21
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING APPEAL BOARD In the Matter of: FLORIDA POWER 5 LIGHT COMPANY (St. Lucie Nuclear Power Plant, Unit No. 2) Docket No. 50-389 AFFIDAVIT OF GEORGE E. LIEBLER I am George E. Liebler. I hold the position of Manager, Power Resources, Nuclear Services 'within the Florida Power 8 Light Company. In this capacity I have previously testified in this proceeding. My educational and professional qualifications are already part of the record (Fol. Tr. 404) and are incorporated herein by reference. / During hearings held in Coral Gables, Florida last December in connection with the above captioned matter, the Appeal Board requested information concerning the per'formance of diesel generator units at St. Lucie l. {Tr. 867, 879-85.) By its order entered February 19, 1980, the Board granted FPL an extension of time to March 14, 1980 to provide the data. In response to the Appeal Board's request, a review of St. Lucie 1 daily Nuclear Control Center Operator {NCCO) log entries has now been completed,- and information concerning the starting performance of St. Lucie 1 diesel generators, from April 1976, the time this log was first officially kept, until January 31, 1980, has been compiled. This data is tabulated in Attachment A to this Affidavit and is incorporated herein by reference. soo4os00lff

Affidavit re performance of Unit 1 diesel generator ...In response to the Appeal Board's request, a review of St. Lucie 1 daily Nuclear Control Center Operator {NCCO) log entries has

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Affidavit re performance of Unit 1 diesel generator ...In response to the Appeal Board's request, a review of St. Lucie 1 daily Nuclear Control Center Operator {NCCO) log entries has

UNITED STATES OF AMERICANUCLEAR REGULATORY COMMISSION

BEFORE THE ATOMIC SAFETY AND LICENSING APPEAL BOARD

In the Matter of:

FLORIDA POWER 5 LIGHT COMPANY

(St. Lucie Nuclear Power Plant,Unit No. 2)

Docket No. 50-389

AFFIDAVIT OF GEORGE E. LIEBLER

I am George E. Liebler. I hold the position of Manager, Power Resources,

Nuclear Services 'within the Florida Power 8 Light Company. In this capacity

I have previously testified in this proceeding. My educational and professional

qualifications are already part of the record (Fol. Tr. 404) and are incorporated

herein by reference./

During hearings held in Coral Gables, Florida last December in connection

with the above captioned matter, the Appeal Board requested information

concerning the per'formance of diesel generator units at St. Lucie l. {Tr. 867,

879-85.) By its order entered February 19, 1980, the Board granted FPL an

extension of time to March 14, 1980 to provide the data.

In response to the Appeal Board's request, a review of St. Lucie 1 daily

Nuclear Control Center Operator {NCCO) log entries has now been completed,- and

information concerning the starting performance of St. Lucie 1 diesel generators,

from April 1976, the time this log was first officially kept, until January 31,

1980, has been compiled. This data is tabulated in Attachment A to this

Affidavit and is incorporated herein by reference.

soo4os00lff

Page 2: Affidavit re performance of Unit 1 diesel generator ...In response to the Appeal Board's request, a review of St. Lucie 1 daily Nuclear Control Center Operator {NCCO) log entries has

Because there is no specific requirement that all diesel generator starts

or attempted starts be entered in the NCCO log, it is possible that all such

events have not, in fact, been recorded. This is especially true in the case

of successful attempts.

In a case of a failure, a diesel generator may be removed from service

for a finite period until the cause has been identified, corrected, and the

set has been tested. The removal of a diesel generator from service in such

a case would almost certainly appear in the NCCO log. A successful attempt,

on the other hand, might not be logged at al.l; perhaps on the basis that proper

operation of the diesel generators is not an off-normal condition and, hence,

not of such significance as to require recording. As a result, Attachment A

is likely to understate diesel generator reliability.

Using the existing data, a more accurate appraisal of diesel generator

performance under emergency conditions can be achieved by eliminating unsuccess-

ful start, attempts that occurred during maintenance and troubleshooting, or that

can definitely be attributed to spurious operation of a trip that is bypassed in

the emergency mode,to a malfunction of equipment that is not operative in the

emergency operating mode or is not part of the present diesel generator unit

design, and to operating conditions which would not be present in an emergency,

~e , a diesel generator output buss already energized by offsite power. (See

also Reg Guide 1. 108, Rev., 1, 99C.2.e(2), C.2.e. (7).) Applying this guide-

line, the diesel generator units failed to operate a total of 10 times.

Because of the incompleteness of the data base, discussed above, a valid

statistical analysis is impossible. However, the data reveals a total of. 10

failures of interest out of a total of 375 attempts. Since the failures are

evenly divided between the diesel generators (5 for A and 5 for B), and attempts

Page 3: Affidavit re performance of Unit 1 diesel generator ...In response to the Appeal Board's request, a review of St. Lucie 1 daily Nuclear Control Center Operator {NCCO) log entries has

are also approximately equal (197 for A and 178 for B), it is appropriate to

calculate a combined diesel generator unreliability of 7 X 10 . This compares

well with the 9 X 10 combined unreliability figure used by the NRC Staff

during the hearing in prepared testimony concerning the period of time a total

loss of AC power was likely to occur at St. Lucie. (Fitzpatrick, Fol. Tr. 624,

p. 17).

RGE E. L BLER

STATE OF FLORIDA ))

COUNTY OF DATE

Subscribed and sworn to before me this 14th day of March, 1980.Notary Publtc, Stato of Rorida at Large

fly i* t "P'

ARY PUBLIC

Page 4: Affidavit re performance of Unit 1 diesel generator ...In response to the Appeal Board's request, a review of St. Lucie 1 daily Nuclear Control Center Operator {NCCO) log entries has

vj ~c1

ATTACHMENT A

'

St. Lucie 1 Diesel Generator Data

Abbreviation Ke :

C.I.S.

C. R.

D/G

Maint.

Containment Isolation Signal

Control Room

'ieselGenerator

Maintenance

Op Check -- Operational Check

Op Test -- Operational Test

P. M.

P. H. 0.

Preventive Maintenance

Plant Work Order

.'.Surv. Run— Surveillance Run

S. U. T.

Tech. Rep.-

Startup Transformer

Techni cal Representa tive

Page 5: Affidavit re performance of Unit 1 diesel generator ...In response to the Appeal Board's request, a review of St. Lucie 1 daily Nuclear Control Center Operator {NCCO) log entries has

I

Page 6: Affidavit re performance of Unit 1 diesel generator ...In response to the Appeal Board's request, a review of St. Lucie 1 daily Nuclear Control Center Operator {NCCO) log entries has

SET

B

1/18/80

1/18/80

1/16/80

1/16/80

1/8/80

1/8/80

1/8/80

1/7/80

1/7/80

1/7/80

1/2/80

12/19/79

12/19/79

12/5/79

12/5/79

12/5/79

11/21/79

11/7/79

1.1/2/79

11/1/79

11/1/79

10/31/79

10/31/79

10/18/79

10/18/79

10/17/79

10/16/79

10/16/79

10/16/79

F10/3/79

START

Y

Y

l.OAD

Y

Y'AIl

REHARVS

Op check prior to removi SUT

Op check prior to removing SUT

Periodic surv. run

Op check

Op check to return to service

Op check-B out of service

Op check

Op check to return to service

Op check-A out of service

Op check-A out of service

Surv. run

Tripped due to reverse current while trying to load

Surv. run

Op check-A our for maint.

Op check

Periodic. test

Periodic test

Periodic test

Op check

Op check prior to A SUT out of service

Op check

Op check prior to A SUT out of service

Op check

Surv. run-24 hrs.

Op check

Surv. run-24 hrs.

Attempted to start-out for ma'int.

Back in serv'ice

Op check

Low kw output (3290 kw); sufficient for safeguards load

Page 7: Affidavit re performance of Unit 1 diesel generator ...In response to the Appeal Board's request, a review of St. Lucie 1 daily Nuclear Control Center Operator {NCCO) log entries has

SET DATE START LOAD FAIL REMARKS

B 10/3/79

A 10/3/79

B 9/26/79

B 9/19/79

B 9/7/79

B 9/5/79

A 9/5/79

B 9/3/79

B 9/3/79

A 9/3/79

A 9/2/79

N

Y'p

check

Surv. run

I'eriodic test-Sync to 1B3 4160 Bus

Surv. run

'p check

Verification

Surv. run

Manual start

Relay in start circuit failed; unit would not start

automatically but was capable of manual start

Op check

Verification

A 9/2/79

9/2/79

9/2/79

Y''

Y

Op check-H2 meter in C.R. put, on P.l<.0.

Op check

Op check-due to hurricane the H2 meter in the C.R.

did not register

B 8/15/79

A 8/1/79

B 7/18/79

A, 7/4/79

B 6/29/79

B 6/28/79

A 6/27/79

A'/27/79B 6/27/79

B 6/27/79

A 6/26/79

B 6/26/79

B 6/26/79

Y

Y

Y Op check

Op check-A out

Op check-A out

of serviceII

of service

Surv. run

Surv. run

Surv. run

Surv. run

Op check.

Op check

Op check

Op check prior to taking B out of service

Op check

Op check prior to taking A out of service

Page 8: Affidavit re performance of Unit 1 diesel generator ...In response to the Appeal Board's request, a review of St. Lucie 1 daily Nuclear Control Center Operator {NCCO) log entries has

SET DATE START FAIL REHARV,S

6/22/79

8 6/22/79

'6/22/79

8 6/19/79

A 6/7/79

8 6/7/79

A 6/6/79

8 5/31/79 '

5/31/79

8 5/31/79

8 5/26/79

A 5/25/79

A 5/24/79

A 5/24/79

8 5/15/79

A 5/9/79

A 5/6/79

A 5/6/79

A 5/5/79

8 5/4/79

8 5/4/79

8 5/4/79

8 5/4/79

A 5/1/79

A 4/25/79

A 4/24/79

4/24/79

4/23/79

8 4/17/79

A 4/4/79

-N

N

Y

Op check

Op check

Op check —prior to removing A from servicejSurv. run

Op check after maint.

Op check-prior to removing A from service1

Surv. run

Op check after maint.

Op check-8 out of service

Op check-prior to removing 8 from service

Op check after maint.

Op check-prior to removing 8 from service

t1aintenance Dept. Checkout

Test run

~ Surv. run

Op check-prior to removing 8 from service

Op check after maint.

Test run for thaint. Dept. observation

Op check

Surv. run

Op check

Op check .

Op check

Surv. run

Op check-prior to removing 8 from service

Op check after maint.

Tripped due to reverse current while trying to load

Surv. run

Surv. run

Unit run at 1500 kw

Page 9: Affidavit re performance of Unit 1 diesel generator ...In response to the Appeal Board's request, a review of St. Lucie 1 daily Nuclear Control Center Operator {NCCO) log entries has

1

L

Page 10: Affidavit re performance of Unit 1 diesel generator ...In response to the Appeal Board's request, a review of St. Lucie 1 daily Nuclear Control Center Operator {NCCO) log entries has

SET

4/4/79

4/4/79

4/3/79

3/31/79

3/31/79

3/31/79

3/31/79

3/20/79

3/19/79

3/6/79

2/20/79

2/14/79

2/6/79

START = LOAD

Y Y Y

RE!'1ARKS

Unit run at 1500 kw

Surv. run

Surv. run

Yerification of oil transfer pump operation

Safeguards Test-accepted full load 3 minutes after

speed droop tripSafeguards Test-speed droop problem; D/G tripped

Safeguards Test

Surv. run

Op check

Surv. run

Surv. run

Op check-A SUT out of service

Surv. run

1/31/79

1/17/79

1/17/79

1/16/79

1/16/79

1/2/79

12/21/78

12/21/78

12/21/78

12/21/78

12/19/78

12/5/79

12/1/78

11/21/78

ll/15/78

11/14/78

11/14/78

Y N

'Op check-prior to removing

Op check-prior to removing

A SUT'

SUT .

Op check-prior to removing A SUT

''Surv. run

Surv. run

Op check-prior to removing A SUT

Surv. run

Test run

Op check

Op check-prior to removing A from service.

Op check-prior to removing B SUT

Op check-after maint.

Op check

Surv. run

Op check-prior to removing B from service

Surv. run

Op check-prior to removing A SUT

Page 11: Affidavit re performance of Unit 1 diesel generator ...In response to the Appeal Board's request, a review of St. Lucie 1 daily Nuclear Control Center Operator {NCCO) log entries has

A 10/4/78

A 10/4/78

A 10/3/78

B 10/3/78

9/19/78

9/19/78

A 9/5/78

B 9/5/78

A 9/5/78

B 8/15/78

B 8/15/78

A 8/10/78,

B, 8/10/78

A 8/10/78

A 8/10/78

A 8/1/78

A 7/19/78

B '/19/78B 7/18/78

A 7/18/78

A 7/18/78

A 7/4/78

B 6/20/78

SET DATEI ~

A ~ 11/7/78

A 11/4/78

B 10/17/78

B 10/12/78

B 10/12/78

START LOAD

Y

N-

FAIL REt 1ARY.S

Surv. run

Low voltage during bus transfer

Surv. run

Op check

Op check-prior to removing B SUT

Check petcock leak

Check petcock leak

Surv. run

Op check

Op check

'

Surv. run

Dirty relay prevented the output breaker from closing

from the control roomII

Op check

Surv. run

Surv. run

Stopped manually due to low lube o'il level-can add

oil when running if needed

Reactor tripped

Surv. run

Op check

Op check

Surv. run

Test run

Test run-prior to removing A from service

Surv. run

Op check-8 out of service

Op check-prior to removing B from service .

Surv. run

Surv. run

Page 12: Affidavit re performance of Unit 1 diesel generator ...In response to the Appeal Board's request, a review of St. Lucie 1 daily Nuclear Control Center Operator {NCCO) log entries has

SET DATE

B 6/15/78

A 6/15/78

B - . 6/5/78

A 6/5/78

A 5/24/78

A 5/23/78

B 5/22/78

B 5/21/78

B 5/21/78

B 5/21/78I

B

B

5/21/78

5/21/78

B 5/21/78

B 5/21/78

A '/14/78A 5/2/78 '

4/21/78

,A 4/21/78

B 4/18/78

A 4/4/78

A 3/25/?8

B 3/25/78

B 3/21/78

A 3/13/78

B 3/13/78

3/10/78

3/10/78

A 2/28/78

B 2/27/78

START LOAD

N

N

FAIL REHARV,S ~=-.

O p check

Op check-B out of service4

Run for tech rep inspection

Surv. run

Troubleshoot-unloaded sat.

Would not unload from the control room

Surv. run

Troubleshoot

Troubleshoot

Troubleshoot

Troubleshoot

Troubleshoot

Troubleshoot

Output breaker would not close

Loss of offsite power-B out of service

Surv. run

Manually stopped because the switchgear door was found.

open

Surv. run

Surv. run

Surv. run

Surv. run

Surv. run

Surv. run

~ .Surv. run-B out of service

Op check-return to service

Op check-return to service

Op check-prior to removing A from service

Op check-prior to returning to service

Op check-prior to removing A from service

Page 13: Affidavit re performance of Unit 1 diesel generator ...In response to the Appeal Board's request, a review of St. Lucie 1 daily Nuclear Control Center Operator {NCCO) log entries has

SET

A

A

A

B

1/17/78 Y

1/3/78 Y

12/21/77 Y

12/21/77 Y

12/16/77 Y

12/16/77 Y

12/6/77 Y

11/18/77 Y

11/18/77 Y

11/18/77 Y

11/16/77 Y

11/15/77 Y

11/15/77 Y

11/15/77 Y

11/15/77 Y

11/1/77 Y

10/28/77 Y

10/28/77 Y

10/23/77 Y.

10/23/77 Y

10/23/77 Y

10/23/77 Y

DATE START

2/26/78 Y

2/21/78

2/14/78

2/14/78

2/7/78

1/29/78

LOAD REflARV,S

Op check-prior to removin from service

Surv. run

Op check-prior to removing B from service

Op check-return to'service

Surv. run

Reactor tripSurv. run

Surv. run

Op check-prior to removin'g B for maint.

Surv. run

Op check after maint.

Op check after maint.

Surv. run

Op check-return .to service

Op check-8 out of service

Op check-prior to removing B from service

Test run

Op check

Test after maint.-Stopped due to low coolant level;

water could have been added during operation, stop

was discr..tionary

Surv. run

Op check

Surv. test

Test after masnt.

Test prior to taking A out of service

Op check

Op check-A out of service

Surv. run

Surv. run

Page 14: Affidavit re performance of Unit 1 diesel generator ...In response to the Appeal Board's request, a review of St. Lucie 1 daily Nuclear Control Center Operator {NCCO) log entries has

SET DATE

8 . 10/22/77

8 10/22/77

8 10/22/77

8 10/21/77

A 9/24/77

8 9/24/77

8 9/23/77

8

8

9/23/77

9/22/77

8 9/22/77

8 9/21/77

A 9/21/77

A 9/21/77

9/21/77

8 10/21/77

10/21/77

10/21/77

8 10/18/77

A 10/8/77

10/4/77

10/4/77

A 10/4/77

A 10/4/77

A 10/4/77

A 10/3/77

A 10/3/77'

10/3/77

A 10/3/77

A 9/26/77

A 9/25/77

SrArn Lono FAIL

Y

Y

Y Y

Y N

Y-

Y

REhlARKS

Op check-A out of servic

Op check-A out of service

Op check=A out of service

Op check-A out of servic'e

Op check-A out of service

Op check prior to taking A out of service

Under voltage relay dropped on 1A3 bus

Surv. run

Loss of offsite power test on A side

Surv. run

Troubleshooting

Troubleshooting

Troubleshooting

Troubleshooting

Troubleshooting

Troubleshooting

Surv. run

Surv. run

Turbocharger breakdown

Surv. run

Surv. run

Surv. run

Op check-SUT out of service

Op check-SUT out of service

Op check-SUT out of service

Op check-SUT out of service

Op check-SUT out of service

Op test-SUT back in service

Op test-SUT out of service

Op'heck-SUT out of service

Page 15: Affidavit re performance of Unit 1 diesel generator ...In response to the Appeal Board's request, a review of St. Lucie 1 daily Nuclear Control Center Operator {NCCO) log entries has

h

~ '

Page 16: Affidavit re performance of Unit 1 diesel generator ...In response to the Appeal Board's request, a review of St. Lucie 1 daily Nuclear Control Center Operator {NCCO) log entries has

SETl

A

A&B

7/5/77 Y

6/28/77 Y

6/21/77 Y

6/7/77 Y

6/7/77 Y

6/7/77 Y

5/31/77 Y

5/31/77 Y

5/16/77 Y

5/3/77 Y

DATE START

'/21/77 Y

9/21/77 Y

9/20/77 Y

9/6/77 Y

9/6/77 Y

8/24/77 Y

8/24/77 Y

8/23/77 Y

8/23/77 Y

8/23/77 Y

8/18/77 Y

8/18/77 Y

8/17/77 Y

8/16/77 Y

8/16/77 Y

8/2/77 Y

7/19/77 Y

7/5/77 Y

LOAD

Y

FAIL REMARKS'p

check-SUT out of servi

Op check-SUT out of service

Surv. run

Op check

Surv. run

Surv. run

Op check

Test run

Test run

Test run

Op check-prior to taking B 'out o'f service

Op check

Op check-prior to taking A out of service

Surv. run

Op check

Surv. run

Surv. run

Sur v. run

Surv. run-stopped due to load fluctuations-stop was

discretionary (added oil to gov.)

Surv. run

Surv. run,

Surv. run

Op check-P.M. on air start relay valves

'Op check after P.M.

Reactor tripReactor trip

- Loss of offsite power following a reactor trip-all systems

responded as designed

Test run-B out of service

Page 17: Affidavit re performance of Unit 1 diesel generator ...In response to the Appeal Board's request, a review of St. Lucie 1 daily Nuclear Control Center Operator {NCCO) log entries has

SET

B

A

B

A

A

B

B

B

, A

DATE

5/3/77

5/2/77

5/2/77

4/30/77

4/30/77

4/22/77

4/22/77

4/19/77

4/19/77

4/19/77

4/10/77

4/10/77

4/9/77

4/9/77

4/5/77

3/15/77

3/15/77

3/15/77

3/8/77

3/8/77

3/8/77

3/8/77

3/2/77

3/1/77

3/1/77

3/1/77

2/22/772/22/77

START

Y'

,Y

LOn

Y

FAIL REHARKS

Test run after repairs

Op check-A out of service

Test run after oil change

Reactor trip-loss of 1A2 and 1A3

Reactor trip-loss of 1B2 and 1B3

Op.check

Op check

Op check-stopped due to low tube-oil level; could add oilduring operation

Op check-stopped due to low lube oil level; could add oilduring operation

Surv. run

Test run after fixing air leak

Op check-air leak on A airstart sys.

Surv. run

Surv. run

Surv. run

Surv. run-was. completed satisfactorily-tripped on reverse

current when taking D/G off the line

Surv. run

P.W.O. test

Surv. run

Op check

Op check-stopped due to low lube oil level; could add oilduring operation

Op check-A out of service

Test run

Surv. run

Op check-A out of service

Attempted to start for surv'. run (failed to start because

of unreset overspeed trip following generator lockout)

Generator trip testGenerator trip '.test

Page 18: Affidavit re performance of Unit 1 diesel generator ...In response to the Appeal Board's request, a review of St. Lucie 1 daily Nuclear Control Center Operator {NCCO) log entries has

SET DATE START l ORD FAIL REt'1ARKS

B

2/22/77

2/22/77

2/15/77

2/2/77

2/2/77

2/1/77

1/21/77

1/20/77

1/20/77

1/20/77

1/20/77

1/19/77

1/19/77

1/19/77

1/19/77

1/19/77

1/18/77

1/18/77

1/18/77

1/7/77

1/7/77

1/7/77

1/6/77

1/6/77

1/5/77

1/3/77

12/21/76

12/7/76

11/29/76

11/19/76

Y

Y

Suppor t for reactor trip

Support for reactor tripSOry. run

Op Check

Op check

Surv. run

Op run

Op run 1 1/2 hrs

Op run .1/2 hr

'Op run

Op run

Op run

Op run

Op run

Failed to start - troubleshooting

Failed to start

Op check

Op check

Turbocharger breakdown

Surv. run

Op check

Op check

Op check

Op check-B out of service

Surv. run

Run to check oil level after maint.

Surv. run

Surv. run

Surv. run

Op check

Page 19: Affidavit re performance of Unit 1 diesel generator ...In response to the Appeal Board's request, a review of St. Lucie 1 daily Nuclear Control Center Operator {NCCO) log entries has

SET

A'

A

A

B

B

B

B

A

B

A

B

DA fE~ ~

11/7/76

11/2/76

11/2/76

11/1/76

11/1/76

10/19/76

10/5/76

10/1/76

'/27/76

9/24/76

9/24/76

9/17/76

9/7/76

9/2/76

8/17/76

8/1 3/76

8/10/76

8/10/76

8/6/76

8/3/77'/1/76

8/1/767/31/767/31/767/31/76

7/20/76

7/6/76

6/21/766/21/76

6/15/76

START

Y

Y

Y

Y

LOAO

N.

Y

FAI l.REMARKS,'est

run

Haint. test'run

Troubleshooting associated with the failure of 11/1/76

Op check

Fai led to start

Surv. run

Surv. run

Test run-working on the Kw-hr meter

Op check-stopped to add coolant -'ater could have

been added during operation, stop was discretionary

Op check

Op check

Started to do periodic test of C.I.S.

Surv. run

Test run

Surv. run

D/6 A channel check

Op check

Surv. run

Op check-prior to removing B from service

Surv. run

Initiation of 1B C.I.S.Initiation of 1B C.I.S.Troubleshooting failure to start on C.I.S.Initiation of 1B C.I.S.-B failed to startInitiation of 1A C.I.S.

Surv. run

Surv. run

Op check-prior to maint.

Op check-prior to maint.

Surv. run

Page 20: Affidavit re performance of Unit 1 diesel generator ...In response to the Appeal Board's request, a review of St. Lucie 1 daily Nuclear Control Center Operator {NCCO) log entries has

t SET DATE START LOAD FAILv t'

6/2/76

'REHARKS

Tripped due to abnormal c nt phase 1

B

B .

MB

ASB

6/2/76 Y

~ 6/2/76 Y

6/2/76 Y

6/1/76 Y

5/26/76 Y

5/26/76 Y

5/26/76 Y

5/20/76 Y

5/20/76 Y

5/18/76 Y

5/18/76 Y

5/18/76 Y

5/17/76 Y

5/17/76'

5/17/76

5/4/76

5/1/76 Y .

5/1/76 Y

4/30/76 Y

4/30/76 Y

4/20/76 Y

4/20/76 Y

4/6/76 Y

N

Troubleshooting

Test of relay

Test sync. verification

Would not sync. with loaded bus (would not occur-in

emergency operation)

Op check

Op check-prior to removing B from service'p

check-prior to removing B from service

Test after maint.

Op check-prior to removing B from service

Test run

Op check after maint. (sluggish start)

Surv. run

Op check-A out of service

Op check-8 out of service

Surv. run

Surv. run

Op check-prior to taking out line 81

Op check-prior to taking out line 5'2

Pick up B SUT- 1 1/2 hrs.

Pick up B SUT- 2 hrs.

Surv. run

Surv. run

Surv. run-KW indicator chart indicated fluctuations;

problem was in the chart not the generator

Page 21: Affidavit re performance of Unit 1 diesel generator ...In response to the Appeal Board's request, a review of St. Lucie 1 daily Nuclear Control Center Operator {NCCO) log entries has