28
Al Fareed Engineering Services & Consultants Al-fareed Engineering & Consultants (Pvt) LTD

AFES Project feasibility for PMCL work

Embed Size (px)

Citation preview

Page 1: AFES Project feasibility for PMCL work

Al Fareed Engineering Services & Consultants

Al-fareed Engineering & Consultants (Pvt) LTD

Page 2: AFES Project feasibility for PMCL work

Al-fareed Engineering & Consultants (Pvt) LTD

COMPANY PROFILE

Adobe Acrobat 7.0 Document

Microsoft Office PowerPoint Presentation

Page 3: AFES Project feasibility for PMCL work

Major Achievements

Zero Outage count (Karachi) S1Less repeated Outage (cable installation)Prolonged T-prime/DC issues rectified

Al-fareed Engineering & Consultants (Pvt) LTD

Page 4: AFES Project feasibility for PMCL work

Organizational Policy

Being Quality Solution provider AFES strives for cost effective and consistent rectification, Keeping above policy Below mentioned Sites may be lead as a role model ,since some of them were running prime fro, 3 yrs.

Al-fareed Engineering & Consultants (Pvt) LTD

Page 5: AFES Project feasibility for PMCL work

Al-fareed Engineering & Consultants (Pvt) LTD

Optimization Initiatives Timely Ho-ToSwift SLA obedience under given

conditions Additional recommendations/ProposalsCost effective ,Consistent rectification Certified electrical Staff for PMT

(Wapda)24/7 NOC availability Transparency in reporting & client

Comfort Level

Page 6: AFES Project feasibility for PMCL work

Performance

Al-fareed Engineering & Consultants (Pvt) LTD

Swift Rectification within 3-5 hrsTracking for faulty transformers through

KESCLow cost Consistent Solution for repeated

outagesLess repeated outage ATS fault indication

Microsoft Office Excel Worksheet

Page 7: AFES Project feasibility for PMCL work

Al-fareed Engineering & Consultants (Pvt) LTD

Karachi

Region wise team builup

Page 8: AFES Project feasibility for PMCL work

Current Karachi trend

Zero Count Record In KHI for AFES End

Al-fareed Engineering & Consultants (Pvt) LTD

Summary KarachiTotal Under process = 05Cases Pending PMCL end = 02Pending at MES End including approvals = 01KESC issues = 02

T-Prime Count Karachi

Day 2-Jan-13 3-Jan-13 4-Jan-13 5-Jan-13 6-Jan-13 7-Jan-13 8-Jan-13 9-Jan-13 10-Jan-13 11-Jan-13 12-Jan-13 13-Jan-13 14-Jan-13 15-Jan-13 16-Jan-13 17-Jan-13

Count 2 4 4 4 4 7 6 6 6 6 4 4 4 4 4 5

2-Ja

n-13

3-Ja

n-13

4-Ja

n-13

5-Ja

n-13

6-Ja

n-13

7-Ja

n-13

8-Ja

n-13

9-Ja

n-13

10-Ja

n-13

11-Ja

n-13

12-Ja

n-13

13-Ja

n-13

14-Ja

n-13

15-Ja

n-13

16-Ja

n-13

17-Ja

n-13

012345678

2

4 4 4 4

76 6 6 6

4 4 4 4 45

T-Prime Trend Karachi (MES)

Page 9: AFES Project feasibility for PMCL work

Team Build Up Karachi Region 1000 sites

Al-fareed Engineering & Consultants (Pvt) LTD

SummeryCable Installation Team-3 PersonsKorangi – 2 personShahfaisal /Landhi– 2 personOrangi– 2 personBaldia -1 personLyari – 2 personDefence – 1 personGarden – 2 personGulsha e hadeed – 2 personsBahadurabad ,Nazimabad - 2Total = 21Logistics DetailsNo Of Bikes – 20No Of Utility van – 03

Cable installation - 3person

Korangi / – 2 person

Orangi 2 ,Baldia1,Lyari2,Defence1,Garden2

Laandhi/Shah faisal ,Gulsha e hadeed – 2 persons

Bahadurabad-Nazimabad -2

Page 10: AFES Project feasibility for PMCL work

Team Build Up Karachi Region 1000 sites

Al-fareed Engineering & Consultants (Pvt) LTD

SummeryCable Installation Team-3 PersonsGulistan e johar – 1 personSurjani– 1 personMalir– 1 person

Gulistan E Johar-1

Surjani – 1 person

Malir -1

Saddar/Garden -2

Saddar/Garden -2

FB area – 1 person

Gulshan E Iqbal-1

Page 11: AFES Project feasibility for PMCL work

Al-fareed Engineering & Consultants (Pvt) LTD

Team Build Up Karachi Region

Cable In-stallation; 3

Korangi; 3

Laandhi; 1Orangi; 1

Baldia; 1

Gulshan-e-Hadeed; 1Bahadurabad; 1Nazimabad; 1

Lyari; 2Defence; 1

Saddar/Garden; 2

Malir; 1

Surjani; 1

Gulis-tan-e-jo-har; 1

FB area; 1

Gulshan-e-Iqbal; 1

Page 12: AFES Project feasibility for PMCL work

Al-fareed Engineering & Consultants (Pvt) LTD

Team Build Up Out of KESC domain sites

Cable In-stallation; 1

Hub; 1

Bela; 1Uthal; 1

National Highway ; 1

Kathore; 1

Gharo; 1

Page 13: AFES Project feasibility for PMCL work

Performance

Al-fareed Engineering & Consultants (Pvt) LTD

Koran

gi

Land

hiM

alir

Shah

faisa

l

Baldia

Nazim

bad

Defenc

e

Garde

nLy

ari

Bhadu

raba

d

Orang

i

Gulsha

n -e-H

adee

dM

isc

20

129

17

1114

1215

128

10 9

2

Area Wise Outage TrendOutage Trend

Page 14: AFES Project feasibility for PMCL work

Monthly Escalation Trend Karachi

Al-fareed Engineering & Consultants (Pvt) LTD

May; 80

June; 210

July; 181

August; 177September; 334

October; 219

November; 183

De-cember; 204

Page 15: AFES Project feasibility for PMCL work

Major Site Rectifications Plz double click

Cable Installation Jobs @-KHI5013__S_Near_Korangi_Crossing -

50 meters 16mm 4 core-KHI0665__P_KDA_Employees_Krngi -

190 meter 16mm 4 core-KHI0656__H_Korangi_5_Township -

115 meter 16mm4core-KHI0910__S_BhainsColonyMor - 120

meter 16 mm4core-KHI5437__S_KgiRes10Sector50B -35

meter 16 mm4core-KHI5328__s_future_colony_blocke  -

15 meter LT-Meter

Al-fareed Engineering & Consultants (Pvt) LTD

Microsoft Office PowerPoint Presentation

Microsoft Office PowerPoint Presentation

Microsoft Office PowerPoint Presentation

Microsoft Office PowerPoint Presentation

Page 16: AFES Project feasibility for PMCL work

Major Site Rectifications Plz double click

KarachiHGW0451__P_Malir_Canttr LT

Span theftHUB5675 cable installation.pptxHUB5675 Jamoot Goth Hub.pptxKHI0641__H_Buffalow_Colony.ppt

xKHI0658__P_H_Javdan_Cmnt_Ma

ng.pptxKHI0669 PMT leads faulty.pptxKHI6510__P_Khuda KiBasti lt

span.pptxKHI6513 N5 Bus Stop separate

PMT Proposal.pptxAl-fareed Engineering & Consultants (Pvt) LTD

Microsoft Office PowerPoint Presentation

Microsoft Office PowerPoint Presentation

Microsoft Office PowerPoint PresentationMicrosoft Office

PowerPoint Presentation

Microsoft Office PowerPoint Presentation

Microsoft Office PowerPoint Presentation

Microsoft Office PowerPoint Presentation

Microsoft Office PowerPoint Presentation

Page 17: AFES Project feasibility for PMCL work

Current Hyderabad trend

Zero Count Record In HYD for AFES End

Al-fareed Engineering & Consultants (Pvt) LTD

Summary HyderabadTotal Under process = 16CP DC cases Pending at PMCL end = 06Pending at myson End including approvals = 07Contactor Faulty Sites = 02

T-Prime Count HYDDay 5-Aug-12 6-Aug-12 7-Aug-12 8-Aug-12 9-Aug-12 10-Aug-12 11-Aug-12 12-Aug-12 13-Aug-12

Count 14 15 16 16 15 14 14 14 16

5-Au

g-12

6-Au

g-12

7-Au

g-12

8-Au

g-12

9-Au

g-12

10-A

ug-1

2

11-A

ug-1

2

12-A

ug-1

2

13-A

ug-1

21313.5

1414.5

1515.5

1616.5

14

15

16 16

15

14 14 14

16T-Prime Trend HYD (MES)

Page 18: AFES Project feasibility for PMCL work

Plz double click

Hyderabad BHT6169__MullMakhan PMT Broken

Insulator.pptx HGW6018 PMT bush replacement and

tapping done.pptx HYD5335__S_Hyderabad2.pptx HYD5336__H_Hyderabad3.pptx HYD5666__Bilal_Complex cable

requirment.pptx HYD5851__Badin_Stop.pptx HYD5856__S_Suzuki Cable

requirment.pptx HYD6312__S_KaimKhaniHostel PMT

Energization issue wapda payment.pptx MRI7070_SarhandiMohallah pole tilt

issue.pptx

Al-fareed Engineering & Consultants (Pvt) LTD

Microsoft Office PowerPoint Presentation

Microsoft Office PowerPoint Presentation

Microsoft Office PowerPoint Presentation

Microsoft Office PowerPoint Presentation

Microsoft Office PowerPoint Presentation

Microsoft Office PowerPoint Presentation

Microsoft Office PowerPoint Presentation

Microsoft Office PowerPoint Presentation Microsoft Office

PowerPoint Presentation

Page 19: AFES Project feasibility for PMCL work

Major Site Rectifications Plz double click

Mirpur Khas

DDH6669__S_Malkani cable installation.pptx

HGW6115 Pole installation.pptxJUD6682 PMT tapping.pptxKGM6451__S_DTESamara_Naka_

KGM pole requirment.pptxMPK5705__S_ChandniChowk

PMT installation.pptxMTP5356 PMT Overhauling

(1).pptxMTP5356 PMT Overhauling.pptx

Al-fareed Engineering & Consultants (Pvt) LTD

Microsoft Office PowerPoint Presentation Microsoft Office

PowerPoint PresentationMicrosoft Office

PowerPoint Presentation

Microsoft Office PowerPoint Presentation

Microsoft Office PowerPoint Presentation

Microsoft Office PowerPoint Presentation

Microsoft Office PowerPoint Presentation

Page 20: AFES Project feasibility for PMCL work

Al-fareed Engineering & Consultants (Pvt) LTD

Hyderabad

Region wise team builup

Page 21: AFES Project feasibility for PMCL work

Al-fareed Engineering & Consultants (Pvt) LTD

Team buildup Hyderabad regionS# Region Applicable sites/Available Person1 Hyd City 145/2 person2 Badin 50/1 person3 Sehvan 14/1 person4 Hala 44/1 person5 Thatta 29/1 person6 Sanghar 19/1 person7 Umarkot 17/1 person8 Mirpurkhas 23/1 person9 Degree 31/1 person10 Tandoallayar 14/1 person11 Moro 20/1 person12 Nwabshah/

Daddu88/2 person

Page 22: AFES Project feasibility for PMCL work

Current MPK trend

Zero Count Record In HYD for AFES End

Al-fareed Engineering & Consultants (Pvt) LTD

T-Prime Count MPKDay 5-Aug-12 6-Aug-12 7-Aug-12 8-Aug-12 9-Aug-12 10-Aug-12 11-Aug-12 12-Aug-12 13-Aug-12

Count 2 1 2 1 1 2 3 3 3

5-Au

g-12

6-Au

g-12

7-Au

g-12

8-Au

g-12

9-Au

g-12

10-A

ug-1

2

11-A

ug-1

2

12-A

ug-1

2

13-A

ug-1

2

00.5

11.5

22.5

33.5

2

1

2

1 1

2

3 3 3T-Prime Trend MPK(MES)

Summary Mirpur khasTotal Under process = 03CP DC cases pending at PMCL end = 02Pending at myson End including approvals = 01

Page 23: AFES Project feasibility for PMCL work

Snag Indication & Achievements HYD Plz double click

Al-fareed Engineering & Consultants (Pvt) LTD

S.No Site name Site Code

Status Generic Reason with Remarks (OSV) CP Restored - Restored / Pending

CP Meter Reading DG Reading

1 DAO7071__S_Dando 7071 T-Prime CP Restored Restored N/A N/A2 HYD5334__S_Hyderabad_1 5334 T Prime CP Restored Restored 19179 62783 HGW6108__H_TMK_HYD_Highway_PW6108 T-Prime CP Restored by replacing of PMT Bush & tapping Restored 311797 3396.254 NRP6362__H_nasarpur_Matiari_Rd6362 T-Prime Access Issue Pending N/A N/A5 MTL5888__H_Digri_Rd_Matli 5888 Stand By (One Phase) No CP issue found - All phases OK Restored 157075 13813.116 HGW6311__H_Khandu_Hala_MRI6311 T-Prime CP Restored Restored 8368 / 3032 1047.687 BUL6168__S_MirpurBathoro 6168 T-Prime CP restored by installing 16 mm 4 core 5 meters cable Restored N/A 2457.568 TBG6377__H_Talhar_Tando_Bagho6377 T Prime CP restored by sagging of HT jumpers Restored 2425 / 1085 2920.79 HYD5856__S_Suzuki 5856 T Prime CP restored by LT Service Restored N/A N/A10 BSC_Auto_Bhan_Repeater 6407 T Prime CP DC due to billing Pending N/A N/A11 HGW7090__S_Palijani_Station7090 T-Prime CP DC due to billing Pending N/A N/A12 RJK7062__S_Rajo_Khanani 7062 T-Prime CP DC due to billing Pending 2741 / 3287 1167.1613 HYD5335__S_Hyderabad2 5335 T-Prime CP restored by sagging of HT jumpers Restored N/A N/A14 BER6132__H_Bherani_DTE 6132 T-Prime CP Restored Restored N/A 490515 PHK0073__S_Falkara 73 T-Prime CP DC due to billing Pending 3200 / 383 N/A16 HYD5666__S_Bilal_Complex 5666 T-Prime Approval req - Neutral grounding 300 ft cable Pending 0 017 HYD6494__S_Ghumanabad 6494 T-Prime CP Restored Restored 1041 1100418 NRP6361__S_Akbari_Masjid 6361 T-Prime CP Restored Restored N/A 258.3219 MRI7070__S_SarhandiMohallah7070 T-Prime CP restored - Structural & Civil work required at site Restored N/A N/A20 HYD5853__S_Unit_5_Latifabad5853 T-Prime CP Restored Restored N/A N/A

Page 24: AFES Project feasibility for PMCL work

Snag Indication Prior To Ho-To

Individual visit to all Sites within regionHighlighting and recommendation of

proposals such as Contactor replacements ,DG auto issue , Meter Burnt ,Cable Requirements

Initiation of approvals Rectification of snags in view of go ahead

Al-fareed Engineering & Consultants (Pvt) LTD

Microsoft Office Excel Worksheet

Page 25: AFES Project feasibility for PMCL work

Al-fareed Engineering & Consultants (Pvt) LTD

Sukkur

Region wise team builup

Page 26: AFES Project feasibility for PMCL work

Al-fareed Engineering & Consultants (Pvt) LTD

Team buildup Sukkur regionSummary

Rohri 30/1 person

Ghotki 57/1 person

Ranipur 38/1 person

Khairpur 28/1 person

Sukkur 24/1 person

Larkana 53/1 person

Jaccobabad 52/1 person

Shikarpur 26/1 person

Total Site Count 308

Page 27: AFES Project feasibility for PMCL work

Al-fareed Engineering & Consultants (Pvt) LTD

Ghotki-57Ranipur-38Khairpur-28Sukkur-24Larkana-53Jaccobabad-52Shikarpur-26

Page 28: AFES Project feasibility for PMCL work

Thank You

Al-fareed Engineering & Consultants (Pvt) LTD