Time 8:30 to 13:30 CTP WELLS
Time WellWHP WHT ANNULUS CHK FLP FLT flow
bar c bar /64 bar c mmscfd
report NSG 1-1 135 68 20 40 82 55 22.45
actual 135 68 20 38 82 56 22.341
report NSG 1-2 127 34 0 34 82 47 13.321
actual 127 57 0 26 83 47 10.72
report SSG 1-1 181 70 5 15 89 53 19.421
actual 176 70 0 12 90 54 23.407
report NWSG 1-1 197 44 0 17 79 19 8.353
actual 200 50 40 17 80 19
report SSSE 3-1 93 55 5 56 80 47 17.912
actual 93 55 0 53 78 50 15.674
report NSG 4-1 189 73 0 41 81 50 24.535
actual 189 73 0 40 81 50 28.649
report NSG 2-3 133 64 40 45 76 51 19.965
actual 124.6 64 40 42 77 52 19.821
Daily wells Monitoring Report