1 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated © 2016 Bentley Systems, Incorporated
Advancing Smart City
Ken Soh
Principal Consultant
3 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated 3 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated
Purpose-fit Solution requires 3D model of various Details
Base Map Block Model City Model
Architectural Model Interior Model
5 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated
It is hard to build 3D City Model But it is even harder to maintain a 3D City Model
KL118
MRT II
Signature
Tower Bukit Jalil City
6 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated
• 20 km2 of Kuala Lumpur
How long does it take to generate this 3D model?
A.) 3 months
B.) 1 months
C.) 2 weeks
D.) 1 week
7 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated
• 20 km2 of Kuala Lumpur
• 2000 Photos
How much does it take to generate this 3D model?
A.) 3,000,000 MYR
B.) 1,000,000 MYR
C.) 500,000 MYR
D.) 100,000 MYR
8 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated
Common Urban Problem across Asian Cities
Beijing shrouded in Smog Chennai underwater
Jakarta trapped in traffic
Kuala Lumpur affected by Haze Stranded Commuters Vietnam after Typhoon Ketsana
Jakarta Traffic
9 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated
Growing Demand for 3D for Advance Needs
Urban Heat Island
Flood Management Telecommunication Coverage
Urban Air Flow Dynamic
Underground Infrastructure
Development Planning
10 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated
Sustainable Simulation is possible! Urban Airflow Dynamic on The Shore Hotel & Residences , Melaka