1 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated © 2018 Bentley Systems, Incorporated
Advancing BIM for TOTEX
Mark-Oliver Lill
2 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated
• Common Data Environment
– Project Platform, Virtual Project Room
– BIM level2
– BS/PAS-1192
• Collaborative production of architectural, engineering and construction information. Code of practice
• Specification for information management for the capital/delivery phase of construction projects using building information modelling
• Specification for information management for the operational phase of assets using building information modelling (BIM)
• Connected Data Environment
• Beyond BIM – the Digital Twin
CDE
Connected Data Environment
DigitalWorkflows
DigitalComponents
iTwinServices
DigitalContext
ProjectDigital Twin
PerformanceDigital Twin
3 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated
Does the short term reality of “On time and On Budget” require a rethink to avoid long term Owner Operator operational losses?
Current Reality:Design for Cost
4 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated4 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated
Line of Sight: Design for TOTEX
• A fundamental error and unfortunate truth is that most organizations have viewed the Asset start of life either at or after commissioning.
– Line of sight lost.
• To realize maximum asset value organizations are front loading the need for increased reliability into the design phase of the asset lifecycle.
– This is design for TOTEX.
• Whole Life Asset Management fundamental of both;
ISO 55000 and PAS 1192: BIM.
• TOTEX really starts on the designers desk and continues until end of asset life.
• RCM/RCD has been globally accepted and standardized as the tool of choice for organizations that wish to Zero base their maintenance program.
Detailed - Asset
Design
Create Asset
Tag
Assert
Failure Mode
and Effect
Catalog
Is the design
Function of the asset
known?
Is
the performance
criteria of the asset
known?
In what ways can the
asset fail?
Document the
Design function
What the end users
needs the asset to do.
Document the Asset
Performance Criteria
Define REQUIRED
Criteria from a list
e.g. Load, Speed,
Pressure..etc
What Causes it to
fails?
Client owned
Failure mode
and effect
Repository
Bentley Online
Failure mode
and Effect
CatalogWhat
happens when it
fails?
Design - What
it can do
“Design state capability”
Will
the failure of this
asset be obvious
during normal
operating
YES
YES
What are the
consequnces of the
asset
Failure
Reference
Bentley Online
Catalog item to
Create Asset
Tag
Association
7D Handover
Information Portal
Failure Mode
Failure Effects
Failure Consequences
Define an
initial
performance
data baseline
(Initial health
state)
What does it
have/has to do
Initial
“Functional State”
Design for cost vs Design
for reliability (Life-Cycle)
Instance Data (BIM)
Commissioning
Assess against the
Design Baseline Data
Import Strategy
development plans
(Action Plans)
association to Asset
Tag Registry
Trigger EWP – CWP
IWP - closure
Assumes Conceptual
model created
Add Expected Design
performance baselines
(into Asset Tag Registry)
Safety
Consequences
Environmental
Consequencesl
Quality,
Goodwill,
Reputation
Consequences
Operational
Consequences
YES YES YESNO
Redesign
Does a
Maintenance Action
Plan exist to
reduce the
Consequences?
Is/are the
Maintenance Action
Plan(s) solution within
the current cost
model?
YES
NO“Asset Design” ModelingDesign for TOTEX: Total
Expenditures (lifeCycle)
7D
Operate/Maintain
Create Strategy development
Maintenance Plan
Development
MINOR
Create OoTB
Indicator
(triggers) from
BaselineDevelop OOTB Threshold
(configurable) asset state
(Health) triggers
E.g.,10%, 20% 30% from initial
(Degradation (RBI),
Deterioration (RC, MTA, CPR)
Asset
Strategic
Information
Management.
Associate Assets to CMMS
and to Organizational General
Ledger Account Registry
(Track Lifecycle costs)
Analysis
&
Optimization
Reliability
Program
Implementation
Strategy
Development
Validate Strategy
(Performance/Cost Modeling)
“Margin Management” from Initial Design Cost model
Does a Warranty Condition
Exist?
Is the strategy
valid?
YES
Work
Management
Develop Operations
Hierarchy at
Maintainable asset
level (at the level of
asset where work is
performed)
Manual Strategy
Development
Asset Criticality
RCM/MTA/RBI/CPR
NO
Advancing
Asset-Centric
Engineering
Project
Information
Management.
Design
Repository
Operational
Analytics
REDESIGN/OPTIMIZE
Has
all asset data been
entered against the
TAG registryYES
Asset Registry expanded data
fields for Asset Centric
Engineering
NO
EPC Constructor Connection
Point
Traditional Hanover
point
“Margin Management”
As
Designed
State
As Is State
As Built State
4D:
Construction
Point
NO
NO
• What do we (Bentley) need to add (expand) to
• the asset tag registry to realize the BIM strategy
• within the ALIM CDE?
• Information from:
• Engineering Deliverables
• Vendor documents
• Metadata (datasheets, manuals (PDF), etc.).
Failed State
Reference
Reliability Catalog
Within the Context of
the Parent Asset
Performance
Management
Action Plan:
No Scheduled
Maintenance
Is the
cost of Action Plan
greater than the
estimated cost of
Asset Failure?
YES YES
NO
NO
Trigger from
Maintenance Action
Plan Checksheets
Document Process
Project Information
Management
Advanced Dash boarding
Advanced Asset Health Indices
Advanced Analytics
Document Control
Change
Management
Commissioning Checksheets
created from
Maintenance Action plans
What do we (Bentley) need to
add to the asset tag registry to
realize the BIM strategy with
Asset Centric Engineering
Are
current reliability
strategies, costs and
performance below
model
thresholds?
OK
Redesign, Refurbish
or Dispose “End of Life”
Lifecycle Model
Expected vs Actual
“Lifecycle Margin Management”
5 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated
6 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated
%
7 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated
All the data you haveDark Data
8 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated
Analysts project by 2025,
data from connected devices will yield insights driving potential economic value
of as much as $11 trillion- Unlocking the potential of Internet of Things. McKinsey & Company, June 2015
Accenture estimates the Industrial Internet of Things(IIoT) could add $14.2 trillion to the global economy by 2030
Gartner says 8.4 BillionConnected "Things" in use in 2017, up 31% from 2016
IIoT Growth
9 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated
MACHINE LEARNING: An application of artificial intelligence (AI) that provides systems the ability to automatically learn and improve from experience without being explicitly programmed.
10 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated
Drone image? Reality model AMW??
Topcon video from Greg’s preso
11 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated
Can we answer this question today?
How can we answer this question (and get the answer in seconds)?:
“highlight in my 3D or Reality model all the components that are currently being worked on, that show pitting problems, where these components were recently inspected and cross reference those with all the functional failures in the last 6 months and were modified in the last year”
Modeling Tool, EAM, Inspection Tool, Reliability Tool, Engineering Tool, Operational Analytics Tool
Business Intelligence enables a person or organization to answer relevant questions, evaluate outcomes and make predictions about future probabilities and trends.
12 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated
Digital Twin
13 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated © 2018 Bentley Systems, Incorporated
CONNECTED Data Environment
CONNECTED Data Environment – What is it and why do I care?
14 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated
CONNECTED DATA ENVIRONMENT
Components Center
ContextShare
ConstructSim Completions
DIGITAL COMPONENTS
DIGITAL CONTEXT
AS
SE
T P
ER
FO
RM
AN
CE
iModelHubAzure
ProjectWise AssetWise
PR
OJ
EC
T D
EL
IVE
RY
15 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated#YII2016
Ok. So how do I get there?
16 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated
Steps towards CONNECTED Environment
• Start by understanding and modeling the business (not the databases)
• Adopt appropriate industry standards and best practices
• Understand your configuration management requirements
• See where the software fits in
• Determine enabling technologies and practices that help your business
17 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated
• Relate structured and unstructured information to people, teams, and organizations
• Focus on how the information is related to the relationships
• Record conditions, incidents, events, and corrective actions
• Capture, track, facilitate, and transmit changes
• Create auditable reports of when, how, and why information changed
CONNECTED Information
DOCUMENTS
REQUIREMENTS
ORGANIZATIONSPEOPLE
DISTRIBUTION
LOCATION PROJECTS
CHANGE REQ
DRAWINGS
18 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated
AssetWise Platform
• Know what you own
• Know where its located
• Know the Historic and
Current Condition of what
you own
• Know the Historic and
Current Performance
• Know what the Historic,
Current and Planned
Work schedule
• Risk Based Decision Support
19 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated © 2018 Bentley Systems, Incorporated
20 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated
Digital Context: Immersive
Visibility
21 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated21 #YII2018
Industrializing Project Delivery: Construction
• UAVs capturereal-time, accurate data of 450 acre site
• Optimizes collaboration and decision making
Shell Chemicals project in Pennsylvania - continuous surveyingin constructioneering
22 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated
Inspectioneering!
DIGITAL WORKFLOWS
DIGITAL WORKFLOWS
23 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated
24 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated
Bentley Reality Modeling Academy Solutions Partner
25 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated
Connected Asset Visibility 2018
26 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated
CONNECTED DATA ENVIRONMENT
Components Center
ContextShare
ConstructSim Completions
DIGITAL COMPONENTS
DIGITAL CONTEXT
AS
SE
T P
ER
FO
RM
AN
CE
iModelHubAzure
ProjectWise AssetWise
PR
OJ
EC
T D
EL
IVE
RY
OpenPlant
OpenRoads
AECOSim
SACSSTAAD
ALIM
Reliability
Analytics
Enterprise Connectors
27 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated © 2018 Bentley Systems, Incorporated
…and now the next dimension CDE
28 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated
Manufacturing
Service
(Part Manufacturing
Platform)
Product EngineeringPlant Maintenance
(Issue Management)
Plant Operations
(Analytics)
Multi-site plant
Siemens-Bentley Collaboration Workflow
Plant 1
performance
monitoring
Performance
issue
identified
3D printing
Design
Installation
Intosite
multi-plant
walk-down
Intosite
multi-plant
walk-down
Plant 1
performance
monitoring
Performance
monitoring
MindApp
Teamcenter
and Bentley
ContextCapture/
Reliability toolsSimulation
3D-printing
Manufacturing
programming
Plant 1
performance
monitoring
Digital Twin
updated
29 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated
30 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated
31 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated
Are you interested in more?
Don‘t miss
Going Digital – How BIM Applies to the Digital TransformationLutz Bettels – Vice President Regional Executive Europe
Wednesday 28th November, 10:20
Conference Saal 13 Keynote Session