Lab Budget for IPP
Column8 Column1
SL No. Items
1 Lab Spares
2 Future Machinary
3 Third Party Testing
Lab Budget for IPP
Column2 Column3
Water TestFTS 22FOCU 4Focs 4DG 1 2DG 2 2DG 3 2DG 4 2DG 5 2GT 1 2GT 2 2GT 3 2GT 4 2GT 5 2TANK A 2TANK B 2TANK C 2Total 56Per Year 672Extra 30 percent 874Kits Required 17Cost Per Kit (QAR) 10373.5108Transportation Cost (QAR) 2300Final Cost Per year 15601
Total cost per year with 20 Percent Margin (QAR)
15000
Gas 8900Diesel 29593.2Lube Oil 52721.76Total 91214.96
Lab Budget for IPP
Column4 Column5 Column6
TBN Test Insoluble Test Particulate Test
10 20 74120 240 888156 312 1154
6 enough stock 122927.808 10046.4
109211138.4
32256
Lab Budget for IPP
Column7
Butane Test
15 Bottle
151520
7
140