OIL ESA IMPLEMENTATION STATUS. QTR 2. AS ON 30.06.2014 AFTER 2008 UNIT PR OJ ECT Date RECOMMENDATION C O M P R E V E R S E D ACTION TAKEN SCHE DULE R SCH I R SCH II REVSC HIII OISD Remarks GENERAL DU L 16-05-2 008 Drill cuttings and drilling fluid disposal to be carried out as per latest MOEF guidelines. N o N o Four ETPs for the purpose are functioning satisfactorily. Tender no CDG/8514P13 floated for six sets of ETP. Bid open 26.3.13. Technical evaluation completed. Further process is on. Work is in progress to equip all CH rigs also with ETP (Revised EDC)30.06.15 (Due to cancellation of tender against CH3 and CH4 31-12- 2012 30-06- 2013 31-07-2 014 30-06-2 015 ANX-2-2

AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

  • Upload
    others

  • View
    21

  • Download
    1

Embed Size (px)

Citation preview

Page 1: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

OIL ESA IMPLEMENTATION STATUS. QTR 2. AS ON 30.06.2014

AFTER 2008

UNIT PROJ

ECT

Date RECOMMENDATION COMP

REVERSED

ACTION TAKEN SCHEDULE

R SCH I

R SCH II REVSCHIII

OISD Remarks

GENERAL DUL

16-05-2008

Drill cuttings and drilling fluid disposal to be carried out as per latest MOEF guidelines.

No

No

Four ETPs for the purpose are functioning satisfactorily. Tender no CDG/8514P13 floated for six sets of ETP. Bid open 26.3.13. Technical evaluation completed. Further process is on. Work is in progress to equip all CH rigs also with ETP (Revised EDC)30.06.15 (Due to cancellation of tender against CH3 and CH4

31-12-2012

30-06-2013

31-07-2014

30-06-2015

ANX-2-2

Page 2: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

I-ITF-TENGAKHAT

DUL

16-05-2008

1. Being comparatively a new installation, it is suggested that records of base values (thickness) of equipment like storage tanks, vessels, piping should be maintained for reference, when health check is carried out in future. Tank No. 203 roof should be checked for excessive undulations. Fire water & fuel gas lines which are showing signs of corrosion require corrective action.

No

Yes

Records of base values of equipment maintained. Roof for tank no. 203 checked and found ok. The entire length of the fire and fuel gas lines at ITF has been repainted with protective coating. Corrective action taken for fire water & fuel gas lines.

30-09-2013

compliance report is not provided

Page 3: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

I-QPS-Balijan

DUL

16-05-2008

5. Health assessment of storage tanks, manifold, piping etc has not been carried out, except hydrostatic testing of separators.

No

No

Budget sanction obtained for carrying out NDT in the installation.

30-06-2010

31-12-2013

31-12-2015

Page 4: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

I-QPS-Balijan

DUL

16-05-2008

15. Generator shed electrical system needs total refurbishment and up-gradation. In DG set, MCCB should be used instead of isolator. MCBs should be used in lighting distribution network instead of isolators (ICTPN). ELR should be installed in power system.

No

No

Generator shed construction is in progress.

31-12-2009

31-12-2012

31-12-2013

31-12-2014

approval from competenet authority to be obtained for changing the EDC

Page 5: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

I-EPS-Baghjan

DUL

06-07-2009

13. Fire water lines and piping to be re-routed out of tank dyke area, to the extent possible. Minimum number of fire lines and piping should be passing through dyke. Layout may be reviewed.

No

Yes

Two numbers of crude oil storage tank constructed and commissioned on 05.06.2014. Fire water piping in the new tank farm was routed considering minimum number of fire lines and piping passing through dyke

31-12-2013

31-12-2014

Page 6: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

I-OCS-Makum

DUL

06-07-2009

1. Inter distances and other requirements as per OISD STD 118 should be checked. In case of shortcomings, additional control measures should be introduced based on risk assessment study.

No

No

Mobilization of contract completed on 7/7/14 by M/s CGC Converse Technology who was awarded the contract

31-12-2012

31-12-2013

31-12-2014

Out of the cases where OISD-STD-118 requirements are not being met. For typical (representative) cases, Quantitative Risk Analysis should be carried out. (only qualitative analysis may not suffice)

Page 7: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

R-E-3000 DUL

06-07-2009

3. Well control equipment at the rigs should be as per OISD-RP-174. Following shortcomings were observed in the well control equipment : - BOP stack for drilling – lesser number of rams in 10,000 psi 13 5/8” stack; no ram in 21 1/4” BOP (only annular). - Kill line / kill manifold being used with 10000 psi stack is of only 5,000 psi rating and status with respect to fulfilling of requirements of API specifications by having API monogram could not be established. Well control equipment being critical safety equipment should meet requirements of applicable Industry standards. - MGS should be made available. - Kill line valves should be as per 6.5.2.V of OISD-RP-174. - BOP control unit (accumulator) – auto start switch not functioning

No

No

G & R has been advised to incorporate details of 10M BOP stack with three rams. When 10M BOP is used for wells when anticipated well pressure is expected (as per policy) more than 5000 psi, additional 10M ram BOP is invariably used as per OISD RP-174. Noted . Procurement action has already been taken for Poor Boy Degaser/MGS vide PR No. 1409122 dt. 18.5.2012. EDC for PBG: 30.6.2013

31-03-2011

30-06-2013

31-12-2014

OIL’s contention quote “ Three rams will be used in the 10 M preventers when the well pressure demands.” Is accepted. However, there should be one single ram in addition to Annular in 21 ¼” BOP.

Page 8: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

W-CW-C DUL

06-07-2009

7. Fire fighting facility to be as per OISD STD 189. (Similar recommendation was made in 2007 audit)

No

No

Pumps: Received against P.O. No.7905839 & commissioning is in progress. Tanks: Tanks received and commissioned. 12 SETS: Pump: PR-1409221 dt.07.07.2012. E-Tender SKI 7707P13-bid opened on 30.11.12 and Tech evaluation was completed but no bidder was found suitable and the tender had to be cancelled. Re Tender SKI1100P14 dated 12.09.13 against new PR-1410623. Bid opened on 15.11.13 & PO No. 7906492 dated 05/03/14 placed with delivery date 31.12.14.Tanks: As no party was found suitable the tender got cancelled, re tendering process has been initiated Commercial bid opened – Approval for purchase proposal is in circulation

31-12-2011

30-06-2013

30-06-2014

Page 9: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

GENERAL DUL

19-04-2010

MSDS relevant points (emergency first aid procedure and PPE requirements) should be displayed near chemical storage/handling area (in local language also). Eye wash and safety shower facility should be provided.

No

No

Drilling: MSDS relevant points implemented and complied. Eye wash and shower is partially complied and action initiated for full compliance (EDC:31.05.2015) Work over: MSDS relevant points implemented and complied. Eye wash and shower is partially complied and action initiated for full compliance (EDC: 31.05.2015) P-Gas: MSDS relevant points have been displayed in English & local language. Provisioning of Eye Wash & Safety shower facility is being implemented in phases. (EDC: 15-05-2014) P-Oil: MSDS relevant points have been displayed in English & local language. Provisioning of Eye Wash & Safety shower facility is being implemented in phases. (EDC: 15-05-2014)

31-12-2011

31-12-2012

31-05-2015

ANX-1-11

Page 10: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

GENERAL DUL

19-04-2010

At workover rigs fixed fire fighting system is not available. Fire fighting facility to be provided as per OISD-STD-189.

No

No

Fixed fire fighting system is available in some rigs. For full compliance following actions have been taken. TWO SETS: 1. Pumps: PR-1409083 of 07.05.2012 for 2 pumps: Order-7905839 placed against E-Tender No.SKI6716P13. Exp.Deliv: Aug2013 2. Tanks: Received in April13 against P.O-7905527 dt14.8.2012 12 SETS: 1. Pumps: PR-1409221 dt.07.07.2012. E-Tender SKI 7707P13-bid opened on 30.11.12 and Tech evaluation was completed but no bidder was found suitable and the tender had to be cancelled. New PR-1410623 is being processed. 2. Tanks: PR-1409372 dt 11.08.2012, Commercial bid opening is being process against Tender No.SDI/8568/P13/P2 Dt 11.01. EDC was 30.06.13 As no party was found suitable the tender got cancelled, re tendering process has been initiated for the fire pumps. Rev. EDC: 30.06.14 Work in progress for compliance of revised OISD STD 189

31-12-2011

30-06-2013

30-06-2014

ANX-2-4

Page 11: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

I-OCS-06-NHK

DUL

19-04-2010

3. Though NDT has been carried for storage tanks, vessels and piping the data has not been interpreted / analyzed to confirm fit for purpose status.

No

No

NDT has already been carried out in the installation in 2007. NDT data can be interpreted once the NDT will be carried out once again after five years. The matter is looked into. Proposed in the budget for carrying out NDT in the installation

31-12-2013

31-12-2015

Page 12: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

I-OCS-06-NHK

DUL

19-04-2010

11. Discharge line from SRVs of separators should be routed to flare through a common header in production installations.

No

No

Action initiated. Compilation of budgetary estimate is in progress. Execution job started

31-12-2013

30-09-2014

Page 13: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

I-OCS-06-NHK

DUL

19-04-2010

4. Internal inspection and bottom plate thickness measurement of storage tanks has not been carried out since inception (1963).

No

No

Request to liquidate the recommendation as: The present fluid handled in the installation is very less and as such the crude oil handled is sweet crude. No bottom plate failure of crude oil storage tank has been recognised since inception in this area (about 48 years) (NHK field) . The matter is being looked into.

31-12-2014

Page 14: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

I-QPS-Kusijan

DUL

19-04-2010

5. DGMS approval of the installation is not available.

No

No

Application for obtaining DGMS approval has been sent to DGMS. DMS visited Kushijan QPS ON 16.10.2013 and suggested for some correction/modification etc. vide letter NO.As/Oil/POM/PI(13)/981 dated 23.10.2013 before obtaining DGMS approval. DGMS again visited OIL’s office on 27.06.2014 and asked for submission of additional documents and drawings.

31-12-2011

30-06-2012

31-03-2013

31-12-2014

EDC CHANGED

Page 15: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

I-QPS-Kusijan

DUL

19-04-2010

1. Health assessment of storage tanks, manifold, piping and separator has not been carried out, except hydrostatic testing of separators.

No

No

Obtained budget sanction for carrying out NDT in the installation. Job initiated for NDT.

31-12-2013

31-12-2015

Page 16: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

I-WI-21 DUL

19-04-2010

. Health assessment of manifold and piping has not been carried out.

No

No

Obtained budget sanction for carrying out NDT in the installation. Job initiated for NDT

31-12-2013

31-12-2015

Page 17: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

GENERAL DUL

09-05-2011

On the drilling and workover rigs, health check of mast, structure, crown block, travelling block, draw works etc should be carried out. NDT data should be interpreted / analysed to confirm the ‘fit for purpose’ status. API RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices.

No

No

Drilling & Workover: NDT has been completed on 6 out of 8 drilling rigs. NDT has been completed on 8 nos out of 12 work-over rigs. NDT Work is in progress for rest of the rigs.

31-12-2012

31-07-2013

31-07-2014

ANX-2-17

Page 18: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

GENERAL DUL

09-05-2011

On drilling and workover rigs, as per OISD-RP-174, Asstt. Shift In charge and above personnel should have valid accredited well control certificate (of the appropriate level) to ensure competence. (Appropriate level means – ‘Driller’ level and ‘Drilling Supervisor’ level for the required function - drilling / well intervention).

No

No

Drilling & Workover: As decided in the meeting held in OISD office Noida on 09/04/2014 with OISD, the recommendation on Asstt Driller is dropped and accepted by OISD. Drillers (in shift basis) with valid well control certificate are working round the clock basis at drilling locations. However, junior engineer without valid control certificate is working in place of Asstt Driller in well site. Effort is on to train up junior engineer s for increasing competency level

31-12-2012

31-12-2017

ANX-2-7

Page 19: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

GENERAL DUL

09-05-2011

Major inspection of well control equipment should be done as per requirements of section 6.2 (IV) of OISD-RP-174.

No

No

Drilling & Workover: Pre-bid conference held on 19.03.2014 and Tender cancelled and fresh PR being raised with modified NIT.

01-01-2014

31-12-2015

ANX-2-16

Page 20: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

GENERAL DUL

09-05-2011

Gas detectors should be installed at rig sub structure and shale shaker.

No

No

Drilling: PO No 7906187 dated 30/07/2013 issued with delivery date 28.02.2014 against Tender No SDG/7718 (PR No 1408957 dated 12/04/2012). However Party yet to deliver the product. Following up with the party through Materials department for execution of the order in progress

31-03-2013

30-04-2014

ANX-2-15

Page 21: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

GENERAL DUL

09-05-2011

On the workover rigs operating on manpower contract, in the shift, only Shift In charge / Driller is deployed as competent person; there is no provision of Asstt. Driller / Asstt. Shift In charge. This practice should be reviewed for ensuring safe operations. [Industry practice is to have two competent persons Driller and Asstt. Driller in the shift, so that driller is not overloaded thereby affecting his alertness (which would be detrimental to safety). For instance, on workover rig Cardwell K-600, Mr. M. Khaklani (shift incharge) worked on 08.05.2011 (1300 – 2100 hrs.) and then on 09.05.2011 (0500 – 2100 hrs.)].

No

No

Workover: As decided in the meeting held in OISD office Noida on 09/04/2014 with OISD, the recommendation on Asstt Driller is dropped and accepted by OISD. Although there is no provision for Asst. Driller in existing contracts however provision for Asst. driller will be made in the new contracts. At present Drillers (in shift basis) with valid well control certificate are working round the clock basis at drilling locations. However, junior engineer without valid control certificate is working in place of Asstt Driller in well site. Effort is on to train up junior engineers for increasing competency level)

31-12-2017

ANX-2-18

Page 22: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

GENERAL DUL

09-05-2011

At some of the installations (for example CTF Duliajan, OCS Jorajan, GCS Nagajan and Chabua EPS) audited, inter distances are not as per OISD-STD-118. Inter distances and other requirements as per OISD-STD-118 should be checked. In case of shortcomings, risk assessment study should be carried out for such installations and required additional control measures should be introduced.

No

No

P-Gas: Action initiated. Will take up during HAZOP Study. Contract for HAZOP Study awarded on 07/05/2014 to M/s CGC Converse technology Ltd. Complete implementation is not possible due to subsequent construction activities and land development of the old installations. Additional measures such as coating and wrapping and/or painting, regular inspection /NDT etc are being taken up. P-Oil Noted. Action initiated Partially implemented EDC:31.12.2015

31-12-2015

ANX-3-7

Page 23: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

GENERAL DUL

09-05-2011

On the production installations, health check of equipment should be carried out for storage tanks, pressure vessels and piping. NDT data should be interpreted / analysed to confirm the ‘fit for purpose’ status.

No

No

P-Gas NDT inspections have been completed in 8 gas installations. It is now being taken up in the other gas installations in a phased manner EDC: 31-12-2014 P-Oil NDT inspection in Production installations is a continuous process and is being carried out in phased manner EDC: 31.12.2015 r

31-12-2015

ANX-3-6

Page 24: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

GENERAL DUL

09-05-2011

Appropriate flare system, corresponding to operating parameters, to be installed, in line with the applicable OMR & MOEF stipulations and OISD-STD-106.

No

No

P-Gas Appropriate flare system being installed at FGGS at Kushijan Well No 2. For the remaining installations flare system not required. EDC: 31.12.2014 P-Oil Action initiated EDC:31.12.2015

31-12-2015

ANX-3-2

Page 25: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

GENERAL DUL

09-05-2011

On workover rigs, availability of trip tank to be ensured, when the rig is deployed on a gas well / high pressure well, in line with OISD-RP-174.

No

No

Already available in some of work over rigs and used as recommended. The issue is reviewed and decided to equip all the rigs with trip tank. Action has been initiated for procurement of same.

31-12-2014

ANX-2-14

Page 26: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

GENERAL DUL

09-05-2011

Spinning of tubular is being done by use of manila rope and cathead. Use of manila rope is hazardous (An accident during cathead operation at FE Cooper rig, on 01.10.2008 has been reported to OISD). Drilling industry led by IADC has stopped such unsafe working practices by use of pipe spinner, Kelly spinner etc. Unsafe work practice of manila rope and cathead should be stopped.

No

No

Drilling & Workover: Use of spinning ropes will be phase out by 2015. In this connection following action has been initiated: Procurement of Pipe Spinner : Initial tender cancelled as the price of the technically accepted single party found to be 90% higher than the estimated budget. Technical scrutiny is in progress against new refloated Tender. Procurement of Kelly spinner: Budget is sanctioned and PR has been raised

31-12-2014

ANX-2-13

Page 27: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

GENERAL DUL

09-05-2011

Road around the dyke should be constructed for the easy movement of fire tender in case of crisis.

No

No

P-Oil Wherever sufficient land is available actions have been initiated to improve peripheral road around the tanks. However, for old installations the complete implementation is not possible and actions have been initiated to provide at least two approach roads to the furthest point. P-Gas: Not applicable

31-12-2013

ANX-3-4

Page 28: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

I-CTF-DUL DUL

09-05-2011

2. Sludge lying inside the dyke of storage tank No. 7 should be evacuated on priority. Removal of 10” line (not in use) passing through dykes of storage tanks is in progress. It should be completed on priority.

No

No

Action has been taken for transfer of sludge lying inside the dyke of storage Tank no 7. Job on progress Complied. (10” line passing through the dyke of storage tanks) is removed.

31-12-2012

31-12-2013

30-09-2014

Page 29: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

I-CTF-DUL DUL

09-05-2011

1. Fire drill on storage tank No. 8 was carried out; water could not reach on the top of tank. Company has already been informed about implementing requirements of amended OISD-STD-116 and OISD-STD-117 at all the applicable installations. Company is required to submit action plan for same, which is overdue.

No

No

Execution of job for implementing M.B. Lal Committee’s recommendation has been started which will address the recommendation

31-08-2013

31-10-2014

Page 30: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

I-CTF-DUL DUL

09-05-2011

3. Piping should be painted for corrosion protection. Piping should be above ground and should have single point supports.

No

No

Painting of all process lines has been completed. Replacement of pipe of fire water lines are going on under the MB Lal’s recommendations implementation Project

31-12-2012

30-10-2014

Page 31: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

I-GCS-NAGAJAN

DUL

09-05-2011

Online gas detection system should be provided in gas compressor area.

No

No

PR No. 1411791of dated 11/02/2014 raised. BEC/BRC under preparation.

30-03-2013

31-12-2014

31-03-2015

Page 32: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

I-GCS-NAGAJAN

DUL

09-05-2011

1. Fire drill was carried out at the installation and following was observed. a) Water could not be sprayed on compressor assumed to be on fire. b) Heavy smoke from the engine was observed. Running fire water pump was causing the other pump to rotate due to non availability of NRV on interconnection lines. c) Due to lack of documented procedure crew could not work in co-ordinated manner resulting in confusion and delay. d) Fire fighting system should be as per OISD-STD-189.

No

No

a) Necessary modification has been initiated as per OISD std. 189. b)Job completed. c) Operating procedure documented and put in place. d) Necessary modification has been initiated as per OISD std. 189.

31-12-2012

31-12-2014

Page 33: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

I-OCS-JORAJAN

DUL

09-05-2011

. Fire water storage requirement as per OISD-STD-189 should be ensured.

No

No

Already in process. Site selected, Action initiated for supplementary Budget sanction

31-12-2012

31-12-2013

31-12-2016

EDCChanged

Page 34: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

GENERAL DUL

21-05-2012

Piping should have single point support. No

No

P-Gas: Complete implementation is not possible due to subsequent construction activities and land development of the old installations. Wherever possible, over-ground piping within the installations are being taken up for provision of single point support. For buried / semi-buried piping within the installation, where provision of single point support is not feasible, additional measures such as coating and wrapping and/or painting, regular inspection /NDT etc are being taken up P-Oil: Complete implementation is not possible due to old design, land development subsequent to construction of the Installation etc Requested to OISD at a meeting on 9th April’14 at New Delhi to waive/modify this point for older installations

31-12-2014

ANX-3-8

Page 35: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

I-OCS-KATHALONI

DUL

21-05-2012

Lot of corrosion was observed on tanks and piping. This needs immediate attention.

No

No

Special Revenue Budget Approved for external surface painting of crude oil storage tank. Contract PR formulation progress.

30-06-2015

Page 36: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

I-OCS-KATHALONI

DUL

21-05-2012

Considering the large size of the installation, communication system inside the installation should be available for interaction between crew working at different locations

No

No

This has been taken up for all big installation commonly

30-06-2015

Page 37: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

GENERAL DUL

08-04-2013

Wells should be fenced, with access control. No

No

P-Gas: Producing wells are fenced with access gates securely locked. P-Oil Policy for providing fencing of all wells is in place and is a continuous process. However, due to recurrent miscreant activities, all fencings may not be in place. EDC: 31.12.2015

31-12-2015

ANX-3-9

Page 38: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

GENERAL DUL

08-04-2013

Fire fighting system, as per OISD-STD-189 (revised in 2012) is to be ensured at production installations, drilling & workover rigs at the earliest.

No

No

Drilling: Procurement action in hand for Fire Fighting items such as multipurpose nozzle, Trailer Fire Pump, Fire Extinguishers etc. as per revised OISD STD 189 is in progress. (EDC: 31.07 2014 Workover:Procurement action in hand for Fire Fighting items such as multipurpose nozzle, Trailer Fire Pump, Fire Extinguishers etc. as per revised OISD STD 189 is in progress P-Gas Gap Analysis Completed Job will be done in phases. (EDC: 31.12 2015 P-Oil Complied

31-12-2015

ANX-1-18

Page 39: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

I-GCS-05 DUL

08-04-2013

There is no online gas detection system. No

No

PR No. 1411791of dated 11/02/2014 raised. BEC/BRC under preparation.

31-12-2014

Page 40: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

I-GCS-05 DUL

08-04-2013

6. Situation here is similar to OCS-5, of not meeting OISD-STD-118 requirements and large population around the installation. The following point requires urgent attention: - Operator cabin which is permanently manned is a serious risk, in view of its close proximity to compressor area. Till additional control measures are put in place, based in Quantitative Risk Assessment, manning level in the cabin to be drastically reduced

No

No

Use of operator cabin is discontinued. A bunk house for operators is placed at a safe distance of 30m from the operating area. HAZOP study to be done along with other stations. Contract for HAZOP Study awarded on 07/05/2014.

31-05-2014

Page 41: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

I-GCS-KATHALONI

DUL

08-04-2013

With reference to the observations at Sl. No. 7 of Annexure 3 with respect to meeting requirements of OISD-STD-118, this installation should also be checked to ensure compliance with OISD-STD-118 requirements.

No

No

This will be taken up during HAZOP Study. Contract awarded to carry out HAZOP Study on 07/05/2014. Complete implementation is not possible due to subsequent construction activities and land development of the installation. Additional measures such as coating and wrapping and/or painting, regular inspection /NDT etc are being taken up.

31-12-2014

Page 42: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

I-OCS-05-NHK

DUL

08-04-2013

Health check report (of 2011) of an external agency is with many riders and recommends further testing / actions. No follow-up action has been taken by OIL on the report (there is no mechanism in place, apparently). No records available for tanks inspection other than ultrasonic survey done in 2011. Bottom plate has never been inspected. Tank inspection to be done as per OISD-STD-129. The installation being very old its fit-for-purpose status should be urgently ensured.

No

No

action initiated 31-12-2016

Page 43: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

I-OCS-05-NHK

DUL

08-04-2013

the following points (some already appearing under ‘common points’) are emphasized below in view of heavy concentration of human dwellings around the installation, and the installation not meeting OISD-STD-118 inter-distance requirements: a) Quantitative Risk assessment to be carried out urgently, to decide on control measures; b) On line gas detection and alarm system to be installed

No

No

a)QRA will be done along with the HAZOP study b)Proposed for the budget approval in the capital budget2014-15

31-12-2015

Page 44: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

W-RG--D (Oo,Mmc)

DUL

08-04-2013

No evidence to support non- requirement of trip tank. (i.e. well is not a high pressure/gas well).

No

No

Already available in some of work over rigs and used as recommended. The issue is reviewed and decided to equip all the rigs with trip tank. Action has been initiated for procurement of same.

31-10-2013

31-12-2015

EDC CHANGED

Page 45: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

GENERAL DUL

28-04-2014

Many of the equipment do not have double and distinctearthing. At some of places (production installations, drilling rigs and workover rigs), earth pits/earthing electrodeare not numbered and maintained

No

No

Drilling: complied Work over: Complied P Oil Complied P Gas: Jobs are taken up in phased manner EDC: 31-12-2015

ESA from 28.4.2014 to 2.5.2014

Page 46: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

GENERAL DUL

28-04-2014

The NGR (Neutral Grounding Resistor) was not found in the incoming power supply, which is required as per CEA Regulations, 2010,Clause 100 (1). The same needs to be provided.

No

No

Drilling: NGR have been installed in 6 out of 8drilling rigs. Rest of the rig will be completed in phase manner. EDC: 31.12.2016 Work over: For work-over rigs, the process have been initiated P Oil: Jobs are taken up in phased manner. P Gas Job initiated to remove the old panels by NGR compliant panels and will be taken up phase wise for all installations.. Put up budget proposal to replace the old panels.

ESA from 28.4.2014 to 2.5.2014

Page 47: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

GENERAL DUL

28-04-2014

. Standard SOPs were available at drilling and workover rigs. However rig specific SOPs for operations like replacement of casing line, BOP& XMAS tree fitting, breaking of pipes, replacing dies of handling tools etc. should also be developed and followed.

No

No

Drilling: Rig specific SOPs for the specific operations are developed and available at site. Incorporation of SOP for replacement of casing line, handling of BOP, X-mass tree fitting, breaking of pipe, replacing of die of handling tools has already been initiated. Work over: Rig specific SOPs for the specific operations are developed and available at site. Incorporation of SOP for replacement of casing line, handling of BOP, X-mass tree fitting, breaking of pipe, replacing of die of handling tools has already been initiated.

ESA from 28.4.2014 to 2.5.2014

Page 48: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

GENERAL DUL

28-04-2014

. ‘Onsite ERP’ available at sites does not include all the emergency scenarios applicable for the installation. ERP document should be revised and emergency drills be conducted for all the scenarios envisaged in the revised ERP.

No

No

Drilling: Complied. Work over: Complied. P-Gas: On site ERP revised and future emergency drills will be conducted accordingly P-Oil: It is a continuous process. Action initiated to include presently available emergency scenario to onsite ERP

ESA from 28.4.2014 to 2.5.2014

Page 49: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

GENERAL DUL

28-04-2014

. It was observed that no designated person has been posted at the installations for carrying out the work on electrical apparatus and electrical system as per requirements of the CEA Regulations, 2010, Clause 3.

No

No

P Gas: At present a common group of Supervisors and Technicians are assigned for all production installations. P Oil: At present a common group of Supervisors and Technicians are assigned for all production installations.

ESA from 28.4.2014 to 2.5.2014

Page 50: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

I -EPS-Deroi

DUL

28-04-2014

Spill containment wall / dyke has not been provided around the oil storage tanks (37M3X3

No

No

Construction of dyke is in planning stage

ESA from 28.4.2014 to 2.5.2014

Page 51: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

I-GCS-DIGBOI

DUL

28-04-2014

. Lighting transformer for the plant lighting was not available at the installation. The same needs to be provided.

No

No

Procurement action initiated for lighting transformer

31-12-2014

ESA from 28.4.2014 to 2.5.2014

Page 52: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

I-GCS-DIGBOI

DUL

28-04-2014

. Lighting transformer for the plant lighting was not available at the installation. The same needs to be provided

No

No

Procurement action initiated for lighting transformer

31-12-2014

ESA from 28.4.2014 to 2.5.2014

Page 53: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

I-GCS-DIGBOI

DUL

28-04-2014

SRV discharge lines should be connected to a common header and released at safe distance.

No

No

Necessary actions are initiated to a common header and released at safe distance with high derrick structure. Preliminary study completed and materials collected

31-12-2014

ESA from 28.4.2014 to 2.5.2014

Page 54: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

I-GCS-DIGBOI

DUL

28-04-2014

P&ID diagram was not available at the installation at the time of audit.

No

No

Preparation of P&ID diagram is in progress

30-08-2014

ESA from 28.4.2014 to 2.5.2014

Page 55: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

I-GCS-DIGBOI

DUL

28-04-2014

. Emergency power for critical loads like plant lighting is not available. The whole plant would be blacked out in case of DG power failure. The same needs to be provided through a battery backup

No

No

action taken on this point is not given in the compliance report.

Page 56: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

I-GCS-DIGBOI

DUL

28-04-2014

P&ID diagram was not available at t3. P&ID diagram was not available at the installation at the time of audit

No

No

Preparation of P&ID diagram is in progress.

ESA from 28.4.2014 to 2.5.2014

Page 57: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

I-GCS-HAPJAN

DUL

28-04-2014

. Online gas detectors are available only for the new compressors. HC gas should be measured, recorded and documented at regular intervals near old compressors

No

No

PR No. 1411791of dated 11/02/2014 raised. BEC/BRC under preparation.

31-01-2015

ESA from 28.4.2014 to 2.5.2014

Page 58: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

I-GCS-HAPJAN

DUL

28-04-2014

. Noise level is higher than the permissible limit in operator room, installation manager’s office and compressor shed. Though S&E department has pointed out this issue, apparently no action has been taken for its control.

No

No

Necessary actions to shift/modify the operator’s room, installation manager’s office have been initiated.

31-12-2014

ESA from 28.4.2014 to 2.5.2014

Page 59: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

I-GCS-HAPJAN

DUL

28-04-2014

Firewater network line was found half buried at many places. At one place lower flange of firewater monitor isolation valve has been cemented. Also, leakage observed from two firewater monitors

No

No

Job is being done in phased manner 31-12-2014

ESA from 28.4.2014 to 2.5.2014

Page 60: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

I-GCS-HAPJAN

DUL

28-04-2014

SOPs are not available for all the operations being carried out at the installation. A few SOPs have been displayed in compressor shed by simply sticking the paper print-outs. These should be preferably painted on the body of the equipment through permanent display board.

No

No

SOP for individual gas compressors, GDU, Air compressors has been prepared and fabrication of display boards is in progress

31-12-2014

ESA from 28.4.2014 to 2.5.2014

Page 61: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

I-GCS-HAPJAN

DUL

28-04-2014

Written order for designated electrical supervisor as per CEA Regulations, 2010, Clause 115 was not available at the installation.

No

No

Discussed with Mines Authority, will revert soon.

ESA from 28.4.2014 to 2.5.2014

Page 62: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

I-OCS-NAGAJAN

DUL

28-04-2014

Earthen dyke was observed around the oil storage tanks. It was not capable to contain the volume of the crude oil, in event of the tank rupture.

No

No

Construction of dyke is in progress 30-06-2015

ESA from 28.4.2014 to 2.5.2014

Page 63: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

I-OCS-NAGAJAN

DUL

28-04-2014

The document available as ‘onsite ERP’ does not include all the emergency scenarios applicable for the installation. ERP document to be revised and drills be conducted for the entire scenario envisaged in the revised ERP.

No

No

The process of making Installation specific ‘on site ERP’ is initiated. and drills will be done as per revised ERP

30-06-2015

ESA from 28.4.2014 to 2.5.2014

Page 64: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

I-OCS-NAGAJAN

DUL

28-04-2014

Regular IR of motors / cables is not being carried out in line with OISD-STD-137.

No

No

Job initiated by Electrical Deptt. It is a periodic work to be carried out once in a year

31-12-2014

ESA from 28.4.2014 to 2.5.2014

Page 65: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

I-OCS-NAGAJAN

DUL

28-04-2014

There was no evidence of inspection of Old storage tanks. The oil storage tanks should be taken for inspection urgently in line with requirements OISD-STD-129

No

No

Complied Details of inspection carried out may be forwared to us .

Page 66: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

R-CH-2 DUL

28-04-2014

Mud gas separator was not available. The vacuum degasser available at the rig was observed not to be capable of handling the volume of mud in deep exploratory wells

No

No

Contractor has been advised to replace the existing Vacuum degasser with one to handle sufficient volume of mud from next well onwards. (EDC:31.10.2014) MGS will be incorporated in the next contract. ( EDC: 31.12.2017)

31-12-2017

ESA from 28.4.2014 to 2.5.2014

Page 67: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

R-CH-2 DUL

28-04-2014

. Dyke around the diesel storage tank was not compatible to handle the volume of the diesel, in case of leakage in the tank.

No

No

Action initiated and will be complied next location onward

ESA from 28.4.2014 to 2.5.2014

Page 68: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

R-CH-2 DUL

28-04-2014

Return line/discharge line and associated valves of the diverter system should be above the cellar pit level. Also, the diameter of the discharge line should be >8”.

No

No

Action initiated and will be complied next location onward

ESA from 28.4.2014 to 2.5.2014

Page 69: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

R-CH-2 DUL

28-04-2014

. All the BOPs are due for 5 yearly major inspections

No

No

no compliance given agaisnst this point

Page 70: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

R-E-1400-S1

DUL

28-04-2014

Electrical Lockout and Tagout procedures are to be revised.

No

No

Under implementation. 31-08-2015

ESA from 28.4.2014 to 2.5.2014

Page 71: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

W-CH-5 DUL

28-04-2014

Fire water monitor was not available at the rig. No

No

Fire water monitor already purchased. Installation initiated.

30-09-2014

ESA from 28.4.2014 to 2.5.2014

Page 72: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

W-CH-5 DUL

28-04-2014

. BOPs are due for 5 yearly major inspections. Refer OISD-RP-174.

No

No

Process initiated by the contractor for inspection with API approved 3rd party agency

ESA from 28.4.2014 to 2.5.2014

Page 73: AFTER 2008 - OILWEBAPI RP 4G for mast and structure, API RP 8B for hoisting equipment and API RP 7L for drilling equipment may be referred for recommended practices. N o N o Drilling

W-RG-E DUL

28-04-2014

. Interfacing of Hot/cold work permit with electrical isolation permit is not being followed

No

No

As per OIL’s policy no Electrical person is deployed in work over rigs. However in all type of special work where electrical isolation is required the generators are kept shut.

ESA from 28.4.2014 to 2.5.2014