Draft 16 Dec 2016 pm 1 Advice Note on Motion 65 cut off date Synopsis for the Public Consultation feedback Document type Code Version No. Draft No. Circulated Policy Manager Consultation Deadline for comment Compilation date ADVICE NOTE ADV-20-007-018 V1-0 0 01/10/ to 06/12/2016 Dr. Pasi Miettinen Public 06/12/2016 01 - 31/12/2016 Source of comments Nr of respondents Economic North 8 Economic South 4 Social South 1 Environmental North 7 Environmental South 4 National Offices 4 Research Institute 1 Unspecified response in Portuguese 1 total 30

Advice Note on Motion 65 cut off date Synopsis for the ... · Draft 16 Dec 2016 pm 1 Advice Note on Motion 65 cut off date Synopsis for the Public Consultation feedback Document type

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Advice Note on Motion 65 cut off date Synopsis for the ... · Draft 16 Dec 2016 pm 1 Advice Note on Motion 65 cut off date Synopsis for the Public Consultation feedback Document type

Draft16Dec2016pm

1

Advice Note on Motion 65 cut off date

Synopsis for the Public Consultation feedback

Documenttype Code VersionNo.

DraftNo. Circulated PolicyManager Consultation Deadlineforcomment

Compilationdate

ADVICENOTE ADV-20-007-018 V1-0 0 01/10/to06/12/2016 Dr.PasiMiettinen Public 06/12/2016 01-31/12/2016

Source of comments Nr of respondents Economic North 8 Economic South 4 Social South 1 Environmental North 7 Environmental South 4 National Offices 4 Research Institute 1 Unspecified response in Portuguese 1

total 30

Page 2: Advice Note on Motion 65 cut off date Synopsis for the ... · Draft 16 Dec 2016 pm 1 Advice Note on Motion 65 cut off date Synopsis for the Public Consultation feedback Document type

Draft16Dec2016pm

2

Reference

Number of

comments received from chambers

Key message Proposed change

PSU response

ADVICE-20-007-018 3/Economic2/Environment

Economic:AdviceNotedoesnotspeakaboutICLThisadvicenoteisveryconfusing,bothinitsstructureanditscontent.Structure:a),Thenoticeshouldbemoreclearlyseparatedintotwosections;1stsectionbeingdirectedtoCHandCBsand2ndsectionbeingdirectedtoSDGs.b).Usingthesamenumberingforthetwooptionsunderadvice#2andthenumberingofrequirementsfor#1isn’thelpful.Environment:IdonotsupportthedraftAdviceNoteaswritten.Itistoovague.ItisnotconsistentwiththeintentofMotion65.ItseemsalsounfairinOption1clause1.1toaskSDGstoprovideupdatedworkplanswhentheadvicefromPSUand/ortheHCVTWGisalsonotclear.

Economic:RemoveICLfromtitleEnvironment:WestronglyencourageFSCtofullycomplywiththeintentofMotion65defaultindicatorbyputtinginplaceatemporaryhalttologginginatleast80%ofIFLsinFSCforests,untilrobustindicatorsareimplemented.ThisisthecleanestandsimplestwayofsafeguardingIFLswhileindicatorsarebeingdeveloped.

TheconceptofICLcannotberemoved,becauseitiselementarytotheCanadiandialogueandveryusefulforaddressingM65,points3and8.IncaseothercountrieshaveothersolutionsforengagingtheIndigenousPeople,theyareallowedtodroptheconcept.We’llsimplifythestructureofthenextversionoftheAdviceNote

Normativereference 3/Economic

Economic:TheAdviceNotedoesn’trefer“FSC-PRO-60-006V2-0EN”althoughitconflictswithitwhenitimposesstricttimelinesforthecompletionofthetransferprocess.

Economic:addFSC-STD-60-002,FSC-STD-60-006;FSC-PRO-60-006Proposedenddate:January012019

We’lladdthesenormativereferencestothenextversionoftheAdviceNote

Page 3: Advice Note on Motion 65 cut off date Synopsis for the ... · Draft 16 Dec 2016 pm 1 Advice Note on Motion 65 cut off date Synopsis for the Public Consultation feedback Document type

Draft16Dec2016pm

3

Reference

Number of comments received

from chambers

Key message Proposed change

PSU response

Effectivedate 1/Economic ImportantthattheperiodthatthisAdviceappliedbemadeclear–startdateandexpirydateexplicitlystatedinthescope,asitisonlyintendedasatemporarymeasure

We’lldefineexpirydatetothenextversionoftheAdviceNote

Scope 5/Economic5/Environment1/NationalOffice

Economic:ItishardtounderstandwhytheAdvicenoteonlyapplytofourcountries/regions.Accordingtowww.intactforests.org,“IFLexistedin64countriesinyear2013Ingeneralitisbelievedthatthisissueistooimportanttobedealtinsuchashorttimeframe.CHareinterestedindealingwiththeissueinarationalandscientificbasedway.Thetypeofoperations(verylittleimpact)andthelegalbindingobligationofthecentralAfricancertificateholderstorespecttheirmanagementplanshouldentitlethemnottobeconcernedbytransitionmeasures.TheadviceshouldbeappliedtoallIFLsglobally,forconsistencyandtoaddressvulnerableareasoutsidethe

Economic:TheAdviceNoteshouldapplytoallIFLcountriesEnvironment:ThisAdviceNoteappliestoNetworkPartners,StandardDevelopmentGroups,certificateholdersandCertificationBodiesoperatingincountrieswhereIFLsarepresent.NationalOffice:SpecifyinthescopetheimplicationstoControlledWood

TheSteeringCommitteedecidedtoexpandtheSection1toapplyinallIFLcountries

Page 4: Advice Note on Motion 65 cut off date Synopsis for the ... · Draft 16 Dec 2016 pm 1 Advice Note on Motion 65 cut off date Synopsis for the Public Consultation feedback Document type

Draft16Dec2016pm

4

Reference

Number of comments received

from chambers

Key message Proposed change

PSU response

priorityregions.ItiscriticallyimportantthatIndonesiaisincludedaswellasthefullAmazonBasin.

Environment:ScopemustbeextendedtoincludeallcountrieswithIFLs.ThisisimportantbecausetheexistingscopemaynotapplytosomeIFLswhicharethemostrareand/orvulnerable.AlsotheapplicabledatesshouldbeincludedhereastheAdviceNoteismeanttobeatemporarymeasure.

Terms&definitions 10/Economic1/Social5/Environment3/NationalOffices1/Research

Economic:GeneralflexibilityinestablishingandmanagingIFLsisneededinCanada“Humaneconomicactivities”isanewterm.Terminologyanddefinitionsshouldbeconsistentwithpre-existingtermsintheIGIs,theFSCGlossaryofTermsandotherstandardsandpolicies.Theword“commercial”isusedintheIGIsandthusshouldalsobeusedinthedefinitionofIFLs.IFLDefinitionMostforestintheworld,includinginthetropicshavebeeninfluencedby

Economic:Option1:Incaseanationalorregionaldefinitionissettofitthelocalconditions,thisdefinitionwillapply.Option2:ThedefaultdefinitionforIFLis“Aterritory…sourceWRIetc.”appliesincasenoregionalornationaldefinitionapplies.…IntactForestLandscapesmapsaccessedthroughGlobalForestWatchasabaseline.“territorywithintoday'sglobalextentofforestcoverwhichcontainsforestandnon-forestecosystemsminimallyinfluencedbycommercialactivities…”

ThedefinitionforIFLgiveninFSC-STD-60-004forIGIsisintendedtobeastartingpointtotheSDGsfornationalorregionaldefinition.ThedefinitioncanbeelaboratedfurtherusingBestAvailableInformation.TheSDGisalsobetterpositionedtodefinewhatexactly‘minimallyinfluencedbyhumanactivity’means.

ThedefinitionforIndigenousCultural

Page 5: Advice Note on Motion 65 cut off date Synopsis for the ... · Draft 16 Dec 2016 pm 1 Advice Note on Motion 65 cut off date Synopsis for the Public Consultation feedback Document type

Draft16Dec2016pm

5

Reference

Number of comments received

from chambers

Key message Proposed change

PSU response

humanssignificantly,whichhavecreatedalsomanysecondary,disturbedforests.Theconceptof’Intactness’isveryarbitraryandhasbeenabandonedinecologysincelongtime,inthesamewayas‘Climaxforest’.Theseareconceptsthatappliedtoanidealisticview,withoutlookingatthelongerperspective.Also,itisknownthatintermediatedisturbancebringshigherbiodiversityasitcreatesmore‘niches’fordifferentspecies.IngeneralFSCshouldincludethefactthatIFLdefinitionwillberefinedatthenationalorregionalleveltofitlocalconditions.AndFSCshallallowtodefineattheregionalandnationallevelwhatexactly‘minimallyinfluencedbyhumanactivity’means.“CoreAreaofIFL”andICLaredefinedbutnotreferencedinanywayintheadvicenote.Definitionof“CoreareaofIFL”isnotconsistentwith“Coreareas”asdefinedindraftstandardFSC-STD-60-004V1-1.

DeletethedefinitionofICL.GettheconceptdiscussedandapprovedbyMembership,beforeitcanbeincludedintheFSCstandardasitentailsasignificantchangeoftheFSCFMstandard.Define‘’IFLdegradation’’Environment:SpecifywhichhumaneconomicactivitiesaltertheintactnessofIFLs.Replacetheprovideddefinitionby“CoreareaofIFL(FSC-STD-60-004V1-1):TheportionofanIntactForestLandscape*whereintactnessismaintained,thatcontainsthemostimportantecologicalandculturalvaluesandwheretimberharvestingandroadbuildingaregenerallynotpermitted.”ModificationstoBrazil:(i)CoreareaofIFLisatleast15%oftheIntactForestLandscapefallingwithinthemanagementunit,tobeincludedtotheConservationAreaNetwork.(ii)DeleteIndigenousCulturalLandscapefromthedefinitionasitwasnotapartofthemotion65

LandscapeisformulatedbythePermanentIndigenousPeoplesCommittee,whichhasamandateoftheFSCBoardofDirectors.FSCrespectstheIndigenousPeoplesself-determinationrightsandthedefinitionofICLbelongstothesphereofUnitedNationsDeclarationontheRightsofIndigenousPeoples(UNDRIP).Asnobodycommentedthephrasingofdefinition,we’llkeepitasitis.

WerespectthesupportgivenbyallBrazilianchamberstotheRIL-basedforestmanagementinAmazon.However,asthegenericconceptofRILisloose,itisimportanttospecifyexactlywhicharetheindicatorsforRILinAmazon,what‘’minimalhumaninfluence’’means

Page 6: Advice Note on Motion 65 cut off date Synopsis for the ... · Draft 16 Dec 2016 pm 1 Advice Note on Motion 65 cut off date Synopsis for the Public Consultation feedback Document type

Draft16Dec2016pm

6

Reference

Number of comments received

from chambers

Key message Proposed change

PSU response

InBrazil,CoreArea:stakeholdersandNetworkPartnershavesenttheircommentsagainstthedefinitionof80%oftheIFLareaascorearea.CoreareasmustbeacompositionoftheNetworkConservationAreawerethetotalwouldbemaximum15%Definitionof“CoreareaofIFL”isnotconsistentwith“Coreareas”asdefinedindraftstandardFSC-STD-60-004V1-1.ICLDefinition:ThisconceptiscompletelynewtotheFSCsystem.Therefore,incompliancewithFSCprocedures,iftobeincludedintheFSCFMstandard,itshouldbeapprovedbythemembership,differentchambers,theGA.Social:SupportsEconomicandEnvironmentalchambervisiononRILandlimitingthecoreareaas15%.SuggestsdeletingICLconceptfromtheAdviceNoteasitwasnotmentionedintheMotionEnvironment:InBrazil,ReducedImpactLoggingpractisesareso

InBrazil:Modification:CoreareaofIFL:Atleast15%oftheintactforestlandscapefallingwithinthemanagementunit,composedbytheNetworkConservationAreaNationalOffice:Bestavailableinformation*,ofecologicaland/orsocialsources,relevanttoIFLsandICLs,shouldbeacceptable.Asexample,GlobalForestWatchCanada(exampleforCanada),localeco-forestmapsusedforforestmanagementplanning,andreferencesspecifictoICLsandIndigenousculturalvaluescouldbeincluded.*BestAvailableInformation:Data,facts,documents,expertopinions,andresultsoffieldsurveysorconsultationswithstakeholders*andengagementwithIndigenousPeoplesthataremostcredible,accurate,complete,and/orpertinentandthatcanbeobtainedthroughreasonable*effortandcost,subjecttothescale*andintensity*ofthemanagementactivities*andthePrecautionaryApproach*.ThedefinitionofcoreshouldbedevelopedthrougharigorousprocessandincollaborationwithregionalNetworkpartnerstoberepresentativeofregionalrealities.

andhowtherelatedlegislationisformulated.

We’lltakeoutthedefinitionforaCoreareafromthenextversionoftheAdviceNote,becauseitwillnotbereferredinthetextanymore

Page 7: Advice Note on Motion 65 cut off date Synopsis for the ... · Draft 16 Dec 2016 pm 1 Advice Note on Motion 65 cut off date Synopsis for the Public Consultation feedback Document type

Draft16Dec2016pm

7

Reference

Number of comments received

from chambers

Key message Proposed change

PSU response

delicatethattheyenablemaintainingtheintactnesswithinforestconcessions.ThesemanagementsunitscontinuetobeclassifiedasIFLattheinternationalevaluation.ThereforethereisnoneedofstoptheReducedImpactLoggingoperationsinBrazilNationalOffices:GlobalForestWatchismentionedastheonlydatasource.ThisdataisusefultogetaquickandfirstideaofwhereIntactForestsarelocatedbutnotpreciseenoughandupdatedenoughtomakesuchimportantdecisionon.TheIndigenousChamberhasidentifiedconcernsabouttheidentificationandmappingofIFLs,sinceaprocessofidentificationandmappinginfluencesnationalandprovincialpolicies.Whodecideonthedefinitionofcores?ItwasnotdefinedwhenvotingforintheMotion.FSCCanadahascompletedascience-basedexercisetoproposeadefinitionandtodevelopa

Socialandculturalconsiderationsneedtobeincludedwhendefiningcores.AstheIFLconceptispartofFSC-STD-60-004V-1-1shallbeincludedanexplanationnotesayingwhat“minimuminfluenced”meanstoallowtheapplicationandcontrolofdegradationlevelsinBrazil.ICLconceptshallbebetterunderstoodinordertobeapplicableandnotcontradictorywithIFLconceptinBrazil.Ifapprovedthroughstandarddevelopmentprocessneeded,FSCshallclarifytheindicatorsthatshouldapply.

Modification1:IndigenousCulturalLandscape(givenforinformation):[…]

Modification2:CoreareaofIFL:TheportionofanIntactForestLandscape*whereintactnessismaintained,thatcontainsthemostimportantecologicalandculturalvaluesandwheretimberharvestingandroadbuildingaregenerallynotpermitted

Page 8: Advice Note on Motion 65 cut off date Synopsis for the ... · Draft 16 Dec 2016 pm 1 Advice Note on Motion 65 cut off date Synopsis for the Public Consultation feedback Document type

Draft16Dec2016pm

8

Reference

Number of comments received

from chambers

Key message Proposed change

PSU response

clearmethodologytoidentifycoreareas.Moreworkisplannedtodevelopmethodologytoidentifysocialandculturalvalues(ICL).Adefinitionofcores,ifimposedinternationally,couldhavesignificantimpactontheproposedapproachdevelopedbyFSCCanadaandpotentialnegativesorunintendedconsequencestoonthegroundpractices.

IFLconcept:TheconceptofIFLitselfisnoteasytoapplyandneedfurtherdetailingtoallowimplementationofprotectionmeasuresinBrazil…andICLconcept:what´sthesource?What´sthelevelofdiscussionthisconceptwassubmittedtopriortoturnanofficialFSCdefinition?Research:TheICLconceptistotallynewandisnotpartofmotion65,thereforeshouldnotbeintegratedwithinFSCnormativeframeworkwithoutaclearlyapprovalatGeneralAssembly.Moreover,theICLconceptisnotusedintheadvice.Itisdefinedin"Terms&

Page 9: Advice Note on Motion 65 cut off date Synopsis for the ... · Draft 16 Dec 2016 pm 1 Advice Note on Motion 65 cut off date Synopsis for the Public Consultation feedback Document type

Draft16Dec2016pm

9

Reference

Number of comments received

from chambers

Key message Proposed change

PSU response

Definitions",butwithoutreferenceacrosstheadvice.

Background 5/Economic1/NationalOffice

Economic:Theintentofthisadvicenoteisn’tclear.Itshouldbeexplainedhere.Itseemstohavetwopurposes:1).SetexpectationsforCHandCBsinterimtoIFLindicatorsbeingdrafted(tobeclarified)2).SettimelinesforSDGsforthedevelopmentoftheIFLindicators.Itissurprisingtomentionthat“TheFSCBoardofDirectors(BM72.31,July2016)hasconcludedthattheMotion65defaultclausecannotbeimplementedaswritteninthemotion,duetothesignificantundesiredsideeffectsinsomeofthemostimportantcountriesforFSC”whilenotaddressingthischallengeintheAdviceNote.The“Motion65defaultclause”wouldhaveprecludedharvestinginthe“coreareaofeachIFLwithinthemanagementunit”bytheendof2016.ThisAdviceNotewillprecludeharvestingthatdegradeIFLstotheextentthatitlosesitsIFLstatusby3monthsafterJanuary2017.Itisnot

Economic:Addanexplanationoftheendgoalofthenotice.Thiscouldbe:ThepurposeofthisnoticeistoprovidedirectivestocertificateholdersandcertificationbodieswiththeaimofensuringminimalfurtherdestructionofIFLsinterimtothedevelopmentofclearindicatorsonIFLsandICLs,andtodiscloseafinaldeadlineforthefinalizationandimplementationofIFL/ICLrequirements.ThewholeAdviceNoteshouldbewithdrawnandrewritetocomeupwithaproposalthatdoesaddressthe“significantundesiredsideeffects”discussedbytheFSCBoard.ForcountrieswellengagedinthestandardrevisionprocessoftheirFMstandard,thisadvicemustnotapply.TheonlyviablesolutionforIFLandICLinCanada,relyinabalancedmulti-chambercountryadaptedprocessaddressingIFL/ICLforthecountryasawholeandnotattheFMUlevel.IftheAdviceNoteisintendedtobeasafeguardforIFLs,thenitshouldapplytoallcountries,andinparticular,inthosecountrieswherethereisveryfewIFLsremaining.

We’llclarifytheintentoftheAdviceNoteinitsnextversion

Page 10: Advice Note on Motion 65 cut off date Synopsis for the ... · Draft 16 Dec 2016 pm 1 Advice Note on Motion 65 cut off date Synopsis for the Public Consultation feedback Document type

Draft16Dec2016pm

10

Reference

Number of comments received

from chambers

Key message Proposed change

PSU response

clearhowthischangeofvernacularcombinedwitha3monthsextensiondoesanythingtoaddressthe“significantundesiredsideeffects”thatarementionedintheBackground.WesupporttheconclusionreachedbytheBoardofFSCInternationalatBM72“thattheMotion65defaultclausecannotbeimplementedaswritteninthemotion”.NationalOffice:ThisAdviceNotehasnotadequatelytakenintoaccountagreementsreachedduringtheIFLSolutionsForuminJuly2016.Itdoesn’tconsideranyoftheimportantobjectionsanddifficultiesexpressed.

Advice

6/Economic1/EnvironmentNationalOffice1/Research

Economic:Clearlyseparatethenoticein2sectionswouldprovidemoreclaritytothenotice.Advice#1shouldbere-writtentodirectactionbyCHs,notCBs.TheAdviceNoteitselfissuedbyFSCshould

Economic:Advicedirectedtocertificateholdersandtheircertificationbody.Forexample,“Within3monthsoftheeffectivedateofthisAdviceNote,CertificateHoldersmust….”Add:“Transitionmeasuresbeforetheapplicationofnationalindicatorsorbydefault

We’llseparatetheNoticetotwosections.FirstonetargetedtoallCHsandthesecondonetotheSDGsinprioritycountriesWe’llclarifywhathappensincaseofnon-compliance.

Page 11: Advice Note on Motion 65 cut off date Synopsis for the ... · Draft 16 Dec 2016 pm 1 Advice Note on Motion 65 cut off date Synopsis for the Public Consultation feedback Document type

Draft16Dec2016pm

11

Reference

Number of comments received

from chambers

Key message Proposed change

PSU response

serveasnoticeThisadvicenotedoesnotaddressthe“significantundesiredsideeffects”mentionedbytheFSCInternationalBOD.Infact,thelackofflexibilityofthisAdviceNotewouldmakethingsmoreproblematicandwouldgenerateevenmoredetrimentalsideeffects.Validfortheentirepoint1.:Itshouldbeclarifiedthatthemeasuresdescribedinpoint1aretransitionmeasuresbeforenationalindicatorsortheIGIareinforce.Ingeneral,itwouldbeimportanttoclarifywhathappensincaseofnon-compliance.FSCcertifiedforestmanagementbasedonRILkeepstheforestsintactasdefinedbyIFLinBrazilTheabsenceofflexibilityinthewording,lackofrecognitionoflimitationstothecertificateholders’‘sphereofinfluence’andmis-alignmentIGI6.5andwiththeICLapproach,maketheAdvicecontentunacceptabletous

ofIGIs”asthetitleofthissection.Addaparagraphontheoutcomeincaseofnon-compliance.ExplainhowthetransitionwilltakeplacefromtherequirementsofthisAdviceNotetotheIndicatorsofarevisedandapprovedNFSS.Environment:“Operations(includingharvestingandroadbuilding)thatdonotimpactmorethan20%ofIntactForestLandscapesmayproceediftheydonotreduceanyIFLsbelowthe50,000hathreshold.GlobalForestWatchIFLmapsmustbeusedinallregions.”IfthislanguageisNOTused,werecommendthechangesoutlinedbelow.

We’llintroducetheproposaltoallowthecommercialuseof20%ofIFLswithinthemanagementunit

Page 12: Advice Note on Motion 65 cut off date Synopsis for the ... · Draft 16 Dec 2016 pm 1 Advice Note on Motion 65 cut off date Synopsis for the Public Consultation feedback Document type

Draft16Dec2016pm

12

Reference

Number of comments received

from chambers

Key message Proposed change

PSU response

Environment:WestronglyencourageFSCtocreateaverysimpleadvicenotethatisstraightforwardandeasytoimplement.ThefoundationforthiswouldbeacaponoperationsinIFLstocreateaholdingpattern,andlimitoperationsinIFLswithoutpreventingthemaltogether.Webelievethatthisapproachwillgivethemajorityofoperatorstocontinuewithplannedoperationswhileindicatorsarebeingdevelopedandimplemented.Ifthisapproachisused,werecommendthattheclausesbelowcanbeeliminated.Research:TheadvicedoesnotclarifyiftherequirementsdescribedbeforeOption1wouldbeincorporatedinFSC-STD-01-001orinotherstandard,oriftherequirementsaregoingtobeincorporatedintheindicatorsonlythroughOption1and2,describedinthisdocument.

1.ByJanuary2017, 10/Economic Economic: Economic: We’lldescribewhatis

Page 13: Advice Note on Motion 65 cut off date Synopsis for the ... · Draft 16 Dec 2016 pm 1 Advice Note on Motion 65 cut off date Synopsis for the Public Consultation feedback Document type

Draft16Dec2016pm

13

Reference

Number of comments received

from chambers

Key message Proposed change

PSU response

CertificationBodiesshallsendanoticetotheCertificateHoldersrequiringthemtomaintainand/orenhancetheintactnessofIFLareaswithintheManagementUnit,withminimalfurtherdestructionofIFLs.Thenoticeshallrequirethat:

1/Social5/Environment2/NationalOffice1/Research

ThisisunacceptabletosomecompaniesSpecifyiftherequirementsunderpoint1willstillbevalidoncearevisedNFSSisapprovedandgetseffectiveForCHtobeabletosendthisnotice,theinterimIFLmapstobeusedshouldbeclearlyidentifiedhere.Canamapbeincludeddirectlyinthisnoticesothereisnoroomforuseofdifferentsources?AccordingtheevaluationdoneinBrazil,theforestmanagementimplementedincertifiedareasiscapabletokeepforestlandscapesmanagedwithverysimilarcharacteristicstotheuntouched.Then,wecanassumethattheproceduresdefinedinBrazilianlegislationcouldbeadoptedasapossiblewaytomaintaintheIFLwiththeirvalues(RIL,ReducedImpactLogging)Environment:InBrazil,Reduced

ExplainhowthetransitionwilltakeplacefromtherequirementsofthisAdviceNotetotheIndicatorsofarevisedandapprovedNFSS.Define‘destruction’orusetheterm‘degradation’or‘alteration’,wherethereisnolandusechangeDefine‘minimal’EnvironmentSpecifywhichhumanactivitiesdonotmaintainandwhichhumanactivitiesdonotenhancetheintactnessofIFLs.NationalOffice:Thefirststepshouldbethedevelopmentofanapproach.1.ByJanuary2017,CertificationBodiesshallsendanoticetotheCertificateHoldersrequiringthemtomaintainand/orenhancetheintactnessofIFLareaswithintheManagementUnit,withminimalfurtherdestructionofIFLs.Thenoticeshallrequirethat:Research:1.ByJanuary2017,CertificationBodiesshall

allowed,insteadofwhatisprohibitedinthenextversionoftheAdviceNote

Page 14: Advice Note on Motion 65 cut off date Synopsis for the ... · Draft 16 Dec 2016 pm 1 Advice Note on Motion 65 cut off date Synopsis for the Public Consultation feedback Document type

Draft16Dec2016pm

14

Reference

Number of comments received

from chambers

Key message Proposed change

PSU response

ImpactLoggingpractiseshastobeacceptedSocial:SupportsEconomicandEnvironmentalchambervisiononRILinBrazilNationalOffice:Ifwearerequiringtomaintainand/orenhanceintactnessofIFL,anapproachneedstobedevelopbefore.

ThereisanissuetoenhancetheintactnessofIFLareas,sincesylviculturalpracticeswillimpactintactnessofthelandscape.

sendanoticetotheCertificateHoldersrequiringthattheirforestmanagementactivitiesarealignedwiththeconceptsofReducedImpactLogging,maintainingtheintactnessofIFLareaswithintheManagementUnit,withminimalfurtherdestructionofIFLsinanextentthatdoesnotcompromisetheforestmanagementactivities.

1.1.Nolaterthan3monthsafterreceivingthenotice,CertificateholdersshallnotifytheirCBsaboutanyplannedlogginginIFLsoverthenexttwoyears.

8/Economic1/Social10/Environment2/NationalOffice1/Research

Economic:NotpossibleinQuebeck,whereGovernmentmakestheplanning.ItisclearthattheendresultofthisadvicenoteisthateithernewstandardsarecreatedusingIGIsorexistingstandardsaremodifiedtoincludeIGIsastheyrelatetoIFLs,andthatCHswouldberequiredtoconformtothosestandards.Butwhatisexpectedtohappenintheinterim?

Economic:ThetimeneedstobeextendedtoJanuary2018ManagementplansshouldfollowtheRILprinciplesinBrazil,andanysubsequentchangesshouldstrictlyfollowsuchconceptsinordertokeeptheforestlandscapeprotectedwithminimumchanges.…CBsshallrequirecertificateholderstocomplywiththeIFLsafeguards.Failureto

Thisrequirementappearstobetechnicallyimpossibletobeimplementedinsomecases.Therefore,we’llremovethisfromthenextversionoftheAdviceNote

Page 15: Advice Note on Motion 65 cut off date Synopsis for the ... · Draft 16 Dec 2016 pm 1 Advice Note on Motion 65 cut off date Synopsis for the Public Consultation feedback Document type

Draft16Dec2016pm

15

Reference

Number of comments received

from chambers

Key message Proposed change

PSU response

#1doesnotprovideclarityonthis.Questionstobeanswered:WhatisexpectedofCHoncethey’vedisclosedtheirplannedlogginginIFLsoverthenexttwoyears?Also:WhatisexpectedofCBs?IfCBsdon’thearfromtheminthreemonths,theygetanNCR?IsitexpectedthatCBsconductanevaluationofwhetherornottheirplannedactivitiesareinconformance?Ifso,basedonwhatbasis?Therequirementsunder#1arenotdetailedenoughtomakethisassessment.Inaddition,giventhetimelines(e.g.mapsdevelopedby12/31/17),theCHnoticedoesnotseemapplicablewithoutmoreclarityon“whatIFLs”aretobeconsideredbyCHandCBsintheinterim.Finally:Whytwoyears?ThetwooptionsproposedforSDGrequirenewindicatorstobeappliedwithin1year(Jan2018).Whateverisrequiredin1.2shouldbeconsistentwith1.1.

complywillresultinMajorNonConformanceEnvironment:Nolaterthan3monthsafterreceivingthenotice,CertificateholdersshallnotifytheirCBsaboutanyplannedlogginginIFLsoverthenexttwoyears,usingthe“IntactForestLandscapes.2000/2013”mapsaccessedthroughGlobalForestWatch(www.globalforestwatch.org)asabaselineAdd:CBsshallrequirecertificateholderstocomplywiththefollowingsafeguards.FailuretocomplywillresultinMajorNonConformanceReports.(Note:Thecurrentdraftdoesn’toutlineanymechanismforenforcement)Clarifytheconditionsunderwhichinitiallyplannedloggingwillbeundertaken;Inthecaseofmodificationsofplannedloggingoperations,providesolutiontointegratemodificationsofmanagementplansinthelegalframeworkInBrazil,ManagementplansshouldfollowtheRILprinciples,andanysubsequentchangesshouldstrictlyfollowsuchconceptsinordertokeeptheforestlandscapeprotectedandlittlechanged.

Page 16: Advice Note on Motion 65 cut off date Synopsis for the ... · Draft 16 Dec 2016 pm 1 Advice Note on Motion 65 cut off date Synopsis for the Public Consultation feedback Document type

Draft16Dec2016pm

16

Reference

Number of comments received

from chambers

Key message Proposed change

PSU response

ThisrequirementisnotapplicableinallProvincialcontextinCanadaasCHdon’talwayshavetwoyearsofforestmanagementplanexistingateverypointintime.Insomeinstances,harvestingblocksareattributedthroughauctionsales–whichsectorscannotbeknowninadvance.Environment:Mapsusedmustbegloballyconsistent.EnforcementmeasuresneedtobemadeexplicitSocial:SupportsEconomicandEnvironmentalchambervisiononRILinBrazilNationalOffice:Thenwhat?NotclearwhattheCBshoulddoafterthatandwhenandwhattheyhavetoenforce.DuringthelastIFLsolutionsforum,ithasbeendiscussedandalmostagreedthatoperationscouldbepursuedin20%oftheIFLs.Thedegradationof20%oftheIFLswithintheManagementUnithasbeenacceptedbyGreenpeaceandUMD.As

NationalOffice:Pleaseclarify.

Page 17: Advice Note on Motion 65 cut off date Synopsis for the ... · Draft 16 Dec 2016 pm 1 Advice Note on Motion 65 cut off date Synopsis for the Public Consultation feedback Document type

Draft16Dec2016pm

17

Reference

Number of comments received

from chambers

Key message Proposed change

PSU response

suggestedpreviously,wecoulddraftanoteprecisingclearlywhatisintendedhere.Research:HowcanFSCexpectthatCHsareawareoftheexistenceofIFLSwithinitsFMUs?Thepublicationofmapsisexpectedtotheendof2017andtheimplementationofIFL'sindicatorsisexpectedtoJanuary2017.

1.1.1Amendmentstoforestmanagementplans,whichincreaselogginginIFLsshallnotbepermitted.

6/Economic1/Social9/Environment

Economic:NotpossibleinQuebeck,whereGovernmentmakestheplanning.Forhowlong?TheremaybeconflictwithprovincialdirectioninCanadaDoesthismeanincreaseloggingabovethatwhichwasoriginallyplanned?Giventhattheseseemtobemeasuresforthetransition,whyisthereaneedtospecifythis?FortheCB,thetimeframetomakeamendmentstoMParemuchhigherthanthis.Thislanguageisunacceptablefor

Economic:‘’Amendmentstoforestmanagementplans,whichincreaseloggingandroadbuildinginIFLsshallnotbepermittedwhilethisadvicenoteisineffect.’’Foresthealthloggingsincriticalhazardsituationsshouldbeaccepted(fires,pestanddiseaseoutbreaks)InBrazil,ReducedImpactLoggingtechniques(RIL)shouldbeusedandpresentedtothecertifierasameansofguaranteeingIFLmaintenance.Anadditionalprecautionaryapproachmaybesuggestedbycertifiersinrelationtohigh-impactactivitieswithinareaspreviouslyidentifiedasIFLs,suchasroadleasesandinfrastructures,whilemaintaininglowimpactexplorationactivities.

Thisrequirementappearstobetechnicallyimpossibletobeimplementedinsomecases.Therefore,we’llremovethisfromthenextversionoftheAdviceNote

Page 18: Advice Note on Motion 65 cut off date Synopsis for the ... · Draft 16 Dec 2016 pm 1 Advice Note on Motion 65 cut off date Synopsis for the Public Consultation feedback Document type

Draft16Dec2016pm

18

Reference

Number of comments received

from chambers

Key message Proposed change

PSU response

reasonsnotedabove.IFLsareofdifferentsizes,locationsandcontexts.Suchaninflexibleapproachisunacceptable.HowcansucharequirementbeguaranteediftherearequestioningsabouttheconceptofIFL,andhowtheOrganization,whichhasevenlessknowledge,canguaranteesucharequirement?ConsideringthatCertifiedManagementareasdon’tdamagetheIFLforestcover,newcertifiedprojectsorExpansionsofcertifiedprojectsunderwayhastobeallowedinBrazilSocial:SupportsEconomicandEnvironmentalchambervisiononRILinBrazilEnvironment:TheseadditionalsafeguardsarerequiredtoensurethatIFLsareintentionallyhigh-graded.

Environment:Add:1.1.2LoggingshallnotbeconductedinIFLsunlessevidenceispresentedwhichprovesthatoperationsoutsidetheIFLarenotsufficienttomeetshort-termwoodsupplyneedsofcertificateholders.1.1.3NoconstructionofloggingroadsortracksinIFLswillbepermittedduringtheperiodthisAdviceNoteapplies.InBrazil,ReducedImpactLoggingtechniques(RIL)shouldbeaccepted

1.1.2Nooperations(includingloggingandroadbuilding)shalloccurwhichdegradeanIFLto

7/Economic1/Social10/Environment2/NationalOffices1/Research

Economic:NotpossibleinQuebeck,whereGovernmentmakestheplanning.

Economic:Nooperations(includingloggingandroadbuilding)shalloccurwhichdegradeanIFLtotheextentthatitlosesitsIFLstatus.

Thisrequirementappearstobetechnicallyimpossibletobeimplementedinsomecases.Therefore,we’llremovethisfromthenext

Page 19: Advice Note on Motion 65 cut off date Synopsis for the ... · Draft 16 Dec 2016 pm 1 Advice Note on Motion 65 cut off date Synopsis for the Public Consultation feedback Document type

Draft16Dec2016pm

19

Reference

Number of comments received

from chambers

Key message Proposed change

PSU response

theextentthatitlosesitsIFLstatus.

Thisgoesbeyondthe‘sphereofinfluence”,forCHorpartnerforestmanagers,whicharenotthelandowner.Gov’thasdecisionauthorityonlanduseplanning.Motion65:IndicatorswillbedefinedatthenationallevelfortheprotectionofIFL.ThereforetheywillbyoppositiondefinewhatdegradesanIFL.Clarifywhatismeantby“degradeIFLtotheextentthatitlosesitsIFLstatus»duringthetransitionperiod.Duringthetransitiontime,itwasunderstoodthatloggingcantakeplace(whichincludesroadbuilding)duringthesecondmeetingoftheIFLSolutionForum.InBrazil,ForestManagementareas,certifiedbyFSC,hastobeoutoftheIFLrestrictionsbecauseitwasprovedbytheIFLmaps,generatedaboveforestcover(seePWAattachedmaps),thatareasclassifiedasIFLactuallyhavebeenusedforForestManagement,(producingwood)formorethan20years.AtthemapispossibletoconfirmthattheCertified

ComplianceshallbeverifiedbytheCBpriortoanyloggingactivitybeingconductedinIFLs.Additionalcomment:toavoidincreasedcoststoCH,thisevaluationshouldbeaddedtothescopeoftheregularsurveillanceaudittobeplannedin2017and2018(interimtothenew/revisedIFLindicators).Proposal:IncasetheManagementUnitownsorispartofthePFI,generaldataregardingsuchareasandtheirprotectionmeasuresmustbepubliclyavailable.DefineIFLdegradationRILbasedoperationshastobeacceptedinBrazilEnvironment:1.1.4Nooperations(includingloggingandroadbuilding)shalloccurwhichdegradeanIFLtotheextentthatitlosesitsIFLstatuswithintheFMUorthebroaderlandscape.Add:1.1.5AnnualsurveillanceauditsduringthisperiodwillincludeanassessmentofPrinciple3.1.1.6LoggingthatoccursinIFLswillminimizeimpactsonbiodiversityandforestecology,

versionoftheAdviceNote

Page 20: Advice Note on Motion 65 cut off date Synopsis for the ... · Draft 16 Dec 2016 pm 1 Advice Note on Motion 65 cut off date Synopsis for the Public Consultation feedback Document type

Draft16Dec2016pm

20

Reference

Number of comments received

from chambers

Key message Proposed change

PSU response

FMprotecttheforestSocial:SupportsEconomicandEnvironmentalchambervisiononRILinBrazilNationalOffices:Ifoperationswerealreadyplannedinthisarea,thismayrequiremodificationofamanagementplan.ForestManagementplanningisalongandcomplexprocessinCanadawhichrequirealotofsteps,therespectofalonglistofrequirementandintensiveconsultationswhichmayincludespecificagreementswithstakeholders.Theprocessonlyforanannualplanmaytakeoneyearandanymodificationmayrequiregoingbackintheconsultationprocessandchangingagreements.Thiscannotbealwaysdoneinasoshortperiodoftime.HowanIFLlosesitsstatus?What´sthemetric?IfremainsintheIFLconcept“..minimallyinfluencedbyhumaneconomicactivity,”itshallbeclarifiedwhatmeansminimallyinfluenced.Environment:Wecouldhavethe

andannualsurveillanceauditswillduringthisperiodwillincludeanassessmentofPrinciple9.3.1.1.7VolumefromavoidedIFLareaswillberemovedfromsustainableharvestrates,andannualsurveillanceauditswillbeconductedonPrinciple5.1and5.2.GeneraldataregardingIFLareasandtheirprotectionmeasuresmustbepubliclyavailable.SpecifywhichoperationsdegradeIFLtotheextentthattheylosetheirIFLstatus,andunderwhichconditionsloggingdegradesIFLtothisextent.NationalOfficeInsertwhatexactlywhatcouldnotbedoneto“losesitsIFLstatus”Research:1.1.2ReduceImpactLoggingtechniques(RIL)shouldbeusedandpresentedtothecertificationbodytoensurePFImaintenance.Certificationbodiesmaysuggesttheimplementationofadditionalprecautionaryapproachinhigh-impactactivitieswithinareaspreviouslyidentifiedasIFLs,suchasroadsandinfrastructures,whilemaintaininglowimpact

Page 21: Advice Note on Motion 65 cut off date Synopsis for the ... · Draft 16 Dec 2016 pm 1 Advice Note on Motion 65 cut off date Synopsis for the Public Consultation feedback Document type

Draft16Dec2016pm

21

Reference

Number of comments received

from chambers

Key message Proposed change

PSU response

situationwherethewholeIFLdoesn’tloseitsstatusbuttheIFLwithinanFMUdoesifwedon’tmakethisspecification.AdditionalsafeguardsareneededtoensurethatmonitoringtakesplaceduringthisperiodandthatCHsdon’tintentionallyincreaseharvestofIFLsforthepurposeofhavingfewerrestrictionsoncetheMotionisimplemented.I’tsnecessaryclarifythemapsandinformationrequested.InBrazilthisinformationisnotpubliclydisclosed(georeferenced)duetotherisksofinvasion,theftofwood,orotherinappropriateuseofsuchinformation.Inaddition,thescaleofidentificationofIFLatthegloballevelwilloftenbeinconsistentwiththescaleofidentificationoftheseareasattheleveloftheforestmanagementunit

explorationactivities.

1.2.Certificateholdersshallmakepubliclyavailablethemapsoftheirmanagementunits,

7/Economic5/Environment1/NationalOffice1/Research

Economic:Asstatedabove,arequirementthatanevaluationbeconductedbytheCBshouldbeincludedinthenotice,includingarequirementforCBsto

Economic:‘’1.2.Certificateholdersshallmakepubliclyavailablethemapsoftheirmanagementunits,ofIFLswithinthesemanagementunits,andof

Thisrequirementappearstobetechnicallyimpossibletobeimplementedinsomecases.Therefore,we’llremovethisfromthenext

Page 22: Advice Note on Motion 65 cut off date Synopsis for the ... · Draft 16 Dec 2016 pm 1 Advice Note on Motion 65 cut off date Synopsis for the Public Consultation feedback Document type

Draft16Dec2016pm

22

Reference

Number of comments received

from chambers

Key message Proposed change

PSU response

ofIFLswithinthesemanagementunits,andofanyplannedlogginginIFLs.

postpubliclythereportofthatassessment,confirmingtheseplansareinconformance.Thisrequirementisnotconstructive.Itsstrictapplicationwouldonly“paintatargetontheback”ofeverycertificateholdersplanningtologinIFLsUntilIFLmappingmethodologyandconsultationonFSCCanadaIFL/ICLindicatorsarefinalized,wecannotconfirm‘IFL’ItcannotbethatFSCFMcertificateholdershavenoobligationtomakemapsavailable,andnowthosewhoareinIFLhavetomakemapspublicallyavailable.Whatkindofmaps?InBrazilmanyofthisinformationisnotpubliclydisclosed(georeferenced)duetotherisksofinvasion,theftofwood,ortheinappropriateuseofsuchinformation.Inaddition,thescaleofidentificationofIFLSatthegloballevelwilloftenbeinconsistentwiththescaleofidentificationoftheseareasatthe

anyplannedlogginginIFLs.CBsshallpostpublicsummariesoftheevaluationconductedtoconfirmthestatusoftheaffectedIFLs’’Delete1.2andinsteadrelyonpublicparticipationandstakeholderinvolvementrequiredbytheforestmanagementstandard.CHshallmakepublicallyavailablethemaps….(i.e.thiscanbetotheirCertificationBodyandtoFSCforexample)Environment:1.2.Certificateholdersshallmakepubliclyavailablethemapsoftheirmanagementunits,ofIFLswithinthesemanagementunits,ofannualharvestblocks,andofanyplannedlogginginIFLs,usingthe“IntactForestLandscapes.2000/2013”mapsaccessedthroughGlobalForestWatch(www.globalforestwatch.org)asabaseline.Add:1.3.3Incountriesthatarescoredbelow50inTransparencyInternational’scorruptionindex,therequirementsin1.1and1.2shallbeverifiedbyASI.NationalOffice:Clarifywhenthishastobecompleted.Isitthesameactionaspoint1.4ofoption1below?Isitforendof2017?

versionoftheAdviceNote

Page 23: Advice Note on Motion 65 cut off date Synopsis for the ... · Draft 16 Dec 2016 pm 1 Advice Note on Motion 65 cut off date Synopsis for the Public Consultation feedback Document type

Draft16Dec2016pm

23

Reference

Number of comments received

from chambers

Key message Proposed change

PSU response

leveloftheforestmanagementunitEnvironment:Consistencyinmapsisnecessary.Concernthatinsomeregions,IFLswillcontinuetobesubjecttostatusquopracticesdespiterequirements.NationalOffice:Inordertomakemapsavailable,theIFLidentificationmethodologyshouldbecompletedandcertificateholderwillneedtoanalysetheirtenureanddefineIFLproperly.ItcannotbedonewiththehighlevelsatellitemapsfromGFWastheinformationisnotpreciseenoughandwilllandonexpectationsonareasthatareperhapsnotanIFL.IdentificationandmappingofIFLsrequiressocialandculturalconsiderations,especiallyasitrelatestoIndigenousrightsandinterests.Thisneedstobeincludedwithmoreresourcesdedicatedtounderstandwaysthatthiscanbecompleted.InsomepartsofCanada,itisthegovernmentwhichisresponsibletoplanmanagementactivitiesonpubliclands(90%ofterritory).Certificateholdersdonothavealotofinfluence

1.2.Certificateholdersshallmakepubliclyavailabletheoftheirmanagementunits,ofIFLswithinthesemanagementunits,andofanyplannedlogginginIFLsmapstoFSCandtoitsCertificationBody.

Page 24: Advice Note on Motion 65 cut off date Synopsis for the ... · Draft 16 Dec 2016 pm 1 Advice Note on Motion 65 cut off date Synopsis for the Public Consultation feedback Document type

Draft16Dec2016pm

24

Reference

Number of comments received

from chambers

Key message Proposed change

PSU response

ondecision,including,timing(intermofspeedinguptheprocess)Notclearwhenthishastobecompleted.Isitthesameactionaspoint1.4ofoption1below?Isitforendof2017?

ThisrequirementneedstobecheckedbyLegalUnitIguess,sinceIdon’tknowtowhichextentFSCismandatedtoaskCHstomakeeconomicintelligencepublic.Therearealsoissueswhereconcessionsareprivatelyowned(US…)YoumayhaveseenmapsdraftedbyourOffice(thankstoWWF-USfunds)foreachcountry,withtheseinformation(exceptroadsplanningforthenextyears)areavailableandwehavesignedaDataSecrecywitheachCertificateHolderallowingustousethemapsandpublishthem.Research:ThepublicationofmapsiscomplicatedinBrazil,becauseitcanbringsIFLstotheattentionofill-intentionedperson,puttingtheseareasinrisk(invasions,theftofwood,orinappropriateuseof

Page 25: Advice Note on Motion 65 cut off date Synopsis for the ... · Draft 16 Dec 2016 pm 1 Advice Note on Motion 65 cut off date Synopsis for the Public Consultation feedback Document type

Draft16Dec2016pm

25

Reference

Number of comments received

from chambers

Key message Proposed change

PSU response

suchinformation).2.StandardDevelopmentGroups(SDGs)inBrazil,Canada,CongoBasinandRussiashallusethedefaultgenericIFLindicators(aspresentedinFSC-STD-60-004V1-1)forthedevelopmentofnationalindicatorsfortheprotectionofIFLs.

8/Economic5/Environment2/NationalOffices

Economic:Thisisunclear.Whatthelinksand/orimplicationsarebetweentherequirementsof#1and#2andthisshouldbeclarified.Forexample,ascommentedabove,itisconfusingtoaskCHtodiscloseanyplanninginIFLs(1.1ofsection1)whilethemappingofIFLsisnotyetfinalized(1.4ofsection2).Timelines(2vs1year)arealsoconfusingTheIGI’scanaccordingtoFSCprocedures(forIFLorotherindicators),beadaptedtotheNationalorRegionalsituation.Isthisvalidforthetransitionmeasures?TheadviceshouldbeappliedtoallIFLsglobally,forconsistencyandtoaddressvulnerableareasoutsidethepriorityregions.Environment:Scopeneedstobebroadened.NationalOffices:FSCCanadahasworkedhardoverthe

Economic:Replace“use”by“adaptoradopt”andadd“aspertheoptionshighlightedbelow”attheendStandardDevelopmentGroups(SDGs)incountrieswhereIFLsarepresentshallusethe…AdoptFSCCanada’sIFL/ICLindicatorsifGov’tsupports.TimelinesshouldallowsufficienttimeforFSCCanadatocompletedrafting,fieldtestingandfinalisationofIFL/ICLindicators.Environment:2.StandardDevelopmentGroups(SDGs)incountrieswhereIFLsarepresentshallusethedefaultgenericIFLindicators(aspresentedinFSC-STD-60-004V1-1)forthedevelopmentofnationalindicatorsfortheprotectionofIFLs.NationalOffices:FSCneedstocoordinateaprocesswithNetworkPartnerstoexplorecompatibilityofproposedapproacheswiththework(IGIs)comingfromtheHCVWG.TherewillbebacklashifatopdownapproachoftheIGIsisimposedonNPsFocusneedstobeoncomingtoanagreementonworkplanandtimelinesforcountrieswith

Thisrequirementseemstoraiselotsofconfusion.ThenextversionofIGIsisintendedtohelptheSDGssimilarlyasthecurrentversion,sothattheSDGswillhavethepossibilitytoadopt,adapt,ordroptheIGIs.AstheuseofIGIsisdescribedinfulldetailsintheTransferProcedure,itisnotnecessarytorepeatitintheAdviceNote.We’llremovethisclausefromthenextversion.

Page 26: Advice Note on Motion 65 cut off date Synopsis for the ... · Draft 16 Dec 2016 pm 1 Advice Note on Motion 65 cut off date Synopsis for the Public Consultation feedback Document type

Draft16Dec2016pm

26

Reference

Number of comments received

from chambers

Key message Proposed change

PSU response

last2yearstodevelopindicatorsthatmakesenseinourcontext.TheIFLIGIindicatorsarenotenoughtoallowproperindicatordevelopmentforBrazil.TheSDGsneedtohavetheresultofIFLTechnicalWGtoclarifytermsanddefinitionsatleasttoensureminimumconsistencybetweenglobalnationalstandards.

significantIFLs.ThatwillleadtothelongtermsuccessforsafeguardingIFLandICL

StandardDevelopmentGroups(SDGs)inBrazil,Canada,CongoBasinandRussiashallusethedefaultgenericIFLindicators(aspresentedinFSC-STD-60-004V1-1)forthedevelopmentofnationalindicatorsfortheprotectionofIFLsoncefinalizedtheworkofIFLTechnicalWorkingGroúpandtheresultsincludedonFSC-STD-60-004.

OR

StandardDevelopmentGroups(SDGs)inBrazil,Canada,CongoBasinandRussiashallusethedefaultgenericIFLindicators(aspresentedinFSC-STD-60-004V1-1)forthedevelopmentofnationalindicatorsfortheprotectionofIFLs.TheresultsofIFLTechnicalWorkingGroupwillgenerateaGuidanceonhowtodevelopnationalindicatorsandwillbepublishedtillMarch2017.

Option 1: Adapting theInternational GenericIndicators

NOTE:Options 1 shall beimplemented by SDGs asthedefaultoption

4/Economic

Economic:IFLindicatorscouldnotbedefinedandimplementedbeforeICLisdefinedthroughproperengagementwithFN.Anyrushingofthisprocesscouldonlyleadtofailureandtheadditionalpotentialadverseeffectoflosingthe

Economic:Thereshouldbenoshort-cutoftheNFSStransferprocessforthesolepurposeofimplementingIFLindicators.

We’lltrytorelaxthetimelinestoenablemeaningfulengagementwithIPAdaptingordroppingtheIGIsisallowedaccordingto

Page 27: Advice Note on Motion 65 cut off date Synopsis for the ... · Draft 16 Dec 2016 pm 1 Advice Note on Motion 65 cut off date Synopsis for the Public Consultation feedback Document type

Draft16Dec2016pm

27

Reference

Number of comments received

from chambers

Key message Proposed change

PSU response

supportofFN,acriticalpartnerinthedevelopmentoftheFSCstandardsinCanada.It’snotclearthat“adapting”theIGIIndicatorsisallowed(“shallusethedefaultIGIIndicators”)eventhoughitisclearlyintendedtobeallowedunderoption1,whichisthedefaultoption.

theTransferProcedure

1.1 By 31 January 2017,SDGs shall provideupdated work plans withdefined and timetableddeliverables for theprocessofdeveloping IFLindicators,including:

a) Description howthe IFL indicatordevelopmentprocess will beaccelerated.

b) PlansforengagingIndigenousPeoples(throughFPIC).

7/Economic1/Social10/Environment2/NationalOffices

Economic:1.1b)Engagementwithindigenouspeoples?DoestheSDGneedtodoFPICprocesses?Ifforeachoftheabovequestionstheanswerisyes,ourpositioningiscontraryinBrazil,sincetheconceptofIntactIndigenousLandscapesisnotpartofmotion65,justasthereisnoclearlydefinedconcept,muchlessvalidatedbyFSCmembers.AnotherimportantpointisthatSDGsdonothavecapacity(sinceallitsmembersarevoluntary)anotherpointofimportanceisthatthistypeofcostisimpracticable.Wesupportthisoption,butthereshouldbemoretimeforthisEnvironment:PIPCindicatedthatitwouldbefinalizingworkplansbythe

Economic:Furtherexplainhowthese“PlansforengagingIndigenousPeoples(throughFPIC)”alignwithoraddtoFSC-PRO-60-006.ProposalforBrazil:1.1.bAplanforengagingaffectedpartiesshouldbepartoftheSDG'sdevelopmentprocessofindicators(meetings,workshops,etc.)Itisaddedtothisjustificationthatthecurrent(andunderreview)Standardsalreadydefinetheprocessesofrelationshipswithtraditionalcommunitiesandimpactedindigenouspeoples.Environment:b)PlansforengagingIndigenousPeoples(throughFPIC).Whererelevant,updatedworkplanswithdefinedandtimetableddeliverablesfortheincorporationofIndigenousCulturalLandscapes(ICLs)willalsobefinalizedby31January2017.

EngagingtheIndigenousPeoplesisnecessaryforaddressingthepoints3and8ofM65.TheAdvicetoSDGswillbedroppedout.We’llproviderecommendationforthistopicintheNewsItem

Page 28: Advice Note on Motion 65 cut off date Synopsis for the ... · Draft 16 Dec 2016 pm 1 Advice Note on Motion 65 cut off date Synopsis for the Public Consultation feedback Document type

Draft16Dec2016pm

28

Reference

Number of comments received

from chambers

Key message Proposed change

PSU response

endof2016atthelastIFLSolutionsForum.ImportanttointegrateICLsintothis.Social:SupportsEconomicandEnvironmentalchambervisionsinBrazilNationalOffice:Wewelcomeadiscussionaroundourworkplanandtimeline.FPICisaconcepttobeusedwhenyouaredelegatingrightsoverresourcesand/orlands.InthecasedevelopmentofindicatorsFPICdonotapplyforBrazil.Certificationisvoluntary.IfanOrganizationwouldliketomanageaIndigenousPeoplesLandthanFPICwouldapply.Research:This deadline is unfeasible, becauseSDGwouldhave less thanamonthtodevelop the work plan, taking intoaccountthattheeffectivedateof thisadviceisJanuary2017.Onemonthisashort deadline when we are talkingabout a teamwork, which demands

InBrazil,theprocessesofrelationshipswithtraditionalcommunitiesandimpactedindigenouspeoplesisalreadydesignedNationalOffice:

1.1. b) Plans for engaging IndigenousPeoples (through FPIC through culturallyappropriateengagement).

Page 29: Advice Note on Motion 65 cut off date Synopsis for the ... · Draft 16 Dec 2016 pm 1 Advice Note on Motion 65 cut off date Synopsis for the Public Consultation feedback Document type

Draft16Dec2016pm

29

Reference

Number of comments received

from chambers

Key message Proposed change

PSU response

engagement with indigenous people.Moreover, January is a month whenthemostpersonareonvacation. Thedeadlinesmustbemorerealistic.Inaddition,itembmustbeexcludedbecausetheconceptofICLisnotpartofmotion65andtheIGIsalreadydemandengagementwithtraditionalcommunitiesandimpactedindigenouspeoples.

1.2 SDGs shall completethe transfer of nationalforest stewardshipstandard (NFSS) to P&CV5,oramendtheexistingNFSS with IFL indicatorsand submit the NFFS toPSU before 31 July 2017forapproval.

6/Economic1/Social9/Environment2/NationalOffices1/Research

Economic:TheideaofacceleratingthetransferofNFSSinthecontextofspecificindicatorcouldcreateacomplexandproblematicsituation.ItisnotlikelythatbyadoptingsuchanAdviceNotewillsuddenlyacceleratetheSDGsworktotransfertheNFSS.ItisasunlikelythatSDGswillbecomfortableadoptinganNFSSthatmightaddressIFLsbutnotyetthefullsuiteofotherIndicators(includingICLs).Assuch,countriescouldend-upapplyingOption2whileatthesametimecontinuingtheworkontheirtransferofNFSStoP&CV5.ThiswouldcreateanumberofdifferentNFSStobeapplyinashorttimeperiodwhichwouldbeconfusingandprostrating.

Economic:Thereshouldbenoshort-cutoftheNFSStransferprocessforthesolepurposeofimplementingIFLindicators.Timelineuntilend2017…oraccordingtoagreedworkplantimetableProposalforBrazil:changethedateJuly31,2017to"sixmonthsafterpublicationoftheindicatorsandsupplementarymaterialscomingfromtheInternationalWorkingGrouphavebeenapproved."Environment:1.2SDGsshallcompletethetransferofnationalforeststewardshipstandard(NFSS)toP&CV5,oramendtheexistingNFSSwithIFLindicators(andICLindicatorswhererelevant)andsubmitthe

TheAdvicetoSDGswillbedroppedout.We’llproviderecommendationforthistopicintheNewsItemWeareplanningtohandleRIL/AmazoninthenextversionofHCVGuideline,HCV2

Page 30: Advice Note on Motion 65 cut off date Synopsis for the ... · Draft 16 Dec 2016 pm 1 Advice Note on Motion 65 cut off date Synopsis for the Public Consultation feedback Document type

Draft16Dec2016pm

30

Reference

Number of comments received

from chambers

Key message Proposed change

PSU response

Itisproposedthatthetime-lineisuntilend2017.SeenthecomplexityoftheIFLconcept,thetimelineistooshort.ThisdeadlineshouldbeextendedtoaftertheGeneralAssemblyforBrazilsincethismatterwillbeontheagenda.TheInternationalWorkingGrouphasnotyetbeenabletobringpartiallyacceptedmaterialfortropicalforestmanagementissues.Social:SupportsEconomicandEnvironmentalchambercommentsinBrazilEnvironment:Seecommentabove.InBrazil,thisdeadlinecan’tbeachieved.ItshouldbeextendedovertheGeneralAssemblysincethismatterwillbeontheagenda.Sofar,theindicatorssuggestedbyHCVTWGarenotpracticalforthetimberproducersintropicalcountries.NationalOffice:TheproposedapproachdevelopedforIFLandICLsbyFSCCanadawillnotbereadyforthistime.Wewouldliketo

NFFStoPSUbefore31July2017forapproval.1.2.Certificateholdersshallmakepubliclyavailablethemapsoftheirmanagementunits,ofIFLswithinthesemanagementunits,ofannualharvestblocks,andofanyplannedlogginginIFLs,usingthe“IntactForestLandscapes.2000/2013”mapsaccessedthroughGlobalForestWatch(www.globalforestwatch.org)asabaseline.

Add:

1.3.3Incountriesthatarescoredbelow50inTransparencyInternational’scorruptionindex,therequirementsin1.1and1.2shallbeverifiedbyASI.

ForBrazil,thedate31July2017shouldbepostponedto"sixmonthsaftertheapprovalandpublicationoftheIGIsforIFLsproducedbytheHCVTWG."

Page 31: Advice Note on Motion 65 cut off date Synopsis for the ... · Draft 16 Dec 2016 pm 1 Advice Note on Motion 65 cut off date Synopsis for the Public Consultation feedback Document type

Draft16Dec2016pm

31

Reference

Number of comments received

from chambers

Key message Proposed change

PSU response

exploredevelopingstagedrequirementsandcomingtoagreementwithFSCIConaworkplanandtimelinethatwilldeliversuccessfuloutcomes.‘’…oramendtheexistingNFSSwithIFLindicators’’Doesthismeanthatwe(Russia)cantakeourrecentNFSS,basedonP&CV4,andincorporateIFLindicatorsasrequiredbyM65there?Ifyes,whataretherequirementsforthenationalapprovalofsucha“hybrid”NFSS?Aretheythesameasin60-006?(twopublicconsultationsnotlessthan60dayseach,consultativeforumetc.),oraretheyeasier?Shallwesubmitthewholestandardfortheconsultations,orjustindicators?Andsoon.Isupposethatthereshallbeasetofrulesforthisoption.Andhowwilltherequirementsforthefurthertransferofthis“hybrid”standardtoP&CV5looklike?Theprocedure,thetimeschedule,etc.?Research:FSCshouldreviewalldeadlines,consideringthatthedefinition

Page 32: Advice Note on Motion 65 cut off date Synopsis for the ... · Draft 16 Dec 2016 pm 1 Advice Note on Motion 65 cut off date Synopsis for the Public Consultation feedback Document type

Draft16Dec2016pm

32

Reference

Number of comments received

from chambers

Key message Proposed change

PSU response

regardingIFL’sfuturewillonlybetakenattheFSCGA2017.

1.3 The approved NFSSshall be published by 01October 2017 to becomeeffective on 01 January2018.

9/Economic1/Social4/Environment2/NationalOffice1/Research

Economic:Idem,timelineuntilend2018ThistiminggoesagainsttherulesoftransferofstandardsapprovedandvalidintheFSCsystem.OurreadingisCHmustbeinconformancewiththenew/revisedstandardbyJan2018.Thisleavesonly3monthstodevelopmapsANDthelaunchingofcommunicationsstrategies(soit’sclearwhat’srequiredoncecommunicationsarelaunched).Thistimelineseemsveryshort.PerhapsthemappingofIFLsshouldbedoneasthe1ststepinpriority(toinformtheprocessinsection#1forCHandCBs),thenworkcanbedoneonhowtheywillneedtobetakenintoaccount.Environment:ThisproposalgoesagainstalltherulesoftransferofstandardsapprovedandvalidintheFSCsystem,thetransferprocessprovidesfor1yearofadaptationperiodbetweenstandards,thistimeis

Economic:Timelineuntilend2018…oraccordingtoagreedworkplantimetableProposalforBrazil:1-Delete.Or2-Thiswillbeeffectiveonthefield1yearaftertheapprovalbythePSUofthestandardthisbecomesvalidinthefield.EnvironmentProposalto(i)Deleteor(ii)Maintainthedeadlinesalreadyforeseenwithinthenormsoftransfer,thatis,1yearaftertheapprovalbythePSUofthestandardthisbecomesvalidinthefield.NationalOffice:PleaseclarifyhowtodealwithICLs.IntheIFLSolutionsForum,someresponsibilitiesweregiventothePIPCtosubmitaworkplanandatimeline.Thisshouldremainanimportantaspect.Modification:1.3TheapprovedNFSSshallbepublishedby31December2017tobecomeeffectiveon01September2018.

TheAdvicetoSDGswillbedroppedout.

Page 33: Advice Note on Motion 65 cut off date Synopsis for the ... · Draft 16 Dec 2016 pm 1 Advice Note on Motion 65 cut off date Synopsis for the Public Consultation feedback Document type

Draft16Dec2016pm

33

Reference

Number of comments received

from chambers

Key message Proposed change

PSU response

necessary,evenmoreatthismomentwheretheV5standardhasgreatchangesandWhichreflectsignificantchangesinthefieldbythecertificateholders.SuchadeadlinelikepresentedisimpracticableandwillimplythelossofallcertificatesintheBrazilianAmazon.Social:SupportsEconomicandEnvironmentalchambercommentsinBrazilNationalOffice:ThisAdviceNotedoesn’tmentionICL.AttheIFLSolutionForuminJuly,thePIPCmadeclearthattheywon’tsupportIFLimplementationbeforeICLhasbeendeterminedasthisconceptofIFLmaybeconflictingwiththeirrightsandinterestsandwiththeICLconcept.DuringtheForum,ithasbeenclearlystatedthatIFLcannotstandwithoutICL.Sofar,IGIsarenotfullyfinalized,wedon’thavecleardefinitionsonICLandweareimplementinghighlycomplexprocessesacrosstheGlobe,quitedifferentsometimesbetweenkey

Page 34: Advice Note on Motion 65 cut off date Synopsis for the ... · Draft 16 Dec 2016 pm 1 Advice Note on Motion 65 cut off date Synopsis for the Public Consultation feedback Document type

Draft16Dec2016pm

34

Reference

Number of comments received

from chambers

Key message Proposed change

PSU response

prioritiesregion.Research:Twomonths(JulytoOctober2017)seemstobeanambitiousdeadlinetoPSUevaluateNFSSoffourcountries.Furthermore,thisschedulegoesagainsttheproceduretotransfertheIGIs,whichgivesCHsandCBsoneyearofadaptationtothenewNFSS.

1.4 A communicationsplan shall be launchedwith all affectedcertificateholdersineachcountry/sub-region,ensuring a dialogue onIFL areas that leads toclear maps beingdevelopedbeforetheendof 2017 (maps shall bebased on existing mapsprovided through GlobalForest Watch, but withthe flexibility to updateto current situation incases where newinformationisavailable).

6/Economic4/Environment1/NationalOffice1/Research

Economic:MappingshouldnotbebasedonGFWmapsonly,butonregionallyadaptedinterpretationofIFL.ItseemsthesemapswillbedifferentthantheonestobeconsideredbyCHholdersintheinterim(1.1insectionforCHandCBs)butitwouldbelessconfusingiftheywerethesame,i.e.themappingexerciserequiredundersection2shouldbedonepriortorequestingCHholderdisclosingplannedlogging.Itcouldreduceconfusiontoseparaterequirementsonthemappingfromthecommunicationplanissue.Thecommunicationpartof1.4shouldbetransferredto1.5anditshouldbeclarifiedspecificallywhowilldevelop

Economic:RemovethesentenceinparenthesisTimelineaccordingtoagreedworkplantimetableNationalOffice:Communicationplanneedstobedefinedinaccordancewiththeworkplan.

TheAdvicetoSDGswillbedroppedout.We’llproviderecommendationforthecommunicationsplanintheNewsItem

Page 35: Advice Note on Motion 65 cut off date Synopsis for the ... · Draft 16 Dec 2016 pm 1 Advice Note on Motion 65 cut off date Synopsis for the Public Consultation feedback Document type

Draft16Dec2016pm

35

Reference

Number of comments received

from chambers

Key message Proposed change

PSU response

andimplementthecommunicationsplan(i.e.NationalInitiativesorPSUintheabsenceofNis.)andwhoisresponsiblefordevelopingmaps.Environment:Thisshouldbearequirementforoption2aswell.NationalOffice:Maybepossiblebutwearenotintotalharmonywiththe«datasourceofIFL»aswritteninthe«Terms&definitions»section.Sensitivityofmappingandidentificationneedsfurtherdiscussion.ButoverallagreefullywithneedforacommunicationplanthatiscoordinatedwithFSCIC.Research:Wouldbemorelogicaltoextendthedeadlinestolaunchthestandardstogetherwiththemaps,becausetheimplementationofindicatorsdependsonthemaps.ThepublicationofindicatorsinOctoberandthemapsonlyinDecemberwouldcreateauselessgap.

1.5Communicationsshallbe initiated withgovernments explaining

4/Economic1/NationalOffice

Economic:Whodoesthis?

Economic:Clarifytheresponsibility

WesupportthesuggestionfromtheNationalOfficeto

Page 36: Advice Note on Motion 65 cut off date Synopsis for the ... · Draft 16 Dec 2016 pm 1 Advice Note on Motion 65 cut off date Synopsis for the Public Consultation feedback Document type

Draft16Dec2016pm

36

Reference

Number of comments received

from chambers

Key message Proposed change

PSU response

the IFL process, what itaims to achieve andhowit may impact onconcessionholders.

WhatisthecommunicationapproachiftheIFLprocessconflictswithestablishedgovernmentproceduresforprotectedareasand/orwithforestmanagementrequirementsthroughthegovernment-regulatedFMPprocess?NationalOffice:WhilenotapprovedtheIFLapproach/indicators,theactivitieswouldfocusonengaginggovernmentsonthediscussionofimportanceofIFLsandtheFSCstandarddevelopmentprocess.It´sstillnotclearwhatacorezonemeansthelevelofmanagementallowedonIFL.HowthecommunicationintheproposedwaywithGovernmentswouldoccurswithoutcausingpanic?Theengagementonstandarddevelopmentprocesswouldbemoreeffective.

CommunicationswithgovernmentsshallbeinitiatedbyFSCNationalofficesexplainingtheNationalForestStewardshipStandarddevelopmentprocessandhowIFL/ICLindicatorsaretobeintegratedintoafinalNFSSNationalOffice:1.5DuringIFLindicatorsdevelopment,governmentsasastakeholdershallbeinvitedtotakepartoftheconsultationprocess.AfterapprovalofNFSScommunicationsshallbeinitiatedwithgovernmentsexplainingtheIFLprocess,whatitaimstoachieveandhowitmayimpactonconcessionholders.

invitegovernmentrepresentativestoparticipatetheconsultationprocessoftheIFLindicators.We’llproviderecommendationforthistopicintheNewsItem

Option2:AdoptingtheInternational GenericIndicators

NOTE: Option 2 onlyapplies when NetworkPartner or SDGs fail toimplementOption1.

4/Economic

Economic:‘’Option’’isnotreallyanoptionhereOPTION1section1.4&1.5shouldbeincludedinbothOption1and2.Communicationsplanswillbenecessaryregardlessofwhethernational/regionalorinternational

Economic:Selectotherwordfor‘’Options1and2’’ordropOption2

ThispartoftheAdviceNotewillbedroppedout,inordertoprovidesufficienttimeforthedialoguewiththeIndigenousPeoples

Page 37: Advice Note on Motion 65 cut off date Synopsis for the ... · Draft 16 Dec 2016 pm 1 Advice Note on Motion 65 cut off date Synopsis for the Public Consultation feedback Document type

Draft16Dec2016pm

37

Reference

Number of comments received

from chambers

Key message Proposed change

PSU response

indicatorsareused.ThisoptiondoesnotpermitthedevelopmentofaflexibleandintegratedapproachthatisnecessaryforthepossibilityofapragmaticIFL/ICLoutcomeintheCanadianNFSS.

2.1 For countries wherenational IFL indicatorshavenotbeen submittedtoPSUbytheendofJuly2017, the following shallapply:

3/Economic1/Social4/Environment

Economic:ThedatecannotbefixedsincethegenericinternationalindicatorsforIFLaswellastheirconceptualdefinitionsarestillindevelopmentandfarfrombeingapproved.Environment:ThedatecannotbefixedsincethegenericinternationalindicatorsforIFLaswellastheirconceptualdefinitionsarestillindevelopmentandfarfrombeingapprovedbytheBrazilians.Social:SupportsEconomicandEnvironmentalchambercommentsinBrazil

Economic:Proposal:replace"bytheendofJuly2017"with"sixmonthsafterapprovalofmaterialfromtheInternationalWorkingGrouponIFLs".Environment:ProposalforBrazil:replace"bytheendofJuly2017"with"sixmonthsafterapprovalofmaterialfromtheinternationalHCVTWG".

ThispartoftheAdviceNotewillbedroppedout,inordertoprovidesufficienttimeforthedialoguewiththeIndigenousPeoples

2.2TheNetworkPartneror SDG shall incorporatethe default generic IFLindicators (as presentedin FSC-STD-60-004 V1-1)intotheexistingNFSS.

1/Economic

Economic:TheFSC-STD-60-004V1-1isnotadopted.FSCInternationalwebsiteindicatethat“Firstconsultationisnowclosed.Wearecurrentlyassessing

Economic:Tobeclear,theAdviceNoteshouldre-stateanylanguageitneedstoreferfromaDraftstandardorindicatewhetherornotthedraftorthefinalversionwillapply.

ThispartoftheAdviceNotewillbedroppedout,inordertoprovidesufficienttimeforthedialoguewiththe

Page 38: Advice Note on Motion 65 cut off date Synopsis for the ... · Draft 16 Dec 2016 pm 1 Advice Note on Motion 65 cut off date Synopsis for the Public Consultation feedback Document type

Draft16Dec2016pm

38

Reference

Number of comments received

from chambers

Key message Proposed change

PSU response

feedback.”Itdoesappearcontradictorytobothbeconsultingonindicatorsandapplyingthemwhiledraftinanadvicenote.Itisalsounclearwhethertheseindicatorsshouldbeusedascurrentlydrafted(moreoverthedraftdocumentisnomoreaccessible)orifthefinalversionwillbetheonetobeimplemented.

IndigenousPeoples

2.3TherevisedNFSSshallbe submitted to PSU forapproval by the end ofJuly2017.

4/Economic1/Social4/Environment

Economic:Thedatescannotbefixedsincethegenericinternationalindicatorsanddefinitionsarestillunderdevelopmentandfarfrombeingapproved.Environment:ThedatecannotbefixedsincethegenericinternationalindicatorsforIFLaswellastheirconceptualdefinitionsarestillindevelopmentandfarfrombeingapprovedbytheBrazilians.Social:SupportsEconomicandEnvironmentalchambercommentsinBrazil

Economic:Thereshouldbenoshort-cutoftheNFSStransferprocessforthesolepurposeofimplementingIFLindicators.ProposalforBrazil:replace"bytheendofJuly2017"with"sixmonthsafterapprovalofmaterialfromtheInternationalWorkingGrouponIFLs".Environment:ProposalforBrazil:replace"bytheendofJuly2017"with"sixmonthsafterapprovalofmaterialfromtheinternationalHCVTWG".

ThispartoftheAdviceNotewillbedroppedout,inordertoprovidesufficienttimeforthedialoguewiththeIndigenousPeoples

2.4TheapprovedNFSSshallbepublishedby01October2017tobecomeeffectiveon01January2018.

2/Economic1/Social4/Environment

Economic:Moretimeisnecessary,evenmoreatthismomentwheretheV5standardhasgreatchangesandreflects

Economic:ProposalforBrazil:1- Delete.2- Or2-tomaintainthedeadlines

ThispartoftheAdviceNotewillbedroppedout,inordertoprovidesufficienttimeforthe

Page 39: Advice Note on Motion 65 cut off date Synopsis for the ... · Draft 16 Dec 2016 pm 1 Advice Note on Motion 65 cut off date Synopsis for the Public Consultation feedback Document type

Draft16Dec2016pm

39

Reference

Number of comments received

from chambers

Key message Proposed change

PSU response

significantchangesinthefieldSuchadeadlineisimpracticableThistimelineisnotconsistentwiththestandardandproceduresthatsurroundthetransferordevelopmentofNFSS.Environment:ThisproposalgoesagainstalltherulesoftransferofstandardsapprovedandvalidintheFSCsystem,thetransferprocessprovidesfor1yearofadaptationperiodbetweenstandards,thistimeisnecessary,evenmoreatthismomentwheretheV5standardhasgreatchangesandWhichreflectsignificantchangesinthefieldbythecertificateholders.SuchadeadlinelikepresentedisimpracticableandwillimplythelossofallcertificatesintheBrazilianAmazon.Social:SupportsEconomicandEnvironmentalchambercommentsinBrazil

alreadyforeseenwithinthenormsoftransfer,thatis,1yearaftertheapprovalbythePSUofthestandardthisbecomesvalidinthefield.EnvironmentProposalto(i)Deleteor(ii)Maintainthedeadlinesalreadyforeseenwithinthenormsoftransfer,thatis,1yearaftertheapprovalbythePSUofthestandardthisbecomesvalidinthefield.

dialoguewiththeIndigenousPeoples

Additionalquestion: Suggestionsforadditionalsafeguards PSUresponse

Page 40: Advice Note on Motion 65 cut off date Synopsis for the ... · Draft 16 Dec 2016 pm 1 Advice Note on Motion 65 cut off date Synopsis for the Public Consultation feedback Document type

Draft16Dec2016pm

40

FSC secretariat islooking for additionalsafeguards to limitlogging in IFLs in 2017and 2018.Do youhavesuggestionsforsuch?

3/Economic1/Social7/Environment2/NationalOffices

Economic:

TheMinistryofForests,WildlifeandParksofQuebecsupportsforestcompaniesintheprovincewhowishtogetforestcertification.Inaccordancewiththisobjective,wewanttomeasuretheimpactthetransitionalmeasuresproposedbytheFSC(Motion65)willhaveonexistingcertificates.Tocarryoutthisanalysis,wemustfirstlyupdatetheintactforestlandscapes(IFL)layerproducedbytheGlobalForestWatchin2013.WealsoneedtovalidatetheIFLsectorsthathavebeenidentifiedsincetheyweregeneratedfromsatelliteimagery.Theseoperationsrequiretomanagealotofdataandtaketime.Furthermore,FSCCanadapublishestodayaguidefortheimplementationoftheIFLconceptinCanada.Giventheimportanceofthisissue,youwillunderstandthatweprefertocompleteouranalysisandtakeintoaccountallavailableinformationbeforesharinganycommentswithFSCInternational.Therefore,youwillreceiveourconclusionsbytheendofDecember2016,ifrelevant.ItistroublingthatFSCSecretariatislookingforadditionalsafeguardstolimitlogginginIFLswhiletheBoardofdirectorshasmandatedtheSecretariattoavoid“thesignificantundesiredsideeffectsinsomeofthemostimportantcountriesforFSC”.Aswritten,thisAdviceNotemightnotevenpreventthose“significantundesiredeffects”tohappen.Thisissueshouldbefirstmanagedatthecountrylevelandnotatthemanagementunitlevel.IfacountryalreadyhasmostofitsIFLoutsidethereachofforestmanagementactivities,itshouldsufficetomeettheintentofprotectingIFL.AdditionalindicatorsshouldbedevelopedinaveryshorttimeframeforrestoringIFLincountrieswithfewIFLlefttodemonstratethatIFLisanewemergingvalueintheFSCworldandtoensuresomefairness.

ConsistentwithrecommendationsfromtheIFLSolutionsForum,FSCpersonnelshoulddevelopanengagementstrategywithCanadianprovincialagencieswithlanduseplanningjurisdiction.ManyareasthattodayinCanadaappearas‘IFLsaretheresultoflanduseplanningprocessesanddecisionsmadebyprovincialagencies.Goingforward,forIFLsthatarenotprotected,theCHisnotincontrolofthisoutcomeandcanonlymakerecommendationstolanduseplanningauthorities.Government

TheseaspectswillbetakenintoconsiderationswhenformulatingtheAgendasforthenextIFLSolutionsForummeetings

Page 41: Advice Note on Motion 65 cut off date Synopsis for the ... · Draft 16 Dec 2016 pm 1 Advice Note on Motion 65 cut off date Synopsis for the Public Consultation feedback Document type

Draft16Dec2016pm

41

agenciesmayacttoimplementanIFLprotectionrecommendation,rejectit,acceptatemporarydeferral,confirmexistingallocationofthelandforforestmanagement,re-allocatethelandorotherpurposeconsistentwiththepublicinterest.FirstNationswillbeconsultedbygovernmentintheseprocesses.Agreeincertaincircumstancesandregionsthat‘logging’inIFLhasnoimpactontheintegrity,intactnessandbiodiversityoftheforest.

Allowing SFM (Sustainable Forest Management) will attain the objective that FSCstrivesfor:

• tomaintainthetropicalforestandavoidconversiontootherland-uses;

• to see IFL in its wider landscape context: protected areas which could beincreased and SFM in the surrounding area, where for ex. In the tropicalforests, there is no impact on connectivity, wildlife is well protected andforestsaremaintainedunderFSCcertified,SFM;

InterpretIFLinitswidercontext,useascientificbasisforimplementingtheconcept,based on scientific information of degradation, un-sustainable management andfragmentation,andnotonsatelliteimagesofroadsonly.

ThepositiontoIFLcoreareasmustcomeupwithaclearroadmap:arecertificateholdersallowedtoharvestornotwithinCoreAreasduringthistransitionperiod?

WhataboutthosewhohavestartedharvestingwithinthoseareaswithrespecttotheirongoingManagementPlans?Aretheylosingtheircertificates?

ArecertifiedcompaniesbeingallocatedthepossibilitytoidentifytheirIFLcoreareasduringtheirplanning?

If those questions can be answered, than we can assess as well the need to addfurthersafeguards.

Brazil: Very concerned with potential problems in tropical forests the fact thatopinionsarenotbeenheardbytheWorkingGrouporFSChimself.

Brazil:VoicesfromthefieldclaimsthatifthisconceptisappliedhowitisFSCwillnotlhaveanycertifiedforestmanagementoperationsintropicalforests.Thisthiswillbeahugelossforall.Aforestwithouteconomicvaluewillturnintonon-forestuse.

Page 42: Advice Note on Motion 65 cut off date Synopsis for the ... · Draft 16 Dec 2016 pm 1 Advice Note on Motion 65 cut off date Synopsis for the Public Consultation feedback Document type

Draft16Dec2016pm

42

Brazil:TheadoptionoftheIFLoperationsrestrictionsonFSCForestManagementcertifiedareasisanindirectassumptionthatFSCcertificationhasnoeffectiveness,despitealltechnicalinformationbedemonstratingtheopposite.Brazil:It’simportanttoclarifythatiftheIFLwillbeadopted,theFSCwilllossallFMcompaniesinAmazonia,openingspacetotheillegalwood.TheIFLmodeldoesn'tworkstotheseriousAmazonianCompanies.Environment:WehaveintegratedsafeguardsthroughoutthetextoftheAdvice,seeabove.

InBrazil,weunderstandthepressureandthedemandsfrommemberstoapplythismotion,butwearealsoveryworriedaboutthepotentialproblemsthemotionmayresulttothecertificationoftropicalforests.WehavethefeelingthatourconcernsarenotlistenedbytheHCVTechnicalWorkingGroup.Youallneedtobeawarethatifthisconceptwillbeappliedinitsoriginalform,therewillbenolongerFSCcertifiedforestmanagementinthetropics.Thiswouldbeabigloss,becausetheforestthatdonothaveeconomicvalueturnsintoothernon-forestsuses.InBrasilweonlyhave10forestsmanagementunitscertified,becausewearestrugglingwiththeillegallogging.IfFSCcreatesmoreproblemstothecertifiedcompanies,whicharealreadyinthebrinkofeconomicfeasibility,theymaybelostforgood.Itismorethanatechnicalproblem,itisapoliticalissueforus,andwethinkthatFSCICandothersarenotlisteningus.Oursystem(FSCsystem)havebeenalreadyquestioninourcountry,becauseofothermistakesformFSCIC.Social:SupportsEconomicandEnvironmentalchambercommentsinBrazilNationalOffices:FSCCanadawouldliketoworkwithourstakeholderstonegotiateasolutionandagreeonpotentialsafeguardsforCanada.AnexampleinCanadacouldbetheimplementationofthecaribouindicator…..FSCwouldadvicetheuseofReducedImpactLoggingonIFLuntilIFLindicatorapprovalatnationalleveltogetherwithclearguidanceonwhat“coreareas*”means.Mostimportantistobeclearisifcoreareaiswithinmanagementunitoratlandscape

Page 43: Advice Note on Motion 65 cut off date Synopsis for the ... · Draft 16 Dec 2016 pm 1 Advice Note on Motion 65 cut off date Synopsis for the Public Consultation feedback Document type

Draft16Dec2016pm

43

level.Ifcoreareacouldbebetterexplained,FSCwouldincludearecommendationforcertificateholdersthattimberharvestingandroadbuildingarenotpermittedinsideIFLcoreareaswithinthemanagementunitsayingalsotheminimum%ofcoreareathatshouldbedefinedbytheCHtakingintoconsiderationlandscapelevelandmanagementplan.*Coreareas:TheportionofanIntactForestLandscape*whereintactnessismaintained,thatcontainsthemostimportantecologicalandculturalvaluesandwheretimberharvestingandroadbuildingaregenerallynotpermitted.(FSC-STD-60-004V1-0ENINTERNATIONALGENERICINDICATORS)My thoughts around how could be shaped the next Advice Note, allowing key regions to pursue the initiated work: According to me, FSC should act as a facilitator to insure that IFL debate is consequently connected to:

- Key areas for conservations (not only for forest stands: endangered species, sensible biotopes…);

- Human footprints and its prospective with the land-use plans being developed by WRI across the Globe;

- Indigenous and local communities territories; - Key ecological corridors that should be maintained for the humankind (network

of protected areas and FSC certified concessions). We didn’t start properly the dialogue with governments by lack of human resources and of money. Inviting governments for a roundtable is extremely costly and time-consuming. This dialogue will be highly difficult but needed, of course. I already know that reviewing a management plan because of the Motion 65 would be something almost impossible in a time frame inferior to 05 years, because we are not parliamentarians and even if FSC is changing the paradigms of the forestry sector for 20 years, we need time and means to achieve our mission. The indicator 1.5 is key in the process, and this would require a real brainstorm between Regional Offices, PSU and Director’s Office to see how we could be relevant and efficient here. FSC Congo Basin Office is committed to implement the Advice Note and FSC policies but we enter in a new phase here, after the already commonly accepted HCV management.

Page 44: Advice Note on Motion 65 cut off date Synopsis for the ... · Draft 16 Dec 2016 pm 1 Advice Note on Motion 65 cut off date Synopsis for the Public Consultation feedback Document type