    CONTENTS PAGE

    1.0 SCOPE 2

    2.0 TECHNICAL REQUIREMENTS TO BE SPECIFIED BY THE ENGINEER 2

    3.0 DEFINITIONS 2

    4.0 REQUIREMENTS 3

    4.1 General 34.2 Materials 4

    4.3 Insulation system 74.4 Construction 74.5 Design 7

    5.0 QUALITY ASSURANCE REQUIREMENTS 9

    5.1 Sampling 9

    6.0 INSPECTION AND TESTING 9

    6.1 Type tests 96.2 Production tests 106.3 Acceptance certificates and tests 11

    7.0 MARKING, PACKING, TRANSPORT AND STORAGE 11

    7.1 Marking 117.2 Packing 117.3 Transport 117.4 Storage 117.5 Training 12

    APPENDIX A : RELATED DOCUMENTS 13

    APPENDIX B : RECORD OF AMENDMENTS 14

    APPENDIX C : DATA SHEET 15

  • 7/30/2019 AGA_SPEC_412010

    2/15

    412/10 ISSUE 4PAGE 2 OF 15

    ANGLOGOLD ASHANTI SPECIFICATION

    THERMAL INSULATION SYSTEM FOR CHILLED WATERPIPING

    COPYRIGHT ANGLOGOLD ASHANTI 2002 APPROVED 2002-10-04

    1.0 SCOPE

    This specification details the requirements for the thermal insulation of chilled water pipes includingflanges, valves and other fittings installed underground, and covers pre-insulation on surface andin-situ applications underground.

    NOTE: THIS DOCUMENT REPLACES ANGLOGOLD ASHANTI SPECIFICATIONS 412/1, 412/9AND 412/10 (Issue 3).

    2.0 TECHNICAL REQUIREMENTS TO BE SPECIFIED BY THE ENGINEER

    Pipe outside diameter

    Insulation section lengths

    Total length of piping Bend or pipe fitting details

    Pipe material

    Pipe joint details (flanged or shouldered, outside diameter and bolt lengths)

    Required life and type of corrosion protection for complete system

    The prevailing ambient conditions affecting corrosion

    Packaging, transport and storage requirements

    Whether pipes are to be pre-insulated on surface or insulation to be installed in-situ

    underground

    3.0 DEFINITIONS

    ANGLOGOLD ASHANTI : AngloGold Ashanti Limited

    ASTM : American Society for Testing and Materials

    OVED : Agreed in writing by the head of the appropriateAngloGold Ashanti Corporate Office discipline or nominated

    representative

    : British Standard

    RACTOR : As defined in the General Conditions of Contract

    CSIR BOUTEK : Council for Scientific and Industrial Research Building

    Technology

    MININGTEK : Council for Scientific and Industrial Research Miningtek

    DIN : Deutsches Institute Fr Normung

    ENGINEER : AngloGold Ashanti Head of Engineering or the nominatedrepresentative

    INSULANT : Material providing thermal insulation through low heat transfer

    INSULATION SYSTEM : Combination of one or more of sleeve, water vapour barrier,sealant and insulant so providing required properties

  • 7/30/2019 AGA_SPEC_412010

    3/15

    412/10 ISSUE 4PAGE 3 OF 15

    ANGLOGOLD ASHANTI SPECIFICATION

    THERMAL INSULATION SYSTEM FOR CHILLED WATERPIPING

    COPYRIGHT ANGLOGOLD ASHANTI 2002 APPROVED 2002-10-04

    LDPE : Low density polyethyleneNBS : National Building Standards

    NES : Naval Engineering Standard (Royal Navy)

    : Water reticulation pipe

    PE : Polyethylene

    QSP : An AngloGold Ashanti Quality System Procedure

    : South African Bureau of Standards

    VE : Outer covering which provides protection to the insulantand vapour barrier

    : Unplasticised polyvinyl chloride

    UR BARRIER : Layer of continuous impermeable material or compoundcovering all sides of the insulation.

    4.0 REQUIREMENTS

    4.1 General

    Insulation produced by the chemical reaction of two or more components, which during thechemical action produce a water vapour or contain an acid shall not be injected or cast into a closedvoid.

    Insulation produced by the chemical reaction of two or more constituents, one of which is an acid,shall not be used as slab stock in voids which have metallic walls unless a vapour barrier covers theinsulation.

    The Data Sheet in Appendix C shall be completed and submitted with the tender. If the Data Sheetis not supplied the tender will be disqualified.

  • 7/30/2019 AGA_SPEC_412010

    4/15

    412/10 ISSUE 4PAGE 4 OF 15

    ANGLOGOLD ASHANTI SPECIFICATION

    THERMAL INSULATION SYSTEM FOR CHILLED WATERPIPING

    COPYRIGHT ANGLOGOLD ASHANTI 2002 APPROVED 2002-10-04

    4.2 Materials

    4.2.1 Protective cover: A protective cover (made of either UPVC, stainless steel, galvanised steel orrockshield reinforced cloth) shall be located on the external surface of the insulation systems andshall comply with the requirements specified in Table 1.

    TABLE 1 Protective Cover Requirements

    1 2 3

    MATERIAL REQUIREMENTS TEST METHOD

    UPVC(See note below)

    1. Thickness 3.2 mm and non-combustible UL 214 CSIR TestMethod, Modified

    2. Comply with AECI Specification No.130/S/03 or Approved equivalent

    4. UPVC sleeves shall be colour coded blue

    Steel (Grade 430stainless steel)

    Minimum thickness 0.3 mm

    Steel (hot dipgalvanised)

    Minimum thickness 0.8 mm for pipes installedin shafts (Grade Z600).Minimum thickness 0.5 mm for pipes installedin haulages (Grade Z275)

    SABS ISO 4998

    Rockshield

    reinforced cloth

    1. 50% linear LDPE / 50% Polypropyleynereinforced cloth

    2. Flame retardant added3. Minimum thickness 0.8 mm

    UL 214 CSIR Test

    Method, Modified.

    Note: Where uPVC or rockshield covered piping is routed closer than 6.0 m fromfuelling bays oil stores, conveyor belts, oil-filled transformers and switchgear,timber supports, etc, external steel cladding shall be applied, see AngloGold AshantiDrawing No. Y1903.

    The combination of an UPVC cover and phenolic foam or nitrile rubber insulation isnot acceptable as the toxicity index exceeds 5.

  • 7/30/2019 AGA_SPEC_412010

    5/15

    412/10 ISSUE 4PAGE 5 OF 15

    ANGLOGOLD ASHANTI SPECIFICATION

    THERMAL INSULATION SYSTEM FOR CHILLED WATERPIPING

    COPYRIGHT ANGLOGOLD ASHANTI 2002 APPROVED 2002-10-04

    4.2.2 Water vapour barrier:The water vapour barrier shall comply with the requirements specified inTable 2.

    TABLE 2 Water vapour barrier requirements

    1 2 3

    PROPERTY/MATERIAL

    REQUIREMENTS TEST METHOD

    Water vapourtransmission (includesbonding/sealingcompounds)

    1. 0.0 g maximum per m/24 h at 38C drybulb 2 % and 90 % 5 % R.H.

    2. The vapour barrier shall cover the entireinsulation section from all sides and bethermally sealed along the seam and notglued.

    3. Minimum width of thermal seal shall be atleast 6 mm.

    ASTM E96

    Tensile strength Not less than 2.24 N/mmSABS 952 1985Subsection 5.6

    Elongation

    To breaking point

    In machine direction not less than 30 %

    In cross direction not less than 22 %

    SABS 952 - 1985Subsection 5.6

    Joint seal (if applicable) Breaking strength not less than 1.6 N/mm SABS 952 1985Subsection 5.6

    Tear strength

    In machine direction not less than 1 120

    mN/sheet

    In cross direction not less than 1 870

    mN/sheet

    BS 782, Part 3,Method 360B

    Combustibility PassUL214CSIR TestMethod, modified

    Vapour barrierconstruction andminimum thickness of

    material

    A 35 m aluminium foil (not metalized andguaranteed pinhole free) with a 300 m (70%LDPE and 30% Polypropylene) co-extruded

    outer layer and a 35 m PE inner layer.

    Using a dial gaugefor thickness.Using a microscope

    for pinholes.

    Note: Foam glass and nitrile rubber insulation do not require a vapour barrier as these materialshave a closed cell structure and are not affected when in contact with water.

  • 7/30/2019 AGA_SPEC_412010

    6/15

    412/10 ISSUE 4PAGE 6 OF 15

    ANGLOGOLD ASHANTI SPECIFICATION

    THERMAL INSULATION SYSTEM FOR CHILLED WATERPIPING

    COPYRIGHT ANGLOGOLD ASHANTI 2002 APPROVED 2002-10-04

    4.2.3 Insulation:The insulation shall comply with the requirements specified in Table 3

    TABLE 3 Insulation requirements

    1 2 3

    PROPERTY/MATERIAL

    REQUIREMENTS TEST METHOD

    Combustibility PassUL 214CSIR TestMethod, modified

    Maximum thermalconductivity at 10C

    Phenolic foam:--------------------0.022 W/mCRock wool:-------------------------0.035 W/mCFoam Glass (T4):----------------0.039 W/mCNitrile rubber:----------------------0.040 W/mCPolyethylene foam:--------------0.048 W/mC

    ASTM C177 (readin conjunction with

    ASTM C518)

    Density (allowing a 5%tolerance)

    Phenolic foam:-------------------- 60 kg/m3Rock wool:-------------------------160 kg/m3

    Foam Glass (T4):----------------120 kg/m3

    Nitrile rubber(superlon):--------- 77 kg/m3

    Polyethylene foam:----------------40 kg/m3

    SABS Method 79

    Water vapourtransmission (includesbonding/sealing

    compounds)

    For insulation systems that do not use a watervapour barrier: a maximum of 0.05 g perm/24 h at 32C dry bulb 2 % and 90 % 5

    % R.H.

    ASTM E96

    Any insulation, which physically or chemically decomposes when in contact withmust be covered with a water vapour barrier.

  • 7/30/2019 AGA_SPEC_412010

    7/15

    412/10 ISSUE 4PAGE 7 OF 15

    ANGLOGOLD ASHANTI SPECIFICATION

    THERMAL INSULATION SYSTEM FOR CHILLED WATERPIPING

    COPYRIGHT ANGLOGOLD ASHANTI 2002 APPROVED 2002-10-04

    4.3 Insulation system

    The insulation system shall comply with the requirements specified in Table 4.

    TABLE 4 System requirements (for piping and flange covers)

    1 2 3

    PROPERTY/MATERIAL

    REQUIREMENTS TEST METHOD

    For the completesystem as installed(Insulation / watervapour barrier / jointseal / cover)

    Toxicity index = 5 maximumFlame spread = pass

    Smoke production max index = pass

    Smouldering combustion = not allowed

    SABS Method T1 /NES 713;CSIR Boutek, FireEngineeringSciences full scaletestCSIR Boutek, FireEngineeringSciences smallscale test

    Minimum thickness ofinsulation based oninsulation properties in

    table 3, allowable heatgains in Table 6 andconditions specified inTable 5

    Phenolic foam:--------------------15 mmRock wool:-------------------------20 mm

    Foamglass:------------------------25 mmNitrile rubber (Superlon):-------25 mmPolyethylene foam:--------------30 mm

    SABS approved

    measuring tape

    Thermal conductivity As given in table 3 ASTM C177

    Note: The overall length of insulation system on pre-insulated pipes shall allow adequate accessto flange bolt holes to prevent damage during bolt on/off action.

    4.4 Construction

    4.4.1 Insulant: The insulation shall be homogenous, free of voids and shall occupy all cavities with.

    4.4.2 Water vapour protection: Water vapour protection of the insulation shall be such that theinsulation is encapsulated in a material which complies with the requirements of a water vapourbarrier detailed in Table 2. Where this material is joined, it shall be thermally sealed and not glued.

    4.4.2 Products of organic nature: Polyurethane or polystyrene-based materials shall not be used.

    4.5 Design

    The Contractor shall provide dimensioned drawings, completed data sheet (as given in appendix C)and certified test certificates (as required by this specification) with his tender.

    The Contractor shall also provide for Approval, the methods and materials to be used for fixing in-situ type insulation to the pipes.

  • 7/30/2019 AGA_SPEC_412010

    8/15

    412/10 ISSUE 4PAGE 8 OF 15

    ANGLOGOLD ASHANTI SPECIFICATION

    THERMAL INSULATION SYSTEM FOR CHILLED WATERPIPING

    COPYRIGHT ANGLOGOLD ASHANTI 2002 APPROVED 2002-10-04

    4.5.1 Calculations: The parameters detailed in Table 5 shall be used for design purposes.

    TABLE 5 Calculations parameters (standard at test site)

    1 2

    PARAMETER VALUES

    Water velocity 1 m/s

    Water temperature 5C

    Pipe diameter range 100 mm 300 mm

    Pipe wall thickness 6 mmPipe thermal conductivity 45 W/mC (mild steel)

    Air temperature 32C dry bulb

    Air velocity 5 m/s

    If pipes of different thermal conductivity pipe diameter and wall thickness areused, this shall be specified by the company.

    4.5.2 Design performance requirements: Themaximum heat gain per linear metre of insulated pipeshall not exceed the value given in Table 6.

    Note: The value given is for the combined insulating value of pipe wall, vapour barrier and sleeve

    and is based on a dry clean sleeve outer surface.

    TABLE 6 Calculations parameters

    1 2 3

    PIPE : NOMINAL SIZE(mm)

    HEAT GAIN(W/linear m)

    TEST METHOD

    100 17

    See Clause 6.1.2 ofthis specification

    150 25

    200 32

    250 39

    300 45

  • 7/30/2019 AGA_SPEC_412010

    9/15

    412/10 ISSUE 4PAGE 9 OF 15

    ANGLOGOLD ASHANTI SPECIFICATION

    THERMAL INSULATION SYSTEM FOR CHILLED WATERPIPING

    COPYRIGHT ANGLOGOLD ASHANTI 2002 APPROVED 2002-10-04

    4.5.3 Designed maximum outside diameter: The designed maximum diameter of the insulation shallcomply with the requirements of Table 7.

    TABLE 7 Maximum insulation system outside diameters (including sleeve)

    1 2

    NOMINAL STEEL PIPE SIZE(mm)

    INSULATIONS SYSTEM OUTSIDEDIAMETER (mm)

    100 225

    150 290200 350

    250 420

    300 470

    1 2

    NOMINAL uPVC PIPE SIZE (mm)INSULATIONS SYSTEM OUTSIDEDIAMETER (mm)

    OD ID

    105 88.6 216

    155 130.8 266

    210 177.2 321

    250 211.0 361

    5.0 QUALITY ASSURANCE REQUIREMENTS

    The requirements of QSP 101 shall apply.

    5.1 Sampling

    Sampling for type testing shall be as determined by the AngloGold Ashanti Manager OccupationalEnvironment.

    Sampling for production testing shall be in accordance with the requirements detailed in theApproved Quality Plan.

    6.0 INSPECTION AND TESTING

    6.1 Type tests

    6.1.1 Full scale fire test (CSIR Boutek, Fire Engineering Sciences): Full-scale pipe insulation testsshall be performed on two 200 mm diameter insulated pipes complete with vapour barriers, bondingand external protective cover. The pipes shall be installed in parallel.

  • 7/30/2019 AGA_SPEC_412010

    10/15

    412/10 ISSUE 4PAGE 10 OF 15

    ANGLOGOLD ASHANTI SPECIFICATION

    THERMAL INSULATION SYSTEM FOR CHILLED WATERPIPING

    COPYRIGHT ANGLOGOLD ASHANTI 2002 APPROVED 2002-10-04

    6.2 Production tests

    Production tests shall be performed on samples as detailed in the Quality Plan and at the frequencyspecified in Table 8.

    TABLE 8 Sampling plans for test Clause 6.2

    1 2 3

    LOT SIZE SAMPLE SIZEDEFECTIVE

    ACCEPTABLEUp to and including 25 3 0

    26 50 5 0

    51 - 150 8 0

    cted from BS 6001 AQL 6.5)

    6.2.1 Small scale flame spread: Combustibility shall be tested in accordance with the requirements ofUL 214 CSIR Method, Modified.

    6.2.2 Toxicity: Toxicity shall be tested in accordance with the requirements of SABS Method T1 (NES713).

    6.2.3 Conductivity: The conductivity of a sample of the insulation shall be tested according to ASTMC177.

    6.2.4 Water vapour transmission: The water vapour transmission values of the water vapour barriershall be tested according to ASTM E96.

    6.2.5 Tensile strength: The tensile strength shall be tested in accordance with SABS 952-1985 subsection 5.6.

    6.2.6 Elongation: The elongation shall be tested in accordance with SABS 952-1985 Subsection 5.6.

    6.2.7 Joint heat seal breaking strength: The joint heat seal breaking strength shall be tested inaccordance with SABS 952-1985 Subsection 5.6.

    6.2.8 Tear strength: The tear strength shall be tested in accordance with BS 2782, Part 3, Method360B.

    6.2.9 Mass: The mass shall be tested in accordance with SABS Method 79.

    6.2.10 Thickness: The thickness shall be tested in accordance with SABS 952-1985 Subsection 5.6.

    6.2.11 Density of insulant: Remove a cube from an insulated pipe and determine its mass. Calculatethe volume of the cube and determine the density of the insulant by dividing the mass by thevolume. Express the result in kg/m. The result shall comply with the requirements of Table 3.

  • 7/30/2019 AGA_SPEC_412010

    11/15

    412/10 ISSUE 4PAGE 11 OF 15

    ANGLOGOLD ASHANTI SPECIFICATION

    THERMAL INSULATION SYSTEM FOR CHILLED WATERPIPING

    COPYRIGHT ANGLOGOLD ASHANTI 2002 APPROVED 2002-10-04

    6.2.12 Thickness of insulant: The thickness of the insulant shall be measured prior to encapsulation inthe vapour barrier and outside protective sleeve for in-situ type insulation.

    For pre-insulated pipes, the circumference of the pipe and the outside circumference of theprotective sleeve of the insulated pipe shall be measured.

    6.3 Acceptance certificates and tests

    The following tests are required per batch of insulation / insulation system produced:

    Small scale flame spread (UL 214 CSIR Method)

    Toxicity SABS Method T1 (NES 713)

    Conductivity (ASTM C177)

    If any of these tests do not pass the specifications, then the batch shall be rejected. When theinsulation is delivered, a batch certificate with acceptable test results, shall be provided to

    AngloGold Ashanti before payment can be made. The batch number shall be clearly andpermanently marked on the insulation. The batch number shall give the date of manufacture andthe run number.

    Additional testing shall be performed as determined by the Manager Occupational Environment orhis representative(for example thickness tests, conductivity, vapour barrier composition, etc.).These additional tests will be for AngloGold Ashantis account. If the insulation does not pass one ofthe test, all delivered insulation shall be taken back by the supplier and AngloGold Ashanti shall berefunded for insulation which has already been paid for.

    7.0 MARKING, PACKING, TRANSPORT AND STORAGE

    7.1 Marking

    The outer surface of all insulation sections and the water vapour barrier shall be marked with thefollowing information:

    The Contractor's name or logo

    The Batch number (with the date of manufacture and run number)

    7.2 Packing

    Packing shall provide protection during transit from the place of manufacture to the underground

    installation site. All insulation sections which have water vapour barriers, shall be contained in areinforced bag which will prevent damage during transit.

    7.3 Transport

    Transport, loading and unloading shall be performed in a manner which will prevent any damage tothe insulation system.

    Damaged items will not be accepted from the Contractor.

    7.4 Storage

  • 7/30/2019 AGA_SPEC_412010

    12/15

    412/10 ISSUE 4PAGE 12 OF 15

    ANGLOGOLD ASHANTI SPECIFICATION

    THERMAL INSULATION SYSTEM FOR CHILLED WATERPIPING

    COPYRIGHT ANGLOGOLD ASHANTI 2002 APPROVED 2002-10-04

    Pipes shall be stored so that damage to the insulation system by mechanical means or by adverseweather conditions is prevented.

    7.5 Training

    Awareness training shall be given for the transportation, storage, installation and maintenance ofthe insulation system offered, by the Contractor.

  • 7/30/2019 AGA_SPEC_412010

    13/15

    412/10 ISSUE 4PAGE 13 OF 15

    ANGLOGOLD ASHANTI SPECIFICATION

    THERMAL INSULATION SYSTEM FOR CHILLED WATERPIPING

    COPYRIGHT ANGLOGOLD ASHANTI 2002 APPROVED 2002-10-04

    APPENDIX A : RELATED DOCUMENTS

    The latest issues of the following documents shall be deemed to form part of this specification:

    ASTM C177 : Test method of steady-state heat flux measurements and thermaltransmission properties by means of guarded-hot-plate apparatus

    ASTM C518 : Test method of steady-state heat flux measurements andthermal transmission properties by means of guarded-hot-

    Plate apparatus

    AECI 130/5/03 : Specification for PVC formulation

    AngloGold Ashanti Drawing Y1903 : Cladding

    AngloGold Ashanti QSP 101 : Quality requirements for minor products and standard stockconsumable items

    ASTM D304 : Recommended practice for heat ageing of plastics withoutload

    ASTM E96 : Test for water vapour transmission of materials

    BS 782 Part 3 Method 360B : Determination of tear strength of sheet and sheeting

    CSIR Boutek FireEngineering Sciences Test : Full scale fire test

    DIN 53448 : Testing of plastics, tensile impact test

    NES 713 (Royal Navy) : Determination of the toxicity index of the products of Combustion from shall specimens of materials

    SABS 952 : Polyolefin film for damp-proofing and water-proofing inbuildings

    SABS ISO 9001 : Quality management systems

    SABS Method 79 : Mass / unit area of conditioned textile fabrics

    UL 214 CSIR Method Modified : Fire testing of materials, components and elements

  • 7/30/2019 AGA_SPEC_412010

    14/15

    412/10 ISSUE 4PAGE 14 OF 15

    ANGLOGOLD ASHANTI SPECIFICATION

    THERMAL INSULATION SYSTEM FOR CHILLED WATERPIPING

    COPYRIGHT ANGLOGOLD ASHANTI 2002 APPROVED 2002-10-04

    APPENDIX B : RECORD OF AMENDMENTS

    Issue 3 : Tables 1, 2, 4 amendedClauses 4.5, 7.3 amendedClause 7.5 added

    Appendix C sleeve, vapour barrier, and system requirements amended(M. Karsten 2001-02-28)

    Issue 4: Table 1,2,3,4,6,7 amendedClauses 4.1, 4.2.1, 4.4.1, 4.5, 7.1, 7.2, amendedClauses 6.1.2, 4.4.5 removed

    Appendix C amended(C Hegermann 2002-09-25)

  • 7/30/2019 AGA_SPEC_412010

    15/15

    412/10 ISSUE 4PAGE 15 OF 15

    ANGLOGOLD ASHANTI SPECIFICATION

    THERMAL INSULATION SYSTEM FOR CHILLED WATERPIPING

    COPYRIGHT ANGLOGOLD ASHANTI 2002 APPROVED 2002-10-04

    APPENDIX C : DATA SHEET (to be completed as part of the tender document)

    CONFORMANCE TO SPECIFICATION 412/10 Issue 4

    1 2 3 4

    COMPONENT REQUIREMENTS TEST METHODSUPPLIERCONFORMANCEYes or No?

    Protective CoverAs per table 1 of Spec 412/10Issue 4

    1. UL 214CSIR TestMethod,modified

    2. SABS ISO4998

    Water vapourbarrier

    As per table 2 of Spec 412/10Issue 4

    1. ASTM E962. UL 214

    CSIR TestMethod,modified

    InsulationAs per table 3 of Spec 412/10

    Issue 4

    1. UL 214CSIR TestMethod,modified

    2. ASTM C177(in

    conjunctionwith ASTMC518)

    3. ASTM E964. SABS

    Method 79

    InsulationSystem

    As per table 4 of Spec 412/10Issue 4

    1. SABSMethod T1 /NES 713

    2. CSIR, Fullscale firetest

    3. CSIR, Small

    scale test

    Installed sizesAs per table 7 of Spec 412/10Issue 4

    1. SABSapprovedmeasuringtape