1 Agenda for the 61 st meeting of the Board of Approval to be held on 10 th March, 2014, in the Room No. 47, Udyog Bhawan Item No. 61.1: Requests for extension of validity of formal approvals BoA in its meeting held on 14 th September, 2012, examining similar cases observed as under: - “The Board advised the Development Commissioners to recommend the requests for extension of formal approval beyond 5 th year and onwards only after satisfying that the developer has taken sufficient steps towards operationalisation of the project and further extension is based on justifiable reasons. Board also observed that extensions may not be granted as a matter of routine unless some progress has been made on ground by the developers. The Board, therefore, after deliberations, extended the validity of the formal approval to the requests for extensions beyond fifth years for a period of one year and those beyond sixth year for a period of 6 months from the date of expiry of last extension”. (i) Request of M/s. Dr. Reddy’s Laboratories Ltd. for further extension of the validity period of formal approval, granted for setting up of sector specific SEZ for Pharmaceuticals at Devunipalavalasa Village, Ranasthalam Mandal, Srikakulam District, Andhra Pradesh, beyond 26 th February 2014 Formal approval to the developer was granted on 26 th February, 2009. The SEZ stands notified as on date. The developer has been granted two extensions validity period of which is upto 26 th February, 2014. The developer has requested for further extension so as to implement the project. The developer has made following investments/plans. (i) Investment of Rs. 150 crores have been made for creation of required infrastructure facilities in the project (ii) Two units of their own group have been set up in the SEZ and are likely to commence production during the next fiscal. DC VSEZ has recommended the request for its consideration by BoA for a period of one year. The request of the developer is accordingly placed before BoA for its consideration. (ii) Request for further extension of LoA from Gujarat Industrial Development Corporation (GIDC) for setting up an IT/ITES SEZ at Gandhinagar-Sarkhej, Highway, Gandhinagar, Gujarat, beyond 6 th January 2014 Formal approval to the developer was granted on 7 th January, 2008. The SEZ stands notified as on date. The developer has been granted three extensions of the formal approval, the validity of which was up to 6 th January, 2014.

Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

1

Agenda for the 61st meeting of the Board of Approval to be held on 10th March, 2014, in the Room No. 47, Udyog Bhawan

Item No. 61.1: Requests for extension of validity of formal approvals

BoA in its meeting held on 14th September, 2012, examining similar cases observed as under: -

“The Board advised the Development Commissioners to recommend the requests for extension of formal approval beyond 5th year and onwards only after satisfying that the developer has taken sufficient steps towards operationalisation of the project and further extension is based on justifiable reasons. Board also observed that extensions may not be granted as a matter of routine unless some progress has been made on ground by the developers. The Board, therefore, after deliberations, extended the validity of the formal approval to the requests for extensions beyond fifth years for a period of one year and those beyond sixth year for a period of 6 months from the date of expiry of last extension”.

(i) Request of M/s. Dr. Reddy’s Laboratories Ltd. for further extension of the validity period of formal approval, granted for setting up of sector specific SEZ for Pharmaceuticals at Devunipalavalasa Village, Ranasthalam Mandal, Srikakulam District, Andhra Pradesh, beyond 26th February 2014

Formal approval to the developer was granted on 26th February, 2009. The SEZ stands notified as on date. The developer has been granted two extensions validity period of which is upto 26th February, 2014.

The developer has requested for further extension so as to implement the project.

The developer has made following investments/plans. (i) Investment of Rs. 150 crores have been made for creation of required

infrastructure facilities in the project (ii) Two units of their own group have been set up in the SEZ and are likely to

commence production during the next fiscal.

DC VSEZ has recommended the request for its consideration by BoA for a period of one year.

The request of the developer is accordingly placed before BoA for its consideration.

(ii) Request for further extension of LoA from Gujarat Industrial Development Corporation (GIDC) for setting up an IT/ITES SEZ at Gandhinagar-Sarkhej, Highway, Gandhinagar, Gujarat, beyond 6th January 2014

Formal approval to the developer was granted on 7th January, 2008. The SEZ stands notified as on date. The developer has been granted three extensions of the formal approval, the validity of which was up to 6th January, 2014.

Page 2: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

2

The developer vide his letter dated 10th December, 2013 has sought for further extension of his LoA beyond 6th January, 2014 due to various factors like few takers for SEZ unit, imposition of MAT and 11 KV power line passing above the allotted plots in SEZ wherein the units have requested for shifting of the same and the matter is pending with the Govt. of Gujarat.

The developer has informed that it has completed boundary wall, all basic

infrastructure like internal roads, street light and storm water drainage system, water distribution network, electric power supply. UAC has approved four cases of the units, wherein LoA was issued to the applicants.

The developer has made total investment of Rs. 24.66 crores on land and Rs. 16.49

crores on other infrastructure work. The developer proposes to complete the project by 6th January, 2015. DC KASEZ has recommended the proposal for further extension by one year. The request of the developer is accordingly placed before BoA for its consideration.

(iii) Request for further extension of LoA from M/s. Cognizant Technology Solutions India Pvt. Limited for setting up an IT/ITES SEZ at Adibatla Village, Ibrahimpatnam Mandal, Ranga Reddy District, Andhra Pradesh beyond 6th January, 2014

Formal approval to the developer was granted on 7th January, 2008. The SEZ stands

notified as on date. The developer has been granted three extensions validity period of which is upto 6th January, 2014.

The developer has requested for further extension so as to implement the project. The developer has stated that they have entered into a contract on turnkey basis with

M/s. Larsen and Toubro Limited for construction of campus in the Adibatla SEZ. They have commenced preliminary construction activities and they anticipate rapid progress in construction in ensuring months. The construction of the compound wall was completed during the year 2012 and the said land had undergone re-orientation towards the end of the year 2012 and they anticipate rapid progress in construction in ensuring months.

DC VSEZ has recommended the request for its consideration by BoA for a period of

one year.

The request of the developer is accordingly placed before BoA for its consideration. (iv) Request for further extension of LoA from M/s Nagaland Industrial Development Corporation Limited, for setting up a sector specific SEZ for Agro and Food Processing at Dimapur, Nagaland, beyond 11th October, 2013

Formal approval to the developer was granted on 12th October, 2007. The SEZ stands notified as on date. The developer has been granted three extensions of the formal approval, the validity of which was up to 11th October, 2013.

Page 3: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

3

The developer has requested for further extension so as to implement the project. Status of implementation of the project: (i) Site Development for industrial plots 100% (ii) Boundary walls 100% (iii) Administrative Block 100% (iv) Guest House 100% (v) Electrification 80% (vi) Internal roads 100% (vii) Water pipes 75% (viii) Water treatment plant , C.E.T.P, Cold Storage Under Progress (ix) Residential block 100% (x) Factory shed and standard design factory 100% DC FSEZ has recommended the proposal for further extension by one year as it is a

Government of Nagaland promoted SEZ. The request of the developer is accordingly placed before BoA for its consideration.

(v) Request of M/s. Selecto Systems Private Limited for further extension of the validity period of formal approval, granted for setting up of sector specific SEZ for IT/ITES at 15/1, Mathura Road, Faridabad, Haryana beyond 11th December 2013

The developer was granted formal approval for setting up the above mentioned SEZ, over an area of 3 hectares vide LoA dated 16th June 2006. The above mentioned SEZ was notified on 17th April 2007 over an area of 3.34 hectares. The developer has already been granted five extensions. The validity of the last extension is up to 11th December, 2013.

The developer has stated that the Master Plan and Zoning Plan of the SEZ have

already been approved by UAC. However, certified copy of zoning plan is still awaited from DTCP, Haryana due to a pending case of the developer for payment of EDC/IDC. As such there is no effective work on the ground.

DC NSEZ has not recommended the proposal for consideration by BoA. The request is placed before BoA for consideration.

(vi) Request of M/s. Kumar Builders Township Ventures Pvt. Ltd. for further extension of the validity period of formal approval, granted for setting up of sector specific SEZ for IT/ITES at Village Hinjewadi & Man n, Taluka - Mulshi, Pune, Maharashtra, beyond 27th August 2013

Formal approval to the developer was granted on 28th August, 2006. The SEZ stands notified as on date. The developer has been granted four extensions validity period of which is upto 27th August, 2013.

The developer has stated that demand for space in IT/ITES and Hardware is less due to impact and effect of global slowdown and changes in tax regime and also they are going through financial crunch due to non availability of funds from banks.

Page 4: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

4

The developer has made following investments/plans. (i) Investment in land Rs. 3027.386 Lakhs (for notified area) (ii) Investment in development of infrastructure Rs. 6014.41 Lakhs (iii) Construction of boundary wall is in progress and completed up to 55%

approximately (iv) Incubation centre admeasuring 23,000 sqft. is under construction and

completed up to 50% approximately. (v) Construction of building is in progress and completed up to 20%

approximately (vi) The SEZ can become operational within one year.

DC SEEPZ has recommended the request for its consideration by BoA for a period of

one year.

The request of the developer is accordingly placed before BoA for its consideration. (vii) Request of M/s. Newfound Properties and Leasing Private Limited for further extension of the validity period of formal approval, granted for setting up of sector specific SEZ for IT/ITES at Juinagar, District Thane, Maharashtra, beyond 20th August 2012

Formal approval to the developer was granted on 21st August, 2006. The SEZ stands

notified as on date. The developer has been granted three extensions validity period of which is upto 20th August, 2012.

The developer has stated that they have initiated the construction work for 3 building

and the actual expense incurred for the project aggregate around Rs. 81.15 crores. They have further stated that the project was delayed due to the following reasons:-

(i) Enormous undulations on the plot and heavy quarrying activity on the eastern

side of the plot. (ii) Non-co-operation on certain maters by the Land Authority (MIDC) and Local

Governing Body (NMMC). (iii) Global economy environmental has not been conducive for green field project

in the past couple of years The developer has made following investments/plans. (i) Investment in land is Rs. 40.95 crores (ii) Investment in infrastructure Rs. 40.45 crores including capitalization of

borrowing cost of Rs. 13.35 crores (iii) SEZ would be operation within a period of 15-18 months from the extended

date of formal approval. DC SEEPZ has recommended the request for its consideration by BoA for 4th and 5th

extension up to 02.05.2014.

The request of the developer is accordingly placed before BoA for its consideration.

Page 5: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

5

(viii) Request of M/s. Balaji Infra Projects Limited for further extension of the validity period of formal approval, granted for setting up of a port based multi product SEZ inclusive of FTWZ, at Dighi Port, District Raigad, Maharashtra, beyond 22nd October 2012

Formal approval to the developer was granted on 23rd October, 2006. The SEZ is yet

to be notified. The developer has been granted three extensions validity period of which was upto 22nd October, 2012.

The developer has submitted the documents for notification of the SEZ as per revised

requirements of minimum land area for setting up of the SEZ for land area of 69.12.94 Ha. The developer is in possession of the land.

The developer has stated that once extension is granted and notification issued financial closure will be achieved within three quarters. The overall project implementation shall be completed within 24 months.

The developer has stated that Dighi Port is the first green port development in

Maharashtra of which SEZ/FTWZ is an integral part. The aggregate investment up to 31.10.2013 in the Dighi Port project is approximately Rs. 2000 crores. The developer have recently operationalised Dighi Port and handled approx. 4 million tons of cargo till date.

DC SEEPZ has recommended the request for its consideration by BoA for 4th and 5th extension up to 27.08.2014.

The request of the developer is accordingly placed before BoA for its consideration. (ix) Request of M/s. International Biotech Park Limited for further extension of the validity period of formal approval, granted for setting up of sector specific SEZ for Biotechnology at Hinjewadi, District Pune, Maharashtra, beyond 24th October 2012

Formal approval to the developer was granted on 25th October, 2006. The SEZ stands

notified as on date. The developer has been granted three extensions validity period of which was upto 24th October, 2012.

The developer has requested for further extension so as to implement the project. The developer has submitted the following reasons for delay:- (i) Severe financial crunch following the global economic slowdown. (ii) Confusion and non-clarity in MIDC rules pertaining to global FSI and open

RG areas. (iii) Negative market sentiment regarding provisions of Direct Tax Code.

The developer has made following investments/plans. (i) Investment in land is Rs. 5.8 crores (ii) Investment on infrastructure Rs. 1 crores. (iii) They propose to develop the project in two phases.

Page 6: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

6

DC SEEPZ has recommended the request for its consideration by BoA for 4th and 5th extension up to 24.10.2014.

The request of the developer is accordingly placed before BoA for its consideration. (x) Request of M/s. G.P. Realtors Private Limited for further extension of the validity period of formal approval, granted for setting up of sector specific SEZ for IT/ITES at village Behrampur, District Gurgaon, Har yana, beyond 13th November 2013

The developer was granted formal approval for setting up the above mentioned SEZ,

vide LoA dated 14th November 2006. The SEZ stands notified as on date. The developer has already been granted four extensions. The validity of the last extension was up to 13th November, 2013.

The developer has requested for further extension so as to implement the project. The developer has informed that they managed to get Environment Clearance in

September, 2013, after 2.5 years delay from the Haryana Government. The developer has made following investments/plans. (i) Investment in land, building design, statutory levies and site improvements is

Rs. 175 crores (ii) Master plan and zonal plan approved. (iii) Building plan approved. (iv) Construction to start by December, 2014

DC NSEZ has recommended the request for its consideration by BoA for one year.

The request of the developer is accordingly placed before BoA for its consideration.

(xi) Request of M/s. Ansal IT City & Parks Ltd. for further extension of the validity period of formal approval, granted for setting up of sector specific SEZ for IT/ITES at TZ-06, Tech Zone, Gr. Noida, Uttar Pradesh beyond 11th December, 2013

The developer was granted formal approval for setting up the above mentioned SEZ, vide LoA dated 7th April, 2006. The SEZ stands notified as on date. The developer has already been granted five extensions. The validity of the last extension was up to 11th December, 2013.

The developer has requested for further extension so as to implement the project.

The developer has made following investments/plans.

(i) Investment in land, infrastructure and construction Rs. 101.01 crores (ii) Infrastructure under stages of final development. (iii) UAC has approved four units in the SEZ. DC NSEZ has recommended the case for further extension of one year up to

10.12.2014. The request is placed before BoA for consideration.

Page 7: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

7

(xii) Request of M/s. Adityapur Industrial Area Development Authority for further extension of the validity period of formal approval, granted for setting up of sector specific SEZ for Automobiles/Auto Components at Adityapur, Jharkhand, beyond 13th December 2013

The developer was granted formal approval for setting up the above mentioned SEZ,

vide LoA dated 14th June, 2006. The SEZ stands notified over an area of 36.4218 ha. The developer has already been granted three yearly and two half yearly extensions. The validity of the last extension was up to 13th December, 2013.

The developer has requested for further extension stating that 54.18 acres of land is to

be de-notified by MOEF and that the process of de-notification is at concluding stage in the Ministry after which the set up of SEZ will proceed.

DC FSEZ has recommended extension by one year as this is the only notified SEZ in

Jharkhand and is promoted by Government of Jharkhand. The request of the developer is placed before the BoA for consideration.

(xiii) Request of M/s. Kakinada SEZ Private Limited for further extension of the validity period of formal approval, granted for setting up of port based multi product SEZ at Kakinada, East Godavari District, Andhra Pradesh beyond 26th February, 2012 for a period of another 3 years

The developer was granted formal approval for setting up the above mentioned SEZ,

vide LoA dated 7th April, 2006. The SEZ stands notified as on date. The developer has already been granted three extensions. The validity of the last extension was up to 26th February, 2012.

The developer has requested for further extension so as to implement the project. The developer has informed that on account of several legal cases filed against them

the development of the SEZ could not commence subsequent to the notification and that lasts of these petitions were dismissed by the Hon’ble Court of Andhra Pradesh in the months of September, 2012. Further, the views/recommendation of the Govt. of Andhra Pradesh for extension of formal approval for a further period was given only in the month of October, 2013. It is informed that they have invested an amount of Rs. 152.83 crores so far in the project and undertaken the activities of development and approval of the master plan, obtaining environmental clearances, infrastructure and utility provisions, undertaken various studies for business planning etc.

DC VSEZ has recommended the proposal for extension of Formal Approval by

another three years. The request is placed before BoA for consideration.

Page 8: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

8

(xiv) Request of M/s. Frontier Lifeline Pvt. Ltd. for further extension of the validity period of formal approval, granted for setting up of sector specific SEZ for Biotechnology at Edur Elavur Village, Thiruvallur D istrict, Tamil Nadu, beyond 27th November, 2013

Formal approval to the developer was granted on 28th November, 2008. The SEZ stands notified as on date. The developer has been granted two extensions validity period of which is upto 27th November, 2013.

The developer has requested for further extension so as to implement the project.

The developer has made following investments/plans. (i) Infrastructure development work completed (ii) Boundary walls - Completed (iii) Administrative Blocks (Research block, Training block, CSSD block) – Civil

Work, electrification, water pipelines, painting work completed. (iv) Conventional centre (Auditorium) – Civil work Completed (v) Heating Ventilation Air-condition, Building Management System, Fire

fighting systems and Sewage Treatment Plant / Water Treatment Plant activities are pending for commissioning

DC MEPZ has recommended the request for its consideration by BoA for a period of

one year.

The request of the developer is accordingly placed before BoA for its consideration.

(xv) Request of M/s. Nagarjuna Oil Corporation Ltd., for further extension of the validity period of formal approval, granted for setting up of sector specific SEZ for Pharmaceuticals and Petroleum at Kayalattu Village, Cuddalore, Tamil Nadu, beyond 26th February 2012

The developer was issued formal letter of approval dated 27.02.2009. The three year validity period of the LoA expired on 27.02.2012 and was recommended for cancellation to DoC in the absence of application for extension in the prescribed form, from the developer. As per DoC’s directions that another opportunity may be given to the developer to reconsider their SEZ proposal in view of MOC&I recent amendment to SEZ Rules dated 12.08.13, the developer was advised accordingly and the developer has submitted an application seeking extension of LoA upto December, 2017 for completion of their SEZ project.

The developer has further stated in their application that no activity has taken place in the proposed SEZ area so far and that the reason for the dealy in implementation of the SEZ project is the delay in commissioning of their refinery plant (which is outside the proposed SEZ area and on which their proposed SEZ for petrochemicals and petroleum is dependent on supply of input material). They have also stated that they had commenced their refinery project in 2009 with an investment of Rs. 6500 crores and that the commissioning of the refinery was severely affected by cyclone “Thane” in 2011, leading to delay in implementation of the refinery project and consequent delay in setting up of the SEZ project and meeting the time schedules. The developer has further stated that their refinery plant is 60% complete and likely to be commissioned by the end of December 2015 and the SEZ

Page 9: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

9

project will be completed by December, 2017 i.e. two years after the commissioning/completion of their refinery plant. DC’s recommendation

In view of the fact that no activity has taken place in the SEZ after issue of LoA dated 27.02.2009 and the submission made by the developer that the SEZ project can be completed only by December 2017, which is too long a period to merit consideration without any developmental activity having taken place in the SEZ, it is recommended that the LoA be treated as lapsed as on 27.02.2012 and that the developer could be advised to apply afresh for formal LoA after completion of their refinery project and when they are better placed to implement their SEZ project.

The request is placed before BoA for its consideration.

(xvi) Request from M/s. Bagmane Builders Private Limited (BBPL), developer of IT/ITES including Hardware and Software SEZ at Mahadevapura K.R. Puram, Bangalore, Karnataka for extension of validity of formal approval, beyond 30th June, 2013 and change in the name of the developer from Bagmane Builders Pvt. Ltd. to Bagmane Developer Pvt. Ltd. Following proposals have been received from the Developer, through DC CSEZ:-

(a) Proposal for extension of formal approval

Formal approval to the developer was granted on 26th October, 2006. The SEZ stands notified over an area of 10.42 hectares. The developer has been granted four extensions validity period of which was upto 30th June, 2013. The developer has requested for further extension so as to implement the project.

The developer has made following investments/plans.

(i) Completed the acquisition process for 15.58 acres of land (ii) The developer would able to complete the development of 100,000 sqm on this extent

of land and meet the minimum area requirement as per amended provisions of the SEZ (Amendment) Rules, 2013.

(iii) The developer would proceed with the notification upon receipt of the approval for the extension and commence the development process.

The reasons for seeking extension has been mentioned as delay in land acquisition

process due to litigation and other commercial differences with the parties who had agreed to transfer land.

DC has recommended the proposal for extension of validity of formal approval by one year.

The proposal is placed before BoA for consideration.

Page 10: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

10

(b) Proposal for decrease in area of the SEZ

The developer has also proposed to decrease the existing land area from 10.42 hectares to 6.31 hectares.

The proposal for decrease in area shall be considered on file in terms of decision taken by the BoA in its 60th meeting held on 08.11.2013.

(c) Proposal for change of name of the developer from Bagmane Builders Pvt. Ltd. (BBPL) to Bagmane Developer Pvt. Ltd. (BDPL) Consequent on issue of Hon’ble High Court of Karnataka Order dated 06.11.2013 for

sanction of merger of BBPL into BDPL, based on the Company Petition filed by Bagmane Developers Pvt. Ltd and Bagmane Builders Pvt. Ltd., BBPL has requested for change in the developer of the SEZ from BBPL to BDPL. The Developer has also informed that, after merger the Developer will function as BDPL.

DC has recommended the proposal.

The proposal is placed before BoA for consideration.

(xvii) Request of M/s. DS Realtors Pvt. Ltd. for further extension of the validity period of formal approval, granted for setting up of sector specific SEZ for IT sector at NH-8, Village Kukrola and Sehrewan, District Gurgaon, Haryana, beyond 23rd October, 2012

The developer was granted formal approval for setting up the above mentioned SEZ,

over an area of 56.65 hectares, vide LoA dated 23rd October, 2007. The SEZ is yet to be notified. The developer has already been granted two extensions. The validity of the last extension was up to 22nd October, 2012. The developer has requested for further extension of the validity.

The proposal was earlier forwarded by DC NSEZ at the time of BoA meeting on

18.01.2013. At that time, O/o DC NSEZ had noted that even after 5 years of its LoA the developer has failed to submit the requisite documents for notification of the SEZ. Besides, the proposal for extension in the validity of formal LoA has been received by 10.10.2012, however, as per condition no. (xvii) of LoA, the developer is required to submit proposal for extension in the validity period of LoA before six months of its expiry. The proposal was returned to DC NSEZ with a request to furnish the following details:-

(i) Present status of the project (ii) Reasons of delay and the justifications (iii)Whether DC NSEZ finds the justification to be adequate and agree with this (iv) Future plans of the developer alongwith clear cut road map (v) Overall recommendations of the DC

Now, DC NSEZ has forwarded the proposal for extension of LoA informing that the

developer has stated that they are vigorously progressing required approvals from various authorities. They have applied for NOC for Environmental Clearance and have invested considerable resources in terms of money, time and human efforts. The developer has informed that they have come to know that their land on which SEZ is coming up, has been proposed for acquisition by HSIIDC, Gurgaon by Notification issued under Section – 4 of the

Page 11: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

11

Land Acquisition Act. They have also informed that the case for release of the land is pending with the Hon’ble Supreme Court. Therefore, developer has stated that there will be some delay, in further development of the project, is anticipated.

The steps taken by the developer for implementation of the project (i) Procurement of 140 acres of land and its development (ii) Preparation of detailed project report (DPR) (iii) Completion of Environmental clearance study, several presentations to SEAC

(State Expert Appraisal Committee) & SEIAA (State Environment Impact Assessment Authority).

(iv) Comprehensive report prepared for obtaining Concurrence of Govt. of Haryana

(v) Applied for permission for drawal of water etc. Developer has indicated a time frame of 3 years for completion of the project.

Reasons for seeking extension has been indicated as “Case pending with Supreme Court against acquisition; getting approvals / clearances, environmental clearance etc are complex and time consuming processes”.

DC, NSEZ has not acceded to the request for issuing recommendation for the

proposal of developer for extension in the validity period of LoA. The request is placed before BoA for consideration.

(xviii) Request of Orissa Industrial Infrastructure Development Corporation (IDCO) for extension of the validity period of formal approval, granted for setting up of sector specific SEZ for IT/ITES at villages Gaudakashipur and Arisal, Tehsil Jatni, District Khurda, Orissa, beyond 24th April 2014

The developer was granted formal approval vide LoA dated 25th October 2006. The SEZ stands notified over an area of 106.260 hectares.

The developer has been granted five extensions validity period of which is upto 24th

April, 2014.

The developer has requested for further extension so as to implement the project. The developer has made following investments/plans. (i) Four lane access road, 132 KV Power Substation as well as the feeder

transmission line are in progress. (ii) Provision of water supply is available at SEZ site. (iii) Environmental Clearance for the project has been obtained from SEIAA,

Odisha (iv) Infosys Ltd has been co-opted as co-developer and Anchor Tenant in the SEZ.

They have been allotted 50.919 acres of land in the SEZ for their development centre. Their project construction work is in progress.

(v) Preparation is on for participating in the Road shows arranged in Sillicon Valley, California, USA for attracting investor to the park, IDCO is also

Page 12: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

12

activity considering to join had with the Hsinchu Science Park of Taiwan for establishing a dedicated IT/ITES Electronics Park within the notified SEZ.

DC FSEZ has recommended the request for its consideration by BoA for a period of

one year.

The request of the developer is accordingly placed before BoA for its consideration.

(xix) Request of M/s. Saraf Agencies Private Ltd. for extension of the validity period of formal approval, granted for setting up of sector specific SEZ for Mineral based Industries at Chhatrapur, District Ganjam, Orissa, beyond 26th February 2014

The developer was granted formal approval vide LoA dated 27th February, 2009. The SEZ stands notified over an area of 105.1953 hectares.

The developer has been granted two extensions validity period of which is upto 26th

February, 2014.

The developer has requested for further extension so as to implement the project.

The developer has made following investments/plans. (i) Boundary wall – 3080 meter out of 3499 meter has been completed (ii) Power including construction – 11 KV construction for Power supply in

process (iii) Water – NOC from Government of India received (iv) Construction water – Bore wells constructed (v) Supply of equipments – payment of USD 58.50 lakhs made (vi) Civil work – Rs. 2.5 crores spent on foundation and other civil work.

DC FSEZ has recommended the request for its consideration by BoA for a period of

one year.

The request of the developer is accordingly placed before BoA for its consideration. (xx) Request of M/s. Vedanta Aluminium Limited for extension of the validity period of formal approval, granted for setting up of sector specific SEZ for Manufacture and Export of Aluminium at village Bhurkamunda & Bhagki palli Tehsil & District Jharsuguda, Orissa beyond 22nd May, 2014

Formal approval was granted vide LoA dated 23rd May, 2007. The SEZ stands notified as on date. The developer has been granted four extensions the validity of which will expire on 22nd May, 2014

The developer has requested for further extension by one more year. DC has recommended the proposal for extension for one year considering the

advanced status of the project status and steps taken by the developer. The request is placed before BoA for consideration

Page 13: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

13

(xxi) Request for further extension of LoA from M/s. Beneficent Knowledge Parks & Properties Limited for setting up a multi services SEZ at Parigi and Serikokum Villages, Parigi Mandal, C. Kodigepalli village, Madakasara Mandal, Anantapur District, Andhra Pradesh, beyond 4th February 2014

Formal approval to the developer was granted on 4th February, 2008. The SEZ was notified on 23rd April, 2009 over an area of 366.455 hectares. The developer has been granted three extensions of the formal approval, the validity of which was up to 4th February, 2014.

The developer has requested for extension of validity of formal approval for a period

of one more year. The developer has informed that it has proposes to undertake completion of the

project in the following manner: (a) II Notification of multi product SEZ: March 2014 (b) Change of sector from sector specific to multi product April 2014 (c) Demarcation of processing and non-processing areas May 2014 (d) Boundary walls June 2013 (e) ICD July 2014 (f) Development of FTZ August 2014

DC VSEZ has recommended the proposal. The request of the developer is accordingly placed before BoA for its consideration.

(xxii) Request for further extension of LoA from M/s Kerala Industrial Development Corporation (KINFRA) , for setting up a sector specific SEZ for Electronics Industries at Village Thrikkakkara, Ernakulam District, Kerala , beyond 20th February 2014

Formal approval to the developer was granted on 21th August, 2006. The SEZ stands notified as on date. The developer has been granted five extensions of the formal approval, the validity of which was up to 20th February, 2014.

The developer has sought for further extension up to 19.08.2014 due to delay in

completion of 1st phase building due to financial issues of the co-developer. The developer has informed of completing the following tasks worth Rs. 10 crores. (a) Compound walls completed. (b) External power supply for SEZ including 110 KV substation completed. (c) Water supply distribution system nearing completion. (d) External road development completed. (e) Co-developer commenced construction of 1st phase building (3lakh sq ft.). Piling

and two basement floors completed. Co-developer has invested Rs. 680 lakhs. (f) Site development partially completed. (g) Construction of 30000 sqft building commenced.

Page 14: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

14

DC CSEZ has recommended the proposal for further extension for a period of six months.

The request of the developer is accordingly placed before BoA for its consideration.

(xxiii) Request of M/s. Ascendant Estates Pvt. Ltd. for further extension of the validity period of formal approval, granted for setting up of sector specific SEZ for IT/ITES at Village Bhondsi, Tehsil Sohna, Gurgaon, Haryana, beyond 5th November, 2012

Formal approval to the developer was granted on 6th November, 2006. The SEZ

stands notified as on date. The developer has been granted three extensions validity period of which has expired on 5th November, 2012.

The request from the developer for grant of further extension was considered by the

BoA in its 60th meeting held on 08.11.2013. The Board noted that the progress made by the developer since the last extension is not satisfactory. The Board after deliberations rejected the proposal of further extension and directed the DC NSEZ to issue notice for cancellation of LoA.

Now, the developer has again requested for extension of validity of formal approval

by one year from the date of approval. The developer has made following investment/plans:-

(1) Investment of more than Rs. 30 crores on land. (2) Development of land and approach road (3) Fencing of notified land

The developer has stated that the delay is due to drastic changes in Global Financial

Market and recession in IT industry and substantial decline in absorption of IT space. Recommendation of the DC NSEZ is awaited. The request of the developer is accordingly placed before BoA for its consideration.

(xxiv) Request of M/s. Gopalan Enterprises (India) Private Limited for further extension of the validity period of formal approval, granted for setting up of sector specific SEZ for IT/ITES at Mahadevapura & Kaggadaspura, K.R. Puram, Whitefield, Bangalore, Karnataka, beyond 2nd July, 2013

Formal approval to the developer was granted on 3rd July, 2007. The SEZ was notified

on date. The developer has been granted three extensions of the formal approval, the validity of which was up to 2nd July, 2013.

The developer has requested for extension of validity of formal approval for a period

of one more year. The developer has informed that the implementation of the project is delayed owing

to delay in getting the approval of development plan from BDA. They have incurred an amount of Rs. 66 lakhs towards development fee to BDA and another Rs. 5.08 crores towards other fees/approvals and expenses for clearing and development of land.

Page 15: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

15

DC has recommended the proposal for extension of validity of formal approval by

one year. The request of the developer is placed before the BoA for consideration.

(xxv) Request of M/s. Smart City (Kochi) Infrastructure Pvt. Ltd. for further extension of the validity period of formal approval, granted for setting up of sector specific SEZ for IT/ITES at Block 9, Kakkanad Village, Kanayannor Taluk, Ernakulam District, Kerala, beyond 20th April, 2014

Formal approval to the developer was granted on 21st April, 2008. The SEZ stands notified as on date. The developer has been granted three extensions of the formal approval, the validity of which was up to 20th April, 2014.

The developer has requested for extension of validity of formal approval for a period

of one more year. The developer has informed that the construction of 1st IT building of 6.5 lakhs sqft. is

under progress and is likely to be complete by April, 2015. Infrastructure work such as these connectivity with public road is under implementation. The developer propose to complete implementation of phase – 1 with a total investment of Rs. 280 crores by March, 2014, Phase-II with a total investment of Rs. 660 crores by October, 2016 and Phase-III with a investment of Rs. 3300 crores by 2020.

The SEZ is being developed by SPV of which Government of Kerala is a partner. DC CSEZ has recommended the proposal for extension of validity of formal approval

by one year. The request of the developer is placed before the BoA for consideration.

(xxvi) Request of M/s. Ansal Colours Engineering SEZ Ltd. for further extension of the validity period of formal approval, granted for setting up of sector specific SEZ for Agro & Food Processing Products at Village Bhigan and Kurar Ibrahimpur, Near Murthal, Distt. Sonepat (Haryana) beyond 17th June 2013

The developer was granted formal approval for setting up the above mentioned SEZ, vide LoA dated 18th June, 2008. The SEZ stands notified as on date. The developer has been granted two extensions. The validity of the last extension was up to 17th June, 2013. The developer had requested for further extension of validity period of formal approval by one year. The proposal was included in the 59th meeting of the BoA held on 30th August, 2013 wherein it was decided that before approving the said request of the developer, the opinion of State Government be obtained on the issue of contiguity of the SEZ land. Till such time the request for extension will be in abeyance.

DC NSEZ has now informed that the State Government has given the NOC for part de-notification of 75.55 hectares from the notified area of 101.24 hectares on 02.01.2014. The

Page 16: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

16

proposal of part de-notification is already under consideration on file in the Department of Commerce.

DC NSEZ has forwarded the proposal for extension for a period of one year. The request of the developer is placed before the BoA for consideration.

Item No. 61.2: Request for extension of In-Principal Approval (i) Request for grant of extension of in-principle approval to M/s. Mumbai SEZ Limited for setting up of multi product SEZ at Khop ta, District Raigad, Maharashtra

The above mentioned developer was granted in-principle approval on 8th August, 2006. In terms of SEZ Rules, the validity of the above mentioned in-principle approval was up to 7th August, 2007. The developer has been granted six extensions the validity of which has expired on 7th August, 2013. The developer has applied for seeking further extension of validity of his in-principle approval for one more year i.e. up to 7th August, 2014.

DC NMSEZ has informed that the developer has invested Rs. 1800 crores on land as on date and the balance acquisition to achieve contiguity can be done after the enactment of new land acquisition (amendment) bills and R&R bill which has been delayed. DC NMSEZ has further observed that the developer has so far acquired all private lands and is not sitting over Government land.

The proposal was earlier considered in the 58th meeting of the BoA held on 12th June,

2013. The Board deferred the proposal and decided to obtain the views of the State Government on the issue before considering the extension.

The State Government has now recommended the further extension of validity period of in-principle approval for one year.

DC has recommended the proposal. The proposal is, accordingly, placed before BoA for its consideration.

Item No. 61.3: Requests for extension of LoP beyond 3rd Year onwards

(i) Request of M/s Dr. Reddy’s Laboratories Limited - CTO, a unit in Dr. Reddy’s Laboratories SEZ for manufacture of Pharmaceuticals & APIs at Devunipatavalsa village, Ranasthalam Mandal, Srikakulam District, Andhra Pradesh for extension of validity period of its LoP beyond 12th January, 2014

The above mentioned unit was granted LoP on 13th January, 2010 for manufacture of Pharmaceuticals & APIs for export. Thereafter the developer has been granted three extensions by DC VSEZ validity of which has expired on 12th January, 2014.

The unit has stated that they have completed all the works relating to the unit (plant & machinery). At present, trial and validation batches of some products are in progress. The stringent norms take more time for commercialization of the Pharma plant. The unit has expecting to commercialize three to four products in the first quarter of 2014-15.

Page 17: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

17

The unit has invested an amount of Rs. 122 crores in the project and additionally an

amount of Rs. 30 crores is likely to be invested on this project towards additional machinery.

DC VSEZ has recommended the request of extension of LoP for a period of one year (Annexure-1).

The request is placed before BoA for its consideration. (ii) Request of M/s Dr. Reddy’s Laboratories Limited - FTO, a unit in Dr. Reddy’s Laboratories SEZ for manufacture of Pharmaceuticals & APIs at Devunipatavalsa village, Ranasthalam Mandal, Srikakulam District, Andhra Pradesh for extension of validity period of its LoP beyond 18th April, 2014

The above mentioned unit was granted LoP on 19th April, 2010 for manufacture of Pharmaceuticals & APIs for export. Thereafter the developer has been granted three extensions validity of which has expired on 18th April, 2014.

The unit has informed that the criticality in Pharma sector is that they need to obtain number of approvals from various statutory agencies including FDA for export of the approved products. At present they are undertaking trial runs and validation batches of some of the products are in progress and is expected to commercialise the production of some of the products during the first quarter of 2014-15. Hence, the unit has requested to extend the Letter of Approval by another one year i.e. upto 18.04.2015.

DC has recommended the request of extension of LoP for a period of one year (Annexure -2).

The request is placed before BoA for its consideration. (iii) Request of M/s. Amneal Life Sciences Pvt. Ltd., a unit in the sector specific SEZ for Pharmaceuticals being developed by M/s. Zydus Pharma SEZ at Ahmedabad, Gujarat for extension of Letter of Permission (LoP) beyond 4th April 2014

M/s. Amneal Life Sciences Pvt. Ltd., was granted LoP for setting up a unit in the above mentioned SEZ, vide LoP dated 5th April, 2010 for manufacture of various pharmaceuticals products. The unit has been granted three extensions by the O/o DC, KASEZ validity of which is up to 4th April, 2014.

The unit has requested for further extension of the validity of the LoP beyond 4th

April, 2014 The unit has invested Rs. 142.72 crores in the project out of which Rs. 52.20 crores is

for construction of factory buildings and Rs. 80.04 crores is for plant and machinery etc. The unit has started trial production and initiated the process of various regulatory

approvals from various overseas agencies which could take another 20-24 months. DC KASEZ has recommended the request of extension of LoP for a period of one

year. The request is placed before BoA for its consideration.

Page 18: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

18

(iv) Request of M/s. Zydus Technologies Ltd., a unit in the sector specific SEZ for Pharmaceuticals being developed by M/s. Zydus Pharma SEZ at Ahmedabad, Gujarat for extension of Letter of Permission (LoP) beyond 28th June 2014

M/s. Zydus Technologies Ltd., was granted LoP for setting up a unit in the above

mentioned SEZ, vide LoP dated 29th June, 2009 for manufacture of various Transdermal patches (medical patches). The unit has been granted four extensions validity of which is up to 28th June, 2014.

The unit has requested for further extension of the validity of the LoP beyond

28th June, 2014 The unit has invested Rs. 338.90 crores in the project out of which Rs. 53.43 crores

for construction of factory building and installation of plant and machinery and Rs. 285.47 crores on product development up to September, 2013.

The unit has stated that Transdermal Patches being an extremely complex form of

dosage for delivering the medicine to a human body, the regulations are becoming more stringent keeping in view the quality issues in many national and multinational companies. On account of the approval pending for the products developed, the units is unable to commence commercial production and it is expected that the same could take 5-7 years from issuance of LoA.

DC KASEZ has recommended the request of extension of LoP for a period of one year.

The request is placed before BoA for its consideration.

(v) Request of M/s. Sajjan Specialty Ltd., a unit in Dahej SEZ for extension of Letter of Permission (LoP) beyond 8th November 2013

M/s. Sajjan Specialty Ltd., was granted LoP for setting up a unit in the above

mentioned SEZ, vide LoP dated 9th November, 2010 for manufacture and export of various Organic Chemicals. The unit has been granted two extensions by the O/o DC, Dahej validity of which was up to 8th November, 2013.

The unit has requested for further extension of the validity of the LoP beyond

8th November, 2013 The unit has invested Rs. 9 crores for the project in SEZ, which includes land and

other preliminary work. The project implementation schedule/timeline submitted by the unit is as under:-

(i) Completion of civil and structural works: January, 2015 (ii) Erection and installation of plant & machinery: October, 2015 (iii) Commissioning of the plant/production: January, 2016 DC has stated that the unit requires extension in validity of LoP for the fourth year

from the BoA, in the absence of completion of two-thirds of activities including construction, as stipulated in terms of the second proviso of Rule 19(4) of the SEZ Rules, 2006. The unit

Page 19: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

19

could not commence production within the time since they faced hurdles and circumstances beyond their control to implement the approved project in time.

DC Dahej has recommended the request of extension of LoP for a period of one year. The request is placed before BoA for its consideration.

(vi) Request of M/s. KSK Surya Photovoltaic Venture Private Limited, a unit in the sector specific SEZ for Semiconductors being developed by M/s. FAB City SPV (India) Private Limited at Raviryala village, Maheswaram Mandal, Ranga Reddy District, Andhra Pradesh, for extension of Letter of Permission (LOP) beyond 11th November 2013

M/s. KSK Surya Photovoltaic Venture Private Limited, was granted LoP for setting

up a unit in the above mentioned SEZ, vide LoP dated 12.11.2008 for manufacture of Photovoltaic Cells. The unit has been granted four extensions validity of which was up to 11.11.2013.

The unit has requested for further extension of the validity of the LoP beyond

11.11.2013. The unit has invested Rs. 100 crores in the project. DC VSEZ has recommended the request of extension of LoP for a period of one year. The request is placed before BoA for its consideration.

(vii) Request of M/s. Ipca Laboratories Limited, a unit Indore SEZ at Plot No. 1, Phase – II, Pithampur, District Dhar, Madhya Pradesh for extension of Letter of Permission (LoP)

M/s. Ipca Laboratories Ltd., a unit in Indore SEZ had been issued LoA dated

09.11.2004 for manufacturing of formulations of pharmaceuticals (tablets and capsules). The unit has requested for extension of validity of LoA dated 09.11.2004 for a further

period of 2 years and 14 days beyond the earlier declared date of commencement of commercial production to the revised date approved by the UAC under Rule 19(4) of SEZ Rules 2006. The subject LoA was issued in terms of the provisions of Chapter 7 of the then prevailing FTP i.e. prior to the enactment of the SEZ Act, 2005 and Rules framed there under and in terms of the condition of the LoA, the unit was required to implement the project and commence production within 3 years from the date of issue of LoA i.e. upto 08.11.2007. As per governing provisions, the validity of LoA could be extended upon receipt of application by the unit before the end of the validity period and in terms of the request submitted by the unit for further extension of the validity of LoA, the same was extended for a further period up to 24.11.2008 i.e. the date of commencement of production declared by the unit as per the conditions of the LoA.

M/s. Ipca Laboratories Ltd. filed an appeal before the BoA for SEZs for ex-post facto

approval for extension of their LoA dated 09.11.2004 beyond the earlier declared date of commencement of commercial production under sub rule 4 of Rule 19 of SEZ Rules 2006

Page 20: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

20

including re-consideration of date of commencement of commercial production against the decision of the UAC which was considered in the 59th BoA meeting held on 30.08.2013. The Board after deliberations, decided to remand the issue back to the UAC with directions to reconsider the matter after giving an opportunity to the unit to present all the facts of the case.

The request of the unit was taken up in the UAC on 18.11.2013 and approved the

same for re-consideration of date of commencement of commercial production as 7.12.2010. With regards to extension of the LoA dated 9.11.2004 for the intervening period from 24.11.2008 to 7.12.2010, the same was also agreed in-principle by the Committee wherein the extension may be granted duly condoning the delay in terms of the provisions of Rule 19(4) of SEZ Rules, 2006 within the stipulated powers granted to the Competent Authority and to take up the matter before the Board of Approval for SEZs to extend the validity up to the actual date of production commenced by the unit, as the time period has already lapsed.

The present extension sought by the unit is up to 7.12.2010 which is beyond the

power of the DC, since in terms of Rule 19, DC has the power to grant extension up to 3 years only beyond original validity, and in this case, the period recommended by the UAC exceeds 3 years.

DC has recommended that the request of the unit for approval of extension of validity

of their LoA dated 9.11.2004 may be considered and the LoA may be extended for a further period of 2 years and 14 days beyond the earlier declared date of commencement of commercial production i.e. beyond 24.11.2008 i.e. to the revised date approved by the UAC i.e. up to 7.12.2010.

The request is placed before BoA for its consideration.

(viii) Request of M/s. Sameer Industries, a unit KASEZ for extension of Letter of Permission (LoP)

The unit has been issued LoA dated 23.09.1995 for “Recycled items for imported

scrap such as MS Scrap, MH Scrap, CI Scrap, Copper-Brass-Aluminium and other minor metal scrap, and recycling of brass and copper dross”. The unit was given permission for broad-banding for "Cleaving of rough diamonds" and "Processing of cereals, oils seeds and agro products" from time to time. The renewal of the LOA was due w.e.f. 01.11.2005 which was not considered for want of clearance from GPCB for consent and authorization. Gujarat Pollution Control Board issued the NOC on 24.10.2008.

In the 33rd meeting of the BOA held on 02.06.2009 the extension of LOA was granted for a period of five years viz, 31.10.2005 to 31.10.2010. Thus, actually the validity left for operation of the unit was only for the period between 02.06.2009 to 31.10.2010. The unit again applied for further extension on 30.11.2010 which was rejected by BoA in its 44th meeting held on 14.01.2011 on the ground that there was no activity during the last five years. It was also observed by the BOA that the unit was engaged in manufacturing of recycled items from imported scrap/old and used machinery items and decided that such units should be discouraged from operating in the SEZ.

Against the decision of the BOA the unit vide their letter dated 25.01.2011 have represented for reconsideration of the decision of the BOA. The main points raised by the unit were as under:

Page 21: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

21

(i) They have positive NFE in the last block year, in which they were operational. (ii) They have invested more than 260 lakhs in the zone which is lying idle. (iii)Gujarat Pollution Control Board issued their consent on 24.10.2008 and the

LOA was renewed as per the decision of the BOA on 02.06.2009 up to 31.10.2010. (iv) There was a case of seizure of their goods effected by SIIB, Kandla Customs and thus

they were not able to operate even after renewal of LOA. The said case has been settled now by the order issued by CESTAT and Customs has vacated the said seizure.

(v) They will be providing employment to 350 people.

DC KASEZ has further stated that as per the letter dated 28.01.2009 addressed to the unit, the Central Pollution Control Board (CPCB) clarified that Mix metal scrap and other Non-ferrous metal scrap are not covered under the Schedule 4 of the HW(MH&TM) Rules, 2008 and hence registration for procuring and processing of these raw material is not required from CPCB and they are required to obtain consent and authorization from GPCB for the same. Further, the unit has submitted letter dated 22.11.2013 for clearance of goods to DTA on payment of duty and renewal of LOA for further period of five years to this office, in which they have also submitted a copy of certificate issued by the Gujarat Pollution Control Board valid up to 20.08.2014.

DC KASEZ has submitted the following facts for consideration:

(i) As the unit is engaged in recycling of non-ferrous metal scrap, under Rule 18 (4) (d), permission for extension of LOP can be granted by BOA only.

(ii) The firm has been representing in the matter. The matter was last considered by BoA in its 53rd meeting held in June 2012 which records that the matter was referred for further examination by DC, KASEZ.

DC KASEZ has stated that the renewal of their LOA was delayed due to delay in

receipt of the NOC from GPCB and by the time it was received major period of their five years block period (01.11.2005 to 31.10.2010) had lapsed and thus no activity could be started. The unit was entirely inactive during this period which was because of renewal issue. However, during their previous block of five years they had achieved positive NFE. It is further to mention that the unit has made up-to-date payment of their shed/ plot rent.

DC KASEZ has recommended the case for renewal of LOP by the BoA subject to following conditions:

(i) The extension of LOP beyond 20.08.2014 will be subject to further

extension of their permission by GPCB. (ii) The extension of LOP will be subject to fulfillment of all the conditions

mentioned in CPCB's permission and other usual conditions of LOP. (iii) No broad banding of any other item shall be allowed.

The request is placed before BoA for its consideration.

Page 22: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

22

(ix) Request of M/s Kaizen Power Limited, a unit in APSEZ at Atchutapuram, Visakhapatnam District, Andhra Pradesh for extension of validity period of its LoP beyond 13th October, 2013

The above mentioned unit was granted LoP on 13th October, 2010 for setting up of 300 MW power in APSEZ over an area of 153 acres. Thereafter the developer has been granted two extensions by DC APSEZ validity of which has expired on 13th October, 2013.

The unit now requires extension in validity of LoP for the fourth year and beyond in

the absence of completion of two-third of activities including construction in terms of second proviso of Rule 19 (4) of SEZ Rules, 2006.

DC has informed that the unit has not initiated any project work till date and intimated that the reason for delay is due to R&R problem. The matter has been informed to the developer APIIC on 1.11.2013 for immediate action. The Managing Director APIIC informed DC APSEZ that one Special Officer is being appointed to resolve the R&R issue.

The developer has requested for further extension so as to implement the project. Status of implementation of the project: (i) Boundary wall 98 % (ii) Area grading 75% (iii) Construction power 95% (iv) Site office 30 % (v) Bathymetric survey 100% (vi) Preliminary soil investigation 100% DC has recommended the request of extension of LoP for a period of one year.

The request is placed before BoA for its consideration.

(x) Request of M/s. Alstom Bharat Forge Power Ltd., a unit of APSEZ at Mundra, Kutch, Gujarat for extension of Letter of Permission (LOP) beyond 2nd February 2014

M/s. Alstom Bharat Forge Power Ltd., was granted LoP for setting up a unit in the above mentioned SEZ, vide LoP dated 3rd February, 2010. The unit has been granted three extensions validity of which was upto 02.02.2014.

The unit has requested for further extension of the validity of the LoP beyond

3rd February, 2014. DC has stated that the unit was unable to construct at the site since 9th May 2012

when the Gujarat High Court stopped all construction work at APSEZ due to absence of Environment Clearance to APSEZ.

DC has recommended the proposal for extension upto 02.02.2015. The request of the unit is accordingly placed before BoA for its consideration.

Page 23: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

23

(xi) Request of M/s. Kalyani Alstom Power Ltd., a unit of APSEZ at Mundra, Kutch, Gujarat for extension of Letter of Permission (LOP) beyond 2nd February 2014

M/s. Kalyani Alstom Power Ltd., was granted LoP for setting up a unit in the above mentioned SEZ, vide LoP dated 3rd February, 2010. The unit has been granted three extensions validity of which was upto 02.02.2014.

The unit has requested for further extension of the validity of the LoP beyond

3rd February, 2014. DC has stated that the unit was unable to construct at the site since 9th May 2012

when the Gujarat High Court stopped all construction work at APSEZ due to absence of Environment Clearance to APSEZ.

DC has recommended the proposal for extension upto 02.02.2015. The request of the unit is accordingly placed before BoA for its consideration.

(xii) Request of M/s. Tata Consultancy Services Limited, a unit in MIHAN SEZ, Nagpur, Maharashtra for extension of Letter of Permission (LOP) beyond 23rd April, 2014

M/s. Tata Consultancy Services Limited was granted LoP for setting up an IT/ITES unit in MIHAN SEZ, vide LoP dated 24th April, 2008. The unit has been given six extensions validity of which is up to 23rd April, 2014.

The unit has requested for extension of the validity period of its LoP up to 31st

December, 2014. DC MIHAN SEZ has recommended the request stating that the unit has already

invested Rs. 460.74 crores in the project and completed almost 53% of the construction work.

The request is placed before the BoA for consideration.

(xiii) Request of M/s. G. Metals Company, a unit in NSEZ at Plot No. 98, NSEZ for extension of validity period of its LoP beyond 27th October, 2013

M/s. G. Metals company has been issued LoP on 28.10.2010 for manufacturing of

precious metals including non ferrous alloys, chains, jewellery, finding components. The unit has been granted two extensions by DC, the last extension was given up to 27.10.2013.

Now the unit applied for further extension for next two years i.e. up to 27.10.2015 so

as to enable it to reconstruct the building & implement the LoP. Since, LoP extension beyond 27.10.2013 for next one year (fourth year) i.e. up to

27.10.2014 can only be given subject to production of a Chartered Engineer certificate regarding completion of 2/3rd activities, as per second proviso to Rule 19(4) of SEZ Rules, 2006, which the unit has not been able to produce as it has yet to start construction work at the allotted plot, its proposal for LoP extension was placed before the Unit Approval Committee, which decided to refer the proposal to the BoA.

Page 24: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

24

DC NSEZ has forwarded the proposal for consideration by the BoA.

The request is placed before BoA for its consideration.

(xiv) Request of M/s. Sesa Sterlite Ltd., a unit in Vedanta Aluminum Limited SEZ at Jharsuguda, Odisha for extension of validity period of its LoP beyond 8th April 2014

M/s. Sesa Sterlite Ltd. has been issued LoP on 9th April, 2009 for setting up aluminum manufacturing facilities. The unit has been granted three extensions, validity of which is up to 8th April, 2014.

Now the unit has applied for further extension of one more year. The unit has completed all construction work and installation of machinery. As the

unit has completed five years and their activities are at advance stage of completion, DC has recommended extension of one year for completion of balance formalities.

The request is placed before BoA for its consideration. (xv) Request of M/s. Trendy Rooms Export Pvt. Ltd., a unit in GIDC – AAP SEZ at Ahmedabad for extension of validity period of its LoP beyond 2nd June 2012

M/s. Trendy Rooms Export Pvt. Ltd. has been issued LoP on 3rd June, 2010 for

manufacture and export of readymade garments. The unit has been granted one extension by DC, validity of which was up to 2nd June, 2012.

The unit vide letter dated 10th December, 2012 reported the death of their Director due

to which the entire project got held up and they could not start commercial production. So far they have invested an amount of 36.93 lakhs towards purchase of land in the SEZ.

The unit now requires extension in validity of LoP for the fourth year and beyond in

the absence of completion of two-third of activities including construction in terms of second proviso of Rule 19 (4) of SEZ Rules, 2006.

DC KASEZ has recommended the proposal for extension for a period of six months

since the unit faced hurdles and circumstances beyond their control to implement the project in time and have already made a substantial investment in SEZ.

The request is placed before BoA for its consideration.

(xvi) Request of M/s. Makhteshim-Agan India Pvt. Ltd., a unit in Dahej SEZ at Bharuch, Gujarat for extension of validity period of its LoP beyond 5th January, 2013

M/s. Makhteshim-Agan India Pvt. Ltd. has been issued LoP on 6th January, 2010 for

manufacture and export of 1) Herbicides & its intermediate products; and 2) formulations. The unit has been granted two extensions by DC, validity of which was up to 5th January, 2013.

The unit had reported that due to change of ownership of the company, the new

management had shelved the approved project. However, the group have now decided to

Page 25: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

25

revive the investment proposal and intend to invest Rs. 500 crores to set up the proposed plant. The unit have already invested Rs. 22.94 crores on land.

The project implementation schedule/time line submitted by them indicates

commencement of trial production by April, 2015 and commercial production by September, 2015.

The unit now requires extension in validity of LoP for the fourth year and beyond in

the absence of completion of two-third of activities including construction in terms of second proviso of Rule 19 (4) of SEZ Rules, 2006.

DC has recommended the proposal for extension up to 5th January, 2015 in view of

substantial investment made on land. The request is placed before BoA for its consideration.

(xvii) Request of M/s. Microtek Infocom Limited, a unit in MIDC SEZ at Plot No. 26/2, Rajiv Gandhi Infotech Park, Hinjewadi, Phase-III, Maharashtra for extension of validity period of its LoP beyond 2nd March 2014

M/s. Microtek Infocom Limited has been issued LoP on 3rd March, 2011. The unit has

been granted two extensions by DC, validity of which was up to 2nd March, 2014. The unit has stated that due to slowdown in IT industry, they could not achieve any

progress at the site till now. However, following activities has been undertaken:- (a) Architect’s and structural engineers have been appointed and a sum of Rs. 6 lacs

have already been paid to them. (b) The drawings have been submitted to MIDC for approval

The unit now requires extension in validity of LoP for the fourth year and beyond in

the absence of completion of two-third of activities including construction in terms of second proviso of Rule 19 (4) of SEZ Rules, 2006.

The unit intends to commence construction immediately after the approval of the plan so as to make the unit operational as per MIDC norms at the earliest. The construction of building will be completed within desired extension period before March, 2015 and the same shall be operational after completing the MIDC norms within the extension period.

DC has requested to consider the proposal for extension of validity period by the BoA (Annexure -3).

The request is placed before BoA for its consideration.

(xviii) Request of M/s. Microtek Infocom Limited, a unit in MIDC SEZ at Plot No. 13/10-A, Rajiv Gandhi Infotech Park, Hinjewadi, Phase–III, Maharashtra for extension of validity period of its LoP beyond 2nd March 2014

M/s. Microtek Infocom Limited has been issued LoP on 3rd March, 2011. The unit has

been granted two extensions by DC, validity of which was up to 2nd March, 2014.

Page 26: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

26

The unit has stated that due to slowdown in IT industry, they could not achieve any

progress at the site till now. However, following activities has been undertaken:- (a) Architect’s and structural engineers have been appointed and a sum of Rs. 6 lacs

have already been paid to them. (b) The drawings have been submitted to MIDC for approval

The unit now requires extension in validity of LoP for the fourth year and beyond in

the absence of completion of two-third of activities including construction in terms of second proviso of Rule 19 (4) of SEZ Rules, 2006.

The unit intends to commence construction immediately after the approval of the plan so as to make the unit operational as per MIDC norms at the earliest. The construction of building will be completed within desired extension period before March, 2015 and the same shall be operational after completing the MIDC norms within the extension period.

DC has requested to consider the proposal for extension of validity period by the BoA (Annexure -4).

The request is placed before BoA for its consideration.

(xix) Request of M/s. Microtek Infocom Limited, a unit in MIDC SEZ at Plot No. 22/2, Rajiv Gandhi Infotech Park, Hinjewadi, Phase–III, Maharashtra for extension of validity period of its LoP beyond 10th March 2014

M/s. Microtek Infocom Limited has been issued LoP on 11th March, 2011. The unit

has been granted two extensions by DC, validity of which was up to 10th March, 2014. The unit has stated that due to slowdown in IT industry, they could not achieve any

progress at the site till now. However, following activities has been undertaken:- (a) Architect’s and structural engineers have been appointed and a sum of Rs. 6 lacs

have already been paid to them. (b) The drawings have been submitted to MIDC for approval

The unit now requires extension in validity of LoP for the fourth year and beyond in the absence of completion of two-third of activities including construction in terms of second proviso of Rule 19 (4) of SEZ Rules, 2006.

The unit intends to commence construction immediately after the approval of the plan so as to make the unit operational as per MIDC norms at the earliest. The construction of building will be completed within desired extension period before March, 2015 and the same shall be operational after completing the MIDC norms within the extension period.

DC has requested to consider the proposal for extension of validity period by the BoA (Annexure -5).

The request is placed before BoA for its consideration.

Page 27: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

27

(xx) Request of M/s Hospira Healthcare India Pvt. Ltd., a unit in Ramky Pharmacity India Limited SEZ for manufacture of Injectables Formulations at Parawada, Visakhapatnam District, Andhra Pradesh for extension of validity period of its LoP beyond 24th June 2014

The above mentioned unit was granted LoP on 25th June, 2010 for manufacture of Injectables formulations. Thereafter the developer has been granted three extensions validity of which is upto 24th June, 2014.

The unit has informed that they have completed all the works relating to the plant and machinery and they are undertaking trial batches and the USFDA team is expected to visit the unit for inspection during next month and after inspection and approval they expected to commence commercial batches within the next ten months. Hence, the unit has requested to extend the LoP by another one year i.e. up to 25.06.2015.

DC has recommended the proposal of extension of LoP for a period of one year (Annexure -6).

The request is placed before BoA for its consideration. (xxi) Request of M/s Kusum Healthcare Pvt. Ltd., a unit in Indore SEZ for extension of validity period of its LoP beyond 28th February 2014

The above mentioned unit was granted LoP on 14th June, 2010 for manufacturing of tablets, capsules, ointments, dry syrups & injections. The unit has been granted three extensions, validity of which was up to 28th February, 2014.

The unit has applied for further extension of its validity period by one year. The unit has incurred Rs. 325.03 lakhs in the project and actually started activities in

the zone by taking various statutory permissions and exploring new markets. DC Indore SEZ has recommended the proposal of extension for one year (Annexure-7)

The request is placed before BoA for its consideration. (xxii) Request of M/s De Core Nanosemiconductors Ltd., (De-core), a unit in GIDC SEZ for Electronics – IT/ITES at Gandhinagar, Gujarat for extension of validity period of its LoP beyond 14th February, 2014

The above mentioned unit was granted LoP on 15th February, 2010 for manufacture and export of “Light Emitting Diodes (LED) and its Chips. Thereafter the developer has been granted three extensions validity of which has expired on 14th February, 2014.

The unit has stated that they were unable to commence production within the stipulated and extended time limit of the LoA, since they faced un-precedented delays in procuring various clearances, delays on the part of their suppliers/turn-key contractors as they lacked expertise and experience in execution of the project in absence of this industry locally. They have reported that this plant is first of its kind for nano-semoconductor fabrication in India. Presently, they are into the final stages of erection and commissioning of their plant in SEZ. The unit has already invested Rs. 82 crores till date.

Page 28: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

28

DC has recommended the proposal of extension of LoP for a period of six months (Annexure -8).

The request is placed before BoA for its consideration. Item No. 61.4: Request for increase in area

(i) Request of M/s. Larsen & Toubro Ltd. (L&T), developer of sector specific SEZ for IT/ITES at Villages Ankhol and Bapod, District Vadodara, Gujarat for increase in area of its SEZ

The above mentioned SEZ stands notified over an area of 10 hectares.

The developer has requested for addition of an area of 2.1974 hectares and deletion of an area of 7.0867 hectares, thereby making the total area of SEZ as 5.11.07 hectares for expansion of their SEZ.

The request for decrease in area shall be considered on file in terms of decision taken by the BoA in its 60th meeting held on 08.11.2013.

State Government has recommended the proposal subject to NOC of concerned

department that the developer has refunded all the tax/duty benefits availed under SEZ Act/Rules.

DC KASEZ has recommended the request for increase and decrease in the area of the

SEZ. The request of the developer for increase in area of 2.1974 hectares to the existing 10

hectares is placed before the BoA for consideration.

(ii) Request of Electronics Technology Parks-Kerala for addition of area in sector specific SEZ for IT/ITES at Attipra village, Trivan drum Taluk, Kerala

The above mentioned SEZ was notified on 19th November, 2009 over an area of

11.87.65 hectares. The developer has requested for addition of an area of 10.86.23 Ha, thereby making the total area as 22.73.88 Ha.

The area to be added to the SEZ is more than 10% of the area of the SEZ.

State Government of Kerala has recommended the proposal.

DC, CSEZ has recommended the request of the developer. The request of the developer for increase in area is submitted for consideration of the

Board of Approval.

Page 29: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

29

Item No. 61.5: Cases for ratification by the BoA

(i) Request of M/s. Tata Consultancy Services Limited for further extension of the validity period of formal approval, granted for setting up of sector specific SEZ for IT/ITES at Adibatla Village, Ibrahimpatnam Mandal, Ranga Reddy District, Andhra Pradesh, beyond 3rd February, 2014

Formal approval to the developer was granted on 4th February, 2008. The SEZ stands

notified as on date. The developer has been granted three extensions validity period of which is upto 3rd February, 2014.

The developer had requested for further extension so as to implement the project.

The developer has made following investments/plans. (i) Investment of Rs. 416.63 crores on the project (ii) Application for LoA to one unit is also under consideration of the Approval

Committee. DC VSEZ had recommended the request for its consideration by BoA for a period of

one year. The request of the developer was accordingly placed before BoA for its consideration. However, since the meeting of the BoA, which was to be held on 17th January, 2014 got postponed, the DC extended the formal approval of the developer by 3 months i.e. up to 03.05.2014, as the construction work in the SEZ is nearing completion. One unit was issued Letter of Approval and its expected commencement date is March/April 2014.

DC has requested to place the matter before BoA for ratification of extension of

formal approval granted to the developer for 3 months. The request is accordingly placed before BoA for ratification.

(ii) Proposal of M/s. Larsen & Toubro Ltd., a unit in M/s. L&T Shipbuilding Ltd. SEZ at Kattupalli, Tamil Nadu requesting permission to import restricted items

The above mentioned unit was granted LoP for “manufacture, assembly, quality

assurance/quality control, test & trial and load out of “Offshore Platforms and products: Piles, Jackets, Topsides and parts thereof, Floating production and storage units: FPSO, Semi-Submersible, TLP,SPAR, Jack-up Rig and parts thereof”. The unit is operational as on date.

The unit has sought approval for procurement of restricted items that were put in use

in the shipbuilding activities as indicated below:-

Name of the Item IT HS CODE No of quantity required Radar 85261000 1 set Non-Directional Beacon 85269140 1 set

As per Instruction No. 47 issued by this Department, prior approval of BoA to be

obtained for the import/procurement of restricted items from DTA supplier.

Page 30: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

30

The proposal was considered by the BoA in its 60th meeting held on 08.11.2013 and it decided to obtain views of M/o Defence and M/o Home Affairs and process the matter further on file after taking into account the comments so received.

Meanwhile, the unit requested for early clearance of the proposal since the item is to

be exported by 10.02.2014 failing which they will be liable to a heavy penalty. It was noted that the two items imported are not prohibited items and the same will be exported immediately after installation in the offshore platform. Accordingly, the proposal was approved on file anticipating BoA approval.

The proposal is accordingly placed before BoA for ratification.

(iii) Request of M/s. Cadila Healthcare Ltd., a unit in the sector specific SEZ for Pharmaceuticals being developed by M/s. Zydus Pharma SEZ at Ahmedabad, Gujarat for extension of Letter of Permission (LoP) beyond 21st February 2014

M/s. Cadila Healthcare Ltd., was granted LoP for setting up a unit in the above

mentioned SEZ, vide LoP dated 22nd February, 2010 for manufacture of various pharmaceutical products. The unit has been granted three extensions by the O/o DC, KASEZ validity of which is up to 21st February, 2014.

The unit had requested for further extension of the validity of the LoP beyond 21st

February, 2014.

The unit has invested Rs. 45.51 crores for construction of factory building and installation of plant and machineries. They have also made an investment of Rs. 24.13 crores toward development of pharmaceutical products.

The unit has started trial production of their exhibit batches in their manufacturing premises for study purpose and approval of the respective Pharmaceutical Regulatory Authority of the country for export.

DC KASEZ has recommended the request of extension of LoP for a period of one year. The request of the developer was accordingly placed before BoA for its consideration. However, since the meeting of the BoA, which was to be held on 17th January, 2014 got postponed, the unit requested to grant approval for extension on file so that they can continue their import/export activities in regular course since their LoP was expiring on 21.02.2014. Accordingly, the validity of LoP of the unit was extended upto 21.02.2015 on file.

The proposal is accordingly placed before BoA for ratification.

Item No. 61.6: LoP extension of units dealing in recycling of various items

(i) Proposal of M/s Trishiraya recycling Pvt. Ltd. a unit in MEPZ for extension of its LoP for a further period of four years w.e.f. 1.1.2014. M/s Trishiraya recycling Pvt. Ltd. was granted approval for setting up of a unit vide, LoP dated 4th April, 2000 for recycling of ferrous/non ferrous/electrical and other scrap and converted into SEZ scheme w.e.f. 01.01.2003.

Page 31: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

31

The request of the unit for renewal of their SEZ status with the revised projection for the five year period from 01.01.2013 to 31.12.2017 and their request for capacity enhancement from 1500 MT to 4500 MT were placed in 56th BoA meeting held on 18th January, 2013 have approved the renewal of LoA subject to a condition that No. DTA sale will be permitted and their request for capacity enhancement was deferred. Further in the 58th meeting of BOA held on 12th June, 2013, the unit’s request for capacity enhancement was not acceded to and a clarification to the effect that the renewal of LoA would be one year only i.e. up to 1.1.2014 subject to finalization of policy on the issue. No policy has been finalized on the issue.

DC has recommended the proposal for extension of LoP for four years w.e.f.

1.1.2014. The request is placed again before BoA for its consideration.

(ii) Proposal of M/s SEZ Recycling, a recycling unit in Mahindra World City for extension of LoP for the 2nd five year period from 24th March, 2013 to 23rd March, 2018.

The proposal was earlier placed before 57th meeting of the BoA held on 15th March, 2013 and it was decided to seek necessary clarifications from DC, MEPZ and take a suitable decision after necessary examination, on file.

DC MEPZ has informed that the unit was issued LoA on 07.04.2006. The LoA was

issued by the DC as during that period the SEZ Act was not promulgated and the UAC was not in place. However, now the SEZ is in force and the renewal of the unit’s LoA cannot be processed by the UAC or the DC as it is a recycling unit. Hence the DC has requested BoA to extend the LoA of the unit in terms of Rule 18(4)(d) of the SEZ Rules, 2006.

DC has recommended the proposal for extension of LoP of the unit for the 2nd five

year period from 24th March, 2013 to 23rd March, 2018.

The request is placed below for consideration of BoA.

Item No. 61.7: Miscellaneous cases for LoP extension of units dealing in recycling of plastic w.r.t.

(i) Requests of M/s. Anita Exports, a unit in KASEZ for extension of LoP engaged in the business of recycling of plastic.

Policy relating to SEZ namely Policy on units in SEZs carrying on recycling of plastic

scrap or waste were separately issued by D/o Commerce (Annexure -9) on 17th September, 2013

Rule 18(4) of SEZ Rules states that any proposal for extension of LoP w.r.t. a unit dealing with recycling of plastic or worn and used clothings shall be decided by the Board of Approval (BoA).

The BoA in its 58th meeting held on 12th June, 2013 decided that the validity of LoPs of units dealing with recycling of plastic and worn and used clothings be extended till 30th September 2013 or till such time the guidelines are finalized whichever is earlier.

Page 32: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

32

Meanwhile the policy on units in SEZ carrying on recycling of plastic scrap or waste

in SEZs was separately issued by D/o Commerce (Annexure -9) on 17th September, 2013.

In view of above it was decided to extend the LoPs of all the above mentioned units for a further period upto 30th November, 2013 or till further orders with directions for all the zonal DCs to bring all such cases before the next BoA meeting (originally scheduled for 17th October, 2013) for considering grant of extensions of their LoPs. Accordingly, extension of LoPs in respect of 28 units was considered in BoA in its meeting held on 08.11.2013 and approved. Now DC, KASEZ has sent the case of M/s Anita Exports for renewal of their LoP for consideration of BoA (Annexure -10).

The request is placed before BoA for its consideration.

Item No. 61.8: Miscellaneous cases for LoP extension of units dealing in recycling of worn and used clothing

(i) Requests of M/s Jindal International and M/s Afcan Impex Pvt. Ltd., units in KASEZ for extension of LoP engaged in the business of recycling of worn and used clothing.

Policy relating to SEZ namely Policy to regulate functioning of worn and used clothings

in SEZs were separately issued by D/o Commerce (Annexure -11) on 17th September, 2013

Rule 18(4) of SEZ Rules states that any proposal for extension of LoP w.r.t. a unit dealing with recycling of plastic or worn and used clothings shall be decided by the Board of Approval (BoA).

The BoA in its 58th meeting held on 12th June, 2013 decided that the validity of LoPs of units dealing with recycling of plastic and worn and used clothings be extended till 30th September 2013 or till such time the guidelines are finalized whichever is earlier.

Meanwhile the policy on units in SEZ to regulate functioning of worn and used clothings in SEZs was separately issued by D/o Commerce (Annexure-11) on 17th September, 2013.

In view of above it was decided to extend the LoPs of all the above mentioned units for a further period upto 30th November, 2013 or till further orders with directions for all the zonal DCs to bring all such cases before the next BoA meeting (originally scheduled for 17th October, 2013) for considering grant of extensions of their LoPs. Accordingly, extension of LoPs in respect of 14 units was considered in BoA in its meeting held on 08.11.2013 and approved.

Now DC, KASEZ has sent the case of M/s Jindal International and M/s Afcan

Impex Pvt. Ltd. for renewal of their LoP for consideration of BoA (Annexure-12). The DC has also raised certain issues regarding these two units (Annexure -13)

The requests are placed before BoA for its consideration.

Page 33: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

33

(ii) Request of M/s Gujarat Textiles, a unit in FSEZ for extension of LoP engaged in the business of recycling of worn and used clothing.

The unit was granted LoP on 02.05.2000 for setting up of a manufacturing unit of all kinds of re-processed garments/ used clothings/ secondary textile materials/clippings/rags/Industrial wipers/shoddy wool/yarn/blanket/shawls and other re-cyclable textiles materials at Falta SEZ. The validity of the LoP was up to 31.10.2013. The unit has applied for further extension of LOP for five years w.e.f. 1.11.2013.

DC Falta has sent the proposal to BoA for a decision.

The request is placed before BoA for its consideration.

Item No.61.9: Requests for co-developer

(i) Request of M/s. Swarnim DahejSpring Desalination Pvt. Ltd. for co-developer in the Multi Product SEZ at Vagra, District Bharuch, Gujarat, being developed by M/s. Dahej SEZ Ltd.

The SEZ was notified on 20th December, 2006 over an area of 1732.55.34 hectares. M/s. Swarnim DahejSpring Desalination Pvt. Ltd. has submitted a proposal for

becoming a co-developer in the aforesaid SEZ to develop, operate and maintain desalination plant of 336 MLD capacity for supply of desalinated water to developer, co-developer, SEZ unit, over an area of 60 hectares.

Co-developer agreement dated 22nd March, 2012 entered into with the developer has

been provided. The developer has allotted Plot No. Z-84/2 (60 Ha) for the proposed project. The proposed investment for the project is Rs. 3000 crores. The co-developer agreement dated 22.03.2012 required revision with reference to the allotted plot area. The amendment dated 7th January, 2014 to the co-developer agreement dated 22nd March, 2012 indicating 60 Ha of land has been provided. The sub-lease deed between the developer and co-developer has also been provided.

DC Dahej has recommended the proposal for in-principle approval by the Board of

Approval. The request of the co-developer is submitted for consideration of BoA.

(ii) Request of M/s. Japson Estates Pvt. Limited for co-developer in the sector specific SEZ for IT/ITES at Manikonda Village, Rajendra Nagar Mandal, Ranga Reddy District, Andhra Pradesh, being developed by M/s. Lanco Hills Technology Park Pvt. Limited

The above mentioned SEZ stands notified over an area of 12.43 hectares.

M/s. Japson Estates Pvt. Limited has submitted a proposal for becoming a co-developer in the aforesaid SEZ for developing infrastructure like flooring, interiors, fitouts and other facilities related to IT industry in part of the new building over an area of 0.66 hectares.

Page 34: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

34

Co-developer agreement dated 25th November, 2013 entered into with the developer has been provided. Draft Lease Deed proposed to be executed has also been provided. Lease period is 33 years. Lease rent is fixed at Rs. 1 lakhs per month for the entire property.

DC VSEZ has recommended the proposal. The request of the co-developer is submitted for consideration of BoA.

(iii) Request of M/s. DRSS Solar Power Private Limited for co-developer in the sector specific SEZ for Pharmaceuticals & APIs at Devunipalavalsa Village, Ranasthalam Mandal, Srikakulam District, Andhra Pradesh, being developed by M/s. Dr. Reddy’s Laboratories Limited

The SEZ was notified on 11th November, 2009 over an area of 100 hectares. M/s. DRSS Solar Power Private Limited, a Special Purpose Vehicle (SPV), is a joint

venture between Dr. Reddy’s Laboratories Limited and M/s. SS Solar Power Pvt. Limited.

M/s. DRSS Solar Power Private Limited has submitted a proposal for becoming a co-developer in the aforesaid SEZ, over an area of 22,901 sqm, to set up Photovoltaic Solar Power Panels/Plant on the roof tops of six building blocks in the SEZ and the power generated will be supplied for manufacturing facilities in the SEZ.

Co-developer agreement dated 12th November, 2013 entered into with the developer has been provided. Lease deed dated 30th October, 2013 has also been provided. Lease period is 5 years. Lease rent is fixed at Rs. 1000 per year for the entire premises.

DC VSEZ has recommended the proposal. The request of the co-developer is submitted for consideration of BoA.

(iv) Request of M/s. Okaya Infocom Private Limited for co-developer in the sector specific SEZ for IT/ITES at Viswanathapuram village, Hosur Taluk, Krishnagiri District, Tamil Nadu, being developed by Electronics Corporation of Tamil Nadu Ltd.

The above mentioned SEZ stands notified over an area of 70.01 hectares. M/s Okaya Infocom Private Limited has submitted a proposal for becoming a co-

developer in the aforesaid SEZ for providing infrastructure facilities for the purpose, to operate and maintain IT/ITES, to provide uninterrupted Power Supply, Central Air Conditioning and other facilities over an area of 10 acres.

Co-developer agreement dated 5th November, 2012 entered into with the developer

has been provided. Lease Deed dated 5th November, 2012 has also been provided. Lease period is 99 years. Lease rent is fixed at Rs. 1/- per year. An amount of Rs. 6.377 crores has been paid to the developer which is refundable after forfeiting an amount of 5% per year subject to a minimum deduction of 15% and a maximum of 85%.

DC MEPZ has recommended the proposal. The request of the co-developer is submitted for consideration of BoA.

Page 35: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

35

(v) Request of M/s. HBS Amenity and Management Consultancy LLP for co-developer in the sector specific SEZ for Pharmaceuticals at Village Panoli, Taluka Ankleshwar, District Bharuch, Gujarat, being developed by M/s. HBS Pharma SEZ Pvt. Ltd. (formerly JBSEZ Pvt. Ltd.)

The above mentioned SEZ stands notified on 09.01.2009 over an area of 125.04 hectares for setting up sector specific SEZ for Pharmaceuticals. The developer has completed the boundary wall, Administrative block, internal roads, pipeline network for gas, water, effluent, etc.

M/s. HBS Amenity and Management Consultancy LLP has submitted a proposal for

becoming a co-developer in the aforesaid SEZ for undertaking services in SEZ, for development, maintenance and repair of infrastructure at site including security, fire protection system, water treatment, storm drainage & sewage disposal, HVAC systems, landscaping & water bodies, housekeeping services, transport, PMC services, access control & monitoring, road network, commercial or industrial construction, advertising & marketing and other consultancy services, over entire area of 125.04 hectares.

LLP Agreement between M/s HBS City Private Limited and Mr. Kavyanna Shah s/o

Mr. Mahendra Shah of Mumbai has been provided. Draft Co-developer agreement entered into with the developer has been provided.

DC KASEZ has recommended the proposal. The request of the co-developer is submitted for consideration of BoA.

(vi) Request of M/s. GSPC LNG Ltd. for co-developer in the multi product SEZ at Mundra, Kutch, Gujart, being developed by M/s. Adani Port and Special Economic Zone Ltd alongwith specific authorized operations.

The case of M/s GSPC LNG Ltd. was considered in the BoA meeting held on 08.11.2013, wherein it was decided that the matter be decided after examination on file by DoC.

DGEP has now requested to take up the proposal of the co-developer in the next

meeting of the BoA for further discussions.

DC, KASEZ has also submitted the following documents/information i.r.o. the proposal (Annexure -14):-

(i) The applicant has informed that Cabinet Committee on Investments (CCI) has cleared the said project. The delay in approval will result in loss of Rs. 40-65 crores in the next three months because of service tax payment.

(ii) Vide letter dated 06.02.2014 the applicant has emphasized that they are executing the work by paying duties to avoid time. Out of total capacity of 5 MMTPA, 3.8 MMTPA will be supplied to different SEZs.

(iii) The applicant vide letter dated 14.02.2014 has informed that the Expert Appraisal Committee of MoEF has given consent to the project in their 130th meeting.

The case is, accordingly, placed before the BoA for consideration.

Page 36: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

36

(vii) Request of M/s. Embassy Services Pvt. Ltd. for co-developer in the sector specific SEZ for IT/ITES at Rajiv Gandhi Infotech Park, Hinj ewadi Phase II, Village Marunji, Taluka Mulshi, Dist. Pune, Maharashtra, being developed by M/s. Pune Embassy Projects Pvt. Ltd.

The above mentioned SEZ stands notified over an area of 20 hectares.

M/s. Embassy Services Pvt. Ltd. has submitted a proposal for becoming a co-developer in the aforesaid SEZ for Operation and Maintenance of buildings and other infrastructure facilities at the SEZ.

Co-developer agreement dated 12th November, 2013 entered into with the developer

has been provided. DC SEEPZ SEZ has submitted the proposal for consideration by the BoA. The request of the co-developer is submitted for consideration of BoA.

(viii) Request of M/s. VTV Infrastructure Management Private Limited for co-developer in the sector specific SEZ for IT/ITES at Devarabeesanahalli & Kariyammana Agrahara Villages of Varthu Hobli, Bangalore, Karnataka, being developed by M/s. Vikas Telecom Limited

The above mentioned SEZ stands notified over an area of 38.16 hectares.

M/s. VTV Infrastructure Management Private Limited has submitted a proposal for becoming a co-developer in the aforesaid SEZ for the following activities:-

(a) Operation and maintenance of buildings and other infrastructure/facilities to be

undertaken in the entire area of the SEZ. (b) Engineering Maintenance including electrical and mechanical works, heating

ventilation and air conditioning (HVAC) systems, fire detection & alarm system, water supply, storm drainage and sewage disposal, building upkeep services including maintenance of lift, lobby, conference hall, parking area utility area, garbage and scrap disposal, horticulture, pest control, façade cleaning services.

(c) Security Services (d) Fire and life safety measures. (e) Generation of Electricity and Chilled water. Co-developer agreement dated 6th November, 2013 entered into with the developer

has been provided. DC CSEZ has recommended the proposal for consideration by the BoA. The request of the co-developer is submitted for consideration of BoA.

(ix) Request of M/s. Mahindra EPC Services Pvt. Ltd. for co-developer in the sector specific SEZ for IT/ITES at Village Kalwara, Tehsil-Sanganer, Distt. Jaipur, Rajasthan, being developed by M/s. Mahindra World City (Jaipur) Ltd.

The above mentioned SEZ stands notified over an area of 156.456 hectares.

Page 37: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

37

M/s. Mahindra EPC Services Pvt. Ltd. has submitted a proposal for becoming a co-developer in the aforesaid SEZ for development of available rooftop areas and unutilized ground areas for setting up of 10 MW Solar Photovoltaic Power plant over an area of 20 Ha (Approx).

Co-developer agreement dated 19th February, 2013 entered into with the developer

has also been provided. Draft lease deed proposed to be executed has also been provided for a period of 25 years. Lease rental has been mentioned as equivalent to 6% of the energy price which LESSEE shall bill to LESSOR.

DC NSEZ has recommended the proposal for consideration by the BoA. The request of the co-developer is submitted for consideration of BoA.

(x) Request of M/s. Mahindra EPC Services Pvt. Ltd. for co-developer in the sector specific SEZ for Handicraft at Village Kalwara and Bhambhoriya, Tehsil-Sanganer, Distt. Jaipur, Rajasthan, being developed by M/s. Mahindra World City (Jaipur) Ltd.

The above mentioned SEZ stands notified over an area of 153.76 hectares.

M/s. Mahindra EPC Services Pvt. Ltd. has submitted a proposal for becoming a co-developer in the aforesaid SEZ for development of available rooftop areas and unutilized ground areas for setting up of 10 MW Solar Photovoltaic Power plant over an area of 40 Ha (Approx).

Co-developer agreement dated 19th February, 2013 entered into with the developer

has also been provided. Draft lease deed proposed to be executed has also been provided for a period of 25 years. Lease rental has been mentioned as equivalent to 6% of the energy price which LESSEE shall bill to LESSOR.

DC NSEZ has recommended the proposal for consideration by the BoA. The request of the co-developer is submitted for consideration of BoA.

(xi) Request of M/s. Mahindra EPC Services Pvt. Ltd. for co-developer in the sector specific SEZ for Engineering & related industries at Village Kalwara and Bhambhoriya, Tehsil-Sanganer, Distt. Jaipur, Rajasthan being developed by M/s. Mahindra World City (Jaipur) Ltd.

The above mentioned SEZ stands notified over an area of 222.66 hectares.

M/s. Mahindra EPC Services Pvt. Ltd. has submitted a proposal for becoming a co-developer in the aforesaid SEZ for development of available rooftop areas and unutilized ground areas for setting up of 10 MW Solar Photovoltaic Power plant over an area of 40 Ha (Approx).

Co-developer agreement dated 19th February, 2013 entered into with the developer

has also been provided. Draft lease deed proposed to be executed has also been provided for a period of 25 years. Lease rental has been mentioned as equivalent to 6% of the energy price which LESSEE shall bill to LESSOR.

Page 38: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

38

DC NSEZ has recommended the proposal for consideration by the BoA. The request of the co-developer is submitted for consideration of BoA.

(xii) Request of M/s. Mahindra EPC Services Pvt. Ltd. for co-developer in the sector specific SEZ for IT/ITES including Software & Hardw are manufacturing at Village Kalwara, Tehsil-Sanganer, Distt. Jaipur, Rajasthan being developed by M/s. Mahindra World City (Jaipur) Ltd.

The above mentioned SEZ stands notified over an area of 56.91 hectares.

M/s. Mahindra EPC Services Pvt. Ltd. has submitted a proposal for becoming a co-developer in the aforesaid SEZ for development of available rooftop areas and unutilized ground areas for setting up of 10 MW Solar Photovoltaic Power plant over an area of 10 Ha (Approx).

Co-developer agreement dated 19th February, 2013 entered into with the developer

has also been provided. Draft lease deed proposed to be executed has also been provided for a period of 25 years. Lease rental has been mentioned as equivalent to 6% of the energy price which LESSEE shall bill to LESSOR.

DC NSEZ has recommended the proposal for consideration by the BoA. The request of the co-developer is submitted for consideration of BoA.

(xiii) Request of M/s. Adani Hospitals Mundra Pvt. Ltd. (AHMPL) for co-developer in the multi product SEZ at Mundra, Kutch, Gujart, being developed by M/s. Adani Port and Special Economic Zone Ltd (APSEZL) alongwith specific authorized operations.

The above mentioned SEZ stands notified over an area of 6456.3349 hectares.

M/s. Adani Hospitals Mundra Pvt. Ltd. has submitted a proposal for becoming a co-developer in the aforesaid SEZ to develop, operate, maintain and provide IPD/OPD services to patients at the 100 Bed Hospital in the non-processing area of APSEZ over an area of 2.99 hectares. Presently the hospital facilities are being run by Sterling Addlife Mundra Hospital Pvt. Ltd. (an approved co-developer), promoted by Sterling Addlife India Ltd., which wants to discontinue as co-developer.

AHMPL is a wholly owned subsidiary of APSEZL and the entire share capital of the

company is held by APSEZL. Co-developer agreement dated 19th December, 2013 entered into with the developer

has been provided. DC KASEZ has recommended the proposal of Sterling Addlife India Ltd. (SAIL) to

exit from APSEZ after complying with SEZ Act/Rules and the proposal of AHMPL for becoming a Co-developer for providing hospital services in non-processing area of SEZ for the use of SEZ entities for consideration by the BoA.

The request of the co-developer is submitted for consideration of BoA.

Page 39: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

39

Item No. 61.10: Proposals for setting up of SEZs

S. No

Name of the Developer

Location Sector Area (in ha)

Land Possession

SGR* Status of application

(i) M/s. Venkatesh Coke & Power Ltd.

Athipattu, Nandiambakkam and Puludivakkam villages, Ponneri Taluk, Thiruvallur District, Tamil Nadu

FTWZ 48.56 Yes** Yes New

*State Government Recommendation

State Government has recommended the proposal for according “In-principle approval” subject to the condition that it does not imply or taken to imply or assure that the State Government will offer its poromboke lands, which is processed separately by the Revenue Department of the State Government. ** Developer has acquired the land. However, it is not contiguous as about 10.255 Ha of Government poromboke land is falling between the land owned by the company. The company has applied to the State Government for allotment of the land in favour of them by way of exchange/lease/sale. The approval of the State Government is awaited. *** Issue of contiguity and other related issues shall be considered at the time of Formal Approval.

DC MEPZ has recommended the proposal for in-principal approval, as the alienation of Government poromboke land and relocation of TNEB HT lines passing through the proposed FTWZ area is necessary for establishing contiguity of the proposed FTWZ.

The request of the developer is submitted for consideration of BoA.

S. No

Name of the Developer

Location Sector Area (in ha)

Land Possession

SGR* Status of application

(ii) M/s. Adani Ports and Special Economic Zone Ltd. (APSEZL)

Mundra Taluka, District Kutch, Gujarat

Multi Product

1856.5335 Yes Yes *

* The proposal for grant of formal approval to the developer was considered in the 59thmeeting of BoA on SEZ held on 30thAugust, 2013 and it was decided as under: “The Board noted that the developer was in possession of the land. The Government of Gujarat had also recommended the proposal for approval. However, DC KASEZ/APSEZ had raised certain issues relating to independent access to the proposed SEZ etc. Board noted that MHA had yet to offer its comments and asked that comments be sent within the next 30 days. Board after deliberations, decided to grant in-principle approval to the proposal of M/s. Adani Ports and Special Economic Zone Ltd. (APSEZL) for setting up of Multi Product Special Economic Zone at Mundra Taluka, District Kutch, Gujarat, over an area of 1856.5335 hectares. Before grant of formal approval BoA directed DoC to constitute a committee to examine the outstanding issues and furnish its report to BoA.”

Page 40: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

40

The comments of MHA are still awaited.

In compliance with the above directions of BoA, a committee under the chairmanship of DC KASEZ was constituted and directed to submit its report to DoC. Since there was no clear recommendation in the Report of the Committee dated 15.10.2013, DC KASEZ was asked to furnish clear recommendations of the committee. The recommendations of the Committee have since been received (Minutes dated 22.11.2013). The Committee decided to submit the proposal of the developer for grant of formal approval for the proposed new SEZ of Adani Port and SEZ Ltd. (APSEZL) subject to the following conditions:-

(i) The Specified Officer of the existing SEZ shall, in consultation with DC, APSEZL

and Commissioner of Customs, Kandla, devise a fool-proof system to avoid any revenue leakage and confirm whether the mechanism proposed by the developer will be adequate to ensure that diversion of material or leakage or revenue is eliminated/minimized.

(ii) The developer shall build proposed fly over within a period of 5 years. In the meantime, the developer should furnish evidence to show that they will have the necessary land/permission to build the flyover.

(iii) The developer shall complete the boundary wall in left out parts, all around the Processing and Non-processing areas of existing SEZ before commencing any other work in the proposed SEZ. No LOP for any units should be given until the area is fully securitized by a boundary wall and proper connectivity between the three pockets of proposed SEZ is established by construction of roads/corridor and boundary wall.

(iv) The area abetting the creek/sea where it is not feasible to build boundary wall should be provided with adequate marine security by dedicated patrolling vessels with sufficient security and regulatory manpower to ensure that the area is securitized in a fool-proof manner.

(v) The proposed SEZ should be used not as an extension of the existing port-based SEZ but as a stand-alone SEZ for exporting units and activities. The infrastructure or activities to be undertaken in the proposed SEZ should not be allowed for port related services.

(vi) Prior approval of CRZ & environment clearance shall be obtained by the developer before commencing any commercial operations.

(vii) The land-locked pocket of land bounded on all sides by the proposed SEZ and also the places wherever access has been presently provided to the local fishermen/villagers to go through the SEZ shall be manned by security as well as Customs personnel.

As per decisions of the BoA, the Report of the Committee (Annexure-15) is placed

before the BoA. In the light of the Report of the Committee, the proposal for grant of formal approval

to M/s. Adani Ports and Special Economic Zone Ltd. (APSEZL) is placed before BoA for consideration.

Page 41: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

41

S. No

Name of the Developer

Location Sector Area (in ha)

Land Possession

SGR Status of application

(iii) M/s. Transcendent Developers Pvt. Ltd.

Wagholi & Bhavadi, Taluka Haveli, Dist. Pune, Maharashtra

IT/ITES 13.01 Yes Yes #

# The proposal was placed in the 59th meeting of BoA held on 30th August, 2013. The Board noted that DC SEEPZ had sought for certain information/documents from the developer and had not furnished its recommendations to the above proposal. Accordingly, the Board decided to defer the proposal.

Subsequently, DC SEEPZ had furnished its recommendations and the proposal was considered in the 60th meeting. However, the proposal was withdrawal upon request by the DC.

DC had asked the developer to submit a copy of registered lease deed/proof of

possession of the identified land area of the proposed SEZ. The developer has stated that since the owners of the identified land are promoters of the company, they have leased the said land to the company for development of proposed IT/ITES SEZ projects and accordingly possession has been handed over to the developer on 20.12.2013 vide possession certificate dated 20.12.2013. Accordingly, DC has recommended the proposal for consideration by the BoA.

The request is placed before BoA for its consideration

S.

No Name of the Developer

Location Sector Area (in ha)

Land Possession

SGR Status of application

(iv) Andhra Pradesh Industrial Infrastructure Corporation (APIIC) Limited

Sitapalem (halmet of Jirayatichintuva village), Rambilli Mandal, Visakhapatnam District, Andhra Pradesh

Oil, Petroleum & Natural Gas Field Services

111.58 Yes No New

DC has forwarded the proposal for placing the same before BoA. The request is placed before BoA for its consideration

Item No. 61.11: Miscellaneous cases

(i) Request from M/s. Khed Economic Infrastructure Pvt. Ltd., a sector specific SEZ for Engineering and Electronics at Taluka Shirur and Khed, District Pune, Maharashtra for withdrawal of formal approval over 559.81 hectares (not notified)

Formal approval dated 02.01.2009 was originally issued to the developer over an area of 1559.81 hectares.

Page 42: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

42

The SEZ was subsequently notified over 1000 hectares.

BoA in its 59th meeting held on 30th August, 2013 approved de-notification of an area of 900 hectares, thereby, making the resultant notified area of the SEZ as 100 hectares. BoA also approved change in sector of this SEZ from multi product to sector specific for Engineering and Electronics.

The developer has now requested for withdrawal of formal approval of his remaining 559.81 hectares (not notified) of SEZ.

Government of Maharashtra has agreed in-principle for withdrawal of 559.81 hectares

from the formal approval.

DC SEEPZ SEZ has submitted the request of the Developer for placing it before the BoA.

The request is placed before the BoA for consideration.

(ii) Withdrawal of formal approval granted to M/s. Fama Estate Pvt. Ltd. for setting up of sector specific SEZ for IT/ ITES at village Shivkar and Chikale, Taluka Panvel, Dist. Raigad, Maharashtra

M/s. Fama Estate Pvt. Ltd. was granted formal approval for setting up of a sector specific SEZ for IT/ ITES at village Shivkar and Chikale, Taluka Panvel, Dist. Raigad, Maharashtra, over an area of 10.35 hectares, vide LoA dated 18th February 2008. The SEZ is yet to be notified. Now, the developer has requested for withdrawal of formal approval due to present scenario of Industrial Recession and uncertainty of the Fiscal benefits the SEZ project has become unviable.

DC SEEPZ SEZ has recommended the request of the developer. The request of the developer for withdrawal of formal approval is placed before the

BoA for consideration.

(iii) Withdrawal of formal approval granted to M/s. Haldia Free Trade Warehousing Private Limited for setting up of FTWZ at Haldia, W est Bengal

M/s. Haldia Free Trade Warehousing Private Limited was granted formal approval for setting up of FTWZ at Haldia, West Bengal, over an area of 80.94 hectares, vide LoA dated 18th February 2008. The SEZ is yet to be notified. Now, the developer has requested for withdrawal of formal approval as they have decided to develop outside the scope of SEZ in view of the present policy of the State Government.

DC FSEZ has recommended the request of the developer. The request of the developer for withdrawal of formal approval is placed before the

BoA for consideration.

Page 43: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

43

(iv) Request of UP State Industrial Development Corporation Ltd. (UPSIDC) for broad banding of handicraft sector specific SEZ at Moradabad, Uttar Pradesh to include Textile (including Apparels), Leather Products, Carpets & Rugs, Toys & Dolls, Sports items, Gems & Jewellery (Excluding precious metal) and Engineering (including hardware products).

Moradabad SEZ was notified in 2003 over an area of 421.03 acres (170.385 Ha) and became operational on 16.04.2007. At present SEZ is housing only 25 units out of which 14 units are in regular operation.

UPSIDC has submitted proposal for broad-banding of “Textile (including Apparels), Leather Products, Carpets & Rugs, Toys & Dolls, Sports items, Gems & Jewellery (Excluding precious metal) and Engineering (including hardware products)” sectors in the Handicraft sector SEZ at Moradabad as per Amendments in SEZ Rules issued by DoC on 12.08.2013 with subsequent clarification on 13.09.2013.

The developer has informed that Handicraft sector is presently facing tremendous recessionary pressure and a tough competition from Chinese Manufacturers of handicraft. The units need diversification of manufacturing products to settle in the international market and based on the suggestions from local exporters, the additional sectors have been selected for broad-banding in the existing handicraft sector SEZ. As per the amended provisions, broad-banding provisions for categories of sectors to encompass similar / related areas with each broad-banded sector treated as a single sector for the purpose of minimum land criteria.

Vide letter dated 13.09.2013, clarifications to the amendments made to the provisions of the SEZ Rules, 2006 issued vide GSR (540(E) dated 12.08.2013 were issued by the DoC. Para 6 of the clarification relating to Broad-banding provides the following:-

“Sectoral broad-banding provisions have been introduced for categories of sectors to encompass similar / related areas with each broad-banded sector treated as a single sector for the purposes of minimum land area criteria. The principle of broad-banding would be applied taking into account the fact that no additional environmental externalities be required for the additional units which would come up on account of such broad-banding. Some illustrative example of such broad-banded category comprising a sector would include: • Textile, apparel, hosiery, fashion garments, wool and carpet • Leather, leather handicrafts, leather garments and sports goods • Auto components / parts, light engineering • Biotechnology, Pharmaceuticals and chemicals • IT, ITES, Electronic components and hardware manufacturing, non-conventional

energy, BPO (including legal, medical and similar services), KPO and R&D related ancillary services of the sector and R&D services will be included and treated as an integral part of the sectoral broad-banding. Board of Approval will have the discretion to allow additional categories to be broad-banded into a sector based on compatibility of area requirement etc.

DC has recommended the proposal. The request is placed before BoA for its consideration.

Page 44: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

44

(v) Request of Kerala Industrial Infrastructure Development Corporation (KINFRA) for change of sector of the notified sector specific SEZ at Village Chelembra, Taluk Thirurangadi, District Malappuram, Kerala fro m “Food Processing” to “Agro based Food Processing”

The above mentioned SEZ stands notified as on date over an area of 12.52 Ha. The developer has requested for change of sector from “Food Processing” to “Agro based Food Processing”. Developer has stated the reason for change in sector is “to cater to the increasing demand for area in the domestic food processing zone since all the area in this zone has already been let out.

Simultaneously, the developer has also requested to de-notify an area of 2.17 Ha in

their SEZ out of existing area of 12.52 Ha. The request for de-notification shall be considered on file in terms of decision taken by the BoA in its 60th meeting held on 08.11.2013.

DC has recommended the proposal. The request of the developer for change of sector from “Food Processing” to “Agro

based Food Processing” is placed before BoA for its consideration. (vi) Proposal of M/s. Solar Semiconductor Pvt. Limited, a unit in M/s. FAB City SPV (India) Pvt. Ltd. SEZ for Semiconductor in Andhra Pradesh for selling of conductor paste

The above mentioned unit was granted LoP for manufacture and export of (i) Solar

Photovoltaic Cells (ii) Solar Photovoltaic Modules (iii) Solar Photovoltaic Thin Film Modules. The unit had commenced operations on 23.02.2009. Their plant was manufacturing the cells with 14% efficiency. The technology has changed rapidly in the area and current efficiency of cells is in between 16.5% - 17%. This has made the present plant obsolete and unviable for operations. The plant operations are therefore shut down temporarily.

The unit had imported 1278 kgs of conductor paste on different date out of which they

could utilize only 236 kgs and remaining 1042 kgs could not be utilize due to change of technology and the shelf life of the material has expired. M/s. Targray Limited of Czech Republic has agreed to import this expired material. The unit has sought permission to export this expired material.

DC VSEZ has recommended the proposal in terms of Rule 26 of the SEZ Rules,

2006. Rule 26 is quoted as under:- “A Unit may export goods and services, including agro-products, partly processed goods, sub- assemblies, components, by-products, rejects, waste or scrap except prohibited items of exports indicated in the Import Trade Control (Harmonized System) Classifications of Export and Import Items:

Provided that export of Special Chemicals, Organisms, Materials, Equipment and Technologies shall be subject to fulfillment of the conditions indicated in the Import Trade Control (Harmonized System) Classifications of Export and Import Items:

Page 45: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

45

Provided further that if any permission is required for import under any other law, the same shall be allowed with the approval of the Board of Approval.

Provided also that the Foreign Trade Policy restrictions on State Trading Enterprises

shall not apply to Special Economic Zone manufacturing Units. Provided also that export of iron-ore shall be subject to the conditions as imposed by

the Central Government.”

The proposal is placed before BoA for its consideration. (vii) Request from M/s. Bagmane Constructions Private Limited (BCPL), developer of IT/ITES including Hardware and Software SEZ at Mahadevapura K.R. Puram, Bangalore, Karnataka for approval to change of name to M/s. Bagmane Developers Private Limited

M/s. Bagmane Constructions Private Limited is developer of the sector specific SEZ for IT/ITES at Mahadevapura K.R. Puram, Bangalore, Karnataka. The SEZ stands notified over an area of 11.31 hectares.

The Developer has submitted request for change of name of developer from Bagmane Constructions Private Limited (BCPL) to Bagmane Developers Private Limited (BDPL) in pursuant to the orders of the High Court dated 19.11.2013 on the company petitions filed by Bagmane Constructions Pvt. Ltd and Bagmane Developers Pvt. Ltd.

The Developer has confirmed that consequent on High Court Order and Demerger, there will not be any change in the shareholders, Board of Directors of both Bagmane Constructions Pvt. Ltd. and Bagmane Developers Pvt. Ltd.

DC CSEZ has recommended the proposal.

The proposal is placed before BoA for consideration.

(viii) Request from M/s Calorx Education Company, co-developer of multi product SEZ at Mundra, Kutch, Gujarat being developed by M/s. Mundra Port and Special Economic Zone Ltd. for approval to change of name to M/s. Atlus Learning Pvt. Ltd.

M/s Calorx Education Company Pvt. Ltd., a co-developer of multi product SEZ at

Mundra, Kutch, Gujarat being developed by M/s. Mundra Port and Special Economic Zone Ltd. has requested for change of name to M/s Atlus Learning Pvt. Ltd. (Annexure-16). The co-developer has submitted the list of Directors and shareholding pattern as on 27.02.2009 and at present (as on 15.10.2013).

DC APSEZ has recommended the proposal. The request is placed before BoA for its consideration.

Page 46: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

46

(ix) Request from M/s MAS GMR Aero Technic Limited, a unit in M/s. GMR Hyderabad Aviation SEZ Limited, SEZ in Andhra Pradesh for merger of M/s. MAS GMR Aerospace Engineering Company Limited, co-developer and M/s. MAS GMR Aero Technic Pvt. Limited (unit)

M/s. MAS GMR Aerospace Engineering Company Limited (Co-developer) was issued LoA dated 20.09.2010. The co-developer has made an investment of Rs. 200.14 crores as on 30.11.2013.

M/s. MAS GMR Aero Technic Limited (Unit) was issued LoA dated 2.11.2010. The unit has made an investment of Rs. 73.83 crores as on 30.11.2013.

M/s MAS GMR Aero Technic Limited has requested to merger of two companies (Annexure-17).

DC VSEZ has recommended the proposal subject to:-

(i) Decision not interfering with Income Tax assessment of both entities (ii) Despite merger only balance period for benefit calculation to be allowed (iii)Separate books of accounts to be maintained.

The request is placed before BoA for its consideration.

(x) Request of M/s. L&T Tech Park Limited and L&T T ejomaya Limited, co-developer in sector specific SEZ for IT/ITES developed by M/s Infopark SEZ at Ernakulam, Kerala for change of ownership by transfer of 100% equity to M/s. Emmay Ventures (India) Pvt. Limited

M/s L&T Tech Park Limited had entered into a co-developer agreement with Infopark, the Developer of SEZ on 2.6.2006 and 10.7.2008 for a total area of 7.44 acres. The lease deed was executed with the Developer for a period of 90 years. M/s. L&T Tech Park Limited had undertaken the development of the aforesaid plots in two phases. The 1st Phase, comprising of the development of a superstructure named “Tejomaya” of 0.4 million sqft has been completed and the said superstructure has been fully leased out and operational since March, 2008. A multi-level car parking facility was also developed by L&T Tech Park Limited in the 1st Phase and being utilized by the occupants of Tejomaya.

The 2nd Phase comprising of the development of a superstructure name “Signature

Tower” of approximately 0.65 million sqft is presently vested with L&T Tech Park Limited. They had already invested an amount of Rs. 12 crores for construction and piling work of Phase 2.

L&T Tech Park Limited has de-merged its development in Phase – 1 to L&T

Tejomaya Limited to focus on its remaining business of development of Phase 2. The Hon’ble High Court of Judicature at Madras sanctioned the scheme of de-merger on 26th April, 2013.

Consequently, the request of M/s L&T Tejomaya Limited and M/s L&T Tech Park

Limited for granting Co-developer status alongwith infrastructure activities was approved by the BoA in its 60th meeting held on 08.11.2013. Both the Co-developers vide letters dated

Page 47: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

47

17.12.2013 intimated to CSEZ compliance with all the above conditions and attached copies of their correspondences with CBDT.

Presently, the above companies have submitted their applications requesting approval

for change of ownership of both the companies by way of transfer of 100% equity to M/s Emmay Ventures (India) Pvt. Limited.

DC CSEZ has recommended the proposal (Annexure-18). The request may be placed before BoA for its consideration

(xi) Request of M/s. Hexaware Technologies (P) Limited, the developer of sector specific SEZ for IT/ITES at Siruseri, Chennai for change of shareholding pattern of the company

M/s Hexaware Technologies (P) Limited the developer of the sector specific SEZ for IT/ITES, Siruseri, Chennai was issued LoA dated 09.06.2006 and the SEZ was notified over an area of 11 hectares. Pursuant to the notification, the developer has developed 764,524 sqft of office space.

The developer viz. M/s. Hexaware Technologies (P) Limited now desires to transfer

up to 75% of its share to HT Global IT Solutions Holdings Limited (HGISHL) along with Parel Investment Holding Limited (PACI) and the Baring Asia (P) equity fund V.L.P (PAC2). As per the BoA decision taken in the 31st meeting held on 15.01.2009, BoA’s approval is required, since the promoter decided to decrease the shareholding below 51%. As per Instruction No. 23 dated 16.07.2009 of DoC, BoAs prior approval is required.

DC MEPZ has recommended the proposal for placing it before the BoA.

The proposal is placed before BoA for its consideration. (xii) Request of M/s. MAS GMR Aero Technic Limited, a Unit in M/s. GMR Hyderabad Aviation SEZ Limited for permission to do Aircraft recovery work of KFA lessors aircrafts-reg.

M/s. MAS GMR Aero Technic Limited, a Unit in M/s. GMR Hyderabad Aviation SEZ Limited, applied for undertaking the aircraft recovery work outside the SEZ and to send required spares and tools to be used on the aircrafts taken on lease by King Fisher Airlines. The Unit has stated that King Fisher Airlines had grounded 14 aircrafts (7 ATRS and 7 Air Bus 320) in various airports of Delhi, Chennai, Bangalore and Calcutta due to their operational problems. These aircrafts are not in flying condition. DGCA has deregistered these aircrafts and allowed the lessor to take over these aircrafts. The lessors AWAS and Investee who are real owners of the aircrafts approached them for aircraft recovery. They therefore need to send their engineers along with required tools and spares for repair and make the aircrafts in flying condition.

DC has recommended the case for consideration (Annexure-19). The request is placed before the BoA for consideration.

Page 48: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

48

(xiii) Request from M/s. HCL Technology Ltd., a unit in M/s. IG3 Infra Limited, Thoraipakam, Kancheepuram District, Chennai, for re-location of its SEZ unit to another SEZ developed by M/s. ELCOT, Sholinganallur SEZ, Kancheepuram District, Chennai

The unit has proposed to change the location from IG3 Infra Limited-SEZ to ELCOT Sholinganallur-SEZ to reduce the rental cost, cost reduction of support staff in consolidated own location and to continue with tax benefits for the remaining period. Since the entire unit will be shifted to another SEZ, there is no splitting up or reconstruction of business.

The unit was issued LOA dated 14.12.2006 for service activity “Software

Development” and started their commercial production w.e.f. 4.07.2007. The NFE earnings of the unit are Rs. 240.41 crores as on 31.03.2013.

DC MEPZ has recommended the proposal for placing it in the BoA for approval.

(Annexure-20).

The proposals are placed before BoA for its consideration. (xiv) Request from M/s. Anthelio Business Technologies Pvt. Limited, a unit in M/s. DLF Commercial Developers Limited, IT/ITES SEZ at Gachibowli Village, Ranga Reddy District, Andhra Pradesh, for shifting of its SEZ unit to another SEZ developed by M/s. TSI Business Park (Hyderabad) Pvt. Limited, co-developer for M/s APIIC Ltd., IT/ITES SEZ at Nanakramguda Village, Ranga Reddy District, Andhra Pradesh

The unit has proposed to change the location from M/s. DLF Commercial Developers

Limited, IT/ITES SEZ to another SEZ developed by M/s. TSI Business Park (Hyderabad) Pvt. Limited, co-developer for M/s APIIC Ltd., IT/ITES as their requirement of space has come down due to fall in employee count and the Developer has expressed inability to accommodate their request for downsizing the space. The new place has the option to add on capacity as and when required and has the cost consideration as well saving close to 50% of their existing operational cost by moving to the proposed facility.

The unit was issued LOA dated 8.11.2010 for setting up of an IT/ITES SEZ and

started their commencement of operational on 1.4.2011. The Exports of the unit for 2011-12 are 5954.98 lakhs and for 2012-13 are 4595.48 lakhs.

DC VSEZ has recommended the proposal for placing it in the BoA for approval.

(Annexure-21).

The proposals are placed before BoA for its consideration. (xv) Request from M/s Reliance Industries Limited for permission to (i) erect 50 pillars in SEZ area to provide connectivity of their upcoming C2 Complex from DTA Refinery (ii) construct two under passes below the existing rail line and SEZ Road M/s Reliance Industries Limited, developer of Jamnagar (Reliance) SEZ have requested for permission to (i) erect 50 pillars in SEZ area to provide connectivity of their upcoming C2 Complex from DTA Refinery (ii) construct two under passes below the existing rail line and SEZ Road. Erection of elevated structure would require around 50

Page 49: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

49

foundation footings (pillars) to be constructed in SEZ area. The size of these pillars would be approximately 2 sqm. each. The pillars would be raised in a manner that they would not affect the contiguity or free movement within SEZ.

DC has carried out physical inspection of the concerned area and recommended the proposal taking into account the quantum of investment proposed by the firm and also taking into account the fact that execution of these facilities would neither impact the contiguity nor the operations of the SEZ. This permission may also be subject to all other relevant conditions imposed by DOC while granting ROW permission to the firm vide Ministry letter No. F.2/41/2005-SEZ dated 5th July, 2013.

Similar request from M/s Reliance Industries Limited for permission to install a pipe rack through SEZ connecting DTA Refinery and up-coming C2 Complex of M/s Reliance Industries Limited was considered and approved by the BoA in its meeting held on 12th June, 2013 subject to the following conditions:-

(a) The pipe rack must be installed in a manner that it does not affect contiguity/movement within the SEZ. Accordingly, wherever the pipe rack crosses the interconnecting roads or other existing pipelines, within SEZ, the height of the rack must be raised to provide clearance of 15 meters from the ground level;

(b) The pipe rack must be fenced along its length to protect the integrity of the SEZ area. The height of the fencing should be as per the SEZ Rules;

(c) A distinct colour code for these pipes / pipe rack should be followed to ensure their distinct visibility;

(d) For construction of the pipe rack, no duty free material may be used. The usage of the material during the construction may be properly accounted and the account should be made available to designated government authorities at any point time;

(e) There should no interconnection of any nature of these pipes with any of the SEZ pipes/facilities/equipment. Further, any gases or liquids transferred from SEZ refinery including any of its plants, if transported to the C2 Complex, the same should be through a separate dedicated pipeline. The two pipelines/pipe-racks should maintain a distance of atleast 8 metres within SEZ area to ensure that there is no intermingling of SEZ materials with DTA materials.

The proposal is, accordingly, placed before BoA for its consideration.

(xvi) Case of M/s. Satguru Polyfab Pvt. Ltd., a unit under KASEZ regarding appeal against order dated 21st May 2013 of the UAC

M/s. Satguru Polyfab Pvt. Ltd., a unit under KASEZ applied for change of Directors and the same was approved in the 55th meeting of UAC of KASEZ held on 4th March, 2013 with the condition of enhanced lease rental charges.

The appellant has filed the appeal against the above decision to charge higher lease

rental upon change of directors which was considered by the BoA in its 59th meeting held on 30th August, 2013 and it was decided to seek opinion of M/o Corporate Affairs as to whether change of the entire directorship of the company constitute a change of ownership/management of the company, and if such company after such change in directorship can be treated as a new entity, different from the original company.

Page 50: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

50

As per the decision of the BoA, opinion of M/o Corporate Affairs was sought, which is still awaited. Meanwhile unit has requested to take up the appeal for consideration in the next meeting of the BOA as it is pending for the last six months.

The case is, accordingly, placed before the BoA for consideration. (xvii) Request M/s TCS Ltd., a SEZ Unit being operated in IT/ITES SEZ located in Hyderabad for inclusion of certain services as services required for authorized operations

M/s Tata Consultancy Services Ltd., a SEZ Unit being operated in IT/ITES SEZ located in Hyderabad appealed before 59th BOA Meeting held on 30.08.2013 against the decision of UAC dated 30.7.2013 in respect of the following additional list of services required for authorized operations:

1. Air Travel Agent Services 2. Convention Services 3. Rail Travel Agent’s Services 4. Rent-a-cab Scheme operator’s services 5. Travel Agent’s Services

The Board after considering the above appeals deliberated upon the subject and decided that as the subject matter was already under consideration with DoC a suitable decision may be taken by DoC in this regard at the earliest.

The issue regarding uniform list of services which may be permitted by all UACs as authorized service was discussed during the DCs meeting held on 29th August, 2013 and a default list of 58 services including Convention Services as stated above have been finalized and intimated to all DCs. Subsequently, representation was received for inclusion of additional services for inclusion in the list of default authorized operations. The matter was discussed during the DCs meeting held on 7th November, 2013 and two more services viz. Rent-a-cab scheme Operator’s services and SEZ Online Services were also included in the list of default authorized operations. Uniform list of services for authorized operations is at Annexure-22). All DCs may be advised that the uniform list of 60 services may be permitted by all UACs as default authorised services. The request of TCS for inclusion of the following services in uniform list of services as authorised services is submitted for consideration of BoA :

i. Air Travel Agent Services ii. Rail Travel Agent’s Services iii. Travel Agent’s Services

(xviii) Request from M/s Toonz Infrastructure Pvt. Ltd., co-developer in KINFRA for setting up of Animation and Gaming SEZ – request for cancellation of LoA M/s. Toonz Infrastructure Pvt. Ltd. were granted approval as a co-developer on 26.08.2008 in the Animation and Gaming SEZ, Trivandrum for providing infrastructure facilities over an area of 2.428 Ha.

Page 51: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

51

They have neither executed the Bond-cum-legal undertaking, as per SEZ Rules, for authorized operations nor carried out any infrastructure developmental activity in SEZ since the issue of LoA. The co-developer was issued show-cause notice which was not responded. The Developer, KINFRA, was accordingly requested by DC CSEZ to intimate the status of project implementation undertaken by the co-developer in the SEZ. In reply, developer on 20.08.2013 has informed that co-developer has not started any activities in the land allotted to them till date. The licence agreement executed with the co-developer has also expired. The co-developer has not availed any duty benefits since issue of LoA.

DC CSEZ has recommended to cancel the LoA issued to M/s Toonz Infrastructure Pvt. Ltd. The case is, accordingly, placed before the BoA for consideration. (xix) Special permission to grant M/s SE Forge Ltd, a SEZ unit in Synefra-Engineering SEZ, Vadodara, Gujarat for carrying out job-work for DRDO, Ministry of Defence

DRDO, Ministry of Defence has requested to grant permission to M/s SE Forge Ltd, a SEZ unit Synefra-Engineering SEZ, Gujarat for carrying out defence related job-works relating to AD Programme of DRDO for manufacture of Forged Rings without any dimension i.e. “conversion of steel/metal materials, ingots/blooms or any other form or types/grade/size/alloy content into Rings Forging” (Annexure–23).

It may be stated that earlier, the unit was granted similar permission for undertaking defence related job works with the concurrence of Department of Revenue with certain conditions.

DC, KASEZ has recommended the case with an additional condition that the SEZ unit will have to maintain separate accounts for different material received and the products manufactured thereof along with the quantum of waste and rejects generated during the process.

DC, KSEZ has also stated that the SEZ unit was granted LOA on 31.7.2007 and after completion of 5 years manufacturing period (from 24.9.2008), the unit could not achieve positive NFE and the proceedings in terms of Rule 54 of SEZ Rules, 2006 are initiated. Presently, the unit is granted permission to continue operations for a period of six months from 23.9.2013 is accorded, subject to furnishing of Bond-cum-Legal Undertaking, to the effect, that in the event, the LOA dated 31-7-2007 does not qualify extension forthwith, than the revenue involved on the receipt and clearances of all the goods/material in/from the unit, will be dealt with, as per the provisions of SEZ Act, 2005 and Rules framed thereunder.

The request of DRDO is accordingly placed before BoA for its consideration. (xx) Application of M/s Wipro Ltd., Bangalore, a unit in SEZ developed by KIADB at Bangalore for issuance of Industrial licence for manufacture of defence products The above mentioned unit was originally granted Industrial Licence dated 29th July, 2011 by Department of Industrial License and Promotion (DIPP) for design, development, manufacture, assembly & upgrades of and precision engineered hydraulic and mechanical

Page 52: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

52

components of EW systems (stand along and integrated), design, development, manufacture, upgrade and assembly of precession engineered components / parts e.g. land gear actuators, air-frame, fuselages and other hydraulic and mechanical parts bridge laying systems on combat vehicles with annual capacity of 10-15 numbers in each category (Annexure-24). It was mentioned in clause no. 10 of the aforementioned licence that “if commercial production is not commenced within a period of 2 years from the date of grant of industrial licence, the licence will cease to be valid. For extension of this period, the licensee may apply to the Ministry / Department of Defence Production, New Delhi with full justification giving circumstances under which and the period for which extension is sought” The work of considering and issuing Industrial Licence including entities relating to SEZ / EOU which was being looked after by DIPP has since been transferred to DOC. With respect to SEZ entities it has been decided in DOC to place all such requests before BOA for its consideration. M/s Wipro Ltd, Bangalore the above mentioned unit, applied before DOC for extension of its industrial licence which was essentially to be considered by Department of Defence Production. However as the procedure to be adopted by DOC in cases of fresh and / or subsequent issue of industrial license to SEZ/ EOU entities was being finalized, the unit was requested to apply for fresh issue of Industrial license. The unit has since submitted an application for issue of its industrial license. Comments of stakeholder Ministries / Departments ( including Department of Defence Production and MHA) have already been sought for vide OM dated 4th October, 2013. DC CSEZ has further informed that the Industrial licence of the unit has expired on 28th July, 2013. However the unit has declared commercial production on 2nd September, 2013. As the fresh application of the above unit is in continuation to its original request for extension of its IL, it was decided to obtain the views of Department of Defence Production and MHA and to place the proposal before BOA for its consideration. D/o Defence Production has given its “No Objection” on the proposal of the company to set up its manufacturing unit for the activities intended to be undertaken by them subject to standard terms and conditions for licensing and the extant FDI Policy guidelines applicable to Defence Sector and clearance of MHA. The proposal is accordingly placed before BOA for its consideration.

(xxi) Request of Sunstream City Pvt. Ltd. for broad banding of IT/ITES sector specific SEZ at Mumbai, Maharashtra to include LED & LCD Panel, Smart Phone, Computer and allied products, R&D Centre, BPO – Legal Medical & similar services, Non-conventional Energy such as solar panel & other products, Surveillance security system, Computerised medical equipment’s apparatus, Computerised smart camera & video, Off shore banking.

The above mentioned SEZ was notified on 23rd April, 2008 over an area of 57.0979 Ha. One unit has commenced its operation w.e.f. 22nd April, 2013.

Page 53: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

53

The developer has submitted the proposal for broad-banding to include LED & LCD Panel, Smart Phone, Computer and allied products, R&D Centre, BPO – Legal Medical & similar services, Non-conventional Energy such as solar panel & other products, Surveillance security system, Computerised medical equipment’s apparatus, Computerised smart camera & video, Off shore banking.

DC has submitted the proposal for consideration of the BoA. The request is placed before BoA for its consideration.

(xxii) Request of Sunstream City Pvt. Ltd., a sector specific SEZ for IT/ITES at Mumbai, Maharashtra for conversion of 10 Ha out of existing 57.0979 Ha into Agro based Food Processing SEZ

The above mentioned SEZ was notified on 23rd April, 2008 over an area of 57.0979

Ha. One unit has commenced its operation w.e.f. 22nd April, 2013. The developer has submitted the proposal for conversion of 10 Ha out of 57.0979 Ha

notified as IT/ITES SEZ into Agro based Food Processing SEZ. The developer has proposed that the SEZ would comprise of 25 acres of land (carved out of existing SEZ) with (a) processing area to the tune of 90% (b) non-processing area to the tune of 10% comprising of commercial & other ancillary services.

The developer proposes to invest Rs. 3500 crores in the project and would be

developed within 5-7 years. DC has submitted the proposal for consideration of the BoA. The request is placed before BoA for its consideration.

(xxiii) Request from M/s Nagarro Software (Jaipur) Pvt. Ltd., a unit in IT/ITES SEZ of M/s. Mahindra World City (Jaipur) Ltd. for approval to change in shareholding pattern

M/s Nagarro Software (Jaipur) Pvt. Ltd., a unit in IT/ITES SEZ of M/s. Mahindra

World City (Jaipur) Ltd. at Jaipur has requested for change in shareholding pattern as under:-

Previous Share holding Pattern Present share holding pattern Name of Shareholder Percentage of share

holding Name of shareholder Percentage of share

holding Nagarro USA 98.00 Allgeier Global

Services Asia Pte. Ltd.

99.99

Vikram Sehgal 01.00 Mr. Vikram Sehgal 0.01 Mrs. Savitri Fuloria 00.50 Mrs. Priyadarshni Jadav

00.50

The unit has submitted a share purchase agreement which was executed for change in

share holding pattern as per Instruction No. 23 dated 16.07.2009 issued by DOC, in case the

Page 54: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

54

promoter decided to decrease the shareholding below 51% then prior approval of BoA must be taken.

DC NSEZ has forwarded the proposal for consideration of BoA (Annexure-25). The request is placed before BoA for its consideration.

(xxiv) Request of M/s. EON Kharadi Infrastructure Pvt. Ltd. (EKIPL), the developer of sector specific SEZ for IT/ITES at Pune, Maharashtra for change of shareholding pattern of the company

The above mentioned SEZ stands notified as on date. The SEZ is operational w.e.f. March, 2007.

The SEZ is still under construction hence additional investment is required to

complete the project. The developer intends to dilute its equity shareholding held in EKIPL held through Premsagar Infra Realty Pvt. Ltd. (PIRPL) by way of issue of new equity shares to M/s. SG Indian Holding (NQ) Co. VII Pte. Ltd. and SG Indian Holding (NQ) Co. IX Pte. Ltd. affiliated entities of the Blackstone Group L.P. (Blackstone Group).

The current shareholding pattern of EKIPL, after the proposed transaction has been

proposed as follows:-

S. No. Name of the shareholder Percentage of existing shareholding

Percentage of shareholding after the proposed transaction

1. Premsagar Infra Realty Pvt. Ltd. 51% 50% 2. SG India Holding (NQ) Co VII Pte

Ltd., Singapore 48.75% 49.74%

3. SG India Holding (NQ) Co IX Pte Ltd., Singapore

0.25% 0.26%

Total 100% 100% Post issuance of shares as proposed, there will not be any change in Directorship of

EKIPL. DC has submitted the request of the developer for consideration by the BoA

(Annexure-26). The proposal is placed before BoA for its consideration.

(xxv) Request of M/s. Biocon Ltd. a unit of M/s. Biocon SEZ, Bangalore for broad banding of products to manufacture and export – Approvals granting by the UAC for confirmation as biotechnology products

The unit was issued LoP on 30.08.2006 for manufacture and export of various

biotechnology products including stains (lova statin, Simva stating, Prava statin, compactin), insulin, enzymes, mycophenolate, eptifibatide, erythropoietin, acetonitile, everolimus, 11a-hydroxy canrenone, temisirolimus, eplerenone, sumatriptan sucinate, glatriramer acetate,

Page 55: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

55

bivalirudin (trifluroacetate) recombinant proteins (monoclonal antibodies), fusion proteins & peptides, placebos and R&D Services.

DC CSEZ has informed (Annexure-27) that the unit has been frequently approaching

the UAC for inclusion of several products under broad banding procedure as biotechnology products. The UAC has so far approved 53 products under broad banding based on certification, technical write-up and Drug Licences issued by the Government of Karnataka, furnished by the unit themselves. DC has requested for advice on obtaining a confirmation from D/o Biotechnology on whether all the products so far approved can be considered as biotechnology products. The D/o Biotechnology had accordingly been requested vide letter dated 20.02.2014 to confirm whether these products can be considered as similar or related products of bio-technology.

The request is placed before BoA for its consideration.

(xxvi) Withdrawal of formal approval granted to M/s . Godrej Real Estate Pvt. Limited for setting up of sector specific SEZ for IT/ ITES at Patancheru Village, Taluk Sangareddy, Medak District, Andhra Pradesh

M/s. Godrej Real Estate Pvt. Limited was granted formal approval for setting up of a sector specific SEZ for IT/ ITES at Patancheru Village, Taluk Sangareddy, Medak District, Andhra Pradesh, vide LoA dated 3rd September, 2008. The SEZ is yet to be notified. The LoA has lapsed on 2nd September, 2011. Now, the developer has requested for withdrawal of formal approval due to financial meltdown and complete collapse of demand in the market.

DC VSEZ has informed that the State Government has granted NOC to the proposal. DC VSEZ has recommended the proposal. The request of the developer for withdrawal of formal approval is placed before the

BoA for consideration. (xxvii) Proposal of NASSCOM’s Chennai Office to set up their office in TRIL Infopark SEZ, a sector specific SEZ for IT/ITES at Taramani, Chennai, Tamil Nadu

M/s. TRIL Infopark Limited was notified on 23rd January 2009 over an area of 10.24.225 hectares.

NASSCOM has informed (Annexure – 28) that in response to their application to the

Development Commissioner they were accorded approval to set up their office in the non-processing area of the SEZ. NASSCOM has further informed that the developer does not have any plans to make available office space in the non-processing area. Accordingly, NASSCOM has submitted a proposal to set up their office in the processing area of the SEZ.

NASSCOM has submitted that considering the demands of the Units of the benefits

arising out of an association with NASSCOM, their office can be treated as infrastructure facilities. NASSCOM would not be availing any duty benefits and income tax benefits, for which they are willing to submit an undertaking.

Page 56: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

56

The proposal of NASSCOM for setting up an office in the processing area of the SEZ is placed before the BoA for consideration.

Item No. 61.12: Appeals before BoA (i) Appeal of M/s. MAS GMR Aero Technic Pvt. Limited, a unit in M/s. GMR Hyderabad Aviation SEZ Limited against order dated 21st August, 2013 of the UAC

M/s. MAS GMR Aero Technic Pvt. Limited, a unit in M/s. GMR Hyderabad Aviation SEZ Limited applied for conducting On Job Training which was rejected by the approval committee in its meeting held on 21.08.2013 as the project envisaged independent training center wherein trainees would be made available for open market and no guarantee for absorption in SEZ unit would be given.

The appellant has filed the instant appeal (Annexure-29) against the above rejection

through DC. The appeal is placed before the BoA for consideration.

(ii) Appeal of M/s. Accenture Services Pvt. Ltd., a unit in M/s. Unitech-Hitech Structures Ltd., IT/ITES SEZ, New Town, Rajarhat, Kolkata against order dated 16th December 2013 of the UAC

M/s. Accenture Services Pvt. Ltd., a unit in M/s. Unitech-Hitech Structures Ltd. applied for approval of services i.e. Business Auxiliary Service, Management and Business Consultant Service, Business support Service, Air Travel Agent Service, Transport Passengers by Air, Accommodation service. The UAC in its meeting on 27.11.2013 has approved the service Business Auxiliary service, Management and Business Consultant Service. The unit is aggrieved by the decision of the UAC to not consider the other services and thus denied/rejected the same.

The appellant has filed the instant appeal (Annexure-30) against the above rejection. The appeal is placed before the BoA for consideration.

(iii) Proposal of M/s Tech Mahindra Ltd., a unit in Kolkata IT Park SEZ at Bantala, 24 Pargana(S), West Bengal for revalidation of the LoA and permission to restart their unit.

The unit was issued LoP on 24.08.2007 for taking up authorized operations of software development and business processing which was extended for two years w.e.f. 23.08.2008 to 23.08.2010. When the unit again requested for extension of validity of their LoA till 23.08.2011, it was advised to submit a report from the Chartered Engineer that 2/3rd of their activities relating to setting up of the unit has been completed as per Rule 19(4) of SEZ Rules. Since 25.08.2010, the unit neither submitted any Chartered Engineer Certificate nor made any further communication with DC FSEZ seeking extension of LoA.

The entire matter was placed before the 54th UAC meeting of FSEZ held on 22.08.2013 wherein it was decided to treat the LoP as lapsed and cancelled from the date of expiry i.e. on 23.08.2010 and the same was communicated to the unit on 13.09.2013. The unit

Page 57: Agenda for 10th March 2014 BoA - sezindia.nic.insezindia.nic.in/upload/uploadfiles/files/35Agenda for 10th March 2014 BoA.pdf · 31.10.2013 in the Dighi Port project is approximately

57

has now requested for revalidation of their LoA. DC FSEZ has placed the matter for a decision of the BoA as no powers are available with the DC or the UAC under SEZ Rules to accede to their request, as also the time period for filling an appeal is long over.

The unit has requested for revalidation of its LoP which has been cancelled in the UAC (Annexure –31).

The appeal is placed before the BoA for consideration. (iv) Appeal of M/s. Biomedical Life Sciences Pvt. Ltd., a unit in pharmaceutical SEZ developed by M/s. Zydus Infrastructure Pvt. Ltd. at Ahmedabad, Gujarat against order of DC KASEZ

The appeal of the unit in the prescribed form has been received on 4th February, 2014. The appeal of the unit against the order of DC was earlier considered by the BoA in

its 60th meeting held on 8th November, 2014, wherein, it was decided to remand the case back to the DC, KASEZ with the direction to give a hearing to the unit and the developer and pass speaking order within 30 days.

Subsequently, DC had passed the order dated 10/13.1.2014. Now the unit has filed an

appeal before the BoA against the order of DC (Annexure -32). The appeal is placed before the BoA for consideration.

(v) Appeal of M/s. Garmex India, a unit in NSEZ against order dated 28th January, 2014 of the UAC

M/s. Garmex India, a unit in NSEZ has filed an appeal against the order of the UAC. The unit had applied for transfer of building erected at plot no. 142 in favour of M/s. iGate Global Solutions Ltd. and the same has been rejected by the UAC on the grounds that the unit i.e. M/s. Garmex India does not hold a valid LoA as on date hence it does not fulfil the conditions of Rule 74 A.

The appellant has filed the instant appeal (Annexure-33) against the above rejection. The appeal is placed before the BoA for consideration.

*********