1 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated © 2018 Bentley Systems, Incorporated Advancing BIM for TOTEX Mark-Oliver Lill

Advancing BIM for TOTEX · 2018-12-06 · 1 | | © 2018 Bentley Systems, Incorporated © 2018 Bentley Systems, Incorporated Advancing BIM for TOTEX Mark-Oliver Lill

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Advancing BIM for TOTEX · 2018-12-06 · 1 |  | © 2018 Bentley Systems, Incorporated © 2018 Bentley Systems, Incorporated Advancing BIM for TOTEX Mark-Oliver Lill

1 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated © 2018 Bentley Systems, Incorporated

Advancing BIM for TOTEX

Mark-Oliver Lill

Page 2: Advancing BIM for TOTEX · 2018-12-06 · 1 |  | © 2018 Bentley Systems, Incorporated © 2018 Bentley Systems, Incorporated Advancing BIM for TOTEX Mark-Oliver Lill

2 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated

• Common Data Environment

– Project Platform, Virtual Project Room

– BIM level2

– BS/PAS-1192

• Collaborative production of architectural, engineering and construction information. Code of practice

• Specification for information management for the capital/delivery phase of construction projects using building information modelling

• Specification for information management for the operational phase of assets using building information modelling (BIM)

• Connected Data Environment

• Beyond BIM – the Digital Twin

CDE

Connected Data Environment

DigitalWorkflows

DigitalComponents

iTwinServices

DigitalContext

ProjectDigital Twin

PerformanceDigital Twin

Page 3: Advancing BIM for TOTEX · 2018-12-06 · 1 |  | © 2018 Bentley Systems, Incorporated © 2018 Bentley Systems, Incorporated Advancing BIM for TOTEX Mark-Oliver Lill

3 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated

Does the short term reality of “On time and On Budget” require a rethink to avoid long term Owner Operator operational losses?

Current Reality:Design for Cost

Page 4: Advancing BIM for TOTEX · 2018-12-06 · 1 |  | © 2018 Bentley Systems, Incorporated © 2018 Bentley Systems, Incorporated Advancing BIM for TOTEX Mark-Oliver Lill

4 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated4 | WWW.BENTLEY.COM | © 2016 Bentley Systems, Incorporated

Line of Sight: Design for TOTEX

• A fundamental error and unfortunate truth is that most organizations have viewed the Asset start of life either at or after commissioning.

– Line of sight lost.

• To realize maximum asset value organizations are front loading the need for increased reliability into the design phase of the asset lifecycle.

– This is design for TOTEX.

• Whole Life Asset Management fundamental of both;

ISO 55000 and PAS 1192: BIM.

• TOTEX really starts on the designers desk and continues until end of asset life.

• RCM/RCD has been globally accepted and standardized as the tool of choice for organizations that wish to Zero base their maintenance program.

Detailed - Asset

Design

Create Asset

Tag

Assert

Failure Mode

and Effect

Catalog

Is the design

Function of the asset

known?

Is

the performance

criteria of the asset

known?

In what ways can the

asset fail?

Document the

Design function

What the end users

needs the asset to do.

Document the Asset

Performance Criteria

Define REQUIRED

Criteria from a list

e.g. Load, Speed,

Pressure..etc

What Causes it to

fails?

Client owned

Failure mode

and effect

Repository

Bentley Online

Failure mode

and Effect

CatalogWhat

happens when it

fails?

Design - What

it can do

“Design state capability”

Will

the failure of this

asset be obvious

during normal

operating

YES

YES

What are the

consequnces of the

asset

Failure

Reference

Bentley Online

Catalog item to

Create Asset

Tag

Association

7D Handover

Information Portal

Failure Mode

Failure Effects

Failure Consequences

Define an

initial

performance

data baseline

(Initial health

state)

What does it

have/has to do

Initial

“Functional State”

Design for cost vs Design

for reliability (Life-Cycle)

Instance Data (BIM)

Commissioning

Assess against the

Design Baseline Data

Import Strategy

development plans

(Action Plans)

association to Asset

Tag Registry

Trigger EWP – CWP

IWP - closure

Assumes Conceptual

model created

Add Expected Design

performance baselines

(into Asset Tag Registry)

Safety

Consequences

Environmental

Consequencesl

Quality,

Goodwill,

Reputation

Consequences

Operational

Consequences

YES YES YESNO

Redesign

Does a

Maintenance Action

Plan exist to

reduce the

Consequences?

Is/are the

Maintenance Action

Plan(s) solution within

the current cost

model?

YES

NO“Asset Design” ModelingDesign for TOTEX: Total

Expenditures (lifeCycle)

7D

Operate/Maintain

Create Strategy development

Maintenance Plan

Development

MINOR

Create OoTB

Indicator

(triggers) from

BaselineDevelop OOTB Threshold

(configurable) asset state

(Health) triggers

E.g.,10%, 20% 30% from initial

(Degradation (RBI),

Deterioration (RC, MTA, CPR)

Asset

Strategic

Information

Management.

Associate Assets to CMMS

and to Organizational General

Ledger Account Registry

(Track Lifecycle costs)

Analysis

&

Optimization

Reliability

Program

Implementation

Strategy

Development

Validate Strategy

(Performance/Cost Modeling)

“Margin Management” from Initial Design Cost model

Does a Warranty Condition

Exist?

Is the strategy

valid?

YES

Work

Management

Develop Operations

Hierarchy at

Maintainable asset

level (at the level of

asset where work is

performed)

Manual Strategy

Development

Asset Criticality

RCM/MTA/RBI/CPR

NO

Advancing

Asset-Centric

Engineering

Project

Information

Management.

Design

Repository

Operational

Analytics

REDESIGN/OPTIMIZE

Has

all asset data been

entered against the

TAG registryYES

Asset Registry expanded data

fields for Asset Centric

Engineering

NO

EPC Constructor Connection

Point

Traditional Hanover

point

“Margin Management”

As

Designed

State

As Is State

As Built State

4D:

Construction

Point

NO

NO

• What do we (Bentley) need to add (expand) to

• the asset tag registry to realize the BIM strategy

• within the ALIM CDE?

• Information from:

• Engineering Deliverables

• Vendor documents

• Metadata (datasheets, manuals (PDF), etc.).

Failed State

Reference

Reliability Catalog

Within the Context of

the Parent Asset

Performance

Management

Action Plan:

No Scheduled

Maintenance

Is the

cost of Action Plan

greater than the

estimated cost of

Asset Failure?

YES YES

NO

NO

Trigger from

Maintenance Action

Plan Checksheets

Document Process

Project Information

Management

Advanced Dash boarding

Advanced Asset Health Indices

Advanced Analytics

Document Control

Change

Management

Commissioning Checksheets

created from

Maintenance Action plans

What do we (Bentley) need to

add to the asset tag registry to

realize the BIM strategy with

Asset Centric Engineering

Are

current reliability

strategies, costs and

performance below

model

thresholds?

OK

Redesign, Refurbish

or Dispose “End of Life”

Lifecycle Model

Expected vs Actual

“Lifecycle Margin Management”

Page 5: Advancing BIM for TOTEX · 2018-12-06 · 1 |  | © 2018 Bentley Systems, Incorporated © 2018 Bentley Systems, Incorporated Advancing BIM for TOTEX Mark-Oliver Lill

5 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated

Page 6: Advancing BIM for TOTEX · 2018-12-06 · 1 |  | © 2018 Bentley Systems, Incorporated © 2018 Bentley Systems, Incorporated Advancing BIM for TOTEX Mark-Oliver Lill

6 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated

%

Page 7: Advancing BIM for TOTEX · 2018-12-06 · 1 |  | © 2018 Bentley Systems, Incorporated © 2018 Bentley Systems, Incorporated Advancing BIM for TOTEX Mark-Oliver Lill

7 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated

All the data you haveDark Data

Page 8: Advancing BIM for TOTEX · 2018-12-06 · 1 |  | © 2018 Bentley Systems, Incorporated © 2018 Bentley Systems, Incorporated Advancing BIM for TOTEX Mark-Oliver Lill

8 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated

Analysts project by 2025,

data from connected devices will yield insights driving potential economic value

of as much as $11 trillion- Unlocking the potential of Internet of Things. McKinsey & Company, June 2015

Accenture estimates the Industrial Internet of Things(IIoT) could add $14.2 trillion to the global economy by 2030

Gartner says 8.4 BillionConnected "Things" in use in 2017, up 31% from 2016

IIoT Growth

Page 9: Advancing BIM for TOTEX · 2018-12-06 · 1 |  | © 2018 Bentley Systems, Incorporated © 2018 Bentley Systems, Incorporated Advancing BIM for TOTEX Mark-Oliver Lill

9 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated

MACHINE LEARNING: An application of artificial intelligence (AI) that provides systems the ability to automatically learn and improve from experience without being explicitly programmed.

Page 10: Advancing BIM for TOTEX · 2018-12-06 · 1 |  | © 2018 Bentley Systems, Incorporated © 2018 Bentley Systems, Incorporated Advancing BIM for TOTEX Mark-Oliver Lill

10 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated

Drone image? Reality model AMW??

Topcon video from Greg’s preso

Page 11: Advancing BIM for TOTEX · 2018-12-06 · 1 |  | © 2018 Bentley Systems, Incorporated © 2018 Bentley Systems, Incorporated Advancing BIM for TOTEX Mark-Oliver Lill

11 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated

Can we answer this question today?

How can we answer this question (and get the answer in seconds)?:

“highlight in my 3D or Reality model all the components that are currently being worked on, that show pitting problems, where these components were recently inspected and cross reference those with all the functional failures in the last 6 months and were modified in the last year”

Modeling Tool, EAM, Inspection Tool, Reliability Tool, Engineering Tool, Operational Analytics Tool

Business Intelligence enables a person or organization to answer relevant questions, evaluate outcomes and make predictions about future probabilities and trends.

Page 12: Advancing BIM for TOTEX · 2018-12-06 · 1 |  | © 2018 Bentley Systems, Incorporated © 2018 Bentley Systems, Incorporated Advancing BIM for TOTEX Mark-Oliver Lill

12 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated

Digital Twin

Page 13: Advancing BIM for TOTEX · 2018-12-06 · 1 |  | © 2018 Bentley Systems, Incorporated © 2018 Bentley Systems, Incorporated Advancing BIM for TOTEX Mark-Oliver Lill

13 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated © 2018 Bentley Systems, Incorporated

CONNECTED Data Environment

CONNECTED Data Environment – What is it and why do I care?

Page 14: Advancing BIM for TOTEX · 2018-12-06 · 1 |  | © 2018 Bentley Systems, Incorporated © 2018 Bentley Systems, Incorporated Advancing BIM for TOTEX Mark-Oliver Lill

14 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated

CONNECTED DATA ENVIRONMENT

Components Center

ContextShare

ConstructSim Completions

DIGITAL COMPONENTS

DIGITAL CONTEXT

AS

SE

T P

ER

FO

RM

AN

CE

iModelHubAzure

ProjectWise AssetWise

PR

OJ

EC

T D

EL

IVE

RY

Page 15: Advancing BIM for TOTEX · 2018-12-06 · 1 |  | © 2018 Bentley Systems, Incorporated © 2018 Bentley Systems, Incorporated Advancing BIM for TOTEX Mark-Oliver Lill

15 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated#YII2016

Ok. So how do I get there?

Page 16: Advancing BIM for TOTEX · 2018-12-06 · 1 |  | © 2018 Bentley Systems, Incorporated © 2018 Bentley Systems, Incorporated Advancing BIM for TOTEX Mark-Oliver Lill

16 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated

Steps towards CONNECTED Environment

• Start by understanding and modeling the business (not the databases)

• Adopt appropriate industry standards and best practices

• Understand your configuration management requirements

• See where the software fits in

• Determine enabling technologies and practices that help your business

Page 17: Advancing BIM for TOTEX · 2018-12-06 · 1 |  | © 2018 Bentley Systems, Incorporated © 2018 Bentley Systems, Incorporated Advancing BIM for TOTEX Mark-Oliver Lill

17 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated

• Relate structured and unstructured information to people, teams, and organizations

• Focus on how the information is related to the relationships

• Record conditions, incidents, events, and corrective actions

• Capture, track, facilitate, and transmit changes

• Create auditable reports of when, how, and why information changed

CONNECTED Information

DOCUMENTS

REQUIREMENTS

ORGANIZATIONSPEOPLE

DISTRIBUTION

LOCATION PROJECTS

CHANGE REQ

DRAWINGS

Page 18: Advancing BIM for TOTEX · 2018-12-06 · 1 |  | © 2018 Bentley Systems, Incorporated © 2018 Bentley Systems, Incorporated Advancing BIM for TOTEX Mark-Oliver Lill

18 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated

AssetWise Platform

• Know what you own

• Know where its located

• Know the Historic and

Current Condition of what

you own

• Know the Historic and

Current Performance

• Know what the Historic,

Current and Planned

Work schedule

• Risk Based Decision Support

Page 19: Advancing BIM for TOTEX · 2018-12-06 · 1 |  | © 2018 Bentley Systems, Incorporated © 2018 Bentley Systems, Incorporated Advancing BIM for TOTEX Mark-Oliver Lill

19 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated © 2018 Bentley Systems, Incorporated

Page 20: Advancing BIM for TOTEX · 2018-12-06 · 1 |  | © 2018 Bentley Systems, Incorporated © 2018 Bentley Systems, Incorporated Advancing BIM for TOTEX Mark-Oliver Lill

20 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated

Digital Context: Immersive

Visibility

Page 21: Advancing BIM for TOTEX · 2018-12-06 · 1 |  | © 2018 Bentley Systems, Incorporated © 2018 Bentley Systems, Incorporated Advancing BIM for TOTEX Mark-Oliver Lill

21 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated21 #YII2018

Industrializing Project Delivery: Construction

• UAVs capturereal-time, accurate data of 450 acre site

• Optimizes collaboration and decision making

Shell Chemicals project in Pennsylvania - continuous surveyingin constructioneering

Page 22: Advancing BIM for TOTEX · 2018-12-06 · 1 |  | © 2018 Bentley Systems, Incorporated © 2018 Bentley Systems, Incorporated Advancing BIM for TOTEX Mark-Oliver Lill

22 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated

Inspectioneering!

DIGITAL WORKFLOWS

DIGITAL WORKFLOWS

Page 23: Advancing BIM for TOTEX · 2018-12-06 · 1 |  | © 2018 Bentley Systems, Incorporated © 2018 Bentley Systems, Incorporated Advancing BIM for TOTEX Mark-Oliver Lill

23 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated

Page 24: Advancing BIM for TOTEX · 2018-12-06 · 1 |  | © 2018 Bentley Systems, Incorporated © 2018 Bentley Systems, Incorporated Advancing BIM for TOTEX Mark-Oliver Lill

24 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated

Bentley Reality Modeling Academy Solutions Partner

Page 25: Advancing BIM for TOTEX · 2018-12-06 · 1 |  | © 2018 Bentley Systems, Incorporated © 2018 Bentley Systems, Incorporated Advancing BIM for TOTEX Mark-Oliver Lill

25 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated

Connected Asset Visibility 2018

Page 26: Advancing BIM for TOTEX · 2018-12-06 · 1 |  | © 2018 Bentley Systems, Incorporated © 2018 Bentley Systems, Incorporated Advancing BIM for TOTEX Mark-Oliver Lill

26 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated

CONNECTED DATA ENVIRONMENT

Components Center

ContextShare

ConstructSim Completions

DIGITAL COMPONENTS

DIGITAL CONTEXT

AS

SE

T P

ER

FO

RM

AN

CE

iModelHubAzure

ProjectWise AssetWise

PR

OJ

EC

T D

EL

IVE

RY

OpenPlant

OpenRoads

AECOSim

SACSSTAAD

ALIM

Reliability

Analytics

Enterprise Connectors

Page 27: Advancing BIM for TOTEX · 2018-12-06 · 1 |  | © 2018 Bentley Systems, Incorporated © 2018 Bentley Systems, Incorporated Advancing BIM for TOTEX Mark-Oliver Lill

27 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated © 2018 Bentley Systems, Incorporated

…and now the next dimension CDE

Page 28: Advancing BIM for TOTEX · 2018-12-06 · 1 |  | © 2018 Bentley Systems, Incorporated © 2018 Bentley Systems, Incorporated Advancing BIM for TOTEX Mark-Oliver Lill

28 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated

Manufacturing

Service

(Part Manufacturing

Platform)

Product EngineeringPlant Maintenance

(Issue Management)

Plant Operations

(Analytics)

Multi-site plant

Siemens-Bentley Collaboration Workflow

Plant 1

performance

monitoring

Performance

issue

identified

3D printing

Design

Installation

Intosite

multi-plant

walk-down

Intosite

multi-plant

walk-down

Plant 1

performance

monitoring

Performance

monitoring

MindApp

Teamcenter

and Bentley

ContextCapture/

Reliability toolsSimulation

3D-printing

Manufacturing

programming

Plant 1

performance

monitoring

Digital Twin

updated

Page 29: Advancing BIM for TOTEX · 2018-12-06 · 1 |  | © 2018 Bentley Systems, Incorporated © 2018 Bentley Systems, Incorporated Advancing BIM for TOTEX Mark-Oliver Lill

29 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated

Page 30: Advancing BIM for TOTEX · 2018-12-06 · 1 |  | © 2018 Bentley Systems, Incorporated © 2018 Bentley Systems, Incorporated Advancing BIM for TOTEX Mark-Oliver Lill

30 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated

Page 31: Advancing BIM for TOTEX · 2018-12-06 · 1 |  | © 2018 Bentley Systems, Incorporated © 2018 Bentley Systems, Incorporated Advancing BIM for TOTEX Mark-Oliver Lill

31 | WWW.BENTLEY.COM | © 2018 Bentley Systems, Incorporated