50
Advancing integrated transport in Latin America cities Transforming Transportation 2013 Presented at Transforming Transportation 2013 Pilar Rodriguez Vice-President, SIBRT President, Metrocali

Advancing Integrated Transport in Latin American Cities - Pilar Rodriguez - SIBRT Metrocali - Transforming Transportation 2013 - EMBARQ and The World Bank

  • Upload
    embarq

  • View
    668

  • Download
    0

Embed Size (px)

Citation preview

Advancing integrated transport in Latin America cities!

Transforming Transportation 2013!

!   Presented at Transforming Transportation 2013!

! Pilar Rodriguez!!   Vice-President, SIBRT!!   President, Metrocali!

Advancing  integrated  transport  in  La1n  America  ci1es  

Transforming  Transporta1on  –  Washington  DC  –  January  18,  2013  

High  Quality  Transit  in  La1n  America  

Citywide  Integrated  Transit  System  in  Cali,  Colombia  

Pilar  Rodriguez  Vice-­‐President  SIBRT  /  President  Metrocali  

Inertial Future (everybody already knows…) fewer passengers on Public Transport…

Modal Split Trend in Brazil (%) – similar to others

↑  Conges1on  ↑  Fare  ↓  Speed  

↑  Income,  ↓  Prices  

Source: ANTP

congestion, productivity loss, mobility reduction, and…

1.2 million deaths 1.3 million deaths

3.2 millions of deaths

Noise: stress, cardiovascular diseases,

analytical capacity problems

impacts on Public Health! Analy1cal  capacity  problems??    Quizá  otros  presentarán  lo  mismo.  Hay  que  chequear…  

Urban Public Transport NEEDS Urgent Improvements

ü  8  countries  –  19  La1n  American  ci1es  ü  20  million  passengers  daily  

ü  700  km  of  exclusive  lanes  ü  30.000  transport  units  

The  La1n-­‐American  Associa1on  of  Integrated  Systems  and  BRT  (SIBRT)  works  for  the  development  and  quality  improvement  of  urban  transit.  

Latin America and the Caribbean!50 cities!145 corridors!16.07 M pax/day!

Europe!43 cities!

51 corridors!1.67 M pax/day!

Asia!24 cities!25 corridors!5.78 M pax/day!

USA and Canada!20 cities!27 corridors!0.85 M pax/day!

Africa!3 cities!3 corridors!0.24 M pax/day!

Oceania!7 cities!

7 corridors!0.33 M pax/day!

source: BRTdata.org, January, 2013!

64% of the world demand for BRT/Exclusive Bus Corridors are concentrated in 50 Latin American cities

Rio de Janeiro:Primer BRT 2012 Transoeste: 40 km

Foto: Mariana Gil/ EMBARQ Brasil

New  in  2012!  

http://www.metroenbogota.com/wp-content/uploads/2012/08/transmilenio-hasta-el-aeropuerto-el-doraro.jpg

BOGOTA: Transmilenio Third Phase Portal El Dorado

New  in  2012!  

Photo:  CTS  EMBARQ  Mexico

New  in  2012!  

MEXICO DF: Metrobus Line 4

Since improvements are urgent, HOW CAN WE IMPROVE QUALITY?

HOW CAN WE ACCELERATE MODERNIZATION?

SIBRT – EMBARQ – BRT CoE

MassachuseTs  Ins1tute  of  Technology  

Technical  University  of  Linbon  

PUC  -­‐  Chile  

Gen

eral

Sec

reta

riat

!   SIBRT  is  a  Benchmarking  Associa1on    !   Public  Transit  Agencies  commi\ed  with  improvement  !   A  capacity  building  process  based  on  collabora1on  !   Learning  from  other’s  experiences  and  mistakes  

High Quality Urban Transit for All

!   Basic Information 55+ data from each associated system, with complementary information and links.

!   Photos

800+ photos with descriptions, showing the characteristics of each system.

!   Maps

Maps of corridors and routes of each system.

Produced by

SIBRT Data Support the GLOBAL BRT Data: www.brtdata.org

SIBRT Datasheets: www.sibrtonline.org

Introduce the Performance Indicators and Complementary Information monitored to Identify Best Practices and the aspects that we can be improved comparing to other agencies.

Benchmarking Indicators System

Performance Indicators

Complementary Information

* The indicators are divided by topics and are monitored online by the associates, respecting the confidentiality agreement.

Future Performance

Example of Improved

Performance

Per

form

ance

+

Cost / Other attribute +

Current Performance

Outliers

Benchmarking Indicators

!   Quality of Service and User Satisfaction

!   Road Safety for urban buses

!   Financing of Integrated Transport Systems

Technical Datasheets

Benchmarking Indicators System

Conferences and

Workshops

Terms of Reference

studies contracting

Studies + Guides of

best practices

Current Road Map:

Center of Excellence

Main Topics

Benchmarking and Innovation

In cooperation with:

Conferences, Workshops, Share Knowledge

I Workshop SIBRT on Quality of Service and User Satisfaction

SIBRT is working for a broad alliance of main urban transit stakeholders

Academia and Research

Center of Excelence BRT, Universities, Consulting

Press / Media USERS

Government Operators

Associations and Companies

(NTU, AMTM…)

Industry Vehicles, services and

technology

Banks Private, Multilateral and Development

Public agencies  

!   Need to eliminate competition with conventional buses and extend better quality to the whole city

!   Create an Integrated Transport System  

Foto: Luis Antonio Lindau/ EMBARQ Brasil

Transmilenio’s Model (Mexico, Colombia, Ecuador, Peru,…)

!   Build BRT Corridors/Network (trunk-feeded high capacity system in parallel to conventional buses)  

In  process,  difficult…  

Low Investments, Insuficient Transit Priority,  ↑Congestion, ↓Speed, ↓  Passengers

!   Optimize with BRT corridors,

 

Foto: Luis Antonio Lindau/ EMBARQ Brasil

Santiago’s Model (Brasil, Chile)

!   Replace with Citywide Transport System (some BRT, most bus corridors)

Increase  speed,  reliability  and  efficiency  (in  process…)  

!   Modal,  fare,  ins1tu1onal,  and  management  integra1on  in  Metropolitan  Areas      

Target: Integration y Optimization

Citywide  Integrated  Mass  Transport  System  in  Cali,  

Colombia    MIO  

Washington,  D.C.  -­‐  January  14,  2013  

Outline  

•  Context  

•  Project  descrip1on  and  progress    •  Challenges  and  lessons  learned  

Context  -­‐  Cali  

•  3rd  largest  city  in  Colombia  

•  2.3  million  people  in  the  urban  area  

•  2.9  million  in  the  metropolitan  area  

Caribbean  Sea  

COLOMBIA  

ECUADOR  BRASIL  

VENEZUELA  PANAMA  

Bogotá  Cali  

Pacific  Ocean  

Context  -­‐  Transporta1on  in  Cali  

•  Conven1onal  third  world  transit  system  –  Privately  owned  buses  –  Public  agency  providing  route  permits  but  lacking  service  control    Walk

24%

Bike 11%

Moto 7% Auto

10%

Public Transp

40%

Jeeps 1%

Taxi 7%

Mode Distribution in Cali 3.179.283 trips/day

35%  

Source:  O-­‐D  Matrix  –  Bikeways  Master  Plan  2005  

Context  -­‐  Transporta1on  in  Cali  •  Up  to  now  

–  Started  to  implement  a  modern,  integrated  transit  system  •  We  s1ll  had  to  

–  Create  a  sustainable  mul1modal  mobility  plan:  recognizes  all  modes  of  transport  but  focuses  on  maintaining    mode  share  for  transit,  bike,  and  walk  trips  

•  Invest  in  infrastructure  for  walk  and  bike  trips  •  Integrate  bike,  walk,  and  taxi  trips  to  transit  effec1vely  •  Integrate  regional  transit  to  the  city’s  MIO  system  •  Improve  quality  of  service  in  MIO  system  •  Discourage  use  of  private  cars  and  motorcycles  •  Create  educa1onal  programs  to    reduce  accident  rate  in  motorcycles  

Project  Descrip1on  –  Integrated  System    •  Objec1ve:  replace  conven1onal  old  bus  system  with  new  modern  integrated  transit  system  –  Create  new  Transit  Authority  –  Concession  out  opera1ons  to  few  companies  and  buy  out  old  buses  

–  Create  new  card-­‐based  payment  system  

Project  Descrip1on  -­‐  Corridors  Map  

Trunk Corridors Pre-trunk Corridors Feeder Routes Transfer Stations

Project  Descrip1on  -­‐  Opera1ons  Item   Planned   Done  

New  Transit  Authority  -­‐  Metrocali   1   1  

Fare  Collec1on  System   1   1  

AVL  System   1   1  

Bike  Sharing/Ren1ng  System   1   0  

Transit  Demand  Coverage   100%   53%  

Daily  Trips   960.000   510.000  

Spa1al  Coverage  (300  mt  buffer)   100%   90%  

Routes   100   90  

New  Buses  in  Opera1on   911   858  

Old  Buses  out  of  Opera1on   4931   3228  

Project  Descrip1on  -­‐  Infrastructure  Item   Planned   Done  

Trunk  corridors     38  km   36  km  

Terminal  Sta1ons   5   2  

Medium  Transfer  Sta1ons   4   1  

Sta1ons   56   56  

Aerial  Cable  Line   1   0  

Bikeways   50  km   19.6  km  

Bus  Garages   4   2  

Project  Descrip1on  -­‐  Infrastructure  

Trunk Corridors

Future Trunk Corridors

Built Transfer Stations

Future Tra nsferStations

Cable System

Challenges  and  Lessons  Learned  •  Replacing  old  system  –  balancing  act    

–  Implementa1on  schedule  •  Too  fast  (San1ago,  Chile)  –  chaos  •  Too  slow  (Bogota,  Colombia)  –  process  may  never  finish  

– Who  buys  out  old  operators  and  bus  owners?  •  Government  •  New  operators  •  No  one  

–  Poli1cal  will  is  absolutely  necessary  to  enforce  all  necessary  measures  to  replace  old  system  while  having  a  fair  process  

•  Difficult  social  process  –  impact  on  bus  owners,  drivers,  other  informal  workers  in  the  industry  

Challenges  and  Lessons  Learned  •  Integrated  Network  Design  

– Usually,  the  conven1onal  system  in  developing  countries  is  a  privately  operated  over-­‐supplied  system,  which  results  in  good  level  of  service  for  users  regarding  access  and  wai1ng  1me,  and  no  transfers  

– Generally,  Integrated  Network  Systems  introduce  transfers  to  trips,  which  is  perceived  as  poor  level  of  service  

•  A  ra1onalized  Integrated  Network  System  may  be  efficient  from  a  supply  point  of  view  but  it  may  deteriorate  the  Level  of  Service  perceived  by  users  – Number  of  buses  and  route  design  is  crucial  

Challenges  and  Lessons  learned  •  Cultural  change  

–  Fare  collec1on  system  •  Learn  to  use  and  trust  a  fare-­‐card  system  instead  of  cash  is  difficult  for  typical  lower-­‐income  user  of  transit  in  developing  countries  

– Understanding  maps  and  way-­‐finding  signs  –  Vehicles  stop  only  at  designated  stops  

•  Ins1tu1onal  and  Organiza1onal  Capabili1es  –  Implemen1ng  an  organized  system  requires  many  trained  professionals  –  Authority,  operators,  designers  

–  Being  part  of  SIBRT  has  helped    to  train  Metrocali’s  staff  

Challenges  and  Lessons  learned  •  Fare  Collec1on  System  

– Contact-­‐less  rechargeable  card  

– Enough  points  of  sales  and  recharge  

– Has  become  No.  1  deterrent  for  people  to  use  the  MIO  system  

Challenges  and  Lessons  learned  

•  Economic  Model  –  It  was  designed  to  cover  all  opera1onal  costs  – The  MIO  system  is  not  there  yet  – Operators  are  s1ll  injec1ng  money  every  month  into  their  opera1ons  

– Demand  has  to  increase  to  reach  breaking  point  •  In  a  citywide  integrated  system,  there  will  be  low-­‐performing  routes,  that  are  a  social  service  – Can  it  be  sustained  without  opera1onal  subsidies?  

THANK  YOU  Pilar  Rodriguez  

[email protected]  

June  4-­‐7  of  2013  

Organized  by  

III SIBRT Conference on Best Practices

Spa1al  Coverage  

Trunk  Corridors  –  5th  Street  

Trunk  Corridor  –  Downtown  

Trunk  Corridor  and  Sta1ons  

Andres  Sanin  Transfer  Sta1on  

Menga  Transfer  Sta1on  

Aguablanca  Transfer  Sta1on  

Garages  

Aerial  Cable  System    

Green  Corridor  

Transforming Transportation 2013!

!   Co-organized by EMBARQ and The World Bank!!   More information at:!! EMBARQ.org!! worldbank.org/transport!

!   Questions? Comments? Contact us at [email protected]!!   Follow us on Twitter: @EMBARQnetwork!

Transforming Transportation 2013!