31
AECS, LLC Show Me the Money

AECS, LLC Show Me the Money. AECS, LLC Energy Efficiency

Embed Size (px)

Citation preview

AECS, LLC

Show Me the Money

AECS, LLC

AECS, LLC

Energy EfficiencyEnergy Efficiency

AECS, LLC

Enabling the systems you have in place to operate with less energy

4

Without altering appearance, performance or productivity

Creating a compelling and efficient return on investment for clients

AECS, LLC

“Energy efficiency is the fifth fuel after coal, gas, renewables and nuclear. It should be our first choice in meeting our growing demand for

electricity as well as solving the climate challenge”

Jim Rogers, CEO Duke Energy

AECS, LLC

“Efficiency is the steak, renewables are the sizzle”

Carl Pope, Executive Director, Sierra Club

AECS, LLC

The Energy Efficiency MarketThe Energy Efficiency Market

GHG emissions reduction could be as high as 40% by 2030

Estimated 130 billion in US annual energy savings

Deutsche Bank, Goldman Sachs, Barclays and others have $3 trillion in assets with nowhere to invest.

AECS, LLC

We pair proven energy efficiency technologies with the latest material rebates, tax planning and

financing strategies to create supplementary revenues for commercial and industrial clients

AECS, LLC

EQUIPMENT 2% to 15%

AIR CONDITIONING

12% to 30%

WATER 15%-40%

REFRIGERATION25%-50%

LIGHTING 30-75%

AECS, LLC

Half of our projects payback within 40 months, before rebates, Federal and State tax credits

AND

We lower maintenance costs, and reduce equipment downtime.

We improve electrical equipment operation, reliability, and longevity.

We improve electric power quality, usage and efficiency throughout the operation

AECS, LLC

We conduct a detailed energy audit & survey to determine exactly where the electricity is being used in a facility

We determine exactly the amount of time, amperage and profile of each electrical component in a facility

We create a customized energy & financial savings solution based on a facility’s profile and needs

We meet our guarantees with a turnkey solution - passive technology that requires no involvement from employees

We monitor and report on the savings throughout the payback period

AECS, LLC

AECS, LLC

Load Cost

AECS, LLC

Chattanooga Warehouse Proposal Summary

Kenco Storage Warehouse

Total Project Cost $102,420.00

Avg Monthly Electric Costs $13,368.00

Total Monthly Savings $3,012.00

Simple Payback Period 34 Months

ROI 35.2%

AECS, LLCPercent of Efficiency Projects that are actually approved

Noesis Energy Survey 2013

AECS, LLC

50 percent of the consultants surveyed report less than one in four of their projects get the green

light

AECS, LLC

Primary reason projects do not proceed

Noesis Energy Survey 2013

AECS, LLC

More than half the time, "Not budgeted" is the reason these projects do not get internal approval. One quarter of the projects are derailed by a “lack of certainty” of theirestimated savings.

AECS, LLC

Primary Barriers to EE Implementation

High upfront capital costsLong payback periodsUncertainty of savings (perceptions of risk)Budgets do not prioritize energy efficiencySplit incentives*Limited available capital

AECS, LLC

• Cash• Financing• Leasing• Shared Savings (performance contract)• Energy Service Agreement

Primary options for funding an EE Project

AECS, LLC

CashCash(Internal Financing)(Internal Financing)

Owner can take advantage of all rebates & tax incentivesOwner can take an accelerated depreciation on qualifying equipmentOwner gets 100% of the savings, right up front

AECS, LLC

Financing/LeasingFinancing/LeasingMany excellent loans in market right now for EE projects (under 6%)Rate costs are usually less than energy savingsFinancing costs tax deductable (depending on lease structure)

Kenco Warehouse Lighting Proposal Summary

Kenco Storage

Total Project Cost $102,420.00

Avg Monthly Electric Costs $13,368.00

Total Monthly Savings $3,012.00

Lease Cost (60 months) $2,203.00

Monthly Profit (pre tax) $809.00

AECS, LLC

Shared SavingsShared Savings

•Client and ESCO create an agreement to share in savings for a set period of time •Client and ESCO establish clear measurement and verification parameters and process•After installation client pays ESCO a percentage of the savings (usually +/- 80/20 for 48 to 60 months)

AECS, LLCAtlanta Client

Total Project Cost $74,499.00

Projected monthly savings $2,593.00

75/25 share (60 Months) $648.00

Total client “profit” $38,900.00

AECS, LLC

Energy Service AgreementEnergy Service Agreement

Landlord or 3rd party agrees to pay historical energy use for client for a contracted period of timeUndertakes energy efficiency upgrades at their costImposes management fee (not to exceed historical energy costs)Profits from the energy savings margin

AECS, LLC

Other Financing OptionsOther Financing Options

On Bill Financing – Utility involvementPACE – Tax value lendingGreen Revolving Funds – Requires seedingMunicipal Lease Agreements – Subject to annual appropriationsMunicipal Bonds – Require scale & long initiation

AECS, LLC

Astec (Chattanooga, Tennessee)Asphalt Technology

Goal: Power Quality Issues & Cost Reductions Guaranteed: 7.6 % savings, payback 36 months Result: 12.8 % savings, 17 month payback Installation: Lights, HVAC, Power Conditioning, 50 acre

facility Contact: George Francisco,

Senior V.P. Operations (423) 899-5898

AECS, LLC

Tepro, Inc. (Winchester, Tennessee)Rubber molding plant

Goal: reduce monthly electric costs and improve reliability and power quality

Guarantee: 11.29% savings, payback 22 month Results: payback 8 months on first project. Multiple

projects now completed. Additional Benefits: Improved the efficiency of all loads

allowing a 25% increase in floor space production with no increase in the electric bill

Contact: Lee Stinman, Superintendent of Maintenance, (931) 967-5189

AECS, LLC

Roadtec (Chattanooga, Tennessee)Road Paving Equipment

Goal: Cost reduction Guaranteed: 11.6 % savings, payback 48 months Result: 19.6 % savings, payback 28 months Installation: Lights, Senors, EMS, Power Conditioning Contact: Mike Bliss,

Director of Operations,(423) 265-0600

AECS, LLC

Sports Barn (Chattanooga, Tennessee)Health Club

Goal: Cost reduction Guaranteed: 10.37% savings, payback 40 months Result: 11.67 % savings, payback 30 months Installation: Lights, HVAC Contact: Don Sims, Superintendent of Maintenance,

(423) 266-1125

AECS, LLC

www.consensusenergy.com Steve O’Neil, Managing Partner

[email protected](678) 666-4684