AES Corporation Energy Storage & Advancion ®

AES Corporation Energy Storage Advancion - … Meeting Materials/2016 WIRES Spri… · 2 AES Operates the Largest Fleet of Battery‐Based Energy Storage on the Power Grid Contains

Embed Size (px)

Citation preview

AES CorporationEnergy Storage & Advancion®

2

AES Operates the Largest Fleet of Battery‐Based Energy Storage on the Power Grid

Contains Forward Looking Statements

AES Proprietary and Confidential

Credit: GE

KilrootNorthern Ireland

Alamitos US‐CA 

Tait, US‐OH

Laurel Mountain US‐WV

Northern Ireland Project #2

AngamosChile Cochrane   

Chile   

Operations: 116 MWConstruction: 50 MWLate Stage Development: 218 MW

IPLUS‐IN 

Philippines   Project   

Texas   Project   

Dominican Republic Project

AdvancionTMApplications Center US‐PA

Warrior Run,US-MD

Zeeland, Netherland

s

Los Andes,Chile

The AES Corporation.  All rights reserved.

4

Initial project leading to over 100MW of energy storage in Chile

• Edison Award 2012 24 MW Los Andes ResourceAtacama, Chile

• Primary & secondary reserves• Contingency management

Impact: Avoided load shedding and 

emergency curtailment Increased energy production & 

reduced cost Increased system security  Inertia‐like performance

Energy Storage Supplying Critical Spinning ReservesAES Proprietary and Confidential

5

Serving PJM Interconnection – world’s largest power market

98 MW Laurel Mountain Wind Farmwith 64 MW Storage Resource

West Virginia, USA

Adding System Reliability with WindAES Proprietary and Confidential

6

AES Advancion Array Providing 20MW of flexibility to Netherlands Market

20 MW Zeeland ResourceVlissingen, Netherlands

• Primary Control Reserve for integrated market (DE, NL, CH, AU)

Impact: Reduce total reserve cost Fast, accurate reserves Increased system flexibility Opportunity to explore fast 

resource benefits Scalable 

Storage Serving TenneT and Integrated Reserve MarketAES Proprietary and Confidential

7

Project Description:• 2x50 MW advanced battery array• Provides local capacity reliability• 4 hour duration• 24x7 power resource• No emission or water• Tolling PPA

100 MW Interconnection (rendered)200 MW of flexibility (discharge + charge)

AES Advancion Selected by SCE in Competitive RFP and Awarded a 20 Year PPA Contract AES Proprietary and Confidential

8

Project Description:• 2x50 MW advanced battery array• Provides local capacity reliability• 4 hour duration• 24x7 power resource• No emission or water• Tolling PPA

100 MW Interconnection (rendered)200 MW of flexibility (discharge + charge)

AES Energy Storage Offering to CaliforniaAES Proprietary and Confidential