    ITEM No. 1: CONFIRMATION OF THE MINUTES

    Minutes of 482nd meeting of Operation & Coordination Sub-Committee of WRPC held on

    12TH April 2016 at WRPC, Mumbai were forwarded vide letter No. WRPC/OPN/OCC-

    Minutes/2015-16/4393 dated 20.04.2016.

    AGM(Comml), RGPPL vide letter dated 22.04.2016 commented on item no. 8.4 regarding

    arrangement of alternate allocation of power to Indian railway, in western region Para 3 of

    482nd OCC MoM:

    Quote:“RGPPL representative informed that during the tripping of any running units, they willarrange the power from other units to Railways. But it takes 8-10 time blocks.

    GM (WRLDC) suggested that in case of tripping of RGPPL running units and drawl byRailways, if there is any excess drawl by states, DSM liabilities shall be borne by state &which in turn should be pass on to Railways”.

    Unquote:He requested to following amendments:

    RGPPL representative informed that during the tripping of any running units, they willarrange the power from other units to Railways. But it takes 8-10 time blocks.

    RGPPL representative further stated that as per clause 6.3.2 of PPA with CentralRailway “ In case RGPPL is not able to supply the power or fails to arrangealternative power, as per schedule to be given by Railways, subject to open accessin place and technical minimum, RGPPL shall compensate to Railways for suchpower purchased by them at a higher tariff to make up shortfall in supply of powerby RGPPL.

    GM (WRLDC) suggested that in case of tripping of RGPPL running units and drawl byRailways, if there is any excess drawl by states, DSM liabilities shall be borne by state &which in turn should be pass on to Railways.

    The sub-committee like to discuss the same. No other comment has been received.Sub-Committee may confirm the same accordingly.

  • 2

    483rd OCC Agenda

    ITEM NO.2: REVIEW OF SYSTEM OPERATION DURING THE MONTH OF APRIL 2016.

    2.1 Frequency Particulars

    The average frequency during the month of April, 2016 was 49.98 Hz. The maximum

    instantaneous frequency was 50.32 Hz at 18:02:00 hrs on 1st April -16 while minimum

    instantaneous frequency was 49.64 Hz at 12:18:30 hrs on 26th April -16. The frequency

    profile during April, 2016 was as under:

    01st April 2016 to 30th April 2016 % time

    IEGC band (49.9 < f < 50.05 Hz) 69.94

    < 49.9 Hz 13.07

    > 50.05 Hz 16.98

    The frequency particulars is enclosed at Annex-2.1

    The Sub-Committee may like to note.

    2.2 INTER-REGIONAL EXCHANGES

    There was a net inter-regional export of 6177.00 MUs by WR against net export schedule of

    5875.00 MUs.

    The Sub-Committee may like to discuss.2.3 Voltage Profile

    Voltage profile at some of 765/400 kV sub-stations during the month of April 2016

    furnished by WRLDC is enclosed at Annex-2.3.

    The Sub-Committee may like to discuss.

    2.4 U/F Relay Operations

    As per WRLDC records during April 2016 the system frequency didn’t touch 49.2 Hz and no

    UFR operation has been reported by WRLDC.

    The Sub-Committee may kindly note.

    2.5 Power Cuts / Load Restrictions

    Details of Power Cuts and Regulatory measures during April 2016 as furnished by the state

    utilities are given in Annex. 2.5.

    The Sub-Committee may note.

  • 3

    483rd OCC Agenda

    2.6 Details of Generating Units under Forced outages

    Details of generating units under forced outages during April 2016 are given in Annex-2.6.

    The Sub-Committee may discuss.

    2.7 Details of Generating Units under Planned outages

    The details of generating units under Planned Outages during April 2016 are given inAnnex-2.7

    The Sub-Committee may discuss.

    ITEM NO.3: OPERATIONAL PLANNING

    3.1Proposed Planned maintenance programme of generating units.

    The maintenance programme of generating units for the months May 2016 & June 2016 isgiven in Annex 3.1.

    The Sub-Committee may discuss and finalize the outage schedule of generatingunits for the above period.

    3.2 OUTAGE PROGRAMME OF TRANSMISSION LINES/ELEMENTS

    Maintenance programme for transmission lines during the months May 2016 & June 2016 isgiven in Annex 3.2.

    The Sub-Committee may discuss and finalize the maintenance programmeproposed above.

    3.3 ANTICIPATED POWER SUPPLY POSITION FOR THE MONTHS – MAY 2016 &JUNE – 2016

    Details of anticipated restricted & un-restricted demands for the months of May 2016 & June

    2016 are given in Annex 3.3.

    Constituents may furnish the anticipated station wise Availability & Energy for the months of

    May 2016 & June 2016.

    The Sub-Committee may like to note/update.

    ITEM NO. 4: OPERATIONAL STATISTICS FOR THE MONTH OF APRIL 2016

    The details of actual generation, demand, drawl of power from grid; exchanges etc. are

    given in the following Annexures:

  • 4

    483rd OCC Agenda

    Annex 4.1 - Actual Generation and Requirement for April 2016.

    Annex 4.2 - Peak Demand: Schedule Vs Actual for April 2016.

    Annex 4.3 - Integrated Operation of the System and Operation of Inter State Tie lines

    for April 2016.

    Annex 4.7 – Details of level of Major Reservoirs in Western Region for April 2016.

    The Sub-Committee may like to note.

    ITEM NO. 5: SYSTEM DISTURBANCES IN WESTERN REGION

    There was no major grid disturbance in the Western Region during the month of April

    2016. However the details of minor incidences during the month received from WRLDC

    are enclosed at Annexure-5.The Sub-Committee may like to note/discuss.

    ITEM NO. 6: Healthiness status of SERs/DRs of equipment in the system.

    Constituents have furnished the status of healthiness of SER/DRs in their systems on thedates below:

    Sl No. Name ofconstituents

    Date of Receipt

    1 PGCIL,WRTS-I 02.05.20162 PGCIL,WRTS-II 05.04.20163 MPPTCL 12.04.20164 NTPC 03.04.20165 CSPTCL 03.05.20166 GETCO 08.04.20167 MSETCL 04.04.2016

    The sub-Committee may like to note.ITEM NO. 7: STATUS OF COMPLETION OF ONGOING SCHEMES FOR

    COMMISSIONING OF REACTORS, TRANSMISSION LINES ANDGENERATING UNITS IN WR.

    7.1 Status of completion of ongoing Schemes for Commissioning of reactors in 2016-17.

    S.No.

    400 kVSub/stn.

    Size(MVAR)

    Implementing agency

    Expected commissioningdate

    1 Nanded 125 MVAR MSETCL June – 2016

    2 Sholapur 125 MVAR MSETCL June – 2016

    3 Kolhapur 125 MVAR MSETCL June – 2016

  • 5

    483rd OCC Agenda

    4 Akola 125 MVAR MSETCL June – 2016

    *5 Nagda 125 MVAR MPPTCL June – 2016

    6 ISP 125 MVAR NHDC May/June– 2016 (Expected)

    7 Line reactorat Nagda-ISPline at Nagdaend

    50MVAR MPPTCL Sept 2016 (Expected)

    8 Satpura 50 MVAR MPPGCL Dec-2016

    9 Khandwa 125MVAR PGCIL Commissioned on01.04.2016

    *50 MVAR existing bus reactor to be shifted to Nagda-ISP line as line reactor aftercommissioning of 125 MVAr reactor at Nagda.

    Utilities are requested to ensure that reactors are installed and commissionedaccording to the schedule agreed as above.

    The WR utilities may intimate the current status on above.

    7.2 STATUS OF COMPLETION OF 765/400 KV AND ABOVE ONGOING TRANSMISSIONSCHEMES BEING EXECUTED/IMPLEMENTED BY TRANSMISSION AGENCIES.

    The updated status on various ongoing transmission schemes for the year 2016-17 as per

    the current information available is as follows: -

    S.No.

    Name of the Line TargetCompletionDate

    Remarks

    POWERGRID1 400 kV Navsari – Kudus D/C Line May -16 ROW/Forest problem2 765 kV Wardha –Nizamabad-

    Hyderabad D/CDec -16

    3 400 kV Aurangabad - Boisar line D/Cline

    Oct -16

    4 765 kV Aurangabad (PG) - Padghe(PG) D/C

    Dec -16

    5 800kV Champa – Kurukshetra Bipole May -166 LILO of both circuits of Aurangabad –

    Pune 400 kV D/c line at Pune 765/400kV GIS

    May -16

    CHHATTISHGARH1 400 kV DCDS Raipur(Raita)-

    Jagdalpur(DCDS)June- 2016

    2 LILO of 220 kV Raigarh-Budipadar at May -16 Under discussion with

  • 6

    483rd OCC Agenda

    400 kV PGCIL S/s Raigarh. Idealcharged on 11.8.2015 for no theftreason

    Orissa and ERLDC, beingtaken up by WRPC

    GUJARAT1 400 kV D/C Vadinar-Amreli line June -16

    2 400kV APL-Hadala LILO to Halvad June -16

    3 400 kV D/C Amreli-Kasor line(Part-1) Dec -16

    4 400 kV Charanka- Veloda June -16

    5 400kV Varsana-Halvad June -16

    MADHYA PRADESH

    MAHARASHTRA(STU)1 400 kV Bableshwar-Kudus D/C

    (Quad) August -16

    STERLITE (RPTCL)1 400 kV Sujalpur(PG)-RAPP(Kota)(IR by

    RTCL)

    Commissioned on28.11.2015(But notcharged)

    The WR utilities may intimate the current status on above.

    7.3 Commissioning of new Generating units in Western Region and the capacityexpected to be commissioned during the current year 2016-17.

    The status regarding Generating units, commissioned /expected to be commissionedduring the current year 2016-17 according the available information is as below:

    Name of the Power Projects Unit No. Capacity(MW)

    Date of Commissioning/Schedule Date

    GUJARAT

    CHHATTISGARH

    MARWA 2 500 Date of synchronization -02.03.2016 yet to be CoD.

    MAHARASHTRA

    CHANDRAPUR 8 500 Synchronized on 29.3.2016.Yet to be COD

    CHANDRAPUR 9 500 Commissioned on21.03.2016. COD not yet

    KORADI 9 660 Synchronized on21.01.2016. COD not yet

  • 7

    483rd OCC Agenda

    KORADI 10 660 June -2016

    MADHYA PRADESH

    M/s Jhabua Power, Seoni 1 600 Synchronized on23.02.2016

    Essar Power MP Ltd(Mahan) 2 600 July -16

    MB Power 2 600 Cod on 07.04.2016

    CENTRAL SECTOR/IPP

    GMR Chhattisgarh 2 685 Cod on 01.04.2016

    KSK 3 600 June – 2016

    KSK 4 600 August – 2016

    RKM 3 360 July 2016

    RKM 4 360 August 2016

    The WR utilities may intimate the current status on above.

    ITEM NO. 8: MISCELLANEOUS OPERATIONAL ITEMS

    ITEM NO. 8.1: QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

    All the constituents are requested to submit the CMP report for the Fourth quarter (January

    2016 to March 2016) for the year 2015-16.

    The Sub-Committee may like to note and furnish details in respect of above.

    ITEM NO. 8.2: STATUS OF PHYSICAL & CYBER SECURITY IN POWER SECTOR

    Status of physical & cyber security in Power Sector for the Fourth quarter (January 2016 to

    March 2016) for the year 2015-16 have not been received from some of the constituents.

    The Sub-Committee may like to note and furnish details in respect of above.

  • 8

    483rd OCC Agenda

    ITEM NO. 8.3: READINESS OF SLDC AT GOA, OTHER SLDCs AND WRLDC FORUPGRADATION OF EXISTING SCADA/EMS SYSTEMDuring 29th WRPC meeting it was decided that the status of progress of SLDC’s & Back-up SLDC’s of WR constituents /WRLDC would be regularly monitored in monthly OCCmeeting.The matter was discussed during 31st TCC/WRPC meeting and WRTS-II, PGCIL hasbeen assigned the role to coordinate & sort-out the issues at the earliest for timelineimplementation of project with states & LD&C division of PGCIL. WRPC suggested to calla meeting to expedite the same.Accordingly a meeting on SCADA/EMS was held on 27th April, 2016 with M/s Alstom at

    Bhopal. The most of the issues have been resolved by M/s Alstom. Other small punch

    points will be resolved by resident engineer of M/s Alstom by the end of September 2016.

    Representative from M/s Alstom informed regarding resolution & escalation of project

    three level of engineers will be deployed viz at site level, at regional level & at all India

    level. Issues will be monitored at centralized level & resolving of the issues will be solved

    by appropriate level of expertise.

    Representatives from Gujarat, MP & Chhattisgarh have agreed to the above

    arrangements of punch points resolving & man power deployments by M/s Alstom .

    PGCIL confirmed the same for Goa, DD & DNH. The defect liability period will be started

    from 1st June 2016 for one year & thereafter AMC will be continued for next five year as

    per contracted terms & conditions.

    The updated status of SCADA/EMS of WR Project as submitted by PGCIL Vadodara isattached at Annexure-8.3.PGCIL may update the OCC forum about outcome of 27th April 2016 meeting.

    The Sub-Committee may like to note/discuss.

    ITEM NO. 8.4 COMMISSIONING OF ASSETS IN ADVANCE – CERTIFICATE FROMWRPC FOR CLAIMING OF ADDITIONAL ROE:

    Executive Director(WRTS-II) PGCIL Vadodara vide letter dated 08th April 2016 requested for

    certification of timeline commissioning of following transmission elements by WRTS-II,

    PGCIL in Western Region.

  • 9

    483rd OCC Agenda

    S N Name of the Asset Zero dateof Project

    Timeline ofProject issued

    by CERC(IN Months)

    DOCOQualifiesfor Addl.

    RoE

    1 765 kV S/C Indore-Vadodara T/L 02-09-2011 38 05-May-2014 YES

    2 765 KV S/C (Quad)Bina -Gwalior Ckt-3 17-03-2011 40 07-May-2014 YES

    Accordingly a letter from WRPC has been send to GM, WRLDC for justification regarding

    benefits of above lines in the overall system operation in WR grid.

    GM, WRLDC vide letter dated 21.04.2016(copy enclosed at Annexure 8.4) requested for

    taking the issue of justification for early commissioning of above transmission elements in

    OCC meeting for taking consent from beneficiaries/utilities.

    Sub-Committee may like to discuss the same.

    ITEM NO. 8.5 FREQUENT AND SIMULTANEOUS TRIPPING OF TRANSMISSIONLINES EMANATING FROM RGPPL.AGM(Comml), RGPPL vide email dated 03.05.2016 informed that the RGPPL station is

    connected with rest of grid through 4 nos 400 KV circuits (Dabhol- Nagothane I & II and

    Dabhol – New Koyana I & II) of MSETCL. Recently it is observed that above lines are

    frequent and simultaneous tripping. The detail of tripping are given hereunder:

    Date Circuit Description Tripping time Reason Recharging time

    08.04.16 Dabhol- Nagothane- II 14:07 hrs Distance prot. 16:30 hrs /

    09.04.16

    27.04.16 Dabhol- New Koyana- I 01:39 hrs Distance prot. 12:20 hrs

    27.04.16 Dabhol- New Koyana- II 02:28 hrs Distance prot. 19:25 hrs

    28.04.16 Dabhol- Nagothane- I 21:55 hrs Distance prot. 22:24 hrs

    29.04.16 Dabhol- Nagothage- I 04:03 hrs Distance prot. Still out

    29.04.16 Dabhol- NewKoyana – I 06:14 hrs Distance prot. 14:24 hrs

    29.04.16 Dabhol- New Koyana -II 06:27 hrs Distance prot. 10:55 hrs

  • 10

    483rd OCC Agenda

    The situation became critical due to simultaneous outage of 3 out of 4 circuits for approx.

    four and half hours on 29.04.16 and station generation approx. 500 MW was flowing

    through only available Dabhol- Nagothane – II. There was no redundancy available.

    There would have been a station black out situation incase only available line tripped on

    any reason.

    He requested to look into the matter and suggest necessary preventive / corrective action

    to avoid such critical situation.

    The Sub-Committee may like to discuss.

    ITEM NO. 8.6 CONTROLLING FAULT LEVEL AT RAIPUR & RAIGARH PSS/S OF PGCIL:

    DGM, WRTS-I, PGCIL Nagpur vide email dated 04.05.2016 intimated that in the 39TH

    meeting of Standing committee on power system planning in Western region held on

    30/11/2015 , following decision was taken to control fault level at pooling station / sub

    station in Chhattisgarh area as below

    Para 18.0 –C , of minutes of 39th SCM(copy attached at annexure – 8.6 )

    “Further in 30th SCM held on 8/7/2010 , it was decided to keep following circuits in

    normally open condition at a later date

    Raigarh pool(Kotra) – Raigarh (existing) 400kV D/C lines , & Raipur Pool – Raipur

    (existing ) 400kV D/C line

    These lines may be kept normally open and may be closed depending on the system

    condition “

    Further vide IOM ref : C/CTU/W/Chhattisgarh dtd 8/3/16 received from COO (CTU-

    Planning ) , it was communicated for opening above lines to control fault level at Raipur &

    Raigarh PS .

    He requested WRLDC for opening of above interconnector lines to control fault level at

    Raipur & Raigarh PS .

    The Sub-Committee may like to discuss.

  • 11

    483rd OCC Agenda

    ITEM NO. 9: WRLDC ITEMS

    9.1Blind fold operation –Threat for Grid SecurityIt is being observed that instances of loss of crucial real time data are increasing and

    there is lack of matching response in restoring the same. Ideally there has to be

    protection path from each nodes and n-1 criteria. The locations having major issues

    are as under:

    a) Non availability of data from VSTPS stage 3Data is not coming since 30/03/2016. The matter was escalated time and again.

    Apart from compromising the Grid security, VSTPS 3 was not able to participate in

    Ancillary services. NTPC to indicate the present status and action plan that in

    future such loss of data is restored in 24 Hrs.

    b) Highly intermittent data from Kolhapur GIS400kV Kolhapur GIS-Kudgi-D/C data is also being used to calculate the drawl of

    Maharashtra. POWERGRID to share the network diagram and confirm that the

    route is well protected.

    c) Single path between Kalwa and WRTCCTelemetry from SLDC Maharashtra was down on 17th April 2016 from 11:30 Hrs to

    21:00 Hrs due to fibre cut between Kalwa and WRLDC. Again it was down at about

    1630 hrs of 21.04.16. There is single dark fibre available between Kalwa and

    WRLDC which is prone to fibre cut and hence interruption. The 2nd route on OPGW

    from Reliance may take another 2-3 months. Problem can be resolved if there is

    second channel available between Kalwa and WRLDC. POWERGRID to indicate

    the present status of arranging the 2nd channel.

    d) Gateway problems at SolapurBoth gateways hanged on 16.04.16 ,which resulted incorrect computation of

    drawal of Maharashtra. POWERGRID WRTS1 site representative informed that

    these gateways are giving frequent problems and new gateways are under

    procurement. POWERGRID to indicate the present status.

  • 12

    483rd OCC Agenda

    e) RTU problem at TarapurTarapur Stage-2 data is not reporting at WRLDC due to suspected RTU problem at

    Tarapur. POWERGRID to update the actions taken.

    9.2Constraints in 400 KV Bableswar-Padghe corridorIt is observed that during high demand of the order of 18500-20000 in Maharashtra

    during morning peak, the 400 kV Bableshwar-Padghe D/C is critically loaded to

    more than 500 MW in each ckt. The 400 / 220 kV ICTs at Bableshwar are also

    critically loaded and the area is N-1 non-compliant. The above constraints would

    be addressed by following measures:

    a. Commissioning of 400/220 kV Kudus sub-station and 400 kV Bableshwar-

    Kudus D/C

    b. Augmentation of 400/220 kV Transformation Capacity at Bableshwar

    c. Interconnection of 400 kV Nasik with 220 kV Nasik old substation using idle

    charged ICT at Rattan India Nasik.

    SLDC MSETCL may update the progress of the above.

    9.3 765/400 kV ICT at Tirora and 765/400 kV ICT at Akola II -- N-1 non-compliantThere is only one 765/400 kV ICT at Akola2 as well as at Tirora station of

    MEGPTCL / APML. The N-1 criteria mandated by CEA Transmission Planning is

    not getting satisfied at Tirora as well as at Akola2. The issue was being regularly

    discussed in OCC till Oct-15. As per the last discussion, MEGPTCL had initiated

    action for the amendment in transmission license for inclusion of these 2nd ICTs.

    The approval from MERC was under process. MEGPTCL and APML to update the

    progress and present status.

    9.4 Insecure operation at 765/400 kV Ektuni765 kV Ektuni station of MSETCL has been charged through 765 kV Akola-Ektuni

    ckt -2. With this the constraint of 765/400 kV ICT loading has shifted from Akola2 to

    Ektuni. The station is handling more than 1000 MW of power. However the station

    is N-1 insecure as it is operating with a single 765 kV Bus, single Bay and single

    765/400 kV ICT. Present status may be reviewed.

  • 13

    483rd OCC Agenda

    9.5 Transmission system for Koradi St-II (3x660MW) and IEPL(2x270MW)Koradi-II S/S is connected to Wardha-Warora one ckt as an interim arrangement .

    At present 2x660 MW units of Koradi-II and 1x270 MW of IEPL units are

    commissioned (not scheduled at present by MSETCL). The generation at these

    stations would be evacuated through 400 kV Koradi –II-IEPL-Warora S/C and 400

    kV Koradi-II-Wardha S/C. With full generation at these station the system would be

    N-1 non-compliant. WRLDC vide its letter dated WRLDC/ MO-III/1662/2016 dated

    19th Jan 2016 had requested MSETCL to intimate the final arrangement for

    evacuation of generation from Koradi-II and IEPL. MSETCL may update the final

    arrangement for evacuation of Koradi-stage-II along with its progress.

    9.6 Strengthening of Interconnection of Southern Gujarat and MaharashtraTransmission constraint is often experienced in lines connecting Southern Gujarat

    with Northern Gujarat due to high demand and poor generation at the Kakrapar

    APS and other Gas based stations in South Gujarat. South Gujarat is presently

    connected to Maharashtra system through 400 kV Vapi-Boiser S/C and 220 kV

    Nasik-Navsari D/C. Powerflow is generally from Maharashtra towards Gujarat on

    these lines.

    In Maharashtra system recent charging of Akola-Ektuni ckt at 765 kV level has

    increased the availability of power at 400 kV Bableshwar. However in view of the

    constraint at 400/220 kV level at Bableshwar, only one circuit of 400 kV

    Taptithanda-Bableshwar is generally kept in service.

    The constraints in South Gujarat and in Maharashtra system (Bableshwar)could be simultaneously addressed by strengthening the interconnection ofNavsari in Gujarat with Nasik in Maharashtra. Few suggestions in this regardare as under:

    Option Proposal Impact on power system

    A Interconnect 220 kV Nasik with400 kV Nasik and uprate theconductor of 220 kV Nasik-Navsari

    This will help in relieving theconstraint at Bableshwar andenhance utilization of 220 kV Nasik-Navsari D/C. Both circuits of 400 kVTaptithanda-Bableshwar D/C can bekept in service.

    B Upgradation of 220 kV Nasik-Navsari D/C to 400 kV by usingthe existing ROW.

    This will help in dispersal of powerfrom Bableshwar relieving theconstraint at Bableshwar. Both

  • 14

    483rd OCC Agenda

    220 kV Nasik-Navsari is ajointly owned line of GETCOand MSETCL so STUs couldupgrade the sections lyingwithin their jurisdiction.

    circuits of 400 kV Taptithanda-Bableshwar D/C can be kept inservice.

    Action with regard to Option-A may be taken by MSETCL. The relevant extracts

    from the CEA manual on Transmission Planning Criteria recommending utilization

    of existing ROW for upgrading of existing AC lines to higher voltage level is quoted

    below (emphasis added):

    “3.11 The following options may be considered for strengthening of the

    transmission network. The choice shall be based on cost, reliability, right-of-

    way requirements, transmission losses, down time (in case of up-gradation

    and re-conductoring options) etc.

    o Addition of new transmission lines/ substations to avoid overloading ofexisting system including adoption of next higher voltage.

    o Application of Series Capacitors, FACTS devices and phase-shiftingtransformers in existing and new transmission systems to increase powertransfer capability.

    o Up-gradation of the existing AC transmission lines to higher voltageusing same right-of-way.

    o Re-conductoring of the existing AC transmission line with higher ampacityconductors.

    o Use of multi-voltage level and multi-circuit transmission lines.o Use of narrow base towers and pole type towers in semi-urban / urban

    areas keeping in view cost and right-of-way optimization.o Use of HVDC transmission – both conventional as well as voltage source

    convertor (VSC) based.o Use of GIS / Hybrid switchgear (for urban, coastal, polluted areas etc)”

    The committee may like to deliberate.

    9.7 Telemetry issues from Maharashtra Stations and POWERGRID StationsTelemetry issues from Maharashtra Stations have been flagged in various WRPC /

    OCC meetings (since Dec’13). There is very close monitoring on Telemetry issues by

    Hon’ble CERC. CERC order vide dt 29.1.16, directs all utilities to up-date telemetry

    status in their system within one month of this order with an advance copy to NLDC,

    respective RLDC and RPC. RLDC have been directed by CERC to monitor the

    implementation of telemetry and in case of any difficulty, the matter has to be

    discussed and sorted out in the RPC meetings. If any entities does not submit the

    information, the concerned RLDC has to file application before the Commission

    against the said entities under Section 142 of the Act. The status of telemetry for all

  • 15

    483rd OCC Agenda

    WR constituents is uploaded in the WRLDC Website. The present status of telemetry

    in Maharashtra is tabulated below:

    Number ofstationswhose

    telemetryshould be

    available atWRLDC

    Number ofstationswhose

    telemetry isnot

    integrated inWR-SCADA

    Number ofstations whose

    telemetry isintermittent /

    unreliable

    % observability ofstations underjurisdiction ofMaharashtraSTU/SLDC

    at WRLDC

    A B C (A – (B+ C)/AGenerating

    Stations 32 0 4** 87.50%765/400 kV

    TransmissionSubstations

    19 2* 4***73.68%

    220 kVTransmissionsubstations

    178 8 5862.92%

    Total 229 10 66 67.25%

    Telemetry not available from *Chandrapur(ii), Lonikhand(II): During the March OCC it

    was informed that it will be made available by end March16. During the April OCC, it

    was informed that telemetry from Chandrapur2 is established upto Kalwa and will be

    extended upto WRLDC shortly and Lonikhand will be made available by April end.

    Present status to be updated by MSETCL.

    ** Jaigarh, Trombay, Koyna, Deepnagar- MSETCL to give status for resolving the

    issue of intermittency.These are important Generating stations .

    *** Bableswar, Khargar, Nagothane, Jejuri- MSETCL to give status for resolving the

    issue of intermittency. These are important Load points

    9.8 Implementation of Revised SPS setting for NEW GRID-SR as advised by NLDCThe envisaged SPS is for security of the interconnected system in case ofcontingencies. The perception of SLDC, MSETCL that 765 kV Solapur-Raichur linesare beneficial only for Southern Region is misplaced. The transmission systemassociated with SR-NEW Grid interconnection have helped in enhancing the reliabilityof East-West corridor within Maharashtra. Maharashtra has been able to meetadditional demand of ~ 4000 MW as compared to past. On several occasions theplanned/emergency outage of HVDC Chandrapur-Padghe could be convenientlyfacilitated due to availability of 765 kV Wardha-Aurangabad Q/C and 765 kVAurangabad-Solapur and 765 kV Solapur-Pune. The lines have rescued Maharashtraand Western Regional System during contingencies by dynamic MW as well as MVARsupport to Southern Maharashtra. During crisis manual picking up of generation atKoyna often gets delayed or constrained due to inadequate availability of water.

  • 16

    483rd OCC Agenda

    Further telemetry from several stations in Maharashtra are not available at WRLDC.Thus it is in the interest of the entire system that pending SPS actions areimplemented by MSETCL / MahaGenco as recommended in the scheme.

    SPSName

    Final Logic SPS Action Status on 25th April 2016

    SPS-5 400kV Wardha - Parli D/C:

    Tripping of any one circuitof 400 kV Wardha - ParliD/C and flow on othercircuit > 750 MW

    - 800MW Gen Back downin WR: Tirora-200 MW,Koradi – 70 MW,Chandrapur – 250 MW,Mauda – 100MW,Khaperkheda– 150 MW,Indiabulls – 30 MW

    - Load Shedding:- 800 MW in SR.- 200-300 MW in Western

    Maharashtra

    - Only Tiroda and Maudawired for SPS action.

    - Wiring of SPS forgeneration backingdown at Koradi,Chandrapur,Khaparkheda andRattan India yet to beimplemented byMaharashtra.

    - Wiring for 200 – 300MW load shedding inWestern Maharashtrayet to be implemented.

    SPS-6 400kV Parli – SholapurD/C:

    Flow on either circuit of400 kV Parli – SholapurD/C crossing 800 MWand remaining abovethis value for 2.5 secondsOrTripping of any one circuitof 400 kV Parli –

    Sholapur D/Cand flow on other circuit

    > 700 MW

    - 800 MW Gen Back downin WR: JPL-150 MW, JPLExtn – 150 MW, KSK –100 MW, LANCO –100MW, DB Power – 100MW, KWPCL – 100 MW,BALCO – 50 MW, NSPCL– 50 MW

    - Load of 800 MW shall beshed in SR.

    - 200-300 MW loadshedding in WesternMaharashtra

    - Wiring of Gen Backdown at all Stationsimplemented

    -- Wiring of SPS for 200-

    300 MW automatic loadshedding inMaharashtra yet to beimplemented.

    During 31st TCC/WRPC meeting it was advised to Maharashtra to explore their stand

    on non participation in SPS 5 & 6 to NLDC who have formulated the scheme.

    Maharashtra may either implement the SPS or convince NLDC about their action plan

    during emergency situation of SPS 5 & 6.

    Maharashtra SLDC may explain their stand.

    9.9 Frequency Response Characteristic of Generators in WRDuring 478th OCCM (Dec-15,Tarapur), The FRC of the major generating stations (500

    MW and above was reviewed during 478th, 479th, 480th, 481st and 482nd OCC

    meetings. FRC of following events have already been analzed.

  • 17

    483rd OCC Agenda

    Event Date Time Frequency ChangeDesirable

    actions

    1 26 Oct 1514:41

    Hrs

    0.27 Hz Rise : 50.02 to

    50.29Gen reduction

    2 21 Feb 1616:46

    Hrs

    0.16 Hz Rise : 49.96 to

    50.12Gen reduction

    3 06 Mar 1606:47

    Hrs

    0.16 Hz Dip: 50.02 to

    49.86Gen pick up

    4 14 Mar 1601:36

    Hrs

    0.17 Hz Dip: 50.00 to

    49.83Gen pick up

    Subsequently two more events have been captured

    5 14 Apr 1613:29

    Hrs

    0.13 Hz Dip: 49.90 to

    49.77Gen pick up

    6 17 Apr 1601:09

    Hrs

    0.21 Hz Dip : 49.98 to

    49.77Gen pick up

    Analysis of the events are tabulated below:

    Station Remarks

    Event-5 Frequency Response was observed from VSTPS-II, VSTPS-IV, VSTPS-V, Sipat-I, Korba-II, Mouda, CGPL, KSK and JPL.

    NTPC Korba and NTPC Sipat have stage wise response of the event inexcel sheet.NTPC Mouda sent screenshot of the DAS at the station.

    CGPL had forwarded the frequency vs MW data of 1 second resolution forunit 10, 20, 30 and 40. It is observed that the units are responding to thefrequency change, though the initial delay in response needs to beaddressed. It is understood that the units were operating in turbine followmode.

    Response of VSTPS-III could not be analysed as SCADA data was notavailable from the station. Response of MB Power was not analysed as thegeneration was NIL.Sipat-II generation was ramping down, while JP Nigrie units had tripped atthat time.Sasan, APML, DB Power showed negative response i.e. generation

  • 18

    483rd OCC Agenda

    reduced instead of increasing. Sasan, APML and DB Power examine thesettings at their station and ensure compliance to provisions of the IEGC.

    No response was visible from APL-II, APML Tirora and KWPCL. TheseStations have to send the frequency vs MW data (1 second interval) for theevent in Excel sheet to assess their response.

    Event-6 Frequency Response observed from CGPL (with 3 min delay), KSK, JPNigrie and Mouda.No response observed at Sasan and JPL Tamnar. Negative responseseen at KWPCL. These stations to examine the settings and ensurecompliance to provisions of the IEGC.Response of VSTPS-II, III, IV, V, Sipat-I & II, Korba-II & III, APL-II & III,APML could not be analysed due to non-availability of telemetry from thesestations at the instant of the event.

    Out of the six events analysed four events were of frequency dip. Under these events

    generators were expected to pick up generation up to 105% of their Maximum

    Continuous Rating. Vide CERC order dated 23.10.2015 in petition no. 302/MP/2013

    dated in the matter of RGMO or FGMO with manual intervention (MI), CERC

    mandated as under:

    Quote

    “22. On the issue of keeping margins while scheduling of the units, we are of the view

    that the units should not be scheduled by RLDCs/SLDCs beyond ex-bus generation

    corresponding to 100% of the Installed Capacity. Further, units should not be allowed

    to operate with their valves wide open. This would ensure adequate primary response

    by opening of the valve to the fullest.”

    “33. With regard to the prayer of the petitioner to direct the generators to seek

    approval of the Commission whenever the expected duration of outage of

    RGMO/FGMO feature exceeds more than a week due to technical/operational

    limitations, the Commission is of the view that requests for outage of RGMO/FGMO

    with MI based on valid technical reasons, shall be dealt at SLDC/RLDC level. In case

    of any dispute/difficulty, the matter should be resolved at RPC level at first instance.”

    Unquote

    In view of the above CERC order and IEGC provisions all generating stations need to

    keep the RGMO or FGMO with manual intervention in service at all time. The upper

  • 19

    483rd OCC Agenda

    load limiter may be set at units to pick up generation upto 105% of MCR for short

    duration.

    9.10 Implementation of Scheduling softwareA detailed workshop cum interactive session with all stakeholders was held at WRLDC

    on 17th and 18th March16, wherein the detailed presentation of the software features,

    associated issues and concerns were deliberated . Hands on training was also given.

    The software was launched for Mock Trial on 21.03.2016. The progress of activities is

    as under:

    Activity Responsibility Status/RemarkSubmission of DC All regional Entity

    Generating StationsNow all stations includingAtomic Power Stationsare filling the data

    Submission of requisition All regional entityStates/beneficiaries

    All except Maharashtra,GOA, DD, DNH are fillingthe data.

    Preparation of RPCreports

    WRLDC Completed and trialcompleted. Sample file for7 days to be generated.

    All regional entity constituents are requested to participate in the mock trial so that the

    software could be launched as soon as possible.

    9.11 Availability of Real time data involving old RTU / Communication equipment

    DGM, WRLDC informed that availability of real time data is very critical now consideringthe complex nature of grid operation, renewable penetration and introduction of Ancillaryservice. Also Hon'ble CERC has directed all users vide order dt 26.9.2012 on petition no194/MP/2011 to ensure availability of reliable real time data at WRLDC as under.Quote

    We also observe that many State Transmission Utilities, State Power Departments /Electricity Departments have not responded to our directions to submit a clear cutaction plan for the establishment of the communication system for the existingsystem and the time schedule for completion includingthe provisioning for integration of new generating stations and the sub-stationscoming in future.Un quote

    During the 19th SCADA/EMS meeting held on 27th April 2016 at Bhopal, it was emergedthat part of data interruption is due to technological obsolescence and old equipments inoperation. Some of the ULDC equipments (RTUs & communication equipments) have

  • 20

    483rd OCC Agenda

    been commissioned during 2003-05 and are rendered obsolete, more-so, due to non-availability of spares & maintenance agencies. After detailed discussion, membersdiscussed on the subject and it emerged that a committee comprising members fromWRPC, WRLDC, Maharastra, Gujarat, MP, Chhatishgarh, PGCIL & ISGS would beformed for assessment of current status of these equipment and suggest for replacement/ up gradation. It has also been agreed that WRPC/WRLDC would coordinate for thecommittee formation and assessment & recommendation. The committeerecommendation would be taken up in WRPC forum for implementation.

    The Sub- Committee may like to discuss/note the same.

    ITEM NO. 10: DATE AND VENUE OF NEXT OCC MEETING

    482nd OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure-10.

    As per roster 483rd OCC meeting will be held on 12th May 2016 hosted by M B Power.

    The 484th OCC meeting would be hosted by GMR Chhattisgarh. The tentative date for the

    meeting is 14th & 15th June 2016. GMR Chhattisgarh may confirm the same.

    *****************************

  • Anaulagnak 2.1

    maah Ap`Ola 2016

    1. INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

    1.1 MAXIMUM FREQUENCY 50.11 Hz. BETWEEN 1300 Hrs & 1400 Hrs Hrs. ON 21.04.2016

    AiQaktma AavaRi%t

    1.2 MINIMUM FREQUENCY 49.80 Hz. BETWEEN 1400 Hrs & 1500 Hrs Hrs. ON 26.04.2016

    nyaUnatma AavaRi%t

    1.3 AVERAGE FREQUENCY 49.98 Hz.

    AaOsat AavaRi%t

    2. INSTANTANEOUS ta%kailak

    2.1 MAXIMUM FREQUENCY 50.32 Hz. AT 18:02:20 Hrs. ON 01.04.2016

    AiQaktma AavaRi%t

    2.2 MINIMUM FREQUENCY 49.64 Hz. AT 12:18:00 hrs Hrs. ON 26.04.2016

    nyaUnatma AavaRi%t

    3. %AGE OF TIME WHEN FREQUENCY WAS APRIL 2016 MARCH 2016 FEBRUARY 2016

    AavaRi%t ka samaya p`itSat maoM

    3.1 BELOW 48.5 Hz. 0.00 0.00 0.00

    48.5 hT\ja ko naIcao3.2 BETWEEN 48.5 Hz. AND 48.8 Hz. 0.00 0.00 0.00

    48.5 hT\ja AaOr 48.8 hT\ja ko baIca3.3 BETWEEN 48.8 Hz. AND 49.2 Hz. 0.00 0.00 0.00

    48.8 hT\ja AaOr 49.2 hT\ja ko baIca3.4 BETWEEN 49.2 Hz. AND 49.5 Hz. 0.00 0.00 0.00

    49.2 hT\ja AaOr 49.5 hT\ja ko baIca3.5 BETWEEN 49.5 Hz. AND 49.7 Hz. 0.16 0.10 0.10

    49.5 hT\ja AaOr 49.7 hT\ja ko baIca3.6 BETWEEN 49.7 Hz. AND 49.9 Hz. 12.91 8.59 5.52

    49.7 hT\ja AaOr 50.2 hT\ja ko baIca3.7 BETWEEN 49.9 Hz. AND 50.05 Hz. 69.94 70.02 70.49

    49.9 hT\ja AaOr 50.05 hT\ja ko baIca3.8 BETWEEN 50.05 Hz. AND 51.5 Hz. 16.98 21.29 23.89

    50.05 hT\ja AaOr 51.5 hT\ja ko baIca3.9 ABOVE 51.5 Hz. 0.00 0.00 0.00

    51.5 hT\ja ko }pr

    4.1 NO. OF TIMES FREQUENCY 0 0 0

    TOUCHED 48.80 Hz. AavaRi%t 48.80 hT\ja kao CUhI

    4.2 NO. OF TIMES FREQUENCY 0 0 0

    TOUCHED 48.60 Hz. AavaRi%t 48.60 hT\ja kao CUhI

    4.3 NO. OF TIMES FREQUENCY 0 0 0

    TOUCHED 51.00 Hz. AavaRi%t 51.00 hT\ja kao CUhI

    maoM AavaRi%t ko AaMkD,aoM ka ivavarNa

    FREQUENCY PARTICULARS DURING APRIL 2016

    (AS PER FREQUENCY REPORT OF WRLDC)

    (piScama xao~ Baar p`oYaNa kond` kI AavaRi%t irpaoT- ko AaQaar pr)

  • 2016 Voltage Profile during the month of Apr. 2016

    Date

    Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min1 416 398 429 407 415 396 424 410 405 390 420 410 416 407 417 4042 415 397 427 409 413 396 423 411 421 405 424 390 425 408 415 4053 415 402 427 410 413 399 423 410 421 408 423 410 425 416 415 4064 413 401 426 409 414 402 421 412 420 408 413 404 422 415 413 4045 414 399 427 409 416 401 419 411 423 405 414 403 422 413 417 4046 414 400 427 411 417 403 423 409 421 407 411 404 419 413 413 4047 415 400 426 410 414 399 425 410 409 392 413 405 414 405 421 4148 414 400 428 407 413 397 427 406 408 394 411 403 411 403 419 4049 411 396 426 409 411 397 427 408 409 389 413 403 414 405 416 405

    10 413 400 428 412 413 399 430 413 409 389 414 408 414 408 420 40511 414 398 425 409 411 397 422 409 422 406 411 403 418 411 410 40212 414 398 421 421 412 398 422 405 423 406 412 403 417 412 411 40213 412 398 427 413 412 399 420 405 423 407 412 404 417 412 411 403

    ANNEXURE 2.3

    रायगढ़ Raigarh Bhilai400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV

    भोपाल Bhopal खंडवा Khandwa इटारसी Itarsi दमोह Damoh नागदा Nagda रायपुर Raipur

    12 414 398 421 421 412 398 422 405 423 406 412 403 417 412 411 40213 412 398 427 413 412 399 420 405 423 407 412 404 417 412 411 40314 412 396 424 406 411 395 421 405 422 402 410 403 416 410 409 40115 417 397 430 407 415 396 423 406 424 406 410 403 418 412 411 40116 418 398 429 409 412 397 425 406 424 406 412 403 419 410 409 40217 415 396 430 409 416 396 425 405 423 404 416 405 419 412 414 40418 410 396 426 404 408 394 422 407 418 399 412 402 418 411 410 40119 410 394 423 406 408 392 420 400 418 399 409 401 416 410 408 40120 414 397 424 408 411 395 420 404 420 403 409 401 416 411 408 40121 415 399 426 407 413 397 423 406 420 402 412 404 419 412 412 40222 416 401 427 404 415 398 423 409 423 405 413 404 419 412 413 40423 414 399 424 410 412 399 421 407 421 407 412 404 418 411 412 40324 417 402 428 412 417 400 427 409 424 409 415 405 420 412 415 40525 411 399 424 409 410 395 421 409 419 403 412 404 418 411 412 40526 413 400 424 409 411 398 420 407 419 405 412 403 418 410 412 40327 413 401 425 411 411 400 423 409 420 410 413 406 417 411 413 40628 416 402 428 413 414 399 424 410 424 407 416 404 419 411 416 40429 415 400 426 410 413 398 423 408 422 406 415 404 420 412 414 40530 414 400 427 409 411 397 423 409 422 404 416 407 423 416 416 407

    418 394 430 404 417 392 430 400 424 389 424 390 425 403 421 401

  • Date

    Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min1 433 414 429 415 429 394 417 401 426 407 419 402 413 401 423 4112 423 410 432 406 431 400 419 396 126 401 415 398 412 390 422 4083 423 406 432 404 431 400 419 401 426 405 415 402 412 400 423 4124 421 406 423 399 420 399 417 395 424 399 415 401 412 401 422 4145 419 406 427 403 428 395 417 396 425 400 417 398 413 401 422 4126 421 406 412 412 430 395 416 393 404 404 417 399 416 400 424 4127 433 416 427 403 430 395 411 390 424 395 414 399 424 408 420 4098 432 414 430 398 427 395 413 389 421 396 413 398 423 408 420 4099 431 414 428 405 429 400 421 399 426 402 414 400 426 413 420 409

    10 432 417 431 407 429 404 415 399 426 407 415 402 425 414 420 40911 420 405 419 400 425 398 417 396 394 392 416 400 425 412 421 40912 421 410 423 404 425 401 416 398 425 395 415 403 425 412 420 410

    देहगाम Dehgam कासोर Kasor400kV 400kV 400kV 400kV 400kV 400kV 400kV 400kV

    Wardha धुले Dhule Parli बोईसर Boisar कलवा Kalwa असोज Asoj

    12 421 410 423 404 425 401 416 398 425 395 415 403 425 412 420 41013 421 407 420 400 425 394 418 395 424 397 415 400 425 411 422 40914 419 406 418 396 423 395 417 395 424 397 414 395 425 412 421 41015 422 406 421 399 425 395 417 400 422 401 414 398 424 413 422 41016 423 406 422 398 429 399 417 402 424 407 415 398 422 412 425 40817 424 410 424 404 430 404 420 406 424 393 415 401 427 415 423 41118 419 406 420 395 423 391 418 393 420 395 412 393 425 410 421 40819 417 405 415 399 417 393 414 393 421 397 412 397 424 410 419 40820 418 405 415 397 418 396 416 397 425 399 414 397 425 400 421 40821 422 408 418 405 421 397 419 398 423 409 412 396 423 410 419 40822 422 406 424 399 424 404 419 403 425 399 415 399 426 411 423 41123 423 408 421 402 428 397 420 400 425 405 414 398 425 411 423 41024 425 409 423 402 429 399 420 404 426 399 416 402 425 412 423 41325 423 408 422 401 424 397 421 399 422 400 413 397 425 411 422 41126 420 409 421 401 424 401 418 399 410 392 413 400 423 413 422 41127 422 413 420 402 425 403 419 402 412 395 413 401 423 411 422 41128 422 409 420 401 428 401 423 400 415 394 416 400 426 410 424 41029 419 409 419 401 425 402 420 407 414 397 414 399 425 411 421 41030 424 408 423 397 427 396 416 399 407 389 413 395 423 410 422 409

    433 405 432 395 431 391 423 389 426 389 419 393 427 390 425 408433 405 432 395 431 391 423 389 426 389 419 393 427 390 425 408

  • Date

    Max Min Max Min Max Min Max Min Max Min Max Min Max Min Max Min1 415 402 417 404 417 401 766 760 781 760 786 764 780 751 784 7462 413 401 418 407 415 388 765 753 788 751 802 771 782 756 779 7413 413 402 418 406 415 394 765 753 788 765 803 759 782 761 779 7474 411 401 416 407 414 391 765 753 783 770 795 757 780 758 776 7455 414 403 417 407 414 390 765 754 783 755 799 760 781 755 780 7496 415 401 417 408 411 390 767 755 788 762 797 762 785 757 782 7517 415 401 421 414 411 390 767 755 787 762 797 762 785 757 783 7518 414 403 419 404 413 389 770 754 787 762 795 757 782 761 780 7479 414 404 416 405 421 399 770 758 786 760 797 765 780 752 780 747

    10 414 404 420 405 415 399 772 761 791 768 804 776 784 758 777 75111 413 404 417 409 415 395 769 759 785 760 799 764 781 758 785 747

    बीना Bina इंदौर Indore400kV 400kV 400kV 765kV 765kV 765kV 765kV 765kV

    जेतपुर Jetpur Amreli वापी Vapi सीपत Sipat Seoni Wardha

    11 413 404 417 409 415 395 769 759 785 760 799 764 781 758 785 74712 414 403 418 408 413 393 770 760 784 767 799 774 784 755 782 74413 413 406 418 406 414 392 769 759 786 764 801 768 784 749 779 74414 411 403 413 406 413 390 767 756 785 756 794 760 784 753 775 74315 413 405 415 408 413 395 771 758 789 761 799 765 786 753 788 74616 414 405 417 409 416 399 767 756 792 758 804 765 786 750 785 74217 414 406 416 408 419 402 759 759 795 765 806 768 795 754 779 73618 416 405 416 408 416 391 770 754 786 758 795 765 785 755 779 73219 415 406 416 408 412 391 765 751 780 751 788 756 783 749 778 73520 414 407 416 410 413 393 765 754 781 758 795 758 784 748 782 74221 415 406 417 410 417 395 768 755 787 762 801 773 788 753 783 74222 415 407 417 409 417 398 769 755 793 759 805 763 790 756 785 74723 414 405 417 407 417 397 766 754 788 763 803 768 785 752 775 75024 414 405 416 408 417 400 770 755 785 767 806 771 794 756 785 74625 414 403 418 408 418 396 765 754 785 766 801 768 784 755 771 73726 415 406 417 408 416 396 765 754 786 763 798 765 784 751 776 74427 415 406 416 409 416 397 766 756 786 766 800 775 782 752 774 74628 414 405 416 374 419 395 768 752 791 762 803 771 783 757 781 75029 414 404 418 406 416 400 767 755 784 761 795 765 782 753 778 74130 413 404 417 405 411 393 770 757 790 761 804 765 782 758 778 73830 413 404 417 405 411 393 770 757 790 761 804 765 782 758 778 738

    416 401 421 374 421 388 772 751 795 751 806 756 795 748 788 732

  • Date

    Max Min Max Min Max Min Max Min Max Min1 769 758 774 754 811 792 809 790 817 7892 769 758 774 759 809 795 809 794 804 7863 769 751 774 760 809 789 809 788 804 7764 769 761 776 760 801 787 801 786 795 7765 770 760 779 755 801 780 800 777 792 7746 770 761 779 758 792 780 791 779 886 7767 771 758 779 758 795 780 792 779 786 7768 769 760 775 760 790 778 788 777 785 7769 769 755 776 754 795 778 794 777 786 775

    10 768 758 777 758 794 778 793 780 793 77511 770 760 777 758 789 778 794 776 785 77412 772 760 780 757 790 779 789 778 783 774

    765kV 765kV 765kV 765kV 765kV

    सासन Sasan सतना Satna तमनार Tamnar कोटरा Kotra Durg

    12 772 760 780 757 790 779 789 778 783 77413 770 755 780 750 789 777 788 776 783 77414 774 757 782 753 787 773 786 772 783 76415 769 758 775 757 792 778 791 778 791 77316 772 734 781 755 793 775 793 775 791 76317 776 758 787 753 794 779 794 778 790 77118 768 758 773 749 791 778 791 776 787 77419 768 756 774 749 786 773 785 772 777 76820 769 756 778 751 786 776 785 774 777 76821 770 756 781 751 791 778 790 776 786 77322 775 760 785 752 793 777 792 776 792 77423 770 756 777 751 791 777 790 775 783 77424 776 756 785 755 788 778 787 777 792 77425 771 757 777 755 790 777 789 775 783 76426 766 757 777 749 789 776 789 774 784 77427 771 751 775 752 789 778 789 777 789 77028 769 758 775 756 792 776 791 776 785 76629 769 758 775 751 795 776 794 775 787 77530 768 757 776 755 801 787 801 755 796 777

    776 734 787 749 811 773 809 755 886 763776 734 787 749 811 773 809 755 886 763

  • No. ofOccasions

    Max Load Reliefat 49.2 Hz

    No. ofOccasions

    Max Load Reliefat 49.2 Hz

    No. ofOccasions

    Max Load Reliefat 49.2 Hz

    No. ofOccasions

    Max Load Reliefat 49.2 Hz

    1 01-Mar-16 0 0 0 0 0 0 0 02 02-Mar-16 0 0 0 0 0 0 0 03 03-Mar-16 0 0 0 0 0 0 0 04 04-Mar-16 0 0 0 0 0 0 0 05 05-Mar-16 0 0 0 0 0 0 0 06 06-Mar-167 07-Mar-168 08-Mar-16 0 0 0 0 0 0 0 09 09-Mar-16 0 0 0 0 0 0 0 0

    10 10-Mar-16 0 0 0 0 0 0 0 011 11-Mar-16 0 0 0 0 0 0 0 012 12-Mar-16 0 0 0 0 0 0 0 013 13-Mar-16 0 0 0 0 0 0 0 014 14-Mar-16 0 0 0 0 0 0 0 015 15-Mar-16 0 0 0 0 0 0 0 016 16-Mar-16 0 0 0 0 0 0 0 017 17-Mar-16 0 0 0 0 0 0 0 018 18-Mar-16 0 0 0 0 0 0 019 19-Mar-16 NIL 0 NIL NIL NIL 020 20-Mar-16 0 0 0 0 0 0 0 021 21-Mar-16 0 0 0 0 0 0 0 022 22-Mar-16 0 0 0 0 0 0 0 023 23-Mar-16 0 0 0 0 0 0 0 024 24-Mar-16 0 0 0 0 0 0 0 025 25-Mar-16 0 0 0 0 0 0 0 026 26-Mar-16 0 0 0 0 0 0 0 027 27-Mar-16 0 0 0 0 0 0 0 028 28-Mar-16 0 0 0 0 0 0 0 029 29-Mar-16 0 0 0 0 0 0 0 030 30-Mar-16 0 0 0 0 0 0 0 031 31-Mar-16 0 0 0 0 0 0 0 0

    1025 91 490 851Recommonded Load relief at49.2 Hz / 49.0/48.8/48.6 Hz

    Gujarat Maharashtra

    ANNEX -2.4

    DateSl. No Madhya Pradesh( Compiled from the data received from the constituents)

    Chhattisgarh

    Under Frequency Operation in various Constituent System of Western Region during the month MARCH- 2016

  • ANNEXURE – 2.5

    Power Cut/Restrictions in Western Region for the month of April-2016

    k : gaujarat Gujarat

    1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM1 Power Cut/ Restriction on Industriesa) All industries are allowed to run their units on all days of week & if they want to avail staggered holiday,

    then they will have to staggered on notified day only & cannot avail as per their choice.b) All industries are required to keep their recess timings staggered.

    2 kRiYa va gaàmaINa xao~aoM kao ivaVut AapUit-2. Power supply to Agricultural & Rural Sectors

    a) Only 8 Hrs. Power supply in staggered form in rotation of day & night is given to Ag. Single Phasesupply during rest of 16 Hrs by providing LSTC.

    b) Jyotigram Yojana 24 hrs.

    3 Anya jaanakarI3. Any other information: NIL.K : maQya p`doSa Madhya Pradesh

    1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid1 Power Cut/ Restriction on Industries, Load Shedding in the state etc

    ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

    power cut (MW)

    pabandI ka samayaRestriction Timing

    p`it idna kula }jaa- kTaOtITotal Energy Cut

    (MUs /daysao From tk To(a) Power Restrictions(Eveningpeak Hour) on non continuous

    process HT/LT Industries M(b) Baar inayamana Load Shedding

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    SaUnya Nil

    (c) Anya jaanakarI Other information1.Weekly Off2.Staggering of power supply

    SaUnya NilSaUnya Nil

    SaUnya NilSaUnya Nil

    SaUnya NilSaUnya Nil

    SaUnya NilSaUnya Nil

    2 kRiYa xao~ kao ivaVut AapUit-2. Power supply to Agricultural Sector: -

    ivavarNa Details sao FromidnaaMk Date

    tk ToidnaaMk Date

    p`it idna AapUit- GaMTo Supply Hours per dayMax. (Hrs) Min. (Hrs) Average (Hrs)

    2.1 Three-PhaseSupply(DLF)

    01.04.2016 30.04.2016 23:41 23:25 23:33

    2.1 Three-PhaseSupply(Irrigation)

    01.04.2016 30.04.2016 09:54 09:47 09:51

    2.1 Three-PhaseSupply(Mixed)

    01.04.2016 30.04.2016 23:32 23:14 23:25

  • 3 Anya jaanakarI3. Any other information

    SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban AreasivavarNa Details sao From

    idnaaMk Datetk To idnaaMk

    DateAaosat p`itidna Average SupplyAapUit- GaMTo Hours per day

    Max.(Hrs)

    Min. (Hrs) Average (Hrs)

    3.1 Commissionary H. Qtrs. 01.04.2016 30.04.2016 23:52 23:41 23:473.2 District Head Qtrs. 01.04.2016 30.04.2016 23:56 23:39 23:513.3 Tehsil Head Qtrs. 01.04.2016 30.04.2016 23:50 23:34 23:44

    ga : maharaYT/ Maharashtra1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid1. Power Cut/ Restriction on Industries, Load Shedding in the state etc

    ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

    power cut (MW)

    pabandI ka samayaRestriction Timing

    pìt idna kula }jaa- kTaOtITotal Energy Cut

    (MUs /dayFrom To

    (a) Power Cuts/Restriction on HT/LT Industries(b) Load SheddingFrom 01.04.16 to 30.04.16

    SaUnya Nil

    @ 0-536 MW

    SaUnya Nil

    00.00

    SaUnya Nil

    24.00

    SaUnya Nil

    @ 0.118 MUs/day

    (c) Any other information1.Weekly Off2. Staggering of power supplyIndustrial Staggering LSwithdrawn from 03/02/2012

    SaUnya Nil SaUnya Nil SaUnya Nil SaUnya Nil

    2 kRiYa xao~ kao ivaVut AapUit-2. Power supply to Agricultural Sector

    ivavarNa Details sao FromidnaaMk Date

    tk ToidnaaMk Date

    p`it idna AapUit- GaMTo Supply Hours per day

    Max. (Hrs) Min. (Hrs) Average (Hrs)2.1 Three-Phase Supply 01.04.2016 30.04.2016 10:00 08:00 09:00

    2.2 Single-Phase Supply 01.04.2016 30.04.2016 18:00 18:00 18:003 Anya jaanakarI Any other information:There is no load shedding on industrial feeders in Maharashtra

  • Ga : C%tIsagaZ, Chhattisgarh:1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM / pabMaidyaaM , rajya maoM Baar inayamana Aaid1 Power Cut/ Restriction on Industries, Load Shedding in the state etc

    ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

    pabandI ka samayaRestriction Time

    p`it idna kula}jaa- kTaOtI

    TotalEnergy Cut(MUs /day)

    sao From tkTo

    (A) Scheduled(a) (i) Power Cuts/Restriction on HT Industries(ii) Power Cuts/Restrictionon LT Industries(iii) Power Cuts/Restrictionon Rural(iv) Agriculture pump*

    (v)Urban/ Sub-Urban(iv)Town feeders(C-1to C-6)

    (B) Un-Scheduled(a) Load Shedding

    00.00(Av)

    00.00(Av)

    00.00 (Av)00.00 (Av)00.00(Av)00.00 (Av)

    1.Rural 88.34 MW(Av) For 25.16 Hrs.2.Town Feeders (C-1to C-6 & X) : 0.00(Av)

    -

    -

    -00.00

    --

    -

    -

    -

    -00.00

    --

    -

    -

    -

    -

    -0.00

    --

    0.0.073

    -

    3. Industries 81.55 (Av) For 128.29 Hrs.0.28

    Total Energy Cut/day 0.353( b) Any other information1.Weekly Off/staggering ofpower supply

    1day (In a week as perconsumer’s option) 50MW(Av.) - - -

    2 kRiYa xao~ kao ivaVut AapUit-2. Power supply to Agricultural Sector

    ivavarNa Details sao FromidnaaMk Date

    tk ToidnaaMk Date

    p`it idna AapUit- GaMTo Supply Hours per dayMax. (Hrs) Min. (Hrs) Average (Hrs)

    2.1 Three-Phase Supply 01.04.2016 to 30.04.2016, 6.00Hrs (Power cut)

    18.00

    2.2 Single-Phase Supply - - - - -2.3 Remarks/Note/ - - - - -

    3 Anya jaanakarI / Any other information: SaUnya Nilca : gaaovaa Goa: SaUnya Nil

  • Annex-2.6

    ( )

    ,Power System Operation Corporation Ltd.(A wholly owned subsidiary company of POWERGRID)

    Western Regional Load Despatch Centre,Mumbai

    2016Details of forced unit outages during the month of April 2016

    अनु

    Sl.No

    Unitसंघटक

    Constituent/IPP

    मतामेगावॉटCap.MW

    सoFrom

    समय

    सoFrom

    समय

    कारणReason

    Time Date Date

    1. ESSAR-2 GSECL 172 12:12 22-02-2013 Still out Still out No Schedule

    2. GTPS-2 GSECL 120 20:20 22-10-2014 01:30 09-04-2016 RSD

    3. GTPS-2 GSECL 120 01:30 09-04-2016 Still out Still out Long restoration period

    4. GTPS-1 GSECL 120 5:36 22-10-2014 01:30 09-04-2016 RSD /After attending flamefailure

    5. GTPS-1 GSECL 120 01:30 09-04-2016 Still out Still out Long restoration period

    6. उकाई Ukai-2 GSECL 120 15:02 10-11-2014 16:00 09-04-2016 RSD7. Pipavav 1 GSECL 350 00:00 03-04-2015 Still out Still out RSD

    8. उकई Ukai 1 GSECL 120 06:15 17-09-2015 06:24 09-04-2016 BTL9. STPS 1 GSECL 120 11:00 19-09-2015 10:50 09-04-2016 RSD

    10. GTPS 3 GSECL 210 08:30 11-12-2015 00:00 03-04-2016 RSD

    11. सूजन SUGEN 3 GSECL 382 11:54 22-12-2015 00:10 08-04-2016 RSD

    12. STPS 4 GSECL 250 11:37 14-01-2016 05:37 11-04-2016Header pressurelow/RSD since 05:15hrson 01-02-2016

    13. STPS 2 GSECL 120 08:05 28-02-2016 16:30 09-04-2016 RSD

    14. जीपीपीसी GPPC 2 GSECL 351 12:03 28-02-2016 10:50 13-04-2016Cooling Water SystemProblem; RSD since13:34HRS/13-03-2016

    15. Wanakbori 3 GSECL 210 18:43 14-03-2016 03:18 08-04-2016 RSD

    16. जीआईपीसीएलGIPCL STG 2

    GSECL 165 13:30 31-03-2016 07:50 09-04-2016 RSD

    17. उतरण Utran STG II 1 GSECL 375 23:47 31-03-2016 04:10 07-04-2016 RSD18. जीपेक GPEC 1 GSECL 218 04:47 01-04-2016 22:51 06-04-2016 RSD19. जीपेक GPEC 3 GSECL 218 05:57 01-04-2016 22:53 09-04-2016 RSD20. जीपेक GPEC 2 GSECL 218 11:54 01-04-2016 22:29 06-04-2016 RSD21. डीजीबीपी DGBP 2 GSECL 112 03:29 05-04-2016 11:16 09-04-2016 RSD22. सूजन SUGEN 1 GSECL 138 23:26 05-04-2016 Still out Still out RSD23. उकई Ukai 6 GSECL 500 21:28 06-04-2016 Still out Still out GT protection operated24. Wanakbori 3 GSECL 210 03:27 08-04-2016 09:10 19-04-2016 Governor System Problem

  • 25. एसएलपीपी SLPP 3 GSECL 125 15:01 08-04-2016 09:25 11-04-2016 BTL26. उकई Ukai 2 GSECL 120 16:00 09-04-2016 Still out Still out Long restoration period27. जीपेक GPEC 3 GSECL 218 00:35 10-04-2016 20:32 18-04-2016 RSD28. उतरण UTRAN STG II 1 GSECL 375 21:42 10-04-2016 08:14 13-04-2016 Non availability of gas29. उकई Ukai 1 GSECL 120 06:10 13-04-2016 08:35 29-04-2016 BTL30. जीपेक GPEC 1 GSECL 218 16:23 13-04-2016 Still out Still out RSD Costly Generation31. डीजीबीपी DGBP 2 GSECL 112 17:34 13-04-2016 09:02 18-04-2016 RSD Costly Generation32. जीपीपीसी GPEC 2 GSECL 218 18:54 13-04-2016 08:40 18-04-2016 RSD Costly Generation33. जीपीपीसी GPPC 2 GSECL 351 18:56 13-04-2016 15:09 19-04-2016 RSD34. जीआईपीसीएल GIPCL

    STG 2GSECL 165 22:57 13-04-2016 19:54 18-04-2016 RSD Costly Generation

    35. डीजीबीपी DGBP 1 GSECL 107 14:00 18-04-2016 09:05 22-04-2016 GT HRSG Below damage36. जीपेक GPEC 3 GSECL 218 15:22 19-04-2016 05:03 25-04-2016 RSD37. जीपेक GPEC 2 GSECL 218 15:41 19-04-2016 Still out Still out RSD38. डीजीबीपी DGBP 2 GSECL 112 02:38 21-04-2016 06:25 24-04-2016 RSD39. एसएलपीपी SLPP 2 GSECL 125 11:46 23-04-2016 12:24 16-04-2016 BTL40. उकई Ukai 5 GSECL 210 11:27 24-04-2016 07:03 28-04-2016 Turbine Problem41. डीजीबीपी DGBP 1 GSECL 107 07:42 27-04-2016 Still out Still out Cooling fan problem42. जीपेक GPEC 3 GSECL 218 09:31 27-04-2016 05:04 03-05-2016 RSD43. एसएलपीपी SLPP 4 GSECL 125 13:04 28-04-2016 02:47 01-05-2016 BTL44. Pipavav 2 GSECL 350 00:30 29-04-2016 Still out Still out RSD

    45. जीआईपीसीएल GIPCLSTG 2

    GSECL 165 19:24 30-04-2016 Still out Still out RSD

    46.Chandrapur-1

    MAHAGENCO 210 7:15 28-08-2014 Still out Still out BTL/ economic shutdown.

    47. Parli 6 MAHAGENCO 250 15:07 25-06-2015 Still out Still out Water shortage

    48. कोराडी Koradi-6 MAHAGENCO 210 01:02 20-03-2015 Still out Still out Economic shutdown49. Parli-3 MAHAGENCO 210 12:52 14.06.2015 Still out Still out Water shortage

    50. Parli 4 MAHAGENCO 210 19:47 05-07-2015 Still out Still out Water shortage

    51. Parli 5 MAHAGENCO 210 14:55 06-07-2015 Still out Still out Water shortage.

    52. Parli 7 MAHAGENCO 250 12:07 08-07-2015 Still out Still out Water shortage

    53. Chandrapur 2 MAHAGENCO 210 04:42 12-01-2016 Still out Still out BTL

    54. WPCL 1 MAHAGENCO 135 17:03 16-02-2016 Still out Still out Low Schedule

    55. कोराडी Koradi 5 MAHAGENCO 200 11:21 18-02-2016 Still out Still out Less schedule56. WPCL 2 MAHAGENCO 135 21:46 29-02-2016 Still out Still out

    Change over against unit-3 as per scheduleddispatch

    57. कोराडी Koradi 7 MAHAGENCO 200 23:55 01-03-2016 Still out Still out RSD58. Chandrapur 6 MAHAGENCO 500 10:15 05-03-2016 02:00 18-04-2016 Turbine Shaft VibrationHigh

    59. कोराडी Koradi -8 MAHAGENCO 660 12:30 10-03-2016 14:13 12-04-2016 Ash evacuation problem60. डहाणु Dahanu II MAHAGENCO 250 08:39 18-03-2016 15:26 26-04-2016 stator earth fault

  • 61. उरण Uran 6 MAHAGENCO 108 00:14 01-04-2016 06:50 08-04-2016 Gas shortage62. उरण Uran 8 MAHAGENCO 108 08:40 08-04-2016 12:14 23-04-2016 Gas Shortage63. Chandrapur 4 MAHAGENCO 210 01:28 12-04-2016 06:10 15-04-2016 BTL

    64. कोराडी Koradi-8 MAHAGENCO 660 20:48 14-04-2016 02:23 17-04-2016 Generator differentialprotection operated.65. NASIK -3 MAHAGENCO 210 00:01 15-04-2016 04:15 19-04-2016 Less Schedule

    66. कोराडी Koradi-8 MAHAGENCO 660 02:38 23-04-2016 20:16 29-04-2016 CW pump work67. उरण Uran- 7 MAHAGENCO 108 15:11 23-04-2016 11:44 02-05-2016 Interchanged with unit 868. भुसावल Bhusawal 3 MAHAGENCO 210 11:13 24-04-2016 06:20 29-04-2016 BTL69. जयगढ़ Jaigad -1 MAHAGENCO 300 09:43 22-04-2016 16:19 30-04-2016 Air pre-heater problem70. खापरखेड़ा

    Khaparkheda 5MAHAGENCO 500 04:06 26-04-2016 22:32 29-04-2016 furnace draft high

    71. Chandrapur 7 MAHAGENCO 500 20:36 28-04-2016 20:50 02-05-2016 BTL

    72. आरजीपीपीएलRGPPL-1B

    RGPPL 320 23:00 31-03-2014 Still out Still out Dry preservation

    73. आरजीपीपीएलRGPPL-1A RGPPL 320 13:30 8-07-2014 Still out Still out Less requisition74. आरजीपीपीएल

    RGPPL 3BRGPPL 332 17:51 07-01-2016 10:28 03.05.2016 Changeover of units

    75. आरजीपीपीएलRGPPL 2A

    RGPPL 205 17:31 03-04-2016 10:51 07-04-2016 Gas valve problem

    76. आरजीपीपीएलRGPPL 2B

    RGPPL 205 14:14 07-04-2016 16:41 18-04-2016Turbine lube oil systemproblem

    77. आरजीपीपीएलRGPPL 2A

    RGPPL 205 19:58 18-04-2016 09:48 26-04-2016Super heater spray valveproblem

    78. आरजीपीपीएलRGPPL 2B

    RGPPL 205 13:12 26-04-2016 Still out Still outSince 2A unit taken intoservice

    79. AMRAVATITPP(INDIABULL)-1

    RATTANPOWER INDIA

    LTD270 00:00 20-03-2016 05:23 13-04-2016 Less Schedule

    80. AMRAVATITPP(INDIABULL)-5

    RATTANPOWER INDIA

    LTD270 00:00 03-04-2016 18:39 20-04-2016 RSD

    81. AMRAVATITPP(INDIABULL)-4

    RATTANPOWER INDIA

    LTD270 04:02 08-04-2016 13:31 20-04-2016 Less Schedule

    82. AMRAVATITPP(INDIABULL)-1

    RATTANPOWER INDIA

    LTD270 17:14 20-04-2016 Still out Still out No schedule

    83. AMRAVATITPP(INDIABULL)-3

    RATTANPOWER INDIA

    LTD270 20:50 20-04-2016 Still out Still out No schedule

    84. एपीएल मुँदराAPL Mundra 6

    Adani PowerLtd

    660 06:38 09-04-2016 15:08 13-04-2016 CTL

    85. एपीएल मुँदराAPL Mundra 5

    Adani PowerLtd

    660 04:39 04-04-2016 Still out Still out ID fan problem

    86. एपीएल मुँदराAPL Mundra 6

    Adani PowerLtd

    660 22:02 17-04-2016 9:53 27-04-2016 Condenser tube leakage

    87. APML Tiroda 3 Adani PowerLtd 660 03:33 20-04-2016 Still out Still out Furnace pressure high

    88. एमसीसीपीएलMCCPL 1

    ACBIL 300 16:44 28-10-2015 Still out Still outProblem in bottom ashsystem

  • 89. महानESSAR MAHAN-1

    ESSARPOWER

    660 17:16 17.10.14 10:03 17-Apr-2016 Less schedule

    90. ESSAR IPP 1 ESSAR 170 12:30 11-08-2015 Still out Still out Sparking on GT

    91. EPGL- 2 ESSAR 600 00:00 27-02-2016 Still out Still out Expansion Joint leakageproblem

    92. ESSAR IPP 3 ESSAR 172 20:47 04.03.2013 Still out Still out Low schedule

    93. अमरकंटकAMARKANTAK-4

    MPPGCL 120 11:13 30-04-2014 Still out Still out Turbine vibration

    94. अमरकंटकAMARKANTAK-3

    MPPGCL 120 0:25 12-01-2015 Still out Still out Fire caught in turbine floor

    95. Singaji-1 MPPGCL 600 00:02 28-02-2016 05:48 21-04-2016 RSD

    96. JP BINA-1 MPPGCL 250 23:55 29-02-2016 Still out Still out RSD

    97. JP BINA -2 MPPGCL 250 00:09 02-03-16 Still out Still out Low Schedule

    98. Singaji -2 MPPGCL 600 20:35 09-03-2016 Still out Still out RSD

    99. एमबी पावरMB Power 1

    MPPGCL 600 20:24 03-04-2016 17:52 16-04-2016Turbine Lub oil pressurelow.

    100. एमबी पावरMB Power 2

    MPPGCL 600 01:30 06-04-2016 02:46 28-04-2016 Taken out after COD Test

    101. एसजीटीपीएसSGTPS 2

    MPPGCL 210 04:05 08-04-2016 20:43 12-04-2016 Reheater tube leakage

    102. सातपुरा Satpura III 9 MPPGCL 210 20:05 23-04-2016 08:54 26-04-2016 Boiler tube leakage103. सातपुरा Satpura II 7 MPPGCL 210 23:15 30-04-2016 12:35 03-05-2016 LTSH Tube Leakage104. मारवा Marwa TPS 1 CSPGCL 500 17:51 04-04-2016 12:45 12-04-2016 MFT operated

    105. वंदनाVANDANA -1 VANDANA 135 15:00 9-01-2015 Still out Still out BTL

    106. जेपीएलJPL Stg-II 3

    JPL 600 00:42 11-10-2015 08:37 12-04-2016 Low schedule

    107. जेपीएलJPL STG-II -1

    JPL 600 19:56 03-12-2015 Still out Still out Coal feeding problem

    108. जेपीएल JPL Stg-II 2 JPL 600 00:38 13-04-2016 15:04 21-04-2016 RSD109. जेपीएल JPL Stg-I -2 JPL 250 02:31 14-04-2016 Still out Still out NO/LESS SCHEDULE110. जेपीएल JPL Stg-II- 3 JPL 600 23:53 21-04-2016 19:16 28-04-2016 Less schedule111. जेपीएल JPL Stg-II- 2 JPL 600 00:41 29-04-2016 Still out Still out NO SCHEDULE

    112. JP Nigrie-1 JAYPEE 660 18:27 10-03-2016 18:23 08-04-2016Turbine main steam inletTemporary strainerremoval work

    113. एसीबीआईएलACBIL 2 ACBIL 135 03:12 10-04-2016 14:56 13-04-2016 HP heater tube leakage114. जीएमआर छतीसगढ़

    GMR CHHATISGARH -2GMR EMCO 300 22:48 31-03-2016 Still out Still out Taken out after COD Test

    115. जीएमआर छतीसगढ़GMR CHHATISGARH 1

    GMR EMCO 300 23:45 08-04-2016 08:03 18-04-2016Super heater spray lineleakage

    116. जीएमआर छतीसगढ़GMR CHHATISGARH 1

    GMR EMCO 300 23:59 23-04-2016 00:55 29-04-2016 HP Heater Tube Leakage

    117. एमको EMCO -I EMCO 300 18:22 15-04-2016 Still out Still out Due to water scarcity118. एमको EMCO- II EMCO 300 12:01 19-04-2016 Still out Still out Due to shortage of water.

    119. सीजीपीएल CGPL -5 CGPL 830 23:22 08-04-2016 Still out Still outBottom ash heavy airingress and refractorydamage/AOH

  • 120. सीजीपीएल CGPL 1 CGPL 830 06:43 15-04-2016 13:24 23-04-2016 BTL121. सीजीपीएल CGPL 4 CGPL 830 13:05 16-04-2016 04:04 04-05-2016 BTL

    122. बालको BALCO-2 BALCO 300 01:55 02-04-2016 01:56 05-04-2016Tripped during Loadrejection test/Tubeleakages

    123. डीजीईएन DGEN-53 TPGL 400 21:45 02-03-2016 Still out Still out Low schedule124. उनोसुजन UNOSUGEN-

    1TPGL 382 21:55 04-03-2016 Still out Still out RSD

    125. डीजीईएन DGEN-51 TPGL 400 07:41 31-03-2016 Still out Still out Combustion chamberpressure high126. डीजीईएन DGEN-52 TPGL 400 23:58 31-03-2016 Still out Still out As per schedule127. एनएसपीसीएल

    NSPCL 1NSPCL 250 08:35 05-03-2016 18:26 06-Apr-2016 Stator Earth Fault

    128. KAPS 2 NPCIL 220 14:09 01-07-2015 Still out Still outNuclear reactor sideproblem

    129. TAPS 2 NPCIL 160 12:55 10-09-2015 Still out Still out Refueling outage

    130. KAPS 1 NPCIL 220 08:52 11-03-2016 Still out Still out Reactor side problem

    131. मौदा Mouda 2 NTPC 500 01:39 24-02-2016 22:47 07-04-2014 Less schedule/RSD132. कावास Kawas 1B NTPC 164 00:17 13-03-2016 08:00 16-04-2016 Less schedule/RSD133. गांधार Gandhar GT ST 1 NTPC 219 18:48 18-03-2016 Still out Still out Pressure valve problem134. कावास Kawas GT 1A NTPC 164 00:00 31-03-2016 03:10 14-04-2016 Combustion inspection135. कावास Kawas ST 1C NTPC 116 00:00 31-03-2016 Still out Still out Combustion inspection136. वीएसटीपीएस VSTPS- 12 NTPC 500 18:13 10-04-2016 16:40 13-04-2016 BTL

    137. कावास Kawas GT 1A NTPC 106 03:57 14-04-2016 Still out Still out RSD138. कावास Kawas 1B NTPC 08:00 16-04-2016 Still out Still out GT1B combustioninspection139. SIPAT I 3 NTPC 660 00:09 17-04-2016 09:43 20-04-2016

    Flame failure./continuedto be out due to problemof hydrogen coolant

    140. वीएसटीपीएस- VSTPS 1 NTPC 210 15:04 24-04-2016 Still out Still out Excitation system problem

    Note: Units out for more than 72 hrs are only included.

  • Annex-2.7

    ( )

    ,Power System Operation Corporation Ltd.(A wholly owned subsidiary company of POWERGRID)

    Western Regional Load Despatch Centre,Mumbai

    2016Details of planned unit outages during the month of April 2016

    अनु

    Sl.No

    Unitसंघटक

    Constituent/IPPमता

    मेगावॉटCap.MW

    सoFrom

    समय

    सoFrom

    समय

    कारणReason

    Time Date Time Date

    1.TROMBAY 6

    TPC 500 00:00 06-03-2016 Still out Still out AOH

    2. एसीबीआईएलACBIL -1

    ACBIL 135 00:00 16-03-2016 17:35 10-04-2016 AOH

    3. खापरखेड़ाKhaparkheda 5

    MAHAGENCO 500 01:12 15-03-2016 20:39 12-04-2016 AOH

    4. वीएसटीपीएसVSTPS 2

    NTPC 210 06:42 01-04-2016 Still out Still out AOH

    5. उकई Ukai 3 GSECL 200 00:00 01-01-2016 10:14 04-May-2016 COH6

    GTPS 3

    GSECL 210 00:00 03-04-2016 Still out Still out COH

  • (MW) From To1 GUVNL1.1 APL, Mundra 7 660 01-Jun-16 07-Jul-16 Capital Overhauling

    2

    NIL3 CSPGCL

    3.1 Korba East-3 3 50 19/May/16 03/Jun/16 AOH

    3.2 Korba East-4 4 50 16/May/16 31/May/16 AOH

    3.3 Korba Ext 5 500 27.06.2016 20.07.2016 AOH

    44.1 APML, Tiroda 2 660 01-Jun-16 25-Jun-16 License Renewal +AOH

    5 Central Sector5.1 TAPS 3 540 15-May-16 25-Jun-16 BIENNIAL SHUTDOWN5.2 VINDHYACHAL 1 200 13-May-16 06-Jun-16 BLR+ESP GUILLOTINE GATES -PRE R&M WORK5.3 JPL Ext(4X600 MW) 2 0:00 16.05.2016 05.06.2016 Annual over hauling maintenance of Unit at stage-2

    Annexure- 3.1

    MSPGCL

    MPPGCL

    ReasonS. No. Unit No.

    DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING MAY 2016 AND JUNE 2016

    Capacity Outage as per AnnualMaintenance Plan

  • SN KV Element Name (as per Element List) Basis Reason System Agency TypeDate Time Date Time

    1 400 400Kv PUNE(GIS)-PUNE(TALEGOAN)_1 & 2 20-May-16 6:00 19-Jun-16 18:00 Daily Online OPGW work. A/R to be kept in Nonauto modeWRTML/WRTS-I WRTS-I C

    2 400 400kV WARDHA-MAUDA I & II 20-May-16 6:00 19-Jun-16 18:00 Daily Online OPGW work & PID Testing . A/R tobe kept in Non auto mode WRTS-I WRTS-I C

    3 765 765 KV MAIN BAY_ICT1_KOTRA PS 20-May-16 6:00 20-May-16 14:00 Daily AMP work at Kotra PS WRTS-I WRTS-I R

    4 765 765kV SEONI-WARDHA I 20-May-16 6:00 19-Jun-16 18:00 DailyOnline OPGW work. A/R to be kept in Nonauto mode. For installation of 48 OPGWcable at repeater station.

    WRTS-I WRTS-I C

    5 765 Seoni-Bina 20-May-16 6:00 19-Jun-16 18:00 Daily Online OPGW work. A/R to be kept in Nonauto mode WRTS-II WRTS-I C

    6 400 Solapur-Kolhapur-1&2 20-May-16 6:00 19-Jun-16 18:00 Daily Online OPGW work. A/R to be kept in Nonauto mode WRTML WRTS-I C

    7 400 Koradi-Satpura 20-May-16 6:00 19-Jun-16 18:00 DailyOnline OPGW work. A/R to be kept in Nonauto mode. For installation of 48 OPGWcable at repeater station.

    WRTS-I WRTS-I C

    8 400 Chandrapur -Parli S/C line 20-May-16 8:00 20-May-16 18:00 Daily

    Powerline crossing works of 765kV D/CHyderabad-Wardha between tower locationNos 17/0 & 18/0 (Chandrapur -Parli SC400KV Line tower nos.201 to 202 )

    MSETCL WRTS-I C

    9 400 400KV RAIPUR-SIPAT I &400KV RAIPUR-SIPAT II 20-May-16 8:00 20-May-16 18:00 DailyFor Making Diamond arrangement of E/Wwith upcoming under construction 800KVHVDC Champa-Kurukshetra line

    WRTS-I WRTS-I C

    10 765 Bilaspur -II (Tie bay 717) at Seoni 20-May-16 8:00 20-May-16 18:00 Daily AMP works (DCRM & Timing test of CB) WRTS-I WRTS-I R11 765 816 Main Bay of Champa #1 at Durg PS 20-May-16 9:00 21-May-16 18:00 Daily For AMP Works WRTS-I WRTS-I R12 765 Aurangabad # 1 Main Bay 716 at Wardha 20-May-16 9:00 20-May-16 18:00 Daily AMP work at Wardha WRTS-I WRTS-I R

    13 400 BUS REACTOR_400kV_80MVAR_DHULE 20-May-16 9:00 31-May-16 18:00 Conti. For over hauling of 80MVAR Bus Reactorand CB at Dhule MSETCL WRTS-I MSETCL R

    Outage Planning of Transmission elements during the Duration 20.05.2016 to 19.06.2016 From To

    ANNEXURE-3.2

    13 400 BUS REACTOR_400kV_80MVAR_DHULE 20-May-16 9:00 31-May-16 18:00 Conti. For over hauling of 80MVAR Bus Reactorand CB at Dhule MSETCL WRTS-I MSETCL R

    14 400 SWITCHABLELR_400kV_BOISAR2_AURANGABAD 20-May-16 9:00 20-May-16 13:00 DailyFor rectification of FF System Boisar-2 Linereactor at Aurangabad WRTS-I WRTS-I R

    15 765 BUS REACTOR_765kV_240MVAR_TAMNARPS 20-May-16 10:00 20-May-16 14:00 DailyFor AMP Works of 240MVAr Bus reactor atTamnar PS WRTS-I WRTS-I R

    16 400 125 MVAr Bus Reactor-2 Main Bay (419) atBachau 20-May-16 9:00 20-May-16 13:00 Daily Oil Sampling of Alstom CT POWERGRIDWR-II

    17 400 125 MVAr Bus Reactor-2 & Future Tie Bay(420) at Bachau 20-May-16 14:00 20-May-16 17:00 Daily Oil Sampling of Alstom CT POWERGRIDWR-II

    18 765 765kV Gwalior-3 Switchable Reactor CB atBina 20-May-16 9:00 27-May-16 18:00 Cont.For Reactor CB Marshling box change(765kV GWL - 3 line will be in service & onlyline reactor will be out of service)

    POWERGRIDWR-II C

    19 400 BUS 2 at Boisar 20-May-16 9:00 20-May-16 18:00 Daily AMP and Bus Stability for commissioningof new Navsari Bays PGCIL WR-II R

    20 400 Tie Bay of Sami#2 at Dehgam 20-May-16 9:00 31-May-16 17:00 cont. Erection of Main Bay CB in Newlyconstruction Bay. ADANI WR-II C

    21 765 765kV ICT # 2 at Jabalpur Pooling Station 20-May-16 10:00 20-May-16 12:00 Daily For Jumpering work from 33kV Delta Bus of ICT # 2 to 33kV Isolator for Teriary Loading (i.e. 800KVA Station Auxiliary Transformer) in ICT # 2 for First Time Charging / Commissioining.POWERGRIDWRTS-II C

    22 765 765KV Jabalpur - Bina # 3 Reactor (821-52R) at Jabalpur Pooling Station 20-May-16 13:00 20-May-16 18:00 Daily To attend the Reactor Oil Leakages POWERGRIDWRTS-II R

    23 220 KAPP- Haldarwa Ckt I 20-May-16 9:00 20-May-16 18:00 ContinuousAMP and CVT Testing Work at HaldarwaGTECO POWERGRIDWR-II R

    24 220 Kawas-Dastan Ckt 1 & 2 20-May-16 8:00 19-Jun-16 18:00 Daily Online permit for OPGW work POWERGRIDWR-II C25 220 Kawas-Haldarwa Ckt 1 & 2 20-May-16 8:00 19-Jun-16 18:00 Daily Online permit for OPGW work POWERGRIDWR-II C26 220 Kawas-Vav Ckt 1 & 2 20-May-16 8:00 19-Jun-16 18:00 Daily Online permit for OPGW work POWERGRIDWR-II C27 220 Dastan-Navsari Ckt 1 & 2 20-May-16 8:00 19-Jun-16 18:00 Daily Online permit for OPGW work POWERGRIDWR-II C28 220 KAPP-Haldarwa Ckt 1 & 2 20-May-16 8:00 19-Jun-16 18:00 Daily Online permit for OPGW work POWERGRIDWR-II C29 400 Navsari Magarwada 20-May-16 8:00 19-Jun-16 18:00 Daily Online permit for OPGW work POWERGRIDWR-II C

    30 220 203 Bay (Bus Coupler Bay) at PGCIL RajgarhS/S 20-May-16 10:00 20-May-16 13:00 Daily For Tan delta measurement of Bay CT POWERGRIDWR-II R

    31 765KV 765KV Sasan-Satna Line#2 20-May-16 9:00 20-May-16 18:00 Daily For AMP of Non Switchable Reactor POWERGRIDWR-II R

    32 765 Sasan - Satna Ckt-I 20-May-16 6:00 19-Jun-16 18:00 Daily Online replacement of E/W with OPGW.A/R shall be kept in non auto mode POWERGRIDWR-II C32 765 Sasan - Satna Ckt-I 20-May-16 6:00 19-Jun-16 18:00 DailyOnline replacement of E/W with OPGW.A/R shall be kept in non auto mode POWERGRIDWR-II C

    33 765 Gwalior - Agra Ckt-II 20-May-16 6:00 19-Jun-16 18:00 Daily Online replacement of E/W with OPGW.A/R shall be kept in non auto mode POWERGRIDWR-II C

    34 765 Satna - Gwalior Ckt-I 20-May-16 6:00 19-Jun-16 18:00 Daily Online replacement of E/W with OPGW.A/R shall be kept in non auto mode POWERGRIDWR-II C

  • 35 400 Vapi - Kala Ckt-I&2 20-May-16 6:00 19-Jun-16 18:00 Daily Online replacement of E/W with OPGW.A/R shall be kept in non auto mode POWERGRIDWR-II C

    36 400 Navsari - Magarwada # I,2 20-May-16 6:00 19-Jun-16 18:00 Daily Online replacement of E/W with OPGW.A/R shall be kept in non auto mode POWERGRIDWR-II C

    37 400 Kala -Magarwada #1,2 20-May-16 6:00 19-Jun-16 18:00 Daily Online replacement of E/W with OPGW.A/R shall be kept in non auto mode POWERGRIDWR-II C

    38 220 Kawas - Haldarwa # I,II 20-May-16 6:00 19-Jun-16 18:00 Daily Online replacement of E/W with OPGW.A/R shall be kept in non auto mode POWERGRIDWR-II C

    39 220 Gandhar - Haldarwa #1,2 20-May-16 6:00 19-Jun-16 18:00 Daily Online replacement of E/W with OPGW.A/R shall be kept in non auto mode POWERGRIDWR-II C

    40 220 Kawas - Dastan # 1,2 20-May-16 6:00 19-Jun-16 18:00 Daily Online replacement of E/W with OPGW.A/R shall be kept in non auto mode POWERGRIDWR-II C

    41 220 Vav - Navsari #1,2 20-May-16 6:00 19-Jun-16 18:00 Daily Online replacement of E/W with OPGW.A/R shall be kept in non auto mode POWERGRIDWR-II C

    42 220 Kawas-Vav#1,2 20-May-16 6:00 19-Jun-16 18:00 Daily Online replacement of E/W with OPGW.A/R shall be kept in non auto mode POWERGRIDWR-II C

    43 400 Vindhyachal Pooling - SASAN UMPP #1 20-May-16 6:00 19-Jun-16 18:00 Daily Online replacement of E/W with OPGW.A/R shall be kept in non auto mode POWERGRIDWR-II C

    44 220 Chhegeon – Khandwa # 1,2 20-May-16 6:00 19-Jun-16 18:00 Daily Online replacement of E/W with OPGW.A/R shall be kept in non auto mode POWERGRIDWR-II C

    45 220 Kawas-Dastan # 1,2 20-May-16 6:00 19-Jun-16 18:00 Daily Online replacement of E/W with OPGW.A/R shall be kept in non auto mode POWERGRIDWR-II C

    46 220 Dastan-Navsari # 1,2 20-May-16 6:00 19-Jun-16 18:00 Daily Online replacement of E/W with OPGW.A/R shall be kept in non auto mode POWERGRIDWR-II C

    47 220 Haldarwa-Kakrapar (NPC) # 1,2 20-May-16 6:00 19-Jun-16 18:00 Daily Online replacement of E/W with OPGW.A/R shall be kept in non auto mode POWERGRIDWR-II C

    48 220 Barwatha –Chhegeon (MPPTCL) # 1,2 20-May-16 6:00 19-Jun-16 18:00 Daily Online replacement of E/W with OPGW.A/R shall be kept in non auto mode POWERGRIDWR-II C

    49 220 Seoni- Seoni ( MPPTCL) 20-May-16 6:00 19-Jun-16 18:00 Daily Online replacement of E/W with OPGW.A/R shall be kept in non auto mode POWERGRIDWR-II C

    50 400 Sasan - Vindhyachal Pooling Ckt-1 20-May-16 6:00 19-Jun-16 18:00 Daily Online replacement of E/W with OPGW.A/R shall be kept in non auto mode POWERGRIDWR-II C

    51 400 Annupur-Jabalpur#1,2 20-May-16 6:00 19-Jun-16 18:00 Daily Online replacement of E/W with OPGW.A/R shall be kept in non auto mode POWERGRIDWR-II C51 400 Annupur-Jabalpur#1,2 20-May-16 6:00 19-Jun-16 18:00 DailyOnline replacement of E/W with OPGW.A/R shall be kept in non auto mode POWERGRIDWR-II C

    52 400 Vadodara-Asoj Ckt#1 20-May-16 10:00 20-May-16 18:00 Daily For Commissioning of Digital ProtectionCoupler of PLCC POWERGRIDWR-II C

    53 220 UKAI-VAV-I 20-May-16 7:00 21-May-16 18:00 Daily Stringing of 400 KV Kakrapar to Vapi 400 KVD/C line GETCO WR-II

    54 220 UKAI-VAV-II 20-May-16 7:00 21-May-16 18:00 Daily Stringing of 400 KV Kakrapar to Vapi 400 KVD/C line GETCO WR-II

    55 400 401 main bay of 400 kv SASAN -VIN.POOLING bus 1 20-May-16 7:00 20-May-16 15:00 Daily AMP work at Vindhyachal PS POWERGRIDWR-II

    56 400 125 MVAR BUS-REACTOR-2, Khandwa 20-May-16 10:00 20-May-16 16:00 Daily AMP of B/R-2 POWERGRIDWR-II R

    57 400 Itarsi - Khandwa Ckt.1 &2 20-May-16 8:00 19-Jun-16 18:00 DAILY

    ON-LINE pemit for PID testing of lines toidentify defective insulator strings. A/R ofboth Ckt.1&2 to be kept in non auto modeduring PID testing

    POWERGRIDWR-II C

    58 400 Khandwa - Dhule Ckt.1 &2 20-May-16 8:00 19-Jun-16 18:00 DAILY

    ON-LINE pemit for PID testing of lines toidentify defective insulator strings. A/R ofboth Ckt.1&2 to be kept in non auto modeduring PID testing

    POWERGRIDWR-II C

    59 765 765kV Satna-1 line reactor AT SASAN 20-May-16 9:00 21-May-16 18:00 CONT. Yearly maintenance SASAN RELIANCE

    60 400 Korba-Balco line 20-May-16 08:30 hrs 23-May-16 17:30 Hrs. ContinuousAnnual PM (over due) of bay equipment,Reactor & relay testing NTPC NTPC

    61 400 KATNI-315 MVA (BHEL) TRANSFORMER 20/May/16 9:00 21/May/16 17:00 DAILY MAINTAINANCE & TESTING WORK MPPTCL MPPTCL R

    62 400 ASHTA-315 MVA (CGL-I ) TRANSFORMER 20/May/16 8:00 21/May/16 17:00 DAILY MAINTAINANCE & TESTING WORK MPPTCL MPPTCL R

    63 400 400 KV S/S CHHEGAON- BUS TIE BAY 20/May/16 9:00 20/May/16 17:00 DAILY MAINTAINANCE & TESTING WORK MPPTCL MPPTCL R64 400 400 KV BIRSINGPUR- KATNI CkT-II 20/May/16 9:30 20/May/16 17:30 daily PRE MONSOON MAINTENANCE WORK MPPTCL MPPTCL R

    65 220 220 KV GWALIOR( PG )- GWALIOR(MPPTCL-II)CKT-I 20/May/16 9:00 21/May/16 17:00 daily PRE MONSOON MAINTENANCE WORK MPPTCL MPPTCL R

    66

    400 Asoj - Chorania No. 1 20/May/16 8:00 20/May/16 18:00 Daily PMM and condition monitoring GETCO GETCO For information. Code will be issued bySLDC. Non auto reclose code for 400kvKasor - SSP and 400kv Kasor-Chorania line is to be required.

    67 400 Vadavi - Bhacau line-1 20/May/16 8:00 20/May/16 18:00 Daily PMM work PGCIL GETCO67 400 Vadavi - Bhacau line-1 20/May/16 8:00 20/May/16 18:00 Daily PMM work PGCIL GETCO68 220 Bhilad - Vapi (PG) line - 3 20/May/16 9:00 20/May/16 18:00 Daily PMM work PGCIL GETCO

    69 400 400 KV DGEN Line-2 at PGCIL Dastan S/S 20-May-16 7:00 22-May-16 18:00 ContinuousTo attend SF6 Gas leak from GD6 (410)section by M/s. HYOSUNG at Navsari S/SEnd

    TPL TPL Forced

  • 70 400 BVT- Dhariwal & Dhariwal- Parli 20-May-16 8:00:00 AM 15-Jun-16 6:00:00 PM daily basis For Puncture Insulator Detection Testing (PID) of tesnsion insulator string of line by LIVE LINE METHOD only auto reclosure to be bypassed.WRTS-I Dhariwal Infrastructure Ltd.71 400 KSK - Riapur Ckt, III 20-May-16 9:00 20-May-16 17:00 Daily Attending defects in KSK LILO Portion KSK PGCIL

    72 400KV Koyna Stage IV - Lonikand 20-May-16 7:00 19-Jun-16 17:00 DailyFor replacement of normal disc insulator byantifog disc insulator string at variouslocations.

    MSETCL MSETCL

    In the absence this outage,400 KV Jejuri-Kouna-stg-4 will be availed through D-3if feasible .D/C lies passes through hillyareas

    73 400kV Parli - Solapur S/C 20-May-16 6:00 19-Jun-16 18:00 Daily

    Establishment of comprehensivecommunication network of OPGW byreplacement of existing earth wire withOPGW

    MSETCL MSETCL A/R shall be kept in non auto mode

    74 400kV Solapur (PG) - Karad 20-May-16 6:00 19-Jun-16 18:00 Daily

    Establishment of comprehensivecommunication network of OPGW byreplacement of existing earth wire withOPGW

    MSETCL MSETCL A/R shall be kept in non auto mode

    75 400kV Karad - Kolhapur D/C 20-May-16 6:00 19-Jun-16 18:00 Daily

    Establishment of comprehensivecommunication network of OPGW byreplacement of existing earth wire withOPGW

    MSETCL MSETCL A/R shall be kept in non auto mode

    76 400 kV Chandrapur Nanded Line 20-May-16 8:00 20-May-16 18:00 Daily Repalcement of Damaged Earthwire MSETCL MSETCL 400kV Chandrapur-II- Parali Ckt. I &400kV Chandrapur - Parali Ckt. III.

    77 765kV Tiroda - Koradi Line-2 at Koradi III SS 20-May-16 8:00 20-May-16 18:00 Daily To Carry Out conductor repairing work MEGPTCL MEGPTCL

    78 400/220/33kV315 MVA ICT-2 @ Aurangabad 20-May-16 7:30 20-May-16 17:00 Daily 89C PGI overhauling work MSETCL MSETCL 400/220/33kv 315MVA ICT-1 &3*167MVA ICT-3 will be in service.

    79 765 SWITCHABLE LR_765kV_SEONI2_BILASPUR 21-May-16 8:00 21-May-16 9:00 DailySeoni-2 line eractor at bilaspur forChangeover of L/R (for taking B-Ph out &Spare ph in)at Bilaspur.

    WRTS-I WRTS-I R

    80 765 SWITCHABLE LR_765kV_WARDHA 2_SEONI21-May-16 8:00 21-May-16 18:00 Daily Commissioning of spare reactor withWardha-II line reactor at seoni. WRTS-I WRTS-I C

    81 765 765KV DURG PS - D'JAIGARH 21-May-16 9:00 21-May-16 19:00 Daily Refixing of broken jumper pad WRTS-I WRTS-I R82 765 Aurangabad # 1 Tie Bay 717 at Wardha 21-May-16 9:00 21-May-16 18:00 Daily AMP work at Wardha WRTS-I WRTS-I R

    83 400 SWITCHABLELR_400kV_BOISAR1_AURANGABAD 21-May-16 9:00 21-May-16 13:00 DailyFor rectification of FF System Boisar-1 Linereactor at Aurangabad WRTS-I WRTS-I R83 400

    SWITCHABLELR_400kV_BOISAR1_AURANGABAD 21-May-16 9:00 21-May-16 13:00 Daily

    For rectification of FF System Boisar-1 Linereactor at Aurangabad WRTS-I WRTS-I R

    84 400 63 MVAR Line Reactor of Essar Ckt 1 atBhachau 21-May-16 9:00 21-May-16 11:00 DailyOil Sampling of Alstom HV Bushings (Linemay be taken into service after taking outLine Reactor)

    POWERGRIDWR-II

    85 400 63 MVAR Line Reactor of Essar Ckt 2 atBhachau 21-May-16 12:00 21-May-16 14:00 DailyOil Sampling of Alstom HV Bushings (Linemay be taken into service after taking outLine Reactor)

    POWERGRIDWR-II

    86 400 125 MVAr Bus Reactor-2 at Bhachau 21-May-16 15:00 21-May-16 17:00 Daily Oil Sampling of Alstom HV Bushing POWERGRIDWR-II

    87 765 765kV Bus Reactor-1 & 2 at Bina 21-May-16 9:00 21-May-16 18:00 daily Configuaration/Modification of Jumper ofBUS Reactor-II POWERGRIDWR-II C

    88 400 407 Bay - Padghe Main Bay 21-May-16 8:00 21-May-16 12:00 Daily AMP PGCIL WR-II R89 400 408 Bay - Tie Bay of Padghe and ICT 1 21-May-16 15:00 21-May-16 18:00 Daily AMP PGCIL WR-II R

    90 765 765 KV S/C Indore -Vadodara line 21-May-16 8:00 21-May-16 18:00 daily For New 400KV, Khandwa- Indore linecrossing work PGCIL WR-II

    91 400 400kV Bus Reactor # 1 Main bay (401 Bay) atJabalpur Pooling Station 21-May-16 9:00 21-May-16 13:00 Daily For AMP Work POWERGRIDWRTS-II R

    92 400 400kV Bus Reactor # 1 Tie bay (402 Bay) atJabalpur Pooling Station 21-May-16 14:00 21-May-16 18:00 Daily For AMP Work POWERGRIDWRTS-II R

    93 220 KAPP- Haldarwa Ckt II 21-May-16 9:00 21-May-16 18:00 ContinuousAMP and CVT Testing Work at HaldarwaGETCO SS POWERGRIDWR-II R

    94 400 DGEN-NAVSARI CKT 2 21-May-16 8:00 23-May-16 18:00 Daily Erection work of 33/0 of 400kV KAPP-Navsari line Torrent Torrent C

    95 765KV 765KV Gwalior-Satna#1 21-May-16 9:00 21-May-16 14:00 Daily For Checking of A/R & Replacement ofReactor OTI & WTI at Satna SS POWERGRIDWR-II R

    96 400 Vadodara-Asoj Ckt#2 21-May-16 10:00 21-May-16 18:00 Daily For Commissioning of Digital ProtectionCoupler of PLCC POWERGRIDWR-II C

    97 400 404 main bay of 400 kv SASAN -VIN.POOLING bus 1 21-May-16 7:00 21-May-16 15:00 Daily AMP work at Vindhyachal PS POWERGRIDWR-II

    98 400 400 KV BUS- 2 AT KAHNDWA SS 21-May-16 9:00 21-May-16 17:00 Daily STABILITY TESTING WORK for new bayconstruction work. POWERGRIDWR-II R

    99 400 Asoj - Chorania No. 2 21/May/16 8:00 21/May/16 18:00 Daily PMM and condition monitoring GETCO GETCO For information. Code will be issued bySLDC100 400 Chorania - Vadavi line - 1 21/May/16 8:00 21/May/16 18:00 Daily Conditioning monitoring work WRTGPL GETCO

    101 400/220kV 500 MVA ICT - 2 @ Deepnagar 21-May-16 9:00 21-May-16 17:00 Daily Diagnostic testing of ICT units, routine baymaintenance and relay testing MSETCL MSETCL101 400/220kV 500 MVA ICT - 2 @ Deepnagar 21-May-16 9:00 21-May-16 17:00 Dai