopal -Indore 765 kv SC Line MPPTCL BDTCL subjected to sldc

clearance N

83 400 Bus-1 at Bilaspur 24-Feb-14 800 24-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I N

84400 Seoni -

Khedamara(Bhilai) Ckt25-Feb-14 900 25-Feb-14 1800 daily For maintenance workFeeder bay maintenance at

KMaraMPPTCL CSPTCLMPPT

CLNo confirmation on D-3

N

85400 Ranchi-Sipat 1 amp 2 25-Feb-14 800 26-Feb-14 1800 Conti Crossing work of upcoming 765 KV DC

Jharsuguda-Korba amp 765KV SC Ranchi-BilaspurWRTS-I WRTS-I No confirmation on D-3

N

86765 Sasan‐Satna2 25‐Feb‐14 800 26‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐II POWERGRID No confirmation on D-3 N

87400 Bus Reactor1 at Satna 25‐Feb‐14 1000 25‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

88400 400 kV DC Damoh -

Bhopal Line26-Feb-14 800 27-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL Not availed by agency for

rainsN

89400 Raipur-Bhadrawati 2 amp

327-Feb-14 800 27-Feb-14 2100 Daily For Bus spliting work at Raipur765 KV Raigarh-

Raipur and 765 Champa Raipur linesWRTS-1 WRTS-1 Subject to Telemetry from

Durg PS RaipurN

90 400 Birsinghpur‐Vandana Vidyut

27‐Feb‐14 800 27‐Feb‐14 1700 Daily AMP of Terminal Equipment amp line Reactor WRTS‐I POWERGRID Ready N

91 400 Bhusawal-Akola 28-Feb-14 900 28-Feb-14 1700 Daily QMwork MSETCL MSETCL N92 220 Bus-1 at Wardha 28-Feb-14 800 28-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I N93 400 Birsinghpur‐Balco 28‐Feb‐14 800 28‐Feb‐14 1700 Daily AMP of Terminal Equipment amp line Reactor WRTS‐I WRTS‐I Deferred by site N

94 400 Nagda‐Dehgam2 5‐Feb‐14 1000 5‐Feb‐14 1800 DailyCommissioning amp checking of CSD relay in Main CB for reactor switching at Dehgam end by MS ABB

WRTS‐II POWERGRID N

95 400 400kV Satpura Itarsi 10‐Feb‐14 900 11‐Feb‐14 1700 DailyCommissioning of new CB after dismantling of existing TELK make CB at Satpura end amp normalising of line on main CB

POWERGRID

WRTS‐II N

96 765 765 kV Satna - Bina Ckt I

6-Feb-14 800 8-Feb-14 1800 cont Stringing of Jabalpur-Bina 765 kv SC Line PGCIL JTCL Original27-28 Jan14 Def N

97 765400 765400 kV ICT-1 at Bina 20-Feb-14 90000 AM 21-Feb-13 60000 PM Continuou

sCSD commissioning for 400kV Side CB of 765400 kV ICT-1 WRTS-II POWERGRID Deferred by site N

98 400 Nagda - Dehgam 1amp2 20-Feb-14 80000 AM 28-Feb-14 1700 Daily Online PID testing to insulators in both circuits AR shall be kept in non auto mode in both circuits WRTS-II POWERGRID

N

99 220MC Waluj-Chitegaon amp Waluj-Jalna

21-Feb-14 700 21-Feb-14 1900 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad MSETCL WRTS-I

N

100 400 Bus 1 at Asoj 21-Feb-14 000 21-Feb-14 1800 Daily For checking bus stability testing of Piran 1 amp 2 bays (for charging of new line) GETCO WRTS-II N

101 400 Bus-1 at Wardha 22-Feb-14 800 22-Feb-14 1800 Daily Jumper spacers connection at Wardha WRTS-I WRTS-I N102 400 Bus-1 at Raigarh 22-Feb-14 800 22-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I Deferred by site N103 765 Bus - II at Indore 22-Feb-14 90000 AM 23-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Not availed NLDC consenN104 220 Kakrapar-Haldarwa2 22-Feb-14 1000 Hrs 22-Feb-14 1600 Hrs Daily AMP POWERG

RID WRTS-II N

105 400 Bus 2 at Asoj 22-Feb-14 000 22-Feb-14 1800 Daily For checking bus stability testing of Piran 1 amp 2 bays (for charging of new line) GETCO WRTS-II N N

106400 400 kv DC Bhopal -

Bina Line (Ckt I amp II)(Tower no 34 amp35)

23-Feb-14 800 24-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line MPPTCLBDTCL

N

107 765kV SASAN Main Bus-1BBay 10 - Jack Bus 24-Feb-14 800 Hrs 2-Mar-14 1900 Hrs Continuous Dia-4

(Bay-10) - SCCOCC Test of Unit 4 GTSasan Sasan N

108 765 Bus - I at Indore 24-Feb-14 90000 AM 25-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID N

109 765 765 KV Bina-Indore Line 24-Feb-14 0900 Hrs 24-Feb-14 1800 Hrs Daily

For taking spare reactor unit in service amp checking the scheme for spare reactor with 765 KV Bina-Indore Line Reactor at Bina

POWERGRID WRTS-II

Deferred by site N

110 400 Kasor - GPEC 24-Feb-14 800 25-Feb-14 1800 Daily PMM Work GETCO GETCO N111 40022033 315 MVA ICT2 at Kheda 24-Feb-14 900 10-Mar-14 1800 cont modification work in SS lay out CSPTCL CSPTCL N112 400 315 MVA ICT2 at

Gwalior 25-Feb-14 90000 AM 25-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID N

113 400KV V-Satna-4 Line Shunt Reactor 25-Feb-14 1000 25-Feb-14 2000 Daily

Basis AMP NTPC NTPC N

114 400 Raipur-Wardha 1 26-Feb-14 800 26-Feb-14 2000 Daily Balance construction works at Wardha end WRTS-I WRTS-IReady Ori26214 Deferred by site

N

115 400 Bus -I at Indore 26-Feb-14 90000 AM 26-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Deferred by site N116 400 315 MVA ICT3 at

Gwalior 26-Feb-14 90000 AM 26-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID N

117 400 400 kV DC Damoh - Bhopal Line

26-Feb-14 800 26-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL N

118 400 Chorania-Kasor 26-Feb-14 800 26-Feb-14 1800 Daily PMM work GETCO GETCO N119 400 Koradi-Satpura sc 26-Feb-14 800 26-Feb-14 1600 Daily 765KV Tiroda Koradi Transmission LineII crossing

worksPOWERGRID MEGPTCL Cancelled by MEGPTL N

120 400 400 kV DC Damoh - Bhopal Line

26-Feb-14 800 26-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL N

121 400 Raipur-Wardha 2 27-Feb-14 800 27-Feb-14 2000 Daily Balance construction works at Wardha end WRTS-I WRTS-I Deferred by site N122 400 Vindhyachal-Satna2 27-Feb-14 1000 27-Feb-14 1800 Daily Commissioning of CSD Relay in ABB make main

CB at Satna WRTS-II POWERGRID Deferred by site N

123 400 Bus -II at Indore 27-Feb-14 90000 AM 27-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Ready N124 400 315 MVA ICT1 at

Rajgarh 27-Feb-14 90000 AM 27-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID Ready N

125 400400 KV SC Kosamba - Asoj line(730-740)

27-Feb-14 700 27-Feb-14 1800 cont Crossing of Dhule - Vadodara 765 kv SC Line GETCOBDTCL

N

126 400 Indore (MP) -Indore (PG)-DC 27-Feb-14 700 28-Feb-14 1600 Cont Stringing of 765kV Indore - Vadodara line POWERG

RID WRTS-II Deferred by site N

Anaulagnak 33(A)

maaca- 2014 AaOr Ap`Ola 2014 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR MARCH 2014 AND APRIL 2014

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)maaca- 2014 Ap`Ola 2014 maaca- 2014 Ap`Ola 2014

MARCH 2014 APRIL 2014 MARCH 2014 APRIL 2014

1 gaujarat

saIimat 11700 12100 7750 7800

AsaIimat 11740 12140 7760 7810

2 maQya p`doSa

saIimat 8340 9050 5338 5540

AsaIimat 8340 9050 5338 5540

3 CltaIsagaZ

saIimat 3200 3075 1929 1809

AsaIimat 3225 3105 1944 1827

4 maharaYT

saIimat 19000 19150 10200 10300

AsaIimat 19050 19200 10250 10350

5 gaaovaa

saIimat 425 410 300 295

AsaIimat 425 415 310 300

6 dmana dIva

saIimat 340 345 210 205

AsaIimat 345 350 225 210

7 DI ena eca

saIimat 635 640 445 425

AsaIimat 635 640 445 425

8 piScama xao~

saIimat 41961 43047 28500 27900

AsaIimat 42076 43173 29560 28840

Diversity factor of 10401

March 2014 and April 2014

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah frvarI 2014

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 1552 75

]k[- Ukai - 2 1719 75]k[- Ukai - 3 598 75]k[- Ukai - 4 1757 75]k[- Ukai (Total) 5627 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 024 2]k[- ela baI saI eca Ukai LBCH - 2 131 3]k[- ela baI saI eca Ukai LBCH (Total) 154 5 0008

3 kDanaa Kadana - 1 000 0 0005kDanaa Kadana - 2 246 62 0000kDanaa Kadana - 3 223 62kDanaa Kadana - 4 166 63 0000kDanaa Kadana (Total) 634 63 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 431 9 0020 6 kula jalaIya TOTAL(H) 6846 225 0401

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 2060 32 21822 TaoronT pavar ilaimaToD yauinaT DI 7979 125 69803 TaoronT pavar ilaimaToD yauinaT [- 075 122 07584 TaoronT pavar ilaimaToD yauinaT ef 8023 124 66915 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 018811 Qauvarna tapIya Dhuvaran - GT 2 000 0 041912 Qauvarna tapIya Dhuvaran - STG 023 1013 ]ka[- yauinaT 1 Ukai -1 000 0 005114 ]ka[- yauinaT 2 Ukai -2 000 0 010815 ]ka[- yauinaT 3 Ukai -3 3147 200 297216 ]ka[- yauinaT 4 Ukai -4 10588 202 1002617 ]ka[- yauinaT 5 Ukai -5 9496 210 884118 ]ka[- yauinaT 6 Ukai -6 23703 500 1844819 gaaMQaInagar 1 Gandhinagar - 1 000 0 008620 gaaMQaInagar 2 Gandhinagar - 2 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 000 0 029622 gaaMQaInagar 4 Gandhinagar - 4 000 0 036223 gaaMQaInagar 5 Gandhinagar - 5 11676 212 1148924 vaNakbaaorI 1 Wanakbori - 1 10648 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 11069 21026 vaaNakbaaOrI 3 Wanakbori - 3 1891 20627 vaaNakbaaOrI 4 Wanakbori - 4 5244 21228 vaaNakbaaOrI 5 Wanakbori - 5 5531 21029 vaaNakbaaOrI 6 Wanakbori - 6 000 030 vaaNakbaaOrI 7 Wanakbori - 7 8902 20931 ]trna Utran GT 1 000 0 019832 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 000 0 024635 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 000 0 0000

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Anaulagnak 41

ACTUAL GENERATION amp AVALABILITY FOR FEBRUARY 2014Actual vaastivak

Actual vaastivak

37 isaka Sikka - 1 3696 112 439838 isaka Sikka - 2 000 0 017639 kcC ilagnaa[-T Kutch Lignite - 1 4429 71 848640 kcC ilagnaa[-T Kutch Lignite - 2 4037 7241 kcC ilagnaa[-T Kutch Lignite - 3 3646 6742 kcC ilagnaa[-T Kutch Lignite - 4 2215 66 525343 saUrt ilagnaa[-T Surat Lignite - 1 6705 131 682544 saUrt ilagnaa[-T Surat Lignite - 2 7475 131 738745 saUrt ilagnaa[-T Surat Lignite - 3 6965 130 728846 saUrt ilagnaa[-T Surat Lignite - 4 6362 130 688647 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5454 107 848648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5649 11449 jaI Aa[- pI saI ela GIPCL GT - 1 1589 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1587 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1702 3552 jaI Aa[- pI saI ela GIPCL ST - 1 2902 5153 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 020556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 000 0 000060 jaI pI [- saI GPEC GT - 2 267 156 013261 jaI pI [- saI GPEC GT - 3 143 146 002762 jaI pI [- saI GPEC STG 131 17263 jaI esa [- jaI GSEG GT - 1 000 0 098964 jaI esa [- jaI GSEG GT - 2 1181 5065 jaI esa [- jaI GSEG STG 642 2366 Sugen (GT 1 + GT 2) 1767 308 602467 saIpIpI sao Aayaat Imp from CPP+MUNDRA 269359 6881

kula tapIya Total (T) 475652 8386 302021kula jalaIya+tapIya Total (H+T) 482498 8604 302422ivaMD [najaI- Wind Energy 52123kula jalaIya+tapIya+hvaa Total (H+T+Wind) 534621 9539ivainamaya Exchanges 155314 saIimat jaa- maaMga Restricted Energy Req 689935

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 6800 194

11 gaaMQaI saagar Gandhi Sagar 3366 117 008012 raNaa p`tap sagar RPSagar 5883 172 004013 javaahr sagar Jawahar Sagar 4350 99 0050

2 ponca Pench 3052 165 00903 baargaI Bargi 4581 91 00804 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 11764 315 02806 banasaagar Bansagar-2 (Deolondh) 000 07 banasaagar Bansagar-3 (Silpara) 1236 32 00708 banasaagar Bansagar-4 (Zinaha) 1320 22 00509 maoDIKoDa Medikheda 396 63

10 ibarisaMGapur Birsingpur 040 20 002011 Tavaa Tawa 000 012 rajaGaaT Rajghat 165 12 006013 Omkareshwar 10620 402 14 [Midra saagar Indira Sagar 23077 997 0849

kula jalaIya TOTAL(H) MPPGCL 59999 2365 1273Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 6049 98 232502 AmarkMTk II AMK II Unit -2 6080 983 AmarkMTk III AMK III Unit -5 12212 219 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 06505 satpura II Satpura-II Unit 6 10323 180 165906 satpura II Satpura-II Unit 7 5926 1807 satpura II Satpura-II Unit 8 10964 195 191608 satpura II Satpura-II Unit 9 8353 1709 satpura III Satpura-III Unit 10 000 0 2080

10 satpura III Satpura-III Unit 11 9447 182 1909011 esajaITIpIesa 1 SGTPS Unit - 1 9447 182 1909012 esajaITIpIesa 2 SGTPS Unit - 2 10572 18213 esajaITIpIesa 3 SGTPS Unit - 3 9037 192 2064014 esajaITIpIesa 4 SGTPS Unit - 4 10700 18015 esajaITIpIesa 5 SGTPS Unit - 5 28804 51216 SSTPS 6864 587 8930

kula tapIya Total (T) 133714 3002 115350kula jalaIya+tapIya Total (H+T) 193713 5735 116623Injection from WIND 000 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 193713 5735ivainamaya Exchanges 193660 saIimat jaa- maaMga Rest En Req 387372

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 850 120 00902 Gangrel 475 10 00503 Mini Micro KWB 039 7

kula jalaIya TOTAL(H) CSEB 1364 137 0150tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 47 127402 kaorbaa (pU) Korba (E) Unit-2 2764 483 kaorbaa (pU) Korba (E) Unit-3 2764 484 kaorbaa (pU) Korba (E) Unit-4 2784 465 kaorbaa (pU) Korba (E) Unit -5 3685 120 253306 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 247808 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 15410

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 15839 256 1197012 KORBA(EB) Extn - 2 15876 256 11770

kula tapIya Total (T) 119907 1880 10190013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 119907 1880kula jalaIya+tapIya Total (H+T) 121271 2017 102050ivainamaya Exchanges 40207 0saIimat jaa- maaMga Rest En Req 161478 2017

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 9590 585 25142 kaoyanaa III Koyna III 5920 3203 kaoyanaa IV Koyna IV 18012 11324 kaoyanaa DIpIeca Koyna DPH 1442 385 TaTa jalaIya TATA Hydro 10242 741 28836 vaOtrNaa Vaitarna 000 07 eladarI Eldari 528 168 BaTgar AaOr vaIr Bhatgar amp Vir 915 49 pOzana Paithan 175 59

10 itlaarI Tillari 1106 6511 BaIra Tola rosa Bhira Tail Race 374 4112 GaTGar Ghatghar 5297 29313 Anya CaoTo jalaIya Small Hydro (others) 6173 0

kula jalaIya TOTAL(H) 58910 1599 5397Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 7700 1954 naaisak 4 Nasik Unit -4 10772 1965 naaisak 5 Nasik Unit -5 11160 1976 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 28827 5058 Tambao 6 Trombay Unit -6 000 09 Tambao 8 Trombay Unit -8 000 0

10 Tambao 7A gaOsa Trombay -7A (Gas) 7882 135 250411 Tambao 7ba Trombay -7B (WHR) 4499 7212 kaoraDI 5 Koradi Unit -5 5003 16013 kaoraDI 6 Koradi Unit -6 3963 19014 kaoraDI 7 Koradi Unit -7 10015 19015 Bausaavala 2 Bhusawal Unit -2 8329 17016 Bausaavala 3 Bhusawal Unit -3 9248 18017 Bausaavala 4 Bhusawal Unit -4 22734 50518 Bausaavala 4 Bhusawal Unit -5 19742 41519 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 7451 18621 parlaI 5 Parli Unit -5 10626 18022 parlaI 6 Parli Unit -6 14013 25323 parlaI 7 Parli Unit -7 13728 26024 KaprKoDa 1 Khaperkheda Unit -1 11173 20025 KaprKoDa 2 Khaperkheda Unit -2 10373 19526 KaprKoDa 3 Khaperkheda Unit -3 10998 20127 KaprKoDa 4 Khaperkheda Unit -4 12019 20728 KaprKoDa 5 Khaperkheda Unit -5 28882 50730 parsa Paras-3 14447 25731 parsa Paras-4 13504 25932 ]rna Uran (Gas) 18284 33833 ]rna Uran (WHR) 000 148 586234 caMd`pur 1 Chandrapur Unit -1 9087 17735 caMd`pur 2 Chandrapur Unit -2 1816 19436 caMd`pur 3 Chandrapur Unit -3 11737 21037 caMd`pur 4 Chandrapur Unit - 4 11843 46038 caMd`pur 5 Chandrapur Unit -5 7759 45539 caMd`pur 6 Chandrapur Unit -6 24420 44240 caMd`pur 7 Chandrapur Unit -7 23258 041 DhaNaU 1 Dahanu Unit-1 16339 250 1427842 DhaNaU 2 Dahanu Unit-2 16196 250 1427843 CPP 193651 29840044 RGPPL Share 000 0

kula tapIya Total (T) 631479 15369 329920MAH Wind + Solar Generation 16922 0kula jalaIya +tapIya Total (H+T+Wind) 707311 17451 372239

TOTAivainamaya Exchanges 324731saIimat jaa- maaMga Rest En Req 1032042

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1871 26ivainamaya Exchanges 33252saIimat jaa- maaMga Rest En Req 35123 434

C (F) dmana AaOr dIva DAMAN amp DIU 18245 298ja (G) dadra nagar hvaolaI DNH 40600 655

kula DD ampDNH (T) 58845 952Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 9600 160 1399112 tara`pur 2 TAPS Unit -2 11069 16013 tara`pur 3 TAPS Unit -3 36144 545 6584014 tara`pur 4 TAPS Unit -4 36197 54715 kakrapr 1 KAPS Unit -1 15230 545 3134216 kakrapr 2 KAPS Unit -2 14662 547

kula ena pI saI NPC Total 122901 25042 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14008 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 13913 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14076 214 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 32894 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 33204 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 33190 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33176 514

kula kaorbaa KSTPS Total 174461 2498 10394427 ivanQa esaTIpIesa 1 VSTPS Unit-1 12762 21328 ivanQa esaTIpIesa 2 VSTPS Unit-2 12708 21529 ivanQa esaTIpIesa 3 VSTPS Unit-3 12854 212210 ivanQa esaTIpIesa 4 VSTPS Unit-4 12909 214211 ivanQa esaTIpIesa 5 VSTPS Unit-5 12174 215212 ivanQa esaTIpIesa 6 VSTPS Unit-6 12625 214213 ivanQa esaTIpIesa 7 VSTPS Unit-7 31487 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 31075 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 31592 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 31488 512217 ivanQa esaTIpIesa 11 VSTPS Unit-11 30948 512

kula ivanQayaacala VSTPS Total 232623 3750 15107 31 saIpt -1 -SIPAT-1 38822 66400 32 saIpt -2 -SIPAT-2 32404 66500 33 saIpt -3 -SIPAT-3 38930 66300 34 saIpt -4 -SIPAT-4 26383 51600 35 saIpt -5 SIPAT-5 26400 51400

kula saIpt -SIPAT TOTAL 162939 285000 838941 kvaasa gaOsa 1e Kawas GT-1A 792 10742 kvaasa gaOsa 1baI Kawas GT-1B 2623 10943 kvaasa esaTI 1saI Kawas ST-1C 1571 11444 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 4986 304 222951 gaMQaar gaOsa 1 Gandhar GT-1 000 052 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 000 054 gaMQaar esaTI 4 Gandhar ST-4 000 0

kula gaMQaar GGPS Total 000 0 000061 maaOda 1 Mauda -1 19614 514 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 19614 514 1422661 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 000 31 000071 esa esa pI SSP RBPH - 1 6753 19372 esa esa pI SSP RBPH - 2 5907 19273 esa esa pI SSP RBPH - 3 5577 19574 esa esa pI SSP RBPH - 4 5513 19475 esa esa pI SSP RBPH - 5 7237 19476 esa esa pI SSP RBPH - 6 3109 19277 esa esa pI SSP CHPH - 1 1817 4078 esa esa pI SSP CHPH - 2 491 3679 esa esa pI SSP CHPH - 3 000 0710 esa esa pI SSP CHPH - 4 1639 39711 esa esa pI SSP CHPH - 5 901 37

kula esa esa pI SSP Total 38944 1312 389481 kula poMca Pench Total 3052 165 009082 Jindal Injection 38956 083 Amarkantak Lanco 15478 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2372740

(J) ]plabQata Availability 2308426 naoT ivainamaya Net Exchanges -292048 ]plabQa jaa- Energy Availability 2016379

maah frvarI 2014 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR FEBRUARY 2014 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 11532 - - - 11532 020214 1100 4993

saIimat Restricted 11700

AsaIimat Unrestricted 11740 11532 0 28 0 11560 010214 1200 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8366 8366 17022014 0500 5007

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9346 - - - 9346 120214 0900 4986

saIimat Restricted 8340

AsaIimat Unrestricted 8340 9346 0 38 0 9384 120214 0900 4986

nyaUnatma pMjaIkRt maaMga Min Registered Demand 3204 3204 270214 0200

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3210 3210 070214 1900 4989

saIimat Restricted 3200

AsaIimat Unrestricted 3225 3210 233 12 0 3246 070214 1900 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1617 1617 230214 2300 5021

maharaYT MAHARASHTRApMjaIkRt Registered 18510 - - - 18510 050214 1100 4984

saIimat Restricted 19000

AsaIimat Unrestricted 19050 17980 1655 -13 0 19622 190214 1200 5002

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12005 12005 280214 0400 5037

gaaovaa GOApMjaIkRt Registered 425 434 - - 434 130214 1400 5006

AsaIimat Unrestricted 425 434 1 -1 - 434 130214 1400 5006

nyaUnatma pMjaIkRt maaMga Min Registered Demand 311 311 100214 0300

essaar ESSAR(ESIL)pMjaIkRt Registered 487 - - 487 240214 1700 5004

AsaIimat Unrestricted 487 0 0 - 487 240214 1700 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 268 - - 268 250214 1200 5003

AsaIimat Unrestricted 268 0 0 - 268 250214 1200 5003

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 644 - - 644 260214 1200 4999

AsaIimat Unrestricted 644 0 - 644 260214 1200 4999

nyaUnatma pMjaIkRt maaMga Min Registered Demand 508 508 280214

piScama xao~ WESTERN REGIONpMjaIkRt Registered 42253 - - - 42253 110214 1100 4994

saIimat Restricted 41961

AsaIimat Unrestricted 42076 42021 850 235 0 43106 120214 1100 4994

nyaUnatma pMjaIkRt maaMga Min Registered Demand 27524 27524 280214 0400 5040 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

piScama xaoi~ya Baar p`oYaNa kond` mauumba[-

णाली चालन-ISO-I

ANNEXURE-43

माह फरवर 2014 February2014

समातरवतीय चालन PARALLELRADIAL OPERATION

TOTAL OPERATING

HOURS 1 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-NR) 66972

2 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-SR) 67200

टाई लाईन TIE LINE 1 765कवी िसवनी स वधा-I 765kV Sonito Wardha 67200 2 765कवी िसवनी स वधा-II 765kV Seonito Wardha 65247 3 400 कवी िभलाई स कोराड 400kV Bhilai to Koradi 67200

4 400 कवी िभलाई स भिावती 400kV Bhilai to Bhadravati 67200

5 400 कवी रायपर स भिावती-I 400kV Raipur to Bhadravati-I 67200

6 400 कवी रायपर स भिावतीETHII 400kV Raipur to Bhadravati-II 67139

7 400 कवी रायपर स भिावतीETHIII 400kV Raipur to Bhadravati-III 67200

8 400 कवी सातपरा स कोराड 400kV Satpura to Koradi 67200

9 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 67004 10 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 65308 11 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 66259 12 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 67200 13 400 कवी को हापर स मापसा-I 400kV Kolhapur-Mapusa-I 38740

14 400 कवी को हापर स मापसा-II 400kV Kolhapur-Mapusa-II 49532

15 400 कवी वापी स बोईसर 400kV Vapi-Boisar 67200

16 400 कवी रायगढ़ स ःटरलाइट-I 400kV Raigarh to Sterlight-I 66258

17 400 कवी रायगढ़ स ःटरलाइट-II 400kV Raigarh to Sterlight -II 67200

18 400 कवी रायगढ़ स झरसगड़ा-I 400kV Raigarh to Jharsuguda-I 67200

19 400 कवी रायगढ़ स झरसगड़ा-II 400kV Raigarh to Jharsuguda-II 67200

20 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 65028

21 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 66132

22 400 कवी रायपर स वधाETHI 400kV Raipur to Wardha-I 66836

23 400 कवी रायपर स वधाETHII 400kV Raipur to Wardha-II 67200

24 220 कवी कोरबा पव स ब पादर-III 220kV K(E) to Budhipadar-III 63853

Anaulagnak 47Annex-47

maah frvarI 2014 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39514 64944

10287 39711

Levels in Mtrs str maITr maoM

]ka[- Ukai

64392

9914

25402

25994

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF FEBRUARY 2014

ivavarNa Particulars

TRIPPING DETAILS FOR THE MONTH OF FEBRUARY 2014

Sr No Brief Details of incident (Elements Generation Tripped) Owner Utility Date amp Time Load

Gen LossCategory

1 Multiple Tripping from 400 kV New Koyna MSETClMSEGCLRGPPL 05‐02‐2014 0950 Hrs ‐ GI‐2

2Bus Bar protection mal‐operation at 400 kV Soja in Gujarat resulting in multiple Tripping

GETCO 06‐02‐2014 1755 Hrs ‐ GI‐2

ANNEXURE ‐ 5

  • annexpdf
    • 21pdf
    • 231pdf
    • 232pdf
    • 24pdf
    • 25pdf
    • 31pdf
    • 32C1pdf
    • 32C2pdf
    • 33Apdf
    • 41pdf
    • 42pdf
    • 47pdf
    • 5pdf
Page 13: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014

13

457th OCCM AGENDA

ldquoMSETCL stated that they were working to resolve the issue and assured that there

would be an improvement in availability of Telemetry from Maharashtra stations within

one Monthrdquo

UNQUOTE

Representative of MSETCL may apprise the OCC regarding present status and the

likely schedule for resolution of the issue

The sub committee may like to discuss the same

ITEM NO 94 STATUS OF LINE AND BUS REACTORS AT 765 KV SASAN

The line reactor of 765 kV Sasan-Satna ckt-2 as well as the Bus reactors of 765 kV Sasan bus are yet to be commissioned at Sasan end In the absence of these reactors high voltage is experienced at Sasan and nearby stations Often one circuit of 765 kV Sasan-Satna is required to be opened for voltage regulation Consequently the reliability of evacuation of generation from two units of Sasan is affected During 456th OCC meeting the revised schedule of the above elements as informed by Ms Reliance was as under

Schedule in formed in meetings 451st OCC 455th OCC 454th OCC 1 Line reactor of 765

kV Sasan-Satna ckt-2

By Dec 2013 By April 2014 By May 2014

2 765 kV Bus-1 Reactor

Jan 2014 By Mar 2014 By June 2014

3 765 kV Bus-2 Reactor

Jan 2014 By Mar 2014 By June 2014

It was decided in 456th OCC meeting that one representative from MPPTCL would visit the SASAN site to check readiness of Line and Bus reactors Representative from MPPTCL and Sasan may apprise the OCC-members on the progress of commissioning of reactors at 765 kV Sasan OCC members may also be apprised of the tap position of the generator transformer 2 and 3

The sub committee may like to discuss the same

14

457th OCCM AGENDA

ITEM NO 95 CHARGING OF NEW TRANSMISSION ASSET IN THE GRID In order to have better coordination of the transmission utilities with RLDCNLDC during charging synchronization of new elements into the grid a communication has been received from NLDC (ref POSOSCONLDCSystem OperationOutage Planning1239) on 10022014 It has been proposed that

a Owner of the asset shall submit the request for expected chargingcommissioning of new element for the calendar month latest by 5th day of the month to the respective RLDC amp NLDC along with status of activities mentioned in the check-list

b RLDC shall study the impact of the new element commissioning and based on its assessment of the preparedness of the utility may recommend to NLDC who in turn would examine the issue independently considering pan India grid scenario

c After the above the owner of the new asset shall give its readiness to charge the new element atleast three days in advance with current status of activities mentioned in the check list

Check list is as under 1 List of elements to be charged along with the details of approval of the

transmission scheme from the Standing CommitteeCTUSTU 2 Single Line Diagram of the concerned substations along with status of

completion of each diabusbreakers 3 Availability of real-time data and communication to the designated

SLDCRLDC 4 Installation of Special Energy Meter complying with CEArsquos Regulations

(Serial number Meter number CTPT ratio to be indicated) 5 Charging Instructions by CTUSTU 6 Schedule and sequence of charging of elements 7 Availability of line bus reactors as per planning In case the transmission

system is planned to be charged without the planned line reactor requisite authorization from CTUSTU by studies

8 Connection Agreement (along with all annexures) with CTU or STU 9 Copy of Long term Access (LTA) or MTOA granted by CTU or STU as the

case may be 10 Copy of Power Purchase Agreement (PPA) 11 A signed undertaking with name and designation of the officer clarly

indicating the following a All Disturbance recorders (DR) and Event Loggers (ELs) with time

synchronization are commissioned b All protective systems have been commissioned c All statutory clearances have been obtained

12 Output of EL and DR after charging

15

457th OCCM AGENDA

Each document mentioned in check list from Sl No 1 to 10 must be attached for sake of completeness and emailed as a consolidated document to the nodal RLDC well before the new element charging date The sub-committee may like to discuss ITEM NO 96 OPENING FEEDERS WITHOUT PRIOR INTIMATION TO WRLDC

It was gathered based on the observation from WRLDC SCADA data and subsequent

discussion with MPPTCL that 220 kV Bina (MP)-Gwalior(MP) DC were taken under

shut down for LILO works at Datia at 0910hrs on 23022014 for 4 days The outage

of these lines was neither discussed in OCC and neither was there any intimation to

WRLDC before availing the outage These lines are included in the important grid

elements list of Western region and prior concurrence of WRLDC is required for

switching these lines Further these lines form the parallel path to 765 kV Bina-Gwalior

DC and with the shutdown of these lines the network upstream of WR-NR inter

regional corridor was depleted

The sub-committee may like to discuss ITEM NO 97 TRIPPING OF 765 KV LINES ON OVER VOLTAGE Recently several tripping of 765 kV lines have been reported on over voltage These are indicated below

1) 765 kV Bina-Gwalior I at 2358 hrs of 16022014 2) 765 kV Bina-Gwalior I at 2011 hrs of 14022014 3) 765 kV Satna-Gwalior at 1300 hrs of 06022014 4) 765 kV Sasan-Satna II at 0013 hrs of 18012014 5) 765 kV Jabalpur-Bina I at 2350 hrs of 10012014 6) 765 kV Jabalpur-Bina II at 0405 hrs of 06012014

It is understood that the adopted Stage-I OV setting for the above lines vary from 108 (ie 826 kV) to 110 (841 kV) As per SCADA data the bus voltage at any of the substations mentioned above had not reached 826 kV during the above incidents

POWERGRID may examine the above tripping in detail and apprise the OCC regarding the above In case of issues related with protective relays field equipment are detected these may be addressed at the earliest The sub-committee may like to discuss

16

457th OCCM AGENDA

ITEM NO 98 RGMO FGMO OF MANDATED GENERATORS IN WESTERN REGION

As per the latest information available at WRLDC there are 251 number of units with a total capacity of 57517 MW in Western Region that are mandated to operate in Restricted Free Governor Mode The need for compliance to the IEGC regulations wrt RGMOFGMO was emphasized in the 455th and 456th OCC meeting as well as during the 25th TCCWRPC meeting Subsequently it was communicated by email to all entities in WR to provide the latest status of RGMOFGMO implementation We have received updated status from MPPTCL LANCO CGPL DB Power and JPL Tamnar in Feb 2014 The latest state wise RGMOFGMO summary is given below

Name of Entity No of mandated units

RGMO FGMO available at

RGMOFGMO Not available at

Maharashtra 90 35 55 Madhya Pradesh 58 36 22 Gujarat 35 19 16 Chhattisgarh 10 3 7 CGPL 5 5 0 NCA 11 6 5 SASAN 2 1 1 NTPC 24 10 14 ESSAR_Mahan 1 1 0 NSPCL 2 2 0 KSK 1 1 0 KWPCL 1 0 1 DB POWER 1 1 0 JPL 5 4 1 LANCO 2 2 0 IEPL 1 0 1 EMCO 2 0 2 WR_Total 251 126 125

WRLDC vide its letter ref WRLDCRGMO-FGMO1-2014 dated 23012014 has issued directions under Section 29 of the Electricity Act to ensure compliance of IEGC regulations 52 (f) (g) (h) and (i) All utilities are requested to furnish the status of compliance in respect of generating units under their jurisdiction The sub-committee may like to discuss ITEM NO 99 STATUS OF TELEMETRY IN WESTERN REGION

The status of telemetry related issues in respect of WR constituents is as under

a) Chhattisgarh Data (except MW) from 500 MW Korba West extension generating station is not available Status points from 400 kV Raita pending

17

457th OCCM AGENDA

b) Madhya Pradesh Telemetry of following bus reactors is not available at WRLDC

S No

Station Name Bus Reactor

Nunber x Capacity

Total MVAR

Rated voltage

Status of Telemetry at

WRLDC1 Nagda 250 100 420 Not available2 Indore 225 50 33 Not available3 Bhopal 225 50 33 Not available4 Birsinghpur 150 50 420 Not available

c) Gujarat Data is not-availableintermittent from following stations in Gujarat

a 220 kV Nano of Tatamdash(not available) b Kansari 400 kV ss and Navsari 220 kVhellipIntermittent (PLCC Problem)

d) Goa Due to non-availability of SCADA data from Goa the difference between drawal as seen in SCADA and as recorded in SEM is as high as 572 during the period 1st Feb to 16th Feb 2014 Data from the following stations in Goa is not available at WRLDC S No Station Status

1 Amona 220 kV Not available 2 Cuncolin 220 kV Not available 3 Kadamba 110 kV Intermittent 4 Tivim 220 kV Intermittent 5 Ponda 220 kV Intermittent 6 Xeldam-220 kV Intermittent 7 Verna-110 kV Intermittent

e) Daman amp Diu

Due to non-availability of SCADA data from Daman amp Diu the difference between drawal as seen in SCADA and as recorded in SEM is as high as 571 during the period 1st Feb to 16th Feb 2014 Data from The error is mainly due to non-availability of data from 220 kV Magarwada

f) DNH Telemetry from 220 kV Kharadpara and Khadoli station is not available

g) POWERGRID The data from the following stations is not available at WRLDC

1) 765 kV Tamnar (Communication problem GPRS link is not stable)

18

457th OCCM AGENDA

Telemetry from following stations is Intermittent at WRLDC 1) 765 kV Durg (PLCC frequent problems)

2) 765 kV Kotra (communication intermittency)

3) 765 kV Gwalior (PLCC link established but still there is some

issue(Delay) in data updation at WRLDC Rectification work under

progress by Site Engineer

4) 765 kV Solapur - Redundant link established through Reliance but

the gateway connected to above link is not configured for 765 KV

data Hence when BSNL link is down 765 KV data is not updating at

WRLDC

The sub-committee may like to discuss

ITEM NO 910 COMPARISON OF DRAWAL AS SEEN IN SCADA VS SEM The IEGC second amendment and the Deviation Settlement Mechanism is in force since the 17022014 The IEGC stipulates maintaining injection drawal within the limits prescribed in the Deviation Settlement Mechanism The sub-committee may like to discuss ITEM NO 911 MOCK BLACK START EXERCISE

As per sec 58(b) of IEGC the usersSTUs etc need to conduct Black start mock

exercises in their respective systems once in every six month under intimation to

RLDC Also the all the black start Diesel Generator (DG) sets are [as per sec 58(b)

of IEGC] required to be tested weekly and the test report needs to be sent to RLDC

on quarterly basis

The following table summarizes the status of mock exercises in respect of black start

facilities in Western Region

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

GUJARAT

1 Ukai (H) 4 x 75 Hydro Diesel 500 kVA 221213 Y

2 Mini Hydro 2 x 25 Hydro Diesel 50 KW N

3 Kadana 4 x 60 Hydro Diesel 500 KVA 2413 Y (2413)

19

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

4

Dhuvaran

1 x 107 (68+39) + 1 x 112 (72+40)

Gas

Details to be furnished by Gujarat

Details to be furnished by Gujarat

N

5 GIPCL-I 3 x 32 + 1 x49

Gas Steam Diesel 141 KW

070912 Y

6 GIPCL-II 1x104+1x56 Gas Steam Diesel 500 kVA N

7

Torrent Power Stn C Stn- DEFCCPP

StnC2x30 StnD120 StnEF(110MW each)CCPP100MW

Thermal (Units-CDEF) Gas(CCPP)

Stn-C islands Diesel

StnC15kVA StnDE F and CCPP(500 kVA each)

281112

Y

8 GPEC 3x138+1x241 Thermal Natural Gas 3000 kVA N

9 Sugen 3x3825 MW Gas Diesel 2x6MVA N

Madhya Pradesh

10 Gandhisagar 5 x 23 Hydro DG set 100 kVA N

11 Birsinghpur 1 x 20 Hydro Battery 220 Volt

Battery N

12 Pench 2 x 80 Hydro DG set 250 kVA 121012 Y

13 Bargi 2 x 45 Hydro DG set 250 kVA 100212 Y

14 Bansagar Stage-I 3 x 105 Hydro DG set 250 kVA N

15 Indira Sagar 8x125 Hydro DG set 2x1000

KVA 22511 Y

Chhattisgarh 16

Hasdeo Bango 3 x 40 Hydro DG Set 250 kVA 250812 N

17

Korba(E)-phse-I

Power plant retired but Black start DG set available and on- load trial is reported to be carried out regularly

DG Set 1500 kW(33kV)

N

Maharashtra

18

Koyna I amp II

4 x 65 4 x 75 Hydro

House generator

2 MVA 231013 N

19 KDPH 2 x20 Hydro DG set 310 KW N

20 Eldari 3 x 75 Hydro DG set 6 KW N

21

Uran (Gas)

4 x 60 (GT) + 4x108 (GT)+ 2x120 WHR

Gas DG set

4 MW PH1412kVA PH2450kVA WH520kVA

161012

N

20

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

22 RGPPL

Block 1 640MW+Block 2 66354MW+Block 3 66354MW

Gas

Gas Turbine (Frame-6)

35 MW (Under testing) Details to be provided by RGPPL

N

23 Ghatghar 2x125 Hydro DG set 1x1250

kVA 51012

N

24 Khopoli 3x24+2x12 Hydro

DC Governor amp bearing oil pumps

DC power (self start)

271013 (detailed report awaited)

N

25 Bhivpuri 3 x 24 +

2 x 15 +2x12 Hydro

DC Governor amp bearing

-do-

N

26 Bhira 6 x 25 Hydro

1 Noof 500 KVA house generator with water turbine

500 kVA

201013 (detailed

report awaited)

N

27

Bhira PSS 1 x 150 Hydro DG set 500 kVA

N

28 Trombay 1 x 120 Gas

Turbine DG Set 25 MW

N

1 x 60 Steam Turbine

NTPC

21

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

29 Kawas 4 x 106 2 x 116 Gas Diesel 2850 KW 151013

N

30 Gandhar 3 x 144 + 1x225 Gas Diesel 2975 KW

N

NCA

31 SSP(RBPH amp CHPH) 6x200+550 Hydro Diesel 2x1000kVA 080412

N

Accordingly the Black start capable stations may forward their tentative plan for conducting Black start exercises in compliance to sec 58(b) of IEGC bull As per the communication for MPPTCL the tentative plan of Black start in Madhya

Pradesh system is given under SL No Name of the Station Tentative Date Remarks 1 Pench March 2014 DG set at Pench amp are Bargi

under outage 2 ISP Apr-May 2014 - 3 TONS June 2014 Governor Problem being

attended 4 Birsinghpur June 2014 -do- 5 Medikheda June 2014 -do- 6 Rjghat June 2014 -do- Other utilities may also update their tentative plan for black start

The sub-committee may like to discuss

22

457th OCCM AGENDA

ITEM NO 912 HEALTHINESS OF MAIN CIRCUIT BREAKER OF 400 KV BIRSINGPUR-KATNI-I AT KATNI END The main CB of Birsingpur-Katni-I is under shut down since 2350 hrs of 14th February 2013 Representatives from MPPTCL may kindly apprise on the progress and expected date of restoration of the Main CB of 400 kV Birsingpur-Katni-I at Katni end The sub-committee may like to discuss

ITEM NO 913 TESTING OF SPS RELATED TO TRIPPING OF BINA-GWALIOR-AGRA AT CGPL VINDHYACHAL AND KORBA

As per the information received from NTPC and CGPL the SPS for the 765 kV Bina-

Gwalior-Agra has been installed and a mock drill has to be carried out for the same

The matter was discussed in the 456th OCC and it was decided that SPS may be

tested for reduction of say 50MW for each station instead of backing down of entire

500MWs POWERGRID WRTS-2 may confirm the testing schedule so that the

same could be coordinated in from WRLDC

The sub-committee may like to discuss

ITEM NO 914 SPS AT SIPAT WRLDC vide letter No WRLDCMO-I17192013 dt 21613 requested to take up this matter with the concerned for early implementation of the SPS Status of the SPS at NTPC Sipat is as under

1 449th OCC SPS was proposed by WRLDC It was decided to have a

separate meeting to finalize the scheme 2 450th OCC Member Secretary WRPC intimated that the matter will be

discussed in 119th PCM on 3rd amp 4th September 2013 at Tarapur 3 451st OCC It was intimated that the issue of SPS of Sipat was discussed in

119th PCM held on 3rd amp 4th September 2013 at TARAPUR The tentative scheme were formulated which needed finer tuning

4 452nd OCC Matter not discussed 5 453rd OCC NTPC representative intimated proposal sent to their corporate

office for engineering approval 6 454th OCC Approval from our corporate office is yet to be obtained 7 455th OCC Approval from our corporate office is yet to be obtained 8 456th OCC Approval from corporate office has been obtained and would be

forwarded to WRPC for approval The sub-committee may like to discuss

23

457th OCCM AGENDA

ITEM NO 915 SPS AT 4X300 MW BALCO IPP The SPS at 2010 MW Balco (4x675MW + 4x135 MW + 4x300 MW) was to be commissioned by Nov 2013 before commissioning of first unit of 4x300 MW Balco IPP For the new SPS scheme envisaged for the Balco CTU connection namely the Grid Islanding and Load Management Scheme (GILMS) Balco had reported to have placed an order with Ms SEL As discussed earlier the scheme suggested by WRLDC may be implemented before commissioning of first unit of 300 MW It was intimated during the 456th OCCM by the Balco representatives that the SPS shall be commissioned by March 2014

The sub-committee may like to discuss

ITEM NO 916 ACTIONS TAKEN FOR REVIVAL OF TRANSMISSION ELEMENTS UNDER LONG OUTAGE

As per the information available at WRLDC following elements are out for a

long period

Sl No Date of

outage

Reason

ISTSIPP

1 80 MVAR BR at

ESSAR(Mahan)

231213 Oil leakage

2 125 MVAR BR at JPL 120513 Hydrogen formation

3 50 MVAR LR of Indore-Asoj-II

at Indore

190613 R phase bushing burst

4 50 MVAR LR of Birsingpur-

Damoh at Damoh(PG)

13102014 Oil Leakage

5 765 kV Durg-Kotra-I 24022014 Sparking in Isolator

6 400 kV Raipur-Raigarh-IV 18012014 Voltage Regulation

MSETCL

1 400 kV RGPPL-NrsquoKoyna-I 22012014 Voltage Regulation

2 400 kV Sholapur-

Sholapur(PG)

26022014 Tower Collapse

MPPTCL

1 400 kV Birsingpur-Katni-I 28012014 Voltage Regulation

24

457th OCCM AGENDA

2 50 MVAR LR of Indore-Asoj-II

at Indore

6012014 DGA Violation

CSPTCL

1 400220 kV Bhilai-II 24022014 Maintenance

OCC may like to be apprised of the actions being taken for expediting revival of

the above elements

The sub-committee may like to discuss

ITEM NO 917 STATUS OF 220 KV KOLHAPUR-MUDSINGHI-CHIKODI- BELGAM LINE Consent for trial operation of 220 kV Kolhapur-Mudsinghi-Chikodi- Belgam line in radial mode for supply of Karnataka load from Maharashtra side was granted after discussion in the 455th OCC meeting WRLDC is in receipt of letter from SRLDC regarding concurrence for the above arrangement SLDC Kalwa may apprise the OCC regarding the present status The sub-committee may like to discuss

ITEM NO 918 CONTRIBUTION OF GENERATORS IN VOLTAGE CONTROL The contribution of generators in WR in voltage control was analyzed during 456th OCC meeting It was noted that following units were injecting reactive power even during high voltage

1 210 MW units of Khaparkheda Koradi and Chandrapur (Maharashtra) 2 210 MW units of Satpura and Birsinghpur (Madhya Pradesh) 3 210 MW unit 23 of Korba West (Chattisgarh) 4 200 MW unit 34 of Ukai (T) in (Gujarat)

Utilities were requested to check the setting of AVRGT tap and revert back with findings Members may apprise OCC regarding the status The sub-committee may like to discuss

ITEM NO 919 REAL-TIME MONITORING OF FEEDERS SUBSTATIONS THAT ARE COVERED UNDER THE AUFLS Telemetry of feeders substations covered under the AUFLS is desirable for real-time assessment of the anticipated relief that would be available from the AUFLS scheme at any given instant of time CERC has also directed all the constituents to for

25

457th OCCM AGENDA

mapping of these feeders in the SCDA of SLDCsRLDC Members may like to deliberate further The sub-committee may like to discuss

ITEM NO 920 LOAD FORECASTING As per the amended Indian Electricity Grid Code that is effective from 17th February 2013 the SLDCs SEB distribution licensees shall always restrict the net drawal of the State from the grid within the drawal schedule keeping the deviations from the schedule within the limits specified in the Deviation settlement mechanism regulations Therefore it is imperative that adequate attention may be paid towards load forecasting The matter was discussed in the 455th and 456th OCC as well as in the 25th TCCWRPC board meeting wherein it was decided to create a task force for exploring development of a software for load forecasting Members may like to deliberate further The sub-committee may like to discuss

ITEM NO 921 IMPLEMENTATION OF THE REVISED AUFLS IN GOA DD AND DNH It was decided during the 455th and 456th OCC meeting as well as during 25th WRPC meeting that Goa DD and DNH shall complete the implementation of the revised AUFLS in Goa DD and DNH at the earliest Representatives from the Goa DD and DNH may apprise the status of the progress The sub-committee may like to discuss

ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING As per meeting roaster circulated during 452nd OCC meeting the 458th OCC Meeting

will be hosted by Maharashtra and may be scheduled on 16th amp 17th April 2014

Maharashtra may confirm the same

Anaulagnak 21

maah frvarI 2014

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5051 Hz BETWEEN 0200 Hrs amp 0300 Hrs Hrs ON 28022014

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4970 Hz BETWEEN 1800 Hrs amp 1900 Hrs Hrs ON 28022014

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 5006 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5071 Hz AT 0210 Hrs ON 28022014

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4937 Hz AT 185000 Hrs ON 28022014

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS FEBRUARY 2014 JANUARY 2014 DECEMBER 2013

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 001 005

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 041 061 188 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 1069 5423 4864 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 4014 3569 3987

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 4876 946 956

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING FEBRUARY 2014

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

Voltage Profile during the month of Feb 2014

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 421 401 426 403 409 409 408 408 415 399 414 402 424 413 417 3922 420 402 423 404 409 409 408 408 417 402 418 404 425 415 420 3993 421 399 426 400 429 405 425 402 412 399 419 408 423 410 413 3964 422 402 426 404 430 406 428 401 414 400 414 404 424 412 414 3965 420 396 423 400 409 409 408 408 413 396 415 401 424 411 415 3996 420 396 426 400 428 405 426 402 415 398 416 402 423 411 412 4007 420 394 424 399 430 402 427 401 416 399 417 402 423 409 416 3968 418 393 422 397 409 409 408 408 416 399 416 402 422 409 418 3989 418 399 423 404 409 409 408 408 417 402 417 407 419 409 419 400

व तदाब परखा फरवर 2014 स नक Annex-23

इदौर इटारसी कराड धल असोज कासोर िभलाई जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

10 419 394 423 399 409 409 408 408 416 400 415 401 420 408 417 39511 421 393 426 397 429 405 427 401 44 399 419 404 423 407 414 39912 419 395 422 400 409 409 408 408 416 401 419 407 421 410 418 39813 420 396 424 401 409 409 408 408 417 400 416 401 421 409 418 40114 421 399 424 403 430 419 428 414 417 402 415 402 421 409 417 40015 423 397 424 399 428 414 429 412 417 398 406 406 421 407 418 40016 423 397 424 400 431 404 424 401 416 401 422 409 421 409 418 40317 421 402 424 403 432 414 420 404 416 402 412 405 422 410 417 39818 420 397 423 399 409 409 408 408 416 400 414 401 422 414 416 40019 420 396 423 399 409 409 408 408 411 398 418 405 421 413 413 39920 417 397 420 402 429 406 426 401 413 399 416 404 421 413 410 39821 419 399 422 402 430 407 421 401 415 401 418 406 422 411 414 39722 419 397 422 402 432 409 423 401 416 400 413 402 423 413 414 40023 420 396 423 397 430 412 428 404 414 404 415 402 427 414 416 40324 421 399 423 401 433 411 425 400 416 398 414 402 427 415 418 40225 421 399 423 401 433 411 425 400 416 398 414 402 427 415 418 40226 420 397 423 404 431 411 428 409 411 397 415 404 424 414 412 39327 418 398 426 403 409 409 408 408 417 399 418 402 429 415 419 39128 421 400 427 406 409 409 408 408 414 400 416 403 430 415 418 401

423 393 427 397 433 402 429 400 417 396 422 401 430 407 420 391

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 424 404 415 392 424 404 431 407 766 746 797 765 800 756 804 7692 422 406 417 398 426 404 434 407 769 754 798 774 801 769 804 7773 423 405 416 402 426 401 432 410 767 750 796 768 802 773 805 7764 426 407 417 402 423 403 430 408 768 751 797 779 801 776 808 7785 422 403 415 398 423 397 430 400 768 749 797 767 798 763 797 7586 425 404 417 401 423 399 432 404 768 750 797 767 802 773 807 7707 427 401 419 397 423 396 431 404 770 741 800 763 807 769 809 7698 422 403 416 403 424 395 427 399 756 737 788 756 801 765 802 7679 422 405 416 401 424 402 427 404 755 738 786 758 804 773 804 775

10 421 400 414 396 423 398 429 403 3 88 6 98 6 801 60

वािलयर बनाBina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

बना वािलयर नागदा खडवा िसपत िसविन

10 421 400 414 396 423 398 429 403 755 737 788 765 798 765 801 76011 423 397 414 390 426 396 433 399 758 736 794 750 800 752 802 75612 420 403 414 395 423 397 428 403 757 739 787 759 801 763 798 77013 424 405 417 400 427 397 430 402 759 740 794 760 804 773 803 77214 426 410 420 406 424 400 431 405 761 740 794 766 810 780 808 78215 425 404 417 399 426 399 430 401 762 738 794 962 808 768 806 76816 426 406 422 400 427 402 429 400 759 739 792 760 815 774 811 77617 429 407 417 398 427 404 427 406 761 742 792 762 805 765 810 77418 426 404 418 395 423 399 427 404 763 748 793 768 805 759 806 76819 423 409 415 394 422 399 428 403 759 737 795 765 804 758 806 76720 421 406 410 397 420 398 426 406 765 749 795 771 791 766 799 77421 423 407 424 399 423 403 428 405 759 744 792 760 795 761 800 76722 425 406 414 398 423 400 425 404 760 743 790 762 794 762 800 76823 425 402 412 392 424 400 428 405 758 740 790 759 796 755 799 76124 425 401 411 393 423 401 427 403 760 744 796 764 792 757 798 75625 421 408 412 395 423 401 427 403 756 742 793 766 795 764 795 76926 422 405 413 390 421 399 426 402 757 739 789 760 796 750 798 76127 426 407 416 393 421 401 431 403 760 741 795 762 803 755 804 76228 428 409 414 392 423 403 432 405 762 740 795 753 809 775 803 771

429 397 424 390 427 395 434 399 770 736 800 750 815 750 811 756

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Feb-14 0 0 0 0 0 0 0 02 02-Feb-14 0 0 0 0 0 0 0 03 03-Feb-14 0 0 0 0 0 0 0 04 04-Feb-14 0 0 0 0 0 0 0 05 05-Feb-14 0 0 0 0 0 0 0 06 06-Feb-14 0 0 0 0 0 0 0 07 07-Feb-14 0 0 0 0 0 0 0 08 08-Feb-14 0 0 0 0 0 0 0 09 09-Feb-14 0 0 0 0 0 0 0 0

10 10-Feb-14 0 0 0 0 0 0 0 011 11-Feb-14 0 0 0 0 0 0 0 012 12-Feb-14 0 0 0 0 0 0 0 013 13-Feb-14 0 0 0 0 0 0 0 014 14-Feb-14 0 0 0 0 0 0 0 015 15-Feb-14 0 0 0 0 0 0 016 16-Feb-14 0 0 NIL NIL NIL 017 17-Feb-14 0 0 0 0 0 0 0 018 18-Feb-14 0 0 0 0 0 0 0 019 19-Feb-14 0 0 0 0 0 0 0 020 20-Feb-14 0 0 0 0 0 0 0 021 21-Feb-14 0 0 0 0 0 0 0 022 22-Feb-14 0 0 0 0 0 0 0 023 23-Feb-14 0 0 0 0 0 0 0 024 24-Feb-14 0 0 0 0 0 0 0 025 25-Feb-14 1 17 0 0 0 0 0 026 26-Feb-14 0 0 0 0 0 0 0 027 27-Feb-14 0 0 0 0 0 0 0 028 28-Feb-14 0 0 0 0 0 0 0 0

Max 1 17 0 0 0 00 0 0Total 1 17 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month FEBRUARY 2014

Recommonded Load relief at 492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE-25

Power CutRestrictions in Western Region for the month of February-2014 k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply(DLF)

01022014 28022014 2344 2240 2332

21 Three-Phase Supply(Irrigation)

01022014 28022014 0956 0905 0946

21 Three-Phase Supply(Mixed)

01022014 28022014 2343 2227 2330

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01022014 28022014 2353 2337 2347 32 District Head Qtrs 01022014 28022014 2355 2340 2351 33 Tehsil Head Qtrs 01022014 28022014 2349 2309 2341

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid

1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 010214 to 280214

SaUnya Nil

0-1655MW

SaUnya Nil

0000

SaUnya Nil 2400

SaUnya Nil

95 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-

2 Power supply to Agricultural Sector ivavarNa Details sao From

idnaaMk Date tk To

idnaaMk Date p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs) 21 Three-Phase Supply 01022014 28022014 1000 0800 0900

22 Single-Phase Supply 01022014 28022014 1800 1800 1800 3 Anya jaanakarI Any other information

There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

11107 (Av) of 23 days 0000(Av) 0000 (Av)

1Rural 9031(Av) for 3486 Hrs 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0666 - -

0105 -

3 HT Industries 000 (Av) for 00 Hrs 000 Total Energy Cutday 0771 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01022014 to 280214 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 2322014 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का फरवर 2014का वःता रत यौरा

Details of forced unit outages during the month ofFeb2014

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 एःसार वा डनर

ESSAR VADINAR-I

गरा विनिल GSECL

660 2156 20-Jan-14 2018 10-Feb-14 Coal shortage

2 एःसार Essar-2

गरा विनिल GSECL

172 1212 22-Feb-13 अनपल ध Still out

अनपल ध Still out

Shortage of gas

3 एसएलपीपी SLPP-1

गरा विनिल GSECL

125 1445 23-Feb-14 1237 27-Feb-14 BTL

4 एकएलट पीएसAKLTPS-1

गरा विनिल GSECL

125 1147 26-Feb-14 अनपल ध Still out

अनपल ध Still out

DCS FAIL

5 एपीएल APL - 2

अदानी ADANI

330 056 3-Feb-14 अनपल ध Still out

अनपल ध Still out

Turbine vibration bearing probl em

6 एपीएल APL-5

अदानी ADANI

660 1732 15-Feb-14 456 27-Feb-14 Turbine vibration

7 एपीएल APL - 6

अदानी ADANI

660 2049 25-Feb-14 1947 3-Mar-14 Coal mill problem

8 टाटा TATA-6

मारा वउकिल MSPGCL

500 2352 19-Jul-13 अनपल ध Still out

अनपल ध Still out

For Economy SD

9 वीआईपीएल VIPL-I

मारा वउकिल MSPGCL

300 105 2-Oct-13 अनपल ध Still out

अनपल ध Still out

Turbine bearing vibration probl em

10 टाटा TATA-8

मारा वउकिल MSPGCL

250 2255 9-Jan-14 अनपल ध Still out

अनपल ध Still out

HT due to fire near turbine generator desk

11 चिपर Chandrapur-2

मारा वउकिल MSPGCL

210 1238 14-Jan-14 1310 23-Feb-14 ID fan problem

12 कोराड KORADI-6

मारा वउकिल MSPGCL

210 651 24-Jan-14 1456 14-Feb-14 Coal bunkering problem

13 डब यपीसीएल WPCL-1

मारा वउकिल MSPGCL

135 1245 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Furnace press high

14 डब यपीसीएल WPCL-3

मारा वउकिल MSPGCL

135 421 7-Feb-14 Ready Ready Less requisition

प म ऽय भार षण कि म बई णाली चालन-ISO-I

15 चिपर CPUR - 6

मारा वउकिल MSPGCL

500 1523 11-Feb-14 2033 13-Feb-14 BTL

16 नािसक NASIK-3

मारा वउकिल MSPGCL

250 300 11-Feb-14 100 19-Feb-14 UAT problem

17 कोराड KORADI-5

मारा वउकिल MSPGCL

210 153 14-Feb-14 अनपल ध Still out

अनपल ध Still out

ID fan problem

18 ितरोडा Tiroda-I

मारा वउकिल MSPGCL

660 2059 15-Feb-14 2054 26-Feb-14 Turbine bearing problem

19 ितरोडा Tiroda-2

मारा वउकिल MSPGCL

660 1125 17-Feb-14 152 22-Feb-14 BTL

20 कोराड KORADI-6

मारा वउकिल MSPGCL

210 2357 19-Feb-14 250 23-Feb-14 BTL

21 भसावल BHUSWAL-2

मारा वउकिल MSPGCL

210 301 22-Feb-14 1706 25-Feb-14 PA fan temp High

22 खापरखड़ा KHAPERKHEDA-3

मारा वउकिल MSPGCL

250 1448 22-Feb-14 130 25-Feb-14 BTL

23 जयगड Jaigad-4

मारा वउकिल MSPGCL

300 1930 22-Feb-14 1107 4-Mar-14 Low schedule

24 कोराड Koradi-5

मारा वउकिल MSPGCL

300 404 23-Feb-14 अनपल ध Still out

अनपल ध Still out

Electrical fault

25 पल PARLI-4

मारा वउकिल MSPGCL

210 1836 28-Jan-14 1956 3-Feb-14 Air preheater problem

26 भसावल BHUSAWAL-4

मारा वउकिल MSPGCL

250 1432 28-Feb-14 1802 3-Mar-14 Ash hopper problem

27 आरजीपीपीएल RGPPL-1B

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

28 आरजीपीपीएल RGPPL-2B

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

29 आरजीपीपीएल RGPPL 3A

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

30 आरजीपीपीएल RGPPL-1A

आरजीपीपीएल RGPPL

320 1500 18-Jan-14 अनपल ध Still out

अनपल ध Still out

SRV problem

31 आरजीपीपीएल RGPPL 3B

आरजीपीपीएल RGPPL

320 1230 8-Feb-14 Ready Ready Less requisition

32 िसगाजी SINGAJI - I

म वउकिल MPPGCL

600 422 12-Feb-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

33 सातपरा SATPURA-11

म वउकिल MPPGCL

250 1913 15-Feb-14 2149 19-Feb-14 Main stream temperature low

34 सातपरा SATPURA-11

म वउकिल MPPGCL

250 542 26-Feb-14 1642 2-Mar-14 BTL

35 एःसार महान Essar-Mahan-1

एःसार ESSAR

600 000 29-Jan-14 015 18-Feb-14 Less requisi tion

36 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

37 वदना Vandana-1

वदना Vandana

135 149 12-Jan-14 अनपल ध Still out

अनपल ध Still out

BTL

प म ऽय भार षण कि म बई णाली चालन-ISO-I

38 ससान Sasan-2

आरईएल REL

660 205 16-Feb-14 1650 23-Feb-14 Problem in ash handling

39 कावास Kawas 2A

एनट पीसीNTPC 164 2018 23-Dec-13 Ready Ready Less requisition

40 गाधार Gandhar-3

एनट पीसीNTPC 144 2037 28-Dec-13 Ready Ready Less requisition

41 गाधार Gandhar-I

एनट पीसीNTPC 144 2011 1-Jan-14 Ready Ready Less requisition

42 कावास Kawas 2B

एनट पीसीNTPC 164 900 13-Jan-14 421 5-Mar-14 Maintenance

43 गाधार Gandhar-2

एनट पीसीNTPC 219 023 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Less requisition

44 कावास Kawas-1A

एनट पीसीNTPC 164 2055 4-Feb-14 712 20-Feb-14 Less requisition

45 कावास

Kawas-1B एनट पीसीNTPC 164 1951 13-Feb-14 503 20-Feb-14 Less requisition

46 कावास Kawas 1A

एनट पीसीNTPC 164 1210 21-Feb-14 Ready Ready Less requisition

47 कावास Kawas 1B

एनट पीसीNTPC 164 012 22-Feb-14 1144 26-Feb-14 Less requisition

Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का फरवर 2014 का वःता रत यौरा

Details of planned unit outages during the month of Feb2014 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Time Date

1 डब यट पीएस WTPS-3

गरा विनिल GSECL

210 212 12-Feb-14 अनपल ध Still out

अनपल ध Still out

AOH

2 पल ParlI-3

मारा वउकिल MSPGCL

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

AOH

3 चिपर Chandrapur-5

मारा वउकिल MSPGCL

500 101 14-Jul-13 841 19-Feb-14 AOH

4 कोरबा प म KORBA-(W)-4

छरा वउकिल CSPGCL

210 2226 7-Feb-14 अनपल ध Still out

अनपल ध Still out

AOH

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

NIL2

NIL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING MARCH 2014 AND APRIL 2014

Capacity Outage as per Annual Maintenance Plan

3 Craiva]kMila CSPGCL

NIL

4

NIL

5 koMd``Iya xao~ Central Sector51 VSTPS 4 210 010414 070414 AOH52 VSTPS 2 210 080414 270414 AOH53 VSTPS 1 210 300414 190514 AOH54 CGPL 10 800 280314 130514 COH

maraiva]kMila MSPGCL

Date Time Date Time1 220 Bus-1 at Mapusa 20-Mar-14 1000 20-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R

2 765 Bus-1 at Sasan 20-Mar-14 800 20-Mar-14 1800 Daily Stringing of Main bus 1 for 765 kV Vichal Pooling - Sasan feeder

Reliance WR-II C

3 400 400kV Bus-2 at Satna 20-Mar-14 800 20-Mar-14 1800 Continuous Bay extension work related to JP - Nigrie Bays POWERGRID WR-II C

4 400 400kV ICT 1 at Satna 20-Mar-14 800 20-Mar-14 1000 Continuous Bay extension work related to JP - Nigrie Bays POWERGRID WR-II C

5 400 400kV Jabalpur Itarsi 1amp2 (Dc) 20-Mar-14 1000 20-Mar-14 1400 Continuous For commissioning of Line Impedance measurement kit

POWERGRID WR-II C

6 765 3X80 MVAr Bina Line Reactor at Indore 20-Mar-14 1000 21-Mar-14 1800 Continuous For installation of online dry out amp online DGA kit

POWERGRID WR-II C

7 400kV Damoh - Bhopal 1 20-Mar-14 800 31-Mar-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

8 400 Chorania Kasor 20-Mar-14 800 20-Mar-14 1800 Daily PMM work GETCO GETCO9 400 400 KV Main Bus-I at 400 KV Ss Khedamara 20-Mar-14 900 22-Mar-14 1700 Daily Erection of Pantograph 1 Set of IP amp CVT CSPTCL CSPTCL C

10 400 400 KV Khedamara-KSTPS NTPC ckt-II at 400 KV Ss Khedamara

20-Mar-14 900 22-Mar-14 1700 Daily Erection of Pantograph CVT amp 1 Set of IP PGCIL CSPTCL C

11 400 Korba -Vandana 20-Mar-14 900 21-Mar-14 1900 days continuouTesting of LBB auto re-close M-I amp M-II relays NTPC NTPC

12 400 Korba -Vandana 20-Mar-14 900 21-Mar-14 1900 days continuouTesting of LBB auto re-close M-I amp M-II relays NTPC NTPC

13 400DC Akola-Aurangabad (MSETCL) 1 and Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

21-Mar-14 600 23-Mar-14 1800 Conti Crossing work of 400kv MC Aurangabad - Aurangabad

MSETCLWRTS-I WRTS-I C

14400 amp 220 amp 132

400KV DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 400KV Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

21-Mar-14 600 21-Mar-14 1800 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad

MSETCLWRTS-I WRTS-I C

15 400 Bhadrawati-Parli 1amp 2 21-Mar-14 900 31-Mar-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I C

16 220 Bus-1 at Pune 21-Mar-14 800 21-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R

17 400 Solapur-Kolhapur 1 amp 2 21-Mar-14 700 21-Mar-14 1800 Daily Stringing work upcoming 765 kV Solapur-Pune line

Reliance WRTS-I C

18 220 220kV DC Raigarh- Raigarh (CSPTCL) Line (if outage not avail on 13140314)

21-Mar-14 900 22-Mar-14 1700 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (040-50)

CSPTCL WRTS-I C

19 220 Bus-2 (Section-A) at Mapusa 21-Mar-14 1000 21-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R20 400 Bus-1 at Itarsi 21-Mar-14 900 21-Mar-14 1800 Daily AMP POWERGRID WR-II R21 220 Bus-1 at Gwalior 21-Mar-14 1000 21-Mar-14 1800 Daily AMP POWERGRID WR-II R22 220 Jhanor - Haldarwa 1 21-Mar-14 900 21-Mar-14 1800 Daily AMP POWERGRID WR-II R23 400 Vapi Boisar 21-Mar-14 700 22-Mar-14 1900 Continuous For crossing of 220kV Kala Khadoli TL POWERGRID WR-II C

24 765 Sasan-Satna2 21-Mar-14 800 22-Mar-14 1800 Continuous For Power Line crossing of 765kV Vindhyanchal (pooling) - Satna 2 Line

POWERGRID WR-II R

25 400 400220 ICT NO1 at Kasor 21-Mar-14 800 21-Mar-14 1800 Daily PMM work GETCO GETCO26 400 400KV Sipat-Pathadi(LANCO) line 21-Mar-14 900 22-Mar-14 1900 Continous Annual Preventive maintenance job NTPC NTPC27 400 Pune-Parli 2 50MVAr Line Reactor at Pune 22-Mar-14 800 22-Mar-14 1800 Daily AMP Work Line in service wo reactor Reliance WRTS-I R

28 765 Bus-2 at Solapur 22-Mar-14 700 22-Mar-14 1800 Daily 765KV Pune bay commissioning amp SCADA works

WRTS-I WRTS-I C

29 400 Bus-1 at Bhatapara 22-Mar-14 800 23-Mar-14 1800 Conti Bus extension work for new 125MVAr Bus Reactor at Bhatapara

WRTS-I WRTS-I C

30 220 Bus-2 (Section-B) at Mapusa 22-Mar-14 1000 22-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R31 400 Vadavi Chorania 1 22-Mar-14 900 22-Mar-14 1800 Daily AMP Reliance WR-II R32 220 Jhanor - Haldarwa 2 22-Mar-14 900 22-Mar-14 1800 Daily AMP POWERGRID WR-II R33 220 Bus-2 at Gwalior 22-Mar-14 1000 22-Mar-14 1800 Daily AMP POWERGRID WR-II R

34 765 3X80 MVAr Bus Reactor at Indore 22-Mar-14 1000 23-Mar-14 1800 Continuous For installation of online dry out amp online DGA kit

POWERGRID WR-II C

35 220 Transfer Bus at Mapusa 23-Mar-14 1000 23-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R

36 400 Raigarh- Raipur 4 amp Raigarh-Kotra PS 2 23-Mar-14 800 30-Mar-14 1800 Conti Bay shifting work for up-coming 125MVAr Bus Reactor at Raigarh

WRTS-I WRTS-I C

37 765 Bus-1 at Indore (PG) 23-Mar-14 1000 23-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

Outages Proposal of Transmission elements during the month of MARCH‐2014Type

ANNEXURE‐32A

SN KV Line From To

Basis Reason System Agency

38 220 MC Waluj-Chitegaon amp Waluj-Jalna on same tower

24-Mar-14 600 24-Mar-14 1800 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad

MSETCL WRTS-I C

39 400 Raipur-Sipat 1 amp 2 24-Mar-14 800 2-Apr-14 1800 Conti Diversion of line for Lafarge Railway trackERS removal

WRTS-I Lafarge C

40 220 Bus-2 at Pune 24-Mar-14 800 24-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R41 765 Bus-1 at Bilaspur 24-Mar-14 800 24-Mar-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R

42 400 Bus-2 at Bhatapara 24-Mar-14 800 25-Mar-14 1800 Conti Bus extension work for new 125MVAr Bus Reactor at Bhatapara

WRTS-I WRTS-I C

43 400 Kolhapur-Mapusa 2 24-Mar-14 600 24-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

44 400 Vadavi Chorania 2 24-Mar-14 900 24-Mar-14 1800 Daily AMP Reliance WR-II R45 765 Bus-2 at Indore (PG) 24-Mar-14 1000 24-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

46 765 Bus-2 at Sasan 24-Mar-14 800 24-Mar-14 1800 Daily Strining of Main Bus 2 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

47 220 KAPP - Haldarwa 1 24-Mar-14 800 24-Mar-14 1800 Daily AMP POWERGRID WR-II R48 400 Bus - 2 at Pune 25-Mar-14 800 25-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R

49 765 Bus - 1 at Wardha 25-Mar-14 800 25-Mar-14 1800 Daily Jumper connection work of 765KV Raipur-Wardha line

WRTS-I WRTS-I R

50 400 Kolhapur-Mapusa 2 25-Mar-14 600 25-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

51 220 Mapusa-Ponda line 25-Mar-14 1000 25-Mar-14 1500 Daily AMP Work GOA WRTS-I R

52 765 Bus-1 at Sasan 25-Mar-14 800 25-Mar-14 1800 Daily Jumpering of Bus 1 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

53 220 KAPP - Haldarwa 2 25-Mar-14 800 25-Mar-14 1800 Daily AMP POWERGRID WR-II R54 400 Vadavi - Kansari2 25-Mar-14 900 25-Mar-14 1800 Daily AMP Reliance WR-II R55 400 Bus-1 at Indore (PG) 25-Mar-14 1000 26-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C56 765 Bus-1 at Satna 25-Mar-14 800 25-Mar-14 1800 Continuous Bay extension work POWERGRID WR-II C57 765 Sipat 765KV 400KV 1000MVA ICT-1 25-Mar-14 900 25-Mar-14 1900 Daily SPS Protection scheme modification NTPC NTPC

58 765 Bus - 2 at Wardha 26-Mar-14 800 26-Mar-14 1800 Daily Jumper connection work of 765KV Raipur-Wardha line

WRTS-I WRTS-I R

59 400 Bhadrawati-Parli 2 63MVAr Line Reactor at Parli

26-Mar-14 800 26-Mar-14 1800 Daily AMP Work of Recator at Parli line in service wo reactor

WRTS-I WRTS-I R

60 400 Kolhapur-Mapusa 1 26-Mar-14 600 26-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

61 220 Mapusa-Amona line 26-Mar-14 1000 26-Mar-14 1500 Daily AMP Work GOA WRTS-I R62 765 Bus-2 at Satna 26-Mar-14 800 26-Mar-14 1800 Continuous Bay extension work POWERGRID WR-II C

63 765 Bus-2 at Sasan 26-Mar-14 800 26-Mar-14 1800 Daily Jumpering of bus 2 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

64 400 401 KV Main Bus-I at 400 KV Ss Khedamara 26-Mar-14 900 27-Mar-14 1700 Daily Erection of IPS Tube CSPTCL CSPTCL C

65 400 401 KV Khedamara-KSTPS NTPC ckt-II at 400 KV Ss Khedamara

26-Mar-14 900 27-Mar-14 1700 Daily Erection of IPS Tube PGCIL CSPTCL C

66 400 ACBIL-BILASPUR-CKT NO -2 26-Mar-14 900 31-Mar-14 1800 CONT FOR lilo CONNECTIVITY OF 300MW MCCPL TPP

ACBIL ACBIL C

67 765 Bus-2 at Bilaspur 27-Mar-14 800 27-Mar-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R68 220 Mapusa-Thivim 1 27-Mar-14 1000 27-Mar-14 1500 Daily AMP Work GOA WRTS-I R69 220 KAPP - Vav 2 27-Mar-14 800 27-Mar-14 1800 Daily AMP POWERGRID WR-II R70 400 Bus-2 at Indore (PG) 27-Mar-14 1000 28-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

71 765 Bus-2 at Gwalior 27-Mar-14 1000 27-Mar-14 1800 Daily Bay extension work related to Gwalior Jaipur 1 Bays

POWERGRID WR-II C

72 400 VSTPS Tie- Line-1 ( Line from Stage-III to IV Switchyard)

27-Mar-14 900 27-Mar-14 1900 Daily Basis AMP and rectification of hot spots NTPC NTPC

73 765 Sipat 765KV 400KV 1000MVA ICT-2 27-Mar-14 900 27-Mar-14 1900 Daily SPS Protection scheme modification NTPC NTPC74 765 Bus-1 at Solapur 28-Mar-14 700 30-Mar-14 1800 Daily commissioning tests amp SCADA works WRTS-I WRTS-I C75 220 Mapusa-Thivim 2 28-Mar-14 1000 28-Mar-14 1500 Daily AMP Work GOA WRTS-I R

76 400 Koradi-Satpura 28-Mar-14 1000 28-Mar-14 1400 Daily Earthwire tighting work damaged during Crossing work

WRTS-I ADANI C

77 220 Bus-1 at Dehgam 28-Mar-14 900 28-Mar-14 1800 Daily AMP POWERGRID WR-II R78 220 Kawas - Haldarwa 2 28-Mar-14 800 28-Mar-14 1800 Daily AMP POWERGRID WR-II R79 400 Chorania Amreli 28-Mar-14 800 28-Mar-14 1800 Daily PMM work GETCO GETCO

80 400DC Akola-Aurangabad (MSETCL) 1 and Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

29-Mar-14 600 30-Mar-14 1800 Conti Charging amp shifting of Akola-Abad line on MC Abad-Abad line WRTS-I WRTS-I C

81 220 Bus-2 at Dehgam 29-Mar-14 900 29-Mar-14 1800 Daily AMP POWERGRID WR-II R82 400 Bus -1 at Mapusa 30-Mar-14 1000 30-Mar-14 1500 Daily AMP Work WRTS-I WRTS-I R

83 765 765kV Bus Reactor at Solapur 31-Mar-14 700 2-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

Date Time Date Time

1 400 Bhilai-Koradi 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

2 400 DC Korba-Birsingpur 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

3 400 Korba-Bhilai 2 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

4 220 Korba-Budhipadar 3 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

5 400 Akola-Wardha 1amp 2 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

6 400 Raipur-Raigarh 1 amp Raipur-KSK-DBPL-Raigarh

1-Apr-14 800 30-Apr-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

7 400 Bhadrawati-Parli 1amp 2 1-Apr-14 900 30-Apr-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I C

8 400 400220kv ICT-1 at Pune 1-Apr-14 800 1-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R9 400 Bus-1 at Bilaspur 1-Apr-14 800 1-Apr-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R

10 400 Solapur(PG) -Karad line 1-Apr-14 700 10-Apr-14 1800 Conti Erection of 80MVAr new reactor by shifitng line equipments at Solapur

MSETCL WRTS-I C

11 400 Bus-1 at Jabalpur (pooling) 01-Apr-14 1000 01-Apr-14 1800 Daily Busbar Stability test related to Jhabua Power Bays

POWERGRID WR-II C

12 400 Shujalpur - Nagda 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

13 400 Mundra - Bhachau 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

14 400 Bina - Shujalpur 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

15 220 Omkareshwar-Khandwa Ckt 1-Apr-14 900 1-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI16 400 Sipat 400KV Bay 10 and 11 1-Apr-14 900 3-Apr-14 1900 Continous 400KV CT 3nos replacement NTPC NTPC17 400 Padgha-Nagothane ckt I 1-Apr-14 900 1-Apr-14 1700 Daily QMwork MSETCL MSETCL

18 400 Bus-2 at Jabalpur (pooling) 02-Apr-14 1000 02-Apr-14 1800 Daily Busbar Stability test related to Jhabua Power Bays

POWERGRID WR-II C

19 400 Vindhyanchal - Mahan - Korba (Section of both the line on same Dc tower)

02-Apr-14 800 03-Apr-14 1700 Continuous For Power Line crossing of 765kV Vindhyanchal (pooling) - Satna 1 Line

POWERGRID WR-II C

20 400 400kV ICT 4 at Indore MPPTCL 02-Apr-14 1000 04-Apr-14 1800 ContinuousFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

MPPTCL WR-II C

21 400 400kV Bus Coupler bay at Indore MPPTCL 02-Apr-14 1000 04-Apr-14 1800 ContinuousFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

MPPTCL WR-II C

22 400 400kV Itarsi - Indore MPPTCL 1 Line 02-Apr-14 1000 02-Apr-14 1500 DailyFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

POWERGRID WR-II C

23 400400 KV LILO Line of 400 KV SC Korba West-Khedamara to 400 KV Ss Raita (Between Loc69 amp70 near Raita Ss)

2-Apr-14 800 3-Apr-14 1700 DailyMaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

CSPTCL CSPTCL C

24 400 Chandrapur-Khaparkheda 2-Apr-14 900 2-Apr-14 1700 Daily QMwork MSETCL MSETCL

25 400 Lamboti-Solapur PG 2-Apr-14 900 2-Apr-14 1700 Daily QMwork MSETCL MSETCL

26 400 Bus-1 at Durg PS Ss 3-Apr-14 900 3-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R27 400 Bus-1 at Jabalpur 03-Apr-14 900 03-Apr-14 1800 Daily Retrofitting of Isolator arms(689A) POWERGRID WR-II R28 400 315MVA ICT2 at Khandwa 03-Apr-14 1000 03-Apr-14 1600 Daily AMP POWERGRID WR-II R29 400 Mundra - Hadala 3-Apr-14 800 3-Apr-14 1800 Daily PMM GETCO GETCO30 400 400KV Seoni -Bhilai Ckt 3-Apr-14 900 3-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I31 400 Lonikand-Chakan 3-Apr-14 900 3-Apr-14 1700 Daily QMwork MSETCL MSETCL32 400 Bus-2 at Durg PS Ss 4-Apr-14 900 4-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R33 400 Bus-1 at Jabalpur 04-Apr-14 900 04-Apr-14 1800 Daily Retrofitting of Isolator arms(2089A) POWERGRID WR-II R

34 400 400kV Itarsi - Indore MPPTCL 1 Line 04-Apr-14 1300 04-Apr-14 1800 DailyFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

POWERGRID WR-II C

35 400 Varsana - Hadala 4-Apr-14 800 4-Apr-14 1800 Daily PMM GETCO GETCO

Agency Type

ANNEXURE‐32BOutages Proposal of Transmission elements during the month of APRIL ‐2014

SN KV Line From To

Basis Reason System

36 220 Vapi - Vapi (PG) 4-Apr-14 800 4-Apr-14 1800 Daily PMM work PGCIL GETCO37 220 Haldarva - Jhanor - 1 (NTPC) 4-Apr-14 800 4-Apr-14 1800 Daily PMM amp Tan Delta testing PGCIL GETCO38 400 400KV Birsinghpur -Katni Ckt - I 4-Apr-14 800 4-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I39 220 Badod - Kota Ckt 4-Apr-14 900 4-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI40 220 Malanpur-Auriya Ckt 4-Apr-14 900 5-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI

41 400 Bhusawal-Akola 4-Apr-14 900 4-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

42 400 Deepnagar-Aurangabad II 4-Apr-14 900 4-Apr-14 1700 Daily QMwork MSETCL MSETCL43 400 Kalwa-Padgha Ckt I 4-Apr-14 900 4-Apr-14 1700 Daily QMwork MSETCL MSETCL44 765 Bus Reactor at Seoni 5-Apr-14 900 5-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R

45 400 DC Korba-KhedamaraLilo at Marwa lilo section yet to be charge 5-Apr-14 800 6-Apr-14 1800 Daily

Crossing work of upcoming 765 KV DC Raigarh-Champa (AP-48A0- AP 490)DC Korba-Khedamara is in service

CSPTCL WRTS-1 C

46 400 Bus-1 at Jabalpur 05-Apr-14 900 05-Apr-14 1800 Daily Retrofitting of Isolator arms(1689A) POWERGRID WR-II R

47 400 Mundara -Limbdi 1 05-Apr-14 800 07-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

48 220 Badod - Modak Ckt 5-Apr-14 900 5-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI49 400 Dhule-Babhleswar ckt 1 5-Apr-14 900 5-Apr-14 1700 Daily QMwork MSETCL MSETCL50 400 400220kv ICT-1 at Seoni 7-Apr-14 900 7-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R51 400 Bus-2 at Jabalpur 07-Apr-14 900 07-Apr-14 1800 Daily Retrofitting of Isolator arms(1789B) POWERGRID WR-II R52 400 315MVA ICT1 at Khandwa 07-Apr-14 1000 07-Apr-14 1600 Daily AMP POWERGRID WR-II R53 220 Chhegoan-Khandwa Ckt -II 7-Apr-14 900 7-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI54 400 Korba- Bhilai1 7-Apr-14 900 8-Apr-14 1900 days continuou Bay Maint and testing NTPC NTPC55 400 Vindhyachal - Mahan line 7-Apr-14 900 8-Apr-14 1900 Continuous Replacement of R Y and B Phase CT NTPC NTPC56 400 Bhusawal-Aurangabad 7-Apr-14 900 7-Apr-14 1700 Daily QMwork MSETCL MSETCL57 400 New Koyna-Karad ckt 2 7-Apr-14 830 7-Apr-14 1730 Daily QMwork MSETCL MSETCL

58 400 Mundara -Limbdi 2 08-Apr-14 800 10-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

59 400 Chorania Hadala 8-Apr-14 800 8-Apr-14 1800 Daily PMM GETCO GETCO60 400 Sipat 400KV Bay 23 8-Apr-14 900 9-Apr-14 1900 Continous One 400KV CT replacement NTPC NTPC61 400 Koradi-Khaparkheda I 8-Apr-14 900 8-Apr-14 1700 Daily QMwork MSETCL MSETCL62 765 765400KV ICT-1 at Kotra PS 9-Apr-14 900 9-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R63 400 Bus-2 at Jabalpur 09-Apr-14 900 09-Apr-14 1800 Daily Retrofitting of Isolator arms(489B) POWERGRID WR-II R64 400 315MVA ICT1 at Damoh 09-Apr-14 1000 09-Apr-14 1600 Daily AMP POWERGRID WR-II R65 400 Amreli-Jetpur 2 9-Apr-14 800 9-Apr-14 1800 Daily PMM GETCO GETCO66 400 SSP- Rajgarh - 1 9-Apr-14 800 9-Apr-14 1800 Daily PMM GETCOMPTCL GETCO67 220 TAPS1 amp2-TAPS 3amp4 tie line 9-Apr-14 800 9-Apr-14 1600 one day Annual maintenance Works MSETCL NPCIL68 220 TAPS TIE LIE-I 9-Apr-14 800 10-Apr-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL69 400 400 KV Indore - Nagda Ckt 9-Apr-14 900 9-Apr-14 1600 daily For maintenance work MPPTCL EHT- Mamp I70 400 400 KV Sarni - Isp Ckt 9-Apr-14 900 9-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I71 220 Mehgaon-Auriya Ckt 9-Apr-14 900 10-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI72 400 315 MVA 400220Kv X-mer III At Bhopal SS 9-Apr-14 900 10-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI73 400 Padgha-Tarapur CktII 9-Apr-14 900 9-Apr-14 1700 Daily QMwork MSETCL MSETCL74 765 Bus Reactor at Kotra PS 10-Apr-14 900 10-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R

75 765 amp 400

765400 kV ICT-I at Solapur amp 400KV Solapur-Parli 2 10-Apr-14 700 12-Apr-14 1800 Daily 765400 kV spare ICT unit Aux bus works CSD

commissioning amp Fire fighting works at Solapur WRTS-IReliance WRTS-I C

76 400 315MVA ICT2 at Damoh 10-Apr-14 1000 10-Apr-14 1600 Daily AMP POWERGRID WR-II R

77 765 Sasan-Satna 1 10-Apr-14 800 11-Apr-14 1800 Daily For AMP of line amp Line terminal Equipments Post commissioning checks

POWERGRID WR-II C

78 400 APL-Varsana 10-Apr-14 800 10-Apr-14 1800 Daily PMM GETCO GETCO79 400 400 KV Isp - Nagda Ckt 10-Apr-14 900 10-Apr-14 1600 daily For maintenance work MPPTCL EHT- Mamp I80 400 400 KV Bhopal-Itarsi(PGCIL) Ckt-I 10-Apr-14 900 11-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I81 220 Chhegoan-Khandwa Ckt -I 10-Apr-14 900 10-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI82 400 315 MVA 400220Kv X-mer At Katni SS 10-Apr-14 800 11-Apr-14 1800 continue For maintenance work MPPTCL EHT -MampI83 400 Korba- Bhilai2 10-Apr-14 900 11-Apr-14 1900 days continuou Bay Maint and testing NTPC NTPC84 400 Sipat 400KV Bay 14 10-Apr-14 900 12-Apr-14 1900 Continous 400KV CT 3nos replacement NTPC NTPC

85 400 Chandrapur II-Parli II 10-Apr-14 900 10-Apr-14 1700 Daily Providing of Arching horncorona rings Bird guards quarter pinsNut bolts

MSETCL MSETCL

86 400 Karad-Lonikand 10-Apr-14 900 10-Apr-14 1700 Daily QMwork MSETCL MSETCL87 400 Raipur-Durg PS 1 11-Apr-14 900 11-Apr-14 1700 Daily AMP Work WRTS-I WRTS-I R

88 400 Mundara -Jetpur 1 11-Apr-14 800 15-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

89 400 Varsana-Hadala Line 11-Apr-14 800 11-Apr-14 1800 Daily PMM GETCO GETCO90 220 Haldarwa Kawas-2 11-Apr-14 800 11-Apr-14 1800 Daily PMM work PGCIL GETCO91 400 400 KV Nagda-Rajgarh(PGCIL) Ckt-I 11-Apr-14 900 11-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

92 400 315 MVA 400220Kv X-mer III ampTie bay At Bhopal SS

11-Apr-14 900 11-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI

93 400 Akola-Nandgaonpeth 11-Apr-14 900 11-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

94 400 Akola-Wardha I 11-Apr-14 900 11-Apr-14 1700 Daily QMwork MSETCL MSETCL95 400 Kalwa-Lonikand 11-Apr-14 900 11-Apr-14 1700 Daily QMwork MSETCL MSETCL96 400 400220kv ICT-1 at Mapusa 12-Apr-14 900 12-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R97 400 Raipur-Durg PS 2 12-Apr-14 900 12-Apr-14 1700 Daily AMP Work WRTS-I WRTS-I R98 765 Sasan-Satna2 with line reactor 12-Apr-14 1000 12-Apr-14 1800 Daily AMP POWERGRID WR-II R99 400 400 KV Nagda-Rajgarh(PGCIL) Ckt-II 12-Apr-14 900 12-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I100 400 Deepnagar-Aurangabad I 12-Apr-14 900 12-Apr-14 1700 Daily QMwork MSETCL MSETCL101 400 Amreli-Jetpur 2 14-Apr-14 800 14-Apr-14 1800 Daily PMM GETCO GETCO102 400 Kasor - Gpec 14-Apr-14 800 14-Apr-14 1800 Daily PMM GETCO GETCO103 220 GWL(PGCIL)-Malanpur Ckt-I 14-Apr-14 900 15-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI104 400 DC Korba-Raipur 3 amp 4 15-Apr-14 800 16-Apr-14 1800 Conti Bus splitting work at Raipur WRTS-1 WRTS-1 C

105 400 Korba-Bhatapara 15-Apr-14 800 24-Apr-14 1800 Conti For raising of ground clearence for Railway track of Lafarge

WRTS-I Lafarge C

106 765 765400 kV ICT-II at Solapur 15-Apr-14 700 17-Apr-14 1800 Daily CSD commissioning amp Fire fighting works WRTS-I WRTS-I C107 400 Vindhyachal-Satna1 15-Apr-14 1000 15-Apr-14 1800 Daily AMP POWERGRID WR-II R108 400 Ssnl-Dhule-1 15-Apr-14 800 15-Apr-14 1800 Daily PMM GETCOMSETCL GETCO109 220 TAPS-Vapi 15-Apr-14 800 17-Apr-14 1900 Daily Annual maintenance Works GETCO NPCIL110 220 Pithampur-Rajgarh(PGCIL) Ckt - I 15-Apr-14 900 15-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI111 400 Sipat 400KV Bay-18 ( Ranchi-1 Main) 15-Apr-14 900 15-Apr-14 1900 Daily Annual Preventive maintenance job NTPC NTPC112 400 Karad-Kolhapur Ckt I 15-Apr-14 900 15-Apr-14 1700 Daily QMwork MSETCL MSETCL

113 400 DC Raipur-Bhadrawati 2 amp 3 16-Apr-14 800 17-Apr-14 1800 Conti Bus splitting work at Raipur WRTS-1 WRTS-1 C

114 400 Vindhyachal-Satna2 16-Apr-14 1000 16-Apr-14 1800 Daily AMP POWERGRID WR-II R

115 400 Mundara -Jetpur 2 16-Apr-14 800 20-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

116 400 Vadavi - Dehgam (Pg) - 1 16-Apr-14 800 16-Apr-14 1800 Daily PMM amp Tandelta testing GETCO GETCO117 400 Chorania Asoj-1 16-Apr-14 800 16-Apr-14 1800 Daily PMM GETCO GETCO118 220 Bhilad - TAPS 16-Apr-14 800 16-Apr-14 1800 Daily PMM work PGCIL GETCO119 220 Bhat - Pirana (PG) - 1 16-Apr-14 800 16-Apr-14 1800 Daily PMM work GETCO GETCO120 400 400 KV Bhopal-Itarsi(PGCIL) Ckt-II 16-Apr-14 900 17-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I121 220 Damoh(PGCIL) - Tikamgarh Ckt 16-Apr-14 900 16-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI

122 400 400KV SC Korba-Raipur-II (Between Korba - Bhatapara end)(Between Loc2980 amp 2990) 16-Apr-14 800 17-Apr-14 1700 Daily

MaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

PGCIL CSPTCL C

123 400 Sipat 400KV Bay-19 ( Ranchi-2 Main) 16-Apr-14 900 16-Apr-14 1900 Daily Annual Preventive maintenance job NTPC NTPC124 400 Padgha-Babhleswar ckt I 16-Apr-14 900 16-Apr-14 1700 Daily QMwork MSETCL MSETCL125 400 Vadavi - Dehgam (Pg) - 2 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCO GETCO126 400 Ssnl-Dhule-2 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCOMSETCL GETCO127 400 Vadinar-Hadala- 1 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCO GETCO128 220 Bhat - Pirana (PG) - 2 17-Apr-14 800 17-Apr-14 1800 Daily PMM work GETCO GETCO129 400 400KV Birsinghpur -Katni Ckt - II 17-Apr-14 800 17-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I130 220 Pithampur-Rajgarh(PGCIL) Ckt - II 17-Apr-14 900 17-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI131 400 Jejuri-Lonikand 17-Apr-14 900 17-Apr-14 1700 Daily QMwork MSETCL MSETCL132 400 Deepnagar-Khadka II 17-Apr-14 900 17-Apr-14 1700 Daily QMwork MSETCL MSETCL133 400 Chorania Kasor 18-Apr-14 800 18-Apr-14 1800 Daily PMM GETCO GETCO134 220 GWL(PGCIL)-Malanpur Ckt-II 18-Apr-14 900 19-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI135 400 Akola-Wardha II 18-Apr-14 900 18-Apr-14 1700 Daily QMwork MSETCL MSETCL

136 400 Koradi-Nandgaonpeth 18-Apr-14 800 18-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

137 765 765kV Pune line Reactor at Solapur 19-Apr-14 700 20-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

138 400 400KV Bina -Power(JP) Ckt 19-Apr-14 900 19-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I139 400 Dhule-SSarovar I 19-Apr-14 900 19-Apr-14 1700 Daily QMwork MSETCL MSETCL

140 400 Koradi-Khaparkheda II 19-Apr-14 900 19-Apr-14 1700 Daily QMwork MSETCL MSETCL141 220 KAPP - VAPI - 1 20-Apr-14 800 20-Apr-14 1800 Daily Isolator replacement under ASIDE scheme PGCIL GETCO

142 400 DC Bhilai-Bhadrawati amp Raipur-Bhadrawati 1 21-Apr-14 800 28-Apr-14 1800 Conti Diversion of line for Vidarbha Industrial Devlopment Corporation(VIDC)

WRTS-I VIDC C

143 400 Bhachau- Ranchhodpura 1amp2 21-Apr-14 800 27-Apr-14 1800 Continuous Tower shifting work at canal crossingInsulator replacement work

POWERGRID WR-II C

144 400 Hadala-Amreli 21-Apr-14 800 21-Apr-14 1800 Daily PMM GETCO GETCO145 400 Vadinar-Hadala- 2 21-Apr-14 800 21-Apr-14 1800 Daily PMM GETCO GETCO146 220 TAPS-Boisar 21-Apr-14 800 23-Apr-14 1900 Daily Annual maintenance Works MSETCL NPCIL147 220 Bina(PGCIL)-220 KV Bina Ckt 21-Apr-14 900 21-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI148 400 CGPL Bhachau -1 21-Apr-14 8AM 21-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL149 220 Kawas-Ichhapore 1+Bus 1 21-Apr-14 900 21-Apr-14 1800 daily RTV Coating NTPC NTPC150 400 Karad-Kolhapur Ckt II 21-Apr-14 900 21-Apr-14 1700 Daily QMwork MSETCL MSETCL151 400 New Koyna-Koyna Stg-4-1 21-Apr-14 830 21-Apr-14 1730 Daily QMwork MSETCL MSETCL152 400 Ssp - Rajgarh - 2 22-Apr-14 800 22-Apr-14 1800 Daily PMM GETCOMPTCL GETCO153 400 Vadavi-Bhachau 2 22-Apr-14 800 22-Apr-14 1800 Daily PMM amp Tan Delta testing PGCIL GETCO154 220 Bhilad - Vapi (PG) - 1 22-Apr-14 800 22-Apr-14 1800 Daily PMM work PGCIL GETCO155 400 400 KV Rajgarh(PGCIL)-Ssp Ckt-I 22-Apr-14 900 22-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I156 400 400KV Seoni -Sarni Ckt 22-Apr-14 900 23-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I157 220 Khandwa(PGCIL)-Nepanagar Ckt 22-Apr-14 900 22-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI158 220 Kawas-Ichhapore 2+Bus 1 22-Apr-14 900 22-Apr-14 1800 daily For maintenance work NTPC NTPC159 400 Karad-Jaigad II 22-Apr-14 900 22-Apr-14 1700 Daily Annual maintenance work MSETCL MSETCL160 220 Bhilad - Vapi (PG) - 2 23-Apr-14 800 23-Apr-14 1800 Daily PMM work PGCIL GETCO161 400 400KV Bina -Bhopal Ckt -I 23-Apr-14 900 24-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I162 400 400 KV Rajgarh(PGCIL)-Ssp Ckt-II 23-Apr-14 900 23-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I163 220 Bina(PGCIL)-Shivpuri Ckt 23-Apr-14 900 24-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI164 220 Damoh(PGCIL) - Damoh I C - I 23-Apr-14 900 23-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI

165 400 400 KV DCDS Sipat- Raipur (IampII) 23-Apr-14 800 24-Apr-14 1700 DailyMaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

PGCIL CSPTCL C

166 400 CGPL Bhachau - 2 23-Apr-14 8AM 23-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL

167 220 Kawas-Navsari 2 +Bus 1 23-Apr-14 900 23-Apr-14 1800 daily Insulator replcement and routine maintenance NTPC NTPC168 400 Padgha-Babhleswar ckt II 23-Apr-14 900 23-Apr-14 1700 Daily QMwork MSETCL MSETCL169 400 Kasor - SSP 24-Apr-14 800 24-Apr-14 1800 Daily PMM work GETCO GETCO170 220 Bhilad - Vapi (PG) - 3 24-Apr-14 800 24-Apr-14 1800 Daily PMM work PGCIL GETCO171 220 TAPS-Bhilad 24-Apr-14 800 26-Apr-14 1900 Daily Annual maintenance Works GETCO NPCIL172 220 Damoh(PGCIL) - Damoh I C - II 24-Apr-14 900 24-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI173 400 CGPL Jetpur- 1 24-Apr-14 8AM 24-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL

174 220 Kawas-Ichhapore 1 +Bus 2 24-Apr-14 900 24-Apr-14 1400 daily Insulator replcement and routine maintenance NTPC NTPC

175 220 Kawas-Ichhapore 2 +Bus 2 24-Apr-14 1400 24-Apr-14 1900 daily Insulator replcement and routine maintenance NTPC NTPC176 400 Padgha-Talegaon 24-Apr-14 900 24-Apr-14 1700 Daily QMwork MSETCL MSETCL

177 765 765kV Raichur 1 line Reactor at Solapur 25-Apr-14 700 27-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

178 400 400KV Bina -Bhopal Ckt -II 25-Apr-14 900 26-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I179 400 CGPL Jetpur- 2 25-Apr-14 8AM 25-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL180 400 Vindhyachal -Satna-4 Line Shunt Reactor 25-Apr-14 900 25-Apr-14 1900 Daily Basis AMP NTPC NTPC

181 400 Bhusawal-Koradi 25-Apr-14 900 25-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

182 400 Deepnagar-Khadka I 25-Apr-14 900 25-Apr-14 1700 Daily QMwork MSETCL MSETCL183 400 Soja -Kansari 26-Apr-14 800 26-Apr-14 1800 Daily PMM GETCO GETCO184 400 Raipur-Wardha 1 27-Apr-14 800 28-Apr-14 1800 Daily Balance construction work WRTS-1 WRTS-1 C185 220 KAPP - VAPI - 2 27-Apr-14 800 27-Apr-14 1800 Daily Isolator replacement under ASIDE scheme PGCIL GETCO186 400 Soja -Kansari 28-Apr-14 800 28-Apr-14 1800 Daily PMM GETCO GETCO187 220 TAPS-Boisar II 28-Apr-14 800 30-Apr-14 1900 Daily Annual maintenance Works MSETCL NPCIL188 400 400KV Damoh - Katni Ckt 28-Apr-14 900 28-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I189 400 400 KV Damoh(PGCIL)-Katni Ckt 28-Apr-14 900 28-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I190 400 New Koyna-Karad ckt 1 28-Apr-14 830 28-Apr-14 1730 Daily QMwork MSETCL MSETCL

191 400 DC Raigarh-DB Power (Tudri) - KSK 29-Apr-14 800 30-Apr-14 1800 Conti Crossing work of 765kV SC Raigrah-Champa (90 - 100)

WRTS-I WRTS-I C

192 400 Raipur-Wardha 2 29-Apr-14 800 30-Apr-14 1800 Daily Balance construction work WRTS-1 WRTS-1 C193 220 Navsari - Nasik - 1 29-Apr-14 800 29-Apr-14 1800 Daily PMM work GETCOMSETCL GETCO194 220 Seoni(PGCIL)-Chhindwara Ckt-I 29-Apr-14 900 29-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI195 220 Kawas-Vav 1+ bus 2 29-Apr-14 900 29-Apr-14 1800 daily For maintenance work NTPC NTPC196 400 Chorania Asoj-1 30-Apr-14 800 30-Apr-14 1900 Daily PMM GETCO GETCO197 220 Navsari - Nasik - 2 30-Apr-14 800 30-Apr-14 1800 Daily PMM work GETCOMSETCL GETCO198 220 Vapi - TAPS 30-Apr-14 800 30-Apr-14 1800 Daily PMM work PGCIL GETCO199 220 Seoni(PGCIL)-Chhindwara Ckt-II 30-Apr-14 900 30-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI200 220 Kawas-Vav 1+ bus 2 30-Apr-14 000 30-Apr-14 000 daily For maintenance work NTPC NTPC

Annexure-32-C1

List of Emergency Outages availed in Feb 2014

SlNo

Element kV Agency From

Date To Date

Remarks

1 SATNA‐BINA‐II 765 WRTS‐2 4‐Feb‐14

5‐Feb‐14

Hot spot attending

2 SUJALPUR‐NAGDA LR NAGDA

400 WRTS‐2 6‐Feb‐14

19‐Feb‐14

Oil leackage

3 SOLAPUR‐PARLI‐II

400 WRTS‐2 6‐Feb‐14

6‐Feb‐14

Hotspot attend at solapur

4 JABALPUR‐ITARSI‐IV LR AT ITARSI‐LR

400 WRTS‐2 7‐Feb‐14

17‐Feb‐14

Oil leackage

5 APL‐HADALA‐SC 400 GEB 7‐Feb‐14

7‐Feb‐14

Hot spot

6 SOLAPUR‐PARLI(PG)‐1

400 WRTM(REL)

9‐Feb‐14

9‐Feb‐14

Hot spot

7 BOISAR‐BOISAR(PG)‐II

220 MSETCL 9‐Feb‐14

9‐Feb‐14

Hotspots

8 NEW KOYNA‐KARAD ‐ I

400 MSETCL 10‐Feb‐14

11‐Feb‐14

Dc‐earth leakage

9 LONIKHAND ‐ KARAD

400 MSETCL 10‐Feb‐14

11‐Feb‐14

Hotspot

10 NAGDHA ICT ‐ III

400220

MPPTCL 10‐Feb‐14

10‐Feb‐14

Hotspot

11 AKOLA ‐ ABAD ‐I AKOLA

400 WRTS‐1 11‐Feb‐14

12‐Feb‐14

Oil leackage

12 AKOLA ‐ AURANGABAD ‐ I

400 WRTS‐1 11‐Feb‐14

11‐Feb‐14

Oil leackage ion lr

13 BINA‐GWALIOR 765 WRTS‐1 14‐Feb‐ 14‐Feb‐ Attend oil leakage on lr

SlNo

Element kV Agency From

Date To Date

Remarks

II 14 14

14 AKOLA‐TIRORA‐I 765 MSETCL 22‐Feb‐14

23‐Feb‐14

Sparking in LR at Tirora SYED AT TIRORA END

15 KHAEGAR‐ICT‐I 400220

MSETCL 22‐Feb‐14

22‐Feb‐14

Hot spot

16 KHANDWA‐NEPANAGR‐SC

220 MPPTCL 23‐Feb‐14

23‐Feb‐14

Hot spot

17 GWALIAR ‐SATNA ‐ I

765 WRTS‐2 24‐Feb‐14

1‐Mar‐14

Attend hot spot

18 KORBA BUS‐III 400 NTPC 25‐Feb‐14

25‐Feb‐14

Hots pot attend

19 BUS‐1 AT GWALIOR

765 WRTS‐2 13‐Feb‐14

13‐Feb‐14

Checking of blocked BB main‐1 relay

20 RAIPUR‐BWATI‐2

400 WRTS‐1 17‐Feb‐14

17‐Feb‐14

Urgent Removal of LR at Raipur end for DGA violation

21 TAPS‐PADGHE 400 TAPS‐3amp4 19‐Feb‐14

23‐Feb‐14

To attend SF‐6 leakage

22 SATNA‐GWALIOR‐1

765 WRTS‐2 24‐Feb‐14

26‐Feb‐14

To attend hot spots

23 VCHAL‐JABALPUR‐IV

400 WRTS‐2 27‐Feb‐14

27‐Feb‐14

To increase OPGW‐Top conductor clearance to avoid tripping

24 APL‐SAMI‐2 400 APL 26‐Feb‐14

26‐Feb‐14

To attend hot sopt

25 SHOLAPUR BUS‐1

765 WRTS‐1 27‐Feb‐14

27‐Feb‐14

To attend hot sopt

26 BOISAR BUS‐2 220 WRTS‐1 28‐Feb‐14

28‐Feb‐14

To attend hot sopt

Sl No KV element From To Basis Work System Agency Remarks

1220 Vapi (GETCO)‐Bhilad 1‐Feb‐14 800 2‐Feb‐14 1800 Daily Line crossing work of 400KV LILO line for

Magarwada SSGETCO POWERGRID N

2 220 Omkareshwar-Khandwa Ckt

3-Feb-14 900 3-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

3 400 New Koyna-Koyna Stg-4-1

3-Feb-14 830 3-Feb-14 1730 Daily QMwork MSETCL MSETCL N

4220 Vapi ‐ Magarwada

Ckt13‐Feb‐14 900 3‐Feb‐14 1400 Daily AMP of line amp equipment WRTS‐II POWERGRID DD may have to do load

shedding as per Reliability Suggestion

N

5 220 DC Raigarh- Raigarh 1amp 2

4-Feb-14 800 5-Feb-14 1800 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (040-50)

CSPTCL WRTS-I N

6 220 Itarsi(PGCIL)-Hoshangabad Ckt

4-Feb-14 900 4-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N

7 400 Mundra -Limbdi-2 4-Feb-14 800 4-Feb-14 1800 Daily Suspension Insulator replcement and routine maintenance

PGCIL CGPL N

8 400 400 kV DC Satna - Bina 1amp2

4-Feb-14 800 5-Feb-14 1800 Continous Crossing of Jabalpur-Bina 765 kv SC Line PGCIL JTCL N

9220 Vapi ‐ Magarwada

Ckt24‐Feb‐14 0900 4‐Feb‐14 1400 Daily AMP of line amp equipment WRTS‐II POWERGRID N

10 765 Seoni-Bina line with LR 4‐Feb‐14 800 4-Feb-14 1800 Daily AMP Work WRTS-2 WRTS-1 N

11 400 Bus I Bina 5‐Feb‐14 800 5‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

12220 Kawas ‐ Navsari (PG)

25‐Feb‐14 800 5‐Feb‐14 1800 Daily Replacement of ST insulators by Double Tension

insulator in Railway crossing spansWRTS‐II POWERGRID N

13400 Indoer (PG) ‐Indore

(MP) DC5‐Feb‐14 800 6‐Feb‐14 1800 Continou

sStringing of 765kV Indore ‐ Vadodara line WRTS‐II POWERGRID N

14 400 APL - Hadala 6-Feb-14 800 6-Feb-14 1800 Daily PMM GETCO GETCO N N

15 220 Seoni(PGCIL ) - Chhindwara CKT I

6-Feb-14 900 6-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N N

16 400 Jejuri-Koyna stg IV 6-Feb-14 900 6-Feb-14 1700 Daily QMwork MSETCL MSETCL N17 400 Akola-Nandgaonpeth 6-Feb-14 900 6-Feb-14 1700 Daily Quaterly Maintainance Work MSETCL MSETCL N18 400KV Korba-Bhatapara 6-Feb-14 900 7-Feb-14 1900 Cont Testing of LBB auto re-close M-I amp M-II relays NTPC NTPC N19 220 Haldarva - Jhanor - 2

(NTPC)6-Feb-14 900 6-Feb-14 1800 Daily PMM work GETCO N

20220 Navsar (PG) ‐Navsari

(GETCO) 16‐Feb‐14 800 6‐Feb‐14 1800 Daily Replacement of ST insulators by Double Tension

insulator in Railway crossing spansWRTS‐II POWERGRID

N

21 400 Bus‐II Bina 6‐Feb‐14 800 6‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

22400 Seoni‐Khandwa1 6‐Feb‐14 1000 6‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Khandwa end by MS ABB

WRTS‐II POWERGRID Rescheduled to 6th March N

23 400 Rajgarh-Ssp Ckt-II 7-Feb-14 900 7-Feb-14 1600 daily For maintenance work MPPTCL EHT- Mamp I N24 220 Chhegoan-Khandwa

Ckt -II7-Feb-14 900 7-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

25 220 Wardha (PG)-Wardha 7-Feb-14 800 7-Feb-14 1800 Daily AMP Work MSETCL WRTS-I N26 400 Chorania - Vadavi-2 7-Feb-14 800 7-Feb-14 1800 Daily PMM amp Tan Delta testing WRTGPL GETCO N27 400 Jabalpur‐Itarsi1 7‐Feb‐14 900 7‐Feb‐14 1400 Daily AMP OF TERMINAL EQUIPMENT WRTS‐II POWERGRID N

28220 Vapi(PG)‐ Bhilad ckt

2 amp 3 7‐Feb‐14 800 8‐Feb‐14 1800 Daily Line crossing work of 400KV LILO of Navsari‐Boisar

at MagarwadaGETCO POWERGRID N

29 220 Mapusa-Thivim 1 8-Feb-14 800 8-Feb-14 1800 Daily AMP Work GOA WRTS-I N

30400 Seoni‐Khandwa2 9‐Feb‐14 1000 9‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Khandwa end by MS ABB

WRTS‐II POWERGRID Rescheduled to 7th March N

31 220 Chhegoan-Khandwa Ckt -I

10-Feb-14 900 10-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

Annexure-32-C2OCC approved outage not availed in Feb‐2014

32132 132 kV Dhule

Dondaicha line10-Feb-14 800 11-Feb-14 1800 Cont Crossing of Dhule-Vadodara 765 kv SC Line MSETCL BDTCL subjected to sldc

clearance N

33 400132 KV

Vindhyachal ICT-1 10-Feb-14 900 14-Feb-14 1900 Cont ICT Overhauling NTPC NTPC N

34400 KV Vindhyachal - Jabalpur-

3 Line Shunt Reactor10-Feb-14 900 14-Feb-14 1900 Cont Reactor Overhauling NTPC NTPC

N

35 400 KSK-DB Power 10-Feb-14 800 13-Feb-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end WRTS-IDBKSK

KSK N36 220 Ipore-Kawas-1 10-Feb-14 800 10-Feb-14 1800 Daily PMM work GETCO N

37400 Vindhyachal‐Mahan 10‐Feb‐14 800 11‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐I WRTS‐II N

38400 Mahan‐Korba 10‐Feb‐14 800 11‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐I WRTS‐II N

39765 Jabalpur ‐ Bina 1 10‐Feb‐14 1000 10‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Jabalur end by MS ABB

WRTS‐II POWERGRID Differed by siteN

40 400 SSP - Rajgarh - 1 10-Feb-14 800 11-Feb-14 1800 Daily Basis

PMM Work GETCO N

41 400 DC Tundri (DB Power) -ksk-Raigarh

10-Feb-14 800 11-Feb-14 1800 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (092-100)

DB Power WRTS-I N42 400 Jetpur - Amreli - 1 11-Feb-14 800 12-Feb-14 1800 Daily PMM GETCO GETCO N43 400 Hadala - Vadinar-2 11-Feb-14 800 11-Feb-14 1800 Daily PMM GETCO GETCO N44 400 Nagda-Rajgarh Ckt-I 11-Feb-14 900 11-Feb-14 1800 daily For maintenance work MPPTCL EHT- Mamp I N45 220 Mehgaon-Auriya Ckt 11-Feb-14 900 11-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N46 220 Seoni(PGCIL ) -

Chhindwara CKT II11-Feb-14 900 11-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

47

765kV Main Bus-1B at SASANBay 13 - Jack Bus

11-Feb-14 900 21-Feb-14 1800 Daily Jumper Installations amp ConnectionsIsolator Allignment

PGCIL Reliance Provisional Subject to details of works done to be apprised on daily basis

N

48 220 Ipore-Kawas-2 11-Feb-14 800 11-Feb-14 1800 Daily PMM work GETCO N49 220 Navsari - Nasik - 2 11-Feb-14 900 11-Feb-14 1800 Daily PMM work GETCO N

50765 Jabalpur ‐ Bina 2 11‐Feb‐14 1000 11‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Jabalur end by MS ABB

WRTS‐II POWERGRID Deferred by siteN

51 400 Nagda-Rajgarh Ckt-II 12-Feb-14 900 12-Feb-14 1800 daily For maintenance work MPPTCL EHT- Mamp I N52 400 Karad-Solapur (PGCIL) 12-Feb-14 900 12-Feb-14 1700 Daily QMwork MSETCL MSETCL N53 400 Raipur-Sipat 1 amp 2 26-Feb-14 800 3-Mar-14 1800 Conti Diversion of line for Lafarge Railway track WRTS-I Lafarge Ori 12-16 Feb 14 Deferre N54 220 Haldarwa Kawas-2 12-Feb-14 900 12-Feb-14 1800 Daily PMM work GETCO N

55 220 Bus‐I Bina 12‐Feb‐14 800 12‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

56 400 Chorania - Hadala 13-Feb-14 800 14-Feb-14 1800 Daily PMM GETCO GETCO N57 400 Tarpur-Padghe-2 13-Feb-14 800 14-Feb-14 1800 Daily maintenance work POWERG

RIDNPCIL N

58400 Vindhyachal‐Satna1 13‐Feb‐14 1000 13‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

59 220 Bus‐II Bina 13‐Feb‐14 800 13‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

60 220 Pithampur-Rajgarh Ckt - I

14-Feb-14 900 14-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

61 220 Wardha (PG)-Badnera 14-Feb-14 800 14-Feb-14 1800 Daily AMP Work at Wardha MSETCL WRTS-I N

62 400 Bhusawal-Koradi 14-Feb-14 900 14-Feb-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL N

63 400 Raipur-KSK 14-Feb-14 800 16-Feb-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end WRTS-IKSK

KSK N

64 220 GWL(PGCIL)-Malanpur Ckt-II

15-Feb-14 900 15-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N

65 220 Pithampur-Rajgarh Ckt - II

15-Feb-14 900 15-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

66400 Vindhyachal‐Satna2 16‐Feb‐14 1000 16‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

67 220 KAPS - Haldarwa - 1 17-Feb-14 800 17-Feb-14 2000 Daily Yearly PM checks KAPS N

68400 3X105 MVA 400220Kv

X-mer I At Indore ss17-Feb-14 800 18-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI

N

69

220 SC Korba-Raigarh-Budhipadar sc(PGCIL) amp DC Korba-Budipadar both circuits (CSPTCL)

18-Feb-14 800 19-Feb-14 1800 Conti Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCLWRTS-I

WRTS-I

N

70 400 Itarsi-Bhopal Ckt-I 18-Feb-14 900 19-Feb-14 1700 daily For maintenance work MPPTCL EHT- Mamp I N71 220 Badod - Kota Ckt 18-Feb-14 900 18-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N72 220 Damoh(PGCIL) -

Damoh I C - II18-Feb-14 900 18-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

73 220 Badod - Modak Ckt 19-Feb-14 900 19-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

74220 KAPS - Ukai - Mota 19-Feb-14 800 19-Feb-14 2000 Daily Yearly PM checks KAPS Non consent from SLDC

GETCO N

75400 315 MVA 400220 KvX-

mer III At Indore ss20-Feb-14 800 21-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI

N

76 220 Seoni(PG)-Seoni 2 21-Feb-14 800 21-Feb-14 1800 Daily AMP Work MPPTCL WRTS-I Y N77 220 Bina(PGCIL)-Shivpuri

Ckt21-Feb-14 900 22-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI Y N

78 400 Koradi-Nandgaonpeth 21-Feb-14 900 21-Feb-14 1700 Daily QMwork MSETCL MSETCL N N79 220 Haldarva - Jhanor - 1

(NTPC)21-Feb-14 900 21-Feb-14 1800 Daily PMM work GETCO N

80

765kV Main Bus-2A at SASANSatna Line-2

22-Feb-14 900 28-Feb-14 1800 Contionious

Equipment ConnectionsCircuit Breaker TestingJumper MeasurementIsolator Allignment Reactor accessories erection on R-Phase

PGCIL Reliance

N

81 400 Korba-Raipur 3 amp 4 23-Feb-14 800 24-Feb-14 1800 Conti For Bus spliting work at Raipur765 KV Raigarh-Raipur and 765 Champa Raipur lines

WRTS-1 WRTS-1 N

82132 132kV Astha - Polai SC

line of MPPTCL24-Feb-14 800 25-Feb-14 1800 Continous Crossing of Bhopal -Indore 765 kv SC Line MPPTCL BDTCL subjected to sldc

clearance N

83 400 Bus-1 at Bilaspur 24-Feb-14 800 24-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I N

84400 Seoni -

Khedamara(Bhilai) Ckt25-Feb-14 900 25-Feb-14 1800 daily For maintenance workFeeder bay maintenance at

KMaraMPPTCL CSPTCLMPPT

CLNo confirmation on D-3

N

85400 Ranchi-Sipat 1 amp 2 25-Feb-14 800 26-Feb-14 1800 Conti Crossing work of upcoming 765 KV DC

Jharsuguda-Korba amp 765KV SC Ranchi-BilaspurWRTS-I WRTS-I No confirmation on D-3

N

86765 Sasan‐Satna2 25‐Feb‐14 800 26‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐II POWERGRID No confirmation on D-3 N

87400 Bus Reactor1 at Satna 25‐Feb‐14 1000 25‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

88400 400 kV DC Damoh -

Bhopal Line26-Feb-14 800 27-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL Not availed by agency for

rainsN

89400 Raipur-Bhadrawati 2 amp

327-Feb-14 800 27-Feb-14 2100 Daily For Bus spliting work at Raipur765 KV Raigarh-

Raipur and 765 Champa Raipur linesWRTS-1 WRTS-1 Subject to Telemetry from

Durg PS RaipurN

90 400 Birsinghpur‐Vandana Vidyut

27‐Feb‐14 800 27‐Feb‐14 1700 Daily AMP of Terminal Equipment amp line Reactor WRTS‐I POWERGRID Ready N

91 400 Bhusawal-Akola 28-Feb-14 900 28-Feb-14 1700 Daily QMwork MSETCL MSETCL N92 220 Bus-1 at Wardha 28-Feb-14 800 28-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I N93 400 Birsinghpur‐Balco 28‐Feb‐14 800 28‐Feb‐14 1700 Daily AMP of Terminal Equipment amp line Reactor WRTS‐I WRTS‐I Deferred by site N

94 400 Nagda‐Dehgam2 5‐Feb‐14 1000 5‐Feb‐14 1800 DailyCommissioning amp checking of CSD relay in Main CB for reactor switching at Dehgam end by MS ABB

WRTS‐II POWERGRID N

95 400 400kV Satpura Itarsi 10‐Feb‐14 900 11‐Feb‐14 1700 DailyCommissioning of new CB after dismantling of existing TELK make CB at Satpura end amp normalising of line on main CB

POWERGRID

WRTS‐II N

96 765 765 kV Satna - Bina Ckt I

6-Feb-14 800 8-Feb-14 1800 cont Stringing of Jabalpur-Bina 765 kv SC Line PGCIL JTCL Original27-28 Jan14 Def N

97 765400 765400 kV ICT-1 at Bina 20-Feb-14 90000 AM 21-Feb-13 60000 PM Continuou

sCSD commissioning for 400kV Side CB of 765400 kV ICT-1 WRTS-II POWERGRID Deferred by site N

98 400 Nagda - Dehgam 1amp2 20-Feb-14 80000 AM 28-Feb-14 1700 Daily Online PID testing to insulators in both circuits AR shall be kept in non auto mode in both circuits WRTS-II POWERGRID

N

99 220MC Waluj-Chitegaon amp Waluj-Jalna

21-Feb-14 700 21-Feb-14 1900 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad MSETCL WRTS-I

N

100 400 Bus 1 at Asoj 21-Feb-14 000 21-Feb-14 1800 Daily For checking bus stability testing of Piran 1 amp 2 bays (for charging of new line) GETCO WRTS-II N

101 400 Bus-1 at Wardha 22-Feb-14 800 22-Feb-14 1800 Daily Jumper spacers connection at Wardha WRTS-I WRTS-I N102 400 Bus-1 at Raigarh 22-Feb-14 800 22-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I Deferred by site N103 765 Bus - II at Indore 22-Feb-14 90000 AM 23-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Not availed NLDC consenN104 220 Kakrapar-Haldarwa2 22-Feb-14 1000 Hrs 22-Feb-14 1600 Hrs Daily AMP POWERG

RID WRTS-II N

105 400 Bus 2 at Asoj 22-Feb-14 000 22-Feb-14 1800 Daily For checking bus stability testing of Piran 1 amp 2 bays (for charging of new line) GETCO WRTS-II N N

106400 400 kv DC Bhopal -

Bina Line (Ckt I amp II)(Tower no 34 amp35)

23-Feb-14 800 24-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line MPPTCLBDTCL

N

107 765kV SASAN Main Bus-1BBay 10 - Jack Bus 24-Feb-14 800 Hrs 2-Mar-14 1900 Hrs Continuous Dia-4

(Bay-10) - SCCOCC Test of Unit 4 GTSasan Sasan N

108 765 Bus - I at Indore 24-Feb-14 90000 AM 25-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID N

109 765 765 KV Bina-Indore Line 24-Feb-14 0900 Hrs 24-Feb-14 1800 Hrs Daily

For taking spare reactor unit in service amp checking the scheme for spare reactor with 765 KV Bina-Indore Line Reactor at Bina

POWERGRID WRTS-II

Deferred by site N

110 400 Kasor - GPEC 24-Feb-14 800 25-Feb-14 1800 Daily PMM Work GETCO GETCO N111 40022033 315 MVA ICT2 at Kheda 24-Feb-14 900 10-Mar-14 1800 cont modification work in SS lay out CSPTCL CSPTCL N112 400 315 MVA ICT2 at

Gwalior 25-Feb-14 90000 AM 25-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID N

113 400KV V-Satna-4 Line Shunt Reactor 25-Feb-14 1000 25-Feb-14 2000 Daily

Basis AMP NTPC NTPC N

114 400 Raipur-Wardha 1 26-Feb-14 800 26-Feb-14 2000 Daily Balance construction works at Wardha end WRTS-I WRTS-IReady Ori26214 Deferred by site

N

115 400 Bus -I at Indore 26-Feb-14 90000 AM 26-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Deferred by site N116 400 315 MVA ICT3 at

Gwalior 26-Feb-14 90000 AM 26-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID N

117 400 400 kV DC Damoh - Bhopal Line

26-Feb-14 800 26-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL N

118 400 Chorania-Kasor 26-Feb-14 800 26-Feb-14 1800 Daily PMM work GETCO GETCO N119 400 Koradi-Satpura sc 26-Feb-14 800 26-Feb-14 1600 Daily 765KV Tiroda Koradi Transmission LineII crossing

worksPOWERGRID MEGPTCL Cancelled by MEGPTL N

120 400 400 kV DC Damoh - Bhopal Line

26-Feb-14 800 26-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL N

121 400 Raipur-Wardha 2 27-Feb-14 800 27-Feb-14 2000 Daily Balance construction works at Wardha end WRTS-I WRTS-I Deferred by site N122 400 Vindhyachal-Satna2 27-Feb-14 1000 27-Feb-14 1800 Daily Commissioning of CSD Relay in ABB make main

CB at Satna WRTS-II POWERGRID Deferred by site N

123 400 Bus -II at Indore 27-Feb-14 90000 AM 27-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Ready N124 400 315 MVA ICT1 at

Rajgarh 27-Feb-14 90000 AM 27-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID Ready N

125 400400 KV SC Kosamba - Asoj line(730-740)

27-Feb-14 700 27-Feb-14 1800 cont Crossing of Dhule - Vadodara 765 kv SC Line GETCOBDTCL

N

126 400 Indore (MP) -Indore (PG)-DC 27-Feb-14 700 28-Feb-14 1600 Cont Stringing of 765kV Indore - Vadodara line POWERG

RID WRTS-II Deferred by site N

Anaulagnak 33(A)

maaca- 2014 AaOr Ap`Ola 2014 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR MARCH 2014 AND APRIL 2014

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)maaca- 2014 Ap`Ola 2014 maaca- 2014 Ap`Ola 2014

MARCH 2014 APRIL 2014 MARCH 2014 APRIL 2014

1 gaujarat

saIimat 11700 12100 7750 7800

AsaIimat 11740 12140 7760 7810

2 maQya p`doSa

saIimat 8340 9050 5338 5540

AsaIimat 8340 9050 5338 5540

3 CltaIsagaZ

saIimat 3200 3075 1929 1809

AsaIimat 3225 3105 1944 1827

4 maharaYT

saIimat 19000 19150 10200 10300

AsaIimat 19050 19200 10250 10350

5 gaaovaa

saIimat 425 410 300 295

AsaIimat 425 415 310 300

6 dmana dIva

saIimat 340 345 210 205

AsaIimat 345 350 225 210

7 DI ena eca

saIimat 635 640 445 425

AsaIimat 635 640 445 425

8 piScama xao~

saIimat 41961 43047 28500 27900

AsaIimat 42076 43173 29560 28840

Diversity factor of 10401

March 2014 and April 2014

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah frvarI 2014

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 1552 75

]k[- Ukai - 2 1719 75]k[- Ukai - 3 598 75]k[- Ukai - 4 1757 75]k[- Ukai (Total) 5627 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 024 2]k[- ela baI saI eca Ukai LBCH - 2 131 3]k[- ela baI saI eca Ukai LBCH (Total) 154 5 0008

3 kDanaa Kadana - 1 000 0 0005kDanaa Kadana - 2 246 62 0000kDanaa Kadana - 3 223 62kDanaa Kadana - 4 166 63 0000kDanaa Kadana (Total) 634 63 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 431 9 0020 6 kula jalaIya TOTAL(H) 6846 225 0401

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 2060 32 21822 TaoronT pavar ilaimaToD yauinaT DI 7979 125 69803 TaoronT pavar ilaimaToD yauinaT [- 075 122 07584 TaoronT pavar ilaimaToD yauinaT ef 8023 124 66915 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 018811 Qauvarna tapIya Dhuvaran - GT 2 000 0 041912 Qauvarna tapIya Dhuvaran - STG 023 1013 ]ka[- yauinaT 1 Ukai -1 000 0 005114 ]ka[- yauinaT 2 Ukai -2 000 0 010815 ]ka[- yauinaT 3 Ukai -3 3147 200 297216 ]ka[- yauinaT 4 Ukai -4 10588 202 1002617 ]ka[- yauinaT 5 Ukai -5 9496 210 884118 ]ka[- yauinaT 6 Ukai -6 23703 500 1844819 gaaMQaInagar 1 Gandhinagar - 1 000 0 008620 gaaMQaInagar 2 Gandhinagar - 2 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 000 0 029622 gaaMQaInagar 4 Gandhinagar - 4 000 0 036223 gaaMQaInagar 5 Gandhinagar - 5 11676 212 1148924 vaNakbaaorI 1 Wanakbori - 1 10648 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 11069 21026 vaaNakbaaOrI 3 Wanakbori - 3 1891 20627 vaaNakbaaOrI 4 Wanakbori - 4 5244 21228 vaaNakbaaOrI 5 Wanakbori - 5 5531 21029 vaaNakbaaOrI 6 Wanakbori - 6 000 030 vaaNakbaaOrI 7 Wanakbori - 7 8902 20931 ]trna Utran GT 1 000 0 019832 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 000 0 024635 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 000 0 0000

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Anaulagnak 41

ACTUAL GENERATION amp AVALABILITY FOR FEBRUARY 2014Actual vaastivak

Actual vaastivak

37 isaka Sikka - 1 3696 112 439838 isaka Sikka - 2 000 0 017639 kcC ilagnaa[-T Kutch Lignite - 1 4429 71 848640 kcC ilagnaa[-T Kutch Lignite - 2 4037 7241 kcC ilagnaa[-T Kutch Lignite - 3 3646 6742 kcC ilagnaa[-T Kutch Lignite - 4 2215 66 525343 saUrt ilagnaa[-T Surat Lignite - 1 6705 131 682544 saUrt ilagnaa[-T Surat Lignite - 2 7475 131 738745 saUrt ilagnaa[-T Surat Lignite - 3 6965 130 728846 saUrt ilagnaa[-T Surat Lignite - 4 6362 130 688647 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5454 107 848648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5649 11449 jaI Aa[- pI saI ela GIPCL GT - 1 1589 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1587 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1702 3552 jaI Aa[- pI saI ela GIPCL ST - 1 2902 5153 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 020556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 000 0 000060 jaI pI [- saI GPEC GT - 2 267 156 013261 jaI pI [- saI GPEC GT - 3 143 146 002762 jaI pI [- saI GPEC STG 131 17263 jaI esa [- jaI GSEG GT - 1 000 0 098964 jaI esa [- jaI GSEG GT - 2 1181 5065 jaI esa [- jaI GSEG STG 642 2366 Sugen (GT 1 + GT 2) 1767 308 602467 saIpIpI sao Aayaat Imp from CPP+MUNDRA 269359 6881

kula tapIya Total (T) 475652 8386 302021kula jalaIya+tapIya Total (H+T) 482498 8604 302422ivaMD [najaI- Wind Energy 52123kula jalaIya+tapIya+hvaa Total (H+T+Wind) 534621 9539ivainamaya Exchanges 155314 saIimat jaa- maaMga Restricted Energy Req 689935

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 6800 194

11 gaaMQaI saagar Gandhi Sagar 3366 117 008012 raNaa p`tap sagar RPSagar 5883 172 004013 javaahr sagar Jawahar Sagar 4350 99 0050

2 ponca Pench 3052 165 00903 baargaI Bargi 4581 91 00804 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 11764 315 02806 banasaagar Bansagar-2 (Deolondh) 000 07 banasaagar Bansagar-3 (Silpara) 1236 32 00708 banasaagar Bansagar-4 (Zinaha) 1320 22 00509 maoDIKoDa Medikheda 396 63

10 ibarisaMGapur Birsingpur 040 20 002011 Tavaa Tawa 000 012 rajaGaaT Rajghat 165 12 006013 Omkareshwar 10620 402 14 [Midra saagar Indira Sagar 23077 997 0849

kula jalaIya TOTAL(H) MPPGCL 59999 2365 1273Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 6049 98 232502 AmarkMTk II AMK II Unit -2 6080 983 AmarkMTk III AMK III Unit -5 12212 219 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 06505 satpura II Satpura-II Unit 6 10323 180 165906 satpura II Satpura-II Unit 7 5926 1807 satpura II Satpura-II Unit 8 10964 195 191608 satpura II Satpura-II Unit 9 8353 1709 satpura III Satpura-III Unit 10 000 0 2080

10 satpura III Satpura-III Unit 11 9447 182 1909011 esajaITIpIesa 1 SGTPS Unit - 1 9447 182 1909012 esajaITIpIesa 2 SGTPS Unit - 2 10572 18213 esajaITIpIesa 3 SGTPS Unit - 3 9037 192 2064014 esajaITIpIesa 4 SGTPS Unit - 4 10700 18015 esajaITIpIesa 5 SGTPS Unit - 5 28804 51216 SSTPS 6864 587 8930

kula tapIya Total (T) 133714 3002 115350kula jalaIya+tapIya Total (H+T) 193713 5735 116623Injection from WIND 000 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 193713 5735ivainamaya Exchanges 193660 saIimat jaa- maaMga Rest En Req 387372

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 850 120 00902 Gangrel 475 10 00503 Mini Micro KWB 039 7

kula jalaIya TOTAL(H) CSEB 1364 137 0150tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 47 127402 kaorbaa (pU) Korba (E) Unit-2 2764 483 kaorbaa (pU) Korba (E) Unit-3 2764 484 kaorbaa (pU) Korba (E) Unit-4 2784 465 kaorbaa (pU) Korba (E) Unit -5 3685 120 253306 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 247808 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 15410

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 15839 256 1197012 KORBA(EB) Extn - 2 15876 256 11770

kula tapIya Total (T) 119907 1880 10190013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 119907 1880kula jalaIya+tapIya Total (H+T) 121271 2017 102050ivainamaya Exchanges 40207 0saIimat jaa- maaMga Rest En Req 161478 2017

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 9590 585 25142 kaoyanaa III Koyna III 5920 3203 kaoyanaa IV Koyna IV 18012 11324 kaoyanaa DIpIeca Koyna DPH 1442 385 TaTa jalaIya TATA Hydro 10242 741 28836 vaOtrNaa Vaitarna 000 07 eladarI Eldari 528 168 BaTgar AaOr vaIr Bhatgar amp Vir 915 49 pOzana Paithan 175 59

10 itlaarI Tillari 1106 6511 BaIra Tola rosa Bhira Tail Race 374 4112 GaTGar Ghatghar 5297 29313 Anya CaoTo jalaIya Small Hydro (others) 6173 0

kula jalaIya TOTAL(H) 58910 1599 5397Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 7700 1954 naaisak 4 Nasik Unit -4 10772 1965 naaisak 5 Nasik Unit -5 11160 1976 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 28827 5058 Tambao 6 Trombay Unit -6 000 09 Tambao 8 Trombay Unit -8 000 0

10 Tambao 7A gaOsa Trombay -7A (Gas) 7882 135 250411 Tambao 7ba Trombay -7B (WHR) 4499 7212 kaoraDI 5 Koradi Unit -5 5003 16013 kaoraDI 6 Koradi Unit -6 3963 19014 kaoraDI 7 Koradi Unit -7 10015 19015 Bausaavala 2 Bhusawal Unit -2 8329 17016 Bausaavala 3 Bhusawal Unit -3 9248 18017 Bausaavala 4 Bhusawal Unit -4 22734 50518 Bausaavala 4 Bhusawal Unit -5 19742 41519 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 7451 18621 parlaI 5 Parli Unit -5 10626 18022 parlaI 6 Parli Unit -6 14013 25323 parlaI 7 Parli Unit -7 13728 26024 KaprKoDa 1 Khaperkheda Unit -1 11173 20025 KaprKoDa 2 Khaperkheda Unit -2 10373 19526 KaprKoDa 3 Khaperkheda Unit -3 10998 20127 KaprKoDa 4 Khaperkheda Unit -4 12019 20728 KaprKoDa 5 Khaperkheda Unit -5 28882 50730 parsa Paras-3 14447 25731 parsa Paras-4 13504 25932 ]rna Uran (Gas) 18284 33833 ]rna Uran (WHR) 000 148 586234 caMd`pur 1 Chandrapur Unit -1 9087 17735 caMd`pur 2 Chandrapur Unit -2 1816 19436 caMd`pur 3 Chandrapur Unit -3 11737 21037 caMd`pur 4 Chandrapur Unit - 4 11843 46038 caMd`pur 5 Chandrapur Unit -5 7759 45539 caMd`pur 6 Chandrapur Unit -6 24420 44240 caMd`pur 7 Chandrapur Unit -7 23258 041 DhaNaU 1 Dahanu Unit-1 16339 250 1427842 DhaNaU 2 Dahanu Unit-2 16196 250 1427843 CPP 193651 29840044 RGPPL Share 000 0

kula tapIya Total (T) 631479 15369 329920MAH Wind + Solar Generation 16922 0kula jalaIya +tapIya Total (H+T+Wind) 707311 17451 372239

TOTAivainamaya Exchanges 324731saIimat jaa- maaMga Rest En Req 1032042

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1871 26ivainamaya Exchanges 33252saIimat jaa- maaMga Rest En Req 35123 434

C (F) dmana AaOr dIva DAMAN amp DIU 18245 298ja (G) dadra nagar hvaolaI DNH 40600 655

kula DD ampDNH (T) 58845 952Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 9600 160 1399112 tara`pur 2 TAPS Unit -2 11069 16013 tara`pur 3 TAPS Unit -3 36144 545 6584014 tara`pur 4 TAPS Unit -4 36197 54715 kakrapr 1 KAPS Unit -1 15230 545 3134216 kakrapr 2 KAPS Unit -2 14662 547

kula ena pI saI NPC Total 122901 25042 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14008 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 13913 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14076 214 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 32894 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 33204 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 33190 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33176 514

kula kaorbaa KSTPS Total 174461 2498 10394427 ivanQa esaTIpIesa 1 VSTPS Unit-1 12762 21328 ivanQa esaTIpIesa 2 VSTPS Unit-2 12708 21529 ivanQa esaTIpIesa 3 VSTPS Unit-3 12854 212210 ivanQa esaTIpIesa 4 VSTPS Unit-4 12909 214211 ivanQa esaTIpIesa 5 VSTPS Unit-5 12174 215212 ivanQa esaTIpIesa 6 VSTPS Unit-6 12625 214213 ivanQa esaTIpIesa 7 VSTPS Unit-7 31487 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 31075 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 31592 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 31488 512217 ivanQa esaTIpIesa 11 VSTPS Unit-11 30948 512

kula ivanQayaacala VSTPS Total 232623 3750 15107 31 saIpt -1 -SIPAT-1 38822 66400 32 saIpt -2 -SIPAT-2 32404 66500 33 saIpt -3 -SIPAT-3 38930 66300 34 saIpt -4 -SIPAT-4 26383 51600 35 saIpt -5 SIPAT-5 26400 51400

kula saIpt -SIPAT TOTAL 162939 285000 838941 kvaasa gaOsa 1e Kawas GT-1A 792 10742 kvaasa gaOsa 1baI Kawas GT-1B 2623 10943 kvaasa esaTI 1saI Kawas ST-1C 1571 11444 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 4986 304 222951 gaMQaar gaOsa 1 Gandhar GT-1 000 052 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 000 054 gaMQaar esaTI 4 Gandhar ST-4 000 0

kula gaMQaar GGPS Total 000 0 000061 maaOda 1 Mauda -1 19614 514 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 19614 514 1422661 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 000 31 000071 esa esa pI SSP RBPH - 1 6753 19372 esa esa pI SSP RBPH - 2 5907 19273 esa esa pI SSP RBPH - 3 5577 19574 esa esa pI SSP RBPH - 4 5513 19475 esa esa pI SSP RBPH - 5 7237 19476 esa esa pI SSP RBPH - 6 3109 19277 esa esa pI SSP CHPH - 1 1817 4078 esa esa pI SSP CHPH - 2 491 3679 esa esa pI SSP CHPH - 3 000 0710 esa esa pI SSP CHPH - 4 1639 39711 esa esa pI SSP CHPH - 5 901 37

kula esa esa pI SSP Total 38944 1312 389481 kula poMca Pench Total 3052 165 009082 Jindal Injection 38956 083 Amarkantak Lanco 15478 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2372740

(J) ]plabQata Availability 2308426 naoT ivainamaya Net Exchanges -292048 ]plabQa jaa- Energy Availability 2016379

maah frvarI 2014 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR FEBRUARY 2014 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 11532 - - - 11532 020214 1100 4993

saIimat Restricted 11700

AsaIimat Unrestricted 11740 11532 0 28 0 11560 010214 1200 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8366 8366 17022014 0500 5007

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9346 - - - 9346 120214 0900 4986

saIimat Restricted 8340

AsaIimat Unrestricted 8340 9346 0 38 0 9384 120214 0900 4986

nyaUnatma pMjaIkRt maaMga Min Registered Demand 3204 3204 270214 0200

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3210 3210 070214 1900 4989

saIimat Restricted 3200

AsaIimat Unrestricted 3225 3210 233 12 0 3246 070214 1900 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1617 1617 230214 2300 5021

maharaYT MAHARASHTRApMjaIkRt Registered 18510 - - - 18510 050214 1100 4984

saIimat Restricted 19000

AsaIimat Unrestricted 19050 17980 1655 -13 0 19622 190214 1200 5002

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12005 12005 280214 0400 5037

gaaovaa GOApMjaIkRt Registered 425 434 - - 434 130214 1400 5006

AsaIimat Unrestricted 425 434 1 -1 - 434 130214 1400 5006

nyaUnatma pMjaIkRt maaMga Min Registered Demand 311 311 100214 0300

essaar ESSAR(ESIL)pMjaIkRt Registered 487 - - 487 240214 1700 5004

AsaIimat Unrestricted 487 0 0 - 487 240214 1700 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 268 - - 268 250214 1200 5003

AsaIimat Unrestricted 268 0 0 - 268 250214 1200 5003

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 644 - - 644 260214 1200 4999

AsaIimat Unrestricted 644 0 - 644 260214 1200 4999

nyaUnatma pMjaIkRt maaMga Min Registered Demand 508 508 280214

piScama xao~ WESTERN REGIONpMjaIkRt Registered 42253 - - - 42253 110214 1100 4994

saIimat Restricted 41961

AsaIimat Unrestricted 42076 42021 850 235 0 43106 120214 1100 4994

nyaUnatma pMjaIkRt maaMga Min Registered Demand 27524 27524 280214 0400 5040 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

piScama xaoi~ya Baar p`oYaNa kond` mauumba[-

णाली चालन-ISO-I

ANNEXURE-43

माह फरवर 2014 February2014

समातरवतीय चालन PARALLELRADIAL OPERATION

TOTAL OPERATING

HOURS 1 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-NR) 66972

2 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-SR) 67200

टाई लाईन TIE LINE 1 765कवी िसवनी स वधा-I 765kV Sonito Wardha 67200 2 765कवी िसवनी स वधा-II 765kV Seonito Wardha 65247 3 400 कवी िभलाई स कोराड 400kV Bhilai to Koradi 67200

4 400 कवी िभलाई स भिावती 400kV Bhilai to Bhadravati 67200

5 400 कवी रायपर स भिावती-I 400kV Raipur to Bhadravati-I 67200

6 400 कवी रायपर स भिावतीETHII 400kV Raipur to Bhadravati-II 67139

7 400 कवी रायपर स भिावतीETHIII 400kV Raipur to Bhadravati-III 67200

8 400 कवी सातपरा स कोराड 400kV Satpura to Koradi 67200

9 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 67004 10 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 65308 11 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 66259 12 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 67200 13 400 कवी को हापर स मापसा-I 400kV Kolhapur-Mapusa-I 38740

14 400 कवी को हापर स मापसा-II 400kV Kolhapur-Mapusa-II 49532

15 400 कवी वापी स बोईसर 400kV Vapi-Boisar 67200

16 400 कवी रायगढ़ स ःटरलाइट-I 400kV Raigarh to Sterlight-I 66258

17 400 कवी रायगढ़ स ःटरलाइट-II 400kV Raigarh to Sterlight -II 67200

18 400 कवी रायगढ़ स झरसगड़ा-I 400kV Raigarh to Jharsuguda-I 67200

19 400 कवी रायगढ़ स झरसगड़ा-II 400kV Raigarh to Jharsuguda-II 67200

20 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 65028

21 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 66132

22 400 कवी रायपर स वधाETHI 400kV Raipur to Wardha-I 66836

23 400 कवी रायपर स वधाETHII 400kV Raipur to Wardha-II 67200

24 220 कवी कोरबा पव स ब पादर-III 220kV K(E) to Budhipadar-III 63853

Anaulagnak 47Annex-47

maah frvarI 2014 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39514 64944

10287 39711

Levels in Mtrs str maITr maoM

]ka[- Ukai

64392

9914

25402

25994

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF FEBRUARY 2014

ivavarNa Particulars

TRIPPING DETAILS FOR THE MONTH OF FEBRUARY 2014

Sr No Brief Details of incident (Elements Generation Tripped) Owner Utility Date amp Time Load

Gen LossCategory

1 Multiple Tripping from 400 kV New Koyna MSETClMSEGCLRGPPL 05‐02‐2014 0950 Hrs ‐ GI‐2

2Bus Bar protection mal‐operation at 400 kV Soja in Gujarat resulting in multiple Tripping

GETCO 06‐02‐2014 1755 Hrs ‐ GI‐2

ANNEXURE ‐ 5

  • annexpdf
    • 21pdf
    • 231pdf
    • 232pdf
    • 24pdf
    • 25pdf
    • 31pdf
    • 32C1pdf
    • 32C2pdf
    • 33Apdf
    • 41pdf
    • 42pdf
    • 47pdf
    • 5pdf
Page 14: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014

14

457th OCCM AGENDA

ITEM NO 95 CHARGING OF NEW TRANSMISSION ASSET IN THE GRID In order to have better coordination of the transmission utilities with RLDCNLDC during charging synchronization of new elements into the grid a communication has been received from NLDC (ref POSOSCONLDCSystem OperationOutage Planning1239) on 10022014 It has been proposed that

a Owner of the asset shall submit the request for expected chargingcommissioning of new element for the calendar month latest by 5th day of the month to the respective RLDC amp NLDC along with status of activities mentioned in the check-list

b RLDC shall study the impact of the new element commissioning and based on its assessment of the preparedness of the utility may recommend to NLDC who in turn would examine the issue independently considering pan India grid scenario

c After the above the owner of the new asset shall give its readiness to charge the new element atleast three days in advance with current status of activities mentioned in the check list

Check list is as under 1 List of elements to be charged along with the details of approval of the

transmission scheme from the Standing CommitteeCTUSTU 2 Single Line Diagram of the concerned substations along with status of

completion of each diabusbreakers 3 Availability of real-time data and communication to the designated

SLDCRLDC 4 Installation of Special Energy Meter complying with CEArsquos Regulations

(Serial number Meter number CTPT ratio to be indicated) 5 Charging Instructions by CTUSTU 6 Schedule and sequence of charging of elements 7 Availability of line bus reactors as per planning In case the transmission

system is planned to be charged without the planned line reactor requisite authorization from CTUSTU by studies

8 Connection Agreement (along with all annexures) with CTU or STU 9 Copy of Long term Access (LTA) or MTOA granted by CTU or STU as the

case may be 10 Copy of Power Purchase Agreement (PPA) 11 A signed undertaking with name and designation of the officer clarly

indicating the following a All Disturbance recorders (DR) and Event Loggers (ELs) with time

synchronization are commissioned b All protective systems have been commissioned c All statutory clearances have been obtained

12 Output of EL and DR after charging

15

457th OCCM AGENDA

Each document mentioned in check list from Sl No 1 to 10 must be attached for sake of completeness and emailed as a consolidated document to the nodal RLDC well before the new element charging date The sub-committee may like to discuss ITEM NO 96 OPENING FEEDERS WITHOUT PRIOR INTIMATION TO WRLDC

It was gathered based on the observation from WRLDC SCADA data and subsequent

discussion with MPPTCL that 220 kV Bina (MP)-Gwalior(MP) DC were taken under

shut down for LILO works at Datia at 0910hrs on 23022014 for 4 days The outage

of these lines was neither discussed in OCC and neither was there any intimation to

WRLDC before availing the outage These lines are included in the important grid

elements list of Western region and prior concurrence of WRLDC is required for

switching these lines Further these lines form the parallel path to 765 kV Bina-Gwalior

DC and with the shutdown of these lines the network upstream of WR-NR inter

regional corridor was depleted

The sub-committee may like to discuss ITEM NO 97 TRIPPING OF 765 KV LINES ON OVER VOLTAGE Recently several tripping of 765 kV lines have been reported on over voltage These are indicated below

1) 765 kV Bina-Gwalior I at 2358 hrs of 16022014 2) 765 kV Bina-Gwalior I at 2011 hrs of 14022014 3) 765 kV Satna-Gwalior at 1300 hrs of 06022014 4) 765 kV Sasan-Satna II at 0013 hrs of 18012014 5) 765 kV Jabalpur-Bina I at 2350 hrs of 10012014 6) 765 kV Jabalpur-Bina II at 0405 hrs of 06012014

It is understood that the adopted Stage-I OV setting for the above lines vary from 108 (ie 826 kV) to 110 (841 kV) As per SCADA data the bus voltage at any of the substations mentioned above had not reached 826 kV during the above incidents

POWERGRID may examine the above tripping in detail and apprise the OCC regarding the above In case of issues related with protective relays field equipment are detected these may be addressed at the earliest The sub-committee may like to discuss

16

457th OCCM AGENDA

ITEM NO 98 RGMO FGMO OF MANDATED GENERATORS IN WESTERN REGION

As per the latest information available at WRLDC there are 251 number of units with a total capacity of 57517 MW in Western Region that are mandated to operate in Restricted Free Governor Mode The need for compliance to the IEGC regulations wrt RGMOFGMO was emphasized in the 455th and 456th OCC meeting as well as during the 25th TCCWRPC meeting Subsequently it was communicated by email to all entities in WR to provide the latest status of RGMOFGMO implementation We have received updated status from MPPTCL LANCO CGPL DB Power and JPL Tamnar in Feb 2014 The latest state wise RGMOFGMO summary is given below

Name of Entity No of mandated units

RGMO FGMO available at

RGMOFGMO Not available at

Maharashtra 90 35 55 Madhya Pradesh 58 36 22 Gujarat 35 19 16 Chhattisgarh 10 3 7 CGPL 5 5 0 NCA 11 6 5 SASAN 2 1 1 NTPC 24 10 14 ESSAR_Mahan 1 1 0 NSPCL 2 2 0 KSK 1 1 0 KWPCL 1 0 1 DB POWER 1 1 0 JPL 5 4 1 LANCO 2 2 0 IEPL 1 0 1 EMCO 2 0 2 WR_Total 251 126 125

WRLDC vide its letter ref WRLDCRGMO-FGMO1-2014 dated 23012014 has issued directions under Section 29 of the Electricity Act to ensure compliance of IEGC regulations 52 (f) (g) (h) and (i) All utilities are requested to furnish the status of compliance in respect of generating units under their jurisdiction The sub-committee may like to discuss ITEM NO 99 STATUS OF TELEMETRY IN WESTERN REGION

The status of telemetry related issues in respect of WR constituents is as under

a) Chhattisgarh Data (except MW) from 500 MW Korba West extension generating station is not available Status points from 400 kV Raita pending

17

457th OCCM AGENDA

b) Madhya Pradesh Telemetry of following bus reactors is not available at WRLDC

S No

Station Name Bus Reactor

Nunber x Capacity

Total MVAR

Rated voltage

Status of Telemetry at

WRLDC1 Nagda 250 100 420 Not available2 Indore 225 50 33 Not available3 Bhopal 225 50 33 Not available4 Birsinghpur 150 50 420 Not available

c) Gujarat Data is not-availableintermittent from following stations in Gujarat

a 220 kV Nano of Tatamdash(not available) b Kansari 400 kV ss and Navsari 220 kVhellipIntermittent (PLCC Problem)

d) Goa Due to non-availability of SCADA data from Goa the difference between drawal as seen in SCADA and as recorded in SEM is as high as 572 during the period 1st Feb to 16th Feb 2014 Data from the following stations in Goa is not available at WRLDC S No Station Status

1 Amona 220 kV Not available 2 Cuncolin 220 kV Not available 3 Kadamba 110 kV Intermittent 4 Tivim 220 kV Intermittent 5 Ponda 220 kV Intermittent 6 Xeldam-220 kV Intermittent 7 Verna-110 kV Intermittent

e) Daman amp Diu

Due to non-availability of SCADA data from Daman amp Diu the difference between drawal as seen in SCADA and as recorded in SEM is as high as 571 during the period 1st Feb to 16th Feb 2014 Data from The error is mainly due to non-availability of data from 220 kV Magarwada

f) DNH Telemetry from 220 kV Kharadpara and Khadoli station is not available

g) POWERGRID The data from the following stations is not available at WRLDC

1) 765 kV Tamnar (Communication problem GPRS link is not stable)

18

457th OCCM AGENDA

Telemetry from following stations is Intermittent at WRLDC 1) 765 kV Durg (PLCC frequent problems)

2) 765 kV Kotra (communication intermittency)

3) 765 kV Gwalior (PLCC link established but still there is some

issue(Delay) in data updation at WRLDC Rectification work under

progress by Site Engineer

4) 765 kV Solapur - Redundant link established through Reliance but

the gateway connected to above link is not configured for 765 KV

data Hence when BSNL link is down 765 KV data is not updating at

WRLDC

The sub-committee may like to discuss

ITEM NO 910 COMPARISON OF DRAWAL AS SEEN IN SCADA VS SEM The IEGC second amendment and the Deviation Settlement Mechanism is in force since the 17022014 The IEGC stipulates maintaining injection drawal within the limits prescribed in the Deviation Settlement Mechanism The sub-committee may like to discuss ITEM NO 911 MOCK BLACK START EXERCISE

As per sec 58(b) of IEGC the usersSTUs etc need to conduct Black start mock

exercises in their respective systems once in every six month under intimation to

RLDC Also the all the black start Diesel Generator (DG) sets are [as per sec 58(b)

of IEGC] required to be tested weekly and the test report needs to be sent to RLDC

on quarterly basis

The following table summarizes the status of mock exercises in respect of black start

facilities in Western Region

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

GUJARAT

1 Ukai (H) 4 x 75 Hydro Diesel 500 kVA 221213 Y

2 Mini Hydro 2 x 25 Hydro Diesel 50 KW N

3 Kadana 4 x 60 Hydro Diesel 500 KVA 2413 Y (2413)

19

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

4

Dhuvaran

1 x 107 (68+39) + 1 x 112 (72+40)

Gas

Details to be furnished by Gujarat

Details to be furnished by Gujarat

N

5 GIPCL-I 3 x 32 + 1 x49

Gas Steam Diesel 141 KW

070912 Y

6 GIPCL-II 1x104+1x56 Gas Steam Diesel 500 kVA N

7

Torrent Power Stn C Stn- DEFCCPP

StnC2x30 StnD120 StnEF(110MW each)CCPP100MW

Thermal (Units-CDEF) Gas(CCPP)

Stn-C islands Diesel

StnC15kVA StnDE F and CCPP(500 kVA each)

281112

Y

8 GPEC 3x138+1x241 Thermal Natural Gas 3000 kVA N

9 Sugen 3x3825 MW Gas Diesel 2x6MVA N

Madhya Pradesh

10 Gandhisagar 5 x 23 Hydro DG set 100 kVA N

11 Birsinghpur 1 x 20 Hydro Battery 220 Volt

Battery N

12 Pench 2 x 80 Hydro DG set 250 kVA 121012 Y

13 Bargi 2 x 45 Hydro DG set 250 kVA 100212 Y

14 Bansagar Stage-I 3 x 105 Hydro DG set 250 kVA N

15 Indira Sagar 8x125 Hydro DG set 2x1000

KVA 22511 Y

Chhattisgarh 16

Hasdeo Bango 3 x 40 Hydro DG Set 250 kVA 250812 N

17

Korba(E)-phse-I

Power plant retired but Black start DG set available and on- load trial is reported to be carried out regularly

DG Set 1500 kW(33kV)

N

Maharashtra

18

Koyna I amp II

4 x 65 4 x 75 Hydro

House generator

2 MVA 231013 N

19 KDPH 2 x20 Hydro DG set 310 KW N

20 Eldari 3 x 75 Hydro DG set 6 KW N

21

Uran (Gas)

4 x 60 (GT) + 4x108 (GT)+ 2x120 WHR

Gas DG set

4 MW PH1412kVA PH2450kVA WH520kVA

161012

N

20

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

22 RGPPL

Block 1 640MW+Block 2 66354MW+Block 3 66354MW

Gas

Gas Turbine (Frame-6)

35 MW (Under testing) Details to be provided by RGPPL

N

23 Ghatghar 2x125 Hydro DG set 1x1250

kVA 51012

N

24 Khopoli 3x24+2x12 Hydro

DC Governor amp bearing oil pumps

DC power (self start)

271013 (detailed report awaited)

N

25 Bhivpuri 3 x 24 +

2 x 15 +2x12 Hydro

DC Governor amp bearing

-do-

N

26 Bhira 6 x 25 Hydro

1 Noof 500 KVA house generator with water turbine

500 kVA

201013 (detailed

report awaited)

N

27

Bhira PSS 1 x 150 Hydro DG set 500 kVA

N

28 Trombay 1 x 120 Gas

Turbine DG Set 25 MW

N

1 x 60 Steam Turbine

NTPC

21

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

29 Kawas 4 x 106 2 x 116 Gas Diesel 2850 KW 151013

N

30 Gandhar 3 x 144 + 1x225 Gas Diesel 2975 KW

N

NCA

31 SSP(RBPH amp CHPH) 6x200+550 Hydro Diesel 2x1000kVA 080412

N

Accordingly the Black start capable stations may forward their tentative plan for conducting Black start exercises in compliance to sec 58(b) of IEGC bull As per the communication for MPPTCL the tentative plan of Black start in Madhya

Pradesh system is given under SL No Name of the Station Tentative Date Remarks 1 Pench March 2014 DG set at Pench amp are Bargi

under outage 2 ISP Apr-May 2014 - 3 TONS June 2014 Governor Problem being

attended 4 Birsinghpur June 2014 -do- 5 Medikheda June 2014 -do- 6 Rjghat June 2014 -do- Other utilities may also update their tentative plan for black start

The sub-committee may like to discuss

22

457th OCCM AGENDA

ITEM NO 912 HEALTHINESS OF MAIN CIRCUIT BREAKER OF 400 KV BIRSINGPUR-KATNI-I AT KATNI END The main CB of Birsingpur-Katni-I is under shut down since 2350 hrs of 14th February 2013 Representatives from MPPTCL may kindly apprise on the progress and expected date of restoration of the Main CB of 400 kV Birsingpur-Katni-I at Katni end The sub-committee may like to discuss

ITEM NO 913 TESTING OF SPS RELATED TO TRIPPING OF BINA-GWALIOR-AGRA AT CGPL VINDHYACHAL AND KORBA

As per the information received from NTPC and CGPL the SPS for the 765 kV Bina-

Gwalior-Agra has been installed and a mock drill has to be carried out for the same

The matter was discussed in the 456th OCC and it was decided that SPS may be

tested for reduction of say 50MW for each station instead of backing down of entire

500MWs POWERGRID WRTS-2 may confirm the testing schedule so that the

same could be coordinated in from WRLDC

The sub-committee may like to discuss

ITEM NO 914 SPS AT SIPAT WRLDC vide letter No WRLDCMO-I17192013 dt 21613 requested to take up this matter with the concerned for early implementation of the SPS Status of the SPS at NTPC Sipat is as under

1 449th OCC SPS was proposed by WRLDC It was decided to have a

separate meeting to finalize the scheme 2 450th OCC Member Secretary WRPC intimated that the matter will be

discussed in 119th PCM on 3rd amp 4th September 2013 at Tarapur 3 451st OCC It was intimated that the issue of SPS of Sipat was discussed in

119th PCM held on 3rd amp 4th September 2013 at TARAPUR The tentative scheme were formulated which needed finer tuning

4 452nd OCC Matter not discussed 5 453rd OCC NTPC representative intimated proposal sent to their corporate

office for engineering approval 6 454th OCC Approval from our corporate office is yet to be obtained 7 455th OCC Approval from our corporate office is yet to be obtained 8 456th OCC Approval from corporate office has been obtained and would be

forwarded to WRPC for approval The sub-committee may like to discuss

23

457th OCCM AGENDA

ITEM NO 915 SPS AT 4X300 MW BALCO IPP The SPS at 2010 MW Balco (4x675MW + 4x135 MW + 4x300 MW) was to be commissioned by Nov 2013 before commissioning of first unit of 4x300 MW Balco IPP For the new SPS scheme envisaged for the Balco CTU connection namely the Grid Islanding and Load Management Scheme (GILMS) Balco had reported to have placed an order with Ms SEL As discussed earlier the scheme suggested by WRLDC may be implemented before commissioning of first unit of 300 MW It was intimated during the 456th OCCM by the Balco representatives that the SPS shall be commissioned by March 2014

The sub-committee may like to discuss

ITEM NO 916 ACTIONS TAKEN FOR REVIVAL OF TRANSMISSION ELEMENTS UNDER LONG OUTAGE

As per the information available at WRLDC following elements are out for a

long period

Sl No Date of

outage

Reason

ISTSIPP

1 80 MVAR BR at

ESSAR(Mahan)

231213 Oil leakage

2 125 MVAR BR at JPL 120513 Hydrogen formation

3 50 MVAR LR of Indore-Asoj-II

at Indore

190613 R phase bushing burst

4 50 MVAR LR of Birsingpur-

Damoh at Damoh(PG)

13102014 Oil Leakage

5 765 kV Durg-Kotra-I 24022014 Sparking in Isolator

6 400 kV Raipur-Raigarh-IV 18012014 Voltage Regulation

MSETCL

1 400 kV RGPPL-NrsquoKoyna-I 22012014 Voltage Regulation

2 400 kV Sholapur-

Sholapur(PG)

26022014 Tower Collapse

MPPTCL

1 400 kV Birsingpur-Katni-I 28012014 Voltage Regulation

24

457th OCCM AGENDA

2 50 MVAR LR of Indore-Asoj-II

at Indore

6012014 DGA Violation

CSPTCL

1 400220 kV Bhilai-II 24022014 Maintenance

OCC may like to be apprised of the actions being taken for expediting revival of

the above elements

The sub-committee may like to discuss

ITEM NO 917 STATUS OF 220 KV KOLHAPUR-MUDSINGHI-CHIKODI- BELGAM LINE Consent for trial operation of 220 kV Kolhapur-Mudsinghi-Chikodi- Belgam line in radial mode for supply of Karnataka load from Maharashtra side was granted after discussion in the 455th OCC meeting WRLDC is in receipt of letter from SRLDC regarding concurrence for the above arrangement SLDC Kalwa may apprise the OCC regarding the present status The sub-committee may like to discuss

ITEM NO 918 CONTRIBUTION OF GENERATORS IN VOLTAGE CONTROL The contribution of generators in WR in voltage control was analyzed during 456th OCC meeting It was noted that following units were injecting reactive power even during high voltage

1 210 MW units of Khaparkheda Koradi and Chandrapur (Maharashtra) 2 210 MW units of Satpura and Birsinghpur (Madhya Pradesh) 3 210 MW unit 23 of Korba West (Chattisgarh) 4 200 MW unit 34 of Ukai (T) in (Gujarat)

Utilities were requested to check the setting of AVRGT tap and revert back with findings Members may apprise OCC regarding the status The sub-committee may like to discuss

ITEM NO 919 REAL-TIME MONITORING OF FEEDERS SUBSTATIONS THAT ARE COVERED UNDER THE AUFLS Telemetry of feeders substations covered under the AUFLS is desirable for real-time assessment of the anticipated relief that would be available from the AUFLS scheme at any given instant of time CERC has also directed all the constituents to for

25

457th OCCM AGENDA

mapping of these feeders in the SCDA of SLDCsRLDC Members may like to deliberate further The sub-committee may like to discuss

ITEM NO 920 LOAD FORECASTING As per the amended Indian Electricity Grid Code that is effective from 17th February 2013 the SLDCs SEB distribution licensees shall always restrict the net drawal of the State from the grid within the drawal schedule keeping the deviations from the schedule within the limits specified in the Deviation settlement mechanism regulations Therefore it is imperative that adequate attention may be paid towards load forecasting The matter was discussed in the 455th and 456th OCC as well as in the 25th TCCWRPC board meeting wherein it was decided to create a task force for exploring development of a software for load forecasting Members may like to deliberate further The sub-committee may like to discuss

ITEM NO 921 IMPLEMENTATION OF THE REVISED AUFLS IN GOA DD AND DNH It was decided during the 455th and 456th OCC meeting as well as during 25th WRPC meeting that Goa DD and DNH shall complete the implementation of the revised AUFLS in Goa DD and DNH at the earliest Representatives from the Goa DD and DNH may apprise the status of the progress The sub-committee may like to discuss

ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING As per meeting roaster circulated during 452nd OCC meeting the 458th OCC Meeting

will be hosted by Maharashtra and may be scheduled on 16th amp 17th April 2014

Maharashtra may confirm the same

Anaulagnak 21

maah frvarI 2014

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5051 Hz BETWEEN 0200 Hrs amp 0300 Hrs Hrs ON 28022014

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4970 Hz BETWEEN 1800 Hrs amp 1900 Hrs Hrs ON 28022014

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 5006 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5071 Hz AT 0210 Hrs ON 28022014

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4937 Hz AT 185000 Hrs ON 28022014

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS FEBRUARY 2014 JANUARY 2014 DECEMBER 2013

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 001 005

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 041 061 188 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 1069 5423 4864 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 4014 3569 3987

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 4876 946 956

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING FEBRUARY 2014

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

Voltage Profile during the month of Feb 2014

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 421 401 426 403 409 409 408 408 415 399 414 402 424 413 417 3922 420 402 423 404 409 409 408 408 417 402 418 404 425 415 420 3993 421 399 426 400 429 405 425 402 412 399 419 408 423 410 413 3964 422 402 426 404 430 406 428 401 414 400 414 404 424 412 414 3965 420 396 423 400 409 409 408 408 413 396 415 401 424 411 415 3996 420 396 426 400 428 405 426 402 415 398 416 402 423 411 412 4007 420 394 424 399 430 402 427 401 416 399 417 402 423 409 416 3968 418 393 422 397 409 409 408 408 416 399 416 402 422 409 418 3989 418 399 423 404 409 409 408 408 417 402 417 407 419 409 419 400

व तदाब परखा फरवर 2014 स नक Annex-23

इदौर इटारसी कराड धल असोज कासोर िभलाई जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

10 419 394 423 399 409 409 408 408 416 400 415 401 420 408 417 39511 421 393 426 397 429 405 427 401 44 399 419 404 423 407 414 39912 419 395 422 400 409 409 408 408 416 401 419 407 421 410 418 39813 420 396 424 401 409 409 408 408 417 400 416 401 421 409 418 40114 421 399 424 403 430 419 428 414 417 402 415 402 421 409 417 40015 423 397 424 399 428 414 429 412 417 398 406 406 421 407 418 40016 423 397 424 400 431 404 424 401 416 401 422 409 421 409 418 40317 421 402 424 403 432 414 420 404 416 402 412 405 422 410 417 39818 420 397 423 399 409 409 408 408 416 400 414 401 422 414 416 40019 420 396 423 399 409 409 408 408 411 398 418 405 421 413 413 39920 417 397 420 402 429 406 426 401 413 399 416 404 421 413 410 39821 419 399 422 402 430 407 421 401 415 401 418 406 422 411 414 39722 419 397 422 402 432 409 423 401 416 400 413 402 423 413 414 40023 420 396 423 397 430 412 428 404 414 404 415 402 427 414 416 40324 421 399 423 401 433 411 425 400 416 398 414 402 427 415 418 40225 421 399 423 401 433 411 425 400 416 398 414 402 427 415 418 40226 420 397 423 404 431 411 428 409 411 397 415 404 424 414 412 39327 418 398 426 403 409 409 408 408 417 399 418 402 429 415 419 39128 421 400 427 406 409 409 408 408 414 400 416 403 430 415 418 401

423 393 427 397 433 402 429 400 417 396 422 401 430 407 420 391

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 424 404 415 392 424 404 431 407 766 746 797 765 800 756 804 7692 422 406 417 398 426 404 434 407 769 754 798 774 801 769 804 7773 423 405 416 402 426 401 432 410 767 750 796 768 802 773 805 7764 426 407 417 402 423 403 430 408 768 751 797 779 801 776 808 7785 422 403 415 398 423 397 430 400 768 749 797 767 798 763 797 7586 425 404 417 401 423 399 432 404 768 750 797 767 802 773 807 7707 427 401 419 397 423 396 431 404 770 741 800 763 807 769 809 7698 422 403 416 403 424 395 427 399 756 737 788 756 801 765 802 7679 422 405 416 401 424 402 427 404 755 738 786 758 804 773 804 775

10 421 400 414 396 423 398 429 403 3 88 6 98 6 801 60

वािलयर बनाBina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

बना वािलयर नागदा खडवा िसपत िसविन

10 421 400 414 396 423 398 429 403 755 737 788 765 798 765 801 76011 423 397 414 390 426 396 433 399 758 736 794 750 800 752 802 75612 420 403 414 395 423 397 428 403 757 739 787 759 801 763 798 77013 424 405 417 400 427 397 430 402 759 740 794 760 804 773 803 77214 426 410 420 406 424 400 431 405 761 740 794 766 810 780 808 78215 425 404 417 399 426 399 430 401 762 738 794 962 808 768 806 76816 426 406 422 400 427 402 429 400 759 739 792 760 815 774 811 77617 429 407 417 398 427 404 427 406 761 742 792 762 805 765 810 77418 426 404 418 395 423 399 427 404 763 748 793 768 805 759 806 76819 423 409 415 394 422 399 428 403 759 737 795 765 804 758 806 76720 421 406 410 397 420 398 426 406 765 749 795 771 791 766 799 77421 423 407 424 399 423 403 428 405 759 744 792 760 795 761 800 76722 425 406 414 398 423 400 425 404 760 743 790 762 794 762 800 76823 425 402 412 392 424 400 428 405 758 740 790 759 796 755 799 76124 425 401 411 393 423 401 427 403 760 744 796 764 792 757 798 75625 421 408 412 395 423 401 427 403 756 742 793 766 795 764 795 76926 422 405 413 390 421 399 426 402 757 739 789 760 796 750 798 76127 426 407 416 393 421 401 431 403 760 741 795 762 803 755 804 76228 428 409 414 392 423 403 432 405 762 740 795 753 809 775 803 771

429 397 424 390 427 395 434 399 770 736 800 750 815 750 811 756

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Feb-14 0 0 0 0 0 0 0 02 02-Feb-14 0 0 0 0 0 0 0 03 03-Feb-14 0 0 0 0 0 0 0 04 04-Feb-14 0 0 0 0 0 0 0 05 05-Feb-14 0 0 0 0 0 0 0 06 06-Feb-14 0 0 0 0 0 0 0 07 07-Feb-14 0 0 0 0 0 0 0 08 08-Feb-14 0 0 0 0 0 0 0 09 09-Feb-14 0 0 0 0 0 0 0 0

10 10-Feb-14 0 0 0 0 0 0 0 011 11-Feb-14 0 0 0 0 0 0 0 012 12-Feb-14 0 0 0 0 0 0 0 013 13-Feb-14 0 0 0 0 0 0 0 014 14-Feb-14 0 0 0 0 0 0 0 015 15-Feb-14 0 0 0 0 0 0 016 16-Feb-14 0 0 NIL NIL NIL 017 17-Feb-14 0 0 0 0 0 0 0 018 18-Feb-14 0 0 0 0 0 0 0 019 19-Feb-14 0 0 0 0 0 0 0 020 20-Feb-14 0 0 0 0 0 0 0 021 21-Feb-14 0 0 0 0 0 0 0 022 22-Feb-14 0 0 0 0 0 0 0 023 23-Feb-14 0 0 0 0 0 0 0 024 24-Feb-14 0 0 0 0 0 0 0 025 25-Feb-14 1 17 0 0 0 0 0 026 26-Feb-14 0 0 0 0 0 0 0 027 27-Feb-14 0 0 0 0 0 0 0 028 28-Feb-14 0 0 0 0 0 0 0 0

Max 1 17 0 0 0 00 0 0Total 1 17 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month FEBRUARY 2014

Recommonded Load relief at 492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE-25

Power CutRestrictions in Western Region for the month of February-2014 k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply(DLF)

01022014 28022014 2344 2240 2332

21 Three-Phase Supply(Irrigation)

01022014 28022014 0956 0905 0946

21 Three-Phase Supply(Mixed)

01022014 28022014 2343 2227 2330

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01022014 28022014 2353 2337 2347 32 District Head Qtrs 01022014 28022014 2355 2340 2351 33 Tehsil Head Qtrs 01022014 28022014 2349 2309 2341

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid

1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 010214 to 280214

SaUnya Nil

0-1655MW

SaUnya Nil

0000

SaUnya Nil 2400

SaUnya Nil

95 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-

2 Power supply to Agricultural Sector ivavarNa Details sao From

idnaaMk Date tk To

idnaaMk Date p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs) 21 Three-Phase Supply 01022014 28022014 1000 0800 0900

22 Single-Phase Supply 01022014 28022014 1800 1800 1800 3 Anya jaanakarI Any other information

There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

11107 (Av) of 23 days 0000(Av) 0000 (Av)

1Rural 9031(Av) for 3486 Hrs 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0666 - -

0105 -

3 HT Industries 000 (Av) for 00 Hrs 000 Total Energy Cutday 0771 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01022014 to 280214 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 2322014 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का फरवर 2014का वःता रत यौरा

Details of forced unit outages during the month ofFeb2014

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 एःसार वा डनर

ESSAR VADINAR-I

गरा विनिल GSECL

660 2156 20-Jan-14 2018 10-Feb-14 Coal shortage

2 एःसार Essar-2

गरा विनिल GSECL

172 1212 22-Feb-13 अनपल ध Still out

अनपल ध Still out

Shortage of gas

3 एसएलपीपी SLPP-1

गरा विनिल GSECL

125 1445 23-Feb-14 1237 27-Feb-14 BTL

4 एकएलट पीएसAKLTPS-1

गरा विनिल GSECL

125 1147 26-Feb-14 अनपल ध Still out

अनपल ध Still out

DCS FAIL

5 एपीएल APL - 2

अदानी ADANI

330 056 3-Feb-14 अनपल ध Still out

अनपल ध Still out

Turbine vibration bearing probl em

6 एपीएल APL-5

अदानी ADANI

660 1732 15-Feb-14 456 27-Feb-14 Turbine vibration

7 एपीएल APL - 6

अदानी ADANI

660 2049 25-Feb-14 1947 3-Mar-14 Coal mill problem

8 टाटा TATA-6

मारा वउकिल MSPGCL

500 2352 19-Jul-13 अनपल ध Still out

अनपल ध Still out

For Economy SD

9 वीआईपीएल VIPL-I

मारा वउकिल MSPGCL

300 105 2-Oct-13 अनपल ध Still out

अनपल ध Still out

Turbine bearing vibration probl em

10 टाटा TATA-8

मारा वउकिल MSPGCL

250 2255 9-Jan-14 अनपल ध Still out

अनपल ध Still out

HT due to fire near turbine generator desk

11 चिपर Chandrapur-2

मारा वउकिल MSPGCL

210 1238 14-Jan-14 1310 23-Feb-14 ID fan problem

12 कोराड KORADI-6

मारा वउकिल MSPGCL

210 651 24-Jan-14 1456 14-Feb-14 Coal bunkering problem

13 डब यपीसीएल WPCL-1

मारा वउकिल MSPGCL

135 1245 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Furnace press high

14 डब यपीसीएल WPCL-3

मारा वउकिल MSPGCL

135 421 7-Feb-14 Ready Ready Less requisition

प म ऽय भार षण कि म बई णाली चालन-ISO-I

15 चिपर CPUR - 6

मारा वउकिल MSPGCL

500 1523 11-Feb-14 2033 13-Feb-14 BTL

16 नािसक NASIK-3

मारा वउकिल MSPGCL

250 300 11-Feb-14 100 19-Feb-14 UAT problem

17 कोराड KORADI-5

मारा वउकिल MSPGCL

210 153 14-Feb-14 अनपल ध Still out

अनपल ध Still out

ID fan problem

18 ितरोडा Tiroda-I

मारा वउकिल MSPGCL

660 2059 15-Feb-14 2054 26-Feb-14 Turbine bearing problem

19 ितरोडा Tiroda-2

मारा वउकिल MSPGCL

660 1125 17-Feb-14 152 22-Feb-14 BTL

20 कोराड KORADI-6

मारा वउकिल MSPGCL

210 2357 19-Feb-14 250 23-Feb-14 BTL

21 भसावल BHUSWAL-2

मारा वउकिल MSPGCL

210 301 22-Feb-14 1706 25-Feb-14 PA fan temp High

22 खापरखड़ा KHAPERKHEDA-3

मारा वउकिल MSPGCL

250 1448 22-Feb-14 130 25-Feb-14 BTL

23 जयगड Jaigad-4

मारा वउकिल MSPGCL

300 1930 22-Feb-14 1107 4-Mar-14 Low schedule

24 कोराड Koradi-5

मारा वउकिल MSPGCL

300 404 23-Feb-14 अनपल ध Still out

अनपल ध Still out

Electrical fault

25 पल PARLI-4

मारा वउकिल MSPGCL

210 1836 28-Jan-14 1956 3-Feb-14 Air preheater problem

26 भसावल BHUSAWAL-4

मारा वउकिल MSPGCL

250 1432 28-Feb-14 1802 3-Mar-14 Ash hopper problem

27 आरजीपीपीएल RGPPL-1B

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

28 आरजीपीपीएल RGPPL-2B

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

29 आरजीपीपीएल RGPPL 3A

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

30 आरजीपीपीएल RGPPL-1A

आरजीपीपीएल RGPPL

320 1500 18-Jan-14 अनपल ध Still out

अनपल ध Still out

SRV problem

31 आरजीपीपीएल RGPPL 3B

आरजीपीपीएल RGPPL

320 1230 8-Feb-14 Ready Ready Less requisition

32 िसगाजी SINGAJI - I

म वउकिल MPPGCL

600 422 12-Feb-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

33 सातपरा SATPURA-11

म वउकिल MPPGCL

250 1913 15-Feb-14 2149 19-Feb-14 Main stream temperature low

34 सातपरा SATPURA-11

म वउकिल MPPGCL

250 542 26-Feb-14 1642 2-Mar-14 BTL

35 एःसार महान Essar-Mahan-1

एःसार ESSAR

600 000 29-Jan-14 015 18-Feb-14 Less requisi tion

36 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

37 वदना Vandana-1

वदना Vandana

135 149 12-Jan-14 अनपल ध Still out

अनपल ध Still out

BTL

प म ऽय भार षण कि म बई णाली चालन-ISO-I

38 ससान Sasan-2

आरईएल REL

660 205 16-Feb-14 1650 23-Feb-14 Problem in ash handling

39 कावास Kawas 2A

एनट पीसीNTPC 164 2018 23-Dec-13 Ready Ready Less requisition

40 गाधार Gandhar-3

एनट पीसीNTPC 144 2037 28-Dec-13 Ready Ready Less requisition

41 गाधार Gandhar-I

एनट पीसीNTPC 144 2011 1-Jan-14 Ready Ready Less requisition

42 कावास Kawas 2B

एनट पीसीNTPC 164 900 13-Jan-14 421 5-Mar-14 Maintenance

43 गाधार Gandhar-2

एनट पीसीNTPC 219 023 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Less requisition

44 कावास Kawas-1A

एनट पीसीNTPC 164 2055 4-Feb-14 712 20-Feb-14 Less requisition

45 कावास

Kawas-1B एनट पीसीNTPC 164 1951 13-Feb-14 503 20-Feb-14 Less requisition

46 कावास Kawas 1A

एनट पीसीNTPC 164 1210 21-Feb-14 Ready Ready Less requisition

47 कावास Kawas 1B

एनट पीसीNTPC 164 012 22-Feb-14 1144 26-Feb-14 Less requisition

Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का फरवर 2014 का वःता रत यौरा

Details of planned unit outages during the month of Feb2014 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Time Date

1 डब यट पीएस WTPS-3

गरा विनिल GSECL

210 212 12-Feb-14 अनपल ध Still out

अनपल ध Still out

AOH

2 पल ParlI-3

मारा वउकिल MSPGCL

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

AOH

3 चिपर Chandrapur-5

मारा वउकिल MSPGCL

500 101 14-Jul-13 841 19-Feb-14 AOH

4 कोरबा प म KORBA-(W)-4

छरा वउकिल CSPGCL

210 2226 7-Feb-14 अनपल ध Still out

अनपल ध Still out

AOH

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

NIL2

NIL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING MARCH 2014 AND APRIL 2014

Capacity Outage as per Annual Maintenance Plan

3 Craiva]kMila CSPGCL

NIL

4

NIL

5 koMd``Iya xao~ Central Sector51 VSTPS 4 210 010414 070414 AOH52 VSTPS 2 210 080414 270414 AOH53 VSTPS 1 210 300414 190514 AOH54 CGPL 10 800 280314 130514 COH

maraiva]kMila MSPGCL

Date Time Date Time1 220 Bus-1 at Mapusa 20-Mar-14 1000 20-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R

2 765 Bus-1 at Sasan 20-Mar-14 800 20-Mar-14 1800 Daily Stringing of Main bus 1 for 765 kV Vichal Pooling - Sasan feeder

Reliance WR-II C

3 400 400kV Bus-2 at Satna 20-Mar-14 800 20-Mar-14 1800 Continuous Bay extension work related to JP - Nigrie Bays POWERGRID WR-II C

4 400 400kV ICT 1 at Satna 20-Mar-14 800 20-Mar-14 1000 Continuous Bay extension work related to JP - Nigrie Bays POWERGRID WR-II C

5 400 400kV Jabalpur Itarsi 1amp2 (Dc) 20-Mar-14 1000 20-Mar-14 1400 Continuous For commissioning of Line Impedance measurement kit

POWERGRID WR-II C

6 765 3X80 MVAr Bina Line Reactor at Indore 20-Mar-14 1000 21-Mar-14 1800 Continuous For installation of online dry out amp online DGA kit

POWERGRID WR-II C

7 400kV Damoh - Bhopal 1 20-Mar-14 800 31-Mar-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

8 400 Chorania Kasor 20-Mar-14 800 20-Mar-14 1800 Daily PMM work GETCO GETCO9 400 400 KV Main Bus-I at 400 KV Ss Khedamara 20-Mar-14 900 22-Mar-14 1700 Daily Erection of Pantograph 1 Set of IP amp CVT CSPTCL CSPTCL C

10 400 400 KV Khedamara-KSTPS NTPC ckt-II at 400 KV Ss Khedamara

20-Mar-14 900 22-Mar-14 1700 Daily Erection of Pantograph CVT amp 1 Set of IP PGCIL CSPTCL C

11 400 Korba -Vandana 20-Mar-14 900 21-Mar-14 1900 days continuouTesting of LBB auto re-close M-I amp M-II relays NTPC NTPC

12 400 Korba -Vandana 20-Mar-14 900 21-Mar-14 1900 days continuouTesting of LBB auto re-close M-I amp M-II relays NTPC NTPC

13 400DC Akola-Aurangabad (MSETCL) 1 and Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

21-Mar-14 600 23-Mar-14 1800 Conti Crossing work of 400kv MC Aurangabad - Aurangabad

MSETCLWRTS-I WRTS-I C

14400 amp 220 amp 132

400KV DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 400KV Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

21-Mar-14 600 21-Mar-14 1800 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad

MSETCLWRTS-I WRTS-I C

15 400 Bhadrawati-Parli 1amp 2 21-Mar-14 900 31-Mar-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I C

16 220 Bus-1 at Pune 21-Mar-14 800 21-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R

17 400 Solapur-Kolhapur 1 amp 2 21-Mar-14 700 21-Mar-14 1800 Daily Stringing work upcoming 765 kV Solapur-Pune line

Reliance WRTS-I C

18 220 220kV DC Raigarh- Raigarh (CSPTCL) Line (if outage not avail on 13140314)

21-Mar-14 900 22-Mar-14 1700 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (040-50)

CSPTCL WRTS-I C

19 220 Bus-2 (Section-A) at Mapusa 21-Mar-14 1000 21-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R20 400 Bus-1 at Itarsi 21-Mar-14 900 21-Mar-14 1800 Daily AMP POWERGRID WR-II R21 220 Bus-1 at Gwalior 21-Mar-14 1000 21-Mar-14 1800 Daily AMP POWERGRID WR-II R22 220 Jhanor - Haldarwa 1 21-Mar-14 900 21-Mar-14 1800 Daily AMP POWERGRID WR-II R23 400 Vapi Boisar 21-Mar-14 700 22-Mar-14 1900 Continuous For crossing of 220kV Kala Khadoli TL POWERGRID WR-II C

24 765 Sasan-Satna2 21-Mar-14 800 22-Mar-14 1800 Continuous For Power Line crossing of 765kV Vindhyanchal (pooling) - Satna 2 Line

POWERGRID WR-II R

25 400 400220 ICT NO1 at Kasor 21-Mar-14 800 21-Mar-14 1800 Daily PMM work GETCO GETCO26 400 400KV Sipat-Pathadi(LANCO) line 21-Mar-14 900 22-Mar-14 1900 Continous Annual Preventive maintenance job NTPC NTPC27 400 Pune-Parli 2 50MVAr Line Reactor at Pune 22-Mar-14 800 22-Mar-14 1800 Daily AMP Work Line in service wo reactor Reliance WRTS-I R

28 765 Bus-2 at Solapur 22-Mar-14 700 22-Mar-14 1800 Daily 765KV Pune bay commissioning amp SCADA works

WRTS-I WRTS-I C

29 400 Bus-1 at Bhatapara 22-Mar-14 800 23-Mar-14 1800 Conti Bus extension work for new 125MVAr Bus Reactor at Bhatapara

WRTS-I WRTS-I C

30 220 Bus-2 (Section-B) at Mapusa 22-Mar-14 1000 22-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R31 400 Vadavi Chorania 1 22-Mar-14 900 22-Mar-14 1800 Daily AMP Reliance WR-II R32 220 Jhanor - Haldarwa 2 22-Mar-14 900 22-Mar-14 1800 Daily AMP POWERGRID WR-II R33 220 Bus-2 at Gwalior 22-Mar-14 1000 22-Mar-14 1800 Daily AMP POWERGRID WR-II R

34 765 3X80 MVAr Bus Reactor at Indore 22-Mar-14 1000 23-Mar-14 1800 Continuous For installation of online dry out amp online DGA kit

POWERGRID WR-II C

35 220 Transfer Bus at Mapusa 23-Mar-14 1000 23-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R

36 400 Raigarh- Raipur 4 amp Raigarh-Kotra PS 2 23-Mar-14 800 30-Mar-14 1800 Conti Bay shifting work for up-coming 125MVAr Bus Reactor at Raigarh

WRTS-I WRTS-I C

37 765 Bus-1 at Indore (PG) 23-Mar-14 1000 23-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

Outages Proposal of Transmission elements during the month of MARCH‐2014Type

ANNEXURE‐32A

SN KV Line From To

Basis Reason System Agency

38 220 MC Waluj-Chitegaon amp Waluj-Jalna on same tower

24-Mar-14 600 24-Mar-14 1800 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad

MSETCL WRTS-I C

39 400 Raipur-Sipat 1 amp 2 24-Mar-14 800 2-Apr-14 1800 Conti Diversion of line for Lafarge Railway trackERS removal

WRTS-I Lafarge C

40 220 Bus-2 at Pune 24-Mar-14 800 24-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R41 765 Bus-1 at Bilaspur 24-Mar-14 800 24-Mar-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R

42 400 Bus-2 at Bhatapara 24-Mar-14 800 25-Mar-14 1800 Conti Bus extension work for new 125MVAr Bus Reactor at Bhatapara

WRTS-I WRTS-I C

43 400 Kolhapur-Mapusa 2 24-Mar-14 600 24-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

44 400 Vadavi Chorania 2 24-Mar-14 900 24-Mar-14 1800 Daily AMP Reliance WR-II R45 765 Bus-2 at Indore (PG) 24-Mar-14 1000 24-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

46 765 Bus-2 at Sasan 24-Mar-14 800 24-Mar-14 1800 Daily Strining of Main Bus 2 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

47 220 KAPP - Haldarwa 1 24-Mar-14 800 24-Mar-14 1800 Daily AMP POWERGRID WR-II R48 400 Bus - 2 at Pune 25-Mar-14 800 25-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R

49 765 Bus - 1 at Wardha 25-Mar-14 800 25-Mar-14 1800 Daily Jumper connection work of 765KV Raipur-Wardha line

WRTS-I WRTS-I R

50 400 Kolhapur-Mapusa 2 25-Mar-14 600 25-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

51 220 Mapusa-Ponda line 25-Mar-14 1000 25-Mar-14 1500 Daily AMP Work GOA WRTS-I R

52 765 Bus-1 at Sasan 25-Mar-14 800 25-Mar-14 1800 Daily Jumpering of Bus 1 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

53 220 KAPP - Haldarwa 2 25-Mar-14 800 25-Mar-14 1800 Daily AMP POWERGRID WR-II R54 400 Vadavi - Kansari2 25-Mar-14 900 25-Mar-14 1800 Daily AMP Reliance WR-II R55 400 Bus-1 at Indore (PG) 25-Mar-14 1000 26-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C56 765 Bus-1 at Satna 25-Mar-14 800 25-Mar-14 1800 Continuous Bay extension work POWERGRID WR-II C57 765 Sipat 765KV 400KV 1000MVA ICT-1 25-Mar-14 900 25-Mar-14 1900 Daily SPS Protection scheme modification NTPC NTPC

58 765 Bus - 2 at Wardha 26-Mar-14 800 26-Mar-14 1800 Daily Jumper connection work of 765KV Raipur-Wardha line

WRTS-I WRTS-I R

59 400 Bhadrawati-Parli 2 63MVAr Line Reactor at Parli

26-Mar-14 800 26-Mar-14 1800 Daily AMP Work of Recator at Parli line in service wo reactor

WRTS-I WRTS-I R

60 400 Kolhapur-Mapusa 1 26-Mar-14 600 26-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

61 220 Mapusa-Amona line 26-Mar-14 1000 26-Mar-14 1500 Daily AMP Work GOA WRTS-I R62 765 Bus-2 at Satna 26-Mar-14 800 26-Mar-14 1800 Continuous Bay extension work POWERGRID WR-II C

63 765 Bus-2 at Sasan 26-Mar-14 800 26-Mar-14 1800 Daily Jumpering of bus 2 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

64 400 401 KV Main Bus-I at 400 KV Ss Khedamara 26-Mar-14 900 27-Mar-14 1700 Daily Erection of IPS Tube CSPTCL CSPTCL C

65 400 401 KV Khedamara-KSTPS NTPC ckt-II at 400 KV Ss Khedamara

26-Mar-14 900 27-Mar-14 1700 Daily Erection of IPS Tube PGCIL CSPTCL C

66 400 ACBIL-BILASPUR-CKT NO -2 26-Mar-14 900 31-Mar-14 1800 CONT FOR lilo CONNECTIVITY OF 300MW MCCPL TPP

ACBIL ACBIL C

67 765 Bus-2 at Bilaspur 27-Mar-14 800 27-Mar-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R68 220 Mapusa-Thivim 1 27-Mar-14 1000 27-Mar-14 1500 Daily AMP Work GOA WRTS-I R69 220 KAPP - Vav 2 27-Mar-14 800 27-Mar-14 1800 Daily AMP POWERGRID WR-II R70 400 Bus-2 at Indore (PG) 27-Mar-14 1000 28-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

71 765 Bus-2 at Gwalior 27-Mar-14 1000 27-Mar-14 1800 Daily Bay extension work related to Gwalior Jaipur 1 Bays

POWERGRID WR-II C

72 400 VSTPS Tie- Line-1 ( Line from Stage-III to IV Switchyard)

27-Mar-14 900 27-Mar-14 1900 Daily Basis AMP and rectification of hot spots NTPC NTPC

73 765 Sipat 765KV 400KV 1000MVA ICT-2 27-Mar-14 900 27-Mar-14 1900 Daily SPS Protection scheme modification NTPC NTPC74 765 Bus-1 at Solapur 28-Mar-14 700 30-Mar-14 1800 Daily commissioning tests amp SCADA works WRTS-I WRTS-I C75 220 Mapusa-Thivim 2 28-Mar-14 1000 28-Mar-14 1500 Daily AMP Work GOA WRTS-I R

76 400 Koradi-Satpura 28-Mar-14 1000 28-Mar-14 1400 Daily Earthwire tighting work damaged during Crossing work

WRTS-I ADANI C

77 220 Bus-1 at Dehgam 28-Mar-14 900 28-Mar-14 1800 Daily AMP POWERGRID WR-II R78 220 Kawas - Haldarwa 2 28-Mar-14 800 28-Mar-14 1800 Daily AMP POWERGRID WR-II R79 400 Chorania Amreli 28-Mar-14 800 28-Mar-14 1800 Daily PMM work GETCO GETCO

80 400DC Akola-Aurangabad (MSETCL) 1 and Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

29-Mar-14 600 30-Mar-14 1800 Conti Charging amp shifting of Akola-Abad line on MC Abad-Abad line WRTS-I WRTS-I C

81 220 Bus-2 at Dehgam 29-Mar-14 900 29-Mar-14 1800 Daily AMP POWERGRID WR-II R82 400 Bus -1 at Mapusa 30-Mar-14 1000 30-Mar-14 1500 Daily AMP Work WRTS-I WRTS-I R

83 765 765kV Bus Reactor at Solapur 31-Mar-14 700 2-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

Date Time Date Time

1 400 Bhilai-Koradi 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

2 400 DC Korba-Birsingpur 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

3 400 Korba-Bhilai 2 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

4 220 Korba-Budhipadar 3 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

5 400 Akola-Wardha 1amp 2 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

6 400 Raipur-Raigarh 1 amp Raipur-KSK-DBPL-Raigarh

1-Apr-14 800 30-Apr-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

7 400 Bhadrawati-Parli 1amp 2 1-Apr-14 900 30-Apr-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I C

8 400 400220kv ICT-1 at Pune 1-Apr-14 800 1-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R9 400 Bus-1 at Bilaspur 1-Apr-14 800 1-Apr-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R

10 400 Solapur(PG) -Karad line 1-Apr-14 700 10-Apr-14 1800 Conti Erection of 80MVAr new reactor by shifitng line equipments at Solapur

MSETCL WRTS-I C

11 400 Bus-1 at Jabalpur (pooling) 01-Apr-14 1000 01-Apr-14 1800 Daily Busbar Stability test related to Jhabua Power Bays

POWERGRID WR-II C

12 400 Shujalpur - Nagda 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

13 400 Mundra - Bhachau 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

14 400 Bina - Shujalpur 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

15 220 Omkareshwar-Khandwa Ckt 1-Apr-14 900 1-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI16 400 Sipat 400KV Bay 10 and 11 1-Apr-14 900 3-Apr-14 1900 Continous 400KV CT 3nos replacement NTPC NTPC17 400 Padgha-Nagothane ckt I 1-Apr-14 900 1-Apr-14 1700 Daily QMwork MSETCL MSETCL

18 400 Bus-2 at Jabalpur (pooling) 02-Apr-14 1000 02-Apr-14 1800 Daily Busbar Stability test related to Jhabua Power Bays

POWERGRID WR-II C

19 400 Vindhyanchal - Mahan - Korba (Section of both the line on same Dc tower)

02-Apr-14 800 03-Apr-14 1700 Continuous For Power Line crossing of 765kV Vindhyanchal (pooling) - Satna 1 Line

POWERGRID WR-II C

20 400 400kV ICT 4 at Indore MPPTCL 02-Apr-14 1000 04-Apr-14 1800 ContinuousFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

MPPTCL WR-II C

21 400 400kV Bus Coupler bay at Indore MPPTCL 02-Apr-14 1000 04-Apr-14 1800 ContinuousFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

MPPTCL WR-II C

22 400 400kV Itarsi - Indore MPPTCL 1 Line 02-Apr-14 1000 02-Apr-14 1500 DailyFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

POWERGRID WR-II C

23 400400 KV LILO Line of 400 KV SC Korba West-Khedamara to 400 KV Ss Raita (Between Loc69 amp70 near Raita Ss)

2-Apr-14 800 3-Apr-14 1700 DailyMaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

CSPTCL CSPTCL C

24 400 Chandrapur-Khaparkheda 2-Apr-14 900 2-Apr-14 1700 Daily QMwork MSETCL MSETCL

25 400 Lamboti-Solapur PG 2-Apr-14 900 2-Apr-14 1700 Daily QMwork MSETCL MSETCL

26 400 Bus-1 at Durg PS Ss 3-Apr-14 900 3-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R27 400 Bus-1 at Jabalpur 03-Apr-14 900 03-Apr-14 1800 Daily Retrofitting of Isolator arms(689A) POWERGRID WR-II R28 400 315MVA ICT2 at Khandwa 03-Apr-14 1000 03-Apr-14 1600 Daily AMP POWERGRID WR-II R29 400 Mundra - Hadala 3-Apr-14 800 3-Apr-14 1800 Daily PMM GETCO GETCO30 400 400KV Seoni -Bhilai Ckt 3-Apr-14 900 3-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I31 400 Lonikand-Chakan 3-Apr-14 900 3-Apr-14 1700 Daily QMwork MSETCL MSETCL32 400 Bus-2 at Durg PS Ss 4-Apr-14 900 4-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R33 400 Bus-1 at Jabalpur 04-Apr-14 900 04-Apr-14 1800 Daily Retrofitting of Isolator arms(2089A) POWERGRID WR-II R

34 400 400kV Itarsi - Indore MPPTCL 1 Line 04-Apr-14 1300 04-Apr-14 1800 DailyFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

POWERGRID WR-II C

35 400 Varsana - Hadala 4-Apr-14 800 4-Apr-14 1800 Daily PMM GETCO GETCO

Agency Type

ANNEXURE‐32BOutages Proposal of Transmission elements during the month of APRIL ‐2014

SN KV Line From To

Basis Reason System

36 220 Vapi - Vapi (PG) 4-Apr-14 800 4-Apr-14 1800 Daily PMM work PGCIL GETCO37 220 Haldarva - Jhanor - 1 (NTPC) 4-Apr-14 800 4-Apr-14 1800 Daily PMM amp Tan Delta testing PGCIL GETCO38 400 400KV Birsinghpur -Katni Ckt - I 4-Apr-14 800 4-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I39 220 Badod - Kota Ckt 4-Apr-14 900 4-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI40 220 Malanpur-Auriya Ckt 4-Apr-14 900 5-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI

41 400 Bhusawal-Akola 4-Apr-14 900 4-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

42 400 Deepnagar-Aurangabad II 4-Apr-14 900 4-Apr-14 1700 Daily QMwork MSETCL MSETCL43 400 Kalwa-Padgha Ckt I 4-Apr-14 900 4-Apr-14 1700 Daily QMwork MSETCL MSETCL44 765 Bus Reactor at Seoni 5-Apr-14 900 5-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R

45 400 DC Korba-KhedamaraLilo at Marwa lilo section yet to be charge 5-Apr-14 800 6-Apr-14 1800 Daily

Crossing work of upcoming 765 KV DC Raigarh-Champa (AP-48A0- AP 490)DC Korba-Khedamara is in service

CSPTCL WRTS-1 C

46 400 Bus-1 at Jabalpur 05-Apr-14 900 05-Apr-14 1800 Daily Retrofitting of Isolator arms(1689A) POWERGRID WR-II R

47 400 Mundara -Limbdi 1 05-Apr-14 800 07-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

48 220 Badod - Modak Ckt 5-Apr-14 900 5-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI49 400 Dhule-Babhleswar ckt 1 5-Apr-14 900 5-Apr-14 1700 Daily QMwork MSETCL MSETCL50 400 400220kv ICT-1 at Seoni 7-Apr-14 900 7-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R51 400 Bus-2 at Jabalpur 07-Apr-14 900 07-Apr-14 1800 Daily Retrofitting of Isolator arms(1789B) POWERGRID WR-II R52 400 315MVA ICT1 at Khandwa 07-Apr-14 1000 07-Apr-14 1600 Daily AMP POWERGRID WR-II R53 220 Chhegoan-Khandwa Ckt -II 7-Apr-14 900 7-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI54 400 Korba- Bhilai1 7-Apr-14 900 8-Apr-14 1900 days continuou Bay Maint and testing NTPC NTPC55 400 Vindhyachal - Mahan line 7-Apr-14 900 8-Apr-14 1900 Continuous Replacement of R Y and B Phase CT NTPC NTPC56 400 Bhusawal-Aurangabad 7-Apr-14 900 7-Apr-14 1700 Daily QMwork MSETCL MSETCL57 400 New Koyna-Karad ckt 2 7-Apr-14 830 7-Apr-14 1730 Daily QMwork MSETCL MSETCL

58 400 Mundara -Limbdi 2 08-Apr-14 800 10-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

59 400 Chorania Hadala 8-Apr-14 800 8-Apr-14 1800 Daily PMM GETCO GETCO60 400 Sipat 400KV Bay 23 8-Apr-14 900 9-Apr-14 1900 Continous One 400KV CT replacement NTPC NTPC61 400 Koradi-Khaparkheda I 8-Apr-14 900 8-Apr-14 1700 Daily QMwork MSETCL MSETCL62 765 765400KV ICT-1 at Kotra PS 9-Apr-14 900 9-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R63 400 Bus-2 at Jabalpur 09-Apr-14 900 09-Apr-14 1800 Daily Retrofitting of Isolator arms(489B) POWERGRID WR-II R64 400 315MVA ICT1 at Damoh 09-Apr-14 1000 09-Apr-14 1600 Daily AMP POWERGRID WR-II R65 400 Amreli-Jetpur 2 9-Apr-14 800 9-Apr-14 1800 Daily PMM GETCO GETCO66 400 SSP- Rajgarh - 1 9-Apr-14 800 9-Apr-14 1800 Daily PMM GETCOMPTCL GETCO67 220 TAPS1 amp2-TAPS 3amp4 tie line 9-Apr-14 800 9-Apr-14 1600 one day Annual maintenance Works MSETCL NPCIL68 220 TAPS TIE LIE-I 9-Apr-14 800 10-Apr-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL69 400 400 KV Indore - Nagda Ckt 9-Apr-14 900 9-Apr-14 1600 daily For maintenance work MPPTCL EHT- Mamp I70 400 400 KV Sarni - Isp Ckt 9-Apr-14 900 9-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I71 220 Mehgaon-Auriya Ckt 9-Apr-14 900 10-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI72 400 315 MVA 400220Kv X-mer III At Bhopal SS 9-Apr-14 900 10-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI73 400 Padgha-Tarapur CktII 9-Apr-14 900 9-Apr-14 1700 Daily QMwork MSETCL MSETCL74 765 Bus Reactor at Kotra PS 10-Apr-14 900 10-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R

75 765 amp 400

765400 kV ICT-I at Solapur amp 400KV Solapur-Parli 2 10-Apr-14 700 12-Apr-14 1800 Daily 765400 kV spare ICT unit Aux bus works CSD

commissioning amp Fire fighting works at Solapur WRTS-IReliance WRTS-I C

76 400 315MVA ICT2 at Damoh 10-Apr-14 1000 10-Apr-14 1600 Daily AMP POWERGRID WR-II R

77 765 Sasan-Satna 1 10-Apr-14 800 11-Apr-14 1800 Daily For AMP of line amp Line terminal Equipments Post commissioning checks

POWERGRID WR-II C

78 400 APL-Varsana 10-Apr-14 800 10-Apr-14 1800 Daily PMM GETCO GETCO79 400 400 KV Isp - Nagda Ckt 10-Apr-14 900 10-Apr-14 1600 daily For maintenance work MPPTCL EHT- Mamp I80 400 400 KV Bhopal-Itarsi(PGCIL) Ckt-I 10-Apr-14 900 11-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I81 220 Chhegoan-Khandwa Ckt -I 10-Apr-14 900 10-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI82 400 315 MVA 400220Kv X-mer At Katni SS 10-Apr-14 800 11-Apr-14 1800 continue For maintenance work MPPTCL EHT -MampI83 400 Korba- Bhilai2 10-Apr-14 900 11-Apr-14 1900 days continuou Bay Maint and testing NTPC NTPC84 400 Sipat 400KV Bay 14 10-Apr-14 900 12-Apr-14 1900 Continous 400KV CT 3nos replacement NTPC NTPC

85 400 Chandrapur II-Parli II 10-Apr-14 900 10-Apr-14 1700 Daily Providing of Arching horncorona rings Bird guards quarter pinsNut bolts

MSETCL MSETCL

86 400 Karad-Lonikand 10-Apr-14 900 10-Apr-14 1700 Daily QMwork MSETCL MSETCL87 400 Raipur-Durg PS 1 11-Apr-14 900 11-Apr-14 1700 Daily AMP Work WRTS-I WRTS-I R

88 400 Mundara -Jetpur 1 11-Apr-14 800 15-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

89 400 Varsana-Hadala Line 11-Apr-14 800 11-Apr-14 1800 Daily PMM GETCO GETCO90 220 Haldarwa Kawas-2 11-Apr-14 800 11-Apr-14 1800 Daily PMM work PGCIL GETCO91 400 400 KV Nagda-Rajgarh(PGCIL) Ckt-I 11-Apr-14 900 11-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

92 400 315 MVA 400220Kv X-mer III ampTie bay At Bhopal SS

11-Apr-14 900 11-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI

93 400 Akola-Nandgaonpeth 11-Apr-14 900 11-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

94 400 Akola-Wardha I 11-Apr-14 900 11-Apr-14 1700 Daily QMwork MSETCL MSETCL95 400 Kalwa-Lonikand 11-Apr-14 900 11-Apr-14 1700 Daily QMwork MSETCL MSETCL96 400 400220kv ICT-1 at Mapusa 12-Apr-14 900 12-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R97 400 Raipur-Durg PS 2 12-Apr-14 900 12-Apr-14 1700 Daily AMP Work WRTS-I WRTS-I R98 765 Sasan-Satna2 with line reactor 12-Apr-14 1000 12-Apr-14 1800 Daily AMP POWERGRID WR-II R99 400 400 KV Nagda-Rajgarh(PGCIL) Ckt-II 12-Apr-14 900 12-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I100 400 Deepnagar-Aurangabad I 12-Apr-14 900 12-Apr-14 1700 Daily QMwork MSETCL MSETCL101 400 Amreli-Jetpur 2 14-Apr-14 800 14-Apr-14 1800 Daily PMM GETCO GETCO102 400 Kasor - Gpec 14-Apr-14 800 14-Apr-14 1800 Daily PMM GETCO GETCO103 220 GWL(PGCIL)-Malanpur Ckt-I 14-Apr-14 900 15-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI104 400 DC Korba-Raipur 3 amp 4 15-Apr-14 800 16-Apr-14 1800 Conti Bus splitting work at Raipur WRTS-1 WRTS-1 C

105 400 Korba-Bhatapara 15-Apr-14 800 24-Apr-14 1800 Conti For raising of ground clearence for Railway track of Lafarge

WRTS-I Lafarge C

106 765 765400 kV ICT-II at Solapur 15-Apr-14 700 17-Apr-14 1800 Daily CSD commissioning amp Fire fighting works WRTS-I WRTS-I C107 400 Vindhyachal-Satna1 15-Apr-14 1000 15-Apr-14 1800 Daily AMP POWERGRID WR-II R108 400 Ssnl-Dhule-1 15-Apr-14 800 15-Apr-14 1800 Daily PMM GETCOMSETCL GETCO109 220 TAPS-Vapi 15-Apr-14 800 17-Apr-14 1900 Daily Annual maintenance Works GETCO NPCIL110 220 Pithampur-Rajgarh(PGCIL) Ckt - I 15-Apr-14 900 15-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI111 400 Sipat 400KV Bay-18 ( Ranchi-1 Main) 15-Apr-14 900 15-Apr-14 1900 Daily Annual Preventive maintenance job NTPC NTPC112 400 Karad-Kolhapur Ckt I 15-Apr-14 900 15-Apr-14 1700 Daily QMwork MSETCL MSETCL

113 400 DC Raipur-Bhadrawati 2 amp 3 16-Apr-14 800 17-Apr-14 1800 Conti Bus splitting work at Raipur WRTS-1 WRTS-1 C

114 400 Vindhyachal-Satna2 16-Apr-14 1000 16-Apr-14 1800 Daily AMP POWERGRID WR-II R

115 400 Mundara -Jetpur 2 16-Apr-14 800 20-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

116 400 Vadavi - Dehgam (Pg) - 1 16-Apr-14 800 16-Apr-14 1800 Daily PMM amp Tandelta testing GETCO GETCO117 400 Chorania Asoj-1 16-Apr-14 800 16-Apr-14 1800 Daily PMM GETCO GETCO118 220 Bhilad - TAPS 16-Apr-14 800 16-Apr-14 1800 Daily PMM work PGCIL GETCO119 220 Bhat - Pirana (PG) - 1 16-Apr-14 800 16-Apr-14 1800 Daily PMM work GETCO GETCO120 400 400 KV Bhopal-Itarsi(PGCIL) Ckt-II 16-Apr-14 900 17-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I121 220 Damoh(PGCIL) - Tikamgarh Ckt 16-Apr-14 900 16-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI

122 400 400KV SC Korba-Raipur-II (Between Korba - Bhatapara end)(Between Loc2980 amp 2990) 16-Apr-14 800 17-Apr-14 1700 Daily

MaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

PGCIL CSPTCL C

123 400 Sipat 400KV Bay-19 ( Ranchi-2 Main) 16-Apr-14 900 16-Apr-14 1900 Daily Annual Preventive maintenance job NTPC NTPC124 400 Padgha-Babhleswar ckt I 16-Apr-14 900 16-Apr-14 1700 Daily QMwork MSETCL MSETCL125 400 Vadavi - Dehgam (Pg) - 2 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCO GETCO126 400 Ssnl-Dhule-2 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCOMSETCL GETCO127 400 Vadinar-Hadala- 1 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCO GETCO128 220 Bhat - Pirana (PG) - 2 17-Apr-14 800 17-Apr-14 1800 Daily PMM work GETCO GETCO129 400 400KV Birsinghpur -Katni Ckt - II 17-Apr-14 800 17-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I130 220 Pithampur-Rajgarh(PGCIL) Ckt - II 17-Apr-14 900 17-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI131 400 Jejuri-Lonikand 17-Apr-14 900 17-Apr-14 1700 Daily QMwork MSETCL MSETCL132 400 Deepnagar-Khadka II 17-Apr-14 900 17-Apr-14 1700 Daily QMwork MSETCL MSETCL133 400 Chorania Kasor 18-Apr-14 800 18-Apr-14 1800 Daily PMM GETCO GETCO134 220 GWL(PGCIL)-Malanpur Ckt-II 18-Apr-14 900 19-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI135 400 Akola-Wardha II 18-Apr-14 900 18-Apr-14 1700 Daily QMwork MSETCL MSETCL

136 400 Koradi-Nandgaonpeth 18-Apr-14 800 18-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

137 765 765kV Pune line Reactor at Solapur 19-Apr-14 700 20-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

138 400 400KV Bina -Power(JP) Ckt 19-Apr-14 900 19-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I139 400 Dhule-SSarovar I 19-Apr-14 900 19-Apr-14 1700 Daily QMwork MSETCL MSETCL

140 400 Koradi-Khaparkheda II 19-Apr-14 900 19-Apr-14 1700 Daily QMwork MSETCL MSETCL141 220 KAPP - VAPI - 1 20-Apr-14 800 20-Apr-14 1800 Daily Isolator replacement under ASIDE scheme PGCIL GETCO

142 400 DC Bhilai-Bhadrawati amp Raipur-Bhadrawati 1 21-Apr-14 800 28-Apr-14 1800 Conti Diversion of line for Vidarbha Industrial Devlopment Corporation(VIDC)

WRTS-I VIDC C

143 400 Bhachau- Ranchhodpura 1amp2 21-Apr-14 800 27-Apr-14 1800 Continuous Tower shifting work at canal crossingInsulator replacement work

POWERGRID WR-II C

144 400 Hadala-Amreli 21-Apr-14 800 21-Apr-14 1800 Daily PMM GETCO GETCO145 400 Vadinar-Hadala- 2 21-Apr-14 800 21-Apr-14 1800 Daily PMM GETCO GETCO146 220 TAPS-Boisar 21-Apr-14 800 23-Apr-14 1900 Daily Annual maintenance Works MSETCL NPCIL147 220 Bina(PGCIL)-220 KV Bina Ckt 21-Apr-14 900 21-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI148 400 CGPL Bhachau -1 21-Apr-14 8AM 21-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL149 220 Kawas-Ichhapore 1+Bus 1 21-Apr-14 900 21-Apr-14 1800 daily RTV Coating NTPC NTPC150 400 Karad-Kolhapur Ckt II 21-Apr-14 900 21-Apr-14 1700 Daily QMwork MSETCL MSETCL151 400 New Koyna-Koyna Stg-4-1 21-Apr-14 830 21-Apr-14 1730 Daily QMwork MSETCL MSETCL152 400 Ssp - Rajgarh - 2 22-Apr-14 800 22-Apr-14 1800 Daily PMM GETCOMPTCL GETCO153 400 Vadavi-Bhachau 2 22-Apr-14 800 22-Apr-14 1800 Daily PMM amp Tan Delta testing PGCIL GETCO154 220 Bhilad - Vapi (PG) - 1 22-Apr-14 800 22-Apr-14 1800 Daily PMM work PGCIL GETCO155 400 400 KV Rajgarh(PGCIL)-Ssp Ckt-I 22-Apr-14 900 22-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I156 400 400KV Seoni -Sarni Ckt 22-Apr-14 900 23-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I157 220 Khandwa(PGCIL)-Nepanagar Ckt 22-Apr-14 900 22-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI158 220 Kawas-Ichhapore 2+Bus 1 22-Apr-14 900 22-Apr-14 1800 daily For maintenance work NTPC NTPC159 400 Karad-Jaigad II 22-Apr-14 900 22-Apr-14 1700 Daily Annual maintenance work MSETCL MSETCL160 220 Bhilad - Vapi (PG) - 2 23-Apr-14 800 23-Apr-14 1800 Daily PMM work PGCIL GETCO161 400 400KV Bina -Bhopal Ckt -I 23-Apr-14 900 24-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I162 400 400 KV Rajgarh(PGCIL)-Ssp Ckt-II 23-Apr-14 900 23-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I163 220 Bina(PGCIL)-Shivpuri Ckt 23-Apr-14 900 24-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI164 220 Damoh(PGCIL) - Damoh I C - I 23-Apr-14 900 23-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI

165 400 400 KV DCDS Sipat- Raipur (IampII) 23-Apr-14 800 24-Apr-14 1700 DailyMaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

PGCIL CSPTCL C

166 400 CGPL Bhachau - 2 23-Apr-14 8AM 23-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL

167 220 Kawas-Navsari 2 +Bus 1 23-Apr-14 900 23-Apr-14 1800 daily Insulator replcement and routine maintenance NTPC NTPC168 400 Padgha-Babhleswar ckt II 23-Apr-14 900 23-Apr-14 1700 Daily QMwork MSETCL MSETCL169 400 Kasor - SSP 24-Apr-14 800 24-Apr-14 1800 Daily PMM work GETCO GETCO170 220 Bhilad - Vapi (PG) - 3 24-Apr-14 800 24-Apr-14 1800 Daily PMM work PGCIL GETCO171 220 TAPS-Bhilad 24-Apr-14 800 26-Apr-14 1900 Daily Annual maintenance Works GETCO NPCIL172 220 Damoh(PGCIL) - Damoh I C - II 24-Apr-14 900 24-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI173 400 CGPL Jetpur- 1 24-Apr-14 8AM 24-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL

174 220 Kawas-Ichhapore 1 +Bus 2 24-Apr-14 900 24-Apr-14 1400 daily Insulator replcement and routine maintenance NTPC NTPC

175 220 Kawas-Ichhapore 2 +Bus 2 24-Apr-14 1400 24-Apr-14 1900 daily Insulator replcement and routine maintenance NTPC NTPC176 400 Padgha-Talegaon 24-Apr-14 900 24-Apr-14 1700 Daily QMwork MSETCL MSETCL

177 765 765kV Raichur 1 line Reactor at Solapur 25-Apr-14 700 27-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

178 400 400KV Bina -Bhopal Ckt -II 25-Apr-14 900 26-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I179 400 CGPL Jetpur- 2 25-Apr-14 8AM 25-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL180 400 Vindhyachal -Satna-4 Line Shunt Reactor 25-Apr-14 900 25-Apr-14 1900 Daily Basis AMP NTPC NTPC

181 400 Bhusawal-Koradi 25-Apr-14 900 25-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

182 400 Deepnagar-Khadka I 25-Apr-14 900 25-Apr-14 1700 Daily QMwork MSETCL MSETCL183 400 Soja -Kansari 26-Apr-14 800 26-Apr-14 1800 Daily PMM GETCO GETCO184 400 Raipur-Wardha 1 27-Apr-14 800 28-Apr-14 1800 Daily Balance construction work WRTS-1 WRTS-1 C185 220 KAPP - VAPI - 2 27-Apr-14 800 27-Apr-14 1800 Daily Isolator replacement under ASIDE scheme PGCIL GETCO186 400 Soja -Kansari 28-Apr-14 800 28-Apr-14 1800 Daily PMM GETCO GETCO187 220 TAPS-Boisar II 28-Apr-14 800 30-Apr-14 1900 Daily Annual maintenance Works MSETCL NPCIL188 400 400KV Damoh - Katni Ckt 28-Apr-14 900 28-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I189 400 400 KV Damoh(PGCIL)-Katni Ckt 28-Apr-14 900 28-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I190 400 New Koyna-Karad ckt 1 28-Apr-14 830 28-Apr-14 1730 Daily QMwork MSETCL MSETCL

191 400 DC Raigarh-DB Power (Tudri) - KSK 29-Apr-14 800 30-Apr-14 1800 Conti Crossing work of 765kV SC Raigrah-Champa (90 - 100)

WRTS-I WRTS-I C

192 400 Raipur-Wardha 2 29-Apr-14 800 30-Apr-14 1800 Daily Balance construction work WRTS-1 WRTS-1 C193 220 Navsari - Nasik - 1 29-Apr-14 800 29-Apr-14 1800 Daily PMM work GETCOMSETCL GETCO194 220 Seoni(PGCIL)-Chhindwara Ckt-I 29-Apr-14 900 29-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI195 220 Kawas-Vav 1+ bus 2 29-Apr-14 900 29-Apr-14 1800 daily For maintenance work NTPC NTPC196 400 Chorania Asoj-1 30-Apr-14 800 30-Apr-14 1900 Daily PMM GETCO GETCO197 220 Navsari - Nasik - 2 30-Apr-14 800 30-Apr-14 1800 Daily PMM work GETCOMSETCL GETCO198 220 Vapi - TAPS 30-Apr-14 800 30-Apr-14 1800 Daily PMM work PGCIL GETCO199 220 Seoni(PGCIL)-Chhindwara Ckt-II 30-Apr-14 900 30-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI200 220 Kawas-Vav 1+ bus 2 30-Apr-14 000 30-Apr-14 000 daily For maintenance work NTPC NTPC

Annexure-32-C1

List of Emergency Outages availed in Feb 2014

SlNo

Element kV Agency From

Date To Date

Remarks

1 SATNA‐BINA‐II 765 WRTS‐2 4‐Feb‐14

5‐Feb‐14

Hot spot attending

2 SUJALPUR‐NAGDA LR NAGDA

400 WRTS‐2 6‐Feb‐14

19‐Feb‐14

Oil leackage

3 SOLAPUR‐PARLI‐II

400 WRTS‐2 6‐Feb‐14

6‐Feb‐14

Hotspot attend at solapur

4 JABALPUR‐ITARSI‐IV LR AT ITARSI‐LR

400 WRTS‐2 7‐Feb‐14

17‐Feb‐14

Oil leackage

5 APL‐HADALA‐SC 400 GEB 7‐Feb‐14

7‐Feb‐14

Hot spot

6 SOLAPUR‐PARLI(PG)‐1

400 WRTM(REL)

9‐Feb‐14

9‐Feb‐14

Hot spot

7 BOISAR‐BOISAR(PG)‐II

220 MSETCL 9‐Feb‐14

9‐Feb‐14

Hotspots

8 NEW KOYNA‐KARAD ‐ I

400 MSETCL 10‐Feb‐14

11‐Feb‐14

Dc‐earth leakage

9 LONIKHAND ‐ KARAD

400 MSETCL 10‐Feb‐14

11‐Feb‐14

Hotspot

10 NAGDHA ICT ‐ III

400220

MPPTCL 10‐Feb‐14

10‐Feb‐14

Hotspot

11 AKOLA ‐ ABAD ‐I AKOLA

400 WRTS‐1 11‐Feb‐14

12‐Feb‐14

Oil leackage

12 AKOLA ‐ AURANGABAD ‐ I

400 WRTS‐1 11‐Feb‐14

11‐Feb‐14

Oil leackage ion lr

13 BINA‐GWALIOR 765 WRTS‐1 14‐Feb‐ 14‐Feb‐ Attend oil leakage on lr

SlNo

Element kV Agency From

Date To Date

Remarks

II 14 14

14 AKOLA‐TIRORA‐I 765 MSETCL 22‐Feb‐14

23‐Feb‐14

Sparking in LR at Tirora SYED AT TIRORA END

15 KHAEGAR‐ICT‐I 400220

MSETCL 22‐Feb‐14

22‐Feb‐14

Hot spot

16 KHANDWA‐NEPANAGR‐SC

220 MPPTCL 23‐Feb‐14

23‐Feb‐14

Hot spot

17 GWALIAR ‐SATNA ‐ I

765 WRTS‐2 24‐Feb‐14

1‐Mar‐14

Attend hot spot

18 KORBA BUS‐III 400 NTPC 25‐Feb‐14

25‐Feb‐14

Hots pot attend

19 BUS‐1 AT GWALIOR

765 WRTS‐2 13‐Feb‐14

13‐Feb‐14

Checking of blocked BB main‐1 relay

20 RAIPUR‐BWATI‐2

400 WRTS‐1 17‐Feb‐14

17‐Feb‐14

Urgent Removal of LR at Raipur end for DGA violation

21 TAPS‐PADGHE 400 TAPS‐3amp4 19‐Feb‐14

23‐Feb‐14

To attend SF‐6 leakage

22 SATNA‐GWALIOR‐1

765 WRTS‐2 24‐Feb‐14

26‐Feb‐14

To attend hot spots

23 VCHAL‐JABALPUR‐IV

400 WRTS‐2 27‐Feb‐14

27‐Feb‐14

To increase OPGW‐Top conductor clearance to avoid tripping

24 APL‐SAMI‐2 400 APL 26‐Feb‐14

26‐Feb‐14

To attend hot sopt

25 SHOLAPUR BUS‐1

765 WRTS‐1 27‐Feb‐14

27‐Feb‐14

To attend hot sopt

26 BOISAR BUS‐2 220 WRTS‐1 28‐Feb‐14

28‐Feb‐14

To attend hot sopt

Sl No KV element From To Basis Work System Agency Remarks

1220 Vapi (GETCO)‐Bhilad 1‐Feb‐14 800 2‐Feb‐14 1800 Daily Line crossing work of 400KV LILO line for

Magarwada SSGETCO POWERGRID N

2 220 Omkareshwar-Khandwa Ckt

3-Feb-14 900 3-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

3 400 New Koyna-Koyna Stg-4-1

3-Feb-14 830 3-Feb-14 1730 Daily QMwork MSETCL MSETCL N

4220 Vapi ‐ Magarwada

Ckt13‐Feb‐14 900 3‐Feb‐14 1400 Daily AMP of line amp equipment WRTS‐II POWERGRID DD may have to do load

shedding as per Reliability Suggestion

N

5 220 DC Raigarh- Raigarh 1amp 2

4-Feb-14 800 5-Feb-14 1800 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (040-50)

CSPTCL WRTS-I N

6 220 Itarsi(PGCIL)-Hoshangabad Ckt

4-Feb-14 900 4-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N

7 400 Mundra -Limbdi-2 4-Feb-14 800 4-Feb-14 1800 Daily Suspension Insulator replcement and routine maintenance

PGCIL CGPL N

8 400 400 kV DC Satna - Bina 1amp2

4-Feb-14 800 5-Feb-14 1800 Continous Crossing of Jabalpur-Bina 765 kv SC Line PGCIL JTCL N

9220 Vapi ‐ Magarwada

Ckt24‐Feb‐14 0900 4‐Feb‐14 1400 Daily AMP of line amp equipment WRTS‐II POWERGRID N

10 765 Seoni-Bina line with LR 4‐Feb‐14 800 4-Feb-14 1800 Daily AMP Work WRTS-2 WRTS-1 N

11 400 Bus I Bina 5‐Feb‐14 800 5‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

12220 Kawas ‐ Navsari (PG)

25‐Feb‐14 800 5‐Feb‐14 1800 Daily Replacement of ST insulators by Double Tension

insulator in Railway crossing spansWRTS‐II POWERGRID N

13400 Indoer (PG) ‐Indore

(MP) DC5‐Feb‐14 800 6‐Feb‐14 1800 Continou

sStringing of 765kV Indore ‐ Vadodara line WRTS‐II POWERGRID N

14 400 APL - Hadala 6-Feb-14 800 6-Feb-14 1800 Daily PMM GETCO GETCO N N

15 220 Seoni(PGCIL ) - Chhindwara CKT I

6-Feb-14 900 6-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N N

16 400 Jejuri-Koyna stg IV 6-Feb-14 900 6-Feb-14 1700 Daily QMwork MSETCL MSETCL N17 400 Akola-Nandgaonpeth 6-Feb-14 900 6-Feb-14 1700 Daily Quaterly Maintainance Work MSETCL MSETCL N18 400KV Korba-Bhatapara 6-Feb-14 900 7-Feb-14 1900 Cont Testing of LBB auto re-close M-I amp M-II relays NTPC NTPC N19 220 Haldarva - Jhanor - 2

(NTPC)6-Feb-14 900 6-Feb-14 1800 Daily PMM work GETCO N

20220 Navsar (PG) ‐Navsari

(GETCO) 16‐Feb‐14 800 6‐Feb‐14 1800 Daily Replacement of ST insulators by Double Tension

insulator in Railway crossing spansWRTS‐II POWERGRID

N

21 400 Bus‐II Bina 6‐Feb‐14 800 6‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

22400 Seoni‐Khandwa1 6‐Feb‐14 1000 6‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Khandwa end by MS ABB

WRTS‐II POWERGRID Rescheduled to 6th March N

23 400 Rajgarh-Ssp Ckt-II 7-Feb-14 900 7-Feb-14 1600 daily For maintenance work MPPTCL EHT- Mamp I N24 220 Chhegoan-Khandwa

Ckt -II7-Feb-14 900 7-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

25 220 Wardha (PG)-Wardha 7-Feb-14 800 7-Feb-14 1800 Daily AMP Work MSETCL WRTS-I N26 400 Chorania - Vadavi-2 7-Feb-14 800 7-Feb-14 1800 Daily PMM amp Tan Delta testing WRTGPL GETCO N27 400 Jabalpur‐Itarsi1 7‐Feb‐14 900 7‐Feb‐14 1400 Daily AMP OF TERMINAL EQUIPMENT WRTS‐II POWERGRID N

28220 Vapi(PG)‐ Bhilad ckt

2 amp 3 7‐Feb‐14 800 8‐Feb‐14 1800 Daily Line crossing work of 400KV LILO of Navsari‐Boisar

at MagarwadaGETCO POWERGRID N

29 220 Mapusa-Thivim 1 8-Feb-14 800 8-Feb-14 1800 Daily AMP Work GOA WRTS-I N

30400 Seoni‐Khandwa2 9‐Feb‐14 1000 9‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Khandwa end by MS ABB

WRTS‐II POWERGRID Rescheduled to 7th March N

31 220 Chhegoan-Khandwa Ckt -I

10-Feb-14 900 10-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

Annexure-32-C2OCC approved outage not availed in Feb‐2014

32132 132 kV Dhule

Dondaicha line10-Feb-14 800 11-Feb-14 1800 Cont Crossing of Dhule-Vadodara 765 kv SC Line MSETCL BDTCL subjected to sldc

clearance N

33 400132 KV

Vindhyachal ICT-1 10-Feb-14 900 14-Feb-14 1900 Cont ICT Overhauling NTPC NTPC N

34400 KV Vindhyachal - Jabalpur-

3 Line Shunt Reactor10-Feb-14 900 14-Feb-14 1900 Cont Reactor Overhauling NTPC NTPC

N

35 400 KSK-DB Power 10-Feb-14 800 13-Feb-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end WRTS-IDBKSK

KSK N36 220 Ipore-Kawas-1 10-Feb-14 800 10-Feb-14 1800 Daily PMM work GETCO N

37400 Vindhyachal‐Mahan 10‐Feb‐14 800 11‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐I WRTS‐II N

38400 Mahan‐Korba 10‐Feb‐14 800 11‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐I WRTS‐II N

39765 Jabalpur ‐ Bina 1 10‐Feb‐14 1000 10‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Jabalur end by MS ABB

WRTS‐II POWERGRID Differed by siteN

40 400 SSP - Rajgarh - 1 10-Feb-14 800 11-Feb-14 1800 Daily Basis

PMM Work GETCO N

41 400 DC Tundri (DB Power) -ksk-Raigarh

10-Feb-14 800 11-Feb-14 1800 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (092-100)

DB Power WRTS-I N42 400 Jetpur - Amreli - 1 11-Feb-14 800 12-Feb-14 1800 Daily PMM GETCO GETCO N43 400 Hadala - Vadinar-2 11-Feb-14 800 11-Feb-14 1800 Daily PMM GETCO GETCO N44 400 Nagda-Rajgarh Ckt-I 11-Feb-14 900 11-Feb-14 1800 daily For maintenance work MPPTCL EHT- Mamp I N45 220 Mehgaon-Auriya Ckt 11-Feb-14 900 11-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N46 220 Seoni(PGCIL ) -

Chhindwara CKT II11-Feb-14 900 11-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

47

765kV Main Bus-1B at SASANBay 13 - Jack Bus

11-Feb-14 900 21-Feb-14 1800 Daily Jumper Installations amp ConnectionsIsolator Allignment

PGCIL Reliance Provisional Subject to details of works done to be apprised on daily basis

N

48 220 Ipore-Kawas-2 11-Feb-14 800 11-Feb-14 1800 Daily PMM work GETCO N49 220 Navsari - Nasik - 2 11-Feb-14 900 11-Feb-14 1800 Daily PMM work GETCO N

50765 Jabalpur ‐ Bina 2 11‐Feb‐14 1000 11‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Jabalur end by MS ABB

WRTS‐II POWERGRID Deferred by siteN

51 400 Nagda-Rajgarh Ckt-II 12-Feb-14 900 12-Feb-14 1800 daily For maintenance work MPPTCL EHT- Mamp I N52 400 Karad-Solapur (PGCIL) 12-Feb-14 900 12-Feb-14 1700 Daily QMwork MSETCL MSETCL N53 400 Raipur-Sipat 1 amp 2 26-Feb-14 800 3-Mar-14 1800 Conti Diversion of line for Lafarge Railway track WRTS-I Lafarge Ori 12-16 Feb 14 Deferre N54 220 Haldarwa Kawas-2 12-Feb-14 900 12-Feb-14 1800 Daily PMM work GETCO N

55 220 Bus‐I Bina 12‐Feb‐14 800 12‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

56 400 Chorania - Hadala 13-Feb-14 800 14-Feb-14 1800 Daily PMM GETCO GETCO N57 400 Tarpur-Padghe-2 13-Feb-14 800 14-Feb-14 1800 Daily maintenance work POWERG

RIDNPCIL N

58400 Vindhyachal‐Satna1 13‐Feb‐14 1000 13‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

59 220 Bus‐II Bina 13‐Feb‐14 800 13‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

60 220 Pithampur-Rajgarh Ckt - I

14-Feb-14 900 14-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

61 220 Wardha (PG)-Badnera 14-Feb-14 800 14-Feb-14 1800 Daily AMP Work at Wardha MSETCL WRTS-I N

62 400 Bhusawal-Koradi 14-Feb-14 900 14-Feb-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL N

63 400 Raipur-KSK 14-Feb-14 800 16-Feb-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end WRTS-IKSK

KSK N

64 220 GWL(PGCIL)-Malanpur Ckt-II

15-Feb-14 900 15-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N

65 220 Pithampur-Rajgarh Ckt - II

15-Feb-14 900 15-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

66400 Vindhyachal‐Satna2 16‐Feb‐14 1000 16‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

67 220 KAPS - Haldarwa - 1 17-Feb-14 800 17-Feb-14 2000 Daily Yearly PM checks KAPS N

68400 3X105 MVA 400220Kv

X-mer I At Indore ss17-Feb-14 800 18-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI

N

69

220 SC Korba-Raigarh-Budhipadar sc(PGCIL) amp DC Korba-Budipadar both circuits (CSPTCL)

18-Feb-14 800 19-Feb-14 1800 Conti Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCLWRTS-I

WRTS-I

N

70 400 Itarsi-Bhopal Ckt-I 18-Feb-14 900 19-Feb-14 1700 daily For maintenance work MPPTCL EHT- Mamp I N71 220 Badod - Kota Ckt 18-Feb-14 900 18-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N72 220 Damoh(PGCIL) -

Damoh I C - II18-Feb-14 900 18-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

73 220 Badod - Modak Ckt 19-Feb-14 900 19-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

74220 KAPS - Ukai - Mota 19-Feb-14 800 19-Feb-14 2000 Daily Yearly PM checks KAPS Non consent from SLDC

GETCO N

75400 315 MVA 400220 KvX-

mer III At Indore ss20-Feb-14 800 21-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI

N

76 220 Seoni(PG)-Seoni 2 21-Feb-14 800 21-Feb-14 1800 Daily AMP Work MPPTCL WRTS-I Y N77 220 Bina(PGCIL)-Shivpuri

Ckt21-Feb-14 900 22-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI Y N

78 400 Koradi-Nandgaonpeth 21-Feb-14 900 21-Feb-14 1700 Daily QMwork MSETCL MSETCL N N79 220 Haldarva - Jhanor - 1

(NTPC)21-Feb-14 900 21-Feb-14 1800 Daily PMM work GETCO N

80

765kV Main Bus-2A at SASANSatna Line-2

22-Feb-14 900 28-Feb-14 1800 Contionious

Equipment ConnectionsCircuit Breaker TestingJumper MeasurementIsolator Allignment Reactor accessories erection on R-Phase

PGCIL Reliance

N

81 400 Korba-Raipur 3 amp 4 23-Feb-14 800 24-Feb-14 1800 Conti For Bus spliting work at Raipur765 KV Raigarh-Raipur and 765 Champa Raipur lines

WRTS-1 WRTS-1 N

82132 132kV Astha - Polai SC

line of MPPTCL24-Feb-14 800 25-Feb-14 1800 Continous Crossing of Bhopal -Indore 765 kv SC Line MPPTCL BDTCL subjected to sldc

clearance N

83 400 Bus-1 at Bilaspur 24-Feb-14 800 24-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I N

84400 Seoni -

Khedamara(Bhilai) Ckt25-Feb-14 900 25-Feb-14 1800 daily For maintenance workFeeder bay maintenance at

KMaraMPPTCL CSPTCLMPPT

CLNo confirmation on D-3

N

85400 Ranchi-Sipat 1 amp 2 25-Feb-14 800 26-Feb-14 1800 Conti Crossing work of upcoming 765 KV DC

Jharsuguda-Korba amp 765KV SC Ranchi-BilaspurWRTS-I WRTS-I No confirmation on D-3

N

86765 Sasan‐Satna2 25‐Feb‐14 800 26‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐II POWERGRID No confirmation on D-3 N

87400 Bus Reactor1 at Satna 25‐Feb‐14 1000 25‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

88400 400 kV DC Damoh -

Bhopal Line26-Feb-14 800 27-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL Not availed by agency for

rainsN

89400 Raipur-Bhadrawati 2 amp

327-Feb-14 800 27-Feb-14 2100 Daily For Bus spliting work at Raipur765 KV Raigarh-

Raipur and 765 Champa Raipur linesWRTS-1 WRTS-1 Subject to Telemetry from

Durg PS RaipurN

90 400 Birsinghpur‐Vandana Vidyut

27‐Feb‐14 800 27‐Feb‐14 1700 Daily AMP of Terminal Equipment amp line Reactor WRTS‐I POWERGRID Ready N

91 400 Bhusawal-Akola 28-Feb-14 900 28-Feb-14 1700 Daily QMwork MSETCL MSETCL N92 220 Bus-1 at Wardha 28-Feb-14 800 28-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I N93 400 Birsinghpur‐Balco 28‐Feb‐14 800 28‐Feb‐14 1700 Daily AMP of Terminal Equipment amp line Reactor WRTS‐I WRTS‐I Deferred by site N

94 400 Nagda‐Dehgam2 5‐Feb‐14 1000 5‐Feb‐14 1800 DailyCommissioning amp checking of CSD relay in Main CB for reactor switching at Dehgam end by MS ABB

WRTS‐II POWERGRID N

95 400 400kV Satpura Itarsi 10‐Feb‐14 900 11‐Feb‐14 1700 DailyCommissioning of new CB after dismantling of existing TELK make CB at Satpura end amp normalising of line on main CB

POWERGRID

WRTS‐II N

96 765 765 kV Satna - Bina Ckt I

6-Feb-14 800 8-Feb-14 1800 cont Stringing of Jabalpur-Bina 765 kv SC Line PGCIL JTCL Original27-28 Jan14 Def N

97 765400 765400 kV ICT-1 at Bina 20-Feb-14 90000 AM 21-Feb-13 60000 PM Continuou

sCSD commissioning for 400kV Side CB of 765400 kV ICT-1 WRTS-II POWERGRID Deferred by site N

98 400 Nagda - Dehgam 1amp2 20-Feb-14 80000 AM 28-Feb-14 1700 Daily Online PID testing to insulators in both circuits AR shall be kept in non auto mode in both circuits WRTS-II POWERGRID

N

99 220MC Waluj-Chitegaon amp Waluj-Jalna

21-Feb-14 700 21-Feb-14 1900 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad MSETCL WRTS-I

N

100 400 Bus 1 at Asoj 21-Feb-14 000 21-Feb-14 1800 Daily For checking bus stability testing of Piran 1 amp 2 bays (for charging of new line) GETCO WRTS-II N

101 400 Bus-1 at Wardha 22-Feb-14 800 22-Feb-14 1800 Daily Jumper spacers connection at Wardha WRTS-I WRTS-I N102 400 Bus-1 at Raigarh 22-Feb-14 800 22-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I Deferred by site N103 765 Bus - II at Indore 22-Feb-14 90000 AM 23-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Not availed NLDC consenN104 220 Kakrapar-Haldarwa2 22-Feb-14 1000 Hrs 22-Feb-14 1600 Hrs Daily AMP POWERG

RID WRTS-II N

105 400 Bus 2 at Asoj 22-Feb-14 000 22-Feb-14 1800 Daily For checking bus stability testing of Piran 1 amp 2 bays (for charging of new line) GETCO WRTS-II N N

106400 400 kv DC Bhopal -

Bina Line (Ckt I amp II)(Tower no 34 amp35)

23-Feb-14 800 24-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line MPPTCLBDTCL

N

107 765kV SASAN Main Bus-1BBay 10 - Jack Bus 24-Feb-14 800 Hrs 2-Mar-14 1900 Hrs Continuous Dia-4

(Bay-10) - SCCOCC Test of Unit 4 GTSasan Sasan N

108 765 Bus - I at Indore 24-Feb-14 90000 AM 25-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID N

109 765 765 KV Bina-Indore Line 24-Feb-14 0900 Hrs 24-Feb-14 1800 Hrs Daily

For taking spare reactor unit in service amp checking the scheme for spare reactor with 765 KV Bina-Indore Line Reactor at Bina

POWERGRID WRTS-II

Deferred by site N

110 400 Kasor - GPEC 24-Feb-14 800 25-Feb-14 1800 Daily PMM Work GETCO GETCO N111 40022033 315 MVA ICT2 at Kheda 24-Feb-14 900 10-Mar-14 1800 cont modification work in SS lay out CSPTCL CSPTCL N112 400 315 MVA ICT2 at

Gwalior 25-Feb-14 90000 AM 25-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID N

113 400KV V-Satna-4 Line Shunt Reactor 25-Feb-14 1000 25-Feb-14 2000 Daily

Basis AMP NTPC NTPC N

114 400 Raipur-Wardha 1 26-Feb-14 800 26-Feb-14 2000 Daily Balance construction works at Wardha end WRTS-I WRTS-IReady Ori26214 Deferred by site

N

115 400 Bus -I at Indore 26-Feb-14 90000 AM 26-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Deferred by site N116 400 315 MVA ICT3 at

Gwalior 26-Feb-14 90000 AM 26-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID N

117 400 400 kV DC Damoh - Bhopal Line

26-Feb-14 800 26-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL N

118 400 Chorania-Kasor 26-Feb-14 800 26-Feb-14 1800 Daily PMM work GETCO GETCO N119 400 Koradi-Satpura sc 26-Feb-14 800 26-Feb-14 1600 Daily 765KV Tiroda Koradi Transmission LineII crossing

worksPOWERGRID MEGPTCL Cancelled by MEGPTL N

120 400 400 kV DC Damoh - Bhopal Line

26-Feb-14 800 26-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL N

121 400 Raipur-Wardha 2 27-Feb-14 800 27-Feb-14 2000 Daily Balance construction works at Wardha end WRTS-I WRTS-I Deferred by site N122 400 Vindhyachal-Satna2 27-Feb-14 1000 27-Feb-14 1800 Daily Commissioning of CSD Relay in ABB make main

CB at Satna WRTS-II POWERGRID Deferred by site N

123 400 Bus -II at Indore 27-Feb-14 90000 AM 27-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Ready N124 400 315 MVA ICT1 at

Rajgarh 27-Feb-14 90000 AM 27-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID Ready N

125 400400 KV SC Kosamba - Asoj line(730-740)

27-Feb-14 700 27-Feb-14 1800 cont Crossing of Dhule - Vadodara 765 kv SC Line GETCOBDTCL

N

126 400 Indore (MP) -Indore (PG)-DC 27-Feb-14 700 28-Feb-14 1600 Cont Stringing of 765kV Indore - Vadodara line POWERG

RID WRTS-II Deferred by site N

Anaulagnak 33(A)

maaca- 2014 AaOr Ap`Ola 2014 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR MARCH 2014 AND APRIL 2014

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)maaca- 2014 Ap`Ola 2014 maaca- 2014 Ap`Ola 2014

MARCH 2014 APRIL 2014 MARCH 2014 APRIL 2014

1 gaujarat

saIimat 11700 12100 7750 7800

AsaIimat 11740 12140 7760 7810

2 maQya p`doSa

saIimat 8340 9050 5338 5540

AsaIimat 8340 9050 5338 5540

3 CltaIsagaZ

saIimat 3200 3075 1929 1809

AsaIimat 3225 3105 1944 1827

4 maharaYT

saIimat 19000 19150 10200 10300

AsaIimat 19050 19200 10250 10350

5 gaaovaa

saIimat 425 410 300 295

AsaIimat 425 415 310 300

6 dmana dIva

saIimat 340 345 210 205

AsaIimat 345 350 225 210

7 DI ena eca

saIimat 635 640 445 425

AsaIimat 635 640 445 425

8 piScama xao~

saIimat 41961 43047 28500 27900

AsaIimat 42076 43173 29560 28840

Diversity factor of 10401

March 2014 and April 2014

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah frvarI 2014

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 1552 75

]k[- Ukai - 2 1719 75]k[- Ukai - 3 598 75]k[- Ukai - 4 1757 75]k[- Ukai (Total) 5627 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 024 2]k[- ela baI saI eca Ukai LBCH - 2 131 3]k[- ela baI saI eca Ukai LBCH (Total) 154 5 0008

3 kDanaa Kadana - 1 000 0 0005kDanaa Kadana - 2 246 62 0000kDanaa Kadana - 3 223 62kDanaa Kadana - 4 166 63 0000kDanaa Kadana (Total) 634 63 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 431 9 0020 6 kula jalaIya TOTAL(H) 6846 225 0401

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 2060 32 21822 TaoronT pavar ilaimaToD yauinaT DI 7979 125 69803 TaoronT pavar ilaimaToD yauinaT [- 075 122 07584 TaoronT pavar ilaimaToD yauinaT ef 8023 124 66915 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 018811 Qauvarna tapIya Dhuvaran - GT 2 000 0 041912 Qauvarna tapIya Dhuvaran - STG 023 1013 ]ka[- yauinaT 1 Ukai -1 000 0 005114 ]ka[- yauinaT 2 Ukai -2 000 0 010815 ]ka[- yauinaT 3 Ukai -3 3147 200 297216 ]ka[- yauinaT 4 Ukai -4 10588 202 1002617 ]ka[- yauinaT 5 Ukai -5 9496 210 884118 ]ka[- yauinaT 6 Ukai -6 23703 500 1844819 gaaMQaInagar 1 Gandhinagar - 1 000 0 008620 gaaMQaInagar 2 Gandhinagar - 2 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 000 0 029622 gaaMQaInagar 4 Gandhinagar - 4 000 0 036223 gaaMQaInagar 5 Gandhinagar - 5 11676 212 1148924 vaNakbaaorI 1 Wanakbori - 1 10648 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 11069 21026 vaaNakbaaOrI 3 Wanakbori - 3 1891 20627 vaaNakbaaOrI 4 Wanakbori - 4 5244 21228 vaaNakbaaOrI 5 Wanakbori - 5 5531 21029 vaaNakbaaOrI 6 Wanakbori - 6 000 030 vaaNakbaaOrI 7 Wanakbori - 7 8902 20931 ]trna Utran GT 1 000 0 019832 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 000 0 024635 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 000 0 0000

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Anaulagnak 41

ACTUAL GENERATION amp AVALABILITY FOR FEBRUARY 2014Actual vaastivak

Actual vaastivak

37 isaka Sikka - 1 3696 112 439838 isaka Sikka - 2 000 0 017639 kcC ilagnaa[-T Kutch Lignite - 1 4429 71 848640 kcC ilagnaa[-T Kutch Lignite - 2 4037 7241 kcC ilagnaa[-T Kutch Lignite - 3 3646 6742 kcC ilagnaa[-T Kutch Lignite - 4 2215 66 525343 saUrt ilagnaa[-T Surat Lignite - 1 6705 131 682544 saUrt ilagnaa[-T Surat Lignite - 2 7475 131 738745 saUrt ilagnaa[-T Surat Lignite - 3 6965 130 728846 saUrt ilagnaa[-T Surat Lignite - 4 6362 130 688647 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5454 107 848648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5649 11449 jaI Aa[- pI saI ela GIPCL GT - 1 1589 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1587 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1702 3552 jaI Aa[- pI saI ela GIPCL ST - 1 2902 5153 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 020556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 000 0 000060 jaI pI [- saI GPEC GT - 2 267 156 013261 jaI pI [- saI GPEC GT - 3 143 146 002762 jaI pI [- saI GPEC STG 131 17263 jaI esa [- jaI GSEG GT - 1 000 0 098964 jaI esa [- jaI GSEG GT - 2 1181 5065 jaI esa [- jaI GSEG STG 642 2366 Sugen (GT 1 + GT 2) 1767 308 602467 saIpIpI sao Aayaat Imp from CPP+MUNDRA 269359 6881

kula tapIya Total (T) 475652 8386 302021kula jalaIya+tapIya Total (H+T) 482498 8604 302422ivaMD [najaI- Wind Energy 52123kula jalaIya+tapIya+hvaa Total (H+T+Wind) 534621 9539ivainamaya Exchanges 155314 saIimat jaa- maaMga Restricted Energy Req 689935

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 6800 194

11 gaaMQaI saagar Gandhi Sagar 3366 117 008012 raNaa p`tap sagar RPSagar 5883 172 004013 javaahr sagar Jawahar Sagar 4350 99 0050

2 ponca Pench 3052 165 00903 baargaI Bargi 4581 91 00804 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 11764 315 02806 banasaagar Bansagar-2 (Deolondh) 000 07 banasaagar Bansagar-3 (Silpara) 1236 32 00708 banasaagar Bansagar-4 (Zinaha) 1320 22 00509 maoDIKoDa Medikheda 396 63

10 ibarisaMGapur Birsingpur 040 20 002011 Tavaa Tawa 000 012 rajaGaaT Rajghat 165 12 006013 Omkareshwar 10620 402 14 [Midra saagar Indira Sagar 23077 997 0849

kula jalaIya TOTAL(H) MPPGCL 59999 2365 1273Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 6049 98 232502 AmarkMTk II AMK II Unit -2 6080 983 AmarkMTk III AMK III Unit -5 12212 219 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 06505 satpura II Satpura-II Unit 6 10323 180 165906 satpura II Satpura-II Unit 7 5926 1807 satpura II Satpura-II Unit 8 10964 195 191608 satpura II Satpura-II Unit 9 8353 1709 satpura III Satpura-III Unit 10 000 0 2080

10 satpura III Satpura-III Unit 11 9447 182 1909011 esajaITIpIesa 1 SGTPS Unit - 1 9447 182 1909012 esajaITIpIesa 2 SGTPS Unit - 2 10572 18213 esajaITIpIesa 3 SGTPS Unit - 3 9037 192 2064014 esajaITIpIesa 4 SGTPS Unit - 4 10700 18015 esajaITIpIesa 5 SGTPS Unit - 5 28804 51216 SSTPS 6864 587 8930

kula tapIya Total (T) 133714 3002 115350kula jalaIya+tapIya Total (H+T) 193713 5735 116623Injection from WIND 000 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 193713 5735ivainamaya Exchanges 193660 saIimat jaa- maaMga Rest En Req 387372

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 850 120 00902 Gangrel 475 10 00503 Mini Micro KWB 039 7

kula jalaIya TOTAL(H) CSEB 1364 137 0150tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 47 127402 kaorbaa (pU) Korba (E) Unit-2 2764 483 kaorbaa (pU) Korba (E) Unit-3 2764 484 kaorbaa (pU) Korba (E) Unit-4 2784 465 kaorbaa (pU) Korba (E) Unit -5 3685 120 253306 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 247808 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 15410

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 15839 256 1197012 KORBA(EB) Extn - 2 15876 256 11770

kula tapIya Total (T) 119907 1880 10190013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 119907 1880kula jalaIya+tapIya Total (H+T) 121271 2017 102050ivainamaya Exchanges 40207 0saIimat jaa- maaMga Rest En Req 161478 2017

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 9590 585 25142 kaoyanaa III Koyna III 5920 3203 kaoyanaa IV Koyna IV 18012 11324 kaoyanaa DIpIeca Koyna DPH 1442 385 TaTa jalaIya TATA Hydro 10242 741 28836 vaOtrNaa Vaitarna 000 07 eladarI Eldari 528 168 BaTgar AaOr vaIr Bhatgar amp Vir 915 49 pOzana Paithan 175 59

10 itlaarI Tillari 1106 6511 BaIra Tola rosa Bhira Tail Race 374 4112 GaTGar Ghatghar 5297 29313 Anya CaoTo jalaIya Small Hydro (others) 6173 0

kula jalaIya TOTAL(H) 58910 1599 5397Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 7700 1954 naaisak 4 Nasik Unit -4 10772 1965 naaisak 5 Nasik Unit -5 11160 1976 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 28827 5058 Tambao 6 Trombay Unit -6 000 09 Tambao 8 Trombay Unit -8 000 0

10 Tambao 7A gaOsa Trombay -7A (Gas) 7882 135 250411 Tambao 7ba Trombay -7B (WHR) 4499 7212 kaoraDI 5 Koradi Unit -5 5003 16013 kaoraDI 6 Koradi Unit -6 3963 19014 kaoraDI 7 Koradi Unit -7 10015 19015 Bausaavala 2 Bhusawal Unit -2 8329 17016 Bausaavala 3 Bhusawal Unit -3 9248 18017 Bausaavala 4 Bhusawal Unit -4 22734 50518 Bausaavala 4 Bhusawal Unit -5 19742 41519 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 7451 18621 parlaI 5 Parli Unit -5 10626 18022 parlaI 6 Parli Unit -6 14013 25323 parlaI 7 Parli Unit -7 13728 26024 KaprKoDa 1 Khaperkheda Unit -1 11173 20025 KaprKoDa 2 Khaperkheda Unit -2 10373 19526 KaprKoDa 3 Khaperkheda Unit -3 10998 20127 KaprKoDa 4 Khaperkheda Unit -4 12019 20728 KaprKoDa 5 Khaperkheda Unit -5 28882 50730 parsa Paras-3 14447 25731 parsa Paras-4 13504 25932 ]rna Uran (Gas) 18284 33833 ]rna Uran (WHR) 000 148 586234 caMd`pur 1 Chandrapur Unit -1 9087 17735 caMd`pur 2 Chandrapur Unit -2 1816 19436 caMd`pur 3 Chandrapur Unit -3 11737 21037 caMd`pur 4 Chandrapur Unit - 4 11843 46038 caMd`pur 5 Chandrapur Unit -5 7759 45539 caMd`pur 6 Chandrapur Unit -6 24420 44240 caMd`pur 7 Chandrapur Unit -7 23258 041 DhaNaU 1 Dahanu Unit-1 16339 250 1427842 DhaNaU 2 Dahanu Unit-2 16196 250 1427843 CPP 193651 29840044 RGPPL Share 000 0

kula tapIya Total (T) 631479 15369 329920MAH Wind + Solar Generation 16922 0kula jalaIya +tapIya Total (H+T+Wind) 707311 17451 372239

TOTAivainamaya Exchanges 324731saIimat jaa- maaMga Rest En Req 1032042

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1871 26ivainamaya Exchanges 33252saIimat jaa- maaMga Rest En Req 35123 434

C (F) dmana AaOr dIva DAMAN amp DIU 18245 298ja (G) dadra nagar hvaolaI DNH 40600 655

kula DD ampDNH (T) 58845 952Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 9600 160 1399112 tara`pur 2 TAPS Unit -2 11069 16013 tara`pur 3 TAPS Unit -3 36144 545 6584014 tara`pur 4 TAPS Unit -4 36197 54715 kakrapr 1 KAPS Unit -1 15230 545 3134216 kakrapr 2 KAPS Unit -2 14662 547

kula ena pI saI NPC Total 122901 25042 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14008 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 13913 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14076 214 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 32894 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 33204 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 33190 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33176 514

kula kaorbaa KSTPS Total 174461 2498 10394427 ivanQa esaTIpIesa 1 VSTPS Unit-1 12762 21328 ivanQa esaTIpIesa 2 VSTPS Unit-2 12708 21529 ivanQa esaTIpIesa 3 VSTPS Unit-3 12854 212210 ivanQa esaTIpIesa 4 VSTPS Unit-4 12909 214211 ivanQa esaTIpIesa 5 VSTPS Unit-5 12174 215212 ivanQa esaTIpIesa 6 VSTPS Unit-6 12625 214213 ivanQa esaTIpIesa 7 VSTPS Unit-7 31487 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 31075 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 31592 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 31488 512217 ivanQa esaTIpIesa 11 VSTPS Unit-11 30948 512

kula ivanQayaacala VSTPS Total 232623 3750 15107 31 saIpt -1 -SIPAT-1 38822 66400 32 saIpt -2 -SIPAT-2 32404 66500 33 saIpt -3 -SIPAT-3 38930 66300 34 saIpt -4 -SIPAT-4 26383 51600 35 saIpt -5 SIPAT-5 26400 51400

kula saIpt -SIPAT TOTAL 162939 285000 838941 kvaasa gaOsa 1e Kawas GT-1A 792 10742 kvaasa gaOsa 1baI Kawas GT-1B 2623 10943 kvaasa esaTI 1saI Kawas ST-1C 1571 11444 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 4986 304 222951 gaMQaar gaOsa 1 Gandhar GT-1 000 052 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 000 054 gaMQaar esaTI 4 Gandhar ST-4 000 0

kula gaMQaar GGPS Total 000 0 000061 maaOda 1 Mauda -1 19614 514 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 19614 514 1422661 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 000 31 000071 esa esa pI SSP RBPH - 1 6753 19372 esa esa pI SSP RBPH - 2 5907 19273 esa esa pI SSP RBPH - 3 5577 19574 esa esa pI SSP RBPH - 4 5513 19475 esa esa pI SSP RBPH - 5 7237 19476 esa esa pI SSP RBPH - 6 3109 19277 esa esa pI SSP CHPH - 1 1817 4078 esa esa pI SSP CHPH - 2 491 3679 esa esa pI SSP CHPH - 3 000 0710 esa esa pI SSP CHPH - 4 1639 39711 esa esa pI SSP CHPH - 5 901 37

kula esa esa pI SSP Total 38944 1312 389481 kula poMca Pench Total 3052 165 009082 Jindal Injection 38956 083 Amarkantak Lanco 15478 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2372740

(J) ]plabQata Availability 2308426 naoT ivainamaya Net Exchanges -292048 ]plabQa jaa- Energy Availability 2016379

maah frvarI 2014 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR FEBRUARY 2014 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 11532 - - - 11532 020214 1100 4993

saIimat Restricted 11700

AsaIimat Unrestricted 11740 11532 0 28 0 11560 010214 1200 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8366 8366 17022014 0500 5007

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9346 - - - 9346 120214 0900 4986

saIimat Restricted 8340

AsaIimat Unrestricted 8340 9346 0 38 0 9384 120214 0900 4986

nyaUnatma pMjaIkRt maaMga Min Registered Demand 3204 3204 270214 0200

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3210 3210 070214 1900 4989

saIimat Restricted 3200

AsaIimat Unrestricted 3225 3210 233 12 0 3246 070214 1900 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1617 1617 230214 2300 5021

maharaYT MAHARASHTRApMjaIkRt Registered 18510 - - - 18510 050214 1100 4984

saIimat Restricted 19000

AsaIimat Unrestricted 19050 17980 1655 -13 0 19622 190214 1200 5002

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12005 12005 280214 0400 5037

gaaovaa GOApMjaIkRt Registered 425 434 - - 434 130214 1400 5006

AsaIimat Unrestricted 425 434 1 -1 - 434 130214 1400 5006

nyaUnatma pMjaIkRt maaMga Min Registered Demand 311 311 100214 0300

essaar ESSAR(ESIL)pMjaIkRt Registered 487 - - 487 240214 1700 5004

AsaIimat Unrestricted 487 0 0 - 487 240214 1700 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 268 - - 268 250214 1200 5003

AsaIimat Unrestricted 268 0 0 - 268 250214 1200 5003

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 644 - - 644 260214 1200 4999

AsaIimat Unrestricted 644 0 - 644 260214 1200 4999

nyaUnatma pMjaIkRt maaMga Min Registered Demand 508 508 280214

piScama xao~ WESTERN REGIONpMjaIkRt Registered 42253 - - - 42253 110214 1100 4994

saIimat Restricted 41961

AsaIimat Unrestricted 42076 42021 850 235 0 43106 120214 1100 4994

nyaUnatma pMjaIkRt maaMga Min Registered Demand 27524 27524 280214 0400 5040 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

piScama xaoi~ya Baar p`oYaNa kond` mauumba[-

णाली चालन-ISO-I

ANNEXURE-43

माह फरवर 2014 February2014

समातरवतीय चालन PARALLELRADIAL OPERATION

TOTAL OPERATING

HOURS 1 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-NR) 66972

2 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-SR) 67200

टाई लाईन TIE LINE 1 765कवी िसवनी स वधा-I 765kV Sonito Wardha 67200 2 765कवी िसवनी स वधा-II 765kV Seonito Wardha 65247 3 400 कवी िभलाई स कोराड 400kV Bhilai to Koradi 67200

4 400 कवी िभलाई स भिावती 400kV Bhilai to Bhadravati 67200

5 400 कवी रायपर स भिावती-I 400kV Raipur to Bhadravati-I 67200

6 400 कवी रायपर स भिावतीETHII 400kV Raipur to Bhadravati-II 67139

7 400 कवी रायपर स भिावतीETHIII 400kV Raipur to Bhadravati-III 67200

8 400 कवी सातपरा स कोराड 400kV Satpura to Koradi 67200

9 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 67004 10 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 65308 11 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 66259 12 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 67200 13 400 कवी को हापर स मापसा-I 400kV Kolhapur-Mapusa-I 38740

14 400 कवी को हापर स मापसा-II 400kV Kolhapur-Mapusa-II 49532

15 400 कवी वापी स बोईसर 400kV Vapi-Boisar 67200

16 400 कवी रायगढ़ स ःटरलाइट-I 400kV Raigarh to Sterlight-I 66258

17 400 कवी रायगढ़ स ःटरलाइट-II 400kV Raigarh to Sterlight -II 67200

18 400 कवी रायगढ़ स झरसगड़ा-I 400kV Raigarh to Jharsuguda-I 67200

19 400 कवी रायगढ़ स झरसगड़ा-II 400kV Raigarh to Jharsuguda-II 67200

20 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 65028

21 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 66132

22 400 कवी रायपर स वधाETHI 400kV Raipur to Wardha-I 66836

23 400 कवी रायपर स वधाETHII 400kV Raipur to Wardha-II 67200

24 220 कवी कोरबा पव स ब पादर-III 220kV K(E) to Budhipadar-III 63853

Anaulagnak 47Annex-47

maah frvarI 2014 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39514 64944

10287 39711

Levels in Mtrs str maITr maoM

]ka[- Ukai

64392

9914

25402

25994

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF FEBRUARY 2014

ivavarNa Particulars

TRIPPING DETAILS FOR THE MONTH OF FEBRUARY 2014

Sr No Brief Details of incident (Elements Generation Tripped) Owner Utility Date amp Time Load

Gen LossCategory

1 Multiple Tripping from 400 kV New Koyna MSETClMSEGCLRGPPL 05‐02‐2014 0950 Hrs ‐ GI‐2

2Bus Bar protection mal‐operation at 400 kV Soja in Gujarat resulting in multiple Tripping

GETCO 06‐02‐2014 1755 Hrs ‐ GI‐2

ANNEXURE ‐ 5

  • annexpdf
    • 21pdf
    • 231pdf
    • 232pdf
    • 24pdf
    • 25pdf
    • 31pdf
    • 32C1pdf
    • 32C2pdf
    • 33Apdf
    • 41pdf
    • 42pdf
    • 47pdf
    • 5pdf
Page 15: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014

15

457th OCCM AGENDA

Each document mentioned in check list from Sl No 1 to 10 must be attached for sake of completeness and emailed as a consolidated document to the nodal RLDC well before the new element charging date The sub-committee may like to discuss ITEM NO 96 OPENING FEEDERS WITHOUT PRIOR INTIMATION TO WRLDC

It was gathered based on the observation from WRLDC SCADA data and subsequent

discussion with MPPTCL that 220 kV Bina (MP)-Gwalior(MP) DC were taken under

shut down for LILO works at Datia at 0910hrs on 23022014 for 4 days The outage

of these lines was neither discussed in OCC and neither was there any intimation to

WRLDC before availing the outage These lines are included in the important grid

elements list of Western region and prior concurrence of WRLDC is required for

switching these lines Further these lines form the parallel path to 765 kV Bina-Gwalior

DC and with the shutdown of these lines the network upstream of WR-NR inter

regional corridor was depleted

The sub-committee may like to discuss ITEM NO 97 TRIPPING OF 765 KV LINES ON OVER VOLTAGE Recently several tripping of 765 kV lines have been reported on over voltage These are indicated below

1) 765 kV Bina-Gwalior I at 2358 hrs of 16022014 2) 765 kV Bina-Gwalior I at 2011 hrs of 14022014 3) 765 kV Satna-Gwalior at 1300 hrs of 06022014 4) 765 kV Sasan-Satna II at 0013 hrs of 18012014 5) 765 kV Jabalpur-Bina I at 2350 hrs of 10012014 6) 765 kV Jabalpur-Bina II at 0405 hrs of 06012014

It is understood that the adopted Stage-I OV setting for the above lines vary from 108 (ie 826 kV) to 110 (841 kV) As per SCADA data the bus voltage at any of the substations mentioned above had not reached 826 kV during the above incidents

POWERGRID may examine the above tripping in detail and apprise the OCC regarding the above In case of issues related with protective relays field equipment are detected these may be addressed at the earliest The sub-committee may like to discuss

16

457th OCCM AGENDA

ITEM NO 98 RGMO FGMO OF MANDATED GENERATORS IN WESTERN REGION

As per the latest information available at WRLDC there are 251 number of units with a total capacity of 57517 MW in Western Region that are mandated to operate in Restricted Free Governor Mode The need for compliance to the IEGC regulations wrt RGMOFGMO was emphasized in the 455th and 456th OCC meeting as well as during the 25th TCCWRPC meeting Subsequently it was communicated by email to all entities in WR to provide the latest status of RGMOFGMO implementation We have received updated status from MPPTCL LANCO CGPL DB Power and JPL Tamnar in Feb 2014 The latest state wise RGMOFGMO summary is given below

Name of Entity No of mandated units

RGMO FGMO available at

RGMOFGMO Not available at

Maharashtra 90 35 55 Madhya Pradesh 58 36 22 Gujarat 35 19 16 Chhattisgarh 10 3 7 CGPL 5 5 0 NCA 11 6 5 SASAN 2 1 1 NTPC 24 10 14 ESSAR_Mahan 1 1 0 NSPCL 2 2 0 KSK 1 1 0 KWPCL 1 0 1 DB POWER 1 1 0 JPL 5 4 1 LANCO 2 2 0 IEPL 1 0 1 EMCO 2 0 2 WR_Total 251 126 125

WRLDC vide its letter ref WRLDCRGMO-FGMO1-2014 dated 23012014 has issued directions under Section 29 of the Electricity Act to ensure compliance of IEGC regulations 52 (f) (g) (h) and (i) All utilities are requested to furnish the status of compliance in respect of generating units under their jurisdiction The sub-committee may like to discuss ITEM NO 99 STATUS OF TELEMETRY IN WESTERN REGION

The status of telemetry related issues in respect of WR constituents is as under

a) Chhattisgarh Data (except MW) from 500 MW Korba West extension generating station is not available Status points from 400 kV Raita pending

17

457th OCCM AGENDA

b) Madhya Pradesh Telemetry of following bus reactors is not available at WRLDC

S No

Station Name Bus Reactor

Nunber x Capacity

Total MVAR

Rated voltage

Status of Telemetry at

WRLDC1 Nagda 250 100 420 Not available2 Indore 225 50 33 Not available3 Bhopal 225 50 33 Not available4 Birsinghpur 150 50 420 Not available

c) Gujarat Data is not-availableintermittent from following stations in Gujarat

a 220 kV Nano of Tatamdash(not available) b Kansari 400 kV ss and Navsari 220 kVhellipIntermittent (PLCC Problem)

d) Goa Due to non-availability of SCADA data from Goa the difference between drawal as seen in SCADA and as recorded in SEM is as high as 572 during the period 1st Feb to 16th Feb 2014 Data from the following stations in Goa is not available at WRLDC S No Station Status

1 Amona 220 kV Not available 2 Cuncolin 220 kV Not available 3 Kadamba 110 kV Intermittent 4 Tivim 220 kV Intermittent 5 Ponda 220 kV Intermittent 6 Xeldam-220 kV Intermittent 7 Verna-110 kV Intermittent

e) Daman amp Diu

Due to non-availability of SCADA data from Daman amp Diu the difference between drawal as seen in SCADA and as recorded in SEM is as high as 571 during the period 1st Feb to 16th Feb 2014 Data from The error is mainly due to non-availability of data from 220 kV Magarwada

f) DNH Telemetry from 220 kV Kharadpara and Khadoli station is not available

g) POWERGRID The data from the following stations is not available at WRLDC

1) 765 kV Tamnar (Communication problem GPRS link is not stable)

18

457th OCCM AGENDA

Telemetry from following stations is Intermittent at WRLDC 1) 765 kV Durg (PLCC frequent problems)

2) 765 kV Kotra (communication intermittency)

3) 765 kV Gwalior (PLCC link established but still there is some

issue(Delay) in data updation at WRLDC Rectification work under

progress by Site Engineer

4) 765 kV Solapur - Redundant link established through Reliance but

the gateway connected to above link is not configured for 765 KV

data Hence when BSNL link is down 765 KV data is not updating at

WRLDC

The sub-committee may like to discuss

ITEM NO 910 COMPARISON OF DRAWAL AS SEEN IN SCADA VS SEM The IEGC second amendment and the Deviation Settlement Mechanism is in force since the 17022014 The IEGC stipulates maintaining injection drawal within the limits prescribed in the Deviation Settlement Mechanism The sub-committee may like to discuss ITEM NO 911 MOCK BLACK START EXERCISE

As per sec 58(b) of IEGC the usersSTUs etc need to conduct Black start mock

exercises in their respective systems once in every six month under intimation to

RLDC Also the all the black start Diesel Generator (DG) sets are [as per sec 58(b)

of IEGC] required to be tested weekly and the test report needs to be sent to RLDC

on quarterly basis

The following table summarizes the status of mock exercises in respect of black start

facilities in Western Region

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

GUJARAT

1 Ukai (H) 4 x 75 Hydro Diesel 500 kVA 221213 Y

2 Mini Hydro 2 x 25 Hydro Diesel 50 KW N

3 Kadana 4 x 60 Hydro Diesel 500 KVA 2413 Y (2413)

19

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

4

Dhuvaran

1 x 107 (68+39) + 1 x 112 (72+40)

Gas

Details to be furnished by Gujarat

Details to be furnished by Gujarat

N

5 GIPCL-I 3 x 32 + 1 x49

Gas Steam Diesel 141 KW

070912 Y

6 GIPCL-II 1x104+1x56 Gas Steam Diesel 500 kVA N

7

Torrent Power Stn C Stn- DEFCCPP

StnC2x30 StnD120 StnEF(110MW each)CCPP100MW

Thermal (Units-CDEF) Gas(CCPP)

Stn-C islands Diesel

StnC15kVA StnDE F and CCPP(500 kVA each)

281112

Y

8 GPEC 3x138+1x241 Thermal Natural Gas 3000 kVA N

9 Sugen 3x3825 MW Gas Diesel 2x6MVA N

Madhya Pradesh

10 Gandhisagar 5 x 23 Hydro DG set 100 kVA N

11 Birsinghpur 1 x 20 Hydro Battery 220 Volt

Battery N

12 Pench 2 x 80 Hydro DG set 250 kVA 121012 Y

13 Bargi 2 x 45 Hydro DG set 250 kVA 100212 Y

14 Bansagar Stage-I 3 x 105 Hydro DG set 250 kVA N

15 Indira Sagar 8x125 Hydro DG set 2x1000

KVA 22511 Y

Chhattisgarh 16

Hasdeo Bango 3 x 40 Hydro DG Set 250 kVA 250812 N

17

Korba(E)-phse-I

Power plant retired but Black start DG set available and on- load trial is reported to be carried out regularly

DG Set 1500 kW(33kV)

N

Maharashtra

18

Koyna I amp II

4 x 65 4 x 75 Hydro

House generator

2 MVA 231013 N

19 KDPH 2 x20 Hydro DG set 310 KW N

20 Eldari 3 x 75 Hydro DG set 6 KW N

21

Uran (Gas)

4 x 60 (GT) + 4x108 (GT)+ 2x120 WHR

Gas DG set

4 MW PH1412kVA PH2450kVA WH520kVA

161012

N

20

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

22 RGPPL

Block 1 640MW+Block 2 66354MW+Block 3 66354MW

Gas

Gas Turbine (Frame-6)

35 MW (Under testing) Details to be provided by RGPPL

N

23 Ghatghar 2x125 Hydro DG set 1x1250

kVA 51012

N

24 Khopoli 3x24+2x12 Hydro

DC Governor amp bearing oil pumps

DC power (self start)

271013 (detailed report awaited)

N

25 Bhivpuri 3 x 24 +

2 x 15 +2x12 Hydro

DC Governor amp bearing

-do-

N

26 Bhira 6 x 25 Hydro

1 Noof 500 KVA house generator with water turbine

500 kVA

201013 (detailed

report awaited)

N

27

Bhira PSS 1 x 150 Hydro DG set 500 kVA

N

28 Trombay 1 x 120 Gas

Turbine DG Set 25 MW

N

1 x 60 Steam Turbine

NTPC

21

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

29 Kawas 4 x 106 2 x 116 Gas Diesel 2850 KW 151013

N

30 Gandhar 3 x 144 + 1x225 Gas Diesel 2975 KW

N

NCA

31 SSP(RBPH amp CHPH) 6x200+550 Hydro Diesel 2x1000kVA 080412

N

Accordingly the Black start capable stations may forward their tentative plan for conducting Black start exercises in compliance to sec 58(b) of IEGC bull As per the communication for MPPTCL the tentative plan of Black start in Madhya

Pradesh system is given under SL No Name of the Station Tentative Date Remarks 1 Pench March 2014 DG set at Pench amp are Bargi

under outage 2 ISP Apr-May 2014 - 3 TONS June 2014 Governor Problem being

attended 4 Birsinghpur June 2014 -do- 5 Medikheda June 2014 -do- 6 Rjghat June 2014 -do- Other utilities may also update their tentative plan for black start

The sub-committee may like to discuss

22

457th OCCM AGENDA

ITEM NO 912 HEALTHINESS OF MAIN CIRCUIT BREAKER OF 400 KV BIRSINGPUR-KATNI-I AT KATNI END The main CB of Birsingpur-Katni-I is under shut down since 2350 hrs of 14th February 2013 Representatives from MPPTCL may kindly apprise on the progress and expected date of restoration of the Main CB of 400 kV Birsingpur-Katni-I at Katni end The sub-committee may like to discuss

ITEM NO 913 TESTING OF SPS RELATED TO TRIPPING OF BINA-GWALIOR-AGRA AT CGPL VINDHYACHAL AND KORBA

As per the information received from NTPC and CGPL the SPS for the 765 kV Bina-

Gwalior-Agra has been installed and a mock drill has to be carried out for the same

The matter was discussed in the 456th OCC and it was decided that SPS may be

tested for reduction of say 50MW for each station instead of backing down of entire

500MWs POWERGRID WRTS-2 may confirm the testing schedule so that the

same could be coordinated in from WRLDC

The sub-committee may like to discuss

ITEM NO 914 SPS AT SIPAT WRLDC vide letter No WRLDCMO-I17192013 dt 21613 requested to take up this matter with the concerned for early implementation of the SPS Status of the SPS at NTPC Sipat is as under

1 449th OCC SPS was proposed by WRLDC It was decided to have a

separate meeting to finalize the scheme 2 450th OCC Member Secretary WRPC intimated that the matter will be

discussed in 119th PCM on 3rd amp 4th September 2013 at Tarapur 3 451st OCC It was intimated that the issue of SPS of Sipat was discussed in

119th PCM held on 3rd amp 4th September 2013 at TARAPUR The tentative scheme were formulated which needed finer tuning

4 452nd OCC Matter not discussed 5 453rd OCC NTPC representative intimated proposal sent to their corporate

office for engineering approval 6 454th OCC Approval from our corporate office is yet to be obtained 7 455th OCC Approval from our corporate office is yet to be obtained 8 456th OCC Approval from corporate office has been obtained and would be

forwarded to WRPC for approval The sub-committee may like to discuss

23

457th OCCM AGENDA

ITEM NO 915 SPS AT 4X300 MW BALCO IPP The SPS at 2010 MW Balco (4x675MW + 4x135 MW + 4x300 MW) was to be commissioned by Nov 2013 before commissioning of first unit of 4x300 MW Balco IPP For the new SPS scheme envisaged for the Balco CTU connection namely the Grid Islanding and Load Management Scheme (GILMS) Balco had reported to have placed an order with Ms SEL As discussed earlier the scheme suggested by WRLDC may be implemented before commissioning of first unit of 300 MW It was intimated during the 456th OCCM by the Balco representatives that the SPS shall be commissioned by March 2014

The sub-committee may like to discuss

ITEM NO 916 ACTIONS TAKEN FOR REVIVAL OF TRANSMISSION ELEMENTS UNDER LONG OUTAGE

As per the information available at WRLDC following elements are out for a

long period

Sl No Date of

outage

Reason

ISTSIPP

1 80 MVAR BR at

ESSAR(Mahan)

231213 Oil leakage

2 125 MVAR BR at JPL 120513 Hydrogen formation

3 50 MVAR LR of Indore-Asoj-II

at Indore

190613 R phase bushing burst

4 50 MVAR LR of Birsingpur-

Damoh at Damoh(PG)

13102014 Oil Leakage

5 765 kV Durg-Kotra-I 24022014 Sparking in Isolator

6 400 kV Raipur-Raigarh-IV 18012014 Voltage Regulation

MSETCL

1 400 kV RGPPL-NrsquoKoyna-I 22012014 Voltage Regulation

2 400 kV Sholapur-

Sholapur(PG)

26022014 Tower Collapse

MPPTCL

1 400 kV Birsingpur-Katni-I 28012014 Voltage Regulation

24

457th OCCM AGENDA

2 50 MVAR LR of Indore-Asoj-II

at Indore

6012014 DGA Violation

CSPTCL

1 400220 kV Bhilai-II 24022014 Maintenance

OCC may like to be apprised of the actions being taken for expediting revival of

the above elements

The sub-committee may like to discuss

ITEM NO 917 STATUS OF 220 KV KOLHAPUR-MUDSINGHI-CHIKODI- BELGAM LINE Consent for trial operation of 220 kV Kolhapur-Mudsinghi-Chikodi- Belgam line in radial mode for supply of Karnataka load from Maharashtra side was granted after discussion in the 455th OCC meeting WRLDC is in receipt of letter from SRLDC regarding concurrence for the above arrangement SLDC Kalwa may apprise the OCC regarding the present status The sub-committee may like to discuss

ITEM NO 918 CONTRIBUTION OF GENERATORS IN VOLTAGE CONTROL The contribution of generators in WR in voltage control was analyzed during 456th OCC meeting It was noted that following units were injecting reactive power even during high voltage

1 210 MW units of Khaparkheda Koradi and Chandrapur (Maharashtra) 2 210 MW units of Satpura and Birsinghpur (Madhya Pradesh) 3 210 MW unit 23 of Korba West (Chattisgarh) 4 200 MW unit 34 of Ukai (T) in (Gujarat)

Utilities were requested to check the setting of AVRGT tap and revert back with findings Members may apprise OCC regarding the status The sub-committee may like to discuss

ITEM NO 919 REAL-TIME MONITORING OF FEEDERS SUBSTATIONS THAT ARE COVERED UNDER THE AUFLS Telemetry of feeders substations covered under the AUFLS is desirable for real-time assessment of the anticipated relief that would be available from the AUFLS scheme at any given instant of time CERC has also directed all the constituents to for

25

457th OCCM AGENDA

mapping of these feeders in the SCDA of SLDCsRLDC Members may like to deliberate further The sub-committee may like to discuss

ITEM NO 920 LOAD FORECASTING As per the amended Indian Electricity Grid Code that is effective from 17th February 2013 the SLDCs SEB distribution licensees shall always restrict the net drawal of the State from the grid within the drawal schedule keeping the deviations from the schedule within the limits specified in the Deviation settlement mechanism regulations Therefore it is imperative that adequate attention may be paid towards load forecasting The matter was discussed in the 455th and 456th OCC as well as in the 25th TCCWRPC board meeting wherein it was decided to create a task force for exploring development of a software for load forecasting Members may like to deliberate further The sub-committee may like to discuss

ITEM NO 921 IMPLEMENTATION OF THE REVISED AUFLS IN GOA DD AND DNH It was decided during the 455th and 456th OCC meeting as well as during 25th WRPC meeting that Goa DD and DNH shall complete the implementation of the revised AUFLS in Goa DD and DNH at the earliest Representatives from the Goa DD and DNH may apprise the status of the progress The sub-committee may like to discuss

ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING As per meeting roaster circulated during 452nd OCC meeting the 458th OCC Meeting

will be hosted by Maharashtra and may be scheduled on 16th amp 17th April 2014

Maharashtra may confirm the same

Anaulagnak 21

maah frvarI 2014

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5051 Hz BETWEEN 0200 Hrs amp 0300 Hrs Hrs ON 28022014

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4970 Hz BETWEEN 1800 Hrs amp 1900 Hrs Hrs ON 28022014

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 5006 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5071 Hz AT 0210 Hrs ON 28022014

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4937 Hz AT 185000 Hrs ON 28022014

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS FEBRUARY 2014 JANUARY 2014 DECEMBER 2013

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 001 005

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 041 061 188 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 1069 5423 4864 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 4014 3569 3987

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 4876 946 956

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING FEBRUARY 2014

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

Voltage Profile during the month of Feb 2014

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 421 401 426 403 409 409 408 408 415 399 414 402 424 413 417 3922 420 402 423 404 409 409 408 408 417 402 418 404 425 415 420 3993 421 399 426 400 429 405 425 402 412 399 419 408 423 410 413 3964 422 402 426 404 430 406 428 401 414 400 414 404 424 412 414 3965 420 396 423 400 409 409 408 408 413 396 415 401 424 411 415 3996 420 396 426 400 428 405 426 402 415 398 416 402 423 411 412 4007 420 394 424 399 430 402 427 401 416 399 417 402 423 409 416 3968 418 393 422 397 409 409 408 408 416 399 416 402 422 409 418 3989 418 399 423 404 409 409 408 408 417 402 417 407 419 409 419 400

व तदाब परखा फरवर 2014 स नक Annex-23

इदौर इटारसी कराड धल असोज कासोर िभलाई जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

10 419 394 423 399 409 409 408 408 416 400 415 401 420 408 417 39511 421 393 426 397 429 405 427 401 44 399 419 404 423 407 414 39912 419 395 422 400 409 409 408 408 416 401 419 407 421 410 418 39813 420 396 424 401 409 409 408 408 417 400 416 401 421 409 418 40114 421 399 424 403 430 419 428 414 417 402 415 402 421 409 417 40015 423 397 424 399 428 414 429 412 417 398 406 406 421 407 418 40016 423 397 424 400 431 404 424 401 416 401 422 409 421 409 418 40317 421 402 424 403 432 414 420 404 416 402 412 405 422 410 417 39818 420 397 423 399 409 409 408 408 416 400 414 401 422 414 416 40019 420 396 423 399 409 409 408 408 411 398 418 405 421 413 413 39920 417 397 420 402 429 406 426 401 413 399 416 404 421 413 410 39821 419 399 422 402 430 407 421 401 415 401 418 406 422 411 414 39722 419 397 422 402 432 409 423 401 416 400 413 402 423 413 414 40023 420 396 423 397 430 412 428 404 414 404 415 402 427 414 416 40324 421 399 423 401 433 411 425 400 416 398 414 402 427 415 418 40225 421 399 423 401 433 411 425 400 416 398 414 402 427 415 418 40226 420 397 423 404 431 411 428 409 411 397 415 404 424 414 412 39327 418 398 426 403 409 409 408 408 417 399 418 402 429 415 419 39128 421 400 427 406 409 409 408 408 414 400 416 403 430 415 418 401

423 393 427 397 433 402 429 400 417 396 422 401 430 407 420 391

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 424 404 415 392 424 404 431 407 766 746 797 765 800 756 804 7692 422 406 417 398 426 404 434 407 769 754 798 774 801 769 804 7773 423 405 416 402 426 401 432 410 767 750 796 768 802 773 805 7764 426 407 417 402 423 403 430 408 768 751 797 779 801 776 808 7785 422 403 415 398 423 397 430 400 768 749 797 767 798 763 797 7586 425 404 417 401 423 399 432 404 768 750 797 767 802 773 807 7707 427 401 419 397 423 396 431 404 770 741 800 763 807 769 809 7698 422 403 416 403 424 395 427 399 756 737 788 756 801 765 802 7679 422 405 416 401 424 402 427 404 755 738 786 758 804 773 804 775

10 421 400 414 396 423 398 429 403 3 88 6 98 6 801 60

वािलयर बनाBina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

बना वािलयर नागदा खडवा िसपत िसविन

10 421 400 414 396 423 398 429 403 755 737 788 765 798 765 801 76011 423 397 414 390 426 396 433 399 758 736 794 750 800 752 802 75612 420 403 414 395 423 397 428 403 757 739 787 759 801 763 798 77013 424 405 417 400 427 397 430 402 759 740 794 760 804 773 803 77214 426 410 420 406 424 400 431 405 761 740 794 766 810 780 808 78215 425 404 417 399 426 399 430 401 762 738 794 962 808 768 806 76816 426 406 422 400 427 402 429 400 759 739 792 760 815 774 811 77617 429 407 417 398 427 404 427 406 761 742 792 762 805 765 810 77418 426 404 418 395 423 399 427 404 763 748 793 768 805 759 806 76819 423 409 415 394 422 399 428 403 759 737 795 765 804 758 806 76720 421 406 410 397 420 398 426 406 765 749 795 771 791 766 799 77421 423 407 424 399 423 403 428 405 759 744 792 760 795 761 800 76722 425 406 414 398 423 400 425 404 760 743 790 762 794 762 800 76823 425 402 412 392 424 400 428 405 758 740 790 759 796 755 799 76124 425 401 411 393 423 401 427 403 760 744 796 764 792 757 798 75625 421 408 412 395 423 401 427 403 756 742 793 766 795 764 795 76926 422 405 413 390 421 399 426 402 757 739 789 760 796 750 798 76127 426 407 416 393 421 401 431 403 760 741 795 762 803 755 804 76228 428 409 414 392 423 403 432 405 762 740 795 753 809 775 803 771

429 397 424 390 427 395 434 399 770 736 800 750 815 750 811 756

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Feb-14 0 0 0 0 0 0 0 02 02-Feb-14 0 0 0 0 0 0 0 03 03-Feb-14 0 0 0 0 0 0 0 04 04-Feb-14 0 0 0 0 0 0 0 05 05-Feb-14 0 0 0 0 0 0 0 06 06-Feb-14 0 0 0 0 0 0 0 07 07-Feb-14 0 0 0 0 0 0 0 08 08-Feb-14 0 0 0 0 0 0 0 09 09-Feb-14 0 0 0 0 0 0 0 0

10 10-Feb-14 0 0 0 0 0 0 0 011 11-Feb-14 0 0 0 0 0 0 0 012 12-Feb-14 0 0 0 0 0 0 0 013 13-Feb-14 0 0 0 0 0 0 0 014 14-Feb-14 0 0 0 0 0 0 0 015 15-Feb-14 0 0 0 0 0 0 016 16-Feb-14 0 0 NIL NIL NIL 017 17-Feb-14 0 0 0 0 0 0 0 018 18-Feb-14 0 0 0 0 0 0 0 019 19-Feb-14 0 0 0 0 0 0 0 020 20-Feb-14 0 0 0 0 0 0 0 021 21-Feb-14 0 0 0 0 0 0 0 022 22-Feb-14 0 0 0 0 0 0 0 023 23-Feb-14 0 0 0 0 0 0 0 024 24-Feb-14 0 0 0 0 0 0 0 025 25-Feb-14 1 17 0 0 0 0 0 026 26-Feb-14 0 0 0 0 0 0 0 027 27-Feb-14 0 0 0 0 0 0 0 028 28-Feb-14 0 0 0 0 0 0 0 0

Max 1 17 0 0 0 00 0 0Total 1 17 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month FEBRUARY 2014

Recommonded Load relief at 492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE-25

Power CutRestrictions in Western Region for the month of February-2014 k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply(DLF)

01022014 28022014 2344 2240 2332

21 Three-Phase Supply(Irrigation)

01022014 28022014 0956 0905 0946

21 Three-Phase Supply(Mixed)

01022014 28022014 2343 2227 2330

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01022014 28022014 2353 2337 2347 32 District Head Qtrs 01022014 28022014 2355 2340 2351 33 Tehsil Head Qtrs 01022014 28022014 2349 2309 2341

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid

1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 010214 to 280214

SaUnya Nil

0-1655MW

SaUnya Nil

0000

SaUnya Nil 2400

SaUnya Nil

95 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-

2 Power supply to Agricultural Sector ivavarNa Details sao From

idnaaMk Date tk To

idnaaMk Date p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs) 21 Three-Phase Supply 01022014 28022014 1000 0800 0900

22 Single-Phase Supply 01022014 28022014 1800 1800 1800 3 Anya jaanakarI Any other information

There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

11107 (Av) of 23 days 0000(Av) 0000 (Av)

1Rural 9031(Av) for 3486 Hrs 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0666 - -

0105 -

3 HT Industries 000 (Av) for 00 Hrs 000 Total Energy Cutday 0771 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01022014 to 280214 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 2322014 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का फरवर 2014का वःता रत यौरा

Details of forced unit outages during the month ofFeb2014

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 एःसार वा डनर

ESSAR VADINAR-I

गरा विनिल GSECL

660 2156 20-Jan-14 2018 10-Feb-14 Coal shortage

2 एःसार Essar-2

गरा विनिल GSECL

172 1212 22-Feb-13 अनपल ध Still out

अनपल ध Still out

Shortage of gas

3 एसएलपीपी SLPP-1

गरा विनिल GSECL

125 1445 23-Feb-14 1237 27-Feb-14 BTL

4 एकएलट पीएसAKLTPS-1

गरा विनिल GSECL

125 1147 26-Feb-14 अनपल ध Still out

अनपल ध Still out

DCS FAIL

5 एपीएल APL - 2

अदानी ADANI

330 056 3-Feb-14 अनपल ध Still out

अनपल ध Still out

Turbine vibration bearing probl em

6 एपीएल APL-5

अदानी ADANI

660 1732 15-Feb-14 456 27-Feb-14 Turbine vibration

7 एपीएल APL - 6

अदानी ADANI

660 2049 25-Feb-14 1947 3-Mar-14 Coal mill problem

8 टाटा TATA-6

मारा वउकिल MSPGCL

500 2352 19-Jul-13 अनपल ध Still out

अनपल ध Still out

For Economy SD

9 वीआईपीएल VIPL-I

मारा वउकिल MSPGCL

300 105 2-Oct-13 अनपल ध Still out

अनपल ध Still out

Turbine bearing vibration probl em

10 टाटा TATA-8

मारा वउकिल MSPGCL

250 2255 9-Jan-14 अनपल ध Still out

अनपल ध Still out

HT due to fire near turbine generator desk

11 चिपर Chandrapur-2

मारा वउकिल MSPGCL

210 1238 14-Jan-14 1310 23-Feb-14 ID fan problem

12 कोराड KORADI-6

मारा वउकिल MSPGCL

210 651 24-Jan-14 1456 14-Feb-14 Coal bunkering problem

13 डब यपीसीएल WPCL-1

मारा वउकिल MSPGCL

135 1245 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Furnace press high

14 डब यपीसीएल WPCL-3

मारा वउकिल MSPGCL

135 421 7-Feb-14 Ready Ready Less requisition

प म ऽय भार षण कि म बई णाली चालन-ISO-I

15 चिपर CPUR - 6

मारा वउकिल MSPGCL

500 1523 11-Feb-14 2033 13-Feb-14 BTL

16 नािसक NASIK-3

मारा वउकिल MSPGCL

250 300 11-Feb-14 100 19-Feb-14 UAT problem

17 कोराड KORADI-5

मारा वउकिल MSPGCL

210 153 14-Feb-14 अनपल ध Still out

अनपल ध Still out

ID fan problem

18 ितरोडा Tiroda-I

मारा वउकिल MSPGCL

660 2059 15-Feb-14 2054 26-Feb-14 Turbine bearing problem

19 ितरोडा Tiroda-2

मारा वउकिल MSPGCL

660 1125 17-Feb-14 152 22-Feb-14 BTL

20 कोराड KORADI-6

मारा वउकिल MSPGCL

210 2357 19-Feb-14 250 23-Feb-14 BTL

21 भसावल BHUSWAL-2

मारा वउकिल MSPGCL

210 301 22-Feb-14 1706 25-Feb-14 PA fan temp High

22 खापरखड़ा KHAPERKHEDA-3

मारा वउकिल MSPGCL

250 1448 22-Feb-14 130 25-Feb-14 BTL

23 जयगड Jaigad-4

मारा वउकिल MSPGCL

300 1930 22-Feb-14 1107 4-Mar-14 Low schedule

24 कोराड Koradi-5

मारा वउकिल MSPGCL

300 404 23-Feb-14 अनपल ध Still out

अनपल ध Still out

Electrical fault

25 पल PARLI-4

मारा वउकिल MSPGCL

210 1836 28-Jan-14 1956 3-Feb-14 Air preheater problem

26 भसावल BHUSAWAL-4

मारा वउकिल MSPGCL

250 1432 28-Feb-14 1802 3-Mar-14 Ash hopper problem

27 आरजीपीपीएल RGPPL-1B

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

28 आरजीपीपीएल RGPPL-2B

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

29 आरजीपीपीएल RGPPL 3A

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

30 आरजीपीपीएल RGPPL-1A

आरजीपीपीएल RGPPL

320 1500 18-Jan-14 अनपल ध Still out

अनपल ध Still out

SRV problem

31 आरजीपीपीएल RGPPL 3B

आरजीपीपीएल RGPPL

320 1230 8-Feb-14 Ready Ready Less requisition

32 िसगाजी SINGAJI - I

म वउकिल MPPGCL

600 422 12-Feb-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

33 सातपरा SATPURA-11

म वउकिल MPPGCL

250 1913 15-Feb-14 2149 19-Feb-14 Main stream temperature low

34 सातपरा SATPURA-11

म वउकिल MPPGCL

250 542 26-Feb-14 1642 2-Mar-14 BTL

35 एःसार महान Essar-Mahan-1

एःसार ESSAR

600 000 29-Jan-14 015 18-Feb-14 Less requisi tion

36 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

37 वदना Vandana-1

वदना Vandana

135 149 12-Jan-14 अनपल ध Still out

अनपल ध Still out

BTL

प म ऽय भार षण कि म बई णाली चालन-ISO-I

38 ससान Sasan-2

आरईएल REL

660 205 16-Feb-14 1650 23-Feb-14 Problem in ash handling

39 कावास Kawas 2A

एनट पीसीNTPC 164 2018 23-Dec-13 Ready Ready Less requisition

40 गाधार Gandhar-3

एनट पीसीNTPC 144 2037 28-Dec-13 Ready Ready Less requisition

41 गाधार Gandhar-I

एनट पीसीNTPC 144 2011 1-Jan-14 Ready Ready Less requisition

42 कावास Kawas 2B

एनट पीसीNTPC 164 900 13-Jan-14 421 5-Mar-14 Maintenance

43 गाधार Gandhar-2

एनट पीसीNTPC 219 023 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Less requisition

44 कावास Kawas-1A

एनट पीसीNTPC 164 2055 4-Feb-14 712 20-Feb-14 Less requisition

45 कावास

Kawas-1B एनट पीसीNTPC 164 1951 13-Feb-14 503 20-Feb-14 Less requisition

46 कावास Kawas 1A

एनट पीसीNTPC 164 1210 21-Feb-14 Ready Ready Less requisition

47 कावास Kawas 1B

एनट पीसीNTPC 164 012 22-Feb-14 1144 26-Feb-14 Less requisition

Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का फरवर 2014 का वःता रत यौरा

Details of planned unit outages during the month of Feb2014 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Time Date

1 डब यट पीएस WTPS-3

गरा विनिल GSECL

210 212 12-Feb-14 अनपल ध Still out

अनपल ध Still out

AOH

2 पल ParlI-3

मारा वउकिल MSPGCL

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

AOH

3 चिपर Chandrapur-5

मारा वउकिल MSPGCL

500 101 14-Jul-13 841 19-Feb-14 AOH

4 कोरबा प म KORBA-(W)-4

छरा वउकिल CSPGCL

210 2226 7-Feb-14 अनपल ध Still out

अनपल ध Still out

AOH

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

NIL2

NIL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING MARCH 2014 AND APRIL 2014

Capacity Outage as per Annual Maintenance Plan

3 Craiva]kMila CSPGCL

NIL

4

NIL

5 koMd``Iya xao~ Central Sector51 VSTPS 4 210 010414 070414 AOH52 VSTPS 2 210 080414 270414 AOH53 VSTPS 1 210 300414 190514 AOH54 CGPL 10 800 280314 130514 COH

maraiva]kMila MSPGCL

Date Time Date Time1 220 Bus-1 at Mapusa 20-Mar-14 1000 20-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R

2 765 Bus-1 at Sasan 20-Mar-14 800 20-Mar-14 1800 Daily Stringing of Main bus 1 for 765 kV Vichal Pooling - Sasan feeder

Reliance WR-II C

3 400 400kV Bus-2 at Satna 20-Mar-14 800 20-Mar-14 1800 Continuous Bay extension work related to JP - Nigrie Bays POWERGRID WR-II C

4 400 400kV ICT 1 at Satna 20-Mar-14 800 20-Mar-14 1000 Continuous Bay extension work related to JP - Nigrie Bays POWERGRID WR-II C

5 400 400kV Jabalpur Itarsi 1amp2 (Dc) 20-Mar-14 1000 20-Mar-14 1400 Continuous For commissioning of Line Impedance measurement kit

POWERGRID WR-II C

6 765 3X80 MVAr Bina Line Reactor at Indore 20-Mar-14 1000 21-Mar-14 1800 Continuous For installation of online dry out amp online DGA kit

POWERGRID WR-II C

7 400kV Damoh - Bhopal 1 20-Mar-14 800 31-Mar-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

8 400 Chorania Kasor 20-Mar-14 800 20-Mar-14 1800 Daily PMM work GETCO GETCO9 400 400 KV Main Bus-I at 400 KV Ss Khedamara 20-Mar-14 900 22-Mar-14 1700 Daily Erection of Pantograph 1 Set of IP amp CVT CSPTCL CSPTCL C

10 400 400 KV Khedamara-KSTPS NTPC ckt-II at 400 KV Ss Khedamara

20-Mar-14 900 22-Mar-14 1700 Daily Erection of Pantograph CVT amp 1 Set of IP PGCIL CSPTCL C

11 400 Korba -Vandana 20-Mar-14 900 21-Mar-14 1900 days continuouTesting of LBB auto re-close M-I amp M-II relays NTPC NTPC

12 400 Korba -Vandana 20-Mar-14 900 21-Mar-14 1900 days continuouTesting of LBB auto re-close M-I amp M-II relays NTPC NTPC

13 400DC Akola-Aurangabad (MSETCL) 1 and Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

21-Mar-14 600 23-Mar-14 1800 Conti Crossing work of 400kv MC Aurangabad - Aurangabad

MSETCLWRTS-I WRTS-I C

14400 amp 220 amp 132

400KV DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 400KV Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

21-Mar-14 600 21-Mar-14 1800 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad

MSETCLWRTS-I WRTS-I C

15 400 Bhadrawati-Parli 1amp 2 21-Mar-14 900 31-Mar-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I C

16 220 Bus-1 at Pune 21-Mar-14 800 21-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R

17 400 Solapur-Kolhapur 1 amp 2 21-Mar-14 700 21-Mar-14 1800 Daily Stringing work upcoming 765 kV Solapur-Pune line

Reliance WRTS-I C

18 220 220kV DC Raigarh- Raigarh (CSPTCL) Line (if outage not avail on 13140314)

21-Mar-14 900 22-Mar-14 1700 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (040-50)

CSPTCL WRTS-I C

19 220 Bus-2 (Section-A) at Mapusa 21-Mar-14 1000 21-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R20 400 Bus-1 at Itarsi 21-Mar-14 900 21-Mar-14 1800 Daily AMP POWERGRID WR-II R21 220 Bus-1 at Gwalior 21-Mar-14 1000 21-Mar-14 1800 Daily AMP POWERGRID WR-II R22 220 Jhanor - Haldarwa 1 21-Mar-14 900 21-Mar-14 1800 Daily AMP POWERGRID WR-II R23 400 Vapi Boisar 21-Mar-14 700 22-Mar-14 1900 Continuous For crossing of 220kV Kala Khadoli TL POWERGRID WR-II C

24 765 Sasan-Satna2 21-Mar-14 800 22-Mar-14 1800 Continuous For Power Line crossing of 765kV Vindhyanchal (pooling) - Satna 2 Line

POWERGRID WR-II R

25 400 400220 ICT NO1 at Kasor 21-Mar-14 800 21-Mar-14 1800 Daily PMM work GETCO GETCO26 400 400KV Sipat-Pathadi(LANCO) line 21-Mar-14 900 22-Mar-14 1900 Continous Annual Preventive maintenance job NTPC NTPC27 400 Pune-Parli 2 50MVAr Line Reactor at Pune 22-Mar-14 800 22-Mar-14 1800 Daily AMP Work Line in service wo reactor Reliance WRTS-I R

28 765 Bus-2 at Solapur 22-Mar-14 700 22-Mar-14 1800 Daily 765KV Pune bay commissioning amp SCADA works

WRTS-I WRTS-I C

29 400 Bus-1 at Bhatapara 22-Mar-14 800 23-Mar-14 1800 Conti Bus extension work for new 125MVAr Bus Reactor at Bhatapara

WRTS-I WRTS-I C

30 220 Bus-2 (Section-B) at Mapusa 22-Mar-14 1000 22-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R31 400 Vadavi Chorania 1 22-Mar-14 900 22-Mar-14 1800 Daily AMP Reliance WR-II R32 220 Jhanor - Haldarwa 2 22-Mar-14 900 22-Mar-14 1800 Daily AMP POWERGRID WR-II R33 220 Bus-2 at Gwalior 22-Mar-14 1000 22-Mar-14 1800 Daily AMP POWERGRID WR-II R

34 765 3X80 MVAr Bus Reactor at Indore 22-Mar-14 1000 23-Mar-14 1800 Continuous For installation of online dry out amp online DGA kit

POWERGRID WR-II C

35 220 Transfer Bus at Mapusa 23-Mar-14 1000 23-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R

36 400 Raigarh- Raipur 4 amp Raigarh-Kotra PS 2 23-Mar-14 800 30-Mar-14 1800 Conti Bay shifting work for up-coming 125MVAr Bus Reactor at Raigarh

WRTS-I WRTS-I C

37 765 Bus-1 at Indore (PG) 23-Mar-14 1000 23-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

Outages Proposal of Transmission elements during the month of MARCH‐2014Type

ANNEXURE‐32A

SN KV Line From To

Basis Reason System Agency

38 220 MC Waluj-Chitegaon amp Waluj-Jalna on same tower

24-Mar-14 600 24-Mar-14 1800 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad

MSETCL WRTS-I C

39 400 Raipur-Sipat 1 amp 2 24-Mar-14 800 2-Apr-14 1800 Conti Diversion of line for Lafarge Railway trackERS removal

WRTS-I Lafarge C

40 220 Bus-2 at Pune 24-Mar-14 800 24-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R41 765 Bus-1 at Bilaspur 24-Mar-14 800 24-Mar-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R

42 400 Bus-2 at Bhatapara 24-Mar-14 800 25-Mar-14 1800 Conti Bus extension work for new 125MVAr Bus Reactor at Bhatapara

WRTS-I WRTS-I C

43 400 Kolhapur-Mapusa 2 24-Mar-14 600 24-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

44 400 Vadavi Chorania 2 24-Mar-14 900 24-Mar-14 1800 Daily AMP Reliance WR-II R45 765 Bus-2 at Indore (PG) 24-Mar-14 1000 24-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

46 765 Bus-2 at Sasan 24-Mar-14 800 24-Mar-14 1800 Daily Strining of Main Bus 2 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

47 220 KAPP - Haldarwa 1 24-Mar-14 800 24-Mar-14 1800 Daily AMP POWERGRID WR-II R48 400 Bus - 2 at Pune 25-Mar-14 800 25-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R

49 765 Bus - 1 at Wardha 25-Mar-14 800 25-Mar-14 1800 Daily Jumper connection work of 765KV Raipur-Wardha line

WRTS-I WRTS-I R

50 400 Kolhapur-Mapusa 2 25-Mar-14 600 25-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

51 220 Mapusa-Ponda line 25-Mar-14 1000 25-Mar-14 1500 Daily AMP Work GOA WRTS-I R

52 765 Bus-1 at Sasan 25-Mar-14 800 25-Mar-14 1800 Daily Jumpering of Bus 1 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

53 220 KAPP - Haldarwa 2 25-Mar-14 800 25-Mar-14 1800 Daily AMP POWERGRID WR-II R54 400 Vadavi - Kansari2 25-Mar-14 900 25-Mar-14 1800 Daily AMP Reliance WR-II R55 400 Bus-1 at Indore (PG) 25-Mar-14 1000 26-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C56 765 Bus-1 at Satna 25-Mar-14 800 25-Mar-14 1800 Continuous Bay extension work POWERGRID WR-II C57 765 Sipat 765KV 400KV 1000MVA ICT-1 25-Mar-14 900 25-Mar-14 1900 Daily SPS Protection scheme modification NTPC NTPC

58 765 Bus - 2 at Wardha 26-Mar-14 800 26-Mar-14 1800 Daily Jumper connection work of 765KV Raipur-Wardha line

WRTS-I WRTS-I R

59 400 Bhadrawati-Parli 2 63MVAr Line Reactor at Parli

26-Mar-14 800 26-Mar-14 1800 Daily AMP Work of Recator at Parli line in service wo reactor

WRTS-I WRTS-I R

60 400 Kolhapur-Mapusa 1 26-Mar-14 600 26-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

61 220 Mapusa-Amona line 26-Mar-14 1000 26-Mar-14 1500 Daily AMP Work GOA WRTS-I R62 765 Bus-2 at Satna 26-Mar-14 800 26-Mar-14 1800 Continuous Bay extension work POWERGRID WR-II C

63 765 Bus-2 at Sasan 26-Mar-14 800 26-Mar-14 1800 Daily Jumpering of bus 2 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

64 400 401 KV Main Bus-I at 400 KV Ss Khedamara 26-Mar-14 900 27-Mar-14 1700 Daily Erection of IPS Tube CSPTCL CSPTCL C

65 400 401 KV Khedamara-KSTPS NTPC ckt-II at 400 KV Ss Khedamara

26-Mar-14 900 27-Mar-14 1700 Daily Erection of IPS Tube PGCIL CSPTCL C

66 400 ACBIL-BILASPUR-CKT NO -2 26-Mar-14 900 31-Mar-14 1800 CONT FOR lilo CONNECTIVITY OF 300MW MCCPL TPP

ACBIL ACBIL C

67 765 Bus-2 at Bilaspur 27-Mar-14 800 27-Mar-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R68 220 Mapusa-Thivim 1 27-Mar-14 1000 27-Mar-14 1500 Daily AMP Work GOA WRTS-I R69 220 KAPP - Vav 2 27-Mar-14 800 27-Mar-14 1800 Daily AMP POWERGRID WR-II R70 400 Bus-2 at Indore (PG) 27-Mar-14 1000 28-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

71 765 Bus-2 at Gwalior 27-Mar-14 1000 27-Mar-14 1800 Daily Bay extension work related to Gwalior Jaipur 1 Bays

POWERGRID WR-II C

72 400 VSTPS Tie- Line-1 ( Line from Stage-III to IV Switchyard)

27-Mar-14 900 27-Mar-14 1900 Daily Basis AMP and rectification of hot spots NTPC NTPC

73 765 Sipat 765KV 400KV 1000MVA ICT-2 27-Mar-14 900 27-Mar-14 1900 Daily SPS Protection scheme modification NTPC NTPC74 765 Bus-1 at Solapur 28-Mar-14 700 30-Mar-14 1800 Daily commissioning tests amp SCADA works WRTS-I WRTS-I C75 220 Mapusa-Thivim 2 28-Mar-14 1000 28-Mar-14 1500 Daily AMP Work GOA WRTS-I R

76 400 Koradi-Satpura 28-Mar-14 1000 28-Mar-14 1400 Daily Earthwire tighting work damaged during Crossing work

WRTS-I ADANI C

77 220 Bus-1 at Dehgam 28-Mar-14 900 28-Mar-14 1800 Daily AMP POWERGRID WR-II R78 220 Kawas - Haldarwa 2 28-Mar-14 800 28-Mar-14 1800 Daily AMP POWERGRID WR-II R79 400 Chorania Amreli 28-Mar-14 800 28-Mar-14 1800 Daily PMM work GETCO GETCO

80 400DC Akola-Aurangabad (MSETCL) 1 and Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

29-Mar-14 600 30-Mar-14 1800 Conti Charging amp shifting of Akola-Abad line on MC Abad-Abad line WRTS-I WRTS-I C

81 220 Bus-2 at Dehgam 29-Mar-14 900 29-Mar-14 1800 Daily AMP POWERGRID WR-II R82 400 Bus -1 at Mapusa 30-Mar-14 1000 30-Mar-14 1500 Daily AMP Work WRTS-I WRTS-I R

83 765 765kV Bus Reactor at Solapur 31-Mar-14 700 2-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

Date Time Date Time

1 400 Bhilai-Koradi 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

2 400 DC Korba-Birsingpur 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

3 400 Korba-Bhilai 2 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

4 220 Korba-Budhipadar 3 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

5 400 Akola-Wardha 1amp 2 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

6 400 Raipur-Raigarh 1 amp Raipur-KSK-DBPL-Raigarh

1-Apr-14 800 30-Apr-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

7 400 Bhadrawati-Parli 1amp 2 1-Apr-14 900 30-Apr-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I C

8 400 400220kv ICT-1 at Pune 1-Apr-14 800 1-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R9 400 Bus-1 at Bilaspur 1-Apr-14 800 1-Apr-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R

10 400 Solapur(PG) -Karad line 1-Apr-14 700 10-Apr-14 1800 Conti Erection of 80MVAr new reactor by shifitng line equipments at Solapur

MSETCL WRTS-I C

11 400 Bus-1 at Jabalpur (pooling) 01-Apr-14 1000 01-Apr-14 1800 Daily Busbar Stability test related to Jhabua Power Bays

POWERGRID WR-II C

12 400 Shujalpur - Nagda 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

13 400 Mundra - Bhachau 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

14 400 Bina - Shujalpur 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

15 220 Omkareshwar-Khandwa Ckt 1-Apr-14 900 1-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI16 400 Sipat 400KV Bay 10 and 11 1-Apr-14 900 3-Apr-14 1900 Continous 400KV CT 3nos replacement NTPC NTPC17 400 Padgha-Nagothane ckt I 1-Apr-14 900 1-Apr-14 1700 Daily QMwork MSETCL MSETCL

18 400 Bus-2 at Jabalpur (pooling) 02-Apr-14 1000 02-Apr-14 1800 Daily Busbar Stability test related to Jhabua Power Bays

POWERGRID WR-II C

19 400 Vindhyanchal - Mahan - Korba (Section of both the line on same Dc tower)

02-Apr-14 800 03-Apr-14 1700 Continuous For Power Line crossing of 765kV Vindhyanchal (pooling) - Satna 1 Line

POWERGRID WR-II C

20 400 400kV ICT 4 at Indore MPPTCL 02-Apr-14 1000 04-Apr-14 1800 ContinuousFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

MPPTCL WR-II C

21 400 400kV Bus Coupler bay at Indore MPPTCL 02-Apr-14 1000 04-Apr-14 1800 ContinuousFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

MPPTCL WR-II C

22 400 400kV Itarsi - Indore MPPTCL 1 Line 02-Apr-14 1000 02-Apr-14 1500 DailyFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

POWERGRID WR-II C

23 400400 KV LILO Line of 400 KV SC Korba West-Khedamara to 400 KV Ss Raita (Between Loc69 amp70 near Raita Ss)

2-Apr-14 800 3-Apr-14 1700 DailyMaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

CSPTCL CSPTCL C

24 400 Chandrapur-Khaparkheda 2-Apr-14 900 2-Apr-14 1700 Daily QMwork MSETCL MSETCL

25 400 Lamboti-Solapur PG 2-Apr-14 900 2-Apr-14 1700 Daily QMwork MSETCL MSETCL

26 400 Bus-1 at Durg PS Ss 3-Apr-14 900 3-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R27 400 Bus-1 at Jabalpur 03-Apr-14 900 03-Apr-14 1800 Daily Retrofitting of Isolator arms(689A) POWERGRID WR-II R28 400 315MVA ICT2 at Khandwa 03-Apr-14 1000 03-Apr-14 1600 Daily AMP POWERGRID WR-II R29 400 Mundra - Hadala 3-Apr-14 800 3-Apr-14 1800 Daily PMM GETCO GETCO30 400 400KV Seoni -Bhilai Ckt 3-Apr-14 900 3-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I31 400 Lonikand-Chakan 3-Apr-14 900 3-Apr-14 1700 Daily QMwork MSETCL MSETCL32 400 Bus-2 at Durg PS Ss 4-Apr-14 900 4-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R33 400 Bus-1 at Jabalpur 04-Apr-14 900 04-Apr-14 1800 Daily Retrofitting of Isolator arms(2089A) POWERGRID WR-II R

34 400 400kV Itarsi - Indore MPPTCL 1 Line 04-Apr-14 1300 04-Apr-14 1800 DailyFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

POWERGRID WR-II C

35 400 Varsana - Hadala 4-Apr-14 800 4-Apr-14 1800 Daily PMM GETCO GETCO

Agency Type

ANNEXURE‐32BOutages Proposal of Transmission elements during the month of APRIL ‐2014

SN KV Line From To

Basis Reason System

36 220 Vapi - Vapi (PG) 4-Apr-14 800 4-Apr-14 1800 Daily PMM work PGCIL GETCO37 220 Haldarva - Jhanor - 1 (NTPC) 4-Apr-14 800 4-Apr-14 1800 Daily PMM amp Tan Delta testing PGCIL GETCO38 400 400KV Birsinghpur -Katni Ckt - I 4-Apr-14 800 4-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I39 220 Badod - Kota Ckt 4-Apr-14 900 4-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI40 220 Malanpur-Auriya Ckt 4-Apr-14 900 5-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI

41 400 Bhusawal-Akola 4-Apr-14 900 4-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

42 400 Deepnagar-Aurangabad II 4-Apr-14 900 4-Apr-14 1700 Daily QMwork MSETCL MSETCL43 400 Kalwa-Padgha Ckt I 4-Apr-14 900 4-Apr-14 1700 Daily QMwork MSETCL MSETCL44 765 Bus Reactor at Seoni 5-Apr-14 900 5-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R

45 400 DC Korba-KhedamaraLilo at Marwa lilo section yet to be charge 5-Apr-14 800 6-Apr-14 1800 Daily

Crossing work of upcoming 765 KV DC Raigarh-Champa (AP-48A0- AP 490)DC Korba-Khedamara is in service

CSPTCL WRTS-1 C

46 400 Bus-1 at Jabalpur 05-Apr-14 900 05-Apr-14 1800 Daily Retrofitting of Isolator arms(1689A) POWERGRID WR-II R

47 400 Mundara -Limbdi 1 05-Apr-14 800 07-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

48 220 Badod - Modak Ckt 5-Apr-14 900 5-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI49 400 Dhule-Babhleswar ckt 1 5-Apr-14 900 5-Apr-14 1700 Daily QMwork MSETCL MSETCL50 400 400220kv ICT-1 at Seoni 7-Apr-14 900 7-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R51 400 Bus-2 at Jabalpur 07-Apr-14 900 07-Apr-14 1800 Daily Retrofitting of Isolator arms(1789B) POWERGRID WR-II R52 400 315MVA ICT1 at Khandwa 07-Apr-14 1000 07-Apr-14 1600 Daily AMP POWERGRID WR-II R53 220 Chhegoan-Khandwa Ckt -II 7-Apr-14 900 7-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI54 400 Korba- Bhilai1 7-Apr-14 900 8-Apr-14 1900 days continuou Bay Maint and testing NTPC NTPC55 400 Vindhyachal - Mahan line 7-Apr-14 900 8-Apr-14 1900 Continuous Replacement of R Y and B Phase CT NTPC NTPC56 400 Bhusawal-Aurangabad 7-Apr-14 900 7-Apr-14 1700 Daily QMwork MSETCL MSETCL57 400 New Koyna-Karad ckt 2 7-Apr-14 830 7-Apr-14 1730 Daily QMwork MSETCL MSETCL

58 400 Mundara -Limbdi 2 08-Apr-14 800 10-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

59 400 Chorania Hadala 8-Apr-14 800 8-Apr-14 1800 Daily PMM GETCO GETCO60 400 Sipat 400KV Bay 23 8-Apr-14 900 9-Apr-14 1900 Continous One 400KV CT replacement NTPC NTPC61 400 Koradi-Khaparkheda I 8-Apr-14 900 8-Apr-14 1700 Daily QMwork MSETCL MSETCL62 765 765400KV ICT-1 at Kotra PS 9-Apr-14 900 9-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R63 400 Bus-2 at Jabalpur 09-Apr-14 900 09-Apr-14 1800 Daily Retrofitting of Isolator arms(489B) POWERGRID WR-II R64 400 315MVA ICT1 at Damoh 09-Apr-14 1000 09-Apr-14 1600 Daily AMP POWERGRID WR-II R65 400 Amreli-Jetpur 2 9-Apr-14 800 9-Apr-14 1800 Daily PMM GETCO GETCO66 400 SSP- Rajgarh - 1 9-Apr-14 800 9-Apr-14 1800 Daily PMM GETCOMPTCL GETCO67 220 TAPS1 amp2-TAPS 3amp4 tie line 9-Apr-14 800 9-Apr-14 1600 one day Annual maintenance Works MSETCL NPCIL68 220 TAPS TIE LIE-I 9-Apr-14 800 10-Apr-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL69 400 400 KV Indore - Nagda Ckt 9-Apr-14 900 9-Apr-14 1600 daily For maintenance work MPPTCL EHT- Mamp I70 400 400 KV Sarni - Isp Ckt 9-Apr-14 900 9-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I71 220 Mehgaon-Auriya Ckt 9-Apr-14 900 10-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI72 400 315 MVA 400220Kv X-mer III At Bhopal SS 9-Apr-14 900 10-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI73 400 Padgha-Tarapur CktII 9-Apr-14 900 9-Apr-14 1700 Daily QMwork MSETCL MSETCL74 765 Bus Reactor at Kotra PS 10-Apr-14 900 10-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R

75 765 amp 400

765400 kV ICT-I at Solapur amp 400KV Solapur-Parli 2 10-Apr-14 700 12-Apr-14 1800 Daily 765400 kV spare ICT unit Aux bus works CSD

commissioning amp Fire fighting works at Solapur WRTS-IReliance WRTS-I C

76 400 315MVA ICT2 at Damoh 10-Apr-14 1000 10-Apr-14 1600 Daily AMP POWERGRID WR-II R

77 765 Sasan-Satna 1 10-Apr-14 800 11-Apr-14 1800 Daily For AMP of line amp Line terminal Equipments Post commissioning checks

POWERGRID WR-II C

78 400 APL-Varsana 10-Apr-14 800 10-Apr-14 1800 Daily PMM GETCO GETCO79 400 400 KV Isp - Nagda Ckt 10-Apr-14 900 10-Apr-14 1600 daily For maintenance work MPPTCL EHT- Mamp I80 400 400 KV Bhopal-Itarsi(PGCIL) Ckt-I 10-Apr-14 900 11-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I81 220 Chhegoan-Khandwa Ckt -I 10-Apr-14 900 10-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI82 400 315 MVA 400220Kv X-mer At Katni SS 10-Apr-14 800 11-Apr-14 1800 continue For maintenance work MPPTCL EHT -MampI83 400 Korba- Bhilai2 10-Apr-14 900 11-Apr-14 1900 days continuou Bay Maint and testing NTPC NTPC84 400 Sipat 400KV Bay 14 10-Apr-14 900 12-Apr-14 1900 Continous 400KV CT 3nos replacement NTPC NTPC

85 400 Chandrapur II-Parli II 10-Apr-14 900 10-Apr-14 1700 Daily Providing of Arching horncorona rings Bird guards quarter pinsNut bolts

MSETCL MSETCL

86 400 Karad-Lonikand 10-Apr-14 900 10-Apr-14 1700 Daily QMwork MSETCL MSETCL87 400 Raipur-Durg PS 1 11-Apr-14 900 11-Apr-14 1700 Daily AMP Work WRTS-I WRTS-I R

88 400 Mundara -Jetpur 1 11-Apr-14 800 15-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

89 400 Varsana-Hadala Line 11-Apr-14 800 11-Apr-14 1800 Daily PMM GETCO GETCO90 220 Haldarwa Kawas-2 11-Apr-14 800 11-Apr-14 1800 Daily PMM work PGCIL GETCO91 400 400 KV Nagda-Rajgarh(PGCIL) Ckt-I 11-Apr-14 900 11-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

92 400 315 MVA 400220Kv X-mer III ampTie bay At Bhopal SS

11-Apr-14 900 11-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI

93 400 Akola-Nandgaonpeth 11-Apr-14 900 11-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

94 400 Akola-Wardha I 11-Apr-14 900 11-Apr-14 1700 Daily QMwork MSETCL MSETCL95 400 Kalwa-Lonikand 11-Apr-14 900 11-Apr-14 1700 Daily QMwork MSETCL MSETCL96 400 400220kv ICT-1 at Mapusa 12-Apr-14 900 12-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R97 400 Raipur-Durg PS 2 12-Apr-14 900 12-Apr-14 1700 Daily AMP Work WRTS-I WRTS-I R98 765 Sasan-Satna2 with line reactor 12-Apr-14 1000 12-Apr-14 1800 Daily AMP POWERGRID WR-II R99 400 400 KV Nagda-Rajgarh(PGCIL) Ckt-II 12-Apr-14 900 12-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I100 400 Deepnagar-Aurangabad I 12-Apr-14 900 12-Apr-14 1700 Daily QMwork MSETCL MSETCL101 400 Amreli-Jetpur 2 14-Apr-14 800 14-Apr-14 1800 Daily PMM GETCO GETCO102 400 Kasor - Gpec 14-Apr-14 800 14-Apr-14 1800 Daily PMM GETCO GETCO103 220 GWL(PGCIL)-Malanpur Ckt-I 14-Apr-14 900 15-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI104 400 DC Korba-Raipur 3 amp 4 15-Apr-14 800 16-Apr-14 1800 Conti Bus splitting work at Raipur WRTS-1 WRTS-1 C

105 400 Korba-Bhatapara 15-Apr-14 800 24-Apr-14 1800 Conti For raising of ground clearence for Railway track of Lafarge

WRTS-I Lafarge C

106 765 765400 kV ICT-II at Solapur 15-Apr-14 700 17-Apr-14 1800 Daily CSD commissioning amp Fire fighting works WRTS-I WRTS-I C107 400 Vindhyachal-Satna1 15-Apr-14 1000 15-Apr-14 1800 Daily AMP POWERGRID WR-II R108 400 Ssnl-Dhule-1 15-Apr-14 800 15-Apr-14 1800 Daily PMM GETCOMSETCL GETCO109 220 TAPS-Vapi 15-Apr-14 800 17-Apr-14 1900 Daily Annual maintenance Works GETCO NPCIL110 220 Pithampur-Rajgarh(PGCIL) Ckt - I 15-Apr-14 900 15-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI111 400 Sipat 400KV Bay-18 ( Ranchi-1 Main) 15-Apr-14 900 15-Apr-14 1900 Daily Annual Preventive maintenance job NTPC NTPC112 400 Karad-Kolhapur Ckt I 15-Apr-14 900 15-Apr-14 1700 Daily QMwork MSETCL MSETCL

113 400 DC Raipur-Bhadrawati 2 amp 3 16-Apr-14 800 17-Apr-14 1800 Conti Bus splitting work at Raipur WRTS-1 WRTS-1 C

114 400 Vindhyachal-Satna2 16-Apr-14 1000 16-Apr-14 1800 Daily AMP POWERGRID WR-II R

115 400 Mundara -Jetpur 2 16-Apr-14 800 20-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

116 400 Vadavi - Dehgam (Pg) - 1 16-Apr-14 800 16-Apr-14 1800 Daily PMM amp Tandelta testing GETCO GETCO117 400 Chorania Asoj-1 16-Apr-14 800 16-Apr-14 1800 Daily PMM GETCO GETCO118 220 Bhilad - TAPS 16-Apr-14 800 16-Apr-14 1800 Daily PMM work PGCIL GETCO119 220 Bhat - Pirana (PG) - 1 16-Apr-14 800 16-Apr-14 1800 Daily PMM work GETCO GETCO120 400 400 KV Bhopal-Itarsi(PGCIL) Ckt-II 16-Apr-14 900 17-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I121 220 Damoh(PGCIL) - Tikamgarh Ckt 16-Apr-14 900 16-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI

122 400 400KV SC Korba-Raipur-II (Between Korba - Bhatapara end)(Between Loc2980 amp 2990) 16-Apr-14 800 17-Apr-14 1700 Daily

MaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

PGCIL CSPTCL C

123 400 Sipat 400KV Bay-19 ( Ranchi-2 Main) 16-Apr-14 900 16-Apr-14 1900 Daily Annual Preventive maintenance job NTPC NTPC124 400 Padgha-Babhleswar ckt I 16-Apr-14 900 16-Apr-14 1700 Daily QMwork MSETCL MSETCL125 400 Vadavi - Dehgam (Pg) - 2 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCO GETCO126 400 Ssnl-Dhule-2 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCOMSETCL GETCO127 400 Vadinar-Hadala- 1 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCO GETCO128 220 Bhat - Pirana (PG) - 2 17-Apr-14 800 17-Apr-14 1800 Daily PMM work GETCO GETCO129 400 400KV Birsinghpur -Katni Ckt - II 17-Apr-14 800 17-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I130 220 Pithampur-Rajgarh(PGCIL) Ckt - II 17-Apr-14 900 17-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI131 400 Jejuri-Lonikand 17-Apr-14 900 17-Apr-14 1700 Daily QMwork MSETCL MSETCL132 400 Deepnagar-Khadka II 17-Apr-14 900 17-Apr-14 1700 Daily QMwork MSETCL MSETCL133 400 Chorania Kasor 18-Apr-14 800 18-Apr-14 1800 Daily PMM GETCO GETCO134 220 GWL(PGCIL)-Malanpur Ckt-II 18-Apr-14 900 19-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI135 400 Akola-Wardha II 18-Apr-14 900 18-Apr-14 1700 Daily QMwork MSETCL MSETCL

136 400 Koradi-Nandgaonpeth 18-Apr-14 800 18-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

137 765 765kV Pune line Reactor at Solapur 19-Apr-14 700 20-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

138 400 400KV Bina -Power(JP) Ckt 19-Apr-14 900 19-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I139 400 Dhule-SSarovar I 19-Apr-14 900 19-Apr-14 1700 Daily QMwork MSETCL MSETCL

140 400 Koradi-Khaparkheda II 19-Apr-14 900 19-Apr-14 1700 Daily QMwork MSETCL MSETCL141 220 KAPP - VAPI - 1 20-Apr-14 800 20-Apr-14 1800 Daily Isolator replacement under ASIDE scheme PGCIL GETCO

142 400 DC Bhilai-Bhadrawati amp Raipur-Bhadrawati 1 21-Apr-14 800 28-Apr-14 1800 Conti Diversion of line for Vidarbha Industrial Devlopment Corporation(VIDC)

WRTS-I VIDC C

143 400 Bhachau- Ranchhodpura 1amp2 21-Apr-14 800 27-Apr-14 1800 Continuous Tower shifting work at canal crossingInsulator replacement work

POWERGRID WR-II C

144 400 Hadala-Amreli 21-Apr-14 800 21-Apr-14 1800 Daily PMM GETCO GETCO145 400 Vadinar-Hadala- 2 21-Apr-14 800 21-Apr-14 1800 Daily PMM GETCO GETCO146 220 TAPS-Boisar 21-Apr-14 800 23-Apr-14 1900 Daily Annual maintenance Works MSETCL NPCIL147 220 Bina(PGCIL)-220 KV Bina Ckt 21-Apr-14 900 21-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI148 400 CGPL Bhachau -1 21-Apr-14 8AM 21-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL149 220 Kawas-Ichhapore 1+Bus 1 21-Apr-14 900 21-Apr-14 1800 daily RTV Coating NTPC NTPC150 400 Karad-Kolhapur Ckt II 21-Apr-14 900 21-Apr-14 1700 Daily QMwork MSETCL MSETCL151 400 New Koyna-Koyna Stg-4-1 21-Apr-14 830 21-Apr-14 1730 Daily QMwork MSETCL MSETCL152 400 Ssp - Rajgarh - 2 22-Apr-14 800 22-Apr-14 1800 Daily PMM GETCOMPTCL GETCO153 400 Vadavi-Bhachau 2 22-Apr-14 800 22-Apr-14 1800 Daily PMM amp Tan Delta testing PGCIL GETCO154 220 Bhilad - Vapi (PG) - 1 22-Apr-14 800 22-Apr-14 1800 Daily PMM work PGCIL GETCO155 400 400 KV Rajgarh(PGCIL)-Ssp Ckt-I 22-Apr-14 900 22-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I156 400 400KV Seoni -Sarni Ckt 22-Apr-14 900 23-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I157 220 Khandwa(PGCIL)-Nepanagar Ckt 22-Apr-14 900 22-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI158 220 Kawas-Ichhapore 2+Bus 1 22-Apr-14 900 22-Apr-14 1800 daily For maintenance work NTPC NTPC159 400 Karad-Jaigad II 22-Apr-14 900 22-Apr-14 1700 Daily Annual maintenance work MSETCL MSETCL160 220 Bhilad - Vapi (PG) - 2 23-Apr-14 800 23-Apr-14 1800 Daily PMM work PGCIL GETCO161 400 400KV Bina -Bhopal Ckt -I 23-Apr-14 900 24-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I162 400 400 KV Rajgarh(PGCIL)-Ssp Ckt-II 23-Apr-14 900 23-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I163 220 Bina(PGCIL)-Shivpuri Ckt 23-Apr-14 900 24-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI164 220 Damoh(PGCIL) - Damoh I C - I 23-Apr-14 900 23-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI

165 400 400 KV DCDS Sipat- Raipur (IampII) 23-Apr-14 800 24-Apr-14 1700 DailyMaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

PGCIL CSPTCL C

166 400 CGPL Bhachau - 2 23-Apr-14 8AM 23-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL

167 220 Kawas-Navsari 2 +Bus 1 23-Apr-14 900 23-Apr-14 1800 daily Insulator replcement and routine maintenance NTPC NTPC168 400 Padgha-Babhleswar ckt II 23-Apr-14 900 23-Apr-14 1700 Daily QMwork MSETCL MSETCL169 400 Kasor - SSP 24-Apr-14 800 24-Apr-14 1800 Daily PMM work GETCO GETCO170 220 Bhilad - Vapi (PG) - 3 24-Apr-14 800 24-Apr-14 1800 Daily PMM work PGCIL GETCO171 220 TAPS-Bhilad 24-Apr-14 800 26-Apr-14 1900 Daily Annual maintenance Works GETCO NPCIL172 220 Damoh(PGCIL) - Damoh I C - II 24-Apr-14 900 24-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI173 400 CGPL Jetpur- 1 24-Apr-14 8AM 24-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL

174 220 Kawas-Ichhapore 1 +Bus 2 24-Apr-14 900 24-Apr-14 1400 daily Insulator replcement and routine maintenance NTPC NTPC

175 220 Kawas-Ichhapore 2 +Bus 2 24-Apr-14 1400 24-Apr-14 1900 daily Insulator replcement and routine maintenance NTPC NTPC176 400 Padgha-Talegaon 24-Apr-14 900 24-Apr-14 1700 Daily QMwork MSETCL MSETCL

177 765 765kV Raichur 1 line Reactor at Solapur 25-Apr-14 700 27-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

178 400 400KV Bina -Bhopal Ckt -II 25-Apr-14 900 26-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I179 400 CGPL Jetpur- 2 25-Apr-14 8AM 25-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL180 400 Vindhyachal -Satna-4 Line Shunt Reactor 25-Apr-14 900 25-Apr-14 1900 Daily Basis AMP NTPC NTPC

181 400 Bhusawal-Koradi 25-Apr-14 900 25-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

182 400 Deepnagar-Khadka I 25-Apr-14 900 25-Apr-14 1700 Daily QMwork MSETCL MSETCL183 400 Soja -Kansari 26-Apr-14 800 26-Apr-14 1800 Daily PMM GETCO GETCO184 400 Raipur-Wardha 1 27-Apr-14 800 28-Apr-14 1800 Daily Balance construction work WRTS-1 WRTS-1 C185 220 KAPP - VAPI - 2 27-Apr-14 800 27-Apr-14 1800 Daily Isolator replacement under ASIDE scheme PGCIL GETCO186 400 Soja -Kansari 28-Apr-14 800 28-Apr-14 1800 Daily PMM GETCO GETCO187 220 TAPS-Boisar II 28-Apr-14 800 30-Apr-14 1900 Daily Annual maintenance Works MSETCL NPCIL188 400 400KV Damoh - Katni Ckt 28-Apr-14 900 28-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I189 400 400 KV Damoh(PGCIL)-Katni Ckt 28-Apr-14 900 28-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I190 400 New Koyna-Karad ckt 1 28-Apr-14 830 28-Apr-14 1730 Daily QMwork MSETCL MSETCL

191 400 DC Raigarh-DB Power (Tudri) - KSK 29-Apr-14 800 30-Apr-14 1800 Conti Crossing work of 765kV SC Raigrah-Champa (90 - 100)

WRTS-I WRTS-I C

192 400 Raipur-Wardha 2 29-Apr-14 800 30-Apr-14 1800 Daily Balance construction work WRTS-1 WRTS-1 C193 220 Navsari - Nasik - 1 29-Apr-14 800 29-Apr-14 1800 Daily PMM work GETCOMSETCL GETCO194 220 Seoni(PGCIL)-Chhindwara Ckt-I 29-Apr-14 900 29-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI195 220 Kawas-Vav 1+ bus 2 29-Apr-14 900 29-Apr-14 1800 daily For maintenance work NTPC NTPC196 400 Chorania Asoj-1 30-Apr-14 800 30-Apr-14 1900 Daily PMM GETCO GETCO197 220 Navsari - Nasik - 2 30-Apr-14 800 30-Apr-14 1800 Daily PMM work GETCOMSETCL GETCO198 220 Vapi - TAPS 30-Apr-14 800 30-Apr-14 1800 Daily PMM work PGCIL GETCO199 220 Seoni(PGCIL)-Chhindwara Ckt-II 30-Apr-14 900 30-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI200 220 Kawas-Vav 1+ bus 2 30-Apr-14 000 30-Apr-14 000 daily For maintenance work NTPC NTPC

Annexure-32-C1

List of Emergency Outages availed in Feb 2014

SlNo

Element kV Agency From

Date To Date

Remarks

1 SATNA‐BINA‐II 765 WRTS‐2 4‐Feb‐14

5‐Feb‐14

Hot spot attending

2 SUJALPUR‐NAGDA LR NAGDA

400 WRTS‐2 6‐Feb‐14

19‐Feb‐14

Oil leackage

3 SOLAPUR‐PARLI‐II

400 WRTS‐2 6‐Feb‐14

6‐Feb‐14

Hotspot attend at solapur

4 JABALPUR‐ITARSI‐IV LR AT ITARSI‐LR

400 WRTS‐2 7‐Feb‐14

17‐Feb‐14

Oil leackage

5 APL‐HADALA‐SC 400 GEB 7‐Feb‐14

7‐Feb‐14

Hot spot

6 SOLAPUR‐PARLI(PG)‐1

400 WRTM(REL)

9‐Feb‐14

9‐Feb‐14

Hot spot

7 BOISAR‐BOISAR(PG)‐II

220 MSETCL 9‐Feb‐14

9‐Feb‐14

Hotspots

8 NEW KOYNA‐KARAD ‐ I

400 MSETCL 10‐Feb‐14

11‐Feb‐14

Dc‐earth leakage

9 LONIKHAND ‐ KARAD

400 MSETCL 10‐Feb‐14

11‐Feb‐14

Hotspot

10 NAGDHA ICT ‐ III

400220

MPPTCL 10‐Feb‐14

10‐Feb‐14

Hotspot

11 AKOLA ‐ ABAD ‐I AKOLA

400 WRTS‐1 11‐Feb‐14

12‐Feb‐14

Oil leackage

12 AKOLA ‐ AURANGABAD ‐ I

400 WRTS‐1 11‐Feb‐14

11‐Feb‐14

Oil leackage ion lr

13 BINA‐GWALIOR 765 WRTS‐1 14‐Feb‐ 14‐Feb‐ Attend oil leakage on lr

SlNo

Element kV Agency From

Date To Date

Remarks

II 14 14

14 AKOLA‐TIRORA‐I 765 MSETCL 22‐Feb‐14

23‐Feb‐14

Sparking in LR at Tirora SYED AT TIRORA END

15 KHAEGAR‐ICT‐I 400220

MSETCL 22‐Feb‐14

22‐Feb‐14

Hot spot

16 KHANDWA‐NEPANAGR‐SC

220 MPPTCL 23‐Feb‐14

23‐Feb‐14

Hot spot

17 GWALIAR ‐SATNA ‐ I

765 WRTS‐2 24‐Feb‐14

1‐Mar‐14

Attend hot spot

18 KORBA BUS‐III 400 NTPC 25‐Feb‐14

25‐Feb‐14

Hots pot attend

19 BUS‐1 AT GWALIOR

765 WRTS‐2 13‐Feb‐14

13‐Feb‐14

Checking of blocked BB main‐1 relay

20 RAIPUR‐BWATI‐2

400 WRTS‐1 17‐Feb‐14

17‐Feb‐14

Urgent Removal of LR at Raipur end for DGA violation

21 TAPS‐PADGHE 400 TAPS‐3amp4 19‐Feb‐14

23‐Feb‐14

To attend SF‐6 leakage

22 SATNA‐GWALIOR‐1

765 WRTS‐2 24‐Feb‐14

26‐Feb‐14

To attend hot spots

23 VCHAL‐JABALPUR‐IV

400 WRTS‐2 27‐Feb‐14

27‐Feb‐14

To increase OPGW‐Top conductor clearance to avoid tripping

24 APL‐SAMI‐2 400 APL 26‐Feb‐14

26‐Feb‐14

To attend hot sopt

25 SHOLAPUR BUS‐1

765 WRTS‐1 27‐Feb‐14

27‐Feb‐14

To attend hot sopt

26 BOISAR BUS‐2 220 WRTS‐1 28‐Feb‐14

28‐Feb‐14

To attend hot sopt

Sl No KV element From To Basis Work System Agency Remarks

1220 Vapi (GETCO)‐Bhilad 1‐Feb‐14 800 2‐Feb‐14 1800 Daily Line crossing work of 400KV LILO line for

Magarwada SSGETCO POWERGRID N

2 220 Omkareshwar-Khandwa Ckt

3-Feb-14 900 3-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

3 400 New Koyna-Koyna Stg-4-1

3-Feb-14 830 3-Feb-14 1730 Daily QMwork MSETCL MSETCL N

4220 Vapi ‐ Magarwada

Ckt13‐Feb‐14 900 3‐Feb‐14 1400 Daily AMP of line amp equipment WRTS‐II POWERGRID DD may have to do load

shedding as per Reliability Suggestion

N

5 220 DC Raigarh- Raigarh 1amp 2

4-Feb-14 800 5-Feb-14 1800 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (040-50)

CSPTCL WRTS-I N

6 220 Itarsi(PGCIL)-Hoshangabad Ckt

4-Feb-14 900 4-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N

7 400 Mundra -Limbdi-2 4-Feb-14 800 4-Feb-14 1800 Daily Suspension Insulator replcement and routine maintenance

PGCIL CGPL N

8 400 400 kV DC Satna - Bina 1amp2

4-Feb-14 800 5-Feb-14 1800 Continous Crossing of Jabalpur-Bina 765 kv SC Line PGCIL JTCL N

9220 Vapi ‐ Magarwada

Ckt24‐Feb‐14 0900 4‐Feb‐14 1400 Daily AMP of line amp equipment WRTS‐II POWERGRID N

10 765 Seoni-Bina line with LR 4‐Feb‐14 800 4-Feb-14 1800 Daily AMP Work WRTS-2 WRTS-1 N

11 400 Bus I Bina 5‐Feb‐14 800 5‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

12220 Kawas ‐ Navsari (PG)

25‐Feb‐14 800 5‐Feb‐14 1800 Daily Replacement of ST insulators by Double Tension

insulator in Railway crossing spansWRTS‐II POWERGRID N

13400 Indoer (PG) ‐Indore

(MP) DC5‐Feb‐14 800 6‐Feb‐14 1800 Continou

sStringing of 765kV Indore ‐ Vadodara line WRTS‐II POWERGRID N

14 400 APL - Hadala 6-Feb-14 800 6-Feb-14 1800 Daily PMM GETCO GETCO N N

15 220 Seoni(PGCIL ) - Chhindwara CKT I

6-Feb-14 900 6-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N N

16 400 Jejuri-Koyna stg IV 6-Feb-14 900 6-Feb-14 1700 Daily QMwork MSETCL MSETCL N17 400 Akola-Nandgaonpeth 6-Feb-14 900 6-Feb-14 1700 Daily Quaterly Maintainance Work MSETCL MSETCL N18 400KV Korba-Bhatapara 6-Feb-14 900 7-Feb-14 1900 Cont Testing of LBB auto re-close M-I amp M-II relays NTPC NTPC N19 220 Haldarva - Jhanor - 2

(NTPC)6-Feb-14 900 6-Feb-14 1800 Daily PMM work GETCO N

20220 Navsar (PG) ‐Navsari

(GETCO) 16‐Feb‐14 800 6‐Feb‐14 1800 Daily Replacement of ST insulators by Double Tension

insulator in Railway crossing spansWRTS‐II POWERGRID

N

21 400 Bus‐II Bina 6‐Feb‐14 800 6‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

22400 Seoni‐Khandwa1 6‐Feb‐14 1000 6‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Khandwa end by MS ABB

WRTS‐II POWERGRID Rescheduled to 6th March N

23 400 Rajgarh-Ssp Ckt-II 7-Feb-14 900 7-Feb-14 1600 daily For maintenance work MPPTCL EHT- Mamp I N24 220 Chhegoan-Khandwa

Ckt -II7-Feb-14 900 7-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

25 220 Wardha (PG)-Wardha 7-Feb-14 800 7-Feb-14 1800 Daily AMP Work MSETCL WRTS-I N26 400 Chorania - Vadavi-2 7-Feb-14 800 7-Feb-14 1800 Daily PMM amp Tan Delta testing WRTGPL GETCO N27 400 Jabalpur‐Itarsi1 7‐Feb‐14 900 7‐Feb‐14 1400 Daily AMP OF TERMINAL EQUIPMENT WRTS‐II POWERGRID N

28220 Vapi(PG)‐ Bhilad ckt

2 amp 3 7‐Feb‐14 800 8‐Feb‐14 1800 Daily Line crossing work of 400KV LILO of Navsari‐Boisar

at MagarwadaGETCO POWERGRID N

29 220 Mapusa-Thivim 1 8-Feb-14 800 8-Feb-14 1800 Daily AMP Work GOA WRTS-I N

30400 Seoni‐Khandwa2 9‐Feb‐14 1000 9‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Khandwa end by MS ABB

WRTS‐II POWERGRID Rescheduled to 7th March N

31 220 Chhegoan-Khandwa Ckt -I

10-Feb-14 900 10-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

Annexure-32-C2OCC approved outage not availed in Feb‐2014

32132 132 kV Dhule

Dondaicha line10-Feb-14 800 11-Feb-14 1800 Cont Crossing of Dhule-Vadodara 765 kv SC Line MSETCL BDTCL subjected to sldc

clearance N

33 400132 KV

Vindhyachal ICT-1 10-Feb-14 900 14-Feb-14 1900 Cont ICT Overhauling NTPC NTPC N

34400 KV Vindhyachal - Jabalpur-

3 Line Shunt Reactor10-Feb-14 900 14-Feb-14 1900 Cont Reactor Overhauling NTPC NTPC

N

35 400 KSK-DB Power 10-Feb-14 800 13-Feb-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end WRTS-IDBKSK

KSK N36 220 Ipore-Kawas-1 10-Feb-14 800 10-Feb-14 1800 Daily PMM work GETCO N

37400 Vindhyachal‐Mahan 10‐Feb‐14 800 11‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐I WRTS‐II N

38400 Mahan‐Korba 10‐Feb‐14 800 11‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐I WRTS‐II N

39765 Jabalpur ‐ Bina 1 10‐Feb‐14 1000 10‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Jabalur end by MS ABB

WRTS‐II POWERGRID Differed by siteN

40 400 SSP - Rajgarh - 1 10-Feb-14 800 11-Feb-14 1800 Daily Basis

PMM Work GETCO N

41 400 DC Tundri (DB Power) -ksk-Raigarh

10-Feb-14 800 11-Feb-14 1800 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (092-100)

DB Power WRTS-I N42 400 Jetpur - Amreli - 1 11-Feb-14 800 12-Feb-14 1800 Daily PMM GETCO GETCO N43 400 Hadala - Vadinar-2 11-Feb-14 800 11-Feb-14 1800 Daily PMM GETCO GETCO N44 400 Nagda-Rajgarh Ckt-I 11-Feb-14 900 11-Feb-14 1800 daily For maintenance work MPPTCL EHT- Mamp I N45 220 Mehgaon-Auriya Ckt 11-Feb-14 900 11-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N46 220 Seoni(PGCIL ) -

Chhindwara CKT II11-Feb-14 900 11-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

47

765kV Main Bus-1B at SASANBay 13 - Jack Bus

11-Feb-14 900 21-Feb-14 1800 Daily Jumper Installations amp ConnectionsIsolator Allignment

PGCIL Reliance Provisional Subject to details of works done to be apprised on daily basis

N

48 220 Ipore-Kawas-2 11-Feb-14 800 11-Feb-14 1800 Daily PMM work GETCO N49 220 Navsari - Nasik - 2 11-Feb-14 900 11-Feb-14 1800 Daily PMM work GETCO N

50765 Jabalpur ‐ Bina 2 11‐Feb‐14 1000 11‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Jabalur end by MS ABB

WRTS‐II POWERGRID Deferred by siteN

51 400 Nagda-Rajgarh Ckt-II 12-Feb-14 900 12-Feb-14 1800 daily For maintenance work MPPTCL EHT- Mamp I N52 400 Karad-Solapur (PGCIL) 12-Feb-14 900 12-Feb-14 1700 Daily QMwork MSETCL MSETCL N53 400 Raipur-Sipat 1 amp 2 26-Feb-14 800 3-Mar-14 1800 Conti Diversion of line for Lafarge Railway track WRTS-I Lafarge Ori 12-16 Feb 14 Deferre N54 220 Haldarwa Kawas-2 12-Feb-14 900 12-Feb-14 1800 Daily PMM work GETCO N

55 220 Bus‐I Bina 12‐Feb‐14 800 12‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

56 400 Chorania - Hadala 13-Feb-14 800 14-Feb-14 1800 Daily PMM GETCO GETCO N57 400 Tarpur-Padghe-2 13-Feb-14 800 14-Feb-14 1800 Daily maintenance work POWERG

RIDNPCIL N

58400 Vindhyachal‐Satna1 13‐Feb‐14 1000 13‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

59 220 Bus‐II Bina 13‐Feb‐14 800 13‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

60 220 Pithampur-Rajgarh Ckt - I

14-Feb-14 900 14-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

61 220 Wardha (PG)-Badnera 14-Feb-14 800 14-Feb-14 1800 Daily AMP Work at Wardha MSETCL WRTS-I N

62 400 Bhusawal-Koradi 14-Feb-14 900 14-Feb-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL N

63 400 Raipur-KSK 14-Feb-14 800 16-Feb-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end WRTS-IKSK

KSK N

64 220 GWL(PGCIL)-Malanpur Ckt-II

15-Feb-14 900 15-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N

65 220 Pithampur-Rajgarh Ckt - II

15-Feb-14 900 15-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

66400 Vindhyachal‐Satna2 16‐Feb‐14 1000 16‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

67 220 KAPS - Haldarwa - 1 17-Feb-14 800 17-Feb-14 2000 Daily Yearly PM checks KAPS N

68400 3X105 MVA 400220Kv

X-mer I At Indore ss17-Feb-14 800 18-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI

N

69

220 SC Korba-Raigarh-Budhipadar sc(PGCIL) amp DC Korba-Budipadar both circuits (CSPTCL)

18-Feb-14 800 19-Feb-14 1800 Conti Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCLWRTS-I

WRTS-I

N

70 400 Itarsi-Bhopal Ckt-I 18-Feb-14 900 19-Feb-14 1700 daily For maintenance work MPPTCL EHT- Mamp I N71 220 Badod - Kota Ckt 18-Feb-14 900 18-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N72 220 Damoh(PGCIL) -

Damoh I C - II18-Feb-14 900 18-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

73 220 Badod - Modak Ckt 19-Feb-14 900 19-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

74220 KAPS - Ukai - Mota 19-Feb-14 800 19-Feb-14 2000 Daily Yearly PM checks KAPS Non consent from SLDC

GETCO N

75400 315 MVA 400220 KvX-

mer III At Indore ss20-Feb-14 800 21-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI

N

76 220 Seoni(PG)-Seoni 2 21-Feb-14 800 21-Feb-14 1800 Daily AMP Work MPPTCL WRTS-I Y N77 220 Bina(PGCIL)-Shivpuri

Ckt21-Feb-14 900 22-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI Y N

78 400 Koradi-Nandgaonpeth 21-Feb-14 900 21-Feb-14 1700 Daily QMwork MSETCL MSETCL N N79 220 Haldarva - Jhanor - 1

(NTPC)21-Feb-14 900 21-Feb-14 1800 Daily PMM work GETCO N

80

765kV Main Bus-2A at SASANSatna Line-2

22-Feb-14 900 28-Feb-14 1800 Contionious

Equipment ConnectionsCircuit Breaker TestingJumper MeasurementIsolator Allignment Reactor accessories erection on R-Phase

PGCIL Reliance

N

81 400 Korba-Raipur 3 amp 4 23-Feb-14 800 24-Feb-14 1800 Conti For Bus spliting work at Raipur765 KV Raigarh-Raipur and 765 Champa Raipur lines

WRTS-1 WRTS-1 N

82132 132kV Astha - Polai SC

line of MPPTCL24-Feb-14 800 25-Feb-14 1800 Continous Crossing of Bhopal -Indore 765 kv SC Line MPPTCL BDTCL subjected to sldc

clearance N

83 400 Bus-1 at Bilaspur 24-Feb-14 800 24-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I N

84400 Seoni -

Khedamara(Bhilai) Ckt25-Feb-14 900 25-Feb-14 1800 daily For maintenance workFeeder bay maintenance at

KMaraMPPTCL CSPTCLMPPT

CLNo confirmation on D-3

N

85400 Ranchi-Sipat 1 amp 2 25-Feb-14 800 26-Feb-14 1800 Conti Crossing work of upcoming 765 KV DC

Jharsuguda-Korba amp 765KV SC Ranchi-BilaspurWRTS-I WRTS-I No confirmation on D-3

N

86765 Sasan‐Satna2 25‐Feb‐14 800 26‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐II POWERGRID No confirmation on D-3 N

87400 Bus Reactor1 at Satna 25‐Feb‐14 1000 25‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

88400 400 kV DC Damoh -

Bhopal Line26-Feb-14 800 27-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL Not availed by agency for

rainsN

89400 Raipur-Bhadrawati 2 amp

327-Feb-14 800 27-Feb-14 2100 Daily For Bus spliting work at Raipur765 KV Raigarh-

Raipur and 765 Champa Raipur linesWRTS-1 WRTS-1 Subject to Telemetry from

Durg PS RaipurN

90 400 Birsinghpur‐Vandana Vidyut

27‐Feb‐14 800 27‐Feb‐14 1700 Daily AMP of Terminal Equipment amp line Reactor WRTS‐I POWERGRID Ready N

91 400 Bhusawal-Akola 28-Feb-14 900 28-Feb-14 1700 Daily QMwork MSETCL MSETCL N92 220 Bus-1 at Wardha 28-Feb-14 800 28-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I N93 400 Birsinghpur‐Balco 28‐Feb‐14 800 28‐Feb‐14 1700 Daily AMP of Terminal Equipment amp line Reactor WRTS‐I WRTS‐I Deferred by site N

94 400 Nagda‐Dehgam2 5‐Feb‐14 1000 5‐Feb‐14 1800 DailyCommissioning amp checking of CSD relay in Main CB for reactor switching at Dehgam end by MS ABB

WRTS‐II POWERGRID N

95 400 400kV Satpura Itarsi 10‐Feb‐14 900 11‐Feb‐14 1700 DailyCommissioning of new CB after dismantling of existing TELK make CB at Satpura end amp normalising of line on main CB

POWERGRID

WRTS‐II N

96 765 765 kV Satna - Bina Ckt I

6-Feb-14 800 8-Feb-14 1800 cont Stringing of Jabalpur-Bina 765 kv SC Line PGCIL JTCL Original27-28 Jan14 Def N

97 765400 765400 kV ICT-1 at Bina 20-Feb-14 90000 AM 21-Feb-13 60000 PM Continuou

sCSD commissioning for 400kV Side CB of 765400 kV ICT-1 WRTS-II POWERGRID Deferred by site N

98 400 Nagda - Dehgam 1amp2 20-Feb-14 80000 AM 28-Feb-14 1700 Daily Online PID testing to insulators in both circuits AR shall be kept in non auto mode in both circuits WRTS-II POWERGRID

N

99 220MC Waluj-Chitegaon amp Waluj-Jalna

21-Feb-14 700 21-Feb-14 1900 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad MSETCL WRTS-I

N

100 400 Bus 1 at Asoj 21-Feb-14 000 21-Feb-14 1800 Daily For checking bus stability testing of Piran 1 amp 2 bays (for charging of new line) GETCO WRTS-II N

101 400 Bus-1 at Wardha 22-Feb-14 800 22-Feb-14 1800 Daily Jumper spacers connection at Wardha WRTS-I WRTS-I N102 400 Bus-1 at Raigarh 22-Feb-14 800 22-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I Deferred by site N103 765 Bus - II at Indore 22-Feb-14 90000 AM 23-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Not availed NLDC consenN104 220 Kakrapar-Haldarwa2 22-Feb-14 1000 Hrs 22-Feb-14 1600 Hrs Daily AMP POWERG

RID WRTS-II N

105 400 Bus 2 at Asoj 22-Feb-14 000 22-Feb-14 1800 Daily For checking bus stability testing of Piran 1 amp 2 bays (for charging of new line) GETCO WRTS-II N N

106400 400 kv DC Bhopal -

Bina Line (Ckt I amp II)(Tower no 34 amp35)

23-Feb-14 800 24-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line MPPTCLBDTCL

N

107 765kV SASAN Main Bus-1BBay 10 - Jack Bus 24-Feb-14 800 Hrs 2-Mar-14 1900 Hrs Continuous Dia-4

(Bay-10) - SCCOCC Test of Unit 4 GTSasan Sasan N

108 765 Bus - I at Indore 24-Feb-14 90000 AM 25-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID N

109 765 765 KV Bina-Indore Line 24-Feb-14 0900 Hrs 24-Feb-14 1800 Hrs Daily

For taking spare reactor unit in service amp checking the scheme for spare reactor with 765 KV Bina-Indore Line Reactor at Bina

POWERGRID WRTS-II

Deferred by site N

110 400 Kasor - GPEC 24-Feb-14 800 25-Feb-14 1800 Daily PMM Work GETCO GETCO N111 40022033 315 MVA ICT2 at Kheda 24-Feb-14 900 10-Mar-14 1800 cont modification work in SS lay out CSPTCL CSPTCL N112 400 315 MVA ICT2 at

Gwalior 25-Feb-14 90000 AM 25-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID N

113 400KV V-Satna-4 Line Shunt Reactor 25-Feb-14 1000 25-Feb-14 2000 Daily

Basis AMP NTPC NTPC N

114 400 Raipur-Wardha 1 26-Feb-14 800 26-Feb-14 2000 Daily Balance construction works at Wardha end WRTS-I WRTS-IReady Ori26214 Deferred by site

N

115 400 Bus -I at Indore 26-Feb-14 90000 AM 26-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Deferred by site N116 400 315 MVA ICT3 at

Gwalior 26-Feb-14 90000 AM 26-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID N

117 400 400 kV DC Damoh - Bhopal Line

26-Feb-14 800 26-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL N

118 400 Chorania-Kasor 26-Feb-14 800 26-Feb-14 1800 Daily PMM work GETCO GETCO N119 400 Koradi-Satpura sc 26-Feb-14 800 26-Feb-14 1600 Daily 765KV Tiroda Koradi Transmission LineII crossing

worksPOWERGRID MEGPTCL Cancelled by MEGPTL N

120 400 400 kV DC Damoh - Bhopal Line

26-Feb-14 800 26-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL N

121 400 Raipur-Wardha 2 27-Feb-14 800 27-Feb-14 2000 Daily Balance construction works at Wardha end WRTS-I WRTS-I Deferred by site N122 400 Vindhyachal-Satna2 27-Feb-14 1000 27-Feb-14 1800 Daily Commissioning of CSD Relay in ABB make main

CB at Satna WRTS-II POWERGRID Deferred by site N

123 400 Bus -II at Indore 27-Feb-14 90000 AM 27-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Ready N124 400 315 MVA ICT1 at

Rajgarh 27-Feb-14 90000 AM 27-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID Ready N

125 400400 KV SC Kosamba - Asoj line(730-740)

27-Feb-14 700 27-Feb-14 1800 cont Crossing of Dhule - Vadodara 765 kv SC Line GETCOBDTCL

N

126 400 Indore (MP) -Indore (PG)-DC 27-Feb-14 700 28-Feb-14 1600 Cont Stringing of 765kV Indore - Vadodara line POWERG

RID WRTS-II Deferred by site N

Anaulagnak 33(A)

maaca- 2014 AaOr Ap`Ola 2014 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR MARCH 2014 AND APRIL 2014

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)maaca- 2014 Ap`Ola 2014 maaca- 2014 Ap`Ola 2014

MARCH 2014 APRIL 2014 MARCH 2014 APRIL 2014

1 gaujarat

saIimat 11700 12100 7750 7800

AsaIimat 11740 12140 7760 7810

2 maQya p`doSa

saIimat 8340 9050 5338 5540

AsaIimat 8340 9050 5338 5540

3 CltaIsagaZ

saIimat 3200 3075 1929 1809

AsaIimat 3225 3105 1944 1827

4 maharaYT

saIimat 19000 19150 10200 10300

AsaIimat 19050 19200 10250 10350

5 gaaovaa

saIimat 425 410 300 295

AsaIimat 425 415 310 300

6 dmana dIva

saIimat 340 345 210 205

AsaIimat 345 350 225 210

7 DI ena eca

saIimat 635 640 445 425

AsaIimat 635 640 445 425

8 piScama xao~

saIimat 41961 43047 28500 27900

AsaIimat 42076 43173 29560 28840

Diversity factor of 10401

March 2014 and April 2014

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah frvarI 2014

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 1552 75

]k[- Ukai - 2 1719 75]k[- Ukai - 3 598 75]k[- Ukai - 4 1757 75]k[- Ukai (Total) 5627 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 024 2]k[- ela baI saI eca Ukai LBCH - 2 131 3]k[- ela baI saI eca Ukai LBCH (Total) 154 5 0008

3 kDanaa Kadana - 1 000 0 0005kDanaa Kadana - 2 246 62 0000kDanaa Kadana - 3 223 62kDanaa Kadana - 4 166 63 0000kDanaa Kadana (Total) 634 63 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 431 9 0020 6 kula jalaIya TOTAL(H) 6846 225 0401

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 2060 32 21822 TaoronT pavar ilaimaToD yauinaT DI 7979 125 69803 TaoronT pavar ilaimaToD yauinaT [- 075 122 07584 TaoronT pavar ilaimaToD yauinaT ef 8023 124 66915 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 018811 Qauvarna tapIya Dhuvaran - GT 2 000 0 041912 Qauvarna tapIya Dhuvaran - STG 023 1013 ]ka[- yauinaT 1 Ukai -1 000 0 005114 ]ka[- yauinaT 2 Ukai -2 000 0 010815 ]ka[- yauinaT 3 Ukai -3 3147 200 297216 ]ka[- yauinaT 4 Ukai -4 10588 202 1002617 ]ka[- yauinaT 5 Ukai -5 9496 210 884118 ]ka[- yauinaT 6 Ukai -6 23703 500 1844819 gaaMQaInagar 1 Gandhinagar - 1 000 0 008620 gaaMQaInagar 2 Gandhinagar - 2 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 000 0 029622 gaaMQaInagar 4 Gandhinagar - 4 000 0 036223 gaaMQaInagar 5 Gandhinagar - 5 11676 212 1148924 vaNakbaaorI 1 Wanakbori - 1 10648 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 11069 21026 vaaNakbaaOrI 3 Wanakbori - 3 1891 20627 vaaNakbaaOrI 4 Wanakbori - 4 5244 21228 vaaNakbaaOrI 5 Wanakbori - 5 5531 21029 vaaNakbaaOrI 6 Wanakbori - 6 000 030 vaaNakbaaOrI 7 Wanakbori - 7 8902 20931 ]trna Utran GT 1 000 0 019832 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 000 0 024635 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 000 0 0000

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Anaulagnak 41

ACTUAL GENERATION amp AVALABILITY FOR FEBRUARY 2014Actual vaastivak

Actual vaastivak

37 isaka Sikka - 1 3696 112 439838 isaka Sikka - 2 000 0 017639 kcC ilagnaa[-T Kutch Lignite - 1 4429 71 848640 kcC ilagnaa[-T Kutch Lignite - 2 4037 7241 kcC ilagnaa[-T Kutch Lignite - 3 3646 6742 kcC ilagnaa[-T Kutch Lignite - 4 2215 66 525343 saUrt ilagnaa[-T Surat Lignite - 1 6705 131 682544 saUrt ilagnaa[-T Surat Lignite - 2 7475 131 738745 saUrt ilagnaa[-T Surat Lignite - 3 6965 130 728846 saUrt ilagnaa[-T Surat Lignite - 4 6362 130 688647 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5454 107 848648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5649 11449 jaI Aa[- pI saI ela GIPCL GT - 1 1589 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1587 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1702 3552 jaI Aa[- pI saI ela GIPCL ST - 1 2902 5153 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 020556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 000 0 000060 jaI pI [- saI GPEC GT - 2 267 156 013261 jaI pI [- saI GPEC GT - 3 143 146 002762 jaI pI [- saI GPEC STG 131 17263 jaI esa [- jaI GSEG GT - 1 000 0 098964 jaI esa [- jaI GSEG GT - 2 1181 5065 jaI esa [- jaI GSEG STG 642 2366 Sugen (GT 1 + GT 2) 1767 308 602467 saIpIpI sao Aayaat Imp from CPP+MUNDRA 269359 6881

kula tapIya Total (T) 475652 8386 302021kula jalaIya+tapIya Total (H+T) 482498 8604 302422ivaMD [najaI- Wind Energy 52123kula jalaIya+tapIya+hvaa Total (H+T+Wind) 534621 9539ivainamaya Exchanges 155314 saIimat jaa- maaMga Restricted Energy Req 689935

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 6800 194

11 gaaMQaI saagar Gandhi Sagar 3366 117 008012 raNaa p`tap sagar RPSagar 5883 172 004013 javaahr sagar Jawahar Sagar 4350 99 0050

2 ponca Pench 3052 165 00903 baargaI Bargi 4581 91 00804 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 11764 315 02806 banasaagar Bansagar-2 (Deolondh) 000 07 banasaagar Bansagar-3 (Silpara) 1236 32 00708 banasaagar Bansagar-4 (Zinaha) 1320 22 00509 maoDIKoDa Medikheda 396 63

10 ibarisaMGapur Birsingpur 040 20 002011 Tavaa Tawa 000 012 rajaGaaT Rajghat 165 12 006013 Omkareshwar 10620 402 14 [Midra saagar Indira Sagar 23077 997 0849

kula jalaIya TOTAL(H) MPPGCL 59999 2365 1273Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 6049 98 232502 AmarkMTk II AMK II Unit -2 6080 983 AmarkMTk III AMK III Unit -5 12212 219 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 06505 satpura II Satpura-II Unit 6 10323 180 165906 satpura II Satpura-II Unit 7 5926 1807 satpura II Satpura-II Unit 8 10964 195 191608 satpura II Satpura-II Unit 9 8353 1709 satpura III Satpura-III Unit 10 000 0 2080

10 satpura III Satpura-III Unit 11 9447 182 1909011 esajaITIpIesa 1 SGTPS Unit - 1 9447 182 1909012 esajaITIpIesa 2 SGTPS Unit - 2 10572 18213 esajaITIpIesa 3 SGTPS Unit - 3 9037 192 2064014 esajaITIpIesa 4 SGTPS Unit - 4 10700 18015 esajaITIpIesa 5 SGTPS Unit - 5 28804 51216 SSTPS 6864 587 8930

kula tapIya Total (T) 133714 3002 115350kula jalaIya+tapIya Total (H+T) 193713 5735 116623Injection from WIND 000 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 193713 5735ivainamaya Exchanges 193660 saIimat jaa- maaMga Rest En Req 387372

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 850 120 00902 Gangrel 475 10 00503 Mini Micro KWB 039 7

kula jalaIya TOTAL(H) CSEB 1364 137 0150tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 47 127402 kaorbaa (pU) Korba (E) Unit-2 2764 483 kaorbaa (pU) Korba (E) Unit-3 2764 484 kaorbaa (pU) Korba (E) Unit-4 2784 465 kaorbaa (pU) Korba (E) Unit -5 3685 120 253306 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 247808 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 15410

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 15839 256 1197012 KORBA(EB) Extn - 2 15876 256 11770

kula tapIya Total (T) 119907 1880 10190013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 119907 1880kula jalaIya+tapIya Total (H+T) 121271 2017 102050ivainamaya Exchanges 40207 0saIimat jaa- maaMga Rest En Req 161478 2017

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 9590 585 25142 kaoyanaa III Koyna III 5920 3203 kaoyanaa IV Koyna IV 18012 11324 kaoyanaa DIpIeca Koyna DPH 1442 385 TaTa jalaIya TATA Hydro 10242 741 28836 vaOtrNaa Vaitarna 000 07 eladarI Eldari 528 168 BaTgar AaOr vaIr Bhatgar amp Vir 915 49 pOzana Paithan 175 59

10 itlaarI Tillari 1106 6511 BaIra Tola rosa Bhira Tail Race 374 4112 GaTGar Ghatghar 5297 29313 Anya CaoTo jalaIya Small Hydro (others) 6173 0

kula jalaIya TOTAL(H) 58910 1599 5397Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 7700 1954 naaisak 4 Nasik Unit -4 10772 1965 naaisak 5 Nasik Unit -5 11160 1976 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 28827 5058 Tambao 6 Trombay Unit -6 000 09 Tambao 8 Trombay Unit -8 000 0

10 Tambao 7A gaOsa Trombay -7A (Gas) 7882 135 250411 Tambao 7ba Trombay -7B (WHR) 4499 7212 kaoraDI 5 Koradi Unit -5 5003 16013 kaoraDI 6 Koradi Unit -6 3963 19014 kaoraDI 7 Koradi Unit -7 10015 19015 Bausaavala 2 Bhusawal Unit -2 8329 17016 Bausaavala 3 Bhusawal Unit -3 9248 18017 Bausaavala 4 Bhusawal Unit -4 22734 50518 Bausaavala 4 Bhusawal Unit -5 19742 41519 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 7451 18621 parlaI 5 Parli Unit -5 10626 18022 parlaI 6 Parli Unit -6 14013 25323 parlaI 7 Parli Unit -7 13728 26024 KaprKoDa 1 Khaperkheda Unit -1 11173 20025 KaprKoDa 2 Khaperkheda Unit -2 10373 19526 KaprKoDa 3 Khaperkheda Unit -3 10998 20127 KaprKoDa 4 Khaperkheda Unit -4 12019 20728 KaprKoDa 5 Khaperkheda Unit -5 28882 50730 parsa Paras-3 14447 25731 parsa Paras-4 13504 25932 ]rna Uran (Gas) 18284 33833 ]rna Uran (WHR) 000 148 586234 caMd`pur 1 Chandrapur Unit -1 9087 17735 caMd`pur 2 Chandrapur Unit -2 1816 19436 caMd`pur 3 Chandrapur Unit -3 11737 21037 caMd`pur 4 Chandrapur Unit - 4 11843 46038 caMd`pur 5 Chandrapur Unit -5 7759 45539 caMd`pur 6 Chandrapur Unit -6 24420 44240 caMd`pur 7 Chandrapur Unit -7 23258 041 DhaNaU 1 Dahanu Unit-1 16339 250 1427842 DhaNaU 2 Dahanu Unit-2 16196 250 1427843 CPP 193651 29840044 RGPPL Share 000 0

kula tapIya Total (T) 631479 15369 329920MAH Wind + Solar Generation 16922 0kula jalaIya +tapIya Total (H+T+Wind) 707311 17451 372239

TOTAivainamaya Exchanges 324731saIimat jaa- maaMga Rest En Req 1032042

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1871 26ivainamaya Exchanges 33252saIimat jaa- maaMga Rest En Req 35123 434

C (F) dmana AaOr dIva DAMAN amp DIU 18245 298ja (G) dadra nagar hvaolaI DNH 40600 655

kula DD ampDNH (T) 58845 952Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 9600 160 1399112 tara`pur 2 TAPS Unit -2 11069 16013 tara`pur 3 TAPS Unit -3 36144 545 6584014 tara`pur 4 TAPS Unit -4 36197 54715 kakrapr 1 KAPS Unit -1 15230 545 3134216 kakrapr 2 KAPS Unit -2 14662 547

kula ena pI saI NPC Total 122901 25042 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14008 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 13913 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14076 214 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 32894 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 33204 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 33190 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33176 514

kula kaorbaa KSTPS Total 174461 2498 10394427 ivanQa esaTIpIesa 1 VSTPS Unit-1 12762 21328 ivanQa esaTIpIesa 2 VSTPS Unit-2 12708 21529 ivanQa esaTIpIesa 3 VSTPS Unit-3 12854 212210 ivanQa esaTIpIesa 4 VSTPS Unit-4 12909 214211 ivanQa esaTIpIesa 5 VSTPS Unit-5 12174 215212 ivanQa esaTIpIesa 6 VSTPS Unit-6 12625 214213 ivanQa esaTIpIesa 7 VSTPS Unit-7 31487 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 31075 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 31592 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 31488 512217 ivanQa esaTIpIesa 11 VSTPS Unit-11 30948 512

kula ivanQayaacala VSTPS Total 232623 3750 15107 31 saIpt -1 -SIPAT-1 38822 66400 32 saIpt -2 -SIPAT-2 32404 66500 33 saIpt -3 -SIPAT-3 38930 66300 34 saIpt -4 -SIPAT-4 26383 51600 35 saIpt -5 SIPAT-5 26400 51400

kula saIpt -SIPAT TOTAL 162939 285000 838941 kvaasa gaOsa 1e Kawas GT-1A 792 10742 kvaasa gaOsa 1baI Kawas GT-1B 2623 10943 kvaasa esaTI 1saI Kawas ST-1C 1571 11444 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 4986 304 222951 gaMQaar gaOsa 1 Gandhar GT-1 000 052 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 000 054 gaMQaar esaTI 4 Gandhar ST-4 000 0

kula gaMQaar GGPS Total 000 0 000061 maaOda 1 Mauda -1 19614 514 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 19614 514 1422661 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 000 31 000071 esa esa pI SSP RBPH - 1 6753 19372 esa esa pI SSP RBPH - 2 5907 19273 esa esa pI SSP RBPH - 3 5577 19574 esa esa pI SSP RBPH - 4 5513 19475 esa esa pI SSP RBPH - 5 7237 19476 esa esa pI SSP RBPH - 6 3109 19277 esa esa pI SSP CHPH - 1 1817 4078 esa esa pI SSP CHPH - 2 491 3679 esa esa pI SSP CHPH - 3 000 0710 esa esa pI SSP CHPH - 4 1639 39711 esa esa pI SSP CHPH - 5 901 37

kula esa esa pI SSP Total 38944 1312 389481 kula poMca Pench Total 3052 165 009082 Jindal Injection 38956 083 Amarkantak Lanco 15478 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2372740

(J) ]plabQata Availability 2308426 naoT ivainamaya Net Exchanges -292048 ]plabQa jaa- Energy Availability 2016379

maah frvarI 2014 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR FEBRUARY 2014 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 11532 - - - 11532 020214 1100 4993

saIimat Restricted 11700

AsaIimat Unrestricted 11740 11532 0 28 0 11560 010214 1200 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8366 8366 17022014 0500 5007

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9346 - - - 9346 120214 0900 4986

saIimat Restricted 8340

AsaIimat Unrestricted 8340 9346 0 38 0 9384 120214 0900 4986

nyaUnatma pMjaIkRt maaMga Min Registered Demand 3204 3204 270214 0200

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3210 3210 070214 1900 4989

saIimat Restricted 3200

AsaIimat Unrestricted 3225 3210 233 12 0 3246 070214 1900 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1617 1617 230214 2300 5021

maharaYT MAHARASHTRApMjaIkRt Registered 18510 - - - 18510 050214 1100 4984

saIimat Restricted 19000

AsaIimat Unrestricted 19050 17980 1655 -13 0 19622 190214 1200 5002

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12005 12005 280214 0400 5037

gaaovaa GOApMjaIkRt Registered 425 434 - - 434 130214 1400 5006

AsaIimat Unrestricted 425 434 1 -1 - 434 130214 1400 5006

nyaUnatma pMjaIkRt maaMga Min Registered Demand 311 311 100214 0300

essaar ESSAR(ESIL)pMjaIkRt Registered 487 - - 487 240214 1700 5004

AsaIimat Unrestricted 487 0 0 - 487 240214 1700 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 268 - - 268 250214 1200 5003

AsaIimat Unrestricted 268 0 0 - 268 250214 1200 5003

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 644 - - 644 260214 1200 4999

AsaIimat Unrestricted 644 0 - 644 260214 1200 4999

nyaUnatma pMjaIkRt maaMga Min Registered Demand 508 508 280214

piScama xao~ WESTERN REGIONpMjaIkRt Registered 42253 - - - 42253 110214 1100 4994

saIimat Restricted 41961

AsaIimat Unrestricted 42076 42021 850 235 0 43106 120214 1100 4994

nyaUnatma pMjaIkRt maaMga Min Registered Demand 27524 27524 280214 0400 5040 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

piScama xaoi~ya Baar p`oYaNa kond` mauumba[-

णाली चालन-ISO-I

ANNEXURE-43

माह फरवर 2014 February2014

समातरवतीय चालन PARALLELRADIAL OPERATION

TOTAL OPERATING

HOURS 1 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-NR) 66972

2 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-SR) 67200

टाई लाईन TIE LINE 1 765कवी िसवनी स वधा-I 765kV Sonito Wardha 67200 2 765कवी िसवनी स वधा-II 765kV Seonito Wardha 65247 3 400 कवी िभलाई स कोराड 400kV Bhilai to Koradi 67200

4 400 कवी िभलाई स भिावती 400kV Bhilai to Bhadravati 67200

5 400 कवी रायपर स भिावती-I 400kV Raipur to Bhadravati-I 67200

6 400 कवी रायपर स भिावतीETHII 400kV Raipur to Bhadravati-II 67139

7 400 कवी रायपर स भिावतीETHIII 400kV Raipur to Bhadravati-III 67200

8 400 कवी सातपरा स कोराड 400kV Satpura to Koradi 67200

9 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 67004 10 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 65308 11 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 66259 12 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 67200 13 400 कवी को हापर स मापसा-I 400kV Kolhapur-Mapusa-I 38740

14 400 कवी को हापर स मापसा-II 400kV Kolhapur-Mapusa-II 49532

15 400 कवी वापी स बोईसर 400kV Vapi-Boisar 67200

16 400 कवी रायगढ़ स ःटरलाइट-I 400kV Raigarh to Sterlight-I 66258

17 400 कवी रायगढ़ स ःटरलाइट-II 400kV Raigarh to Sterlight -II 67200

18 400 कवी रायगढ़ स झरसगड़ा-I 400kV Raigarh to Jharsuguda-I 67200

19 400 कवी रायगढ़ स झरसगड़ा-II 400kV Raigarh to Jharsuguda-II 67200

20 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 65028

21 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 66132

22 400 कवी रायपर स वधाETHI 400kV Raipur to Wardha-I 66836

23 400 कवी रायपर स वधाETHII 400kV Raipur to Wardha-II 67200

24 220 कवी कोरबा पव स ब पादर-III 220kV K(E) to Budhipadar-III 63853

Anaulagnak 47Annex-47

maah frvarI 2014 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39514 64944

10287 39711

Levels in Mtrs str maITr maoM

]ka[- Ukai

64392

9914

25402

25994

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF FEBRUARY 2014

ivavarNa Particulars

TRIPPING DETAILS FOR THE MONTH OF FEBRUARY 2014

Sr No Brief Details of incident (Elements Generation Tripped) Owner Utility Date amp Time Load

Gen LossCategory

1 Multiple Tripping from 400 kV New Koyna MSETClMSEGCLRGPPL 05‐02‐2014 0950 Hrs ‐ GI‐2

2Bus Bar protection mal‐operation at 400 kV Soja in Gujarat resulting in multiple Tripping

GETCO 06‐02‐2014 1755 Hrs ‐ GI‐2

ANNEXURE ‐ 5

  • annexpdf
    • 21pdf
    • 231pdf
    • 232pdf
    • 24pdf
    • 25pdf
    • 31pdf
    • 32C1pdf
    • 32C2pdf
    • 33Apdf
    • 41pdf
    • 42pdf
    • 47pdf
    • 5pdf
Page 16: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014

16

457th OCCM AGENDA

ITEM NO 98 RGMO FGMO OF MANDATED GENERATORS IN WESTERN REGION

As per the latest information available at WRLDC there are 251 number of units with a total capacity of 57517 MW in Western Region that are mandated to operate in Restricted Free Governor Mode The need for compliance to the IEGC regulations wrt RGMOFGMO was emphasized in the 455th and 456th OCC meeting as well as during the 25th TCCWRPC meeting Subsequently it was communicated by email to all entities in WR to provide the latest status of RGMOFGMO implementation We have received updated status from MPPTCL LANCO CGPL DB Power and JPL Tamnar in Feb 2014 The latest state wise RGMOFGMO summary is given below

Name of Entity No of mandated units

RGMO FGMO available at

RGMOFGMO Not available at

Maharashtra 90 35 55 Madhya Pradesh 58 36 22 Gujarat 35 19 16 Chhattisgarh 10 3 7 CGPL 5 5 0 NCA 11 6 5 SASAN 2 1 1 NTPC 24 10 14 ESSAR_Mahan 1 1 0 NSPCL 2 2 0 KSK 1 1 0 KWPCL 1 0 1 DB POWER 1 1 0 JPL 5 4 1 LANCO 2 2 0 IEPL 1 0 1 EMCO 2 0 2 WR_Total 251 126 125

WRLDC vide its letter ref WRLDCRGMO-FGMO1-2014 dated 23012014 has issued directions under Section 29 of the Electricity Act to ensure compliance of IEGC regulations 52 (f) (g) (h) and (i) All utilities are requested to furnish the status of compliance in respect of generating units under their jurisdiction The sub-committee may like to discuss ITEM NO 99 STATUS OF TELEMETRY IN WESTERN REGION

The status of telemetry related issues in respect of WR constituents is as under

a) Chhattisgarh Data (except MW) from 500 MW Korba West extension generating station is not available Status points from 400 kV Raita pending

17

457th OCCM AGENDA

b) Madhya Pradesh Telemetry of following bus reactors is not available at WRLDC

S No

Station Name Bus Reactor

Nunber x Capacity

Total MVAR

Rated voltage

Status of Telemetry at

WRLDC1 Nagda 250 100 420 Not available2 Indore 225 50 33 Not available3 Bhopal 225 50 33 Not available4 Birsinghpur 150 50 420 Not available

c) Gujarat Data is not-availableintermittent from following stations in Gujarat

a 220 kV Nano of Tatamdash(not available) b Kansari 400 kV ss and Navsari 220 kVhellipIntermittent (PLCC Problem)

d) Goa Due to non-availability of SCADA data from Goa the difference between drawal as seen in SCADA and as recorded in SEM is as high as 572 during the period 1st Feb to 16th Feb 2014 Data from the following stations in Goa is not available at WRLDC S No Station Status

1 Amona 220 kV Not available 2 Cuncolin 220 kV Not available 3 Kadamba 110 kV Intermittent 4 Tivim 220 kV Intermittent 5 Ponda 220 kV Intermittent 6 Xeldam-220 kV Intermittent 7 Verna-110 kV Intermittent

e) Daman amp Diu

Due to non-availability of SCADA data from Daman amp Diu the difference between drawal as seen in SCADA and as recorded in SEM is as high as 571 during the period 1st Feb to 16th Feb 2014 Data from The error is mainly due to non-availability of data from 220 kV Magarwada

f) DNH Telemetry from 220 kV Kharadpara and Khadoli station is not available

g) POWERGRID The data from the following stations is not available at WRLDC

1) 765 kV Tamnar (Communication problem GPRS link is not stable)

18

457th OCCM AGENDA

Telemetry from following stations is Intermittent at WRLDC 1) 765 kV Durg (PLCC frequent problems)

2) 765 kV Kotra (communication intermittency)

3) 765 kV Gwalior (PLCC link established but still there is some

issue(Delay) in data updation at WRLDC Rectification work under

progress by Site Engineer

4) 765 kV Solapur - Redundant link established through Reliance but

the gateway connected to above link is not configured for 765 KV

data Hence when BSNL link is down 765 KV data is not updating at

WRLDC

The sub-committee may like to discuss

ITEM NO 910 COMPARISON OF DRAWAL AS SEEN IN SCADA VS SEM The IEGC second amendment and the Deviation Settlement Mechanism is in force since the 17022014 The IEGC stipulates maintaining injection drawal within the limits prescribed in the Deviation Settlement Mechanism The sub-committee may like to discuss ITEM NO 911 MOCK BLACK START EXERCISE

As per sec 58(b) of IEGC the usersSTUs etc need to conduct Black start mock

exercises in their respective systems once in every six month under intimation to

RLDC Also the all the black start Diesel Generator (DG) sets are [as per sec 58(b)

of IEGC] required to be tested weekly and the test report needs to be sent to RLDC

on quarterly basis

The following table summarizes the status of mock exercises in respect of black start

facilities in Western Region

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

GUJARAT

1 Ukai (H) 4 x 75 Hydro Diesel 500 kVA 221213 Y

2 Mini Hydro 2 x 25 Hydro Diesel 50 KW N

3 Kadana 4 x 60 Hydro Diesel 500 KVA 2413 Y (2413)

19

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

4

Dhuvaran

1 x 107 (68+39) + 1 x 112 (72+40)

Gas

Details to be furnished by Gujarat

Details to be furnished by Gujarat

N

5 GIPCL-I 3 x 32 + 1 x49

Gas Steam Diesel 141 KW

070912 Y

6 GIPCL-II 1x104+1x56 Gas Steam Diesel 500 kVA N

7

Torrent Power Stn C Stn- DEFCCPP

StnC2x30 StnD120 StnEF(110MW each)CCPP100MW

Thermal (Units-CDEF) Gas(CCPP)

Stn-C islands Diesel

StnC15kVA StnDE F and CCPP(500 kVA each)

281112

Y

8 GPEC 3x138+1x241 Thermal Natural Gas 3000 kVA N

9 Sugen 3x3825 MW Gas Diesel 2x6MVA N

Madhya Pradesh

10 Gandhisagar 5 x 23 Hydro DG set 100 kVA N

11 Birsinghpur 1 x 20 Hydro Battery 220 Volt

Battery N

12 Pench 2 x 80 Hydro DG set 250 kVA 121012 Y

13 Bargi 2 x 45 Hydro DG set 250 kVA 100212 Y

14 Bansagar Stage-I 3 x 105 Hydro DG set 250 kVA N

15 Indira Sagar 8x125 Hydro DG set 2x1000

KVA 22511 Y

Chhattisgarh 16

Hasdeo Bango 3 x 40 Hydro DG Set 250 kVA 250812 N

17

Korba(E)-phse-I

Power plant retired but Black start DG set available and on- load trial is reported to be carried out regularly

DG Set 1500 kW(33kV)

N

Maharashtra

18

Koyna I amp II

4 x 65 4 x 75 Hydro

House generator

2 MVA 231013 N

19 KDPH 2 x20 Hydro DG set 310 KW N

20 Eldari 3 x 75 Hydro DG set 6 KW N

21

Uran (Gas)

4 x 60 (GT) + 4x108 (GT)+ 2x120 WHR

Gas DG set

4 MW PH1412kVA PH2450kVA WH520kVA

161012

N

20

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

22 RGPPL

Block 1 640MW+Block 2 66354MW+Block 3 66354MW

Gas

Gas Turbine (Frame-6)

35 MW (Under testing) Details to be provided by RGPPL

N

23 Ghatghar 2x125 Hydro DG set 1x1250

kVA 51012

N

24 Khopoli 3x24+2x12 Hydro

DC Governor amp bearing oil pumps

DC power (self start)

271013 (detailed report awaited)

N

25 Bhivpuri 3 x 24 +

2 x 15 +2x12 Hydro

DC Governor amp bearing

-do-

N

26 Bhira 6 x 25 Hydro

1 Noof 500 KVA house generator with water turbine

500 kVA

201013 (detailed

report awaited)

N

27

Bhira PSS 1 x 150 Hydro DG set 500 kVA

N

28 Trombay 1 x 120 Gas

Turbine DG Set 25 MW

N

1 x 60 Steam Turbine

NTPC

21

457th OCCM AGENDA

Sl No Power Station

Installed Cap (MW)

Unit Type

Black Start Source

Capacity of Black start source

Last BS Capabil

ity demonstrated

on

Receipt of DG set testing

report at RLDC

29 Kawas 4 x 106 2 x 116 Gas Diesel 2850 KW 151013

N

30 Gandhar 3 x 144 + 1x225 Gas Diesel 2975 KW

N

NCA

31 SSP(RBPH amp CHPH) 6x200+550 Hydro Diesel 2x1000kVA 080412

N

Accordingly the Black start capable stations may forward their tentative plan for conducting Black start exercises in compliance to sec 58(b) of IEGC bull As per the communication for MPPTCL the tentative plan of Black start in Madhya

Pradesh system is given under SL No Name of the Station Tentative Date Remarks 1 Pench March 2014 DG set at Pench amp are Bargi

under outage 2 ISP Apr-May 2014 - 3 TONS June 2014 Governor Problem being

attended 4 Birsinghpur June 2014 -do- 5 Medikheda June 2014 -do- 6 Rjghat June 2014 -do- Other utilities may also update their tentative plan for black start

The sub-committee may like to discuss

22

457th OCCM AGENDA

ITEM NO 912 HEALTHINESS OF MAIN CIRCUIT BREAKER OF 400 KV BIRSINGPUR-KATNI-I AT KATNI END The main CB of Birsingpur-Katni-I is under shut down since 2350 hrs of 14th February 2013 Representatives from MPPTCL may kindly apprise on the progress and expected date of restoration of the Main CB of 400 kV Birsingpur-Katni-I at Katni end The sub-committee may like to discuss

ITEM NO 913 TESTING OF SPS RELATED TO TRIPPING OF BINA-GWALIOR-AGRA AT CGPL VINDHYACHAL AND KORBA

As per the information received from NTPC and CGPL the SPS for the 765 kV Bina-

Gwalior-Agra has been installed and a mock drill has to be carried out for the same

The matter was discussed in the 456th OCC and it was decided that SPS may be

tested for reduction of say 50MW for each station instead of backing down of entire

500MWs POWERGRID WRTS-2 may confirm the testing schedule so that the

same could be coordinated in from WRLDC

The sub-committee may like to discuss

ITEM NO 914 SPS AT SIPAT WRLDC vide letter No WRLDCMO-I17192013 dt 21613 requested to take up this matter with the concerned for early implementation of the SPS Status of the SPS at NTPC Sipat is as under

1 449th OCC SPS was proposed by WRLDC It was decided to have a

separate meeting to finalize the scheme 2 450th OCC Member Secretary WRPC intimated that the matter will be

discussed in 119th PCM on 3rd amp 4th September 2013 at Tarapur 3 451st OCC It was intimated that the issue of SPS of Sipat was discussed in

119th PCM held on 3rd amp 4th September 2013 at TARAPUR The tentative scheme were formulated which needed finer tuning

4 452nd OCC Matter not discussed 5 453rd OCC NTPC representative intimated proposal sent to their corporate

office for engineering approval 6 454th OCC Approval from our corporate office is yet to be obtained 7 455th OCC Approval from our corporate office is yet to be obtained 8 456th OCC Approval from corporate office has been obtained and would be

forwarded to WRPC for approval The sub-committee may like to discuss

23

457th OCCM AGENDA

ITEM NO 915 SPS AT 4X300 MW BALCO IPP The SPS at 2010 MW Balco (4x675MW + 4x135 MW + 4x300 MW) was to be commissioned by Nov 2013 before commissioning of first unit of 4x300 MW Balco IPP For the new SPS scheme envisaged for the Balco CTU connection namely the Grid Islanding and Load Management Scheme (GILMS) Balco had reported to have placed an order with Ms SEL As discussed earlier the scheme suggested by WRLDC may be implemented before commissioning of first unit of 300 MW It was intimated during the 456th OCCM by the Balco representatives that the SPS shall be commissioned by March 2014

The sub-committee may like to discuss

ITEM NO 916 ACTIONS TAKEN FOR REVIVAL OF TRANSMISSION ELEMENTS UNDER LONG OUTAGE

As per the information available at WRLDC following elements are out for a

long period

Sl No Date of

outage

Reason

ISTSIPP

1 80 MVAR BR at

ESSAR(Mahan)

231213 Oil leakage

2 125 MVAR BR at JPL 120513 Hydrogen formation

3 50 MVAR LR of Indore-Asoj-II

at Indore

190613 R phase bushing burst

4 50 MVAR LR of Birsingpur-

Damoh at Damoh(PG)

13102014 Oil Leakage

5 765 kV Durg-Kotra-I 24022014 Sparking in Isolator

6 400 kV Raipur-Raigarh-IV 18012014 Voltage Regulation

MSETCL

1 400 kV RGPPL-NrsquoKoyna-I 22012014 Voltage Regulation

2 400 kV Sholapur-

Sholapur(PG)

26022014 Tower Collapse

MPPTCL

1 400 kV Birsingpur-Katni-I 28012014 Voltage Regulation

24

457th OCCM AGENDA

2 50 MVAR LR of Indore-Asoj-II

at Indore

6012014 DGA Violation

CSPTCL

1 400220 kV Bhilai-II 24022014 Maintenance

OCC may like to be apprised of the actions being taken for expediting revival of

the above elements

The sub-committee may like to discuss

ITEM NO 917 STATUS OF 220 KV KOLHAPUR-MUDSINGHI-CHIKODI- BELGAM LINE Consent for trial operation of 220 kV Kolhapur-Mudsinghi-Chikodi- Belgam line in radial mode for supply of Karnataka load from Maharashtra side was granted after discussion in the 455th OCC meeting WRLDC is in receipt of letter from SRLDC regarding concurrence for the above arrangement SLDC Kalwa may apprise the OCC regarding the present status The sub-committee may like to discuss

ITEM NO 918 CONTRIBUTION OF GENERATORS IN VOLTAGE CONTROL The contribution of generators in WR in voltage control was analyzed during 456th OCC meeting It was noted that following units were injecting reactive power even during high voltage

1 210 MW units of Khaparkheda Koradi and Chandrapur (Maharashtra) 2 210 MW units of Satpura and Birsinghpur (Madhya Pradesh) 3 210 MW unit 23 of Korba West (Chattisgarh) 4 200 MW unit 34 of Ukai (T) in (Gujarat)

Utilities were requested to check the setting of AVRGT tap and revert back with findings Members may apprise OCC regarding the status The sub-committee may like to discuss

ITEM NO 919 REAL-TIME MONITORING OF FEEDERS SUBSTATIONS THAT ARE COVERED UNDER THE AUFLS Telemetry of feeders substations covered under the AUFLS is desirable for real-time assessment of the anticipated relief that would be available from the AUFLS scheme at any given instant of time CERC has also directed all the constituents to for

25

457th OCCM AGENDA

mapping of these feeders in the SCDA of SLDCsRLDC Members may like to deliberate further The sub-committee may like to discuss

ITEM NO 920 LOAD FORECASTING As per the amended Indian Electricity Grid Code that is effective from 17th February 2013 the SLDCs SEB distribution licensees shall always restrict the net drawal of the State from the grid within the drawal schedule keeping the deviations from the schedule within the limits specified in the Deviation settlement mechanism regulations Therefore it is imperative that adequate attention may be paid towards load forecasting The matter was discussed in the 455th and 456th OCC as well as in the 25th TCCWRPC board meeting wherein it was decided to create a task force for exploring development of a software for load forecasting Members may like to deliberate further The sub-committee may like to discuss

ITEM NO 921 IMPLEMENTATION OF THE REVISED AUFLS IN GOA DD AND DNH It was decided during the 455th and 456th OCC meeting as well as during 25th WRPC meeting that Goa DD and DNH shall complete the implementation of the revised AUFLS in Goa DD and DNH at the earliest Representatives from the Goa DD and DNH may apprise the status of the progress The sub-committee may like to discuss

ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING As per meeting roaster circulated during 452nd OCC meeting the 458th OCC Meeting

will be hosted by Maharashtra and may be scheduled on 16th amp 17th April 2014

Maharashtra may confirm the same

Anaulagnak 21

maah frvarI 2014

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5051 Hz BETWEEN 0200 Hrs amp 0300 Hrs Hrs ON 28022014

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4970 Hz BETWEEN 1800 Hrs amp 1900 Hrs Hrs ON 28022014

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 5006 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5071 Hz AT 0210 Hrs ON 28022014

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4937 Hz AT 185000 Hrs ON 28022014

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS FEBRUARY 2014 JANUARY 2014 DECEMBER 2013

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 000 001 005

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 041 061 188 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 1069 5423 4864 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 4014 3569 3987

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 4876 946 956

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING FEBRUARY 2014

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

Voltage Profile during the month of Feb 2014

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 421 401 426 403 409 409 408 408 415 399 414 402 424 413 417 3922 420 402 423 404 409 409 408 408 417 402 418 404 425 415 420 3993 421 399 426 400 429 405 425 402 412 399 419 408 423 410 413 3964 422 402 426 404 430 406 428 401 414 400 414 404 424 412 414 3965 420 396 423 400 409 409 408 408 413 396 415 401 424 411 415 3996 420 396 426 400 428 405 426 402 415 398 416 402 423 411 412 4007 420 394 424 399 430 402 427 401 416 399 417 402 423 409 416 3968 418 393 422 397 409 409 408 408 416 399 416 402 422 409 418 3989 418 399 423 404 409 409 408 408 417 402 417 407 419 409 419 400

व तदाब परखा फरवर 2014 स नक Annex-23

इदौर इटारसी कराड धल असोज कासोर िभलाई जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

10 419 394 423 399 409 409 408 408 416 400 415 401 420 408 417 39511 421 393 426 397 429 405 427 401 44 399 419 404 423 407 414 39912 419 395 422 400 409 409 408 408 416 401 419 407 421 410 418 39813 420 396 424 401 409 409 408 408 417 400 416 401 421 409 418 40114 421 399 424 403 430 419 428 414 417 402 415 402 421 409 417 40015 423 397 424 399 428 414 429 412 417 398 406 406 421 407 418 40016 423 397 424 400 431 404 424 401 416 401 422 409 421 409 418 40317 421 402 424 403 432 414 420 404 416 402 412 405 422 410 417 39818 420 397 423 399 409 409 408 408 416 400 414 401 422 414 416 40019 420 396 423 399 409 409 408 408 411 398 418 405 421 413 413 39920 417 397 420 402 429 406 426 401 413 399 416 404 421 413 410 39821 419 399 422 402 430 407 421 401 415 401 418 406 422 411 414 39722 419 397 422 402 432 409 423 401 416 400 413 402 423 413 414 40023 420 396 423 397 430 412 428 404 414 404 415 402 427 414 416 40324 421 399 423 401 433 411 425 400 416 398 414 402 427 415 418 40225 421 399 423 401 433 411 425 400 416 398 414 402 427 415 418 40226 420 397 423 404 431 411 428 409 411 397 415 404 424 414 412 39327 418 398 426 403 409 409 408 408 417 399 418 402 429 415 419 39128 421 400 427 406 409 409 408 408 414 400 416 403 430 415 418 401

423 393 427 397 433 402 429 400 417 396 422 401 430 407 420 391

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 424 404 415 392 424 404 431 407 766 746 797 765 800 756 804 7692 422 406 417 398 426 404 434 407 769 754 798 774 801 769 804 7773 423 405 416 402 426 401 432 410 767 750 796 768 802 773 805 7764 426 407 417 402 423 403 430 408 768 751 797 779 801 776 808 7785 422 403 415 398 423 397 430 400 768 749 797 767 798 763 797 7586 425 404 417 401 423 399 432 404 768 750 797 767 802 773 807 7707 427 401 419 397 423 396 431 404 770 741 800 763 807 769 809 7698 422 403 416 403 424 395 427 399 756 737 788 756 801 765 802 7679 422 405 416 401 424 402 427 404 755 738 786 758 804 773 804 775

10 421 400 414 396 423 398 429 403 3 88 6 98 6 801 60

वािलयर बनाBina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

बना वािलयर नागदा खडवा िसपत िसविन

10 421 400 414 396 423 398 429 403 755 737 788 765 798 765 801 76011 423 397 414 390 426 396 433 399 758 736 794 750 800 752 802 75612 420 403 414 395 423 397 428 403 757 739 787 759 801 763 798 77013 424 405 417 400 427 397 430 402 759 740 794 760 804 773 803 77214 426 410 420 406 424 400 431 405 761 740 794 766 810 780 808 78215 425 404 417 399 426 399 430 401 762 738 794 962 808 768 806 76816 426 406 422 400 427 402 429 400 759 739 792 760 815 774 811 77617 429 407 417 398 427 404 427 406 761 742 792 762 805 765 810 77418 426 404 418 395 423 399 427 404 763 748 793 768 805 759 806 76819 423 409 415 394 422 399 428 403 759 737 795 765 804 758 806 76720 421 406 410 397 420 398 426 406 765 749 795 771 791 766 799 77421 423 407 424 399 423 403 428 405 759 744 792 760 795 761 800 76722 425 406 414 398 423 400 425 404 760 743 790 762 794 762 800 76823 425 402 412 392 424 400 428 405 758 740 790 759 796 755 799 76124 425 401 411 393 423 401 427 403 760 744 796 764 792 757 798 75625 421 408 412 395 423 401 427 403 756 742 793 766 795 764 795 76926 422 405 413 390 421 399 426 402 757 739 789 760 796 750 798 76127 426 407 416 393 421 401 431 403 760 741 795 762 803 755 804 76228 428 409 414 392 423 403 432 405 762 740 795 753 809 775 803 771

429 397 424 390 427 395 434 399 770 736 800 750 815 750 811 756

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Feb-14 0 0 0 0 0 0 0 02 02-Feb-14 0 0 0 0 0 0 0 03 03-Feb-14 0 0 0 0 0 0 0 04 04-Feb-14 0 0 0 0 0 0 0 05 05-Feb-14 0 0 0 0 0 0 0 06 06-Feb-14 0 0 0 0 0 0 0 07 07-Feb-14 0 0 0 0 0 0 0 08 08-Feb-14 0 0 0 0 0 0 0 09 09-Feb-14 0 0 0 0 0 0 0 0

10 10-Feb-14 0 0 0 0 0 0 0 011 11-Feb-14 0 0 0 0 0 0 0 012 12-Feb-14 0 0 0 0 0 0 0 013 13-Feb-14 0 0 0 0 0 0 0 014 14-Feb-14 0 0 0 0 0 0 0 015 15-Feb-14 0 0 0 0 0 0 016 16-Feb-14 0 0 NIL NIL NIL 017 17-Feb-14 0 0 0 0 0 0 0 018 18-Feb-14 0 0 0 0 0 0 0 019 19-Feb-14 0 0 0 0 0 0 0 020 20-Feb-14 0 0 0 0 0 0 0 021 21-Feb-14 0 0 0 0 0 0 0 022 22-Feb-14 0 0 0 0 0 0 0 023 23-Feb-14 0 0 0 0 0 0 0 024 24-Feb-14 0 0 0 0 0 0 0 025 25-Feb-14 1 17 0 0 0 0 0 026 26-Feb-14 0 0 0 0 0 0 0 027 27-Feb-14 0 0 0 0 0 0 0 028 28-Feb-14 0 0 0 0 0 0 0 0

Max 1 17 0 0 0 00 0 0Total 1 17 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month FEBRUARY 2014

Recommonded Load relief at 492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE-25

Power CutRestrictions in Western Region for the month of February-2014 k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply(DLF)

01022014 28022014 2344 2240 2332

21 Three-Phase Supply(Irrigation)

01022014 28022014 0956 0905 0946

21 Three-Phase Supply(Mixed)

01022014 28022014 2343 2227 2330

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01022014 28022014 2353 2337 2347 32 District Head Qtrs 01022014 28022014 2355 2340 2351 33 Tehsil Head Qtrs 01022014 28022014 2349 2309 2341

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid

1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 010214 to 280214

SaUnya Nil

0-1655MW

SaUnya Nil

0000

SaUnya Nil 2400

SaUnya Nil

95 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit-

2 Power supply to Agricultural Sector ivavarNa Details sao From

idnaaMk Date tk To

idnaaMk Date p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs) 21 Three-Phase Supply 01022014 28022014 1000 0800 0900

22 Single-Phase Supply 01022014 28022014 1800 1800 1800 3 Anya jaanakarI Any other information

There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

11107 (Av) of 23 days 0000(Av) 0000 (Av)

1Rural 9031(Av) for 3486 Hrs 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0666 - -

0105 -

3 HT Industries 000 (Av) for 00 Hrs 000 Total Energy Cutday 0771 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01022014 to 280214 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 2322014 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil ca gaaovaa Goa SaUnya Nil

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का फरवर 2014का वःता रत यौरा

Details of forced unit outages during the month ofFeb2014

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 एःसार वा डनर

ESSAR VADINAR-I

गरा विनिल GSECL

660 2156 20-Jan-14 2018 10-Feb-14 Coal shortage

2 एःसार Essar-2

गरा विनिल GSECL

172 1212 22-Feb-13 अनपल ध Still out

अनपल ध Still out

Shortage of gas

3 एसएलपीपी SLPP-1

गरा विनिल GSECL

125 1445 23-Feb-14 1237 27-Feb-14 BTL

4 एकएलट पीएसAKLTPS-1

गरा विनिल GSECL

125 1147 26-Feb-14 अनपल ध Still out

अनपल ध Still out

DCS FAIL

5 एपीएल APL - 2

अदानी ADANI

330 056 3-Feb-14 अनपल ध Still out

अनपल ध Still out

Turbine vibration bearing probl em

6 एपीएल APL-5

अदानी ADANI

660 1732 15-Feb-14 456 27-Feb-14 Turbine vibration

7 एपीएल APL - 6

अदानी ADANI

660 2049 25-Feb-14 1947 3-Mar-14 Coal mill problem

8 टाटा TATA-6

मारा वउकिल MSPGCL

500 2352 19-Jul-13 अनपल ध Still out

अनपल ध Still out

For Economy SD

9 वीआईपीएल VIPL-I

मारा वउकिल MSPGCL

300 105 2-Oct-13 अनपल ध Still out

अनपल ध Still out

Turbine bearing vibration probl em

10 टाटा TATA-8

मारा वउकिल MSPGCL

250 2255 9-Jan-14 अनपल ध Still out

अनपल ध Still out

HT due to fire near turbine generator desk

11 चिपर Chandrapur-2

मारा वउकिल MSPGCL

210 1238 14-Jan-14 1310 23-Feb-14 ID fan problem

12 कोराड KORADI-6

मारा वउकिल MSPGCL

210 651 24-Jan-14 1456 14-Feb-14 Coal bunkering problem

13 डब यपीसीएल WPCL-1

मारा वउकिल MSPGCL

135 1245 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Furnace press high

14 डब यपीसीएल WPCL-3

मारा वउकिल MSPGCL

135 421 7-Feb-14 Ready Ready Less requisition

प म ऽय भार षण कि म बई णाली चालन-ISO-I

15 चिपर CPUR - 6

मारा वउकिल MSPGCL

500 1523 11-Feb-14 2033 13-Feb-14 BTL

16 नािसक NASIK-3

मारा वउकिल MSPGCL

250 300 11-Feb-14 100 19-Feb-14 UAT problem

17 कोराड KORADI-5

मारा वउकिल MSPGCL

210 153 14-Feb-14 अनपल ध Still out

अनपल ध Still out

ID fan problem

18 ितरोडा Tiroda-I

मारा वउकिल MSPGCL

660 2059 15-Feb-14 2054 26-Feb-14 Turbine bearing problem

19 ितरोडा Tiroda-2

मारा वउकिल MSPGCL

660 1125 17-Feb-14 152 22-Feb-14 BTL

20 कोराड KORADI-6

मारा वउकिल MSPGCL

210 2357 19-Feb-14 250 23-Feb-14 BTL

21 भसावल BHUSWAL-2

मारा वउकिल MSPGCL

210 301 22-Feb-14 1706 25-Feb-14 PA fan temp High

22 खापरखड़ा KHAPERKHEDA-3

मारा वउकिल MSPGCL

250 1448 22-Feb-14 130 25-Feb-14 BTL

23 जयगड Jaigad-4

मारा वउकिल MSPGCL

300 1930 22-Feb-14 1107 4-Mar-14 Low schedule

24 कोराड Koradi-5

मारा वउकिल MSPGCL

300 404 23-Feb-14 अनपल ध Still out

अनपल ध Still out

Electrical fault

25 पल PARLI-4

मारा वउकिल MSPGCL

210 1836 28-Jan-14 1956 3-Feb-14 Air preheater problem

26 भसावल BHUSAWAL-4

मारा वउकिल MSPGCL

250 1432 28-Feb-14 1802 3-Mar-14 Ash hopper problem

27 आरजीपीपीएल RGPPL-1B

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

28 आरजीपीपीएल RGPPL-2B

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

29 आरजीपीपीएल RGPPL 3A

आरजीपीपीएल RGPPL

320 000 16-Jan-14 Ready Ready Less requisition

30 आरजीपीपीएल RGPPL-1A

आरजीपीपीएल RGPPL

320 1500 18-Jan-14 अनपल ध Still out

अनपल ध Still out

SRV problem

31 आरजीपीपीएल RGPPL 3B

आरजीपीपीएल RGPPL

320 1230 8-Feb-14 Ready Ready Less requisition

32 िसगाजी SINGAJI - I

म वउकिल MPPGCL

600 422 12-Feb-14 अनपल ध Still out

अनपल ध Still out

Coal shortage

33 सातपरा SATPURA-11

म वउकिल MPPGCL

250 1913 15-Feb-14 2149 19-Feb-14 Main stream temperature low

34 सातपरा SATPURA-11

म वउकिल MPPGCL

250 542 26-Feb-14 1642 2-Mar-14 BTL

35 एःसार महान Essar-Mahan-1

एःसार ESSAR

600 000 29-Jan-14 015 18-Feb-14 Less requisi tion

36 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

37 वदना Vandana-1

वदना Vandana

135 149 12-Jan-14 अनपल ध Still out

अनपल ध Still out

BTL

प म ऽय भार षण कि म बई णाली चालन-ISO-I

38 ससान Sasan-2

आरईएल REL

660 205 16-Feb-14 1650 23-Feb-14 Problem in ash handling

39 कावास Kawas 2A

एनट पीसीNTPC 164 2018 23-Dec-13 Ready Ready Less requisition

40 गाधार Gandhar-3

एनट पीसीNTPC 144 2037 28-Dec-13 Ready Ready Less requisition

41 गाधार Gandhar-I

एनट पीसीNTPC 144 2011 1-Jan-14 Ready Ready Less requisition

42 कावास Kawas 2B

एनट पीसीNTPC 164 900 13-Jan-14 421 5-Mar-14 Maintenance

43 गाधार Gandhar-2

एनट पीसीNTPC 219 023 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Less requisition

44 कावास Kawas-1A

एनट पीसीNTPC 164 2055 4-Feb-14 712 20-Feb-14 Less requisition

45 कावास

Kawas-1B एनट पीसीNTPC 164 1951 13-Feb-14 503 20-Feb-14 Less requisition

46 कावास Kawas 1A

एनट पीसीNTPC 164 1210 21-Feb-14 Ready Ready Less requisition

47 कावास Kawas 1B

एनट पीसीNTPC 164 012 22-Feb-14 1144 26-Feb-14 Less requisition

Note Units out for more than 72 hrs are only included

प म ऽय भार षण कि म बई णाली चालन-ISO-I

सल नकAnnex-27

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का फरवर 2014 का वःता रत यौरा

Details of planned unit outages during the month of Feb2014 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Time Date

1 डब यट पीएस WTPS-3

गरा विनिल GSECL

210 212 12-Feb-14 अनपल ध Still out

अनपल ध Still out

AOH

2 पल ParlI-3

मारा वउकिल MSPGCL

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

AOH

3 चिपर Chandrapur-5

मारा वउकिल MSPGCL

500 101 14-Jul-13 841 19-Feb-14 AOH

4 कोरबा प म KORBA-(W)-4

छरा वउकिल CSPGCL

210 2226 7-Feb-14 अनपल ध Still out

अनपल ध Still out

AOH

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

NIL2

NIL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING MARCH 2014 AND APRIL 2014

Capacity Outage as per Annual Maintenance Plan

3 Craiva]kMila CSPGCL

NIL

4

NIL

5 koMd``Iya xao~ Central Sector51 VSTPS 4 210 010414 070414 AOH52 VSTPS 2 210 080414 270414 AOH53 VSTPS 1 210 300414 190514 AOH54 CGPL 10 800 280314 130514 COH

maraiva]kMila MSPGCL

Date Time Date Time1 220 Bus-1 at Mapusa 20-Mar-14 1000 20-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R

2 765 Bus-1 at Sasan 20-Mar-14 800 20-Mar-14 1800 Daily Stringing of Main bus 1 for 765 kV Vichal Pooling - Sasan feeder

Reliance WR-II C

3 400 400kV Bus-2 at Satna 20-Mar-14 800 20-Mar-14 1800 Continuous Bay extension work related to JP - Nigrie Bays POWERGRID WR-II C

4 400 400kV ICT 1 at Satna 20-Mar-14 800 20-Mar-14 1000 Continuous Bay extension work related to JP - Nigrie Bays POWERGRID WR-II C

5 400 400kV Jabalpur Itarsi 1amp2 (Dc) 20-Mar-14 1000 20-Mar-14 1400 Continuous For commissioning of Line Impedance measurement kit

POWERGRID WR-II C

6 765 3X80 MVAr Bina Line Reactor at Indore 20-Mar-14 1000 21-Mar-14 1800 Continuous For installation of online dry out amp online DGA kit

POWERGRID WR-II C

7 400kV Damoh - Bhopal 1 20-Mar-14 800 31-Mar-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

8 400 Chorania Kasor 20-Mar-14 800 20-Mar-14 1800 Daily PMM work GETCO GETCO9 400 400 KV Main Bus-I at 400 KV Ss Khedamara 20-Mar-14 900 22-Mar-14 1700 Daily Erection of Pantograph 1 Set of IP amp CVT CSPTCL CSPTCL C

10 400 400 KV Khedamara-KSTPS NTPC ckt-II at 400 KV Ss Khedamara

20-Mar-14 900 22-Mar-14 1700 Daily Erection of Pantograph CVT amp 1 Set of IP PGCIL CSPTCL C

11 400 Korba -Vandana 20-Mar-14 900 21-Mar-14 1900 days continuouTesting of LBB auto re-close M-I amp M-II relays NTPC NTPC

12 400 Korba -Vandana 20-Mar-14 900 21-Mar-14 1900 days continuouTesting of LBB auto re-close M-I amp M-II relays NTPC NTPC

13 400DC Akola-Aurangabad (MSETCL) 1 and Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

21-Mar-14 600 23-Mar-14 1800 Conti Crossing work of 400kv MC Aurangabad - Aurangabad

MSETCLWRTS-I WRTS-I C

14400 amp 220 amp 132

400KV DC Aurangabad-Pune amp 132kv SC Padegaon - Gangapur 400KV Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

21-Mar-14 600 21-Mar-14 1800 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad

MSETCLWRTS-I WRTS-I C

15 400 Bhadrawati-Parli 1amp 2 21-Mar-14 900 31-Mar-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I C

16 220 Bus-1 at Pune 21-Mar-14 800 21-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R

17 400 Solapur-Kolhapur 1 amp 2 21-Mar-14 700 21-Mar-14 1800 Daily Stringing work upcoming 765 kV Solapur-Pune line

Reliance WRTS-I C

18 220 220kV DC Raigarh- Raigarh (CSPTCL) Line (if outage not avail on 13140314)

21-Mar-14 900 22-Mar-14 1700 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (040-50)

CSPTCL WRTS-I C

19 220 Bus-2 (Section-A) at Mapusa 21-Mar-14 1000 21-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R20 400 Bus-1 at Itarsi 21-Mar-14 900 21-Mar-14 1800 Daily AMP POWERGRID WR-II R21 220 Bus-1 at Gwalior 21-Mar-14 1000 21-Mar-14 1800 Daily AMP POWERGRID WR-II R22 220 Jhanor - Haldarwa 1 21-Mar-14 900 21-Mar-14 1800 Daily AMP POWERGRID WR-II R23 400 Vapi Boisar 21-Mar-14 700 22-Mar-14 1900 Continuous For crossing of 220kV Kala Khadoli TL POWERGRID WR-II C

24 765 Sasan-Satna2 21-Mar-14 800 22-Mar-14 1800 Continuous For Power Line crossing of 765kV Vindhyanchal (pooling) - Satna 2 Line

POWERGRID WR-II R

25 400 400220 ICT NO1 at Kasor 21-Mar-14 800 21-Mar-14 1800 Daily PMM work GETCO GETCO26 400 400KV Sipat-Pathadi(LANCO) line 21-Mar-14 900 22-Mar-14 1900 Continous Annual Preventive maintenance job NTPC NTPC27 400 Pune-Parli 2 50MVAr Line Reactor at Pune 22-Mar-14 800 22-Mar-14 1800 Daily AMP Work Line in service wo reactor Reliance WRTS-I R

28 765 Bus-2 at Solapur 22-Mar-14 700 22-Mar-14 1800 Daily 765KV Pune bay commissioning amp SCADA works

WRTS-I WRTS-I C

29 400 Bus-1 at Bhatapara 22-Mar-14 800 23-Mar-14 1800 Conti Bus extension work for new 125MVAr Bus Reactor at Bhatapara

WRTS-I WRTS-I C

30 220 Bus-2 (Section-B) at Mapusa 22-Mar-14 1000 22-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R31 400 Vadavi Chorania 1 22-Mar-14 900 22-Mar-14 1800 Daily AMP Reliance WR-II R32 220 Jhanor - Haldarwa 2 22-Mar-14 900 22-Mar-14 1800 Daily AMP POWERGRID WR-II R33 220 Bus-2 at Gwalior 22-Mar-14 1000 22-Mar-14 1800 Daily AMP POWERGRID WR-II R

34 765 3X80 MVAr Bus Reactor at Indore 22-Mar-14 1000 23-Mar-14 1800 Continuous For installation of online dry out amp online DGA kit

POWERGRID WR-II C

35 220 Transfer Bus at Mapusa 23-Mar-14 1000 23-Mar-14 1500 Daily Jumper connection work WRTS-I WRTS-I R

36 400 Raigarh- Raipur 4 amp Raigarh-Kotra PS 2 23-Mar-14 800 30-Mar-14 1800 Conti Bay shifting work for up-coming 125MVAr Bus Reactor at Raigarh

WRTS-I WRTS-I C

37 765 Bus-1 at Indore (PG) 23-Mar-14 1000 23-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

Outages Proposal of Transmission elements during the month of MARCH‐2014Type

ANNEXURE‐32A

SN KV Line From To

Basis Reason System Agency

38 220 MC Waluj-Chitegaon amp Waluj-Jalna on same tower

24-Mar-14 600 24-Mar-14 1800 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad

MSETCL WRTS-I C

39 400 Raipur-Sipat 1 amp 2 24-Mar-14 800 2-Apr-14 1800 Conti Diversion of line for Lafarge Railway trackERS removal

WRTS-I Lafarge C

40 220 Bus-2 at Pune 24-Mar-14 800 24-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R41 765 Bus-1 at Bilaspur 24-Mar-14 800 24-Mar-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R

42 400 Bus-2 at Bhatapara 24-Mar-14 800 25-Mar-14 1800 Conti Bus extension work for new 125MVAr Bus Reactor at Bhatapara

WRTS-I WRTS-I C

43 400 Kolhapur-Mapusa 2 24-Mar-14 600 24-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

44 400 Vadavi Chorania 2 24-Mar-14 900 24-Mar-14 1800 Daily AMP Reliance WR-II R45 765 Bus-2 at Indore (PG) 24-Mar-14 1000 24-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

46 765 Bus-2 at Sasan 24-Mar-14 800 24-Mar-14 1800 Daily Strining of Main Bus 2 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

47 220 KAPP - Haldarwa 1 24-Mar-14 800 24-Mar-14 1800 Daily AMP POWERGRID WR-II R48 400 Bus - 2 at Pune 25-Mar-14 800 25-Mar-14 1800 Daily AMP Work WRTS-I WRTS-I R

49 765 Bus - 1 at Wardha 25-Mar-14 800 25-Mar-14 1800 Daily Jumper connection work of 765KV Raipur-Wardha line

WRTS-I WRTS-I R

50 400 Kolhapur-Mapusa 2 25-Mar-14 600 25-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

51 220 Mapusa-Ponda line 25-Mar-14 1000 25-Mar-14 1500 Daily AMP Work GOA WRTS-I R

52 765 Bus-1 at Sasan 25-Mar-14 800 25-Mar-14 1800 Daily Jumpering of Bus 1 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

53 220 KAPP - Haldarwa 2 25-Mar-14 800 25-Mar-14 1800 Daily AMP POWERGRID WR-II R54 400 Vadavi - Kansari2 25-Mar-14 900 25-Mar-14 1800 Daily AMP Reliance WR-II R55 400 Bus-1 at Indore (PG) 25-Mar-14 1000 26-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C56 765 Bus-1 at Satna 25-Mar-14 800 25-Mar-14 1800 Continuous Bay extension work POWERGRID WR-II C57 765 Sipat 765KV 400KV 1000MVA ICT-1 25-Mar-14 900 25-Mar-14 1900 Daily SPS Protection scheme modification NTPC NTPC

58 765 Bus - 2 at Wardha 26-Mar-14 800 26-Mar-14 1800 Daily Jumper connection work of 765KV Raipur-Wardha line

WRTS-I WRTS-I R

59 400 Bhadrawati-Parli 2 63MVAr Line Reactor at Parli

26-Mar-14 800 26-Mar-14 1800 Daily AMP Work of Recator at Parli line in service wo reactor

WRTS-I WRTS-I R

60 400 Kolhapur-Mapusa 1 26-Mar-14 600 26-Mar-14 1800 Daily Replacement of Porcelain Insulator with Polymer Long Rod due to high pollution

WRTS-I WRTS-I R

61 220 Mapusa-Amona line 26-Mar-14 1000 26-Mar-14 1500 Daily AMP Work GOA WRTS-I R62 765 Bus-2 at Satna 26-Mar-14 800 26-Mar-14 1800 Continuous Bay extension work POWERGRID WR-II C

63 765 Bus-2 at Sasan 26-Mar-14 800 26-Mar-14 1800 Daily Jumpering of bus 2 for 765 kV Vchal pooling-Sasan feeder

Reliance WR-II C

64 400 401 KV Main Bus-I at 400 KV Ss Khedamara 26-Mar-14 900 27-Mar-14 1700 Daily Erection of IPS Tube CSPTCL CSPTCL C

65 400 401 KV Khedamara-KSTPS NTPC ckt-II at 400 KV Ss Khedamara

26-Mar-14 900 27-Mar-14 1700 Daily Erection of IPS Tube PGCIL CSPTCL C

66 400 ACBIL-BILASPUR-CKT NO -2 26-Mar-14 900 31-Mar-14 1800 CONT FOR lilo CONNECTIVITY OF 300MW MCCPL TPP

ACBIL ACBIL C

67 765 Bus-2 at Bilaspur 27-Mar-14 800 27-Mar-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R68 220 Mapusa-Thivim 1 27-Mar-14 1000 27-Mar-14 1500 Daily AMP Work GOA WRTS-I R69 220 KAPP - Vav 2 27-Mar-14 800 27-Mar-14 1800 Daily AMP POWERGRID WR-II R70 400 Bus-2 at Indore (PG) 27-Mar-14 1000 28-Mar-14 1800 Daily Bay extension work POWERGRID WR-II C

71 765 Bus-2 at Gwalior 27-Mar-14 1000 27-Mar-14 1800 Daily Bay extension work related to Gwalior Jaipur 1 Bays

POWERGRID WR-II C

72 400 VSTPS Tie- Line-1 ( Line from Stage-III to IV Switchyard)

27-Mar-14 900 27-Mar-14 1900 Daily Basis AMP and rectification of hot spots NTPC NTPC

73 765 Sipat 765KV 400KV 1000MVA ICT-2 27-Mar-14 900 27-Mar-14 1900 Daily SPS Protection scheme modification NTPC NTPC74 765 Bus-1 at Solapur 28-Mar-14 700 30-Mar-14 1800 Daily commissioning tests amp SCADA works WRTS-I WRTS-I C75 220 Mapusa-Thivim 2 28-Mar-14 1000 28-Mar-14 1500 Daily AMP Work GOA WRTS-I R

76 400 Koradi-Satpura 28-Mar-14 1000 28-Mar-14 1400 Daily Earthwire tighting work damaged during Crossing work

WRTS-I ADANI C

77 220 Bus-1 at Dehgam 28-Mar-14 900 28-Mar-14 1800 Daily AMP POWERGRID WR-II R78 220 Kawas - Haldarwa 2 28-Mar-14 800 28-Mar-14 1800 Daily AMP POWERGRID WR-II R79 400 Chorania Amreli 28-Mar-14 800 28-Mar-14 1800 Daily PMM work GETCO GETCO

80 400DC Akola-Aurangabad (MSETCL) 1 and Akola-Aurangabad(PG) 2 amp Aurangabad(PG)-Aurangabad(MSETCL)

29-Mar-14 600 30-Mar-14 1800 Conti Charging amp shifting of Akola-Abad line on MC Abad-Abad line WRTS-I WRTS-I C

81 220 Bus-2 at Dehgam 29-Mar-14 900 29-Mar-14 1800 Daily AMP POWERGRID WR-II R82 400 Bus -1 at Mapusa 30-Mar-14 1000 30-Mar-14 1500 Daily AMP Work WRTS-I WRTS-I R

83 765 765kV Bus Reactor at Solapur 31-Mar-14 700 2-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

Date Time Date Time

1 400 Bhilai-Koradi 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

2 400 DC Korba-Birsingpur 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

3 400 Korba-Bhilai 2 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

4 220 Korba-Budhipadar 3 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

5 400 Akola-Wardha 1amp 2 1-Apr-14 800 30-Apr-14 1800 Daily For Online PID Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

6 400 Raipur-Raigarh 1 amp Raipur-KSK-DBPL-Raigarh

1-Apr-14 800 30-Apr-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I For IO

7 400 Bhadrawati-Parli 1amp 2 1-Apr-14 900 30-Apr-14 1800 Daily For OPGW installation Line in service with AR in non-auto mode

WRTS-I WRTS-I C

8 400 400220kv ICT-1 at Pune 1-Apr-14 800 1-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R9 400 Bus-1 at Bilaspur 1-Apr-14 800 1-Apr-14 1800 Daily AMPConstruction Work WRTS-I WRTS-I R

10 400 Solapur(PG) -Karad line 1-Apr-14 700 10-Apr-14 1800 Conti Erection of 80MVAr new reactor by shifitng line equipments at Solapur

MSETCL WRTS-I C

11 400 Bus-1 at Jabalpur (pooling) 01-Apr-14 1000 01-Apr-14 1800 Daily Busbar Stability test related to Jhabua Power Bays

POWERGRID WR-II C

12 400 Shujalpur - Nagda 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

13 400 Mundra - Bhachau 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

14 400 Bina - Shujalpur 1 01-Apr-14 800 30-Apr-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non auto mode

POWERGRID WR-II C

15 220 Omkareshwar-Khandwa Ckt 1-Apr-14 900 1-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI16 400 Sipat 400KV Bay 10 and 11 1-Apr-14 900 3-Apr-14 1900 Continous 400KV CT 3nos replacement NTPC NTPC17 400 Padgha-Nagothane ckt I 1-Apr-14 900 1-Apr-14 1700 Daily QMwork MSETCL MSETCL

18 400 Bus-2 at Jabalpur (pooling) 02-Apr-14 1000 02-Apr-14 1800 Daily Busbar Stability test related to Jhabua Power Bays

POWERGRID WR-II C

19 400 Vindhyanchal - Mahan - Korba (Section of both the line on same Dc tower)

02-Apr-14 800 03-Apr-14 1700 Continuous For Power Line crossing of 765kV Vindhyanchal (pooling) - Satna 1 Line

POWERGRID WR-II C

20 400 400kV ICT 4 at Indore MPPTCL 02-Apr-14 1000 04-Apr-14 1800 ContinuousFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

MPPTCL WR-II C

21 400 400kV Bus Coupler bay at Indore MPPTCL 02-Apr-14 1000 04-Apr-14 1800 ContinuousFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

MPPTCL WR-II C

22 400 400kV Itarsi - Indore MPPTCL 1 Line 02-Apr-14 1000 02-Apr-14 1500 DailyFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

POWERGRID WR-II C

23 400400 KV LILO Line of 400 KV SC Korba West-Khedamara to 400 KV Ss Raita (Between Loc69 amp70 near Raita Ss)

2-Apr-14 800 3-Apr-14 1700 DailyMaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

CSPTCL CSPTCL C

24 400 Chandrapur-Khaparkheda 2-Apr-14 900 2-Apr-14 1700 Daily QMwork MSETCL MSETCL

25 400 Lamboti-Solapur PG 2-Apr-14 900 2-Apr-14 1700 Daily QMwork MSETCL MSETCL

26 400 Bus-1 at Durg PS Ss 3-Apr-14 900 3-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R27 400 Bus-1 at Jabalpur 03-Apr-14 900 03-Apr-14 1800 Daily Retrofitting of Isolator arms(689A) POWERGRID WR-II R28 400 315MVA ICT2 at Khandwa 03-Apr-14 1000 03-Apr-14 1600 Daily AMP POWERGRID WR-II R29 400 Mundra - Hadala 3-Apr-14 800 3-Apr-14 1800 Daily PMM GETCO GETCO30 400 400KV Seoni -Bhilai Ckt 3-Apr-14 900 3-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I31 400 Lonikand-Chakan 3-Apr-14 900 3-Apr-14 1700 Daily QMwork MSETCL MSETCL32 400 Bus-2 at Durg PS Ss 4-Apr-14 900 4-Apr-14 1800 Daily AMP Work WRTS-I WRTS-I R33 400 Bus-1 at Jabalpur 04-Apr-14 900 04-Apr-14 1800 Daily Retrofitting of Isolator arms(2089A) POWERGRID WR-II R

34 400 400kV Itarsi - Indore MPPTCL 1 Line 04-Apr-14 1300 04-Apr-14 1800 DailyFor the replacement of existing transfer gantry beam with new beam for taking new Transfer bay into service

POWERGRID WR-II C

35 400 Varsana - Hadala 4-Apr-14 800 4-Apr-14 1800 Daily PMM GETCO GETCO

Agency Type

ANNEXURE‐32BOutages Proposal of Transmission elements during the month of APRIL ‐2014

SN KV Line From To

Basis Reason System

36 220 Vapi - Vapi (PG) 4-Apr-14 800 4-Apr-14 1800 Daily PMM work PGCIL GETCO37 220 Haldarva - Jhanor - 1 (NTPC) 4-Apr-14 800 4-Apr-14 1800 Daily PMM amp Tan Delta testing PGCIL GETCO38 400 400KV Birsinghpur -Katni Ckt - I 4-Apr-14 800 4-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I39 220 Badod - Kota Ckt 4-Apr-14 900 4-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI40 220 Malanpur-Auriya Ckt 4-Apr-14 900 5-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI

41 400 Bhusawal-Akola 4-Apr-14 900 4-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

42 400 Deepnagar-Aurangabad II 4-Apr-14 900 4-Apr-14 1700 Daily QMwork MSETCL MSETCL43 400 Kalwa-Padgha Ckt I 4-Apr-14 900 4-Apr-14 1700 Daily QMwork MSETCL MSETCL44 765 Bus Reactor at Seoni 5-Apr-14 900 5-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R

45 400 DC Korba-KhedamaraLilo at Marwa lilo section yet to be charge 5-Apr-14 800 6-Apr-14 1800 Daily

Crossing work of upcoming 765 KV DC Raigarh-Champa (AP-48A0- AP 490)DC Korba-Khedamara is in service

CSPTCL WRTS-1 C

46 400 Bus-1 at Jabalpur 05-Apr-14 900 05-Apr-14 1800 Daily Retrofitting of Isolator arms(1689A) POWERGRID WR-II R

47 400 Mundara -Limbdi 1 05-Apr-14 800 07-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

48 220 Badod - Modak Ckt 5-Apr-14 900 5-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI49 400 Dhule-Babhleswar ckt 1 5-Apr-14 900 5-Apr-14 1700 Daily QMwork MSETCL MSETCL50 400 400220kv ICT-1 at Seoni 7-Apr-14 900 7-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R51 400 Bus-2 at Jabalpur 07-Apr-14 900 07-Apr-14 1800 Daily Retrofitting of Isolator arms(1789B) POWERGRID WR-II R52 400 315MVA ICT1 at Khandwa 07-Apr-14 1000 07-Apr-14 1600 Daily AMP POWERGRID WR-II R53 220 Chhegoan-Khandwa Ckt -II 7-Apr-14 900 7-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI54 400 Korba- Bhilai1 7-Apr-14 900 8-Apr-14 1900 days continuou Bay Maint and testing NTPC NTPC55 400 Vindhyachal - Mahan line 7-Apr-14 900 8-Apr-14 1900 Continuous Replacement of R Y and B Phase CT NTPC NTPC56 400 Bhusawal-Aurangabad 7-Apr-14 900 7-Apr-14 1700 Daily QMwork MSETCL MSETCL57 400 New Koyna-Karad ckt 2 7-Apr-14 830 7-Apr-14 1730 Daily QMwork MSETCL MSETCL

58 400 Mundara -Limbdi 2 08-Apr-14 800 10-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

59 400 Chorania Hadala 8-Apr-14 800 8-Apr-14 1800 Daily PMM GETCO GETCO60 400 Sipat 400KV Bay 23 8-Apr-14 900 9-Apr-14 1900 Continous One 400KV CT replacement NTPC NTPC61 400 Koradi-Khaparkheda I 8-Apr-14 900 8-Apr-14 1700 Daily QMwork MSETCL MSETCL62 765 765400KV ICT-1 at Kotra PS 9-Apr-14 900 9-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R63 400 Bus-2 at Jabalpur 09-Apr-14 900 09-Apr-14 1800 Daily Retrofitting of Isolator arms(489B) POWERGRID WR-II R64 400 315MVA ICT1 at Damoh 09-Apr-14 1000 09-Apr-14 1600 Daily AMP POWERGRID WR-II R65 400 Amreli-Jetpur 2 9-Apr-14 800 9-Apr-14 1800 Daily PMM GETCO GETCO66 400 SSP- Rajgarh - 1 9-Apr-14 800 9-Apr-14 1800 Daily PMM GETCOMPTCL GETCO67 220 TAPS1 amp2-TAPS 3amp4 tie line 9-Apr-14 800 9-Apr-14 1600 one day Annual maintenance Works MSETCL NPCIL68 220 TAPS TIE LIE-I 9-Apr-14 800 10-Apr-14 1700 Daily FOR MAINTENANCE WORK PGCIL NPCIL69 400 400 KV Indore - Nagda Ckt 9-Apr-14 900 9-Apr-14 1600 daily For maintenance work MPPTCL EHT- Mamp I70 400 400 KV Sarni - Isp Ckt 9-Apr-14 900 9-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I71 220 Mehgaon-Auriya Ckt 9-Apr-14 900 10-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI72 400 315 MVA 400220Kv X-mer III At Bhopal SS 9-Apr-14 900 10-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI73 400 Padgha-Tarapur CktII 9-Apr-14 900 9-Apr-14 1700 Daily QMwork MSETCL MSETCL74 765 Bus Reactor at Kotra PS 10-Apr-14 900 10-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R

75 765 amp 400

765400 kV ICT-I at Solapur amp 400KV Solapur-Parli 2 10-Apr-14 700 12-Apr-14 1800 Daily 765400 kV spare ICT unit Aux bus works CSD

commissioning amp Fire fighting works at Solapur WRTS-IReliance WRTS-I C

76 400 315MVA ICT2 at Damoh 10-Apr-14 1000 10-Apr-14 1600 Daily AMP POWERGRID WR-II R

77 765 Sasan-Satna 1 10-Apr-14 800 11-Apr-14 1800 Daily For AMP of line amp Line terminal Equipments Post commissioning checks

POWERGRID WR-II C

78 400 APL-Varsana 10-Apr-14 800 10-Apr-14 1800 Daily PMM GETCO GETCO79 400 400 KV Isp - Nagda Ckt 10-Apr-14 900 10-Apr-14 1600 daily For maintenance work MPPTCL EHT- Mamp I80 400 400 KV Bhopal-Itarsi(PGCIL) Ckt-I 10-Apr-14 900 11-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I81 220 Chhegoan-Khandwa Ckt -I 10-Apr-14 900 10-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI82 400 315 MVA 400220Kv X-mer At Katni SS 10-Apr-14 800 11-Apr-14 1800 continue For maintenance work MPPTCL EHT -MampI83 400 Korba- Bhilai2 10-Apr-14 900 11-Apr-14 1900 days continuou Bay Maint and testing NTPC NTPC84 400 Sipat 400KV Bay 14 10-Apr-14 900 12-Apr-14 1900 Continous 400KV CT 3nos replacement NTPC NTPC

85 400 Chandrapur II-Parli II 10-Apr-14 900 10-Apr-14 1700 Daily Providing of Arching horncorona rings Bird guards quarter pinsNut bolts

MSETCL MSETCL

86 400 Karad-Lonikand 10-Apr-14 900 10-Apr-14 1700 Daily QMwork MSETCL MSETCL87 400 Raipur-Durg PS 1 11-Apr-14 900 11-Apr-14 1700 Daily AMP Work WRTS-I WRTS-I R

88 400 Mundara -Jetpur 1 11-Apr-14 800 15-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

89 400 Varsana-Hadala Line 11-Apr-14 800 11-Apr-14 1800 Daily PMM GETCO GETCO90 220 Haldarwa Kawas-2 11-Apr-14 800 11-Apr-14 1800 Daily PMM work PGCIL GETCO91 400 400 KV Nagda-Rajgarh(PGCIL) Ckt-I 11-Apr-14 900 11-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I

92 400 315 MVA 400220Kv X-mer III ampTie bay At Bhopal SS

11-Apr-14 900 11-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI

93 400 Akola-Nandgaonpeth 11-Apr-14 900 11-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

94 400 Akola-Wardha I 11-Apr-14 900 11-Apr-14 1700 Daily QMwork MSETCL MSETCL95 400 Kalwa-Lonikand 11-Apr-14 900 11-Apr-14 1700 Daily QMwork MSETCL MSETCL96 400 400220kv ICT-1 at Mapusa 12-Apr-14 900 12-Apr-14 1300 Daily AMP Work WRTS-I WRTS-I R97 400 Raipur-Durg PS 2 12-Apr-14 900 12-Apr-14 1700 Daily AMP Work WRTS-I WRTS-I R98 765 Sasan-Satna2 with line reactor 12-Apr-14 1000 12-Apr-14 1800 Daily AMP POWERGRID WR-II R99 400 400 KV Nagda-Rajgarh(PGCIL) Ckt-II 12-Apr-14 900 12-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I100 400 Deepnagar-Aurangabad I 12-Apr-14 900 12-Apr-14 1700 Daily QMwork MSETCL MSETCL101 400 Amreli-Jetpur 2 14-Apr-14 800 14-Apr-14 1800 Daily PMM GETCO GETCO102 400 Kasor - Gpec 14-Apr-14 800 14-Apr-14 1800 Daily PMM GETCO GETCO103 220 GWL(PGCIL)-Malanpur Ckt-I 14-Apr-14 900 15-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI104 400 DC Korba-Raipur 3 amp 4 15-Apr-14 800 16-Apr-14 1800 Conti Bus splitting work at Raipur WRTS-1 WRTS-1 C

105 400 Korba-Bhatapara 15-Apr-14 800 24-Apr-14 1800 Conti For raising of ground clearence for Railway track of Lafarge

WRTS-I Lafarge C

106 765 765400 kV ICT-II at Solapur 15-Apr-14 700 17-Apr-14 1800 Daily CSD commissioning amp Fire fighting works WRTS-I WRTS-I C107 400 Vindhyachal-Satna1 15-Apr-14 1000 15-Apr-14 1800 Daily AMP POWERGRID WR-II R108 400 Ssnl-Dhule-1 15-Apr-14 800 15-Apr-14 1800 Daily PMM GETCOMSETCL GETCO109 220 TAPS-Vapi 15-Apr-14 800 17-Apr-14 1900 Daily Annual maintenance Works GETCO NPCIL110 220 Pithampur-Rajgarh(PGCIL) Ckt - I 15-Apr-14 900 15-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI111 400 Sipat 400KV Bay-18 ( Ranchi-1 Main) 15-Apr-14 900 15-Apr-14 1900 Daily Annual Preventive maintenance job NTPC NTPC112 400 Karad-Kolhapur Ckt I 15-Apr-14 900 15-Apr-14 1700 Daily QMwork MSETCL MSETCL

113 400 DC Raipur-Bhadrawati 2 amp 3 16-Apr-14 800 17-Apr-14 1800 Conti Bus splitting work at Raipur WRTS-1 WRTS-1 C

114 400 Vindhyachal-Satna2 16-Apr-14 1000 16-Apr-14 1800 Daily AMP POWERGRID WR-II R

115 400 Mundara -Jetpur 2 16-Apr-14 800 20-Apr-14 1800 Daily For porcelain insualtor replacement by polymer POWERGRID WR-II C

116 400 Vadavi - Dehgam (Pg) - 1 16-Apr-14 800 16-Apr-14 1800 Daily PMM amp Tandelta testing GETCO GETCO117 400 Chorania Asoj-1 16-Apr-14 800 16-Apr-14 1800 Daily PMM GETCO GETCO118 220 Bhilad - TAPS 16-Apr-14 800 16-Apr-14 1800 Daily PMM work PGCIL GETCO119 220 Bhat - Pirana (PG) - 1 16-Apr-14 800 16-Apr-14 1800 Daily PMM work GETCO GETCO120 400 400 KV Bhopal-Itarsi(PGCIL) Ckt-II 16-Apr-14 900 17-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I121 220 Damoh(PGCIL) - Tikamgarh Ckt 16-Apr-14 900 16-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI

122 400 400KV SC Korba-Raipur-II (Between Korba - Bhatapara end)(Between Loc2980 amp 2990) 16-Apr-14 800 17-Apr-14 1700 Daily

MaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

PGCIL CSPTCL C

123 400 Sipat 400KV Bay-19 ( Ranchi-2 Main) 16-Apr-14 900 16-Apr-14 1900 Daily Annual Preventive maintenance job NTPC NTPC124 400 Padgha-Babhleswar ckt I 16-Apr-14 900 16-Apr-14 1700 Daily QMwork MSETCL MSETCL125 400 Vadavi - Dehgam (Pg) - 2 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCO GETCO126 400 Ssnl-Dhule-2 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCOMSETCL GETCO127 400 Vadinar-Hadala- 1 17-Apr-14 800 17-Apr-14 1800 Daily PMM GETCO GETCO128 220 Bhat - Pirana (PG) - 2 17-Apr-14 800 17-Apr-14 1800 Daily PMM work GETCO GETCO129 400 400KV Birsinghpur -Katni Ckt - II 17-Apr-14 800 17-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I130 220 Pithampur-Rajgarh(PGCIL) Ckt - II 17-Apr-14 900 17-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI131 400 Jejuri-Lonikand 17-Apr-14 900 17-Apr-14 1700 Daily QMwork MSETCL MSETCL132 400 Deepnagar-Khadka II 17-Apr-14 900 17-Apr-14 1700 Daily QMwork MSETCL MSETCL133 400 Chorania Kasor 18-Apr-14 800 18-Apr-14 1800 Daily PMM GETCO GETCO134 220 GWL(PGCIL)-Malanpur Ckt-II 18-Apr-14 900 19-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI135 400 Akola-Wardha II 18-Apr-14 900 18-Apr-14 1700 Daily QMwork MSETCL MSETCL

136 400 Koradi-Nandgaonpeth 18-Apr-14 800 18-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

137 765 765kV Pune line Reactor at Solapur 19-Apr-14 700 20-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

138 400 400KV Bina -Power(JP) Ckt 19-Apr-14 900 19-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I139 400 Dhule-SSarovar I 19-Apr-14 900 19-Apr-14 1700 Daily QMwork MSETCL MSETCL

140 400 Koradi-Khaparkheda II 19-Apr-14 900 19-Apr-14 1700 Daily QMwork MSETCL MSETCL141 220 KAPP - VAPI - 1 20-Apr-14 800 20-Apr-14 1800 Daily Isolator replacement under ASIDE scheme PGCIL GETCO

142 400 DC Bhilai-Bhadrawati amp Raipur-Bhadrawati 1 21-Apr-14 800 28-Apr-14 1800 Conti Diversion of line for Vidarbha Industrial Devlopment Corporation(VIDC)

WRTS-I VIDC C

143 400 Bhachau- Ranchhodpura 1amp2 21-Apr-14 800 27-Apr-14 1800 Continuous Tower shifting work at canal crossingInsulator replacement work

POWERGRID WR-II C

144 400 Hadala-Amreli 21-Apr-14 800 21-Apr-14 1800 Daily PMM GETCO GETCO145 400 Vadinar-Hadala- 2 21-Apr-14 800 21-Apr-14 1800 Daily PMM GETCO GETCO146 220 TAPS-Boisar 21-Apr-14 800 23-Apr-14 1900 Daily Annual maintenance Works MSETCL NPCIL147 220 Bina(PGCIL)-220 KV Bina Ckt 21-Apr-14 900 21-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI148 400 CGPL Bhachau -1 21-Apr-14 8AM 21-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL149 220 Kawas-Ichhapore 1+Bus 1 21-Apr-14 900 21-Apr-14 1800 daily RTV Coating NTPC NTPC150 400 Karad-Kolhapur Ckt II 21-Apr-14 900 21-Apr-14 1700 Daily QMwork MSETCL MSETCL151 400 New Koyna-Koyna Stg-4-1 21-Apr-14 830 21-Apr-14 1730 Daily QMwork MSETCL MSETCL152 400 Ssp - Rajgarh - 2 22-Apr-14 800 22-Apr-14 1800 Daily PMM GETCOMPTCL GETCO153 400 Vadavi-Bhachau 2 22-Apr-14 800 22-Apr-14 1800 Daily PMM amp Tan Delta testing PGCIL GETCO154 220 Bhilad - Vapi (PG) - 1 22-Apr-14 800 22-Apr-14 1800 Daily PMM work PGCIL GETCO155 400 400 KV Rajgarh(PGCIL)-Ssp Ckt-I 22-Apr-14 900 22-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I156 400 400KV Seoni -Sarni Ckt 22-Apr-14 900 23-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I157 220 Khandwa(PGCIL)-Nepanagar Ckt 22-Apr-14 900 22-Apr-14 1600 daily For maintenance work MPPTCL EHT -MampI158 220 Kawas-Ichhapore 2+Bus 1 22-Apr-14 900 22-Apr-14 1800 daily For maintenance work NTPC NTPC159 400 Karad-Jaigad II 22-Apr-14 900 22-Apr-14 1700 Daily Annual maintenance work MSETCL MSETCL160 220 Bhilad - Vapi (PG) - 2 23-Apr-14 800 23-Apr-14 1800 Daily PMM work PGCIL GETCO161 400 400KV Bina -Bhopal Ckt -I 23-Apr-14 900 24-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I162 400 400 KV Rajgarh(PGCIL)-Ssp Ckt-II 23-Apr-14 900 23-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I163 220 Bina(PGCIL)-Shivpuri Ckt 23-Apr-14 900 24-Apr-14 1700 daily For maintenance work MPPTCL EHT -MampI164 220 Damoh(PGCIL) - Damoh I C - I 23-Apr-14 900 23-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI

165 400 400 KV DCDS Sipat- Raipur (IampII) 23-Apr-14 800 24-Apr-14 1700 DailyMaintenanceRectification work in existing 400KV DCDS Marwa TPP- Raita (Raipur) Transmission line

PGCIL CSPTCL C

166 400 CGPL Bhachau - 2 23-Apr-14 8AM 23-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL

167 220 Kawas-Navsari 2 +Bus 1 23-Apr-14 900 23-Apr-14 1800 daily Insulator replcement and routine maintenance NTPC NTPC168 400 Padgha-Babhleswar ckt II 23-Apr-14 900 23-Apr-14 1700 Daily QMwork MSETCL MSETCL169 400 Kasor - SSP 24-Apr-14 800 24-Apr-14 1800 Daily PMM work GETCO GETCO170 220 Bhilad - Vapi (PG) - 3 24-Apr-14 800 24-Apr-14 1800 Daily PMM work PGCIL GETCO171 220 TAPS-Bhilad 24-Apr-14 800 26-Apr-14 1900 Daily Annual maintenance Works GETCO NPCIL172 220 Damoh(PGCIL) - Damoh I C - II 24-Apr-14 900 24-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI173 400 CGPL Jetpur- 1 24-Apr-14 8AM 24-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL

174 220 Kawas-Ichhapore 1 +Bus 2 24-Apr-14 900 24-Apr-14 1400 daily Insulator replcement and routine maintenance NTPC NTPC

175 220 Kawas-Ichhapore 2 +Bus 2 24-Apr-14 1400 24-Apr-14 1900 daily Insulator replcement and routine maintenance NTPC NTPC176 400 Padgha-Talegaon 24-Apr-14 900 24-Apr-14 1700 Daily QMwork MSETCL MSETCL

177 765 765kV Raichur 1 line Reactor at Solapur 25-Apr-14 700 27-Apr-14 1800 Daily Spare unit commissioning amp Fire fighting works WRTS-I WRTS-I C

178 400 400KV Bina -Bhopal Ckt -II 25-Apr-14 900 26-Apr-14 1700 daily For maintenance work MPPTCL EHT- Mamp I179 400 CGPL Jetpur- 2 25-Apr-14 8AM 25-Apr-14 6PM Daily Insulator replcement and routine maintenance PGCIL CGPL180 400 Vindhyachal -Satna-4 Line Shunt Reactor 25-Apr-14 900 25-Apr-14 1900 Daily Basis AMP NTPC NTPC

181 400 Bhusawal-Koradi 25-Apr-14 900 25-Apr-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL

182 400 Deepnagar-Khadka I 25-Apr-14 900 25-Apr-14 1700 Daily QMwork MSETCL MSETCL183 400 Soja -Kansari 26-Apr-14 800 26-Apr-14 1800 Daily PMM GETCO GETCO184 400 Raipur-Wardha 1 27-Apr-14 800 28-Apr-14 1800 Daily Balance construction work WRTS-1 WRTS-1 C185 220 KAPP - VAPI - 2 27-Apr-14 800 27-Apr-14 1800 Daily Isolator replacement under ASIDE scheme PGCIL GETCO186 400 Soja -Kansari 28-Apr-14 800 28-Apr-14 1800 Daily PMM GETCO GETCO187 220 TAPS-Boisar II 28-Apr-14 800 30-Apr-14 1900 Daily Annual maintenance Works MSETCL NPCIL188 400 400KV Damoh - Katni Ckt 28-Apr-14 900 28-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I189 400 400 KV Damoh(PGCIL)-Katni Ckt 28-Apr-14 900 28-Apr-14 1800 daily For maintenance work MPPTCL EHT- Mamp I190 400 New Koyna-Karad ckt 1 28-Apr-14 830 28-Apr-14 1730 Daily QMwork MSETCL MSETCL

191 400 DC Raigarh-DB Power (Tudri) - KSK 29-Apr-14 800 30-Apr-14 1800 Conti Crossing work of 765kV SC Raigrah-Champa (90 - 100)

WRTS-I WRTS-I C

192 400 Raipur-Wardha 2 29-Apr-14 800 30-Apr-14 1800 Daily Balance construction work WRTS-1 WRTS-1 C193 220 Navsari - Nasik - 1 29-Apr-14 800 29-Apr-14 1800 Daily PMM work GETCOMSETCL GETCO194 220 Seoni(PGCIL)-Chhindwara Ckt-I 29-Apr-14 900 29-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI195 220 Kawas-Vav 1+ bus 2 29-Apr-14 900 29-Apr-14 1800 daily For maintenance work NTPC NTPC196 400 Chorania Asoj-1 30-Apr-14 800 30-Apr-14 1900 Daily PMM GETCO GETCO197 220 Navsari - Nasik - 2 30-Apr-14 800 30-Apr-14 1800 Daily PMM work GETCOMSETCL GETCO198 220 Vapi - TAPS 30-Apr-14 800 30-Apr-14 1800 Daily PMM work PGCIL GETCO199 220 Seoni(PGCIL)-Chhindwara Ckt-II 30-Apr-14 900 30-Apr-14 1800 daily For maintenance work MPPTCL EHT -MampI200 220 Kawas-Vav 1+ bus 2 30-Apr-14 000 30-Apr-14 000 daily For maintenance work NTPC NTPC

Annexure-32-C1

List of Emergency Outages availed in Feb 2014

SlNo

Element kV Agency From

Date To Date

Remarks

1 SATNA‐BINA‐II 765 WRTS‐2 4‐Feb‐14

5‐Feb‐14

Hot spot attending

2 SUJALPUR‐NAGDA LR NAGDA

400 WRTS‐2 6‐Feb‐14

19‐Feb‐14

Oil leackage

3 SOLAPUR‐PARLI‐II

400 WRTS‐2 6‐Feb‐14

6‐Feb‐14

Hotspot attend at solapur

4 JABALPUR‐ITARSI‐IV LR AT ITARSI‐LR

400 WRTS‐2 7‐Feb‐14

17‐Feb‐14

Oil leackage

5 APL‐HADALA‐SC 400 GEB 7‐Feb‐14

7‐Feb‐14

Hot spot

6 SOLAPUR‐PARLI(PG)‐1

400 WRTM(REL)

9‐Feb‐14

9‐Feb‐14

Hot spot

7 BOISAR‐BOISAR(PG)‐II

220 MSETCL 9‐Feb‐14

9‐Feb‐14

Hotspots

8 NEW KOYNA‐KARAD ‐ I

400 MSETCL 10‐Feb‐14

11‐Feb‐14

Dc‐earth leakage

9 LONIKHAND ‐ KARAD

400 MSETCL 10‐Feb‐14

11‐Feb‐14

Hotspot

10 NAGDHA ICT ‐ III

400220

MPPTCL 10‐Feb‐14

10‐Feb‐14

Hotspot

11 AKOLA ‐ ABAD ‐I AKOLA

400 WRTS‐1 11‐Feb‐14

12‐Feb‐14

Oil leackage

12 AKOLA ‐ AURANGABAD ‐ I

400 WRTS‐1 11‐Feb‐14

11‐Feb‐14

Oil leackage ion lr

13 BINA‐GWALIOR 765 WRTS‐1 14‐Feb‐ 14‐Feb‐ Attend oil leakage on lr

SlNo

Element kV Agency From

Date To Date

Remarks

II 14 14

14 AKOLA‐TIRORA‐I 765 MSETCL 22‐Feb‐14

23‐Feb‐14

Sparking in LR at Tirora SYED AT TIRORA END

15 KHAEGAR‐ICT‐I 400220

MSETCL 22‐Feb‐14

22‐Feb‐14

Hot spot

16 KHANDWA‐NEPANAGR‐SC

220 MPPTCL 23‐Feb‐14

23‐Feb‐14

Hot spot

17 GWALIAR ‐SATNA ‐ I

765 WRTS‐2 24‐Feb‐14

1‐Mar‐14

Attend hot spot

18 KORBA BUS‐III 400 NTPC 25‐Feb‐14

25‐Feb‐14

Hots pot attend

19 BUS‐1 AT GWALIOR

765 WRTS‐2 13‐Feb‐14

13‐Feb‐14

Checking of blocked BB main‐1 relay

20 RAIPUR‐BWATI‐2

400 WRTS‐1 17‐Feb‐14

17‐Feb‐14

Urgent Removal of LR at Raipur end for DGA violation

21 TAPS‐PADGHE 400 TAPS‐3amp4 19‐Feb‐14

23‐Feb‐14

To attend SF‐6 leakage

22 SATNA‐GWALIOR‐1

765 WRTS‐2 24‐Feb‐14

26‐Feb‐14

To attend hot spots

23 VCHAL‐JABALPUR‐IV

400 WRTS‐2 27‐Feb‐14

27‐Feb‐14

To increase OPGW‐Top conductor clearance to avoid tripping

24 APL‐SAMI‐2 400 APL 26‐Feb‐14

26‐Feb‐14

To attend hot sopt

25 SHOLAPUR BUS‐1

765 WRTS‐1 27‐Feb‐14

27‐Feb‐14

To attend hot sopt

26 BOISAR BUS‐2 220 WRTS‐1 28‐Feb‐14

28‐Feb‐14

To attend hot sopt

Sl No KV element From To Basis Work System Agency Remarks

1220 Vapi (GETCO)‐Bhilad 1‐Feb‐14 800 2‐Feb‐14 1800 Daily Line crossing work of 400KV LILO line for

Magarwada SSGETCO POWERGRID N

2 220 Omkareshwar-Khandwa Ckt

3-Feb-14 900 3-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

3 400 New Koyna-Koyna Stg-4-1

3-Feb-14 830 3-Feb-14 1730 Daily QMwork MSETCL MSETCL N

4220 Vapi ‐ Magarwada

Ckt13‐Feb‐14 900 3‐Feb‐14 1400 Daily AMP of line amp equipment WRTS‐II POWERGRID DD may have to do load

shedding as per Reliability Suggestion

N

5 220 DC Raigarh- Raigarh 1amp 2

4-Feb-14 800 5-Feb-14 1800 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (040-50)

CSPTCL WRTS-I N

6 220 Itarsi(PGCIL)-Hoshangabad Ckt

4-Feb-14 900 4-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N

7 400 Mundra -Limbdi-2 4-Feb-14 800 4-Feb-14 1800 Daily Suspension Insulator replcement and routine maintenance

PGCIL CGPL N

8 400 400 kV DC Satna - Bina 1amp2

4-Feb-14 800 5-Feb-14 1800 Continous Crossing of Jabalpur-Bina 765 kv SC Line PGCIL JTCL N

9220 Vapi ‐ Magarwada

Ckt24‐Feb‐14 0900 4‐Feb‐14 1400 Daily AMP of line amp equipment WRTS‐II POWERGRID N

10 765 Seoni-Bina line with LR 4‐Feb‐14 800 4-Feb-14 1800 Daily AMP Work WRTS-2 WRTS-1 N

11 400 Bus I Bina 5‐Feb‐14 800 5‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

12220 Kawas ‐ Navsari (PG)

25‐Feb‐14 800 5‐Feb‐14 1800 Daily Replacement of ST insulators by Double Tension

insulator in Railway crossing spansWRTS‐II POWERGRID N

13400 Indoer (PG) ‐Indore

(MP) DC5‐Feb‐14 800 6‐Feb‐14 1800 Continou

sStringing of 765kV Indore ‐ Vadodara line WRTS‐II POWERGRID N

14 400 APL - Hadala 6-Feb-14 800 6-Feb-14 1800 Daily PMM GETCO GETCO N N

15 220 Seoni(PGCIL ) - Chhindwara CKT I

6-Feb-14 900 6-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N N

16 400 Jejuri-Koyna stg IV 6-Feb-14 900 6-Feb-14 1700 Daily QMwork MSETCL MSETCL N17 400 Akola-Nandgaonpeth 6-Feb-14 900 6-Feb-14 1700 Daily Quaterly Maintainance Work MSETCL MSETCL N18 400KV Korba-Bhatapara 6-Feb-14 900 7-Feb-14 1900 Cont Testing of LBB auto re-close M-I amp M-II relays NTPC NTPC N19 220 Haldarva - Jhanor - 2

(NTPC)6-Feb-14 900 6-Feb-14 1800 Daily PMM work GETCO N

20220 Navsar (PG) ‐Navsari

(GETCO) 16‐Feb‐14 800 6‐Feb‐14 1800 Daily Replacement of ST insulators by Double Tension

insulator in Railway crossing spansWRTS‐II POWERGRID

N

21 400 Bus‐II Bina 6‐Feb‐14 800 6‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

22400 Seoni‐Khandwa1 6‐Feb‐14 1000 6‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Khandwa end by MS ABB

WRTS‐II POWERGRID Rescheduled to 6th March N

23 400 Rajgarh-Ssp Ckt-II 7-Feb-14 900 7-Feb-14 1600 daily For maintenance work MPPTCL EHT- Mamp I N24 220 Chhegoan-Khandwa

Ckt -II7-Feb-14 900 7-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

25 220 Wardha (PG)-Wardha 7-Feb-14 800 7-Feb-14 1800 Daily AMP Work MSETCL WRTS-I N26 400 Chorania - Vadavi-2 7-Feb-14 800 7-Feb-14 1800 Daily PMM amp Tan Delta testing WRTGPL GETCO N27 400 Jabalpur‐Itarsi1 7‐Feb‐14 900 7‐Feb‐14 1400 Daily AMP OF TERMINAL EQUIPMENT WRTS‐II POWERGRID N

28220 Vapi(PG)‐ Bhilad ckt

2 amp 3 7‐Feb‐14 800 8‐Feb‐14 1800 Daily Line crossing work of 400KV LILO of Navsari‐Boisar

at MagarwadaGETCO POWERGRID N

29 220 Mapusa-Thivim 1 8-Feb-14 800 8-Feb-14 1800 Daily AMP Work GOA WRTS-I N

30400 Seoni‐Khandwa2 9‐Feb‐14 1000 9‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Khandwa end by MS ABB

WRTS‐II POWERGRID Rescheduled to 7th March N

31 220 Chhegoan-Khandwa Ckt -I

10-Feb-14 900 10-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

Annexure-32-C2OCC approved outage not availed in Feb‐2014

32132 132 kV Dhule

Dondaicha line10-Feb-14 800 11-Feb-14 1800 Cont Crossing of Dhule-Vadodara 765 kv SC Line MSETCL BDTCL subjected to sldc

clearance N

33 400132 KV

Vindhyachal ICT-1 10-Feb-14 900 14-Feb-14 1900 Cont ICT Overhauling NTPC NTPC N

34400 KV Vindhyachal - Jabalpur-

3 Line Shunt Reactor10-Feb-14 900 14-Feb-14 1900 Cont Reactor Overhauling NTPC NTPC

N

35 400 KSK-DB Power 10-Feb-14 800 13-Feb-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end WRTS-IDBKSK

KSK N36 220 Ipore-Kawas-1 10-Feb-14 800 10-Feb-14 1800 Daily PMM work GETCO N

37400 Vindhyachal‐Mahan 10‐Feb‐14 800 11‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐I WRTS‐II N

38400 Mahan‐Korba 10‐Feb‐14 800 11‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐I WRTS‐II N

39765 Jabalpur ‐ Bina 1 10‐Feb‐14 1000 10‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Jabalur end by MS ABB

WRTS‐II POWERGRID Differed by siteN

40 400 SSP - Rajgarh - 1 10-Feb-14 800 11-Feb-14 1800 Daily Basis

PMM Work GETCO N

41 400 DC Tundri (DB Power) -ksk-Raigarh

10-Feb-14 800 11-Feb-14 1800 Conti Crossing work of upcoming 765 KV SC Raigarh-Champa (092-100)

DB Power WRTS-I N42 400 Jetpur - Amreli - 1 11-Feb-14 800 12-Feb-14 1800 Daily PMM GETCO GETCO N43 400 Hadala - Vadinar-2 11-Feb-14 800 11-Feb-14 1800 Daily PMM GETCO GETCO N44 400 Nagda-Rajgarh Ckt-I 11-Feb-14 900 11-Feb-14 1800 daily For maintenance work MPPTCL EHT- Mamp I N45 220 Mehgaon-Auriya Ckt 11-Feb-14 900 11-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N46 220 Seoni(PGCIL ) -

Chhindwara CKT II11-Feb-14 900 11-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

47

765kV Main Bus-1B at SASANBay 13 - Jack Bus

11-Feb-14 900 21-Feb-14 1800 Daily Jumper Installations amp ConnectionsIsolator Allignment

PGCIL Reliance Provisional Subject to details of works done to be apprised on daily basis

N

48 220 Ipore-Kawas-2 11-Feb-14 800 11-Feb-14 1800 Daily PMM work GETCO N49 220 Navsari - Nasik - 2 11-Feb-14 900 11-Feb-14 1800 Daily PMM work GETCO N

50765 Jabalpur ‐ Bina 2 11‐Feb‐14 1000 11‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Jabalur end by MS ABB

WRTS‐II POWERGRID Deferred by siteN

51 400 Nagda-Rajgarh Ckt-II 12-Feb-14 900 12-Feb-14 1800 daily For maintenance work MPPTCL EHT- Mamp I N52 400 Karad-Solapur (PGCIL) 12-Feb-14 900 12-Feb-14 1700 Daily QMwork MSETCL MSETCL N53 400 Raipur-Sipat 1 amp 2 26-Feb-14 800 3-Mar-14 1800 Conti Diversion of line for Lafarge Railway track WRTS-I Lafarge Ori 12-16 Feb 14 Deferre N54 220 Haldarwa Kawas-2 12-Feb-14 900 12-Feb-14 1800 Daily PMM work GETCO N

55 220 Bus‐I Bina 12‐Feb‐14 800 12‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

56 400 Chorania - Hadala 13-Feb-14 800 14-Feb-14 1800 Daily PMM GETCO GETCO N57 400 Tarpur-Padghe-2 13-Feb-14 800 14-Feb-14 1800 Daily maintenance work POWERG

RIDNPCIL N

58400 Vindhyachal‐Satna1 13‐Feb‐14 1000 13‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

59 220 Bus‐II Bina 13‐Feb‐14 800 13‐Feb‐14 1800 Daily Annual Maintenance Bus amp Protection system WRTS‐II POWERGRID N

60 220 Pithampur-Rajgarh Ckt - I

14-Feb-14 900 14-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

61 220 Wardha (PG)-Badnera 14-Feb-14 800 14-Feb-14 1800 Daily AMP Work at Wardha MSETCL WRTS-I N

62 400 Bhusawal-Koradi 14-Feb-14 900 14-Feb-14 1700 Daily Disc string replacementfixing of spacersdampersearthbond

MSETCL MSETCL N

63 400 Raipur-KSK 14-Feb-14 800 16-Feb-14 1800 Cont Lilo 400KV Raipur-Raigarh 4 at KSK end WRTS-IKSK

KSK N

64 220 GWL(PGCIL)-Malanpur Ckt-II

15-Feb-14 900 15-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI N

65 220 Pithampur-Rajgarh Ckt - II

15-Feb-14 900 15-Feb-14 1600 daily For maintenance work MPPTCL EHT -MampI N

66400 Vindhyachal‐Satna2 16‐Feb‐14 1000 16‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

67 220 KAPS - Haldarwa - 1 17-Feb-14 800 17-Feb-14 2000 Daily Yearly PM checks KAPS N

68400 3X105 MVA 400220Kv

X-mer I At Indore ss17-Feb-14 800 18-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI

N

69

220 SC Korba-Raigarh-Budhipadar sc(PGCIL) amp DC Korba-Budipadar both circuits (CSPTCL)

18-Feb-14 800 19-Feb-14 1800 Conti Crossing work of upcoming 765 KV DC Jharsuguda-Korba amp SC Sipat-Ranchi

CSPTCLWRTS-I

WRTS-I

N

70 400 Itarsi-Bhopal Ckt-I 18-Feb-14 900 19-Feb-14 1700 daily For maintenance work MPPTCL EHT- Mamp I N71 220 Badod - Kota Ckt 18-Feb-14 900 18-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N72 220 Damoh(PGCIL) -

Damoh I C - II18-Feb-14 900 18-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

73 220 Badod - Modak Ckt 19-Feb-14 900 19-Feb-14 1800 daily For maintenance work MPPTCL EHT -MampI N

74220 KAPS - Ukai - Mota 19-Feb-14 800 19-Feb-14 2000 Daily Yearly PM checks KAPS Non consent from SLDC

GETCO N

75400 315 MVA 400220 KvX-

mer III At Indore ss20-Feb-14 800 21-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI

N

76 220 Seoni(PG)-Seoni 2 21-Feb-14 800 21-Feb-14 1800 Daily AMP Work MPPTCL WRTS-I Y N77 220 Bina(PGCIL)-Shivpuri

Ckt21-Feb-14 900 22-Feb-14 1700 daily For maintenance work MPPTCL EHT -MampI Y N

78 400 Koradi-Nandgaonpeth 21-Feb-14 900 21-Feb-14 1700 Daily QMwork MSETCL MSETCL N N79 220 Haldarva - Jhanor - 1

(NTPC)21-Feb-14 900 21-Feb-14 1800 Daily PMM work GETCO N

80

765kV Main Bus-2A at SASANSatna Line-2

22-Feb-14 900 28-Feb-14 1800 Contionious

Equipment ConnectionsCircuit Breaker TestingJumper MeasurementIsolator Allignment Reactor accessories erection on R-Phase

PGCIL Reliance

N

81 400 Korba-Raipur 3 amp 4 23-Feb-14 800 24-Feb-14 1800 Conti For Bus spliting work at Raipur765 KV Raigarh-Raipur and 765 Champa Raipur lines

WRTS-1 WRTS-1 N

82132 132kV Astha - Polai SC

line of MPPTCL24-Feb-14 800 25-Feb-14 1800 Continous Crossing of Bhopal -Indore 765 kv SC Line MPPTCL BDTCL subjected to sldc

clearance N

83 400 Bus-1 at Bilaspur 24-Feb-14 800 24-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I N

84400 Seoni -

Khedamara(Bhilai) Ckt25-Feb-14 900 25-Feb-14 1800 daily For maintenance workFeeder bay maintenance at

KMaraMPPTCL CSPTCLMPPT

CLNo confirmation on D-3

N

85400 Ranchi-Sipat 1 amp 2 25-Feb-14 800 26-Feb-14 1800 Conti Crossing work of upcoming 765 KV DC

Jharsuguda-Korba amp 765KV SC Ranchi-BilaspurWRTS-I WRTS-I No confirmation on D-3

N

86765 Sasan‐Satna2 25‐Feb‐14 800 26‐Feb‐14 1800 Continou

sLine crossing work of 765KV Vin (pooling)‐Satna1amp2

WRTS‐II POWERGRID No confirmation on D-3 N

87400 Bus Reactor1 at Satna 25‐Feb‐14 1000 25‐Feb‐14 1800 Daily Commissioning amp checking of CSD relay in Main

CB for reactor switching at Satna end by MS ABBWRTS‐II POWERGRID

N

88400 400 kV DC Damoh -

Bhopal Line26-Feb-14 800 27-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL Not availed by agency for

rainsN

89400 Raipur-Bhadrawati 2 amp

327-Feb-14 800 27-Feb-14 2100 Daily For Bus spliting work at Raipur765 KV Raigarh-

Raipur and 765 Champa Raipur linesWRTS-1 WRTS-1 Subject to Telemetry from

Durg PS RaipurN

90 400 Birsinghpur‐Vandana Vidyut

27‐Feb‐14 800 27‐Feb‐14 1700 Daily AMP of Terminal Equipment amp line Reactor WRTS‐I POWERGRID Ready N

91 400 Bhusawal-Akola 28-Feb-14 900 28-Feb-14 1700 Daily QMwork MSETCL MSETCL N92 220 Bus-1 at Wardha 28-Feb-14 800 28-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I N93 400 Birsinghpur‐Balco 28‐Feb‐14 800 28‐Feb‐14 1700 Daily AMP of Terminal Equipment amp line Reactor WRTS‐I WRTS‐I Deferred by site N

94 400 Nagda‐Dehgam2 5‐Feb‐14 1000 5‐Feb‐14 1800 DailyCommissioning amp checking of CSD relay in Main CB for reactor switching at Dehgam end by MS ABB

WRTS‐II POWERGRID N

95 400 400kV Satpura Itarsi 10‐Feb‐14 900 11‐Feb‐14 1700 DailyCommissioning of new CB after dismantling of existing TELK make CB at Satpura end amp normalising of line on main CB

POWERGRID

WRTS‐II N

96 765 765 kV Satna - Bina Ckt I

6-Feb-14 800 8-Feb-14 1800 cont Stringing of Jabalpur-Bina 765 kv SC Line PGCIL JTCL Original27-28 Jan14 Def N

97 765400 765400 kV ICT-1 at Bina 20-Feb-14 90000 AM 21-Feb-13 60000 PM Continuou

sCSD commissioning for 400kV Side CB of 765400 kV ICT-1 WRTS-II POWERGRID Deferred by site N

98 400 Nagda - Dehgam 1amp2 20-Feb-14 80000 AM 28-Feb-14 1700 Daily Online PID testing to insulators in both circuits AR shall be kept in non auto mode in both circuits WRTS-II POWERGRID

N

99 220MC Waluj-Chitegaon amp Waluj-Jalna

21-Feb-14 700 21-Feb-14 1900 Daily Crossing work of 400kv MC Aurangabad - Aurangabad amp Akola-Abad MSETCL WRTS-I

N

100 400 Bus 1 at Asoj 21-Feb-14 000 21-Feb-14 1800 Daily For checking bus stability testing of Piran 1 amp 2 bays (for charging of new line) GETCO WRTS-II N

101 400 Bus-1 at Wardha 22-Feb-14 800 22-Feb-14 1800 Daily Jumper spacers connection at Wardha WRTS-I WRTS-I N102 400 Bus-1 at Raigarh 22-Feb-14 800 22-Feb-14 1800 Daily AMP Work WRTS-I WRTS-I Deferred by site N103 765 Bus - II at Indore 22-Feb-14 90000 AM 23-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Not availed NLDC consenN104 220 Kakrapar-Haldarwa2 22-Feb-14 1000 Hrs 22-Feb-14 1600 Hrs Daily AMP POWERG

RID WRTS-II N

105 400 Bus 2 at Asoj 22-Feb-14 000 22-Feb-14 1800 Daily For checking bus stability testing of Piran 1 amp 2 bays (for charging of new line) GETCO WRTS-II N N

106400 400 kv DC Bhopal -

Bina Line (Ckt I amp II)(Tower no 34 amp35)

23-Feb-14 800 24-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line MPPTCLBDTCL

N

107 765kV SASAN Main Bus-1BBay 10 - Jack Bus 24-Feb-14 800 Hrs 2-Mar-14 1900 Hrs Continuous Dia-4

(Bay-10) - SCCOCC Test of Unit 4 GTSasan Sasan N

108 765 Bus - I at Indore 24-Feb-14 90000 AM 25-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID N

109 765 765 KV Bina-Indore Line 24-Feb-14 0900 Hrs 24-Feb-14 1800 Hrs Daily

For taking spare reactor unit in service amp checking the scheme for spare reactor with 765 KV Bina-Indore Line Reactor at Bina

POWERGRID WRTS-II

Deferred by site N

110 400 Kasor - GPEC 24-Feb-14 800 25-Feb-14 1800 Daily PMM Work GETCO GETCO N111 40022033 315 MVA ICT2 at Kheda 24-Feb-14 900 10-Mar-14 1800 cont modification work in SS lay out CSPTCL CSPTCL N112 400 315 MVA ICT2 at

Gwalior 25-Feb-14 90000 AM 25-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID N

113 400KV V-Satna-4 Line Shunt Reactor 25-Feb-14 1000 25-Feb-14 2000 Daily

Basis AMP NTPC NTPC N

114 400 Raipur-Wardha 1 26-Feb-14 800 26-Feb-14 2000 Daily Balance construction works at Wardha end WRTS-I WRTS-IReady Ori26214 Deferred by site

N

115 400 Bus -I at Indore 26-Feb-14 90000 AM 26-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Deferred by site N116 400 315 MVA ICT3 at

Gwalior 26-Feb-14 90000 AM 26-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID N

117 400 400 kV DC Damoh - Bhopal Line

26-Feb-14 800 26-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL N

118 400 Chorania-Kasor 26-Feb-14 800 26-Feb-14 1800 Daily PMM work GETCO GETCO N119 400 Koradi-Satpura sc 26-Feb-14 800 26-Feb-14 1600 Daily 765KV Tiroda Koradi Transmission LineII crossing

worksPOWERGRID MEGPTCL Cancelled by MEGPTL N

120 400 400 kV DC Damoh - Bhopal Line

26-Feb-14 800 26-Feb-14 1800 Continous Crossing of Bhopal -Jabalpur 765 kv SC Line PGCIL BDTCL N

121 400 Raipur-Wardha 2 27-Feb-14 800 27-Feb-14 2000 Daily Balance construction works at Wardha end WRTS-I WRTS-I Deferred by site N122 400 Vindhyachal-Satna2 27-Feb-14 1000 27-Feb-14 1800 Daily Commissioning of CSD Relay in ABB make main

CB at Satna WRTS-II POWERGRID Deferred by site N

123 400 Bus -II at Indore 27-Feb-14 90000 AM 27-Feb-14 60000 PM Daily For bay extension works WRTS-II POWERGRID Ready N124 400 315 MVA ICT1 at

Rajgarh 27-Feb-14 90000 AM 27-Feb-14 10000 PM Daily For AMP WRTS-II POWERGRID Ready N

125 400400 KV SC Kosamba - Asoj line(730-740)

27-Feb-14 700 27-Feb-14 1800 cont Crossing of Dhule - Vadodara 765 kv SC Line GETCOBDTCL

N

126 400 Indore (MP) -Indore (PG)-DC 27-Feb-14 700 28-Feb-14 1600 Cont Stringing of 765kV Indore - Vadodara line POWERG

RID WRTS-II Deferred by site N

Anaulagnak 33(A)

maaca- 2014 AaOr Ap`Ola 2014 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR MARCH 2014 AND APRIL 2014

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)maaca- 2014 Ap`Ola 2014 maaca- 2014 Ap`Ola 2014

MARCH 2014 APRIL 2014 MARCH 2014 APRIL 2014

1 gaujarat

saIimat 11700 12100 7750 7800

AsaIimat 11740 12140 7760 7810

2 maQya p`doSa

saIimat 8340 9050 5338 5540

AsaIimat 8340 9050 5338 5540

3 CltaIsagaZ

saIimat 3200 3075 1929 1809

AsaIimat 3225 3105 1944 1827

4 maharaYT

saIimat 19000 19150 10200 10300

AsaIimat 19050 19200 10250 10350

5 gaaovaa

saIimat 425 410 300 295

AsaIimat 425 415 310 300

6 dmana dIva

saIimat 340 345 210 205

AsaIimat 345 350 225 210

7 DI ena eca

saIimat 635 640 445 425

AsaIimat 635 640 445 425

8 piScama xao~

saIimat 41961 43047 28500 27900

AsaIimat 42076 43173 29560 28840

Diversity factor of 10401

March 2014 and April 2014

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

maah frvarI 2014

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 1552 75

]k[- Ukai - 2 1719 75]k[- Ukai - 3 598 75]k[- Ukai - 4 1757 75]k[- Ukai (Total) 5627 150 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 024 2]k[- ela baI saI eca Ukai LBCH - 2 131 3]k[- ela baI saI eca Ukai LBCH (Total) 154 5 0008

3 kDanaa Kadana - 1 000 0 0005kDanaa Kadana - 2 246 62 0000kDanaa Kadana - 3 223 62kDanaa Kadana - 4 166 63 0000kDanaa Kadana (Total) 634 63 0005

4 pnama PANAM amp Madhuban Dam 1 amp 2 431 9 0020 6 kula jalaIya TOTAL(H) 6846 225 0401

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 2060 32 21822 TaoronT pavar ilaimaToD yauinaT DI 7979 125 69803 TaoronT pavar ilaimaToD yauinaT [- 075 122 07584 TaoronT pavar ilaimaToD yauinaT ef 8023 124 66915 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 018811 Qauvarna tapIya Dhuvaran - GT 2 000 0 041912 Qauvarna tapIya Dhuvaran - STG 023 1013 ]ka[- yauinaT 1 Ukai -1 000 0 005114 ]ka[- yauinaT 2 Ukai -2 000 0 010815 ]ka[- yauinaT 3 Ukai -3 3147 200 297216 ]ka[- yauinaT 4 Ukai -4 10588 202 1002617 ]ka[- yauinaT 5 Ukai -5 9496 210 884118 ]ka[- yauinaT 6 Ukai -6 23703 500 1844819 gaaMQaInagar 1 Gandhinagar - 1 000 0 008620 gaaMQaInagar 2 Gandhinagar - 2 000 0 007121 gaaMQaInagar 3 Gandhinagar - 3 000 0 029622 gaaMQaInagar 4 Gandhinagar - 4 000 0 036223 gaaMQaInagar 5 Gandhinagar - 5 11676 212 1148924 vaNakbaaorI 1 Wanakbori - 1 10648 210 000025 vaaNakbaaOrI 2 Wanakbori - 2 11069 21026 vaaNakbaaOrI 3 Wanakbori - 3 1891 20627 vaaNakbaaOrI 4 Wanakbori - 4 5244 21228 vaaNakbaaOrI 5 Wanakbori - 5 5531 21029 vaaNakbaaOrI 6 Wanakbori - 6 000 030 vaaNakbaaOrI 7 Wanakbori - 7 8902 20931 ]trna Utran GT 1 000 0 019832 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 000 0 024635 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 000 0 0000

Anaulagnak 412

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Anaulagnak 41

ACTUAL GENERATION amp AVALABILITY FOR FEBRUARY 2014Actual vaastivak

Actual vaastivak

37 isaka Sikka - 1 3696 112 439838 isaka Sikka - 2 000 0 017639 kcC ilagnaa[-T Kutch Lignite - 1 4429 71 848640 kcC ilagnaa[-T Kutch Lignite - 2 4037 7241 kcC ilagnaa[-T Kutch Lignite - 3 3646 6742 kcC ilagnaa[-T Kutch Lignite - 4 2215 66 525343 saUrt ilagnaa[-T Surat Lignite - 1 6705 131 682544 saUrt ilagnaa[-T Surat Lignite - 2 7475 131 738745 saUrt ilagnaa[-T Surat Lignite - 3 6965 130 728846 saUrt ilagnaa[-T Surat Lignite - 4 6362 130 688647 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 5454 107 848648 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 5649 11449 jaI Aa[- pI saI ela GIPCL GT - 1 1589 32 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1587 3251 jaI Aa[- pI saI ela GIPCL GT - 3 1702 3552 jaI Aa[- pI saI ela GIPCL ST - 1 2902 5153 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 020556 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 000 0 000060 jaI pI [- saI GPEC GT - 2 267 156 013261 jaI pI [- saI GPEC GT - 3 143 146 002762 jaI pI [- saI GPEC STG 131 17263 jaI esa [- jaI GSEG GT - 1 000 0 098964 jaI esa [- jaI GSEG GT - 2 1181 5065 jaI esa [- jaI GSEG STG 642 2366 Sugen (GT 1 + GT 2) 1767 308 602467 saIpIpI sao Aayaat Imp from CPP+MUNDRA 269359 6881

kula tapIya Total (T) 475652 8386 302021kula jalaIya+tapIya Total (H+T) 482498 8604 302422ivaMD [najaI- Wind Energy 52123kula jalaIya+tapIya+hvaa Total (H+T+Wind) 534621 9539ivainamaya Exchanges 155314 saIimat jaa- maaMga Restricted Energy Req 689935

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 6800 194

11 gaaMQaI saagar Gandhi Sagar 3366 117 008012 raNaa p`tap sagar RPSagar 5883 172 004013 javaahr sagar Jawahar Sagar 4350 99 0050

2 ponca Pench 3052 165 00903 baargaI Bargi 4581 91 00804 baargaI Bargi (LBCH) 000 05 banasaagar Toansa Bansagar-1 (Tons) 11764 315 02806 banasaagar Bansagar-2 (Deolondh) 000 07 banasaagar Bansagar-3 (Silpara) 1236 32 00708 banasaagar Bansagar-4 (Zinaha) 1320 22 00509 maoDIKoDa Medikheda 396 63

10 ibarisaMGapur Birsingpur 040 20 002011 Tavaa Tawa 000 012 rajaGaaT Rajghat 165 12 006013 Omkareshwar 10620 402 14 [Midra saagar Indira Sagar 23077 997 0849

kula jalaIya TOTAL(H) MPPGCL 59999 2365 1273Anaulagnak 413

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 6049 98 232502 AmarkMTk II AMK II Unit -2 6080 983 AmarkMTk III AMK III Unit -5 12212 219 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 06505 satpura II Satpura-II Unit 6 10323 180 165906 satpura II Satpura-II Unit 7 5926 1807 satpura II Satpura-II Unit 8 10964 195 191608 satpura II Satpura-II Unit 9 8353 1709 satpura III Satpura-III Unit 10 000 0 2080

10 satpura III Satpura-III Unit 11 9447 182 1909011 esajaITIpIesa 1 SGTPS Unit - 1 9447 182 1909012 esajaITIpIesa 2 SGTPS Unit - 2 10572 18213 esajaITIpIesa 3 SGTPS Unit - 3 9037 192 2064014 esajaITIpIesa 4 SGTPS Unit - 4 10700 18015 esajaITIpIesa 5 SGTPS Unit - 5 28804 51216 SSTPS 6864 587 8930

kula tapIya Total (T) 133714 3002 115350kula jalaIya+tapIya Total (H+T) 193713 5735 116623Injection from WIND 000 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 193713 5735ivainamaya Exchanges 193660 saIimat jaa- maaMga Rest En Req 387372

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 850 120 00902 Gangrel 475 10 00503 Mini Micro KWB 039 7

kula jalaIya TOTAL(H) CSEB 1364 137 0150tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 47 127402 kaorbaa (pU) Korba (E) Unit-2 2764 483 kaorbaa (pU) Korba (E) Unit-3 2764 484 kaorbaa (pU) Korba (E) Unit-4 2784 465 kaorbaa (pU) Korba (E) Unit -5 3685 120 253306 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 247808 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 15410

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 15839 256 1197012 KORBA(EB) Extn - 2 15876 256 11770

kula tapIya Total (T) 119907 1880 10190013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 119907 1880kula jalaIya+tapIya Total (H+T) 121271 2017 102050ivainamaya Exchanges 40207 0saIimat jaa- maaMga Rest En Req 161478 2017

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 9590 585 25142 kaoyanaa III Koyna III 5920 3203 kaoyanaa IV Koyna IV 18012 11324 kaoyanaa DIpIeca Koyna DPH 1442 385 TaTa jalaIya TATA Hydro 10242 741 28836 vaOtrNaa Vaitarna 000 07 eladarI Eldari 528 168 BaTgar AaOr vaIr Bhatgar amp Vir 915 49 pOzana Paithan 175 59

10 itlaarI Tillari 1106 6511 BaIra Tola rosa Bhira Tail Race 374 4112 GaTGar Ghatghar 5297 29313 Anya CaoTo jalaIya Small Hydro (others) 6173 0

kula jalaIya TOTAL(H) 58910 1599 5397Anaulagnak 414

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 7700 1954 naaisak 4 Nasik Unit -4 10772 1965 naaisak 5 Nasik Unit -5 11160 1976 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 28827 5058 Tambao 6 Trombay Unit -6 000 09 Tambao 8 Trombay Unit -8 000 0

10 Tambao 7A gaOsa Trombay -7A (Gas) 7882 135 250411 Tambao 7ba Trombay -7B (WHR) 4499 7212 kaoraDI 5 Koradi Unit -5 5003 16013 kaoraDI 6 Koradi Unit -6 3963 19014 kaoraDI 7 Koradi Unit -7 10015 19015 Bausaavala 2 Bhusawal Unit -2 8329 17016 Bausaavala 3 Bhusawal Unit -3 9248 18017 Bausaavala 4 Bhusawal Unit -4 22734 50518 Bausaavala 4 Bhusawal Unit -5 19742 41519 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 7451 18621 parlaI 5 Parli Unit -5 10626 18022 parlaI 6 Parli Unit -6 14013 25323 parlaI 7 Parli Unit -7 13728 26024 KaprKoDa 1 Khaperkheda Unit -1 11173 20025 KaprKoDa 2 Khaperkheda Unit -2 10373 19526 KaprKoDa 3 Khaperkheda Unit -3 10998 20127 KaprKoDa 4 Khaperkheda Unit -4 12019 20728 KaprKoDa 5 Khaperkheda Unit -5 28882 50730 parsa Paras-3 14447 25731 parsa Paras-4 13504 25932 ]rna Uran (Gas) 18284 33833 ]rna Uran (WHR) 000 148 586234 caMd`pur 1 Chandrapur Unit -1 9087 17735 caMd`pur 2 Chandrapur Unit -2 1816 19436 caMd`pur 3 Chandrapur Unit -3 11737 21037 caMd`pur 4 Chandrapur Unit - 4 11843 46038 caMd`pur 5 Chandrapur Unit -5 7759 45539 caMd`pur 6 Chandrapur Unit -6 24420 44240 caMd`pur 7 Chandrapur Unit -7 23258 041 DhaNaU 1 Dahanu Unit-1 16339 250 1427842 DhaNaU 2 Dahanu Unit-2 16196 250 1427843 CPP 193651 29840044 RGPPL Share 000 0

kula tapIya Total (T) 631479 15369 329920MAH Wind + Solar Generation 16922 0kula jalaIya +tapIya Total (H+T+Wind) 707311 17451 372239

TOTAivainamaya Exchanges 324731saIimat jaa- maaMga Rest En Req 1032042

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1871 26ivainamaya Exchanges 33252saIimat jaa- maaMga Rest En Req 35123 434

C (F) dmana AaOr dIva DAMAN amp DIU 18245 298ja (G) dadra nagar hvaolaI DNH 40600 655

kula DD ampDNH (T) 58845 952Anaulagnak 415

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 9600 160 1399112 tara`pur 2 TAPS Unit -2 11069 16013 tara`pur 3 TAPS Unit -3 36144 545 6584014 tara`pur 4 TAPS Unit -4 36197 54715 kakrapr 1 KAPS Unit -1 15230 545 3134216 kakrapr 2 KAPS Unit -2 14662 547

kula ena pI saI NPC Total 122901 25042 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14008 212 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 13913 210 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14076 214 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 32894 51025 kaorbaa esaTIpIesa 5 KSTPS Unit-5 33204 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 33190 51327 kaorbaa esaTIpIesa 7 KSTPS Unit-7 33176 514

kula kaorbaa KSTPS Total 174461 2498 10394427 ivanQa esaTIpIesa 1 VSTPS Unit-1 12762 21328 ivanQa esaTIpIesa 2 VSTPS Unit-2 12708 21529 ivanQa esaTIpIesa 3 VSTPS Unit-3 12854 212210 ivanQa esaTIpIesa 4 VSTPS Unit-4 12909 214211 ivanQa esaTIpIesa 5 VSTPS Unit-5 12174 215212 ivanQa esaTIpIesa 6 VSTPS Unit-6 12625 214213 ivanQa esaTIpIesa 7 VSTPS Unit-7 31487 514214 ivanQa esaTIpIesa 8 VSTPS Unit-8 31075 513215 ivanQa esaTIpIesa 9 VSTPS Unit-9 31592 515216 ivanQa esaTIpIesa 10 VSTPS Unit-10 31488 512217 ivanQa esaTIpIesa 11 VSTPS Unit-11 30948 512

kula ivanQayaacala VSTPS Total 232623 3750 15107 31 saIpt -1 -SIPAT-1 38822 66400 32 saIpt -2 -SIPAT-2 32404 66500 33 saIpt -3 -SIPAT-3 38930 66300 34 saIpt -4 -SIPAT-4 26383 51600 35 saIpt -5 SIPAT-5 26400 51400

kula saIpt -SIPAT TOTAL 162939 285000 838941 kvaasa gaOsa 1e Kawas GT-1A 792 10742 kvaasa gaOsa 1baI Kawas GT-1B 2623 10943 kvaasa esaTI 1saI Kawas ST-1C 1571 11444 kvaasa gaOsa 2e Kawas GT-2A 000 045 kvaasa gaOsa 2baI Kawas GT-2B 000 046 kvaasa esaTI 2saI Kawas ST-2C 000 0

kula kvaasa KGPS Total 4986 304 222951 gaMQaar gaOsa 1 Gandhar GT-1 000 052 gaMQaar gaOsa 2 Gandhar GT-2 000 053 gaMQaar gaOsa 3 Gandhar GT-3 000 054 gaMQaar esaTI 4 Gandhar ST-4 000 0

kula gaMQaar GGPS Total 000 0 000061 maaOda 1 Mauda -1 19614 514 000062 maaOda 2 Mauda -2 000 0 0000

kula maaOda MAUDA Total 19614 514 1422661 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 000 31 000071 esa esa pI SSP RBPH - 1 6753 19372 esa esa pI SSP RBPH - 2 5907 19273 esa esa pI SSP RBPH - 3 5577 19574 esa esa pI SSP RBPH - 4 5513 19475 esa esa pI SSP RBPH - 5 7237 19476 esa esa pI SSP RBPH - 6 3109 19277 esa esa pI SSP CHPH - 1 1817 4078 esa esa pI SSP CHPH - 2 491 3679 esa esa pI SSP CHPH - 3 000 0710 esa esa pI SSP CHPH - 4 1639 39711 esa esa pI SSP CHPH - 5 901 37

kula esa esa pI SSP Total 38944 1312 389481 kula poMca Pench Total 3052 165 009082 Jindal Injection 38956 083 Amarkantak Lanco 15478 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2372740

(J) ]plabQata Availability 2308426 naoT ivainamaya Net Exchanges -292048 ]plabQa jaa- Energy Availability 2016379

maah frvarI 2014 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR FEBRUARY 2014 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 11532 - - - 11532 020214 1100 4993

saIimat Restricted 11700

AsaIimat Unrestricted 11740 11532 0 28 0 11560 010214 1200 4993

nyaUnatma pMjaIkRt maaMga Min Registered Demand 8366 8366 17022014 0500 5007

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 9346 - - - 9346 120214 0900 4986

saIimat Restricted 8340

AsaIimat Unrestricted 8340 9346 0 38 0 9384 120214 0900 4986

nyaUnatma pMjaIkRt maaMga Min Registered Demand 3204 3204 270214 0200

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3210 3210 070214 1900 4989

saIimat Restricted 3200

AsaIimat Unrestricted 3225 3210 233 12 0 3246 070214 1900 4989

nyaUnatma pMjaIkRt maaMga Min Registered Demand 1617 1617 230214 2300 5021

maharaYT MAHARASHTRApMjaIkRt Registered 18510 - - - 18510 050214 1100 4984

saIimat Restricted 19000

AsaIimat Unrestricted 19050 17980 1655 -13 0 19622 190214 1200 5002

nyaUnatma pMjaIkRt maaMga Min Registered Demand 12005 12005 280214 0400 5037

gaaovaa GOApMjaIkRt Registered 425 434 - - 434 130214 1400 5006

AsaIimat Unrestricted 425 434 1 -1 - 434 130214 1400 5006

nyaUnatma pMjaIkRt maaMga Min Registered Demand 311 311 100214 0300

essaar ESSAR(ESIL)pMjaIkRt Registered 487 - - 487 240214 1700 5004

AsaIimat Unrestricted 487 0 0 - 487 240214 1700 5004

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 268 - - 268 250214 1200 5003

AsaIimat Unrestricted 268 0 0 - 268 250214 1200 5003

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 644 - - 644 260214 1200 4999

AsaIimat Unrestricted 644 0 - 644 260214 1200 4999

nyaUnatma pMjaIkRt maaMga Min Registered Demand 508 508 280214

piScama xao~ WESTERN REGIONpMjaIkRt Registered 42253 - - - 42253 110214 1100 4994

saIimat Restricted 41961

AsaIimat Unrestricted 42076 42021 850 235 0 43106 120214 1100 4994

nyaUnatma pMjaIkRt maaMga Min Registered Demand 27524 27524 280214 0400 5040 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

piScama xaoi~ya Baar p`oYaNa kond` mauumba[-

णाली चालन-ISO-I

ANNEXURE-43

माह फरवर 2014 February2014

समातरवतीय चालन PARALLELRADIAL OPERATION

TOTAL OPERATING

HOURS 1 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-NR) 66972

2 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-SR) 67200

टाई लाईन TIE LINE 1 765कवी िसवनी स वधा-I 765kV Sonito Wardha 67200 2 765कवी िसवनी स वधा-II 765kV Seonito Wardha 65247 3 400 कवी िभलाई स कोराड 400kV Bhilai to Koradi 67200

4 400 कवी िभलाई स भिावती 400kV Bhilai to Bhadravati 67200

5 400 कवी रायपर स भिावती-I 400kV Raipur to Bhadravati-I 67200

6 400 कवी रायपर स भिावतीETHII 400kV Raipur to Bhadravati-II 67139

7 400 कवी रायपर स भिावतीETHIII 400kV Raipur to Bhadravati-III 67200

8 400 कवी सातपरा स कोराड 400kV Satpura to Koradi 67200

9 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 67004 10 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 65308 11 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 66259 12 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 67200 13 400 कवी को हापर स मापसा-I 400kV Kolhapur-Mapusa-I 38740

14 400 कवी को हापर स मापसा-II 400kV Kolhapur-Mapusa-II 49532

15 400 कवी वापी स बोईसर 400kV Vapi-Boisar 67200

16 400 कवी रायगढ़ स ःटरलाइट-I 400kV Raigarh to Sterlight-I 66258

17 400 कवी रायगढ़ स ःटरलाइट-II 400kV Raigarh to Sterlight -II 67200

18 400 कवी रायगढ़ स झरसगड़ा-I 400kV Raigarh to Jharsuguda-I 67200

19 400 कवी रायगढ़ स झरसगड़ा-II 400kV Raigarh to Jharsuguda-II 67200

20 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 65028

21 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 66132

22 400 कवी रायपर स वधाETHI 400kV Raipur to Wardha-I 66836

23 400 कवी रायपर स वधाETHII 400kV Raipur to Wardha-II 67200

24 220 कवी कोरबा पव स ब पादर-III 220kV K(E) to Budhipadar-III 63853

Anaulagnak 47Annex-47

maah frvarI 2014 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39514 64944

10287 39711

Levels in Mtrs str maITr maoM

]ka[- Ukai

64392

9914

25402

25994

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF FEBRUARY 2014

ivavarNa Particulars

TRIPPING DETAILS FOR THE MONTH OF FEBRUARY 2014

Sr No Brief Details of incident (Elements Generation Tripped) Owner Utility Date amp Time Load

Gen LossCategory

1 Multiple Tripping from 400 kV New Koyna MSETClMSEGCLRGPPL 05‐02‐2014 0950 Hrs ‐ GI‐2

2Bus Bar protection mal‐operation at 400 kV Soja in Gujarat resulting in multiple Tripping

GETCO 06‐02‐2014 1755 Hrs ‐ GI‐2

ANNEXURE ‐ 5

  • annexpdf
    • 21pdf
    • 231pdf
    • 232pdf
    • 24pdf
    • 25pdf
    • 31pdf
    • 32C1pdf
    • 32C2pdf
    • 33Apdf
    • 41pdf
    • 42pdf
    • 47pdf
    • 5pdf
Page 17: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014
Page 18: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014
Page 19: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014
Page 20: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014
Page 21: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014
Page 22: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014
Page 23: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014
Page 24: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014
Page 25: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014
Page 26: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014
Page 27: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014
Page 28: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014
Page 29: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014
Page 30: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014
Page 31: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014
Page 32: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014
Page 33: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014
Page 34: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014
Page 35: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014
Page 36: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014
Page 37: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014
Page 38: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014
Page 39: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014
Page 40: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014
Page 41: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014
Page 42: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014
Page 43: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014
Page 44: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014
Page 45: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014
Page 46: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014
Page 47: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014
Page 48: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014
Page 49: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014
Page 50: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014
Page 51: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014
Page 52: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014
Page 53: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014
Page 54: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014
Page 55: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014
Page 56: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014
Page 57: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014
Page 58: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014
Page 59: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014
Page 60: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014
Page 61: AGENDA NOTES FOR 457 th - wrpc.gov.inwrpc.gov.in/occ/457occ_agenda.pdf13 Raigarh 125 MVAR PGCIL June 2014 14 Aurangabad 125 MVAR PGCIL June 2014 15 Nanded 125 MVAR MSETCL 2014